1 Action Fiche for Paraguay (Annex I) Title/Number Support to the economic integration of the Paraguayan rural sector No CRIS: DCI-ALA/2010/22009 Total cost 5,100,000 EU Contribution: 4,000,000 Contribution of Paraguay: 1,000,000 Contribution Beneficiaries of Support Fund: 100,000 Aid method / Method of implementation Project approach partially decentralised DAC-code Sector Agricultural policy and administrative management 1. RATIONALE 1.1. Sector context The Paraguayan economy largely depends on agriculture and livestock, mainly the production and export of soybeans, cereals, oil, cotton and beef (25% of the GDP). For this reason, exports remain vulnerable to climate and fluctuations of international commodity prices. The main market is MERCOSUR with 48% of the total exports, followed by the European Union with 8%. According to a recent survey 1, one of the key elements that hinder agriculture and forestry competitiveness is "weak application of quality criteria at different stages of the production chain". The Government of Paraguay implemented several activities to enhance competitiveness, addressing, in particular, sectors with high export potential. The Plan Estratégico Económico y Social (PEES) established enhancement of competitiveness and improvement of the business and investment climate as one of the pillars for economic growth. Within the framework of the Plan Nacional de Exportación 2004, the Ministry of Industry and Commerce created, with the support of several donors, a network assembling investors and exporters, REDIEX, as well as 8 sector-oriented working groups. The Ventanilla Única del Exportador (VUE) that aims to simplify export processes constitutes an important tool in facilitating export operations. The Ministry of Agriculture and Livestock promotes Livestock and Farm Development, as well as the Development of Agricultural Competitiveness through the Strategic Framework for Agriculture 2009/ Lessons learnt The Project picks up in part where the initiatives of the Project on Strengthening the Competitiveness of the Paraguayan Export Sector (FOCOSEP ALA/PY/2004/16713) left off. Indeed, the identification of this Project has partly been based on the conclusions and recommendations of the different monitoring and evaluation missions that took place as part of FOCOSEP. One of the main reasons for the difficulties encountered in implementing FOCOSEP was the lack of knowledge and previous experience of EU contractual and financial procedures by the Beneficiary. Therefore, technical assistance has been foreseen again in this Project. 1 American Institute for Cooperation on Agriculture, 2008 EN 1 EN

2 Another weakness was the lack of coordination between international donors and the Government, in particular on agricultural issues. With the recent creation of the round table on agriculture, chaired by the Ministry itself (see 2.4), this problem should be solved and coordination should be reinforced. FOCOSEP has performed well at the level of institutions and clusters, but did not fully reach the producers. In addition, the strengthening of the National Animal Quality and Health Service SENACSA capacities was strongly focused on beef and not other meat production. Therefore, this project seeks to concentrate on activities in a way to reach directly the producers of poultry, swine and dairy products and to reinforce the capacities of SENACSA to provide assistance to these sectors. Finally, FOCOSEP has contributed to the National Agriculture and Livestock Census through which the country has been able to update its data on swine, poultry and dairy production. These data will enable the Government can implement, with this Project's support, a National Sanitary Plan for Poultry and Swine Complementary actions This action will be complementary to the project of Support to the Economic Integration of Paraguay (ALA/PY/2007/19481), financed by the EU for an amount of 6 million. This project aims to strengthen institutional capacity to deal with the challenges of globalisation and increase and diversify external trade through the adoption of simplified customs procedures, providing assistance to overcome Technical Barriers to Trade (TBT) and increase the capacity of private companies to address external trade requirements. The project covers four areas of intervention: (1) Trade Facilitation (TF) through the simplification of export and import procedures, (2) setting of strategies to tackle TBT and Non-Tariff Barriers (NTB), (3) innovation, including the strengthening of quality certification systems for companies and (4) coordination. EU-MERCOSUR initiatives like cooperation for the harmonisation of veterinary and phyto-sanitary norms and procedures, food safety and differentiated agricultural and livestock production, and AL- INVEST IV, will complement this project. Additionally, the Government is implementing several projects in order to increase Paraguayan export capacity Donor coordination In line with the Declaration of Paris, which has recently been signed by Paraguay, this project aims to promote and strengthen existing national entities responsible for the execution of the project in order to guarantee ownership and sustainability. In November 2009, the Round table for External Technical and Financial Cooperation in the Agricultural Sector was created by Presidential Decree. This coordination stage is presided over by the Ministry of Agriculture and Livestock. Its main objective is to coordinate, rationalise and prioritise external technical and financial cooperation in the context of the Strategic Framework for Agriculture. Finally, one of the expected results of the project is public-public and public-private coordination. This component will also increase the coordination among donors and projects in order to avoid overlapping of activities and to increase the impact of the funds. 2. DESCRIPTION 2.1. Objectives The overall objective of the Project is to contribute to the economic integration of the Paraguayan rural sector. The specific objective is the improvement of Paraguayan livestock production competitiveness EN 2 EN

3 by strengthening the producers' capacities as well as the institutions involved, and fostering production chains and/or clusters, with the objective of meeting national and international market requirements Expected results and main activities The Project has three expected results: 1. Support to producers' capacities: Competitive livestock producers are integrated into production chains and/or clusters. 2. Institutional capacity-building: Public institutions responsible for livestock development, capacity-building, technical assistance and the application of sanitary controls are equipped and strengthened in order to tackle challenges in national and international markets. 3. Strengthening of public private and public public partnerships: Public-private and publicpublic sectors execute actions in a coordinated way to improve competitiveness and to ensure market access for livestock products. The main activities to obtain these results are: For result 1: Training and capacity-building of producers on new technologies, norms, hygienic and sanitary measures, negotiation tools, cost analysis, etc. Exchange of experiences and best practices through field visits, participation in national and international fairs. Long-term technical assistance on technical issues, such as the implementation of adequate production systems, as well as on administrative and financial issues. Short-term consultation to improve sectoral competitiveness. Technological innovation through training, capacity-building, improved technologies, etc. through the implementation of a Support Fund (Calls for Proposals). Studies. For result 2: Purchase of equipment for the laboratories of SENACSA and staff training to diagnose certain diseases. Training and capacity-building of the staff of the Vice Minister of Livestock and other public departments involved in the project. Exchange of experiences and best practices through field visits. Short-term consultation on public policy making and institutional positioning. Reinforcement of the Centros Demostrativos of the Vice Minister of Livestock to promote good practices in the livestock sector. EN 3 EN

