Narrative Report for Quarterly Disbursement Package 1 October to 31 December 2010

Size: px
Start display at page:

Download "Narrative Report for Quarterly Disbursement Package 1 October to 31 December 2010"

Transcription

1 MILLENNIUM CHALLENGE ACCOUNT NAMIBIA Narrative Report for Quarterly Disbursement Package 1 October to 31 December 2010 Introduction This is the 4 th and final Disbursement Request for Fiscal Year Disbursements up to 10 September 2010 amount to USD18.8m and contracts to the value of USD 73.5m have been signed. A. Current Quarter Commitments & Expenditures Education There are on-going commitments under the following contracts: Consultant for the Final Design, Supervision, Environmental Impact Assessment and the Supervision for the 47 Schools Consultant for the Final Design, Supervision, Environmental Impact Assessment and the Supervision for the Regional Study and Resource Centres (RSRCs) Procurement, sorting and distribution of Textbooks (near complete) Namibia Training Fund (NTF) Advisor Works Contractor for Renovation, Upgrading and Expansion of 13 Schools in Oshana and Omusati Regions The first three activities listed above have previously been introduced in the Narrative Report. The NTF Advisor was mobilized in August 2010 and the team is working from the premises of the Namibia Training Authority. The first deliverable (Inception Report) was received, commented on and resubmitted by the Consultant with invoice in time for Fiscal Year The CEO of the NTA commenced her duties in Q4 and so senior management. Two Works Contracts were signed on 9 and 10 September 2010 for in total 3 lots for the 13 schools in the first package related to the 47 Schools Activity. Important to note is that nearly all textbooks (close to 700,000) have been distributed. The schools that ordered in time for inclusion in the November 2009 procurement were catered for 1 P a g e

2 first and remaining books schools had over-order hence the surplus have been and continue to be distributed to schools that ordered late. This process will be concluded shortly. Tourism There are on-going commitments under the following contracts: Environmental and Social Impact Assessment in support of the ENP Housing and Management Centres Infrastructure Road Maintenance and Game Capture Equipment (for MET) NTB Website development Change Management Advisor (MET) Wildlife Translocation Technician (MET) Marketing Coordinators (NTB) All these activities have previously been introduced in the Narrative Report. Important to note is that the Change Management Advisor (CMA) has supported the Ministry of Environment & Tourism to meet a sufficient number of CPs/performance targets by the end of this Fiscal Year for MCA-N to proceed with the procurement of the Consultant for the Final Design, Supervision, Environmental Impact Assessment and the Supervision for the ENP Housing & Management Infrastructure. The Wildlife Translocation Technician was instrumental in the translocation of 288 Black Faced Impala from Etosha National Park and 15 Rhino from the Palmwag Concession to conservancies in the North West. Some of the equipment for MET was delivered and handed over, however, with disbursements to follow for the caravans, game crates, diesel/water trailer, giraffe trailer, more road maintenance equipment and the retainer payments. And finally, the NTB Website Development is experiencing delays due to delays in the NTB funded MIS development, a separate project outside of MCA-N. The NTB Website in part draws on data produced by this NTB MIS. A contract amendment was effected for MMG, the website developer, to develop a listings database. Agriculture There are on-going commitments under the following contracts: CBRLM Facilitator long-term service contract CLS Facilitator long-term service contract 2 P a g e

3 INP PPO Facilitator long-term service contract MAWF and MLR Coordinators All these activities, other than the INP PPO Facilitator, have previously been introduced in the Narrative Report. The INP PPO Facilitator was mobilized in Q4 and the first deliverable (Inception Report) was submitted and accepted, with related payment. Monitoring & Evaluation While the Data Quality Review Consultant was already mobilized in Q3, the first disbursement under this contract is only due in Q5. Cross Sector Support A Consultant was hired in Q1 and continues to work with MCA-N. Under her professional guidance the MCA-N Gender Strategy was finalized and posted on the MCA-N website. Next Quarter Multi-Year Financial Plan & Work Plan The Work Plan has been revised and updated. There are some shifts in programmed activities as reflected in the projections in this Disbursement Request. B. Next Quarter Commitments & Expenditures The Disbursement Request sent to MCC for consideration forecasts the following: i. Commitments (from DFP - Commitments): USD 20.69m ii. Cash Requirements (from DFP - Cash): USD 10.29m The significant activities to be undertaken in the next quarter with the requested funds are as follows: Education The conceptualization for Continuous Professional Development (CPD) for teachers was not completed in Q4 as anticipated and will now only be mobilized in Q5 and so the 3 P a g e

4 Textbook Procurement Reform. A Grant Agreement and one or more new contracts will be introduced to accommodate these activities. Further delays in the high priority Vocational Tourism Training were experienced yet a Grant Agreement with the first Training Service Provider will be signed in Q5, with related disbursements. The contract with the Consultant for the Final Design, Supervision, Environmental Impact Assessment and the Supervision for the Community Skills Development Centres (COSDECs) will be signed in Q5 with related disbursements. The contract with the Consultant for Monitoring & Evaluation in MoE will be signed in Q5 with related disbursements. Tourism The contract with the Consultant for the Conservancy Development Support Services will be signed in Q5, with related disbursements. The contract with the Consultant for the North American Destination Marketing will be signed in Q5, with related disbursements. The contract with the Consultant bids for the GIS based Maintenance Database for Infrastructure and Equipment in ENP will be signed in Q5, with related disbursements. Agriculture The contracts with the Consultant for the Final Design, Supervision, Environmental Impact Assessment and the Supervision for the State Veterinary Offices (SVOs) may still be signed in Q4 or otherwise early in Q5, with related disbursements. The contract with the Consultant for the Quarantine Camps in the Caprivi Region will be signed early in Q5, with related disbursements. The first group of grants under the Livestock Marketing Efficiency Fund and the INP Innovation Fund may be signed towards the end of Q5, with related disbursements as from Q6. 4 P a g e

