1 Preparing a successful proposal 2018 CEF Energy Virtual Info Day 9 April 2018 Bianca Holdford Project Manager - INEA

2 Aims 1) What is the reader of the application looking for? 2) The 3Cs Test the key to quality Tips and examples on preparing a successful CEF-E application 2

3 What is the reader looking for? 1. Simple language 2. Information easy to find 3. Relevant maps, graphs etc. 3

4 The 3Cs Test the key to quality What? Where? How? Who? Deliverables? Overall logic Links among resources, scope and budget 4

5 The 3Cs Test the key to quality Clear: Action's scope Activity description Milestones 5

6 Action's Scope Application Form: Part A1 and D2.1 Guide for Applicants: What What is the action about? Ex: feasibility study, preparation of permitting documents, the construction of an overhead line (OHL), preparation of the front end engineering design. What are the PCI/action technical parameters? Ex: +/-100km of 320kV double circuit OHL between X and Y, construction of an LNG terminal of a storage capacity xm³, preparation of permitting documentation to be approved by the competent authority. How How will the action's objectives be reached? Ex: a set of studies that will identify a gas pipeline route, consult stakeholders to generate consensus, specifications for procurement. Who Who will carry out the action? Ex: all activities of the Action will be carried out by internal and external resources. Deliverables What are the deliverables? Ex: a double circuit 320 kv OHL constructed, the commissioning of an LNG terminal, final procurement documents prepared, approval of permitting 6 documents.

7 Activities Application Form: Part A3.1 and Part D2.3 Guide for Applicants: What What is the activity about? Ex: This activity encompasses data collection, creation of a common grid and description of scenarios, the construction of X between the substations of Y and Z in country/region A, preparation of the necessary documentation for submission to the competent authority. Clear activity's name matching its description. Ex: Detailed Design and Tender Documents, Construction of new 330kV substation, Preparation and submission of permitting documentation. Deliverables and interdependencies What are the deliverables? Ex: final procurement documents, the construction of a double circuit 320 kv OHL, application documents and the acknowledgement of receipt by the competent authority. Are the activities dependent on each other? Ex: the results of Activity 1 feed into Activity 2, Activity 2 must be completed before Activities 3 and 4 can start. 7

8 Milestones (1) Application Form: Part A3.1 Guide for Applicants: Rules of thumb 1) Each activity should have at least 2 milestones START -> END. 2) Activities lasting >1year, at least one milestone per year. 3) Means of verifications should be reliable and realistic. Here are some examples 8

9 Milestones STUDY (2) EXAMPLE Milestones Activity Activity number 1 Activity name Preparation and submission of planning application to competent authority Implementing applicant(s) X Activity description Y Indicative start date 31/03/2018 START Indicative end date 31/12/2018 END Verifying milestone(s) 1,2 Milesto ne No. Milestone description Milestone Summary Indicative completion date Means of verification 1 Start of the preparation of planning application to the competent authority 2 Submission of the planning application to the competent authority The beneficiary kick starts the procedure for the start of the preparation of the planning application The beneficiary submits the planning application to the competent authority 3 Start of FEED study The beneficiary signs the contract to start the FEED study 4 End of FEED study The beneficiary approves the final FEED study 31/03/2018 START 31/12/2018 END Minutes of meeting by beneficiaries Receipt of acknowledgement by competent authority 31/12/2018 Award of contract by beneficiary to consultant 31/12/2019 Final report approved by beneficiary 9

10 Milestones WORKS (3) EXAMPLE Milestones Milestone No. Activity Activity number 1 Activity name Construction of 320 kv transmission line between X and Y Implementing X applicant(s) Activity description Y Indicative start date 01/01/2017 START Indicative end date 30/12/2019 END Verifying milestone(s) 1,2,3 Milestone description Milestone Summary Indicative completion date Means of verification 1 Kick-off meeting on implementation of 320kV transmission line 2 Start of tendering procedure 3 Commissioning of the 320kV transmission line The beneficiary holds a kick-off meeting The tender documentation was approved by the beneficiary. The procedure in the OJ was launched The construction contractor informs the beneficiary that 100% of the works have been done 01/01/2017 START 01/09/2018 Intermediate 30/12/2019 END Management Board minutes Publication of the notice of the tender in the appropriate media Signature of the deed 10

11 The 3Cs Test the key to quality Consistency between: data text 11

12 Consistency (1) Application Form: Parts A-D Action's start/end dates activity start/end dates Action start date: 01/01/2015 Action end dates: 31/12/2020 First Activity Activity number 1 Activity name Start of the extension of 320kV substation in X Implementing applicant(s) X Activity description Y Indicative start date 01/01/2015 START Indicative end date 31/12/2020 Verifying milestone(s) 1,2,3 Last Activity Activity number 5 Activity name Finalisation of the substations reinforcements and extensions Implementing applicant(s) X Activity description Y Indicative start date 04/01/2015 Indicative end date 31/12/2020 END Verifying milestone(s) 7,8,9 12

13 Consistency (2) Application Form: Parts A-D Activity start/end dates milestone start/end dates Activity Activity number 1 Activity name Start of the construction of the substation in X Implementing applicant(s) X Activity description Y Indicative start date 01/01/2015 START Indicative end date 31/12/2016 END Verifying milestone(s) 1,2 Milestone Milestone No. Milestone description Milestone Summary Indicative completion date Means of verification 1 Kick-off meeting on implementation of substation 2 Commissioning of the substation The beneficiary holds a kick-off meeting The construction contractor informs the beneficiary that 100% of the works have been done 01/01/2015 START 31/12/2016 END Management Board minutes Signature of the deed 13