4 For result 3: Coordination activities to formalise the dialogue between public institutions, private sector and universities to meet the expectations of the producers, guaranteeing sustainability of the project activities. Joint drafting committee to establish production protocols, etc. Studies that contribute to the improvement of quality control, market studies to understand the specific needs of the market. Risks and assumptions Risks: Risks are associated with the outbreak of any disease that could close the border for export animal products with negative economic consequences for producers. The aim of the Project is to strengthen the capacity of SENACSA in order to reduce this risk. Institutional instability could delay the implementation of the activities foreseen in the Project. Since the Project will contribute to the implementation of the Strategic Framework for Agriculture, which was agreed by several actors from public and private sectors and authorities at regional level, it is expected that institutional instability will only marginally affect the implementation of the project. Finally, the failure of tenders for services, supplies and works could end with no acquisition of important resources for the project. To mitigate this risk, technical assistance is expected to aid in the drafting of tender dossiers. The political decision to implement the actions foreseen in the Strategic Framework for Agriculture and the functioning of the round table for coordination will contribute to the achievement of the project's results Crosscutting Issues The Project will take into account the national and international legislation concerning environmental issues. Producers, processors and traders will follow and implement the norms and resolutions derived from The Secretariat of Environment. In addition, all the producers and the industries must have a study of environmental impact approved by the competent authority before the start up of action. In addition, actions of mitigation and adaptation to climate change are expected. Gender equality will be promoted through encouraging women's participation, in particular, in the call for proposals that will be launched to support producers' organisations. Good governance will be strengthened through the formalisation of sector activities and the improvement of technical sanitary and tax inspections Stakeholders The project aims to improve the competitiveness of small and medium scale producers, organised in committees, unions, non-profit associations and/or cooperatives, that have a minimum productive infrastructure but a high growth potential, and are located in the Departments of Central, Cordillera, Paraguarí, Caaguazú, Itapúa, and Alto Paraná. These are the main departments that produce and process poultry, swine and dairy, the products that are of interest to this Project. The Vice Minister of Livestock is responsible for the execution of the Project and therefore one of the main stakeholders. Other offices of the Ministry involved in the execution of the project are: the Directorate of Research and Animal Production, the Directorate for Agriculture Education, the Directorate for Commercialisation, and the Directorate for Agriculture Extension. Other stakeholders are: the External Technical and Financial Cooperation Desk for Agricultural and Rural Development, the National Animal Quality and Health Service (SENACSA), the Ministry of EN 4 EN

5 Industry and Commerce, the Technical Planning Secretariat, and the National Competitiveness Strategy Promotion Organisation (ONPEC). The municipalities will also be involved in the activities. All these stakeholders have been involved in the identification and formulation of this project through meetings and workshops and have approved the objectives, results and activities. 3. IMPLEMENTATION ISSUES 3.1. Method of implementation Partial decentralised management through the signature of a financing agreement with the Republic of Paraguay. The Commission controls ex ante all the procurement procedures except in cases where programme estimates are applied, under which the Commission applies ex ante control for procurement contracts > 50,000 EUR and may apply ex post for procurement contracts 50,000 EUR. The Commission controls ex ante the contracting procedures for all grant contracts. Payments are executed by the Commission except in cases where programmes estimates are applied, under which payments are executed by the beneficiary country for operating costs and contracts up to the ceilings indicated in the table below. The responsible Authorising Officer ensures that, by using the model of financing agreement for decentralised management, the segregation of duties between the authorising officer and the accounting officer or of the equivalent functions within the delegated entity will be effective, so that the decentralisation of the payments can be carried out for contracts up to the ceilings specified below. Works Supplies Services Grants < 300,000 EUR < 150,000 EUR < 200,000 EUR 100,000 EUR The project management is integrated to the internal structure of the institution responsible for the execution of the project, in order to ensure adequate ownership of its various components. In accordance to the Agreement signed among the parties and the EU procedures, the Beneficiary will appoint the project team, which will have autonomy in the execution of all aspects of the project. An Administrator and an Accounting Officer will be appointed for the Project management by the representative of the beneficiary country. Technical Assistance (TA) will be recruited according to EU procedures. The TA experts will integrate the project team Procurement and grant award procedures/programme estimates All contracts implementing the action must be awarded and implemented in accordance with the procedures and standard documents laid down and published by the Commission for the implementation of external operations, in force at the time of the launch of the procedure in question. The essential selection and award criteria for the award of grants are laid down in the Practical Guide to contract procedures for EU external actions. The maximum possible rate of co-financing for grants is 90%. Full financing may only be applied in the cases provided for in Article 253 of the Commission Regulation (EC, Euratom) No 2342/2002 of 23 December 2002 laying down detailed rules for the implementation of the Financial Regulation applicable to the general budget of the European Union. Participation in the award of contracts for the present action shall be open to all natural and legal persons covered by Regulation 1905/2006 of 18 December Further extensions of this EN 5 EN

6 participation to other natural or legal persons by the concerned authorising officer shall be subject to the conditions provided for in articles 31(7) and (8) Development Cooperation Instrument. All programme estimates must respect the procedures and standard documents laid down by the Commission, in force at the time of the adoption of the programme estimates in question Budget and calendar The duration of the project will be of 42 months (operational period of 36 months and a closure phase of 6 months). Item EU % Beneficiary % Other Benef. Total (Euro) 1. SERVICES 1,130, , ,210, Technical Assistance 1.2 Training, capacity-building, exchange of experiences 2. GRANTS (Support Fund)* 3. SUPPLIES 4. WORKS 5. COMMUNICATION AND VISIBILITY 6. RUNNING COSTS 6.1 Staff 6.2 Other running costs 7. INCIDENTALS 8. MONITORING, EVALUATION and AUDIT TOTAL 830, , , , ,000 1,000, ,000 1,100, , , , , , , , , , , , , , , , , , ,000 4,000,000 1,000, ,000 5,100,000 *For this Support Fund, Calls for proposals will be organised. They will enable non-profit organizations, such as unions, producer associations, chambers, universities, cooperatives, etc., to present proposals coherent with the objectives of the project. Such projects must foresee a financial contribution of maximum 10% of the total cost of the action Performance monitoring The programme will establish an internal monitoring system for each area. Specific indicators beyond those identified in the Logical framework (annex 1 of Technical and Administrative Provisions) will be identified in the course of the preparation of the programme estimates. The following are some of the Objectively Verifiable Indicators (OVIs): Overall objective: to contribute to the economic integration of the Paraguayan rural sector. By the end of the project's implementation, 20% increase of exports of swine, poultry and dairy. Specific objective: to improve Paraguayan livestock production competitiveness. By the end of the project, 20% increase of the volume of the production which provides the national market. EN 6 EN

