Federal Experience. Statement of Qualifications:

Size: px
Start display at page:

Download "Federal Experience. Statement of Qualifications:"

Transcription

1 Statement of Qualfcatons: BLM Dspatch, Reno, Nevada Naval Ar Staton, Fallon, Nevada VA Hosptal, Reno, Nevada hompson Federal Courthouse, Reno, NV USFS aylor Creek Amphtheater, CA Buckley AFB, Colorado Federal Experence Reno hoenx Coeur d Alene Offce: 385 Gentry Way Offce: 3770 North 7th St. Offce: W. Lree Drve Reno, NV Sute 150 Hauser Lake, ID hone: hoenx, AZ hone: Fax: hone: Web: Fax:

2 Contents General Overvew 1 Key ersonnel 7 age Keller C. Hackbusch Chef Executve / Manager of Arfeld Electrcal Department Electrcal Engneer eter K. Hackbusch resdent / Electrcal rncpal-n-charge m A. rocksh Executve Vce resdent / Manager of Idaho Offce and of Electrcal Department Chef Electrcal Engneer homas. Federc rncpal / Manager of Mechancal Department Chef Mechancal Engneer Matthew C. Myres Mechancal Department roducton Manager Mechancal Engneer Donald Y. West Mechancal Engneer eter M. Syntax, LEED A Electrcal Engneer Edward R. Gansberg Assstant Manager of Electrcal Department Electrcal roject Manager Kevn B. Melrose Electrcal roject Manager Mltary rojects 17 Other Federal rojects 25 References 29 Summary 34 Engneerng Confdence. Arfeld Electrcal Mechancal

3 General Overvew Dnter Engneerng Company Consultng Engneers for Mechancal, Electrcal and Arfeld Electrcal Systems D nter Engneerng Company s a small busness corporaton whch provdes consultng engneerng servces for mechancal, plumbng, and electrcal systems and ncludes a dedcated Arfeld Electrcal Department for arfeld power, lghtng, sgnage and NAVAIDS systems. he frm s corporate offce began operatons n Reno, Nevada, n 1961 and opened a branch offce n hoenx, Arzona, n 2006 and another n Coeur d Alene, Idaho, n he frm s experence s extensve, wth over 4,200 projects completed that cover a wde range of mltary, arport/arfeld, lght and heavy ral, health care, commercal, ndustral, educatonal, and nsttutonal facltes of all szes and complextes. Servces: Routnely Dnter Engneerng Company s geared to provde the followng: Investgatons and reports estng and evaluatng Feasblty studes and master plans Energy audts lan checkng Engneer s Reports Desgns, drawngs, specfcatons and cost opnons Consultaton durng bddng and constructon phases Constructon observaton and support As-bult plans and documents Desgn-Buld contractor desgn assstance Staff: Dnter s staff s comprsed of professonal engneers lcensed throughout the Western U.S. as well as engneer nterns, project managers, desgners, CADD techncans, Revt BIM techncans, and admnstratve personnel wth years of experence. Staff members coordnate effectvely n-house, resultng n the best possble product delvered on tme and wthn budget. We also utlze departmental crossover of our draftng and techncal personnel whenever needed to meet project deadlnes. Stablty: Dnter has a long hstory of servce coupled wth a contnuous, competent work record and key personnel retenton. hese factors have encouraged many repeat clents over the years ncludng arports; hosptals; cty, county, state and federal agences and most branches of the Armed Servces. echnologcal Capabltes: Dnter s totally automated and networked usng the latest computer technology. We have a Web page at and a general e-mal address of marketng@dnter.com, along wth ndvdualzed addresses. Our hgh-speed Internet capabltes allow nearly nstantaneous transfer of data and plot fles, affordng speedy and cost-effectve coordnaton between offces separated by dstance. We also utlze a constantly updated, rgorous vrus protecton system and fre walls. Extensve Mltary Experence: Dnter s overall mltary experence spans four decades 45 years for Army and Ar Force Base jobs, 48 years for Natonal Guard facltes, and 45 years for Naval and Marne Corps projects demonstratng long-term Government busness relatonshps. Our resume ncludes work for 48 mltary bases n 8 states. 1 Engneerng Confdence. Arfeld Electrcal Mechancal

4 General Overvew k k k k k Army: 27 projects for 6 bases (and 2 IDIQ contracts) Ar Force: 34 projects for 19 bases (and 2 IDIQ contracts) Natonal Guard: 66 projects for facltes n 7 ctes (and 6 IDIQ contracts) Coast Guard: 2 projects for 1 base Navy/Marne Corps: 146 projects for 15 bases (and 12 IDIQ contracts) NAS Fallon Dnter has also desgned a number of projects for former mltary ar bases such as Southern Calforna Logstcs Arport (formerly George AFB), ocatello Regonal Arport (formerly an Army Ar Base), hoenx-mesa Gateway Arport (formerly Wllams AFB), Mather Arport (formerly Mather AFB), and Klamath Falls Arport (formerly an Ar Force Base). Federal Government Experence: Dnter not only has a substantal amount of experence workng for varous branches of the Department of Defense (DOD) but also for other Federal agences: Bureau of Land Management Department of Homeland Securty/Customs and Border rotecton Federal Emergency Management Agency General Servces Admnstraton U.S. Department of Agrculture U.S.D.A. Forest Servce U.S. Fsh and Wldlfe Servce U.S. Department of Health and Human Servces -- Offce of Head Start (OHS) U.S. Department of Labor U.S. ostal Servce U.S. Department of Veterans Affars Federal IDIQ Experence: Dnter has served on 28 Indefnte Delvery/Indefnte Quantty (IDIQ) contracts for federal government agences, of whch 22 were for the DOD. A consequence of ths ntense IDIQ experence s a staff experenced n successfully managng multple ask Orders wthn allotted tme schedules. We ve also servced all types of facltes through these contracts ncludng: Arfelds and arcraft runways, taxways, aprons, helpads Control towers Electronc warfare bombng ranges, radar statons Arcraft mantenance and storage hangars, arfeld vehcle support facltes, Avoncs facltes Mantenance facltes, shop buldngs, muntons faclty, bomb and rocket assembly buldng, engne repar/test facltes Crash/fre/rescue facltes and fre statons Fuel analyss laboratory, fuel farm Warehouses, storage facltes, hazardous waste storage facltes Headquarters, admnstratve/offce buldngs, telecommuncaton centers, computer facltes ranng facltes, battle/flght tranng centers (smulaton centers), vocatonal trade facltes Resdences, famly housng, offcers quarters, dormtores, barracks Dnng halls, ktchens, offcers' clubs Chapels 2 Engneerng Confdence. Arfeld Electrcal Mechancal

5 General Overvew Recreatonal buldngs, physcal ftness centers, gymnasums, bowlng alley, theater, commssares Chld care/development/youth centers Medcal and dental facltes Vstor centers Campgrounds, pcnc areas, trals, ball felds arkng areas Access control/gate mprovements Wastewater treatment plants, domestc water storage, water dstrbuton Central plants Utltes, utlty pedestals, nfrastructure systems. Engneerng Systems: Our staff s experenced n all types of mechancal, plumbng and electrcal systems wth partcular qualfcatons n evaluatng or desgnng the followng: Mechancal/lumbng: Heatng, ventlatng, and ar condtonng (HVAC) for nsttutonal, commercal, and ndustral applcatons Central plants (bolers/chllers) Co-generaton systems Steam heatng and process Underground utltes and utlty dstrbuton Vehcle exhaust source extracton systems wth automatc start and dsconnect capabltes ncludng Nederman vehcle exhaust Fre protecton ncludng aqueous flm formng foam (AFFF) fre suppresson, clean-agent dry fre suppresson (FM-200, Inergen and FE-13 ), and fre sprnklers lumbng, fuels (gaseous and lqud), domestc water, and dran/waste/vent Backflow preventon assembles Specal waste handlng--sand-and-ol nterceptors, waste ol collecton/storage Medcal gases Ar tank breathng-ar fllng statons Compressed ar rocess ppng Underground and above grade fuel storage tanks, dspensng facltes, appurtenances Generator fuelng and ventlaton emperature and process controls Solar space heatng and water heatng desgns and feasblty studes Hydronc snowmelt for walkways, drveways and buldng entrances Energy management (buldng energy control) Energy audts and effcency evaluatons. Electrcal: ower transmsson and dstrbuton, substatons and generatng plants Buldng power (desgn and evaluaton) Wre management Lghtng, nteror, wth controls and dmmng systems Standby generator and unnterruptble power supply (US) Lghtng, exteror, wth controls for roadways, parks, aprons, and parkng lots ower for automatc roll-up doors Intercom, pagng, and nurse call Specal power for computer systems, ncludng local area network (LAN) Fber optcs Fre alarm and detecton Buldng securty and access rson securty and control 3 Engneerng Confdence. Arfeld Electrcal Mechancal

6 General Overvew Electrcal (contnued): Securty electroncs, ncludng personal duress alarms, card access, prson lockng, and faclty control panels Securty fencng and automatc gates Intruson detecton (IDS) Closed crcut televson (CCV) Clock and program elevson dstrbuton and utlzaton Master antenna televson dstrbuton Communcatons, telephones, data, and voce outlets wth Category 6 wrng Energy management ump staton controls and control telemetry, ncludng Supervsory Control and Data Acquston (SCADA). Specalzed Arsde Electrcal: Our Arfeld Electrcal Department regularly provdes power and/or lghtng desgn for: I I Runways, taxways, aprons/ramps, and helcopter landng pads (helpads) Navgatonal and vsual ads, such as AIs, REILs, approach lghtng systems, ILS, GS, LOC, and DME I I Arfeld lghtng control and montorng systems (ALCMS)--computerzed and analog Standby generators and unnterruptble power supples (US) I Beacons and wnd cones/wnd socks I Communcatons I I Arfeld mandatory/drectonal/gudance sgnage Weather statons (AWOS and ASOS) I I I Ste electrcal utltes Constant Current Regulators (CCRs) Arfeld electrcal/power/lghtng vaults. Staff: Dnter utlzes departmental crossover of our draftng and techncal personnel whenever needed to meet project deadlnes as well as ndependent thrd party revew where possble. Our staff members coordnate effectvely n-house, resultng n the best possble product delvered on tme and wthn budget. We feel that qualty assurance and cost control are of prmary mportance, along wth meetng schedules, and we follow specfc qualty assurance gudelnes to hold errors to a mnmum, contan costs, and acheve deadlnes. Our clents have told us that our work s techncally superor to that of many other frms wth whom they have worked and that we are honest, sncere, hardworkng, easy to get along wth, and respond faster natonwde than many other frms. Our frm has an excellent reputaton, has been ltgaton-free snce the begnnng, and s fnancally secure. 4 Engneerng Confdence. Arfeld Electrcal Mechancal

7 General Overvew Sustanablty: Dnter Engneerng Company regularly ncorporates energyeffcent desgns conformng to the latest gudelnes of the Model Energy Code, ASHRAE90.1, EAC 2005, Executve Order No , state energy codes, Calforna tle 24, and local adopted green standards. All of our desgns nclude the latest n energy-effcent systems and reduced consumpton technologes. Dnter has receved many awards from utlty companes for our energy-effcent desgns n both mechancal and electrcal engneerng dscplnes. Bethlehem Lutheran Church and School -- energyeffcent electrcal systems Members of our staff have completed a Leadershp n Energy and Envronmental Desgn (LEED ) certfcaton course, we employ LEED Accredted rofessonals, and we utlze LEED prncples and technques whenever possble to desgn envronmentally frendly "Green Buldngs" ncorporatng energy effcency and waste reducton. Dnter s currently n charge of the LEED process for the new mult-mllon-dollar HX Sky ran at Sky Harbor Internatonal Arport n hoenx that wll result n LEED Green Buldng certfcaton for the entre project. We routnely desgn energy-effcent lghtng fxtures and low-consumpton plumbng fxtures and have engneered projects whch utlze solar and geothermal energy. Our mechancal desgns nclude the latest technques for energy-effcent desgn by ncorporatng ce storage, heat recovery, geothermal energy, outsde ar economzng and energy management controls utlzng state-of-the-art drect dgtal controls (DDC). Our electrcal projects nclude the latest n hgh-effcency lghtng sources wth automatc controls to lmt use to occuped tmes only. As a standard practce, we specfy outdoor lght fxtures whch are Nghttme Frendly wth hgh-effcency lamps. hs means that the lght fxtures we select are consstent wth U.S. Green Buldng Councl s LEED and Green GlobesM product crtera for energy effcency and lght polluton reducton. Desgn-Buld: Dnter Engneerng has been nvolved n desgn-buld work for many years. Examples nclude: Creech Ar Force Base, Nevada: Desgn-Buld UAS Man Gate and Infrastructure Nells Ar Force Base, Las Vegas, Nevada: Desgn and Repar Varous 58th ara RQS Facltes n Area II Naval Ar Weapons Staton (NAWS), Chna Lake, Calforna: Desgn-Buld Repar Flghtlne Lghtng Electrcal Dstrbuton System [part of Dry Utltes Multple Award Contract Constructon (MACC)] El Centro Naval Ar Faclty, El Centro, Calforna: Desgn-Buld Lghtng for Smulated Arcraft Carrer Deck wth Landng Lghts and Helcopter Landng ad Desgn-Buld rojects for Naval Ar Staton, Fallon, Nevada: < Desgn-Buld axways B, F, G - Lghtng Upgrade < Electrcal Infrastructure Upgrades at Varous Locatons < Desgn-Buld axway Alpha Lghtng Systems Upgrade < Desgn-Buld axway E, CALA Ramp, Aprons for Hangars 3, 4 and 7 < Desgn-Buld Heatng lant Decentralzaton < Insulaton Resstance Montorng System (IRMS) and Wave-off Lghtng for Runway 13L-31R NAS Fallon 5 Engneerng Confdence. Arfeld Electrcal Mechancal

