Airport Project Development: From Beginning to End

Size: px
Start display at page:

Download "Airport Project Development: From Beginning to End"

Transcription

1 Airport Project Development: From Beginning to End AVIATION DIVISION April 16, 2015 Embassy Suites San Marcos

2 Introductions Amy Slaughter, CTPM Grants Harry Lorton, PE Engineering Ed Mayle, PM - Engineering Bill Macke, MSPM Planning 5/13/2015 Project Development: From Beginning to End 2

3 Mapping the Field Project development TxDOT Aviation Planning Process TxDOT Aviation Grants Processes TxDOT Aviation Engineering Processes Design Construction Project wrap-up Questions and discussions Conclude 5/13/2015 Project Development: From Beginning to End 3

4 Conceptual Project Path Stakeholders Sponsors TxDOT Aviation Planning Grants Engineering Consultants / Contractors FAA Other Agencies 5/13/2015 Project Development: From Beginning to End 4

5 Conceptual Project Path AVIATION DIVISION 5/13/2015 Project Development: From Beginning to End 5

6 Project Development AVIATION DIVISION TxDOT Aviation Planning Process 5/13/2015 Project Development: From Beginning to End 6

7 PLANNING AND PROGRAMMING Staff (12) Greg Miller, Planning Section Director Bill Gunn, Aviation Ed./Information Coordinator Bill Macke, Aviation Planner Daniel Benson, Aviation Planner Ed Oshinski, PE, Transportation Engineer, Project Scoping Keith Snodgrass, Planning Megan McLellan, Aviation Planner Michelle Hannah, Aviation Planner Robert Jackson, Environmentalist / Aviation Planner Scott Bryan, Transportation Specialist Sophia Bradford, GIS Analyst / GIS Coordinator Wade Troth, Aviation Planner 5/13/2015 Project Development: From Beginning to End 7

8 TxDOT Planning Project Contacts Wade Troth, West Texas and Panhandle Bill Macke, Northwest Texas to West Dallas Daniel Benson, Dallas to East Texas Robert Jackson, Southeast Texas Michelle Hannah, Central to South Texas Megan McLellan, Southwest to West Texas 5/13/2015 Project Development: From Beginning to End 8

9 5/13/2015 Project Development: From Beginning to End 9

10 Airport Layout Plan Pre-Project Elements Set of drawings that provide a graphic representation of the longterm development plan for an airport. The primary drawing in this set is the Airport Layout Plan. (Also referred to as Airport Layout Drawing) Other drawings may also be included, depending on the size and complexity of the individual airport. Requirement found in 49 USC 47107(a)(16) General Assurances for Grant Application Sponsor must maintain a current ALP Sponsor must not make an alteration to the airport unless determined that it will not adversely affect the safety, utility, and efficiency of the airport. Requirements are met by obtaining an airspace determination and ALP approval to add the project to the airport layout plan 5/13/2015 Project Development: From Beginning to End 10

11 Pre-Project Elements Development Worksheet Internal document to TxDOT Aviation List of items to potentially be programmed for development Gives idea on funding levels to budget for Items placed in a 0-5, 6-10, year plan Routine and repetitive items each planning timespan Pavement rehab and marking 5/13/2015 Project Development: From Beginning to End 11

12 5/13/

13 Pre-Project Elements (continued) Other Elements 5010 Airport Safety Data site visits Pavement Studies Planning and Programming Visits FAA Notifications 5/13/2015 Project Development: From Beginning to End 13

14 Launching a Project AVIATION DIVISION Letter of Interest (LOI) Letter from airport sponsor indicating desire for participation in a project at airport Elements of a good LOI Letterhead Brief introduction A list of the desired project elements Background information as needed Attachments Sketches, layout locations, and supporting or required documents Hard copy mailed to TxDOT Aviation, attn. Dir Planning & Programming Scanned PDF or FAX, too. Added to Planning evaluation task lists (130 LOIs right now in various stages of review) 5/13/2015 Project Development: From Beginning to End 14

15 Project Planning - Eligibility AVIATION DIVISION Planner assigned to airport begins LOI review/evaluation Airport Layout Plan Project Priority Categories Safety/Special Programs Ensure the continuing safety of persons and property either in the air or on the ground Preservation/Reconstruction Maintain the functional integrity of an existing airport at its current design standard Standards Provide fundamental development or bring airport up to recommended standards based on the current design standard of the airport Capacity development is excluded, as is development for the purpose of accommodating larger aircraft types not included within the current design category of the airport Capacity Accommodate more based aircraft or a higher level of aircraft operations Improvements do not result in a change to the design standard of airport or permit the airport to accommodate a more demanding critical aircraft Upgrade Accommodate larger, more demanding aircraft or to permit longer non-stop flights and greater load factors. Generally, upgrade projects will bring the airport to a higher design standard 5/13/2015 Project Development: From Beginning to End 15

16 Project Planning Eligibility (continued) History and Previous Projects Support, Eligibility, and Justification Programming and Funding Guidelines FAA AIP Handbook TxDOT Aviation Policies and Standards Advisory Circulars Supporting Documentation Based aircraft counts ( Operations Lease agreements Letters of support from users 5/13/2015 Project Development: From Beginning to End 16

17 Project Planning Eligibility (continued) Design Review Resolve complex issues and conflicting details Scoping Review In house first-look at project scale Recommendations on design/layout Draft project created Estimate costs figures for budgeting Funding source capacity Environmental Input Potential impact and mitigation options National Environmental Policy Act (NEPA) documentation Adjust draft project if needed Sponsor Input Review gathered evaluation data with airport sponsor Scope of work and cost summaries Proposed budgeting and programming timelines 5/13/2015 Project Development: From Beginning to End 17

18 Project Planning Programming AVIATION DIVISION Aviation Capital Improvement Program (CIP) Draft project moves to Pending Work with Grants Section on funding availability Generally programming three to five years out FY 2017/FY2018 Engineering and Design first year Construction following year Project implementation time frame and project scope may be adjusted based on the priority needs in comparison with other airport requirements across the state Placement in the CIP does not obligate TxDOT or the Sponsor for funding at this time No commitment on the part of TxDOT Aviation Division until the project is approved by the Texas Transportation Commission Final programming is based on the availability of funds 5/13/2015 Project Development: From Beginning to End 18

19 5/13/2015 Project Development: From Beginning to End 19

20 Project Planning Programming LOI Closeout Notify sponsor of the project details Advise of the next steps Planning and Implementation Meeting (PIM) Archive documents AVIATION DIVISION Pass to GRANTS 5/13/2015 Project Development: From Beginning to End 20

21 Project Development AVIATION DIVISION TxDOT Aviation Grants Process 5/13/2015 Project Development: From Beginning to End 21

22 Grant Management AVIATION DIVISION Amy Slaughter, CTPM TxDOT Aviation Division 5/13/2015 Project Development: From Beginning to End 22

23 Grant Management Staff Sheri Quinlan Contracts Allison Martin Budget Manager Trudy Hill DBE/HUB Amy Slaughter, Contract Compliance & Procurement Beverly Longfellow Contracts Kari Campbell Manager Becky Vick Grant Manager Megan Caffall RAMP Kelle Chancey Contracts Rose Pankhurst Certified Payroll Judy Barnes Business Analyst Laura Gonzales Receptionist 5/13/2015 Project Development: From Beginning to End 23