7 Result 1: Competitive livestock producers are integrated into production chains and/or clusters By the end of the project, 30% increase of number of producers who providing raw material to processing plants. Result 2: Public institutions responsible for livestock development, capacity-building, technical assistance and the application of sanitary controls. By the end of the project, 3 national sanitary related projects implemented. Result 3: Public-private and public-public sectors execute actions in a coordinated way to improve competitiveness and to ensure market access for livestock products. By the end of the project, 3 sectoral action plans defined and implemented in coordination. The project's degree of progress and the fulfilment of its objectives and results will be internally regularly monitored. Ad-hoc monitoring reports will be prepared and distributed to all the stakeholders. Regardless of this monitoring, the Commission may carry out external monitoring missions (ROM) whose reports will be shared and evaluated in conjunction with the involved institutions Evaluation and audit The Project budget will cover the costs of mid-term and final evaluation missions and possibly an ex post mission. If necessary, complementary missions will be carried out at the request of the Commission or in agreement with the beneficiary. Evaluation missions will be carried out by teams of independent experts. The Beneficiary and the Commission will assess the conclusions and recommendations of the midterm evaluation and will agree on the follow-up to be given to such conclusions and recommendations and on the adjustments they may raise, including, where appropriate, the re-orientation of the project. Reports from other evaluation and supervision missions will be handed to the Beneficiary in order to take into account any recommendation that may result from such missions. The Internal Audit Directorate of the concerned Ministries will ensure internal control of the management operations. The national institution for independent external audit is the Controloría General de la República (CGR). External audits provided in the national legislation will be carried out by the national institutional responsible for independent external audit. The Beneficiary will also carry out a final audit during the closing phase. The results from this audit will be submitted to the Commission along with Project Final Report. The Audit Final Report will not include any reservations. In addition to these reports, the European Commission will carry out its own audit missions, in particular of each programme estimate Communication and visibility The Project team will follow the indications of the EU Visibility Guidelines for External Action. Communication, information, publicity, public relations, and other visibility actions will be carried out to value and make the Project known. A budget of 120,000 will be reserved for such actions. Each Program Estimate will include a detailed action plan for communication and visibility activities. This plan will be submitted, for prior approval to the Delegation. EN 7 EN

Action Fiche for Jordan

Action Fiche for Jordan Action Fiche for Jordan 1. IDENTIFICATION Title/Number Total cost Reinforce and expand the modernisation of the services sector in Jordan (ENPI/2011/23205) EU Contribution : EUR 15 million Jordan Contribution:

More information

Project Action Fiche for TRTA/PSD III

Project Action Fiche for TRTA/PSD III Project Action Fiche for TRTA/PSD III 1. IDENTIFICATION Title/Number Trade Related Technical Assistance Programme, Private Sector Development Phase Three (TRTA/PSD III) CRIS No. ASIE/2010/022-378 Total

More information

III. The provider of support is the Technology Agency of the Czech Republic (hereafter just TA CR ) seated in Prague 6, Evropska 2589/33b.

III. The provider of support is the Technology Agency of the Czech Republic (hereafter just TA CR ) seated in Prague 6, Evropska 2589/33b. III. Programme of the Technology Agency of the Czech Republic to support the development of long-term collaboration of the public and private sectors on research, development and innovations 1. Programme

More information

SERBIA. Preparatory measures for full participation in Erasmus+ INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

SERBIA. Preparatory measures for full participation in Erasmus+ INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 SERBIA Preparatory measures for full participation in Erasmus+ Action Summary This action will facilitate the Serbia s harmonisation with the

More information

Joint Operational Programme Romania Republic of Moldova

Joint Operational Programme Romania Republic of Moldova Joint Operational Programme Romania Republic of Moldova 2014-2020 Procedure for the evaluation and approval of large infrastructure projects selected through direct award Abbreviations CBC Cross Border

More information

STDF MEDIUM-TERM STRATEGY ( )

STDF MEDIUM-TERM STRATEGY ( ) STDF MEDIUM-TERM STRATEGY (2012-2016) 1. This Medium-Term Strategy sets outs the principles and strategic priorities that will guide the work of the Standards and Trade Development Facility (STDF) and

More information

Incentive Guidelines Network Support Scheme (Assistance for collaboration)

Incentive Guidelines Network Support Scheme (Assistance for collaboration) Incentive Guidelines Network Support Scheme (Assistance for collaboration) Issue Date: 5th April 2011 Version: 1.4 Updated: 20 th March 2014 http://support.maltaenterprise.com Contents Incentive Guidelines

More information

CAPACITIES PROVISIONAL 1 WORK PROGRAMME 2007 PART 2. (European Commission C(2006) 6849) RESEARCH FOR THE BENEFIT OF SMES

CAPACITIES PROVISIONAL 1 WORK PROGRAMME 2007 PART 2. (European Commission C(2006) 6849) RESEARCH FOR THE BENEFIT OF SMES PROVISIONAL 1 WORK PROGRAMME 2007 CAPACITIES PART 2 RESEARCH FOR THE BENEFIT OF SMES (European Commission C(2006) 6849) 1 This provisional work programme is subject to formal confirmation following the

More information

Strengths and weaknesses: existing veterinary legislation

Strengths and weaknesses: existing veterinary legislation Strengths and weaknesses: existing veterinary legislation Zimbabwe: (Website) Animal Health Act Established: 1961 2001 - Authority to organize import and export - Authority to appoint officers - Definitions

More information

EUROPEAID/127054/C/SER/multi REQUEST N 2011/269413/1

EUROPEAID/127054/C/SER/multi REQUEST N 2011/269413/1 SPECIFIC TERMS OF REFERENCE PRISM Formulation Part II, Support in Identification of Potential Hosts for a Pro-Poor Private Sector Development FWC BENEFICIARIES 2009 - LOT N 10 - Trade, Standards and Private

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE SPECIFIC PROGRAMME "ISEC" (2007-2013) PREVENTION OF AND FIGHT AGAINST CRIME CALL FOR PROPOSALS JUST/2013/ISEC/DRUGS/AG Action grants Targeted call on cross

