Feasibility Study and Design & Construction GRANTS

Size: px
Start display at page:

Download "Feasibility Study and Design & Construction GRANTS"

Transcription

1 Prgram Feasibility Study and Design & Cnstructin GRANTS Rund 7 Backgrund and Instructins Slicitatin N CH-R7 Slicitatin Manager: Amy Barad Slicitatin Psted: December 11, 2015 Applicatins Accepted: Rlling, thrugh March 11, 2016

2 Table f Cntents 1. Intrductin Overview Purpse f this Dcument Wh We Are... Errr! Bkmark nt defined. 2. Key Definitins Minimum Applicant and Prject Requirements Feasibility Study Grant Specifics Funding and Cst Share Supprted Activities, Required Deliverables and Milestnes Payment Schedule Design & Cnstructin Grant Specifics Prject Funding and Cst Share Supprted Activities Deliverables, Milestnes, and Payment Prcess Selectin Prcess and Criteria Selectin Prcess Selectin Criteria Applicatin Prcess Applicatin Frms Authrized Respndents Signature and Acceptance Frm Applicatin Package Applicatin Timeframe Questins General Cnditins Ntice f Public Disclsure Cntractual Requirements Waiver Authrity Disclaimer Grant Taxability Appendices t this Slicitatin and assciated applicatin frms are available as separate dcuments. i

3 1. Intrductin 1.1. Overview The Prgram prvides grants fr cnstructin prjects and feasibility studies fr eligible hydrpwer generatin facilities. Thrugh the prvisin f this supprt, Cmmnwealth Hydr seeks t increase the utput and eclgical acceptability f hydrpwer facilities that are qualified fr the Massachusetts Renewable Energy Prtfli Standard (MA RPS), r have a strng likelihd f attaining qualificatin, as further explained herein. Applicants facilities must als be licensed by the Federal Energy Regulatry Cmmissin (FERC), have an rder frm FERC indicating that they are nnjurisdictinal t FERC, r have a determinatin frm FERC that they are a qualifying cnduit hydrpwer facility in accrdance with FERC Order 800. Applicants may request funding in the fllwing activity areas: Upgrade f existing hydrpwer facilities, including but nt limited t turbine replacement r refurbishment; rewinding f generatrs installatin r upgrade f autmated cntrls replacement f wden flashbards with rubber skirt/inflatable crest gate systems enhanced fish r eel passage (in cnjunctin with measures t increase generatin) Develpment f new hydrpwer facilities that are eligible fr FERC cnduit exemptins Feasibility studies fr any f the types f prjects listed abve Grants fr cnstructin prjects (with r withut a design phase) will be capped at the lesser f $600,000, r 50% f actual csts, r $1.00 per incremental kilwatt hur per year (e.g., a grant fr a prject that csts $1 millin and will increase a facility s utput by 250,000 kwh per year wuld be capped at $250,000). Applicants fr cnstructin grants must explain hw the requested amunt, if awarded, wuld affect the prject s financial viability. Grants fr feasibility studies will be capped at $45,000, subject t a frmula and cst-share requirements described in Sectin 4.1 belw. Apprximately $875,000 is available fr Rund 7. Applicatins will be accepted under this slicitatin n a rlling basis until March 11, 2016, r until funds are exhausted, whichever cmes first. It is the Applicant s respnsibility t check fr updates t this slicitatin n MassCEC s website Purpse f this Dcument The purpse f this Backgrund and Instructins dcument is t explain the eligibility requirements, supprted activities, applicatin prcess and payment prcess fr grants ffered by the Cmmnwealth Hydrpwer Prgram. Assciated with this dcument (as separate dwnladable files frm the web page are the fllwing frms and appendices: Title Frm A Frm B (FS) Frm B (D&C) Frm C Appendix A Appendix B-1 Dcument Cntents Authrized Applicant Signature and Acceptance Statement Feasibility Study Grant Applicatin Design and Cnstructin Grant Applicatin Frm Standard Budget Frms MassCEC General Terms and Cnditins Feasibility Task Order Template 1

4 Appendix B-2 Appendix C Appendix D Design & Cnstructin Task Order Template (includes Minimum Technical Requirements and Milestne Checklists and Templates) Sample Feasibility Study Outline Energy Mdeling Methdlgy 1.3. Wh We Are The Massachusetts Clean Energy Center Created by the Green Jbs Act f 2008, the Massachusetts Clean Energy Center (MassCEC) is dedicated t accelerating the success f clean energy technlgies, cmpanies and prjects in the Cmmnwealth while creating high-quality jbs and lng-term ecnmic grwth fr the peple f Massachusetts. Since its inceptin in 2009, MassCEC has helped clean energy cmpanies grw, supprted municipal clean energy prjects and invested in residential and cmmercial renewable energy installatins creating a rbust marketplace fr innvative clean technlgy cmpanies and service prviders. The Prgram is a prgram administered by MassCEC. The principal gal f the prgram is t facilitate, in a timely manner, greater energy prductin frm hydrpwer facilities that are eligible fr the MA RPS. 2. Key Definitins FERC-Related Terms (Disclaimer: These infrmal definitins are prvided t help Applicants understand the terms as used by MassCEC and d nt represent frmal, legal definitins as may be prvided in federal law, regulatin, FERC rder, curt decisins, etc. Regulatry definitins may be fund at 18 CFR Sectin 4.30.) Cnduit Exemptin Exemptin A type f authrizatin issued by FERC intended fr facilities that recver energy frm water flwing thrugh a manmade water cnveyance (e.g., tunnel, canal, pipeline, etc.) that was riginally cnstructed t distribute water fr municipal, irrigatin r industrial cnsumptive purpses and nt primarily fr the generatin f electricity. The cnduit may nt be an integral part f a dam. An example f a prject likely t qualify fr a cnduit exemptin is the replacement f a pressure reducing valve with a turbine in a drinking water distributin system. An example f a situatin nt likely t qualify fr a cnduit exemptin is the additin f a generatin system t a dam s spillway, which discharges int a stream. See als, Qualifying Cnduit Hydrpwer Facility, belw. A type f authrizatin issued by FERC fr the cnstructin and peratin f a hydrelectric facility in which the hlder is exempt frm certain prvisins f the Federal Pwer Act; the hlder is subject t cnditins attached t the exemptin. Types f exemptins include small facility exemptins and cnduit exemptins. Exempt prjects are nt exempt frm federal and state review r permitting. Exemptins are issued in perpetuity and d nt expire. Exemptins are smetimes referred t as a type f license. 2

5 Federal Energy Regulatry Cmmissin (FERC) The federal agency with versight f hydrpwer generatin, including the issuance f licenses fr the cnstructin f new prjects and versight f all nging prject peratins, including dam safety inspectins and envirnmental mnitring. See: FERC Order License Nn-Jurisdictinal t FERC Qualifying Cnduit Hydrpwer Facility A frmal Order issued by FERC. The authrizatin issued by FERC fr the cnstructin and peratin f a hydrelectric facility. Licenses are typically gd fr 30 t 50 years and require renewal upn expiratin. Exemptins are smetimes referred t as a type f license. A facility that, in FERC s pinin, meets the fllwing criteria: 1. wuld be cnstructed, perated, r maintained fr the generatin f electric pwer using nly the hydrelectric ptential f a nn-federally wned cnduit, withut the need fr a dam r impundment; 2. wuld have a ttal installed capacity that des nt exceed 5 MW; and 3. is nt licensed under, r exempted frm, the license requirements in Part I f the Federal Pwer Act, as f August 9, T btain a determinatin that a prject is a Qualifying Cnduit Hydrpwer Facility, an entity must file with FERC a ntice f its intent t cnstruct the facility that demnstrates the facility meets the criteria abve. Fr mre infrmatin, see: Facilities that are nt required t have FERC authrizatin. Very few facilities are nt subject t FERC jurisdictin. Typically, nn-jurisdictinal facilities are nly thse that have been in cntinuus peratin since 1935 and whse capacity has nt been increased since that time. The navigability f the waterway may als be a factr. Nte that use f all a hydr facility s utput behind the meter is nt generally a basis fr a determinatin that the facility is nn-jurisdictinal t FERC, particularly if the hst facility is therwise cnnected t the electric grid. Fr infrmatin n determining FERC jurisdictin, see: pdf 3

6 Other Terms Allwable Expenses Applicant Direct Labr Facility Facility Capacity Grantee Lw Impact Hydrpwer Institute (LIHI) Massachusetts Renewable Energy Prtfli Standard (MA RPS) Expenses that may be included in the Prject Budget and may therefre cunt tward Applicant s cst share r be reimbursable. See the end f Frm B (Applicatin Frm) fr mre detail. Any persn wh is seeking funding r ther financial supprt frm, r has submitted ne r mre prpsals fr prjects t MassCEC under any f MassCEC s prgrams r initiatives, as in effect frm time t time Labr by emplyees f the Grantee, including wners f the cmpany. The lcatin and structures at which a Prject wuld take place. The lesser f the Facility s ttal generatr nameplate capacity r ttal turbine nameplate capacity. The entity that has applied fr, been awarded, and executed an agreement fr a grant frm MassCEC. Grants are nt transferrable. The nn-prfit rganizatin whse certificatin is generally required fr hydr facilities t qualify fr the MA RPS. See: Nte that fr cnduit facilities, LIHI certificatin is nt required fr MA RPS qualificatin. The requirement that Massachusetts electric cmpanies include a minimum percentage f qualified renewable energy in the electricity that they sell, that defines the types f generatrs that may qualify as renewable, and that prvides the qualificatin prcess. Fr mre infrmatin, please see this webpage: Prject Rutine Repair The wrk that wuld be funded by the requested MassCEC grant either the feasibility study, r the design and cnstructin activities. MassCEC recgnizes that this is a different use f the term Prject than the way it is ften used by thers. Wrk dne t address custmary wear and tear n equipment and structures, t maintain them in gd wrking cnditin. 4

