1 Handing Over the Keys to a Successful Construction Project Jason Morgan, Assistant Chief, Los Angeles County Department of Public Works Chuck McCormick, Mead & Hunt Cory Hazlewood, C&S Companies
2 Handing Over the Keys to a Successful Construction Project Jason Morgan, Assistant Chief, Los Angeles County Department of Public Works
3 A Sponsor s Perspective Elements of a Successful project: Solid foundation Process
4 A Sponsor s Perspective ACIP PROJECT TIMELINE / CHECKLIST
5 A Sponsor s Perspective ACIP PROJECT TIMELINE / CHECKLIST
6 A Sponsor s Perspective ACIP PROJECT TIMELINE / CHECKLIST
7 A Sponsor s Perspective ACIP PROJECT TIMELINE / CHECKLIST
8 A Sponsor s Perspective ACIP PROJECT TIMELINE / CHECKLIST
9 A Sponsor s Perspective ACIP PROJECT TIMELINE / CHECKLIST
10 A Sponsor s Perspective ACIP PROJECT TIMELINE / CHECKLIST
11 A Sponsor s Perspective Elements of a Successful project: Solid foundation Process Collaborative planning / relationships
12 A Sponsor s Perspective Airport Capital Improvement Plan (ACIP) AIP Eligible Realistic (not wish list) Organized presentation Descriptive titles Cost breakdown Ranking / Master Plan / RSAT items
13 A Sponsor s Perspective Airport Capital Improvement Plan (ACIP) AIP Eligible Realistic (not wish list) Organized presentation Descriptive titles Cost breakdown Ranking / Master Plan / RSAT items
14 A Sponsor s Perspective Elements of a Successful project: Solid foundation Process Collaborative planning / relationships Appropriately designed Fully-funded (Federal & State grant funding + Local share) On-time On-budget On-scope (got what we asked for, what is best for the users) Compliant (Sponsor Assurances, Advisory Circulars, etc.) Effective Communication with FAA/ADO Routine Drawdowns (within 30 days of invoice from contractor) Project Oversight / Quality Control
15 A Sponsor s Perspective Post Construction & Ownership: Pre-closeout requirements Conduct final inspection Submit closeout documents & information to FAA ADO Closeout letter and final drawdown from sponsor Grant assurances Parlay your success on to the next project(s)!
16
17 Handing Over the Keys to a Successful Construction Project Chuck McCormick, Mead & Hunt
18 Construction Safety & Phasing Plan AC 150/5370-2F Operational Safety on Airports During Construction FAA CSPP Checklist Project Schedule
19 Construction Safety & Phasing Plan Coordination Sponnsor FAA Consultant Contact Sheet Construction Emergency Utility
20 Construction Safety & Phasing Plan SMS AC 150/ Introduction to SMS for Airport Operations FAA Order FAA Airports SMS for Airports
21 CSPP and SRM Process ARP SOP 1.00 FAA Evaluation of Sponsor s Construction Safety and Phasing Plans Funded by the AIP or PFC Programs
22 Construction Safety & Phasing Plan Areas affected by Project Safety Areas Part 139 ACSI Coordination NAVAIDS Contractor Access Wildlife Management
23 Construction Safety & Phasing Plan FOD Inspection Requirements NOTAM Changes to Phasing During Construction
24
25 Handing Over the Keys to a Successful Construction Project Cory Hazlewood, C&S Companies
26 Construction Process FAA Advisory Circular E Construction Phase CM Plan guidelines Contractor Control Good communication with funding agencies Pre-Con clarity Meetings FAA weekly reporting Field changes / cost
27 Important facts on Construction Observation? Construction observation or inspection Part-time, full-time, or period observation Sponsor s Budget not always the driver Independent Fee Estimate (IFE) Process Sponsor in house CA/CO You have Procurement options!
28 Project Close Out Field Work Acceptance - Letter Punchlist Final Acceptance- Letter Record Drawings Contractor Releases DBE Summary Warranty or Guarantee Final Construction Report Certs Summary of work Final cost and changes
29 Handing Over the Keys to a Successful Construction Project Questions?
Atlanta ADO Workshop. Communicating with the FAA Financial Focus. Federal Aviation Administration. Presented to: Annual South Carolina Conference.