More information

ANNEX 2: Action Fiche for Tonga

ANNEX 2: Action Fiche for Tonga ANNEX 2: Action Fiche for Tonga 1. IDENTIFICATION Title/Number Rehabilitation of the health sector in Niuatoputapu (CRIS 022-583) Total cost 1,495,000: 1,375,000 (B envelope National Indicative Programme)

More information

WORK PROGRAMME 2012 CAPACITIES PART 2 RESEARCH FOR THE BENEFIT OF SMES. (European Commission C (2011)5023 of 19 July)

WORK PROGRAMME 2012 CAPACITIES PART 2 RESEARCH FOR THE BENEFIT OF SMES. (European Commission C (2011)5023 of 19 July) WORK PROGRAMME 2012 CAPACITIES PART 2 RESEARCH FOR THE BENEFIT OF SMES (European Commission C (2011)5023 of 19 July) Capacities Work Programme: Research for the Benefit of SMEs The available budget for

More information

Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants

Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants Table of Contents INTRODUCTION... 1 1. Who can apply for STDF funding?... 1 2. What type of

More information

Standard Project Fiche for Phare 2005

Standard Project Fiche for Phare 2005 Standard Project Fiche for Phare 2005 1. Basic Information 1.1 CRIS Number BG2005/017-454.02.01 1.2 Title: Integrated support for economic development and promotion of employment 1.3 Sector: Regional development/cbc

More information

( ) Page: 1/24. Committee on Subsidies and Countervailing Measures SUBSIDIES

( ) Page: 1/24. Committee on Subsidies and Countervailing Measures SUBSIDIES 14 July 2017 (17-3798) Page: 1/24 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL NOTIFICATION PURSUANT TO ARTICLE XVI:1 OF THE GATT 1994 AND ARTICLE 25 OF THE

More information

COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document. Proposals for a

COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document. Proposals for a EUROPEAN COMMISSION Brussels, 7.6.2018 SWD(2018) 308 final COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT Accompanying the document Proposals for a REGULATION OF THE EUROPEAN

More information

GRANT APPLICATION FORM for investment grants (INV GAF)

GRANT APPLICATION FORM for investment grants (INV GAF) IDENTITY OF THE PROJECT 1 Blending Facility WBIF 2 Grant Number/code 3 Date of Steering Committee 4 Sector(s) 5 CRS-code 6 Beneficiary country 7 Name of project 8 Lead International Financial Institution

More information

Council of the European Union Brussels, 24 February 2015 (OR. en)

Council of the European Union Brussels, 24 February 2015 (OR. en) Council of the European Union Brussels, 24 February 2015 (OR. en) 6527/15 SAN 52 SOC 96 OUTCOME OF PROCEEDINGS From: General Secretariat of the Council To: Delegations Subject: Working Party on Public

More information

Support for regional and local communities to prevent drug addiction on the local level - continuation

Support for regional and local communities to prevent drug addiction on the local level - continuation - continuation 1. Basic information 1.1. CRIS Number: 2006/018-180.05-04 Twinning No: PL/06/IB/JH/04/TL 1.2. Title: Support for regional and local communities to prevent drug addiction on the local level

More information

Annex 1. Support to Water and Sanitation in Swaziland (SWASS)

Annex 1. Support to Water and Sanitation in Swaziland (SWASS) Annex 1 1. IDENTIFICATION Title/Number Swaziland Support to Water and Sanitation in Swaziland (SWASS) SZ/FED/22695 Total cost Total cost approximately: EUR 12 000 000 EU contribution: EUR 12 000 000 19%

More information

Operational Programme Enterprise and Innovation for Competitiveness (OP EIC)

Operational Programme Enterprise and Innovation for Competitiveness (OP EIC) Operational Programme Enterprise and Innovation for Competitiveness 2014 2020 (OP EIC) Sharing the first experiences with the opening of the 2014 2020 programming period JUDr. Ing. Tomáš Novotný, Ph.D.

More information

COMMUNICATION STRATEGY

COMMUNICATION STRATEGY COMMUNICATION STRATEGY Final version Approved by the Monitoring Committee on 30 March 2016 Final version, 30 March 2016 page 2 of 16 INDEX 1 Introduction 4 1.1 Legal background 4 2 Responsibilities of

More information

Civil Society and local authorities thematic programme South Africa- CSO call for proposals

Civil Society and local authorities thematic programme South Africa- CSO call for proposals This is the presentation done at the information session on 27 January 2016 in Pretoria. Only the information provided the Call for proposals guidelines and the annexes documents constitute the sole authentic

More information

CALL FOR PROPOSALS FOR THE CREATION OF UP TO 25 TRANSFER NETWORKS

CALL FOR PROPOSALS FOR THE CREATION OF UP TO 25 TRANSFER NETWORKS Terms of reference CALL FOR PROPOSALS FOR THE CREATION OF UP TO 25 TRANSFER NETWORKS Open 15 September 2017 10 January 2018 September 2017 1 TABLE OF CONTENT SECTION 1 - ABOUT URBACT III & TRANSNATIONAL

More information

Raising social awareness and strengthening of advocacy and monitoring activities of NGOs

Raising social awareness and strengthening of advocacy and monitoring activities of NGOs Raising social awareness and strengthening of advocacy and monitoring activities of NGOs 1. Basic Information 1.1 CRIS Number: 2005/017-488.01.01 1.2 Title: Raising social awareness and strengthening of

More information

2 nd Project Progress Report

2 nd Project Progress Report Austrian Development Agency Zelinkagasse 1010 Vienna Austria phone: +43 (0)1 90399-0 fax: +43 (0)1 90399-1290 office@ada.gv.at www.entwicklung.at 2 nd Project Progress Report Project Progress Report Contract

More information

CAPACITIES WORK PROGRAMME PART 3. (European Commission C (2011) 5023 of 19 July 2011) REGIONS OF KNOWLEDGE

CAPACITIES WORK PROGRAMME PART 3. (European Commission C (2011) 5023 of 19 July 2011) REGIONS OF KNOWLEDGE WORK PROGRAMME 2012-2013 CAPACITIES PART 3 REGIONS OF KNOWLEDGE (European Commission C (2011) 5023 of 19 July 2011) Capacities Work Programme: Regions of Knowledge The work programme presented here provides