14 Consistency (3) Application Form: Parts A-D Activity's start/end dates budget breakdown Activities Activity number 1 Activity name Start of the construction of the substation in X Implementing applicant(s) X Activity description Y Indicative start date 01/01/2015 Indicative end date 31/12/2017 Verifying milestone(s) 1,2 Costs incurred 2015 to 2017 Activity number 2 Activity name Finalisation of the substations reinforcements and extensions Implementing applicant(s) X Activity description Y Indicative start date 04/01/2016 Indicative end date 31/12/2018 Verifying milestone(s) 1,2 Costs incurred 2016 to 2018 Budget breakdown Activities Estimated Total Eligible costs Requested cofunding rate (5) Requeste d CEF financing Activity 1 10,000 20,000 10, , ,000 Activity ,000 1,000 2,000 13, ,500 TOTAL 10,000 30,000 11,000 2,000 53, ,500 Costs incurred 2015 to 2017 Costs incurred 2016 to 2018 Verifiable and realistic 14

15 Consistency (4) Application Form: Parts A-D Information in one part of the application matches the information in another. Ex: the description of the activity in Part A and D match, supporting documents do not contradict the info in other parts of the application. Information is presented in a logical way. Ex: administrative procedures are presented in chronological order in the activity table, EIA precedes the permit for construction. Gantt chart is consistent with the activity dates, milestones etc. Ex: Gantt chart provided matches the planning set out in Parts A and D (activities, dates, milestones). 15

16 The 3Cs Test the key to quality Connection amongst: resources scope budget 16

17 Connectivity Interdependencies between activities Ex: Basic study finalised before Design study can start EIA precedes the award of a construction permit Application Form: Part A and D2.1 Justification of resources and connection to the action's scope Ex: Human resources: Construction of a substation, 2 staff members Financial resources: 3,000,000 for project management costs for a small study Application Form: Part D2.3 Guide for applicants: 4.5 Level of detail for the risk assessment and the complexity of the action Ex: Complex cross-border works, no risks identified for potential delays Mitigation measures Application Form: Part D2.9 Guide for applicants:

18 Checklist Read the Guide for applicants 3C test Clarity Consistency Connectivity Proof read 18

19 Look for INEA!

CEF Telecom calls , , & : the evaluation process

CEF Telecom calls , , & : the evaluation process CEF Telecom calls 2018-2, 2018-3, & 2018-5: the evaluation process 2018-2/3/5 CEF Telecom call virtual info day 17 May 2018 Anita Kucharska INEA Deputy Head of Unit Programme Support, Coordination & Communication

More information

Negotiation Guidance Notes

Negotiation Guidance Notes Negotiation Guidance Notes FP7 Collaborative Projects, Networks of Excellence, Coordination and Support Actions, Research for the benefit of Specific Groups (in particular SMEs) Version 31/7/2007 Disclaimer

More information

Executive Council approves CLP Power s Five-Year Development Plan New Tariff and Monthly Fuel Cost Adjustment Come into Effect on 1 October

Executive Council approves CLP Power s Five-Year Development Plan New Tariff and Monthly Fuel Cost Adjustment Come into Effect on 1 October 3 July 2018 中華電力有限公司 CLP Power Hong Kong Limited Executive Council approves CLP Power s Five-Year Development Plan New Tariff and Monthly Fuel Cost Adjustment Come into Effect on 1 October CLP Power Hong

More information

Jump Starters Grant Application Getting Started PROJECT INFORMATION SHEET

Jump Starters Grant Application Getting Started PROJECT INFORMATION SHEET Jump Starters Grant Application Getting Started PROJECT INFORMATION SHEET Please answer the following questions about your project. Be honest and complete. You may not know all the answers yet, but we

More information

Communication throughout the project's life cycle

Communication throughout the project's life cycle Communication throughout the project's life cycle CEF Transport Project Management Workshop 17 September 2015 Francesco Falco, Communication Manager - INEA THE AGENCY'S ROLE Communication strategy Objectives:

More information

Netherlands. Development. Organisation

Netherlands. Development. Organisation Netherlands Development Organisation SNV Kenya/Netherlands Development Organisation Kenya Market-led Dairy Programme Phase II (KMDP-II) Innovation and Investment Fund Criteria and Guidelines for Applicants

More information

30, 2019 INTRODUCTION TO SEED GRANTS

30, 2019 INTRODUCTION TO SEED GRANTS Regional Food Bank of NENY Hunger Prevention and Nutrition Assistance Program (HPNAP) Seed Grant For Expenditures through September 30, 2019 INTRODUCTION TO SEED GRANTS Seed Grants are start-up grants

More information

Response to Tender Guidelines

Response to Tender Guidelines Equality Commission for Northern Ireland Response to Tender Guidelines DECEMBER 2015 This document sets out key details regarding the tendering process and the required form and content of submissions.

