REQUEST FOR CONSULTANT QUALIFICATIONS GEOGRAPHIC INFORMATION SYSTEMS CONSULTANT MCAN/COM/RCQ/5A01007

Size: px
Start display at page:

Download "REQUEST FOR CONSULTANT QUALIFICATIONS GEOGRAPHIC INFORMATION SYSTEMS CONSULTANT MCAN/COM/RCQ/5A01007"

Transcription

1 REQUEST FOR CONSULTANT QUALIFICATIONS GEOGRAPHIC INFORMATION SYSTEMS CONSULTANT MCAN/COM/RCQ/5A01007 MCA Namibia () requires the services of an individual Geographical Information Systems Consultant (hereinafter referred to as the Consultant ). This document provides a summary of the services required, application procedure, selection method, Terms of Reference (TOR), and the contractual terms offered for this assignment. Summary of Services: The Consultant will provide technical support to, which shall include, but not be limited to the capture, storage, and spatial display of GIS data from surveys and other data sources in order to enhance stakeholder understanding of Compact activities and results. Additional details concerning the services required are contained in the TOR. Location: Windhoek Anticipated Start Date: January 2010 Duration of Assignment: Approximately 45 months. Application Procedure and Selection Before applying, interested Consultants shall review the TOR (Attachment 2), which provides a detailed description of the assignment and the qualifications and experience required of the Consultant, and Contract Form (Attachment 3), setting out the proposed contractual arrangements. Interested Consultants shall send their Expression of Interest (EOI) in the standard format (Attachment 1) to be considered for the assignment. EOI shall include the date of availability, up-todate CV demonstrating that the Consultant fulfils the minimum requirements described in the TOR, contact details (address, telephone and fax numbers, address, website), at least three references that can comment on the Consultant s related work experience, and any other relevant information. The selection of the Consultant shall be carried out in accordance with the procedures set forth in Section 1.B.V Selection of Individual Consultants of the MCA Namibia Procurement Rules, published on the website EOI shall be submitted to: Victor Paereli, Procurement Manager Millennium Challenge Account Namibia vpaereli@mcanamibia.org Deadline for the submission of responses: 13h00 on 23 November 2010.

2 Attachment 1: Expression of Interest Forms [Location, Date] Mr. Johann Botha Director Procurement MCA Namibia EXPRESSION OF INTEREST: FORM 1 Dear Sir, RE: GEOGRAPHIC INFORMATION SYSTEMS CONSULTANT REF: MCAN/COM/RCQ/5A01007 I, the undersigned, offer to provide the consulting services for the abovementioned assignment in accordance with your Request for Expressions of Interest dated [Insert Date] and this Expression of Interest. I hereby submit my Expression of Interest, which will be open for acceptance for a period of 60 (sixty) days. I hereby declare that all the information and statements made in this Expression of Interest are true and accept that any misrepresentation contained in it may lead to my disqualification. My Expression of Interest is binding upon myself and subject to the modifications resulting from Contract negotiations, and I undertake, if my proposal is accepted, to initiate the consulting services related to the assignment not later than [insert the date on which you will be available to commence with the assignment]. I understand you are not bound to accept any proposal that you may receive. Yours sincerely, [Signature] Name and Title of Signatory Address of Consultant 2

3 Attachment 1: Expression of Interest Forms 1. Name [Insert full name] 2. Date of Birth [Insert birth date] EXPRESSION OF INTEREST: FORM 2 Curriculum Vitae (CV) 3. Nationality [Insert nationality] 4. Education [Indicate college/university and other specialized education, giving names of institutions, degrees obtained, and dates of obtainment]. 5. Membership in Professional Associations 6. Other Training [Indicate appropriate postgraduate and other training] 7. Countries of Work Experience [List countries where the consultant has worked in the last ten years] 8. Languages [For each language indicate proficiency: good, fair, or poor in speaking, reading, and writing] Language Speaking Reading Writing 9. Employment Record [Starting with present position, list in reverse order every employment held by the consultant since graduation, giving for each employment (see format here below): dates of employment, name of employing organization, positions held.] From: [year] To: [year] Employer: Position(s) held: 10. Work undertaken that best illustrates capability to handle the tasks assigned: [Among the assignments in which the consultant has been involved, indicate the following information for those assignments that best illustrate his/her capability to handle the tasks listed in the TOR] Name of assignment or project: Year Location: Client: Main project features: 3

4 Attachment 1: Expression of Interest Forms Position held: Activities performed: 11. References: [List at least three individual references with substantial knowledge of your work. Include each reference s name, title, phone and contact information. MCA Namibia reserves the right to contact other sources as well as to check references, in particular for performance on any relevant MCC-funded projects.] 12. Task assigned for this consultancy: Not Used 13. Certification: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes me, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged. I, the undersigned, hereby declare that I agree to participate in the above-mentioned assignment. I further declare that I am able and willing to work for the period foreseen in the above referenced Request for Consultant's Qualifications. [Signature] [Date] 4

5 TERMS OF REFERENCE GEOGRAPHIC INFORMATION SYSTEMS CONSULTANT 1. Summary The Millennium Challenge Account Namibia s Monitoring and Evaluation (M&E) Plan calls for the undertaking of a number of surveys, as well as the gathering of data from secondary sources, for monitoring, evaluating and reporting purposes. In order to help communicate the data to different stakeholders, it is proposed that Geographic Information Systems (GIS) maps and related materials be included among the products prepared as part of M&E reporting. GIS maps have a strong visual appeal that could assist the communication of the findings of these studies by appealing to a wider audience. Generally, a GIS map allows data to be viewed, understood, questioned, interpreted, and visualized in ways that reveal relationships, patterns, and trends and may be more immediately understandable and user-friendly than traditional survey reports. Therefore, the objective of this TOR is to procure the services of a GIS consultant to during the remainder of the Compact technically support Millennium Challenge Account Namibia () with the capture, storage, and spatial display of GIS data from surveys and other data sources in order to enhance stakeholder understanding of Compact activities and results. The Consultant will work closely with and its stakeholders to advise on GIS matters and to determine and assess GIS needs relating to s M&E activities. The Consultant will report to the Director: M&E. 2. Background Information 2.1 The Millennium Challenge Corporation (MCC) The Millennium Challenge Corporation (MCC) was established in January 2004 as a United States government corporation to implement the Millennium Challenge Account (MCA). MCC s mission is to reduce poverty by supporting sustainable, transformative economic growth in developing countries, which create and maintain sound policy environments. MCC supports socially and economically sound innovative strategies and ensures accountability through measurable results. For additional information on MCC please visit Namibia s Millennium Challenge Compact The Millennium Challenge Account Namibia () Compact, providing grant funding for public investments in Education, Tourism and Agriculture, was signed on 28 July 2008 between the Republic of Namibia and Government of the United States of America, through MCC. The Compact will make available US$304.5 million for development in the target sectors, over and above current Government allocations and assistance from other development partners. 5

6 The Goal of the Compact is to reduce poverty through economic growth in the Education, Tourism and Agriculture sectors. To accomplish this Goal, the programme aims to achieve the following objectives: i) Increase the competence of the Namibian workforce (knowledge, skills, etc.); and ii) Increase the productivity of agricultural and non-agricultural enterprises in rural areas. The Compact aims to improve the quality of education and training for underserved populations, and attempts to capitalize on Namibia s comparative advantages to increase the incomes of poor Namibians, predominantly in the northern areas of the country. In Education, the programme seeks to bring the quality of the work force closer to the requirements of industry and the labour market at large. This is in line with the aspirations of Vision 2030 and the 3 rd National Development Plan s strategic objective for productive and competitive human resource and institutions, which informed the programming, content and activities of the Education and Training Sector Improvement Programme (ETSIP). The Education Project contributes to ETSIP. It aims to improve the competency and knowledge of young Namibians by supporting new and innovative methods of learning in addition to the traditional approaches, and improved physical infrastructure for learning and teaching in schools, Regional Study and Resource Centres and Community Based Skills Development Centres. The Tourism Project seeks to bring conservancies in high potential tourism areas into the mainstream of the tourism industry, increasing the financial and in-kind benefits to rural conservancy members. Internationally-acknowledged best practice models for community-based tourism and community-based natural resource management underpin the Tourism Project. This is the first time in MCC history that a country programme includes tourism, acknowledging the sector s tremendous poverty alleviating potential in conservancy areas. The Etosha National Park will serve as a model for increased participation by the adjacent conservancies. The Tourism Project will facilitate access to the Park for the conservancies around it through exclusive access concessions, to be awarded through the 2007 Concession Policy. The Agriculture Project comprises three main activities: livestock, land access and management, and indigenous natural products. The Livestock Activity seeks to improve the marketing opportunities for farmers north of the Veterinary Cordon Fence in order to bring them closer to the opportunities that farmers south of the Fence enjoy. The focus will be on improving veterinary services aimed at obtaining animal disease-free status for the Northern Communal Areas (NCAs) in order to gain access to international markets. The overall objective is to increase the farmers income derived from large-stock and small-stock farming in the NCA. The accompanying Land Access and Management Activity will improve rangeland management and provide more equitable and secure access to land in the NCA. The Communal Land Boards, traditional authorities and other key stakeholders, most notably the communities themselves, will be empowered to control and better manage the available resources. Increasing direct participation of the primary producers in the value addition of raw, natural products such as Marula, Kalahari Melon Seed, Hoodia, Devil s Claw and Ximenia is the key objective of the Indigenous Natural Products Activity. The value chain approach that the programme has adopted will ensure that the activities are responsive to the fast-changing market realities for natural products. At present, most of the revenue from selling products made of these valuable commodities is generated outside Namibia. The 6

