1 Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 7 February 2017 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation. New Jersey Department of Environmental Protection US Army Corps of Engineers New York District BUILDING STRONG 1
2 Public Information Meeting Outline Selected Plan Impacts to Orange Benefits Construction Operation Cost of Plan Schedule Comments and contacts 2
3 Rahway River Basin Flood Risk Management Feasibility Study Project Area 3
4 Benefit to Cost Analysis 4
5 Tentatively Selected Plan - Cranford 5
6 Tentatively Selected Plan - Cranford TSP - Cranford Alt 4a, Description for Cranford/Orange: New outlet 2-36 pipes at Orange Reservoir, with manual draw down two days before predicted storms. Approximately 8,930 ft of trapezoidal channel modifications throughout the Rahway River in Cranford Township. This alternative is likely to contain the 4% annual chance flood (25 year). Orange Reservoir will mitigate the increase in downstream flow caused by deepening and widening the channel. Orange Reservoir re-fill times: 6
7 Orange Reservoir Dam Details 7
8 Benefits to Orange Contingent upon Orange Dam part of the USACE project: Reduced flooding at the paddle boat house and the Ice Skating parking lot Safer dam Federal Support with the Dam (inspections, technical support, possibly federal repairs if damaged by a storm) 8
9 Orange Reservoir Without & With Project Inundation Mapping (25-Year Floodplain) 9
10 Photo of intake structure with reservoir lowered about 23 feet 1957 El Proposed Reservoir drawdown elevation El El
11 Orange Reservoir Downstream Face (Trees) 11
12 Orange Reservoir Main Spillway (Undermined) 12
13 Orange Reservoir Concerns Dam is over 100 years old. Main Spillway is undermined. Overflow Spillway appears to be under designed and the energy dissipation could be insufficient. Orange Reservoir Dam must meet the Corps design standards & regulations once it s part of the Corps project. As geotechnical and structural data was not available, a cost estimate was developed with the worst case assumption of replacing the dam. Dam assessments will need to be performed to provide an accurate cost for modifying the dam. These include sub-surface investigations (borings, radar, etc.) as well as hydrologic/hydraulic, failure mode, structural, seepage and seismic analyses. These investigation studies will be performed in design phase. Full replacement of the dam may not be necessary once more information is available. If full replacement is not required, the cost of modifying the dam could significantly decrease. 13
14 Orange Reservoir Dam Assumptions for Construction Item Assumed Case Possible Range Construction Period 24 months months Reservoir Drawdown dry dry - 10 feet Coffer Dam None None to 30 foot Bypass Flow Unchanged Unchanged Exercise Path (top of dam) Unusable: 24 months Unusable months Boating Unusable: 24 months Usable: 36 0 months 14
15 Environmental Compliance for Orange Reservoir Collection and relocation of fish within the Orange Reservoir prior to drawdown for dam replacement. Performing slow drawdown prior to construction to minimize erosion and sedimentation downstream of reservoir. Stabilize reservoir shoreline and bed with grass seed during dam replacement drawdown. Maintain partial access to walking path along reservoir during dam replacement. Historic property surveys and documentation of the reservoir and dam in coordination with New Jersey Office of State Historic Preservation and others. 15
16 Operation Corps of Engineers will supply an Operation and Maintenance (O&M) Manual to the State, which will specifically establish the operation plan. The O&M Manual will be jointly coordinated with the Corps, the State and Local communities. When more than approximately 4 inches of rain (5-yr event) is forecasted by the National Weather Service for the Rahway River within the next two days. The gates to the dam will be fully opened manually. As the forecast is updated the operation of the gate would be adjusted. Gates will be nearly closed when the rain starts. The responsibility for operation the gates will be agreed upon before completion of the project. The State, the Water Company or one of the local communities are likely candidates for the operation. 16