5 A pilot in support of the Livestock Traceability System in the Northern Communal Areas will start in November The contract for the ear tags for the animals will be signed still in Q4 or early in Q5, with related disbursements. Monitoring and Evaluation The Consultant for the INP/Conservancy and CBRLM Household Income and Expenditure Surveys has been mobilized in Q4, with related disbursements in Q5. Programme Management and Oversight The MCA-N Management Unit is fully operational. brought in-house seamlessly. The procurement function has been All Stakeholders Committees have been mobilized. Cabinet has approved a reconstitution of the MCA Namibia Board to improve the efficiency of the Board and the new Board will come into effect in Q5. The Board Sub-Committees meet when required. The activation of the Procurement and Finance Sub-Committee in particular is fast-tracking decision-making by the Board. The Implementing Partners are supportive of the MCA Namibia Compact implementation and participate in the various public outreach events. The various Government agencies are making a tremendous contribution in terms of staff commitment in terms of planning and execution. Good progress can be reported in the support of the Implementing Partners towards meeting the conditions precedent and the implementation of a good number of Compact activities. However, there are a number of challenges in managing these relationships and the MCA Namibia Board has been made aware of these. The recently appointed Chairperson of the MCA Namibia Board is working closely with the MCA Namibia management team to improve on the delivery by the Implementing Partners, especially relating to the validation of deliverables by contractors, joint planning and communication to beneficiaries. C. Indicator Tracking Table Notes For the current Disbursement Request, MCA-N has reported out against the indicators included in the March 2010 MCA-NB/MCC approved indicators using the MCC Indicator Tracking Table 5 P a g e

6 (ITT) format. Since MCA-N is still in the early stage of implementation most of the indicators have not come into play. The next iteration of the MCA-N Monitoring & Evaluation Plan will be initiated and finalized in Q5. 6 P a g e

Narrative Report for Quarterly Disbursement Package 1 July to 30 September 2010

Narrative Report for Quarterly Disbursement Package 1 July to 30 September 2010 MILLENNIUM CHALLENGE ACCOUNT NAMIBIA Narrative Report for Quarterly Disbursement Package 1 July to 30 September 2010 Introduction This is the fourth report being submitted by MCA-N since entry into force

More information

MCA Namibia. MCA Namibia Programme. Implementation Modalities & Project Activities Implementation. July 2009

MCA Namibia. MCA Namibia Programme. Implementation Modalities & Project Activities Implementation. July 2009 MCA Namibia MCA Namibia Programme Implementation Modalities & Project Activities Implementation July 2009 Project Objectives 1 Improve the quality of the workforce by enhancing the equity and effectiveness

More information

4/1/2014-6/30/ /1/ /31/2013 1/1/2013-3/31/2013 4/1/2013-6/30/2013 7/1/2013-9/30/2013 1/1/2014-3/31/2014

4/1/2014-6/30/ /1/ /31/2013 1/1/2013-3/31/2013 4/1/2013-6/30/2013 7/1/2013-9/30/2013 1/1/2014-3/31/2014 Detailed Financial Plan - Commitments 2 3 4 5 6 7 21 22 23 26 27 28 29 3 Country: Namibia Accountable Entity: Compact Number: COM7NAM91 Date Submitted: 9 March 212 Cumulative Current Period Next Period

More information

Total Quarter Quarter 14 Quarter 15 Quarter 16 Quarter 17 Quarter 18 Quarter 19 Quarter 20 CIF Year Year 1 Year 2 Year 3 Year 4 Year 5

Total Quarter Quarter 14 Quarter 15 Quarter 16 Quarter 17 Quarter 18 Quarter 19 Quarter 20 CIF Year Year 1 Year 2 Year 3 Year 4 Year 5 Detailed Financial Plan - Commitments 2 3 4 5 6 7 23 26 27 28 29 3 COM7NAM91 Date Submitted: 21 September 212 Forecasted Commitments for -> Cumulative Current Next TOTAL TOTAL Varience Actual Cumulative

More information

MCA Namibia. Millennium Challenge Account Namibia

MCA Namibia. Millennium Challenge Account Namibia reducing poverty through economic growth Millennium Challenge Account Dear Reader The Millennium Challenge Account (-N) is a large-scale development programme to reduce poverty through economic growth.