7 programme will facilitate an increased participation by the primary producers in the processing, packaging and marketing of these products. Please visit for detailed Project Descriptions. 2.3 The Management Structure In terms of the Compact, is the accountable entity, responsible for the overall management of the Compact s implementation. is a legal entity within the National Planning Commission (Office of the President), comprised of a Board and a Programme Management Unit. The Board provides oversight and strategic guidance and is ultimately responsible for the programme s success. The Management Unit is responsible for the day-to-day implementation of the Compact, including programme management, financial management and reporting, and coordination of M&E. The programme is legally governed by the Compact and its supplemental agreements. For additional information please visit Consultancy-Specific Background M&E is essential for a results-based approach to programme management and s M&E Plan is an integral component of the Compact. The M&E Plan serves as a tool to plan and manage the process of monitoring, evaluating and reporting progress towards achieving Compact results. It is used in conjunction with other reporting and management tools such as work plans, procurement plans and financial plans. To monitor progress toward the achievement of the outcomes and impact expected from the programme, the Monitoring Component of the M&E Plan outlines how will track performance against indicators and targets (the expected result and the timeframe for achieving it) covering the programme s activities. Beyond monitoring, evaluations are important to provide analysis of the results. For this purpose, there is an Evaluation Component to the M&E plan that describes the evaluation concepts for each project and activity. To provide additional data to contribute to the Monitoring Component and to support the Evaluation Component, various surveys are planned as well Data Sourced from Surveys The following table outlines the various surveys planned to provide additional data to contribute to the monitoring component and to support the evaluation component. Project Sub- Activity Purpose Timing Tourism and Agriculture Conservancy Support (CS) and Indigenous Natural Products (INP) Contribute to measuring impact of activities on household income, organization revenue, and employment Measure income, offtake, adoption of CBRLM practices, for both monitoring and impact evaluation. Baseline in 2010/11, optional midterm survey round in 2012 and optional end- Compact survey round in 2014 Baseline in 2011 and optional end-compact survey round in 2014 Agriculture Community-based Rangeland & Livestock Management (CBRLM) 7

8 The objective of the CS/INP surveys is to measure key indicators related to the intended beneficiaries of the CS and INP sub-activities. The related evaluation will assess the impact of the two sub-activities on their intended beneficiaries in terms of income, employment, production, and other factors. The purpose of the CBRLM survey rounds and related evaluation is to estimate the impact of the CBRLM intervention on productivity, changes in behaviour of rangeland practices, value of livestock, and household income of the sub-activity s beneficiaries. A specific requirement has been made that survey consultants collect latitude and longitude data of all households that are chosen to participate in the surveys. The GIS consultant will be required to give further advice on the format of this and other spatial data to be collected as well as how to use the datasets generated to create maps based on survey data to effectively communicate the results of the MCA Programme to a variety of stakeholders Other Data Sources to be Reviewed In addition to the two surveys identified above, the GIS consultant is expected to review all the data sources that uses for M&E purposes in order to advise on the suitability of using GIS mapping to display results based on that data. The key data sources that is working with in the three targeted project areas are as follows: Agriculture Data on cattle sales and slaughter of livestock in the Northern Communal Areas (NCAs); Directorate of Veterinary Services (DVS) data on cattle inspections and inspection in the NCAs; Disbursement of funds for construction of State Veterinary Offices (SVOs) and related expenditures in the Northern Communal Areas (NCAs); data on cattle condition, off-take rate, land use plans, trainings conducted, adoption of new and improved production technologies and changes in household income over time; and Land tenure information, such as customary land rights mapping, communal land verification and registration information, leasehold areas allocated, and the extent of fencing on communal lands in the NCAs. Education Ministry of Education s Educational Management Information System (EMIS) data collected on indicators covering promotion rate of learners across the country; Ministry of Education s Directorate for National Examinations and Assessment (DNEA) data collected on indicators covering pass rate of learners across the country; and internal data generated on the disbursement and expenditure related to the execution of the education project and output level data covering the number of beneficiaries from the funded activities. Tourism Ministry of Environment and Tourism (MET) and Namibia Tourism Board (NTB) data on tourism arrivals, tourism related employment, income statistics from tourism and related activities, 8

9 national and regional tourist routes, and trends in tourist visits to Namibia s communal conservancies; MET data on road maintenance in Etosha National Park; internal data on expenditure on the tourism activity and related sub-activities; data on changes in household incomes for targeted beneficiaries of the Conservancy Support intervention; / NTB data on lodge occupancy rates, particularly joint venture lodges and campsites; and NTB information on the number of unique hits on their new website by geographic location. For more detailed information on the specific indicators and data sources, refer to the M&E Plan s indicator tables in Annex I. 3. Objectives The primary objective of this consultancy is to assist s M&E division to communicate and present updates on programme implementation and results of monitoring surveys and evaluation activities through the use and display of spatial data in maps and other reporting documents. A secondary objective of this consultancy is to establish a Geographic Information System (GIS) for the Compact, and to use the spatial data within this GIS to produce visuals that will help stakeholders better understand the actions and results of the programme as well as facilitate the participatory assessment of the interventions. Specific objectives, all in furtherance of information-sharing efforts, are as follows: to summarize and showcase different data types on maps, visually displaying information to reveal patterns and relationships that may not be apparent in tabular displays; to integrate data from multiple sources into a GIS database for the subsequent production of maps; to identify and implement relevant spatial analysis techniques that will help tell the story of the results of the Programme; to visually distinguish programme performance by geographical area; and to advise on all GIS-related matters. 4. Scope of Services (Tasks and Deliverables) The main tasks involved in this exercise are as follows: compilation of spatial data and development of a GIS database using a suitable GIS platform (e.g., ESRI ArcGIS); manipulation, analysis and presentation of GIS data in maps and other reporting tools that display programme activities and results in a spatial manner; performance of spatial analysis as needed to complement other M&E activities; and provision of technical assistance to on GIS-relevant matters. 4.1 Description of Tasks & Services Become thoroughly familiar with the Compact and the different data sources detailed in the M&E Plan s indicator tables; 9

10 Identify and advise on suitable variables for which GIS datasets can be developed or obtained; Advise on what GIS software package and hardware will be required and provide different options based on cost and functionality and provide technical support to contractors to ensure that data are collected in the appropriate format; Present spatial analysis options and tools to staff, discuss which tools may be useful to communicate results to stakeholders, and complete defined spatial analysis tasks and present results in a visually appealing format; Through consultations with all stakeholders, determine and advise on the GIS data formats and systems which would be most compatible with existing systems in Namibia; Work closely with and MCC contracted Survey Consultants and Evaluators to advise on the GIS data formats needed for mapping purposes; Ensure that s GIS is updated with the latest information developed at field level, as well as useful spatial datasets from partners (National Association of Community-Based Natural Resource Management Support Organisations (NACSO), Government Ministries, Implementing Partners 1 ); Prepare metadata for relevant GIS datasets comprising the GIS data; Maintain all GIS datasets based on information provided by Implementing Partners and and MCC contracted Survey Consultants; Prepare maps based on GIS data in various formats (hard-copy with small to large format printing, digital and web-compatible) as well as assist the Manager IT and/or Manager: Public Outreach to put GIS maps on the website; and Develop and implement a user-friendly IT/web-based Decision Support Tool (DST) or GIS Viewing Tool which integrates all GIS data and results into a format that allows the overlaying and viewing of thematic layers by non-gis expert users within and Government. As follow up task, develop a plan with recommendations as to who should be responsible for the hosting, expansion and updating of the tool post-compact. The following general guidelines apply in carrying out the above tasks: The performance of the above tasks shall be organised in a series of work plans with a minimum duration of 6 months. The works plans shall be developed jointly with and approved by the Director: M&E. The work plans shall details the specific tasks to be performed during the respective period and the level of effort (number of days) approved for each tasks. As far as practicable, the work plans shall list the specific deliverables required from the Consultant during the respective period and the deadlines for the submission of these deliverables. Work closely with Survey Consultants, Evaluation Contractors and Implementing Partners to give input on the spatial data to be collected; Solicit input from M&E division and Project Directors and Managers on the possible analyses and maps to be produced to present results. 4.2 Timing of the Provision of Services 1 s Implementing Partners (IPs) include the Ministry of Education, the Namibia Training Authority, the Ministry of Environment and Tourism, the Namibian Tourism Board, the Ministry of Agriculture, Water and Forestry and the Ministry of Lands and Resettlement. 10

11 The services of the GIS Consultant will be required on an ongoing/rolling basis; however, from a preliminary assessment of the data that and its Implementing Partners expect to collect, the surveys have been identified as prime targets for a more time-bound exercise. The surveys will be conducted at different stages in the implementation of the Compact and their timing will dictate to a large extent when related GIS Consultant activities are to take place. As the table below illustrates, for CS/INP surveys, three rounds of GIS analysis and map production are expected in 2010/11, 2012 and For the CBRLM, two rounds are expected in 2010 and Pending the review of the other data sources as detailed in the M&E Plan, all data sources that are eligible for GIS mapping other than the CS/INP and CBRLM surveys will also require GIS services, and it is also possible that there will be a need for GIS analysis periodically to support M&E and Compact Implementation, and therefore additional support may be required as requested by. The timing of these services cannot be pre-established and will thus need to be determined on a rolling basis (refer to 4.1 above) to be agreed upon between and the Consultant. Target Activity Round 01 (2010/11) Round 02 (2012/13) Round 03 (2014) INP/CS survey X X X CBRLM survey X X Other Data Sources per periodic task orders/work plans 4.3 Tasks and Deliverables The specific tasks to be performed by the Consultant and the deliverables associated with each task are described in detail in the following sub-sections. Deliverables shall be considered draft upon initial submission by the Consultant. Drafts will be reviewed by and MCC and accepted or concerns raised/comments provided within 2 weeks of receipt. i) The Consultant shall appropriately address any concerns and provide final versions within 1 week of receiving the response. ii) All deliverables (reports, data sets, available electronic literature) will be submitted electronically in both PDF as well as editable format (reports in Microsoft Word, and data files used in reports in Microsoft Excel and GIS software format), as appropriate Task 1 Advisory GIS Services The Consultant shall perform the following tasks in the provision of advisory GIS services: Become thoroughly familiar with the Compact and the different data sources detailed in the M&E Plan s indicator tables; Identify and advise on suitable Compact-relevant variables for which GIS datasets can be developed or obtained; Through consultations with all stakeholders, determine which GIS data formats and systems which would be most compatible with existing systems in Namibia; Advise on what GIS software package and hardware will be required and provide different options based on cost and functionality and provide technical support to contractors to ensure that data are collected in the appropriate format; 11