17 TSP Cost Sharing Federal Non-Federal Total Initial Project Cost $57,950,100 $31,203,900 $89,154,000 Real Estate Credit $3,473,000 $3,473,000 Cash Contribution $27,730,900 $27,730,900 Total $57,950,100 $31,203,900 $89,154,000 As TSP is optimized plan costs and scale are subject to change. The Final Report scheduled for public release in July 2017 will contain optimized costs and scale. 17
18 Projected Feasibility Study Schedule Milestones Dates Public Review of Draft EIS Begins 9 December 2016 Public Review of Draft EIS Closes 7 February 2017 Final Report November 2017 Chiefs Report (for Congress) May 2018 Project Partnership (PPA) Execution July 2018 Prepare Plans & RFP August 2018 Contract Award February 2020 Construction Complete July
19 Public Review Period All study documents may be found at: Public Comment Period Closes 7 February 2017 Comments should be submitted via to: RahwayRiver@usace.army.mil Includes instructions on how to submit comments via and regular mail. Comments can also be submitted via mail to: Kimberly Rightler U.S. Army Corps of Engineers, New York District CENAN-PL-E 26 Federal Plaza New York, NY Comments provided will become part of the public record for this EIS. Comments submitted will be fully considered during preparation of the final EIS. All written comments, including names and address, will be made a apart of the administrative record, available to the public under the Freedom of Information Act (FOIA). The Administrative Record or portions thereof, may be also be posted on a Corps of Engineers internet website. 19
20 Study Contact Information Study Contacts Rifat Salim Project Manager U.S. Army Corps of Engineer, New York District rifat.salim@usace.army.mil John Moyle, P.E. Chief of Dam Safety & Flood Control NJ Dept. of Environmental Protection John.Moyle@dep.state.nj.us 20
Site Description. CCR Rule (a)(3), Emergency Action Plan (EAP)
Site Description Kentucky Utilities Company (KU) owns and operates the E.W. Brown Auxiliary Pond, a CCR surface impoundment, at the E.W. Brown Generating Station in Mercer County, Kentucky. The Auxiliary
More informationUS Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009
US Army Corps of Engineers Periodic Inspection Report 9 Update Dallas City Council June 3, 2009 1 Briefing Overview Flood Protection is of primary importance to the City. The Dallas Floodway System protects
More informationCHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN
CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 RESTORATION PLAN 110 135 120 252 174.59 112 92 56 62 102
More informationKing County Flood Control District 2017 Work Program
Attachment A 2017 Budget Work Program November 7, 2016 FCD2016-20 Attach A King County Flood Control District 2017 Work Program The District work program is comprised of three categories: district oversight
More informationCivil Works Process Overview
Let Mon Lee Office of Assistant Secretary of the Army (Civil Works) Let.M.Lee.CIV@mail.mil Office: (703)614-3977 Mobile: (703)269-7676 Civil Works Process Overview Organizational Structure Assistant Secretary
More informationFirst Annual RCRA CCR Unit Inspection Report January 2016 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT
NORTHERN INDIANA PUBLIC SERVICE COMPANY R.M. SCHAHFER GENERATING STATION First Annual RCRA CCR Unit Inspection Report January 2016 REPORT WASTE DISPOSAL AREA SURFACE IMPOUNDMENT Submitted To: Northern
More informationPONCE DE LEON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION
PONCE DE LEON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION WHEREAS the Department of Environmental Protection, in partnership with the Ponce DeLeon Port Authority, has conducted a
More informationProgrammatic General Permit (18-PGP-01) Effective Date: XXXXXX Expiration Date: XXXXXXX
Programmatic General Permit (18-PGP-01) Effective Date: XXXXXX Expiration Date: XXXXXXX DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, NASHVLLE DISTRICT PROGRAMMATIC GENERAL PERMIT (18-PGP-01) FOR