More information

TEXMEDIN TEXtile and apparel EuroMEDiterranean heritage for INnovation. Management and Coordination Agreements and Reporting

TEXMEDIN TEXtile and apparel EuroMEDiterranean heritage for INnovation. Management and Coordination Agreements and Reporting TEXMEDIN TEXtile and apparel EuroMEDiterranean heritage for INnovation Management and Coordination Agreements and Reporting Overview Subsidy Contract Start-up report Reporting procedures Auditors data

More information

GUIDE FOR ACTION GRANTS 2015

GUIDE FOR ACTION GRANTS 2015 Guide for Action Grants 2015 Version: June 2015 EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE and CONSUMERS Directorate A Unit A4: Programme management GUIDE FOR ACTION GRANTS 2015 *** Justice Programme

More information

Request for Proposal

Request for Proposal Consolidated Edison Company of New York, Inc. Request for Proposal Non-Wires Solutions to Provide Demand Side Management for Subtransmission and Distribution System Load Relief Newtown Substation Project

More information

NOTICE OF CALL FOR PROPOSALS. with a view to obtaining grants in the field of rail transport, in particular

NOTICE OF CALL FOR PROPOSALS. with a view to obtaining grants in the field of rail transport, in particular NOTICE OF CALL FOR PROPOSALS with a view to obtaining grants in the field of rail transport, in particular Telematics Applications for Passengers' services (TAP) DG MOVE/D2/SUB/446-2011 1. POLICY FRAMEWORK

More information

Guidelines on developing TYNDPs Stakeholders Workshop

Guidelines on developing TYNDPs Stakeholders Workshop 23 November 2017 Guidelines on developing TYNDPs Stakeholders Workshop Rares MITRACHE System Development What`s new? ENTSOG TYNDP Guidelines defining criteria to be fulfilled by promoters for inclusion

More information

Request for Proposal (RFP)

Request for Proposal (RFP) Consolidated Edison Company of New York, Inc. Request for Proposal (RFP) Non-Wires Alternatives to Provide Demand Side Management for Transmission and Distribution System Load Relief Columbus Circle Network

More information

ADMINISTRATIVE REVIEWS AND TRAINING (ART) GRANTS PROGRAM Proposal Response Guidance

ADMINISTRATIVE REVIEWS AND TRAINING (ART) GRANTS PROGRAM Proposal Response Guidance Introduction The purpose of the Administrative Reviews and Training (ART) Grants Program Proposal Response Guidance is to increase the consistency and understanding of program planning prior to grant award.

More information

Horizon 2020 Proposal Development Training Course

Horizon 2020 Proposal Development Training Course Horizon 2020 Proposal Development Training Course Focus: Impact Research Council of Norway Horizon 2020 Proposal Development Training Course Focus: Impact AGENDA DAY 1 08:30 09:00 Registration 09:00 09:15

More information

Community Update Brochure

Community Update Brochure North-South 400kV Interconnection Development Community Update Brochure June 2015 Part Funded by the EU-TEN-E Initiative Application for Planning Approval to An Bord Pleanála Project Background The North-South

More information

2015 CEF Transport Call

2015 CEF Transport Call 2015 CEF Transport Call Peter Van Bockland INEA Project Officer Unit C3 CEF Transport NL CEF Info Day - Apeldoorn 19 November 2015 1 NL CEF Infoday 19/11/2015 1. Content of the 2015 Call 2. Application

More information

Expression of Interest. Gas for Gaza Legal Feasibility Study REF: EOI G4G. April 2016

Expression of Interest. Gas for Gaza Legal Feasibility Study REF: EOI G4G. April 2016 Expression of Interest Gas for Gaza Legal Feasibility Study REF: EOI-2016-78 G4G April 2016 EMPLOYER: OFFICE OF THE QUARTET / UNITED NATIONS DEVELOPMENT PROGRAMME / PROGRAMME OF ASSISTANCE TO THE PALESTINIAN

More information

RESEARCH AWARDS. Information for Applicants Funding Round. Saving 2000 lives a year in Yorkshire by 2025

RESEARCH AWARDS. Information for Applicants Funding Round. Saving 2000 lives a year in Yorkshire by 2025 RESEARCH AWARDS Information for Applicants 2018 Funding Round Saving 2000 lives a year in Yorkshire by 2025 Prepared by: Dr Linda Ko Ferrigno, Research Funding Manager Date: 18 January 2018 2 Contents

More information

CEF TRANSPORT 2016 CALL FOR PROPOSALS. Guide for Applicants

CEF TRANSPORT 2016 CALL FOR PROPOSALS. Guide for Applicants CEF TRANSPORT 2016 CALL FOR PROPOSALS Guide for Applicants 1. Introduction 3 2. Funding under the CEF Transport 5 3. Proposal Evaluation and Selection Process 7 3.1. OVERVIEW OF THE EVALUATION AND SELECTION

More information

CEF Telecom Call: eid & esignature. Carlos Gómez DG CNECT H.4 e-government & Trust

CEF Telecom Call: eid & esignature. Carlos Gómez DG CNECT H.4 e-government & Trust 2018-1 CEF Telecom Call: eid & esignature Carlos Gómez DG CNECT H.4 e-government & Trust eid & esignature CEF eid: helps public administrations and private Service Providers to extend the use of their

More information

Guidance notes: Research Chairs and Senior Research Fellowships

Guidance notes: Research Chairs and Senior Research Fellowships Guidance notes: Research Chairs and Senior Research Fellowships Contents Introduction... 1 Eligibility criteria... 2 Contracts... 2 Further queries... 3 Submission deadline... 3 Resubmissions... 3 Mentoring

More information

2011 Call for proposals Non-State Actors in Development. Delegation of the European Union to Russia

2011 Call for proposals Non-State Actors in Development. Delegation of the European Union to Russia 2011 Call for proposals Non-State Actors in Development Delegation of the European Union to Russia Generally: to promote inclusive and empowered society in partner countries by supporting actions of local

More information

FEED-IN TARIFF POLICY APPLICATION AND IMPLEMENTATION GUIDELINES

FEED-IN TARIFF POLICY APPLICATION AND IMPLEMENTATION GUIDELINES Ministry of Energy FEED-IN TARIFF POLICY APPLICATION AND IMPLEMENTATION GUIDELINES 1 December, 2012 TABLE OF CONTENTS 1 INTRODUCTION 3 2 OVERVIEW OF THE FiT PROCEDURE 3 3 EXPRESSION OF INTEREST APPLICATION