8 General Overvew Defense Depot San Joaqun [Sharpe Defense Depot], racy Ste, Calforna: Renovate Buldng 286, Bays 4, 5 and 6 Brown Feld Muncpal Arport, San Dego, Calforna: Desgn-Buld Fuel Lnes Norman Y. Mneta San José Internatonal Arport, San José, Calforna: Renzel Arfeld axways Y and Z Improvements Los Angeles Internatonal Arport, Los Angeles, Calforna: Arport-wde Computer Arfeld Lghtng Control and Montorng System Upgrade hoenx Sky Harbor Internatonal Arport, hoenx, Arzona: S2 Concourse Apron Development/ axway D Reconstructon ullam Arport, Flagstaff, Arzona: GA Box, - and Shade Hangar Infrastructure and Desgn he Boys & Grls Club of Western Nevada, Carson Cty, Nevada: New Faclty Northern Nevada Adult Mental Health Servces, Sparks, Nevada: Dn- ownsend Hosptal - Desgn-Buld East Wng Remodel Flyng Eagle Ar ark Ranches, Washoe County, Nevada Camp Grzzly Creek, ortola, Calforna: Campground, hase I Buldngs ruckee olce Staton, ruckee, Calforna: Remodel Nevada Department of Motor Vehcles & ublc Safety/Nevada Hghway atrol State Offce Buldng Complex, Elko, Nevada Carson Cty ublc Works, Butt Way, Carson Cty, Nevada: Renovate Electrcal Servce n Buldng #7 he Metropoltan at Cupertno, Cupertno, Calforna: HVAC and lumbng Systems Unversty of Nevada, Reno: Frandsen Humantes Buldng: Retroft Securty and Fre Alarm Systems he Metro ruckee Meadows Reno ransportaton Ral Access Corrdor (ReRAC), Reno, Nevada: hase I - roject Management Reno ReRAC Boys & Grls Club Southwest Contractor's Best of Nevada 2005 Award for ransportaton roject Amercan ublc Works Assocaton 2007 award ublc Works roject of the Year n ransportaton category, more than $100 mllon range 6 Engneerng Confdence. Arfeld Electrcal Mechancal

9 Key ersonnel Key ersonnel: Keller C. Hackbusch - Chef Executve / Manager of Arfeld Electrcal Department Electrcal Engneer eter K. Hackbusch - resdent Electrcal rncpal-n-charge m A. rocksh - Executve Vce resdent / Manager of Idaho Offce and of Electrcal Department Chef Electrcal Engneer homas. Federc - rncpal / Manager of Mechancal Department Chef Mechancal Engneer Matthew C. Myres - Mechancal Department roducton Manager Mechancal Engneer Donald Y. West - Mechancal Engneer eter M. Syntax, LEED A - Electrcal Engneer Edward R. Gansberg - Assstant Manager of Electrcal Department Electrcal roject Manager Kevn B. Melrose - Electrcal roject Manager he staff of Dnter Engneerng Company generally numbers around 30 and s comprsed of professonal engneers lcensed throughout the Western U.S. as well as engneer nterns, project managers, desgners, CADD techncans, Revt BIM techncans, and admnstratve personnel wth years of experence. he frm operates three departments from whch draftng and techncal personnel may be pulled to meet surge workload demands on another department. rofessonal Regstratons: We have mechancal and electrcal engneers lcensed n multple states. rofessonal Afflatons: Actvely partcpatng n many professonal organzatons keeps our staff upto-date wth the latest products and technques. Currently we are represented n the followng assocatons: I I I I I I I Arport Consultants Councl (ACC) Amercan Assocaton of Arport Executves (AAAE) Amercan Assocaton of Arport Executves - South Central Chapter (AAAE-SCC) Northwest Chapter of the Amercan Assocaton of Arport Executves (NWAAAE) Southwest Chapter Amercan Assocaton of Arport Executves, Inc. (SWAAAE) Arzona Arports Assocaton (AzAA) Nevada Arports Assocaton (NvAA) Amercan ublc Works Assocaton (AWA) Amercan Socety of Heatng, Refrgeratng and Ar Condtonng Engneers (ASHRAE) Amercan Socety of Mechancal Engneers (ASME) Bulders Assocaton of Western Nevada (BAWN) he Insttute of Electrcal and Electroncs Engneers, Inc. (IEEE) Illumnatng Engneerng Socety of North Amerca (IESNA) Natonal Fre rotecton Assocaton (NFA) Natonal Socety of rofessonal Engneers (NSE) 7 Engneerng Confdence. Arfeld Electrcal Mechancal

10 Key ersonnel Years: wth Dnter Engneerng: 14.3 rofessonal Regstraton: Nevada.E. No Degree: B.S. Electrcal Engneerng roject Experence: Keller C. Hackbusch - Chef Executve / Manager of Arfeld Electrcal Department / Electrcal Engneer: Mr. Hackbusch began hs employment at Dnter Engneerng n 1995, whle attendng the Unversty of Nevada, Reno. Durng the next nne years hs dutes focused on project management, desgn and constructon observaton servces for arfeld electrcal projects. In 2004 Mr. Hackbusch became manager of Dnter s Arfeld Electrcal Department and s now also Chef Executve for the frm. Keller s consderable arfeld project experence ncludes work for 46 dfferent arports and 6 mltary ar bases n 12 states. Mr. Hackbusch s a member of seven arport-related professonal organzatons, ncludng ACC, AAAE and AzAA, and has lead educatonal presentatons at two ACC/AAAE Arport lannng, Desgn and Constructon Symposums. El Centro Naval Ar Faclty, El Centro, Calforna: Desgn-Buld Lghtng for Smulated Arcraft Carrer Deck wth Landng Lghts and Helcopter Landng ad. MCAS, Camp endleton, Calforna: Repar of Bravo (formerly known as Alpha) axway. Naval Ar Weapons Staton (NAWS), Chna Lake, Calforna: Desgn-Buld Repar Flghtlne Lghtng Electrcal Dstrbuton System. Grand Forks Ar Force Base, North Dakota: Constructon Qualty Assurance Observaton Servces for Runway Reconstructon. Wrght-atterson Ar Force Base, Oho: Replace Runway 05L-23R Approach Lghts. rojects for Naval Ar Staton, Fallon, Nevada: < Desgn-Buld axway E, CALA Ramp, and Aprons for Hangars 3, 4 and 7. < Insulaton Resstance Montorng System & Wave-off Lghtng - Runway 13L-31R [Desgn-Buld]. < Arfeld Electrcal Systems Condton Assessment [part of IDIQ contract.] Klamath Falls Arport, Klamath Falls, Oregon (former Ar Force Base and presently Ar Natonal Guard Base): Varous Arport Improvements. 3 projects for hoenx-mesa Gateway Arport, Mesa, Arzona (former Wllams Ar Force Base). 3 projects for Southern Calforna Logstcs Arport (former George Ar Force Base), Vctorvlle, CA, ncludng: Arfeld Electrcal Systems Upgrade and Vault (Fast-rack: desgn was completed n just 10 weeks from ntal feld nvestgaton through bd documents for complete electrcal upgrade for arport). ocatello Regonal Arport, ocatello, Idaho (former Army Ar Base): Runway 3-21 Improvements. 3 projects for Los Angeles Internatonal Arport, Los Angeles, Calforna, ncludng: < Computer Arfeld Lghtng Control and Montorng System Upgrade [Desgn-Buld]. Idaho Falls Regonal Arport, Idaho Falls, Idaho: Runway 2/20 Rehabltaton. 4 projects for Colorado Sprngs Arport, Colorado Sprngs, Colorado. 6 projects for Reno-Stead Arport (Army Natonal Guard Base), Reno, Nevada. 14 projects for Reno-ahoe Internatonal Arport, Reno, NV (Ar Natonal Guard Base) ncludng: < New Cargo Faclty for U. S. ostal Servce. 5 projects for Norman Y. Mneta San José Internatonal Arport, San José, Calforna, ncludng: < Renzel Arfeld Improvements [Desgn-Buld]. allahassee Regonal Arport, allahassee, Florda: Runway 9/27 Reconstructon and Correcton of Lne of Sght. 8 Engneerng Confdence. Arfeld Electrcal Mechancal

11 Key ersonnel Years: wth Dnter Engneerng: 33 wth other frms: 10 Educaton: Electrcal Engneerng roject Experence: eter K. Hackbusch - resdent / Electrcal rncpal-n- Charge: Mr. Hackbusch has amassed a tremendous amount of electrcal desgn and project management experence on a large varety of projects over the last 43 years. In 1977 he joned Dnter Engneerng and n 1985 became a prncpal n the frm. resently Mr. Hackbusch s presdent and the prncpal n charge of electrcal producton. For over 20 years ete was n drect charge of most of the electrcal engneerng work for the Naval Ar Staton n Fallon, Nevada and he s especally knowledgeable n ndefnte delvery/ndefnte quantty (IDIQ) contracts, havng partcpated n 19 federal IDIQ contracts. He has done projects for DOD agences n Calforna, Colorado, Nevada, North Dakota, Oho, Utah, and Washngton. 4 projects for U.S.D.A. Forest Servce ncludng: < Zephyr Cove Resort Campground and RV ark, Zephyr Cove, Nevada: Rehabltaton [part of IDIQ contract] j Won RA 2003 Best n Basn award. 16 projects n Calforna and Nevada for General Servces Admnstraton, ncludng an IDIQ contract nvolvng federal offce buldngs, courthouses and post offces, and: < New Bruce R. hompson U.S. Courthouse and Federal Buldng, Reno, Nevada j recognzed by AIA as among op 10 desgned courthouses n the naton for aesthetc and securty reasons and earned AIA Nevada Excellence n Desgn Awards for 1997, 1998 and projects for U.S. Department of Labor at Serra Nevada Job Corps Center, Reno, Nevada, ncludng: Buldngs #4, #22, and #30: Fre Safety Retroft. Bureau of Land Management: New Dspatch Faclty, Reno-Stead Arport, Reno, Nevada. Moapa Valley Fsheres, Moapa Natonal Wldlfe Refuge, Nevada: hase 1 Vstor Center Development. 12 projects for U.S. ostal Servce ncludng: Slver Cty, Nevada Remodel. (part of IDIQ contract.) 11 projects for VA Serra Nevada Health Care System (Hosptal), Reno, Nevada, ncludng: < Buldng #1 HVAC System Replacement. Dept. of Veterans Affars Carl. Hayden Medcal Center, hoenx, AZ: Increase Electrcal Dstrbuton. 31 projects for Nevada Ar Natonal Guard, Reno-ahoe Internatonal Arport, Reno, Nevada, ncludng 4 IDIQ contracts. Work for 17 Ar Force Bases n Western U.S. (ncludng an IDIQ contract.) 57 projects for Naval Ar Staton, Fallon, Nevada, ncludng 8 IDIQ contracts. Naval Ar Weapons Staton (NAWS), Chna Lake, Calforna: Desgn-Buld Repar Flghtlne Lghtng Electrcal Dstrbuton System [part of MACC]. El Centro Naval Ar Faclty, El Centro, Calforna: Desgn/Buld Lghtng for Smulated Arcraft Carrer Deck wth Landng Lghts and Helcopter Landng ad. MCAS, Camp endleton, Calforna: Repar of Bravo (formerly known as Alpha) axway. Naval Ar Staton, Lemoore, Calforna: Runway/axway Lghtng Gudance Sgns. Southern Calforna Logstcs Arport, Vctorvlle, Calforna (former George Ar Force Base): Arfeld Electrcal Systems Upgrade and Vault. 9 Engneerng Confdence. Arfeld Electrcal Mechancal

12 Key ersonnel Years: wth Dnter Engneerng: 9 wth other frms: 13 rofessonal Regstraton: Electrcal Engneerng.E. n multple states Degree: B.S. Electrcal Engneerng m A. rocksh - Executve Vce resdent / Manager of Idaho Offce and of Electrcal Department / Electrcal Engneer: Mr. rocksh has 22 years of engneerng experence from varous local electrcal engneerng and contractng frms. He has performed all phases of electrcal engneerng ncludng desgn, project schedulng, estmatng, submttal revew, feld nspectons, overseeng staff and drafters, and system nstallaton. Mr. rocksh has consderable experence wth DOD agences ncludng the Ar Force, Army, Marne Corps, and Navy, s currently Dnter's roject Manager for many recent projects for the NAS n Fallon, Nevada, and has been nvolved n two IDIQ contracts at ths Base. He has also been nvolved n a number of projects for other federal agences ncludng work for the USDA Forest Servce, U.S. Dept. of Housng and Urban Development (HUD), U.S. Dept. of Labor, and Department of Veterans Affars. roject Experence: Buckley Ar Force Base, Aurora, Colorado: axway Zulu Wdenng. El Centro Naval Ar Faclty, El Centro, Calforna: Desgn-Buld Lghtng for Smulated Arcraft Carrer Deck wth Landng Lghts and Helcopter Landng ad. MCAS, Camp endleton, Calforna: Repar of Bravo (formerly known as Alpha) axway. Naval Ar Weapons Staton (NAWS), Chna Lake, Calforna: Desgn-Buld Repar Flghtlne Lghtng Electrcal Dstrbuton System. 19 projects for Naval Ar Staton, Fallon, Nevada, ncludng: < Desgn-Buld axways B, F, G - Lghtng Upgrade. < Desgn-Buld axway Alpha Lghtng Systems Upgrade. < Electrcal Infrastructure Upgrades at Varous Locatons ($2.7 mllon desgn-buld project.) < Insulaton Resstance Montorng System (IRMS) and Wave-off Lghtng for Runway 13L-31R (desgn-buld project--arfeld lghtng, NAVAIDs, vault.) < Desgn-Buld axway E, CALA Ramp, and Aprons for Hangars 3, 4 and 7. < 2003 IDIQ Contract (6 projects). < IDIQ Contract (8 projects). Defense Depot San Joaqun, racy Ste, CA: Renovate Bldg 286, Bays 4, 5 and 6 (desgn-buld). Nells Ar Force Base, Nevada: Desgn and Repar Varous 58th ara RQS Facltes n Area II (Desgn-Buld renovaton of sx buldngs). hoenx-mesa Gateway Arport (former Wllams Ar Force Base), Mesa, Arzona: Fre rotecton System, hases I and II. Norman Y. Mneta San José Intl. Arport, Calforna: Renzel Arfeld Improvements (desgn-buld). rojects for U.S. Forest Servce: < ruckee ublc Servces Center, ruckee, Calforna: Infrastructure. < aylor Creek Vstor Center, (Lake ahoe), CA: Lake of the Sky Amphtheater Rehabltaton and Ste Lghtng Improvements. Other Federal Work: 4 projects for U.S. Dept. of Housng and Urban Development (HUD) [pror to Dnter], 1 project for Department of Veterans Affars. 10 Engneerng Confdence. Arfeld Electrcal Mechancal