12 Present spatial analysis options and tools to staff and discuss which tools may be useful to communicate results to stakeholders; and Advise, as periodically requested, on other GIS-related matters. Task 1 Deliverables: Detailed Advisory Memos (and the procedure undertaken to reach the advisory opinion) on each of the above Task 2 Non-Survey-Specific GIS Services The Consultant shall provide the following GIS services on all variables (including variables from the surveys) found to be suitable for GIS datasets: Take the lead in implementing selected options presented in Advisory Memos; Compilation of spatial data and development of a GIS database using a suitable GIS platform (e.g., ESRI ArcGIS); Manipulation, analysis and presentation of GIS data in maps and other reporting tools that display programme activities and results in a spatial manner; Complete spatial analysis tasks and present results in a visually appealing format; Ensure that s GIS is updated with the latest information developed at field level, as well as useful spatial datasets from partners (e.g., NACSO, Government Ministries, IPs); Prepare metadata for relevant GIS datasets comprising the GIS data; Prepare maps based on GIS data in various formats (hard-copy with small to large format printing, digital and web-compatible) as well as assist the Manager IT and/or Manager: Public Outreach to put GIS maps on the website; and Develop and implement a user-friendly IT/web-based Decision Support Tool (DST) or GIS Viewing Tool which integrates all GIS data and results into a format that allows the overlaying and viewing of thematic layers by non-gis expert users within and Government. As follow up task, develop a plan with recommendations as to who should be responsible for the hosting, expansion and updating of the tool post-compact. Task 2 Deliverables: related electronic GIS database and shape files; electronic datasets; analysis results; maps; a functioning, user-friendly DST or GIS Viewing Tool and hosting/expansion/updating plan; and at least two workshops to present results with appropriate follow-up on feedback from workshop participants Task 3 Survey-Related GIS Services The Consultant shall provide the following GIS services: Work closely with and MCC contracted Survey Consultants and Evaluators to advise on the GIS data formats needed for mapping purposes (at each survey round); For each survey, create a detailed preliminary list of variables suitable for spatial analyses and GIS mapping based on variables and the survey instruments to be used for data collection (onceoff); Provide input to the survey instruments to guide GIS data collection (at each survey round); and Compile the data into a database. Task 3 Deliverables: an outline of the different GIS maps (with samples) and products that can expect for INP/CS and CBRLM surveys and from other data sources identified; a detailed 12

13 presentation of the different spatial analyses to be conducted; GIS data in shape-file format and GIS maps in various formats, hard-copies with small to large format printing, digital and web-compatible; meta data for relevant GIS data collected and used in analyses; an internal workshop for and MCC to present the maps and any other output from the GIS analyses, present and interpret the findings from the GIS exercise and explain the findings implications; planning and hosting a workshop (may be done jointlywith Survey and Evaluation consultants) to present the findings from GIS analyses to external stakeholders; a narrative report detailing the analyses done, data used, databases generated and the meta data files produced and the products generated for the different surveys. 5. Duration of the Assignment and Level of Effort One year, with the option to renew for additional one-year periods for a total of up to four years or the end of the Compact in September 2014, whichever comes first, depending on operational requirements and the Consultant s performance. The maximum anticipated level of effort 225 days over the duration of the assignment. 6. Qualifications & Experience Specific Skills Required The GIS expert is expected to have the following minimum competencies: Strong practical background in GIS and cartography; Knowledge of and experience in the use of the latest GIS software (e.g., ArcGIS 9, ERDAS Imagine, and others); Knowledge of and experience in using related software and systems (Illustrator, Google Earth, MS Access and My SQL databases); Good verbal / written communication skills; and Excellent analytical / problem solving skills. Qualifications & Experience University degree (minimum Bachelors Degree or equivalent) in Geographic Information Systems, computer science or other relevant field; Considerable progressively responsible relevant professional experience; Experience with online mapping technologies is preferable; Good interpersonal and general communication skills; Strong service orientation; Ability to work in a multi-cultural environment; Fluency in oral and written English. 7. Reporting Arrangements and Schedule of Payments The Consultant will report to the Director: M&E, who will be the immediate supervisor of the Consultant. The Director: M&E will be also responsible for determining, administering and monitoring the Consultant s specific tasks and deliverables. This consultancy will be carried out on a part-time basis. 13

14 The Consultant will receive a fixed daily fee, to be negotiated with. Payment will be based on submission to of timesheet-supported invoices signed off by Director: M&E upon completion and approval of deliverables. 14

15 Annex I: Indicator Tables from s M&E Plan 2 Goal Indicator Indicator Unit Baseline Baseline Source Baseline Year 2009/ / / / /14 End of Compact Poverty Rate % 27.9% Central Bureau of Statistics/ National Development Plan / % 20.0% Unemployment Rate % 36.7% Central Bureau of Statistics/ National Development Plan / % 33.6% Household Income $ N$ 43,520 Central Bureau of Statistics/ National Development Plan /2004 N$ 55,269 N$ 55,269 Education Project Indicator Definition Unit Level Classification Source Frequency Responsible Party Gender Disaggregation Vulnerability Disaggregation Notes Multiple Activities (National level) Promotion Rate of 5 th Grade learners Students - Entire Country The percentage of all learners in Grade 5 who were promoted and continued schooling in Grade 6 in the year the data is reported (i.e., the percentage of learners who were promoted from 5th in the school year prior to the one reported on, and then continued in the 6th grade in the year being reported on) % Objective Level EMIS database Annual MOE Yes Yes* *) If practicable Promotion Rate of 7 th Grade learners - Entire Country The percentage of all learners in Grade 7 who were promoted the previous year and continued schooling in Grade 8 in the year the data is reported (i.e., the percentage of students who were promoted from 7th in the school year prior to the one reported on, and then continued in 8th grade in the year being reported on) % Objective Level EMIS database Annual MOE Yes Yes* *) If practicable 2 To be revised on an ongoing (at most annual) basis. 15

16 Percentage of learners who are new entrants in Grade 5 Percentage of students in Grade 5 who are there for the first time, i.e. new enrolments or learners who were promoted at the end of the previous year and continued school % Objective Level EMIS database Annual MOE Yes Percentage of learners who are new entrants in Grade 8 Percentage of students in Grade 8 who are there for the first time, i.e. new enrolments or learners who were promoted at the end of the previous year and continued school % Objective Level EMIS database Annual MOE Yes National Pass Rate of JSC learners (grade 10) - Math - Entire Country Percentage of learners achieving D or better in mathematics (entire country) % Objective Level DNEA Annual MOE Yes National Pass Rate of JSC learners (grade 10) - Science - Entire Country Percentage of learners achieving D or better in Physical and Life Science (entire country) % Objective Level DNEA Annual MOE Yes National Pass Rate of JSC learners (grade 10) - English - Entire Country Percentage of learners achieving D or better in English as a second language (entire country) % Objective Level DNEA Annual MOE Yes National Pass Rate of NSSC learners (grade 12) - Math - Entire Country Percentage of learners achieving D or better in Math (entire country) % Objective Level DNEA Annual MOE Yes National Pass Rate of NSSC learners (grade 12) - Science - Entire Country Percentage of learners achieving D or better in Physical and Life Science (entire country) % Objective Level DNEA Annual MOE Yes National Pass Rate of NSSC learners (grade 12) - English - Entire Country Percentage of learners achieving D or better in English as a second language (entire country) % Objective Level DNEA Annual MOE Yes Promotion Rate of 5 th Grade learners - 47 Schools The percentage of all learners in Grade 5 who were promoted and continued schooling in Grade 6 in the year the data is reported (i.e., the percentage of students who were promoted from 5th in the school year prior to the one reported on, and then continued in 6th grade in the year being reported on) 47 Schools % Objective Level EMIS database Annual MOE Yes Promotion Rate of 7 th Grade learners - 47 schools The percentage of all learners in Grade 7 who were promoted the previous year and continued schooling in Grade 8 in the year the data is reported (i.e., the percentage of students who were promoted from 7th in the school year prior to the one reported on, and then continued in 8th grade in the year being reported on) % Objective Level EMIS database Annual MOE Yes Yes* *) If practicable Percent of learners who are new entrants in Grade 5-47 schools Percent of learners in Grade 5 who are there for the first time; i.e. new enrolments or learners who were promoted at the end of the previous year and continued school % Objective Level EMIS database Annual MOE Yes 16

17 Percent of students who are new entrants in Grade 8-47 schools Percent of learners in Grade 8 who are there for the first time; i.e. new enrolments or learners who were promoted at the end of the previous year and continued school % Objective Level EMIS database Annual MOE Yes Pass Rate of JSC learners (grade 10) - Math - 47 Schools Percentage of learners achieving D or better in mathematics (at the 46 of the 47 schools that include 10th grade) % Objective Level DNEA Year 4, 5 MOE Pass Rate of JSC learners (grade 10) - Science - 47 Schools Percentage of learners achieving D or better in Physical and Life Science (at the 46 of the 47 schools that include 10th grade) % Objective Level DNEA Year 4, 5 MOE Pass Rate of JSC learners (grade 10) - English - 47 Schools Percentage of learners achieving D or better in English as a second language (at the 46 of the 47 schools that include 10th grade) % Objective Level DNEA Year 4, 5 MOE Pass Rate of NSSC learners (grade 12) - Math - 47 schools Percentage of learners achieving D or better in Math (at the 8 of the 47 schools that include 12th grade) % Objective Level DNEA Year 4, 5 MOE Pass Rate of NSSC learners (grade 12) - Science - 47 schools Percentage of learners achieving D or better in Physical and Life Science (at the 8 of the 47 schools that include 12th grade) % Objective Level DNEA Year 4, 5 MOE Pass Rate of NSSC learners (grade 12) - English - 47 schools Percentage of learners achieving D or better in English as a second language (at the 8 of the 47 schools that include 12th grade) % Objective Level DNEA Year 4, 5 MOE Teacher qualification - 47 schools % of teachers in the 47 schools who have a teacher qualification of Code 4, 5, or 6 for Professional Qualification in the Annual Education Census % Outcome Level EMIS database Year 4, 5 MOE Code 4 is defined as: completion of grade 12 and 3-4 years of tertiary education after Grade 12; Code 5 is defined as: post-graduate teacher diploma; Code 6 is defined as: post-graduate degree. % disbursed against construction, rehabilitation and equipment contracts for 47 schools The aggregate amount disbursed divided by all signed contracts for education facility works and/or equipping. Denominator = Value of signed contracts for educational facility works/equipping as defined above. Numerator = Amount of money disbursed on the signed contracts for education facility works/equipping. This is a proxy indicator for physical completion of education facility works. However, since the numerator includes industry standard advance payments and mobilization fees, it does not correlate perfectly with physical progress. % Process Cumulative 17