More information

Probation Service. Social Enterprise Kick Start Seed Fund. Guidance Information & Application Process

Probation Service. Social Enterprise Kick Start Seed Fund. Guidance Information & Application Process Probation Service Social Enterprise Kick Start Seed Fund Guidance Information & Application Process 1 Table of Contents Page Section 1 Background 3 Section 2 What is the purpose of this fund? 3 Section

More information

2 nd Call for approved projects START-UP PLAN AND PROCUREMENT PLANS PROGRESS REPORT CAPITALISATION

2 nd Call for approved projects START-UP PLAN AND PROCUREMENT PLANS PROGRESS REPORT CAPITALISATION 2 nd Call for approved projects START-UP PLAN AND PROCUREMENT PLANS PROGRESS REPORT CAPITALISATION GALINA GEORGIEVA Project Officer 2 nd Info Day Blagoevgrad, Bulgaria, 11 th of September 2017 CP INTERREG

More information

Grant Compliance and Controls October 2016 Original audit report issued May 2015

Grant Compliance and Controls October 2016 Original audit report issued May 2015 Follow-up Of Southwest Florida Water Management District 111 Grant Compliance and Controls October 2016 Original audit report issued May 2015 Karen E. Rushing Clerk of the Circuit Court and County Comptroller

More information

TANZANIA FOREST FUND. Call of Project Proposals. Introduction:

TANZANIA FOREST FUND. Call of Project Proposals. Introduction: TANZANIA FOREST FUND Call of Project Proposals Introduction: Tanzania Forest Fund was established in 2002 under the Forest Act [Cap. 323 R.E. 2002] as a mechanism to provide long term, reliable and sustainable

More information

SESAR Joint Undertaking (SJU) Project Execution Guidelines for SESAR 2020 Exploratory Research 2016

SESAR Joint Undertaking (SJU) Project Execution Guidelines for SESAR 2020 Exploratory Research 2016 SESAR Joint Undertaking (SJU) Project Execution Guidelines for SESAR 2020 Exploratory Research 2016 Version 1.00.00 7 December 2016 EDITION [01.00.00] Authoring & Approval Authors of the document Name

More information

ERASMUS for Young Entrepreneurs

ERASMUS for Young Entrepreneurs Enterprise and Industry Directorate General ERASMUS for Young Entrepreneurs Concept, Roles & First Results Christian Weinberger Entrepreneurship and SME Policy Adviser .. to facilitate exchange of experiences,

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

INDUSTRIAL ENERGY OPTIMIZATION PROGRAM

INDUSTRIAL ENERGY OPTIMIZATION PROGRAM INDUSTRIAL ENERGY OPTIMIZATION PROGRAM YOU VE GOT THE POWER TO SAVE Identify energy waste and reduce your production costs. Our efficiency experts will provide customized technical assistance to help you

More information

Project Management, Reporting and National Erasmus+ Office monitoring

Project Management, Reporting and National Erasmus+ Office monitoring Project Management, Reporting and National Erasmus+ Office monitoring Elements of good management models in Capacity Building in HE projects Relevant documents to be aware of Reports and monitoring Additional

More information

2016 Tailored Collaboration Research Program Request for Preproposals in Water Reuse and Desalination

2016 Tailored Collaboration Research Program Request for Preproposals in Water Reuse and Desalination January 5, 2016 2016 Tailored Collaboration Research Program Request for Preproposals in Water Reuse and Desalination Introduction The WateReuse Research Foundation is seeking preproposals for funding

More information

Other. Mailing Address: City: County: Zip:

Other. Mailing Address: City: County: Zip: Please Complete: Submitting Organization: SEED GRANT APPLICATION: Food Bank of the Southern Tier Hunger Prevention and Nutrition Assistance Program (HPNAP) Funding Period: November 1 st, 2017 October 31

More information

2017 CEF Transport Blending Call. FREQUENTLY ASKED QUESTIONS Blending features Last update 12 July 2017 (new questions in blue)

2017 CEF Transport Blending Call. FREQUENTLY ASKED QUESTIONS Blending features Last update 12 July 2017 (new questions in blue) 2017 CEF Transport Blending Call FREQUENTLY ASKED QUESTIONS Blending features Last update 12 July 2017 (new questions in blue) 1. What is an Affordability analysis? In the context of a PPP, affordability

More information

Yorkshire and Humber ERDF Programme Document Retention Records to Keep

Yorkshire and Humber ERDF Programme Document Retention Records to Keep Yorkshire and Humber ERDF Programme 2007 2013 Document Retention Records to Keep Title Document Retention Records to Keep Version 1 Status Date created 02.09.08 Author LC Date of Issue 05.09.08 Next review

More information

Connecting Europe Facility (CEF) Financing Opportunities

Connecting Europe Facility (CEF) Financing Opportunities Connecting Europe Facility (CEF) Financing Opportunities Pietro Bumma, Senior Project Manager Innovation and Network Executive Agency (INEA) CEF Transport Infoday Spain, 11 November 2014 ES Portfolio Characteristics

More information

NATIONAL SCIENCE FOUNDATION

NATIONAL SCIENCE FOUNDATION NATIONAL SCIENCE FOUNDATION INTERNATIONAL COLLABORATIVE RESEARCH PROGRAMME APPLICATION Part 1 SECTION A 1. Project Title The title of the project should be brief, reflect concisely and accurately the proposed