More informationUpdate on USACE Civil Works Program Authorities, Policies, and Guidance
Update on USACE Civil Works Program Authorities, Policies, 237 237 237 217 217 217 and Guidance 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92
More informationPrepared for CITY OF STAGECOACH Boot Hill Road Stagecoach, Texas 77355
LAKE HARDIN DAM CITY OF STAGECOACH TX05829 EMERGENCY ACTION PLAN Prepared for CITY OF STAGECOACH 16930 Boot Hill Road Stagecoach, Texas 77355 Prepared by City Emergency Manager Michael C. Wethington and
More informationHALDIMAND RURAL WATER QUALITY PROGRAM OVERVIEW
HALDIMAND RURAL WATER QUALITY PROGRAM OVERVIEW The Haldimand Rural Water Quality Program is an initiative of Haldimand County and its partners to improve water quality in the County of Haldimand. The Program
More informationStructural Flood Mitigation
Community Emergency Preparedness Fund Structural Flood Mitigation 1. Introduction 2018 Program & Application Guide The Community Emergency Preparedness Fund (CEPF) is a suite of funding programs intended
More informationCHICAGO AREA WATERWAY SYSTEM (CAWS) DREDGED MATERIAL MANAGEMENT PLAN
CHICAGO AREA WATERWAY SYSTEM (CAWS) DREDGED MATERIAL MANAGEMENT PLAN Briefing for Great Lakes Waterways Conference Presentation by Timothy J. Kroll, P.E. U.S. Army Corps of Engineers, Chicago District
More informationSan Jacinto River Authority. Board of Directors Meeting June 28, 2018
San Jacinto River Authority Board of Directors Meeting June 28, 2018 AGENDA SAN JACINTO RIVER AUTHORITY THURSDAY, JUNE 28, 2018-8:00 A.M. GENERAL AND ADMINISTRATION BUILDING 1577 DAM SITE ROAD, CONROE,
More informationAlthough the final report and decision document has not been released by the Corps, we now have a clear picture of the effort needed to complete the repairs, and the time frame that can be achieved if
More informationDEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017
DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 JANUARY 25, 2017 Regulatory Division SAS-2003-23580 PUBLIC NOTICE ISSUANCE OF PROGRAMMATIC
More informationSabine Pass to Galveston Bay, Texas
Sabine Pass to Galveston Bay, Texas Project Review Plan Independent Technical Review and External Peer Review 1. PURPOSE Pursuant to Engineering Circular (EC) 1105-2-408, Peer Review of Decision Documents,
More informationWATER SUPPLY CHALLENGES: THE ACF CASE
WATER SUPPLY CHALLENGES: THE ACF CASE Presentation to the National Waterways Conference Tunica, Mississippi September 20, 2012 Steven Burns Copyright 2010. Balch & Bingham LLP. All rights reserved 1 Presentation
More informationEmbassy of the United States of America Ottawa, August 29, 1988 No. 364
Exchange of Notes between the Government of Canada and the Government of the United States of America constituting an Agreement concerning the Construction of a Joint Ring Levee Embassy of the United States
More informationAWMEC. Alberta Water Management and Erosion Control Program. Introduction. Who May Apply? Grant Assistance
AWMEC Alberta Water Management and Erosion Control Program Introduction Who May Apply? Grant Assistance Conditions for Project Approval and Priorities Eligibility Criteria Special Policies Northern Alberta
More informationGreat Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues
Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues Marie Strum U.S. Army Corps of Engineers Great Lakes Navigation Team Leader April 10, 2018 The views, opinions and findings
More informationCity of Jersey Village
City of Jersey Village Long-Term Flood Recovery Consultant Request for Qualifications A. INTRODUCTION The City of Jersey Village is seeking consultant services for the development of a Long- Term Flood
More information5/25/2017 FUNDING STORMWATER PROJECTS OVERVIEW PROJECT FUNDING BRIDGE KNOWN PROBLEMS KNOWN SOLUTIONS
FUNDING STORMWATER PROJECTS FRIDAY 9:00 AM TO 9:30 AM PRESENTED BY: MARK EVANS, TEXAS WATER DEVELOPMENT BOARD LAURA CASSET, PE, CFM, CPESC, LOCKWOOD, ANDREWS, AND NEWNAM, INC. OVERVIEW COMMON ROUTES TO
