Emergency Action Plan for. Deconstruction Operations. at 130 Liberty Street. New York, NY

Size: px
Start display at page:

Download "Emergency Action Plan for. Deconstruction Operations. at 130 Liberty Street. New York, NY"

Transcription

1 for Deconstructon Operatons at 130 Lberty Street New York, NY Lower Manhattan Development Corporaton One Lberty Plaza, 20 th Floor New York, NY 10006,

2 TABLE OF CONTENTS SECTION 1 INTRODUCTION 1 SECTION 2 PURPOSE 1 SECTION 3 LOCATION OF PLAN 1 SECTION 4 CONTRACTOR EMERGENCY COORDINATOR 2 SECTION 5 PRE EMERGENCY RESPONSE ACTIVITIES Pre-Plannng Tranng Contractor Emergency Coordnator Subcontractor Emergency Coordnator All Ste Personnel Drlls Emergency Response Coordnaton 5 SECTION 6 EMERGENCY RESPONSE MEASURES Reportng Emergences Buldng Evacuaton Desgnated Assembly Area Ste Evacuaton Process Surroundng Communty Notfcaton Key Agency Notfcaton 8 SECTION 7 RESPONSE TO SPECIFIC EMERGENCY EVENTS Fre or Exploson Power Falure Structural Falure Unplanned Release of Hazardous/Regulated Waste Medcal Emergency and Rescue Fallng or Dropped Buldng Components Protectve Measures n Place 11 SECTION 8 EAP INVESTIGATION AND REPORT 11 APPENDICES Appendx A - Emergency Response Communcaton Chart (wth contact phone numbers) (1sheet) Appendx B - Agency Contact Numbers (1 sheet) Appendx C - Evacuaton Assembly Area (1 sheet) Appendx D - Emergency Egress from Buldng (3 sheets) Appendx E - Hosptal Route Map wth Drectons (2 sheets) Appendx F Communty Notfcaton Plan

3 SECTION 1 INTRODUCTION The 130 Lberty Street ste s occuped by a 40 story, approxmately 1.4 mllon square foot offce buldng (Buldng). Interor and exteror portons of the Buldng were severely damaged and/or mpacted as a result of the collapse of the World Trade Center Towers. The Lower Manhattan Development Corporaton (LMDC) took ownershp of the Buldng on August 31, The deconstructon of the Buldng shall be performed n the followng three (3) phases Preparaton Phase Phase I Asbestos and COPC Abatement and Removal Phase II Structural Deconstructon The Preparaton Phase ncludes the erecton of scaffoldng and hosts on the full extent of the exteror of the buldng, erecton of sdewalk sheds, and the removal of exstng nettng on the exteror of the buldng. Phase I s lmted to non-structural, nteror buldng deconstructon tasks. Phase I actvtes nclude the general cleanup of asbestos and contamnants of potental concern and removal of the nteror non-structural components of the buldng. Removal of the structure s to be undertaken n Phase II. Complete detals of the work are contaned n the overall Deconstructon Plan for 130 Lberty Street. SECTION 2 PURPOSE Ths EAP s desgned to lessen the mpact of any emergency that mght occur durng the deconstructon process through proper plannng and the establshment of a sutable response structure. The Plan desgnates the approprate personnel responsble for mplementng and montorng the EAP and dentfes those who need to be contacted n the event of an emergency. It outlnes the educaton and tranng requred by all on-ste personnel so that all understand the requrements and expectatons of the EAP. Ths EAP wll apply to all contractors workng on the ste (e.g. Contractor, Abatement Subcontractor, Envronmental Consultant, Demolton Subcontractor, Mechancal Subcontractor, Electrcal Subcontractor, etc.), ther employees and any vstors to the ste. SECTION 3 LOCATION OF PLAN A copy of ths EAP wll be provded to LMDC, all Contractor employees workng at the Buldng, and all subcontractors workng on the ste. It wll be avalable at all feld offces, the Buldng Securty Desk and at the entrance to the remote personnel decontamnaton unt located n cellar A as ndcated n Secton 4 (Asbestos and COPC Abatement and Removal Plan) of the Deconstructon Plan. It wll also be provded to the,

4 followng cty, state and federal governmental agences: New York Cty Fre Department (FDNY), Polce Department (NYPD), Offce of Emergency Management (OEM), Department of Buldngs (DOB), Health Department (DOH), Department of Envronmental Protecton (DEP), Department of Transportaton (DOT), (collectvely the Cty Agences ); New York State Department of Health (NYSDOH), New York State Department of Labor (DOL) and Department of Envronmental Conservaton (DEC); and the Unted States Envronmental Protecton Agency (EPA) and Occupatonal Health and Safety Admnstraton (OSHA) (n total, the Governmental Agences ). Any questons concernng ths plan should be drected to Kate Mllea, LMDC Project Manager, Communty Development and Relatons, Ths EAP wll be revsed as necessary durng the course of the project. All revsons wll be marked by date and revson number and conveyed to all on-ste personnel, the Governmental Agences lsted above and to LMDC for dstrbuton as approprate. The EAP wll also be accessble on the LMDC webste, SECTION 4 CONTRACTOR EMERGENCY COORDINATOR The current nterm Emergency Coordnator s lsted n Attachment A. Attachment A wll be updated and nformaton provded as project staffng changes. The Contractor Emergency Coordnator holds a current New York Cty Ste Safety Manager (NYCSSM) lcense and has extensve tranng and experence n the executon of smlar work n New York Cty. The contact numbers are ndcated n Attachment A. These are the prmary Contractor emergency contact phone numbers, and both are 24-hour contact numbers. The Contractor Emergency Coordnator s base of operatons wll be the Contractor s feld offce (traler). In the event that the Contractor Emergency Coordnator s not on ste, an alternate Contractor Emergency Coordnator wll be desgnated and wll be responsble for ensurng proper mplementaton of ths EAP. The name and contact nformaton of the alternate Contractor Emergency Coordnator wll be provded to LMDC and all Subcontractor Emergency Coordnators. The Contractor Emergency Coordnator has overall responsblty for ths EAP and wll ensure that all requred actvtes of the EAP are met. In addton the Contractor Emergency Coordnator has the lead role n drectng all responses to crcumstances covered under ths EAP. Further, the Contractor Emergency Coordnator wll be the lason to the Frst Responder agences for pre-plannng collaboraton, regular contact throughout the work, notfcatons and for coordnatng the Contractor s support of any agency response to an emergency. Further detals of the responsbltes of ths role are outlned throughout ths EAP.

5 SECTION 5 PRE -EMERGENCY RESPONSE ACTIVITIES 5.1 Pre-Plannng The followng actons below wll be mplemented pror to the ntaton of the deconstructon actvtes to mnmze the potental for ncdent occurrence and to ensure proper preparaton for emergency response f needed. Pror to the commencement of work actvtes, the Contractor Emergency Coordnator wll meet wth approprate representatves from the Cty Agences to: o present and dscuss the EAP; o dscuss any requred collaboratve preparaton (practce drlls, etc.); and o ensure they are nformed regardng exstng buldng condtons as well as the potental for the removal of contamnated vctms. A complete set of Buldng drawngs wll be avalable wthn the Contractor feld offce (traler) and LMDC s offce located at 1 Lberty Plaza for use n an emergency stuaton. Copes of the drawngs wll also be provded to FDNY and DOB. As condtons change wthn the buldng that may mpact egress patterns, updated nformaton wll be added to the buldng drawngs and provded to FDNY and DOB. Note: The Contractor wll ensure drawngs ndcate the locaton of all elevator operatons and panels as well as all Fre Department connectons. All Subcontractors wll provde to the Contractor the names, contact nformaton and any requred tranng documentaton for the ndvduals they propose to fulfll the roles of the subcontractor Emergency Coordnator (and substtutes). A schedule for regular emergency preparedness meetngs wll be establshed by the Contractor Emergency Coordnator. Attendance by all Subcontractor Emergency Coordnators s requred. The LMDC and Frst Responder agences shall be nformed of the meetng schedule n advance so they have the opportunty to attend as desred. Emergency ponts of contact lst wll be posted wthn the Contractor s Feld Offce (see Appendx A), the Buldng Securty Checkpont Desk and at the entrance to the remote personnel decontamnaton unt. Ste evacuaton maps wll be posted throughout the faclty for emergency evacuaton (see Appendx D). Exts wll be clearly marked, and sgns reflectng changng egress patterns as the works proceeds wll be promnently posted. Frst ad kt(s) wll be placed wthn the Contractor s feld offce and the Buldng Securty Checkpont Desk. An automated external defbrllator (AED) wll be located wthn the Contactor feld offce. Rally ponts or meetng places have been establshed and are shown on the evacuaton map (see Appendx C).

6 The Contractor wll ensure that all subcontractors that have an on-ste feld offce traler have placed at least one (1) fre extngusher n each traler. The Contractor wll ensure fre extngushers wll be strategcally postoned at desgnated locatons wthn the Buldng as requred by governng regulatons. Note: the Contractor shall nsure that all portable fre extngushers shall be nspected perodcally and mantaned n accordance wth Mantenance and Use of Portable Fre Extngushers, NFPA No. 10A The Contractor wll ensure that a system s n place to track ste personnel and vstors to provde an accurate ste head count at any moment n tme. An audble evacuaton sgnal complant wth the most strngent regulatory requrements wll be establshed and tested daly wth documentaton of each test recorded wthn the project log by the Contractor Emergency Coordnator. o Two (2) long blasts of the ste ar horn wll sound through a temporary rado communcaton system to be nstalled and mantaned by the Demolton Subcontractor. To ensure the evacuaton alarm s audble throughout the Buldng, a loudspeaker wll be strategcally postoned on each floor. o Ths audble evacuaton sgnal wll be tested daly by the Contractor Emergency Coordnator or hs desgnee and the performance of ths test documented n the project log. o The Contractor Emergency Coordnator wll notfy LMDC n advance of the drlls so that approprate communty notfcaton can be gven consstent wth the Communty Notfcaton Plan, attached as Appendx F. o At the concluson of the test each day, all Subcontractor Emergency Coordnators wll poll ther personnel to ensure the alarm was audble n all locatons and report back to the Contractor Emergency Coordnator. o Correctve measures, f necessary, wll be mplemented mmedately. All communcatons systems wll be tested pror to the commencement of any work actvtes. Steam and Gas are beng dsconnected and capped n the street. The remanng utltes wll be cut and capped n the street as necessary,.e., water, electrc and sewer. The Contractor wll coordnate access to the ste for Con Edson. 5.2 Tranng Contractor Emergency Coordnator The Contractor s desgnated Emergency Coordnator shall hold a current NYCSSM lcense. The Contractor shall nsure that ts Emergency Coordnator or a desgnated representatve has been traned n the OSHA Dsaster Ste Worker Outreach Program Subcontractor Emergency Coordnators

7 Pror to deconstructon actvtes, all subcontractors workng on the ste wll dentfy an Emergency Coordnator and one alternate who wll be responsble for the performance of emergency preparedness responsbltes as outlned heren, ncludng coordnatng the emergency evacuaton of ther personnel. In addton, the subcontractor emergency coordnator wll be requred to assst the Contractor Emergency Coordnator wth the dssemnaton of nformaton relatng to an emergency. All desgnated Subcontractor Emergency Coordnators shall have successfully completed the OSHA 30 hour course and must provde the Contractor wth proof of ths certfcaton. All subcontractors workng on the ste shall have a mnmum of one (1) Red Cross Certfed Frst Ad traned ndvdual on the ste at all tmes. Tranng wll nclude basc frst ad, CPR, OSHA blood-borne pathogens, and use of an AED. A lst of names wth copes of ther certfcatons must be provded to the Contractor at tme of moblzaton. In addton, on a daly bass, each Subcontractor Emergency Coordnator wll be requred to desgnate one foreman and/or superntendent per actve work floor to serve as an evacuaton coordnator. In the event of an evacuaton, ths evacuaton coordnator wll be responsble for ensurng the complete evacuaton of ther personnel from the floor for whch they have responsblty. Ths evacuaton coordnator wll be requred to mantan a head count of the personnel under ther supervson All Ste Personnel Pror to the start of on-ste actvtes, all ste personnel wll be requred, at a mnmum, to attend the followng ste-specfc safety orentatons: Contractor on-ste Constructon Safety orentaton Contractor Health and Safety Plan orentaton Contractor orentaton Job Hazard Analyss (JHA) specfc tranng - to be provded by the applcable trade Subcontractor All such tranng wll be documented by the applcable tranng provder. Sgned copes of all orentaton attendance sheets, EAP acknowledgement forms and HASP acknowledgment forms must be provded to the Contractor and wll be mantaned on ste wthn the Contractor s feld offce. If ste condtons warrant a modfcaton to the EAP, all personnel workng on the ste wll be nformed of these changes ether at a general ste safety orentaton conducted by the Contractor or at the ndvdual subcontractors requred weekly toolbox talks. All personnel wll be requred to sgn an attendance sheet acknowledgng the EAP modfcaton.