Federal Aviation Atlanta ADO Workshop Communicating with the FAA Financial Focus Presented to: Annual South Carolina Conference By: John R. Marshall, PE Date: February 9, 2017 1. Intro Agenda 2. Communication
More informationREQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT
REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT 2016-2021 GENERAL The intent and purpose of this Request for Qualifications (RFQ) is
More informationAIP CAPITAL PLANNING 101
AIP CAPITAL PLANNING 101 Understanding ACIP Planning Practices Presented to: By: Jason Knipp and Doug Anderson, P.E. State Planners FAA Central Region Airports Division Date: Objectives Understand AIP
More informationREQUEST FOR QUALIFICATIONS (RFQ) AIRPORT MASTER PLAN MADRAS MUNICPAL AIRPORT
REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT MASTER PLAN MADRAS MUNICPAL AIRPORT The City of Madras is seeking proposals from qualified firms to provide planning services in the development of an Airport Master
More informationFAA Update AirTAP Fall Conference
FAA Update AirTAP Fall Conference October 13, 2016 Lindsay Butler Deputy ADO Manager FAA-DMA-ADO Presentation Topics FAA-DMA-ADO Org Chart & Responsibilities Map FY16 Overview Funding History Reauthorization
More informationSUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY
SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS/PROPOSALS Professional Construction Management Services Gettysburg Regional Airport Rehabilitate Runway 6-24, Phase IV Susquehanna
More informationAirport Cooperative Research Program TRANSPORTATION RESEARCH BOARD
Airport Cooperative Research Program TRANSPORTATION Airport Cooperative Research Program Authorized by Congress. Sponsored (funded) by FAA. Driven by and for the airport industry. ACRP Oversight Committee
More informationCONTENTS 1.0 INTRODUCTION... 1
CONTENTS 1.0 INTRODUCTION... 1 2.0 PROGRAM ADMINISTRATION... 2 2.1 Roles and Responsibilities... 2 2.1.1 Federal Aviation Administration... 2 2.1.2 Pennsylvania Department of Transportation (PennDOT)...
More informationREQUEST FOR QUALIFICATIONS FOR A PROFESSIONAL ARCHITECTURAL FIRM TO PROVIDE ARCHITECTURAL SERVICES FOR THE BZN YELLOWSTONE INTERNATIONAL AIRPORT
REQUEST FOR QUALIFICATIONS FOR A PROFESSIONAL ARCHITECTURAL FIRM TO PROVIDE ARCHITECTURAL SERVICES FOR THE BZN YELLOWSTONE INTERNATIONAL AIRPORT TERMINAL EXPANSION PROJECT FEBRUARY 2018 MORRISON-MAIERLE,
More informationWashington Metropolitan Area Transit Authority Board Action/Information Summary
Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201824 Resolution: Yes No TITLE: Financial Management Oversight (FMO) Progress PRESENTATION
More informationCITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT
CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT Residential Sound Insulation Program A. PROGRAM NARRATIVE The City of Fresno
More informationPIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) for FAR PART 150 NOISE COMPATIBILITY STUDY for PIEDMONT TRIAD INTERNATIONAL AIRPORT The Piedmont Triad Airport Authority (PTAA) will receive
More informationAviation System Action Program (ASAP) Central Oregon ACT November 9 th, 2017
Aviation System Action Program (ASAP) Central Oregon ACT November 9 th, 2017 OVERVIEW Critical Oregon Airport Relief (COAR) Grant Program Minimum Match Requirements Example FAA Timeline and Example COAR
More informationCommunity Development Block Grant Applicant Guide
Community Development Block Grant Applicant Guide Updated 12-14-2016 The CDBG program has long assisted rural communities with carrying out infrastructure and economic development projects. Funding from
More informationJefferson County International Airport. AWOS Installation Project
Jefferson County International Airport AIP No. 3-53-0134-014 prepared for Federal Aviation Administration and Port of Port Townsend Engineer s Design Report July 2014 prepared by Vincent Castro Project
More informationCITY OF INGLEWOOD Residential Sound Insulation Program
CITY OF INGLEWOOD Residential Sound Insulation Program REQUEST FOR QUALIFICATIONS/PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE CITY OF INGLEWOOD RESIDENTIAL SOUND INSULATION PROGRAM JANUARY 2008
More informationObjectives for Financial Control over Grant Programs
Objectives for Financial Control over Grant Programs I. Cash management of grant funds is monitored for appropriate timing of receipts and disbursements of grant funds. (Cash Management) II. Procedures
More informationWorkshop on Small Business Certification at SFO. What You Need to Know and Why You Should Apply
Workshop on Small Business Certification at SFO What You Need to Know and Why You Should Apply Learning Objectives Understand the Different Types of Certifications Learn What Certifications Apply at SFO
More informationSandpoint Airport. FY Overall Goal Amendment to the Disadvantaged Business Enterprise (DBE) Program
Sandpoint Airport FY 2018-2020 Overall Goal Amendment to the Disadvantaged Business Enterprise () Program Table of Contents OVERALL GOALS ( 26.45)... 2 AMOUNT OF GOAL FY 2018-2020 IMPROVEMENTS... 2 METHOD...
