CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION

Size: px
Start display at page:

Download "CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION"

Transcription

1 Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS Draft Aprl 2014 CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION Ths chapter provdes background for the Guam and Commonwealth for the Northern Marana Islands (CNMI) Mltary Relocaton (2012 Roadmap Adjustments) Supplemental Envronmental Impact Statement (SEIS), and descrbes the purpose and need for the proposed acton to develop a cantonment/famly housng area, a lve-fre tranng range complex (LFTRC), and supportng nfrastructure. 1.1 INTRODUCTION In September 2010, the U.S. Department of the Navy (DON) sgned a Record of Decson (ROD) (77 Federal Regster [FR] , September 30, 2010) (DON and Department of the Army 2010) regardng the 2010 Fnal Envronmental Impact Statement (EIS) for the Guam and CNMI Mltary Relocaton; Relocatng Marnes from Oknawa, Vstng Arcraft Carrer Berthng, and Army Ar and Mssle Defense Task Force (DON 2010). The ROD documented the DON s decsons regardng the 2006 Roadmap for Realgnment Implementaton, ncludng the selecton of specfc alternatves analyzed n the 2010 Fnal EIS for the man base (cantonment area), avaton, and waterfront operatons to support relocaton of approxmately 8,600 Marnes and 9,000 dependents from Oknawa to Guam. The ROD deferred a decson on the specfc ste for an LFTRC. Regardng the establshment of the cantonment area, the ROD selected an area on federal lands under the custody and control of the Department of Defense (DoD) located at the Naval Base Guam, Telecommuncatons Ste at Fnegayan 1 (herenafter Fnegayan ) and the nearby South Fnegayan Navy Housng ste, as well as non-federal land known as the former Federal Avaton Admnstraton (FAA) parcel. The 2010 Fnal EIS dentfed ths combned area as the Preferred Alternatve for establshment of the cantonment area, ncludng famly housng. In the months followng ssuance of the ROD, the DON formally commtted that f the Route 15A area was selected for the LFTRC, the DON would provde for 24-hours-a-day, 7-days-a-week access to Pågat Vllage and Pågat Cave hstorcal stes, to nclude the exstng tral from Route 15A leadng to both (DoD 2011, DON 2011; and see Appendx A). The DON, to meet ths commtment, appled a probablstc methodology to more precsely model the sze of the surface danger zone (SDZ) assocated wth the Mult-Purpose Machne Gun (MPMG) Range, whch would be part of the LFTRC. Applcaton of ths methodology reduced the sze of the overall footprnt and enabled the DON to take another look at potental LFTRC locatons on Guam. Ths reevaluaton resulted n the dentfcaton of addtonal LFTRC prelmnary alternatves. In lght of ths nformaton, the DON ntally elected to prepare an SEIS lmted solely to the evaluaton of potental mpacts assocated wth the constructon and operaton of the LFTRC on Guam (herenafter LFTRC SEIS ). The DON ssued ts Notce of Intent (NOI) to prepare the SEIS n February 2012 (77 FR 6787, February 9, 2012) (see Appendx B). In the NOI, the DON prelmnarly dentfed fve potental alternatves for the range complex: two were adjacent to Route 15 n northeastern Guam, and three were located at or mmedately adjacent to the Naval Base Guam, Muntons Ste n southern Guam 1 The names used throughout ths SEIS for specfc DoD propertes on Guam were chosen to mantan consstency n plannng and envronmental documents, and may not be the offcal ste names. 1-1

2 Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS Draft Aprl 2014 (herenafter Naval Magazne [NAVMAG] ). Publc scopng meetngs were conducted for the LFTRC SEIS n March 2012, and the publc scopng comment perod closed on Aprl 6, After the close of the publc scopng comment perod, on Aprl 27, 2012, the U.S.-Japan Securty Consultatve Commttee ssued a jont statement announcng ts decson to adjust the plans outlned n the May 2006 Roadmap for Realgnment Implementaton. In accordance wth these 2012 Roadmap Adjustments, the DoD adopted a new force posture n the Pacfc provdng for a materally smaller and reconfgured force on Guam. In conjuncton wth changes to the mx of personnel nvolved n the relocaton, the force adjustments would reduce the orgnally planned relocaton of approxmately 8,600 Marnes wth 9,000 dependents to a force of approxmately 5,000 Marnes wth approxmately 1,300 dependents. That decson prompted the DON s revew of the actons prevously planned for Guam and approved n the September 2010 ROD. Ths revew concluded that whle some actons reman unchanged as a result of the smaller force sze, others, such as the sze and locaton of the cantonment and famly housng areas, could sgnfcantly change as a result of the modfed force. Therefore, the DON publshed a new NOI on October 11, 2012 (77 FR 61746, October 11, 2012) and amended the scope of the ongong LFTRC SEIS to add those actons that materally changed as a result of the new force posture (see Appendx B, and avalable for revew at: SCOPE OF THIS SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT The DON prepared ths SEIS n accordance wth the Natonal Envronmental Polcy Act (NEPA) (42 U.S. Code [USC] 4321, et seq.) and the Councl on Envronmental Qualty s (CEQ s) mplementng regulatons (40 Code of Federal Regulatons [CFR] Parts ). Pursuant to 40 CFR , the DON prepared ths SEIS for the purpose of supplementng the portons of the 2010 Fnal EIS regardng the establshment on Guam of an LFTRC, a cantonment area, ncludng famly housng, and assocated nfrastructure to support the relocaton of a substantally reduced number of Marnes and dependents than was prevously analyzed. By supplementng the 2010 Fnal EIS, ths SEIS advances NEPA s purpose of nformng decson-makers and the publc about the envronmental effects of the DON s proposed acton. Pursuant to 40 CFR , ths SEIS ncorporates by reference the entre 2010 Fnal EIS and the September 2010 ROD. Compared to the 2010 Fnal EIS, ths SEIS evaluates the potental envronmental mpacts of constructng and operatng a smaller U.S. Marne Corps (herenafter Marne Corps ) cantonment area (ncludng famly housng), a smlarly szed LFTRC that has a smaller SDZ footprnt (based on SDZ reducton acheved by applyng the probablstc methodology to the desgn of the MPMG Range), and nfrastructure requrements to support a reduced number of relocatng Marnes and dependents than orgnally planned. The followng consderatons allowed for the development and evaluaton of addtonal stng alternatves that were not consdered feasble under the condtons evaluated n the 2010 Fnal EIS: Reducton n acreage requrements for the cantonment and famly housng areas. Reconfgured SDZ footprnt for the requred LFTRC. Consderaton of publc nput. Refnement of range desgns. Reassessment of operatonal requrements, conflcts, and opportuntes. Ths SEIS evaluates four alternatves for the cantonment/famly housng component of the proposed acton, all of whch are entrely contaned wthn federally owned land parcels and two of whch nclude locatons on Guam other than Fnegayan. In comparson, the 2010 Fnal EIS evaluated four ste alternatves for cantonment that all nvolved the use of Fnegayan, plus varous combnatons of non- 1-2

3 Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS Draft Aprl 2014 contguous parcels to accommodate the needed famly housng. Three of the four Fnegayan alternatves studed n the 2010 Fnal EIS requred the acquston of non-federal land. Ths SEIS evaluates fve alternatves for the proposed LFTRC, all of whch nclude a proposed standalone Hand Grenade (HG) Range at Andersen South. In comparson, the 2010 Fnal EIS evaluated two ste alternatves for the LFTRC, ncludng a separate proposed locaton for an HG Range at each ste alternatve. The proposed change n sze and composton of the new force structure and the reconsderaton of the LFTRC SDZ footprnt dd not affect all of the decsons that were made n the September 2010 ROD. For example, the locaton of the Avaton Combat Element (ACE), the ar embarkaton facltes (Ar Moblty Command Complex), the development of the North Gate and access road at Andersen Ar Force Base (AAFB), the wharf mprovements at the U.S. Navy (herenafter Navy ) base at Apra Harbor, and the non-lve fre and maneuver ranges on Andersen South reman unaffected by the changes n force structure resultng from the Aprl 2012 Roadmap Adjustments. These actons are not dependent on (and would not be affected by) the ultmate locatons of the cantonment/famly housng areas and LFTRC on Guam. The potental envronmental effects of these actons were fully and accurately consdered and analyzed n the 2010 Fnal EIS. For those decsons that are not affected by the new force structure, the September 2010 ROD stands as the fnal agency acton for those actons. The expanded scope of ths SEIS does not nclude the transent arcraft carrer berthng n Apra Harbor or the U.S. Army (herenafter Army ) Ar and Mssle Defense Task Force (AAMDTF). The decson regardng tranng ranges on Tnan s not affected by the 2012 Roadmap Adjustments, and remans fnal and s not subject to reanalyss n ths SEIS. However, n March of 2013 the DON publshed an NOI to prepare a combned EIS and Overseas EIS (OEIS) for proposed CNMI Jont Mltary Tranng (CJMT) (herenafter CJMT EIS ) on the slands of Tnan and Pagan. If mplemented followng completon of the CJMT NEPA process, the decson regardng proposed tranng ranges as evaluated n the CJMT EIS would supersede the 2010 ROD wth regards to Tnan range projects. Consequently, the DON has deferred any mplementaton of the Tnan tranng ranges from the 2010 ROD pendng the outcome of the CJMT EIS. 1.3 BACKGROUND Overvew of the 2010 Fnal Envronmental Impact Statement The 2010 Fnal EIS examned the envronmental effects of a varety of complex mult-servce actons, ncludng components nvolvng the Marne Corps, Navy, and Army, as well as exstng U.S. Ar Force (herenafter Ar Force ) assets on Guam. Gven ther temporal and geographc proxmty, these actons were addressed n the same EIS. However, each component s based on a dfferent natonal securty objectve, has an ndependent need for and ndependent utlty from each other, and decsons were reached or wll be reached on each component ndependently of the others. The three prmary components of the proposed actons addressed n the 2010 Fnal EIS are brefly summarzed below for each servce. A more detaled overvew s contaned n the 2010 Fnal EIS (Volume 1, Chapter 2: Overvew of Proposed Actons and Volume 6, Chapters 1 and 2: Related Actons Utltes and Roadway Projects). Marne Corps. The Marne Corps component of the 2010 Fnal EIS focused on the 2006 Roadmap for Realgnment Implementaton to relocate Marne Corps forces, and ncluded proposed development and operatons on Guam and on the sland of Tnan n the CNMI. The acton ncluded constructon and operaton of facltes and nfrastructure to support approxmately 8,600 Marnes and ther 9,

