STATE OF INDIANA. Elkhart City. South Bend. 65 J. Edward Roush Lake. Kokomo. C.M. Harden Lake Indianapolis. Columbus. Monroe Lake

Size: px
Start display at page:

Download "STATE OF INDIANA. Elkhart City. South Bend. 65 J. Edward Roush Lake. Kokomo. C.M. Harden Lake Indianapolis. Columbus. Monroe Lake"

Transcription

1 STATE OF INDIANA DLA Lighting & Electrical Systems Upgrade Gary Hammond South Bend Elkhart City Fort Wayne IN Silver Jackets Program 65 J. Edward Roush Lake Salamonie Lake Grissom AFB, IN Projects Dam Safety Program (All COE Indiana Dams) 74 Lafayette Kokomo Mississinewa Lake 69 Muncie Salamonie River, Portland, IN Jay County (CAP Sec 205) White River, Anderson, IN (CAP Sec 205) White Lick Creek, Avon, IN (CAP Sec 14) C.M. Harden Lake Indianapolis 70 White River, Indianapolis North NCA Crown Hill Indy Columbarium Terre Haute Cagles Mill Lake Brookville Lake Young's Creek, Franklin, IN (CAP Sec 205) Gill Township, IN, Levee Rehab FY13 Flood Repair Bloomington Columbus 74 Crane Army Ammunition Activity Projects Monroe Lake Markland Evansville 64 Patoka Lake Jeffersonville / Clarksville New Albany McAlpine Silver Creek Floodplain Management Study John T. Myers Newburgh Cannelton Falling Run Creek, New Albany, IN (CAP Section 205) John T. Myers Locks and Dam Lock Improvements Project, GRR Olmsted Locks & Dam Jacobsville Neighborhood Soil Contamination Superfund Site, IN Legend "/ Lock & Dam Interstate Highway Military Installation µ LRL Civil Works Boundary Levee / Floodwall City Major Stream Waterbody Watershed County Boundary Civil Project Military Project

2 Dam Safety, Indiana Indiana Dams - Special Studies As of 2/13/2018 Dam Safety Special Studies are part of a national program with funds distributed by the Corps of Engineers (USACE) Headquarters Dam Safety Office on a priority basis. Plan is established while further investigations are conducted and/or remedial actions are implemented as necessary. Brookville Dam, IN Study Project Location: Brookville Lake Dam, Cagles Mill Lake Dam, CM Harden Lake Dam, Mississinewa Lake Dam, Monroe Lake Dam, Patoka Lake Dam, J.E. Roush Lake Dam & Markle Levee, and Salamonie Lake Dam (See below for site specific information) Study and Program Information: During normal operations, these dams are routinely inspected daily, weekly, and monthly by USACE operations staff and annually by Louisville District dam safety staff. The dams also receive a comprehensive inspection every five years by a multi-discipline team of Louisville District engineers. The USACE has instituted a risk informed dam safety program. The initial step was conducting a Screening Portfolio Risk Assessment (SPRA). A team of engineers conducted a screening level review of the dam s construction, performance history, and instrumentation to evaluate current dam behavior, as well as economic consequences and the population at risk of potential dam failure. After the initial screening, the risk is reevaluated every ten years as part of a routine Periodic Assessment (PA) in conjunction with the 5 year comprehensive site inspection. The findings are reviewed by the Dam Senior Oversight Group (DSOG) and a Dam Safety Action Classification (DSAC) rating is assigned based upon confirmed or unconfirmed dam safety issues and the combination of life or economic consequences should failure occur. The DSAC ratings are used to prioritize further study to confirm the proposed dam safety issues. If the DSAC rating is 1 through 3, an Interim Risk Reduction Measures (IRRM) The first study phase is an Issue Evaluation Study (IES) which confirms the dam safety issue. Should more information be necessary to confirm the issues, an IES Phase II study may be undertaken to gather the necessary data to reduce the uncertainty. The results of these studies are presented to the USACE Risk Management Center (RMC) and the DSOG. The results may indicate the need to progress to the next phase of study or reduce the DSAC rating for the dam. If the case is made that the dam is in need of remedial construction then the project moves to the Dam Safety Modification Report (DSMR). The DSMR report analyzes potential remedial construction elements to determine the best fix to reduce the overall project risk. These studies and remedial construction are prioritized based upon the relative risk estimates at each stage to best make use of the available funding and resources. Congressional Interests: Senator Joe Donnelly Senator Todd Young

3 Individual Project Status: As of 2/13/2018 Brookville Dam, IN * SPRA (Screening for Portfolio Risk Analysis): 2007 * DSAC (Dam Safety Action Classification) Rating: Class 4 * IRRMP (Interim Risk Reduction Measures Plan): N/A since it is DSAC 4. * IES (Issue Evaluation Study): The findings of the Phase 2 IES risk analysis were presented to the Risk Management Center (RMC) in November 2011 and to the Dam Senior Oversight Group (DSOG) in February The RMC and DSOG agreed with the report recommendation that the project be reclassified to a DSAC 4 based on the results of the risk analysis. * FY2018 Planned Activities: Routine O&M surveillance and monitoring program. Cagles Mill Dam, IN * SPRA (Screening for Portfolio Risk Analysis): 2007 * DSAC (Dam Safety Action Classification) Rating: Class 4 * IRRMP (Interim Risk Reduction Measures Plan): N/A since it is DSAC 4 * IES (Issue Evaluation Study): Not required since it is a DSAC 4 * FY2018 Planned Activities: Routine O&M surveillance and monitoring program. Cecil M Harden Dam, IN * SPRA (Screening for Portfolio Risk Analysis): 2009 * DSAC (Dam Safety Action Classification) Rating: Class 3 * IRRMP (Interim Risk Reduction Measures Plan): Completed 30 June 2010 * IES (Issue Evaluation Study): The findings of the IES risk analysis were presented to the Risk Management Center (RMC) in September 2013 and to the Dam Senior Oversight Group (DSOG) in October The RMC and DSOG agreed with the report recommendation that the project be reclassified from a DSAC 2 to a DSAC 3 based on the results of the risk analysis. Remedial construction is not warranted at this time. This structure has been reprioritized in the risk study queue. * FY2018 Planned Activities: Routine O&M surveillance and monitoring program. Mississinewa Dam, IN * SPRA (Screening for Portfolio Risk Analysis): 2009 * DSAC (Dam Safety Action Classification) Rating: Class 2 * IRRMP (Interim Risk Reduction Measures Plan): Completed 27 July 2010 * IES (Issue Evaluation Study): As a result of the 2014 Periodic Assessment, the dam was rated as a DSAC 2. The IES Phase 2 was initiated in August 2015 and will address concerns with unacceptable foundation conditions and associated seepage in order to remove uncertainty and lower project risk. This will determine if the work needs to continue to complete a full Dam Safety Modification Report (DSMR).

4 As of 2/13/2018 * FY2018 Planned Activities: IES Phase 2 work was initiated in August Additional drilling and piezometer installation was performed in FY 2017 to collect additional data to evaluate potential risk driving failure modes. Additional field surveys have also been performed. After all of the additional data is obtained and analyzed, a risk assessment will be performed and is currently scheduled to begin in April Routine O&M surveillance and monitoring program will also continue. Monroe Dam, IN * SPRA (Screening for Portfolio Risk Analysis): 2006 * DSAC (Dam Safety Action Classification) Rating: Class 5 * IRRMP (Interim Risk Reduction Measures Plan): N/A since it is DSAC 5 * IES (Issue Evaluation Study): Not required since it is a DSAC 5 * Note: The DSAC rating was revised to a 5 in 2017 based on the results from a Periodic Assessment. * FY2018 Planned Activities: Routine O&M surveillance and monitoring program. Patoka Dam, IN * SPRA (Screening for Portfolio Risk Analysis): 2008 * DSAC (Dam Safety Action Classification) Rating: Class 4 * IRRMP (Interim Risk Reduction Measures Plan): N/A since it is DSAC 4 * IES (Issue Evaluation Study): Not required since it is a DSAC 4 * Note: The previous Phase 2 IES was initiated in February The IES terminated at an early stage and a Semi Quantitative Risk Assessment (SQRA) was completed in August The DSAC rating was changed from a DSAC 2 to a DSAC 4. Remedial construction is not warranted at this time. This structure has been reprioritized in the risk study queue. * FY2018 Planned Activities: Routine O&M surveillance and monitoring program. J.E. Roush Dam, IN * SPRA (Screening for Portfolio Risk Analysis): 2005 * DSAC (Dam Safety Action Classification) Rating: Class 3 * IRRMP (Interim Risk Reduction Measures Plan): Completed 6 November 2007 * IES (Issue Evaluation Study): The findings of the Dam Safety Modification Report (DSMR) were presented to the Risk Management Center (RMC) in March 2010 and the Dam Senior Oversight Group (DSOG) in June Based on the reviews, the study was converted from the existing DSMR to a Phase 2 Issue Evaluation Study (IES). * The findings of the Phase 2 IES risk analysis were presented to the RMC in March 2013 and to the DSOG in April The RMC and DSOG agreed with the report recommendation that the project be reclassified to a DSAC 3 based on the results of the risk analysis. Other recommendations were to continue the increased instrumentation monitoring and collecting of performance data and to update the current IRRMs. Remedial construction is not warranted at this time. This structure has been reprioritized in the risk study queue. * FY2018 Planned Activities: Routine O&M surveillance and monitoring program.