More information

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN REQUEST FOR PROPOSAL (RFP) #1314-15 CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN Request for Proposal must be received no later than January 3, 2014 at 2:00 pm CARRI MATSUMOTO

More information

Nursing Home Incident Command System

Nursing Home Incident Command System Nursing Home Incident Command System Module 4 Tool Kit: Guidebook, JAS, Forms, and IPGs/IRGs This program has been produced by the Center for HICS Education and Training with funding from the California

More information

REQUEST FOR PROPOSALS. Guidance Manual on Green Procurement

REQUEST FOR PROPOSALS. Guidance Manual on Green Procurement REQUEST FOR PROPOSALS Guidance Manual on Green Procurement Government of Newfoundland and Labrador Office of Climate Change, Energy Efficiency and Emissions Trading October 7, 2013 1 REQUEST FOR PROPOSALS:

More information

Open call for proposals VP/2004/021. Initiatives to promote gender equality between women and men, including activities concerning migrant women

Open call for proposals VP/2004/021. Initiatives to promote gender equality between women and men, including activities concerning migrant women EUROPEAN COMMISSION EMPLOYMENT, SOCIAL AFFAIRS AND EQUAL OPPORTUNITIES DG Horizontal and international issues Equality for Women and Men Open call for proposals VP/2004/021 Initiatives to promote gender

More information

EEA and Norway Grants digital annual report 2018

EEA and Norway Grants digital annual report 2018 EEA and Norway Grants digital annual report 2018 Terms of Reference for the proposed development of a digital annual report, EEA and Norway Grants www.eeagrants.org EEA and Norway Grants Financial Mechanism

More information

Forest Enhancement Society of BC Guide to submitting a proposal in the FESIMS.

Forest Enhancement Society of BC Guide to submitting a proposal in the FESIMS. Forest Enhancement Society of BC Guide to submitting a proposal in the FESIMS. Background As part of its delivery agreement with the Forest Enhancement Society of BC (FESBC), PricewaterhouseCoopers (PwC)

More information

1 CONTRACTING ENTITY 1.1 Official name: Athens International Airport S.A. 1.2 Postal address: Administration Building (17)/ Procurement Department

1 CONTRACTING ENTITY 1.1 Official name: Athens International Airport S.A. 1.2 Postal address: Administration Building (17)/ Procurement Department 1 CONTRACTING ENTITY 1.1 Official name: Athens International Airport S.A. 1.2 Postal address: Administration Building (17)/ Procurement Department 190 19 Spata Greece 1.3 Contact point: Telephone: +30

More information

Table 1. Cost Share Criteria

Table 1. Cost Share Criteria Under U.S. Government (USG) funding, cost share refers to the resources an organization contributes to the total cost of a USG grant that is not included as part of the grant. Cost share becomes a condition

More information

Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation

Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation Question 1: Does re-granting experience refer to direct experience

More information

Workshop II Project Management

Workshop II Project Management Workshop II Project Management UNITAR-HIROSHIMA FELLOWSHIP FOR AFGHANISTAN 2007 Introduction to Project Management 15 17 August 2007, Dehradun, India Presented by: Dr. Jobaid Kabir Fellowoship Porgram,

More information

COUNTY OF SANTA BARBARA

COUNTY OF SANTA BARBARA COUNTY OF SANTA BARBARA REQUEST FOR PROPOSALS FOR STRATEGIC ENERGY PLANNING SERVICES Question Deadline: Contact Person: Submittal Deadline: Submittal Location: Friday, January 19, 2018, 5 pm PST Jennifer

More information

Gemini Instrument Feasibility Studies RFP No

Gemini Instrument Feasibility Studies RFP No REQUEST FOR PROPOSAL (RFP) Gemini Instrument Feasibility Studies RFP No. 0506720 RFP Main Document (GIFS-01) Association of Universities for Research in Astronomy, Inc. (AURA) Operating the Gemini Observatory

More information

IMI2 PROPOSAL TEMPLATE SECOND STAGE PROPOSAL & SINGLE STAGE PROPOSAL COORDINATION AND SUPPORT ACTIONS IN TWO-STAGE PROCEDURE (TECHNICAL ANNEX)

IMI2 PROPOSAL TEMPLATE SECOND STAGE PROPOSAL & SINGLE STAGE PROPOSAL COORDINATION AND SUPPORT ACTIONS IN TWO-STAGE PROCEDURE (TECHNICAL ANNEX) IMI2 PROPOSAL TEMPLATE SECOND STAGE PROPOSAL IN TWO-STAGE PROCEDURE & SINGLE STAGE PROPOSAL (TECHNICAL ANNEX) COORDINATION AND SUPPORT ACTIONS Please follow the structure of this template when preparing

More information

Terms of Reference (TOR) for Independent End of Project Evaluation

Terms of Reference (TOR) for Independent End of Project Evaluation Terms of Reference (TOR) for Independent End of Project Evaluation Project Name Increasing the provision of clean energy in Uganda hereafter referred to as Clean Energy Project Project Number(s) ESARPO0218;

More information

NOTICE TO CONSULTANTS REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES FOR GROUNDWATER MODELING AND INJECTION TESTING

NOTICE TO CONSULTANTS REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES FOR GROUNDWATER MODELING AND INJECTION TESTING NOTICE TO CONSULTANTS REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES FOR GROUNDWATER MODELING AND INJECTION TESTING March 30, 2018 Issued by: X Rob Livick, PE/PLS Public Works Director/City Engineer City

More information

EC financing for Innovation Procurement (PCP and PPI)

