1 MILLENNIUM CHALLENGE ACCOUNT NAMIBIA Narrative Report for Quarterly Disbursement Package 1 July to 30 September 2010 Introduction This is the fourth report being submitted by MCA-N since entry into force on 16 th September It covers the period 1 July 30 September Despite some technical glitches, the MCA-N Management Information System (MIS) has become an integrated tool to manage the multiple contracts issued by MCA-N, systematically interlinking the procurement and financial systems with programme implementation (and vice versa). Nine (9) months into implementation (MCA-N Compact entered into force on 16 September 2009) disbursements amount to USD12.18m have been made and contracts to the value of USD59.49m have been signed. A. Current Quarter Commitments & Expenditures Education There are on-going commitments under the following contracts: Consultant for the Final Design, Supervision, Environmental Impact Assessment and the Supervision for the 47 Schools Consultant for the Final Design, Supervision, Environmental Impact Assessment and the Supervision for the Regional Study and Resource Centres (RSRCs) Procurement, sorting and distribution of Textbooks The Final Report of the Textbook Baseline Study has been received and will inform the upcoming Textbook Procurement Reform sub-activity (see below). Tourism The Conservancy Needs Assessment (CNA) was finalized at the end of March The Change Management Advisor (CMA) continues to work closely with the Ministry of Environment & Tourism towards the multiple CPs/performance targets that need to be met before MCA-N can proceed with the construction of staff housing and management centres 1 P a g e
2 in/adjacent to the Park. There is good progress made on the various Performance Targets though MCA-N is closely monitoring the process. Mobilized in Q2, the NTB Website Development is in full swing with the launch of the new website expected by early The NTB funded MIS development, a separate project outside of MCA-N, is delayed and MCA-N together with NTB and MMG are looking at how best to mitigate this. The NTB Website in part draws on data produced by this NTB MIS. The Consultant for the Environmental and Social Impact Assessment for the infrastructure development in Etosha National Park was mobilized in Q3. The HIV/AIDS Workplace Programme for MET was finalized in Q3 and approved by MET. The relevant CP was met. Of interest is that MET decided to adopt the HIV/AIDS Workplace Programme that was initially targeting only ENP for all protected areas in Namibia. The Wildlife Translocation Technician started his assignment with the Ministry of Environment and Tourism, one of MCA-N s six Implementing Partners, in Q2. He is preparing the conservancies to receive the 15 Rhinos and 80 Black Faced Impalas which will be translocated in July MCA-N staff to support the NTB in the development and maintenance of marketing tools, including the new NTB website, were recruited and mobilized in Q3 with related disbursements. Game translocation and road maintenance equipment are being delivered, with related disbursements. Agriculture The MCA-N staff who are supporting the Implementing Partners for the Agriculture Project, namely the Ministries of Agriculture, Water & Forestry and Lands & Resettlement, continue their respective assignments. Long-term service contracts under management are: Community Based Rangeland and Livestock Management (CBRLM) Communal Land Support (CLS). The Consultant hired to assist with the development of the Devil s Claw Policy and to provide related training has finalized the Devil s Claw Policy and development of training materials. She has already conducted some of the training events. 2 P a g e
3 Monitoring & Evaluation The Data Quality Review Consultant was mobilized in Q3. Cross Sector Support A Consultant was hired in Q1 and continues to work with MCA-N. Under her professional guidance the MCA-N Gender Strategy was finalized and posted on the MCA-N website. Next Quarter Multi-Year Financial Plan & Work Plan There are no proposed significant changes to the current approved Multi-Year Financial Plan or Work Plans. B. Next Quarter Commitments & Expenditures The Disbursement Request sent to MCC for consideration forecasts the following: i. Commitments (from DFP - Commitments): USD26.48m ii. Cash Requirements (from DFP - Cash): USD9.49m The significant activities to be undertaken in the next quarter with the requested funds are as follows: Education Approx. 570,000 of 700,000 textbooks ordered are being distributed, reaching some 950 schools up to mid July The remaining 130,000 textbooks (resulting from overordering by schools and subsequent rationalization of these orders by MCA-N) will be distributed over the next few months in partial fulfillment of the 2010 school orders that are currently coming in at MoE. The textbook reform process will inculcate the recommendations of the Textbook Baseline Study and will be kick-started during the planning upcoming July 2010 visit by Vincent Bontoux, a textbook procurement expert funded by MCC. The textbook management training will be the first activity under the Continuous Professional Development (CPD) for teachers initiative, carried by MoE, UNAM and NIED, which is likely to start in the next quarter. The first construction works contract under the 47 Schools Activity, covering schools in the Oshana and Omusati regions, will be signed in the upcoming quarter. The IfB closes 3 P a g e
