1 November 25, 2008 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN RE: Asbestos Inspection Project # Dear Ted: Enclosed please find the inspection report for the above-referenced location. If you have any questions or require additional information, please do not hesitate to contact me. Sincerely, INSTITUTE FOR ENVIRONMENTAL ASSESSMENT, INC. Jeff Carlson Director of Inspection Services JLC/wsb Enclosures cc File

2 ASBESTOS INSPECTION PROFILE 60 South Ruth Street Saint Paul, MN Submitted to: Ted Sherman Saint Paul Public Schools Submitted by: Institute for Environmental Assessment 9201 West Broadway North, Suite 600 Brooklyn Park, MN / Client #2001 Project #

3 INDEX SECTION I Asbestos Summary and Inspection Report SECTION II Floor Plans SECTION III Asbestos Laboratory Report SECTION IV Asbestos Inspector and Management Planner Licenses

4 SECTION I Asbestos Summary and Inspection Report

5 Asbestos Summary 60 South Ruth Street Saint Paul, MN On November 5, 2008, an inspection for asbestos-containing materials (ACM) was performed at the above-referenced location. The scope of the inspection included all accessible suspect ACM within the building. Since this was a limited inspection, there may be additional materials not identified on the report located within wall cavities, pipe chases and/or other inaccessible locations. Suspect ACM was identified and sampled for asbestos content. Identified materials confirmed to be ACM include the following: Pipe joint insulation Boiler gaskets Asbestos cement ducting (transite) 9 x 9 floor tile and mastic Black flooring mastic Light cord insulation Black sink undercoating Tan penetration putty Tan and black mastic Wired sidelight window glaze The following suspect materials were not sampled as part of the inspection. These materials are assumed to contain asbestos and shall be treated as ACM or sampled prior to disturbance to determine if they are ACM or not. Identified materials assumed to be ACM include the following: Boiler refractory Asbestos cement ducting (transite) Fire doors Wood floor vapor barriers/felts Chalkboard adhesive See the attached report for specific quantities and locations. Destructive sampling was not performed as a part of this inspection. This inspection does not meet the requirements of the Minnesota Pollution Control Agency (MPCA) or Minnesota OSHA (MNOSHA) for an asbestos demolition/renovation inspection., Inc Page 1of 2

6 Bulk Samples of accessible suspect material were collected and analyzed in accordance with Environmental Protection Agency (EPA) sampling and analytical procedure requirements. Sampling was conducted in a manner determined by the inspector to be sufficient to identify whether the suspect materials are asbestos containing. Where deemed appropriate, prior sample results were used and are referenced in the report. Roof samples were not collected as part of this inspection. Suspect roofing materials should be handled as asbestos or sampled prior to disturbance to determine if they are ACM or not. Specific locations of these materials, as well as those suspect materials which were analyzed and were found not to contain asbestos, are identified in the attached report., Inc Page 2of 2

7 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Chart B - Assessment of Asbestos-Containing Building Materials (ACBM) All asbestos-containing events listed here are to be inspected during each six-month periodic surveillance inspection for changes in condition. The Institute for Environmental Assessment () highly recommends an in depth "front end" inspection prior to any general renovation or remodeling to determine if those activities may disrupt building materials that may involve existing or undiscovered asbestos. Potentially inaccessible or exempt asbestos-containing materials not included in this plan may include: adhesives, caulking, putty, woven blankets, curtains, gloves and gaskets, electrical wiring insulation and heat shields above lights, paints and coatings, roofing felts, flashings and shingles, and mineral core fire doors. Damaged materials which require corrective action to reduce a potential hazard are indicated on Chart A. All non-damaged ACBM identified in Chart B should be monitored through scheduled inspections and removed prior to renovation or demolition activities, or when their condition deteriorates. District administration will direct another formal inspection by a federally certified inspector within three (3) years, and will maintain an ongoing file for each building. Specific recommendations on how to manage the different types of asbestos-containing material are identified in the Asbestos Management Plan. PLEASE NOTE: Based on EPA recommendations, materials analyzed utilizing PLM and found to contain between 0% and 10% should be assumed asbestos containing unless building owner wishes the laboratory to utilize "point counting." For samples analyzed prior to 1994 containing 1% or less (trace) of asbestos, resampling utilizing the 1993 EPA Test Method or point counting is strongly recommended for purposes of demolition or renovation before treating these materials as non-asbestos containing. Contact your local office for questions or additional information. EPA ASSESSMENT CATEGORIES: 1 = Damaged or significantly damaged TSI ACM. 5 = ACBM w/potential for damage. 2 = Damaged friable surfacing ACM. 6 = ACBM w/potential for significant damage. 3 = Significantly damaged friable surfacing ACM. 7 = Any remaining friable ACBM or friable suspected ACBM. 4 = Damaged or significantly damaged friable miscellaneous ACM. Material Type Location Total Friable? % Asbestos EPA Assess. Category 12 T0A Light Cord Insulation THROUGHOUT 1964 ORIGINAL BUILDING 500 Lin. Ft. N 50 CH 5 ORIGINAL FLUORESCENT LIGHTS. 15 P0A Fire Doors BOILER ROOM (1101) 20 Sq. Ft. N ASSUMED 5 Metal - 1-1/2 Hr Rating (Underwriter's Laboratories) ONE (1) DOOR. Page 1