More information

DISBURSEMENT REQUEST. Namibia MCA Namibia 28-Jul-08 GR07NAM07001 MCA Namibia Emerging Markets Group Ltd. 11-Mar-09 1-Apr Jun USD

DISBURSEMENT REQUEST. Namibia MCA Namibia 28-Jul-08 GR07NAM07001 MCA Namibia Emerging Markets Group Ltd. 11-Mar-09 1-Apr Jun USD DISBURSEMENT REQUEST FORM OF CIF DISBURSEMENT REQUEST Country Projects Compact Date/ CIF Letter Agreement Date CIF Number Accountable Entity Fiscal Agent Request Date Disbursement Period Beginning Date

More information

REQUEST FOR CONSULTANT QUALIFICATIONS GEOGRAPHIC INFORMATION SYSTEMS CONSULTANT MCAN/COM/RCQ/5A01007

REQUEST FOR CONSULTANT QUALIFICATIONS GEOGRAPHIC INFORMATION SYSTEMS CONSULTANT MCAN/COM/RCQ/5A01007 REQUEST FOR CONSULTANT QUALIFICATIONS GEOGRAPHIC INFORMATION SYSTEMS CONSULTANT MCAN/COM/RCQ/5A01007 MCA Namibia () requires the services of an individual Geographical Information Systems Consultant (hereinafter

More information

Community Health Centre Program

Community Health Centre Program MINISTRY OF HEALTH AND LONG-TERM CARE Community Health Centre Program BACKGROUND The Ministry of Health and Long-Term Care s Community and Health Promotion Branch is responsible for administering and funding

More information

Department of Agriculture, Environment and Rural Affairs (DAERA)

Department of Agriculture, Environment and Rural Affairs (DAERA) Department of Agriculture, Environment and Rural Affairs (DAERA) Guidance for the implementation of LEADER Cooperation activities in the Rural Development Programme for Northern Ireland 2014-2020 Please

More information

MILLENNIUM CHALLENGE ACCOUNT NAMIBIA

MILLENNIUM CHALLENGE ACCOUNT NAMIBIA MILLENNIUM CHALLENGE ACCOUNT NAMIBIA LIVESTOCK MARKET EFFICIENCY FUND (LMEF FUND) GRANT MANUAL May 2011 MCA-N LMEF Grant Manual i Acronyms and Initialisms GEC GM GRN LMEF MAWF MCA-N MCC NCAs TER US Grant

More information

TERMS OF REFERENCE TECHNICAL COMMITTEE BUSINESS DEVLEOPMENT EXPERT

TERMS OF REFERENCE TECHNICAL COMMITTEE BUSINESS DEVLEOPMENT EXPERT This Trust Fund is funded by the European Union EU Local and Regional Competitiveness Project This Trust Fund is administered by the World Bank TERMS OF REFERENCE TECHNICAL COMMITTEE BUSINESS DEVLEOPMENT

More information

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4293-TA Public Disclosure Authorized Financing Agreement (Zanzibar Basic Education Improvement Project) between Public Disclosure Authorized THE

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF TF GRANT NUMBER TF097126 Public Disclosure Authorized Global Environment Facility Grant Agreement (Financing Energy Efficiency at MSMEs Project) Public Disclosure

More information

RECAPITALISATION AND DEVELOPMENT PROGRAMME PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013

RECAPITALISATION AND DEVELOPMENT PROGRAMME PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013 RECAPITALISATION AND DEVELOPMENT PROGRAMME PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013 HISTORY OF RECAPITILISATION AND DEVELOPMENT PROGRAMME In 2009, the

More information

Global Environment Facility Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF099857 Global Environment Facility Trust Fund Grant Agreement (Nyika Transfrontier Conservation Area Project) between REPUBLIC OF MALAWI and INTERNATIONAL BANK

More information

In accordance with Section 610(b)(2) of the Millennium Challenge Act of

In accordance with Section 610(b)(2) of the Millennium Challenge Act of This document is scheduled to be published in the Federal Register on 11/20/2017 and available online at https://federalregister.gov/d/2017-25198, and on FDsys.gov MILLENNIUM CHALLENGE CORPORATION [MCC

More information

The World Bank Iraq Trust Fund Newsletter

The World Bank Iraq Trust Fund Newsletter The World Bank Iraq Trust Fund Newsletter July 2006 Volume 1, Issue 8 1. Improving Education in Iraq Despite massive degradation and deterioration as a result of three major wars and over a decade of sanctions,

More information

CIVIL ENGINEER EXPERT

CIVIL ENGINEER EXPERT This Trust Fund is funded by the European Union EU Local and Regional Competitiveness Project This Trust Fund is administered by the World Bank TERMS OF REFERENCE TECHNICAL COMMITTEE CIVIL ENGINEER EXPERT

More information

with the Agency for Agricultural Development of Morocco (ADA) for the Kingdom of Morocco 12 July 2017 Entity Support

with the Agency for Agricultural Development of Morocco (ADA) for the Kingdom of Morocco 12 July 2017 Entity Support with the Agency for Agricultural Development of Morocco (ADA) for the Kingdom of Morocco 12 July 2017 Entity Support PAGE 1 OF 15 ver. 19 August 2016 Readiness and Preparatory Support Proposal How to complete

More information

EU Local and Regional Competitiveness Project TERMS OF REFERENCE TECHNICAL COMMITTEE ARCHITECT EXPERT

EU Local and Regional Competitiveness Project TERMS OF REFERENCE TECHNICAL COMMITTEE ARCHITECT EXPERT This Trust Fund is funded by the European Union EU Local and Regional Competitiveness Project This Trust Fund is administered by the World Bank TERMS OF REFERENCE TECHNICAL COMMITTEE ARCHITECT EXPERT LOCAL

More information

N AY AR A E NE RG Y LIMITED (FORM ERLY ESS AR OI L LIMITED) CORPORATE SOCIAL RESPONSIBILITY POLICY

N AY AR A E NE RG Y LIMITED (FORM ERLY ESS AR OI L LIMITED) CORPORATE SOCIAL RESPONSIBILITY POLICY N AY AR A E NE RG Y LIMITED (FORM ERLY ESS AR OI L LIMITED) CORPORATE SOCIAL RESPONSIBILITY POLICY Section 1: Background Nayara Energy Limited (Nayara Energy) is an independent oil company with strong