4 Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS Draft Aprl 2014 dependents to be relocated to Guam (ncludng cantonment, famly housng, communty support, and base support and admnstratve functons). These are the elements of the 2010 Fnal EIS that were revsed n the 2012 Roadmap Adjustments and are reanalyzed n ths SEIS. The 2010 Fnal EIS also ncluded constructon and operaton of other requred facltes and nfrastructure to support the Marnes relocaton to Guam (e.g., non-lve fre and maneuver ranges, lve-fre ranges on Tnan, avaton tranng areas, and several waterfront functons). These components of the acton were not affected by the 2012 Roadmap Adjustments and are not reevaluated n ths SEIS. Navy. The Navy component of the 2010 Fnal EIS ncluded constructon of a new deep-draft wharf wth shoresde nfrastructure mprovements, creatng the capablty n Apra Harbor to support extended arcraft carrer vsts. Ths component of the 2010 Fnal EIS was not affected by the 2012 Roadmap Adjustments and s not reevaluated n ths SEIS. Army. The Army component of the 2010 Fnal EIS ncluded development of facltes and nfrastructure on Guam to establsh and operate an AAMDTF to protect aganst the threat of ballstc mssle attacks on Guam. Ths component also ncluded the relocaton of approxmately 600 mltary personnel and ther 900 dependents. Ths component of the 2010 Fnal EIS was not affected by the 2012 Roadmap Adjustments and s not reevaluated n ths SEIS. Related Actons Utltes and Roadway Projects. The 2010 Fnal EIS (Volume 6: Related Actons Utltes and Roadway Projects) also evaluated a seres of related actons assocated wth the nfrastructure requrements of the varous acton components. The EIS consdered alternatves to satsfy both mmedate and long-term needs of the relocaton and to mtgate the effects of the ncreased demand on exstng utltes and roadways systems on Guam. The 2010 Fnal EIS dentfed and evaluated the potental envronmental mpacts of several alternatves wthn each of the above categores of man components and related actons, and recommended preferred alternatves for possble ncluson n the ROD. In some cases, the scope of these requrements changed as a functon of the 2012 Roadmap Adjustments, so utlty and other nfrastructure projects to support the Marne relocaton are reevaluated n ths SEIS Overvew of the 2010 Record of Decson The Assstant Secretary of the Navy for Energy, Installatons and Envronment sgned the ROD n September The results of the DON decson-makng process are descrbed below and shown n Fgure Marne Corps. In general, the ROD documented the DON s overall decson to proceed wth the Guam and CNMI Mltary Relocaton (2006 Roadmap for Realgnment Implementaton), as descrbed n the 2010 Fnal EIS. Implementaton of the relocaton would nclude: (a) development and constructon of facltes and nfrastructure to support approxmately 8,600 Marnes and approxmately 9,000 dependents beng relocated from Oknawa to Guam; and (b) development and constructon of facltes and nfrastructure to support tranng and operatons on Guam and Tnan. For some elements of the proposed acton that dd not requre a choce of alternatves, such as the proposed tranng and maneuver facltes and operatons at the NAVMAG area and at AAFB-Andersen South (herenafter Andersen South ), the ROD approved the proposed development and operatons by vrtue of ther ncluson n the overall proposed acton analyzed n the 2010 Fnal EIS. The ROD focused more specfcally on the elements of the proposed acton for whch choces needed to be made from the range of alternatves presented n the 2010 Fnal EIS. 1-4

5 Cantonment/Famly Housng Alternatve 2 Fnegayan Former FAA NWF Muntons Storage Area-1 AAFB Ar Embarkaton South Fnegayan Harmon Annex P h l p p n e S e a North Gate Access Road Ar Combat Element (ACE) Apra Harbor Wharf Improvements Non-Lve Fre Tranng Complex Andersen South Apra Medcal Clnc Ste Mltary Workng Dog Kennel Muntons Storage Alternatve A Barrgada NAVMAG NAVMAG Access Road Alternatve B Maneuver Tranng Area P a c f c O c e a n Legend DoD Property Famly Housng Cantonment Landng Zone Muntons Storage Access Road Ar Embarkaton Element Ar Combat Element Wharf Improvements Non-Lve Fre Tranng Area Mles Klometers Fgure Record of Decson: Marne Corps Relocaton Components Selected for Implementaton 1-5 Source: NAVFAC Pacfc 2013

6 Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS Draft Aprl 2014 Specfc ROD decsons for alternatves descrbed n Volume 2 of the 2010 Fnal EIS ncluded the followng: (1) selecton of a cantonment area utlzng federal lands at Fnegayan and South Fnegayan and acquston of non-federal land known as the former FAA parcel; (2) access to the NAVMAG area usng the exstng hkng tral as the access road; (3) use of Parsons Road for the locaton of addtonal ammunton storage at NAVMAG area; (4) the beddown of the Marne Corps ACE and constructon of assocated ACE facltes at AAFB North Ramp, constructon of ar embarkaton facltes at AAFB South Ramp, and constructon of the North Gate and access road at AAFB; and (5) waterfront functons at Apra Harbor to support embarkaton, ncludng wharf and utlty upgrades, assocated dredgng and dredge dsposal management, relocaton of mltary dog kennels, and constructon of a medcal/dental clnc. The ROD deferred a decson on the locaton of the LFTRC on Guam. Decsons made n the ROD relatve to Volume 3 of the 2010 Fnal EIS (Marne Corps Relocaton Tranng on Tnan) ncluded the constructon and operaton of a Platoon Battle Course and Automated Combat Pstol/Mltary Polce Frearms Qualfcaton Course, an Automated Feld Frng Range, and a Known Dstance (KD) Rfle Range. Decsons made n the ROD relatve to Volume 6 of the 2010 Fnal EIS (Related Actons Utltes and Roadway Projects) and solutons to meet requred utltes mprovements necessary to support the mltary buldup on Guam ncluded the followng: (1) power solutons, ncludng recondtonng of up to fve exstng Guam Power Authorty (GPA) combuston turbne power generaton unts, upgrades to power transmsson and dstrbuton lnes to serve mltary needs at Apra Harbor, Fnegayan, and AAFB; (2) potable water solutons, ncludng the provson of addtonal potable water capacty of 11.3 mllon gallons per day (MGd) va the development of up to 22 new DoD water wells at AAFB, rehabltaton of exstng wells, nterconnects wth the Guam Waterworks Authorty (GWA) water system, and constructon of assocated treatment, storage, and transmsson systems; (3) wastewater solutons, ncludng repars and upgrades to prmary treatment capabltes, mprovements to acheve secondary treatment standards, and expanson beyond the current desgn capacty at the Northern Dstrct Wastewater Treatment Plant (WWTP), mprovements to the Northern and Central wastewater collecton systems, and mprovements to the Agana WWTP to acheve secondary treatment standards; (4) sold waste solutons that would contnue the use of the exstng Navy Apra Harbor landfll untl completon of the new Government of Guam (GovGuam) publc landfll at Layon (snce completed); and (5) roadway mprovements, ncludng roadway wdenng, ntersecton mprovements, brdge replacements, pavement strengthenng at specfc locatons sland-wde, and mltary access ponts. Navy. The DON elected to defer selecton of a specfc ste for the constructon and operaton of a vstng arcraft carrer berth wthn Apra Harbor. The DON decded that the analyss presented n the 2010 Fnal EIS, ncludng the marne resources mpacts analyss, provded suffcent nformaton to allow the DON to make a programmatc decson to locate a vstng arcraft carrer berth generally wthn Apra Harbor, whch s the only deep draft harbor on Guam that could support such a berth. A fnal ste selecton would not occur untl a ste-specfc NEPA analyss s conducted. There are currently no plans to conduct such an analyss. Army. The Army selected the preferred alternatve as descrbed n the 2010 Fnal EIS (Volume 5: AAMDTF) and determned that t best represented how the Army could mplement the acton on Guam f the decson s made to assgn the msson to the Army and f Guam s selected from those stes under consderaton for an AAMDTF locaton. Snce the 2010 ROD, the Army has deployed a unt of the AAMDTF as part of an expedtonary force to strengthen defense capabltes for Amercan ctzens and U.S. Forces statoned on Guam. Any future plans to expand capabltes beyond the current expedtonary 1-6