5 Salamonie Dam, IN As of 2/13/2018 * SPRA (Screening for Portfolio Risk Analysis): 2005 * DSAC (Dam Safety Action Classification) Rating: Class 4 * IRRMP (Interim Risk Reduction Measures Plan): N/A since it is DSAC 4 * IES (Issue Evaluation Study): Not required since it is a DSAC 4 * Note: The Dam Safety Modification Report (DSMR) was reviewed by the Risk Management Center (RMC) in March 2010 and the Dam Senior Oversight Group (DSOG) in June Based on the reviews, the title of the study was changed to an Issue Evaluation Study (IES). The report was revised and the IES was completed in April The DSOG re-classified this dam from a DSAC 2 to a DSAC 4. Remedial construction is not warranted at this time. This structure has been reprioritized in the risk study queue. * FY18 Activities: Routine O&M surveillance and monitoring program.

6 As of 2/13/2018 City of Portland, Jay County, Indiana Flood Risk Management Study Study Estimated Federal Cost $254,000 Estimated Non-Federal Cost $154,000 Total Estimated Project Cost $408,000 Allocation thru FY17 $100,000 Balance to Complete after FY17 $154,000 FY18 President s Budget $0 FY18 Allocation (thru JAN 2018) $154,000 FY19 President s Budget $0 City of Portland Central Business District Feasibility The study is located in northeast Indiana in the City of Portland, which is the county seat of Jay County, Indiana. Portland is approximately 75 miles northeast of Indianapolis. The most recent flood events occurred in February 2011, twice in June of 2015, and again in July Numerous business and government offices were impacted by these flood events and suffered several million dollars in damages. The July 2015 flood event is approximately equal to a 3.3% Annual Chance flood (30-yr flood event). This study will evaluate possible flood risk management solutions. FY19 Planned Activities: Selection of the recommended alternative, completion of environmental documentation, and completion of the feasibility study detailed project report. None. As of February 2018, all Federal and non-federal funds have been received. Rep. Jim Banks Section 205 of the 1948 Flood Control Act (P.L ), as amended. Completion of modeling for the existing conditions is scheduled to be complete in March The Focused Array of Alternatives Milestone Meeting is scheduled for April 2018 and will identify a potential list of alternative flood risk management strategies.

7 White River, Anderson, Indiana Flood Risk Management Project As of 2/13/2018 Estimated Federal Cost $4,993,630 Estimated Non-Federal Cost $2,688,878 Total Estimated Project Cost $7,682,508 Allocation thru FY17 $0 Balance to Complete after FY17 $0 FY18 President s Budget $0 FY18 Allocation (thru JAN 2018) $0 FY19 President s Budget $0 The Louisville District is currently working with the City of Anderson and the Federal Emergency Management Agency to complete a Letter of Map Revision (LOMR). Completion of the LOMR is anticipated in FY18. Floodwall and levee Anderson, Indiana This project is located along the White River in Athletic and Edgewater Parks within the city limits of Anderson, Indiana. Anderson is approximately 50 miles northeast of Indianapolis, Indiana. of the levee was completed in December 2014 and the project provided to the sponsor for OMRR&R on September 10, 2015 when the City of Anderson received the notice of completion and interim OMRR&R manual. FY19 Planned Activities: None. None at this time. Rep. Susan Brooks The completed Project consists of the reconstruction of approximately 3,260 linear feet of existing levee by adding earthen embankment to increase the cross sectional area and height. A realignment of an extension of the levee at the upstream end added approximately, 500 feet to the levee system. Approximately 417 linear feet of low concrete I-wall were also constructed. The total length of the levee system is approximately 5,180 feet. Section 205 of the 1948 Flood Control Act (P.L ), as amended.

8 Indianapolis, White River (North), Indiana Flood Risk Management (FRM) Project As of 8FEB18 Estimated Federal Cost $40,917,939 Estimated Non Federal Cost $13,639,313 Total Estimated Project Cost $54,557,252 Allocation thru FY17 $37,746,166 Balance to Complete After FY17 $ 3,171,773 FY18 President s Budget $0 FY18 Allocation (thru January 2018) $0 FY19 President s Budget $0 View of Phase 3A Floodwall The project is located in northern Indianapolis, IN, along a 3.5 mile reach of the White River. The project consists of construction of earthen levees and floodwalls in three sections Warfleigh (Phase 3A), South Warfleigh (Phase 3B; further broken into 3 distinct contracts known as Phase 3B-1, 3B-2, and 3B-3) and Broad Ripple (Phase 3C).. All three sections must be completed to achieve project benefits within the designated areas of protection. Flood Control Act (FCA) of 1936, as amended, Section 10 of FCA 1946, and subject to cost sharing provisions of the Water Resources Development Act of FY 2017 Activities: Multiple construction contracts were ongoing in FY Phase 3A/3C, Phase 3B-2, and Phase 3B-3 were all underway. Phase 3A/3C is a contract to remove vegetation on/near portions of the levee system and this contract was substantially complete by the end of Phase 3B-2 is an earthen levee contract to construct one portion of the overall Phase 3B section and was also substantially complete at the end of The final contract for this overall project, Phase 3B-3, was awarded in August of The Phase 3A/3C and Phase 3B-2 contracts referred to above are both scheduled to be completed in The Phase 3A/3C contract, scheduled for completion in March 2018, will be closed out and turned over to the local sponsor. Phase 3B-2 is scheduled to be completed by the end of FY will take place all of FY 2018 for the Phase 3B-3 contract. FY 2019 Planned Activities: The Phase 3B-2 contract will be closed out and that portion of the project will be turned over to the local sponsor. The Phase 3B-3 contract will continue into FY 2019 and is scheduled for completion in August The Phase 3B-3 contract consists of an option to construct the last section of the levee that ties the entire system into high ground. The option was established because additional Federal funds are needed and the real estate was not available at that time. Due to escalation, Section 106 mitigation, and additional labor required for coordination and design, sufficient funds are not available to exercise the option and complete the project. The required funds will be used to exercise the option and complete the project. The project is sponsored by the Indianapolis Department of Public Works at a cost share of 75% Federal and 25% non-federal. It was designed to provide flood damage reduction for approximately 1,500 residential and commercial structures that would be inundated by an annual 0.35 percent chance flood event (300-year flood event). Absent completion of the project, critical facilities, such as a fire station, waterworks pumping station, and large sewage lift stations would be inundated in major flood events. In addition, portions of the Butler University property, including student housing and a child development/ daycare facility, would be inundated in a 100-year flood event. During such events, structures would be submerged in up to 7 1/2 feet of water. Congressional Interests: Senator Joe Donnelly Senator Todd Young Representative Andre Carson (IN-7)

9 Young s Creek Flooding, Franklin, Indiana Study Estimated Federal Cost $300,000 Estimated Non-Federal Cost $200,000 Total Estimated Project Cost $500,000 Allocation thru FY17 $200,000 Balance to Complete After FY17 $0 FY18 President s Budget $0 FY18 Allocation (thru JAN 2018) $0 FY19 President s Budget $0 As of 2/13/ flood event in Franklin, Indiana Feasibility The study examines the Young s Creek and Hurricane Creek watersheds within the corporate city limits of Franklin, Indiana. The city regularly experiences flooding from heavy rainfall events in region every two to three years. The most recent event occurred in the spring of The 2008 flood event caused over $180M in damages to government services, residences, and businesses. FY19 Planned Activities: Prepare environmental compliance documentation and complete detailed project report. None Rep. Trey Hollingsworth Section 205 of the 1948 Flood Control Act (P.L ), as amended. Model of existing, future without and future with project conditions is complete. Structural measures include detention basins, channel widening, and bridge modifications are being evaluated. Nonstructural measures including flood proofing and relocations, are being examined as well. Selection of economic and environmentally preferred alternative is anticipated in June 2018.

10 Silver Creek, Indiana Floodplain Management Study As of 2/13/2018 Estimated Federal Cost $282,000 Estimated Non-Federal Cost $0 Total Estimated Project Cost $282,000 Allocation thru FY17 $282,000 Balance to Complete After FY17 $0 FY18 President s Budget $0 FY18 Allocation $0 FY19 President s Budget $0 Location of erosion at Clarksville, Indiana Study The project is located in town of Clarksville near the confluence of Silver Creek and the Ohio River. This study examine the effects of stream flow through and around the McAlpine Lock and Dam and the erosion on the occurring on the adjacent shoreline. The erosion has severely affected the town, a boat ramp near the George Rogers Clark cabin, bordering county roads, and the Ohio River Greenways project. FY19 Planned Activities: None None Rep. Trey Hollingsworth Section 206 of the Flood Control Act of 1960 (PL ), as amended. A two-dimensional hydrologic model and draft report of findings are complete. Results indicate that the present lock and dam configuration and its stream flow patterns increase the potential for erosion in the area of concern.