24 Project Timeline Month 1-5 (Grant) Project kickoff meeting (PIM) Commission Approval Month 3-8 (Contract) Solicitation published (RFQ)* Consultant selected Sponsor share due Contract executed Notice to Proceed Month 8-20 (Contract and Project Manager) Project Designed Planning services performed Month (Contract and Project Manager) Project under construction Project Closeout and refund 5/13/2015 Project Development: From Beginning to End 24

25 Grant Management Month 1-3 (Becky Vick) Project Implementation Meeting (PIM) Project Scope Estimated sponsor share Lots of paperwork Commission approval Grant Executed (APPA) Month 3-5 (Contract) Solicitation published (RFQ) *Future work will reduce time by 2 months AVIATION DIVISION 5/13/2015 Project Development: From Beginning to End 25

26 Grant Management Month 6-8 (Contract) Consultant selected Fees negotiated Sponsor share due Notice to Proceed AVIATION DIVISION 5/13/2015 Project Development: From Beginning to End 26

27 Grant Management Month 8-20 (Contract and Project Manager) Design phase Planning services Amendments processed Construction funding availability? Month (Contract and Project Manager) Sponsor share due Commission approval for construction Bid Opening Notice to Proceed Project Closeout Final Audit AVIATION DIVISION 5/13/2015 Project Development: From Beginning to End 27

28 Grant Management Staff We are here to assist you along the way to make a successful project Becky or Allison (Grant) PIM, APPA, billing, questions on SEFA AVIATION DIVISION Sheri, Bev, Kelle, Trudy, Rose and Laura (Contract) Depending on location: procurement, contract execution, payments to vendors DBE/HUB, Davis Bacon compliance Copies of payments Amy Final audit and refund 5/13/2015 Project Development: From Beginning to End 28

29 Project Development TxDOT Aviation Engineering Process Design Construction 5/13/2015 Project Development: From Beginning to End 29

30 THE DESIGN PROCESS Harry Lorton, PE TxDOT Aviation Division Project Manager 5/13/2015 Project Development: From Beginning to End 30

31 ENGINEERING SECTION Bijan Jamalabad, PE Director Ed Mayle - PM Stephanie Kleiber, PE - PM Ryan Hindman, PE - PM Robert Johnson, PE - PM Paul Slusser PM Eusebio Torres, PE - PM???? Land Acquisition AVIATION DIVISION 5/13/2015 Project Development: From Beginning to End 31

32 5/13/2015 Project Development: From Beginning to End 32

33 AVIATION DIVISION 33

34 34

35 Pre-selection of Engineering Consultant 1. Attend Project Implementation Meeting, if scheduled The PIM is scheduled by Grant Management, and also includes the assigned planner, property acquisition (ROW) specialist and approach coordinator (if appropriate), and the AVN engineer who scoped the project. Its purpose is to identify not only the preliminary scope of work elements, but to brief the sponsor on funding and grant issues. When land will be required, the ROW specialist will provide the sponsor with the necessary forms and direction to proceed. If the airport is already familiar with the process through a number of previous projects, this meeting may not be conducted. 2. Develop an Independent Fee Analysis 3. Obtain approval of the fee from the Director of Engineering 4. Provide the approved fee to the assigned grant manager The independent fee is utilized by Grants to set the DBE/HUB requirements, if any, and those requirements will be stipulated in the Request for Proposals (RFP). The engineer is usually selected by the sponsor s Selection Committee. Interested engineers utilize Form 550 to respond to the RFP, and the Committee selects an engineering firm based on a previously announced scoring matrix. The process is verified by Grants. Occasionally, the airport sponsor requests that AVN selects the engineer. 5/13/2015 Project Development: From Beginning to End 35

36 Post-selection of Engineering Consultant AVIATION DIVISION 1. Enter estimated project design schedule into the Texas Airport Development System (TADS) 2. Mark-up Attachment B of the Professional Services Agreement (PSA), for the specific project, and provide to the Grant Manager. 3. Negotiate the final fee and establish the schedule for deliverables Typically the schedule (Attachment C in the PSA) should be derived from the information provided in the engineer s Form Obtain Director of Engineering approval prior to agreeing with the consultant if the fee varies more than 10% from the approved independent fee analysis 5. Create a negotiation log, briefly summarizing issues and rationale leading to the final agreement 6. File the negotiation log, and the Director of Engineering approval if required, in the permanent project file 7. Provide the approved fee and schedule to the grant manager for PSA preparation and execution 5/13/2015 Project Development: From Beginning to End 36

37 Preliminary Engineering Report (PER) Phase 1. Schedule a pre-design meeting on site with the engineer and designated sponsor representative 2. Attend and conduct the pre-design meeting with a prepared agenda and project scope as defined in TADS 3. Issue a Notice to Proceed (NTP) for the PER 4. Provide a copy of the NTP to the grant manager for reference and filing in the permanent project file 5. Coordinate as required to ensure that the engineer is on schedule for issuing the draft PER 6. Provide a copy of the draft PER to the assigned planner for review and coordinate with the approach coordinator if appropriate 7. Confirm that the engineer has provided an additional copy of the draft PER to the sponsor for review 8. Review the draft PER and the preliminary Engineer s Opinion of Probable Cost (OPC) 9. Consult with the ROW specialist and approach coordinator as appropriate 10. Incorporate any AVN and sponsor comments into items to be discussed with the engineer 11. Meet with the engineer and sponsor, if necessary, to clarify remaining issues and available budget that define the project scope 5/13/2015 Project Development: From Beginning to End 37

38 Preliminary Engineering Report (PER) Phase (continued) 12. Request a revised copy of the PER that incorporates any changes 13. Place a copy of the revised PER in the permanent project file 14. Confirm scope and estimated budget changes with Grants, Planning, and the sponsor for funding considerations and changes to TADS 15. Confer with AVN ROW if necessary regarding the TADS acquisition schedule and any changes to the ROW footprint, if appropriate Be aware that land acquisition changes can significantly impact schedule. Typically projects cannot bid until property is acquired. Confer with AVN ROW and the Director of Engineering if acquisition will significantly delay the project bid date. 16. Consider the impact of any improvement to existing or planned future runway approaches and confirm course of action with the approach coordinator Airports with existing approaches can be severely impacted by improvements that will require the establishment of new approach procedures. Additionally, the need for a new procedure can initiate a requirement to meet all of the latest surface design standards. These implications need to be thoroughly evaluated internally with Planning and the approach coordinator, and then with the sponsor. A 7480, as well as a 7460 may need to be prepared by the engineer. 17. Process monthly engineer invoices 18. Assess timing with respect to schedule (Attachment C of the PSA), and share the available time status with the engineer 19. File the PER in permanent project file 20. Update TADS ( PER Accepted ) 5/13/2015 Project Development: From Beginning to End 38

39 Preliminary Design Phase 1. Issue a NTP for the Preliminary Design Phase 2. Provide a copy of the NTP to the GM for reference and filing in the permanent project file 3. Coordinate as required to ensure the engineer is on schedule for delivery of draft plans (typically at least 50% complete) 4. Review plans as to conformance with appropriate design standards and the PER 5. Provide a copy of draft plans to the Planning Environmental Coordinator for comments, if appropriate 6. Ensure that the engineer has provided plans to the sponsor for review 7. Review plans with the engineer and sponsor, and provide mark-ups to engineer for revision 8. Request that the engineer prepare and provide the FAA Airport Data Form and the FAA Design Standards IAP Form, if applicable; coordinate with the approach coordinator as necessary 9. Transfer the Approach Forms, if applicable, to the approach coordinator for processing 10. Accept preliminary design plans when satisfied with the product 11. Assess timing with respect to schedule (Attachment C of the PSA), and share status with the engineer 12. Update ROW needs with AVN ROW if needs have changed; confirm whether necessary ROW has been acquired 13. Process monthly engineer invoices 14. If appropriate, considering certainty of schedule and funding, request that GM place the project on the Commission agenda for approval 5/13/2015 Project Development: From Beginning to End 39