4 at the end of Q3. The IfB for the second package, covering schools in the Ohangwena region, will be launched still in Q3 with contract signing expected in Q4. The first MCA-N funded high priority Vocational Tourism Training was planned for the current quarter (Q3) but this did not materialize due to delays in the finalization of the Grants Manual. This activity will now commence in Q4. The contract with the Namibia Training Fund (NTF) Advisor will still be signed in Q3 as anticipated but mobilization (and related spending) will only be in Q4. Due to further site issues, the procurement for the Consultant for the Final Design, Supervision, Environmental Impact Assessment and the Supervision for the Community Skills Development Centres (COSDECs) was put on hold. The RfP will most likely still be released in June 2010 (Q3) with subsequent contracting/mobilization in Q4. Instead of recruitment, MCA-N, MoE and MCC have agreed to procure a Consultant for Monitoring & Evaluation in MoE. The RfQ is expected to be launched still in June 2010 (Q3) with contracting/mobilization in Q4 or latest early Q5. MCC gave the go-ahead for the procurement of Equipment for the Colleges of Education (CoEs). Due to some technical issues the equipment is highly specialized the procurement was not launched early in Q3 but will be launched at the latest early in Q4, if not still in June Tourism Despite the timely completion of the CNA, the RfP for the Conservancy Development Support Services (CDSS) is still not launched due to late technical comments from MCC. To avoid further implementation delays, the CDSS needs to be mobilized in Q4. Planned for Q2, the official handover of the Game Translocation and Road Maintenance Equipment for the Etosha National Park to MET will now only take place in Q4. However, disbursements are being made already since Q3 with the equipment is coming in piecemeal. The bids for the North American Destination Marketing are under evaluation and the Consultant is expected to be mobilized in Q4, with related disbursements. The Grants Manager for the Conservancy Development Support Programme Grants Facility (CDSPGF) will only be recruited in Q4 (not Q3) but the first call for proposals is still expected to be made in Q4. 4 P a g e
5 The bids for the GIS based Maintenance Database for Infrastructure and Equipment in ENP all came in far above budget. MCA-N, MET and MCC are now consulting on a different approach, possibly involving technical support from US Forestry Service. Agriculture The two agriculture grants funds were launched in early June 2010, namely the: Livestock Marketing Efficiency Fund INP Innovation Fund The first Call for Concept Papers (followed by full Proposals) will still be made in Q3 as planned, with related financial commitments in Q4. The Consultant for Indigenous Natural Products Producer and Processor Organisations will only be mobilized at the end of Q3. The bid had come in far above budget and successful contract price negotiations were held. MCA-N Board approval came through in early June MCA-N has requested a further deferral for the CP for INP related to devil s claw. The Consultant for the Final Design, Supervision, Environmental Impact Assessment and the Supervision for the State Veterinary Offices (SVOs) and Quarantine Camps in the Caprivi region will be mobilized in Q4, with related disbursements. Monitoring and Evaluation Delays in the Technical Evaluation of the bids received for the INP/Conservancy and CBRLM Household Income and Expenditure Surveys and further delays in the approval process have pushed the signing of contracts and mobilization into Q4. This is of concern given the time sensitivity of these surveys. The procurement of the tracking survey on vocational training graduates was delayed and will only be launched in Q4 with possible disbursements still in Q4 but most likely only in Q5. A joint MCA-N, MAWF, CBRLM Facilitator, MCC, MCC-contracted Impact Evaluator mission will take place still in Q3 to find a way forward on the modus operandus of the impact evaluation for the CBRLM activity. This has no immediate impact on the Disbursement Request but is important for the implementation of the CBRLM activity in the Agriculture Project. Programme Management and Oversight With the recruitment of Ms. Kandi Shejavali as the Director: M&E all management level positions at MCA-N are now filled. 5 P a g e
6 MCA-N is taking over all procurement related functions as from 1 July The successful candidates for the positions of Procurement Manager and a Procurement Assistant Manager are awaiting no objection from MCC. All four MCA-N Board Sub-Committees have now been activated. The MCA-N Management Unit is fully operational with only minor administrative procurements outstanding. C. Indicator Tracking Table Notes For the current Disbursement Request, MCA-N has reported out against the indicators included in the March 2010 MCA-NB/MCC approved indicators using the MCC Indicator Tracking Table (ITT) format. Since MCA-N is still in the early stage of implementation most of the indicators have not come into play. 6 P a g e
Narrative Report for Quarterly Disbursement Package 1 October to 31 December 2010
MILLENNIUM CHALLENGE ACCOUNT NAMIBIA Narrative Report for Quarterly Disbursement Package 1 October to 31 December 2010 Introduction This is the 4 th and final Disbursement Request for Fiscal Year 2010.