7 3. Minimum Applicant and Prject Requirements Each Applicant must demnstrate cmpliance with the fllwing minimum criteria: Criteria Eligible Applicant FERC Status MA RPS Status Facility Size, Type and Lcatin Minimum Requirement An Eligible Applicant may be a cmmercial, industrial, institutinal, nn-prfit r public entity. The Applicant must demnstrate lng-term site cntrl ver the prject lcatin and the rights t the water used t pwer the system. If the Applicant des nt wn the dam r cnduit assciated with the prject, a letter f supprt frm the dam r cnduit wner is required. Nte that nce an Applicant has been awarded a grant and executed a grant agreement with MassCEC, that entity is referred t as the Grantee. Subject facilities must have a FERC license r exemptin and be in substantial cmpliance with its cnditins (the need t amend a license r exemptin t accmmdate the prpsed prject will nt disqualify the facility), OR have a FERC rder indicating the facility is nn-jurisdictinal t FERC (the prpsed prject must nt jepardize this status, as determined by MassCEC in the sle exercise f its discretin), OR have a FERC determinatin that the facility is a Qualifying Cnduit Hydrpwer Facility, OR be seeking a license r exemptin under ne f the fllwing cnditins: n a canal system where envirnmental cnditins are managed by the canal system peratr under an existing FERC license, OR likely be eligible fr a cnduit exemptin (the determinatin that a facility is likely eligible fr a cnduit exemptin shall be at MassCEC s sle discretin). Facilities must be qualified fr the Massachusetts Renewable Energy Prtfli Standard (MA RPS), r demnstrate a strng likelihd f gaining qualificatin. See: Massachusetts RPS Regulatins. In mst cases, this will entail certificatin by the Lw Impact Hydrpwer Institute (LIHI). (Nte that fr facilities authrized under a FERC cnduit exemptin r that have a FERC determinatin as a Qualifying Cnduit Hydrpwer Facility, LIHI certificatin is nt required fr MA RPS qualificatin.) Applicants must be familiar with LIHI s criteria fr certificatin and hw thse criteria apply t their facilities. See: T help MassCEC understand the likelihd f LIHI certificatin and MA RPS qualificatin, the applicatin requirements include cnsultatins with the Massachusetts Department f Fish and Game (DFG). Fr all applicatins, such cnsultatins must be dcumented by a letter frm DFG. (See Sec. 5.1, belw.) Applicants whse facilities are already LIHI-certified must seek MA RPS qualificatin. Nte that MassCEC will nt disburse cnstructin-phase funds until the Massachusetts Department f Energy Resurces qualifies a Grantee s facility fr the MA RPS r indicates that qualificatin is imminent. Capacity: Fllwing cmpletin f the prpsed prject, the prtin f the ttal facility capacity that is attributable t increased capacity and efficiency 5

8 Criteria Minimum Requirement imprvements implemented after December 31, 1997 must nt exceed 30 MW. Incremental Generatin: Prpsed prjects must result in incremental generatin as cmpared t histrical annual generatin, as fllws: Prject Type Cnstructin Cnduit Hydr Feasibility Study Nn-Cnduit Feasibility Study Minimum Incremental Generatin 50,000 kwh/year N minimum requirement 200,000 kwh/year Useful Life: Applicants prpsing t rehabilitate r upgrade existing facilities must affirm that the prject will have a useful life f at least 20 years and/r that plans and financing are in place t make additinal repairs t achieve this useful life. Type: This slicitatin is nt intended t supprt demnstratin r pilt prjects. Lcatin: Facilities that are lcated within the service territry f an electric distributin cmpany that pays int the Massachusetts Renewable Energy Trust are eligible. If the Applicant s facility is lcated within the service territry f Massachusetts Municipal Lighting Plant (MLP) r intercnnects with an MLP, the MLP must have executed a Renewable Energy Trust Fund Membership agreement with either MassCEC r the Massachusetts Technlgy Cllabrative. Fr mre infrmatin regarding eligible MLPs, see: Prject Timeframe and Milestnes Eligible Technlgies Feasibility Studies: Draft final study must be cmpleted within 12 mnths frm the effective date f grant agreement; final study within 15 mnths frm the effective date f grant agreement. Design & Cnstructin: Standard prject cmmissining deadlines are three years frm the effective date f a grant agreement fr Design & Cnstructin grants and tw years frm the effective date f grant agreement fr Cnstructin-nly grants. Applicants may request waivers fr these deadlines, with justificatin fr the lnger timeframe requested t be included in the applicatin. Prjects with shrter timeframes until cmpletin are preferred. All prjects must adhere t prject milestnes, detailed further in this slicitatin. MassCEC reserves the right t rescind awards frm prjects that d nt meet the milestnes in the grant agreement. Only prjects emplying established, cmmercially-available technlgies are eligible fr funding under this Slicitatin. Dams assciated with prpsed prjects must be intact (i.e., must nt have been breached). Prjects requiring new dams are ineligible. This slicitatin is nt intended t supprt prjects using hydrkinetic technlgies in marine envirnments. 6

9 Criteria Demnstratin f Feasibility/Pre- Feasibility Financial Need Minimum Technical Requirements Related Parties Minimum Requirement Applicants fr Cnstructin r Design & Cnstructin grants must prvide the results f a feasibility study addressing technical, envirnmental, regulatry, and ecnmic factrs. This includes a rigrus estimate f incremental generatin t be achieved, derived in accrdance with the guidelines in Appendix D. Applicants fr Feasibility Study grants shuld demnstrate that sme prefeasibility wrk has been dne, including a descriptin f existing infrastructure, a characterizatin f the water resurce t be used, an estimate f the annual incremental amunt f electricity t be generated (kilwatt-hurs per year), an identificatin and descriptin f pssible electrical intercnnectin lcatins, an estimate f nsite lad (if any), the regulatry and permitting status f any existing facility, and an identificatin f parties with whm t cnsult n ptential eclgical impacts f the prpsed prject. All Applicants must state their financial threshld fr facility investments (e.g., simple payback requirement r minimum internal rate f return). Applicants fr Cnstructin r Design & Cnstructin grants must als demnstrate hw the requested supprt enables the prject t meet that threshld. Please nte: Applicants are advised t review Sectin 8.1 heref, regarding Ntice f Public Disclsure and treatment f cnfidential infrmatin. Installatins must cmply with the Minimum Technical Requirements in Appendix B-2, Attachment 4. Hydrelectric turbines and generatrs may be either new r refurbished. Hwever, all equipment shuld be accmpanied by warranties and service supprt ptins, which may be subject t MassCEC apprval. Wherever feasible, Grantees must participate in MassCEC s Prductin Tracking System (PTS) fr purpses f tracking the incremental pwer prduced by the prject. (See: Cnstructin prject budget can reflect the purchase and installatin f a data acquisitin system (DAS) r ther equipment needed fr participatin in the PTS. Please see listing f DAS prviders fr mre infrmatin: Unless waived by MassCEC, the reprting must be accmplished thrugh use f an autmated data acquisitin and reprting system; where this is impractical, manual reprting may be allwed. The Applicant must prcure services frm subcntractrs using cmmerciallyrespnsible prcurement mechanisms, and t the greatest extent practicable, using cmpetitive prcurement prcedures. Furthermre, the Applicant is required t ntify MassCEC in the event that it intends t r has entered int an agreement fr gds r services with a related party. Fr purpses f this slicitatin, a related party is any entity that shares any cmmn wnership with Applicant. In the event Applicant is given an award, MassCEC must apprve the use f any related party in writing prir t awardee using MassCEC funds t pay fr the expenses assciated with such related party. 7

10 NOTE TO APPLICANTS: The next tw Sectins (4 and 5) are specific t the type f prject funding requested. Applicants fr Feasibility Study grants shuld read Sectin 4 and skip Sectin 5. Applicants fr Design & Cnstructin grants shuld skip Sectin 4 and read Sectin 5. The remainder f the Backgrund and Instructins applies t bth grant types. 4. Feasibility Study Grant Specifics 4.1. Funding and Cst Share MassCEC is ffering reimbursement grants fr the study f the feasibility f new cnduit facilities and f the upgrade f existing facilities. Studies fr nn-cnduit facilities, which must be expected t increase generatin by at least 200,000 kwh/year, are eligible fr up t $45,000. Fr a cnduit facility, the maximum grant will be calculated as fllws: Maximum Grant = Expected incremental kwh per year x 20 years x $ , r $45,000 per facility, whichever is less Applicants are encuraged t request less than the maximum. All applicants must demnstrate hw they estimate the expected incremental kwh per year. While the estimates may be preliminary, they shuld be based n the basic physical parameters f the setting t be studied and the technlgy t be emplyed. (Nte: Fllwing the guidelines in Appendix D is ptinal fr purpses f an applicatin fr a Feasibility Study grant; hwever, these guidelines must be fllwed as part f perfrming the Feasibility Study.) Applicants fr cnduit facility feasibility studies must cntribute at least 10% f the ttal Allwable Expenses. All ther applicants must cntribute at least 20% f the ttal Allwable Expenses. Permitted cntributins fr purpses f satisfying these cst share requirements may include payments t subcntractrs/cnsultants, direct materials and ther direct expenses. Grantee Direct Labr r Related Party labr are permitted as part f the cst share. Grants frm ther entities such as federal r state agencies r charitable fundatins are als permitted as part f the cst share. Hwever, cnsultants t the Grantee may nt incur any part f the Grantee s cst share n Grantee s behalf. A summary f Allwable Expenses that may be included in the prject budget is included at the end f the applicatin frm. N mre than 50% f the Allwable Expenses in any feasibility study prject budget may be fr Direct Labr and/r Related Parties labr, and n mre than 20% fr legal expenses. MassCEC may specify lwer limits in individual grant agreements. While Applicants fr Design & Cnstructin grants must demnstrate prject feasibility, a MassCEC-funded feasibility study is nt a prerequisite fr applying Supprted Activities, Required Deliverables and Milestnes All feasibility studies shuld address the technical, regulatry, and ecnmic feasibility f the prpsed prject, including issues related t btaining certificatin as a Lw Impact Hydrpwer facility. The studies may include assessments f available flw, envirnmental impacts, cincident nsite electricity cnsumptin, intercnnectin needs, ecnmic analyses and financing ptins. The study shuld discuss any aspects f the facility s cnditin that may jepardize generatin, including repairs needed. The scpe f the feasibility study shuld be cmmensurate with the needs f the facility and shuld nt repeat analyses that may already be available and culd be attached. Appendix C prvides an utline f a cmprehensive feasibility study. Nt every prject may need every sectin; cnversely sme prjects may need t address ther tpics. It is the Grantee s respnsibility t ensure that all relevant tpics are included. All studies shuld include a rigrus estimate f the increase in average annual energy generated as a result f the upgrades examined. T the extent feasible, that estimate shuld be made in accrdance with the energy mdeling methdlgy utlined in Appendix D. 8

