1 Public Disclosure Authorized AFRICA Madagascar Trade & Competitiveness Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 27-Dec-2017 ISR30958 Implementing Agencies: Ministry of Finance and Budget (MFB), National Project Secretariat Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:18-Dec-2014 Planned Mid Term Review Date:14-Apr-2017 Original Closing Date:30-Sep-2019 Project Development Objectives Effectiveness Date:09-Mar-2015 Actual Mid-Term Review Date:20-Mar-2017 Revised Closing Date:30-Sep-2019 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The Project Development Objective is to contribute to increased economic opportunities and access to enabling infrastructure services, as measured by an increase in jobs and formal firms, in Targeted Regions. The Program objective of the Series of Projects (SOP) is the same as the PDO of this Project. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name COMPONENT 1: STRENGTHENING THE ENABLING ENVIRONMENT FOR ENTREPRENEURSHIP AND INVESTMENT:(Cost $11.00 M) Public Disclosure Authorized COMPONENT 2:SECTOR BASED GROWTH IN THE ATSIMO-ANDREFANA, ANOSY AND DIANA REGIONS:(Cost $35.50 M) COMPONENT 3:PROJECT IMPLEMENTATION, M&E, SAFEGUARDS, IMPACT EVALUATION:(Cost $3.50 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate 12/27/2017 Page 1 of 16
2 Implementation Status and Key Decisions Component 1: Strengthening the Enabling Environment for Entrepreneurship and Investment Investment Climate and Investment Promotion Recent mission confirmed that despite some progress in the 2018 ranking, Madagascar remains at the 162nd place out of the 190 economies evaluated in terms of "facilitation of doing business". The Investment Climate (IC)/ Doing Business (DB) reform program has progressed though EDBM, which is the main platform for coordinating and implementing investment climate reforms in Madagascar. EDBM has confirmed interest in developing a more structured reform strategy reflected in its action plan that would allow for more substantial results in the future as well as to present its annual action plans for validation by the Council of Ministers to allow for legitimacy and ownership of the agenda of reforms it coordinates by the higher hierarchy of Government. In the latest version 2018 of the report, Madagascar is recognized for its improvement of the process of starting a business, and an increase in the number of individuals covered by the credit information registry and scores 47.67/100 points on the overall distance to frontier (DTF). Madagascar showed an improvement of 3.05 points, moving up from points last year to this year. Public Private Partnerships (PPPs): s Public-Private Infrastructure Advisory Facility (PPIAF) supported the development of an economic model for ADEMA s 10, outside of the two main airports (Antananarivo and Nosy Be concessioned to the private sector in July 2017). A first analysis of the individual financial contribution of each airport was undertaken but awaits final results of studies financed by PIC in terms of revised investment needs (CAPEX) for the airports finalized in November Secondary analysis involving the final identification of the airports that could be included under a PPP program are under way and the presentation of options for structuring a PPP scheme will be delivered in January Madagascar Business and Investment Facility (MBIF) and Entrepreneurship: The implementation of Window one investment under MBIF is progressing. 104 business plans, out of 450 proposals have been approved for funding in for the amount of US$ 1.02 million. Grants agreements have been singed totaling US$ 743,000 of which 111,000 were disbursed by November 30th All agreements of this current call for proposals are expected to be signed by December Business support services infrastructure linked to the support to implementation of grant activities has also progressed. Completion of the rehabilitation the Tulear regional business center (Centre d Affaires Régional or CAR) finalized in August Works for the CAR in Diego are anticipated for February Two Technical assistants for Tulear will initiate in December 2017 and for Diego in first trimester 2018 following delivery of the respective CARs. The CAR for Anosy (called CARA and based in Fort Dauphin) has set up its incubator and accompanies nearly 30 entrepreneurs (RIO TINTO and MBIF beneficiaries). Specific call for proposal will be launched to additional business plans in Fort Dauphin. Investment promotion: The support of PIC 2 to EDBM in terms of Hotel investment promotion has yielded very positive results with formal expression of interest from 19 international hotel groups, site visit of nine international Hotel Groups and anticipated visit of another seven international hotel groups in February Most international hotel operators have focused on development of properties in Antananarivo and Nosy Be. Branded Hotel investments are currently being negotiated for four properties in Nosy Be and Antananarivo. Special