More informationMCA Namibia. MCA Namibia Programme. Implementation Modalities & Project Activities Implementation. July 2009
MCA Namibia MCA Namibia Programme Implementation Modalities & Project Activities Implementation July 2009 Project Objectives 1 Improve the quality of the workforce by enhancing the equity and effectiveness
More information4/1/2014-6/30/ /1/ /31/2013 1/1/2013-3/31/2013 4/1/2013-6/30/2013 7/1/2013-9/30/2013 1/1/2014-3/31/2014
Detailed Financial Plan - Commitments 2 3 4 5 6 7 21 22 23 26 27 28 29 3 Country: Namibia Accountable Entity: Compact Number: COM7NAM91 Date Submitted: 9 March 212 Cumulative Current Period Next Period
More informationTotal Quarter Quarter 14 Quarter 15 Quarter 16 Quarter 17 Quarter 18 Quarter 19 Quarter 20 CIF Year Year 1 Year 2 Year 3 Year 4 Year 5
Detailed Financial Plan - Commitments 2 3 4 5 6 7 23 26 27 28 29 3 COM7NAM91 Date Submitted: 21 September 212 Forecasted Commitments for -> Cumulative Current Next TOTAL TOTAL Varience Actual Cumulative
More informationMCA Namibia. Millennium Challenge Account Namibia
reducing poverty through economic growth Millennium Challenge Account Dear Reader The Millennium Challenge Account (-N) is a large-scale development programme to reduce poverty through economic growth.
More informationREQUEST FOR CONSULTANT QUALIFICATIONS GEOGRAPHIC INFORMATION SYSTEMS CONSULTANT MCAN/COM/RCQ/5A01007
REQUEST FOR CONSULTANT QUALIFICATIONS GEOGRAPHIC INFORMATION SYSTEMS CONSULTANT MCAN/COM/RCQ/5A01007 MCA Namibia () requires the services of an individual Geographical Information Systems Consultant (hereinafter
More informationDISBURSEMENT REQUEST. Namibia MCA Namibia 28-Jul-08 GR07NAM07001 MCA Namibia Emerging Markets Group Ltd. 11-Mar-09 1-Apr Jun USD
DISBURSEMENT REQUEST FORM OF CIF DISBURSEMENT REQUEST Country Projects Compact Date/ CIF Letter Agreement Date CIF Number Accountable Entity Fiscal Agent Request Date Disbursement Period Beginning Date
More informationMILLENNIUM CHALLENGE ACCOUNT NAMIBIA
MILLENNIUM CHALLENGE ACCOUNT NAMIBIA LIVESTOCK MARKET EFFICIENCY FUND (LMEF FUND) GRANT MANUAL May 2011 MCA-N LMEF Grant Manual i Acronyms and Initialisms GEC GM GRN LMEF MAWF MCA-N MCC NCAs TER US Grant
More informationFinancing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and
Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4293-TA Public Disclosure Authorized Financing Agreement (Zanzibar Basic Education Improvement Project) between Public Disclosure Authorized THE
More informationProject Administration Instructions
Project Administration Instructions PAI 1.01 Page 1 of 5 INITIAL PROJECT ADMINISTRATION ACTIVITIES A. Introduction 1. The Project Administration Instructions (PAIs) outline ADB s policies and procedures
More informationPublic Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933)
Public Disclosure Authorized AFRICA Lesotho Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 08-May-2018 ISR30476 Implementing
More informationTHE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria
THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria Guidelines for Performance-Based Funding Table of Contents 1. Introduction 2. Overview 3. The Grant Agreement: Intended Program Results and Budget
More informationEducation and Science Committee. 2016/17 Estimates Examination. Vote Business, Science and Innovation. Minister of Science and Innovation
Education and Science Committee 2016/17 Estimates Examination Vote Business, Science and Innovation Minister of Science and Innovation Questions 1-18 June 2016 Callaghan Innovation Question 1 We note the
More informationThe Cambodia NGO Database
Kingdom of Cambodia Nation Religion King Royal Government of Cambodia The Cambodia NGO Database User Manual May 2018 Cambodian Rehabilitation and Development Board Council for the Development of Cambodia
More informationDepartment of Agriculture, Environment and Rural Affairs (DAERA)
Department of Agriculture, Environment and Rural Affairs (DAERA) Guidance for the implementation of LEADER Cooperation activities in the Rural Development Programme for Northern Ireland 2014-2020 Please
More informationThe World Bank Iraq Trust Fund Newsletter
The World Bank Iraq Trust Fund Newsletter July 2006 Volume 1, Issue 8 1. Improving Education in Iraq Despite massive degradation and deterioration as a result of three major wars and over a decade of sanctions,
More informationPMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)
1. SUMMARY INFORMATION Implementing Country/Technical Partner: PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) South Africa. Reporting Period: From 1/10/2017 to 30/09/2018 Report Date: 4 October 2018 Implementing
More informationREQUIRED DOCUMENT FROM HIRING UNIT
Terms of reference GENERAL INFORMATION Title: Energy Efficiency Project Development Specialist Project Name : Advancing Indonesia s Lighting Market to High Efficient Technologies (ADLIGHT) Reports to:
More informationPublic Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Liberia Education Global Practice Recipient Executed Activities Specific Investment
More informationGEORGE MASSEY TUNNEL REPLACEMENT PROJECT
COMBINED MONTHLY AND QUARTERLY PROGRESS REPORT FOR QUARTER ENDING JUNE 30, 2014 GEORGE MASSEY TUNNEL MONTHLY STATUS REPORT JANUARY 2017 FINAL PROJECT STATUS DASHBOARD Scope Status* Reference concept includes
More informationWho Do Ministries Hire?