13 Key ersonnel Years: wth Dnter Engneerng: 14.6 wth other frms: 21 rofessonal Regstraton: Mechancal Engneerng.E. n multple states and Calforna Energy Audtor Degree: B.S. Mechancal Engneerng homas. Federc - rncpal and Manager of Mechancal Department / Mechancal Engneer: Mr. Federc has over 35 years' experence n engneerng. He joned Dnter Engneerng as a Senor Mechancal Engneer n May 1995 and s presently a prncpal n the frm and manager of the Mechancal Department, overseeng the mechancal and plumbng desgns for all projects. Mr. Federc s federal experence ncludes projects for the Bureau of Land Management, General Servces Admnstraton, USDA Forest Servce (ncludng an IDIQ contract), US Department of Labor (Job Corps), US ostal Servce, Department of Veterans Affars, and DOD work for four Army and Ar Force Bases n the Western States, for the Navy n Nevada (ncludng three IDIQ contracts), and for the Nevada Natonal Guard (ncludng an IDIQ contract). Hs mltary experence pror to employment at Dnter Engneerng ncludes multple projects for the Ar Force, Navy and Natonal Guard n Nevada. roject Experence: Nevada Natonal Guard State Area Readness Command Complex, Carson Cty, Nevada, comprsed of two new buldngs--usfo (31,000 sq.ft.) and Armory/Headquarters (OAG) (78,683 sq.ft.) rojects for Nevada Ar Natonal Guard, Reno-ahoe Internatonal Arport, Reno, Nevada: < Modfcaton of Hangar Fre Suppresson System and Desgn of Overhead Crane. < Interm C-130 Arcraft Mantenance Hangar. < Addton of Weldng Shop to Jet Engne Shop [part of IDIQ contract.] 11 projects for Naval Ar Staton, Fallon, Nevada, ncludng three IDIQ contracts, and Desgn-Buld Heatng lant Decentralzaton. Bureau of Land Management Dspatch Faclty, Reno-Stead Arport, Stead, Nevada. Serra Nevada Job Corps Center, Stead/Reno, Nevada: HVAC Addton to Women's Dormtores Buldngs #11 and #15. GSA: Bruce R. hompson U.S. Courthouse and Federal Buldng, Reno, Nevada: Securty Gates. 3 projects for U.S.D.A. Forest Servce, ncludng: Zephyr Cove Resort Campground and RV ark, Zephyr Cove, Nevada: Rehabltaton [part of IDIQ contract] j Won RA 2003 Best n Basn award. U.S. ost Offce (bult n 1932), Downtown Branch, Reno, Nevada: Elevator Room. rojects for VA Serra Nevada Health Care System [Hosptal], Reno, Nevada: < Buldng #1 HVAC System Replacement. < Construct Chapel. Defense Depot San Joaqun [Sharpe Defense Depot], racy Ste, Calforna: Renovate Buldng 286, Bays 4, 5 and 6 (desgn-buld project). Nevada Natonal Guard, Carson Cty, Nevada: HVAC System Renovaton n Offce of the Adjutant General (OAG) Buldng. U.S. Army Reserve Center, Mare Island, Calforna: M&E Utlty/AF Evaluaton. * rojects pror to Dnter 4 projects for Naval Ar Staton, Fallon, Nells Ar Force Base, Las Vegas, Nevada: New Accountng Facltes Nevada Natonal Guard, Carson Cty, Nevada: CS/MS and Organzatonal Mantenance Shop. 11 Engneerng Confdence. Arfeld Electrcal Mechancal

14 Key ersonnel Years: wth Dnter Engneerng: 10.3 wth other frms: 3.2 rofessonal Regstraton: Mechancal Engneerng.E. n multple states Degree: B.S. Mechancal Engneerng Matthew C. Myres - Mechancal Department roducton Manager / Mechancal Engneer: Mr. Myres experence ncludes eght years of mltary servce, work for general contractors, employment for a plumbng contractor for whom he started an engneerng department specalzng n desgn-buld projects, and varous postons at Dnter Engneerng, where he s now a key staff member n the frm s mechancal department. Hs dutes nclude desgnng HVAC, plumbng, and fre protecton systems, performng calculatons, AutoCAD work, cost estmatng, specfcaton wrtng and managng mechancal producton. Matt's project experence s vared and ncludes mltary facltes, mantenance shops, commercal ktchens, remodeled offce buldngs, fre statons, vehcle exhaust systems, audtorums, stand-alone restroom facltes, desgn-buld mxed-use condos wth retal spaces, Green buldng desgn, and senor asssted lvng facltes. roject Experence: Nells Ar Force Base, Las Vegas, Nevada: Desgn and Repar Varous 58th ara RQS Facltes n Area II ($4.5 mllon desgn-buld project to repar/refurbsh sx buldngs.) Nevada Natonal Guard State Area Readness Command Complex, Carson Cty, Nevada: < New USFO Buldng ($4.4 mllon; 31,000 sq.ft.) < New Armory/Headquarters (OAG) Buldng ($8.6 mllon; 78,683 sq.ft.) rojects for Naval Ar Staton, Fallon, Nevada: < IDIQ Contract N D-6037: Buldng 455, Central Utlty lant - Replace Ar Compressors. < IDIQ Contract N B-6063: Repar Indoor Swmmng ool. Modfy Rooms B183 and B186 n Strke and Warfare Buldng #465. Defense Depot San Joaqun [Sharpe Defense Depot], racy Ste, Calforna: Renovate Buldng 286, Bays 4, 5 and 6 (desgn-buld project.) 800 Hgh Street Apartments, alo Alto, Calforna: HVAC and lumbng Systems [desgn-buld.] VA Serra Nevada Health Care System, Reno, Nevada: Buldng #1 HVAC System Replacement rme A-E/Mechancal Engneer/Desgner/Constructon Observer for $16 mllon phased renovaton project to replace antquated HVAC system n 132,000 sq.ft., sx-story, 68-year-old buldng.) Housng Authorty of the Cty of Reno (HUD), Nevada: Hawk Vew Apartments: Heatng System Evaluaton and Repar. Unversty of Nevada, Reno: Anderson Health Scence Buldng, Manvlle School of Medcal Scence: Remodel of Anmal Care Laboratory. Sparks Fre Statons Nos. 2, 3 and 4, Sparks, NV: Nederman Vehcle Exhaust Systems (rme A-E.) Squaw Valley ublc Servce Dstrct, Olympc Valley, CA: Fre Staton and Admnstraton Center. hoenx Sky Harbor Internatonal Arport, hoenx, Arzona: HX Sky ran ($800 mllon.) 5 projects for Washoe County Jal, Reno, Nevada, ncludng: < Replace Chller. < Cvl rotectve Custody (CC) Expanson. < Remodel Basement Forensc Laboratory. lumas County Sherff s Correctonal Center, Quncy, Calforna: hase II Remodel. 12 Engneerng Confdence. Arfeld Electrcal Mechancal

15 Key ersonnel Donald Y. West - Mechancal Engneer: Mr. West has eleven years experence as a Mechancal Engneer desgnng HVAC and plumbng systems for a varety of projects ncludng health care, nsttutonal, educatonal, and commercal facltes; offce buldngs; and warehouses. He s now a mechancal engneer n Dnter s hoenx offce. Years: wth Dnter Engneerng: 3.3 wth other frms: 7.7 rofessonal Regstraton: Mechancal Engneerng.E. n multple states Degree: B.S. Mechancal Engneerng Donny s experence ncludes desgn of overall mechancal/hvac ar dstrbuton, plumbng and fre protecton systems; mechancal calculatons for HVAC desgn; selecton of new HVAC equpment and of plumbng fxtures, ncludng ADA-complant fxtures; and desgn of water, waste, and gas dstrbuton, backflow preventon devces, and chllers and water towers Mr. West s an actve member and past-presdent of the local chapter of the Amercan Socety of Heatng, Refrgeratng and Ar Condtonng Engneers, Inc. (ASHRAE). roject Experence: hoenx Sky Harbor Internatonal Arport, hoenx, Arzona: HX Sky ran. Brown Feld Muncpal Arport, San Dego, Calforna: Desgn/Buld Fuel Lnes. Reno-ahoe Internatonal Arport, Reno, Nevada: Integrated In-Lne Explosve Detecton System (Arport Baggage Check-n) roject. Cty of Reno olce Department, Reno, NV: Man olce Staton HVAC Replacement (rme A-E.) Arzona Department of Revenue, hoenx, Arzona: Elevator Modernzaton. Foothlls Communty ark, Goodyear, Arzona: Aquatc Faclty. Regonal ransportaton Commsson of Washoe County, Reno, Nevada: RC Rde and RC Access Facltes: Sesmc Gas Shutoff Valves. Slver eak Grll & aproom on the Rver, Reno, Nevada: Modfcaton and Reconfguraton of Ktchen Hood Exhaust for the arkng Gallery Ventlaton System (rme A-E for Cty of Reno.) Unversty of Nevada, Reno: Fleschmann Agrculture Buldng #032: Envronmental Controls Upgrade for Rooms 135, 137, 137B, Anmal Laboratory (rme A-E.) Lamoreaux Marketplace, hoenx, Arzona (eght 3,000 sq.ft. tenant spaces n new buldng.) Arzona State Veterans Home, hoenx, Arzona: Dnng Room Remodel Expanson. ror to Dnter Engneerng employment: * North ahoe Fre Staton, North Lake ahoe, Calforna (new buldng; ADA-complant plumbng). * Southern Nevada Adult Mental Health Servces, Las Vegas, Nevada: Rawson-Neal sychatrc Hosptal (new 117,000 sq.ft., sngle-story, 190-bed psychatrc hosptal). * Unversty of Nevada, Reno: Student Unon Buldng (new 160,000 sq.ft. buldng). * 3 projects for Lyon County School Dstrct, Nevada, ncludng new elementary and ntermedate schools n Fernley. * Chna Sprngs Boys & Grls Dormtores, Gardnervlle, Nevada (new buldngs). * Comstock Large Anmal Hosptal, Reno, Nevada (new veternary hosptal wth offces). * Lahontan Fsh Hatchery, Gardnervlle, Nevada (new buldng; HVAC equpment selectons and water dstrbuton system for ultravolet (UV) flter system nsde the buldng). 13 Engneerng Confdence. Arfeld Electrcal Mechancal

16 Key ersonnel Years: wth Dnter Engneerng:.8 wth other frms: 9 rofessonal Regstraton: Electrcal Engneerng.E. n Arzona (No ) and LEED Accredted rofessonal Degree: B.S. Marne Engneerng Systems (mnor n Electrcal Engneerng) eter M. Syntax, LEED A - Electrcal Engneer: Mr. Syntax has nearly ten years of engneerng experence from engneerng frms and from U.S. Navy shps. He s currently n the Navy Reserve and holds an actve mltary ID. In addton to electrcal engneerng, hs background ncludes provdng mechancal and plumbng desgns for resdental and commercal projects. Mr. Syntax currently heads up the Electrcal Department for Dnter Engneerng Company's hoenx offce. ete has performed all phases of engneerng ncludng feasblty studes and assessments, project desgns, project schedulng, estmatng, feld nspectons, constructon admnstraton and submttal revew, and overseeng engneers, desgners, and drafters. He also provdes LEED desgn and documentaton. Mr. Syntax s project experence s dverse and ncludes educatonal, admnstratve, nsttutonal, government, fre staton, museum, recreatonal, athletc, mxed-use, retal, conventon, hotel, and restaurant facltes. roject Experence: hoenx Sky Harbor Internatonal Arport, hoenx, Arzona: hx Sky ran (Electrcal Engneer/ Assstant roject Manager for phased new passenger tran system wth elevated gudeways, platform statons, Mantenance and Storage Faclty, and Automated ran Central Control Faclty.) Arzona State Veterans Home, hoenx, Arzona: Dnng Room Remodel Expanson (On-ste Electrcal Engneer.) rojects for Kngman Arport, Kngman, Arzona: < Arfeld Gudance Sgnage (Local Electrcal Engneer/roject Manager.) < New ermnal (Electrcal Engneer/roject Manager.) ror to Dnter Engneerng employment: * AS Deer Valley Operatons Buldng, hoenx, Arzona (new $85 mllon, mult-story, 220,000 sq.ft.) * rojects for Arzona State Unversty, empe, Devl Dome (new $15 mllon, 90,000 sq.ft. ndoor practce and tranng faclty for football sychology Department Expanson and Renovaton ($10 mllon, phased, multple remodel packages of over 65,000 sq.ft. of offce and research space n sx dfferent he Weatherup Center (new $25 mllon, 44,000 sq.ft. basketball practce faclty.) * Surprse Cty Hall, Surprse, Arzona (new, $48.5 mllon, 160,000 sq.ft. cty hall.) * Marcopa County Fre Statons #2 and #571, Marcopa County, Arzona (new muncpal fre statons.) * he Baha Fath Center, Scottsdale, Arzona (three-buldng relgous faclty complex.) * Bank of Amerca Corporate Offces, hoenx, Arzona ($8 mllon, 1.3 mllon sq.ft. remodel.) * George Washngton Carver Museum & Cultural Center, hoenx, AZ: Feasblty Study & Renovaton. * Las Vegas Conventon Center, Las Vegas, Nevada ($890 mllon; three mllon sq.ft.) * he Rock een Center, hoenx, Arzona (new two-story, 26,000 sq.ft. multpurpose.) * Yourland Mxed-Use Development, hoenx, Arzona (new mxed-use development ncludng nne sx-story offce buldngs, three mult-level parkng garages, a hotel, restaurant, and retal space.) 14 Engneerng Confdence. Arfeld Electrcal Mechancal