More information

REQUEST FOR PROPOSALS: COMPACT BLUE PROGRAM MANAGEMENT

REQUEST FOR PROPOSALS: COMPACT BLUE PROGRAM MANAGEMENT REQUEST FOR PROPOSALS: COMPACT BLUE PROGRAM MANAGEMENT Background Compact Blue is an innovative program recently approved for $4 million in grant funding by The Bill and Melinda Gates Foundation. Compact

More information

Tameika Edwards presenting Regulations Title Page Slide #2

Tameika Edwards presenting Regulations Title Page Slide #2 Tameika Edwards presenting Regulations Title Page Slide #2 We re going to begin with the regulations. Governing Regulations Slide #3 Article 15 A and 5 NYCRR Parts 142-144 were signed into law to promote

More information

STATUTORY INSTRUMENTS SUPPLEMENT No th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT

STATUTORY INSTRUMENTS SUPPLEMENT No th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT STATUTORY INSTRUMENTS SUPPLEMENT No. 18 24th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT to The Uganda Gazette No. 45, Volume CIX, dated 24th June, 2016 Printed by UPPC, Entebbe, by Order of the Government.

More information

OFFICIAL DOCUMENTS. Global Partnership for Education Fund Grant Agreement

OFFICIAL DOCUMENTS. Global Partnership for Education Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER TF0A4619 Public Disclosure Authorized Public Disclosure Authorized Global Partnership for Education Fund Grant Agreement (Additional Financing

More information

Performance Indicators

Performance Indicators 2,000 1,800 1,600 1,00 1,200 1,000 800 600 00 200 0 Announced by Assisted Companies Average Hourly Wage $30 $2 $20 $1 $10 $ $0 Wages Paid by Assisted Companies There were 1,27 assisted jobs added to Nevada

More information

Quarterly Progress Report Mogadishu Clean-up Support Project (Atlas ID: )

Quarterly Progress Report Mogadishu Clean-up Support Project (Atlas ID: ) Quarterly Progress Report Mogadishu Clean-up Support Project (Atlas ID: 00085376) Reporting Period 01 April to 30 June 2015 Government Counterpart PSG PSG priorities Focus Locations: AWP Budget 594,150

More information

MISSISSIPPI SMALL MUNICIPALITIES AND LIMITED POPULATION COUNTIES GRANT PROGRAM

MISSISSIPPI SMALL MUNICIPALITIES AND LIMITED POPULATION COUNTIES GRANT PROGRAM MISSISSIPPI SMALL MUNICIPALITIES AND LIMITED POPULATION COUNTIES GRANT PROGRAM 2018 APPLICATION GUIDELINES & IMPLEMENTATION MANUAL Table of Contents SMALL MUNICIPALITIES AND LIMITED POPULATION COUNTIES

More information

1915(j) Self-Directed Personal Assistance Services State Plan Option

1915(j) Self-Directed Personal Assistance Services State Plan Option 1915(j) Self-Directed Personal Assistance Services State Plan Option What are self-directed PAS? 1 Personal care and related services under the Medicaid State plan, and/or Home and community-based services

More information

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Liberia Education Global Practice Recipient Executed Activities Specific Investment

More information

Fiduciary Arrangements for Grant Recipients

Fiduciary Arrangements for Grant Recipients Table of Contents 1. Introduction 2. Overview 3. Roles and Responsibilities 4. Selection of Principal Recipients and Minimum Requirements 5. Assessment of Principal Recipients 6. The Grant Agreement: Intended

More information

Hendry County Fair & Livestock Show, Inc. RODEO and RV Facility Refurbishment

Hendry County Fair & Livestock Show, Inc. RODEO and RV Facility Refurbishment FY 2016-17 Legislative Conference Report Project Information Project Name and Line Item Number: Transportation Economic Development Budget Line Item #2216A Hendry County Fair & Livestock Show, Inc. RODEO

More information

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867)

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867) Public Disclosure Authorized SOUTH ASIA India Education Global Practice IBRD/IDA Program-for-Results FY 2017 Seq No: 1 ARCHIVED on 27-Jun-2017 ISR28685 Implementing Agencies: Ministry of Skill Development

More information

FLORIDA DEPARTMENT OF EDUCATION. Request for Application (RFA Entitlement)

FLORIDA DEPARTMENT OF EDUCATION. Request for Application (RFA Entitlement) FLORIDA DEPARTMENT OF EDUCATION Request for Application (RFA Entitlement) Bureau / Office Division of Public Schools, Bureau of Exceptional Education and Student Services (BEESS) Program Name Grants to

More information

Benita Lynn Horn, MWD

Benita Lynn Horn, MWD Benita Lynn Horn, MWD The World Water Forum offers $10,000 Grants to community colleges & universities for: Research & Development Innovative Water Conservation Projects Local or Global Projects Water-Stressed

More information

Who Do Ministries Hire?