11 New Albany, Indiana Section 205 Study Estimated Federal Cost $175,000 Estimated Non-Federal Cost $175,000 Total Estimated Project Cost $350,000 Allocation thru FY17 $155,000 Balance to Complete After FY17 $20,000 FY18 President s Budget $0 FY18 Allocation (thru JAN 2018) $0 FY19 President s Budget $0 As of 2/13/2018 Stream flow through Fall Run in New Albany, Indiana. Feasibility The study examines the Falling Run and Fall Run watersheds within the corporate city limits of New Albany, Indiana. Approximately 112 structures are located in the floodway and exposed to localized flood risks. Rep. Trey Hollingsworth Section 205 of the 1948 Flood Control Act (P.L ), as amended. Model of existing and future without project is complete. Structural measures being evaluated include small detention basins, channel widening, and bridge modifications. Nonstructural measures including flood proofing and relocations, are being examined as well. FY19 Planned Activities: Select recommend alternative plan, prepare environmental documentation, complete final detailed project report. Project may result in non-structural measures only based on estimated damages and project net benefits.

12 John T. Myers Locks and Dam, IN and KY As of 2/14/2018 Estimated Federal Cost $226,561,000 Estimated Non-Federal Cost $216,239,000 Total Estimated Project Cost $442,800,000 Allocation thru FY17 1/ $19,456,946 Balance to Complete After FY17 $423,343,054 FY18 President s Budget $0 FY18 Allocation (thru January 2018) $0 FY19 President s Budget $0 1/ Includes funds ($10,110,000) provided by the American Recovery and Reinvestment Act of 2009 (ARRA), Public Law 111-5, which are not cost shared with IWTF appropriations. J.T. Myers 600 Lock Extension The project is located on the right bank of the Ohio River at river mile approximately 3.5 miles downstream of Uniontown, KY, with the lock chambers towards the Indiana shore. The John T. Myers Lock Extension Project will extend the existing 600-foot long auxiliary lock chamber to a 1,200-foot long lock chamber. This effort will give the navigation facility twin 1,200-foot locks for inland navigation tow traffic. This additional lock capacity will enable the facility, in operation since 1969, to manage tow traffic during planned and unscheduled main lock closures without significant delays to inland navigation. Many contracts are required to design and construct the project. Preconstruction, Engineering and Design (PED) efforts since 2000 have included hydraulic model studies and engineering analysis and foundation explorations towards preparation of project plans and specifications. Water Resources Development Act (WRDA) 2000, Public Law FY 2017 Activities: No activities were completed in FY2017 since no Federal funds were available. Awaiting funds to re-evaluate the cost and economics of the current approved plan. FY 2019 Planned Activities: If funds are not received in FY2018, funds in FY 2019 would be used to re-evaluate the cost and economics of the current approved plan. In September 2004, the Corps awarded the first site preparation contract for construction of an Operations Support Facility. Those construction activities were completed in late The remaining site preparation contracts will include: a) excavation of the river bank to widen the upper lock approach; b) construction of a Resident Engineer s building; c) miter gate storage area, with spare gate; and d) implementation of aquatic mitigation. Based upon physical modeling, it is necessary to widen the upper approach area for downbound entry of commercial towing vessels into the extended auxiliary lock chamber. The spare miter gate will allow the Corps to expedite both scheduled maintenance activities and emergency repairs to the existing lock miter gates. Environmental mitigation will involve installation of a series of in-water features, over three consecutive summer and fall low water seasons, to enhance aquatic habitat in the nearby vicinity of the project. Upon receipt of additional funding the District would proceed towards award of the remaining contracts. The District plans to award two contracts to construct the lock extension and its new approach walls. The Corps of Engineers has suspended design of the project until receipt of additional funds. The American Recovery and Reinvestment Act of 2009 provided the Corps of Engineers with funding to award the contracts for construction of the upper lock approach widening and Resident Engineer s building. The approach widening contract was awarded on December 17, 2009 and was substantially complete in July The Resident Engineer s Building was awarded on March 31, 2010, and was substantially complete in December of the remaining work will be accomplished by award of both fully and incrementally-funded contracts. The schedule will be developed upon receipt of additional funds. The John T. Myers project passes the highest tonnage of all the Ohio River high lift locks with a 600-foot

13 auxiliary chamber. Approximately 73 million tons of commodities were shipped through the J. T. Myers locks in The project authorization was a product of the Ohio River Mainstem Systems Study, which used a regional systems approach to address the investments needed to provide an efficient navigation system on the Ohio River Mainstem through This project represents a reinvestment in the river transportation infrastructure. As of 2/14/2018 Congressional Interests: Senator Mitch McConnell Senator Rand Paul Senator Todd Young Senator Joe Donnelly Senator Richard J. Durbin Senator Tammy Duckworth Representative John Shimkus (IL-15) Representative Larry Bucshon (IN-8) Representative James Comer (KY-1)

14 As of 2/16/2018 7:44 AM Locks and Dam 52 and 53 Replacement Project (Olmsted Locks and Dam), IL and KY Tainter Gate 5 installed The project is located in Olmsted, IL near Ohio River Mile The project consists of two 110 x1200 locks adjacent to the Illinois bank, and a dam comprised of five tainter gates, 1400 of boat-operated wickets and a fixed weir. The proposed replacement structure will eliminate Ohio River Locks and Dams 52 & 53. Locks & Dams 52 & 53 were completed in 1929 and the temporary 1,200 long lock chambers were added in 1969 at Locks & Dam 52 and 1979 at Locks and Dam 53. The Olmsted Locks & Dam project was authorized by Section 3(a)(6) of the Water Resources Development Act (WRDA) of The authorized project cost was increased on 17 October 2013 as part of a Continuing Appropriations Act, 2014 to $2,918,000,000. The project was funded 50%/50% from the General Treasury and the Inland Waterways Trust Fund (IWTF) through FY2013. The FY2014 Omnibus Appropriation Act changed the split of the IWTF and General Treasury funds to 25%/75% for FY2014 only. Water Resources Reform and Development Act of 2014 changed the IWTF and General Treasury shares to 15%/85% beginning 1 October Estimated Federal Cost $1,940,324,000 Estimated IWTF Cost $1,118,942,000 Total Estimated Project Cost $3,059,266,000 Allocations thru FY17 $2,565,404,000 Balance to Complete after FY17 $210,000,000 President s Budget for FY18 $175,000,000 FY18 Allocations thru Jan 2018 $2,602,662,000 FY19 President s Budget $35,000,000 Activities for FY 2018: Dam becomes operational NLT Oct 2018 Partial Demo of L&D 53 Upstream Mooring Cells River Dikes Operations Buildings Site Restoration FY19 Planned Accomplishments: Dam contract ends March 2019 Demo Locks & Dams 52 and 53 $35M in FY19 are Funds to Completion, resulting in $329M in savings. Senator Mitch McConnell Senator Rand Paul Senator Todd Young Senator Joe Donnelly Senator Richard J. Durbin Senator Tammy Duckworth Representative John Shimkus (IL-15) Representative Larry Bucshon (IN-8) Representative James Comer (KY-1)

15 As of 8FEB2018 Gill Township, Indiana Levee Rehabilitation (2013 & 2015 Flood Events) Design and Estimated Federal Cost $ 1,100,000 Estimated Non-Federal Cost $ 0 Total Estimated Project Cost $ 1,100,000 Allocation thru FY17 $521,620 Balance to Complete after 2017 $578,380 FY18 President s Budget $0 FY18 Allocation (thru January2018) $15,000 FY 19 President s Budget $0 Engineering and Design The Gill Township Levee Rehabilitation Project is located in Sullivan County, Indiana on the left bank of the Wabash River. The project consists of rehabilitation work to the existing levee, which was damaged in the 2013 and 2015 flood events. schedule is 6 months in duration to include the four months (July- October) that historically have favorable weather for this type of repair. Congressional Interests: Rep. Larry Buschon (IN-8) Section 101 of the Water Resources Development Act (WRDA) of 1996, Public Law FY 2017 Activities: Design was initiated in FY2017. The repairs being evaluated at this time include construction of a blanket drain and foundation repairs (grouting) to the existing pump station. Design is scheduled for completion in February Once all the necessary real estate requirements are met by the local sponsor, the contract will be advertised and is scheduled for award in April FY 2019 Planned Activities: will continue into FY 2019, and is scheduled for completion in the 1 st Quarter. Original Ready to Advertise (RTA) date was delayed due to weather related impacts (ground was too saturated to perform geotechnical borings).