More informationState Grants For California Airports. Gwyn Reese, Aviation Funding Specialist Caltrans - Division of Aeronautics September 2006
State Grants For California Airports Gwyn Reese, Aviation Funding Specialist Caltrans - Division of Aeronautics September 2006 State Funding Programs Annual Credits Airport Improvement Program (AIP) Matching
More informationPRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ)
PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ) FAA HOT SPOTS ELIMINATING DESIGN SERVICES PROJECT NO. 770 SOLICITATION NO. HWC-HOUHSE-2017-025 Warren Ching Sr. Procurement Specialist Houston
More informationAirport Project Development: From Beginning to End
Airport Project Development: From Beginning to End AVIATION DIVISION April 16, 2015 Embassy Suites San Marcos Introductions Amy Slaughter, CTPM Grants Harry Lorton, PE Engineering Ed Mayle, PM - Engineering
More informationATTACHMENT 5. Section 26.45: Overall DBE Three-Year Goal Methodology
ATTACHMENT 5 Section 26.45: Overall DBE Three-Year Goal Methodology Name of Recipient: Ontario International Airport Authority (OIAA), owner of Ontario International Airport (ONT) Goal Period: FY-2017-2018-2019
More informationSOUTHEAST MICHIGAN COMMUNITY ALLIANCE (SEMCA)
SOUTHEAST MICHIGAN COMMUNITY ALLIANCE (SEMCA) REQUEST FOR PROPOSALS America s Promise Apprenticeship Grant Participant and Performance Data System Issued September 18th 2017 SECTION 1: CONTACTS & IMPORTANT
More informationRFQ TITLE: On-Call Engineering Services RFQ No: WJ Addendum No. 2
Date: June 7,2013 To: All Proposers Subject: Consisting of Seven (7) Pages RFQ Title: RFQ No.: Owner: Request for Qualifications for Professional On-Call Engineering Services 13-054064WJ Proposer shall
More informationABC S of DBE & ACDBE Programs
ABC S of DBE & ACDBE Programs Project Take Off: Community Partnerships and Economic Growth Conference Presented to: By: Broward County Aviation Department Anthony W. Brown, FAA Date: Presentation Overview
More informationAGENDA Audits and Investigations Committee December 1, :00 a.m. V. Information Item A. Financial Management Overview Update (E.
AGENDA Audits and Investigations Committee December 1, 2016 10:00 a.m. I. Approval of Agenda II. III. IV. Certification of Executive Sessions A. November 3, 2016 B. December 1, 2016 Approval of Minutes
More informationCDBG Subrecipient Management October 3-5, 2018 Aurora, CO
Training Venue Location Aurora Central Library 14949 E. Alameda Parkway Aurora, CO 80012 Course Overview CDBG Subrecipient Management October 3-5, 2018 Aurora, CO The National Community Development Association
More informationREQUEST FOR QUALIFICATIONS
Port of Hood River January 30, 2014 1000 E. Port Marina Drive Hood River OR 97031 (541) 386-1645 www.portofhoodriver.com REQUEST FOR QUALIFICATIONS AIRPORT ARCHITECTURAL, ENGINEERING, PLANNING & CONSULTING
More informationCaltrans Division of Aeronautics Grants and Loans. Tony Sordello, Caltrans - Division of Aeronautics September 12, 2012
Caltrans Division of Aeronautics Grants and Loans Tony Sordello, Caltrans - Division of Aeronautics September 12, 2012 What Can Caltrans Do For Your Airport? 1. Annual Credit Grants 2. Airport Improvement
More informationEligibility Eligibility is restricted to private sector organizations operating in Nunavut as defined in the Inuit Language Protection Act.