8 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Material Type Location Total Friable? % Asbestos EPA Assess. Category 16 D1A Boiler Gaskets BOILER ROOM (1101) 10 Sq. Ft. N 90 CH 5 Boiler #1 17 D2A Interior Boiler Insulation BOILER ROOM (1101) 150 Sq. Ft. N ASSUMED 5 Boiler #1 18 D2B Interior Boiler Insulation BOILER ROOM (1101) 20 Sq. Ft. N ASSUMED 5 Boiler #2 19 J2A Transite Piping 1964 ORIGINAL BUILDING TUNNEL SYSTEM 1500 N 30 CH Original Building FIFTY (50) AT PENETRATIONS. VISIBLE W/I TUNNEL. ESTIMATED UNDER CONCRETE SLAB. 20 P0A Fire Doors TUNNEL SYSTEM 10 Sq. Ft. N ASSUMED 5 Metal - 1-1/2 Hr Rating (Underwriter's Laboratories) ONE (1) DOOR. BOILER ROOM ACCESS. 22 X0A Miscellaneous Material 1964 ORIGINAL BUILDING TUNNEL SYSTEM 50 Sq. Ft. N 25 CH 5 Tan Penetration Putty HVAC PENETRATIONS. 29 K3A Miscellaneous Flooring ROOM Sq. Ft. N 5 CH 5 Black Flooring Mastic ASSUMED PRESENT AT PERIMETER EDGES. 31 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 32 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) Page 2

9 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Material Type Location Total Friable? % Asbestos EPA Assess. Category 35 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 36 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 39 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 40 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 41 S0A Wood Floor Mastic / Felt / Vapor Barrier STAGE (1108) 800 Sq. Ft. N ASSUMED Original Building 42 K0A 9" x 9" Vinyl Floor Tile & Mastic ROOM Sq. Ft. N 3 CH (TILE) Gray 20 CH (MASTIC) 5 UNDER CARPET. 49 V0A Sink Undercoating MAIN OFFICE WORK ROOM (1003) 4 Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 60 A4A Mudded Pipe Joints on Fiberglass Insulation 1964 Original Building GIRLS' HAND WASHING/DRINKING FOUNTAIN CHASE EAST OF ROOM 1317 VISIBLE FROM CHASE & TUNNEL. 61 X0B Miscellaneous Material GIRLS' HAND WASHING/DRINKING FOUNTAIN Tan Mastic Puck CHASE EAST OF ROOM Joints N 20 CH, 15 AM 5 10 Sq. Ft. N 5 CH 5 VISIBLE FROM CHASE & TUNNEL. Page 3

10 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Material Type Location Total Friable? % Asbestos EPA Assess. Category 62 X0C Miscellaneous Material GIRLS' HAND WASHING/DRINKING FOUNTAIN Black Mastic Puck CHASE EAST OF ROOM Sq. Ft. N 25 CH 5 VISIBLE FROM CHASE & TUNNEL. 63 X0B Miscellaneous Material BOYS' HAND WASHING/DRINKING FOUNTAIN Tan Mastic Puck CHASE EAST OF ROOM Sq. Ft. N 5 CH 5 VISIBLE FROM CHASE & TUNNEL. 64 X0C Miscellaneous Material BOYS' HAND WASHING/DRINKING FOUNTAIN Black Mastic Puck CHASE EAST OF ROOM Sq. Ft. N 25 CH 5 VISIBLE FROM CHASE & TUNNEL. 66 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 68 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 69 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 71 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 72 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 74 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. Page 4