8 5.2.4 Drlls The Contractor Emergency Coordnator wll be responsble for settng up and coordnatng spontaneous drlls of ths. For the duraton of the deconstructon work, such spontaneous drlls nvolvng all occupants of the buldng wll occur as warranted. The Contractor Emergency Coordnator wll notfy LMDC n advance of the drlls so that approprate communty notfcaton can be gven consstent wth the Communty Notfcaton Plan, attached as Appendx F. 5.3 Emergency Response Coordnaton The Contractor Emergency Coordnator wll functon as the on-ste representatve to the Frst responders (e.g. FDNY, NYPD, etc.) n the event of an emergency. The man securty check pont at the Buldng, located at Washngton and Albany Streets, has been desgnated as the locaton for frst responders to meet the Contractor Emergency Coordnator to be brefed on the scope and nature of the emergency. Durng an emergency whch requres actvaton of ths the Contractor Emergency Coordnator wll be clearly dentfed by means of a reflectve vest. Ths vest wll promnently dsplay the words Contractor Emergency Coordnator on both the front and back. As part of pre-plannng actvtes the Contractor wll meet wth the Cty Agences pror to the commencement of any work. The Contractor wll provde the Cty Agences wth nformaton on the type and locaton of hazardous materals that may be n the Buldng. By provdng ths nformaton pror to the commencement of work actvtes, the Frst responders wll be able to address any specal PPE requrements necessary for conductng emergency rescue servces wthn the Buldng. The Contractor Emergency Coordnator wll obtan Ste Personnel logs from each Subcontractor Emergency Coordnator on a daly bass by 7:30am. These wll be updated throughout the day as personnel arrve at or leave the ste. These logs wll be used by the Contractor Emergency Coordnator n the event of an emergency to account for all trade personnel. SECTION 6 EMERGENCY RESPONSE MEASURES Ths secton descrbes the actons that wll be taken n the event of an on-ste emergency to mnmze the effect of that "event" or emergency on on-ste personnel, the neghborng communty and the envronment. 6.1 Reportng Emergences All ste personnel, upon dscoverng an emergency stuaton, shall mmedately call 911. The Contractor Emergency Coordnator shall be notfed mmedately thereafter and wll assume responsblty as the onste representatve to the Frst Responders.

9 The Contractor Emergency Coordnator shall mmedately notfy LMDC. LMDC, wll, as necessary actvate the communty notfcaton plan. Refer to Appendx F for Communty Plan. Refer to Appendx A for a copy of the pont of contact flow chart. 6.2 Buldng Evacuaton Any exploson, regardless of sze or type, any structural falure, fres and certan power falures wll requre a complete buldng evacuaton. 911 wll be notfed n the event of an evacuaton. 6.3 Desgnated Assembly Area In the event of an evacuaton the desgnated assembly ponts for ste personnel are: o #1 Edgar Street between Trnty Place and Greenwch Street o #2 Southwest corner of Rector Street and Washngton Street Durng the EAP orentaton, all personnel wll be nstructed to locate and assemble n a manner that wll not mpede the operatons of any busness or agency n the area. No vstors or trade personnel shall leave the assembly pont untl drected by the Contractor Emergency Coordnator. Followng an evacuaton, nobody shall be allowed to re-enter the Buldng untl cleared by approprate Frst Responder, safety, agency or techncal personnel nvestgatng the mpact of the ncdent to the Buldng. The Contractor Emergency Coordnator wll provde the all clear sgnal to the Subcontractor Emergency Coordnators once t s safe to return to normal work operatons. 6.4 Ste Evacuaton Process The Contractor Emergency Coordnator wll be responsble, n conjuncton wth the applcable Subcontractor Emergency Coordnators, to ntate the followng procedures. The Contractor Emergency Coordnator wll: Call 911 Sgnal the audble evacuaton alarm (two (2) long blasts of the ste ar horn wll sound through the Buldng s temporary rado communcaton system). Contact all Subcontractor Emergency Coordnators va cellular phone and/or ste rado system to nform them of the nature and locaton of the emergency and the actons beng ntated ncludng whether t s safe for personnel evacuatng the Buldng to decontamnate. Retreve the daly Vstor Logs and daly Ste Personnel Log Desgnate a Contractor employee to account for all logged vstors at the assembly ponts, the Contractor Securty Detal wll manage entry and ext to ste. Overall

10 accountablty wll be the responsblty of the Contractor Emergency Coordnator. Support and coordnate wth Frst Responders as drected/requested The Subcontractor Emergency Coordnator wll: Secure all manpower (e.g., safely stop work) Secure all operatng equpment Assst n the removal of personnel under ther supervson from the Buldng (the desgnated evacuaton coordnators shall perform a sweep to ensure that everyone has left ther floor of responsblty before extng the floor themselves) If condtons allow, ensure all personnel properly decontamnate Ensure personnel under ther control proceed to the closest assembly pont and reman there to awat further drecton Conduct a head count of ther personnel at each locaton 6.5 Surroundng Communty Notfcaton The Contractor Emergency Coordnator wll mmedately notfy LMDC of an emergency stuaton resultng n the mplementaton of any aspect of ths EAP. In emergency stuatons where Frst Responders wll assume control, all communty notfcatons wll be coordnated wth the Frst Responders Incdent Commander. In stuatons where that s not the case, LMDC wll determne and mplement approprate notfcaton to the communty pursuant to the Communty Notfcaton Plan attached as Appendx F. The Contractor Emergency Coordnator wll advse, cooperate, partcpate, assst and provde support as requested by LMDC n communty notfcaton efforts. 6.6 Key Agency Notfcaton In the event of an emergency stuaton resultng n the mplementaton of any aspect of ths EAP, LMDC wll notfy the approprate Government Agences as warranted by the stuaton. SECTION 7 RESPONSE TO SPECIFIC EMERGENCY EVENTS Below s a lst of unplanned events that may occur durng the deconstructon project. Ths lst may not be all encompassng, but represents events related to smlar projects. These events nclude: Fre or exploson Power falure Structural falure Unplanned, sudden or non-sudden release of hazardous waste or consttuents Worker njury or llness Fallng or dropped buldng debrs Work Stoppages or demonstratons.

11 7.1. Fre or Exploson In the event of an exploson or a fre, the Contractor Emergency Coordnator shall mmedately: 7.2 Power Falure Call 911 Meet Frst responders at the predesgnated locaton (unless crcumstances dctate otherwse, t s the securty desk at the Buldng) for brefng on the scope and nature of the emergency Notfy LMDC In the event of a power falure, the Contractor Emergency Coordnator shall mmedately: Call 911, f warranted Notfy on ste Electrcan to evaluate ssue Start Emergency Generator Coordnate wth the Abatement Subcontractor Emergency Coordnator to ntate contanment solaton actvtes (e.g. both the Personnel and Waste Load Out Decontamnaton unts must be mmedately sealed to prevent a fber release). Coordnate wth the Abatement Subcontractor Emergency Coordnator to ntate back-up power generaton. All contanment solaton barrers are to reman secure untl the requred negatve pressure has been re-establshed. 7.3 Structural Falure In the event of a structural falure, the Contractor Emergency Coordnator shall mmedately: Call 911 Intate, ncludng Buldng evacuaton procedures 7.4 Unplanned Release of Hazardous/Regulated Waste In the event of an unplanned release of a hazardous and/or regulated waste, the Contractor Emergency Coordnator shall, n conjuncton wth the responsble party, the Envronmental Consultant, and others as approprate shall make a determnaton whether to mplement a Buldng evacuaton or control and remedate the release. No untraned personnel shall attempt to remedate any release of hazardous/regulated wastes. Specfc procedures for notfcaton to the approprate regulatory agences and remedatng any releases are addressed n the Deconstructon Plan.

12 In accordance wth the New York State Asbestos Rules, f vsble emssons occur outsde the work area or any ar sample wthn the buldng but outsde the work area ndcates a level of fber concentraton at or greater than the 0.01 fbers per cubc centmeter or background levels, work shall stop for nspecton and repar of barrers and clean-up of surfaces. Any barrers dsturbed wll be restored, and clean up of surfaces outsde the work area usng HEPA vacuums and/or wet-cleanng methods, shall be performed pror to the resumpton of abatement actvty. Work wll not resume untl the onste Envronmental Consultant verfes that approprate correctve actons have been taken. Arborne levels of asbestos fbers outsde the work area wll be closely montored to ensure that they are below background /acton levels. In addton, ths project wll have n place an exteror ar samplng program, as presented n Secton 2- Ambent Ar Montorng Program of the Deconstructon Plan. Per ths plan, the USEPA Regon 2 offce, NYCDEP, NYSDEC and the NYSDOL wll be notfed promptly of any exceedance of ether a Target Ar Qualty Level or a USEPA Ste Specfc Trgger Level and wll be notfed of any correctve actons taken n connecton wth the Target Ar Qualty Level exceedance and the mplementaton of correctve actons n connecton wth USEPA Ste Specfc Trgger Level exceedance. If exteror ambent ar montorng detects any potental contamnants of concern (COPC) as dentfed wthn Secton 2 (Ambent Ar Montorng Program) of the Deconstructon Plan above the USEPA Ste Specfc Trgger Levels, all work wthn the Buldng wll stop and the USEPA Regon 2, NYSDOL and NYSDEP wll be notfed wth regards to the exceedance and the mplemented correctve measures. Work wll not start untl a cause of the release has been determned and correctve measures have been undertaken. For any releases of hazardous/regulated wastes to the exteror of the Buldng, the Contractor Emergency Coordnator shall call 911. LMDC wll also notfy EPA, NYSDOL, DEP, OSHA, DEC and DOB. 7.5 Medcal Emergency and Rescue Potental njures that may result n a medcal emergency nclude: Slps, trps, falls, laceratons Trauma njures caused by beng struck by heavy equpment, buldng components, waste contaners, etc. Eye njures Burns from electrcal, fre or exploson Electrcal contact or electrocuton Heat stress/stroke Chemcal exposures Cardac emergences Respratory emergences