40 Final Design Phase 1. Issue a NTP for the Final Design Phase 2. Provide a copy of the NTP to the GM for reference and filing in the permanent project file 3. File the Final Design NTP in the permanent project file 4. Coordinate as required to ensure the engineer is on schedule for delivery of draft final PS&E 5. Review final plans, specs and the Engineer s Opinion of Probable Cost for conformance to preliminary design, budget and readiness for bidding 6. Confirm that environmental issues have been addressed. The plans need not be returned to the AVN environmental coordinator, unless the scope has changed. 7. Request a Construction Management Plan from the Engineer 8. Provide a copy of the final bid document to the GM for review of the proposal 9. Request that Grants place the construction project on the Commission agenda, if this has not been done during the preliminary design phase 10. Ensure that engineer has provided plans and specs to the sponsor for review 5/13/2015 Project Development: From Beginning to End 40

41 Final Design Phase (continued) 11. Repeat previous steps until PS&E are accepted by AVN for bidding 12. Update TADS ( Final Design Accepted ) 13. Request that the engineer prepare and provide a FAA Transfer the 7460 to the approach coordinator for processing 15. Update TADS ( 7460 to P&P ) 16. Request that the consultant complete the RPR Cost Analysis Form and negotiate fees for testing and RPR services based on approval of the Construction Management Plan (assuming that fees have already been negotiated for the Construction and Close-out phases) 17. Provide the Engineer s Opinion of Probable Cost to GM for establishment of DBE/HUB goals for the construction contract 18. Request that the GM circulate the Bid Approval Checklist form 19. Process monthly engineer invoices 5/13/2015 Project Development: From Beginning to End 41

42 Bidding Phase 1. Issue a NTP for the Bidding Phase 2. Provide a copy of the NTP to the GM for reference and filing in the permanent project file 3. Coordinate the advertisement of the project with the GM 4. Ensure a second PSA has been executed for Construction Phase, Close-out Phase, materials testing and RPR services 5. Attend pre-bid conference 6. Coordinate any required addenda within seven days prior to bid opening 7. Request bid tab and recommendation from engineer 8. Provide Conditional Award Memo and total construction cost estimate to the Director of Engineering for approval 9. Provide the approved Conditional Award Memo to the GM 10. Approve the conditional award 11. Monitor construction contract execution 12. Receive confirmation from Grants to proceed with construction phase 13. Process monthly engineer invoices 5/13/2015 Project Development: From Beginning to End 42

43 Nine women cannot have a baby in one month. 5/13/2015 Project Development: From Beginning to End 43

44 Budget Scope Funding Engineering CIP Costs Level/Cost of Refinement Ideas & Wishes Plan & Specification Development Detailed Engineering PER FD Standards Review Review BID 44

45 45

46 THE PROCESS Pre & Post Selection of Engineering Consultant Preliminary Engineering Report Phase (PER) Preliminary Design Phase (PD) Final Design Phase (FD) Bidding Phase Construction Phase Close Out Phase 5/13/2015 Project Development: From Beginning to End 46

47 5/13/2015 Project Development: From Beginning to End 47

48 Pre Selection of Engineering Consultant AVIATION DIVISION Independent Fee Analysis Request for Qualifications (RFQ) from Engineers. Form 550 Selection by TxDOT Aviation? Selection by Sponsor? 5/13/2015 Project Development: From Beginning to End 48

49 Post Selection of Engineering Consultant Fee submission and negotiation Schedule for project Engineering Professional Services Contract 5/13/2015 Project Development: From Beginning to End 49

50 Preliminary Engineering Phase PreDesign Meeting (PER) Project geotechnical and surveying Consultant evaluation of original scope and budget Preliminary Engineering Report Recommendations on proceeding into design 5/13/2015 Project Development: From Beginning to End 50

51 5/13/2015 Project Development: From Beginning to End 51

52 Preliminary Design Phase (PD) Consultant preparation of preliminary (75%) project plans & specifications Submission of FAA Approach Forms Approach Design Forms 7480 Submission of FAA OEAAA (7460) AVIATION DIVISION 5/13/2015 Project Development: From Beginning to End 52

53 Final Design Phase (FD) Consultant preparation of final design (95%) plans & specifications Land & Environmental Clearance Funding Availability - Sponsor funds needed prior to Commission Texas Transportation Commission Approval 5/13/2015 Project Development: From Beginning to End 53

54 5/13/2015 Project Development: From Beginning to End 54

55 Bidding Phase Bidding plans & specifications (100%) Pre-Bid and Bid dates established Addendum to the plans & specifications? Bid Bid tabulations Recommendation of award Conditional award Contract preparation 5/13/2015 Project Development: From Beginning to End 55

56 5/13/2015 Project Development: From Beginning to End 56

57 THE CONSTRUCTION PROCESS Ed Mayle, PM TxDOT Aviation Division Project Manager 5/13/2015 Project Development: From Beginning to End 57

58 Construction Phase Pre-Construction Meeting Notice To Proceed Resident Project Representative (RPR) Daily & Weekly Reporting Quality Assurance Testing Pre-Pave Meeting Weekly Construction Progress & Safety Meetings Pre & Final Punch-list AVIATION DIVISION 5/13/2015 Project Development: From Beginning to End 58

59 Construction Phase PM Issues a NTP for the Construction Phase to the Engineer AVIATION DIVISION PM advises Engineer to schedule/conduct the pre-construction conference, attendees should include; Sponsor, TxDOT-AVN, Contractor, Sub-contractors, QC & QA labs, RPR (Inspector), and airport users PM issues Contractor a NTP (at pre-con) PM facilitates transmittal of engineer-prepared Notice of Intent (NOI) to the Texas Commission on Environmental Quality (TCEQ) Engineer confirms contractor has filed his/her NOI with the TCEQ PM maintains administrative oversight of submittals, testing, and RPR weekly summary reports Visits the project as needed during critical activities, or to address significant changes to the plans Remain accessible to both the contractor and engineer to provide guidance as necessary 5/13/2015 Project Development: From Beginning to End 59

60 When things are going well, something can / will go wrong. 5/13/2015 Project Development: From Beginning to End 60

61 Like 5/13/

62 5/13/

63 5/13/2015 Project Development: From Beginning to End 63

64 Construction Phase (continued) Attend a pre-pave meeting if either P-401 or P-501 are to be placed AVIATION DIVISION Coordinate with the engineer and GM for any required change orders or supplemental agreements Process monthly engineer and contractor pay requests Attend the final inspection Ensure that punch-list items (if any) are satisfactorily addressed Request and evaluate the engineer s analysis and recommendation for the application of liquidated damages and PWL calculations (for Items P-401/P- 501, if any) Approve the contractor s final pay request Provide engineer prepared a Notice of Termination (NOT) to TCEQ Confirm engineer has verified contractor s filing of their NOT 5/13/2015 Project Development: From Beginning to End 64

65 Close Out Phase Record Drawings Final Test & Quality Control Report NOT s to TCEQ Final Pay Requests (PWL s & LD s if applicable) RPR Diaries Warranty Inspection (within 30 days of expiration) 5/13/2015 Project Development: From Beginning to End 65