16 Avon, Indiana Section 14 Feasibility Estimated Federal Cost $100,000 Estimated Non-Federal Cost $0 Total Estimated Project Cost $100,000 Allocation thru FY17 $75,000 Balance to Complete After FY17 $25,000 FY18 President s Budget $0 FY18 Allocation $25,000 FY19 President s Budget $0 As of 2/13/2018 Location of erosion just south of the Avon Bridge. Feasibility The project is located within the corporate city limits of Avon in Hendricks County, Indiana along South County Road 625 East. Specifically, the project is located near the Haunted Bridge of Avon, an active double track CSX railroad bridge. The project is located in the 4th Congressional District of Indiana. The project examines measures of bank stabilization for slope failures west of South County Road 625 East along the White Lick Creek. The principal cause of the erosion is the scouring of the bank due to the high velocities that concentrate along the left bank of the creek during high flow conditions. FY 2019 Planned Activities: Initiate design and implementation phase. The estimated cost for the bank stabilization effort is $1.2M. Additional federal funds needed to initiate design and implementation phase. Rep. Todd Rokita Section 14 of the 1946 Flood Control Act, as amended The final feasibility study Detailed Project Report and associated NEPA document are currently under review and are expected to be completed in summer of Recommended alternative includes a combination soil nails and natural revegetation.

17 As of 2/13/2018 Indiana Silver Jackets Program USACE Flood Risk Management Program Indiana Silver Jackets Projects o o City of Salem Salem was ravaged by flooding in May 2017, reaching a depth of 10 feet in some areas. This project would provide a flood inundation map and flood response plan to the City of Salem. Indiana Map Flood Mitigation Planner This platform will provide a searchable database for flood risk and mitigation related data. It will inform residents about flood hazard risks and equip decision makers, officials and developers with information in support of risk-informed choices to make their projects resilient today and into the future. Active Projects are located throughout the State of Indiana. Silver Jackets teams in states across the United States bring together multiple state, federal, and sometimes tribal and local agencies to learn from one another in reducing flood risk and other natural disasters. By applying their shared knowledge, the teams enhance response and recovery efforts when such events do occur. While some states do not use the Silver Jackets name, there are a growing number of states applying the Silver Jackets approach the ultimate goal is a state-led interagency team in every state. No single agency has all the answers, but leveraging multiple programs and perspectives can provide a cohesive solution. Although each state Silver Jackets team is unique, common agency participants include state agencies with mission areas of hazard mitigation, emergency management, floodplain management, natural resources management or conservation, etc. Federal participation typically includes the U.S. Army Corps of Engineers and the Federal Emergency Management Agency and often others such as the National Weather Service and the U.S. Geological Survey. Non-Federal Sponsor: Indiana Department of Natural Resources (IDNR) Indiana Department of Homeland Security (IDHS) Indiana Department of Environmental Management Indiana Office of Community and Rural Affairs Indiana Air National Guard Indiana University Purdue University of Indianapolis Purdue University Indiana Association of Floodplain and Storm water Management (ASFPM) Indiana Geographic Information Council Multiple Local Governments and agencies Federal Sponsors: U.S. Army Corps of Engineers (USACE) Federal Emergency Management Agency (FEMA) Natural Resources Conservation Service (NRCS) U.S. Geological Survey (USGS) National Weather Service (NWS) Activities for FY 2018: Finalize LiDAR Data Assessment, complete Indiana Map Flood Mitigation Planner, and initiate City of Salem hydrologic mapping. None

18 Grissom Air Force Base, IN Hydrant Fuel System As of 2/14/2018 Activities in FY18 include commissioning, final pavement work, installation of the pumphouse fire suppression and final BOD. FY19 Planned Activities: Fiscal closeout. Contractor is currently past the Contract Required Completion Date (CRCD). Project Delivery Team is negotiating Requests for Equitable Adjustment (REA)s that could potential have high cost impacts to the Government. Construct a pressurized hydrant fuel system with 16 hydrants outlets and two 556-kiloliter (kl) (3,500-barrel) above ground fuel storage tanks at Grissom Air Force Base, IN. Construct a pumphouse to accommodate 113 liter-per-second (1,800 gallon-per minute) pumps, fuel filters and separators. Construct a four position truck offload and two position truck load facility with canopy; hydrant hose truck checkout; product recovery system; and a transfer pipeline with pig launcher and receiver. Work also includes all necessary pumps, valves, filters, control systems, cathodic protection, fire protection, emergency generator and enclosure, utility and sewer connections, access pavements, fencing, and security lighting. Site preparation and improvements are included. Demolish or decommission the existing hydrant system pumphouse, underground tanks, piping and associated facilities. Estimated Federal Cost $41,200,000 Rep. Susan Brooks FY13 Military

19 Grissom Air Reserve Base, Peru, IN Repair Taxiway C, Facility 998 As of 2/14/2018 Operations & Maintenance (O&M) Estimated Federal Cost $8,000,000 This is a Design-Bid-Build project, and design is scheduled to be complete by April This project will be advertised utilizing a General Small Business set-aside procurement method. The target award date is 31 August FY 2019 Activities: Continued support to the Air Force Reserve Command (AFRC) Design This project is located in Peru, Indiana at Grissom Air Reserve Base, which is about 12 miles north of Kokomo in Cass and Miami counties. The Installation was initially established as Naval Air Station Bunker Hill in 1942 and was an active Air Force Base from 1954 to Grissom Air Reserve Base is home to the 434th Air Refueling Wing, the largest KC-135R Stratotanker wing in the Air Force Reserve Command (AFRC). Grissom also serves units from the US Army Reserve and the US Marine Corps Reserve. NSTR Rep. Jackie Walorski This project consists of a full depth concrete replacement of Taxiway C to accommodate the KC-46A aircraft. The purpose of this project is to reconstruct Taxiway C in order to improve the operational level of the pavement and extend its expected life span to maintain mission capability. The pavements specified in the scope of this project are weathered and deteriorating with hair line cracks throughout. There is also severe spalling occurring along the joints. Aircraft will be placed at risk of engine damage if the pavement is allowed to deteriorate further.

20 Crane Army Ammunition Act, IN Railcar Holding Area FY19 Military As of 2/14/2018 AE selection and design start expected Mar Remainder of FY18 will include continued design efforts that will carry over into FY19. FY19 Planned Activities: FY19 will see design efforts completed and followed by advertisement and eventual award, currently projected for late Sep NSTR Design The project will construct a railcar holding yard and relocate Defense Logistics Agency Disposition functions outside of munitions operation area facility at Crane Army Ammunition Activity, IN. Work will include the installation of new rail lines to create a rail holding yard, installation of lightning protection, relocation of the operations facility, scale house, vehicle scale and storage areas. The project will include the installation of Closed Circuit Television (CCTV), Intrusion Detection Systems (IDS), building information systems, and fire protection and alarm systems. Supporting facilities include site development and utilities as well as construction of an access road, gravel yards for equipment storage and increased earthwork. Heating and air conditioning will be provided by selfcontained systems. The facility will provide accessibility for individuals with disabilities and antiterrorism measures. Demolish 4 buildings at Crane Army Ammo Activity, IN (11,239 Total SF). Estimated Federal Cost $16,000,000 Rep. Larry Bucshon

21 Crane Army Ammunition Act, IN Shipping and Receiving Bldg As of 2/14/2018 Project was advertised on 17 Jan. The construction contract is anticipated to be awarded by 20 Jul FY19 Planned Activities: FY19 activities will be comprised entirely of construction activities. is expected to continue into FY20. NSTR Estimated Federal Cost $24,000,000 Design Rep. Larry Bucshon Design and construction of an Ammunition Shipping and Receiving facility at Crane Army Ammunition Activity, IN. The project will provide 55,860 SF of space for shipping and receiving as well as 615 LF of railroad tracks. FY18 Military

22 Hammond, IN DLA Lighting Upgrades Design and FY19 Planned Activities: Project Closeout NSTR As of 2/8/2018 Estimated Federal Cost $500K Rep. Peter Visclosky Design Build Design, work, materials, and labor required to replace / upgrade designated light fixtures on Warehouse buildings 100E, 100W, 200E, Vehicle Garage Building, Breakroom/Shop Building and Pump House with LED fixtures and associated electrical systems at DLA Strategic Materials, Hammond, IN.

23 Jacobsville Neighborhood Soil Contamination Superfund Site, Indiana As of 2/8/2018 Estimated Federal Cost TBD Estimated Non-Federal Cost TBD Allocation thru FY18 $9,000,000 President s Budget for FY19 TBD Balance to Complete After FY17 $50,000,000 Contract procurement, work planning, field mobilization, and commencement of remedial activities (pending additional funding increments from EPA). FY19 Planned Activities: Remedial activities (pending additional funding increments from EPA). Priority and funding issues at USEPA delayed formal initiation of the Interagency Agreement. USEPA is the lead agency with USACE assisting with the remedial execution. Rep. Larry Buschon Figure: Current remedial status Remedial Action The project area is located in Evansville, Indiana. Airborne dust, soot and smoke from industrial operations from the late 1800 s to the mid 1900 s resulted in lead-contaminated soil at approximately 4,000 residential properties. Site cleanup is ongoing, with approximately 2,000 properties still requiring remediation. EPA has a current remediation contract nearing completion, and has requested USACE support to complete remediation at the remaining 2,000 properties over an estimated five (5) years. Interagency Agreement between EPA and USACE dated 2/2/2018.