APPLICATION FOR ASSISTANCE GRANTS & CONTRIBUTIONS PROGRAMS APPLICATION FORM FOR: INSTRUCTIONS 1. Application deadline: Open all year. 2. Please print or type when completing this form. 3. Attach a separate
More informationFire and Rescue Services Department: Procedure for obtaining No Objection Certificate, and Fire License
Fire and Rescue Services Department: Procedure for obtaining No Objection Certificate, and Fire License 1. Name of Approval: No Objection Certificate The procedure, documents checklist, and processing
More informationSILER CITY MUNICIPAL AIRPORT AIRPORT PLANNING/ENGINEERING SERVICES
SILER CITY MUNICIPAL AIRPORT AIRPORT PLANNING/ENGINEERING SERVICES A Multi-Year Improvement Program to provide pre-applications and applications for Federal and State assistance, planning/environmental
More informationRequest for Proposal(s) for Adult or Youth Re- Entry Model Programs. An equal opportunity employer/program
Request for Proposal(s) for Adult or Youth Re- Entry Model Programs An equal opportunity employer/program Introduction workforce CONNECTIONS (wc) is a public agency that provides a variety of workforce
More informationEXHIBIT "A" SCOPE OF SERVICES
EXHIBIT "A" SCOPE OF SERVICES DISTRICT FIVE PUBLIC TRANSPORTATION GRANT OVERSIGHT COMPLIANCE CONSULTANT SERVICES 1000 PURPOSE OF AGREEMENT 2000 SERVICES TO BE PROVIDED 2100 TECHNICAL SERVICES FM # 410735-1-12-12
More informationProject Implementation: From RFP to Project Closeout
FEDERAL ENERGY MANAGEMENT PROGRAM Project Implementation: From RFP to Project Closeout February 2011 5 FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov Course Overview Course is part of the FEMP renewable
More informationApplicant Showings & Los Angeles ACO Process Improvement Initiative
Applicant Showings & Los Angeles ACO Process Improvement Initiative Presented by: Darren Lovato President/FAA DER DER TECHNOLOGIES, INC. March 21-23, 2016 Gorham - PMA Parts & DER Repairs Conference -
More informationCDBG Subrecipient Management July 24-25, 2018 Hosted by McHenry County Woodstock, IL
Training Venue Location Historic Woodstock Opera House 125 West Van Buren Street Woodstock, IL 60098 Course Overview CDBG Subrecipient Management July 24-25, 2018 Hosted by McHenry County Woodstock, IL
More informationBasic Grants Overview WELCOME
Basic Grants Overview WELCOME Introduction This grants Webinar session is an overview that will focus on the Federal Grant Process. A lot of the information presented during this session can be used when
More informationMinnesota Department of Transportation Office of Transit. State Management Plan
Minnesota Department of Transportation Office of Transit State Management Plan Section 5310 ENHANCED MOBILITY OF SENIORS AND INDIVIDUALS WITH DISABILITIES April 4, 2016 Table of Contents A. Program Goals
More informationCOUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES
COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO. 2018-19-CSB CONSTRUCTION MANAGEMENT SERVICES The County of Dunn is requesting proposals for Construction Management Services. The services
More informationINVITATION TO BID (ITB) RESIDENTIAL NOISE MITIGATION PROGRAM(P676A) ITB NO. H27-RNMP
PRE-BID CONFERENCE INVITATION TO BID (ITB) RESIDENTIAL NOISE MITIGATION PROGRAM(P676A) ITB NO. H27-RNMP-2017-003 Al Oracion Sr. Procurement Specialist Houston Airport System Thursday, August 25, 2016 10:00
More informationOffice of Inspector General Audit Tips for FEMA Public Assistance Grant Recipients and Subrecipients
Office of Inspector General Audit Tips for FEMA Public Assistance Grant Recipients and Subrecipients Tonda L. Hadley, Director Central Regional Office-South Office of Emergency Management Oversight Texas
More informationProjects from the American Recovery and Reinvestment Act of 2009 (ARRA) Enacted February 17, 2009
Projects from the American Recovery and Reinvestment Act of 2009 (ARRA) Enacted February 17, 2009 1 Outline Objectives of the Act General Requirements Accountability and Transparency Reporting Requirements
More informationDisadvantaged Business Enterprise (DBE) and Airport Concessions Disadvantaged Business Enterprise (ACDBE) Certification Workshop
Disadvantaged Business Enterprise (DBE) and Airport Concessions Disadvantaged Business Enterprise (ACDBE) Certification Workshop Welcome to the Introduction Disadvantaged Business Enterprise (DBE) and