66 Close-out Phase Issue NTP to Engineer for Close Out Phase, copy to the GM and permanent Airport file Review and approve the Final Test and Quality Control Report Request a CD of record drawings for entry into Plans on Line Approve Engineer Final Pay Request upon Close-out Phase completion per Attachment B of the PSA Provide Grants with a copy of the consultant s letter of project completion including expiration date of the one-year warranty If required, follow-up on necessary remedial work noted by the engineer as a result of the one-year warranty observation Document required action(s) to address warranty work for permanent project file 5/13/2015 Project Development: From Beginning to End 66

67 Project Development Project Wrap-up Back To Planning 5/13/2015 Project Development: From Beginning to End 67

68 Wrapping Up a Project AVIATION DIVISION Finished Project reflected on the ALD if there is a design change When Ultimate becomes Existing Minor changes to ALD done in-house Update of publications FAA Master Record and National Flight Data Center AFD / TxDOT Airport directories Development Worksheet updated Archive documents 5/13/2015 Project Development: From Beginning to End 68

69 Questions and Discussion 5/13/2015 Project Development: From Beginning to End 69

70 Thank You 5/13/2015 Project Development: From Beginning to End 70

Procedures for Local Public Agency Project Administration (Revised 5/2014)

Procedures for Local Public Agency Project Administration (Revised 5/2014) Procedures for Local Public Agency Project Administration (Revised 5/2014) OVERVIEW A Local Public Agency (LPA) is defined as a county, municipal corporation, state or local authority, board, commission,

More information

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT 2016-2021 GENERAL The intent and purpose of this Request for Qualifications (RFQ) is

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS/PROPOSALS Professional Construction Management Services Gettysburg Regional Airport Rehabilitate Runway 6-24, Phase IV Susquehanna

More information

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS January 17, 2017

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS January 17, 2017 EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 2-17 January 17, 2017 TO: RE: Invited Firms Request for Submittals to El Paso Water-Public Service Board (EPWater) Statement of Work Professional

More information

TABLE OF CONTENTS JEFFERSON - CYPRESS RIVER AIRPORT TXDOT CSJ NO. 1819JFRSN

TABLE OF CONTENTS JEFFERSON - CYPRESS RIVER AIRPORT TXDOT CSJ NO. 1819JFRSN TABLE OF CONTENTS JEFFERSON - CYPRESS RIVER AIRPORT TXDOT CSJ NO. 1819JFRSN 1. REQUEST FOR QUALIFICATIONS SOLICITATION 2. EVALUATION CRITERIA 3. PROJECT DIAGRAM 4. AIRPORT LAYOUT PLAN 5. FORM AVN-550-(PLEASE

More information

AIP CAPITAL PLANNING 101

AIP CAPITAL PLANNING 101 AIP CAPITAL PLANNING 101 Understanding ACIP Planning Practices Presented to: By: Jason Knipp and Doug Anderson, P.E. State Planners FAA Central Region Airports Division Date: Objectives Understand AIP

More information

CITY OF INGLEWOOD Residential Sound Insulation Program

CITY OF INGLEWOOD Residential Sound Insulation Program CITY OF INGLEWOOD Residential Sound Insulation Program REQUEST FOR QUALIFICATIONS/PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE CITY OF INGLEWOOD RESIDENTIAL SOUND INSULATION PROGRAM JANUARY 2008

More information

REQUEST FOR QUALIFICATIONS FOR A PROFESSIONAL ARCHITECTURAL FIRM TO PROVIDE ARCHITECTURAL SERVICES FOR THE BZN YELLOWSTONE INTERNATIONAL AIRPORT

REQUEST FOR QUALIFICATIONS FOR A PROFESSIONAL ARCHITECTURAL FIRM TO PROVIDE ARCHITECTURAL SERVICES FOR THE BZN YELLOWSTONE INTERNATIONAL AIRPORT REQUEST FOR QUALIFICATIONS FOR A PROFESSIONAL ARCHITECTURAL FIRM TO PROVIDE ARCHITECTURAL SERVICES FOR THE BZN YELLOWSTONE INTERNATIONAL AIRPORT TERMINAL EXPANSION PROJECT FEBRUARY 2018 MORRISON-MAIERLE,

More information

SILER CITY MUNICIPAL AIRPORT AIRPORT PLANNING/ENGINEERING SERVICES

SILER CITY MUNICIPAL AIRPORT AIRPORT PLANNING/ENGINEERING SERVICES SILER CITY MUNICIPAL AIRPORT AIRPORT PLANNING/ENGINEERING SERVICES A Multi-Year Improvement Program to provide pre-applications and applications for Federal and State assistance, planning/environmental

More information

PIEDMONT TRIAD AIRPORT AUTHORITY

PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) for FAR PART 150 NOISE COMPATIBILITY STUDY for PIEDMONT TRIAD INTERNATIONAL AIRPORT The Piedmont Triad Airport Authority (PTAA) will receive

More information

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON. October 2, 2018

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON. October 2, 2018 REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON October 2, 2018 The Port of Walla Walla, owner and operator of the Walla Walla Regional Airport,

More information

PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ)

PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ) PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ) FAA HOT SPOTS ELIMINATING DESIGN SERVICES PROJECT NO. 770 SOLICITATION NO. HWC-HOUHSE-2017-025 Warren Ching Sr. Procurement Specialist Houston

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Design Services.

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Design Services. Request for Qualifications Information Architectural / Engineering Design Services For Airfield Pavement Panel Replacement 2011-2014 At Washington Dulles International Airport March, 2011 METROPOLITAN

More information

Design-Build Procurement Overview Manual. Alternative Project Delivery

Design-Build Procurement Overview Manual. Alternative Project Delivery Design-Build Procurement Overview Manual Alternative Project Delivery Table of Contents Chapter 1: Introduction to Design-Build Procurements... 1 1.1 Introduction... 1 1.2 Scope... 1 1.3 Acronyms... 2

More information

TABLE OF CONTENTS MASON COUNTY AIRPORT TXDOT CSJ NO. 1714MASON

TABLE OF CONTENTS MASON COUNTY AIRPORT TXDOT CSJ NO. 1714MASON TABLE OF CONTENTS MASON COUNTY AIRPORT TXDOT CSJ NO. 1714MASON 1. REQUEST FOR QUALIFICATIONS SOLICITATION 2. EVALUATION CRITERIA 3. 5010 DRAWING 4. PROJECT DIAGRAM 5. AIRPORT LAYOUT PLAN 6. FORM AVN-550-(PLEASE

More information

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR FM 471 (CULEBRA ROAD) KALLISON LANE TO FM 1560 CSJ: 0849-01-046 PASS-THROUGH FINANCE PROJECT Bexar County Public

More information

NORFOLK AIRPORT AUTHORITY NORFOLK INTERNATIONAL AIRPORT

NORFOLK AIRPORT AUTHORITY NORFOLK INTERNATIONAL AIRPORT NORFOLK AIRPORT AUTHORITY NORFOLK INTERNATIONAL AIRPORT REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL PLANNING SERVICES FOR AIRPOPRT MASTER PLAN AND AIRPORT LAYOUT PLAN UPDATES I. REQUEST FOR QUALIFICATIONS

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO.: 1 Date: May 12, 2015 To: All Proposers From: Procurement Office RE: Questions and Answers RFP-DOT-14/15-9030-GH-ReAd: EMERGENCY MANAGEMENT SERVICES Notice

More information

Quality Assurance/Quality Control Procedures for Environmental Documents

Quality Assurance/Quality Control Procedures for Environmental Documents Environmental Handbook Quality Assurance/Quality Control Procedures for Environmental s This handbook outlines processes to be used by the project sponsor and department delegate in quality assurance and