24 Indianapolis, IN Crown Hill Indy Columbarium As of 2/14/2018 USACE start design for the new site. VA/NCA to concurrently acquire new site and perform NEPA documentation and site due diligence. FY19 Planned Activities: Award and execute the contract NCA/VA hosted a public meeting in Indianapolis on 23 JAN to discuss the draft Environmental Assessment and new site selection. The meeting went very well. Members of IFA, among other groups, were in attendance as well as the USACE PM. Estimated Federal Cost $6.0M Design Rep. Andre Carson The project will provide additional columbarium space as a satellite facility to the existing Marion National Cemetery in Indianapolis, IN. The initial construction project will include columbarium walls providing 2,500 niches to accommodate cremated remains and the necessary support facilities to provide for cemetery operations and maintenance. Plans and specification documents will be prepared for the columbarium and improvements to the cemetery site including: US flagpole, cortege staging area, committal service shelter, memorial marker wall, and a public restroom building with electronic gravesite locator, administrative work area, and maintenance storage area. Interagency Agreement between National Cemetery Agency (NCA) and USACE.

CONGRESSIONAL DISTRICT: KY 01

CONGRESSIONAL DISTRICT: KY 01 CONGRESSIONAL DISTRICT: KY 01 John T. Myers Locks & Dam Lock Improvements Project, GRR Newburgh Lower Salt River Basin Conservation Vision, PAS Olmsted Locks & Dam Olmsted Hickman Ohio River Shoreline

More information

Olmsted Locks & Dam. Informational Brief. 21 May 2015 BUILDING STRONG. Guest Nick Mariano. Briefer Mike Braden, Chief Olmsted Division

Olmsted Locks & Dam. Informational Brief. 21 May 2015 BUILDING STRONG. Guest Nick Mariano. Briefer Mike Braden, Chief Olmsted Division Olmsted Locks & Dam Informational Brief Guest Nick Mariano Briefer Mike Braden, Chief Olmsted Division 21 May 2015 US Army Corps of Engineers BUILDING STRONG Status Organization Agenda Orientation/Importance/Relevance

More information

US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009

US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009 US Army Corps of Engineers Periodic Inspection Report 9 Update Dallas City Council June 3, 2009 1 Briefing Overview Flood Protection is of primary importance to the City. The Dallas Floodway System protects

More information

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 7 February

More information

King County Flood Control District 2017 Work Program

King County Flood Control District 2017 Work Program Attachment A 2017 Budget Work Program November 7, 2016 FCD2016-20 Attach A King County Flood Control District 2017 Work Program The District work program is comprised of three categories: district oversight

More information

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA REPLY TO ATIENTIONOF DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA 30303-8801 CESAD-RBT 21 May 2012 MEMORANDUM FOR COMMANDER, JACKSONVILLE

More information

Prepared for CITY OF STAGECOACH Boot Hill Road Stagecoach, Texas 77355

Prepared for CITY OF STAGECOACH Boot Hill Road Stagecoach, Texas 77355 LAKE HARDIN DAM CITY OF STAGECOACH TX05829 EMERGENCY ACTION PLAN Prepared for CITY OF STAGECOACH 16930 Boot Hill Road Stagecoach, Texas 77355 Prepared by City Emergency Manager Michael C. Wethington and

More information

HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana

HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana Harbor Location: Calumet Harbor is located on the southwest shore of Lake Michigan in Chicago, Cook County, Illinois and the approach

More information

Florida Job Growth Grant Fund. Public Infrastructure Grant Proposal. Table of Contents

Florida Job Growth Grant Fund. Public Infrastructure Grant Proposal. Table of Contents Florida Job Growth Grant Fund Public Infrastructure Grant Proposal Table of Contents Florida Job Growth Grant Fund Public Infrastructure Grant Proposal Application 1 Florida Job Growth Grant Fund Public

More information

Water Quality Improvement Program. Funding Application Guide

Water Quality Improvement Program. Funding Application Guide Water Quality Improvement Program Funding Application Guide October 2018 Table of Contents I. Introduction... 2 II. Eligibility... 3 II.1 Eligible Projects... 3 II.2 Eligible Recipients... 4 III. Funding

More information

Update on USACE Civil Works Program Authorities, Policies, and Guidance

Update on USACE Civil Works Program Authorities, Policies, and Guidance Update on USACE Civil Works Program Authorities, Policies, 237 237 237 217 217 217 and Guidance 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92

More information

Emergency Support Function #3 Public Works and Engineering Annex. ESF Coordinator: Support Agencies:

Emergency Support Function #3 Public Works and Engineering Annex. ESF Coordinator: Support Agencies: Emergency Support Function #3 Public Works and Engineering Annex ESF Coordinator: Department of Defense/U.S. Army Corps of Engineers Primary Agencies: Department of Defense/U.S. Army Corps of Engineers

More information

U.S. Army Corps of Engineers FY 16 Workplan and FY 17 Budget Navigation Program Update

U.S. Army Corps of Engineers FY 16 Workplan and FY 17 Budget Navigation Program Update U.S. Army Corps of Engineers FY 16 Workplan and FY 17 Budget Navigation Program Update For Inland Waterways Users Board Jeffrey A. McKee Chief, Navigation Branch US Army Corps of Engineers April 1, 2016

More information

WATER SUPPLY CHALLENGES: THE ACF CASE

WATER SUPPLY CHALLENGES: THE ACF CASE WATER SUPPLY CHALLENGES: THE ACF CASE Presentation to the National Waterways Conference Tunica, Mississippi September 20, 2012 Steven Burns Copyright 2010. Balch & Bingham LLP. All rights reserved 1 Presentation

More information

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3 Contents 1. Introduction..3 a. Purpose of This Procedural Review Plan......3 b. Description and Information.....3 c. References...3 2. Review Requirements....5 a. Level of Review Required.....5 b. Review

More information

3A.1 LOCKS AND DAMS UPDATE

3A.1 LOCKS AND DAMS UPDATE 3A.1 LOCKS AND DAMS UPDATE 2012 JOINT CONFERENCE OF HARBOR SAFETY AND AREA MARITIME SECURITY COMMITTEES RICHARD C. LOCKWOOD Operations & Regulatory Division and Great Lakes & Ohio River Division RIT US

More information

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-P Washington, DC Regulation No February 2016

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-P Washington, DC Regulation No February 2016 DEPARTMENT OF THE ARMY ER 1165-2-211 U.S. Army Corps of Engineers CECW-P Washington, DC 20314-1000 Regulation No. 1165-2-211 4 February 2016 Water Resource Policies and Authorities OPERATION AND MAINTENANCE

More information

Funding Principles. Years Passed New Revenue Credit Score Multiplier >3 years 0% % % % After Jan %

Funding Principles. Years Passed New Revenue Credit Score Multiplier >3 years 0% % % % After Jan % Funding Principles I. Infrastructure Incentives Initiative: encourages state, local and private investment in core infrastructure by providing incentives in the form of grants. Federal incentive funds

More information

City of Jersey Village

City of Jersey Village City of Jersey Village Long-Term Flood Recovery Consultant Request for Qualifications A. INTRODUCTION The City of Jersey Village is seeking consultant services for the development of a Long- Term Flood

More information

Civil Works Process Overview

Civil Works Process Overview Let Mon Lee Office of Assistant Secretary of the Army (Civil Works) Let.M.Lee.CIV@mail.mil Office: (703)614-3977 Mobile: (703)269-7676 Civil Works Process Overview Organizational Structure Assistant Secretary

More information

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-ZB Washington, DC Circular No September 2018

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-ZB Washington, DC Circular No September 2018 DEPARTMENT OF THE ARMY EC 1165-2-220 US Army Corps of Engineers CECW-ZB Washington, DC 20314-1000 Circular No. 1165-2-220 10 September 2018 EXPIRES 30 SEPTEMBER 2020 Water Resource Policies and Authorities

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-E Engineer Regulation 1110-2-401 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design OPERATION, MAINTENANCE, REPAIR, REPLACEMENT, AND REHABILITATION

More information

Alteration of Bridges

Alteration of Bridges Alteration of Bridges Program Specific Recovery Act Plan May 14, 2009 United States Coast Guard Message from the United States Coast Guard ARRA Senior Accountable Official 14 May 2009 I am pleased to present

More information

Memorandum. Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso

Memorandum. Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso Memorandum DATE October 7, 2010 TO Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso Mayor Pro Tern Dwaine Caraway

More information

Five-Year Capital Improvement Plan

Five-Year Capital Improvement Plan Five-Year 2017-2022 Capital Improvement Plan Presentation to Board of Supervisors of Sonoma County and Board of Directors of the Sonoma County Water Agency Presented by County Administrator s Office and