Advanced Who Do Ministries Hire? al Backgrounds of Potential Employees The information below can be used as a general reference guide, to help Ambassadors respond to inquiries from potential candidates
More informationMILLENNIUM CHALLENGE ACCOUNT NAMIBIA
MILLENNIUM CHALLENGE ACCOUNT NAMIBIA INDIGENOUS NATURAL PRODUCTS INNOVATION FUND (INP INNOVATION FUND) GRANT MANUAL Version 1 (27 th May 2010) ACRONYMS AND INITIALISMS CBO EU FDA GEC GRN INP IPTT MAWF
More informationThe World Bank Kenya GPE Primary Education Development Project (P146797)
Public Disclosure Authorized AFRICA Kenya Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 01-Nov-2017 ISR29517 Implementing Agencies:
More informationTraining of Devil s Claw Traders and Exporters and MET Officials
Training of Devil s Claw Traders and Exporters and MET Officials Final Report 31 January 2011 commissioned by the Millennium Challenge Account Namibia with funding from the Millennium Challenge Corporation
More informationIn accordance with Section 610(b)(2) of the Millennium Challenge Act of
This document is scheduled to be published in the Federal Register on 11/20/2017 and available online at https://federalregister.gov/d/2017-25198, and on FDsys.gov MILLENNIUM CHALLENGE CORPORATION [MCC
More informationENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) FOR THE UPGRADING OF INFRASTRUCTURE IN THE ETOSHA NATIONAL PARK
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) FOR THE UPGRADING OF INFRASTRUCTURE IN THE ETOSHA NATIONAL PARK Contract No: MCAN/COM/RFP P2A02001 Public Health and Public Safety Awareness Plan March
More informationThe World Bank Kenya GPE Primary Education Development Project (P146797)
Public Disclosure Authorized AFRICA Kenya Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 15-Feb-2017 ISR26822 Implementing Agencies:
More information32 C. General Conference 32nd session, Paris C/62 3 October 2003 Original: English. Item of the agenda
U General Conference 32nd session, Paris 2003 32 C 32 C/62 3 October 2003 Original: English Item 11.16 of the agenda PROPOSAL BY THE DIRECTOR-GENERAL CONCERNING THE USE OF THE CONTRIBUTION OF THE UNITED
More informationwith the Agency for Agricultural Development of Morocco (ADA) for the Kingdom of Morocco 12 July 2017 Entity Support
with the Agency for Agricultural Development of Morocco (ADA) for the Kingdom of Morocco 12 July 2017 Entity Support PAGE 1 OF 15 ver. 19 August 2016 Readiness and Preparatory Support Proposal How to complete
More informationNATIONAL ENVIRONMENT AWARENESS CAMPAIGN
NATIONAL ENVIRONMENT AWARENESS CAMPAIGN Guidelines for 2012-13 Government of India Ministry of Environment and Forests Paryavaran Bhawan, New Delhi Page 2 NATIONAL ENVIRONMENT AWARENESS CAMPAIGN GUIDELINES
More informationSub theme 1: ICT innovations for revitalizing Agricultural extension
Sub theme 1: ICT innovations for revitalizing Agricultural extension Policy and Perspectives Providing gender sensitive enabling environment Creating Informative/ Knowledge society The success of the ICT
More informationFiduciary Arrangements for Grant Recipients
Table of Contents 1. Introduction 2. Overview 3. Roles and Responsibilities 4. Selection of Principal Recipients and Minimum Requirements 5. Assessment of Principal Recipients 6. The Grant Agreement: Intended
More informationREQUEST FOR PROPOSALS: COMPACT BLUE PROGRAM MANAGEMENT
REQUEST FOR PROPOSALS: COMPACT BLUE PROGRAM MANAGEMENT Background Compact Blue is an innovative program recently approved for $4 million in grant funding by The Bill and Melinda Gates Foundation. Compact
More informationFRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.