Who Do Ministries Hire? Advanced Who Do Ministries Hire? al Backgrounds of Potential Employees The information below can be used as a general reference guide, to help Ambassadors respond to inquiries from potential candidates

More information

THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria

THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria Guidelines for Performance-Based Funding Table of Contents 1. Introduction 2. Overview 3. The Grant Agreement: Intended Program Results and Budget

More information

Global Partnership on Output-based Aid. Grant Agreement. GPOBA GRANT NUMBER TF I1rD

Global Partnership on Output-based Aid. Grant Agreement. GPOBA GRANT NUMBER TF I1rD GPOBA GRANT NUMBER TF091511-I1rD Global Partnership on Output-based Aid Grant Agreement (Expanding Piped Water Supply to Surabaya's Urban Poor Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

MCC PRINCIPLES MCC PROCUREMENT PROCESSES LOOKING FORWARD

MCC PRINCIPLES MCC PROCUREMENT PROCESSES LOOKING FORWARD MCC PRINCIPLES MCC PROCUREMENT PROCESSES LOOKING FORWARD WHAT IS MCC? The Millennium Challenge Corporation is a U.S. Government agency designed to reduce poverty through economic growth in select developing

More information

Rwanda Dairy Development Project. Negotiated financing agreement

Rwanda Dairy Development Project. Negotiated financing agreement Document: EB 2016/118/R.19/Sup.1 Agenda: 11(b)(ii) Date: 31 August 2016 Distribution: Public Original: English E Republic of Rwanda Rwanda Dairy Development Project Negotiated financing agreement Executive

More information

Case Study 24X7 WATER SUPPLY IN 3 CITIES OF KARNATAKA. Water Supply

Case Study 24X7 WATER SUPPLY IN 3 CITIES OF KARNATAKA. Water Supply Case Study 24X7 WATER SUPPLY IN 3 CITIES OF KARNATAKA Water Supply 1 CASE OVERVIEW Country: India Centre/State/ULB: 29 select wards in three pilot cities of Gulbarga, Belgaum and Hubli-Dharwad, Karnataka

More information

The World Bank Kenya GPE Primary Education Development Project (P146797)

The World Bank Kenya GPE Primary Education Development Project (P146797) Public Disclosure Authorized AFRICA Kenya Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 01-Nov-2017 ISR29517 Implementing Agencies:

More information

CORPORATE SOCIAL RESPONSIBILITY POLICY March, 2017 Version 1.2

CORPORATE SOCIAL RESPONSIBILITY POLICY March, 2017 Version 1.2 CORPORATE SOCIAL RESPONSIBILITY POLICY March, 2017 Version 1.2 Name of document Corporate Social Responsibility Policy Policy Version 1.2 Issued by CSR Committee Amendment date 22.03.2017 Effective Date

More information

Program Management Plan

Program Management Plan Program Management Plan Section 5310 ENHANCED MOBILITY OF SENIORS AND INDIVIDUALS WITH DISABILITIES PROGRAM Table of Contents GOALS AND OBJECTIVES... 3 ROLES AND RESPONSIBILITIES OF VIA... 3 ALAMO AREA

More information

The Cambodia NGO Database

The Cambodia NGO Database Kingdom of Cambodia Nation Religion King Royal Government of Cambodia The Cambodia NGO Database User Manual May 2018 Cambodian Rehabilitation and Development Board Council for the Development of Cambodia

More information

Establishment of a Grant Program for Georgia. Agreed Upon Procedures Report for the Quarters Ended 31 March and 30 June 2005

Establishment of a Grant Program for Georgia. Agreed Upon Procedures Report for the Quarters Ended 31 March and 30 June 2005 Establishment of a Grant Program for Georgia Agreed Upon Procedures Report for the Quarters Ended 31 March and 30 June TABLE OF CONTENTS Page REPORT OF FACTUAL FINDINGS 1-2 Appendix Additional information

More information

The World Bank Kenya GPE Primary Education Development Project (P146797)

The World Bank Kenya GPE Primary Education Development Project (P146797) Public Disclosure Authorized AFRICA Kenya Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 15-Feb-2017 ISR26822 Implementing Agencies:

More information

Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project

Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project Semi-Annual Progress Report June 2016 Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project Prepared by the project management unit and project implementation

More information

North Sudan Disarmament, Demobilization and Reintegration Programme (NSDDRP)

North Sudan Disarmament, Demobilization and Reintegration Programme (NSDDRP) North Sudan Disarmament, Demobilization and Reintegration Programme (NSDDRP) Call for Proposals (CFP/DDR/007/10) Implementation of Cultural Outreach Project DDR Road show Eastern Sudan A. Background BACKGROUND

More information

A FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICTS FOUR AND SIX COMMUTER SERVICES SCOPE OF SERVICES

A FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICTS FOUR AND SIX COMMUTER SERVICES SCOPE OF SERVICES Exhibit A FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICTS FOUR AND SIX COMMUTER SERVICES SCOPE OF SERVICES 1.0 Purpose The South Florida Commuter services vendor (hereinafter referred to as Vendor ) for

More information

OFFICIAL DOCUMENTS I

OFFICIAL DOCUMENTS I Public Disclosure Authorized OFFICIAL DOCUMENTS I GPEF GRANT NUMBER TF016558 Public Disclosure Authorized Global Partnership for Education Grant Agreement (Second Education Sector Support Project) Public

More information

Livestock Auction Traceability Initiative (LATI) Program Guide

Livestock Auction Traceability Initiative (LATI) Program Guide Livestock Auction Traceability Initiative (LATI) Program Guide Her Majesty the Queen in Right of Canada, 2010 Cat. No. A118-35/2010E-PDF ISBN 978-1-100-16183-9 AAFC No.11225E Aussi offert en français sous

More information

ENHANCED MOBILITY OF SENIORS AND INDIVIDUALS WITH DISABILITIES (SECTION 5310) FUNDS

ENHANCED MOBILITY OF SENIORS AND INDIVIDUALS WITH DISABILITIES (SECTION 5310) FUNDS ENHANCED MOBILITY OF SENIORS AND INDIVIDUALS WITH DISABILITIES (SECTION 5310) FUNDS PROGRAM MANAGEMENT PLAN CITY OF ASHEVILLE APRIL 2015 Contents BACKGROUND AND OVERVIEW... 4 PROGRAM PURPOSE AND GOALS...