More informationU.S. Army Corps of Engineers Chicago District PM Symposium 2015
U.S. Army Corps of Engineers Chicago District PM Symposium 2015 Project Management Innovations for Complex Projects in a Dynamic Environment LTC Kevin Lovell, PMP Deputy District Commander Chicago District,
More informationREQUEST FOR PROPOSALS FOR THE PROVISION OF DAM BREAK ANALYSES AND INUNDATION MAPPING SERVICES FOR SOUTH FEATHER WATER AND POWER AGENCY S
REQUEST FOR PROPOSALS FOR THE PROVISION OF DAM BREAK ANALYSES AND INUNDATION MAPPING SERVICES FOR SOUTH FEATHER WATER AND POWER AGENCY S LITTLE GRASS VALLEY, SLY CREEK AND LOST CREEK DAMS Issued: December
More informationPUBLIC NOTICE. Town of Ocean Isle Beach Attn: Ms. Debbie Smith, Mayor 3 West Third Street Ocean Isle Beach, North Carolina 28469
US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: January 23, 2015 Comment Deadline: February 23, 2015 Corps Action ID Number: SAW-2011-01241 The Wilmington District, Corps of Engineers
More informationFY 2018 Watershed-Based Funding Pilot Program Policy
FY 2018 Watershed-Based Funding Pilot Program Policy From the Board of Water and Soil Resources, State of Minnesota Version: FY2018 Effective Date: 12/20/2017 Approval: Board Resolution #17-94 Policy Statement
More informationCITY OF LAREDO Environmental Services Department
CITY OF LAREDO Environmental Services Department May 11, 2000 Request for Proposals February 18, 2016 Project: Completion of Feasibility Study of the Rio Grande Basin Chacon Creek under Section 203 of
More informationALTERNATIVE SOURCES OF FUNDING FOR
January 2017 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by
More informationJOINT PUBLIC NOTICE. October 1, 2018
JOINT PUBLIC NOTICE United States Army Corps of Engineers New Orleans District Attn: Regulatory Branch 7400 Leake Ave. New Orleans, Louisiana 70118-3651 October 1, 2018 Project Manager: Sara B. Fortuna
More informationDEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-ZB Washington, DC Circular No September 2018
DEPARTMENT OF THE ARMY EC 1165-2-220 US Army Corps of Engineers CECW-ZB Washington, DC 20314-1000 Circular No. 1165-2-220 10 September 2018 EXPIRES 30 SEPTEMBER 2020 Water Resource Policies and Authorities
More informationBrig. Gen. Thomas W. Kula Commanding General Aug. 14, US Army Corps of Engineers BUILDING STRONG
Brig. Gen. Thomas W. Kula Commanding General Aug. 14, 2013 US Army Corps of Engineers Corps of Engineers Footprint Europe District 9 Divisions Transatlantic Division Northwestern South Pacific Southwestern
More informationNEIWPCC. How New Hampshire s Dam Safety Program Prepares for and Reacts to Floods. More than 4,000 houses. More than 130 State Road Crossings
NEIWPCC Storm Response Lessons Learned Lowell, MA June 25, 2013 There are just over 2,600 dams in NH How New Hampshire s Dam Safety Program Prepares for and Reacts to Floods Steve Doyon, PE, Administrator
More informationDEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-P Washington, DC Regulation No February 2016
DEPARTMENT OF THE ARMY ER 1165-2-211 U.S. Army Corps of Engineers CECW-P Washington, DC 20314-1000 Regulation No. 1165-2-211 4 February 2016 Water Resource Policies and Authorities OPERATION AND MAINTENANCE
More informationEMERGENCY ACTION PLAN (EAP) Notifications and Essential Information
EMERGENCY ACTION PLAN (EAP) Notifications and Essential Information BURGESS #1 DAM TELLER COUNTY, COLORADO HAZARD CLASSIFICATION: SIGNIFICANT State of Colorado DAMID: 080406 Location Map: Clear Creek Arapahoe
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CECW-OM Regulation No. 1130-2-530 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Project Operations FLOOD CONTROL OPERATIONS AND MAINTENANCE POLICIES ER 1130-2-530 Distribution
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CECW-E Engineer Regulation 1110-2-401 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design OPERATION, MAINTENANCE, REPAIR, REPLACEMENT, AND REHABILITATION
More informationWhat is MITIGATION? An action that reduces or eliminates long-term risk to people and property from natural hazards and their effects.