More information

REQUEST FOR PROPOSALS FOR AS-NEEDED TRAFFIC ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019

REQUEST FOR PROPOSALS FOR AS-NEEDED TRAFFIC ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019 Board of Commissioners of the Port of New Orleans REQUEST FOR PROPOSALS FOR AS-NEEDED TRAFFIC ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019 June 17, 2016 Deadline for proposals is no

More information

EXHIBIT A. SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES. Revised 3/10/15

EXHIBIT A. SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES. Revised 3/10/15 EXHIBIT A SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES Revised 3/10/15 TABLE OF CONTENTS 1.0 PURPOSE... 3 2.0 PROJECT APPROACH... 3 3.0 SCOPE... 5 4.0 LENGTH OF SERVICE... 6 5.0 PERFORMANCE OF THE

More information

EXHIBIT "A" SCOPE OF SERVICES

EXHIBIT A SCOPE OF SERVICES EXHIBIT "A" SCOPE OF SERVICES DISTRICT FIVE PUBLIC TRANSPORTATION GRANT OVERSIGHT COMPLIANCE CONSULTANT SERVICES 1000 PURPOSE OF AGREEMENT 2000 SERVICES TO BE PROVIDED 2100 TECHNICAL SERVICES FM # 410735-1-12-12

More information

STATE AID TO AIRPORTS PROGRAM NC DEPARTMENT OF TRANSPORTATION DIVISION OF AVIATION

STATE AID TO AIRPORTS PROGRAM NC DEPARTMENT OF TRANSPORTATION DIVISION OF AVIATION APRIL 2014 STATE AID TO AIRPORTS PROGRAM State Authorization: N.C.G.S. 63 NC DEPARTMENT OF TRANSPORTATION DIVISION OF AVIATION Agency Contact Person Program and Financial Nancy C. Seigler, Grants Administrator

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION REQUEST FOR PROPOSALS ( RFP ) PROFESSIONAL ENGINEERING AND CONSTRUCTION ADMINISTRATION AND INSPECTION SERVICES REF: REHABILITATION OF VARIOUS BRIDGES AT MILEPOSTS

More information

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT MASTER PLAN MADRAS MUNICPAL AIRPORT

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT MASTER PLAN MADRAS MUNICPAL AIRPORT REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT MASTER PLAN MADRAS MUNICPAL AIRPORT The City of Madras is seeking proposals from qualified firms to provide planning services in the development of an Airport Master

More information

Town of Derry, NH REQUEST FOR PROPOSALS PROFESSIONAL MUNICIPAL AUDITING SERVICES

Town of Derry, NH REQUEST FOR PROPOSALS PROFESSIONAL MUNICIPAL AUDITING SERVICES Town of Derry, NH Office of the Finance Department Susan A. Hickey Chief Financial Officer susanhickey@derrynh.org REQUEST FOR PROPOSALS PROFESSIONAL MUNICIPAL AUDITING SERVICES The Town of Derry, New

More information

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority

More information

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue DEPARTMENT OF PUBLIC WORKS Matt Machado Director 1010 10 th Street, Suite 3500, Modesto, CA 95354-0847 Phone: 209.525.6550 Date «FirstName» «LastName» «Company» «Address1» «City», «State» «PostalCode»

More information

TEXAS DEPARTMENT OF TRANSPORTATION INSPECT, SAMPLE, AND TEST FOR ASBESTOS CONTAINING MATERIAL AND MONITOR ABATEMENT PROJECTS PUBLICATION

TEXAS DEPARTMENT OF TRANSPORTATION INSPECT, SAMPLE, AND TEST FOR ASBESTOS CONTAINING MATERIAL AND MONITOR ABATEMENT PROJECTS PUBLICATION * TEXAS DEPARTMENT OF TRANSPORTATION INSPECT, SAMPLE, AND TEST FOR ASBESTOS CONTAINING MATERIAL AND MONITOR ABATEMENT PROJECTS PUBLICATION This specification is a product of the Texas Department of Transportation

More information

COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES

COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO. 2018-19-CSB CONSTRUCTION MANAGEMENT SERVICES The County of Dunn is requesting proposals for Construction Management Services. The services

More information

REQUEST FOR QUALIFICATIONS: RFQ PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS

REQUEST FOR QUALIFICATIONS: RFQ PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS REQUEST FOR QUALIFICATIONS: RFQ 2018-100-1 PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS The City of Cedar Hill, Texas is soliciting statements of

More information

Addendum No.3 to ITB Wakulla County Fire and EMS Station Issued: November 1, 2017

Addendum No.3 to ITB Wakulla County Fire and EMS Station Issued: November 1, 2017 Addendum No.3 to ITB 2017-33 Wakulla County Fire and EMS Station Issued: November 1, 2017 MANDATORY PRE-BID CONFERENCE RFI 1. ITB Section 2.0 Schedule of Events Bids are due November 20, 2017 @ 2:00 P.M.

More information

Office of Business and Financial Services Procurement and Contracts Division Section SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES

Office of Business and Financial Services Procurement and Contracts Division Section SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES 2510.8 SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES :1 OBJECTIVE: To establish a uniform policy and procedure for the acquisition of construction services for the City of Orlando (City), including, but

More information

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016 MAYOR GARY O. PHILLIPS VICE MAYOR KATE COLIN COUNCILMEMBER MARIBETH BUSHEY COUNCILMEMBER JOHN GAMBLIN COUNCILMEMBER ANDREW CUYUGAN MCCULLOUGH PUBLIC WORKS DEPARTMENT: (415)485-3355 FAX: (415)485-3334 Bill

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS FOR PROFESSIONAL DESIGN SERVICES RAISED MEDIAN ALONG DR. MARTIN LUTHER KING JR. BOULEVARD CITY PROJECT NO. PW1716 FEDERAL PROJECT NO. HSIPL-5008(167) CITY OF STOCKTON PUBLIC WORKS

More information

REQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT

REQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT SAN JOSE/EVERGREEN COMMUNITY COLLEGE DISTRICT 4750 San Felipe Road, San Jose, CA 95135 REQUEST FOR QUALIFICATIONS G2010.0069 ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS FOR TO PREPARE PROFESSIONAL DESIGN SERVICES PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) FOR THE RAISED MEDIAN ALONG DR. MARTIN LUTHER KING JR. BOULEVARD CITY PROJECT NO. PW1716/ FEDERAL

More information

CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT

CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT Residential Sound Insulation Program A. PROGRAM NARRATIVE The City of Fresno

More information

Request for Qualifications (RFQ) for Engineering/Architectural/Surveying Services

Request for Qualifications (RFQ) for Engineering/Architectural/Surveying Services Request for Qualifications (RFQ) for Engineering/Architectural/Surveying Services September 25, 2017 Re: Proposed Contract Funding for the CDBG Disaster Recovery Fund through GLO Community Development

More information

REQUEST FOR PROPOSALS FOR AS-NEEDED PROJECT MANAGEMENT AND INSPECTION SERVICES FISCAL YEARS 2017 THRU 2019

REQUEST FOR PROPOSALS FOR AS-NEEDED PROJECT MANAGEMENT AND INSPECTION SERVICES FISCAL YEARS 2017 THRU 2019 Board of Commissioners of the Port of New Orleans REQUEST FOR PROPOSALS FOR AS-NEEDED PROJECT MANAGEMENT AND INSPECTION SERVICES FISCAL YEARS 2017 THRU 2019 June 23, 2016 Deadline for proposals is no later

More information

DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6. (February 14, 2012)

DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6. (February 14, 2012) DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6 (February 14, 2012) RFQ 1. Part A, Section 4.2(a), Page 6 2. Part A, Sections 4.2(b) & 4.2(c) Please confirm that financial requirements are to be provided

More information

Quality Management Guideline July, 2017

Quality Management Guideline July, 2017 Quality Management Guideline July, 2017 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Quality Management Overview... 1 Interactive Communications...