13 The Contractor and ts subcontractors wll respond to mnor njures requrng frst ad only; major njures or requrements for search and rescue wll be handled by Frst Responders. If a worker s showng sgns of dstress or obvous njury or llness, the applcable trade Subcontractor Emergency Coordnator shall mmedately notfy the Contractor Emergency Coordnator and provde the followng nformaton: Locaton of vctm Nature of Emergency Whether the vctm s conscous Specfc detals regardng the njury or llness Whether the vctm s n need of decontamnaton The Contractor Emergency Coordnator wll suspend work wthn the mmedate area untl the emergency stuaton has been corrected. If possble the subcontractors frst ad attendant shall treat the njured employee as necessary untl a decson s made to seek outsde medcal assstance or to remove the vctm from the Buldng. The Contractor Emergency Coordnator wll be responsble for callng 911 and wll nform the Frst Responders whether asbestos abatement actvtes are takng place wthn the Buldng, and whether or not the njured employee has been brought through the decontamnaton chamber. Upon arrval at the Buldng, qualfed Frst Responders wll make a decson to enter nto the project work area or request that the applcable Subcontractor Emergency Coordnator and personnel remove the vctm from the Buldng. In addton, the qualfed Frst Responder wll determne the extent of emergency decontamnaton to be performed, f any, dependng on the severty of the njury or llness. If the njury or llness s such that emergency decontamnaton of the vctm cannot be performed safely, the vctm shall be gven necessary frst-ad treatment and wrapped n a blanket pror to transportaton to emergency medcal servces. 7.6 Fallng or Dropped Buldng Components Ths secton wll address procedures that must be followed n the event that any buldng component(s), constructon materal(s), equpment, etc. has ether unntentonally been dropped, falls or has the potental to fall from the buldng: Call 911 f warranted The applcable Subcontractor Emergency Coordnator must mmedately notfy the Contractor Emergency Coordnator ether verbally or va cellular telephone.

14 The Contractor Emergency Coordnator shall mmedately contact LMDC va cellular phone and verbally nform them of the stuaton as well as the correctve measures. LMDC wll notfy DEP, NYSDOL, EPA, OSHA and DEC. The Contractor Emergency Coordnator wll contact NYC Department of Buldngs Protectve Measures n Place The followng protectve measures are currently beng utlzed at the ste to reduce rsks assocated wth the potental for buldng components to drop/fall from the Buldng: Plywood constructon fence to restrct ste access Sdewalk closures and/or nstallaton of overhead protecton 24/7 securty guards on-ste (fre watch actvtes, general ste securty around the Buldng permeter, Buldng access) Survey of buldng exteror and selectve removal of spandrel glass n danger of fallng from buldng. The Contractor Emergency Coordnator (or other Contractor desgnee) wll be responsble for ensurng these protectve measures reman ntact and mplementng any correctve measures. SECTION 8 EAP INVESTIGATION AND REPORT The Contractor Emergency Coordnator n conjuncton wth the nvolved trade contractor shall commence an nvestgaton mmedately after stablzaton of the emergency. The Contractor standard protocols for accdent nvestgaton shall be followed. The detals of the nvestgaton procedures are contaned wthn the standard protocol. The Contractor wll cooperate and assst any agency also nvestgatng the ncdent. Wthn twenty-four (24) hours of the emergency a revew meetng wll be held. Ths revew meetng wll nclude an evaluaton of the emergency, response to the emergency acton and, f necessary, address the need to modfy any emergency acton protocols. The applcable trade contractors wll be requred to prepare a wrtten analyss of the emergency as well as provde recommended correctve measures. The Contractor Emergency Coordnator wll use ths nformaton to prepare the report whch shall be submtted to LMDC wthn forty-eght (48) hours of the revew meetng. Implementaton of any correctve measures shall take place mmedately. LMDC wll be nformed of all nvestgaton related events n advance so they have the opportunty to attend as they deem approprate. If warranted communty brefngs wll occur as outlned n the Communty Notfcaton Plan at Appendx F.

15

16 APPENDIX A

17 EMERGENCY RESPONSE COMMUNICATION CHART On-Ste Emergency Coordnator Lus Mendes LMDC Drector of Constructon 24 Hour Emergency Contact Number FIRST RESPONDERS 911 Contractor URS Project Manager Jame Danels C: Medcal Emergency: NY Downtown Hosp. 175 Wllams St. New York, NY New York Cty Ste Safety Manager Lcense No. 525 Amy Peterson O: Davd Rdley O: LMDC Desgnated LMD Representatves (per monthly schedule) LMDC Communty Lason Kate Mllea O: PUBLIC

18 APPENDIX B

19 Agency Contact Informaton MEDICAL EMERGENCY POLICE DEPARTMENT NYU Downtown 1st Precnct 69 Gold St # 15f 16 Ercsson Place New York, NY New York, NY BURNS US DEPARTMENT OF LABOR (OSHA) The NY Hosptal--Cornell Medcal Center Gl Gllen 525 East 68th Street 345 Hudson Street New York, NY New York, NY EYE INJURY DEPARTMENT OF BUILDINGS (NYC) New York Ear & Eye Infrmary Robert Lulo 310 E. 14th Street 280 Broadway New York, NY New York, NY Emergency number: AMBULANCE FDNY ADM. CHIEF INSPE.: (B.E.S.T. SQUAD) Telephone number: 911 Rudy Hahn FIRE DEPARTMENT EMERGENCY 210 Joralemon Street, Room 819 Dspatch: or 911 Brooklyn, NY NYS DEPT. OF ENVIRONMENTAL CONSERVATION US ENVIRONMENTAL PROTECTION AGENCY Pat Evangelsta ORA/NYC RRO, Regon Bdwy, 26th floor NY Rchard Fram th Ave. Long Island Cty, NY NYS DEPARTMENT OF ENVIRONMENTAL PROTECTION Krsh Radhakrshnan Juncton Blvd. 8th floor Flushng, NY NYS DEPARTMENT OF LABOR Chrstopher G. Alonge, P.E. State Offce Buldng Campus Albany, NY

20 APPENDIX C

21 130 Lberty Street Emergency Evacuaton Assembly Locatons 130 Lberty Street Assembly Pont - Southwest corner of Rector Street and Washngton Street Assembly Pont Edgar Street between Trnty Place and Greenwch Street

22 APPENDIX D

23 Emergency Egress from Buldng Ground Floor Layout Washngton Street EXIT N Albany Street Lberty Street Star A Star B DE-CON AREA Greenwch Street,

24 Emergency Egress from Buldng Typcal Floor Layout - Floors 1 thru 24 Washngton Street N Emergency Egress Star A Emergency Egress Star B Greenwch Street,

25 Emergency Egress from Buldng Typcal Floor Layout - Floors 25 thru 39 Washngton Street N Emergency Egress Star A Greenwch Street * Standppe s located n Star A,

26 , APPENDIX E

27 Hosptal Drectons Wth Route Map Hosptal Drectons When an njury occurs, the on-ste Glbane Emergency Coordnator (or ther desgnee) shall determne the response actons. If based on the severty of the njury, emergency response personnel shall not be summoned; the njured personnel should be taken to NYU Downtown Hosptal, 69 Gold Street, # 15F, New York, NY. The hosptal s approxmately 0.9 mles from the ste. The approxmate travel tme between 130 Lberty Street and NYU Downtown Hosptal s 4 mnutes, dependng on the traffc. A map showng the route to the hosptal s provded below. Drectons to the hosptal from the 130 Lberty Street are: 1. Start out gong SOUTH on GREENWICH ST toward CEDAR ST 2. Turn LEFT onto RECTOR ST 3. Turn LEFT onto TRINITY PL 4. TRINITY PL becomes CHURCH ST 5. Turn RIGHT onto VESEY ST 6. VESEY ST becomes ANN ST 7. Turn LEFT onto GOLD ST,

28 ROUTE TO THE HOSPITAL FROM 130 LIBERTY STREET Start: End: 130 Lberty St NYU Downtown Hosptal [ ] New York, NY Gold St # 15f New York, NY 10038

29 Appendx F Communty Notfcaton Plan Addendum 02: v Secton 3_EAP doc-06/14/05

30 Communty Notfcaton Plan Addendum to the at 130 Lberty Street New York, NY Lower Manhattan Development Corporaton One Lberty Plaza, 20 th Floor New York, NY : v Secton 3_EAP doc-06/14/05

31 TABLE OF CONTENTS Secton 1 Secton 2 Introducton...1 Purpose of Communty Notfcaton Plan Addendum...1 Secton 3 Roles and Responsbltes Contractor Emergency Coordnator LMDC Frst Responders Regulatory Agences Battery Park Cty CERT Team The Publc...3 Secton 4 Notfcaton Mechansms Mass Notfcaton Lberty Street E-Updates Lberty Street Incdent Alerts Lberty Street Informaton Hotlne Meda Notfcaton Communty Flyers Communty Brefngs...6 Secton 5 Notfcaton Protocols On-ste Incdent Wth No Impact to Surroundng Area Cty Emergency Neghborhood Impact Emergency Ar Montorng Exceedance...7 Secton 6 Emergency Contact Informaton...8 Secton 7 Non-Emergency Contact Informaton :001980_LW10_10 Secton 3_EAP doc-06/14/05

32 The purpose of the Communty Notfcaton Plan Addendum to the 130 Lberty Street s to outlne the communty notfcaton protocol that the LMDC wll mplement n the event of an emergency ncdent at the 130 Lberty Street ste. Secton 1 Introducton On December 13, 2004 the Lower Manhattan Development Corporaton (LMDC) submtted for regulatory revew a Draft Phase I Deconstructon Plan ( Plan ) for the cleanng, abatement, and deconstructon of the buldng located at 130 Lberty Street. The (EAP) for Phase I actvtes s contaned n Secton 3 of the Plan. The EAP has been desgned to mtgate aganst and lessen the mpact of any emergency that mght occur durng the deconstructon process through proper plannng and the establshment of a sutable response structure. The EAP also desgnates the approprate personnel responsble for mplementng the EAP and dentfes emergency response personnel and agency representatves that need to be contacted n the event of an emergency. It s a requred document that s to be mplemented by all contractors and consultants and followed by any onste vstors workng on the deconstructon ste n the event of an ncdent. The LMDC receved numerous comments from the regulatory agences as well as the publc on the December 13 Draft Phase I Plan. Subsequently, on May 12, 2005 LMDC provded a revsed Draft Phase I Deconstructon Plan for the cleanng, abatement, and deconstructon of the 130 Lberty Street buldng for regulator revew. The May 12, 2005 revsed plan ncorporates comments that LMDC had receved. Secton 2 Purpose of Communty Notfcaton Plan Addendum In response to comments that the LMDC receved from the publc, the LMDC has developed a Communty Notfcaton Plan Addendum to the EAP. The Communty Notfcaton Plan Addendum ( Addendum ) s a supplement to the EAP and complements the protocols already establshed by the EAP. It outlnes the communty notfcaton protocol that the LMDC wll mplement n the event of an ncdent at the 130 Lberty ste durng cleanng and deconstructon actvtes. The Addendum defnes the roles and responsbltes of the LMDC and ther contractors, frst responder and regulatory agences, and the publc and addresses the necessary protocol for broader communty notfcaton concernng on-ste ncdents. The Addendum s a lvng document and wll be revsed and updated throughout the duraton of the 130 Lberty Street deconstructon project. The Addendum apples to all busnesses, resdents, regulatory agences, and vstors vstng the Lower Manhattan area, defned as the geographc area TBD. The Phase I Deconstructon Plan, ncludng the EAP and ths Communty Notfcaton Plan Addendum, s avalable for revew by regulatory agences and the publc and can be vewed on LMDC s webste at 1