Economic Zones (SEZ): Rio Tinto, who operates the Ehoala mine but also the Ehoala port facilities and the adjacent Industrial Park, has held public consultations to discuss the possibility for an improved management of the both the port and Park to increase their use for non-mining activities. In parallel the PIC2 Project has initiated a demand study for private investment in the park, initial results will be presented to the government in January Concerns had been raised regarding the coexistence and duplication of regimes outside of the tax code, and distortion of competition, from the sometimes overlapping, sometimes contradictory multiple zone and investment laws, however the law creating the Zones Economiques Spéciales or ZES was adopted by parliament on November 8, 2017 without amendment. Component 2 : Sector Based Growth in the Atsimo-Andrefana, Anosy and Diana Regions Tourism and Air transport sector: The Project continues to engage in successful support of the Tourism and Air Transport sectors. The project has successfully supported the Board of Air Madagascar in establishing a strategic Partnership with Austral and Air Madagascar on October 9th The Financial close was signed on November 30th The project has also financed the assessment of priority investment needs in 09 airports, including DIE, TLE and FTU, which has been validate by the Ministry of Transport, Airports of Madagascar (ADEMA) and Madagascar Civil Aviation (ACM). In terms of product development in the poles, the sites Montagne des Français (Diégo) et Jardin de la Mer (Tuléar) have been finalized and the management structures are operational. Productions of marketing materials and new internet sites have been delivered to the Tourism Boards of Diégo, Tuléar, Nosy Be. Support which lead to improvements in the Air Transport sector linked to active project support to promotion of Madagascar in key markets (France, Germany and UK) had yielded results as reflected by a 10.5% increase visitors to Madagascar from these key Markets between January and September 2017[1]. The German market showed the largest increase in arrivals of 31% in the same period. The target of visitors for 2017 will be however hard to reach given the pest epidemics that has hit Madagascar in the last few months. Actual impact of the Plague to the tourism sector is still being assessed. Governance. Following the mid-term review, the project s support for cross-cutting governance activities has focused on strengthening sectoral and economic governance, mainly as support to the sectors and value chains of the project. While the project will continue to monitor the Local Governance Index (IGL), the focus of the support will be on improving local revenues and increase local investments. By October 2017, revenues of the 07 urban 12/27/2017 Page 2 of 16
3 communes supported by the project increased by + 53%, as compared to the achievements in The 70 rural communes registered an increase of + 141%. Infrastructure: Works linked to water supply in Diego and Tulear are progressing well. The production capacity connecting new boreholes to the existing system and 30 Km of distribution mains in Tulear are anticipated to be delivered in February 2018 with an anticipated additional production of 4000 m3/day. The finalization of the works in Diego for construction of a water treatment plant with a capacity of m3/day and water tank for 2500m3 to be delivered in March 2018 will ensure that existing distribution system is able to provide water to 80% of the population. Due to savings in the water supply works contract, the project was able to further support the construction of a new 1500m3 reservoir for the city of Tulear for at Andranomena with an additional 10 km of distribution mains. Additional works are anticipated to be finalized in June Component 3: Project Implementation, M&E, Safeguards, Impact Evaluation This ISR reflects outcomes of technical missions related to Investment support and technical desk review of project component progress. A thorough review of the fiduciary and safeguard aspects of the project will be conducted in the January 2018 mission and will be reflected in a follow up ISR. Implementation and disbursement: Project overall Implementation is well advanced, with actual project disbursement at 55 % and commitments of more than 78% on November 30, Procurement: execution of project procurement activities presented no major problems, and there is constant improvement of the management of the process of procurement and management of contracts. Financial Management: Based on desk review, the ratings remain the same. Interim Financial Reports are submitted timely and are deemed satisfactory as they comply with agreed template and provide relevant information to appreciate the financial status of the project. The disbursement schedule as well as the budget are generally respected. The transactions review will be undertaken during the mission of January Safeguards: The overall