More information

Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations

Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations CALL FOR PROPOSALS Application Deadline: 22 September, 2009 This Call for Proposals is designed to pursue

More information

PL National Export Development Strategy

PL National Export Development Strategy PL01.01.06 National Export Development Strategy 1. Basic Information 1.1. Désirée Number: PL01.01.06 Twinning number: PL/IB/2001/EC/02 1.2. Title: National Export Development Strategy 1.3. Sector: Private

More information

RDP analysis: Measure 16 Cooperation M Other forms of cooperation

RDP analysis: Measure 16 Cooperation M Other forms of cooperation RDP analysis: Measure 16 M16.10 Other forms of cooperation In 2015, the Contact Point of the European Network for Rural Development (ENRD CP) carried out a broad analysis of the 2014-2020 Rural Development

More information

FAQs on PRIMA Calls PRIMA FAQ. Overview of PRIMA Programme

FAQs on PRIMA Calls PRIMA FAQ. Overview of PRIMA Programme FAQs on PRIMA Calls These FAQs provide guidance for applicants to PRIMA Calls for Proposals to supplement the information provided in the Call text and Call documents. The FAQs will be updated regularly

More information

EAC ProInvest TRINNEX workshop. Seminar on the EU-EAC Economic Partnership Agreement

EAC ProInvest TRINNEX workshop. Seminar on the EU-EAC Economic Partnership Agreement EAC ProInvest TRINNEX workshop Seminar on the EU-EAC Economic Partnership Agreement Kampala Nov 30th Dec 1st Pro Invest is an EU-ACP programme that provides technical and financial support to organisations

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 16.10.2014 C(2014) 7489 final COMMISSION IMPLEMENTING DECISION of 16.10.2014 laying down rules for the implementation of Decision No 1313/2013/EU of the European Parliament

More information

ITALIAN EGYPTIAN DEBT FOR DEVELOPMENT SWAP PROGRAMME PHASE 3

ITALIAN EGYPTIAN DEBT FOR DEVELOPMENT SWAP PROGRAMME PHASE 3 Ambasciata d Italia Il Cairo Ministry of International Cooperation ITALIAN EGYPTIAN DEBT FOR DEVELOPMENT SWAP PROGRAMME PHASE 3 Civil Society Component CALL FOR PROPOSALS Projects implemented by Egyptian

More information

ACP-EU Joint Parliamentary Assembly The EU blending mechanism: Experiences of KfW development bank

ACP-EU Joint Parliamentary Assembly The EU blending mechanism: Experiences of KfW development bank ACP-EU Joint Parliamentary Assembly The EU blending mechanism: Experiences of KfW development bank Brussels, 17 March 2016 Christoph Gabriel Krieger Regional Manager, West Africa and Madagascar KfW Development

More information

Latin America Investment Facility (LAIF)

Latin America Investment Facility (LAIF) Latin America Investment Facility (LAIF) 1 Background Latin American countries present an expenditure in infrastructures of approximately 2% of their GDP (except: Chile 6 % and Colombia 4%), that is barely

More information

Action Fiche. 1. IDENTIFICATION Title/Number Support for European business in South East Asian markets Indonesia component SEBSEAM-INDONESIA

Action Fiche. 1. IDENTIFICATION Title/Number Support for European business in South East Asian markets Indonesia component SEBSEAM-INDONESIA ANNEX 1 Action Fiche 1. IDENTIFICATION Title/Number Support for European business in South East Asian markets Indonesia component SEBSEAM-INDONESIA CRIS No: ICI-ASIE/2012/22525 Total cost Total Cost :

More information

ANNEXES. to the COMMISSION DELEGATED REGULATION (EU).../...

ANNEXES. to the COMMISSION DELEGATED REGULATION (EU).../... Ref. Ares(2018)4937331-26/09/2018 EUROPEAN COMMISSION Brussels, XXX SANTE/10193/2017 ANNEX CIS Rev. 1 (POOL/G4/2017/10193/10193R1-EN ANNEX CIS.doc) [ ](2018) XXX draft ANNEXES 1 to 2 ANNEXES to the COMMISSION

More information

Annex to Small scale Study PES Business Models COUNTRY FICHE: PORTUGAL. PES NAME: The Employment and Vocational Training Institute (IEFP)

Annex to Small scale Study PES Business Models COUNTRY FICHE: PORTUGAL. PES NAME: The Employment and Vocational Training Institute (IEFP) COUNTRY FICHE: PORTUGAL PES NAME: The Employment and Vocational Training Institute (IEFP) Basic organisational model Type of organisation/relation to government IEFP is a free-of-charge public service

More information

INTERREG ATLANTIC AREA PROGRAMME CITIZENS SUMMARY

INTERREG ATLANTIC AREA PROGRAMME CITIZENS SUMMARY 2014-2020 CITIZENS SUMMARY May 2017 What is the INTERREG Atlantic Area Programme? Territorial cooperation has been an opportunity for the less dynamic regions to establish connections with more dynamic,

More information

Frequently Asked Questions

Frequently Asked Questions Fast Track to Innovation Pilot (2015) Call opening: January 6, 2015 First Cut-off Date: April 29, 2015 Frequently Asked Questions Official European Commission document December 2014 Contents A. Eligibility

More information

Mongolia and the EU. Political relations. Economic and trade relations. Thursday, 12 May, :59

Mongolia and the EU. Political relations. Economic and trade relations. Thursday, 12 May, :59 Thursday, 12 May, 2016-14:59 Mongolia and the EU This page gives an outline of the political, economic and trade relations between the European Union and Mongolia. Information about scientific cooperation

More information

CALL FOR THEMATIC EXPERTS

CALL FOR THEMATIC EXPERTS CALL FOR THEMATIC EXPERTS Call addressed to individuals for the establishment of a roster of prospective independent experts for the assessment of project proposals in the Interreg CENTRAL EUROPE Programme

More information

CEI Know-how Exchange Programme (KEP) KEP AUSTRIA Call for Proposals 2011

CEI Know-how Exchange Programme (KEP) KEP AUSTRIA Call for Proposals 2011 CEI Know-how Exchange Programme (KEP) KEP AUSTRIA Call for Proposals 2011 Date of publication: 12 January 2011 Deadline for submission of applications: 11 March 2011 1 1. BACKGROUND INFORMATION The Central