EC financing for Innovation Procurement (PCP and PPI) EC financing for Innovation Procurement (PCP and PPI) Vasileios Tsanidis European Commission DG CNECT Digital Single Market Start-Ups and Innovation Unit (F3) Innovation Procurement: PCP + PPI Complementarity

More information

Mr. Sang-wan, Byun, Vice President of the EXIM Bank of Korea, Members of the Press, Distinguished Guests, Ladies and Gentlemen:

Mr. Sang-wan, Byun, Vice President of the EXIM Bank of Korea, Members of the Press, Distinguished Guests, Ladies and Gentlemen: STATEMENT BY HON. MUSTAFA HAIDI MKULO (MP.), MINISTER FOR FINANCE ON THE OCCASION OF SIGNING TWO AGREEMENTS BETWEEN THE GOVERNMENT OF THE UNITED REPUBLIC OF TANZANIA AND THE EXIM BANK OF KOREA AT THE TREASURY

More information

Request for Proposal

Request for Proposal Consolidated Edison Company of New York, Inc. Request for Proposal Non-Wires Solutions to Provide Demand Side Management for Subtransmission and Distribution System Load Relief West 42 nd Street Load Transfer

More information

AWARDING FIXED OBLIGATION GRANTS TO NON-GOVERNMENTAL ORGANIZATIONS

AWARDING FIXED OBLIGATION GRANTS TO NON-GOVERNMENTAL ORGANIZATIONS AWARDING FIXED OBLIGATION GRANTS TO NON-GOVERNMENTAL ORGANIZATIONS An Additional Help Document For ADS Chapter 303 New Reference: 11/08/2010 Responsible Office: M/OAA File Name: 303saj_110810 I. PURPOSE

More information

How to submit course or program proposals to the Academic Affairs Committee

How to submit course or program proposals to the Academic Affairs Committee How to submit course or program proposals to the Academic Affairs Committee Where to find the forms and guidance * Revised forms for the creation, deletion, or revision of courses or programs will be located

More information

Participation and funding in H2020 actions Ingrid Mariën-Dusak, DG CONNECT

Participation and funding in H2020 actions Ingrid Mariën-Dusak, DG CONNECT Participation and funding in H2020 actions Ingrid Mariën-Dusak, DG CONNECT Disclaimer : H2020 Regulations are not yet adopted by the legislator. Any information contained in this presentation is legally

More information

NATIONAL GRID GAS UPDATE TO THE STATEMENT OF GAS TRANSMISSION CONNECTION CHARGING INFORMAL CONSULTATION DOCUMENT

NATIONAL GRID GAS UPDATE TO THE STATEMENT OF GAS TRANSMISSION CONNECTION CHARGING INFORMAL CONSULTATION DOCUMENT NATIONAL GRID GAS UPDATE TO THE STATEMENT OF GAS TRANSMISSION CONNECTION CHARGING INFORMAL CONSULTATION DOCUMENT 20 th December 2017 Produced by Claire Gumbley Gas s Contract Manager CONTENTS Section Description

More information

Sponsorship Agreement/Sub-Grant Posted Date June 6, 2016 Due Date for Applications Cycle 1: Cycle 2: July 15, 2016 January 13, 2017

Sponsorship Agreement/Sub-Grant Posted Date June 6, 2016 Due Date for Applications Cycle 1: Cycle 2: July 15, 2016 January 13, 2017 REQUEST FOR PROPOSALS Xcel Energy Renewable Development Fund MnSCU Block Grant Award Type Sponsorship Agreement/Sub-Grant Posted Date June 6, 2016 Due Date for Applications Cycle 1: Cycle 2: July 15, 2016

More information

EDUCATION PROGRAMME. UEFA Research Grant Programme 2018/19 edition. Regulations

EDUCATION PROGRAMME. UEFA Research Grant Programme 2018/19 edition. Regulations EDUCATION PROGRAMME UEFA Research Grant Programme 2018/19 edition Regulations UEFA Research Grant Programme Regulations 1. Eligibility Applicants for a grant must either: have obtained a doctorate and

More information

FMO External Monitoring Manual

FMO External Monitoring Manual FMO External Monitoring Manual The EEA Financial Mechanism & The Norwegian Financial Mechanism Page 1 of 28 Table of contents 1 Introduction...4 2 Objective...4 3 The monitoring plan...4 4 The monitoring

More information

The South African Council for the Project and Construction. Management Professions (SACPCMP)

The South African Council for the Project and Construction. Management Professions (SACPCMP) The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Construction Health and Safety Officers in Terms of Section 18 (1) (c) of the Project

More information

Request for Proposal (RFP) for Grant Writing Services

Request for Proposal (RFP) for Grant Writing Services 1. Background Request for Proposal (RFP) for Grant Writing Services The European Association for the Study of the Liver (EASL - www.easl.eu/) is a non-profit organisation based in Switzerland (Geneva).

More information

Seabank 3 Stakeholder and Community Consultation Strategy. Seabank 3. Stakeholder and Community Consultation Strategy. June 2013.

Seabank 3 Stakeholder and Community Consultation Strategy. Seabank 3. Stakeholder and Community Consultation Strategy. June 2013. Seabank 3 June 2013 June 2013 Page 1 Table of Contents 1.0 Introduction... 3 1.1 The purpose of this document... 3 1.2 The proposed power station (Seabank 3)... 3 1.3 Who is SSE?... 5 2.0 Our approach

More information

Re: NPCC Response to a Request for Criteria Interpretation on Regional Reliability Directory# 8 System Restoration.