More informationNEW ORLEANS AVIATION BOARD (NOAB) DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM Goal Setting Methodology and Calculations
NEW ORLEANS AVIATION BOARD (NOAB) DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM Goal Setting Methodology and Calculations Goal Overview Federal Fiscal Year 2011 (October 1, 2010 to September 30, 2011)
More informationStakeholder Guidance American Recovery and Reinvestment Act (ARRA) of 2009 March 3, 2009
Stakeholder Guidance American Recovery and Reinvestment Act (ARRA) of 2009 March 3, 2009 On February 17, 2009, President Obama signed Public Law 111-5. The legislation, referred to as the American Recovery
More informationSTATE AID TO AIRPORTS PROGRAM NC DEPARTMENT OF TRANSPORTATION DIVISION OF AVIATION
APRIL 2014 STATE AID TO AIRPORTS PROGRAM State Authorization: N.C.G.S. 63 NC DEPARTMENT OF TRANSPORTATION DIVISION OF AVIATION Agency Contact Person Program and Financial Nancy C. Seigler, Grants Administrator
More informationTHE CIVIL AVIATION AUTHORITY OF THAILAND APPLICATION FORM FOR FOREIGN REPAIR STATION CERTIFICATE
Application Form for Foreign Repair Station Certificate attached to the Announcement of the Civil Aviation Authority on 19 December B.E. 2559 (2016) THE CIVIL AVIATION AUTHORITY OF THAILAND APPLICATION
More informationOahuMPO Transportation Alternatives Program
OahuMPO Transportation Alternatives Program Guide for Sponsors and Applicants Approved by the OahuMPO Policy Committee May 19, 2015 This guide focuses upon the Transportation Alternatives Program (TAP)
More informationGuidebook for Implementing FAA s Airports Geographic Information System (AGIS) Program
ACRP Problem No. 12-03-02 Guidebook for Implementing FAA s Airports Geographic Information System (AGIS) Program ACRP Staff Comments: Consideration would need to be given in developing a research objective
More informationAPPLICATION FOR ASSISTANCE GRANTS & CONTRIBUTIONS PROGRAMS APPLICATION FORM FOR: ELDERS AND YOUTH INITIATIVES PROGRAMS
APPLICATION FOR ASSISTANCE GRANTS & CONTRIBUTIONS PROGRAMS APPLICATION FORM FOR: ELDERS AND YOUTH INITIATIVES PROGRAMS INSTRUCTIONS 1. Application deadline is January 31 st. 2. Please print or type when
More informationBloomfield College Grants Financial Management Policy
Bloomfield College Grants Financial Management Policy April 2014 This document provides for policies and procedures for the fiscal grant management process for Bloomfield College. Grants include awards
More informationCapitol Improvement Plan (CIP)
Capitol Improvement Plan (CIP) 2007 AirTAP Fall Forum Michael Ferry, Tracy Schmidt 1 The CIP 2 How CIP is Used Local Planning (projects and budget) Programming Project for Funding Tracking Project Legislative
More informationSTATE AID TO AIRPORTS PROGRAM NC DEPARTMENT OF TRANSPORTATION DIVISION OF AVIATION
APRIL 2018 STATE AID TO AIRPORTS PROGRAM State Authorization: N.C.G.S. 63 NC DEPARTMENT OF TRANSPORTATION DIVISION OF AVIATION Agency Contact Person Program and Financial Betsy Beam, Grants Administrator
More informationWoodland support grant application form
Woodland Community Programme Woodland support grant application form Unique reference number (office use only) Date received (office use only) Before completing your application, please make sure you have
More informationPreparing a successful proposal
Preparing a successful proposal 2018 CEF Energy Virtual Info Day 9 April 2018 Bianca Holdford Project Manager - INEA Aims 1) What is the reader of the application looking for? 2) The 3Cs Test the key to
More informationCDBG Subrecipient Management March 14-15, 2018 Murfreesboro, TN
Training Venue Location Patterson Park Community Center 521 Mercury Blvd. Murfreesboro, TN 37130 Course Overview CDBG Subrecipient Management March 14-15, 2018 Murfreesboro, TN The National Community Development
More informationCONDUCTING A COMPLIANCE REVIEW OF HOSPITALPHYSICIAN FINANCIAL ARRANGEMENTS
CONDUCTING A COMPLIANCE REVIEW OF HOSPITALPHYSICIAN FINANCIAL ARRANGEMENTS Dennis S. Diaz, Esq. Shannon G. Dwyer, Esq. Partner Davis Wright Tremaine LLP Los Angeles, CA Sr. Vice President and General Counsel
More informationNEW HAVEN UNIFIED SCHOOL DISTRICT REQUEST FOR BID