More information

URBACT III Programme Manual

URBACT III Programme Manual URBACT III Programme Manual Fact Sheet 2B Implementation Networks Table of contents Fact Sheet 2B 1. Main objectives and expected results... 1 2. Network s development... 3 3. Partnership... 4 4. Activities

More information

Republic of Latvia. Cabinet Regulation No. 50 Adopted 19 January 2016

Republic of Latvia. Cabinet Regulation No. 50 Adopted 19 January 2016 Republic of Latvia Cabinet Regulation No. 50 Adopted 19 January 2016 Regulations Regarding Implementation of Activity 1.1.1.2 Post-doctoral Research Aid of the Specific Aid Objective 1.1.1 To increase

More information

Assessment of Erasmus+ Sports

Assessment of Erasmus+ Sports Background paper N 3 February 2015 Assessment of Erasmus+ Sports The Erasmus+ Sport programme has been launched in 2014. The results of the first call for proposals are now published. 302 organisations

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

Harmonizing national legislation on Food Safety

Harmonizing national legislation on Food Safety OIE 12th Conference of the OIE Regional Commission for the Middle East Harmonizing national legislation on Food Safety Alberto Mancuso Amman (Jordan) 23 September 2013 CONTENTS Evolution of food safety

More information

(Announcements) ADMINISTRATIVE PROCEDURES EUROPEAN COMMISSION

(Announcements) ADMINISTRATIVE PROCEDURES EUROPEAN COMMISSION 29.10.2014 EN Official Journal of the European Union C 383/5 V (Announcements) ADMINISTRATIVE PROCEDURES EUROPEAN COMMISSION CALL FOR PROPOSALS Support for information measures relating to the common agricultural

More information

Horizon ERA-NET Cofund actions

Horizon ERA-NET Cofund actions Horizon 2020 ERA-NET Cofund actions Jörg NIEHOFF DG Research & Innovation Dir. B Innovation Union and European Research Area Unit B2 ERA Policy and Reforms The presentation will cover: The Definition of

More information

EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME

EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME 2001-2002 EUROPEAN AGENCY FOR SAFETY AND HEALTH AT WORK EXECUTIVE SUMMARY IDOM Ingeniería y Consultoría S.A.

More information

Partner Declaration ITALY-CROATIA PROGRAMME

Partner Declaration ITALY-CROATIA PROGRAMME Partner Declaration ITALY-CROATIA PROGRAMME Before filling in the declaration with due care and attention, the Partner Organisation is requested to read the section D of the Programme Factsheet n. 4 Project

More information

Focusing and Integrating Community Research. 9. Horizontal Research Activities involving SMEs. Work Programme

Focusing and Integrating Community Research. 9. Horizontal Research Activities involving SMEs. Work Programme Annex 6 Focusing and Integrating Community Research 9. Horizontal Research Activities involving SMEs Work Programme 1 Table of Contents 9.1 INTRODUCTION...3 9.2 CO-OPERATIVE RESEARCH ( CRAFT )...3 9.2.1

More information

Contracting Authority: European Commission (EuropeAid) PRO INVEST. Guidelines for grant applicants

Contracting Authority: European Commission (EuropeAid) PRO INVEST. Guidelines for grant applicants Contracting Authority: European Commission (EuropeAid) PRO INVEST Guidelines for grant applicants Budget Line 8.ACP.TPS.108 8th European Development Fund Reference: EuropeAid/12739/C/ACT/Multi Deadline

More information

GUIDE FOR ACTION GRANTS 2015

GUIDE FOR ACTION GRANTS 2015 Guide for Action Grants 2015 Version: June 2015 EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE and CONSUMERS Directorate A Unit A4: Programme management GUIDE FOR ACTION GRANTS 2015 *** Justice Programme

More information

Horizon Support to Public-Public Partnershiups

Horizon Support to Public-Public Partnershiups Horizon 2020 Support to Public-Public Partnershiups Jörg NIEHOFF DG Research & Innovation Dir. B Innovation Union and European Research Area Unit B2 ERA Policy and Reform ERA-NET Cofund main features ERA-NET

More information

TABLE OF CONTENTS I.INTRODUCTION 2 II.PROGRESS UPDATE 4 III.FINANCIAL MANAGEMENT 7 IV. MOBILIZATION OF RESOURCES 11 V. OUTLOOK FOR

TABLE OF CONTENTS I.INTRODUCTION 2 II.PROGRESS UPDATE 4 III.FINANCIAL MANAGEMENT 7 IV. MOBILIZATION OF RESOURCES 11 V. OUTLOOK FOR ACCF I Annual Report 2015 TABLE OF CONTENTS I.INTRODUCTION 2 II.PROGRESS UPDATE 4 III.FINANCIAL MANAGEMENT 7 IV. MOBILIZATION OF RESOURCES 11 V. OUTLOOK FOR 2016 12 VI. ANNEXES 14 1 ACCF I Annual Report

More information

NOTE TO THE HEADS OF NATIONAL AGENCIES

NOTE TO THE HEADS OF NATIONAL AGENCIES * 4 ** * ír ťr ** it* EUROPEAN COMMISSION Directorate-General for Education and Culture Youth, Sport And Citizenship "Youth in action" Brussels, 11-12- 2009 D2/GGM/VR/PLE/SF Ares(2009)^49// NOTE TO THE

More information

UNIDO and the strategies to invest in Myanmar

UNIDO and the strategies to invest in Myanmar UNIDO and the strategies to invest in Myanmar Gerardo Patacconi Director of the Agro-Business Development Department, UNIDO Vienna Michele Boario Chief Technical Advisor, UNIDO MSME development in Myanmar

More information

European External Investment Plan. An overview

European External Investment Plan. An overview European External Investment Plan An overview EC Communication on establishing a new Partnership Framework with third countries under the European Agenda on Migration (June 7 th 2016) The European Commission:

More information

PUBLIC SECTOR CASE STORY TEMPLATE

PUBLIC SECTOR CASE STORY TEMPLATE #4 COMPLETE Collector: Web Link 1 (Web Link) Started: Friday December 19 2014 8:34:58 AM Last Modified: Friday December 19 2014 8:40:30 AM Time Spent: 00:05:32 IP Address: 193.138.105.29 PAGE 4: B.1) YOUR

More information

SCOTTISH ENTERPRISE REGIONAL AND SME INVESTMENT AID SCHEME

SCOTTISH ENTERPRISE REGIONAL AND SME INVESTMENT AID SCHEME SCOTTISH ENTERPRISE REGIONAL AND SME INVESTMENT AID SCHEME 2014-2020 SCHEME REFERENCE NUMBER: SA.39217 LEGAL BASIS The Scottish Enterprise Regional and SME Investment Aid Scheme 2014 2020 (the Scheme )