11 The required deliverables include a Draft Final Feasibility Reprt and a Final Feasibility Reprt. Grantees must review cnsultant wrk prducts and ensure that its cmments have been addressed prir t submissin t MassCEC. Draft Final Feasibility Reprts must be submitted in an editable Wrd frmat t facilitate cmment by MassCEC. If MassCEC staff ffer cmments n the Draft, these cmments shuld be addressed in the Final reprt. All deliverables must be submitted by the Grantee (nt a cnsultant t the Grantee). The Draft Final Feasibility Reprt must be cmpleted within 12 mnths f the effective date f the award, and the Final Feasibility Reprt must be cmpleted within 15 mnths f the effective date f the award. Failure t meet these milestnes may result in rescissin f the award. Shrter timeframes are encuraged. If, during the curse f the feasibility study, the Grantee and/r its cnsultants determine that the prject is clearly infeasible, the Grantee shuld cntact MassCEC t prvide an infrmal, interim status reprt. MassCEC will determine whether the study shuld be cmpleted as riginally planned, r an abbreviated frm f the study shuld be prepared instead. The purpse f this prvisin is t avid unnecessary expenditures (by MassCEC r the Grantee) n studies that will lead t neither actual upgrade/cnstructin prjects nr infrmatin that wuld have general value t the public. If MassCEC determines that a shrtened versin f the study shuld be prepared, the grant may be reduced accrdingly. Please pay careful attentin t the insurance requirements listed in the Task Order template (Appendix B- 1). MassCEC may request evidence f the required insurance upn executin f the grant agreement r at any time thereafter Payment Schedule Disbursement f the Feasibility Study grant will be made in ne payment at the cnclusin f the prject. Payment is cntingent upn electrnic submissin t MassCEC f all the required deliverables, which are subject t MassCEC review and apprval; a request fr payment; and a signed, cmpleted, Expenditure and Cst-Share Certificatin ( Certificatin ). As part f the Certificatin, Grantees must represent that they have paid their share f prject csts. N grant funds may be used t reimburse r write dwn csts incurred prir t the effective date f an agreement with MassCEC, which in n case will be earlier than the date f the award f a grant. (See Sectin 8.2 and Appendices A and B-1 fr mre infrmatin abut cntractual requirements.) Grantee must maintain financial recrds relating t the receipt and expenditure f all funds related t the prject, including the required Cst Share, fr at least seven years fllwing prject final grant disbursement. These recrds may be audited at any time by MassCEC r its agents. 5. Design & Cnstructin Grant Specifics 5.1. Prject Funding and Cst Share The maximum award is $600,000 per prject. Applicants may request grant funding fr bth the design and cnstructin phases f a prject, r fr the cnstructin phase alne. MassCEC will award funding fr bth the design and cnstructin phases simultaneusly. While the inclusin f a design phase is ptinal, MassCEC cnsiders design, intercnnectin studies, initial permitting and licensing (i.e., all the pre-cnstructin requirements), as well as applicatin fr certificatin by the Lw Impact Hydrpwer Institute all t be design phase activities. If an Applicant is requesting bth design and cnstructin funding, a separate budget shuld be submitted fr each phase. Up t 25% f the ttal award may be applied t the design phase, if any. Fr example, if the ttal request is fr $400,000, up t $100,000 f that may be used in the design phase. Awards will als be capped at $1.00 per kilwatt hur f incremental generatin per year as cmpared t histrical generatin. Fr example, if the upgrades t a facility are estimated t result in incremental generatin f 250,000 kwh per year, then the award will be capped at $250,000. Nte that the estimate f incremental generatin per year must be calculated in accrdance with the guidelines described in 9

12 Appendix D. Fr applicants requesting a ttal grant f less than $75,000, MassCEC will allw reasnable adjustments t this apprach. A summary f Allwable Expenses is included at the end f the applicatin frm. N mre than 25% f the budget fr any phase may be fr Grantee s Direct Labr and/r Related Parties labr. N mre than 10% f the prject budget may cnsist f legal expenses. MassCEC may specify lwer limits in individual grant agreements. All awards require a minimum 50% Grantee cst share. This requirement applies t each phase individually. Depending n prject specifics, the required cst share may be higher. Grantee Direct Labr can cunt tward the cst share, subject t the limitatin described abve. The abve caps ntwithstanding, an Applicant must clearly demnstrate hw the requested grant enables the prpsed prject t meet r exceed the Applicant s financial threshld. Applicants are encuraged t request less than the maximum fr which they are eligible. Funds will be disbursed accrding t the payment schedule described in Sectin 5.3, belw Supprted Activities Awarded funds can supprt the fllwing activities: Supprted Design & Cnstructin Activities Design & Permitting Activities Design and permitting activities that are eligible fr funding under this Slicitatin may include, but are nt limited t, the fllwing: preparatin f final detailed system design, technical specificatins, and securing f equipment/cnstructin qutatins cmpletin f generatin intercnnectin studies and executin f Intercnnectin Service Agreement between the awardee and the awardee s electric distributin cmpany preparatin f permitting r licensing dcuments and securing f permits, new licenses (cnduit exemptins nly) r license amendments needed fr cnstructin preparatin f envirnmental impact studies and reprts, if applicable public utreach related t permitting r licensing preparatin f dcuments fr facility certificatin by the Lw Impact Hydrpwer Institute; assciated applicatin fees Cnstructin Activities Cnstructin, installatin and cmmissining activities that are eligible fr funding under this Slicitatin may include, but are nt limited t, the fllwing: site preparatin, including significant repairs r mdificatins t existing structures (beynd rutine repairs) remval f ld equipment refurbishment f existing equipment purchase f new r refurbished equipment t be installed installatin upfrnt payment f service cntracts (up t tw years) 10

13 Supprted Design & Cnstructin Activities purchase and installatin f metering equipment and/r data acquisitin system t facilitate participatin in MassCEC s Prductin Tracking System (see: cmmissining f the new systems MassCEC will nt fund rutine repair f existing equipment that is nt part f a cmprehensive rehabilitatin r upgrade prject Deliverables, Milestnes, and Payment Prcess Grantee may submit invices fr Grant Installments upn cmpletin f each f the Grant Payment Milestnes set frth belw. The deliverables required fr each prject milestne and subsequent payments are described in the Design & Cnstructin Task Order Template, Attachment 3: Milestne Checklists and Cnstructin Prject Descriptin Templates (the Task Order Template is Appendix B-2 f this Slicitatin). Failure t meet the milestne deadlines may result in rescissin f the award. Shrter timeframes are encuraged, and disbursements f the grant may be accelerated accrdingly. Payment is cntingent upn submissin t MassCEC f the required deliverables, which are subject t MassCEC review and apprval a signed invice frm the Grantee a cmpleted, signed Expenditure and Cst-Share Certificatin a cmpleted W-9 frm (with first invice nly). Grantee must maintain financial recrds relating t the receipt and expenditure f all funds related t the prject, including the required Cst Share, fr at least seven years fllwing prject final grant disbursement. These recrds may be audited at any time by MassCEC r its agents. Milestne Cmpletin f design, receipt f all significant permits and licenses; applicatin fr certificatin by the Lw Impact Hydrpwer Institute (except fr cnduit prjects) Design Milestne and Grant Installment Deadline fr Cmpletin 20 mnths frm effective date f grant agreement Maximum Grant Installment up t 100% f Design Grant The Milestne assciated with the Design Grant Installment requires that all significant pre-cnstructin permits (including amendments t FERC licenses) be received by the deadline. In additin, except fr cnduit prjects, an applicatin must be made fr certificatin by the Lw Impact Hydrpwer Institute (LIHI). Actual LIHI certificatin is nt required t receive the Design Grant Installment. Hwever, LIHI certificatin (fr nn-cnduit prjects) and MA RPS qualificatin are critical t receiving full cnstructin phase disbursements, as described belw. 11

14 Milestne 1. Site Preparatin, Financing and Equipment Order Deliverable and Invice; (including LIHI applicatin fr nn-cnduit Cnstructin-nly prjects) 2. Equipment Delivery and Installatin Deliverable and Invice 3. Cmmissining, Final Permitting (including MA RPS qualificatin), Reprt t PTS, Final Reprt and Final Invice Cnstructin Milestnes and Grant Installment Schedule Deadline fr Cmpletin Cnstructin-Only Prjects 6 mnths frm effective date f a Cnstructin-nly grant agreement Deadline fr Cmpletin Design & Cnstructin Prjects 24 mnths frm effective date f a Design & Cnstructin agreement Maximum Grant Installment Up t 30% f Cnstructin Grant, if MA RPS qualificatin btained r imminent; therwise, up t 15% f Cnstructin Grant N/A N/A Up t 85% f Cnstructin Grant, if MA RPS qualificatin btained r imminent, less previus amunts disbursed; therwise up t 42.5% f Cnstructin Grant 24 mnths frm effective date f a Cnstructin nly grant agreement* 36 mnths frm effective date f a Design & Cnstructin agreement* *Applicants may request lnger deadlines fr the final milestne, with justificatin prvided in the applicatin. Up t 100% f Cnstructin Grant, less previus amunts disbursed Fr nn-cnduit prjects, the maximum grant installments assciated with the first tw cnstructin milestnes depend n qualificatin fr the MA RPS: if qualificatin has been achieved r if the MA Department f Energy Resurces indicates that such qualificatin is imminent, a higher percentage f the grant is payable (subject t ther payment requirements); if MA RPS qualificatin has nt yet been achieved r is nt yet imminent, nly half the amunt is payable. Disbursement f the final installment requires that MA RPS qualificatin has been btained. If at any time after the cmpletin f the design phase the facility is rejected fr qualificatin by DOER r fr certificatin by LIHI, the Grantee must immediately prvide MassCEC ntice f such rejectin. The Grantee may then submit an invice fr reimbursement f csts incurred up until the date f the rejectin by DOER r LIHI, less the Grantee's cst share fr the cnstructin phase f the prject. N further reimbursements will be made under the Grant Agreement. Grantees are required t register their facilities in MassCEC s Prductin Tracking System ( PTS ), which is a digital database that tracks the prductin f renewable energy in Massachusetts, and t reprt generatin frm their cmpleted prjects t PTS n a mnthly basis fr at least five years. Please see Attachment 4 (Minimum Technical Requirements) f Appendix B-2 f this Slicitatin and fr mre infrmatin. MassCEC may request initial infrmatin t register a facility immediately upn grant executin, but in n case later than the final Cnstructin milestne package. As part f the final Cnstructin milestne, Grantees must successfully reprt system prductin t PTS. Grantees are advised t allw at least five weeks fr this prcess. Please pay careful attentin t the insurance requirements in the Sample Design & Cnstructin Task Order (see Appendix B-2). MassCEC may request evidence f the required insurance upn executin f the grant agreement r at any time thereafter. If a Grantee cmpletes any milestne fr less than the amunt that wuld be needed t request the Maximum Grant Installment fr that milestne, the excess grant funds may be rlled ver t a subsequent Grant Installment. Grantees will be accuntable fr the minimum cst share percentage identified in the 12