FRAMEWORK FINANCING AGREEMENT (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 29 October 2005 FRAMEWORK FINANCING
More informationGAO. MILLENNIUM CHALLENGE CORPORATION Progress and Challenges with Compacts in Africa
GAO For Release on Delivery Expected at 2:3 p.m. EDT Thursday, June 28, 27 United States Government Accountability Office Testimony Before the Subcommittee on Africa and Global Health, Committee on Foreign
More informationCommunity Health Centre Program
MINISTRY OF HEALTH AND LONG-TERM CARE Community Health Centre Program BACKGROUND The Ministry of Health and Long-Term Care s Community and Health Promotion Branch is responsible for administering and funding
More informationFollow-up Reporting Date: 25 March 2011
Follow-up Reporting Date: 25 March 2011 Reporting on Follow-up Action to Management Response, Evaluation of FAO cooperation in Tajikistan Recommendations Action Agreed Action Taken? Comment/explanation
More informationQuarterly Progress Report Mogadishu Clean-up Support Project (Atlas ID: )
Quarterly Progress Report Mogadishu Clean-up Support Project (Atlas ID: 00085376) Reporting Period 01 April to 30 June 2015 Government Counterpart PSG PSG priorities Focus Locations: AWP Budget 594,150
More informationRwanda Dairy Development Project. Negotiated financing agreement
Document: EB 2016/118/R.19/Sup.1 Agenda: 11(b)(ii) Date: 31 August 2016 Distribution: Public Original: English E Republic of Rwanda Rwanda Dairy Development Project Negotiated financing agreement Executive
More information[01.04] Africa Regional Status Report. 7 TH Regional Coordinators Meeting September 19-21, 2012 Washington, DC
[01.04] Africa Regional Status Report 7 TH Regional Coordinators Meeting September 19-21, 2012 Washington, DC Outline Distribution of participating countries Status of data collection and submission Importance
More informationCDEM Resilience Fund Information for the CDEM sector [IS 11/16] March 2016 ISBN
CDEM Resilience Fund Information for the CDEM sector [IS 11/16] March 2016 ISBN 978-0-478-43514-6 Published by the Ministry of Civil Defence & Emergency Management This document is not copyright and may
More informationKorean Trust Fund for ICT4D E-monitoring of a Conditional Cash Transfer Program in Rural Morocco
GRANT APPLICATION Korean Trust Fund for ICT4D E-monitoring of a Conditional Cash Transfer Program in Rural Morocco Submitted By Najy Benhassine (nbenhassine@worldbank.org) Last Edited May 23, 2008 Printed
More informationCORPORATE SOCIAL RESPONSIBILITY POLICY HI-TECH GEARS LIMITED
CORPORATE SOCIAL RESPONSIBILITY POLICY OF HI-TECH GEARS LIMITED 1 PREAMBLE 1.1 Concept Corporate Social Responsibility is a Company s commitment to its stakeholders to conduct business in an economically,
More informationBC Capacity Initiative
BC Capacity Initiative 2018/2019 PROPOSAL GUIDELINES PROPOSAL CLOSING DATE: 4:30 PM on Monday, December 11, 2017 EMAIL your proposal and all supporting documents to BCMail@aandc.gc.ca. 1. Copy the following
More informationEnglish devolution deals
Report by the Comptroller and Auditor General Department for Communities and Local Government and HM Treasury English devolution deals HC 948 SESSION 2015-16 20 APRIL 2016 4 Key facts English devolution
More informationMongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project
Semi-Annual Progress Report June 2016 Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project Prepared by the project management unit and project implementation
More informationRETF: P (TF097410), P132585, and P (TF014769) BETF: P (TF092194)
PNPM GENERASI Quarterly Progress Report: July to September 214 Summary Information Status Activity Number Task Team Leader(s) Executing Agency(ies) Start date to Closing Date Geographic Coverage Approved
More informationDR KUMAR CQC INSPECTION ACTION PLAN
DR KUMAR CQC INSPECTION ACTION PLAN REVIEWED: 28 TH DECEMBER 2015 RED NOT COMPLETED AMBER STARTED TO COMPLETE or SUPPORT AGREED WITH OTHER PARTNERS/ AGENCIES GREEEN COMPLETED GENERAL CQC CONCERNS ASSURANCE
More informationBoard Report Agreed Management Actions Status Update
Board Report Agreed Management Actions Status Update For information 33 rd Board Meeting Geneva, Switzerland 31 March 1 April 2015 Purpose: This paper gives a status update on Agreed Management Actions
More informationAppalachian Forest Heritage Area Conserving Forests & Communities AmeriCorps Sub-Sponsor Request for Proposals Program Year
Appalachian Forest Heritage Area Conserving Forests & Communities AmeriCorps Sub-Sponsor Request for Proposals -- 2010-2011 Program Year The Appalachian Forest Heritage Area (AFHA) expects to have 20 AmeriCorps