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT. Issued by:

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT. Issued by: REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT FEDERAL PROJECT NO. BPMP-5008 (157) CITY PROJECT NO. PW1603 Issued by: City of Stockton Public Works Department 22 E. Weber

More information

PRE-PROPOSAL CONFERENCE REQUEST FOR COMPETITIVE SEALED PROPOSAL (RFCSP)

PRE-PROPOSAL CONFERENCE REQUEST FOR COMPETITIVE SEALED PROPOSAL (RFCSP) PRE-PROPOSAL CONFERENCE REQUEST FOR COMPETITIVE SEALED PROPOSAL (RFCSP) PROJECT NO. 699 SOLICITATION NO. HWC-SEWER-2018-008 Warren Ching Sr. Procurement Specialist Houston Airports Thursday, May 17, 2018,

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS FOR PROFESSIONAL DESIGN SERVICES INSTALL PEDESTRIAN CROSSINGS AT NINE INTERSECTIONS CITY PROJECT NO. PW1715 FEDERAL PROJECT NO. HSIPL-5008(161) CITY OF STOCKTON PUBLIC WORKS DEPARTMENT

More information

TxDOT Statewide 2017 TA Set-Aside Questions & Answers

TxDOT Statewide 2017 TA Set-Aside Questions & Answers TxDOT Statewide 2017 TA Set-Aside Questions & Answers Below are some common questions received in TxDOT s 2017 TA Set-Aside Call for Projects. The Code of Federal Regulations (CFR) and Texas Administration

More information

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF PURPLE LINE EXTENSION PROJECT BY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY Project No. 16-34 CITY

More information

Londonderry Finance Department

Londonderry Finance Department Londonderry Finance Department 268 B Mammoth Road Londonderry, NH 03053 (603) 432-1100 Douglas Smith, Finance Director email: dsmith@londonderrynh.org Justin Campo, Senior Accountant Email: jcampo@londonderrynh.org

More information

OVERVIEW OF GRANTS ADMINISTRATION PROCESS

OVERVIEW OF GRANTS ADMINISTRATION PROCESS OVERVIEW OF GRANTS ADMINISTRATION PROCESS I. INTRODUCTION Implementation and management of Community Development Block Grant (CDBG) projects is an ongoing process that requires adherence to many state

More information

PRE-PROPOSAL MEETING TUESDAY, JULY 17, 2018

PRE-PROPOSAL MEETING TUESDAY, JULY 17, 2018 The University of Texas Medical Branch RFP 18-053 CRYO EM RENOVATION PRE-PROPOSAL MEETING TUESDAY, JULY 17, 2018 Working Together to Work Wonders 1 PRE-PROPOSAL MEETING AND TOUR 10:00 am Pre-Submittal

More information

REQUEST FOR PROPOSALS CITY OF PORT LAVACA

REQUEST FOR PROPOSALS CITY OF PORT LAVACA REQUEST FOR PROPOSALS CITY OF PORT LAVACA Consulting Services for DISASTER RECOVERY AND FEMA PUBLIC ASSISTANCE Associated with Damage Sustained by HURRICANE HARVEY RFP 2017-9.28 The City of Port Lavaca

More information

University of Houston Procurement Process for Non-Construction and Non- Renovation Contracts Costing More than $1 Million

University of Houston Procurement Process for Non-Construction and Non- Renovation Contracts Costing More than $1 Million 1. UH System Board of Regents (BOR) approval must be obtained for the Chancellor to negotiate and execute a non-construction or non-renovation revenue or expense contract that is anticipated to cost (or

More information

REQUEST FOR STATEMENT OF QUALIFICATIONS PROFESSIONAL CONSTRUCTION INSPECTION SERVICES FOR

REQUEST FOR STATEMENT OF QUALIFICATIONS PROFESSIONAL CONSTRUCTION INSPECTION SERVICES FOR REQUEST FOR STATEMENT OF QUALIFICATIONS PROFESSIONAL CONSTRUCTION INSPECTION SERVICES FOR STREET, DRAINAGE AND REGIONAL FLOOD CONTROL FACILITIES PROJECTS Bexar County Public Works Department invites qualified

More information

Sandpoint Airport. FY Overall Goal Amendment to the Disadvantaged Business Enterprise (DBE) Program

Sandpoint Airport. FY Overall Goal Amendment to the Disadvantaged Business Enterprise (DBE) Program Sandpoint Airport FY 2018-2020 Overall Goal Amendment to the Disadvantaged Business Enterprise () Program Table of Contents OVERALL GOALS ( 26.45)... 2 AMOUNT OF GOAL FY 2018-2020 IMPROVEMENTS... 2 METHOD...

More information

City of Jersey Village

City of Jersey Village City of Jersey Village Long-Term Flood Recovery Consultant Request for Qualifications A. INTRODUCTION The City of Jersey Village is seeking consultant services for the development of a Long- Term Flood

More information

Getting and Managing a Construction Grant. By Henry Flood

Getting and Managing a Construction Grant. By Henry Flood Getting and Managing a Construction Grant Even if your project qualifies for funding, are you ready to take on the challenges? By Henry Flood Your clinic's facilities are 60 years old and no longer meet

More information

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #68-14 REQUEST FOR PROPOSAL

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #68-14 REQUEST FOR PROPOSAL City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #68-14 REQUEST FOR PROPOSAL DESIGN ENGINEERING SERVICES NEW CASTLE WATER LINE IMPROVEMENTS INVITATION Sealed Proposals, plainly

More information

Policies and Procedures. Unsolicited Proposals. Western Lands

Policies and Procedures. Unsolicited Proposals. Western Lands Metropolitan Washington Airports Authority Real Estate Development Policies Policies and Procedures Regarding Unsolicited Proposals for Western Lands at Washington Dulles International Airport March 3,

More information

HAVA GRANTS AND MONITORING. Presented by: Dan Glotzer, Election Funds Manager and Venessa Miller, HAVA Grant Monitor

HAVA GRANTS AND MONITORING. Presented by: Dan Glotzer, Election Funds Manager and Venessa Miller, HAVA Grant Monitor HAVA GRANTS AND MONITORING Presented by: Dan Glotzer, Election Funds Manager and Venessa Miller, HAVA Grant Monitor Overview of the Help America Vote Act (HAVA) Grants Types of Grants Benefit Periods Program

More information

DOING BUSINESS WITH THE. Orange County Board of County Commissioners. Orange County Procurement Division

DOING BUSINESS WITH THE. Orange County Board of County Commissioners. Orange County Procurement Division DOING BUSINESS WITH THE Orange County Board of County Commissioners Orange County Procurement Division TABLE OF CONTENTS Preface... 1 How Can I Receive Copies Of Solicitations?... 2 Bidder s List... 2