performance of the implementation of the environmental and social management of the project remains satisfactory as adequate safeguards instruments have been developed and approved for the already completed and ongoing infrastructure works in Antsiranana and Toliary. The team has however has noted recent delay in submission of final safeguards document for review and clearance for additional works planned for Diana (water supply) and in Anosy and Atsimo-Andrefana regions (energy investments, financed by OPEC funds but subject to WB Safeguard guidelines for being a linked project), which will likely imply the (temporary) resettlement of some families and some land acquisition. The project is currently preparing those key safeguards instruments and once they are declared to the satisfaction of the World Bank, works will proceed. The mission also noted the need for documenting environmental training plans in the context of MBIF and establishment of a consolidated monitoring database of training results in integrated management of Pests and Pesticides for the cotton sector. The team will follow up closely on these items in the coming months. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Substantial Substantial Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Moderate Moderate Institutional Capacity for Implementation and Sustainability -- Low Low Fiduciary -- Moderate Moderate Environment and Social -- Moderate Substantial Stakeholders -- Low Low Other Overall -- Moderate Moderate 12/27/2017 Page 3 of 16
4 Results Project Development Objective Indicators Number of formal jobs created in the targeted poles (Number, Custom) Value 3, , , , Of which in the Diana region (Number, Custom Breakdown) Value 1, , , Of which in tourism (Number, Custom Breakdown) Value Of which in Atsimo-Andrefana region (Number, Custom Breakdown) Value , /27/2017 Page 4 of 16
5 In which in tourism (Number, Custom Breakdown) Value Of which in Anosy region (Number, Custom Breakdown) Value 1, , Number of formal businesses newly registered in the target poles (Number, Custom) Value 1, , , , Date 31-Dec Oct Dec Dec-2018 Of which in Atsimo-Andrefana region (Number, Custom Breakdown) Value , Of which in Anosy region (Number, Custom Breakdown) Value /27/2017 Page 5 of 16
6 Of which in Diana region (Number, Custom Breakdown) Value 1, , , , Direct project beneficiaries (Number, Custom) Value , , Date 31-Dec Dec Dec-2018 Comments The rehabilitation works for water supply just started end 2016 and will last 12 months in Tuléar and 18 months in Diana. Impact will be seen in calendar year Of which people provided with improved water sources under the project (Number, Custom Breakdown) Value , Date 31-Dec May Dec Dec-2018 Of which people provided with access to regular solid waste collection under the project (Number, Custom Breakdown) 12/27/2017 Page 6 of 16
7 Value , , Date 31-Dec Nov Dec Dec-2018 Female beneficiaries (Percentage, Custom Supplement) Value Overall Comments Intermediate Results Indicators Number of reforms (Number, Custom) Value Date 31-Dec Dec Dec-2018 Of which reforms related to tax simplification (Number, Custom Breakdown) Value Date 31-Dec May Dec Dec /27/2017 Page 7 of 16
8 Of which reforms related to commercial disputes (Number, Custom Breakdown) Value Date 31-Dec Dec Dec-2018 Of which IC reforms (Number, Custom Breakdown) Value Date 31-Dec Dec Dec-2018 Increase in the number of wage jobs in the target corridors in the target poles (Percentage, Custom) Value Date 31-Dec Dec Dec-2018 Of which in Atsimo-Andrefana region (Percentage, Custom Breakdown) Value Date 31-Dec Nov Dec Dec /27/2017 Page 8 of 16
9 Of which in the Diana region (Percentage, Custom Breakdown) Value Date 31-Dec Jun Dec Dec-2018 Of which in Anosy Region (Percentage, Custom Supplement) Value Annual municipal revenues collected in the target poles (Amount(USD), Custom) Value 3, , , Date 31-Dec Dec Dec-2018 Of which in Anosy region (Amount(USD), Custom Breakdown) Value /27/2017 Page 9 of 16
10 Of which in Atsimo-Andrefana region (Amount(USD), Custom Breakdown) Value , , Of which in the Diana region (Amount(USD), Custom Breakdown) Value 1, , , Roads Rehabilitated (Kilometers, Custom) Value Date 31-Dec May Dec Dec-2018 Of which non rural (Kilometers, Custom Breakdown) Value Date 31-Dec May Dec Dec /27/2017 Page 10 of 16
11 Passengers traffic, including tourists by air or sea per annum in target poles (Number, Custom) Value 262, , , , Of which in Atsimo-Andrefana region (Number, Custom Breakdown) Value 58, , , , Of which in the Diana region (Number, Custom Breakdown) Value 204, , , , Hotel rooms for establishments in the target poles (Number, Custom) Value 4, , , , /27/2017 Page 11 of 16
12 Of which in Atsimo-Andrefana region (Number, Custom Breakdown) Value 1, , , , Date 31-Dec Nov Dec Dec-2018 Of which in the Diana region (Number, Custom Breakdown) Value 3, , , , Export value for the selected crops in the target poles (Amount(USD), Custom) Value 30,600, ,000, ,940, ,000, Date 31-Dec May Dec Dec-2018 Of which in Atsimo-Andrefana region (cotton and sea cucumber) (Amount(USD), Custom Breakdown) Value 9,000, ,000, ,170, ,000, /27/2017 Page 12 of 16