18 Value of signed contracts for construction, rehabilitation and equipment for 47 schools Value of signed contracts, in US Dollars, for educational facility construction or rehabilitation and/or equipping (e.g. information technology, desks and chairs, electricity and lighting, water systems, girl s latrines, etc.). If the value of the contract changes, the amount of the change (either + or -) should be reported in the quarter that the change occurred. Cost sharing by others (e.g., co financing by other donors or government) should not be included. US$ mil Process Cumulative Value disbursed against construction, rehabilitation and equipment contracts for 47 schools Actual value disbursed against the contracts for construction, rehabilitation and equipment for 47 schools US$ mil Process Cumulative % disbursed against design/supervisory contracts for 47 schools The amount disbursed against signed contracts for Design/ services % Process Cumulative Value of signed contracts for design/supervisory services for 47 schools The value of all contracts that have signed with contractors for design/supervisory services US$ mil Process Cumulative Value disbursed against design/supervisory contracts for 47 schools Actual value disbursed against the contracts for construction, rehabilitation and equipment for 47 schools US$ mil Process Cumulative Educational facilities constructed, rehabilitated, equipped in the 47 schools sub-activity Number of unique educational facilities constructed, rehabilitated, and / or equipped according to standards stipulated in MCA contracts signed with implementers. # Output Cumulative Firm Reports Annually Firm Number of students (any level) participating in the 47 schools subactivity Cumulative number of unique students enrolled or participating in educational programs in the 47 schools. # Output Cumulative EMIS database Annually MOE Yes Yes* *) If practicable Vocational Training Average income of people employed, or ranges of incomes, and disaggregated by sector Average income of vocational training programme graduates per sector N$ Outcome level M&E Survey Bi-annual Yes Yes Targets TBD pending baseline survey. No. of trainees who secure 6 months of income during the 12 months' period after course completion for Vocational Education graduates (disaggregated by COSDEC, VTC, private provider, and other) Income has been secured (formal, informal and self-employment) for at least 6 months during the 1st year after course completion. # trainees Objective Level M&E Survey Bi-annual Yes Yes Targets TBD pending baseline survey. 18

19 Total net enrolment (disaggregated by COSDEC, VTC, private service provider) Net number of unique students (headcount) who enroll in one or more courses in the academic year # Outcome Level NTA Annual NTA Yes Yes Number of COSDEC, VTC and NTA staff trained in admin/management Number of COSDEC, VTC and NTA staff who participate in management and/or administrative training # Output Cumulative Yes COSDEC Consultant / TA contract signed COSDEC Consultant / TA contract signed Date Process Level Once, when Compliance rate for National Training Fund Levy % of firms paying the annual levy out of total firms participating % Outcome Level Collecting Agency Year 3, 4, 5 NTA Targets TBD pending more detailed structure of the fund. Value of Vocational Training Grants Awarded through the Grant Facility Amount of grant agreements signed with training services providers using grant facility US$ Output incremental NTA Targets may be adjusted pending more detailed information on and development of the grant facility. Value of Vocational Training Grants Awarded through the NTF Levy and Facility Amount of grant agreements signed with training services providers using NTF Levy US$ Output incremental NTA Number of Vocational Trainees assisted through the Grant Facility Number of Vocational Trainees assisted through the Grant Facility # trainees Output incremental NTA Yes Yes Targets may be adjusted pending more detailed information on and development of the grant facility. Number of Vocational Trainees assisted through the NTF levy Number of Vocational Trainees assisted through the NTF Training Fund Levy # trainees Output incremental NTA Yes Yes NTF Levy collection system operational Date Process Level NTA Once, when NTA Contract signed for NTA Advisor Date Process Level Once Total number of COSDECS Number of COSDECs fully and operational # of COSDECs Output Cumulative Firm Reports Firm 19

20 % disbursed against construction, rehabilitation and equipment contracts for COSDECs The aggregate amount disbursed divided by all signed contracts for education facility works and/or equipping. Denominator = Value of signed contracts for educational facility works/equipping as defined above. Numerator = Amount of money disbursed on the signed contracts for education facility works/equipping. This is a proxy indicator for physical completion of education facility works. However, since the numerator includes industry standard advance payments and mobilization fees, it does not correlate perfectly with physical progress. % Process Cumulative Value of signed contracts for construction, rehabilitation and equipment for COSDECs Value of signed contracts, in US Dollars, for educational facility construction or rehabilitation and/or equipping (e.g. information technology, desks and chairs, electricity and lighting, water systems, girl s latrines, etc.). If the value of the contract changes, the amount of the change (either + or -) should be reported in the quarter that the change occurred. Cost sharing by others (e.g., co financing by other donors or government) should not be included. US$ mil Process Cumulative Value disbursed against construction, rehabilitation and equipment contracts for COSDECs Actual value disbursed against the contracts for construction, rehabilitation and equipment for COSDECs US$ mil Process Cumulative % disbursed against design/supervisory contracts for COSDECs The amount disbursed against signed contracts for Design/ services % Process Cumulative Value of signed contracts for design/supervisory services for COSDECs The value of all contracts that have signed with contractors for design/supervisory services US$ mil Process Cumulative Value disbursed against design/supervisory contracts for COSDECs Actual value disbursed against the contracts for construction, rehabilitation and equipment for COSDECs US$ mil Process Cumulative Number of beneficiaries from the vocational training sub-activity who have training. The total number of students who complete vocational training and graduate with formal certifications awarded through the vocational training sub-activity Cumulative NTA Annually NTA Yes Yes Textbooks 20

21 Learner-Textbook Ratio of 1 to 1 - disaggregated by Science, Maths and English Percentage of schools that have a Learner - Textbook Ratio of 1 to 1 for Science, Math and English books for all grades % Outcome Level For baseline, data will be provided through the Textbook Baseline Survey commissioned in Sept 2009; from 2010/11 EMIS will report on textbook coverage Years 1-5 for Yr 1; MOE/EMIS for Yr2-5 Learner-Textbook Ratio of 1 to 2 - disaggregated by Science, Maths and English Percentage of schools that have a Learner - Textbook Ratio of 1 to 2 for Science, maths and English books for all grades % Outcome Level Years 1-5 Number of textbooks delivered Number of textbooks funded by delivered to schools # of textbooks Output Level Year 1, 4, 5 Number of teachers and managers trained in textbook management, utilization and storage Total number of teachers and managers who have received textbook management, utilisation and storage training from the MOE regional inspectors # trained Output incremental MOE MOE Yes Yes Textbook management/utilisation training report received from Contractor. Date Process Date MOE Once when Textbook storage plan complete Training materials and training plan for textbook usage and storage training is and ready for use Date Process Date MOE/ Once when First textbook procurement contract signed Date Process Date Once when Textbook baseline study Date Process Date Once when Regional Study and Resource Centres Number of library loans of books and learning and study materials from assisted RSRCs Number of books and materials library loans per year in assisted libraries # of library loans Outcome Level MOE, starting when construction MOE 21

22 Number of visits to assisted RSRCs Number of visits per year to assisted RSRCs # of visits Outcome incremental MOE, starting once construction MOE Yes This indicator includes gross number of visits, and is not for net unique number of visitors (i.e., a person who visits a library more than once may be counted twice) Number of RSRCs & open for visitors Number of RSRCs open for visitors # of RSRCs Outcome Cumulative MOE/ Annually MOE % disbursed against construction, rehabilitation and equipment contracts for RSRCs The aggregate amount disbursed divided by all signed contracts for education facility works and/or equipping. Denominator = Value of signed contracts for educational facility works/equipping as defined above. Numerator = Amount of money disbursed on the signed contracts for education facility works/equipping. This is a proxy indicator for physical completion of education facility works. However, since the numerator includes industry standard advance payments and mobilization fees, it does not correlate perfectly with physical progress. % Process Cumulative Value of signed contracts for construction, rehabilitation and equipment for RSRCs Value of signed contracts, in US Dollars, for educational facility construction or rehabilitation and/or equipping (e.g. information technology, desks and chairs, electricity and lighting, water systems, girl s latrines, etc.). If the value of the contract changes, the amount of the change (either + or -) should be reported in the quarter that the change occurred. Cost sharing by others (e.g., co financing by other donors or government) should not be included. US$ mil Process Cumulative Value disbursed against construction, rehabilitation and equipment contracts for RSRCs Actual value disbursed against the contracts for construction, rehabilitation and equipment for RSRCs US$ mil Process Cumulative % disbursed against design/supervisory contracts for RSRCs The amount disbursed against signed contracts for Design/ services % Process Cumulative Value of signed contracts for design/supervisory services for RSRCs The value of all contracts that has signed with contractors for design/supervisory services US$ mil Process Cumulative Value disbursed against design/supervisory contracts for RSRCs Actual value disbursed against the contracts for construction, rehabilitation and equipment for RSRCs US$ mil Process Cumulative Tertiary Finance and HAMU 22