33 In the event of an ncdent requrng frst response actvtes, the Frst Response agences, the NYC Offce of Emergency Management, FDNY, and the NYPD, wll be the prmary decson makers regardng requred mmedate response actons to safely contan the ncdent. All communty communcatons wll be coordnated through the Incdent Command emergency management system. Secton 3 Roles and Responsbltes The followng paragraphs outlne the roles and responsbltes of the on-ste Contractor Emergency Coordnator, the LMDC, frst responders, regulatory agences, the local communty emergency response team (CERT), and the publc durng emergency events at the 130 Lberty Street ste. 3.1 Contractor Emergency Coordnator The Contractor s desgnated Emergency Coordnator has the overall responsblty for mplementng the EAP and wll ensure that all requrements mposed by the EAP are met. The Contractor Emergency Coordnator s the desgnated lason to the Frst Responder agences and wll mmedately notfy the desgnated LMDC representatve should an emergency event occur. 3.2 LMDC Desgnated LMDC representatves durng emergency response actons nclude the Drector of Constructon, Constructon Project Manager, and Senor Vce Presdent of Memoral, Cultural, and Cvc Development. Upon notfcaton of an emergency event by the Contractor Emergency Coordnator, the desgnated LMDC representatve wll contact, the LMDC Communty Lason to ntate the emergency communcatons process. Ms. Mllea wll mantan an open communty notfcaton and communcatons process by provdng nformaton as t becomes avalable to the surroundng communty. Ths wll be accomplshed va several mechansms, descrbed below n Secton 4.0. LMDC staff, wth assgned responsbltes under ths Addendum, are requred to revew the EAP and ths Addendum n order to be famlar wth, understand and be prepared to carry out the procedures contaned wthn t. Appendx A of the EAP dentfes key LMDC staff and llustrates ntal emergency response communcatons between on-ste deconstructon contractors, the LMDC, and the publc. 3.3 Frst Responders In the event of an ncdent requrng emergency response actvtes, frst responder agences, ncludng the Offce of Emergency Management (OEM), New York Cty Fre Department (FDNY), and the New York Polce Department (NYPD), wll be the prmary decson makers regardng the mmedate response actons needed to safely contan the ncdent. Once the stuaton has been controlled, the frst response agences wll work wth the regulatory agences and LMDC on approprate protocols for mplementng safety measures. 2

34 3.4 Regulatory Agences The desgnated LMDC representatve wll notfy the regulatory agences of an ncdent occurrng at the 130 Lberty Street buldng (see the Emergency Response Communcatons flowchart n Appendx A of the Phase I Deconstructon Plan). These agences nclude U.S. Envronmental Protecton Agency, U.S. Occupatonal Health and Safety Admnstraton, New York State Department of Envronmental Conservaton, New York State Department of Labor, New York State Department of Health, New York Cty Department of Envronmental Protecton, and New York Cty Department of Buldngs. The regulatory agences wll coordnate ther necessary expertse regardng partcular ncdents to ensure that approprate protocols are followed and ncorporated n response to the ncdent. Regulatory agences wll defer to the frst response agences n the event of a large-scale ncdent and work wth the frst responders and LMDC on the protocol for the longer-term response and mtgaton. For addtonal nformaton on Battery Park Cty CERT, please vst: Prepare ahead of tme by: Becomng famlar wth your buldng evacuaton plans; Vstng OEM s Ready New York webste at m/html/readynewyork /home.html Knowng area emergency phone numbers; Preparng Go Bags; and Preparng emergency supples. 3.5 Battery Park Cty CERT Team The New York Cty Communty Emergency Response Team s a communty-based volunteer organzaton that nforms, educates, and trans communty resdents about dsaster preparedness. In the event of an emergency at the 130 Lberty Street buldng, the Battery Park Cty CERT team wll assst frst response agences by provdng emergency support personnel. The Battery Park Cty Cert team has forged a strong partnershp wth resdental buldngs and busnesses n Battery Park Cty and has expanded ther area of coverage to solct volunteer members, and offer emergency response servces n and around the 130 Lberty Street vcnty. 3.6 The Publc On-ste contractors wll be located at the 130 Lberty Street buldng on a 24-hour bass, conductng deconstructon actvtes or provdng securty durng nonworkng hours. Because of the project ste s proxmty to resdental and busness areas n Lower Manhattan, the communty lvng and workng adjacent to 130 Lberty Street wll be contnuous observers of project actvtes. As a result, they wll become famlar wth day-to-day actvtes and the contractors conductng these actvtes. LMDC encourages neghborhood resdents and employees to report unfamlar actvtes or suspcous persons. If an emergency event s observed, please call 911 or the LMDC 24-Hour Emergency Hotlne at

35 In lght of the many steps taken n New York Cty to encourage publc awareness and preparedness, and the ntatves supported by OEM, LMDC encourages all resdents n Lower Manhattan, ncludng neghborhood resdents and busnesses to take a moment and confrm that they are prepared. Ths nvolves lookng at what they have done or need to do to prepare themselves, ther famly or colleagues, and ther place of resdence and/or work n the event of any knd of emergency that may occur. There are no specfc or dfferent steps to be taken to prepare for 130 Lberty Street deconstructon actvtes the Cty recommends an all-hazards approach to evaluatng personal preparedness. Steps may nclude: Becomng famlar wth ther buldng evacuaton plans; Vstng New York Cty s OEM s webste at for Ready New York Materals; Knowng area emergency phone numbers; Preparng Go Bags; and Preparng emergency supples. Secton 4 Notfcaton Mechansms Durng emergency events n whch Frst Responders assume full control, all communcaton notfcatons wll be coordnated through the Incdent Command to ensure that accurate nformaton s beng released. In stuatons where LMDC has retaned full control of the emergency ncdent, LMDC wll notfy and dssemnate all avalable nformaton to the surroundng communty. Communty notfcatons wll be accomplshed through several means, as descrbed below. Sgn up to receve 130 Lberty Street E-Updates and Incdent Alerts at: com/newsletter/ regulatory offcals. 4.1 Mass Notfcaton LMDC s currently nvestgatng the use of a mass notfcaton system. A mass notfcaton system wll allow LMDC to send an emergency message to communty members smultaneously through phone, pager, and emal wthn mnutes of placng the ntal call or message. Ths system enables the surroundng communty to mmedately receve pertnent nformaton regardng an emergency, thereby reducng the rsk for mscommuncaton and/or speculaton. Mass notfcaton wll lkely be provded to communty resdents, tenant assocatons, busnesses, area buldng management, schools, communty facltes, elected offcals, and non-frst responder 4

36 Once a mass notfcaton system has been dentfed and brought onlne, LMDC wll work wth neghborng resdents, busnesses, and other communty groups to obtan up-to-date contact nformaton Lberty Street E-Updates In the summer of 2004, LMDC developed an electronc database of emal addresses n order to dssemnate nformaton regardng the 130 Lberty Street deconstructon project, ncludng meetng notces and project updates. LMDC wll contnue to use ths lst serve (130 Lberty Street E-Updates) to provde project-status updates to all subscrbers. To sgn up for the E- Updates, please vst LMDC s webste at: Lberty Street Incdent Alerts Smlar to E-Updates, Incdent Alerts wll be dssemnated electroncally va emal. The Incdent Alerts wll notfy users of an emergency and provde the status and measures taken to mtgate the emergency event. Incdent Alerts notfcatons are more serous than the E-Updates and wll state so n the Subject Header lne. Recpents of the Incdent Alerts wll nclude those who subscrbe to the E-Update lst serve. To sgn up for the E-Updates and Incdent Alerts please vst LMDC s webste at In the event of an emergency, LMDC wll notfy you by: Mass notfcaton va telephone, pager, or emal; Incdent Alerts va emal; 130 Lberty Street E- Updates; Pre-recorded messages on the 130 Lberty Street Informaton Hotlne; Meda news releases; Communty Flyers; and Lberty Street Informaton Hotlne The LMDC s currently explorng the creaton of a dedcated tollfree hotlne, avalable 24 hours a day. The hotlne wll contan prerecorded messages for area resdents, buldng owners, busnesses, and vstors to obtan nformaton on all actvtes, project- or emergency-related, occurrng at the 130 Lberty Street buldng. The hotlne wll contan a pre-recorded message that provdes the status of actvtes currently occurrng. Follow-up messages wll be recorded as on-ste actvtes change or, n the case of an emergency event, once the stuaton has been mtgated and ncdent response complete. No lve voce wll be avalable to answer questons on ths hotlne number. 4.5 Meda Notfcaton Durng an emergency, LMDC wll provde regular emergency ncdent updates to newspapers and local rado statons and televson statons untl the ncdent has been safely mtgated. Contact nformaton for the LMDC wll also be provded n all meda releases. Communty Brefngs. 5

37 4.6 Communty Flyers The LMDC wll provde notces, flyers, and/or posters to area resdental and commercal buldngs after an ncdent occurs. Durng non-emergency events, communty flyers wll provde project nformaton on the 130 Lberty Street project and LMDC contact nformaton. Durng emergency ncdents, flyers wll provde ncdent updates as well as LMDC contact nformaton. 4.7 Communty Brefngs Once the emergency event has come under safe control or has been mtgated, the LMDC wll hold nformal communty brefngs to provde a status of the ncdent, an overvew of response actvtes, and any addtonal steps by LMDC to further mtgate the stuaton or smlar future stuatons. Secton 5 Notfcaton Protocols 5.1 On-ste Incdent Wth No Impact to Surroundng Area On-ste emergency ncdents wth no mpact on the surroundng area nclude worker njures and/or rescue, on-ste power falure, or contaned fres. LMDC Notfcaton Actons: Immedately ssue E-Updates to the subscrbers of the 130 Lberty lst serve. The purpose of the E-Update s to notfy area resdents that an on-ste ncdent has occurred and to reassure resdents that no mpact on the surroundng area has occurred. Update recordng on toll-free hotlne to provde the status of the ncdent. If an emergency event s observed at the 130 Lberty Street buldng, please call: 911 LMDC 24-Hour Emergency Hotlne Cty Emergency Cty emergences are cty-wde ncdents. These nclude power outages, water man breaks, and weather-related emergences. If the cty emergency were assocated wth the project ste, the Contractor Emergency Coordnator would call Frst Responder agences, f necessary, and mmedately notfy the desgnated LMDC representatve of the ncdent. LMDC Notfcaton Actons: Immedately ssue E-Updates to the subscrbers of the 130 Lberty lst serve. The purpose of the E-Update s to notfy area resdents that a cty emergency has occurred and to nform resdents of the status of the buldng at 130 Lberty Street. Update recordng on toll-free hotlne to provde the status of the ncdent. 6