What is MITIGATION? An action that reduces or eliminates long-term risk to people and property from natural hazards and their effects. Hurricane Andrew (1992) Flagler Co. Wildfires (1997) Port St. Lucie
More informationDEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA
REPLY TO ATIENTIONOF DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA 30303-8801 CESAD-RBT 21 May 2012 MEMORANDUM FOR COMMANDER, JACKSONVILLE
More informationPUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: April 19, 2016 Expiration Date: May 19, 2016 US Army Corps of Engineers No: NWP-2014-37/2 Oregon Department of State Lands No: 56882-RF Interested
More informationMajor in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate
Major in FY2013/2014 (By and ing Source) Environmental Services Solid Waste 4200 4200 06CON 4200 SWM01 Balance $13,753,504.00 Balance $4,631,754.00 Balance $2,738,918.00 ing Source Total: $21,124,176.00
More informationDetermining Residual Flood Risk Associated with a
Determining Residual Flood Risk Associated with a Complex Levee System in Fort Bend County, TX NAFSMA Annual Meeting 2017, Charleston, SC Andre McDonald & Richard Lewis Outline 1. The Fort Bend levee system
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 September 21, 2018 Regulatory Branch SAS-2013-00077 EXTENSION REGIONAL PERMIT
More informationNavigation Approach to 408 Guidance
Navigation Approach to 408 Guidance Dylan Davis Navigation Program Manager South Atlantic Division Harbors & Navigation Committee Meeting 12 August 2014 US Army Corps of Engineers Background 33 USC 408
More informationNovember 20, 2017 PUBLIC NOTICE
DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVENUE NEW ORLEANS, LOUISIANA 70118 REPLY TO ATTENTION OF: Operations Division Central Evaluation Section November 20, 2017 Project
More informationDEPARTMENT OF ENVIRONMENTAL CONSERVATION SELECTED ASPECTS OF THE DAM SAFETY PROGRAM. Report 2006-S-61 OFFICE OF THE NEW YORK STATE COMPTROLLER
Thomas P. DiNapoli COMPTROLLER OFFICE OF THE NEW YORK STATE COMPTROLLER DIVISION OF STATE GOVERNMENT ACCOUNTABILITY Audit Objective...2 Audit Results - Summary...2 Background...3 Audit Findings and Recommendations...5
More informationPHOENIX LAKE IRWM PROJECT UPDATE Ross Town Council Meeting
PHOENIX LAKE IRWM PROJECT UPDATE Ross Town Council Meeting Ross Valley Watershed Flood Risk Reduction Program RossValleyWatershed.org Contact us: 415 473 7226; lizlewis@marincounty.org February 16, 2017
More informationDEPARTMENT OF THE ARMY GENERAL PERMIT
DEPARTMENT OF THE ARMY Wilmington District, Corps of Engineers 69 Darlington A venue Wilmington, North Carolina 28403-1343 http://www.saw.usace.army.mil/wetlands/index.html General Permit No. 198000291
More informationPUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408
DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT P.O. BOX 60267 NEW ORLEANS, LOUISIANA 70160-0267 REPLY TO ATTENTION OF Regional Planning and Environmental Division South Environmental Compliance
More informationCESAM-RD-M May 2, 2013 PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT
DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 CESAM-RD-M May 2, 2013 PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT SCOPING MEETING
More informationSPECIFIC AND MASTER PLANS
CHAPTER 14: SPECIFIC AND MASTER PLANS 14.1. PURPOSE In accordance with the Goals and Policies, TRPA may adopt area-wide specific plans or project-oriented master plans to augment plan area statements or
More informationMidpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017