15 grant agreement. If ttal prject expenses are less than the amunt identified in the grant agreement budget, MassCEC and Grantee will share in any savings by maintaining the required cst share percentage set frth in the grant agreement. N grant funds may be used t reimburse r write dwn expenses incurred prir t the effective date f an agreement with MassCEC, nr may such expenses cunt tward the Grantee s share f csts. MassCEC reserves the right t re-evaluate the award amunt if the planned prject has undergne any changes. 6. Selectin Prcess and Criteria 6.1. Selectin Prcess Bth Feasibility Study and Design & Cnstructin prjects will be evaluated with respect t the criteria discussed in the next sectin. MassCEC reserves the right t reject withut further cnsideratin any applicatins that, in its sle judgment, fail t meet the threshld requirements. MassCEC staff may request supplemental infrmatin during the review prcess. MassCEC may als request an interview with qualified Applicants and/r a site visit. MassCEC may use a technical cnsultant r cnvene a panel f external reviewers t assist it in evaluating the applicatins. While applicatins will be accepted n a rlling basis, MassCEC reserves the right t make awards in an rder ther than that in which the applicatins were submitted; MassCEC may cmpare pending applicatins and make awards based n factrs including but nt limited t cst effectiveness (Grant$/kWh/yr), envirnmental issues, r schedule. MassCEC reserves the right t make n awards, t award less than the Applicant requests, and/r t award less than the maximum amunt f funds ptentially available thrugh this Slicitatin Selectin Criteria MassCEC reserves the right t cnsider nly applicatins that, in its sle judgment, meet the fllwing threshld criteria: The Applicant site meets minimum slicitatin requirements and guidelines (Sectin 3). Eligible Applicant and prject site cntrl requirements FERC status Facility size and lcatin Eligible technlgy The applicatin is cmplete and respnsive t the Slicitatin s requirements (including use f the applicatin templates prvided by MassCEC and adherence t submissin instructins). The applicatin includes all required attachments. The clarity, specificity, and cnsistency f the applicatin are sufficient t be deemed credible. The Applicant has prvided evidence f their cmmitment t the prject and has cmmitted t the cst-share requirements. Applicatins that meet threshld will be evaluated with respect t the fllwing: Criteria Prject Characteristics Sub-Criteria Descriptins f existing facility and prpsed prject are clear 13

16 Criteria Sub-Criteria Dam is in cmpliance with dam safety regulatins. MassCEC prefers prjects at facilities with n safety r ther deficiencies, and that are in gd cnditin Regulatry/licensing status is clearly explained and any new permits r amendments appear reasnable t btain RPS status and DFG utlk n LIHI certificatin are favrable Calculatins f incremental energy prduced are clear and welldcumented In additin, fr Design & Cnstructin prjects: Thrughness f prir feasibility analysis clearly addresses technical cnsideratins estimate f increased generatin calculated in accrdance with the methdlgy utlined in Appendix D (fr grant requests less than $75,000, an Applicant is nt required t fllw the Appendix D methdlgy fr its estimate f increased generatin) eclgical impacts (psitive r negative), such as effects n stream flw, impact n upstream r dwnstream habitat, effects n resident r migrating fish, eels and ther species regulatry and permitting issues such as 401 Water Quality Certificatin, FERC licensing, lcal wetlands bylaws prject financing and financial feasibility Risks t cmpleting the prject are mdest and plans t mitigate thse risks are identified Prject Prgrammatic Benefits Quantity f incremental energy and RECs prduced, and any ther energy benefits t the Cmmnwealth f Massachusetts are clearly stated Timeframe t cmpletin is within three years The prject ffers direct ecnmic benefits thrugh tax payments t Massachusetts gvernmental entities, leases t Massachusetts prperty wners, increased cnstructin r peratin jbs fr Massachusetts residents, r increased ecnmic activity fr Massachusetts firms, and such benefits are quantified Scpe f Wrk, Status and Schedule Wrk plan is clear and lgical Schedule is reasnable fr scpe f prject and meets Slicitatin requirements Budget is cnsistent with cmpetitive prcurement f gds and services Team is qualified t execute the remainder f the prject In additin, fr Design & Cnstructin prjects: Plan and schedule fr financing ther rehab needs, if nt part f this 14

17 Criteria Sub-Criteria prject, are identified Financial Request Grant request cmplies with Sectin 4.1 fr Feasibility Studies r Sectin 5.1 fr Cnstructin Prjects. Cst share percentage prvided by the Applicant meets r exceeds required minimum. Fr Cnstructin prjects: Applicant demnstrates the financial need fr the amunt requested specifically, hw the requested grant enables the prpsed prject t meet the Applicant s financial threshld. 7. Applicatin Prcess 7.1. Applicatin Frms Applicants must cmplete and submit a frmal applicatin fr either a Feasibility Study grant r a Design & Cnstructin grant. A separate applicatin must be submitted fr each prpsed prject. Applicants may nt apply fr bth a Feasibility Study grant and a Design & Cnstructin grant fr the same prject simultaneusly. The dwnladable applicatin frms fr each type f grant are in Frm B (FS) and Frm B (D&C), respectively. Applicants fr Cnstructin-Only grants shuld use Frm B (D&C). The Standard Budget Frms fr all types f applicatins are cntained in Frm C. Feasibility Study Applicants shuld demnstrate that sme pre-feasibility wrk has already been dne t assess the pprtunity, understand technical and ecnmic issues assciated with the prject, and identify ptential fatal flaws. Unless the facility is already MA RPS-qualified, Applicants will need evidence f a cnsultatin with the MA Divisin f Fisheries and Wildlife (DFW) regarding 1) ptential eclgical cncerns with the facility and the prpsed prject, and 2) issues that shuld be addressed in the Feasibility Study. A letter frm DFW is required. Cntact: Dr. Caleb Slater, r caleb.slater@state.ma.us Design & Cnstructin Applicants are expected t have cmpleted a thrugh feasibility study (which des nt need t have been funded by MassCEC r its predecessr). The feasibility analysis shuld prvide substantive technical, eclgical, regulatry and ecnmic detail as well as demnstrate a thrugh understanding f risks t timely prject cmpletin and related mitigatin measures. The applicatin must demnstrate a firm cmmitment frm all partners invlved in the prject. Unless the facility is already MA RPS-qualified, the Applicant must include a letter frm DFW that lists cncerns that may affect LIHI certificatin; the letter may als ffer ptential slutins t thse cncerns. If pssible, the letter shuld ffer a nn-binding pinin as t whether (r under what cnditins) DFW wuld ppse LIHI certificatin. Cntact: Dr. Caleb Slater, r caleb.slater@state.ma.us Please allw plenty f time t discuss yur prject with DFG and ptentially revise yur plans prir t requesting a letter and preparing yur MassCEC applicatin. MassCEC recmmends that Applicants carefully fllw instructins and prepare cmplete, clear, and cncise applicatins. It is the sle respnsibility f the Applicant t ensure that the applicatin is cmplete, meets minimum threshld requirements and is prperly submitted t MassCEC. MassCEC reserves the right t cnsider nly applicatins that, in its sle judgment, meet the minimum threshld and submissin requirements Authrized Respndents Signature and Acceptance Frm A certificatin must be included in the applicatin, indicating cmpliance with the terms, cnditins and specificatins cntained in this slicitatin. By executing the enclsed Authrized Applicant s Signature and Acceptance Frm (Frm A), the Applicant will have satisfied this requirement. 15

18 Any and all data, materials and dcumentatin prperly submitted t MassCEC in respnse t this slicitatin shall becme MassCEC s prperty and shall be subject t public disclsure under the Massachusetts Public Recrds Act. In this regard, PLEASE NOTE: By executing the Authrized Applicant s Signature and Acceptance Frm and submitting a respnse t this slicitatin, Applicants certify that they (1) acknwledge and understand the prcedures fr handling materials submitted t MassCEC as set frth in Sectin 8.1, (2) agree t be bund by thse prcedures, and (3) agree that MassCEC shall nt be liable under any circumstances fr the disclsure f any materials submitted t MassCEC pursuant t this slicitatin r upn the Applicant s selectin as an awardee Applicatin Package The applicatin package must be submitted in bth hard cpy and electrnically, as fllws: Tw bund, duble-sided cpies (n three-ring binders) f the signed Authrized Applicant s Signature and Acceptance Statement (Frm A), Applicatin Frm (Frm B (FS) r B (D&C)) and attachments, and the relevant sectins f Frm C (budget). Please number all pages cnsecutively and use sectin dividers if yu have lengthy attachments. The hard cpies must be sent t: Cmmnwealth Hydr Slicitatin N CH-R7 Massachusetts Clean Energy Center 63 Franklin Street, 3 rd Flr Bstn, MA Electrnic cpies f all the materials listed abve. The budget frm (relevant sectins f Frm C) shuld be prvided as a separate, functinal Excel file. Fr Design & Cnstructin applicatins, the mdel fr estimating annual incremental generatin shuld als be prvided as a functinal Excel file. Fr Feasibility applicatins, the Feasibility Study utline shuld be in an editable Wrd dcument. All ther materials can be in Wrd r PDF frmat. Please d nt submit mre than six electrnic files; yu may cmbine multiple attachments int a single electrnic file. The electrnic files may be submitted n a disk r USB device alng with the hard cpies, r ed t abarad@masscec.cm Applicatin Timeframe The schedule fr the Rund 6 Slicitatin is utlined in the table belw. Slicitatin Psted December 11, 2015 Deadline fr Written Questins Nne Applicatins Accepted n a Rlling Basis Thrugh March 11, 2016 Estimated Review Perid Varies with cmplexity f applicatin and need fr site visit. Target timeframes: Feasibility Study: Less than 6 weeks Cnstructin: Less than 10 weeks 7.5. Questins Questins cncerning this Slicitatin shuld be submitted by t Amy Barad at abarad@masscec.cm. All inquiries shuld reference the Slicitatin. MassCEC prvides a link n the web page (Cmmnwealth Hydr) t a listing f all questins and answers. MassCEC will peridically update this listing and Applicants are encuraged t visit the website fr updates prir t submitting a questin. Only answers psted n the web site shuld be treated as MassCEC s fficial respnse t any questin. 16