38 For nformaton on the 130 Lberty Street project durng Non- Emergency perods, please call: 311 Kate Mllea, LMDC Communty Lason: Neghborhood Impact Emergency Neghborhood mpact emergences are those ncdents that could put the communty at rsk. Such ncdents could, for example consst of structural falure, or fre. Emergency response personnel would be vsble on-ste. LMDC wll rely on the New York Cty emergency response agences for Frst Responder actvtes. Emergency response agences wll arrve at the scene, assess the stuaton, and mplement the requred operatng procedures to safely mtgate the emergency. All communty notfcaton wll be coordnated through the Incdent Command emergency management system. LMDC Actons: Support Frst Response agences and coordnate all communcatons through Incdent Command. Actvate mass notfcaton system. LMDC wll actvate the mass notfcaton system for all subscrbers, ncludng area resdents, busnesses, schools, communty organzatons, and regulatory and elected offcals close to the project ste to notfy them of the ncdent and ntal frst response actvtes mplemented by Frst Responders. Immedately ssue an Incdent Alert to the subscrbers of the 130 Lberty Street lst serve. Update the recordng on the toll-free nformaton hotlne to provde the status of the ncdent. Issue E-Updates wth necessary follow-up nformaton about the ncdent. Develop meda releases. LMDC wll develop meda releases for newspapers, rado, and/or televson statons. Post flyers throughout the communty descrbng the ncdent and the measures employed n response to the ncdent. Convene a communty brefng, open to members of the publc, to dscuss the ncdent, what was done n response to the event, and answer any questons that the communty may have, f necessary. 5.4 Ar Montorng Exceedance If ar montorng trgger levels are exceeded durng project actvtes, LMDC wll notfy U.S. Envronmental Protecton Agency Regon 2, New York Cty Department of Envronmental Protecton, New York State Department of Envronmental Conservaton, and New York State 7

39 Department of Labor. Emergency response personnel would not be requred on-ste. Montorng and response actons wll be consstent wth those outlned Secton 2 Ambent Ar Montorng Program n the revsed Phase I Deconstructon Plan. LMDC Notfcaton Actons: For general Lower Manhattan constructon nformaton, please vst: nfo Immedately ssue an Incdent Alert to the subscrbers of the 130 Lberty Street lst serve. Update the recordng on the toll-free nformaton hotlne to provde the status of ar exceedances. Follow up wth an E-Update to provde the status on ar montorng levels. Contnue to Publsh Ar Montorng Data on Convene a communty brefng, open to members of the publc, to dscuss the ar montorng levels, what was done n response to the exceedances, and answer any questons that the communty may have, f necessary. Secton 6 Emergency Contact Informaton If you are a wtness to an emergency nvolvng the 130 Lberty Street Buldng, please call: 911; or The LMDC 24 Hour Emergency Hotlne at Secton 7 Non-Emergency Contact Informaton For general nformaton on the project at 130 Lberty Street or any other constructon project n Lower Manhattan, please call 311. For general 130 Lberty Street Buldng nqures Monday - Frday, 9 am to 5 pm, please call or emal: Kate Mllea, 130 Lberty Communty Lason Telephone: Emal: kmllea@renewnyc.com 8

EMERGENCY RESPONSE COMMUNICATION CHART

EMERGENCY RESPONSE COMMUNICATION CHART APPENDIX A EMERGENCY RESPONSE COMMUNICATION CHART Scaffolding Emergency Coordinator* Paul Mazzucca Regional Scaffolding 24 Hour Emergency Contact Number 917-807-9992 Alt: Ted Tworzydlo/ Cell: 917-881-1788

More information

Energy Efficiency and Conservation Block Grant Program

Energy Efficiency and Conservation Block Grant Program Energy Effcency and Conservaton Bloc Grant Program Natonal Assocaton of Countes Webnar Aprl 16, 2009 Johanna Zetterberg, State and Local Team Offce of Weatherzaton and Intergovernmental Programs Secretary

More information

WHISTLE BLOWING HANDBOOK

WHISTLE BLOWING HANDBOOK WHISTLE BLOWING HANDBOOK Polcy Date: September 2017 Revew Date: September 2018 Char of Governors: Smon Hanson Governors Approval: 19 th September 2017 Contents 1 Introducton... 3 2 Defnton... 3 3 Prncples

More information

Protecting, Maintaining and Improving the Health ofminnesotans

Protecting, Maintaining and Improving the Health ofminnesotans Protectng, Mantanng and mprovng the Health ofmnnesotans August 13, 2012 Ms. Carol Glbertson, Admnstrator MN Veterans Home Slver Bay 45 Banks Boulevard Slver Bay, Mnnesota 55614 Re: Enclosed Renspecton

More information

Spitzer Space Telescope

Spitzer Space Telescope Sptzer Space Telescope Cycle-1 General Observer Educaton and Publc Outreach Call for Proposals Issued by the Sptzer Scence Center Calforna Insttute of Technology Pasadena, Calforna USA 15 October 2004

More information

Fire Service. Instructor I. Certification Procedures Guide

Fire Service. Instructor I. Certification Procedures Guide Fre Servce Instructor I Certfcaton Procedures Gude Ths Certfcaton Procedure Gude reflects the requrements of NFPA 1041: Standard for Fre Servce Instructor Professonal Qualfcatons, 2012 Edton July 2018

More information

BRAMPTON. Jfc-I. 2. That staff be authorized to provide funding assistance to a maximum value of $30,000

BRAMPTON. Jfc-I. 2. That staff be authorized to provide funding assistance to a maximum value of $30,000 BRAMPTON Jfc-I Report bramptonca FI()W6r Cty Commttee of Councl Commttee of the Councl of The Corporaton of the Cty of Brampton Date: August 2, 2012 COMMITTEE OF COUNCIL Fle: Subject: C16.BR Volunteer

More information

Driver Operator Pumper

Driver Operator Pumper Fre Servce Tranng Bureau Drver Operator Pumper Certfcaton Procedures Gude Ths Certfcaton Procedure Gude reflects the requrements of NFPA 1002: Standard for Fre Apparatus Drver/Operator Professonal Qualfcatons,

More information

Welsh Government Learning Grant Further Education 2017/18

Welsh Government Learning Grant Further Education 2017/18 student fnance wales cylld myfyrwyr cymru Welsh Government Learnng Grant Further Educaton 2017/18 Fnancal Detals Form www.studentfnancewales.co.uk/wglgfe sound advce on STUDENT FINANCE /A How to complete

More information

TRANSMITTAL THE COUNCIL THE MAYOR DEC Ana Guerrero. To: Date: From: TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED.

TRANSMITTAL THE COUNCIL THE MAYOR DEC Ana Guerrero. To: Date: From: TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED. TRANSMITTAL To: THE COUNCIL Date: DEC 2 8 2015 From: THE MAYOR TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED. Ana Guerrero C GARCETpr Mayor V.: BOARD OF POLICE COMMISSIONERS MATTHEW M, JOHNSON

More information

HOUSEKEEPING PROFESSIONAL

HOUSEKEEPING PROFESSIONAL HOUSEKEEPING PROFESSIONAL Tranng Manual & Workbook LEVEL 1 page no. 2 3 4 5 6 7 8 9 1.1 Housekeepng 1.1.1 Health and Hygene 1.1.2 Safety 1.1.3 Safe Workng Envronments 1.1.4 Why do we Clean? 1.1.5 Hygene

More information

CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION

CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION Guam and CNMI Mltary Relocaton (2012 Roadmap Adjustments) SEIS Draft Aprl 2014 CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION Ths chapter provdes background for the Guam and Commonwealth for the

More information

DEPARTMENT OF DEFENSE OFFICE OF FREEDOM OF INFORMATION 1155 DEFENSE PENTAGON WASHINGTON, DC

DEPARTMENT OF DEFENSE OFFICE OF FREEDOM OF INFORMATION 1155 DEFENSE PENTAGON WASHINGTON, DC DEPARTMENT OF DEFENSE OFFCE OF FREEDOM OF NFORMATON 1155 DEFENSE PENTAGON WASHNGTON, DC 20301-1155 JAN 1. 9 2006 Ref: 06-F-0337 Mr. Steven Aftergood Federation of American Scientists 1717 K Street, NW

More information

CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION

CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION CHAPTER 1 PURPOSE OF AND NEED FOR THE PROPOSED ACTION Ths chapter provdes background for the Supplemental Envronmental Impact Statement (SEIS) for the Guam and Commonwealth of the Northern Marana Islands

More information

Declaration of interests There were no declarations of interests made by those present, financial or otherwise, in any item on the agenda.

Declaration of interests There were no declarations of interests made by those present, financial or otherwise, in any item on the agenda. EASTLEIGH COLLEGE BOARD STANDARDS COMMITTEE MINUTES OF THE MEETING OF THE STANDARDS COMMITTEE WEDNESDAY 22 NOVEMBER 2017 AT 1700 HOURS IN THE HIVE, COLLEGE HOUSE Present: Mr J Course (Char) Mrs A Cross-Durrant

More information

UNCLASSIFIED. CHAIRMAN OF THE JOINT CHIEFS OF STAFF NOTICE

UNCLASSIFIED. CHAIRMAN OF THE JOINT CHIEFS OF STAFF NOTICE UNCLASSFED. CHARMAN OF THE JONT CHEFS OF STAFF NOTCE DJ-8/SAJM DSTRBUTON: A, B, C CJCS Notce 4210 EBOLA VRUS DSEASE PRE-DEPLOYMENT TRANNG Reference( s): See Enclosure C for References 1. Purpose. Provde

More information

The conference will be held April 4 th, 2018 at the Eugene M. Hughes Metropolitan Complex, located at 5015 E. 29 th St. North Wichita, KS,

The conference will be held April 4 th, 2018 at the Eugene M. Hughes Metropolitan Complex, located at 5015 E. 29 th St. North Wichita, KS, Expl or ngtheev dencet oaddr ess Heal t hcar ecr ses. Sponsor / Exh b t ori nf or mat on Apr l4,2018 The Fourth Annual Evdence-Based Nursng conference serves nurse leaders at every level by showcasng the

More information

MA C RPSBAS CAMPP D E 0

MA C RPSBAS CAMPP D E 0 G s C Z MA C RPSBAS CAMPP D E 0 Mca Camp Pendleton Marne Corps Base Camp Pendleton (MCBCP) s a unque and rreplaceable resource for mltary tranng actvtes. Located n southern Calforna about mdway between

More information

~ County Administrator's Signature:

~ County Administrator's Signature: Consent Agenda BOARD OF COUNTY COMMSSONERS Regular Agenda D DATE: November 18, 2014 AGENDA TEM NO. /..3 Publc Hearng D ~ County Admnstrator's Sgnature: /Subject: Recept and fle of tems delegated to the

More information

~ ASD(M)

~ ASD(M) ". :! 111 July 13, 1965 NUMBER 5210, 48 ----------------------------,, ------------------------------- ASD(M) Department of Defense Drectve SUBJECT The Conduct of Polygraph Examnatons and the Selecton,

More information

ISLAND TREES PUBLIC SCHOOLS

ISLAND TREES PUBLIC SCHOOLS Phone:516-520-2164 Fox: 51 6-520-D 140 SLAND TREES PUBLC SCHOOLS DSTRCT HEALTH SERVCES, Koren M. Stephens, R.N., Dstrct Head Nurse SLAND TREES MEMORAL MDDLE SCHOOL 45 WANTAGH AVENUE SOUTH LEVTTOWN, NEW

More information

AGENDA MEMBERS: Friday, May 25, 2012 City of Solvang - City Council Chambers 1644 Oak Street, Solvang, CA. 10:00AM - Convene Roll Call Public Comment

AGENDA MEMBERS: Friday, May 25, 2012 City of Solvang - City Council Chambers 1644 Oak Street, Solvang, CA. 10:00AM - Convene Roll Call Public Comment SANTA BARBARA COUNTY INDIAN GAMING LOCAL COMMUNITY BENEFIT COMMITTEE MEMBERS: Trbal Members: Santa Ynez Band of Chumash Indans Vncent Armenta Trbal Charman Regnald Pagalng Enrolled Trbal Member Communty

More information

Acute medical care. The right person, in the right setting first time. Report of the Acute Medicine Task Force