17 Key ersonnel Years: wth Dnter Engneerng: 19 wth other frms: 14 Degree: Junor Desgner roject Experence: Edward R. Gansberg - Assstant Manager of Electrcal Department / Electrcal roject Manager: Mr. Gansberg has 33 years' experence n the constructon ndustry drectly related to electrcal engneerng. Ed joned Dnter n 1991 as an Electrcal roject Manager and s currently assstant manager of the Electrcal Department. Mr. Gansberg's engneerng talents have receved specal recognton for desgn of energy-effcent electrcal systems. He s currently a member of the Illumnatng Engneerng Socety of North Amerca. Ed's federal government experence ncludes projects for the BLM, GSA (an IDIQ contract), Forest Servce (ncludng an IDIQ contract), U.S. Department of Labor, USS (ncludng an IDIQ contract), Veterans Affars, and mltary projects for a Marne Corps Base n Calforna, NAS Fallon, Nevada (ncludng two IDIQ contracts); Nevada Ar Natonal Guard (ncludng an IDIQ contract) and Nevada Army Natonal Guard. 2 projects for Bureau of Land Management, ncludng: New Dspatch Faclty, Stead, Nevada. 4 projects for General Servces Admnstraton, ncludng an IDIQ contract and: < New Bruce R. hompson U.S. Courthouse and Federal Buldng, Reno, Nevada. VA Serra Nevada Health Care System, Reno, Nevada: Buldng #1 HVAC System Replacement. 4 projects for U.S.D.A. Forest Servce: < ruckee ublc Servces Center, ruckee, Calforna: Infrastructure. < Fallen Leaf Water System, Calforna: US Forest Servce Improvement roject hase IA. < aylor Creek Vstor Center, (Lake ahoe), Calforna: Lake of the Sky Amphtheater Rehabltaton and Ste Lghtng Improvements. j Won RA Best n Basn award. < Zephyr Cove Resort Campground and RV ark, Zephyr Cove, Nevada: Rehabltaton (part of IDIQ contract.) j Won RA Best n Basn award. 4 projects for U.S. ostal Servce, ncludng: U.S. ost Offce, Elko, Nevada: New Carrer Annex and an IDIQ contract. Marne Corps Base, Mountan Warfare ranng Center, ckel Meadows, Brdgeport, Calforna: -797(B) ranng Blletng Support Facltes. 11 projects for Naval Ar Staton, Fallon, Nevada: < Electrcal Infrastructure Upgrades at Varous Locatons (desgn-buld). < Desgn/Buld Heatng lant Decentralzaton. < IDIQ Contract N B-6063 (5 projects). < IDIQ Contract N D-0038 (4 projects). 4 projects for Nevada Ar Natonal Guard, Reno-ahoe Intl. Arport, Reno, Nevada, ncludng: < Aeral ort Faclty. < Modfcaton of Hangar Fre Suppresson System and Desgn of Overhead Crane. < Composte RF-4C Flght Smulator and Ar Crew ranng Faclty (IDIQ contract). Serra Nevada Job Corps Center, Stead/Reno, Nevada: HVAC Addton to Women's Dormtores Buldngs #11 and #15. Nevada Army Natonal Guard, Reno-Stead, Nevada: Washoe County Armory. Nevada Natonal Guard State Area Readness Command Complex, Carson Cty, Nevada: New Armory/Headquarters (OAG) Buldng. 15 Engneerng Confdence. Arfeld Electrcal Mechancal

18 Key ersonnel Kevn B. Melrose - Electrcal roject Manager: Mr. Melrose has 6 years of electrcal experence performng feld nvestgatons, desgn, calculatons, cost estmatng, as-buldng systems, and constructon admnstraton tasks. Years: wth Dnter Engneerng: 14 wth other frms: 2 rofessonal Regstraton: Canada - C.E.. Degree: Electrcal Engneerng echnology Kevn has worked on a varety of new and remodeled projects for Dnter Engneerng. Hs mltary experence ncludes projects for the Naval Ar Staton n Fallon, Nevada (part of three separate IDIQ contracts) and the Defense Depot San Joaqun. Hs other federal work ncludes projects for the U.S.D.A. Forest Servce, U.S. ostal Servce (part of an IDIQ contract), and the Department of Veterans Affars. In the last few years Mr. Melrose s work has focused on arport projects specalzng n apron lghtng, securty fencng and gates, automated access controls and card reader systems and on muncpal well and pumpng staton projects. roject Experence: rojects for Naval Ar Staton, Fallon, Nevada: < IDIQ Contract N D-6037: Buldng Water ump Staton System Upgrade. < IDIQ Contract N B-6063: Replace Hgh Voltage ransformer Banks at 15 Stes. < IDIQ Contract N D-3405: Repar Heatng System, Buldng. Defense Depot San Joaqun [Sharpe Defense Depot], racy Ste, Calforna: Renovate Buldng 286, Bays 4, 5 and 6 (desgn-buld). Nells Ar Force Base, Las Vegas, Nevada: Desgn and Repar Varous 58th ara RQS Facltes n Area II (desgn-buld). U.S. ost Offce, Vassar Street, Reno, Nevada: Investgaton for Securty Upgrades (IDIQ Contract). Fallen Leaf Water System, Calforna: US Forest Servce Improvement roject hase IA. Dept. of Veterans Affars Carl. Hayden Medcal Center, hoenx, Arzona: Increase Electrcal Dstrbuton (upgrade for entre medcal center.) Southern Calforna Logstcs Arport (former George Ar Force Base), Vctorvlle, Calforna: Arfeld Electrcal Systems Upgrade and Vault. 4 projects for hoenx-mesa Gateway Arport, Mesa, Arzona (former Wllams Ar Force Base.) Flyng Eagle Ar ark Ranches, Washoe County, Nevada (desgn-buld.) Northern Nevada Adult Mental Health Servces, Sparks, Nevada: Dn-ownsend Hosptal - Desgn- Buld East Wng Remodel (desgn-buld). South Hlls Chrstan Assembly, Geger Grade, Reno, Nevada: Addton and Remodel (desgn-buld). Unversty of Nevada, Reno: Frandsen Humantes Buldng: Retroft Securty and Fre Alarm Systems (desgn-buld). Arzona Department of Revenue, hoenx, Arzona: Elevator Modernzaton. Mneral County Lbrary, Hawthorne, Nevada: Addton and Remodel. Southern Nevada Adult Mental Health Servces, Las Vegas, NV: Rawson-Neal sychatrc Hosptal. Cty of Sparks Glendale/Meredth and Mary Wahl ump Statons, Sparks, Nevada: Storm Dran Control Structures and Lft Staton Desgn. Cty of Mesa, Arzona: Sossaman Road 16-nch Waterlne - ressure Reducng Valve (RV) Staton. Downtown hoenx ublc Market, hoenx, Arzona. 16 Engneerng Confdence. Arfeld Electrcal Mechancal

19 Mltary rojects rojects for Naval Ar Staton, Fallon (NAS Fallon), Nevada: Desgn/Buld axways B, F, G - Lghtng Upgrade - New LED taxway edge lghts, cable and condut. ($3 mllon) 2009 Desgn/Buld Electrcal Infrastructure Upgrades at Varous Locatons - Upgrade exstng underground and overhead nfrastructure. ($2.7 mllon) 2007 Desgn/Buld axway Alpha Lghtng Systems Upgrade - Replace taxway lghts, sgns and cablng; relocate power and communcatons utltes for NAVAIDs; and prepare the utltes for a future arfeld lghtng vault relocaton. ($1.9 mllon) 2007 Desgn/Buld Insulaton Resstance Montorng System and Wave-off Lghtng for Runway 13L-31R - Upgrade arfeld lghtng, NAVAIDs, vault, and conductors. ($483,000) 2005 Heatng lant Decentralzaton - Upgrade temperature control systems and ppng nsulaton for barracks, offce buldngs and hangar. ($496,000) 2000 IDIQ Contract No. N D task orders ncludng: < Assess Arfeld Electrcal Systems Condton 2006 < Buldng 455, Central Utlty lant - Replace Ar Compressors ($700,000) 2005 < Upgrade 400 Hz ower to CALA Ramp ($260,000) 2004 < Buldng 394, Ftness Center - Replace Heatng System ($75,000) 2004 IDIQ Contract N B task orders: < Buldng 466, ower and Wash Rack - Replace Bolers ($30,000) 2004 < Buldng 479, Barracks 10 and 11 - Replace Heatng System ($75,000) 2004 < Upgrade Buldng 51 for New Generator est Stand ($20,000) 2004 < Replace Hgh Voltage ransformer Banks at 15 Stes ($575,000) 2004 < Buldng Upgrade 400 Hz Generaton Equpment ($500,000) 2004 < Edwards Creek Mcrowave Staton #71 ($225,000) 2003 < Repar Indoor Swmmng ool ($400,000) 2003 < Strke and Warfare Buldng 465, Computer Room Modfcatons for B183 and B186 ($220,000) 2002 June 12, 2008, letter of commendaton from Gary L. Smth, NAS Fallon-ublc Works Department: hs s to confrm that Dnter Engneerng, Inc. [sc] has performed a sgnfcant amount of professonal engneerng work at NAS Fallon.... In each of the these [sc] projects, wthout excepton, Dnter Engneerng has submtted accurate delverables on or ahead of tme; and has establshed and mantaned a record of exceptonal performance. I can recommend Dnter Engneerng, Inc. [sc] to others as a qualty desgn frm wthout reservaton. 17

20 Mltary rojects Creech Ar Force Base, Nevada: Desgn-Buld UAS Man Gate and Infrastructure - Electrcal desgn of power, lghtng, communcatons, fre alarm, CCV, emergency generator and US systems for pre-engneered, pre-fabrcated buldngs for ID check pont/gatehouse, guard booth and nspecton booth Nells Ar Force Base, Las Vegas, Nevada: Desgn and Repar Varous 58th ara RQS Facltes n Area II - Desgn eam roject Manager for a desgn/buld project to repar/refurbsh sx buldngs for use by the 58 th ara Rescue Squadron. Sustanable features ncluded specfyng the use of envronmentally frendly refrgerants, upgradng all buldngs to be n accordance wth ASHRAE 62.1, and desgnng controls and economzer optons n accordance wth Green Buldng Gudelnes. ($4.1 mllon) 2009 Buckley Ar Force Base, Aurora, Colorado: axway Zulu Wdenng - Electrcal desgn assstance (desgn/buld) for new lghtng and sgnage systems and modfcatons to the control systems for a taxway and helpad. Included an alternate to upgrade to LED lghtng, and modfcatons to the control systems to accommodate relocaton of the helpad regulators to the arfeld lghtng vault and to enable control of those regulators from the AC. (Electrcal: $90,000) 2008 Naval Ar Weapons Staton (NAWS), Chna Lake, Calforna: Desgn-Buld Repar Flghtlne Lghtng Electrcal Dstrbuton System [part of Dry Utltes Multple Award Contract Constructon (MACC)] - Repar and upgrade runway and taxway lghtng systems and regulator vault. Included reconfgured nfrastructure and crcutng to provde dedcated power and control to each runway, enablng all three runways to be lt ndependently and concurrently; new elevated LED taxway edge lghts, new gudance sgnage, new lghted wnd cones n seven locatons, new regulators; and programmng and new modules for Arfeld Master Control anel (lghtng control) and ower programmng to the arfeld lghtng system. ($6.6 mllon) 2009 Nevada Natonal Guard State Area Readness Command Complex, Carson Cty, Nevada: New USFO Buldng - New 31,000 sq.ft. offce buldng wth computer server room, warehouse, loadng dock, flammable materals storage, and controlled waste handlng faclty. ($4.2 mllon) 2003 New Armory/Headquarters (OAG) Buldng - New 78,683 sq.ft., two-story buldng to consoldate Guard functons and house fve Guard unts and the Offce of the Adjutant General. he faclty ncluded an assembly hall, recrutng offce, securty control room, classrooms, lbrary, ktchen, vendng area, break area, physcal ftness area, tolets/ showers, an armory secure storage vault, varous storage areas, photographc studo, mantenance shop, workbays, and parkng area. ($8.6 mllon)

21 Mltary rojects El Centro Naval Ar Faclty, El Centro, Calforna: Desgn/Buld Lghtng for Smulated Arcraft Carrer Deck wth Landng Lghts and Helcopter Landng ad - Replace exstng carrer deck and helpad lghtng wth full-depth cans and condut, replace regulators and upgrade electrcal vault. Sustanable desgn features ncluded the use of LED lghtng technology for the smulated carrer deck lghts, whch operate wth smaller solaton transformers and constant current regulators, resultng n a 90% savngs n electrcal usage on the carrer deck lghts due to less electrcal demand. ($2 mllon) 2006 May 22, 2009: Ed Cooney, a Navy Engneerng echncan at NAF El Centro, Calforna, rated Dnter s work on a ast erformance Questonnare as "Excellent - erformance greatly exceeded the contract requrements" on all applcable 11 questons and for "Overall Ratng" and answered YES-would award another contract and YES-satsfed wth end product. Naval Ar Faclty, El Centro, Calforna Marne Corps Ar Staton, Camp endleton, Calforna: Repar of Bravo (formerly known as Alpha) axway - Repar axway B to support C-141 arcraft operatons. ($1.2 mllon) 2003 Defense Depot San Joaqun [Sharpe Defense Depot], racy Ste, Calforna: Renovate Buldng 286, Bays 4, 5 and 6 - Remodel 131,000 sq.ft. of warehouse and 1,000 sq.ft. of offce/restroom spaces for a Desgn/Buld project. ($300,000) 2002 rojects for Nevada Ar Natonal Guard Base, Reno, Nevada: Aeral ort Faclty - New 14,200 sq.ft. loadng faclty to support aeral port operatons for C-130 arcraft. ($2.5 mllon) 2001 j AIA Nevada Excellence n Desgn Award for Modfy Hangar Fre Suppresson System and Desgn Overhead Crane - rme A-E to retroft a mantenance hangar for F-4 arcraft to accommodate a sngle C-130E Hercules transport plane. ($500,000)

22 Mltary rojects rojects for Nevada Ar Natonal Guard Base, Reno, Nevada (contnued): A&E IDIQ Contract DAHA26-97-D-0003: < Energy Audt of Base Facltes 1999 < Alter Avoncs Shop ($125,000) 1999 < Alter Buldng 82 (Fuel Cell) for Engne Intake and Repar Buldng ($250,000) 1999 Fuel Systems Mantenance and Corroson Control Hangar - New 26,000 sq.ft. hangar for fuel cell repar and pantng of C-130E Hercules transport planes. ($3.4 mllon) 1998 Add to C-130 Arcraft arkng Apron ($1.2 mllon) 1998 Interm C-130 Arcraft Mantenance Faclty (Hangar) ($650,000) 1997 Wrght-atterson Ar Force Base, Oho: Replace Runway 05L-23R Approach Lghts ($1.4 mllon) 2004 Grand Forks Ar Force Base, North Dakota: Constructon Qualty Assurance Observaton Servces for Runway Reconstructon (reconstructed 12,351-foot-long by 150-foot-wde runway) 2005 Vandenberg Ar Force Base, Calforna: Upgrade Ste Utltes for new Space and Mssle Insttute Ste for Ar Educaton and ranng Command - Upgrades to an astronaut tranng center. ($2.5 mllon) 1997 U.S. Army Reserve Center, Mare Island, Calforna: M&E Utlty/AF Evaluaton - Independent and documented evaluaton and report on the condtons and capactes of the exstng HVAC, plumbng, and electrcal (M&E) systems n a 60,000 sq.ft., three-story, renforced concrete buldng formerly operated as a barracks whch s scheduled to be converted nto offce space