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. A project preparatory technical assistance (PPTA) is required to support the Ministry of New and Renewable Energy (MNRE) and Solar Energy Corporation
More informationDIME-GAFSP First Quarterly Progress Report
DIME-GAFSP First Quarterly Progress Report Feburary 24, 2012 The World Bank s Development Impact Evaluation Initiative (DIME) has been contracted to lead in-depth impact evaluations on a subset of GAFSP
More informationTerms of Reference (ToR) Developing Advocacy Strategy for NCA Partners
Terms of Reference (ToR) Developing Advocacy Strategy for NCA Partners 1. Introduction Norwegian Church Aid (NCA) with its long presence (since 1979) in Afghanistan. NCA is a partner based organization
More informationU. S. Virgin Islands Compliance Agreement
U. S. Virgin Islands Compliance Agreement I. Overview of Issues... 3 II. Consequences for Not Meeting the Terms and Conditions of the Agreement... 4 A. Mutual Agreements and Understandings Regarding the
More informationFleming Fund Grants. Country Grants. Grants. Programme. Regional. Fellowship Scheme. Grants. A central pillar of the Fleming Fund
Fleming Fund Investing in laboratory capacity to deliver more effective surveillance of antimicrobial resistance (AMR) through a One Health approach. A collaboration between the UK Government and 24 country
More informationEUROPEAN STRUCTURAL INVESTMENT FUNDS (ESIF) ESF SEaMLESS Programme
Central Bedfordshire Council EXECUTIVE 7 February 2017 EUROPEAN STRUCTURAL INVESTMENT FUNDS (ESIF) ESF SEaMLESS Programme Report of Cllr Steven Dixon, Executive Member for Education and Skills steven.dixon@centralbedfordshire.gov.uk
More informationPOLICY 6800 PROCUREMENT
POLICY 6800 PROCUREMENT Policy Category: Finance and Business Services Area of Administrative Responsibility: Finance Board of Trustees Approval Date: March 21, 2017 Effective Date: March 22, 2017 Last
More informationWildlife Conservation Society 12/24/08 to 12/31/13 (72 months)
PNPM Green Quarterly Progress Report: July 2012 to September 2012 Summary Information Status Active Activity Number Task Team Leader(s) Executing Agency(ies) TF090912, TF090977, TF011930, TF093076, TF096887,
More informationPerformance Indicators
2,000 1,800 1,600 1,00 1,200 1,000 800 600 00 200 0 Announced by Assisted Companies Average Hourly Wage $30 $2 $20 $1 $10 $ $0 Wages Paid by Assisted Companies There were 1,27 assisted jobs added to Nevada
More informationINVITATION TO SUBMIT FULL PARTNERSHIP PROPOSALS FOR SUSTAINABLE COCOA PARTNERSHIPS
MILLENNIUM CHALLENGE ACCOUNT - INDONESIA Green Prosperity Partnership Grants INVITATION TO SUBMIT FULL PARTNERSHIP PROPOSALS FOR SUSTAINABLE COCOA PARTNERSHIPS MCA - INDONESIA MR21 Building, 11 th Floor
More informationBETF: P (TF and TF013728)
PNPM Urban in Aceh Quarterly Progress Report: January to March 2016 Summary Information Status Activity Number Task Team Leader(s) Executing Agency(ies) Active RETF: P131296 (TF012192) BETF: P131511 (TF012423
More informationFinal MRP Endorsement Date. Implementing Country/Technical Partner. Comments/Remarks
Implementing Country/Technical Partner Argentina Final MRP Endorsement Date Planned: intersessional period prior to PA19 Comments/Remarks Argentina joined as a PMR Implementing Country Participant at PA15
More informationGRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing)
GRANT NUMBER 0426-CAM (SCF) GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) (Cambodia Component) between KINGDOM
More informationArgentine Republic's Readiness Preparation - Readiness Fund for Forest Carbon Partnership Facility (FCPF) FCPFR - Forest Carbon Partnership Facility
Assignment: TF019086 Argentine Republic's Readiness Preparation - Readiness Fund for Forest Carbon Partnership Facility (FCPF) FCPFR - Forest Carbon Partnership Facility Task Team Leader: 00000232745 Approving
More informationGlobal Environment Facility Trust Fund Grant Agreement
CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF099857 Global Environment Facility Trust Fund Grant Agreement (Nyika Transfrontier Conservation Area Project) between REPUBLIC OF MALAWI and INTERNATIONAL BANK
More informationRural Enterprise Finance Project. Negotiated financing agreement
Document: EB 2018/123/R.8/Sup.1 Agenda: 5(a)(i) Date: 6 April 2018 Distribution: Public Original: English E Republic of Mozambique Rural Enterprise Finance Project Negotiated financing agreement Executive
More informationRECAPITALISATION AND DEVELOPMENT PROGRAMME PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013
RECAPITALISATION AND DEVELOPMENT PROGRAMME PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013 HISTORY OF RECAPITILISATION AND DEVELOPMENT PROGRAMME In 2009, the
More informationSensitization of the UoN Procurement Department Staff on Anti-corruption Strategies and the Implementation of the Integrity Testing Programme