Request for Qualifications and Proposals (RFQP) for Design Consulting Services for the Webb Creek Bridge Replacement Project, Bear Creek Redwood Open Space Preserve Midpeninsula Regional Open Space District
More informationSUBJECT: South Atlantic Division Regional Programmatic Review Plan for the Continuing Authorities Program
DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA 30303-8801 CESAD-CG MEMORANDUM FOR Commander, Charleston District Commander, Jacksonville
More informationRESERVOIR LEGISLATION IN NORTHERN IRELAND
RESERVOIR LEGISLATION IN NORTHERN IRELAND BASIC LEGAL FRAMEWORK The United Kingdom comprises four regional administrations, England, Wales, Scotland and Northern Ireland. Reservoirs in Northern Ireland
More informationCOUNTY DRAINAGE SYSTEMS REPORT (Ditch Inspector s Report)
Lincoln County Minnesota January 2014 COUNTY DRAINAGE SYSTEMS REPORT (Ditch Inspector s Report) BOARD MEMBERS DONALD EVERS BOARD CHAIRPERSON CURTIS BLUMEYER COMMISSIONER RICK HAMMER LARRY HANSEN JOAN JAGT
More informationINTERNATIONAL NIAGARA BOARD OF CONTROL. Minutes of the March 31, 2016 Meeting Detroit, MI
1 2 3 4 5 6 7 8 9 INTERNATIONAL NIAGARA BOARD OF CONTROL Minutes of the March 31, 2016 Meeting Detroit, MI BG Kaiser called the meeting to order at 1:00 pm in the US Army Corps of Engineers Detroit District
More informationCURRENT AND FUTURE STUDIES
CURRENT AND FUTURE STUDIES Cheryl Jaynes Plan Formulation Section USACE, Galveston District October 23, 2014 Custodians of the Coast US Army Corps of Engineers Planning Section Update Shallow Draft Channel
More informationHurricane Katrina City of New Orleans
Hurricane Katrina City of New Orleans Rob Stalzer Deputy County Executive Fairfax County, VA Rob.stalzer@fairfaxcounty.gov Why Did NoVA Send Incident Management Teams to New Orleans? New Orleans requested
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 September 21, 2018 Regulatory Branch SAS-2012-00797 EXTENSION REGIONAL PERMIT
More informationState Project No. XXXXXX City Project No. c401807
June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad
More informationGREENVILLE DAM PROJECT LIHI APPLICATION ATTACHMENT F CULTURAL RESOURCE PROTECTION
GREEVILLE DAM PROJECT LIHI APPLICATIO ATTACHMET F CULTURAL RESOURCE PROTECTIO EVIROMETAL ISPECTIO REPORT (ELECTROICALLY SUBMITTED) FEDERAL EERGY REGULATORY COMMISSIO ew York Region Date of Inspection -
More informationHazard Mitigation Assistance
Hazard Mitigation Assistance Mitigation Division Region IX East Bay Municipal Engineers (EBME) 1 Hazard Mitigation What is Hazard Mitigation? Hazard mitigation is defined as any sustained action taken
More informationSUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1
SUMMARY REPORT OPERATIONS and MAINTENANCE PLANS and CRITERIA HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1 ANSONIA and DERBY, CONNECTICUT December 2010 MMI #1560-119 and #3118-03
More informationJacksonville Harbor Deepening
Jacksonville Harbor Deepening Where will the St. Johns River be deepened? The federal channel will be deepened from approximately River Mile 0 (mouth of the St. John s River) to approximately River Mile
More informationWHOLE WATERSHED RESTORATION INITIATIVE
WHOLE WATERSHED RESTORATION INITIATIVE 2015 Request for Proposals for Community-based Habitat Restoration Projects in Oregon Proposal Deadline is February 10, 2015 at 5:00 PM Pacific Standard Time Funding
More informationJOINT PUBLIC NOTICE. July 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana
JOINT PUBLIC NOTICE July 16, 2018 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Water Permits Division 7400 Leake Avenue
More informationVERMONT S RESILIENCE PROGRESS REPORT ROADMAP. August 20, 2015 BACKGROUND WHAT IS RESILIENCE? TRACKING OUR PROGRESS.