23 Mltary rojects Addtonal Mltary Experence: More projects for Naval Ar Staton, Fallon, Nevada: IDIQ Contract N D-3405: < Repar Heatng System, Buldng 350 (Admnstraton). ($500,000) 2000 < Arcraft arts Storage Buldng. ($250,000) 1999 < Renovate and Expand Buldng 308, Gymnasum. ($435,000) 1999 < Remodel Buldng 309 (medcal admnstratve faclty). ($1 mllon) 1999 < AIMD Non-destructve estng Faclty. ($300,000) 1999 < Replace Gas png n Blue Sky Housng. ($160,000) 1998 < Medcal Supply Warehouse. ($150,000) 1998 < Replace Walkway Lghtng. ($125,000) 1998 < Expand Auto Hobby Shop, Buldng 393. ($179,000) 1998 < Add Ktchen to Chld Development Center. ($382,000) 1998 < Central Blletng Offces. ($150,000) 1997 < Upgrade Electrc Servce and Modfy Hood n Sports Lne Bar/Grll. ($45,000) 1997 < Replace Roofs and Add Garages to Blue Sky ownhouses. ($300,000) 1997 < Upgrade Electrcal Servce to Barracks 10 and 11, Buldngs 474, 475, 476, and 477. ($300,000) 1996 < New Softball layng Feld. ($200,000) 1996 elecommuncatons and Fber Optc Cable Consoldaton between (op Gun) Appled Instructon Buldng and Strke Warfare Buldng. ($150,000) 1996 Upgrade Fuel Farm Vent and ank Alarm System. ($180,000) 1992 IDIQ Contract N C A&E Servces n Support of Navy Fghter Weapons School (op Gun) and Carrer Arborne Early Warnng Weapons School (op Dome) rojects: < Four Corners Lft Staton. ($162,000) 1997 < elemetry for Water Dstrbuton Flow Meters. ($10,000) 1996 < -320 Wastewater reatment lant Upgrade and -319 Water Storage Dstrbuton - Corroson Desgn. ($107,000) 1996 < -320 Wastewater reatment lant. ($900,000) 1996 < -319 Domestc Water Storage and Dstrbuton Improvements. ($1.2 mllon) 1996 < elecommuncaton Ducts. ($50,000) 1995 < Hangar -315 and Apron - Corroson Desgn. ($38,780) 1995 < Electrcal Utlty Extensons and Communcaton Relocatons. ($2.5 mllon) 1994 < Arfeld Utltes - Study

24 Mltary rojects rojects for Naval Ar Staton, Fallon, Nevada (contnued): IDIQ Contract (N D-8248): < Remodel Buldng 308, Base Exchange. ($525,000) 1996 < Remodel Bowlng Center. ($716,000) 1995 < Hgh emperature Hot Water Heatng Conversons, Auto Hobby Shop. ($185,000) 1995 < Insulate and Heat Bomb and Rocket Assembly Buldngs 246 and 252. ($400,000) 1994 IDIQ Contract (N D-0038): < ant Booth and Composte Repar Room at Buldng 300. ($200,000) 1995 < Install Electrc Meters at Varous Buldngs. ($110,000) 1994 < Relocate Moble Engne est Faclty. ($100,000) 1993 < Remodel Galley. ($250,000) 1993 < Relocate Hgh ower urn-up ad Faclty. ($275,000) 1993 < Add Drect Dgtal Controls & Upgrade Generator System n Buldng 465, Strke Warfare Complex. ($220,000) 1993 < Repar/Upgrade Crash House. ($255,000) and -294 Range Ar Survellance System (RASS) Radar Stes #1, #2 and #3. ($2 mllon) 1992 More projects for Nevada Ar Natonal Guard, Reno, Nevada: IDQ Contract: < Engne est Stand. ($323,000) 1998 < ype C Servces for Repar/Alter General Mantenance Hangar. ($880,000) 1997 IDIQ Contract: < Alter Buldng 112 for IF Faclty and Repar Smulator Confguraton. ($391,000) 1998 < Alter Squadron Operatons Buldng. ($257,000) 1997 < Alter General urpose/hangar Shops. ($130,000) 1997 < Repar Hangar Roofs and Mantan/Repar Roofs Basewde. ($541,000) 1997 < Repar/Replace Overhead ower Basewde. ($235,000) 1997 < Alter Organzatonal Mantenance Shop Buldng. ($92,000) 1997 < Replace Underground Storage ank. ($250,000) 1997 < Add Weldng Shop to Jet Engne Shop. ($500,000) 1996 < Repar/Upgrade Jet Fuel Operatng System. ($150,000) 1996 < Add to elecommuncatons Buldng. ($232,000) 1995 < Add to and Alter (ADAL) Avoncs/ECM OD Shop and Storage. ($520,000) 1995 < Replace Doors on Muntons Faclty. ($50,000)

25 Mltary rojects More projects for Nevada Ar Natonal Guard, Reno, Nevada (contnued): IDIQ Contract: < Composte RF-4CC Flght Smulator and Ar Crew ranng Faclty. ($350,000) 1994 < ower Check ad wth Sound Suppressor. ($850,000) 1994 < Boler Burner Replacement, Varous Buldngs. ($50,000) 1993 < Addton to Avoncs Fre Suppresson and Detecton/Alarm Systems. ($900,000) 1989 IDIQ Contract: < Repar/Replace Steam Lnes Basewde. ($127,000) 1991 < Alter and Repar Dnng Hall rojects for Nevada Natonal Guard, Carson Cty, Nevada: Offce of the Adjutant General (OAG) Buldng: HVAC System Renovaton ($230,000) 1998 Mantenance Shop Hazardous Materals Waste Storage Buldng at South Carson Faclty. ($20,000) 1993 Hazardous Materals/Waste Storage Buldng at CSMS/OMS. ($43,000) 1992 Nevada Natonal Guard (jont Army/Ar Guard use): Combned Support/Mantenance Shop and Organzatonal Mantenance Shop. ($3.5 mllon) 1992 rojects for Nevada Army Natonal Guard, Reno Stead Arport, Nevada: Washoe County Armory - Natural Gas Lne png Extenson. ($100,000) 1999 Washoe County Armory. ($4.6 mllon) 1997 Nevada Natonal Guard, Ely, Nevada: Re-roof and Repar of Armory. ($80,000) 1992 Nells Ar Force Base, Las Vegas, Nevada: Base Cvl Engneerng Complex, hases I and II. ($12.6 mllon) 1991 and 1994 jletter of commendaton for mechancal, plumbng and electrcal engneerng. 23

26 Mltary rojects rojects for Marne Corps Base, Mountan Warfare ranng Center, ckel Meadows, Brdgeport, Calforna: -797(B) ranng Blletng Support Facltes. ($10 mllon) (A) Communcaton Area Expanson at the Headquarters Buldng. ($250,000) 1993 Construct arkng Lot and Road E 218R. ($1 mllon) 1991 Multpurpose Faclty. ($2.5 mllon) 1990 New arkng Lot and Road to Water anks rojects for Serra Army Depot, Herlong, Calforna: Repar of Magazne Loadng Docks. ($1 mllon) 1997 Outdoor Recreaton Issue Faclty. ($920,000) 1993 raffc Sgnals and Controls at Fre Staton ruck Intersecton.($750,000) Ar Force Bases n Western States (at Beale, Castle, Edwards, Farchld, George, Hll, Luke, March, Mather, McClellan, and Nells) and Fresno, Calforna Ar Guard Base: Utltes for -9 Sound Suppressor Support Facltes (Hush Houses) ($700,000 at each faclty) Skaggs Island Dredgng Faclty, Vallejo, Calforna: Electrcal and Fuel Systems More projects for Naval Ar Staton, Fallon, Nevada: Wholeste Rehabltaton of 160 urnkey and Capehart Famly Housng Unts. ($8.6 mllon) 1990 Remodel Unaccompaned Enlsted ersonnel Housng. ($720,000) Navy Contract: < Addton to Chld Care Center. ($140,000) 1989 < Repar and Alteraton of heater. ($190,000) 1989 < Rehabltaton of Wells Ar Start Buldng (#374) for New ant Spray Booth. ($384,000) 1988 < Ncad Battery Shop. ($73,000) 1988 < Fuel Analyss Lab. ($178,000) 1988 < Addton to Offcers' Club, Buldng 324. ($150,000) 1988 < Repars to Bachelor Enlsted Quarters (B.E.Q.) (600 beds). ($362,000) Navy Contract: < -255 Electronc Warfare (EW) Bombng Range Improvements, owers #1 and #2, and Helpad. ($8.7 mllon) 1988 < -272 Electronc Warfare Stes and Base Utlty System Improvements for New BEQ and BOQ Buldngs (personnel quarters), Arcraft arkng Apron, Arcraft Mantenance Hangar, and Control ower. ($5 mllon) 1988 < -269 ACS/Electronc Warfare Range and Centrod Facltes Improvements. ($6.5 mllon) 1988 < ower Study for -255 Bombng Range < -270 Electronc Warfare Stes. ($2 mllon)

27 Other Federal rojects Department of Homeland Securty/Customs and Border rotecton (DHS/CB), El aso Sector, Southwestern Regon: IDIQ Desgn- Buld Border atrol Fence roject actcal Infrastructure Development - Desgn eam project management for an ntal project to verfy constructon documents for the nfrastructure supportng two mles of new fencng constructon for a desgn/buld contract rojects for VA Serra Nevada Health Care System, Reno, Nevada: IDIQ A/E Contract: < Buldng 1, 5th Floor - Compensaton and enson (C&) HVAC Remodel - Mechancal and electrcal desgn for a new HVAC system to temporarly use the exstng equpment and provde for easy future connecton to the new equpment that wll be provded wth the HVAC system replacement constructon for Buldng < Warehouse Expanson - Mechancal and electrcal desgn Buldng #1 HVAC System Replacement - rme A-E for a phased renovaton project to replace the antquated HVAC system n a 132,000 sq.ft., sx-story, 68-year-old buldng for admnstratve offces, dental servces, clncal lab, and hosptal ktchen and Morgue, athology, BoHazard, and Audology Departments. ($15.8 mllon) 2011 Construct Chapel - Remodel 500 sq.ft. for a chapel and 220 sq.ft. for a quet room/offce on the frst floor of Buldng 12. ($39,000) 2003 Increase Chller Capacty ($600,000) 1999 Ambulatory Care Center - Remodel a buldng for a non-surgcal care center (two stores, ±16,500 gross sq.ft.) wth MRI. ($1.6 mllon) 1998 MRI Ste reparaton - New 25 kv medum voltage dstrbuton system for Ambulatory Care Center. ($180,000) 1996 Renovate Frst Floor Halls and Walls ($750,000) 1995 Nursng Home Care Unt (NHCU): Renovate Halls and Walls ($470,000) 1993 Department of Veterans Affars Carl. Hayden Medcal Center, hoenx, Arzona: Increase Electrcal Dstrbuton - rme A-E to upgrade the electrcal dstrbuton system for the entre medcal center. ($582,000) 2001 Shasta Head Start Faclty, Anderson, Calforna - New federally sponsored preschool buldng Head Start, Carson Cty, Nevada: HVAC Redesgn 2003 On a 12/16/09 ast erformance Questonnare Davd Gs, General Engneer, Facltes Management Servce for Reno VA hosptal, rated Dnter Outstandng - erformance greatly exceeded the contract requrements on 23 applcable questons and also for Overall Ratng and answered YES-would award another contract and YES- satsfed wth end product and sad Dnter Engneerng does great work. 25

28 Other Federal rojects rojects for U.S. Fsh and Wldlfe Servce: Moapa Valley Fsheres, Moapa Natonal Wldlfe Refuge, Nevada: hase 1 - New electrcal raceway dstrbuton system, ncludng branch crcutry and telephone, to servce future ste development for the frst phase vstor areas--entrance gate and booth, entrance sgn, kosk, restroom, group use faclty, parkng area Moapa Valley Fsheres, Moapa Natonal Wldlfe Refuge, Nevada: Feld Investgaton and Report - Investgaton of electrcal and telephone utltes and report wth phase opton recommendatons for a proposed development for approval by U.S. Fsh and Wldlfe Servce U.S. Department of Labor: Serra Nevada Job Corps Center, Stead/ Reno, Nevada: HVAC Addton to Women's Dormtores Buldngs #11 and #15 ($1.4 mllon) 2006 rojects for U.S.D.A. Forest Servce: ruckee ublc Servces Center, ruckee, Calforna: Infrastructure - Ste utltes and parkng lot and roadway ntersecton lghtng to accompany constructon of a new ruckee Ranger Dstrct Offce. (Electrcal: $688,000) 2008 Fallen Leaf Water System, Calforna: US Forest Servce Improvement roject hase IA -Upgrades nvolvng a proposed water lne, exstng and proposed water tank, exstng well and booster pump staton. ($750,000) 2006 aylor Creek Vstor Center, Hghway 89 north of Camp Rchardson (Lake ahoe), Calforna: Lake of the Sky Amphtheater Rehabltaton and Ste Lghtng Improvements - ower and lghtng for a remodeled outdoor stage. ($421,245) 2003 j 2006 Best n Basn award n ublc Faclty Rebuld category from ahoe Regonal lannng Assocaton (RA) for desgn effectveness, ease of mantenance, types of materals used and overall vsual qualty. Kva Beach, Lake ahoe near allac Hstorc Ste, Calforna: Restroom Faclty - New 480 sq.ft. restroom faclty. ($130,000)