More information

MILLENNIUM CHALLENGE ACCOUNT NAMIBIA

MILLENNIUM CHALLENGE ACCOUNT NAMIBIA MILLENNIUM CHALLENGE ACCOUNT NAMIBIA INDIGENOUS NATURAL PRODUCTS INNOVATION FUND (INP INNOVATION FUND) GRANT MANUAL Version 1 (27 th May 2010) ACRONYMS AND INITIALISMS CBO EU FDA GEC GRN INP IPTT MAWF

More information

Chapter 10 Housing Rehabilitation Revolving Loan Fund

Chapter 10 Housing Rehabilitation Revolving Loan Fund Revolving Loan Fund Recipient Checklist It is absolutely essential that the city/county grant recipient, the nonprofit sub recipient and the perspective assisted private property owner not incur any ACTIVITY

More information

Rural Enterprise Finance Project. Negotiated financing agreement

Rural Enterprise Finance Project. Negotiated financing agreement Document: EB 2018/123/R.8/Sup.1 Agenda: 5(a)(i) Date: 6 April 2018 Distribution: Public Original: English E Republic of Mozambique Rural Enterprise Finance Project Negotiated financing agreement Executive

More information

Measure X Senior & Disabled Transportation Program

Measure X Senior & Disabled Transportation Program Pending Adoption by the Transportation Agency for Monterey County Board of Directors Measure X Senior & Disabled Transportation Program Grant Program Guidelines Program applications due: Friday, December

More information

School District of Philadelphia. Grant Management Roles & Responsibilities Matrix POLICIES P S P S S P S S

School District of Philadelphia. Grant Management Roles & Responsibilities Matrix POLICIES P S P S S P S S FINDING FUNDING OPPORTUNITIES 1 Locates funding opportunities and initiates proposal development GP0100 S S P 2 Reviews proposed grant opportunities, prepares overview of proposals for Grant Governance,

More information

LIONS CLUBS INTERNATIONAL FOUNDATION STANDARD GRANT APPLICATION

LIONS CLUBS INTERNATIONAL FOUNDATION STANDARD GRANT APPLICATION LIONS CLUBS INTERNATIONAL FOUNDATION STANDARD GRANT APPLICATION STANDARD GRANT CRITERIA AND REGULATIONS MISSION STATEMENT AND FUNDING PRIORITIES Standard grants provide capital funding to help establish

More information

Wildlife Conservation Society 12/24/08 to 12/31/13 (72 months)

Wildlife Conservation Society   12/24/08 to 12/31/13 (72 months) PNPM Green Quarterly Progress Report: July 2012 to September 2012 Summary Information Status Active Activity Number Task Team Leader(s) Executing Agency(ies) TF090912, TF090977, TF011930, TF093076, TF096887,

More information

Reports for Committee Members / University Campuses

Reports for Committee Members / University Campuses Reports for Committee Members / University Campuses Name of Institution: University of North Carolina Wilmington Date: March 31, 2008 Contact: David C. Girardot 1. Total Amount of Bond Dollars Allocated

More information

Attracting Private Sector Investment in Infrastructure Experiences from India

Attracting Private Sector Investment in Infrastructure Experiences from India UNESCAP High-level Expert Group Meeting on Infrastructure Public-Private Partnerships for Sustainable Development Attracting Private Sector Investment in Infrastructure Experiences from India Cherian Thomas

More information

Training of Devil s Claw Traders and Exporters and MET Officials

Training of Devil s Claw Traders and Exporters and MET Officials Training of Devil s Claw Traders and Exporters and MET Officials Final Report 31 January 2011 commissioned by the Millennium Challenge Account Namibia with funding from the Millennium Challenge Corporation

More information

BC Capacity Initiative

BC Capacity Initiative BC Capacity Initiative 2018/2019 PROPOSAL GUIDELINES PROPOSAL CLOSING DATE: 4:30 PM on Monday, December 11, 2017 EMAIL your proposal and all supporting documents to BCMail@aandc.gc.ca. 1. Copy the following

More information

The purpose of the Arctic Slope Community Foundation Fund is to provide grants in the following three areas:

The purpose of the Arctic Slope Community Foundation Fund is to provide grants in the following three areas: Purpose of the Arctic Slope Community Foundation Fund The Arctic Slope Community Foundation Fund supports organizations based in and providing services and programs to communities within the North Slope

More information

Avian and Human Influenza Facility Grant Agreement

Avian and Human Influenza Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY AHI FACILITY GRANT NUMBER TF057747-VN Public Disclosure Authorized Avian and Human Influenza Facility Grant Agreement Public Disclosure Authorized (Vietnam Avian

More information

Aboriginal Community Capital Grants Program Guide

Aboriginal Community Capital Grants Program Guide APPLICATION GUIDE FOR THE ABORIGINAL COMMUNITY CAPITAL GRANTS PROGRAM WHAT YOU NEED TO KNOW BEFORE YOU APPLY Before completing your Aboriginal Community Capital Grants Program application, please read