13 Of which in the Diana region (cocoa, cashew, ylang ylang) (Amount(USD), Custom Breakdown) Value 21,600, ,770, ,000, Increase in revenues from target cash crop production for smallholders in the target corridors in the target poles (Percentage, Custom) Value Local Governance Index in the targeted municipalities (Number, Custom) Value Of which in Anosy region (Number, Custom Breakdown) Value /27/2017 Page 13 of 16
14 Of which in Atsimo-Andrefana region (Number, Custom Breakdown) Value Of which in the Diana region (Number, Custom Breakdown) Value Date 31-Dec Oct Dec Dec-2018 Enterprises directly benefiting from the project (Number, Custom) Value Date 31-Dec Oct Dec Dec-2018 Annual additional sales value of firms supported by the MBIF (Amount(USD), Custom) Value , Date 31-Dec Dec Dec /27/2017 Page 14 of 16
15 People provided with Business Development Services and training programs (Number, Custom) Value , , , Date 31-Dec Oct Dec Dec-2018 Farmers provided with improved inputs and equipment (Number, Custom) Value , Date 31-Dec Dec Dec-2018 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P IDA Effective USD % Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P IDA Effective 18-Dec Dec Mar Sep Sep-2019 Cumulative Disbursements 12/27/2017 Page 15 of 16
16 Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 12/27/2017 Page 16 of 16
The World Bank Burkina Faso - Bagre Growth Pole Project (P119662)
Public Disclosure Authorized AFRICA Burkina Faso Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 12 ARCHIVED on 11-Jun-2017 ISR28154 Implementing Agencies: BagrePole,
More informationPublic Disclosure Copy. Implementation Status & Results Report CO APL1 La Guajira Water & Sanitation Infrast and Service Mngmt Proj (P096965)
LATIN AMERICA AND CARIBBEAN Colombia Water Global Practice IBRD/IDA Adaptable Program Loan FY 2007 Seq No: 15 ARCHIVED on 04-Dec-2014 ISR17292 Implementing Agencies: Key Dates Key Project Dates Board Approval
More informationThe World Bank The Gambia - Growth & Competitiveness (P114240)
Public Disclosure Authorized AFRICA Gambia, The Financial and Private Sector Development Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 23-Dec-2014 ISR17317 Implementing
More informationThe World Bank Research and Innovation in Science and Technology Project (P121842)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Education Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 8 ARCHIVED on 22-Jun-2017 ISR27107 Implementing Agencies: Ministry
More informationPublic Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933)
Public Disclosure Authorized AFRICA Lesotho Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 08-May-2018 ISR30476 Implementing
More informationPublic Disclosure Copy
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 03-May-2018
More informationThe World Bank JM Youth Employment in Digital and Animation Industries (P148013)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Jamaica Social Development Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 2 ARCHIVED on 29-Jun-2015 ISR19585 Implementing
More informationThe World Bank Africa Higher Education Centers of Excellence Project (P126974)
AFRICA Africa Education Global Practice IBRD/IDA Specific Investment Loan FY 2014 Seq No: 3 ARCHIVED on 25-Jun-2015 ISR19488 Implementing Agencies: National University Commision, Ministry of Higher Education,
More informationThe World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)
Public Disclosure Authorized AFRICA Swaziland Health, Nutrition & Population Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 10 ARCHIVED on 27-Jun-2016 ISR24063 Implementing Agencies:
More informationThe World Bank Kenya GPE Primary Education Development Project (P146797)
Public Disclosure Authorized AFRICA Kenya Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 01-Nov-2017 ISR29517 Implementing Agencies:
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Burundi Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 20-Dec-2017 ISR29199 Implementing Agencies:
More informationThe World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867)
Public Disclosure Authorized SOUTH ASIA India Education Global Practice IBRD/IDA Program-for-Results FY 2017 Seq No: 1 ARCHIVED on 27-Jun-2017 ISR28685 Implementing Agencies: Ministry of Skill Development
More informationOBA Urban Sanitation Facility for the Greater Accra Metropolitan Area (GAMA) (P145139)
Public Disclosure Authorized AFRICA Ghana Water Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 3 ARCHIVED on 10-May-2017 ISR25522 Implementing Agencies: Public
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Ethiopia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 06-Dec-2017 ISR30229 Implementing Agencies: National Bank