7 Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS Draft Aprl 2014 status to a permanent statonng would requre a separate NEPA analyss from ths SEIS. Ths separate NEPA analyss would be completed by the Army. 1.4 PURPOSE OF AND NEED FOR THE PROPOSED ACTION The purpose of the proposed acton evaluated n ths SEIS s to ensure that the relocated Marnes are organzed, traned, and equpped as mandated by 10 USC 5063, to satsfy ndvdual lve-fre tranng requrements as descrbed n the 2010 Fnal EIS and assocated ROD, and to establsh an operatonal Marne Corps presence on Guam n accordance wth the Aprl 2012 Roadmap Adjustments. The purpose remans unchanged from the 2010 Fnal EIS, albet to support a materally smaller relocatng Marne Corps force. The proposed acton s needed to ensure consstency wth the new force posture adopted by the DoD n accordance wth the Aprl 2012 Roadmap Adjustments, whch provde for a materally smaller force on Guam than was orgnally proposed n the 2010 Fnal EIS, whle fulfllng U.S. natonal securty oblgatons to provde mutual defense, deter aggresson, and dssuade coercon n the Western Pacfc Regon. 1.5 NATIONAL ENVIRONMENTAL POLICY ACT COMPLIANCE NEPA requres federal agences to examne the envronmental effects of ther proposed actons. The DON prepared ths SEIS to assess the potental envronmental effects assocated wth the proposed acton to construct and operate an LFTRC on Guam that allows for smultaneous use of all frng ranges to support tranng and operatons of the relocated Marnes, and a cantonment area of suffcent sze and layout to provde mltary support functons, ncludng famly housng. The DON s the lead agency for preparaton of ths SEIS. The Offce of the Secretary of Defense drected the DON to establsh a Jont Guam Program Offce (JGPO) to serve as the acton proponent for the proposed acton. As the lead agency, the DON s responsble for consultaton wth other agences, for coordnaton of approprate envronmental studes and evaluatons, and for preparaton of any NEPA-related determnatons or documents n cooperaton wth other federal agences Cooperatng Agences Per 40 CFR , a cooperatng agency means any federal agency other than a lead agency whch has jursdcton by law or specal expertse wth respect to any envronmental mpact nvolved n a proposal (or a reasonable alternatve) for legslaton or other major federal actons sgnfcantly affectng the qualty of the human envronment. The followng federal agences accepted the DON s nvtaton to partcpate as cooperatng agences for ths SEIS (see Appendx C): FAA Federal Hghway Admnstraton (FHWA) U.S. Department of the Ar Force U.S. Department of Agrculture (USDA) U.S. Department of the Interor (DOI), Offce of Insular Affars U.S. Envronmental Protecton Agency (USEPA) Regon 9 1-7

8 Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS Draft Aprl 2014 The cooperatng agences agreement to partcpate n the NEPA process ncludes: (1) partcpatng n a tmely and effectve manner; (2) advsng JGPO on the scope of the proposal and analyss to be ncluded n ths SEIS; (3) provdng comments on workng drafts of ths SEIS n a tmely manner; (4) respondng to JGPO requests for nformaton; (5) partcpatng, as necessary, n dscussons on SEIS related ssues; and (6) adherng to the overall schedule as set forth by JGPO. The U.S. Fsh and Wldlfe Servce (USFWS) declned the nvtaton, but the USFWS would contnue to collaborate wth the DON through the Secton 7 consultaton process wth the DON as requred under the Endangered Speces Act, Natonal Wldlfe Refuge System Admnstraton Act, and relevant nteragency agreements Publc Involvement Notce of Intent and Publc Scopng 40 CFR defnes scopng as an early and open process for determnng the scope of ssues to be addressed and for dentfyng the sgnfcant ssues related to a proposed acton. Scopng s an mportant aspect of the NEPA process. Scopng not only nforms governmental agences, nterest groups, and the general publc about the proposed acton, but also helps the lead agency dentfy the ssues and concerns that are of partcular nterest to the affected populace. Notng the flexblty afforded by 40 CFR (c), the DON held publc scopng perods for both the LFTRC SEIS and ths SEIS for the 2012 Roadmap Adjustments due to the communty s nterest n the mltary buldup and the recognton that publc nput would be valuable n helpng to shape the range of alternatves that would be analyzed n ths SEIS. The DON publshed an NOI for the LFTRC SEIS on February 10, 2012 (77 FR 6787, February 9, 2012), ntatng a 56-day scopng perod, whch ncluded three scopng meetngs on Guam n March Over 300 people attended the three meetngs, and durng the scopng perod 151 comment letters were receved. The 151 comment letters were delneated nto 348 unque comments. Of these 348 comments, approxmately 24% of the comments related to the proposed actons and prelmnary alternatves, followed by 16% about concerns wth future recreatonal opportuntes. Other concerns ncluded potental mpacts to real estate, hstorc propertes, terrestral bology, nose, transportaton, publc health and safety, and socoeconomcs. A Scopng Summary Report was prepared and made avalable to the publc followng the February 2012 scopng perod. It s ncluded as an appendx to the Scopng Summary Report for the November 2012 scopng perod for ths SEIS (avalable on the project webste at After the scope of ths SEIS was expanded to address the 2012 Roadmap Adjustments, scopng was rentated wth the publcaton of an NOI on October 11, 2012 (77 FR 61746, October 11, 2012). Three scopng meetngs on Guam were held at the begnnng of November 2012 and were attended by a total of 241 people. Durng the 60-day scopng perod, 398 comment letters and forms were receved, ncludng 10 duplcate comments, 131 dentcal form letters from members of the Communty Advocates of the Raceway, and 52 comments from Communty Advocates of the Raceway that attached sgned pettons (collectvely totalng over 13,000 sgnatures) Summary of November 2012 Scopng Comments Durng scopng for ths SEIS, comments were receved from a varety of stakeholders and nterest groups and focused prmarly on the prelmnary alternatves and/or specfc resource ssues. The hghest percentage of comments (48%) related to concerns about the prelmnary alternatves, wth most comments focusng on the LFTRC prelmnary alternatves. Many commented on the locaton of the prelmnary LFTRC alternatves relatve to populated areas. Some comments suggested that the LFTRC 1-8

9 Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS Draft Aprl 2014 should be located on federal land. Others noted the potental mpacts assocated wth the Northwest Feld (NWF) and Route 15 LFTRC prelmnary alternatves to hstorc or cultural stes (ncludng n partcular Pågat near the Route 15 alternatves), and potental mpacts to recreatonal and commercal boatng, dvng, and fshng areas. Several commenters, ncludng those assocated wth the Communty Advocates of the Raceway, commented on the possble loss of the Guam Internatonal Raceway f the Route 15A area were selected for mplementaton and specfcally dentfed the Fnegayan and South Fnegayan areas as preferred locatons for proposed cantonment and NWF as a preferred locaton for the proposed LFTRC. Several comments suggested other alternatves, such as the CNMI, use of exstng ranges on Guam, use of exstng off-sland ranges, and an opton to splt the LFTRC nto separate ranges that could be bult on exstng federal land. Comments regardng the cantonment area prelmnary alternatves offered a varety of ndvdual preferences for a preferred alternatve. Overall, the comments recommended the use of exstng federal land for the cantonment area. Other comments suggested the use of green buldngs and renewable energy. A Scopng Summary Report was prepared and made avalable to the publc on the project webste for ths SEIS ( 1.6 ORGANIZATION OF THE SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT Ths SEIS descrbes the affected envronment and the mpact analyses for all alternatves. The organzaton of ths SEIS, focusng n partcular on the nterrelatonshps between Chapters 1 through 7, s shown n the dagram below, followed by a short descrpton of each chapter. 1-9

10 Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS Draft Aprl 2014 Chapter 1 explans the background of the Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS, and descrbes the purpose of and need for the proposed acton to develop a cantonment/famly housng area, an LFTRC, and supportng nfrastructure. Chapter 2 dentfes the alternatves that are carred forward for analyss n ths SEIS, ncludng the No-Acton Alternatve, dentfes the DON s Preferred Alternatve, and explans why certan alternatves were consdered but then elmnated from further analyss. Ths chapter also ncludes an overvew of the Best Management Practces (BMPs) that would be ncorporated nto the proposed acton and that were factored nto the mpact analyses n ths SEIS. Chapter 3 ntroduces each of the envronmental resources on Guam that are evaluated n ths SEIS. Each resource s defned n terms of ts key characterstcs and relevant ssues of concern gven the nature of the proposed acton (.e., faclty constructon, mltary base operatons and tranng) and publc nput provded durng the scopng process. The regulatory framework that exsts to preserve, protect, and dentfy potental mpacts to each resource s also descrbed, followed by the approach and mpact assessment crtera that were appled n the analyss of potental effects on each resource. Chapter 4 descrbes the affected envronment and envronmental consequences assocated wth the mplementaton of each of the cantonment/famly housng alternatves. Chapter 5 descrbes the affected envronment and envronmental consequences assocated wth the mplementaton of each of the LFTRC alternatves. Chapter 6 evaluates the addtve mpacts (.e., those n addton to the mpacts descrbed n Chapters 4 and 5) that would result when a partcular cantonment/famly housng ste alternatve s pared wth a partcular LFTRC alternatve (ncludng the effects of nstallng communcatons nfrastructure requred to connect a cantonment/famly housng area to an LFTRC and to lnk both facltes to other DoD facltes on Guam). Chapter 6 also addresses the collectve mpacts of combnng the proposed actons evaluated n ths SEIS wth those actons whch reman fnal under the 2010 ROD and are not subject to further analyss n ths SEIS (e.g., ACE facltes at AAFB, Apra Harbor wharf mprovements, ar embarkaton facltes at AAFB, tranng ranges at Andersen South). Chapter 7 dscusses the cumulatve effects of mplementng the 2012 Roadmap Adjustments n conjuncton wth those projects that remaned fnal under the 2010 ROD and other past, present, and reasonably foreseeable future projects on Guam. The DON acknowledges a general trend towards ncorporatng the cumulatve analyss nto the dscusson of drect and ndrect mpacts of an acton. However, because of the unque nature of ths SEIS (.e., t supplements a majorty of the orgnal 2010 acton, presents numerous feasble combnatons of cantonment and LFTRC alternatves, and acknowledges relevant addtve and collectve mpacts), the DON decded to address cumulatve effects n a separate chapter to facltate readablty. Chapter 8 addresses addtonal consderatons requred by NEPA. Chapter 9 provdes a lst of the references cted n ths SEIS. Chapter 10 provdes a lst of preparers of ths SEIS. Appendces cover publc nvolvement, agency consultaton, and techncal supportng documentaton. The appendces complement and expand upon the nformaton provded n ths SEIS. 1-10

CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION

CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION Ths chapter provdes background for the Supplemental Envronmental Impact Statement (SEIS) for the Guam and Commonwealth of the Northern Marana Islands

More information

Energy Efficiency and Conservation Block Grant Program

Energy Efficiency and Conservation Block Grant Program Energy Effcency and Conservaton Bloc Grant Program Natonal Assocaton of Countes Webnar Aprl 16, 2009 Johanna Zetterberg, State and Local Team Offce of Weatherzaton and Intergovernmental Programs Secretary

More information

MA C RPSBAS CAMPP D E 0

MA C RPSBAS CAMPP D E 0 G s C Z MA C RPSBAS CAMPP D E 0 Mca Camp Pendleton Marne Corps Base Camp Pendleton (MCBCP) s a unque and rreplaceable resource for mltary tranng actvtes. Located n southern Calforna about mdway between

More information

BRAMPTON. Jfc-I. 2. That staff be authorized to provide funding assistance to a maximum value of $30,000

BRAMPTON. Jfc-I. 2. That staff be authorized to provide funding assistance to a maximum value of $30,000 BRAMPTON Jfc-I Report bramptonca FI()W6r Cty Commttee of Councl Commttee of the Councl of The Corporaton of the Cty of Brampton Date: August 2, 2012 COMMITTEE OF COUNCIL Fle: Subject: C16.BR Volunteer

More information

Declaration of interests There were no declarations of interests made by those present, financial or otherwise, in any item on the agenda.

Declaration of interests There were no declarations of interests made by those present, financial or otherwise, in any item on the agenda. EASTLEIGH COLLEGE BOARD STANDARDS COMMITTEE MINUTES OF THE MEETING OF THE STANDARDS COMMITTEE WEDNESDAY 22 NOVEMBER 2017 AT 1700 HOURS IN THE HIVE, COLLEGE HOUSE Present: Mr J Course (Char) Mrs A Cross-Durrant

More information

AGENDA MEMBERS: Friday, May 25, 2012 City of Solvang - City Council Chambers 1644 Oak Street, Solvang, CA. 10:00AM - Convene Roll Call Public Comment

AGENDA MEMBERS: Friday, May 25, 2012 City of Solvang - City Council Chambers 1644 Oak Street, Solvang, CA. 10:00AM - Convene Roll Call Public Comment SANTA BARBARA COUNTY INDIAN GAMING LOCAL COMMUNITY BENEFIT COMMITTEE MEMBERS: Trbal Members: Santa Ynez Band of Chumash Indans Vncent Armenta Trbal Charman Regnald Pagalng Enrolled Trbal Member Communty

More information

Spitzer Space Telescope

Spitzer Space Telescope Sptzer Space Telescope Cycle-1 General Observer Educaton and Publc Outreach Call for Proposals Issued by the Sptzer Scence Center Calforna Insttute of Technology Pasadena, Calforna USA 15 October 2004

More information

Emergency Action Plan for. Deconstruction Operations. at 130 Liberty Street. New York, NY

Emergency Action Plan for. Deconstruction Operations. at 130 Liberty Street. New York, NY for Deconstructon Operatons at 130 Lberty Street New York, NY Lower Manhattan Development Corporaton One Lberty Plaza, 20 th Floor New York, NY 10006, TABLE OF CONTENTS SECTION 1 INTRODUCTION 1 SECTION

More information

Driver Operator Pumper

Driver Operator Pumper Fre Servce Tranng Bureau Drver Operator Pumper Certfcaton Procedures Gude Ths Certfcaton Procedure Gude reflects the requrements of NFPA 1002: Standard for Fre Apparatus Drver/Operator Professonal Qualfcatons,

More information

Welsh Government Learning Grant Further Education 2017/18

Welsh Government Learning Grant Further Education 2017/18 student fnance wales cylld myfyrwyr cymru Welsh Government Learnng Grant Further Educaton 2017/18 Fnancal Detals Form www.studentfnancewales.co.uk/wglgfe sound advce on STUDENT FINANCE /A How to complete

More information

DEVELOPING A DECISION SUPPORT SYSTEM FOR NURSE SCHEDULING AT A PUBLIC HOSPITAL IN SOUTH AFRICA

DEVELOPING A DECISION SUPPORT SYSTEM FOR NURSE SCHEDULING AT A PUBLIC HOSPITAL IN SOUTH AFRICA CIE42 Proceedngs, 6-8 July 202, Cape Town, outh Afrca 202 CIE & AIIE DEVELOPING A DECIION UPPORT YTEM FOR NURE CHEDULING AT A PUBLIC HOPITAL IN OUTH AFRICA. Fredrch * and L. van Dyk Department of Industral

More information

Fire Service. Instructor I. Certification Procedures Guide

Fire Service. Instructor I. Certification Procedures Guide Fre Servce Instructor I Certfcaton Procedures Gude Ths Certfcaton Procedure Gude reflects the requrements of NFPA 1041: Standard for Fre Servce Instructor Professonal Qualfcatons, 2012 Edton July 2018

More information

WHISTLE BLOWING HANDBOOK

WHISTLE BLOWING HANDBOOK WHISTLE BLOWING HANDBOOK Polcy Date: September 2017 Revew Date: September 2018 Char of Governors: Smon Hanson Governors Approval: 19 th September 2017 Contents 1 Introducton... 3 2 Defnton... 3 3 Prncples

More information

UNCLASSIFIED. CHAIRMAN OF THE JOINT CHIEFS OF STAFF NOTICE

UNCLASSIFIED. CHAIRMAN OF THE JOINT CHIEFS OF STAFF NOTICE UNCLASSFED. CHARMAN OF THE JONT CHEFS OF STAFF NOTCE DJ-8/SAJM DSTRBUTON: A, B, C CJCS Notce 4210 EBOLA VRUS DSEASE PRE-DEPLOYMENT TRANNG Reference( s): See Enclosure C for References 1. Purpose. Provde

More information

~ County Administrator's Signature:

~ County Administrator's Signature: Consent Agenda BOARD OF COUNTY COMMSSONERS Regular Agenda D DATE: November 18, 2014 AGENDA TEM NO. /..3 Publc Hearng D ~ County Admnstrator's Sgnature: /Subject: Recept and fle of tems delegated to the

More information

TRANSMITTAL THE COUNCIL THE MAYOR DEC Ana Guerrero. To: Date: From: TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED.

TRANSMITTAL THE COUNCIL THE MAYOR DEC Ana Guerrero. To: Date: From: TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED. TRANSMITTAL To: THE COUNCIL Date: DEC 2 8 2015 From: THE MAYOR TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED. Ana Guerrero C GARCETpr Mayor V.: BOARD OF POLICE COMMISSIONERS MATTHEW M, JOHNSON

More information

The conference will be held April 4 th, 2018 at the Eugene M. Hughes Metropolitan Complex, located at 5015 E. 29 th St. North Wichita, KS,

The conference will be held April 4 th, 2018 at the Eugene M. Hughes Metropolitan Complex, located at 5015 E. 29 th St. North Wichita, KS, Expl or ngtheev dencet oaddr ess Heal t hcar ecr ses. Sponsor / Exh b t ori nf or mat on Apr l4,2018 The Fourth Annual Evdence-Based Nursng conference serves nurse leaders at every level by showcasng the

More information

Supplemental Nursing Services Agencies 2003: A Report to the Minnesota Legislature

Supplemental Nursing Services Agencies 2003: A Report to the Minnesota Legislature 4-68 Supplemental Nursng Servces Agences 23: A Report to the Mnnesota Legslature For more nformaton, contact: Mnnesota Department ofhuman Servces Nursng Faclty Rates and Polcy Dvson 444 Lafayette Road