More information

STATE AID TO AIRPORTS PROGRAM NC DEPARTMENT OF TRANSPORTATION DIVISION OF AVIATION

STATE AID TO AIRPORTS PROGRAM NC DEPARTMENT OF TRANSPORTATION DIVISION OF AVIATION APRIL 2018 STATE AID TO AIRPORTS PROGRAM State Authorization: N.C.G.S. 63 NC DEPARTMENT OF TRANSPORTATION DIVISION OF AVIATION Agency Contact Person Program and Financial Betsy Beam, Grants Administrator

More information

Okeechobee Utility Authority Engineering Services for Water Treatment Plant Improvements

Okeechobee Utility Authority Engineering Services for Water Treatment Plant Improvements Okeechobee Utility Authority Engineering Services for Water Treatment Plant Improvements Request for Qualifications/Proposals PART 1 1.1 PURPOSE The Okeechobee Utility Authority is requesting respondents

More information

MINNESOTA STATE COLLEGES AND UNIVERSITIES

MINNESOTA STATE COLLEGES AND UNIVERSITIES MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State Community and Technical College Center for Student and Workforce Success REQUEST FOR PROPOSAL (RFP) FOR ARCHITECTURAL AND ENGINEERING DESIGN SPECIAL

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS ENGINEERING/ARCHITECTURAL DESIGN SERVICES FOR THE NORTHEAST STOCKTON LIBRARY AND RECREATION CENTER CITY PROJECT NO. PW1724 City of Stockton Public Works Department 22 E. Weber Avenue,

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS Port of Hood River January 30, 2014 1000 E. Port Marina Drive Hood River OR 97031 (541) 386-1645 www.portofhoodriver.com REQUEST FOR QUALIFICATIONS AIRPORT ARCHITECTURAL, ENGINEERING, PLANNING & CONSULTING

More information

Ohio Department of Transportation. The Process. Errol Scholtz & Chris Brown ODOT District Three LPA Section. September 22, 2016

Ohio Department of Transportation. The Process. Errol Scholtz & Chris Brown ODOT District Three LPA Section. September 22, 2016 Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director The Process Errol Scholtz & Chris Brown ODOT District Three LPA Section September 22, 2016 Main Phases 1. Application and

More information

Contract No Project No C

Contract No Project No C NOTICE TO PROFESSIONAL ENGINEERING CONSULTANTS REQUEST FOR LETTERS OF INTEREST FOR DESIGN CONSULTANT SERVICES FOR WRONG-WAY DRIVING DEPLOYMENT CONTRACT NO. 001438; PROJECT NO. 599-526C The Central Florida

More information

REQUEST FOR QUALIFICATIONS CONSULTING ENGINEERING SERVICES LLANO COUNTY

REQUEST FOR QUALIFICATIONS CONSULTING ENGINEERING SERVICES LLANO COUNTY REQUEST FOR QUALIFICATIONS FOR CONSULTING ENGINEERING SERVICES 18-401-02 LLANO COUNTY LLANO COUNTY 1447 E. State Highway 71, Unit B Llano, TX 78643 325-247-3783 1 TABLE OF CONTENTS Page Introduction 3

More information

Community Development Block Grant Applicant Guide

Community Development Block Grant Applicant Guide Community Development Block Grant Applicant Guide Updated 12-14-2016 The CDBG program has long assisted rural communities with carrying out infrastructure and economic development projects. Funding from

More information

Glenview School District Greenwood Rd Glenview IL Request for Qualifications For Architect Services

Glenview School District Greenwood Rd Glenview IL Request for Qualifications For Architect Services Glenview School District 34 1401 Greenwood Rd Glenview IL 60026 Request for Qualifications For Architect Services Eric Miller Assistant Superintendent for Business Services (847) 998-5008 A. Introduction

More information

This request for qualifications seeks the following type of service providers:

This request for qualifications seeks the following type of service providers: ANNOUNCEMENT REQUEST FOR STATEMENT OF QUALIFICATIONS NOTICE SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ARCHITECTURAL SERVICES The San Francisco Unified School District, Facilities,

More information

TRANSPORTATION 2050 PROGRAM MANAGEMENT SUPPORT SERVICES

TRANSPORTATION 2050 PROGRAM MANAGEMENT SUPPORT SERVICES CITY OF PHOENIX, ARIZONA OFFICE OF THE CITY ENGINEER REQUEST FOR QUALIFICATIONS TRANSPORTATION 2050 PROGRAM MANAGEMENT SUPPORT SERVICES MAYOR GREG STANTON CITY COUNCIL DISTRICT NO. 1 THELDA WILLIAMS DISTRICT

More information

Brazoria Drainage District No. 4 Request for Qualifications (RFQ) For Engineering Design Services for the Mykawa Drainage Improvement Project

Brazoria Drainage District No. 4 Request for Qualifications (RFQ) For Engineering Design Services for the Mykawa Drainage Improvement Project Brazoria Drainage District No. 4 Request for Qualifications (RFQ) For Engineering Design Services for the Mykawa Drainage Improvement Project Brazoria Drainage District No. 4 is requesting Statements of

More information

On-Call Environmental Engineering Support Services Contract Number 8500362 05.09.18 1 2 Travis Sanderfer, Program Solicitations Manager Design, Code and Construction Solicitation Schedule Deadline for

More information

Federal Funding & Project Administration 101. Presented By: Kyle Johnson, P.E. (Bolton & Menk) Dan Erickson, P.E. (Metro District State Aid Engineer)

Federal Funding & Project Administration 101. Presented By: Kyle Johnson, P.E. (Bolton & Menk) Dan Erickson, P.E. (Metro District State Aid Engineer) Federal Funding & Project Administration 101 Presented By: Kyle Johnson, P.E. (Bolton & Menk) Dan Erickson, P.E. (Metro District State Aid Engineer) Overview of Content Presentation Content This is a general

More information

REQUEST FOR PROPOSALS RFP NO.:

REQUEST FOR PROPOSALS RFP NO.: REQUEST FOR PROPOSALS RFP NO.: 11-019 Sealed proposals for a CONSULTANT SERVICES FOR THE HAZARDOUS MATERIALS & CHEMICAL RESPONSE (HAZMAT & CR) PLAN for the Sheriff s Office will be received by Contracts

More information

RESOLUTION NUMBER 2877

RESOLUTION NUMBER 2877 RESOLUTION NUMBER 2877 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PERRIS, STATE OF CALIFORNIA SETTING FORTH POLICIES INTENDED TO OBTAIN CONSISTENCY AND UNIFORMITY IN THE ADMINISTRATION OF THE FEDERALLY

More information

Dakota County Technical College. Pod 6 AHU Replacement

Dakota County Technical College. Pod 6 AHU Replacement MINNESOTA STATE COLLEGES AND UNIVERSITIES Dakota County Technical College Pod 6 AHU Replacement REQUEST FOR PROPOSAL (RFP) FOR MECHANICAL ENGINEERING SERVICES JULY 16, 2018 SPECIAL NOTE: This Request for

More information

TEXAS DEPARTMENT OF TRANSPORTATION ON-THE-JOB TRAINING AND SUPPORTIVE SERVICES (OJT/SS) PROGRAM

TEXAS DEPARTMENT OF TRANSPORTATION ON-THE-JOB TRAINING AND SUPPORTIVE SERVICES (OJT/SS) PROGRAM TEXAS DEPARTMENT OF TRANSPORTATION SPECIFICATION NO. ON-THE-JOB TRAINING AND SUPPORTIVE SERVICES (OJT/SS) PROGRAM PUBLICATION This specification is a product of the Texas Department of Transportation (TxDOT).