11 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Material Type Location Total Friable? % Asbestos EPA Assess. Category 76 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 77 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 79 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 81 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 83 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 86 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 88 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 91 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 92 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. Page 5

12 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Material Type Location Total Friable? % Asbestos EPA Assess. Category 93 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 96 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 97 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 99 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 102 J2B Transite Piping/Ducting 1966 ADDITION WEST TUNNEL SYSTEM 90 Lin. Ft. N ASSUMED Addition VISIBLE AT PENETRATIONS. ASSUMED UNDER CONCRETE SLAB. 107 X0J Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1966) 109 V0C Sink Undercoating ROOM Sq. Ft. N 10 CH 5 Black (1966) ONE (1) SINK. 111 X0J Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1966) 113 V0C Sink Undercoating ROOM Sq. Ft. N 10 CH 5 Black (1966) ONE (1) SINK. Page 6

13 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Material Type Location Total Friable? % Asbestos EPA Assess. Category 115 X0J Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1966) 117 V0C Sink Undercoating ROOM Sq. Ft. N 10 CH 5 Black (1966) ONE (1) SINK. 120 X0J Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1966) 122 V0C Sink Undercoating ROOM Sq. Ft. N 10 CH 5 Black (1966) ONE (1) SINK. 124 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 125 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 127 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 129 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 130 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) Page 7

14 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Material Type Location Total Friable? % Asbestos EPA Assess. Category 132 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 134 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 135 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 137 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 139 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 140 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 142 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 144 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 145 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) Page 8

15 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Material Type Location Total Friable? % Asbestos EPA Assess. Category 147 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 149 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 150 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 152 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 153 X0B Miscellaneous Material BOYS' HAND WASHING/DRINKING FOUNTAIN Tan Mastic Puck CHASE WEST OF ROOM Sq. Ft. N 5 CH 5 VISIBLE FROM CHASE & TUNNEL. 154 X0C Miscellaneous Material BOYS' HAND WASHING/DRINKING FOUNTAIN Black Mastic Puck CHASE WEST OF ROOM Sq. Ft. N 25 CH 5 VISIBLE FROM CHASE & TUNNEL. 155 X0B Miscellaneous Material GIRLS' HAND WASHING/DRINKING FOUNTAIN Tan Mastic Puck CHASE WEST OF ROOM Sq. Ft. N 5 CH 5 VISIBLE FROM CHASE & TUNNEL. 156 X0C Miscellaneous Material GIRLS' HAND WASHING/DRINKING FOUNTAIN Black Mastic Puck CHASE WEST OF ROOM 1329 VISIBLE FROM CHASE & TUNNEL. 10 Sq. Ft. N 25 CH X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) Page 9

16 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Material Type Location Total Friable? % Asbestos EPA Assess. Category 160 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 162 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 163 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 165 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 169 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 171 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 173 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) 174 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 179 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1964) Page 10

17 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Material Type Location Total Friable? % Asbestos EPA Assess. Category 180 X0I Miscellaneous Material ROOM Sq. Ft. N 4 CH 5 Wired Side Light Window Glaze (1964) 182 V0A Sink Undercoating ROOM Sq. Ft. N 3 CH 5 Black (1964) ONE (1) SINK. 184 X0J Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1966) 188 X0J Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1966) 192 X0J Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1966) 195 J2B Transite Piping/Ducting 1966 ADDITION EAST TUNNEL SYSTEM 90 Lin. Ft. N ASSUMED Addition VISIBLE AT PENETRATIONS. ASSUMED UNDER CONCRETE SLAB. 205 X0O Miscellaneous Material THROUGHOUT 1996 ADDITION 120 Sq. Ft. N ASSUMED 5 Metal Frame Chalkboard Adhesive (1996) Page 11