More information

Development of the nursing home Resident Assessment Instrument in the USA

Development of the nursing home Resident Assessment Instrument in the USA Age and Ageng I997;26-S2: 19-25 Development of the nursng home Resdent Assessment Instrument n the USA CATHERINE HAWES, JOHN N. MORRIS 1, CHARLES D. PHILLIPS 2, BRANT E. FRIES 3, KATHERINE MURPHY 1, VINCENT

More information

Subject Benchmark Statement

Subject Benchmark Statement In partnershp wth Subject Benchmark Statement Paramedcs June 2016 UK Qualty Code for Hgher Educaton Part A: Settng and mantanng academc standards Contents How can I use ths document?... 1 About Subject

More information

DEPARTMENT OF DEFENSE OFFICE OF FREEDOM OF INFORMATION 1155 DEFENSE PENTAGON WASHINGTON, DC

DEPARTMENT OF DEFENSE OFFICE OF FREEDOM OF INFORMATION 1155 DEFENSE PENTAGON WASHINGTON, DC DEPARTMENT OF DEFENSE OFFCE OF FREEDOM OF NFORMATON 1155 DEFENSE PENTAGON WASHNGTON, DC 20301-1155 JAN 1. 9 2006 Ref: 06-F-0337 Mr. Steven Aftergood Federation of American Scientists 1717 K Street, NW

More information

Living arrangement decisions for elderly care in Italy

Living arrangement decisions for elderly care in Italy Lvng arrangement decsons for elderly care n Italy Matteo Lpp Brun, Crstna Ugoln matteo.lppbrun@unbo.t crstna.ugoln@unbo.t Department of Economcs - Unversty of Bologna nd Internatonal Conference on Evdence-based

More information

Protecting, Maintaining and Improving the Health ofminnesotans

Protecting, Maintaining and Improving the Health ofminnesotans Protectng, Mantanng and mprovng the Health ofmnnesotans August 13, 2012 Ms. Carol Glbertson, Admnstrator MN Veterans Home Slver Bay 45 Banks Boulevard Slver Bay, Mnnesota 55614 Re: Enclosed Renspecton

More information

Improving the Last Stages of Life EXECUTIVE SUMMARY

Improving the Last Stages of Life EXECUTIVE SUMMARY Improvng the Last Stages of Lfe EXECUTIVE SUMMARY ABOUT THE LAW COMMISSION OF ONTARIO The Law Commsson of Ontaro (LCO) was created by an Agreement among the Law Foundaton of Ontaro, the Ontaro Mnstry of

More information

RECORD OF DECISION. Guam and CNMI Military Relocation

RECORD OF DECISION. Guam and CNMI Military Relocation RECORD OF DECISION for Guam and CNMI Military Relocation including Relocating Marines from Okinawa Transient Nuclear Aircraft Carrier Berth Air and Missile Defense Task Force Department of the Navy and

More information

STrust: A Trust Model for Social Networks

STrust: A Trust Model for Social Networks 20 Internatonal Jont Conference of IEEE TrustCom-/IEEE ICESS-/FCST- STrust: A Trust Model for Socal Networks Surya Nepal, Wanta Sherchan, Cecle Pars Informaton Engneerng Lab CSIRO ICT Centre, Australa

More information

Hospital chains. Their role in the future of the NHS. Click to launch

Hospital chains. Their role in the future of the NHS. Click to launch Hosptal chans Ther role n the future of the NHS Clck to launch Hosptal chans context and background As one of the most renowned health systems n the world, developng new models of care s not somethng that

More information

Evaluation of the Pilot Partnership between HASA and HHC-COBRA. Feasibility Report. prepared by: October 10, 2006

Evaluation of the Pilot Partnership between HASA and HHC-COBRA. Feasibility Report. prepared by: October 10, 2006 Evaluaton of the Plot Partnershp between HASA and HHC-COBRA Feasblty Report prepared by: Salle Adams Erc Dovak Terry Hamlton Aqulno Gabor October 0, 2006 Ths plot was made possble by the tremendous support

More information

YEAS: Councilman Harold Stewart, Councilman Tyler Turner, Councilman Neal Bourque Councilman David Guitreau, Councilman Kirk Boudreaux

YEAS: Councilman Harold Stewart, Councilman Tyler Turner, Councilman Neal Bourque Councilman David Guitreau, Councilman Kirk Boudreaux MINUTES OF A REGULAR MEETING OF THE MAYOR AND COUNCIL OF THE CITY OF GONZALES, STATE OF LOUISIANA TAKEN ON DECEMBER 11, 2017, 5: 30 P M AT CITY HALL, 120 S IRMA BLVD MEMBERS PRESENT: Mayor Barney Arceneaux

More information

~ ASD(M)

~ ASD(M) ". :! 111 July 13, 1965 NUMBER 5210, 48 ----------------------------,, ------------------------------- ASD(M) Department of Defense Drectve SUBJECT The Conduct of Polygraph Examnatons and the Selecton,

More information

I I I I. General Plan. I i I i i CITY OF SAN PABLO. One Alvarado Square CA San Pablo I I. August 1996

I I I I. General Plan. I i I i i CITY OF SAN PABLO. One Alvarado Square CA San Pablo I I. August 1996 CTY OF SAN PABLO General Plan CTY OF SAN PABLO One Alvarado Square CA 94806 San Pablo August 1996 RESOLUTON NO 96 11 1 RESOLUTON OF T re CTY COUNCL OF CTY OF SAN PABLO ADOPTNG A3 fendm ENT AND UPDATE OF

More information

Universal Flyer. inside. A Universal Avionics Publication

Universal Flyer. inside. A Universal Avionics Publication nsde Unversal Flyer A Unversal Avoncs Publcaton Lookng Forward Promotng Passon n Avaton Empowerng Technology Top Dealers Forge New Paths Servng for the Long Term 1 st Quarter 2017 Unversal Flyer cross

More information

Constitution, Organisation and Operating Procedures of the Council of Military Education Committees of the Universities of the United Kingdom

Constitution, Organisation and Operating Procedures of the Council of Military Education Committees of the Universities of the United Kingdom Consttuton, Organsaton and Operatng Procedures of the Councl of Mltary Educaton Commttees of the Unverstes of the Unted Kngdom FOREWORD The relatonshp between academa and HM Forces has a long hstory and

More information

Acute medical care. The right person, in the right setting first time. Report of the Acute Medicine Task Force

Acute medical care. The right person, in the right setting first time. Report of the Acute Medicine Task Force Acute medcal care The rght person, n the rght settng frst tme Report of the Acute Medcne Task Force October 2007 The Royal College of Physcans of London The Royal College of Physcans plays a leadng role

More information

AND IN THE MATTER OF The legal validity 'of the Regulations mentioned above

AND IN THE MATTER OF The legal validity 'of the Regulations mentioned above '", '" _. _ -.. ~/' // E AND N THE MATTER OF The legal valdty 'of the Regulatons mentoned above AND N THE MATTER OF The consttutonal and legal valdty of the letters dated 10-07~2012 and 16-07-2012 both

More information

Scoping Summary Report

Scoping Summary Report Final Scoping Summary Report Guam and CNMI Military Relocation (2012 Roadmap Adjustments) Supplemental Environmental Impact Statement Prepared for: Joint Guam Program Office Washington, D.C. Prepared by:

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J.Himmelspach, R.Pasupathy, O.Rose, and A.M.Uhrmacher, eds

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J.Himmelspach, R.Pasupathy, O.Rose, and A.M.Uhrmacher, eds Proceedngs of the 2012 Wnter Smulaton Conference C. Laroque, J.Hmmelspach, R.Pasupathy, O.Rose, and A.M.Uhrmacher, eds CALIBRATION OF A DECISION-MAKING PROCESS IN A SIMULATION MODEL BY A BICRITERIA OPTIMIZATION

More information

PY Allocations

PY Allocations Strateges and Actvtes Adult and Dslocated Worker Actvtes 1 WorkSource (OneStop Career) Centers Y WIB Strateges and Actvtes PY 201213 Allocatons PY 201314 Allocatons Tranng Fundng Fundng Workforce Development

More information

A Multinomial Logistics Model for Perceptions on Entrepreneurship

A Multinomial Logistics Model for Perceptions on Entrepreneurship Elana Costa E Slva, Aldna Correa, Alexandra Braga, Vtor Braga A Multnomal Logstcs Model for Perceptons on Entrepreneurshp ELIANA COSTA E SILVA, ALDINA CORREIA, ALEXANDRA BRAGA AND VITOR BRAGA School of

More information

Many countries are currently facing a challenge in terms

Many countries are currently facing a challenge in terms Health polces on target? Revew on health target settng n 18 European countres LOES M. VAN HERTEN, HARRY P.A. VAN DE WATER * Background: In 1984 the European regon of the World Health organsaton (WHO) adopted

More information

HOUSEKEEPING PROFESSIONAL

HOUSEKEEPING PROFESSIONAL HOUSEKEEPING PROFESSIONAL Tranng Manual & Workbook LEVEL 1 page no. 2 3 4 5 6 7 8 9 1.1 Housekeepng 1.1.1 Health and Hygene 1.1.2 Safety 1.1.3 Safe Workng Envronments 1.1.4 Why do we Clean? 1.1.5 Hygene

More information

ISLAND TREES PUBLIC SCHOOLS

ISLAND TREES PUBLIC SCHOOLS Phone:516-520-2164 Fox: 51 6-520-D 140 SLAND TREES PUBLC SCHOOLS DSTRCT HEALTH SERVCES, Koren M. Stephens, R.N., Dstrct Head Nurse SLAND TREES MEMORAL MDDLE SCHOOL 45 WANTAGH AVENUE SOUTH LEVTTOWN, NEW

More information

together SIX issue OUR Working About our Midland region In this 4 Introducing... 8 Breastfeeding REGIONAL OBJECTIVES 21%

together SIX issue OUR Working About our Midland region In this 4 Introducing... 8 Breastfeeding REGIONAL OBJECTIVES 21% M I D L A N D SUMMER 2017/18 E-NEWSLETTER Workng together In ths ssue 2 A word from the HealthShare CEO 3 Mdland Clncal Portal 4 Introducng... Davd Kooker 5 6 Health equty hu workng together to make a

More information

Job search methods, intensity and success in Britain in the 1990s. René Böheim. and. Mark P Taylor *) Working Paper No.