More information

SUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1

SUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1 SUMMARY REPORT OPERATIONS and MAINTENANCE PLANS and CRITERIA HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1 ANSONIA and DERBY, CONNECTICUT December 2010 MMI #1560-119 and #3118-03

More information

HARBOR INFRASTRUCTURE INVENTORIES Michigan City Harbor, Indiana

HARBOR INFRASTRUCTURE INVENTORIES Michigan City Harbor, Indiana HARBOR INFRASTRUCTURE INVENTORIES Michigan City Harbor, Indiana Harbor Location: Michigan City Harbor is located on the southwest shore of Lake Michigan in Michigan City, LaPorte County, Indiana approximately

More information

New Draft Section 408 Policy Document EC

New Draft Section 408 Policy Document EC New Draft Section 408 Policy Document EC 11650-2-220 Presentation to the Lower American River Task Force Ryan Larson, P.E. March 13, 2018 US Army Corps of Engineers Outline 1. USACE Program Governance

More information

ADVANCED PLANNING BRIEF FOR INDUSTRY ABERDEEN PROVING GROUND, MD

ADVANCED PLANNING BRIEF FOR INDUSTRY ABERDEEN PROVING GROUND, MD ADVANCED PLANNING BRIEF FOR INDUSTRY ABERDEEN PROVING GROUND, MD 1 237 217 200 80 BALTIMORE DISTRICT 237 217 200 119 237 217 200 27 PROGRAM OVERVIEW/ 255 0 163 131 239 110 255 0 163 132 65 135 USACE 255

More information

Falls City Engineer September/October 2016

Falls City Engineer September/October 2016 Falls City Engineer September/October 2016 VOL. 8, Issue 5 www.lrl.usace.army.mil U.S. Army Corps of Engineers Louisville District Corps reopens river after emergency closure at Dam 52 page 3 Corps consults

More information

FY 2018 Watershed-Based Funding Pilot Program Policy

FY 2018 Watershed-Based Funding Pilot Program Policy FY 2018 Watershed-Based Funding Pilot Program Policy From the Board of Water and Soil Resources, State of Minnesota Version: FY2018 Effective Date: 12/20/2017 Approval: Board Resolution #17-94 Policy Statement

More information

Joint Application Form for Activities Affecting Water Resources in Minnesota

Joint Application Form for Activities Affecting Water Resources in Minnesota Joint Application Form for Activities Affecting Water Resources in Minnesota This joint application form is the accepted means for initiating review of proposals that may affect a water resource (wetland,

More information

jobs program earmark ban

jobs program earmark ban TESTIMONY OF THE RED RIVER VALLEY ASSOCIATION SUBCOMMITTEE ON ENERGY AND WATER DEVELOPMENT COMMITTEE ON APPROPRIATIONS FY 2016 CIVIL WORKS CORPS OF ENGINEERS UNITED STATES SENATE Mr. Chairman and members

More information

Although the final report and decision document has not been released by the Corps, we now have a clear picture of the effort needed to complete the repairs, and the time frame that can be achieved if

More information

APPENDIX J FUNDING SOURCES

APPENDIX J FUNDING SOURCES APPENDIX J FUNDING SOURCES Existing Programs and Funding Sources There are numerous options available to Dane County for the financing of a flood mitigation program. The identification of potential funding

More information

Nellis Air Force Base

Nellis Air Force Base 99th Air Base Wing Nellis Air Force Base Col Charlie Perham Mission Support Group Commander This Briefing is: UNCLASSIFIED Overview Introduction Installation Overview Construction Program 5 Hours of FAA

More information

DAM AND LEVEE SAFETY

DAM AND LEVEE SAFETY A SPECIAL PERFORMANCE AUDIT OF THE DEPARTMENT OF ENVIRONMENTAL PROTECTION MAY 2008 BUREAU OF DEPARTMENTAL AUDITS May 1, 2008 The Honorable Edward G. Rendell Governor Commonwealth of Pennsylvania 225 Main

More information

COMPLETE STATEMENT OF. Richard P. Wagenaar, Colonel Commander and District Engineer NEW ORLEANS DISTRICT U.S. ARMY CORPS OF ENGINEERS

COMPLETE STATEMENT OF. Richard P. Wagenaar, Colonel Commander and District Engineer NEW ORLEANS DISTRICT U.S. ARMY CORPS OF ENGINEERS COMPLETE STATEMENT OF Richard P. Wagenaar, Colonel Commander and District Engineer NEW ORLEANS DISTRICT U.S. ARMY CORPS OF ENGINEERS DEPARTMENT OF THE ARMY Introduction BEFORE THE Committee on Homeland

More information

BALTIMORE DISTRICT PROGRAM OVERVIEW

BALTIMORE DISTRICT PROGRAM OVERVIEW BALTIMORE DISTRICT PROGRAM OVERVIEW 1 237 237 237 217 217 217 200 200 200 AMERICAN COUNCIL OF ENGINEERING COMPANIES/MARYLAND 255 0 163 131 239 110 112 62 255 0 163 132 65 135 92 102 255 0 163 122 53 120

More information

Incident Planning Guide Tornado Page 1

Incident Planning Guide Tornado Page 1 Incident Planning Guide: Tornado Definition This Incident Planning Guide is intended to address issues associated with a tornado. Tornadoes involve cyclonic high winds with the potential to generate damaging

More information

U.S. Army Corps of Engineers Navigation Program Update

U.S. Army Corps of Engineers Navigation Program Update U.S. Army Corps of Engineers Navigation Program Update For American Association of Port Authorities Harbors and Navigation Meeting Jeffrey A. McKee Chief, Navigation Branch US Army Corps of Engineers August

More information

First Annual RCRA CCR Unit Inspection Report January 2016 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT

First Annual RCRA CCR Unit Inspection Report January 2016 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT NORTHERN INDIANA PUBLIC SERVICE COMPANY R.M. SCHAHFER GENERATING STATION First Annual RCRA CCR Unit Inspection Report January 2016 REPORT WASTE DISPOSAL AREA SURFACE IMPOUNDMENT Submitted To: Northern

More information

Appendix B Review Matrix Text & Table Footnotes

Appendix B Review Matrix Text & Table Footnotes Review Submissions The PDP includes a series of review submissions designed to ensure that all projects are developed in accordance with ODOT policies. The PDP Products Review Matrix found in this Appendix

More information

EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING

EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING Primary Agency: Chatham County Department of Public Works Support Agencies: Chatham Emergency Management Agency Chatham County Engineering

More information

The purpose of the presentation is to provide an overview of the changes that occurred between the Pennsylvania State Programmatic General Permit-4

The purpose of the presentation is to provide an overview of the changes that occurred between the Pennsylvania State Programmatic General Permit-4 The purpose of the presentation is to provide an overview of the changes that occurred between the Pennsylvania State Programmatic General Permit-4 and the Pennsylvania State Programmatic General Permit-5

More information

Digitally signed by BIGELOW.BENJAMIN.JAMES ou=pki, ou=usa, cn=bigelow.benjamin.james Date:

Digitally signed by BIGELOW.BENJAMIN.JAMES ou=pki, ou=usa, cn=bigelow.benjamin.james Date: Digit alysignedbybigelow.benj AMIN.J AMES.1160212310 DN:c = US,o= U.S.Gov er nme nt,ou=dod,ou= PKI,ou= US A,c n= BIGE L OW.BE NJ AMIN.J AM E S.1 1 60 2 12 3 10 Date:2016.08.0313: 13:11-0 4'0 0' Digitally

More information

Programmatic General Permit (18-PGP-01) Effective Date: XXXXXX Expiration Date: XXXXXXX

Programmatic General Permit (18-PGP-01) Effective Date: XXXXXX Expiration Date: XXXXXXX Programmatic General Permit (18-PGP-01) Effective Date: XXXXXX Expiration Date: XXXXXXX DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, NASHVLLE DISTRICT PROGRAMMATIC GENERAL PERMIT (18-PGP-01) FOR

More information

FY2013 LTA - MARION ENGR DEPOT EAST

FY2013 LTA - MARION ENGR DEPOT EAST FY2013 LTA - MARION ENGR DEPOT EAST Army Defense Environmental Restoration Program Installation Action Plan Printed 27 August 2013 Table of Contents Statement Of Purpose... Acronyms... Installation Information...

More information

Lexington s Stormwater Quality Projects Incentive Grant Program

Lexington s Stormwater Quality Projects Incentive Grant Program Lexington s Stormwater Quality Projects Incentive Grant Program PRESENTED BY: Gregory S. Lubeck, P.E., CFM, ENGINEERING SECTION MANAGER LEXINGTON-FAYETTE URBAN COUNTY GOVERNMENT Discussion Topics EPA Consent

More information

BMPs eligible for funding under the Grants in Aid pilot project were based on the draft MRGP, and included the following:

BMPs eligible for funding under the Grants in Aid pilot project were based on the draft MRGP, and included the following: GRANTS IN AID PILOT PROJECT State Fiscal Year 2018- FINAL REPORT INTRODUCTION The Grants-in-Aid pilot project provided funding for municipalities to construct best management practices on municipal roads

More information

FY2016 SIEVERS-SANDBERG USARC

FY2016 SIEVERS-SANDBERG USARC FY2016 SIEVERS-SANDBERG USARC Army Defense Environmental Restoration Program Installation Action Plan Printed 30 August 2016 Table of Contents Statement Of Purpose... Acronyms... Installation Information...