More information

Agri-food cluster in Kharkiv: Feasibility and recommendations

Agri-food cluster in Kharkiv: Feasibility and recommendations Policy Briefing Series [PB/18/2016] Agri-food cluster in Kharkiv: Feasibility and recommendations David Saha, Björn Vogler German Advisory Group in cooperation with IER Kyiv Berlin/Kyiv, November 2016

More information

Non State Actors and Local Authorities in Development

Non State Actors and Local Authorities in Development Development Cooperation Instrument Thematic programme Non State Actors and Local Authorities in Development Karina Chircu / Unit F1 Vienna 15 17 February 2010 Development Education Partnership Fair EU

More information

GENERAL TENDER CONDITIONS

GENERAL TENDER CONDITIONS GENERAL TENDER CONDITIONS F4E_D_27E7D9 v 2.2 Page 1 of 15 TABLE OF CONTENTS 1. Introduction... 3 2. Procurement rules... 3 3. Procurement procedures... 4 4. Compliance with requirements... 5 4.1. Completeness

More information

Guidelines for Applicants and Beneficiaries

Guidelines for Applicants and Beneficiaries Contracting Authority: Ministry of the Interior of the Republic of Lithuania European Neighbourhood Instrument Cross-Border Cooperation Programme Latvia-Lithuania-Belarus 2014-2020 EC Decision C(2015)

More information

GRANT APPLICATION FORM 1

GRANT APPLICATION FORM 1 No of proposal: MOVE/C4/SUB/01-2012/.. (for Commission use only) GRANT APPLICATION FORM 1 Road Safety and young road users (a) Project identification Full title Acronym (20 characters max.) (b) Organisation

More information

1 ST CALL FOR PROPOSALS THE POLAND-RUSSIA CBC PROGRAMME GENERAL INFORMATION

1 ST CALL FOR PROPOSALS THE POLAND-RUSSIA CBC PROGRAMME GENERAL INFORMATION 1 ST CALL FOR PROPOSALS THE POLAND-RUSSIA CBC PROGRAMME 2014-2020 GENERAL INFORMATION Poland-Russia CBC Programme The main objective of the Poland-Russia Cross-border Cooperation Programme 2014-2020 is

More information

orkelated tress Results of the negotiations on work-related stress

orkelated tress Results of the negotiations on work-related stress orkelated tress Results of the negotiations on work-related stress Explanatory note -Results of the negotiations on work-related stress The negotiations on work-related stress are part of the Work Programme

More information

Call for Project Proposals GUIDELINES. For VPA countries. Deadline for the calls for proposal: 31/05/2013!!! New deadline: 30/06/13!!!

Call for Project Proposals GUIDELINES. For VPA countries. Deadline for the calls for proposal: 31/05/2013!!! New deadline: 30/06/13!!! European Union / Food and Agriculture Organization of the United Nations (FAO) FLEGT Programme (GCP/GLO/395/EC) Call for Project Proposals GUIDELINES For VPA countries Deadline for the calls for proposal:

More information

Points of the European Economic and Social Committee opinion considered essential. European Commission position

Points of the European Economic and Social Committee opinion considered essential. European Commission position N 13 Improving the effectiveness of European Union policies for small and medium-sized enterprises (own initiative opinion) EESC 2016/3121 - INT/787 527 th Plenary Session July 2017 Rapporteur: Ms Milena

More information

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies Energy Efficiency Act Promulgated, SG No. 98/14.11.2008, effective 14.11.2008, supplemented, SG No. 6/23.01.2009, effective 1.05.2009, amended, SG No. 19/13.03.2009, effective 10.04.2009, supplemented,

More information

Annex 1: Conceptual Framework of the Swiss- Bulgarian Cooperation Programme

Annex 1: Conceptual Framework of the Swiss- Bulgarian Cooperation Programme Non-official publication Modified version of 21 December 2013 Annex 1: Conceptual Framework of the Swiss- Bulgarian Cooperation Programme Annex 1 is an integral part of the Framework Agreement between

More information

State Aid Rules. Webinar TAFTIE Academy 22th of October 2015 Maija Lönnqvist, Tekes

State Aid Rules. Webinar TAFTIE Academy 22th of October 2015 Maija Lönnqvist, Tekes State Aid Rules Webinar TAFTIE Academy 22th of October 2015 Maija Lönnqvist, Tekes Topics of the seminar 1) What is state aid? 2) State aid modernisation 3) R&D rules 4) General Block Exemtion Regulation:

More information

TERMS OF REFERENCE (ToR)

TERMS OF REFERENCE (ToR) Funded by the European Union TERMS OF REFERENCE (ToR) SETUP OF A REVOLVING FUND SYSTEM, IMPROVED ACCESS TO FINANCE AND WITH BUSINESS ADVISORY SUPPORT SERVICES TO COCOA PRODUCERS AND SERVICE DELIVERY ENTITIES

More information

CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA

CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA European Union/Council of Europe Programmatic Cooperation Framework (PCF) for Armenia, Azerbaijan, Georgia, Moldova, Ukraine

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 19.1.2016 COM(2016) 5 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

International Cooperation in Horizon 2020 Transport R&I area

International Cooperation in Horizon 2020 Transport R&I area No guarantee for accuracy or completeness of the information Your network of Transport National Contact Points International Cooperation in Horizon 2020 Transport R&I area Co-funded by the Horizon 2020

More information

COMMISSION OF THE EUROPEAN COMMUNITIES

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 8.10.2007 COM(2007) 379 final COMMUNICATION FROM THE COMMISSION TO THE COUNCIL, THE EUROPEAN PARLIAMENT, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND

More information

Operational Programme Competitiveness and Economic Growth (Slovakia)

Operational Programme Competitiveness and Economic Growth (Slovakia) Operational Programme Competitiveness and Economic Growth (Slovakia) Annual Conference of Competitiveness Operational Programmes 22nd 24th April 2015, Budapest, Hungary 1 Outline of the topics Programming

More information

DG(SANCO)/ MR

DG(SANCO)/ MR 1 The CA should ensure that standards applied to The INVIMA shall issue a technical regulation that will fishery products exported to the EU are fully equivalent modify Resolution 776 of 2008 through the