More information

Non-Federal Cost Share Match Program Grant Implementation Checklist

Non-Federal Cost Share Match Program Grant Implementation Checklist Non-Federal Cost Share Match Program Grant Implementation Checklist Non-Federal Cost Share Match Program Grant Implementation Checklist Table of Contents 1.0 Introduction... 2.0 Grant Implementation Process

More information

FOR REINVESTMENT ACT. NILAH DEVANEY NWRO, AWARDING OFFICIAL

FOR REINVESTMENT ACT. NILAH DEVANEY NWRO, AWARDING OFFICIAL 1 PL 93-638 AWARD PROCESS FOR AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) NILAH DEVANEY NWRO, AWARDING OFFICIAL 503-872-2867 E-Mail: nilah.devaney@bia.gov 2 ARRA OVERVIEW ON DEADLINES FEBRUARY 17, 2010,

More information

RFP #7529 Dane County Comprehensive Plan Mail Survey

RFP #7529 Dane County Comprehensive Plan Mail Survey Request for Proposals For County of Dane, Wisconsin Department of Planning and Development RFP #7529 Dane County Comprehensive Plan Mail Survey Proposals must be received no later than 2:00 p.m., June

More information

PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ)

PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ) PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ) ON-CALL AVIATION DESIGN SERVICES PROJECT NO. 715 D-E-F SOLICITATION NO. HWC-HASDS-2017-027 Warren Ching Sr. Procurement Specialist Houston Airports

More information

SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY (SBIAA) CONSTRUCTION PROCEDURES MANUAL. Page 1 of 34

SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY (SBIAA) CONSTRUCTION PROCEDURES MANUAL. Page 1 of 34 SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY (SBIAA) CONSTRUCTION PROCEDURES MANUAL Page 1 of 34 INTRODUCTION This manual is intended to be a guide to the San Bernardino International Airport Authority

More information

2016 Request for Proposal LGBT Community Needs Assessment

2016 Request for Proposal LGBT Community Needs Assessment 2016 Request for Proposal LGBT Community Needs Assessment It has been over 20 years since a comprehensive needs assessment of the San Francisco Bay Area s large and diverse LGBT community has been performed.

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS.

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS. REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS Federal Project No. CML-5008(179) City Project No. PW1722 Issued by: City

More information

REQUEST FOR PROPOSAL FOR DESIGN (ARCHITECTURAL & ENGINEERING) SERVICES

REQUEST FOR PROPOSAL FOR DESIGN (ARCHITECTURAL & ENGINEERING) SERVICES REQUEST FOR PROPOSAL FOR DESIGN (ARCHITECTURAL & ENGINEERING) SERVICES Prepared by: Middleton-Cross Plains Area School District 7106 South Avenue Middleton, Wisconsin 53562 December 22, 2011 Request for

More information

REQUEST FOR PROPOSALS FOR AS-NEEDED CIVIL ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019

REQUEST FOR PROPOSALS FOR AS-NEEDED CIVIL ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019 Board of Commissioners of the Port of New Orleans REQUEST FOR PROPOSALS FOR AS-NEEDED CIVIL ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019 June 30, 2016 Deadline for proposals is no

More information

PEPS DIVISION. Presentation for TxDOT Alliance HUB Symposium August 18, Professional Engineering Procurement Services (PEPS)

PEPS DIVISION. Presentation for TxDOT Alliance HUB Symposium August 18, Professional Engineering Procurement Services (PEPS) PEPS DIVISION Presentation for TxDOT Alliance HUB Symposium August 18, 2016 Agenda Topics 1 2 3 4 5 PEPS Introduction FY 2017 Procurement Plan Statewide FY 2017 Procurement Plan Houston Projects TxDOT

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR RAISED MEDIAN AT EL DORADO STREET. Issued by:

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR RAISED MEDIAN AT EL DORADO STREET. Issued by: REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR RAISED MEDIAN AT EL DORADO STREET (BETWEEN ESSEX STREET AND THE CALAVERAS RIVER BRIDGE) Federal Project No. HRRRL-5008(163) Issued by: City of Stockton Public

More information

Project Manager's Procedure Manual

Project Manager's Procedure Manual Project Manager's Procedure Manual Facilities Planning & Construction Department Florida Agriculture and Mechanical University July 2012 Signature Page for Professional Service Guide Approval Director,

More information

Vista Ridge Project Technical Advisor

Vista Ridge Project Technical Advisor Tim Skoglund, P.E. Senior Director Vista Ridge Maria Franco Contract Administrator SOQ Pre-Submittal Meeting Disclaimer Oral statements or discussion during the SOQ Pre-Submittal Meeting will not be binding,

More information

Scope of Services The City is seeking consulting services for the following tasks:

Scope of Services The City is seeking consulting services for the following tasks: REQUEST FOR PROPOSAL (RFP) FOR PROFESSIONAL SERVICES FOR AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES (ATSPM) AND ADAPTIVE TRAFFIC CONTROL SYSTEM (ATCS) DEPLOYMENT AND PROJECT MANAGEMENT May 11, 2018

More information

PacifiCorp 2017S SOLAR Request for Proposals. Bidder s Conference Portland November 21, 2017

PacifiCorp 2017S SOLAR Request for Proposals. Bidder s Conference Portland November 21, 2017 PacifiCorp 2017S SOLAR Request for Proposals Bidder s Conference Portland November 21, 2017 Workshop Date/Time November 21, 2017 Location Portland, Oregon 10:00 AM 12:00 PM Logistics PacifiCorp s Lloyd

More information

The Uniform Guidance and Procurement TEXAS ASSOCIATION OF COUNTY AUDITORS

The Uniform Guidance and Procurement TEXAS ASSOCIATION OF COUNTY AUDITORS The Uniform Guidance and Procurement TEXAS ASSOCIATION OF COUNTY AUDITORS Agenda Uniform Guidance Summary General Federal Procurement Laws Thresholds and Implications Sole Source Vendors Cooperative Purchasing

More information

2018 Pipelines Engineering Services Boerne Stage Road, West Avenue, and Highway 90 & General McMullen

2018 Pipelines Engineering Services Boerne Stage Road, West Avenue, and Highway 90 & General McMullen 2018 Pipelines Engineering Services Boerne Stage Road, West Avenue, and Highway 90 & General McMullen M. Antonio Leyva, P.E. Manager Engineering Angelica Mata Manager Contract Administration Marisol V.

More information

SAN DIEGO POLICE DEPARTMENT PROCEDURE

SAN DIEGO POLICE DEPARTMENT PROCEDURE SAN DIEGO POLICE DEPARTMENT PROCEDURE DATE: March 25, 2016 NUMBER: SUBJECT: RELATED POLICY: ORIGINATING DIVISION: 1.40 ADMINISTRATION GRANT PROCEDURES N/A ADMINISTRATIVE SERVICES PROCEDURE: PROCEDURAL

More information

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final Solar Photovoltaic Standard Offer Program (SVPSOP) 2018 Program Manual Rev # Final CONTENTS 1 Introduction... 3 2 Program Overview... 3 3 Solar Photovoltaic Standard Offer Program... 3 3.1 Program Options...

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL REQUESTOR: 1134 North Fraser Street Georgetown, SC 29440 Contact: Daniella Howard, Purchasing Agent Email: dhoward@cogsc.com Phone: 843.545.4043 PROJECT: Kaminski Street Proj #1511

More information

Quality Management Plan

Quality Management Plan for Submitted to U.S. Environmental Protection Agency Region 6 1445 Ross Avenue, Suite 1200 Dallas, Texas 75202-2733 April 2, 2009 TABLE OF CONTENTS Section Heading Page Table of Contents Approval Page

More information