Job search methods, intensity and success in Britain in the 1990s. René Böheim. and. Mark P Taylor *) Working Paper No. DEPARTMENT OF ECONOMICS JOHANNES KEPLER UNIVERSITY OF LINZ Job search methods, ntensty and success n Brtan n the 1990s by René Böhem and Mark P Taylor *) Workng Paper No. 0206 July 2002 Johannes Kepler

More information

Table No. 9 Internet service rate - E-1 DESCRIPTION MONTHLY RATE INSTALLATION

Table No. 9 Internet service rate - E-1 DESCRIPTION MONTHLY RATE INSTALLATION 33 Cable & Wreless* Table No. 9 Internet servce rate - E-1 DESCRIPTION MONTHLY RATE INSTALLATION * Includes 100 lnes wthout addtonal cost. The rate for each addtonal lne s us$6.00 US $360.00 US $690.00

More information

Do Non-Profit Operators Provide Hig. Long-term Care Industry. Author(s) Noguchi, Haruko; Shimizutani, Satos.

Do Non-Profit Operators Provide Hig. Long-term Care Industry. Author(s) Noguchi, Haruko; Shimizutani, Satos. Do Non-Proft Operators Provde Hg TtleCare? Evdence from Mcro-Level Dat Long-term Care Industry Author(s) Noguch, Haruko; Shmzutan, Satos Ctaton Issue 2005-04 Date Type Techncal Report Text Verson publsher

More information

Research Article Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off

Research Article Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off Mathematcal Problems n Engneerng, Artcle ID 937842, 10 pages http://dx.do.org/10.1155/2014/937842 Research Artcle Modellng a Nurse Shft Schedule wth Multple Preference Ranks for Shfts and Days-Off Chun-Cheng

More information

The Incidence of Student Financial Aid: Evidence from the Pell Grant Program

The Incidence of Student Financial Aid: Evidence from the Pell Grant Program The Incdence of Student Fnancal Ad: Evdence from the Pell Grant Program Lesley Turner Unversty of Maryland October 16, 2012 1 Background and Motvaton Affordablty and access to hgher educaton Large prvate

More information

NORTH LAS VEGAS LIBRARY DISTRICT BOARD OF TRUSTEES MEETING MINUTES

NORTH LAS VEGAS LIBRARY DISTRICT BOARD OF TRUSTEES MEETING MINUTES NORH LAS VEGAS LIBRARY DISRIC BOARD OF RUSEES MEEING MINUES September 22, 2015 Webste - http://www.ctyofnorthlasvegas.com CALL O ORDER 5:05 P.M., Cty Hall, Room 112, 2250 Las Vegas Boulevard North, North

More information

UHCLASSIFIED. Division Reports - Annex EASY V AMPHIBIOUS :ORPS LANDING FORCE. CG 3d Mar Div Report Appendix 2 - CG 4th Mar Div Report -/^(9 JIMA-

UHCLASSIFIED. Division Reports - Annex EASY V AMPHIBIOUS :ORPS LANDING FORCE. CG 3d Mar Div Report Appendix 2 - CG 4th Mar Div Report -/^(9 JIMA- V AMPHBUS :RPS LANDNG FRCE -/^(9 JMA- Appendx. Dvson Reports - CG 3d Mar Dv Report Appendx 2 - CG 4th Mar Dv Report Appendx 3 - GG sth Mar Dv Report UHCLASSFED Annex EASY MAY 945 pofu,*-?-393? k m Dvson

More information

Draft Environmental Impact Statement / Overseas Environmental Impact Statement

Draft Environmental Impact Statement / Overseas Environmental Impact Statement Draft Environmental Impact Statement / Overseas Environmental Impact Statement GUAM AND CNMI MILITARY RELOCATION Relocating Marines from Okinawa, Visiting Aircraft Carrier Berthing, and Army Air and Missile

More information

Officer In Charge of Construction (OICC) Marine Corps Marianas Overview Brief for GEDA Symposium

Officer In Charge of Construction (OICC) Marine Corps Marianas Overview Brief for GEDA Symposium Officer In Charge of Construction (OICC) Marine Corps Marianas Overview Brief for GEDA Symposium 1 CAPT Dan Turner Commanding Officer February 23, 2017 Presentation Clarifying Guidance DISCLAIMER: Although

More information

. \u25a0\u25a0\u25a0\u25a0 \

. \u25a0\u25a0\u25a0\u25a0 \ I ; : Chapter 5* } MQJSJ^^ 118* The followng acton ed trerch-mortars» trench-mortar wllbe bombs,. taken regardng capturhand and rfle grenades, ncludng blnd trench-mortar fred nto our lnes* bombs and projectles

More information

Non-Traded REITs. Olgun Fuat Sahin Minnesota State University Moorhead

Non-Traded REITs. Olgun Fuat Sahin Minnesota State University Moorhead Non-Traded REITs Olgun Fuat Sahn Mnnesota State Unversty Moorhead In ths paper, I examne dfferences between non-traded and traded REITs by usng avalable fnancal data. Fndngs ndcate that there are many

More information

Analysis of Demand in Mount Salak Endah Tourism Object in Bogor Regency

Analysis of Demand in Mount Salak Endah Tourism Object in Bogor Regency EKO-REGIONAL, Vol. 12, No. 1, March 2017, pp. 32-39 Analyss of Demand n Mount Salak Endah Toursm Object n Bogor Regency By: Bunar Pandu Junor Hgh School Bogor Emal: bunaryasmo@yahoo.co.d ABSTRACT Ths research

More information

Multi-objective Nurse Scheduling Models with Patient Workload and Nurse Preferences

Multi-objective Nurse Scheduling Models with Patient Workload and Nurse Preferences Management 01, (5): 149-160 DOI: 10.59/.mm.01005.0 Mult-obectve urse Schedulng Models th Patent Workload and urse Preferences Gno J. Lm 1,, Areou Mobasher 1, Murray J. Côté 1 Department of Industral EngneerngThe

More information

Volume 30, Issue 4. Filling vacancies: Identifying the most efficient recruitment channel

Volume 30, Issue 4. Filling vacancies: Identifying the most efficient recruitment channel Volume 30, Issue 4 Fllng vacances: Identfyng the most effcent recrutment channel Mareva Sabater Unversty of Savoe Abstract Ths paper provdes new results on the recrutment behavour of frms by showng that

More information

- - i 1 0/0 FLEET POST OFFICE, SAN FRANCISCO. 1«In compliance with references (a) and (b) preparation. 2. Commanders for the operation are an follows:

- - i 1 0/0 FLEET POST OFFICE, SAN FRANCISCO. 1«In compliance with references (a) and (b) preparation. 2. Commanders for the operation are an follows: V~tfaY~/ ' r OUN2IS& tt 7 " " " "7\ At^D f*~ffs? b Headquarters, Expedtonary Troops, Task Force 56 I,! CG FMF Pac Ser 00059 of 14 Oct 44 a Ex Trs TF 56 Adm 0 1-44 0' IWO JIMA OPERATION _ fw, - l BOWKGH^.DU)"'

More information

DEFENDING AMERICA'S ALLIES FROM. SHORT-RANGE SOVIET MISSILES I

DEFENDING AMERICA'S ALLIES FROM. SHORT-RANGE SOVIET MISSILES I 580 May 14,1987 DEFENDNG AMERCA'S ALLES FROM. SHORT-RANGE SOVET MSSLES. NTRODUCTON The growng Sovet short-range ballstc mssle (SRBM) threat to Unted States alles. n Western Europe, Asa, and the Mddle Eyt

More information

WEST VIRGINIA SECRETARY OF STATE NATALIE E. TENNANT ADMINISTRATIVE LAW DIVISION

WEST VIRGINIA SECRETARY OF STATE NATALIE E. TENNANT ADMINISTRATIVE LAW DIVISION WEST VRGNA SECRETARY OF STATE NATALE E. TENNANT ADMNSTRATVE LAW DVSON rd& jot Marldn-This-Box 1-- L_LU 2DlZ JUN 28 Pt1 2: 55 Form #2._-------------------------~-------------- NOTCE OF A COMMENT PEROD ON

More information

DEPARTMENT OF THE NAVY OFFICE OF THE ASSISTANT SECRETARY (RESEARCH. DEVELOPMENT AND ACQUISITION) 1000 NAVY PENTAGON WASHINGTON DC