19 8. General Cnditins 8.1. Ntice f Public Disclsure and Open Checkbk As a public entity, MassCEC is subject t Massachusetts Public Recrds Law, cdified at Chapter 66 f the Massachusetts General Laws ( Public Recrds Law ). Applicant acknwledges and agrees that any dcumentary material, data, r ther infrmatin submitted t MassCEC are presumed t be public recrds. An exemptin t the Public Recrds Law may apply t certain recrds, including materials that fall under certain categries under a statutry r cmmn law exemptin, including the limited exemptin at Massachusetts General Laws Chapter 23J, Sectin 2(k) regarding certain types f cnfidential infrmatin submitted t MassCEC by an applicant fr any frm f assistance. By submissin f an applicatin, Applicant acknwledges and agrees that MassCEC, in its sle discretin, shall determine whether any particular dcument, material, data r ther infrmatin is exempt frm r subject t public disclsure. Thus, MassCEC urges Applicant t carefully cnsider what dcuments, materials, data and ther infrmatin is submitted t MassCEC in cnnectin with this Slicitatin. In line with Public Recrds Law requirements, MassCEC generally cnsiders the fllwing types f infrmatin as cnfidential: The financial terms cntained in leases, pwer r REC purchase agreements, r service cntracts with ther parties Prject pr-frmas and statements f financial threshlds Intellectual prperty Persnal infrmatin (Scial Security numbers shuld NOT be prvided t MassCEC) Applicant agrees and acknwledges that MassCEC shall have the right t disclse the name f Grantee the amunt f the payment under the Task Order and any ther infrmatin it may deem reasnably necessary n Open Checkbk, the Cmmnwealth f Massachusetts nline database f state spending Cntractual Requirements Fllwing annuncement f a Grant Award, MassCEC intends t enter int an agreement with the selected Applicants cntaining certain standard prvisins (the Agreement ). MassCEC reserves the right t amend the Agreement withut further issuance f anther slicitatin. The Agreement cnsists f tw parts, the General Terms and Cnditins (included as Appendix A f this slicitatin), which are the legal terms that will gvern the award, and a Task Order. The General Terms and Cnditins are designed t be executed nce by an awardee and are nt intended t be specific t an award made under this slicitatin. Upn MassCEC authrizatin t prceed with an award, MassCEC and the awardee will execute a Task Order that will set frth the respective rles and respnsibilities f the parties specifically as they relate t the prject that is the subject f the award under this slicitatin. Applicants shuld review bth the General Terms and Cnditins (Appendix A) befre signing the Authrized Applicant s Signature and Acceptance Statement (Frm A) Waiver Authrity MassCEC reserves the right, at its sle discretin, t waive minr irregularities in submittal requirements, t request mdificatins f the applicatin, t accept r reject any r all applicatins received, and/r t cancel r mdify all r part f this slicitatin at any time prir t awards. 17

20 8.4. Disclaimer This slicitatin des nt cmmit MassCEC t award any funds, pay any csts incurred in preparing an applicatin, r prcure r cntract fr services r supplies. MassCEC reserves the right t accept r reject any r all applicatins received, negtiate with all qualified Applicants, cancel r mdify the slicitatin in part r in its entirety, change the applicatin guidelines, make n awards, award less than the Applicant requests and/r award less than the maximum amunt f funds ptentially available thrugh this slicitatin, when it is in its best interest Grant Taxability Grants may be cnsidered taxable incme by the U.S. Internal Revenue Service and the Massachusetts Department f Revenue. All parties are strngly encuraged t cnsult with a tax prfessinal t determine the federal and/r state tax implicatins f receipt f a grant. MassCEC will issue a Frm 1099 t each Grantee wh receives funds. Therefre, MassCEC will need t receive a cmpleted W-9 Frm frm each Grantee prir t the remittance f any grant payment. A template W-9 Frm and instructins will be prvided fr the Grantee t cmplete and return t MassCEC s finance department Changes/Amendments t Slicitatin This slicitatin has been distributed electrnically using MassCEC s website. It is the respnsibility f Applicants t check MassCEC s website fr any addenda r mdificatins t a slicitatin t which they intend t respnd. MassCEC, the Cmmnwealth f Massachusetts, and its subdivisins accept n liability and will prvide n accmmdatin t Applicants wh submit an applicatin based n an ut-fdate slicitatin dcument. 18

Feasibility Study and Construction Project GRANTS

Feasibility Study and Construction Project GRANTS Prgram Feasibility Study and Cnstructin Prject GRANTS Rund 8 Backgrund and Instructins Slicitatin N. 2017-CH-R8 Slicitatin Psted: Nvember 4, 2016 Applicatins Accepted: Rlling, until further ntice Table

More information

THE FOX THEATRE INSTITUTE

THE FOX THEATRE INSTITUTE THE FOX THEATRE INSTITUTE GRANT DESCRIPTION This grant is designed t cmplete prjects and develp cmmunity-wide participatin at the lcal level. Als knwn as the brick and mrtar grant, this annual basis grant

More information

Quincy University Grants Development & Management Guide

Quincy University Grants Development & Management Guide 1 Quincy University Grants Develpment & Management Guide Intrductin The Office f University Advancement versees the grants prcess at Quincy University and is yur resurce fr seeking funding frm any external

More information

SC Launch Grant Programs Qualifications and Processing Procedures Effective August 1, 2017

SC Launch Grant Programs Qualifications and Processing Procedures Effective August 1, 2017 SC Launch Grant Prgrams Qualificatins and Prcessing Prcedures Effective August 1, 2017 SCRA s SC Launch Prgram supprts entrepreneurs, increases technlgy cmmercializatin, and fsters early-stage cmpany develpment

More information

Denver Public Schools. Financial Services. Financial Services Manual. Grants

Denver Public Schools. Financial Services. Financial Services Manual. Grants Denver Public Schls Financial Services Financial Services Manual Grants Table f Cntents Grants... 3 Prcedures GRC Website... 3 Step by Step Guide... 4 Federal Grants... 7 Title I... 7 Title II... 8 Time

More information

SAMPLE- Visit FirehouseSubsFoundation.org to apply online. Firehouse Subs Public Safety Foundation Grant Application

SAMPLE- Visit FirehouseSubsFoundation.org to apply online. Firehouse Subs Public Safety Foundation Grant Application SAMPLE- Visit FirehuseSubsFundatin.rg t apply nline. Firehuse Subs Public Safety Fundatin Grant Applicatin 1 SAMPLE- Visit FirehuseSubsFundatin.rg t apply nline. Cngratulatins! Yur rganizatin has met Firehuse

More information

MUNICIPAL EMPLOYMENT INCENTIVE PROGRAM (MEIP)

MUNICIPAL EMPLOYMENT INCENTIVE PROGRAM (MEIP) This dcument cntains bth infrmatin and frm fields. T read infrmatin, use the Dwn Arrw frm a frm field. NIAGARA GATEWAY ECONOMIC ZONE COMMUNITY IMPROVEMENT PLAN MUNICIPAL EMPLOYMENT INCENTIVE PROGRAM (MEIP)

More information

CITY OF MELBOURNE APPLICATION FOR OLDE EAU GALLIE RIVERFRONT CRA FAÇADE IMPROVEMENT PROGRAM

CITY OF MELBOURNE APPLICATION FOR OLDE EAU GALLIE RIVERFRONT CRA FAÇADE IMPROVEMENT PROGRAM The Olde Eau Gallie Riverfrnt Cmmunity Redevelpment Agency (CRA) is pleased t ffer the Façade Imprvement Prgram fr cmmercial buildings lcated within the Olde Eau Gallie Riverfrnt CRA prgram area. This

More information

Instructions. Important Dates. Application Deadline: May 15, 2013 at 5:00 p.m. Grant Awards Announced: July 15, 2013

Instructions. Important Dates. Application Deadline: May 15, 2013 at 5:00 p.m. Grant Awards Announced: July 15, 2013 Instructins Imprtant Dates Applicatin Deadline: May 15, 2013 at 5:00 p.m. Grant Awards Annunced: July 15, 2013 Prject Cmpletin: December 31, 2014 CONTACT: Lancaster Cunty Cnservancy Fritz Schreder PO Bx

More information

Valdez Beautification 2017 Matching Grant Program

Valdez Beautification 2017 Matching Grant Program Valdez Beautificatin 2017 Matching Grant Prgram Gd lks aren t everything, but they can definitely g a lng way especially when it cmes t the utside f a small business. Research was cmpleted n the fllwing

More information

State of Florida Department of Children and Families

State of Florida Department of Children and Families State f Flrida Department f Children and Families Rick Sctt Gvernr Mike Carrll Secretary Request fr Applicatins #11H20GN1 ADDENDUM #001 Criminal Justice Mental Health and Substance Abuse (CJMHSA) Reinvestment

More information

GRANT APPLICATION. Sustainable Agricultural Land Strategy Grants SUSTAINABLE AGRICULTURAL LANDS CONSERVATION PROGRAM

GRANT APPLICATION. Sustainable Agricultural Land Strategy Grants SUSTAINABLE AGRICULTURAL LANDS CONSERVATION PROGRAM SUSTAINABLE AGRICULTURAL LANDS CONSERVATION PROGRAM Sustainable Agricultural Land Strategy Grants GRANT APPLICATION Strategic Grwth Cuncil Califrnia Natural Resurces Agency Califrnia Department f Cnservatin

More information

For purposes of this Security Agreement, the use of the terms you and your includes both the Oil and Gas Operator and the EFA when appropriate.

For purposes of this Security Agreement, the use of the terms you and your includes both the Oil and Gas Operator and the EFA when appropriate. Oil and Gas Operatr and Electrnic Filing Administratr (EFA) Registratin and Security Agreement fr Oil and Gas Electrnic Filing Systems Oil and Gas Operatr (Primary Reprting Entity) Name f Oil and Gas Operatr:

More information

Government Equalities Office Returners Fund

Government Equalities Office Returners Fund Gvernment Equalities Office Returners Fund Overview In the Spring Budget 2017, the Prime Minister cmmitted 5 millin t prmte returnships t the public and private sectrs, helping peple back int emplyment

More information

OLTL Transition Plan CMS HCBS Regulations. Introduction

OLTL Transition Plan CMS HCBS Regulations. Introduction OLTL Transitin Plan CMS HCBS Regulatins Intrductin New Centers fr Medicare and Medicaid Services (CMS) rules utlined at 42 CFR 441.301(c)(4) require public cmment n any new 1915(c) waivers, waiver renewals

More information

CITY OF MELBOURNE APPLICATION FOR DOWNTOWN MELBOURNE CRA RETAIL CORE COMMERCIAL LIGHTING PROGRAM

CITY OF MELBOURNE APPLICATION FOR DOWNTOWN MELBOURNE CRA RETAIL CORE COMMERCIAL LIGHTING PROGRAM The Melburne Dwntwn Cmmunity Redevelpment Agency (CRA) is prviding funding fr a lighting enhancement prgram within the dwntwn retail cre. Grant funding is prvided t encurage building wners r businesses

More information

Government of Ontario IT Standard (GO-ITS) GO-ITS Number 56.5 OPS Grants Management Reference Model

Government of Ontario IT Standard (GO-ITS) GO-ITS Number 56.5 OPS Grants Management Reference Model Gvernment f Ontari IT Standard (GO-ITS) GO-ITS Number 56.5 OPS Grants Management Reference Mdel Versin #: 2.4 Status: Apprved Prepared fr the Infrmatin Technlgy Standards Cuncil (ITSC) under the delegated

More information

2018 HBS New Venture Competition Student Social Enterprise Track

2018 HBS New Venture Competition Student Social Enterprise Track 2018 HBS New Venture Cmpetitin Student Scial Enterprise Track Details fr Participating Teams KEY DATES See details fr each n fllwing pages Date January 31, 2018 12:00 nn February 21, 2018 12:00 nn March

More information

MEDI-CAL (MC051) ERA ENROLLMENT INSTRUCTIONS

MEDI-CAL (MC051) ERA ENROLLMENT INSTRUCTIONS MEDI-CAL (MC051) ERA ENROLLMENT INSTRUCTIONS WHICH FORM(S) SHOULD I DO? Electrnic Healthcare Claim Payment/Advice Receiver Agreement (ANSI ASC X12N 835-Transactin) WHERE SHOULD I SEND THE FORMS? Mail the

More information

2019 IGP Faculty Research Initiation Grant

2019 IGP Faculty Research Initiation Grant 2019 IGP Faculty Research Initiatin Grant Faculty Research Initiatin Grant: Faculty Research Initiatin Grants prvide supprt fr faculty initiating new prgrams f research, schlarship r creative endeavr r

More information

Small Business. Big Recognition.