18 60 South Ruth Street, Saint Paul, MN Inspection Dates: 11/5/2008 Chart C - All Materials List The following list contains all events observed by the inspector, whether or not they actually contained asbestos, and are grouped by homogeneous area (material type). Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total A4A D1A D2A D2B I2A Mudded Pipe Joints on Fiberglass Insulation 1964 Original Building Boiler Gaskets Boiler #1 Interior Boiler Insulation Boiler #1 Interior Boiler Insulation Boiler #2 2' x 2' Acoustical Ceiling Tile Small Dents w/pinholes 60 GIRLS' HAND WASHING/DRINKING FOUNTAIN CHASE EAST OF ROOM BOILER ROOM (1101) 90 CH , BC Total : 2 Joints 20 CH, 15 AM Z-7,8,9 2 Joints CORNER OF OLD BOILER DOOR GASKET. Total : 10 Sq. Ft. 10 Sq. Ft. Total : 150 Sq. Ft. 17 BOILER ROOM (1101) ASSUMED 150 Sq. Ft. Total : 20 Sq. Ft. 18 BOILER ROOM (1101) ASSUMED 20 Sq. Ft. Total : 2,520 Sq. Ft. 25 ROOM 1103 NONE DETECTED ML Sq. Ft. 197 ROOMS 1216, 1217, 1218 & 1219 NONE DETECTED 2000 Sq. Ft. Page 1

19 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total I3A I3B I3C J2A J2B J3A 2' x 4' Ceiling Tile Pockmarks w/pinholes (1996) Total : 8,000 Sq. Ft. 200 THROUGHOUT 1996 ADDITION NONE DETECTED ML-06; : HALLWAY BY ROOM Sq. Ft. 2' x 4' Ceiling Tile Dents w/pinholes (2001) Total : 200 Sq. Ft. 209 ROOM 1214 NONE DETECTED ML Sq. Ft. 2' x 4' Ceiling Tile Lightly Textured w/pinholes Total : 1,030 Sq. Ft ADDITION KITCHEN (1202) NONE DETECTED ML Sq. Ft. 213 KITCHEN STORAGE (1202B) NONE DETECTED 130 Sq. Ft. Transite Piping 1964 Original Building Total : 1, ORIGINAL BUILDING TUNNEL SYSTEM 30 CH M2045-1A SAMPLE TAKEN BY NOVA Transite Piping/Ducting 1966 Addition Total : 180 Lin. Ft ADDITION WEST TUNNEL SYSTEM ASSUMED 90 Lin. Ft ADDITION EAST TUNNEL SYSTEM ASSUMED 90 Lin. Ft. Miscellaneous Cementitious Material Black Window Sills (1964) Total : 204 Sq. Ft. 30 ROOM 1104 NONE DETECTED 12 Sq. Ft. 34 ROOM 1105 NONE DETECTED 12 Sq. Ft. 38 ROOM 1106 NONE DETECTED 12 Sq. Ft. 44 ROOM 1113 NONE DETECTED 4 Sq. Ft. 47 CONFERENCE ROOM (1111) NONE DETECTED 5 Sq. Ft. 48 MAIN OFFICE WORK ROOM (1003) NONE DETECTED 3 Sq. Ft. 51 PRINCIPAL'S OFFICE (1002) NONE DETECTED 3 Sq. Ft. Page 2

20 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total 53 MAIN OFFICE RECEPTION (1001) NONE DETECTED 6 Sq. Ft. 55 MAIN OFFICE CONFERENCE ROOM (1007) NONE DETECTED 3 Sq. Ft. 59 NURSE'S OFFICE/SICK ROOM NONE DETECTED 3 Sq. Ft. 67 ROOM 1317 NONE DETECTED 8 Sq. Ft. 73 ROOM 1316 NONE DETECTED 8 Sq. Ft. 78 ROOM 1315 NONE DETECTED 8 Sq. Ft. 82 ROOM 1314 NONE DETECTED 3 Sq. Ft. 87 ROOM 1312 NONE DETECTED 3 Sq. Ft. 94 ROOM 1313 NONE DETECTED 4 Sq. Ft. 98 ROOM 1310 NONE DETECTED ML-24 8 Sq. Ft. 101 ROOM 1311 NONE DETECTED 3 Sq. Ft. 126 ROOM 1322 NONE DETECTED 8 Sq. Ft. 131 ROOM 1321 NONE DETECTED 8 Sq. Ft. 136 ROOM 1324 NONE DETECTED 8 Sq. Ft. 141 ROOM 1323 NONE DETECTED 8 Sq. Ft. 146 ROOM 1326 NONE DETECTED 8 Sq. Ft. 151 ROOM 1325 NONE DETECTED 8 Sq. Ft. 161 ROOM 1330 NONE DETECTED 8 Sq. Ft. 166 ROOM 1329 NONE DETECTED 12 Sq. Ft. 170 ROOM 1332 NONE DETECTED 8 Sq. Ft. 175 ROOM 1331 NONE DETECTED 12 Sq. Ft. 181 ROOM 1334 NONE DETECTED 8 Sq. Ft. Page 3