23 Indicators, baselines, and targets for the Tertiary Finance and HAMU activities will be determined in the September 2010 M&E Plan revision. Tourism Project Indicator Definition Unit Level Classification Source Frequency Responsible Party Gender Disaggregation Vulnerability Disaggregation Notes Multiple Activities Number of leisure tourist arrivals Total number of leisure tourist arrivals recorded per annum # of arrivals Objective Level NTB, communication to CT, May 2009 Annually in Year 3, 4, 5 NTB Targets are based on a 7.8% annual increase over the next several years, as estimated in the NTB business plan. The number of leisure tourists is determined based on the following percentages of total arrivals: 50% RSA; 30% Angola; 70% other Africa; 70% Europe; 90% other countries. Reporting on this indicator will be disaggregated by place of origin. Jobs created through tourism Number of direct jobs created in the last 12 months within the tourism industry by companies involved in travel and tourism activities, such as hospitality, lodging, food service, equipment rental, guiding, sport hunting, airlines, etc., as defined by NTB # Objective Level NTB Annually in Year 3, 4, 5 NTB Yes Yes Targets are based on an estimated 7% - 9% annual increase as per NTB business plan. Outstanding Issues: indicator is TBD as we don't know the number of new jobs in 2008 (previous figure of 20K was total jobs - new and existing); and we need to determine if these figures exclude government agencies / supplier company employments? Levy Income Total bed levies collected N$ Objective Level NTB bed-levy data Annually in Year 3, 4, 5 NTB 7% increase - The higher increase in years 1 & 2 only is due to expansion of existing levy to other categories, anticipated price increases and fluctuation of the currency. However, from year 3, the levy income will increase at 7% as per NTB business plan Etosha National Park Etosha National Park Gross Revenue Annual total gross revenue generated by ENP, including gate receipts and concession fees N$ Outcome Level MET Annually in Year 3, 4, 5 MET Numbers of visitors to Etosha National Park Annual number of visitors to Etosha National Park # of visitors Outcome Level ENP park entry records in Year 3, 4, 5 MET Ratio of junior staff to senior staff assigned to western area of park Ratio of junior staff to senior staff assigned to the western area of the park # junior staff/ # senior staff Outcome Level MET Annually in Year 3, 4, 5 MET 23

MCA Namibia. MCA Namibia Programme. Implementation Modalities & Project Activities Implementation. July 2009

MCA Namibia. MCA Namibia Programme. Implementation Modalities & Project Activities Implementation. July 2009 MCA Namibia MCA Namibia Programme Implementation Modalities & Project Activities Implementation July 2009 Project Objectives 1 Improve the quality of the workforce by enhancing the equity and effectiveness

More information

Narrative Report for Quarterly Disbursement Package 1 October to 31 December 2010

Narrative Report for Quarterly Disbursement Package 1 October to 31 December 2010 MILLENNIUM CHALLENGE ACCOUNT NAMIBIA Narrative Report for Quarterly Disbursement Package 1 October to 31 December 2010 Introduction This is the 4 th and final Disbursement Request for Fiscal Year 2010.

More information

Narrative Report for Quarterly Disbursement Package 1 July to 30 September 2010

Narrative Report for Quarterly Disbursement Package 1 July to 30 September 2010 MILLENNIUM CHALLENGE ACCOUNT NAMIBIA Narrative Report for Quarterly Disbursement Package 1 July to 30 September 2010 Introduction This is the fourth report being submitted by MCA-N since entry into force

More information

4/1/2014-6/30/ /1/ /31/2013 1/1/2013-3/31/2013 4/1/2013-6/30/2013 7/1/2013-9/30/2013 1/1/2014-3/31/2014

4/1/2014-6/30/ /1/ /31/2013 1/1/2013-3/31/2013 4/1/2013-6/30/2013 7/1/2013-9/30/2013 1/1/2014-3/31/2014 Detailed Financial Plan - Commitments 2 3 4 5 6 7 21 22 23 26 27 28 29 3 Country: Namibia Accountable Entity: Compact Number: COM7NAM91 Date Submitted: 9 March 212 Cumulative Current Period Next Period

More information

Total Quarter Quarter 14 Quarter 15 Quarter 16 Quarter 17 Quarter 18 Quarter 19 Quarter 20 CIF Year Year 1 Year 2 Year 3 Year 4 Year 5

Total Quarter Quarter 14 Quarter 15 Quarter 16 Quarter 17 Quarter 18 Quarter 19 Quarter 20 CIF Year Year 1 Year 2 Year 3 Year 4 Year 5 Detailed Financial Plan - Commitments 2 3 4 5 6 7 23 26 27 28 29 3 COM7NAM91 Date Submitted: 21 September 212 Forecasted Commitments for -> Cumulative Current Next TOTAL TOTAL Varience Actual Cumulative

More information

MCA Namibia. Millennium Challenge Account Namibia

MCA Namibia. Millennium Challenge Account Namibia reducing poverty through economic growth Millennium Challenge Account Dear Reader The Millennium Challenge Account (-N) is a large-scale development programme to reduce poverty through economic growth.

More information

Consultancy to Develop the Model Guidelines for Child-Centred Emergency and Disaster Risk Management in Caribbean Schools and Adaptation Guide

Consultancy to Develop the Model Guidelines for Child-Centred Emergency and Disaster Risk Management in Caribbean Schools and Adaptation Guide 1 The Caribbean Disaster Emergency Management Agency REQUEST FOR PROPOSALS RFP #: UNICEF/9070/17 Consultancy to Develop the Model Guidelines for Child-Centred Emergency and Disaster Risk Management in

More information

MILLENNIUM CHALLENGE ACCOUNT NAMIBIA

MILLENNIUM CHALLENGE ACCOUNT NAMIBIA MILLENNIUM CHALLENGE ACCOUNT NAMIBIA LIVESTOCK MARKET EFFICIENCY FUND (LMEF FUND) GRANT MANUAL May 2011 MCA-N LMEF Grant Manual i Acronyms and Initialisms GEC GM GRN LMEF MAWF MCA-N MCC NCAs TER US Grant

More information

DISBURSEMENT REQUEST. Namibia MCA Namibia 28-Jul-08 GR07NAM07001 MCA Namibia Emerging Markets Group Ltd. 11-Mar-09 1-Apr Jun USD

DISBURSEMENT REQUEST. Namibia MCA Namibia 28-Jul-08 GR07NAM07001 MCA Namibia Emerging Markets Group Ltd. 11-Mar-09 1-Apr Jun USD DISBURSEMENT REQUEST FORM OF CIF DISBURSEMENT REQUEST Country Projects Compact Date/ CIF Letter Agreement Date CIF Number Accountable Entity Fiscal Agent Request Date Disbursement Period Beginning Date

More information

ALLEGHENY COUNTY RESIDENTIAL FINANCE AUTHORITY REQUEST FOR PROPOSALS. Analysis of Housing Markets in Allegheny County

ALLEGHENY COUNTY RESIDENTIAL FINANCE AUTHORITY REQUEST FOR PROPOSALS. Analysis of Housing Markets in Allegheny County ALLEGHENY COUNTY RESIDENTIAL FINANCE AUTHORITY 1. SECTION ONE. GENERAL INFORMATION 1.1. Purpose of the Request for Proposals. The purpose of this Request for Proposals ( RFP ) is to engage a Proposer to

More information

INVITATION TO BID. ITB-214/17 Rehabilitation and Reconstruction of Fallujah Bridge Anbar Governorate, Iraq

INVITATION TO BID. ITB-214/17 Rehabilitation and Reconstruction of Fallujah Bridge Anbar Governorate, Iraq INVITATION TO BID ITB-214/17 Rehabilitation and Reconstruction of Fallujah Bridge Anbar Governorate, Iraq Volume III Submission Forms & Contract Documentation Section 4 - Section 5 - Section 6 - Section

More information

Procurement of Consulting Services' Direct Purchase

Procurement of Consulting Services' Direct Purchase STANDARD PROCUREMENT DOCUMENT Procurement of Consulting Services' Direct Purchase [For Assignments of value up to 0.15 Million] Issued by: Government of Nepal Ministry of Cooperatives and Poverty Alleviation

More information

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4293-TA Public Disclosure Authorized Financing Agreement (Zanzibar Basic Education Improvement Project) between Public Disclosure Authorized THE

More information

OFFICIAL DOCUMENTS. Global Partnership for Education Fund Grant Agreement

OFFICIAL DOCUMENTS. Global Partnership for Education Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER TF0A4619 Public Disclosure Authorized Public Disclosure Authorized Global Partnership for Education Fund Grant Agreement (Additional Financing

More information

LEGEND. Challenge Fund Application Guidelines

LEGEND. Challenge Fund Application Guidelines LEGEND Challenge Fund Application Guidelines 24 th November, 2015 1 Contents 1. Introduction... 3 2. Overview of Challenge Fund... 3 2.1 Expected results... 3 2.2 Potential grantees... 4 2.3 Window structure...

More information

PAKISTAN CIVIL AVIATION AUTHORITY REQUEST FOR PROPOSAL ENERGY PERFORMANCE CONTRACT AT JINNAH INTERNATIONAL AIRPORT

PAKISTAN CIVIL AVIATION AUTHORITY REQUEST FOR PROPOSAL ENERGY PERFORMANCE CONTRACT AT JINNAH INTERNATIONAL AIRPORT PAKISTAN CIVIL AVIATION AUTHORITY REQUEST FOR PROPOSAL ENERGY PERFORMANCE CONTRACT AT JINNAH INTERNATIONAL AIRPORT DISCLAIMER The information contained in this Request for Proposal (RFP) document or information

More information

To enable you to prepare a proposal for this assignment, please find attached the following documents:

To enable you to prepare a proposal for this assignment, please find attached the following documents: Call for Proposals Date: 17 January 2018 Request to submit a written technical and financial proposal for an assignment with STEP on: Bursary Program for Non-formal Skills Development Training Program

More information

Terms of Reference for end of project evaluation

Terms of Reference for end of project evaluation Terms of Reference for end of project evaluation Young Entrepreneurs Program in the Eastern Caribbean (YEPEC), 2012 2015 Youth Business International (YBI) seeks the services of a skilled evaluation consultant

More information

SACU/012/2018/O. Consultancy for the provision of Website Revamping, Hosting and Maintenance Services for the Southern African Customs Union (SACU)

SACU/012/2018/O. Consultancy for the provision of Website Revamping, Hosting and Maintenance Services for the Southern African Customs Union (SACU) SACU/012/2018/O Consultancy for the provision of Website Revamping, Hosting and Maintenance Services for the Southern African Customs Union (SACU) CLOSING DATE AND TIME 01 December 2017 (13h00 Namibian

More information

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA.