29 Other Federal rojects U.S.D.A. Forest Servce IDIQ Contract: < Zephyr Cove Resort Campground and RV ark, Zephyr Cove, Nevada: Rehabltaton - Redevelop a 172-acre agng faclty orgnally bult n the 1920's to brng up to current standards (ncludng ADA accessblty). ($3.2 mllon) 2001 j 2003 Best n Basn award n recreaton category from RA for desgn effectveness, ease of mantenance, types of materals used and overall vsual qualty. < aylor Creek Vstor Center, Hghway 89 north of Camp Rchardson (Lake ahoe), Calforna: Vstor Center Improvements - Improve buldng and ste. ($350,000) 2000 U. S. ostal Servce, Reno, Nevada: New Cargo Faclty at Reno-ahoe Internatonal Arport - emporary faclty (4,320 sq.ft. for modular offces and a 20,000 sq.ft. Rubb buldng for handlng and sortng cargo) and for an arplane parkng ramp for 9 postal arcraft. Included taxway lghts, underground utltes, and apron lghtng. ($5.9 mllon) 1999 rojects for U.S. ost Offce (bult n 1932), Downtown Staton, 50 South Vrgna Street, Reno, Nevada: Install General Area/arkng Lot Lghts ($50,000) 1998 Elevator Room - Modfy HVAC and lghtng for the elevator room n an hstorc buldng IDIQ Contract A-0063 for U.S. ostal Servce: U.S. ost Offce, Vassar Street (Man Staton), Reno, NV: Investgaton for Securty Upgrades IDIQ Contract for Western Regonal Offce of U. S. ostal Servce: U.S. ost Offce, Slver Cty, Nevada: Modfy Man Offce. ($45,000?) 1997 U.S. ost Offce, Vassar Street, Reno, Nevada: Upgrade Battery Room n Vehcle Mantenance Faclty. ($30,000) 1996 U.S. ost Offce, Vassar Street (Man Offce), Reno, Nevada: Remodel CFS Rooms. ($50,000) 1996 U.S. ost Offce, Unversty Staton, Reno, Nevada: Remodel. ($20,000) 1994 he Bruce R. hompson U.S. Courthouse and Federal Buldng for General Servces Admnstraton, Reno, Nevada -New 195,500 sq.ft. hgh-rse buldng for offces and federal court rooms and a 43,600 sq.ft. underground, secure parkng garage. ($31 mllon) jhs faclty was counted by the Washngton D.C.-based Amercan Insttute of Archtects (AIA) as one of the op 10 desgned courthouses n the naton--recognzed for aesthetc and securty reasons--and earned AIA Nevada Excellence n Desgn Awards for 1997, 1998 and ($31 mllon)

~ County Administrator's Signature:

~ County Administrator's Signature: Consent Agenda BOARD OF COUNTY COMMSSONERS Regular Agenda D DATE: November 18, 2014 AGENDA TEM NO. /..3 Publc Hearng D ~ County Admnstrator's Sgnature: /Subject: Recept and fle of tems delegated to the

More information

Energy Efficiency and Conservation Block Grant Program

Energy Efficiency and Conservation Block Grant Program Energy Effcency and Conservaton Bloc Grant Program Natonal Assocaton of Countes Webnar Aprl 16, 2009 Johanna Zetterberg, State and Local Team Offce of Weatherzaton and Intergovernmental Programs Secretary

More information

Driver Operator Pumper

Driver Operator Pumper Fre Servce Tranng Bureau Drver Operator Pumper Certfcaton Procedures Gude Ths Certfcaton Procedure Gude reflects the requrements of NFPA 1002: Standard for Fre Apparatus Drver/Operator Professonal Qualfcatons,

More information

CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION

CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS Draft Aprl 2014 CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION Ths chapter provdes background for the Guam and Commonwealth for the

More information

WHISTLE BLOWING HANDBOOK

WHISTLE BLOWING HANDBOOK WHISTLE BLOWING HANDBOOK Polcy Date: September 2017 Revew Date: September 2018 Char of Governors: Smon Hanson Governors Approval: 19 th September 2017 Contents 1 Introducton... 3 2 Defnton... 3 3 Prncples

More information

Fire Service. Instructor I. Certification Procedures Guide

Fire Service. Instructor I. Certification Procedures Guide Fre Servce Instructor I Certfcaton Procedures Gude Ths Certfcaton Procedure Gude reflects the requrements of NFPA 1041: Standard for Fre Servce Instructor Professonal Qualfcatons, 2012 Edton July 2018

More information

BRAMPTON. Jfc-I. 2. That staff be authorized to provide funding assistance to a maximum value of $30,000

BRAMPTON. Jfc-I. 2. That staff be authorized to provide funding assistance to a maximum value of $30,000 BRAMPTON Jfc-I Report bramptonca FI()W6r Cty Commttee of Councl Commttee of the Councl of The Corporaton of the Cty of Brampton Date: August 2, 2012 COMMITTEE OF COUNCIL Fle: Subject: C16.BR Volunteer

More information

Spitzer Space Telescope

Spitzer Space Telescope Sptzer Space Telescope Cycle-1 General Observer Educaton and Publc Outreach Call for Proposals Issued by the Sptzer Scence Center Calforna Insttute of Technology Pasadena, Calforna USA 15 October 2004

More information

CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION

CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION Ths chapter provdes background for the Supplemental Envronmental Impact Statement (SEIS) for the Guam and Commonwealth of the Northern Marana Islands

More information

AGENDA MEMBERS: Friday, May 25, 2012 City of Solvang - City Council Chambers 1644 Oak Street, Solvang, CA. 10:00AM - Convene Roll Call Public Comment

AGENDA MEMBERS: Friday, May 25, 2012 City of Solvang - City Council Chambers 1644 Oak Street, Solvang, CA. 10:00AM - Convene Roll Call Public Comment SANTA BARBARA COUNTY INDIAN GAMING LOCAL COMMUNITY BENEFIT COMMITTEE MEMBERS: Trbal Members: Santa Ynez Band of Chumash Indans Vncent Armenta Trbal Charman Regnald Pagalng Enrolled Trbal Member Communty

More information

MA C RPSBAS CAMPP D E 0

MA C RPSBAS CAMPP D E 0 G s C Z MA C RPSBAS CAMPP D E 0 Mca Camp Pendleton Marne Corps Base Camp Pendleton (MCBCP) s a unque and rreplaceable resource for mltary tranng actvtes. Located n southern Calforna about mdway between

More information

The conference will be held April 4 th, 2018 at the Eugene M. Hughes Metropolitan Complex, located at 5015 E. 29 th St. North Wichita, KS,

The conference will be held April 4 th, 2018 at the Eugene M. Hughes Metropolitan Complex, located at 5015 E. 29 th St. North Wichita, KS, Expl or ngtheev dencet oaddr ess Heal t hcar ecr ses. Sponsor / Exh b t ori nf or mat on Apr l4,2018 The Fourth Annual Evdence-Based Nursng conference serves nurse leaders at every level by showcasng the

More information

Universal Flyer. inside. A Universal Avionics Publication

Universal Flyer. inside. A Universal Avionics Publication nsde Unversal Flyer A Unversal Avoncs Publcaton Lookng Forward Promotng Passon n Avaton Empowerng Technology Top Dealers Forge New Paths Servng for the Long Term 1 st Quarter 2017 Unversal Flyer cross

More information

Welsh Government Learning Grant Further Education 2017/18

Welsh Government Learning Grant Further Education 2017/18 student fnance wales cylld myfyrwyr cymru Welsh Government Learnng Grant Further Educaton 2017/18 Fnancal Detals Form www.studentfnancewales.co.uk/wglgfe sound advce on STUDENT FINANCE /A How to complete

More information

TRANSMITTAL THE COUNCIL THE MAYOR DEC Ana Guerrero. To: Date: From: TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED.

TRANSMITTAL THE COUNCIL THE MAYOR DEC Ana Guerrero. To: Date: From: TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED. TRANSMITTAL To: THE COUNCIL Date: DEC 2 8 2015 From: THE MAYOR TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED. Ana Guerrero C GARCETpr Mayor V.: BOARD OF POLICE COMMISSIONERS MATTHEW M, JOHNSON

More information

Declaration of interests There were no declarations of interests made by those present, financial or otherwise, in any item on the agenda.

Declaration of interests There were no declarations of interests made by those present, financial or otherwise, in any item on the agenda. EASTLEIGH COLLEGE BOARD STANDARDS COMMITTEE MINUTES OF THE MEETING OF THE STANDARDS COMMITTEE WEDNESDAY 22 NOVEMBER 2017 AT 1700 HOURS IN THE HIVE, COLLEGE HOUSE Present: Mr J Course (Char) Mrs A Cross-Durrant

More information

Protecting, Maintaining and Improving the Health ofminnesotans

Protecting, Maintaining and Improving the Health ofminnesotans Protectng, Mantanng and mprovng the Health ofmnnesotans August 13, 2012 Ms. Carol Glbertson, Admnstrator MN Veterans Home Slver Bay 45 Banks Boulevard Slver Bay, Mnnesota 55614 Re: Enclosed Renspecton

More information

PY Allocations

PY Allocations Strateges and Actvtes Adult and Dslocated Worker Actvtes 1 WorkSource (OneStop Career) Centers Y WIB Strateges and Actvtes PY 201213 Allocatons PY 201314 Allocatons Tranng Fundng Fundng Workforce Development

More information

Emergency Action Plan for. Deconstruction Operations. at 130 Liberty Street. New York, NY

Emergency Action Plan for. Deconstruction Operations. at 130 Liberty Street. New York, NY for Deconstructon Operatons at 130 Lberty Street New York, NY Lower Manhattan Development Corporaton One Lberty Plaza, 20 th Floor New York, NY 10006, TABLE OF CONTENTS SECTION 1 INTRODUCTION 1 SECTION

More information

YEAS: Councilman Harold Stewart, Councilman Tyler Turner, Councilman Neal Bourque Councilman David Guitreau, Councilman Kirk Boudreaux

YEAS: Councilman Harold Stewart, Councilman Tyler Turner, Councilman Neal Bourque Councilman David Guitreau, Councilman Kirk Boudreaux MINUTES OF A REGULAR MEETING OF THE MAYOR AND COUNCIL OF THE CITY OF GONZALES, STATE OF LOUISIANA TAKEN ON DECEMBER 11, 2017, 5: 30 P M AT CITY HALL, 120 S IRMA BLVD MEMBERS PRESENT: Mayor Barney Arceneaux

More information

The Incidence of Student Financial Aid: Evidence from the Pell Grant Program

The Incidence of Student Financial Aid: Evidence from the Pell Grant Program The Incdence of Student Fnancal Ad: Evdence from the Pell Grant Program Lesley Turner Unversty of Maryland October 16, 2012 1 Background and Motvaton Affordablty and access to hgher educaton Large prvate

More information

Supplemental Nursing Services Agencies 2003: A Report to the Minnesota Legislature

Supplemental Nursing Services Agencies 2003: A Report to the Minnesota Legislature 4-68 Supplemental Nursng Servces Agences 23: A Report to the Mnnesota Legslature For more nformaton, contact: Mnnesota Department ofhuman Servces Nursng Faclty Rates and Polcy Dvson 444 Lafayette Road

More information

Acute medical care. The right person, in the right setting first time. Report of the Acute Medicine Task Force

Acute medical care. The right person, in the right setting first time. Report of the Acute Medicine Task Force Acute medcal care The rght person, n the rght settng frst tme Report of the Acute Medcne Task Force October 2007 The Royal College of Physcans of London The Royal College of Physcans plays a leadng role

More information

GROUND WEAPON SYSTEMS/EQUIPMENT (WS/E) AND AUTOMATED INFORMATION SYSTEMS (AIS) LIFE CYCLE LOGISTICS SUPPORT (LCLS) POLICY

GROUND WEAPON SYSTEMS/EQUIPMENT (WS/E) AND AUTOMATED INFORMATION SYSTEMS (AIS) LIFE CYCLE LOGISTICS SUPPORT (LCLS) POLICY DEPARTMENT OF THE NAVY HEADQUARTERS UNTED STATES MARNE CORPS 3000 MARNE CORPS PENTAGON WASHNGTON, DC 20350-3000 MCO 4105.4 LPC-1 17 Dec 12 MARNE CORPS ORDER 4105.4 Administrative Change From: To : Subj:

More information

Table No. 9 Internet service rate - E-1 DESCRIPTION MONTHLY RATE INSTALLATION

Table No. 9 Internet service rate - E-1 DESCRIPTION MONTHLY RATE INSTALLATION 33 Cable & Wreless* Table No. 9 Internet servce rate - E-1 DESCRIPTION MONTHLY RATE INSTALLATION * Includes 100 lnes wthout addtonal cost. The rate for each addtonal lne s us$6.00 US $360.00 US $690.00

More information

Constitution, Organisation and Operating Procedures of the Council of Military Education Committees of the Universities of the United Kingdom

Constitution, Organisation and Operating Procedures of the Council of Military Education Committees of the Universities of the United Kingdom Consttuton, Organsaton and Operatng Procedures of the Councl of Mltary Educaton Commttees of the Unverstes of the Unted Kngdom FOREWORD The relatonshp between academa and HM Forces has a long hstory and

More information

UNCLASSIFIED. CHAIRMAN OF THE JOINT CHIEFS OF STAFF NOTICE

UNCLASSIFIED. CHAIRMAN OF THE JOINT CHIEFS OF STAFF NOTICE UNCLASSFED. CHARMAN OF THE JONT CHEFS OF STAFF NOTCE DJ-8/SAJM DSTRBUTON: A, B, C CJCS Notce 4210 EBOLA VRUS DSEASE PRE-DEPLOYMENT TRANNG Reference( s): See Enclosure C for References 1. Purpose. Provde

More information

~ ASD(M)

~ ASD(M) ". :! 111 July 13, 1965 NUMBER 5210, 48 ----------------------------,, ------------------------------- ASD(M) Department of Defense Drectve SUBJECT The Conduct of Polygraph Examnatons and the Selecton,

More information

Evaluation of the Pilot Partnership between HASA and HHC-COBRA. Feasibility Report. prepared by: October 10, 2006

Evaluation of the Pilot Partnership between HASA and HHC-COBRA. Feasibility Report. prepared by: October 10, 2006 Evaluaton of the Plot Partnershp between HASA and HHC-COBRA Feasblty Report prepared by: Salle Adams Erc Dovak Terry Hamlton Aqulno Gabor October 0, 2006 Ths plot was made possble by the tremendous support

More information

Specialty Tours USA. Explore the best of the

Specialty Tours USA. Explore the best of the 2016 Specalty Tours Dscover Calforna Explore Calforna Explore Calforna Junor Calforna Surf Camp Cnema Camp Actng Camp Photography Camp Outdoor Adventure Dscover New York Basketball Camp TOEFL or SAT Prep

More information

2016 Region III Presidents Cup College Station, Texas June 14 June 19, 2016

2016 Region III Presidents Cup College Station, Texas June 14 June 19, 2016 201 Regon III Presdents Cup Coege Staton, Texas June 14 June 19, 201 TEAM REGISTRATION, PLAYER EVENT AND OPENING CEREMONIES Tuesday, June 14, 201 Brazos County Expo Center 5827 Leonard Road, Bryan, Texas

More information

Development of the nursing home Resident Assessment Instrument in the USA

Development of the nursing home Resident Assessment Instrument in the USA Age and Ageng I997;26-S2: 19-25 Development of the nursng home Resdent Assessment Instrument n the USA CATHERINE HAWES, JOHN N. MORRIS 1, CHARLES D. PHILLIPS 2, BRANT E. FRIES 3, KATHERINE MURPHY 1, VINCENT

More information

STrust: A Trust Model for Social Networks

STrust: A Trust Model for Social Networks 20 Internatonal Jont Conference of IEEE TrustCom-/IEEE ICESS-/FCST- STrust: A Trust Model for Socal Networks Surya Nepal, Wanta Sherchan, Cecle Pars Informaton Engneerng Lab CSIRO ICT Centre, Australa

More information

COMMENCEMENT WEEKEND. Friday and Saturday, May 26 27, Bowdoin College

COMMENCEMENT WEEKEND. Friday and Saturday, May 26 27, Bowdoin College n COMMENCEMENT WEEKEND N Frday and Saturday, May 26 27, 2017 Bowdon College CONTENTS I GREETINGS Schedule of Events...2 Honorands...5 Weekend Dnng...6 Frequently Asked Questons...8 General Informaton...12

More information

Hospital chains. Their role in the future of the NHS. Click to launch

Hospital chains. Their role in the future of the NHS. Click to launch Hosptal chans Ther role n the future of the NHS Clck to launch Hosptal chans context and background As one of the most renowned health systems n the world, developng new models of care s not somethng that

More information

Do Non-Profit Operators Provide Hig. Long-term Care Industry. Author(s) Noguchi, Haruko; Shimizutani, Satos.