More information

OFFICIALf DOCUMENTS. Re: REPUBLIC OF DJIBOUTI JSDF Grant for Enhancing Income Opportunities Project Grant No. TFOAO350

OFFICIALf DOCUMENTS. Re: REPUBLIC OF DJIBOUTI JSDF Grant for Enhancing Income Opportunities Project Grant No. TFOAO350 Public Disclosure Authorized OFFICIALf DOCUMENTS The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Public Disclosure Authorized CONFORMED COPY GPOBA GRANT NUMBER TF096551-BD Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Rural Electrification and Renewable Energy

More information

COUNTY OF SACRAMENTO CALIFORNIA

COUNTY OF SACRAMENTO CALIFORNIA COUNTY OF SACRAMENTO CALIFORNIA For the Agenda of: January 13, 2010 Agenda Item No. 12 TO: FROM: SUBJECT: BOARD OF SUPERVISORS DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT NATOMAS JOINT VISION PROGRESS

More information

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing)

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) GRANT NUMBER 0426-CAM (SCF) GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) (Cambodia Component) between KINGDOM

More information

International Foundation

International Foundation Lions Lions Clubs Clubs International Foundation International Foundation How to Apply for an LCIF Standard Grant What is an LCIF Standard Grant? An LCIF Standard grant is a matching grant opportunity

More information

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA.

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4201-ET Public Disclosure Authorized Financing Agreement (Rural Capacity Building Project) Public Disclosure Authorized between FEDERAL DEMOCRATIC

More information

June Page 1 of 7

June Page 1 of 7 Document Purpose: Defines the Local Broadband Strategy for the Connecting Shropshire Broadband Delivery Programme. The content is only current at the time of issue. Version History Version Issue Date Brief

More information

Global Financing Facility Grant Agreement

Global Financing Facility Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GFF GRANT NUMBER TF0A2561 Public Disclosure Authorized Global Financing Facility Grant Agreement (Transforming Health Systems for Universal Care Project)

More information

St. Ignatius Conference St. Vincent de Paul Leadership Positions

St. Ignatius Conference St. Vincent de Paul Leadership Positions St. Ignatius Conference St. Vincent de Paul Leadership Positions Conference President The position of President is centered on the belief in being a Servant Leader. The Conference President is not expected

More information

CLARIFICATIONS ON ISSUES RAISED BY BIDDERS ON RFP FOR DESIGN AND DELEOPMENT OF A WEB-BASED ROAD MANAGEMENT SYSTEM

CLARIFICATIONS ON ISSUES RAISED BY BIDDERS ON RFP FOR DESIGN AND DELEOPMENT OF A WEB-BASED ROAD MANAGEMENT SYSTEM 1. Clause 2.3.4., sec (i) pg 6 A brief description of the firm s organization and an outline of recent experience on assignments of a similar nature. As per our understanding, similar assignment refers

More information

Terms of Reference (TOR) for Independent End of Project Evaluation

Terms of Reference (TOR) for Independent End of Project Evaluation Terms of Reference (TOR) for Independent End of Project Evaluation Project Name Increasing the provision of clean energy in Uganda hereafter referred to as Clean Energy Project Project Number(s) ESARPO0218;

More information

9. PROJECTED EXPENDITURES FUND CFDA ITEM/APPROPRIATION F.Y. CHAPTER STATUTE PROJECTED EXPENDITURES General Fund N/A / $3,5

9. PROJECTED EXPENDITURES FUND CFDA ITEM/APPROPRIATION F.Y. CHAPTER STATUTE PROJECTED EXPENDITURES General Fund N/A / $3,5 GRANT AGREEMENT AGREEMENT NO. GMS.001 1. GRANT TITLE CCTA Funding for Expanding Autonomous Vehicle Testing 2. NAME OF AGENCY 3. Grant Period Contra Costa Transportation Authority (CCTA) 4. AGENCY UNIT

More information

Rural Business Investment Scheme

Rural Business Investment Scheme Telephone No: 028 8676 4714 e-mail: rdp@midulstercouncil.org Rural Business Investment Scheme The Rural Business Investment Scheme aims to support the development of a strong and diverse rural economy

More information

Attraction Development Grant Program Guidelines & Application

Attraction Development Grant Program Guidelines & Application Attraction Development Grant Program Guidelines & Application Mission: To assist the development of a critical mass of sustainable, market-driven travel experiences within the state that will influence

More information

Conservancy Development Support Services (CDSS) Project. Quarterly Report. July to September 2012

Conservancy Development Support Services (CDSS) Project. Quarterly Report. July to September 2012 Conservancy Development Support Services (CDSS) Project Quarterly Report July to September Commissioned by the Millennium Challenge Account Namibia with funding from the Millennium Challenge Corporation

More information

Afghanistan Reconstruction Trust Fund Grant Agreement

Afghanistan Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS ARTF GRANT NUMBER TFOAO730 Public Disclosure Authorized Public Disclosure Authorized Afghanistan Reconstruction Trust Fund Grant Agreement (Higher Education

More information

OIG AUDIT A GRANTEE S PERSPECTIVE

OIG AUDIT A GRANTEE S PERSPECTIVE OIG AUDIT A GRANTEE S PERSPECTIVE FLOOD SUMMER OF 2011 CDBG-DR ALLOCATION $67 MILLION 2012 CDBG-DR ALLOCATION $35 MILLION 2013 NOT AN ENTITLEMENT CITY BUT TREATED AS ONE THE LETTER OIG AUDIT NOTIFICATION