More information

Site Description. CCR Rule (a)(3), Emergency Action Plan (EAP)

Site Description. CCR Rule (a)(3), Emergency Action Plan (EAP) Site Description Kentucky Utilities Company (KU) owns and operates the E.W. Brown Auxiliary Pond, a CCR surface impoundment, at the E.W. Brown Generating Station in Mercer County, Kentucky. The Auxiliary

More information

LIMITED ENVIRONMENTAL REVIEW

LIMITED ENVIRONMENTAL REVIEW LIMITED ENVIRONMENTAL REVIEW A. Project Identification Name: 2015 Ohio Department of Health/Ohio Environmental Protection Agency Household Sewage Treatment Systems Repair/ Replacement Program using Principal

More information

Project Engineering Peer Review Within The U.S. Army Corps Of Engineers

Project Engineering Peer Review Within The U.S. Army Corps Of Engineers Flawed Projects, Planning, and Mitigation A Decade of Analysis Calls For Reforming the Army Corps of Engineers A Summary of Studies by the National Academy of Sciences, Government Accountability Office,

More information

New Orleans Hurricane and Storm Damage Risk Reduction System Update

New Orleans Hurricane and Storm Damage Risk Reduction System Update New Orleans Hurricane and Storm Damage Risk Reduction System Update by Team New Orleans U.S. Army Corps of Engineers November 13, 2008 New Orleans Area Hurricane Storm Damage Risk Reduction System 5 Parishes

More information

Introduction. Background. Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program

Introduction. Background. Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program Introduction Cannon Air Force Base (AFB) is home to the 27th Special Operations Wing (SOW), whose primary

More information

U.S. Army Corps of Engineers South Pacific Division Building Strong and Taking Care of People

U.S. Army Corps of Engineers South Pacific Division Building Strong and Taking Care of People U.S. Army Corps of Engineers South Pacific Division Building Strong and Taking Care of People SAME Orange County Post Federal Business Opportunities Forum Joe Calcara SES, Director of Programs 12 November

More information

Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional

Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional experience in environmental permitting in California and

More information

EXISTING CONDITIONS

EXISTING CONDITIONS 02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal 02 01 80 Maintenance of Facility

More information

Implementing the Water Resources Development Act of 2007

Implementing the Water Resources Development Act of 2007 Implementing the Water Resources Development Act of 2007 Rich Worthington U.S. Army Corps of Engineers, Headquarters January 17, 2008 WRDA 2007 (PL 110-114 ) PROVISIONS IMPORTANT TO AAPA STATUS: Passed

More information

ALTERNATIVE SOURCES OF FUNDING FOR

ALTERNATIVE SOURCES OF FUNDING FOR January 2017 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by

More information

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA CESAD-RBT REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA 30303-8801 1 3 JUN 2013 MEMORANDUM FOR COMMANDER,

More information

CITY OF LAREDO Environmental Services Department

CITY OF LAREDO Environmental Services Department CITY OF LAREDO Environmental Services Department May 11, 2000 Request for Proposals February 18, 2016 Project: Completion of Feasibility Study of the Rio Grande Basin Chacon Creek under Section 203 of

More information

Dallas Floodway System Update

Dallas Floodway System Update Dallas Floodway System Update Mobility Solutions, Infrastructure & Sustainability Committee February 12, 2018 Sarah Standifer, Director Trinity Watershed Management Presentation Overview Purpose Background/History

More information

FY2016 AFRC FORT WADSWORTH

FY2016 AFRC FORT WADSWORTH FY2016 AFRC FORT WADSWORTH Army Defense Environmental Restoration Program Installation Action Plan Printed 30 August 2016 Table of Contents Statement Of Purpose... Acronyms... Installation Information...

More information

Inner Harbor Navigation Canal Lock Replacement Project

Inner Harbor Navigation Canal Lock Replacement Project Inner Harbor Navigation Canal Lock Replacement Project May 2001 !IHNC Lock (known locally as the Industrial Canal Lock) was opened in 1921!Target for replacement for over 40 years Connecting Waterways

More information

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate Major in FY2013/2014 (By and ing Source) Environmental Services Solid Waste 4200 4200 06CON 4200 SWM01 Balance $13,753,504.00 Balance $4,631,754.00 Balance $2,738,918.00 ing Source Total: $21,124,176.00

More information

RICHLAND COUNTY BLUE RIBBON COMMITTEE MAY 19, :00 PM 4 TH FLOOR CONFERENCE ROOM

RICHLAND COUNTY BLUE RIBBON COMMITTEE MAY 19, :00 PM 4 TH FLOOR CONFERENCE ROOM RICHLAND COUNTY BLUE RIBBON COMMITTEE MAY 19, 2016 2:00 PM 4 TH FLOOR CONFERENCE ROOM MEMBERS PRESENT: Chair Vice Chair Torrey Rush Greg Pearce Marie Stallworth Erich Miarka Carol Kososki Bernice G. Scott

More information

Planning Modernization & WRRDA Implementation

Planning Modernization & WRRDA Implementation Planning Modernization & WRRDA Implementation Theodore Tab Brown, Chief of Planning and Policy U.S. Army Corps of Engineers Headquarters 19 August 2015 US Army Corps of Engineers PLANNING SMART The Four

More information

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues Marie Strum U.S. Army Corps of Engineers Great Lakes Navigation Team Leader April 10, 2018 The views, opinions and findings

More information

Department of the Army U.S. Army Corps of Engineers Washington, DC

Department of the Army U.S. Army Corps of Engineers Washington, DC CECW-CE Engineer Regulation 1110-2-1400 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design RESERVOIR/WATER CONTROL MANAGEMENT Distribution Restriction

More information

Emergency Support Function #3 Public Works and Engineering Annex

Emergency Support Function #3 Public Works and Engineering Annex Emergency Support Function #3 Public Works and Engineering Annex Primary Agency: Support Agencies: Department of Defense, U.S. Army Corps of Engineers Department of Agriculture Department of Commerce Department

More information

Fiscal Year 2012 Defense Environmental Programs Annual Report to Congress

Fiscal Year 2012 Defense Environmental Programs Annual Report to Congress Fiscal Year 2012 Defense Environmental Programs Annual Report to Congress November 2013 Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics The estimated cost of report

More information

Jefferson Parish Department of Drainage. Emergency Plan

Jefferson Parish Department of Drainage. Emergency Plan Jefferson Parish Department of Drainage Emergency Plan Emergency Plan Purpose, Pre-Storm Plan, Approaching Storm/Hurricane Plan and Recovery Plan I. Purpose The Drainage Department is responsible for all

More information

Emergency Management THERE WHEN YOU NEED US

Emergency Management THERE WHEN YOU NEED US Emergency Management THERE WHEN YOU NEED US Disasters can change our lives in an instant. A Atornado, hurricane, flood, earthquake or other disaster can tear through our communities in moments destroying

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Public Notice U.S. Army Corps Permit Application No: SWG-2015-00306 Of Engineers Date Issued: 14 January 2016 Galveston District Comments Due: 16 February 2016 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information

San Jacinto River Authority. Board of Directors Meeting June 28, 2018

San Jacinto River Authority. Board of Directors Meeting June 28, 2018 San Jacinto River Authority Board of Directors Meeting June 28, 2018 AGENDA SAN JACINTO RIVER AUTHORITY THURSDAY, JUNE 28, 2018-8:00 A.M. GENERAL AND ADMINISTRATION BUILDING 1577 DAM SITE ROAD, CONROE,

More information

BOROUGH OF POOLE COUNCIL. 15 December 2015

BOROUGH OF POOLE COUNCIL. 15 December 2015 AGENDA ITEM 21 BOROUGH OF POOLE COUNCIL 15 December 2015 ACCESS STRATEGY FOR THE PORT OF POOLE & REGENERATION AREA GRAVEL HILL IMPROVEMENTS (INCLUDING DUNYEATS JUNCTION) REPORT OF THE HEAD OF TRANSPORTATION

More information

US Army Corps of Engineers. Section 408 Overview. Regulatory Workshop July 22, Kim Leonard/Kevin Lee BUILDING STRONG

US Army Corps of Engineers. Section 408 Overview. Regulatory Workshop July 22, Kim Leonard/Kevin Lee BUILDING STRONG US Army Corps of Engineers Section 408 Overview Regulatory Workshop July 22, 2016 Kim Leonard/Kevin Lee Project Manager Flood Protection and Navigation US Army Corps of Engineers, Sacramento District US

More information

WHOLE WATERSHED RESTORATION INITIATIVE Request for Proposals for Community-based Habitat Restoration Projects in Oregon and Washington