Small Business. Big Recognition. Small Business Develpment Center Small Business. Big Recgnitin. The Small Business Develpment Center knws firsthand that small businesses are the backbne f American free enterprise. Every day, they re

More information

Closing Date for Applications - no applications accepted after midnight (UK Time) on closing date First review of applications begins

Closing Date for Applications - no applications accepted after midnight (UK Time) on closing date First review of applications begins Guidance ntes Research and Develpment Department 1. CIMA S RESEARCH APPLICATION PROCESS CIMA s charter t advance the science f management accunting frms the cre f ur academic research strategy and guides

More information

2017 TOURISM DEVELOPMENT MATCHING GRANT PROGRAM PROGRAM GUIDELINES

2017 TOURISM DEVELOPMENT MATCHING GRANT PROGRAM PROGRAM GUIDELINES 2017 TOURISM DEVELOPMENT MATCHING GRANT PROGRAM PROGRAM GUIDELINES The Fauquier Cunty Department f Ecnmic Develpment has established a Turism Develpment Matching Grant Prgram. The grant prgram is administered

More information

Wood Windows and Doors Application

Wood Windows and Doors Application Wd Windws and Drs Applicatin Please read the attached Plicy Guidelines, Administrative Prcedures and prvide the requested infrmatin. 1. Address f Prperty: 2. Applicant/Owner name & mailing address: Telephne:

More information

1. CIMA S SEEDCORN RESEARCH APPLICATION PROCESS: FEASIBILITY STUDIES

1. CIMA S SEEDCORN RESEARCH APPLICATION PROCESS: FEASIBILITY STUDIES Guidance ntes Research and Develpment Department 1. CIMA S SEEDCORN RESEARCH APPLICATION PROCESS: FEASIBILITY STUDIES CIMA s charter t advance the science f management accuntancy frms the cre f ur academic

More information

LSU HEALTH SHREVEPORT NOTICE OF PRIVACY PRACTICES FOR PROTECTED HEALTH INFORMATION

LSU HEALTH SHREVEPORT NOTICE OF PRIVACY PRACTICES FOR PROTECTED HEALTH INFORMATION LSU HEALTH SHREVEPORT NOTICE OF PRIVACY PRACTICES FOR PROTECTED HEALTH INFORMATION THIS NOTICE DESCRIBES HOW YOUR MEDICAL INFORMATION MAY BE USED AND DISCLOSED AND HOW YOU CAN GET ACCESS TO THIS INFORMATION.

More information

Guidelines for Analysis of Credentials to be Included on COOL

Guidelines for Analysis of Credentials to be Included on COOL Guidelines fr Analysis f Credentials t be Included n COOL Relatedness Determinatin Guidelines Relatedness Determinatin (RD) refers t the identificatin f certificatins relevant t a Navy rating/designatr/ccupatin.

More information

WORKFORCE IMPLEMENTATION GUIDANCE (WIG) LETTER RELEASE OF GEORGIA LWDA STRATEGIC PROGRAMMING GRANTS

WORKFORCE IMPLEMENTATION GUIDANCE (WIG) LETTER RELEASE OF GEORGIA LWDA STRATEGIC PROGRAMMING GRANTS WORKFORCE IMPLEMENTATION GUIDANCE (WIG) LETTER DATE: December 16, 2015 NO: TO: FROM: SUBJECT: WIG GA-15-006 LOCAL WORKFORCE SYSTEM STAKEHOLDERS ODIE DONALD, WIOA Services Directr RELEASE OF GEORGIA LWDA

More information

Tourism Events Grants. FY 2019 (July 1, 2018 June 30, 2019)

Tourism Events Grants. FY 2019 (July 1, 2018 June 30, 2019) CITY OF PRESCOTT 201 S. Crtez St. Presctt, AZ 86303 928-777-1220 www.visit-presctt.cm Turism Events Grants FY 2019 (July 1, 2018 June 30, 2019) POLICIES, PROCEDURES and CRITERIA Dear TAC Grant Applicant:

More information

2016 Community Waste Reduction and Recycling Grants

2016 Community Waste Reduction and Recycling Grants 2016 Cmmunity Waste Reductin and Recycling Grants REQUEST FOR PROPOSALS N.C. Department f Envirnmental Quality Divisin f Envirnmental Assistance and Custmer Service The purpse f this grant prgram is t

More information

CANADA-JERUSALEM CO-DEVELOPMENT AND CO-PRODUCTION INCENTIVE GUIDELINES 2017

CANADA-JERUSALEM CO-DEVELOPMENT AND CO-PRODUCTION INCENTIVE GUIDELINES 2017 CANADA-JERUSALEM CO-DEVELOPMENT AND CO-PRODUCTION INCENTIVE GUIDELINES 2017 The Canada-Jerusalem C-Develpment and C-Prductin Incentive The Canada-Jerusalem C-Develpment and C-Prductin Incentive ( Incentive

More information

REGIONAL ARTS FUND Quick Response Grant

REGIONAL ARTS FUND Quick Response Grant REGIONAL ARTS FUND Quick Respnse Grant Intrductin The Reginal Arts Fund is an Australian Gvernment prgram that supprt sustainable cultural develpment in reginal and remte cmmunities in Australia. The prgram

More information

Resident Assistant Application

Resident Assistant Application Resident Assistant Applicatin 2017-2018 We are excited that yu have decided t apply t be a Resident Assistant (RA). It is a unique pprtunity t wrk with diverse grups f students and be actively invlved

More information

Medical Assistance in Dying: Update Stakeholder Presentation

Medical Assistance in Dying: Update Stakeholder Presentation Medical Assistance in Dying: Update Stakehlder Presentatin Ministry f Health and Lng-Term Care and Ministry f the Attrney General Week f August 1, 2016 Implementatin Questins: What We Heard Frm Yu 1. Reprting:

More information

Resident Assistant Application

Resident Assistant Application Resident Assistant Applicatin We are excited that yu have decided t apply t be a Resident Assistant (RA). It is a unique pprtunity t wrk with diverse grups f students and be actively invlved n the Queens

More information

Terminating the Provider- Patient Relationship. Provided by Coverys Risk Management

Terminating the Provider- Patient Relationship. Provided by Coverys Risk Management Terminating the Prvider- Patient Relatinship Prvided by Cverys Risk Management Terminating the Prvider-Patient Relatinship What s the Risk? An allegatin f abandnment may be brught against a prvider if

More information

1. CIMA S SEEDCORN RESEARCH APPLICATION PROCESS: FEASIBILITY STUDIES

1. CIMA S SEEDCORN RESEARCH APPLICATION PROCESS: FEASIBILITY STUDIES Guidance ntes Research and Develpment Department 1. CIMA S SEEDCORN RESEARCH APPLICATION PROCESS: FEASIBILITY STUDIES CIMA s charter t advance the science f management accuntancy frms the cre f ur academic

More information

DOCUMENT TITLE: Clarification of Bureau of Primary Health Care Credentialing and Privileging Policy outlined in Policy Information Notice

DOCUMENT TITLE: Clarification of Bureau of Primary Health Care Credentialing and Privileging Policy outlined in Policy Information Notice 2002-22 DATE: July 10, 2002 DOCUMENT TITLE: Clarificatin f Bureau f Primary Health Care Credentialing and Privileging Plicy utlined in Plicy Infrmatin Ntice 2001-16 TO: Cmmunity Health Centers Migrant

More information

Yolo County Homeless and Poverty Action Coalition (HPAC)

Yolo County Homeless and Poverty Action Coalition (HPAC) Yl Cunty Hmeless and Pverty Actin Calitin (HPAC) FY 2017 Emergency Slutins Grant (ESG): Lcal Cmpetitin Timeline and Selectin Prcess Adpted June 9, 2017 Tentative Lcal Emergency Slutins Grant (ESG) Cmpetitin

More information

Academic Health Center Mayo Mail Code Delaware Street SE, Minneapolis, MN nexusipe.

Academic Health Center Mayo Mail Code Delaware Street SE, Minneapolis, MN nexusipe. Academic Health Center May Mail Cde 501 420 Delaware Street SE, Minneaplis, MN 55455 612-625-3972 nexusipe@umn.edu nexusipe.rg Natinal Center fr Interprfessinal Practice and Educatin Nexus Summit 2017:

More information

NOTE: The first appearance of terms in bold in the body of this document (except titles) are defined terms please refer to the Definitions section.

NOTE: The first appearance of terms in bold in the body of this document (except titles) are defined terms please refer to the Definitions section. TITLE RESTRAINT AS A LAST RESORT SCOPE Prvincial APPROVAL AUTHORITY Clinical Operatins Executive Cmmittee SPONSOR Senir Operating Officer, Glenrse Rehabilitatin Hspital PARENT DOCUMENT TITLE, TYPE AND

More information

Oregon Registry. Infant Toddler Professional Credential. Overview. Oregon Center for Career Development in Childhood Care and Education

Oregon Registry. Infant Toddler Professional Credential. Overview. Oregon Center for Career Development in Childhood Care and Education Oregn Registry Infant Tddler Prfessinal Credential Overview Oregn Center fr Career Develpment in Childhd Care and Educatin March 2011 Oregn Center fr Career Develpment in Childhd Care and Educatin SETTING

More information

p so January 16, 2014

p so January 16, 2014 Public Disclsure Authrized Public Disclsure Authrized Public Disclsure Authrized Public Disclsure Authrized OFFICIAL p s The Wrld Bank IDOCU IA.I (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND

More information

GRANT GUIDELINES FOR ORGANIZATIONS 2017 CYCLE

GRANT GUIDELINES FOR ORGANIZATIONS 2017 CYCLE GRANT GUIDELINES FOR ORGANIZATIONS 2017 CYCLE SUBMISSION DEADLINE Thursday, March 30, 2017 at 5:00 PM GRANTS PROGRAM OVERVIEW CultureWrks missin is t drive a vibrant cmmunity by inspiring, enabling and

More information

Annual South Carolina School Health LPN of the Year Award ( )

Annual South Carolina School Health LPN of the Year Award ( ) Annual Suth Carlina Schl Health LPN f the Year Award (2017-2018) The SC Schl Health LPN f the Year Award is presented annually by the SC Department f Health and Envirnmental Cntrl and the SC Department

More information

Application. Community Health Excellence (CHE) Grant Program

Application. Community Health Excellence (CHE) Grant Program Cmmunity Health Excellence (CHE) Grant Prgram 2017 2018 Applicatin A cmpleted applicatin must be submitted by July 30, 2017, and must include: A cmpleted Applicatin Cver Sheet and Narrative A cmpleted

More information

R&D Tax Incentive Taxpayer alerts issued

R&D Tax Incentive Taxpayer alerts issued TaxTalk Insights Research and Develpment R&D Tax Incentive Taxpayer alerts issued 28 February 2017 In brief Recently, the Cmmissiner f Taxatin (the Cmmissiner), in cnjunctin with the Department f Industry,

More information

NOTE: The first appearance of terms in bold in the body of this document (except titles) are defined terms please refer to the Definitions section.