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4201-ET Public Disclosure Authorized Financing Agreement (Rural Capacity Building Project) Public Disclosure Authorized between FEDERAL DEMOCRATIC

More information

Terms of Reference Ref: PN/FJI

Terms of Reference Ref: PN/FJI Terms of Reference Ref: PN/FJI-039-19 Empowered Lives. Resilient Nations. Private Sector Engagement consultant to undertake an assessment of Private Sector Engagement for the Implementation of the SDGs

More information

Selection of Consultants

Selection of Consultants STANDARD REQUEST FOR PROPOSALS FOR Selection of Consultants Small Time-Based and Lump-Sum Assignments Public Procurement Authority Accra, Ghana April, 2014 Table of Contents INTRODUCTION... 1 Letter of

More information

1. Invitation. 2. Background

1. Invitation. 2. Background Critical Ecosystem Partnership Fund Call for Proposals Evaluation of Lessons Learned to Inform Reinvestment in the Caribbean Islands Biodiversity Hotspot Opening date: Friday, 8 December 2017 Closing date:

More information

Terms of Reference (TOR) for Independent End of Project Evaluation

Terms of Reference (TOR) for Independent End of Project Evaluation Terms of Reference (TOR) for Independent End of Project Evaluation Project Name Increasing the provision of clean energy in Uganda hereafter referred to as Clean Energy Project Project Number(s) ESARPO0218;

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 22.06.2015 Country: Description of the Assignment: Reference Code: Project Name: Turkey Evaluation of Concept Notes STSF/2015/IPA Future is in Tourism - Sustainable

More information

Republic of Latvia. Cabinet Regulation No. 50 Adopted 19 January 2016

Republic of Latvia. Cabinet Regulation No. 50 Adopted 19 January 2016 Republic of Latvia Cabinet Regulation No. 50 Adopted 19 January 2016 Regulations Regarding Implementation of Activity 1.1.1.2 Post-doctoral Research Aid of the Specific Aid Objective 1.1.1 To increase

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Public Disclosure Authorized CONFORMED COPY GPOBA GRANT NUMBER TF096551-BD Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Rural Electrification and Renewable Energy

More information

REQUEST FOR EXPRESSIONS OF INTEREST. AFRICAN DEVELOPMENT BANK Abidjan, Cote d Ivoire

REQUEST FOR EXPRESSIONS OF INTEREST. AFRICAN DEVELOPMENT BANK Abidjan, Cote d Ivoire REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK Abidjan, Cote d Ivoire Climate Change and Green Growth Department Africa Climate Change Fund (ACCF) E-mail: l.brown@afdb.org Telephone: +225

More information

2018 Corn Research and Education Request for Proposals

2018 Corn Research and Education Request for Proposals 2018 Corn Research and Education Request for Proposals Through the generous support of the NY Senate and Assembly, the New York Corn & Soybean Growers Association (NYCSGA) is pleased to announce their

More information

SEAI Research Development and Demonstration Funding Programme Budget Policy. Version: February 2018

SEAI Research Development and Demonstration Funding Programme Budget Policy. Version: February 2018 SEAI Research Development and Demonstration Funding Programme Budget Policy Version: February 2018 Contents Introduction... 2 Eligible costs... 2 Budget Categories... 3 Staff... 3 Materials... 3 Equipment...

More information

SEEDLING. Introduction of the UN Sustainable Development Goals in Schools in South Eastern Europe. Small Grants Programme. Call for Proposals

SEEDLING. Introduction of the UN Sustainable Development Goals in Schools in South Eastern Europe. Small Grants Programme. Call for Proposals SEEDLING Introduction of the UN Sustainable Development Goals Small Grants Programme Call for Proposals October 2017 SUMMARY Donor: Implementing agency: Topic: Total amount available for all beneficiary

More information

REQUEST FOR PROPOSALS 11 th August, A Strategy for the Atlantic Canadian Aerospace and Defence Sector for a Long-term Development Plan

REQUEST FOR PROPOSALS 11 th August, A Strategy for the Atlantic Canadian Aerospace and Defence Sector for a Long-term Development Plan REQUEST FOR PROPOSALS 11 th August, 2017 A Strategy for the Atlantic Canadian Aerospace and Defence Sector for a Long-term Development Plan Page 1 of 14 Table of Contents 1.0 Introduction... 3 2.0 Contracting

More information

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE Office of Climate Change Guyana September, 2017 TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE ENERGY AUDIT OF PUBLIC INSTITUTIONS, FACILITIES AND STREET LIGHTING

More information

OF THE REPUBLIC OF NAMIBIA. N$5.20 WINDHOEK - 20 September 2010 No. 4565

OF THE REPUBLIC OF NAMIBIA. N$5.20 WINDHOEK - 20 September 2010 No. 4565 GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA N$5.20 WINDHOEK - 20 September 2010 No. 4565 CONTENTS Page GOVERNMENT NOTICE No. 215 Social Security Development Fund Regulations: Social Security Act, 1994...

More information

FEDERAL MINISTRY OF HEALTH NATIONAL TUBERCULOSIS AND LEPROSY CONTROL PROGRAMME TERMS OF REFERENCE FOR ZONAL CONSULTANTS MARCH, 2017

FEDERAL MINISTRY OF HEALTH NATIONAL TUBERCULOSIS AND LEPROSY CONTROL PROGRAMME TERMS OF REFERENCE FOR ZONAL CONSULTANTS MARCH, 2017 FEDERAL MINISTRY OF HEALTH NATIONAL TUBERCULOSIS AND LEPROSY CONTROL PROGRAMME EPIDEMIOLOGICAL ANALYSIS OF TUBERCULOSIS BURDEN AT NATIONAL AND SUB NATIONAL LEVEL (EPI ANALYSIS SURVEY) TERMS OF REFERENCE

More information

ITALIAN EGYPTIAN DEBT FOR DEVELOPMENT SWAP PROGRAMME PHASE 3

ITALIAN EGYPTIAN DEBT FOR DEVELOPMENT SWAP PROGRAMME PHASE 3 Ambasciata d Italia Il Cairo Ministry of International Cooperation ITALIAN EGYPTIAN DEBT FOR DEVELOPMENT SWAP PROGRAMME PHASE 3 Civil Society Component CALL FOR PROPOSALS Projects implemented by Egyptian

More information

Belmont Forum Collaborative Research Action:

Belmont Forum Collaborative Research Action: Belmont Forum Collaborative Research Action: SCIENCE-DRIVEN E-INFRASTRUCTURES INNOVATION (SEI) FOR THE ENHANCEMENT OF TRANSNATIONAL, INTERDISCIPLINARY, AND TRANSDISCIPLINARY DATA USE IN ENVIRONMENTAL CHANGE

More information

Request for Proposals (RFP)

Request for Proposals (RFP) Request for Proposals (RFP) The provision of services to undertake RECP assessment at an Agro-Processing company located in Swellendam, Western Cape on behalf of the CSIR RFP No. 780/14/08/2017 Date of

More information

MINISTRY OF EDUCATION AND HUMAN RESOURCES DEVELOPMENT DRAFT POLICY STATEMENT AND GUIDELINES FOR GRANTS TO EDUCATION AUTHORITIES IN SOLOMON ISLANDS

MINISTRY OF EDUCATION AND HUMAN RESOURCES DEVELOPMENT DRAFT POLICY STATEMENT AND GUIDELINES FOR GRANTS TO EDUCATION AUTHORITIES IN SOLOMON ISLANDS MINISTRY OF EDUCATION AND HUMAN RESOURCES DEVELOPMENT DRAFT POLICY STATEMENT AND GUIDELINES FOR GRANTS TO EDUCATION AUTHORITIES IN SOLOMON ISLANDS 24th of October 2008 Table of contents Abbreviations...

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: Energy Efficiency Project Development Specialist Project Name : Advancing Indonesia s Lighting Market to High Efficient Technologies (ADLIGHT) Reports to:

More information

Department of Agriculture, Environment and Rural Affairs (DAERA)

Department of Agriculture, Environment and Rural Affairs (DAERA) Department of Agriculture, Environment and Rural Affairs (DAERA) Guidance for the implementation of LEADER Cooperation activities in the Rural Development Programme for Northern Ireland 2014-2020 Please

More information

STATUTORY INSTRUMENTS SUPPLEMENT No th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT

STATUTORY INSTRUMENTS SUPPLEMENT No th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT STATUTORY INSTRUMENTS SUPPLEMENT No. 18 24th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT to The Uganda Gazette No. 45, Volume CIX, dated 24th June, 2016 Printed by UPPC, Entebbe, by Order of the Government.

More information

Rwanda Dairy Development Project. Negotiated financing agreement

Rwanda Dairy Development Project. Negotiated financing agreement Document: EB 2016/118/R.19/Sup.1 Agenda: 11(b)(ii) Date: 31 August 2016 Distribution: Public Original: English E Republic of Rwanda Rwanda Dairy Development Project Negotiated financing agreement Executive

More information

Toolbox for the collection and use of OSH data

Toolbox for the collection and use of OSH data 20% 20% 20% 20% 20% 45% 71% 57% 24% 37% 42% 23% 16% 11% 8% 50% 62% 54% 67% 73% 25% 100% 0% 13% 31% 45% 77% 50% 70% 30% 42% 23% 16% 11% 8% Toolbox for the collection and use of OSH data 70% These documents

More information

Guidelines for the Virginia Investment Partnership Grant Program

Guidelines for the Virginia Investment Partnership Grant Program Guidelines for the Virginia Investment Partnership Grant Program Purpose: The Virginia Investment Partnership Grant Program ( VIP ) is used to encourage existing Virginia manufacturers or research and

More information

ACI AIRPORT SERVICE QUALITY (ASQ) SURVEY SERVICES

ACI AIRPORT SERVICE QUALITY (ASQ) SURVEY SERVICES DRAFTED BY ACI WORLD SECRETARIAT Table of Contents Table of Contents... 2 Executive Summary... 3 1. Introduction... 4 1.1. Overview... 4 1.2. Background... 5 1.3. Objective... 5 1.4. Non-binding Nature...