DEPARTMENT OF THE NAVY OFFICE OF THE ASSISTANT SECRETARY (RESEARCH. DEVELOPMENT AND ACQUISITION) 1000 NAVY PENTAGON WASHINGTON DC DEPARTMENT OF THE NAVY OFFICE OF THE ASSISTANT SECRETARY (RESEARCH. DEVELOPMENT AND ACQUISITION) 1000 NAVY PENTAGON WASHINGTON DC 20350-1000 FEB 2 4 2009 MEMORANDUM FOR DISTRIBUTION Subj: REQUEST FOR DEVIATION

More information

GROUND WEAPON SYSTEMS/EQUIPMENT (WS/E) AND AUTOMATED INFORMATION SYSTEMS (AIS) LIFE CYCLE LOGISTICS SUPPORT (LCLS) POLICY

GROUND WEAPON SYSTEMS/EQUIPMENT (WS/E) AND AUTOMATED INFORMATION SYSTEMS (AIS) LIFE CYCLE LOGISTICS SUPPORT (LCLS) POLICY DEPARTMENT OF THE NAVY HEADQUARTERS UNTED STATES MARNE CORPS 3000 MARNE CORPS PENTAGON WASHNGTON, DC 20350-3000 MCO 4105.4 LPC-1 17 Dec 12 MARNE CORPS ORDER 4105.4 Administrative Change From: To : Subj:

More information

econstor Make Your Publications Visible.

econstor Make Your Publications Visible. econstor Make Your Publcatons Vsble. A Servce of Wrtschaft Centre zbwlebnz-informatonszentrum Economcs Kuhn, Peter; Skuterud, Mkal Workng Paper Internet Job Search and Unemployment Duratons IZA Dscusson

More information

A. BUILDING S.WING 3576 PIMLICO PARKWAY. ID PREFlX TAe; F OOO! F174. It is the policy of Bluegrass Care anjl

A. BUILDING S.WING 3576 PIMLICO PARKWAY. ID PREFlX TAe; F OOO! F174. It is the policy of Bluegrass Care anjl DEPARTMENT OF HEALTH AND HUMAN SERVCES CENTERS FOR MEDCARE &. MEDCAD SERVCES STAtEMENT OF OEFJCENC1ES ANO PLAN 0 NAME O. PROVDER OR SUPPLER (X) PROVlDERSU?PLERlCLlo'. JOENTlFCAT10N NUMBER: BLUEGRASS CARE

More information

June 8, Honorable Mayor and City Council TO: Planning & Community Development Department

June 8, Honorable Mayor and City Council TO: Planning & Community Development Department June 8, 15 TO: FROM: SUBJECT: Honorable Mayor and City Council Planning & Community Development Department AUTHORZATON TO ENTER NTO A CONTRACT WTH PACFC MUNCPAL CONSULTANTS (PMC) FOR AN AMOUNT NOT TO EXCEED

More information

Marie-Odile Carrère, Nathalie Havet, Magali Morelle, Raphaël Remonnay. To cite this version:

Marie-Odile Carrère, Nathalie Havet, Magali Morelle, Raphaël Remonnay. To cite this version: Analyzng the determnants of wllngness-to-pay values for testng the valdty of the contngent valuaton method. Applcaton to home care compared to hosptal care Mare-Odle Carrère, Nathale Havet, Magal Morelle,

More information

insidestory Designing plus Win a Champagne meal for two THE MIDDLESEX National Smile Week a healthy hospital How to keep your teeth sparkling white

insidestory Designing plus Win a Champagne meal for two THE MIDDLESEX National Smile Week a healthy hospital How to keep your teeth sparkling white nsdestory News from Unversty College London Hosptals NHS Trust May 2004 Natonal Smle Week How to keep your teeth sparklng whte Desgnng a healthy hosptal THE MIDDLESEX receves a royal vstor plus Wn a Champagne

More information

Outline Natural gas, market, players and roles GAMS 1. A stochastic capacity expansion and equilibrium model for the global natural gas market

Outline Natural gas, market, players and roles GAMS 1. A stochastic capacity expansion and equilibrium model for the global natural gas market Thu March th,, F A stochastc capact expanson and eulbrum model for the global natural gas market Ruud Eggng, Wnterschool, March Ruud Eggng March, page Outlne Natural gas, market, plaers and roles GAMS

More information

Methodological Study to Develop Standard Operational Protocol on Intravenous (IV) Drug Administration For Children and to Assess its Implication

Methodological Study to Develop Standard Operational Protocol on Intravenous (IV) Drug Administration For Children and to Assess its Implication May-August, 2017/Vol 37/Issue 2 Orgnal Artcle Methodologcal Study to Develop Standard Operatonal Protocol on Intravenous (IV) Drug Admnstraton For Chldren and to Assess ts Implcaton Bjarana SK 1, San SK

More information

Rwanda Journal Series B: Social Sciences, Volume 3,

Rwanda Journal Series B: Social Sciences, Volume 3, Effect of Health Insurance on Demand for Outpatent Medcal Care n Rwanda: An Applcaton of the Control Functon Approach DOI: http://dx.do.org/10.4314/rj.v31.6b Ruhara Mulndabgw Charles, Unversty of Rwanda

More information

HE!toi!.,IID<IH FOR THE PRES IDEMT. The Adequacy of NATO ' :; Conventional Forces -...~ ~- '\

HE!toi!.,IID<IH FOR THE PRES IDEMT. The Adequacy of NATO ' :; Conventional Forces -...~ ~- '\ SECRETARY OF DEFENSE WASHNGTON /. - ";'7 -{q) 2 0~ ~/~~E;-~:.-L~ ~ ~ HE!to!.,D

More information

Federal Experience. Statement of Qualifications:

Federal Experience. Statement of Qualifications: Statement of Qualfcatons: BLM Dspatch, Reno, Nevada Naval Ar Staton, Fallon, Nevada VA Hosptal, Reno, Nevada hompson Federal Courthouse, Reno, NV USFS aylor Creek Amphtheater, CA Buckley AFB, Colorado

More information

Cuutfi' S-enAKAfl. Atsfes On Growing Thre Of ^hutomation; Asks Governor CS Commission To Act On Plan

Cuutfi' S-enAKAfl. Atsfes On Growing Thre Of ^hutomation; Asks Governor CS Commission To Act On Plan Cuutf' S-enAKAfl. Amercans Vol. XXIII, No. 46 Larg Offce Seekers Overlookng A Sleepng Gant- Cvl Servce Vote POLITICIANS seekng statewde or Federal offce have always been careful to publcly advocate the

More information

Authority: EO Chisf. ReCO~SO& Oeclass Div. WHS Oate: SEP REPORT BY TIlE J-S. t.o the. JUUI'l' CHIEFS OF STAFF

Authority: EO Chisf. ReCO~SO& Oeclass Div. WHS Oate: SEP REPORT BY TIlE J-S. t.o the. JUUI'l' CHIEFS OF STAFF ,- ".,,.., Re.,.. 2S 0. S22.a COP NO. JCS 2497/24-6 OECLAS'O N 'ULL D5TltBUTOV 3 epteaber 982 Pages - 8, ncl. Authorty: EO 3826 Chsf. ReCOSO& Oeclass Dv. WHS Oate: SEP 3 203 REPORT BY TlE J-S t.o the JUU'l'

More information

ALABAMA ASSOCIATION of EMERGENCY MANAGERS

ALABAMA ASSOCIATION of EMERGENCY MANAGERS LBM SSOCTON of EMERGENCY MNGERS ON O PCE C BELLO MER E T R O CD NCY M N L R G PROFESSONL CERTFCTON PROGRM .. E. M. CERTFCTON PROGRM 2016 RULES ND REGULTONS 1. THERE WLL BE FOUR LEVELS OF CERTFCTON. BSC,

More information

Temporal Specificity and Task Alignment: Evidence from Patient Care

Temporal Specificity and Task Alignment: Evidence from Patient Care Paper to be presented at the DRUID 2011 on INNOVATION, STRATEGY, and STRUCTURE - Organzatons, Insttutons, Systems and Regons at Copenhagen Busness School, Denmark, June 15-17, 2011 Temporal Specfcty and

More information

UNCLASSIFIED. Report on the Legal and Policy Frameworks Guiding the United States' Use of Military Force and Related National Security Operations

UNCLASSIFIED. Report on the Legal and Policy Frameworks Guiding the United States' Use of Military Force and Related National Security Operations UNCLASSFED Report on the Lega and Pocy Frameworks Gudng the Unted States' Use of Mtary Force and Reated Natona Securty Operatons Ths report s provded consstent wth Secton 1264 of the Natona Defense Authorzaton

More information

Advancing DePaul. In life and death, Munster champions women athletes

Advancing DePaul. In life and death, Munster champions women athletes Advancng DePaul Sprng 2008 In lfe and death, Munster champons women athletes The Rev. Thomas Munster, C.M. (LAS MA 54), who ded last December, bequeathed more than $300,000 n planned gft annutes to women

More information

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON DC

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON DC DEPARTMENT OF THE NAVY HEADQUARTERS UNTED STATES MARNE CORPS 3000 MARNE CORPS PENTAGON WASHNGTON DC 20350-3000 Canc: Aug 2017 MCBul 5603 C 116 04 AUG 2016 MARNE CORPS BULLETN 5603 From: Commandant of the

More information

Financing Innovation: Evidence from R&D Grants to Energy Startups. Sabrina T. Howell 1