Acute medical care. The right person, in the right setting first time. Report of the Acute Medicine Task Force Acute medcal care The rght person, n the rght settng frst tme Report of the Acute Medcne Task Force October 2007 The Royal College of Physcans of London The Royal College of Physcans plays a leadng role

More information

STrust: A Trust Model for Social Networks

STrust: A Trust Model for Social Networks 20 Internatonal Jont Conference of IEEE TrustCom-/IEEE ICESS-/FCST- STrust: A Trust Model for Socal Networks Surya Nepal, Wanta Sherchan, Cecle Pars Informaton Engneerng Lab CSIRO ICT Centre, Australa

More information

Evaluation of the Pilot Partnership between HASA and HHC-COBRA. Feasibility Report. prepared by: October 10, 2006

Evaluation of the Pilot Partnership between HASA and HHC-COBRA. Feasibility Report. prepared by: October 10, 2006 Evaluaton of the Plot Partnershp between HASA and HHC-COBRA Feasblty Report prepared by: Salle Adams Erc Dovak Terry Hamlton Aqulno Gabor October 0, 2006 Ths plot was made possble by the tremendous support

More information

PY Allocations

PY Allocations Strateges and Actvtes Adult and Dslocated Worker Actvtes 1 WorkSource (OneStop Career) Centers Y WIB Strateges and Actvtes PY 201213 Allocatons PY 201314 Allocatons Tranng Fundng Fundng Workforce Development

More information

A. BUILDING S.WING 3576 PIMLICO PARKWAY. ID PREFlX TAe; F OOO! F174. It is the policy of Bluegrass Care anjl

A. BUILDING S.WING 3576 PIMLICO PARKWAY. ID PREFlX TAe; F OOO! F174. It is the policy of Bluegrass Care anjl DEPARTMENT OF HEALTH AND HUMAN SERVCES CENTERS FOR MEDCARE &. MEDCAD SERVCES STAtEMENT OF OEFJCENC1ES ANO PLAN 0 NAME O. PROVDER OR SUPPLER (X) PROVlDERSU?PLERlCLlo'. JOENTlFCAT10N NUMBER: BLUEGRASS CARE

More information

together SIX issue OUR Working About our Midland region In this 4 Introducing... 8 Breastfeeding REGIONAL OBJECTIVES 21%

together SIX issue OUR Working About our Midland region In this 4 Introducing... 8 Breastfeeding REGIONAL OBJECTIVES 21% M I D L A N D SUMMER 2017/18 E-NEWSLETTER Workng together In ths ssue 2 A word from the HealthShare CEO 3 Mdland Clncal Portal 4 Introducng... Davd Kooker 5 6 Health equty hu workng together to make a

More information

YEAS: Councilman Harold Stewart, Councilman Tyler Turner, Councilman Neal Bourque Councilman David Guitreau, Councilman Kirk Boudreaux

YEAS: Councilman Harold Stewart, Councilman Tyler Turner, Councilman Neal Bourque Councilman David Guitreau, Councilman Kirk Boudreaux MINUTES OF A REGULAR MEETING OF THE MAYOR AND COUNCIL OF THE CITY OF GONZALES, STATE OF LOUISIANA TAKEN ON DECEMBER 11, 2017, 5: 30 P M AT CITY HALL, 120 S IRMA BLVD MEMBERS PRESENT: Mayor Barney Arceneaux

More information

. \u25a0\u25a0\u25a0\u25a0 \

. \u25a0\u25a0\u25a0\u25a0 \ I ; : Chapter 5* } MQJSJ^^ 118* The followng acton ed trerch-mortars» trench-mortar wllbe bombs,. taken regardng capturhand and rfle grenades, ncludng blnd trench-mortar fred nto our lnes* bombs and projectles

More information

NORTH LAS VEGAS LIBRARY DISTRICT BOARD OF TRUSTEES MEETING MINUTES

NORTH LAS VEGAS LIBRARY DISTRICT BOARD OF TRUSTEES MEETING MINUTES NORH LAS VEGAS LIBRARY DISRIC BOARD OF RUSEES MEEING MINUES September 22, 2015 Webste - http://www.ctyofnorthlasvegas.com CALL O ORDER 5:05 P.M., Cty Hall, Room 112, 2250 Las Vegas Boulevard North, North

More information

Subject Benchmark Statement

Subject Benchmark Statement In partnershp wth Subject Benchmark Statement Paramedcs June 2016 UK Qualty Code for Hgher Educaton Part A: Settng and mantanng academc standards Contents How can I use ths document?... 1 About Subject

More information

Constitution, Organisation and Operating Procedures of the Council of Military Education Committees of the Universities of the United Kingdom

Constitution, Organisation and Operating Procedures of the Council of Military Education Committees of the Universities of the United Kingdom Consttuton, Organsaton and Operatng Procedures of the Councl of Mltary Educaton Commttees of the Unverstes of the Unted Kngdom FOREWORD The relatonshp between academa and HM Forces has a long hstory and

More information

Improving the Last Stages of Life EXECUTIVE SUMMARY

Improving the Last Stages of Life EXECUTIVE SUMMARY Improvng the Last Stages of Lfe EXECUTIVE SUMMARY ABOUT THE LAW COMMISSION OF ONTARIO The Law Commsson of Ontaro (LCO) was created by an Agreement among the Law Foundaton of Ontaro, the Ontaro Mnstry of

More information

Hospital chains. Their role in the future of the NHS. Click to launch

Hospital chains. Their role in the future of the NHS. Click to launch Hosptal chans Ther role n the future of the NHS Clck to launch Hosptal chans context and background As one of the most renowned health systems n the world, developng new models of care s not somethng that

More information

I I I I. General Plan. I i I i i CITY OF SAN PABLO. One Alvarado Square CA San Pablo I I. August 1996

I I I I. General Plan. I i I i i CITY OF SAN PABLO. One Alvarado Square CA San Pablo I I. August 1996 CTY OF SAN PABLO General Plan CTY OF SAN PABLO One Alvarado Square CA 94806 San Pablo August 1996 RESOLUTON NO 96 11 1 RESOLUTON OF T re CTY COUNCL OF CTY OF SAN PABLO ADOPTNG A3 fendm ENT AND UPDATE OF

More information

DEVELOPING A DECISION SUPPORT SYSTEM FOR NURSE SCHEDULING AT A PUBLIC HOSPITAL IN SOUTH AFRICA

DEVELOPING A DECISION SUPPORT SYSTEM FOR NURSE SCHEDULING AT A PUBLIC HOSPITAL IN SOUTH AFRICA CIE42 Proceedngs, 6-8 July 202, Cape Town, outh Afrca 202 CIE & AIIE DEVELOPING A DECIION UPPORT YTEM FOR NURE CHEDULING AT A PUBLIC HOPITAL IN OUTH AFRICA. Fredrch * and L. van Dyk Department of Industral

More information

Living arrangement decisions for elderly care in Italy

Living arrangement decisions for elderly care in Italy Lvng arrangement decsons for elderly care n Italy Matteo Lpp Brun, Crstna Ugoln matteo.lppbrun@unbo.t crstna.ugoln@unbo.t Department of Economcs - Unversty of Bologna nd Internatonal Conference on Evdence-based

More information

Table No. 9 Internet service rate - E-1 DESCRIPTION MONTHLY RATE INSTALLATION

Table No. 9 Internet service rate - E-1 DESCRIPTION MONTHLY RATE INSTALLATION 33 Cable & Wreless* Table No. 9 Internet servce rate - E-1 DESCRIPTION MONTHLY RATE INSTALLATION * Includes 100 lnes wthout addtonal cost. The rate for each addtonal lne s us$6.00 US $360.00 US $690.00

More information

Job search methods, intensity and success in Britain in the 1990s. René Böheim. and. Mark P Taylor *) Working Paper No.

Job search methods, intensity and success in Britain in the 1990s. René Böheim. and. Mark P Taylor *) Working Paper No. DEPARTMENT OF ECONOMICS JOHANNES KEPLER UNIVERSITY OF LINZ Job search methods, ntensty and success n Brtan n the 1990s by René Böhem and Mark P Taylor *) Workng Paper No. 0206 July 2002 Johannes Kepler

More information

Supplemental Nursing Services Agencies 2003: A Report to the Minnesota Legislature

Supplemental Nursing Services Agencies 2003: A Report to the Minnesota Legislature 4-68 Supplemental Nursng Servces Agences 23: A Report to the Mnnesota Legslature For more nformaton, contact: Mnnesota Department ofhuman Servces Nursng Faclty Rates and Polcy Dvson 444 Lafayette Road

More information

insidestory Designing plus Win a Champagne meal for two THE MIDDLESEX National Smile Week a healthy hospital How to keep your teeth sparkling white

insidestory Designing plus Win a Champagne meal for two THE MIDDLESEX National Smile Week a healthy hospital How to keep your teeth sparkling white nsdestory News from Unversty College London Hosptals NHS Trust May 2004 Natonal Smle Week How to keep your teeth sparklng whte Desgnng a healthy hosptal THE MIDDLESEX receves a royal vstor plus Wn a Champagne

More information

Universal Flyer. inside. A Universal Avionics Publication

Universal Flyer. inside. A Universal Avionics Publication nsde Unversal Flyer A Unversal Avoncs Publcaton Lookng Forward Promotng Passon n Avaton Empowerng Technology Top Dealers Forge New Paths Servng for the Long Term 1 st Quarter 2017 Unversal Flyer cross

More information

COMMENCEMENT WEEKEND. Friday and Saturday, May 26 27, Bowdoin College

COMMENCEMENT WEEKEND. Friday and Saturday, May 26 27, Bowdoin College n COMMENCEMENT WEEKEND N Frday and Saturday, May 26 27, 2017 Bowdon College CONTENTS I GREETINGS Schedule of Events...2 Honorands...5 Weekend Dnng...6 Frequently Asked Questons...8 General Informaton...12

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J.Himmelspach, R.Pasupathy, O.Rose, and A.M.Uhrmacher, eds

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J.Himmelspach, R.Pasupathy, O.Rose, and A.M.Uhrmacher, eds Proceedngs of the 2012 Wnter Smulaton Conference C. Laroque, J.Hmmelspach, R.Pasupathy, O.Rose, and A.M.Uhrmacher, eds CALIBRATION OF A DECISION-MAKING PROCESS IN A SIMULATION MODEL BY A BICRITERIA OPTIMIZATION

More information

The Incidence of Student Financial Aid: Evidence from the Pell Grant Program

The Incidence of Student Financial Aid: Evidence from the Pell Grant Program The Incdence of Student Fnancal Ad: Evdence from the Pell Grant Program Lesley Turner Unversty of Maryland October 16, 2012 1 Background and Motvaton Affordablty and access to hgher educaton Large prvate

More information

Development of the nursing home Resident Assessment Instrument in the USA

Development of the nursing home Resident Assessment Instrument in the USA Age and Ageng I997;26-S2: 19-25 Development of the nursng home Resdent Assessment Instrument n the USA CATHERINE HAWES, JOHN N. MORRIS 1, CHARLES D. PHILLIPS 2, BRANT E. FRIES 3, KATHERINE MURPHY 1, VINCENT

More information

Research Article Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off

Research Article Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off Mathematcal Problems n Engneerng, Artcle ID 937842, 10 pages http://dx.do.org/10.1155/2014/937842 Research Artcle Modellng a Nurse Shft Schedule wth Multple Preference Ranks for Shfts and Days-Off Chun-Cheng

More information

- - i 1 0/0 FLEET POST OFFICE, SAN FRANCISCO. 1«In compliance with references (a) and (b) preparation. 2. Commanders for the operation are an follows:

- - i 1 0/0 FLEET POST OFFICE, SAN FRANCISCO. 1«In compliance with references (a) and (b) preparation. 2. Commanders for the operation are an follows: V~tfaY~/ ' r OUN2IS& tt 7 " " " "7\ At^D f*~ffs? b Headquarters, Expedtonary Troops, Task Force 56 I,! CG FMF Pac Ser 00059 of 14 Oct 44 a Ex Trs TF 56 Adm 0 1-44 0' IWO JIMA OPERATION _ fw, - l BOWKGH^.DU)"'

More information

econstor Make Your Publications Visible.

econstor Make Your Publications Visible. econstor Make Your Publcatons Vsble. A Servce of Wrtschaft Centre zbwlebnz-informatonszentrum Economcs Kuhn, Peter; Skuterud, Mkal Workng Paper Internet Job Search and Unemployment Duratons IZA Dscusson

More information

GROUND WEAPON SYSTEMS/EQUIPMENT (WS/E) AND AUTOMATED INFORMATION SYSTEMS (AIS) LIFE CYCLE LOGISTICS SUPPORT (LCLS) POLICY

GROUND WEAPON SYSTEMS/EQUIPMENT (WS/E) AND AUTOMATED INFORMATION SYSTEMS (AIS) LIFE CYCLE LOGISTICS SUPPORT (LCLS) POLICY DEPARTMENT OF THE NAVY HEADQUARTERS UNTED STATES MARNE CORPS 3000 MARNE CORPS PENTAGON WASHNGTON, DC 20350-3000 MCO 4105.4 LPC-1 17 Dec 12 MARNE CORPS ORDER 4105.4 Administrative Change From: To : Subj:

More information

UHCLASSIFIED. Division Reports - Annex EASY V AMPHIBIOUS :ORPS LANDING FORCE. CG 3d Mar Div Report Appendix 2 - CG 4th Mar Div Report -/^(9 JIMA-

UHCLASSIFIED. Division Reports - Annex EASY V AMPHIBIOUS :ORPS LANDING FORCE. CG 3d Mar Div Report Appendix 2 - CG 4th Mar Div Report -/^(9 JIMA- V AMPHBUS :RPS LANDNG FRCE -/^(9 JMA- Appendx. Dvson Reports - CG 3d Mar Dv Report Appendx 2 - CG 4th Mar Dv Report Appendx 3 - GG sth Mar Dv Report UHCLASSFED Annex EASY MAY 945 pofu,*-?-393? k m Dvson

More information

UNCLASSIFIED. Report on the Legal and Policy Frameworks Guiding the United States' Use of Military Force and Related National Security Operations

UNCLASSIFIED. Report on the Legal and Policy Frameworks Guiding the United States' Use of Military Force and Related National Security Operations UNCLASSFED Report on the Lega and Pocy Frameworks Gudng the Unted States' Use of Mtary Force and Reated Natona Securty Operatons Ths report s provded consstent wth Secton 1264 of the Natona Defense Authorzaton

More information

Many countries are currently facing a challenge in terms

Many countries are currently facing a challenge in terms Health polces on target? Revew on health target settng n 18 European countres LOES M. VAN HERTEN, HARRY P.A. VAN DE WATER * Background: In 1984 the European regon of the World Health organsaton (WHO) adopted

More information

AND IN THE MATTER OF The legal validity 'of the Regulations mentioned above

AND IN THE MATTER OF The legal validity 'of the Regulations mentioned above '", '" _. _ -.. ~/' // E AND N THE MATTER OF The legal valdty 'of the Regulatons mentoned above AND N THE MATTER OF The consttutonal and legal valdty of the letters dated 10-07~2012 and 16-07-2012 both

More information

Volume 30, Issue 4. Filling vacancies: Identifying the most efficient recruitment channel

Volume 30, Issue 4. Filling vacancies: Identifying the most efficient recruitment channel Volume 30, Issue 4 Fllng vacances: Identfyng the most effcent recrutment channel Mareva Sabater Unversty of Savoe Abstract Ths paper provdes new results on the recrutment behavour of frms by showng that

More information

2016 Region III Presidents Cup College Station, Texas June 14 June 19, 2016

2016 Region III Presidents Cup College Station, Texas June 14 June 19, 2016 201 Regon III Presdents Cup Coege Staton, Texas June 14 June 19, 201 TEAM REGISTRATION, PLAYER EVENT AND OPENING CEREMONIES Tuesday, June 14, 201 Brazos County Expo Center 5827 Leonard Road, Bryan, Texas

More information

Do Non-Profit Operators Provide Hig. Long-term Care Industry. Author(s) Noguchi, Haruko; Shimizutani, Satos.

Do Non-Profit Operators Provide Hig. Long-term Care Industry. Author(s) Noguchi, Haruko; Shimizutani, Satos. Do Non-Proft Operators Provde Hg TtleCare? Evdence from Mcro-Level Dat Long-term Care Industry Author(s) Noguch, Haruko; Shmzutan, Satos Ctaton Issue 2005-04 Date Type Techncal Report Text Verson publsher

More information

Methodological Study to Develop Standard Operational Protocol on Intravenous (IV) Drug Administration For Children and to Assess its Implication

Methodological Study to Develop Standard Operational Protocol on Intravenous (IV) Drug Administration For Children and to Assess its Implication May-August, 2017/Vol 37/Issue 2 Orgnal Artcle Methodologcal Study to Develop Standard Operatonal Protocol on Intravenous (IV) Drug Admnstraton For Chldren and to Assess ts Implcaton Bjarana SK 1, San SK

More information

DEPARTMENT OF THE NAVY OFFICE OF THE ASSISTANT SECRETARY (RESEARCH. DEVELOPMENT AND ACQUISITION) 1000 NAVY PENTAGON WASHINGTON DC

DEPARTMENT OF THE NAVY OFFICE OF THE ASSISTANT SECRETARY (RESEARCH. DEVELOPMENT AND ACQUISITION) 1000 NAVY PENTAGON WASHINGTON DC DEPARTMENT OF THE NAVY OFFICE OF THE ASSISTANT SECRETARY (RESEARCH. DEVELOPMENT AND ACQUISITION) 1000 NAVY PENTAGON WASHINGTON DC 20350-1000 FEB 2 4 2009 MEMORANDUM FOR DISTRIBUTION Subj: REQUEST FOR DEVIATION

More information

November 4, 2012 Peleliu ARG Arrives in U.S. 5th Fleet

November 4, 2012 Peleliu ARG Arrives in U.S. 5th Fleet PeleNews Pelelu ARG Arrves n U.S. 5th Fleet Photo by MC3 Derek Stroop The Pelelu Amphbous Ready Group steams n formaton. The ARG conssts of USS Green Bay (LPD 20) (left) USS Pelelu (LHA 5) (center) USS

More information

ALABAMA ASSOCIATION of EMERGENCY MANAGERS

ALABAMA ASSOCIATION of EMERGENCY MANAGERS LBM SSOCTON of EMERGENCY MNGERS ON O PCE C BELLO MER E T R O CD NCY M N L R G PROFESSONL CERTFCTON PROGRM .. E. M. CERTFCTON PROGRM 2016 RULES ND REGULTONS 1. THERE WLL BE FOUR LEVELS OF CERTFCTON. BSC,

More information

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 1520 ROYAL PALM SQUARE BOULEVARD, SUITE 310 FORT MYERS, FLORIDA 33919

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 1520 ROYAL PALM SQUARE BOULEVARD, SUITE 310 FORT MYERS, FLORIDA 33919 DEPARTMENT OF THE ARMY JACKSONVLLE DSTRCT CORPS OF ENGNEERS 1520 ROYAL PALM SQUARE BOULEVARD, SUTE 310 FORT MYERS, FLORDA 33919 REPLY TO ATTENTON OF February 6, 2013 Regulatory Division Fort Myers Section

More information

PART TWO PLANNING/INTELLIGENCE SECTION

PART TWO PLANNING/INTELLIGENCE SECTION PART TWO PLANNNG/NTELLGENCE SECTON CONTENTS GENERAL SECTON... P-2 Purpose... '... P-2 Overview... P-2 Objectives... P-2 Concept of Operations... P-3 dentification of Risks... P-4 Section Activation Procedures.....................................................

More information

A Multinomial Logistics Model for Perceptions on Entrepreneurship

A Multinomial Logistics Model for Perceptions on Entrepreneurship Elana Costa E Slva, Aldna Correa, Alexandra Braga, Vtor Braga A Multnomal Logstcs Model for Perceptons on Entrepreneurshp ELIANA COSTA E SILVA, ALDINA CORREIA, ALEXANDRA BRAGA AND VITOR BRAGA School of

More information

Outline Natural gas, market, players and roles GAMS 1. A stochastic capacity expansion and equilibrium model for the global natural gas market

Outline Natural gas, market, players and roles GAMS 1. A stochastic capacity expansion and equilibrium model for the global natural gas market Thu March th,, F A stochastc capact expanson and eulbrum model for the global natural gas market Ruud Eggng, Wnterschool, March Ruud Eggng March, page Outlne Natural gas, market, plaers and roles GAMS

More information

CORNELL UNIVERSITY EMERGENCY OPERATIONS PLAN. Cornell University Environmental Health and Safety Version 5.1

CORNELL UNIVERSITY EMERGENCY OPERATIONS PLAN. Cornell University Environmental Health and Safety Version 5.1 CORNELL UNIVERSITY EMERGENCY OPERATIONS PLAN Cornell University Environmental Health and Safety Version 5.1 Contents 1. Introduction... 1 2. Concept of Operations... 1 3. Objectives... 1 4. Incident Response

More information

Non-Traded REITs. Olgun Fuat Sahin Minnesota State University Moorhead

Non-Traded REITs. Olgun Fuat Sahin Minnesota State University Moorhead Non-Traded REITs Olgun Fuat Sahn Mnnesota State Unversty Moorhead In ths paper, I examne dfferences between non-traded and traded REITs by usng avalable fnancal data. Fndngs ndcate that there are many

More information

Administrative Procedure

Administrative Procedure Administrative Procedure Number: 408 Effective: Interim Supersedes: 07/28/1998 Page: 1 of 7 Subject: EMERGENCY ACTION PLAN 1.0. PURPOSE: To establish procedures for the evacuation of University buildings

More information

Federal Experience. Statement of Qualifications:

Federal Experience. Statement of Qualifications: Statement of Qualfcatons: BLM Dspatch, Reno, Nevada Naval Ar Staton, Fallon, Nevada VA Hosptal, Reno, Nevada hompson Federal Courthouse, Reno, NV USFS aylor Creek Amphtheater, CA Buckley AFB, Colorado

More information

THE EFFECTIVENESS OF AN INTERACTIVE MAP DISPLAY IN TUTORING GEOGRAPHY

THE EFFECTIVENESS OF AN INTERACTIVE MAP DISPLAY IN TUTORING GEOGRAPHY a BOLT B E R A N E K AND NEWMAN 'NC a W- CONSUTNG DEVEOPMENT RESEARCH / BBN REPORT NO. 3346

More information

Eastern Progress - 21 Jan 1971

Eastern Progress - 21 Jan 1971 Eastern Progress Eastern Progress 1970-1971 Eastern Kentucky Unversty Year 1971 Eastern Progress - 21 Jan 1971 Eastern Kentucky Unversty Ths paper s posted at Encompass. http://encompass.eku.edu/progress