Sensitization of the UoN Procurement Department Staff on Anti-corruption Strategies and the Implementation of the Integrity Testing Programme A Presentation by the Chief Legal Officer, Ms. Rebecca Waigwe
More informationNATIONAL ENVIRONMENT AWARENESS CAMPAIGN. Guidelines for RRAs. Page 1 of 1
NATIONAL ENVIRONMENT AWARENESS CAMPAIGN Guidelines- 2013-14 for RRAs Page 1 of 1 Government of India Ministry of Environment and Forests Paryavaran Bhawan, New Delhi INTRODUCTION: NATIONAL ENVIRONMENT
More informationTerms of reference. APPROVED e-requisition. Completed technical proposal
Terms of reference GENERAL INFORMATION Title: Junior Specialist for Natural Resource Governance and Innovation Project Name: Community and Responsible Tourism in Wakatobi, Sovereign Wealth Fund in Muba
More informationGlobal Environment Facility Grant Agreement
Public Disclosure Authorized CONFORMED COPY GEF TF GRANT NUMBER TF097126 Public Disclosure Authorized Global Environment Facility Grant Agreement (Financing Energy Efficiency at MSMEs Project) Public Disclosure
More informationBlack Farmers Discrimination Litigation Cy Pres Funds Phase I Grants REQUEST FOR PROPOSALS
Black Farmers Discrimination Litigation Cy Pres Funds Phase I Grants REQUEST FOR PROPOSALS SUMMARY Lead Class Counsel in the In re Black Farmers Discrimination Litigation (Consolidated Case) are pleased
More informationCooperantesCaixa. RULES FOR NGOs CALL FOR APPLICATIONS 2018
RULES FOR NGOs ----------------- CALL FOR APPLICATIONS 2018 1. WHAT IS COOPERANTESCAIXA? CooperantesCaixa is the international corporate volunteer programme of la Caixa Banking Foundation. Over the past
More information(REVISED) Healthy States Grant Program: Wellness in the Workplace and Community
(REVISED) Healthy States Grant Program: Wellness in the Workplace and Community The National Governors Association Center for Best Practices (NGA Center) invites states to apply for grants under the NGA
More informationEducation Bureau Circular No.6/2014
Education Bureau Circular No.6/2014 From: Permanent Secretary for Education Ref.: EDB(CG)IS/15 Date: 9 May 2014 To: Supervisors / Heads of all aided (including special schools), government, caput and Direct
More information3 MAJOR MACKENZIE DRIVE TRANSPORTATION IMPROVEMENTS HIGHWAY 50 TO WESTON ROAD, CITY OF VAUGHAN STATUS UPDATE, PROJECT 8066
3 MAJOR MACKENZIE DRIVE TRANSPORTATION IMPROVEMENTS HIGHWAY 50 TO WESTON ROAD, CITY OF VAUGHAN STATUS UPDATE, PROJECT 8066 The Transportation and Works Committee recommends the adoption of the recommendations
More informationUniform Guidance Update. Ruth Boardman, Associate Director Office of Grants and Contracts March 2015
Uniform Guidance Update Ruth Boardman, Associate Director Office of Grants and Contracts March 2015 Objectives Latest Updates Internal Controls Procurement Status of Policies and Procedures Research Terms
More informationTerms of Reference. Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC)
Terms of Reference Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC) 1. Introduction August 2016 to August 2018 1. Supporting Kenya s devolution
More information2014 to 2020 European Structural and Investment Funds Growth Programme. Call for Proposals European Social Fund. Priority Axis 2 : Skills for Growth
2014 to 2020 European Structural and Investment Funds Growth Programme Call for Proposals European Social Fund Priority Axis 2: Skills for Growth Managing Authority ESI Fund Priority Axis: Investment Priority:
More informationNovember NHS Rushcliffe CCG Assurance Framework
November 2015 NHS Rushcliffe CCG Assurance Framework ASSURANCE FRAMEWORK SUMMARY No. Lead & Sub Committee Date placed on Assurance Framework narrative Residual rating score L I rating in 19 March 2015
More informationMCC PRINCIPLES MCC PROCUREMENT PROCESSES LOOKING FORWARD
MCC PRINCIPLES MCC PROCUREMENT PROCESSES LOOKING FORWARD WHAT IS MCC? The Millennium Challenge Corporation is a U.S. Government agency designed to reduce poverty through economic growth in select developing
More informationAppendix. Table A1. Overall U.S. Results for Base Pay: Regression of Log Base Salary on Various Individual, Job and Employer Characteristics
Appendix This Appendix provides detailed regression results from Andrew Chamberlain (2016) Demystifying the Gender Pay Gap: Evidence from Glassdoor Salary Data. Please see the complete study for corresponding
More informationAction Fiche for Paraguay (Annex I) Project approach partially decentralised. DAC-code Sector Agricultural policy and administrative management
Action Fiche for Paraguay (Annex I) Title/Number Support to the economic integration of the Paraguayan rural sector No CRIS: DCI-ALA/2010/22009 Total cost 5,100,000 EU Contribution: 4,000,000 Contribution