For DSA PROJECT INSPECTOR (CLASS 1) Itliong Vera Cruz Middle School 21 st Century Classroom Building RFP # 779 DSA PROJECT INSPECTOR (CLASS 1) Itliong Vera Cruz Middle School 21 st Century Classroom Building
More informationProject Manager's Procedure Manual
Project Manager's Procedure Manual Facilities Planning & Construction Department Florida Agriculture and Mechanical University July 2012 Signature Page for Professional Service Guide Approval Director,
More informationTORRES MARTINEZ DESERT CAHUILLA INDIANS ADOBE EXPERIENCE MANAGER FORMS SOFTWARE
TORRES MARTINEZ DESERT CAHUILLA INDIANS REQUEST FOR PROPOSALS (RFP) NUMBER: RFP 10281 FOR ADOBE EXPERIENCE MANAGER FORMS SOFTWARE REQUESTED BY: TORRES MARTINEZ DESERT CAHUILLA INDIANS TORRES MARTINEZ TRIBAL
More informationNORFOLK AIRPORT AUTHORITY NORFOLK INTERNATIONAL AIRPORT
NORFOLK AIRPORT AUTHORITY NORFOLK INTERNATIONAL AIRPORT REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL PLANNING SERVICES FOR AIRPOPRT MASTER PLAN AND AIRPORT LAYOUT PLAN UPDATES I. REQUEST FOR QUALIFICATIONS
More informationDated: 8/29/17. IFB No. B For Purchase & Installation of Manufactured Home
SOUTHERN NEVADA REGIONAL HOUSING AUTHORITY IFB No. B17031 DKMHP Purchase & Installation of Manufactured Home This addendum must be noted on the Bid Form, initialed and submitted under Tab 4 with the bid
More informationTexas Department of Transportation Page 1 of 19 Public Transportation. (a) Purpose. Title 49 U.S.C. 5329, authorizes the
Texas Department of Transportation Page of 0 SUBCHAPTER D. PROGRAM ADMINISTRATION.. Public Transit Safety Program. (a) Purpose. Title U.S.C., authorizes the Secretary of the U.S. DOT to create and implement
More informationRequest for Proposals (RFP) for Accounting Services Community Futures West Yellowhead
Request for Proposals (RFP) for Accounting Services Community Futures West Yellowhead 1.1. Closing Date Responses to this Request for Proposals (RFP) must be received by Community Futures West Yellowhead
More informationProcedures for Local Public Agency Project Administration (Revised 5/2014)
Procedures for Local Public Agency Project Administration (Revised 5/2014) OVERVIEW A Local Public Agency (LPA) is defined as a county, municipal corporation, state or local authority, board, commission,
More informationFinancial Management Oversight (FMO) Progress Report
Finance & Administration Committee Information Item IV-A November 5, 2015 Financial Management Oversight (FMO) Progress Report Page 60 of 116 Washington Metropolitan Area Transit Authority Board Action/Information
More informationTRANSPORTATION ALTERNATIVES (TA) PROGRAM WORKSHOP. Call for Projects 2017 and 2018
TRANSPORTATION ALTERNATIVES (TA) PROGRAM WORKSHOP Call for Projects 2017 and 2018 WELCOME! Casual atmosphere Please silence your phones Restrooms: turn right when you leave this room and they will be around
More informationTitle I, Part A and The Grants Accounting Approval Process
Title I, Part A and The Grants Accounting Approval Process 2016 Georgia Federal Programs Conference Georgia International Convention Center & Atlanta Airport Marriott Gateway Hotel Atlanta, Georgia June
More informationMassachusetts School Building Authority. John K. McCarthy Executive Director. Deborah B. Goldberg Chairman, State Treasurer. Procurement Overview
Massachusetts School Building Authority Deborah B. Goldberg Chairman, State Treasurer John K. McCarthy Executive Director Procurement Overview February 5, 2015 Procurement Overview Agenda Introductions
More informationIntroduction: A. Scope of Work:
Request for Proposal (RFP) goos olgi gowa Community Center- Landscape & Roof Gutters/Drains Klamath Tribes Housing Department (KTHD) RFP # 18-08KTHD-3landscaping Introduction: The Klamath Tribes Housing
More informationCITY OF SAN ANTONIO AVIATION DEPARTMENT 49 CFR PARTS 26 & 23 DBE AND SBEDA PROGRAMS OVERVIEW
CITY OF SAN ANTONIO AVIATION DEPARTMENT 49 CFR PARTS 26 & 23 DBE AND SBEDA PROGRAMS OVERVIEW January 11, 2017 BACKGROUND San Antonio Airport System San Antonio Airport System is composed of the San Antonio
More informationEnergy Efficiency Alberta Residential and Commercial Solar Program Guidebook
Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook This Guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate
More informationWELCOME! Indianapolis Airport Authority SUPPLIER DIVERSITY OUTREACH. Professional Services September 20,
WELCOME! Indianapolis Airport Authority SUPPLIER DIVERSITY OUTREACH Professional Services September 20, 2017 Introduction/Program Purpose Holli Harrington: Director, Supplier Diversity and Title VI Introduction
More informationAPPLICATION FOR ASSISTANCE GRANTS & CONTRIBUTIONS PROGRAMS APPLICATION FORM FOR: OFFICIAL LANGUAGES PROGRAMS
APPLICATION FOR ASSISTANCE GRANTS & CONTRIBUTIONS PROGRAMS APPLICATION FORM FOR: INSTRUCTIONS 1. Application deadline is February 28th. 2. Please print or type when completing this form. 3. Attach a separate
More information30. GRANTS AND FUNDING ASSISTANCE POLICY
30. GRANTS AND FUNDING ASSISTANCE POLICY POLICY It is the policy of Scott County to account for, and file all appropriate documentation in relation to, any grants or other funding that the county applies
More informationProgram Planning & Proposal Writing. Checklist. SUMMARY Provides a brief overview of the entire proposal, including the budget
Program Planning & Proposal Writing Checklist This checklist can help ensure that a proposal includes essential information in a logical order. In all cases, follow the instructions of the funder. Not
More informationReport of an inspection of a Designated Centre for Disabilities (Children)
Report of an inspection of a Designated Centre for Disabilities (Children) Name of designated centre: Name of provider: Cliff House Address of centre: Dublin 3 Stepping Stones Residential Care Limited
More informationPerformance Audit: Aviation Grants Management Federal Recovery Act
Performance Audit: Aviation Grants Management Federal Recovery Act June 2010 City Auditor s Office City of Atlanta File #09.08 CITY OF ATLANTA City Auditor s Office Leslie Ward, City Auditor 404.330.6452
More informationFinancial Status Update and FMO Progress Report
Finance & Administration Committee Information Item IV-A March 12, 2015 Financial Status Update and FMO Progress Report Page 32 of 58 Washington Metropolitan Area Transit Authority Board Action/Information
More informationAverting a Second Disaster: Leading Financial Oversight Practices in Mitigation and Disaster Grant Programs ASFPM 2016 June 14, 2016
Averting a Second Disaster: Leading Financial Oversight Practices in Mitigation and Disaster Grant Programs ASFPM 2016 June 14, 2016 Introductions Matt Jadacki Executive Director Ernst & Young Matt.Jadacki@ey.com
More informationDisadvantaged Business Enterprise Program Open House
Disadvantaged Business Enterprise Program Open House Fiscal Year 2014 Program Update July 25, 2013 FY2014 DBE Program Update Agenda Welcome and Introduction Disadvantaged Business Enterprise Program Overview
More informationFISCAL YEAR FAMILY SELF-SUFFICIENCY PROGRAM GRANT AGREEMENT (Attachment to Form HUD-1044) ARTICLE I: BASIC GRANT INFORMATION AND REQUIREMENTS
1 1 1 1 1 1 1 1 0 1 0 1 0 1 0 1 FISCAL YEAR 01 FAMILY SELF-SUFFICIENCY PROGRAM GRANT AGREEMENT (Attachment to Form HUD-) ARTICLE I: BASIC GRANT INFORMATION AND REQUIREMENTS 1. This Agreement is between
More informationINTERNAL AUDIT DIVISION REPORT 2016/154. Audit of facilities management in the United Nations Interim Force in Lebanon
INTERNAL AUDIT DIVISION REPORT 2016/154 Audit of facilities management in the United Nations Interim Force in Lebanon Facilities management needed to be strengthened by conducting required preventive maintenance
More informationFUNDING AGREEMENT FOR SECTION 5317 NEW FREEDOM PROGRAM GRANT FUNDS
FTA GRANT CA-57-Xxxx MOU.NF FUNDING AGREEMENT FOR SECTION 5317 NEW FREEDOM PROGRAM GRANT FUNDS This Funding Agreement for Section 5317 New Freedom Program Funds (the Agreement ) is dated as of (the Effective
More informationI. Asbestos Abatement Grant Program Summary
I. Asbestos Abatement Grant Program Summary The Arkansas Legislature authorized the Arkansas Department of Environmental Quality (ADEQ) to award grants for certain activities relating to asbestos assessment,
More informationArchitectural & Engineering Services for Cath Lab RFP
Architectural & Engineering Services for Cath Lab RFP 2016-004 Questions to be submitted by March 14. Proposals due March 28, 2016. The following questions were submitted with regards to RFP 2016-004.