Re: NPCC Response to a Request for Criteria Interpretation on Regional Reliability Directory# 8 System Restoration. June 18, 2012 Alan Adamson New York State Reliability Council, LLC 1907 Evva Drive Schenectady, NY 12303 Re: NPCC Response to a Request for Criteria Interpretation on Regional Reliability Directory# 8

More information

Grant Application. Deadlines: January 23 rd, April 23 rd, July 23 rd and October 23 rd

Grant Application. Deadlines: January 23 rd, April 23 rd, July 23 rd and October 23 rd Grant Application Mission: Libra Future Fund was created to capitalize upon the energy and creativity that Maine s young people embody and to combat youth out-migration by supporting initiatives that increase

More information

Program Planning & Proposal Writing. Checklist. SUMMARY Provides a brief overview of the entire proposal, including the budget

Program Planning & Proposal Writing. Checklist. SUMMARY Provides a brief overview of the entire proposal, including the budget Program Planning & Proposal Writing Checklist This checklist can help ensure that a proposal includes essential information in a logical order. In all cases, follow the instructions of the funder. Not

More information

The City of Sandusky. Community Development Block Grant Program (CDBG) Non-Profit Provider Application 501(c) 3 for Program Year 2015

The City of Sandusky. Community Development Block Grant Program (CDBG) Non-Profit Provider Application 501(c) 3 for Program Year 2015 The City of Sandusky Community Development Block Grant Program (CDBG) Non-Profit Provider Application 501(c) 3 for Program Year 2015 Non-Public Service Requests and For-Profit Applicants to use the same

More information

Jane Z. Dumsha, Ph.D., CHES Chief Research Operations Officer PHILADELPHIA COLLEGE OF OSTEOPATHIC MEDICINE

Jane Z. Dumsha, Ph.D., CHES Chief Research Operations Officer PHILADELPHIA COLLEGE OF OSTEOPATHIC MEDICINE Jane Z. Dumsha, Ph.D., CHES Chief Research Operations Officer 1. Develop an Idea 2. Find Potential Sponsors 3. Plan the Proposal 4. Draft the Proposal 5. Complete and Submit the Proposal What is the need?

More information

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON EM

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON EM PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Revised: February 6, 2018 {P1472575.1} CONTENTS

More information

Introduction to GRIP Governance for Railway Investment Projects

Introduction to GRIP Governance for Railway Investment Projects Introduction to GRIP Governance for Railway Investment Projects Document Ref Status Document Owner Date Published GRIP/Intro DRAFT Mike Wright Introduction Network Rail operates in a complex environment

More information

Graduate Student Council Research Grants Program

Graduate Student Council Research Grants Program GSC Research Grants 2016 Request for Applications (RFA) Graduate Student Council Research Grants Program An annual, competitive research grants program for graduate students at the University of Mississippi.

More information

OpenPEPPOL Guidance on the Connecting Europe Facility (CEF)

OpenPEPPOL Guidance on the Connecting Europe Facility (CEF) OpenPEPPOL Guidance on the Connecting Europe Facility (CEF) 2015 CEF Telecom Calls for Proposals for einvoicing and edelivery This document was prepared by to guide its members in the preparation of proposals

More information

Consultant Power Forward. Location: Abuja, Nigeria. Reports to: Country Director and Senior Support Program Manager

Consultant Power Forward. Location: Abuja, Nigeria. Reports to: Country Director and Senior Support Program Manager Title: Consultant Power Forward Location: Abuja, Nigeria Reports to: Country Director and Senior Support Program Manager Africare is a leading non-governmental organization (NGO) committed to addressing

More information

Contracting Authority: European Commission (EuropeAid) PRO INVEST. Guidelines for grant applicants

Contracting Authority: European Commission (EuropeAid) PRO INVEST. Guidelines for grant applicants Contracting Authority: European Commission (EuropeAid) PRO INVEST Guidelines for grant applicants Budget Line 8.ACP.TPS.108 8th European Development Fund Reference: EuropeAid/12739/C/ACT/Multi Deadline

More information

Horizon ERA-NET Cofund actions

Horizon ERA-NET Cofund actions Horizon 2020 ERA-NET Cofund actions Jörg NIEHOFF DG Research & Innovation Dir. B Innovation Union and European Research Area Unit B2 ERA Policy and Reforms The presentation will cover: The Definition of

More information

APPLICATION MANUAL MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS. PHARE National Programme 2004 III part

APPLICATION MANUAL MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS. PHARE National Programme 2004 III part CONTRACTING AUTHORITY: MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS PHARE National Programme 2004 III part APPLICATION MANUAL Conditions and procedures for Bulgarian partners participating within

More information

Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands)

Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands) Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands) New/ Authorization Approp. Current Page State/Installation/Project Request Request Mission No. Virginia Pentagon Reservation

More information

The South African Council for the Project and Construction. Management Professions (SACPCMP)

The South African Council for the Project and Construction. Management Professions (SACPCMP) The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Construction Health and Safety Managers in Terms of Section 18 (1) (c) of the Project

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS April 2018 Capital Pool Feasibility Study and Business Plan Request for Proposals For the development of a business plan to raise capital for debt financing. Statement of Request

More information

THE FOOD ACADEMY START PROGRAMME (Dublin Region) 2017 Local Enterprise Offices: Dublin City, Dun Laoghaire-Rathdown, Fingal, South Dublin

THE FOOD ACADEMY START PROGRAMME (Dublin Region) 2017 Local Enterprise Offices: Dublin City, Dun Laoghaire-Rathdown, Fingal, South Dublin THE FOOD ACADEMY START PROGRAMME (Dublin Region) 2017 Local Enterprise Offices: Dublin City, Dun Laoghaire-Rathdown, Fingal, South Dublin FOOD ACADEMY START Food Academy is a training programme aimed at

More information

WARM HOMES FUND ROADSHOW. November/ December 2017

WARM HOMES FUND ROADSHOW. November/ December 2017 WARM HOMES FUND ROADSHOW November/ December 2017 AGENDA 1. Background 2. Summary of Round 1 3. Eligibility 4. Application Process what we are looking for 5. Contracting 6. Timetable & Communications 7.