More information

2. Review the requirements necessary for grant agreement execution; and

2. Review the requirements necessary for grant agreement execution; and 1 This is the first in a series of five webinars designed to provide an overview for new CDBG grantees. The webinars will be held over the next three months, each one hour in length, and include: 1. Getting

More information

NG-J1-R CNGBI DISTRIBUTION: A 09 June 2014 YELLOW RIBBON REINTEGRATION PROGRAM

NG-J1-R CNGBI DISTRIBUTION: A 09 June 2014 YELLOW RIBBON REINTEGRATION PROGRAM CHIEF NATIONAL GUARD BUREAU INSTRUCTION NG-J1-R CNGBI 1801.01 DISTRIBUTION: A References: See Enclosure B. YELLOW RIBBON REINTEGRATION PROGRAM 1. Purpose. This instruction establishes policy and assigns

More information

Minority, Women, and Small Business Enterprise Program. Board of Education Management Oversight Presentation August 25, 2015

Minority, Women, and Small Business Enterprise Program. Board of Education Management Oversight Presentation August 25, 2015 Minority, Women, and Small Business Enterprise Program Board of Education Management Oversight Presentation August 25, 2015 History/Overview Since 1993, the MWSBE Office has proactively worked to increase

More information

Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants

Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants Table of Contents INTRODUCTION... 1 1. Who can apply for STDF funding?... 1 2. What type of

More information

Pay Plan (Alpha Listing)

Pay Plan (Alpha Listing) 2017-2018 Pay Plan (Alpha Listing) Proposed Grade (Single Plan) Maximum Hourly (10/1/17) Proposed Minimum (Annually) Proposed Maximum (Annually) Maximum (Effective 10/1/17) Minimum Job Class Proposed New

More information

Statewide Nonpoint Source Information & Education Program. Wyoming Natural Resource Foundation. March 2016

Statewide Nonpoint Source Information & Education Program. Wyoming Natural Resource Foundation. March 2016 Statewide Nonpoint Source Information & Education Program Wyoming Natural Resource Foundation March 2016 This project was conducted in cooperation with the State of Wyoming Department of Environmental

More information

EPA Brownfields Cleanup Grant Requirements

EPA Brownfields Cleanup Grant Requirements EPA Brownfields Cleanup Grant Requirements Leah Yasenchak Brownfield Redevelopment Solutions, Inc. New Jersey Institute of Technology Technical Assistance for Brownfields July 22, 2009 10:00 AM to 2:00

More information

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) South Africa. Reporting Period: From 1/10/2017 to 30/09/2018 Report Date: 4 October 2018 Implementing

More information

Education and Science Committee. 2016/17 Estimates Examination. Vote Business, Science and Innovation. Minister of Science and Innovation

Education and Science Committee. 2016/17 Estimates Examination. Vote Business, Science and Innovation. Minister of Science and Innovation Education and Science Committee 2016/17 Estimates Examination Vote Business, Science and Innovation Minister of Science and Innovation Questions 1-18 June 2016 Callaghan Innovation Question 1 We note the

More information

GAO. MILLENNIUM CHALLENGE CORPORATION Progress and Challenges with Compacts in Africa

GAO. MILLENNIUM CHALLENGE CORPORATION Progress and Challenges with Compacts in Africa GAO For Release on Delivery Expected at 2:3 p.m. EDT Thursday, June 28, 27 United States Government Accountability Office Testimony Before the Subcommittee on Africa and Global Health, Committee on Foreign

More information

Information and Guidelines

Information and Guidelines Information and Guidelines The Fund for Voluntary Organisations supports voluntary organisations (registered in Malta with the Office of the Commissioner for Voluntary Organisations and considered compliant)

More information

Farm Energy and Agri-Processing Program Terms and Conditions

Farm Energy and Agri-Processing Program Terms and Conditions Farm Energy and Agri-Processing Program Terms and Conditions 1. Purpose The Farm Energy and Agri-Processing Program shares costs with the agriculture and agriprocessing sector on energy efficiency investments.

More information

Finance and Accounting Services Procurement Request for Proposal

Finance and Accounting Services Procurement Request for Proposal Finance and Accounting Services Procurement 2014 Request for Proposal Application Deadline: Wednesday, April 16, 2014 @ 4:00 p.m. 1 Table of Contents 1.0 Council of Academic Hospitals of Ontario (CAHO)...

More information

Operation Rhino PORTFOLIO COMMITTEE ON POLICE FEEDBACK 18 FEBRUARY 2015

Operation Rhino PORTFOLIO COMMITTEE ON POLICE FEEDBACK 18 FEBRUARY 2015 Operation Rhino PORTFOLIO COMMITTEE ON POLICE FEEDBACK 18 FEBRUARY 2015 CURRENT DEPLOYMENT Section/Unit Coordinating Structure ORS - STF Responsibility Overall Operational Coordination Combatting rhino

More information

CDEM Resilience Fund Information for the CDEM sector [IS 11/16] March 2016 ISBN

CDEM Resilience Fund Information for the CDEM sector [IS 11/16] March 2016 ISBN CDEM Resilience Fund Information for the CDEM sector [IS 11/16] March 2016 ISBN 978-0-478-43514-6 Published by the Ministry of Civil Defence & Emergency Management This document is not copyright and may

More information

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE Office of Climate Change Guyana September, 2017 TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE ENERGY AUDIT OF PUBLIC INSTITUTIONS, FACILITIES AND STREET LIGHTING

More information