WHOLE WATERSHED RESTORATION INITIATIVE Request for Proposals for Community-based Habitat Restoration Projects in Oregon and Washington WHOLE WATERSHED RESTORATION INITIATIVE 2014 Request for Proposals for Community-based Habitat Restoration Projects in Oregon and Washington Proposal Deadline January 9, 2014 at 5:00 PM Pacific Standard

More information

Little Calumet River Basin Commission EXECUTIVE DIRECTOR DAN REPAY

Little Calumet River Basin Commission EXECUTIVE DIRECTOR DAN REPAY Little Calumet River Basin Commission EXECUTIVE DIRECTOR DAN REPAY History Designated by the Indiana General Assembly in 1981 under Governor Otis Bowen Established under IC 14-13-2 Initially as a 11 member

More information

Hazard Mitigation Assistance (HMA) Developing Hazard Resilient Communities February 29, 2012

Hazard Mitigation Assistance (HMA) Developing Hazard Resilient Communities February 29, 2012 Hazard Mitigation Assistance (HMA) Developing Hazard Resilient Communities February 29, 2012 Agenda Intro to Hazard Mitigation Assistance Purpose Who can apply? (HM Plans) What does it fund/how much? HMA

More information

VILLAGE OF FOX CROSSING REQUEST FOR PROPOSAL FOR COMPREHENSIVE PLAN

VILLAGE OF FOX CROSSING REQUEST FOR PROPOSAL FOR COMPREHENSIVE PLAN VILLAGE OF FOX CROSSING REQUEST FOR PROPOSAL FOR COMPREHENSIVE PLAN Issuing Department: Community Development Department Village of Fox Crossing 2000 Municipal Dr. Project Officer: George L. Dearborn Jr.,

More information

PUBLIC INVOLVEMENT PLAN FOR ENVIRONMENTAL CLEANUP

PUBLIC INVOLVEMENT PLAN FOR ENVIRONMENTAL CLEANUP PUBLIC INVOLVEMENT PLAN FOR ENVIRONMENTAL CLEANUP Former Southern Pacific Rail Yard Ashland, Oregon updated April 13, 2006 Greg Aitken, Project Manager Cleanup Program Oregon Department of Environmental

More information

Kansas AAP, KS Conveyance Progress Report

Kansas AAP, KS Conveyance Progress Report Kansas AAP, KS Conveyance Progress Report As of 1 April 2018 Page 2 1 April 2018 BRAC 2005 Table of contents Summary 2 Environmental Cleanup 3 Reuse Plan 4 Programmatic Agreement 5 Property Conveyance

More information

WHOLE WATERSHED RESTORATION INITIATIVE

WHOLE WATERSHED RESTORATION INITIATIVE WHOLE WATERSHED RESTORATION INITIATIVE 2015 Request for Proposals for Community-based Habitat Restoration Projects in Oregon Proposal Deadline is February 10, 2015 at 5:00 PM Pacific Standard Time Funding

More information

REVIEW PLAN. Savannah Harbor DMCA 12A Dike Raising

REVIEW PLAN. Savannah Harbor DMCA 12A Dike Raising REVIEW PLAN For Savannah Harbor DMCA 12A Dike Raising Jasper County, South Carolina Savannah District November 25, 2011 THE INFORMATION CONTAINED IN THIS REVIEW PLAN IS DISTRIBUTED SOLELY FOR THE PURPOSE

More information

Port of Portland FY11-13 Disadvantaged Business Enterprise (DBE) Goal

Port of Portland FY11-13 Disadvantaged Business Enterprise (DBE) Goal Port of FY11-13 Disadvantaged Business Enterprise (DBE) Goal During Federal Fiscal Years FY11, FY12, FY13, October 1, 2010 September 30, 2013, the Port of plans to solicit bids/proposals for the following

More information

USACE 2012: The Objective Organization Draft Report

USACE 2012: The Objective Organization Draft Report USACE 2012: The Objective Organization Draft Report A Critical Analysis September 2003 On August 25, 2003 the Chief of the U.S. Army Corps of Engineers, General Robert Flowers, released to the public a

More information

NAPA COUNTY BOARD OF SUPERVISORS Board Agenda Letter

NAPA COUNTY BOARD OF SUPERVISORS Board Agenda Letter Agenda Date: 8/20/2013 Agenda Placement: 9D Set Time: 9:30 AM Estimated Report Time: 30 Minutes NAPA COUNTY BOARD OF SUPERVISORS Board Agenda Letter TO: FROM: Board of Supervisors Lederer, Steven - Director

More information

2018 FEDERAL PRIORITIES

2018 FEDERAL PRIORITIES 2018 FEDERAL PRIORITIES COMMUNITY PRIORITIES INFRASTRUCTURE OTHER BUILD Grants Department of Energy Education Arts Airport Inland Waterways Highways Railroads Small Business Opportunity Zones Health Care

More information

Brig. Gen. Thomas W. Kula Commanding General Aug. 14, US Army Corps of Engineers BUILDING STRONG

Brig. Gen. Thomas W. Kula Commanding General Aug. 14, US Army Corps of Engineers BUILDING STRONG Brig. Gen. Thomas W. Kula Commanding General Aug. 14, 2013 US Army Corps of Engineers Corps of Engineers Footprint Europe District 9 Divisions Transatlantic Division Northwestern South Pacific Southwestern

More information

U.S. Army Corps of Engineers Chicago District PM Symposium 2015

U.S. Army Corps of Engineers Chicago District PM Symposium 2015 U.S. Army Corps of Engineers Chicago District PM Symposium 2015 Project Management Innovations for Complex Projects in a Dynamic Environment LTC Kevin Lovell, PMP Deputy District Commander Chicago District,

More information

NORFOLK DISTRICT PROGRAM OVERVIEW FUTURE CONTRACTS

NORFOLK DISTRICT PROGRAM OVERVIEW FUTURE CONTRACTS NORFOLK DISTRICT PROGRAM OVERVIEW & FUTURE CONTRACTS ODU CEEVC 18 November 2010 US Army Corps of Engineers NORFOLK DISTRICT Agenda Corps of Engineers Overview Program Overview Current & Future Workload

More information

Hurricane Sandy Coastal Resiliency Competitive Grants Program

Hurricane Sandy Coastal Resiliency Competitive Grants Program Hurricane Sandy Coastal Resiliency Competitive Grants Program Request for Proposals Proposal Due Date: Friday, January 31, 2014 On behalf of the Department of the Interior, the National Fish and Wildlife

More information

RETAIL FUEL STATION ENERGY RESILIENCY PROGRAM PROGRAM GUIDELINES. (revised) December 2014

RETAIL FUEL STATION ENERGY RESILIENCY PROGRAM PROGRAM GUIDELINES. (revised) December 2014 RETAIL FUEL STATION ENERGY RESILIENCY PROGRAM PROGRAM GUIDELINES (revised) December 2014 Retail Fuel Station Energy Resiliency Program Retail Fuel Station Energy Resiliency Program Goal: To enhance the

More information

United States Army Corps of Engineers Pittsburgh District Regulatory Program. Westmoreland County 2014 Engineers Workshop. March 20 th & 21 st, 2014

United States Army Corps of Engineers Pittsburgh District Regulatory Program. Westmoreland County 2014 Engineers Workshop. March 20 th & 21 st, 2014 United States Army Corps of Engineers Pittsburgh District Regulatory Program Westmoreland County 2014 Engineers Workshop March 20 th & 21 st, 2014 Outline of Topics Regulatory Boundary Map USACE Regulatory

More information

2017 Chester County. Municipal Stormwater Summit. Hazard Mitigation Planning, Actions and Funding. - State Perspective -

2017 Chester County. Municipal Stormwater Summit. Hazard Mitigation Planning, Actions and Funding. - State Perspective - 2017 Chester County Municipal Stormwater Summit Hazard Mitigation Planning, Actions and Funding - State Perspective - Ernie Szabo PEMA Hazard Mitigation Planner 1 What is Hazard Mitigation Planning (HMP)?

More information

US Army Corps of Engineers. Little Rock District

US Army Corps of Engineers. Little Rock District US Army Corps of Engineers Little Rock District COL Ed Jackson District Commander Little Rock District 14 April 2010 US Army Corps of Engineers Little Rock District DeQueen Beaver Gillham Ozark Blue Mtn.

More information

VERMONT S RESILIENCE PROGRESS REPORT ROADMAP. August 20, 2015 BACKGROUND WHAT IS RESILIENCE? TRACKING OUR PROGRESS.

VERMONT S RESILIENCE PROGRESS REPORT ROADMAP.   August 20, 2015 BACKGROUND WHAT IS RESILIENCE? TRACKING OUR PROGRESS. PROGRESS REPORT August 20, 2015 VERMONT S ROADMAP TO RESILIENCE BACKGROUND Preparing for Natural Disasters and the Effects of Climate Change in the Green Mountain State In December 2013, following an 18-month

More information