More informationThe World Bank JM Youth Employment in Digital and Animation Industries (P148013)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Jamaica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 5 ARCHIVED on
More informationKey Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions
The World Bank EUROPE AND CENTRAL ASIA Kyrgyz Republic Procurement Global Practice Institutional Development Fund FY 2014 Seq No: 2 ARCHIVED on 08-Jun-2015 ISR19571 Implementing Agencies: Public Procurement
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Ethiopia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 25-May-2017 ISR27984 Implementing Agencies: National Bank
More informationImplementation Status & Results Report MENA- Desert Ecosystems and Livelihoods Knowledge Sharing and Coordination Project (P130343)
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Middle East and North Africa Environment & Natural Resources Global Practice Global Environment Project Technical Assistance Loan FY 2013 Seq No:
More informationPublic Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Liberia Education Global Practice Recipient Executed Activities Specific Investment
More informationThe World Bank Second Karnataka State Highway Improvement (P107649)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOUTH ASIA India Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY
More informationPublic Disclosure Copy
LATIN AMERICA AND CARIBBEAN Brazil Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 1 ARCHIVED on 17-May-2017 ISR27363 Implementing Agencies: Key Dates Key Project Dates Bank
More informationThe World Bank Kenya GPE Primary Education Development Project (P146797)
Public Disclosure Authorized AFRICA Kenya Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 15-Feb-2017 ISR26822 Implementing Agencies:
More informationPublic Disclosure Copy
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Transport & ICT Global Practice IBRD/IDA Program-for-Results FY 2016 Seq No: 3 ARCHIVED on 15-Jun-2017 ISR28180 Implementing Agencies:
More informationThe World Bank Sustainable Rural Sanitation Services Program for Results (P154112)
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Water Global Practice IBRD/IDA Program-for-Results FY 2016 Seq No: 1 ARCHIVED on 05-Nov-2015 ISR21200 Implementing Agencies:
More informationImplementation Status & Results Benin ebenin Project (P113370)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin ebenin Project (P113370) Operation Name: ebenin Project (P113370) Project Stage: Implementation
More informationThe World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)
Public Disclosure Authorized AFRICA Swaziland Health, Nutrition & Population Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 12 ARCHIVED on 29-Jun-2017 ISR28124 Implementing Agencies:
More informationImplementation Status & Results Nigeria Lagos Urban Transport Project 2 (P112956)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nigeria Lagos Urban Transport Project 2 (P112956) Operation Name: Lagos Urban Transport Project
More informationThe World Bank Health Professional Education Quality Project (P113341)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Health, Nutrition and Population Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 9 ARCHIVED on 24-Dec-2014 ISR17306 Implementing
More informationPublic Disclosure Copy. Implementation Status & Results Report Philippines: Extractive Industries Transparency Initiative Implementation (P128290)
Public Disclosure Authorized EAST ASIA AND PACIFIC Philippines Energy & Extractives Global Practice Recipient Executed Activities Technical Assistance Loan FY 2014 Seq No: 1 ARCHIVED on 07-Jul-2015 ISR19833
More informationImplementation Status & Results Kazakhstan Agricultural Competitiveness Project (P049721)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kazakhstan Agricultural Competitiveness Project (P49721) Operation Name: Agricultural Competitiveness
More informationThe World Bank MDTF-Economic Revitalization of KP and FATA (P124268)
Public Disclosure Authorized SOUTH ASIA Pakistan Trade & Competitiveness Global Practice Recipient Executed Activities Emergency Recovery Loan FY 2012 Seq No: 11 ARCHIVED on 06-Dec-2016 ISR25587 Implementing
More informationThe World Bank Serbia Research, Innovation and Technology Transfer Project (P145231)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Serbia Trade & Competitiveness Global Practice Recipient Executed Activities Technical Assistance Loan FY 2015 Seq No: 1 ARCHIVED on 30-Oct-2015 ISR20707
More informationThe World Bank St. Petersburg Economic Development Project (P069063)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Russian Federation Urban Development Global Practice IBRD/IDA Financial Intermediary Loan FY 2003 Seq No: 23 ARCHIVED on 08-Dec-2014 ISR17382 Implementing
More informationImplementation Status & Results Brazil BR-Housing Sector TAL (P050761)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR-Housing Sector TAL (P050761) Operation Name: BR-Housing Sector TAL (P050761) Project Stage:
More informationImplementation Status & Results OECS Countries Telecommunications & ICT Development Project (P088448)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results OECS Countries Telecommunications & ICT Development
More informationPublic Disclosure Copy
SOUTH ASIA Pakistan Agriculture and Rural Development Global Practice Recipient Executed Activities Specific Investment Loan FY 2013 Seq No: 4 ARCHIVED on 26-Nov-2014 ISR17007 Implementing Agencies: KP
More informationPublic Disclosure Copy. Implementation Status & Results Report Senegal: Extractive Industries Transparency Initiative Implementation (P131626)
Public Disclosure Authorized AFRICA Senegal Energy and Mining Global Practice Recipient Executed Activities Technical Assistance Loan FY 2014 Seq No: 1 ARCHIVED on 18-Jun-2015 ISR19209 Implementing Agencies:
More informationImplementation Status & Results Cote d'ivoire RCI- Emergency Urban Infrastructure (FY08) (P110020)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cote d'ivoire RCI- Emergency Urban Infrastructure (FY08) (P110020) Operation Name: RCI- Emergency
More informationINDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)
Public Disclosure Authorized INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU) (P159191) EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global
More informationImplementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658) Operation
More informationImplementation Status & Results Swaziland Swaziland Health, HIV/AIDS and TB Project (P110156)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Swaziland Swaziland Health, HIV/AIDS and TB Project (P110156) Operation Name: Swaziland Health,
More informationPublic Disclosure Copy
Public Disclosure Authorized EAST ASIA AND PACIFIC China Health, Nutrition & Population Global Practice IBRD/IDA Program-for-Results FY 2017 Seq No: 2 ARCHIVED on 25-Feb-2018 ISR31105 Implementing Agencies:
More informationImplementation Status & Results Morocco MA-Rural Roads II (P094007)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Rural Roads II (P094007) Operation Name:
More informationThe World Bank Social Accountability Knowledge, Skills, Action and Networking (P147835)
Public Disclosure Authorized AFRICA Mozambique Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 12-Jan-2018 ISR29464 Implementing Agencies:
More informationImplementation Status & Results Jordan Jordan - Cultural Heritage, Tourism & Urban Development (P081823)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Jordan Jordan - Cultural Heritage, Tourism & Urban Development (P081823) Operation Name: Jordan
More informationImplementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221) Operation Name: DO APL1
More informationImplementation Status & Results Rwanda Second Emergency Demobilization and Reintegration Project (P112712)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Rwanda Second Emergency Demobilization and Reintegration Project (P112712) Operation Name: Second
More informationThe World Bank Romania Secondary Education Project (P148585)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ROMANIA SECONDARY EDUCATION PROJECT APPROVED ON MARCH 16, 2015 TO ROMANIA
More informationImplementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221) Operation Name: DO APL1
More informationImplementation Status & Results Brazil Ceara Regional Economic Development: Cidades do Ceara (P099369)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Ceara Regional Economic Development: Cidades do Ceara (P99369) Operation Name: Ceara Regional
More informationImplementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620) Operation Name: Forest
More informationImplementation Status & Results Sri Lanka Sri Lanka - Second Health Sector Development Project (P118806)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Sri Lanka Sri Lanka - Second Health Sector Development Project (P118806) Operation Name: Sri Lanka
More informationImplementation Status & Results Guinea National Rural Infrastructure Project (P065127)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Guinea National Rural Infrastructure Project (P065127) Operation Name: National Rural Infrastructure
More informationImplementation Status & Results Central African Republic Multisectoral HIV/AIDS Project (P073525)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project
More informationImplementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920) Operation Name: Gaza II Emergency Water
More informationImplementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070) Operation Name: Support for
More informationImplementation Status & Results Morocco MA-Rural Roads II (P094007)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Rural Roads II (P094007) Operation Name: MA-Rural Roads II (P094007) Project Stage: Implementation