More information

Mulilo Renewable Energy Solar PV Prieska (PTY) LTD

Mulilo Renewable Energy Solar PV Prieska (PTY) LTD Mulilo Renewable Energy Solar PV Prieska (PTY) LTD Presented by: The Gestamp Mulilo Consortium Warren Morse (MSc,BSc Engineering) Ally Vusi Mahlangu (Gestamp Solar PDM, BTech Engineering) Program: 1. Introduction

More information

FREQUENTLY ASKED QUESTIONS (FAQ)

FREQUENTLY ASKED QUESTIONS (FAQ) FREQUENTLY ASKED QUESTIONS (FAQ) FOR GLOBAL CALLS FOR PROPOSALS UNDER THE THEMATIC PROGRAMMES DISCLAIMER This document is intended as useful information for applicants. Given varying call requirements

More information

Innovation and Networks Executive Agency

Innovation and Networks Executive Agency Innovation and Networks Executive Agency CALL FOR PROPOSALS CONCERNING PROJECTS OF COMMON INTEREST UNDER THE CONNECTING EUROPE FACILITY IN THE FIELD OF TRANS-EUROPEAN TRANSPORT NETWORK MULTI-ANNUAL WORK

More information

Western Innovation (WINN) Initiative Application

Western Innovation (WINN) Initiative Application Western Innovation (WINN) Initiative Application Part Two You will have approximately 15 business days to complete part two of this application once you receive the invitation. Before submitting this application,

More information

Guidelines for the Innovation Fund

Guidelines for the Innovation Fund Guidelines for the Innovation Fund The Innovation Fund (IF) grant window will provide funding up to a maximum of US$ 250,000 for projects that require up to 24 months to complete. Application for IF funding

More information

LET S DELIVER TOGETHER 2016 CEF TRANSPORT CALLS FOR PROPOSALS SNEAK PREVIEW

LET S DELIVER TOGETHER 2016 CEF TRANSPORT CALLS FOR PROPOSALS SNEAK PREVIEW LET S DELIVER TOGETHER 2016 CEF TRANSPORT CALLS FOR PROPOSALS SNEAK PREVIEW 29 September 2016 CONTENT 2016 CEF Transport Calls for Proposals 3 Preparing proposals under SESAR Deployment Manager coordination

More information

Request for proposals (RFP)

Request for proposals (RFP) Request for proposals (RFP) For the provision of professional consulting services to position the National Cleaner Production Centre as a Technical Reference Partner to the Energy and Water Seta as the

More information

Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384

Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384 Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384 Table of Contents 1 PURPOSE... 3 2 ASSUMPTIONS... 3 3 RESULTS... 4 3.1 Power-flow Analysis Results...

More information

ELECTRICIDADE DE MOÇAMBIQUE, E.P. com energia construimos futuro

ELECTRICIDADE DE MOÇAMBIQUE, E.P. com energia construimos futuro EDM PRESENTATION TO THE ACP EU ENERGY FACILITY SEMINAR PROJECT CASE STUDIES 23-24 TH NOV 2009 MAPUTO 1 CONTENTS 1. Project objectives and beneficiaries 2. Expected projects results 3. Activities to be

More information

Results-based Financing (RBF) Sub-Saharan Africa Grid Densification Challenge Fund. Call for Proposals

Results-based Financing (RBF) Sub-Saharan Africa Grid Densification Challenge Fund. Call for Proposals Results-based Financing (RBF) Sub-Saharan Africa Grid Densification Challenge Fund Call for Proposals 1 st tranche of the grid densification challenge fund (Mozambique and Uganda) Deutsche Gesellschaft

More information

QUESTIONS AND ANSWERS

QUESTIONS AND ANSWERS AND WOMEN IN THE LABOUR MARKET Republic of Croatia 1. Publication reference EuropeAid/129003/M/ACT/HR 2. Procedure Open 3. Programme IPA 4. Financing Operational Programme for Human Resources Development

More information

Aboriginal Community Capital Grants Program Guide

Aboriginal Community Capital Grants Program Guide APPLICATION GUIDE FOR THE ABORIGINAL COMMUNITY CAPITAL GRANTS PROGRAM WHAT YOU NEED TO KNOW BEFORE YOU APPLY Before completing your Aboriginal Community Capital Grants Program application, please read

More information

REQUEST FOR PROPOSALS TO UPDATE THE DISTRICT S HAZARD MITIGATION PLAN

REQUEST FOR PROPOSALS TO UPDATE THE DISTRICT S HAZARD MITIGATION PLAN REQUEST FOR PROPOSALS TO UPDATE THE DISTRICT S HAZARD MITIGATION PLAN Release Date: March 29, 2018 Deadline for Submission: (Corrected) Wednesday, April 11, 2018 at 2:00 PM Santa Fe Irrigation District

More information

Papua New Guinea: Implementation of the Electricity Industry Policy

Papua New Guinea: Implementation of the Electricity Industry Policy Technical Assistance Report Project Number: 46012 December 2012 Papua New Guinea: Implementation of the Electricity Industry Policy The views expressed herein are those of the consultant and do not necessarily

More information