More informationREQUEST FOR PROPOSALS EMERGENCY RIDE HOME TRANSPORTATION SERVICES
REQUEST FOR PROPOSALS The Mid-Ohio Regional Planning Commission (MORPC) is requesting proposals for transportation provider(s) to provide taxi or car rental services for MORPC RideSolutions Emergency Ride
More informationInternal Audit Follow-Up Report
Internal Audit Follow-Up Report Civil Rights Division Program Management TxDOT Internal Audit Division Objective To assess the status of corrective actions for high-risk Management Action Plans (MAPs)
More informationJohns Hopkins University Research Administration (JHURA) Fall 2015
Johns Hopkins University Research Administration (JHURA) Fall 2015 What s New Our Name Our Location Our Organization Our Responsibilities Uniform Guidance Current Initiatives What s New: Our Name Johns
More informationMay 25, Request for Proposals No Offsite Virtual Net Metering
May 25, 2018 Request for Proposals No. 28017 Offsite Virtual Net Metering I. Introduction The Rhode Island Airport Corporation (RIAC) seeks proposals from qualified enterprises to provide offsite virtual
More informationDisparity Study Action Plan June 10, 2009 Recommendation: 10-1 Emerging Small Business (ESB) Program Action: Impact: Timeline:
10-1 Emerging Small Business (ESB) Program - The Port should consider expanding its ESB program. First, broadening the definition of a small business to include other certified small businesses. Second,
More informationThe Lifecycle of a Sponsored Project
The Lifecycle of a Sponsored Project Active Period Spending, Invoicing, Reporting, Monitoring Award Processing And Account Setup Final Reporting Proposal Closeout Funding Funding Sources Where is the Money?
More informationSUBJECT: ACTIONS RELATED TO THE MINETA SAN JOSE INTERNATIONAL AIRPORT - PERIMETER SECURITY TECHNOLOGY INFRASTRUCTURE
COUNCIL AGENDA: 08/02/16 ITEM: 6.4 CITY OF SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL Memorandum FROM: Barry Ng Kimberly J. Becker Jennifer A. Maguire SUBJECT: SEE BELOW DATE:
More informationGetting and Managing a Construction Grant. By Henry Flood
Getting and Managing a Construction Grant Even if your project qualifies for funding, are you ready to take on the challenges? By Henry Flood Your clinic's facilities are 60 years old and no longer meet
More informationOwner s Project Manager Selection
Timothy P. Cahill Chairman, State Treasurer Katherine P. Craven Executive Director Owner s Project Manager Selection INTRODUCTION Selecting a qualified Owner s Project Manager is one of the most important
More informationDate Submitted: Proposed Date(s) of Event:
District: Unit Number: Person Submitting: Email: Phone: Date Submitted: Proposed Date(s) of Event: The Guide to Advancement paragraph 3.0.0.1 establishes the Council Advancement Committee s (CAC) responsibilities
More informationSTUDY AND ARCHITECTURAL DESIGN SERVICES
REQUEST FOR PROPOSALS For a FEASIBILITY STUDY AND ARCHITECTURAL DESIGN SERVICES For the Smugglers Notch Scenic Highway Corridor s Barnes Camp Visitor Center on VT Route 108 in Stowe, VT EA #: EH02030 Contract
More informationTRANSMITTAL 4/18/ S1
TO Deborah Flint. Executive Director Department of Airports TRANSMITTAL 0150-10638-0000 DAT t COUNC*. PU KO 4/18/16 15-1548-S1 "ROM The Mayor ' COUMCL OSTRJCT 11 I Approval to Award an Agreement to ABM
More information