More information

FMO External Monitoring Manual

FMO External Monitoring Manual FMO External Monitoring Manual The EEA Financial Mechanism & The Norwegian Financial Mechanism Page 1 of 28 Table of contents 1 Introduction...4 2 Objective...4 3 The monitoring plan...4 4 The monitoring

More information

Competition #13 Request for Proposals Supported by SENA and the U.S. Department of State

Competition #13 Request for Proposals Supported by SENA and the U.S. Department of State Competition #13 Request for Proposals Supported by SENA and the U.S. Department of State Issuance Date: Deadline for Questions: Responses to Questions: Closing Date/Time: October 14, 2016 October 28, 2016.

More information

TRANSNATIONAL COOPERATION PROGRAMME INTERREG V-B BALKAN - MEDITERRANEAN CO-FINANCED BY THE EUROPEAN REGIONAL DEVELOPMENT FUND (ERDF)

TRANSNATIONAL COOPERATION PROGRAMME INTERREG V-B BALKAN - MEDITERRANEAN CO-FINANCED BY THE EUROPEAN REGIONAL DEVELOPMENT FUND (ERDF) 1 MANAGING AUTHORITY OF EUROPEAN TERRITORIAL COOPERATION PROGRAMMES Thessaloniki, 22-08-2016 Ref. No.: 300997/MA 3834 TRANSNATIONAL COOPERATION PROGRAMME INTERREG V-B BALKAN - MEDITERRANEAN 2014-2020 CO-FINANCED

More information

Request for Proposals to Identifying Gaps in Local Food Product Supply for Ontario Agri-Product Processors. Request Date: April 1, 2018

Request for Proposals to Identifying Gaps in Local Food Product Supply for Ontario Agri-Product Processors. Request Date: April 1, 2018 Request for Proposals to Identifying Gaps in Local Food Product Supply for Ontario Agri-Product Processors Request Date: April 1, 2018 Deadline: May 15, 2018, 12:00pm EST This is a Request for Proposals

More information

IMPACT REPORTING AND ASSESSMENT OFFICER IN SOUTH SUDAN

IMPACT REPORTING AND ASSESSMENT OFFICER IN SOUTH SUDAN Terms of Reference IMPACT REPORTING AND ASSESSMENT OFFICER IN SOUTH SUDAN BACKGROUND ON IMPACT AND REACH REACH was born in 2010 as a joint initiative of two International NGOs (IMPACT Initiatives and ACTED)

More information

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement GPOBA GRANT NUMBER TF092629 DOCUMENTS Global Partnership on Output-based Aid Grant Agreement (Extending Telecommunications in Rural Indonesia Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

Ingham Institute for Applied Medical Research Data Scientist Emergency Medicine Research Unit POSITION DESCRIPTION

Ingham Institute for Applied Medical Research Data Scientist Emergency Medicine Research Unit POSITION DESCRIPTION Ingham Institute for Applied Medical Research Data Scientist Emergency Medicine Research Unit POSITION DESCRIPTION Research Group: Status: Hours: Salary: Reports to: Emergency Medicine Research Unit Full-time

More information

Phnom Penh, Cambodia preferred, but work can be done remotely. Location : Application Deadline : July 20 th, Languages Required : English

Phnom Penh, Cambodia preferred, but work can be done remotely. Location : Application Deadline : July 20 th, Languages Required : English Consultancy to prepare a Funding Proposal draft for the Project Climate-Smart Landscapes Network to mitigate and adapt to climate change impacts in Cambodia. for the Green Climate Fund Location : Phnom

More information

Town of Derry, NH REQUEST FOR PROPOSALS PROFESSIONAL MUNICIPAL AUDITING SERVICES

Town of Derry, NH REQUEST FOR PROPOSALS PROFESSIONAL MUNICIPAL AUDITING SERVICES Town of Derry, NH Office of the Finance Department Susan A. Hickey Chief Financial Officer susanhickey@derrynh.org REQUEST FOR PROPOSALS PROFESSIONAL MUNICIPAL AUDITING SERVICES The Town of Derry, New

More information

UNESCO Dhaka Office. Directorate of Primary Education, Ministry of Primary and Mass Education 2 Bangladesh Bureau of Statistics

UNESCO Dhaka Office. Directorate of Primary Education, Ministry of Primary and Mass Education 2 Bangladesh Bureau of Statistics UNESCO Dhaka Office House : 122, Road : 01, Block : F Banani, Dhaka-1213, Bangladesh Tel : 9873210, 9862073 FAX : 9871150 URL : www.unesco.org/dhaka Email : dhaka@unesco.org Terms of Reference (ToR) for

More information

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies Energy Efficiency Act Promulgated, SG No. 98/14.11.2008, effective 14.11.2008, supplemented, SG No. 6/23.01.2009, effective 1.05.2009, amended, SG No. 19/13.03.2009, effective 10.04.2009, supplemented,

More information

CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA

CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA European Union/Council of Europe Programmatic Cooperation Framework (PCF) for Armenia, Azerbaijan, Georgia, Moldova, Ukraine

More information

REQUEST FOR CONSULTANCY SERVICES INDIVIDUAL CONTRACT (IC) CODE: MEXX Evaluator (Crime Expert) Senior Specialist

REQUEST FOR CONSULTANCY SERVICES INDIVIDUAL CONTRACT (IC) CODE: MEXX Evaluator (Crime Expert) Senior Specialist REQUEST FOR CONSULTANCY SERVICES INDIVIDUAL CONTRACT (IC) CODE: MEXX35-2017-008 Evaluator (Crime Expert) Senior Specialist Organization: United Nations Office on Drugs and Crime Project: Location: Estimated

More information

Request for Proposals (RFP)

Request for Proposals (RFP) Request for Proposals (RFP) RFP Number: AMD-015 Issuance Date: February 4, 2017 Deadline for Offers: February 20, 2017 Description: For: Funded By: Implemented By: Point of Contact: Gender Sensitization

More information

CALL FOR EXPRESSION OF INTEREST Applicants who have already applied for this position do not need to re-apply

CALL FOR EXPRESSION OF INTEREST Applicants who have already applied for this position do not need to re-apply CALL FOR EXPRESSION OF INTEREST Applicants who have already applied for this position do not need to re-apply Title: Expert Duty Station: Doha, Qatar Reference: UNWTO/HHRR/CFE/07/TECO/2018 Start date:

More information

STANDARD GRANT APPLICATION FORM 1 REFERENCE NUMBER OF THE CALL FOR PROPOSALS: 2 TREN/SUB

STANDARD GRANT APPLICATION FORM 1 REFERENCE NUMBER OF THE CALL FOR PROPOSALS: 2 TREN/SUB STANDARD GRANT APPLICATION FORM 1 PROGRAMME CONCERNED: 2 ACTIONS IN THE FIELD OF URBAN MOBILITY REFERENCE NUMBER OF THE CALL FOR PROPOSALS: 2 TREN/SUB 02-2008 [Before filling in this form, please read

More information

Request for Proposals for Identifying Regional Opportunities for Local Production. Request Date: April 1, Deadline: May 15, 2018, 12:00pm EST

Request for Proposals for Identifying Regional Opportunities for Local Production. Request Date: April 1, Deadline: May 15, 2018, 12:00pm EST Request for Proposals for Identifying Regional Opportunities for Local Production Request Date: April 1, 2018 Deadline: May 15, 2018, 12:00pm EST This is a Request for Proposals only. AMI is not obligated

More information

FIAL Project Fund Program

FIAL Project Fund Program FIAL Project Fund Program Programme Guidelines Contents 1. What is the Fund Programme?..Page 2 2. Eligibility Criteria...Page 3 2.1. Consortium Eligibility.Page 3 2.2. Project Eligibility... Page 3 2.3.

More information

South Western Emergency Research Institute

South Western Emergency Research Institute Data Scientist South Western Emergency Research Institute POSITION DESCRIPTION Research Group: South Western Emergency Research Institute Status: Full-time for one (1) year with extension subject to funding

More information

Partnerships for sustainable energy- How to realise the full potential of the Champion District Partnership in rural Uganda

Partnerships for sustainable energy- How to realise the full potential of the Champion District Partnership in rural Uganda CALL FOR PROPOSALS FOR A CONSULTANCY: Partnerships for sustainable energy- How to realise the full potential of the Champion District Partnership in rural Uganda 1 Background In the beginning of 2012,

More information

Strategic Transportation Infrastructure Program

Strategic Transportation Infrastructure Program Strategic Transportation Infrastructure Program Guidelines Community Airport Program Local Road Bridge Program Resource Road Program Local Municipal Initiatives Updated: September 2017 Government STIP

More information

SOLICITATION FOR PROPOSALS: Website design and content creation

SOLICITATION FOR PROPOSALS: Website design and content creation National Estuary Program Puget Sound Marine and Nearshore Grant Program SOLICITATION FOR PROPOSALS: Website design and content creation December 1, 2014 WEBSITE DESIGN AND CONTENT CREATION SOLICITATION

More information

TERMS OF REFERENCE HEALTH PLANNING SPECIALISTS FOR PREPARATION OF DETAILED PLAN AND ACTIONS TO IMPLEMENT MSDS, SMPs and SOPs for HEALTH

TERMS OF REFERENCE HEALTH PLANNING SPECIALISTS FOR PREPARATION OF DETAILED PLAN AND ACTIONS TO IMPLEMENT MSDS, SMPs and SOPs for HEALTH TORs for SP02 Health Minimum Services Delivery Standards Office: Tel: Fax: Email: 37 Sarwar Road Lahore Cantt., Pakistan +92 (0) 42 6603123 +92 (0) 42 6603124 info.pdssptama@gmail.com pd.pdssp@gmail.com

More information

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696 The World Bank INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION 1818 H Street N.W. Washington, D.C. 20433 U.S.A. (202) 473-1000 Cable Address: INTBAFRAD Cable

More information

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN REQUEST FOR PROPOSAL (RFP) #1314-15 CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN Request for Proposal must be received no later than January 3, 2014 at 2:00 pm CARRI MATSUMOTO

More information

Programme guide for Round 6 (November 2017)

Programme guide for Round 6 (November 2017) Programme guide for Round 6 (November 2017) 1 Publication code: BBO1A(2) Further copies available from: Email general.enquiries@biglotteryfund.org.uk Phone 0345 4 10 20 30 Text Relay 18001 plus 0845 4

More information

The projects interventions will be implemented at national level, as well as at local level commune/city.