More informationImplementation Status & Results Dominican Republic Water and Sanitation in Tourist Areas (P054221)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Dominican Republic Water and Sanitation in Tourist Areas (P054221) Operation Name: Water and Sanitation
More informationImplementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620) Operation Name: Forest
More informationImplementation Status & Results Indonesia Health Professional Education Quality Project (P113341)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Health Professional Education Quality Project (P113341) Operation Name: Health Professional
More informationImplementation Status & Results Tanzania Sustainable Management of Mineral Resources (P096302)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Sustainable Management of Mineral Resources (P096302) Operation Name: Sustainable Management
More informationImplementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070) Operation Name: Support for
More informationImplementation Status & Results Guinea Development of Inclusive Education in Guinea (P129210)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Guinea Development of Inclusive Education in Guinea (P129210) Operation Name: Development of Inclusive
More informationThe World Bank Vietnam Climate Innovation Center (VCIC) RETF (P155260)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF VIETNAM CLIMATE INNOVATION CENTER (VCIC) RETF APPROVED ON OCTOBER 30,
More informationImplementation Status & Results Kyrgyz Republic Small Towns Infrastructure & Capacity Building Project (P083377)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kyrgyz Republic Small Towns Infrastructure & Capacity Building Project (P83377) Operation Name:
More informationImplementation Status & Results Montenegro Healthcare System Improvement Project (Montenegro) (P082223)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Healthcare System Improvement Project (Montenegro) (P082223) Operation Name: Healthcare
More informationThe World Bank Gabon Investment Promotion & Competitiveness Project (P129267)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GABON INVESTMENT PROMOTION & COMPETITIVENESS PROJECT APPROVED ON MARCH
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Nigeria Public Sector Governance Global Practice Recipient Executed Activities Specific Investment Loan FY 20 Seq No: 4 ARCHIVED on 3-Feb-205 ISR7805 Implementing Agencies:
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationImplementation Status & Results Guatemala GUATEMALA Maternal and Infant Health and Nutrition (P077756)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Guatemala GUATEMALA Maternal and Infant Health and Nutrition (P077756) Operation Name: GUATEMALA
More informationImplementation Status & Results Indonesia ID SPADA in Aceh and Nias (P097605)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P9765) Operation Name: ID SPADA in Aceh and Nias (P9765) Project
More informationP4: PACIFIC REGIONAL ICT REGULATORY DEVELOPMENT PROJECT APPROVED ON JULY 30, 2014 UNIVERSITY OF THE SOUTH PACIFIC
Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES29928 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationImplementation Status & Results Morocco Morocco Urban WS&S Access Pilots (P102527)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco Morocco Urban WS&S Access Pilots (P102527) Operation Name: Morocco Urban WS&S Access Pilots
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING MADAGASCAR SCALING RENEWABLE ENERGY PROGRAM (SREP) INVESTMENT PLAN (IP)
Public Disclosure Authorized The World Bank REPORT NO.: RES31786 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF MADAGASCAR SCALING RENEWABLE ENERGY PROGRAM (SREP)
More informationNATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS FOR APPROVED ON NOVEMBER 20, 2012 REPUBLIC OF INDONESIA
The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES25530 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS FOR 2012-2015 APPROVED ON
More informationRajasthan Urban Sector Development Program
India: Rajasthan Urban Sector Development Program Project Name Rajasthan Urban Sector Development Program Project Number 42267-026 Country Project Status Project Type / Modality of Assistance Source of
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BUSINESS DEVELOPMENT AND INVESTMENT PROJECT GRANT H865-0-HT
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES15978 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF BUSINESS DEVELOPMENT
More informationEnhancing Competitiveness in Small Island Development States A UNIDO-Competitive Industries Partnership
Enhancing Competitiveness in Small Island Development States A UNIDO-Competitive Industries Partnership Ivan Rossignol Chief Technical Specialist Competitive Industries Global Practice Washington, DC,
More informationMyanmar Country Partnership Framework (CPF) Background Material
Myanmar Country Partnership Framework (CPF) Background Material June 2014 The World Bank Group What is the World Bank Group? The World Bank is a vital source of financial and technical assistance to developing