More information

SECTION HAZARDOUS MATERIALS HEALTH AND SAFETY PLAN

SECTION HAZARDOUS MATERIALS HEALTH AND SAFETY PLAN SECTION 013529 HAZARDOUS MATERIALS HEALTH AND SAFETY PLAN PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all SECTIONS within DIVISION 1 GENERAL

More information

By Bernadette Grey. ^^^puegeju^tudeiits.^^^^aturv'r'- in ; -^ 78%

By Bernadette Grey. ^^^puegeju^tudeiits.^^^^aturv'r'- in ; -^ 78% r V. Volume 27, Number 6 Marst College, Poughkeepse, N.Y. October 28,1982 College offcals justfy rule as school 'tradton 3 By Patt Walsh & Rck O'Donnell Last week, student affars admnstrators decded to

More information

Marie-Odile Carrère, Nathalie Havet, Magali Morelle, Raphaël Remonnay. To cite this version:

Marie-Odile Carrère, Nathalie Havet, Magali Morelle, Raphaël Remonnay. To cite this version: Analyzng the determnants of wllngness-to-pay values for testng the valdty of the contngent valuaton method. Applcaton to home care compared to hosptal care Mare-Odle Carrère, Nathale Havet, Magal Morelle,

More information

Analysis of Demand in Mount Salak Endah Tourism Object in Bogor Regency

Analysis of Demand in Mount Salak Endah Tourism Object in Bogor Regency EKO-REGIONAL, Vol. 12, No. 1, March 2017, pp. 32-39 Analyss of Demand n Mount Salak Endah Toursm Object n Bogor Regency By: Bunar Pandu Junor Hgh School Bogor Emal: bunaryasmo@yahoo.co.d ABSTRACT Ths research

More information

ConnCensus Vol. 50 No. 39

ConnCensus Vol. 50 No. 39 Connectcut College Dgtal Commons @ Connectcut College 1965-1966 Student Newspapers 2-21-1966 ConnCensus Vol. 50 No. 39 Connectcut College Follow ths and addtonal works at: http://dgtalcommons.conncoll.edu/ccnews_1965_1966

More information

Springfield Technical Community College

Springfield Technical Community College Springfield Technical Community College Campus Evacuation Plan (Revision:06/10/2014) Table of Contents 1.1 PURPOSE 1.2 SCOPE 1.3 INTRODUCTION 2.1 SITUATION AND ASSUMPTIONS 2.1.1 Situation 2.1.1.1 Campus

More information

: K nl :D 2 8 viie :

: K nl :D 2 8 viie : ^^'^"gggafe.^ : : K nl :D 2 8 ve : FO Q 6TH NF DV APO 6 800, 28 November 944 MAPS: PHLPPNu E slands, Small Scale :,000, 000. PELPPNE slands, ntermedate Scale :250,000. CENTRAL LUZON Area, Medum Scale :50,000.

More information

HS16 Asbestos Management

HS16 Asbestos Management HS16 Asbestos Management Occupational Health, Safety and Injury Prevention Subject Matter Expert Greg Smith GJS25 CONTENTS 1.0 INTRODUCTION... 3 2.0 OBJECTIVES AND METRICS... 3 3.0 APPLICABILITY... 3 4.0

More information

The UCF Report, Vol. 18 No. 1, July 14, 1995

The UCF Report, Vol. 18 No. 1, July 14, 1995 Unversty of Central Florda The UCF Report Newsletter The UCF Report, Vol. 18 No. 1, July 14, 1995 7-14-1995 Unversty of Central Florda Fnd smlar works at: http://stars.lbrary.ucf.edu/ucfreport Unversty

More information

FOIA Marker. I i F [ ], Monday, October 19, 2015 I I.. Appointments and Schedul:ing, White House Office of

FOIA Marker. I i F [ ], Monday, October 19, 2015 I I.. Appointments and Schedul:ing, White House Office of 1 20.15-9012-F [ ], Monday, October 19, 2015. FOA Marker Ths s ncbt a textual record. Ths FOA Marker ndcates that materal has beeh removed. durng FOA processng by George W. Bush Presdental Lbrarystaff...

More information

Financing Innovation: Evidence from R&D Grants to Energy Startups. Sabrina T. Howell 1

Financing Innovation: Evidence from R&D Grants to Energy Startups. Sabrina T. Howell 1 Fnancng Innovaton: Evdence from R&D Grants to Energy Startups Sabrna T. Howell 1 September 1, 2015 s Abstract Governments regularly subsdze new ventures to spur nnovaton. Ths paper conducts the frst large-sample,

More information

Incident Command System Awareness Participant Guide May 2016

Incident Command System Awareness Participant Guide May 2016 Incident Command System Awareness Participant Guide May 2016 Copyright 2016 Midwest Consortium for Hazardous Waste Worker Training Acknowledgments The Midwest Consortium developed this course for Hazardous

More information

(M.S. SectIon _ Subd. 1) VeterInary MedIcine

(M.S. SectIon _ Subd. 1) VeterInary MedIcine This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp B ENN At REpoRT OF

More information

_~, " I ~ I, ,~~,. t I ( . '..:::. OPERATIONAL SYSTEM DESCRIPTION ICS INCIDENT COMMAND SYSTEM PUBLICATION DECEMBER 12,1981

_~,  I ~ I, ,~~,. t I ( . '..:::. OPERATIONAL SYSTEM DESCRIPTION ICS INCIDENT COMMAND SYSTEM PUBLICATION DECEMBER 12,1981 _~, " ~, :t,~~,. t. '..:::. OPERATONAL SYSTEM DESCRPTON CS 120-1 NCDENT COMMAND SYSTEM PUBLCATON DECEMBER 12,1981 .., TABLE OF CONTENTS 1.0 NTRODUCTON 1-1,. Page 1.1 National nter-agency ncident Management

More information

Temporal Specificity and Task Alignment: Evidence from Patient Care

Temporal Specificity and Task Alignment: Evidence from Patient Care Paper to be presented at the DRUID 2011 on INNOVATION, STRATEGY, and STRUCTURE - Organzatons, Insttutons, Systems and Regons at Copenhagen Busness School, Denmark, June 15-17, 2011 Temporal Specfcty and

More information

Addendum to the Request for Qualifications for Innovative Designs for the World Trade Center site (RFQ LMDC-09)

Addendum to the Request for Qualifications for Innovative Designs for the World Trade Center site (RFQ LMDC-09) 1 Lower Manhattan Development Corporation One Liberty Plaza, 20 th Floor New York, NY 10006 Tel 212.962.2300 Fax 212.962.2431 www.renewnyc.com Addendum to the Request for Qualifications for Innovative

More information

Multi-objective Nurse Scheduling Models with Patient Workload and Nurse Preferences

Multi-objective Nurse Scheduling Models with Patient Workload and Nurse Preferences Management 01, (5): 149-160 DOI: 10.59/.mm.01005.0 Mult-obectve urse Schedulng Models th Patent Workload and urse Preferences Gno J. Lm 1,, Areou Mobasher 1, Murray J. Côté 1 Department of Industral EngneerngThe

More information

Cuutfi' S-enAKAfl. Atsfes On Growing Thre Of ^hutomation; Asks Governor CS Commission To Act On Plan

Cuutfi' S-enAKAfl. Atsfes On Growing Thre Of ^hutomation; Asks Governor CS Commission To Act On Plan Cuutf' S-enAKAfl. Amercans Vol. XXIII, No. 46 Larg Offce Seekers Overlookng A Sleepng Gant- Cvl Servce Vote POLITICIANS seekng statewde or Federal offce have always been careful to publcly advocate the

More information

CITY MANAGER MEMORANDUM. Third Property Improvement Grant Program Extension Maria Bonita Building Improvements, 195 West Granada Boulevard

CITY MANAGER MEMORANDUM. Third Property Improvement Grant Program Extension Maria Bonita Building Improvements, 195 West Granada Boulevard CTY MANAGER MEMORANDUM To: The Honorable Mayor Kelley and City Commissioners Through: Joyce A. Shanahan, City Manager From: Ric Goss, ACP, Planning Director Date: February 21 212 Subject: Third Property

More information

Advancing DePaul. In life and death, Munster champions women athletes

Advancing DePaul. In life and death, Munster champions women athletes Advancng DePaul Sprng 2008 In lfe and death, Munster champons women athletes The Rev. Thomas Munster, C.M. (LAS MA 54), who ded last December, bequeathed more than $300,000 n planned gft annutes to women

More information

ACTIVE SHOOTER GUIDEBOOK

ACTIVE SHOOTER GUIDEBOOK ACTIVE SHOOTER GUIDEBOOK HOW TO RESPOND WHAT IS AN ACTIVE SHOOTER? An Active Shooter is an individual actively engaged in killing or attempting to kill people in a confined and populated area; in most

More information

HEALTH AND SAFETY POLICY 2010

HEALTH AND SAFETY POLICY 2010 April 2008 CONTENTS Page No ii 1 GENERAL STATEMENT OF POLICY 2 2 DELIVERING HEALTH AND SAFETY 3 2.1 Management 3 2.2 Policy and Procedures 3 2.3 Training 4 2.4 Communication and Involvement 4 2.5 The Working

More information

WAR DIARY. (Erase heading not required)

WAR DIARY. (Erase heading not required) nstructons regardng preparaton. of War Dares (whch wll be kept from frst day of moblzaton, creaton or embodment), are contaned n F.S. Regs. Vol.. Ttle pages wll be prepared. Place THE HAGUE lrlr 64894

More information

Eastern Progress - 20 Jan 1972

Eastern Progress - 20 Jan 1972 Eastern Progress Eastern Progress 1971-1972 Eastern Kentucky Unversty Year 1972 Eastern Progress - 20 Jan 1972 Eastern Kentucky Unversty Ths paper s posted at Encompass. http://encompass.eku.edu/progress

More information

Healthcare Reliability Science

Healthcare Reliability Science Healthcare Relablty Scence Delberate Desgn James C. Benneyan, PhD, Drector Healthcare Systems Engneerng Insttute CMS Innovaton Healthcare Systems Engneerng Center NSF Center for Health Organzaton Transformaton

More information

Lexington Tri-County Hospital Survey

Lexington Tri-County Hospital Survey University of Nebraska Omaha DigitalCommons@UNO Publications Archives, 6- Center for Public Affairs Research 86 Lexington Tri-County Hospital Survey Curtis R. Winkle University of Nebraska at Omaha Follow

More information

Lower Manhattan Development Corporation Avi Schick, Chairman David Emil, President. March 2, 2009

Lower Manhattan Development Corporation Avi Schick, Chairman David Emil, President. March 2, 2009 LOWER MANHATTAN DEVELOPMENT CORPORATION REQUEST FOR PROPOSALS ADVERTISING SERVICES The Lower Manhattan Development Corporation, a subsidiary of the New York State Urban Development Corporation d/b/a Empire

More information

Authority: EO Chisf. ReCO~SO& Oeclass Div. WHS Oate: SEP REPORT BY TIlE J-S. t.o the. JUUI'l' CHIEFS OF STAFF

Authority: EO Chisf. ReCO~SO& Oeclass Div. WHS Oate: SEP REPORT BY TIlE J-S. t.o the. JUUI'l' CHIEFS OF STAFF ,- ".,,.., Re.,.. 2S 0. S22.a COP NO. JCS 2497/24-6 OECLAS'O N 'ULL D5TltBUTOV 3 epteaber 982 Pages - 8, ncl. Authorty: EO 3826 Chsf. ReCOSO& Oeclass Dv. WHS Oate: SEP 3 203 REPORT BY TlE J-S t.o the JUU'l'

More information