NOTE: The first appearance of terms in bold in the body of this document (except titles) are defined terms please refer to the Definitions section. TITLE ACCESS TO A DESIGNATED LIVING OPTION IN CONTINUING CARE SCOPE Prvincial DOCUMENT # HCS-117 APPROVAL LEVEL Alberta Health Services Executive Leadership Team SPONSOR Vice President Prvince-Wide Clinical

More information

USF GME - Moonlighting Privileges Request July1, 2018 June 30, 2019

USF GME - Moonlighting Privileges Request July1, 2018 June 30, 2019 USF GME - Mnlighting Privileges Request July1, 2018 June 30, 2019 Achieving the gals and bjectives f the educatinal prgram must be the highest prfessinal respnsibility f the huse fficer. Mnlighting is

More information

Key Points for Approving Officers Regarding Electronic Filing

Key Points for Approving Officers Regarding Electronic Filing Key Pints fr Apprving Officers Regarding Electrnic Filing The Land Title Act allws a subdivisin plan t be prepared and submitted t the Land Title Office electrnically. T assist Apprving Officers (AO) with

More information

PRIVACY IMPACT ASSESSMENT (PIA) For the

PRIVACY IMPACT ASSESSMENT (PIA) For the PRIVACY IMPACT ASSESSMENT (PIA) Fr the Medical Bards Online Tracking System (MEDBOLTS) Department f the Navy - TMA DHP Funded System SECTION 1: IS A PIA REQUIRED? a. Will this Department f Defense (000)

More information

CANADA-LUXEMBOURG CO-DEVELOPMENT AND CO-PRODUCTION INCENTIVE FOR AUDIOVISUAL PROJECTS GUIDELINES

CANADA-LUXEMBOURG CO-DEVELOPMENT AND CO-PRODUCTION INCENTIVE FOR AUDIOVISUAL PROJECTS GUIDELINES CANADA-LUXEMBOURG CO-DEVELOPMENT AND CO-PRODUCTION INCENTIVE FOR AUDIOVISUAL PROJECTS GUIDELINES 2018-2019 Canada-Luxemburg C-Develpment and C-Prductin Incentive fr Audivisual Prjects The Canada-Luxemburg

More information

State Operations Manual Appendix P - Survey Protocol for Long Term Care Facilities - Part I

State Operations Manual Appendix P - Survey Protocol for Long Term Care Facilities - Part I State Operatins Manual Appendix P - Survey Prtcl fr Lng Term Care Facilities - Part I (Rev. 21, 10-20-06) Transmittals fr Appendix P I. Intrductin II. The Survey Prcess II.A The Quality Indicatrs Survey

More information

Down Payment Online Manual

Down Payment Online Manual Dwn Payment Online Manual Dwn Payment Online Manual Member cntacts may use this manual t help navigate Dwn Payment/Set Aside Prgram (DP) Online and perfrm the fllwing functins: 1. Lg int DP Online thrugh

More information

COMMUNITY FOUNDATION OF BOONE COUNTY 2018 Competitive Grant Guidelines

COMMUNITY FOUNDATION OF BOONE COUNTY 2018 Competitive Grant Guidelines COMMUNITY FOUNDATION OF BOONE COUNTY 2018 Cmpetitive Grant Guidelines Histry and Missin The Cmmunity Fundatin f Bne Cunty (CFBC) was funded in 1991 with gifts frm individuals, families, businesses, rganizatins

More information

City of Moncton Immigration Grants Policy 2018

City of Moncton Immigration Grants Policy 2018 IMMIGRATION GRANT POLICY Objectives a) T prvide guidance fr Mnctn City Cuncil when making funding decisins regarding Immigratin Grants. b) T establish the applicatin rules and prcedures fr rganizatins

More information

Regional Sports and Recreation Grants Programme Application Guidelines

Regional Sports and Recreation Grants Programme Application Guidelines Reginal Sprts and Recreatin Grants Prgramme Applicatin Guidelines Aucklanders: mre active, mre ften Auckland ffers sprt and recreatin pprtunities withut equal in the suthern hemisphere which inspire and

More information

SEQOHS Accreditation Assessor Job Description

SEQOHS Accreditation Assessor Job Description SEQOHS Accreditatin Assessr Jb Descriptin Abut this Dcument This dcument supprts the SEQOHS Office prcess fr the recruitment f assessrs fr the SEQOHS accreditatin scheme. Assessrs must be frm an ccupatinal

More information

Work Instruction Patient Visits

Work Instruction Patient Visits Wrk Instructin Patient Visits THE UNIVERSITY OF TEXAS HEALTH SCIENCE CENTER AT SAN ANTONIO Wrk Instructin Patient Visits Vels - eresearch Versin 9.2 Versin: 2.0, 04/30/2015 Wrk Instructin Patient Visits

More information

About this guide 5 Section 1: Meeting VET sector requirements 7

About this guide 5 Section 1: Meeting VET sector requirements 7 Cntents Abut this guide 5 Sectin 1: Meeting VET sectr requirements 7 1.1 Hw Aspire s resurces assist in meeting requirements 7 1.2 Resurce quality assurance prcesses 16 Sectin 2: Unit f cmpetency infrmatin

More information

Original Date: January 27, 2010 Reviewed/Last Modified Date: September 15, 2015

Original Date: January 27, 2010 Reviewed/Last Modified Date: September 15, 2015 Hme and Cmmunity Care - Feedback Reprting Prcess: Cmplaints, Cmpliments and Inquiries Manual: Administratin Sectin: Risk and Safety Management Subsectin: Original Date: January 27, 2010 Reviewed/Last Mdified

More information

South Lake Community Futures Development Corporation

South Lake Community Futures Development Corporation Eastern Ontari Develpment Prgram Business Develpment Fund Purpse: The Business Develpment Fund supprts prjects that lead t the grwth f new and existing businesses within rural eastern Ontari cmmunities.

More information

YOUTH What is Heads Up Football? What are the benefits of a youth football organization adopting Heads Up Football?

YOUTH What is Heads Up Football? What are the benefits of a youth football organization adopting Heads Up Football? YOUTH What is Heads Up Ftball? Heads Up Ftball is a USA Ftball rganizatinal membership prgram designed t create a better, safer game. Key cmpnents f this prgram include caches cmpleting the nly natinally

More information

Additional Non-Tax Incentives

Additional Non-Tax Incentives Additinal Nn-Tax Incentives Revised 03/11/2013 Alabama Department f Cmmerce/Alabama Department f Revenue WORKFORCE: Right-t-Wrk State AIDT (Wrkfrce Recruitment and Training) Amng the tp wrkfrce training

More information

Directions & Instructions for Filing an Application to the Radiologic Technology Program

Directions & Instructions for Filing an Application to the Radiologic Technology Program 2018 Radilgic Technlgy Applicatin Infrmatin Page 1 f 7 Ls Angeles City Cllege Radilgic Technlgy Prgram APPLICATION INFORMATION PACKET Applicatin Filing Perid is February 1, 2018 t March 31, 2018 Directins

More information

IHSS In Home Support Services

IHSS In Home Support Services IHSS In Hme Supprt Services What is IHSS? The IHSS prgram is a statewide mandated prgram administered by each cunty under the directin f the Califrnia Department f Scial Services. It prvides thse with

More information

Financial Officer 18 Applicant Inventory

Financial Officer 18 Applicant Inventory Financial Officer 18 Applicant Inventry Frequently Asked Questins Why has an applicant inventry been created t fill Financial Officer 18 vacancies? The creatin f applicant inventries allws fr a mre cnsistent

More information

PLACEMENT POLICIES FOR WORK & TRAVEL AND TRAINEE/INTERN PROGRAMS

PLACEMENT POLICIES FOR WORK & TRAVEL AND TRAINEE/INTERN PROGRAMS PLACEMENT POLICIES FOR WORK & TRAVEL AND TRAINEE/INTERN PROGRAMS TABLE OF CONTENTS Wrk & Travel Prgram Submissin Prcess 1 Placement Prcedures 2 Trainee/Intern Prgram Submissin Prcess 3 Placement Prcedures

More information

Champions for Healthy Kids Grants

Champions for Healthy Kids Grants Champins fr Healthy Kids Grants 2015-2016 Champins fr Healthy Kids Grants Nw Available! $1 Millin Champins fr Healthy Kids grants available t nnprfit rganizatins fr prgrams perating June 1, 2015-May 31,

More information

Workforce Innovation and Opportunity Act Youth Career Pathways Program

Workforce Innovation and Opportunity Act Youth Career Pathways Program Wrkfrce Innvatin and Opprtunity Act Yuth Career Pathways Prgram Request fr Applicatin State Fiscal Year 2016 Department f Cmmerce and Ecnmic Opprtunity Yuth Career Pathways Prgram Request fr Applicatin

More information

CALL FOR ABSTRACTS. Overview of Summit Themes. Skills-Based Workshops

CALL FOR ABSTRACTS. Overview of Summit Themes. Skills-Based Workshops CALL FOR ABSTRACTS Submissin will pen January 26, 2018 Submissin deadline is March 6, 2018 Presenters will be ntified April 6, 2018 Overview f Summit Themes Nexus Summit 2018 brings tgether a grwing cmmunity

More information

Service Description: Cisco ACI Implementation Review Service (CON-AS-ACI-IMP-REV)

Service Description: Cisco ACI Implementation Review Service (CON-AS-ACI-IMP-REV) Page 1 f 5 Service Descriptin: Cisc ACI Implementatin Review Service (CON-AS-ACI-IMP-REV) This dcument describes the Cisc ACI Implementatin Review Service. Related Dcuments: This dcument shuld be read

More information

TRAINING PLAN FOR STEM OPT STUDENTS

TRAINING PLAN FOR STEM OPT STUDENTS 1 CmpletingtheFrmI983 TRAININGPLANFORSTEMOPTSTUDENTS Science, Technlgy, Engineering & Mathematics (STEM) Optinal Practical Training (OPT) STEMOPTstudentsandtheiremplyersaresubjecttthetermsftheFrmI983,TrainingPlanfr

More information

Smart Energy GB in Communities Fund Small grants. Grant Guidelines May 2016

Smart Energy GB in Communities Fund Small grants. Grant Guidelines May 2016 Smart Energy GB in Cmmunities Fund Small grants Grant Guidelines May 2016 0 What can I d nw? Befre yu apply fr funding make sure yu have lked at the free resurces available. Yu can start using these immediately.