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22379 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationSTRENGTHENING MICRO-ENTREPRENEURSHIP FOR DISADVANTAGED YOUTH APPROVED ON JUNE 27, 2013 MINISTRY OF ECONOMY AND FINANCE (TGR)
The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES26443 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING MICRO-ENTREPRENEURSHIP FOR DISADVANTAGED YOUTH APPROVED ON JUNE 27,
More informationPartnering with Haiti to Rebuild the State
Partnering with Haiti to Rebuild the State Post-Earthquake USG Haiti Strategy October 2010 United States Government Principles of a New USG Haiti Strategy Five Principles USG assistance will be country-led
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF HAITI - URBAN COMMUNITY DRIVEN DEVELOPMENT PROJECT (PRODEPUR) ADDITIONAL FINANCING GRANT
Public Disclosure Authorized Document of The World Bank Report No: 64887-HT Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF HAITI - URBAN COMMUNITY DRIVEN DEVELOPMENT
More information2017 Aid for Trade - Partner Country Questionnaire SurveyMonkey. Q2: About you EVA RAZAFIMANDIMBY (*Translated)
#7 COMPLETE Collector: Web Link 1 (Web Link) Started: Friday October 21 2016 12:32:29 PM Last Modified: Friday October 21 2016 4:01:57 PM Time Spent: 03:29:28 IP Address: 192.91.247.212 PAGE 5: ABOUT YOU
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic
More informationUnited Nations Peace Building Fund Grant Agreement
Public Disclosure Authorized OFFICIAL DOCUMENTS Public Disclosure Authorized GRANT NUMBER TF018255 United Nations Peace Building Fund Grant Agreement (Additional Financing for the Productive Social Safety
More informationPMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)
1. SUMMARY INFORMATION Implementing Country/Technical Partner: PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) South Africa. Reporting Period: From 1/10/2017 to 30/09/2018 Report Date: 4 October 2018 Implementing
More information1. Executive Summary Introduction Methodology... 5
Made in Madagascar: Exporting Handicrafts to the U.S. Market Final Report A Project with the UN Public-Private Alliance for Rural Development Produced by Charlotte Ashamu, Diego Gomez-Pickering, Amanda
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name. Leveraging ICT for Governance, Growth and Employment Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name Leveraging
More informationOFFICIAL r0 4 DOCUMENTS
Public Disclosure Authorized OFFICIAL r0 4 DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD
More informationThe Ethiopian Climate Resilient Green Economy Facility (CRGE Facility) June, 2013 Lombok, Indonesia
The Ethiopian Climate Resilient Green Economy Facility (CRGE Facility) June, 2013 Lombok, Indonesia Introduction Ethiopia is the second most populous country in Africa after Nigeria with over 85 million
More informationGlobal Partnership on Output-based Aid Grant Agreement
Global Partnership on Output-based Aid GRANT NUMBERS TF057614 AND TF057615 Global Partnership on Output-based Aid Grant Agreement (Kenya - Microfinance for Community-Managed Water Projects) between K-REP
More informationProcessor Application
Processor Application Version 1.2 Step 1 Enrolment I confirm that the applicant has completed or updated a Growing Forward 2 (GF2) Enrolment. Step 2 Basic Eligibility Requirements I confirm, on behalf
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Central African Backbone - APL2
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized North East Local Services Improvement [Project TABLE OF CONTENTS NORTH EAST LOCAL SERVICES
More informationIncentive Guidelines Innovative Start-ups Scheme
Incentive Guidelines Innovative Start-ups Scheme Issue Date: 6 th May 2010 Updated: 10 th April 2014 Version: 1.2 http://support.maltaenterprise.com CONTENTS 1. Introduction 4 2. Eligibility 5 3. Incentive
More informationKyrgyz Republic: Investment Climate Improvement Program
Validation Report Reference Number: PVR-423 Project Numbers: 41544-022, 41544-082, 41544-084 Grant Numbers: 0120, 0319, and 0393 October 2015 Kyrgyz Republic: Investment Climate Improvement Program Independent
More informationI Revised closing date [if applicable] : Indicate if the restructuring is:
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date: March 3,2009 Country: Honduras Project Name: Trade Facilitation and Productivity
More informationCIVIL ENGINEER EXPERT
This Trust Fund is funded by the European Union EU Local and Regional Competitiveness Project This Trust Fund is administered by the World Bank TERMS OF REFERENCE TECHNICAL COMMITTEE CIVIL ENGINEER EXPERT
More informationWorld Bank - Grant Reporting and Monitoring (GRM) Report. Report to Donor. Ref. TF0A2303 Reporting Period: 07/01/2016 to 06/30/2017
Assignment: TF0A2303 Third Grant Agreement for Costa Rica's Readiness Preparation Proposal - Readiness Fund of Forest Carbon Partnership Facility (FCPF) FCPFR - Forest Carbon Partnership Facility Task
More information