Do Non-Profit Operators Provide Hig. Long-term Care Industry. Author(s) Noguchi, Haruko; Shimizutani, Satos. Do Non-Proft Operators Provde Hg TtleCare? Evdence from Mcro-Level Dat Long-term Care Industry Author(s) Noguch, Haruko; Shmzutan, Satos Ctaton Issue 2005-04 Date Type Techncal Report Text Verson publsher

More information

AND IN THE MATTER OF The legal validity 'of the Regulations mentioned above

AND IN THE MATTER OF The legal validity 'of the Regulations mentioned above '", '" _. _ -.. ~/' // E AND N THE MATTER OF The legal valdty 'of the Regulatons mentoned above AND N THE MATTER OF The consttutonal and legal valdty of the letters dated 10-07~2012 and 16-07-2012 both

More information

Subject Benchmark Statement

Subject Benchmark Statement In partnershp wth Subject Benchmark Statement Paramedcs June 2016 UK Qualty Code for Hgher Educaton Part A: Settng and mantanng academc standards Contents How can I use ths document?... 1 About Subject

More information

Advancing DePaul. In life and death, Munster champions women athletes

Advancing DePaul. In life and death, Munster champions women athletes Advancng DePaul Sprng 2008 In lfe and death, Munster champons women athletes The Rev. Thomas Munster, C.M. (LAS MA 54), who ded last December, bequeathed more than $300,000 n planned gft annutes to women

More information

DEPARTMENT OF DEFENSE OFFICE OF FREEDOM OF INFORMATION 1155 DEFENSE PENTAGON WASHINGTON, DC

DEPARTMENT OF DEFENSE OFFICE OF FREEDOM OF INFORMATION 1155 DEFENSE PENTAGON WASHINGTON, DC DEPARTMENT OF DEFENSE OFFCE OF FREEDOM OF NFORMATON 1155 DEFENSE PENTAGON WASHNGTON, DC 20301-1155 JAN 1. 9 2006 Ref: 06-F-0337 Mr. Steven Aftergood Federation of American Scientists 1717 K Street, NW

More information

Volume 30, Issue 4. Filling vacancies: Identifying the most efficient recruitment channel

Volume 30, Issue 4. Filling vacancies: Identifying the most efficient recruitment channel Volume 30, Issue 4 Fllng vacances: Identfyng the most effcent recrutment channel Mareva Sabater Unversty of Savoe Abstract Ths paper provdes new results on the recrutment behavour of frms by showng that

More information

Cuutfi' S-enAKAfl. Atsfes On Growing Thre Of ^hutomation; Asks Governor CS Commission To Act On Plan

Cuutfi' S-enAKAfl. Atsfes On Growing Thre Of ^hutomation; Asks Governor CS Commission To Act On Plan Cuutf' S-enAKAfl. Amercans Vol. XXIII, No. 46 Larg Offce Seekers Overlookng A Sleepng Gant- Cvl Servce Vote POLITICIANS seekng statewde or Federal offce have always been careful to publcly advocate the

More information

DEVELOPING A DECISION SUPPORT SYSTEM FOR NURSE SCHEDULING AT A PUBLIC HOSPITAL IN SOUTH AFRICA

DEVELOPING A DECISION SUPPORT SYSTEM FOR NURSE SCHEDULING AT A PUBLIC HOSPITAL IN SOUTH AFRICA CIE42 Proceedngs, 6-8 July 202, Cape Town, outh Afrca 202 CIE & AIIE DEVELOPING A DECIION UPPORT YTEM FOR NURE CHEDULING AT A PUBLIC HOPITAL IN OUTH AFRICA. Fredrch * and L. van Dyk Department of Industral

More information

THE EFFECTIVENESS OF AN INTERACTIVE MAP DISPLAY IN TUTORING GEOGRAPHY

THE EFFECTIVENESS OF AN INTERACTIVE MAP DISPLAY IN TUTORING GEOGRAPHY a BOLT B E R A N E K AND NEWMAN 'NC a W- CONSUTNG DEVEOPMENT RESEARCH / BBN REPORT NO. 3346

More information

Improving the Last Stages of Life EXECUTIVE SUMMARY

Improving the Last Stages of Life EXECUTIVE SUMMARY Improvng the Last Stages of Lfe EXECUTIVE SUMMARY ABOUT THE LAW COMMISSION OF ONTARIO The Law Commsson of Ontaro (LCO) was created by an Agreement among the Law Foundaton of Ontaro, the Ontaro Mnstry of

More information

ISLAND TREES PUBLIC SCHOOLS

ISLAND TREES PUBLIC SCHOOLS Phone:516-520-2164 Fox: 51 6-520-D 140 SLAND TREES PUBLC SCHOOLS DSTRCT HEALTH SERVCES, Koren M. Stephens, R.N., Dstrct Head Nurse SLAND TREES MEMORAL MDDLE SCHOOL 45 WANTAGH AVENUE SOUTH LEVTTOWN, NEW

More information

A. BUILDING S.WING 3576 PIMLICO PARKWAY. ID PREFlX TAe; F OOO! F174. It is the policy of Bluegrass Care anjl

A. BUILDING S.WING 3576 PIMLICO PARKWAY. ID PREFlX TAe; F OOO! F174. It is the policy of Bluegrass Care anjl DEPARTMENT OF HEALTH AND HUMAN SERVCES CENTERS FOR MEDCARE &. MEDCAD SERVCES STAtEMENT OF OEFJCENC1ES ANO PLAN 0 NAME O. PROVDER OR SUPPLER (X) PROVlDERSU?PLERlCLlo'. JOENTlFCAT10N NUMBER: BLUEGRASS CARE

More information

I I I I. General Plan. I i I i i CITY OF SAN PABLO. One Alvarado Square CA San Pablo I I. August 1996

I I I I. General Plan. I i I i i CITY OF SAN PABLO. One Alvarado Square CA San Pablo I I. August 1996 CTY OF SAN PABLO General Plan CTY OF SAN PABLO One Alvarado Square CA 94806 San Pablo August 1996 RESOLUTON NO 96 11 1 RESOLUTON OF T re CTY COUNCL OF CTY OF SAN PABLO ADOPTNG A3 fendm ENT AND UPDATE OF

More information

insidestory Designing plus Win a Champagne meal for two THE MIDDLESEX National Smile Week a healthy hospital How to keep your teeth sparkling white

insidestory Designing plus Win a Champagne meal for two THE MIDDLESEX National Smile Week a healthy hospital How to keep your teeth sparkling white nsdestory News from Unversty College London Hosptals NHS Trust May 2004 Natonal Smle Week How to keep your teeth sparklng whte Desgnng a healthy hosptal THE MIDDLESEX receves a royal vstor plus Wn a Champagne

More information

CITY MANAGER MEMORANDUM. Third Property Improvement Grant Program Extension Maria Bonita Building Improvements, 195 West Granada Boulevard

CITY MANAGER MEMORANDUM. Third Property Improvement Grant Program Extension Maria Bonita Building Improvements, 195 West Granada Boulevard CTY MANAGER MEMORANDUM To: The Honorable Mayor Kelley and City Commissioners Through: Joyce A. Shanahan, City Manager From: Ric Goss, ACP, Planning Director Date: February 21 212 Subject: Third Property

More information

NORTH LAS VEGAS LIBRARY DISTRICT BOARD OF TRUSTEES MEETING MINUTES

NORTH LAS VEGAS LIBRARY DISTRICT BOARD OF TRUSTEES MEETING MINUTES NORH LAS VEGAS LIBRARY DISRIC BOARD OF RUSEES MEEING MINUES September 22, 2015 Webste - http://www.ctyofnorthlasvegas.com CALL O ORDER 5:05 P.M., Cty Hall, Room 112, 2250 Las Vegas Boulevard North, North

More information

UHCLASSIFIED. Division Reports - Annex EASY V AMPHIBIOUS :ORPS LANDING FORCE. CG 3d Mar Div Report Appendix 2 - CG 4th Mar Div Report -/^(9 JIMA-

UHCLASSIFIED. Division Reports - Annex EASY V AMPHIBIOUS :ORPS LANDING FORCE. CG 3d Mar Div Report Appendix 2 - CG 4th Mar Div Report -/^(9 JIMA- V AMPHBUS :RPS LANDNG FRCE -/^(9 JMA- Appendx. Dvson Reports - CG 3d Mar Dv Report Appendx 2 - CG 4th Mar Dv Report Appendx 3 - GG sth Mar Dv Report UHCLASSFED Annex EASY MAY 945 pofu,*-?-393? k m Dvson

More information

A Multinomial Logistics Model for Perceptions on Entrepreneurship

A Multinomial Logistics Model for Perceptions on Entrepreneurship Elana Costa E Slva, Aldna Correa, Alexandra Braga, Vtor Braga A Multnomal Logstcs Model for Perceptons on Entrepreneurshp ELIANA COSTA E SILVA, ALDINA CORREIA, ALEXANDRA BRAGA AND VITOR BRAGA School of

More information

Job search methods, intensity and success in Britain in the 1990s. René Böheim. and. Mark P Taylor *) Working Paper No.

Job search methods, intensity and success in Britain in the 1990s. René Böheim. and. Mark P Taylor *) Working Paper No. DEPARTMENT OF ECONOMICS JOHANNES KEPLER UNIVERSITY OF LINZ Job search methods, ntensty and success n Brtan n the 1990s by René Böhem and Mark P Taylor *) Workng Paper No. 0206 July 2002 Johannes Kepler

More information

From: Commanding Officer, Fleet Tactical Support Squadron FORTY To : Chief of Naval Operations (OP-05D2)

From: Commanding Officer, Fleet Tactical Support Squadron FORTY To : Chief of Naval Operations (OP-05D2) FLEET TACTCAL SUPPORT SQUADRON FORTY FLEET POST OFFCE NEW YORK 09501 VRC-40115 dsb 5750 gi Ser ' 6 WR 1973 From: Commanding Officer, Fleet Tactical Support Squadron FORTY To : Chief of Naval Operations

More information

Fleet Readiness Centers

Fleet Readiness Centers Fleet Readiness Centers Recommendation: Realign Naval Air Station Oceana, VA, by disestablishing the Aircraft Intermediate Maintenance Department Oceana, the Naval Air Depot Cherry Point Detachment, and

More information

NAVFAC Hawaii Construction Outlook

NAVFAC Hawaii Construction Outlook NAVFAC Hawaii NAVFAC Hawaii Construction Outlook Stanley Shen Construction Lead Engineer NAVFAC Hawaii 10/17/2017 1 NAVFAC Hawaii Commanding Officer: CAPT Richard D. Hayes III Executive Officer: CAPT Brian

More information

HOUSEKEEPING PROFESSIONAL

HOUSEKEEPING PROFESSIONAL HOUSEKEEPING PROFESSIONAL Tranng Manual & Workbook LEVEL 1 page no. 2 3 4 5 6 7 8 9 1.1 Housekeepng 1.1.1 Health and Hygene 1.1.2 Safety 1.1.3 Safe Workng Envronments 1.1.4 Why do we Clean? 1.1.5 Hygene

More information

together SIX issue OUR Working About our Midland region In this 4 Introducing... 8 Breastfeeding REGIONAL OBJECTIVES 21%

together SIX issue OUR Working About our Midland region In this 4 Introducing... 8 Breastfeeding REGIONAL OBJECTIVES 21% M I D L A N D SUMMER 2017/18 E-NEWSLETTER Workng together In ths ssue 2 A word from the HealthShare CEO 3 Mdland Clncal Portal 4 Introducng... Davd Kooker 5 6 Health equty hu workng together to make a

More information

Living arrangement decisions for elderly care in Italy

Living arrangement decisions for elderly care in Italy Lvng arrangement decsons for elderly care n Italy Matteo Lpp Brun, Crstna Ugoln matteo.lppbrun@unbo.t crstna.ugoln@unbo.t Department of Economcs - Unversty of Bologna nd Internatonal Conference on Evdence-based

More information

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON DC

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON DC DEPARTMENT OF THE NAVY HEADQUARTERS UNTED STATES MARNE CORPS 3000 MARNE CORPS PENTAGON WASHNGTON DC 20350-3000 Canc: Aug 2017 MCBul 5603 C 116 04 AUG 2016 MARNE CORPS BULLETN 5603 From: Commandant of the

More information

Eastern Progress - 20 Jan 1972

Eastern Progress - 20 Jan 1972 Eastern Progress Eastern Progress 1971-1972 Eastern Kentucky Unversty Year 1972 Eastern Progress - 20 Jan 1972 Eastern Kentucky Unversty Ths paper s posted at Encompass. http://encompass.eku.edu/progress

More information

- - i 1 0/0 FLEET POST OFFICE, SAN FRANCISCO. 1«In compliance with references (a) and (b) preparation. 2. Commanders for the operation are an follows:

- - i 1 0/0 FLEET POST OFFICE, SAN FRANCISCO. 1«In compliance with references (a) and (b) preparation. 2. Commanders for the operation are an follows: V~tfaY~/ ' r OUN2IS& tt 7 " " " "7\ At^D f*~ffs? b Headquarters, Expedtonary Troops, Task Force 56 I,! CG FMF Pac Ser 00059 of 14 Oct 44 a Ex Trs TF 56 Adm 0 1-44 0' IWO JIMA OPERATION _ fw, - l BOWKGH^.DU)"'

More information

The UCF Report, Vol. 18 No. 1, July 14, 1995

The UCF Report, Vol. 18 No. 1, July 14, 1995 Unversty of Central Florda The UCF Report Newsletter The UCF Report, Vol. 18 No. 1, July 14, 1995 7-14-1995 Unversty of Central Florda Fnd smlar works at: http://stars.lbrary.ucf.edu/ucfreport Unversty

More information

Nevada Commission on Economic Development NVEnergy Rural Nevada Development Corporation Wells Fargo

Nevada Commission on Economic Development NVEnergy Rural Nevada Development Corporation Wells Fargo Primary Funding Partners ($100,000 or more/year) U.S. Small Business Administration University of Nevada, Reno U.S. Environmental Protection Agency Nevada Division of Environmental Protection Nevada Department

More information

November 4, 2012 Peleliu ARG Arrives in U.S. 5th Fleet

November 4, 2012 Peleliu ARG Arrives in U.S. 5th Fleet PeleNews Pelelu ARG Arrves n U.S. 5th Fleet Photo by MC3 Derek Stroop The Pelelu Amphbous Ready Group steams n formaton. The ARG conssts of USS Green Bay (LPD 20) (left) USS Pelelu (LHA 5) (center) USS

More information

Corps, Navy each plan to spend $1B on projects here in By BENJAMIN MINNICK Journal Construction Editor

Corps, Navy each plan to spend $1B on projects here in By BENJAMIN MINNICK Journal Construction Editor November 9, 2011 Corps, Navy each plan to spend $1B on projects here in 2012-13 By BENJAMIN MINNICK Journal Construction Editor Image courtesy of NAVFAC Northwest [enlarge] The biggest project in the Northwest

More information

Research Article Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off

Research Article Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off Mathematcal Problems n Engneerng, Artcle ID 937842, 10 pages http://dx.do.org/10.1155/2014/937842 Research Artcle Modellng a Nurse Shft Schedule wth Multple Preference Ranks for Shfts and Days-Off Chun-Cheng

More information

DEFENDING AMERICA'S ALLIES FROM. SHORT-RANGE SOVIET MISSILES I

DEFENDING AMERICA'S ALLIES FROM. SHORT-RANGE SOVIET MISSILES I 580 May 14,1987 DEFENDNG AMERCA'S ALLES FROM. SHORT-RANGE SOVET MSSLES. NTRODUCTON The growng Sovet short-range ballstc mssle (SRBM) threat to Unted States alles. n Western Europe, Asa, and the Mddle Eyt

More information

Advancing DePaul. Czechs endow Vincentian scholarship with $750,000 gift

Advancing DePaul. Czechs endow Vincentian scholarship with $750,000 gift Advancng DePaul SUMMER 2009 Czechs endow Vncentan scholarshp wth $750,000 gft DePaul Unversty Trustee James L. Czech (COM 61) and hs wfe, Dane Czech, recently gave $750,000 to establsh the Czech Vncentan

More information

The Gazette October 1969

The Gazette October 1969 Langston Unversty Dgtal Commons @ Langston Unversty LU Gazette, 1960-1969 LU Gazette (Student Newspaper) 10-1969 The Gazette October 1969 Langston Unversty Follow ths and addtonal works at: http://dclu.langston.edu/

More information

Fleet Logistics Center, Puget Sound

Fleet Logistics Center, Puget Sound Naval Supply Systems Command Fleet Logistics Center, Puget Sound FLEET & INDUSTRIAL SUPPLY CENTER, PUGET SOUND Gold Coast Small Business Conference August 2012 Report Documentation Page Form Approved OMB

More information

Society of American Military Engineers San Francisco Post. 14 February 2013

Society of American Military Engineers San Francisco Post. 14 February 2013 NAVFAC SOUTHWEST Society of American Military Engineers San Francisco Post 14 February 2013 LT Jeremy Schwartz, P.E., CEC, USN Resident Officer in Charge of Construction, SF BAY Mr. Franklin Fernandez

More information

US Army Corps of Engineers Los Angeles District Overview

US Army Corps of Engineers Los Angeles District Overview US Army Corps of Engineers Los Angeles District Overview 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102

More information

Greater Reno-Sparks-Tahoe Economic Development Three-Year Strategic Plan

Greater Reno-Sparks-Tahoe Economic Development Three-Year Strategic Plan Greater Reno-Sparks-Tahoe Economic Development Three-Year Strategic Plan 4.26.12 TABLE OF CONTENTS INTRODUCTION...3 COMMUNITY ASSESSMENT...5 TARGET SECTORS...7 STRATEGIES & METRICS...9 Entrepreneurial

More information

Non-Traded REITs. Olgun Fuat Sahin Minnesota State University Moorhead

Non-Traded REITs. Olgun Fuat Sahin Minnesota State University Moorhead Non-Traded REITs Olgun Fuat Sahn Mnnesota State Unversty Moorhead In ths paper, I examne dfferences between non-traded and traded REITs by usng avalable fnancal data. Fndngs ndcate that there are many

More information

U.S.CG. Station Cleveland Harbor 1055 E. 9 th ST. Cleveland OH (216)

U.S.CG. Station Cleveland Harbor 1055 E. 9 th ST. Cleveland OH (216) U.S.CG. Station Cleveland Harbor 1055 E. 9 th ST. Cleveland OH. 44114 (216) 937-0141 Updated: 13FEB 2014 District 9 Congratulations on receiving orders to Station Cleveland Harbor. We are a Search and

More information

Temporal Specificity and Task Alignment: Evidence from Patient Care

Temporal Specificity and Task Alignment: Evidence from Patient Care Paper to be presented at the DRUID 2011 on INNOVATION, STRATEGY, and STRUCTURE - Organzatons, Insttutons, Systems and Regons at Copenhagen Busness School, Denmark, June 15-17, 2011 Temporal Specfcty and

More information

The Community. p a g e 3

The Community. p a g e 3 The Airport The Department is an enterprise operation, which receives no General Fund support from the City. The Airport also has an 11-member Airport Commission, which is appointed by the Mayor and City

More information

Community Integrated Master Plan Workshop 4: CIMP Consensus Elements

Community Integrated Master Plan Workshop 4: CIMP Consensus Elements Community Integrated Master Plan Workshop 4: CIMP Consensus Elements 22 May 2010 Headquarters Marine Corps Naval Facilities Engineering Command 1 What is a CIMP? A Community Integrated Master Plan is the

More information

MARK YOUR CALENDAR IAFC 2012 CONFERENCES WWW.IAFC.ORG Global Forum For Leadership FRI 2012 FIRE-RESCUE INTERNATIONAL August 1-4, 2012 Colorado Convention Center Denver, CO www.iafc.org/fri co-located with

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J.Himmelspach, R.Pasupathy, O.Rose, and A.M.Uhrmacher, eds

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J.Himmelspach, R.Pasupathy, O.Rose, and A.M.Uhrmacher, eds Proceedngs of the 2012 Wnter Smulaton Conference C. Laroque, J.Hmmelspach, R.Pasupathy, O.Rose, and A.M.Uhrmacher, eds CALIBRATION OF A DECISION-MAKING PROCESS IN A SIMULATION MODEL BY A BICRITERIA OPTIMIZATION

More information

National Disaster Medical System (NDMS) Department of Health and Human Services

National Disaster Medical System (NDMS) Department of Health and Human Services National Disaster Medical System (NDMS) Department of Health and Human Services BRIEFING OVERVIEW ESF #8 Role in Federal Response National Disaster Medical System Local Needs - The Driving Force Emergency

More information

Washington University Record, October 11, 1979

Washington University Record, October 11, 1979 Washngton Unversty School of Medcne Dgtal Commons@Becker Washngton Unversty Record Washngton Unversty Publcatons 10-11-1979 Washngton Unversty Record, October 11, 1979 Follow ths and addtonal works at:

More information

DRT Feb 05 NIC %LVN. Iraq's Weapons of Mass. Destruction Programs

DRT Feb 05 NIC %LVN. Iraq's Weapons of Mass. Destruction Programs DRT Feb 05 %LVN NC raq's Weapons of Mass Destructon Programs July 2002 Summary raq-whch has the expertse, facltes, and equpment to expand ts WMD arsenal-s workng to reconsttute prohbted WMD programs. Snce

More information

Western Regional Partnership Overview

Western Regional Partnership Overview Western Regional Partnership Overview June 2013 Briefing Overview WRP Background Importance of Region WRP Tribal Relations Committee WRP Energy Committee WRP Region s Uniqueness 5 states stretching from

More information

_~, " I ~ I, ,~~,. t I ( . '..:::. OPERATIONAL SYSTEM DESCRIPTION ICS INCIDENT COMMAND SYSTEM PUBLICATION DECEMBER 12,1981

_~,  I ~ I, ,~~,. t I ( . '..:::. OPERATIONAL SYSTEM DESCRIPTION ICS INCIDENT COMMAND SYSTEM PUBLICATION DECEMBER 12,1981 _~, " ~, :t,~~,. t. '..:::. OPERATONAL SYSTEM DESCRPTON CS 120-1 NCDENT COMMAND SYSTEM PUBLCATON DECEMBER 12,1981 .., TABLE OF CONTENTS 1.0 NTRODUCTON 1-1,. Page 1.1 National nter-agency ncident Management

More information

Special Operations - Aerospace Pararescue and Recovery Facility (Guardian Angel Rescue Squadron [RQS]). FAC: 1444

Special Operations - Aerospace Pararescue and Recovery Facility (Guardian Angel Rescue Squadron [RQS]). FAC: 1444 Special Operations - Aerospace Pararescue and Recovery Facility (Guardian Angel Rescue Squadron [RQS]). FAC: 1444 CATCODE: 141454 OPR: AFSOC/A4I / AFIMSC Det 3 OCR: ACC/A3J ***Note: CATCODE 141454 Special

More information

US Army Corps of Engineers Los Angeles District Overview

US Army Corps of Engineers Los Angeles District Overview US Army Corps of Engineers Los Angeles District Overview 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102

More information

UNDER SECRETARY OF DEFENSE 4000 DEFENSE PENTAGON WASHINGTON, DC AUG

UNDER SECRETARY OF DEFENSE 4000 DEFENSE PENTAGON WASHINGTON, DC AUG UNDER SECRETARY OF DEFENSE 4000 DEFENSE PENTAGON WASHNGTON, DC 20301-4000 PERSONNEL AND READNESS AUG 3 1 The Honorable Carl Levin Chairman, Committee on Armed Services United States Senate Washington,

More information

THE COMBAT CENTER. Refining excellence since 1952

THE COMBAT CENTER. Refining excellence since 1952 THE COMBAT CENTER Refining excellence since 1952 When you passed through the gates of the Marine Air Ground Task Force Training Command, Marine Corps Air Ground Combat Center (Combat Center), you entered

More information

CAPABILITIES PRESENTATION

CAPABILITIES PRESENTATION CAPABILITIES PRESENTATION To: By: Accurate Engineering Integrated Construction Services, Inc. POC: Pres/CEO Aldrica Lattimore alattimore@accurateengineeringics.com 858 546-1789 1 Welcome to Accurate Engineering

More information

Military Police Staff Duty Officer hour SAPR line Marine Corps Recruit Depot

Military Police Staff Duty Officer hour SAPR line Marine Corps Recruit Depot Parris Island Depot Facilities & Services Emergency Numbers Emergency 911 Ambulance 911 After Duty Hours 911 Fire 911 Military Police 843-228-3444 Staff Duty Officer 843-228-3318 24-hour SAPR line 843-592-0646

More information

State Miitary Hospital/Clinic CLR Secure Fax Number

State Miitary Hospital/Clinic CLR Secure Fax Number 1 2 3 4 5 6 7 8 9 10 11 12 Alaska (4) Arizona (5) State Miitary Hospital/Clinic CLR Secure Fax Number Alaska 354th Medical Group-Eielson Air Force Base 3349 Central Ave. Eielson AFB, AK 99702 673rd Medical

More information

EMERGENCY SHELTER RELOCATION/EXPANSION

EMERGENCY SHELTER RELOCATION/EXPANSION We could not have gotten where we are in owning property and renovating it into a state of art emergency shelter and advocacy center without years of support and leadership that you have provided -Michelle

More information

HE!toi!.,IID<IH FOR THE PRES IDEMT. The Adequacy of NATO ' :; Conventional Forces -...~ ~- '\

HE!toi!.,IID<IH FOR THE PRES IDEMT. The Adequacy of NATO ' :; Conventional Forces -...~ ~- '\ SECRETARY OF DEFENSE WASHNGTON /. - ";'7 -{q) 2 0~ ~/~~E;-~:.-L~ ~ ~ HE!to!.,D

More information

Eastern Progress - 21 Jan 1971

Eastern Progress - 21 Jan 1971 Eastern Progress Eastern Progress 1970-1971 Eastern Kentucky Unversty Year 1971 Eastern Progress - 21 Jan 1971 Eastern Kentucky Unversty Ths paper s posted at Encompass. http://encompass.eku.edu/progress

More information

HARBOR INFRASTRUCTURE INVENTORIES Michigan City Harbor, Indiana

HARBOR INFRASTRUCTURE INVENTORIES Michigan City Harbor, Indiana HARBOR INFRASTRUCTURE INVENTORIES Michigan City Harbor, Indiana Harbor Location: Michigan City Harbor is located on the southwest shore of Lake Michigan in Michigan City, LaPorte County, Indiana approximately

More information

Eastern Progress - 23 Aug 1973

Eastern Progress - 23 Aug 1973 Eastern Progress Eastern Progress 1973-1974 Eastern Kentucky Unversty Year 1973 Eastern Progress - 23 Aug 1973 Eastern Kentucky Unversty hs paper s posted at Encompass. http://encompass.eku.edu/progress

More information

Nevada Energy Perspectives

Nevada Energy Perspectives Nevada Energy Perspectives Governor s Office of Energy www.energy.nv.gov Paul A. Thomsen Director @PaulThomsen1 @NevGoe 1 Department Overview The mission of the Governor's Office of Energy is to ensure

More information