PROGRESS REPORT August 20, 2015 VERMONT S ROADMAP TO RESILIENCE BACKGROUND Preparing for Natural Disasters and the Effects of Climate Change in the Green Mountain State In December 2013, following an 18-month
More informationDigitally signed by BIGELOW.BENJAMIN.JAMES ou=pki, ou=usa, cn=bigelow.benjamin.james Date:
Digit alysignedbybigelow.benj AMIN.J AMES.1160212310 DN:c = US,o= U.S.Gov er nme nt,ou=dod,ou= PKI,ou= US A,c n= BIGE L OW.BE NJ AMIN.J AM E S.1 1 60 2 12 3 10 Date:2016.08.0313: 13:11-0 4'0 0' Digitally
More informationTEXOMA Same Conference
US Army Corps TEXOMA Same Conference Lieutenant Colonel Chris Sallese June 2005 One Corps Serving One Corps The Army Army and the Nation and the Nation 50,000 sq. miles, LA to Mexico, 100 miles inland
More informationU.S. Army Corps of Engineers Tulsa District
U.S. Army Corps of Engineers Tulsa District OKC SAME POST Presentation 26 June 2014 District Key Topics / Drought Update COL Richard Pratt District Commander June 26, 2014 US Army Corps of Engineers BUILDING
More informationREQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH DATE FEBRUARY 1, 2016
REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH 03580 DATE FEBRUARY 1, 2016 TABLE OF CONTENTS 1. SUMMARY AND BACKGROUND... 2 2. PROPOSAL GUIDELINES...
More informationCreate an account to get started build your profile, create or upload resumes and apply for jobs.
Page 1 of 6 An official website of the United States Government Sign In Search Create an account to get started build your profile, create or upload resumes and apply for jobs. Back to Search results Biologist
More informationCorps Regulatory Program Update
Corps Regulatory Program Update Presentation for the National Association of Flood and Stormwater Management Agencies David Olson Headquarters, U.S. Army Corps of Engineers August 25, 2016 1 BUILDING STRONG
More informationNew Jersey Energy Resilience Bank
New Jersey Energy Resilience Bank Overview SECTION 1 Introduction to the ERB The State of New Jersey 1 New Jersey Energy Resilience Bank (ERB) Overview The extensive damage and outages caused by Superstorm
More informationAPPENDIX J FUNDING SOURCES
APPENDIX J FUNDING SOURCES Existing Programs and Funding Sources There are numerous options available to Dane County for the financing of a flood mitigation program. The identification of potential funding
More informationHurricane Sandy Coastal Resiliency Competitive Grants Program
Hurricane Sandy Coastal Resiliency Competitive Grants Program Request for Proposals Proposal Due Date: Friday, January 31, 2014 On behalf of the Department of the Interior, the National Fish and Wildlife
More informationLOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS The Department of Environmental Protection
More informationEmergency Management THERE WHEN YOU NEED US
Emergency Management THERE WHEN YOU NEED US Disasters can change our lives in an instant. A Atornado, hurricane, flood, earthquake or other disaster can tear through our communities in moments destroying
More informationPASPGP-5 REPORTING CRITERIA CHECKLIST
3150-PM-BWEW0051 8/2016 Rev. COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS DEP USE ONLY Non-Reporting Reporting PASPGP-5 REPORTING CRITERIA
More informationARMY CORPS OF ENGINEERS. Additional Steps Needed for Review and Revision of Water Control Manuals
United States Government Accountability Office Report to Congressional Committees July 2016 ARMY CORPS OF ENGINEERS Additional Steps Needed for Review and Revision of Water Control Manuals GAO-16-685 Highlights
More informationImplementing the Water Resources Development Act of 2007
Implementing the Water Resources Development Act of 2007 Rich Worthington U.S. Army Corps of Engineers, Headquarters January 17, 2008 WRDA 2007 (PL 110-114 ) PROVISIONS IMPORTANT TO AAPA STATUS: Passed
More informationBOROUGH OF STONE HARBOR CRS ACTIVITY 510. Progress Report on Hazard Mitigation Initiatives
BOROUGH OF STONE HARBOR CRS ACTIVITY 510 Progress Report on Hazard Initiatives of Stone Harbor Hazard Plan Adopted: By Resolution 2016 S-125 3 Year CRS Expiration Date: A copy of the adopted plan can be
More informationTREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 5H From: Date: Subject: Staff December 10, 2010 Council Meeting Intergovernmental Coordination and Review Log
More informationMemorandum. Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso
Memorandum DATE October 7, 2010 TO Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso Mayor Pro Tern Dwaine Caraway
More informationRed River Valley Water Supply Project. Request for Statement of Qualifications and Preliminary Proposal for Value Engineering Services.