More informationwith the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks
with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks READINESS AND PREPARATORY SUPPORT PAGE 1 OF 14 ver. 19 August 2016 Readiness and Preparatory
More informationCambodia, Lao PDR, Viet Nam: GMS Biodiversity Conservation Corridor Project
Initial Poverty and Social Assessment Project Number: 40253 September 2009 Cambodia, Lao PDR, Viet Nam: GMS Biodiversity Conservation Corridor Project Appendix 5 1 INITIAL POVERTY AND SOCIAL ANALYSIS
More informationPrimary education (46%); Secondary education (26%); Public administration- Education (16%); Tertiary education (12%) Project ID
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5401 General
More informationBiometric Enrollment Of Conditional Cash Transfer (CCT) Beneficiaries
Biometric Enrollment Of Conditional Cash Transfer (CCT) Beneficiaries 5-May-2011 Cross River State - Ministry of Social Welfare & Community Development Agenda Introduction Background on Cross River State
More informationCapital Project Plan Royal Columbian Hospital Redevelopment Project Phases 2 & 3 May 2, 2017
Capital Project Plan Royal Columbian Hospital Redevelopment Project Phases 2 & 3 May 2, 2017 1. Project Background The planning process for the redevelopment of Royal Columbian Hospital (RCH) has been
More informationInternal Audit. Health and Safety Governance. November Report Assessment
November 2015 Report Assessment G G G A G This report has been prepared solely for internal use as part of NHS Lothian s internal audit service. No part of this report should be made available, quoted
More informationBenita Lynn Horn, MWD
Benita Lynn Horn, MWD The World Water Forum offers $10,000 Grants to community colleges & universities for: Research & Development Innovative Water Conservation Projects Local or Global Projects Water-Stressed
More informationConsultant Power Forward. Location: Abuja, Nigeria. Reports to: Country Director and Senior Support Program Manager
Title: Consultant Power Forward Location: Abuja, Nigeria Reports to: Country Director and Senior Support Program Manager Africare is a leading non-governmental organization (NGO) committed to addressing
More informationRETF: P (TF097410), P132585, and P (TF014769) BETF: P (TF092194)
PNPM Generasi Quarterly Progress Report: January to March 2014 Summary Information Status Active Activity Number RETF: P122032 (TF097410), P132585, and P147658 (TF014769) BETF: P111966 (TF092194) Task
More informationCall for Project Proposals & Criteria
Funds for Local Cooperation in Lebanon: Call for Project Proposals & Criteria Embassy of Finland, Beirut, 2016 What are the Funds for Local Cooperation? Funds for Local Cooperation (FLCs) of the Mission
More informationConservancy Development Support Services (CDSS) Project. Quarterly Report. July to September 2012
Conservancy Development Support Services (CDSS) Project Quarterly Report July to September Commissioned by the Millennium Challenge Account Namibia with funding from the Millennium Challenge Corporation
More informationwith the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support
with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support READINESS AND PREPARATORY SUPPORT PAGE 1 OF 11 ver. 19 August 2016 Readiness and Preparatory Support Proposal
More informationReporting and Monitoring Guidelines
Reporting and Monitoring Guidelines The EEA Financial Mechanism & The Norwegian Financial Mechanism Adopted: 09 June 2005 Amended: 23 September 2007 Amended: 16 January 2008 FM0027-GDL-00008-E-V8 1 Contents
More informationAUDIT UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA. Report No Issue Date: 15 January 2014
UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA Report No. 1130 Issue Date: 15 January 2014 Table of Contents
More informationGrant Agreement. The. - hereinafter referred to as "the Recipient" and
The - hereinafter referred to as "the Recipient" and Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Dag-Hammarskjöld-Weg 1-5 65760 Eschborn Federal Republic of Germany - hereinafter
More information2. Review the requirements necessary for grant agreement execution; and
1 This is the first in a series of five webinars designed to provide an overview for new CDBG grantees. The webinars will be held over the next three months, each one hour in length, and include: 1. Getting
More informationPhase 4 Information Pack and Concept Proposal form
Phase 4 Information Pack and Concept Proposal form Update: May 2017 Incentive Fund is an Australian aid initiative, managed by Coffey, a Tetra Tech company, on behalf of the Australian Government. Table
More information