Financing Innovation: Evidence from R&D Grants to Energy Startups. Sabrina T. Howell 1 Fnancng Innovaton: Evdence from R&D Grants to Energy Startups Sabrna T. Howell 1 September 1, 2015 s Abstract Governments regularly subsdze new ventures to spur nnovaton. Ths paper conducts the frst large-sample,

More information

RESOLUTION OF THE GOVERNMENT SERVICES COMMITTEE OF THE NAVAJO NATION COUNCIL. 21st NAVAJO NATION COUNCL -Second Year, 2008

RESOLUTION OF THE GOVERNMENT SERVICES COMMITTEE OF THE NAVAJO NATION COUNCIL. 21st NAVAJO NATION COUNCL -Second Year, 2008 GSC0-27-08 RESOLUTON OF THE GOVERNMENT SERVCES COMMTTEE OF THE NAVAJO NATON COUNCL 21st NAVAJO NATON COUNCL -Second Year, 2008 AN ACTON RELATNG TO RELATNG TO COMMUNTY DEVELOPMENT AND GOVERNMENT SERVCES;

More information

The UCF Report, Vol. 18 No. 1, July 14, 1995

The UCF Report, Vol. 18 No. 1, July 14, 1995 Unversty of Central Florda The UCF Report Newsletter The UCF Report, Vol. 18 No. 1, July 14, 1995 7-14-1995 Unversty of Central Florda Fnd smlar works at: http://stars.lbrary.ucf.edu/ucfreport Unversty

More information

THE EFFECTIVENESS OF AN INTERACTIVE MAP DISPLAY IN TUTORING GEOGRAPHY

THE EFFECTIVENESS OF AN INTERACTIVE MAP DISPLAY IN TUTORING GEOGRAPHY a BOLT B E R A N E K AND NEWMAN 'NC a W- CONSUTNG DEVEOPMENT RESEARCH / BBN REPORT NO. 3346

More information

Substitution and Crowding-Out Effects of Active Labour Market Policy

Substitution and Crowding-Out Effects of Active Labour Market Policy FRIEDRICH-ALEXANDER-UNIVERSITÄT ERLANGEN- NÜRNBERG Lehrstuhl für VWL, nsbes. Arbetsmarkt- und Regonalpoltk Professor Dr. Claus Schnabel Dskussonspapere Dscusson Papers NO. Substtuton and Crowdng-Out Effects

More information

November 4, 2012 Peleliu ARG Arrives in U.S. 5th Fleet

November 4, 2012 Peleliu ARG Arrives in U.S. 5th Fleet PeleNews Pelelu ARG Arrves n U.S. 5th Fleet Photo by MC3 Derek Stroop The Pelelu Amphbous Ready Group steams n formaton. The ARG conssts of USS Green Bay (LPD 20) (left) USS Pelelu (LHA 5) (center) USS

More information

U.S. Coast Guard. OMB No APPLICATION FOR MERCHANT MARINER CREDENTIAL (MMC) (A/fas(es) or Maiden Name(s) if applicable) 5b.

U.S. Coast Guard. OMB No APPLICATION FOR MERCHANT MARINER CREDENTIAL (MMC) (A/fas(es) or Maiden Name(s) if applicable) 5b. nterchange 3 and 4 Combine 5a, b, & c into one block Add "For Original only" Ensure consistency with other DEPARTMENT OF HOMELAND SECURTY US Coast Guard 719 Forms OMB No 1625-4 APPLCATON FOR MERCHANT MARNER

More information

UNITED STATES SPECIAL OPERATIONS COMMAND OFFICE OF THE COMMANDER 7701 TAMPA POINT BOULEVARD MACDILL AIR FORCE BASE, FLORIDA

UNITED STATES SPECIAL OPERATIONS COMMAND OFFICE OF THE COMMANDER 7701 TAMPA POINT BOULEVARD MACDILL AIR FORCE BASE, FLORIDA UNTED STATES SPECAL OPERATONS COMMAND OFFCE OF THE COMMANDER 7701 TAMPA PONT BOULEVARD MACDLL AR FORCE BASE, FLORDA 33621-5323 MEMORANDUM FOR 22 March 2013 CHEF OF STAFF, U.S. ARMY, 0200 ARMY PENTAGON,

More information

DRT Feb 05 NIC %LVN. Iraq's Weapons of Mass. Destruction Programs

DRT Feb 05 NIC %LVN. Iraq's Weapons of Mass. Destruction Programs DRT Feb 05 %LVN NC raq's Weapons of Mass Destructon Programs July 2002 Summary raq-whch has the expertse, facltes, and equpment to expand ts WMD arsenal-s workng to reconsttute prohbted WMD programs. Snce

More information

INSTALLATION GEOSPATIAL INFORMATION AND SERVICES

INSTALLATION GEOSPATIAL INFORMATION AND SERVICES DEPARTMENT OF THE NAVY HEADQUARTERS UNTED STATES MARNE CORPS 3000 MARNE CORPS PENTAGON WASHNGTON, DC 20350-3000 MCO 11000. 25A Jul. 3 2013 MARNE CORPS ORDER 11000. 25A From: To : Subj: Ref : Encl : Commandant

More information

Eastern Progress - 20 Jan 1972

Eastern Progress - 20 Jan 1972 Eastern Progress Eastern Progress 1971-1972 Eastern Kentucky Unversty Year 1972 Eastern Progress - 20 Jan 1972 Eastern Kentucky Unversty Ths paper s posted at Encompass. http://encompass.eku.edu/progress

More information

UNDER SECRETARY OF DEFENSE 4000 DEFENSE PENTAGON WASHINGTON, DC AUG

UNDER SECRETARY OF DEFENSE 4000 DEFENSE PENTAGON WASHINGTON, DC AUG UNDER SECRETARY OF DEFENSE 4000 DEFENSE PENTAGON WASHNGTON, DC 20301-4000 PERSONNEL AND READNESS AUG 3 1 The Honorable Carl Levin Chairman, Committee on Armed Services United States Senate Washington,

More information

: K nl :D 2 8 viie :

: K nl :D 2 8 viie : ^^'^"gggafe.^ : : K nl :D 2 8 ve : FO Q 6TH NF DV APO 6 800, 28 November 944 MAPS: PHLPPNu E slands, Small Scale :,000, 000. PELPPNE slands, ntermedate Scale :250,000. CENTRAL LUZON Area, Medum Scale :50,000.

More information

Trialling diagnosis-related groups classification in the Iranian health system: a case study examining the feasibility of introducing casemix

Trialling diagnosis-related groups classification in the Iranian health system: a case study examining the feasibility of introducing casemix EMHJ Vol. 16 No. 5 010 Eastern Medterranean Health Journal La Revue de Santé de la Médterranée orentale Trallng dagnoss-related groups classfcaton n the Iranan health system: a case study examnng the feasblty

More information

Specialty Tours USA. Explore the best of the

Specialty Tours USA. Explore the best of the 2016 Specalty Tours Dscover Calforna Explore Calforna Explore Calforna Junor Calforna Surf Camp Cnema Camp Actng Camp Photography Camp Outdoor Adventure Dscover New York Basketball Camp TOEFL or SAT Prep

More information

BASE VlSOT REPORT FORT SILL. OK 11 JUNE 2005

BASE VlSOT REPORT FORT SILL. OK 11 JUNE 2005 ....... --. --..........-.. -....................... -..- 11 June 25 BASE VlSOT REPORT FORT SLL. OK 11 JUNE 25 COMMSSONERS PRESENT None COMMSSON STAFF PRESENT Mike Avenick, Army Analyst List of Attendees

More information

COMMENCEMENT WEEKEND. Friday and Saturday, May 26 27, Bowdoin College

COMMENCEMENT WEEKEND. Friday and Saturday, May 26 27, Bowdoin College n COMMENCEMENT WEEKEND N Frday and Saturday, May 26 27, 2017 Bowdon College CONTENTS I GREETINGS Schedule of Events...2 Honorands...5 Weekend Dnng...6 Frequently Asked Questons...8 General Informaton...12

More information

Public policies promoting the informal economy: effects on incomes, employment and growth in Burkina Faso

Public policies promoting the informal economy: effects on incomes, employment and growth in Burkina Faso Publc polces promotng te nformal economy: effects on ncomes, employment and growt n Burkna Faso December 2015 Jean Abel Traoré * and Idrssa Moamed Ouedraogo Abstract: Ts paper ams to analyze te mpact on

More information

METRO GOLD LINE- SOTO STATION JOINT DEVELOPMENT

METRO GOLD LINE- SOTO STATION JOINT DEVELOPMENT One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro. net 12 PLANNNG AND PROGRAMMNG COMMTTEE MARCH 18, 2015 SUBJECT: ACTON: METRO GOLD LNE- SOTO STATON JONT DEVELOPMENT AUTHORZE EXECUTON

More information

USA Environmental, Inc.

USA Environmental, Inc. ------ USA Environmental, nc. - -- -=========~=::: July 14, 2004 USA-CE-OERS-895 US Army Engineering and Support Center, Huntsville ATTN: CEHNC-CT-E {Mr.Eduardo J. Marrero) 4820 University Square Huntsville,

More information

TO Approved for public release, distribution unlimited

TO Approved for public release, distribution unlimited UNCLASSFED AD NUMBER ADB191910 NEW LMTATON CHANGE TO Approved for public release, distribution unlimited FROM Distribution authorized to U.S. Gov't. agencies only; Test and Evaluation; 18 AUG 1994. Other

More information