More information

Archive and Destruction of Patient Records

Archive and Destruction of Patient Records Archive and Destructin f Patient Recrds If yu have run ut f rm t stre paper recrds yu may need t archive the riginal dcuments. A cmprehensive archive prcess, with written plicies and prcedures will help

More information

REGIONAL ARTS FUND Step Out

REGIONAL ARTS FUND Step Out REGIONAL ARTS FUND Step Out Intrductin The Reginal Arts Fund is an Australian Gvernment prgram that supprts sustainable cultural develpment in reginal and remte cmmunities in Australia. The prgram is managed

More information

Vantel Pearls International, Inc. 46 Eastman Street, South Easton, MA Tel Compensation Plan.

Vantel Pearls International, Inc. 46 Eastman Street, South Easton, MA Tel Compensation Plan. Vantel Pearls Internatinal, Inc. 46 Eastman Street, Suth Eastn, MA 02035 www.vantelpearls.cm Tel. 508.698.2220 (March, 2016) Welcme t Vantel Pearls! This dcument prvides an verview f the incme, benefits,

More information

Medicaid EHR Incentive Program Eligible Professionals

Medicaid EHR Incentive Program Eligible Professionals Medicaid EHR Incentive Prgram Eligible Prfessinals Payment Year 1 Adpt, Implement, Upgrade New Hampshire Department f Health and Human Services Office f Medicaid Business and Plicy First Year Attestatin

More information

Each Home Instead Senior Care franchise office is independently owned and operated Home Instead, Inc.

Each Home Instead Senior Care franchise office is independently owned and operated Home Instead, Inc. Each Hme Instead Senir Care franchise ffice is independently wned and perated. 2010 Hme Instead, Inc. The nrmal aging prcess, which may invlve sensry lss, decline in memry, and slwer prcessing f infrmatin

More information

Medical Assistant Program Western Technical College. Supplemental Information

Medical Assistant Program Western Technical College. Supplemental Information Medical Assistant Prgram Western Technical Cllege Supplemental Infrmatin Curse Sequence and Delivery. This is a tw-term prgram. During the first term, the student cmpletes the basic r fundatinal curses.

More information

Meeting Minutes: Radioactive Materials Unit March 6, 2018

Meeting Minutes: Radioactive Materials Unit March 6, 2018 Meeting Minutes: Radiactive Materials Unit March 6, 2018 Minutes prepared by: Tyler Kruse Lcatin: OLF B-145 Attendance MDH Staff: Sherrie Flaherty, Supervisr, Radiactive Materials Unit Lynn Frtier, Radiatin

More information

Inpatient Rehab/LTLD Discharge Planning Practices Pre- and Post-Implementation Survey Results of TC LHIN Hospitals

Inpatient Rehab/LTLD Discharge Planning Practices Pre- and Post-Implementation Survey Results of TC LHIN Hospitals Inpatient Rehab/ Discharge Planning Practices Pre- and Results f TC LHIN Hspitals 1.0 BACKGROUND The Patient Access and Flw Cmmittee f the GTA Rehab Netwrk develped a new resurce, Discharge Planning Guidelines

More information

PAPER FOR NHS LUTON COMMUNITY SERVICES BOARD MEETING HELD ON 21 ST APRIL 2010

PAPER FOR NHS LUTON COMMUNITY SERVICES BOARD MEETING HELD ON 21 ST APRIL 2010 PAPER FOR NHS LUTON COMMUNITY SERVICES BOARD MEETING HELD ON 21 ST APRIL 2010 TITLE AUTHOR(S) PRESENTED BY DIRECTOR S SIGNATURE PURPOSE/ SUMMARY DECISION REQUIRED Standards fr Better Health & CQC Registratin

More information

Position Statement on Managed Care

Position Statement on Managed Care Psitin Statement n Managed Care The Cuncil n Cathlic Healthcare f the Michigan Health and Hspital Assciatin I. Intrductin In this Psitin Statement, the Cuncil n Cathlic Healthcare f the Michigan Health

More information

Who is authorized to give consent (substitute decision makers) Health Care Consent Act

Who is authorized to give consent (substitute decision makers) Health Care Consent Act Mdule 7 Cnsent In this mdule yu will learn abut Health Care Cnsent Act including Elements f cnsent Definitins including Capable Prpser Treatment Curse and plan f treatment Activities nt cnsidered t be

More information

Environment, Health and Safety Policy Appendix B: Environment, Health and Safety Responsibilities

Environment, Health and Safety Policy Appendix B: Environment, Health and Safety Responsibilities U f A Plicies and Prcedures On-Line (UAPPOL) Original Apprval Date: August 22, 2006 (frmerly a prcedure) Mst Recent Apprval Date: May 28, 2014 Parent Plicy: Envirnment, Health and Safety Plicy Envirnment,

More information

FAQs: ARC PARTICIPATION & ELIGIBILITY CRITERIA

FAQs: ARC PARTICIPATION & ELIGIBILITY CRITERIA FAQs: ARC PARTICIPATION & ELIGIBILITY CRITERIA TOGETHER FOR DEVELOPMENT One UN Plaza DC1-16 Flr New Yrk NY 10017 T +1 212 906 6924 undg.rg FREQUENTLY ASKED QUESTIONS ARC PARTICIPATION & ELIGIBILITY CRITERIA

More information

We believe that creative and sustainable solutions come from people who work in partnership to address common needs and aspirations.

We believe that creative and sustainable solutions come from people who work in partnership to address common needs and aspirations. Cmmunity Grants Guidelines Revised Nvember 2014 Prgram Gals The Cmmunity Grants Prgram is a bradly accessible, respnsive statewide grants prgram. Its lng-term gals are t strengthen the scial fabric f ur

More information

Working Location: Science Council office in Farringdon, London. With some London and UKtravel

Working Location: Science Council office in Farringdon, London. With some London and UKtravel Jb Title: Registratin and Licensing Manager Reprts t: Chief Executive Wrking Hurs: 5 days a week (1.0 FTE); Wrking Lcatin: Science Cuncil ffice in Farringdn, Lndn. With sme Lndn and UKtravel expected.

More information

Bursary Guidelines for Employed

Bursary Guidelines for Employed Bursary Guidelines fr Emplyed Status: Custdian: Apprved: Apprved Learning Divisin Manager Chief Executive Officer Decisin Date: 13/11/2014 Review Date: 29/01/2016 5/12/2016 Versin Number: LD/GL001/2017

More information

Award and Description. Inspire Award. Think Award. Removing engineering obstacles through creative thinking. 1 P a g e. Updated

Award and Description. Inspire Award. Think Award. Removing engineering obstacles through creative thinking. 1 P a g e. Updated 2017-2018 Award Descriptins Updated 11.27.2017 Award and Descriptin Inspire Award Criteria Required criteria fr the Inspire Award: This judged award is given t the Team that embdied the challenge f the

More information

Community Development Small Grants Fund. Guidelines 2018

Community Development Small Grants Fund. Guidelines 2018 Cmmunity Develpment Small Grants Fund Guidelines 2018 This fund is pen t charitable nt-fr-prfit cmmunity welfare grups whse primary clientele cme frm within Palmerstn Nrth City Cuncil (PNCC) bundaries.

More information

FOCUS AREA 1: Creative use of Existing Infrastructure for Future Transportation Needs:

FOCUS AREA 1: Creative use of Existing Infrastructure for Future Transportation Needs: Request fr Applicatins: DISSERTATION & THESIS FELLOWSHIPS 1. Overview The Center fr Transprtatin Equity, Decisins and Dllars (CTEDD) invites qualified applicants t apply fr Spring 2018 Dctral Dissertatin

More information

Home Modifications Enrolment Form

Home Modifications Enrolment Form Hme Mdificatins Enrlment Frm Please answer all questins t cmplete yur Hme Mdificatins enrlment Persnal details 1. Enter yur full name Family Name (Surname) Given Names 2. Enter yur birth date Day/mnth/year

More information

FLORIDA CHILD CARE DIRECTOR CREDENTIAL AND RENEWAL APPLICATION

FLORIDA CHILD CARE DIRECTOR CREDENTIAL AND RENEWAL APPLICATION FLORIDA CHILD CARE DIRECTOR CREDENTIAL RENEWAL APPLICATION RESOURCE PAGE A directr credential is required fr each licensed child care facility and Vluntary Pre-Kindergarten (VPK) Prgram. The directr credential

More information

Health Commerce System (HCS)

Health Commerce System (HCS) New Yrk State Department f Health Divisin f ACF/Assisted Living Surveillance New Administratr/EHP Prgram Crdinatr and/r Operatr Checklist and Infrmatinal Guide As a new Administratr/EHP Prgram Crdinatr

More information

Obtain an official copy of your PN transcript to submit with this packet.

Obtain an official copy of your PN transcript to submit with this packet. Advanced Placement Packet fr LPNs fr Spring 2018 Deadline fr packet submissin: 11/16/17 It is pssible t receive credit fr yur LPN experience and begin the RN prgram at Crning Cmmunity Cllege. Advanced

More information

APA Title Program. Information Booklet

APA Title Program. Information Booklet APA Title Prgram Infrmatin Bklet This wrk is cpyright. Apart frm any use as permitted under the Cpyright Act 1968, n part may be reprduced by any prcess withut permissin frm the Australian Physitherapy

More information

Establishing the Northern Australian Tourism Initiative

Establishing the Northern Australian Tourism Initiative Establishing the Nrthern Australian Turism Initiative Discussin Paper December 2015 www.industry.gv.au Cntents 1. Intrductin... 3 Purpse... Errr! Bkmark nt defined. Nrthern Australia Turism Initiative

More information

MIPS Improvement Activities Performance Category

MIPS Improvement Activities Performance Category MIPS Imprvement Activities Perfrmance Categry The Imprvement Activities cmpnent is ne f the fur Merit-Based Incentive Payment System (MIPS) perfrmance categries under which participating MIPS eligible

More information