More information

MAISON DE L'ECONOMIE EUROPEENNE - RUE JACQUES DE LALAINGSTRAAT 4 - B-1040 BRUXELLES

MAISON DE L'ECONOMIE EUROPEENNE - RUE JACQUES DE LALAINGSTRAAT 4 - B-1040 BRUXELLES Position Paper UEAPME s 1 comments on the mid-term review of Horizon 2020 and first ideas for the 9 th EU Framework Programme for Research and Innovation (FP9) Executive Summary On Horizon 2020 SME instrument

More information

Building synergies between Horizon 2020 and future Cohesion policy ( )

Building synergies between Horizon 2020 and future Cohesion policy ( ) Building synergies between Horizon 2020 and future Cohesion policy (2014-2020) Magda De Carli Unit B5 -Widening Excellence and Spreading Innovation DG Research & Innovation Research and Innovation 1 Contents

More information

2011 Call for proposals Non-State Actors in Development. Delegation of the European Union to Russia

2011 Call for proposals Non-State Actors in Development. Delegation of the European Union to Russia 2011 Call for proposals Non-State Actors in Development Delegation of the European Union to Russia Generally: to promote inclusive and empowered society in partner countries by supporting actions of local

More information

Criteria for selection of operations

Criteria for selection of operations Manual Operational Programme "Science and education for smart growth" 2014-2020 Version 1 Chapter 5 Annex 5.2. Criteria for selection of operations Approved by: Head of MA Date: 1. GENERAL DESCRIPTION

More information

Interreg Europe. National Info Day 26 May 2015, Helsinki. Elena Ferrario Project Officer Interreg Europe Secretariat

Interreg Europe. National Info Day 26 May 2015, Helsinki. Elena Ferrario Project Officer Interreg Europe Secretariat European Union European Regional Development Fund Interreg Europe National Info Day 26 May 2015, Helsinki Elena Ferrario Project Officer Interreg Europe Secretariat Interreg Europe Evolution of the Cohesion

More information

Regulation (GBER)

Regulation (GBER) The General Block Exemption Regulation 2014-2020 (GBER) Roxana Laiu Camelia Grozea Bernhard Von Wendland JASPERS Networking Platform State aid seminar 8 July 2014 1 The GBER 2014-2020 The GBER 2014-2020

More information

Competitiveness. This project has been financed by the European Union

Competitiveness. This project has been financed by the European Union This project has been financed by the European Union Progress towards meeting the SEE 2020 Targets SEE 2020 Headline Indicator 2010 (baseline) Progress towards the target 2020 (target) GDP per capita relative

More information

Horizon 2020 update and what s next. Dr Alex Berry, European Advisor 15 December 2015, Royal Holloway

Horizon 2020 update and what s next. Dr Alex Berry, European Advisor 15 December 2015, Royal Holloway Horizon 2020 update and what s next Dr Alex Berry, European Advisor 15 December 2015, Royal Holloway alexandra.berry@bbsrc.ac.uk Agenda UKRO H2020 background and policy H2020 structure and rationale H2020

More information

November Dimitri CORPAKIS Head of Unit Research and Innovation DG Research and Innovation European Commission

November Dimitri CORPAKIS Head of Unit Research and Innovation DG Research and Innovation European Commission November 2013 Dimitri CORPAKIS Head of Unit Research and Innovation DG Research and Innovation European Commission dimitri.corpakis@ec.europa.eu How European regions invest in R&D Out of a total of 266

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL AND URBAN POLICY

EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL AND URBAN POLICY EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL AND URBAN POLICY CALL FOR EXPRESSION OF INTEREST FOR THEMATIC PARTNERSHIPS TO PILOT INTERREGIONAL INNOVATION PROJECTS TABLE OF CONTENTS 1. BACKGROUND INFORMATION...

More information

The INTERREG IVC approach to capitalise on knowledge

The INTERREG IVC approach to capitalise on knowledge EUROPEAN REGIONAL DEVELOPMENT FUND The INTERREG IVC approach to capitalise on knowledge Magda Anagnostou Capitalisation Officer Joint Technical Secretariat MED CAP event, 24 March, Brussels INTERREG ETC

More information

Follow-up Reporting Date: 25 March 2011

Follow-up Reporting Date: 25 March 2011 Follow-up Reporting Date: 25 March 2011 Reporting on Follow-up Action to Management Response, Evaluation of FAO cooperation in Tajikistan Recommendations Action Agreed Action Taken? Comment/explanation

More information

Fast Track to Innovation Pilot ( ) January 2014

Fast Track to Innovation Pilot ( ) January 2014 Fast Track to Innovation Pilot (2015-2016) January 2014 Fast Track to Innovation Pilot - the concept in a nutshell The FTI pilot (2015-2016) is the only fully bottom-up measure in Horizon 2020 promoting

More information

ANNUAL WORK PROGRAMME FOR GRANTS 2015 of the Office of the European Union Representative (West Bank, Gaza Strip and UNRWA)

ANNUAL WORK PROGRAMME FOR GRANTS 2015 of the Office of the European Union Representative (West Bank, Gaza Strip and UNRWA) ANNUAL WORK PROGRAMME FOR GRANTS 2015 of the Office of the European Union Representative (West Bank, Gaza Strip and UNRWA) I. European Instrument for Democracy and Human Rights / Country- Based Support

More information

EASTERN BORDER SMALL INFRASTRUCTURE PROJECT FUND

EASTERN BORDER SMALL INFRASTRUCTURE PROJECT FUND 03.02 - EASTERN BORDER SMALL INFRASTRUCTURE PROJECT FUND 1. BASIC INFORMATION 1.1. CRIS number: 2003/004-379/03.02 1.2. Title: Eastern border Small Infrastruture Project Fund (SIPF) 1.3. Sector: Justice

More information

Presentation of Interreg Europe

Presentation of Interreg Europe European Union European Regional Development Fund Presentation of Interreg Europe Interreg and interregional cooperation 2014-2020 Committee of the Regions, Brussels, 7 May 2015 Petra Geitner & Nicolas

More information

The New Direct Assistance Scheme Funding for Private Sector Firms

The New Direct Assistance Scheme Funding for Private Sector Firms The New Direct Assistance Scheme Funding for Private Sector Firms New Direct Assistance Scheme The new funding facility aims to build on the success of the 9th EDF funded Direct Assistance Scheme and use

More information