Red River Valley Water Supply Project Request for Statement of Qualifications and Preliminary Proposal for Value Engineering Services June 7, 2018 The Garrison Diversion Conservancy District (Garrison
More informationHazard Mitigation Assistance Programs
Mississippi Emergency Management Agency Lee Smithson, Executive Director Hazard Mitigation Assistance Programs Overview Introduction A few words from those who made this webinar possible: Jana Henderson,
More informationLexington s Stormwater Quality Projects Incentive Grant Program
Lexington s Stormwater Quality Projects Incentive Grant Program PRESENTED BY: Gregory S. Lubeck, P.E., CFM, ENGINEERING SECTION MANAGER LEXINGTON-FAYETTE URBAN COUNTY GOVERNMENT Discussion Topics EPA Consent
More informationVanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator.
Vanderburgh County Surveyor s Rule 13 Workbook Chapter 15.13.15 Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator. Introduction
More informationPUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409
US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: January 15, 2015 Comment Deadline: February 16, 2015 Corps Action ID Number: SAW-2014-02202 The Wilmington District, Corps of Engineers
More informationRequest for Qualifications (RFQ) Environmental and Permitting Services
Request for Qualifications (RFQ) Environmental and Permitting Services Responses Due: City of Banning Public Works Department 99 E. Ramsey Street Banning, CA 92220 (951) 922-3130 May, 2015 05/19/15 i TABLE
More informationPUBLIC NOTICE. Michael Baker International Mr. Edward Smail 4425 Belle Oaks Drive North Charleston, South Carolina 29405
US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: October 3, 2018 Comment Deadline: October 17, 2018 Corps Action ID Number: SAW-2009-01114 The Wilmington District, Corps of Engineers
More informationBIG RIVER COALITION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT DRIVING THE ECONOMY
BIG RIVER COALITION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT DRIVING THE ECONOMY 22618 Sean M. Duffy, Sr. Executive Director sean.duffy@bigrivercoalition.org MARITIME NATION ENGINEER S WEEK
More informationDEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC
CECW-P/CE Regulation No. 1165-2-504 DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000 ER 1165-2-504 12 July 2017 Water Resource Policies and Authorities CONSTRUCTION OF WATER
More informationSec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:
1.1... moves to amend H.F. No. 1731 as follows: 1.2 Delete everything after the enacting clause and insert: 1.3 "Section 1. CLEAN WATER FUND APPROPRIATIONS. 1.4 The sums shown in the columns marked "Appropriations"
More informationREVIEW PLAN. San Clemente Storm Damage and Shoreline Protection Feasibility Study
REVIEW PLAN San Clemente Storm Damage and Shoreline Protection Feasibility Study May 2009 U.S. Army Corps of Engineers Los Angeles District Date: May 15, 2009 Subject: Review Plan Approval for San Clemente
More informationFalls City Engineer September/October 2016
Falls City Engineer September/October 2016 VOL. 8, Issue 5 www.lrl.usace.army.mil U.S. Army Corps of Engineers Louisville District Corps reopens river after emergency closure at Dam 52 page 3 Corps consults
More informationMount St. Helens Long-Term Sediment Management Plan
Mount St. Helens Long-Term Sediment Management Plan Revised Draft Supplemental Environmental Impact Statement September 2017 Sediment retention structure and upstream sediment plain on the North Fork Toutle
More informationStatus Report on LVRT Activities
Status Report on LVRT Activities PennDOT/DCNR/Lebanon County/LVRT, Inc. Initiative Inwood Iron Bridge: Current Phase: Planning to relocate and to rehabilitate the historic Inwood Iron Bridge over the Swatara
More informationSavannah District Presentation
Savannah District Presentation Prepared By Leila Hollis Chief, Office of Small Business Programs Savannah District, US Army Corps of Engineers 10-11 August 2017 Trusted Partners Delivering Value Today
More informationLisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional
Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional experience in environmental permitting in California and
More information