The projects interventions will be implemented at national level, as well as at local level commune/city. 1. Background ROMANIA Integrated Nutrient Pollution Control Project (INPCP) Terms of Reference for Consulting services for ex-ante, mid-term and final impact assessment, including social surveys Romania

More information

Request for Proposals. Housing Study Consulting Services. Proposals DUE: January 6, City of Grandview. Economic Development Department

Request for Proposals. Housing Study Consulting Services. Proposals DUE: January 6, City of Grandview. Economic Development Department Request for Proposals Housing Study Consulting Services Proposals DUE: January 6, 2017 City of Grandview Economic Development Department Leonard Jones, Mayor Cory Smith, City Administrator REQUEST FOR

More information

3. Assignment Duration The Consultant will be engaged in the period October May 2016 in total of up to 30 working days.

3. Assignment Duration The Consultant will be engaged in the period October May 2016 in total of up to 30 working days. Terms of Reference Consultancy Services for monitoring and quality assurance of the process of Development and Implementation of the Business Planning Model for Water Utilities 1. Introduction Water Utilities

More information

Invitation For Tender

Invitation For Tender Invitation For Tender 28 June 2013 Dear Sirs Phase Two of the Sustainable Natural Rubber Project The (IRSG) is an inter-governmental organisation recognised as an international body located in Singapore,

More information

Kenya Seed Company limited

Kenya Seed Company limited Kenya Seed Company limited REQUEST FOR PROPOSAL TENDER REF: KSC/RFP /SP/01/2017 CONSULTANCY SERVICE FOR DEVELOPMENT OF A STRATEGIC PLAN FOR KENYA SEED COMPANY LTD FINANCIAL YEAR 2018/19-2022/2023 TENDER

More information

INTERNATIONAL AGRICULTURE AND FORESTRY EXPERT TERMS OF REFERENCE

INTERNATIONAL AGRICULTURE AND FORESTRY EXPERT TERMS OF REFERENCE INTERNATIONAL AGRICULTURE AND FORESTRY EXPERT TERMS OF REFERENCE Country/Location: UNDP Office, Vientiane, Lao PDR Description of assignment: Short Term to develop the Environmental Impact Assessment Agriculture

More information

CooperantesCaixa. RULES FOR NGOs CALL FOR APPLICATIONS 2018

CooperantesCaixa. RULES FOR NGOs CALL FOR APPLICATIONS 2018 RULES FOR NGOs ----------------- CALL FOR APPLICATIONS 2018 1. WHAT IS COOPERANTESCAIXA? CooperantesCaixa is the international corporate volunteer programme of la Caixa Banking Foundation. Over the past

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF TF GRANT NUMBER TF097126 Public Disclosure Authorized Global Environment Facility Grant Agreement (Financing Energy Efficiency at MSMEs Project) Public Disclosure

More information

NGO Programme - Greece EEA Financial Mechanism APPLICATION FORM FOR THE OUTCOME DEMOCRATIC VALUES, INCLUDING HUMAN RIGHTS, PROMOTED

NGO Programme - Greece EEA Financial Mechanism APPLICATION FORM FOR THE OUTCOME DEMOCRATIC VALUES, INCLUDING HUMAN RIGHTS, PROMOTED NGO Programme - Greece EEA Financial Mechanism 2009-2014 APPLICATION FORM FOR THE OUTCOME DEMOCRATIC VALUES, INCLUDING HUMAN RIGHTS, PROMOTED Athens September 2014 1 Before filling in the application,

More information

Guidelines to Consultant

Guidelines to Consultant Guidelines to Consultant For Expression of Interest For Selection of System Integrator (SI) for Integrated Financial Management Information System (IFMIS) Implementation (NEA/CS/QCBS/PD-5) Client: Country:

More information

Request for Proposal Number #512-11

Request for Proposal Number #512-11 Request for Proposal Number #512-11 Traffic and Transportation Feasibility Study Due: January 24, 2012 at 4:00pm Buyer: Steve Boyd Purchasing and Contracts Manager 831 Grand Avenue Glenwood Springs, CO

More information

Australian Medical Council Limited

Australian Medical Council Limited Australian Medical Council Limited Procedures for Assessment and Accreditation of Specialist Medical Programs and Professional Development Programs by the Australian Medical Council 2017 Specialist Education

More information

MANCOSA BURSARY FUND Information Pack 2018

MANCOSA BURSARY FUND Information Pack 2018 MANCOSA BURSARY FUND Information Pack 2018 MANCOSA recognises the changing needs of dynamic economies and is committed to skills and training development in Southern Africa. Education is the proven means

More information

Refer to section 2.C. for more information on the evaluation criteria.

Refer to section 2.C. for more information on the evaluation criteria. SOLARIZE RALEIGH PILOT PROGRAM DRAFT Request for Proposals from Installers of Residential Solar Photovoltaic Systems Proposed Posting Date: February 4, 2014 I. OPPORTUNITY SUMMARY: The North Carolina Solar

More information

Life Sciences Tax Incentive Program

Life Sciences Tax Incentive Program Life Sciences Tax Incentive Program Solicitation No. 2017 TAX-01 Program Manager: Cheryl Sadeli, Vice President of Finance Questions: Taxprogram@masslifesciences.com Solicitation Issued: December 4, 2017

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 2 June 2017 Country: Thailand Description of the assignment: Graphic Designer (3 Positions) Duty Station: Home- based with possible travel to countries in

More information

For: Approval. Note to Executive Board representatives. Document: EB 2017/LOT/G.18 Date: 27 November Focal points:

For: Approval. Note to Executive Board representatives. Document: EB 2017/LOT/G.18 Date: 27 November Focal points: Document: EB 2017/LOT/G.18 Date: 27 November 2017 Distribution: Public Original: English E President s report on a proposed grant under the country-specific window to the Technical Centre for Agricultural

More information

CLARIFICATIONS ON ISSUES RAISED BY BIDDERS ON RFP FOR DESIGN AND DELEOPMENT OF A WEB-BASED ROAD MANAGEMENT SYSTEM

CLARIFICATIONS ON ISSUES RAISED BY BIDDERS ON RFP FOR DESIGN AND DELEOPMENT OF A WEB-BASED ROAD MANAGEMENT SYSTEM 1. Clause 2.3.4., sec (i) pg 6 A brief description of the firm s organization and an outline of recent experience on assignments of a similar nature. As per our understanding, similar assignment refers

More information

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following.

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following. Note: Bank solar home systems projects receiving grant funds from the Global Environment Facility (GEF) are normally required to have their records and accounts audited by an independent entity each fiscal

More information

Somalia Growth, Enterprise, Employment & Livelihoods (GEEL) Project

Somalia Growth, Enterprise, Employment & Livelihoods (GEEL) Project Annual Program Statement (APS) Call for Applications to Participate in Economic Growth and Employment Partnerships Gums and Resins and Natural Products sector Growth, Enterprise, Employment & Livelihoods

More information

CALL FOR PROPOSALS. Dissemination activities for the Council of Europe Reference Framework of Competences for Democratic Culture. Reference 2018/RFCDC

CALL FOR PROPOSALS. Dissemination activities for the Council of Europe Reference Framework of Competences for Democratic Culture. Reference 2018/RFCDC CALL FOR PROPOSALS Dissemination activities for the Council of Europe Reference Framework of Competences for Democratic Culture Reference 2018/RFCDC Project Awarding entity Reference Framework of Competences

More information

JOB ADVERTISEMENT. Eastern and Southern Africa Higher Education Centers of Excellence Project (ACE II) 1. Project Background

JOB ADVERTISEMENT. Eastern and Southern Africa Higher Education Centers of Excellence Project (ACE II) 1. Project Background Eastern and Southern Africa Higher Education Centers of Excellence Project (ACE II) 1. Project Background JOB ADVERTISEMENT Launched in October 2016 and financed by the World Bank, the ACE II Project supports

More information

Request for Proposals (RFP) The provision of Media Monitoring and Analyses services to the CSIR. RFP No. 770/09/06/2017

Request for Proposals (RFP) The provision of Media Monitoring and Analyses services to the CSIR. RFP No. 770/09/06/2017 Request for Proposals (RFP) The provision of Media Monitoring and Analyses services to the CSIR RFP No. 770/09/06/2017 Date of Issue Monday, 29 May 2017 Closing Date Friday, 09 June 2017 Place Tender box,

More information

Request for Quotations. Annotated Bibliography on Gender Sensitive Child Protection

Request for Quotations. Annotated Bibliography on Gender Sensitive Child Protection Request for Quotations Annotated Bibliography on Gender Sensitive Child Protection Main Facts Table RFQ reference FY18-036 - Annotated Bibliography on Gender Sensitive Child Protection RFQ launch date

More information

ACCENTURE SKILLING FOR CHANGE PROJECT SHORT TERM MONITORING AND EVALUATION CONSULTANCY TERMS OF REFERENCE

ACCENTURE SKILLING FOR CHANGE PROJECT SHORT TERM MONITORING AND EVALUATION CONSULTANCY TERMS OF REFERENCE ACCENTURE SKILLING FOR CHANGE PROJECT SHORT TERM MONITORING AND EVALUATION CONSULTANCY TERMS OF REFERENCE Cherie Blair Foundation for Women Registered Charity No 1125751 PO Box 60519, London W2 7JU T:

More information

GRANT APPLICATION FORM for investment grants (INV GAF)

GRANT APPLICATION FORM for investment grants (INV GAF) IDENTITY OF THE PROJECT 1 Blending Facility WBIF 2 Grant Number/code 3 Date of Steering Committee 4 Sector(s) 5 CRS-code 6 Beneficiary country 7 Name of project 8 Lead International Financial Institution

More information

Section 5: Technical Proposal- Standard Forms

Section 5: Technical Proposal- Standard Forms Section 5: Technical Proposal- Standard Forms Form 5A. Form 5B. Form 5C. Form 5D. Form 5E. Form 5F. Technical Proposal submission form General Information Summary of case examples provided in support of

More information

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing Technical Assistance Report Project Number: 51022-001 Knowledge and Support Technical Assistance (KSTA) December 2017 People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction

More information