21 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total J3B J3C K0A K1A K1B Miscellaneous Cementitious Material Black Window Sill (1966) Miscellaneous Cementitious Material Sliding Glass Door Sill (1964) 9" x 9" Vinyl Floor Tile & Mastic Gray Sheet Vinyl Flooring & Mastic White w/gray & Tan Specks Sheet Vinyl Flooring & Mastic Gray Terrazzo-Look Total : 54 Sq. Ft. 104 ROOM 1302 NONE DETECTED ML-28 3 Sq. Ft. 108 ROOM 1301 NONE DETECTED 8 Sq. Ft. 112 ROOM 1303 NONE DETECTED 4 Sq. Ft. 116 ROOM 1304 NONE DETECTED 4 Sq. Ft. 118 ROOM 1306 NONE DETECTED 3 Sq. Ft. 121 ROOM 1305 NONE DETECTED 8 Sq. Ft. 185 ROOM 1335 NONE DETECTED 8 Sq. Ft. 189 ROOM 1336 NONE DETECTED 8 Sq. Ft. 193 ROOM 1337 NONE DETECTED 8 Sq. Ft. Total : 20 Sq. Ft. 45 ROOM 1112 NONE DETECTED ML Sq. Ft. 42 ROOM CH (TILE) 20 CH (MASTIC) Total : 180 Sq. Ft Sq. Ft. Total : 250 Sq. Ft. 58 NURSE'S OFFICE/SICK ROOM (1006) NONE DETECTED ML Sq. Ft. Total : 180 Sq. Ft. 84 RESTROOM 1314A NONE DETECTED 60 Sq. Ft. 89 RESTROOM 1312A NONE DETECTED ML-33; Sq. Ft. 100 RESTROOM 1310A NONE DETECTED 60 Sq. Ft. Page 4

22 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total K2B K2C K2D K2E 12" x 12" Vinyl Floor Tile & Mastic Gray w/light Gray & Beige Smudges Total : 10,000 Sq. Ft. 2 THROUGHOUT BUILDING NONE DETECTED ENTRY TO ROOM Sq. Ft. 12" x 12" Vinyl Floor Tile & Mastic Light Gray w/gray Blotches (1997) Total : 4,600 Sq. Ft. 24 GYMNASIUM (1110) NONE DETECTED ML Sq. Ft. 12" x 12" Vinyl Floor Tile & Mastic Gray w/dark Gray & White Flecks Total : 4,730 Sq. Ft. 27 ROOM 1103 NONE DETECTED 520 Sq. Ft. 28 ROOM 1104 NONE DETECTED ML Sq. Ft. 50 PRINCIPAL'S OFFICE (1002) NONE DETECTED 90 Sq. Ft. 52 MAIN OFFICE RECEPTION (1001) NONE DETECTED 400 Sq. Ft. 54 MAIN OFFICE CONFERENCE ROOM (1007) NONE DETECTED 170 Sq. Ft. 56 COPY ROOM 1004 NONE DETECTED 100 Sq. Ft. 57 OFFICE 1005 NONE DETECTED 90 Sq. Ft. 158 ROOM 1330 NONE DETECTED 720 Sq. Ft. 168 ROOM 1332 NONE DETECTED 720 Sq. Ft. 178 ROOM 1334 NONE DETECTED 720 Sq. Ft. 12" x 12" Vinyl Floor Tile & Mastic Gray, Tan & Beige Blotches Total : 4,130 Sq. Ft. 33 ROOM 1105 NONE DETECTED ML Sq. Ft. 37 ROOM 1106 NONE DETECTED 100 Sq. Ft. 65 ROOM 1317 NONE DETECTED 30 Sq. Ft. 70 ROOM 1316 NONE DETECTED 30 Sq. Ft. 75 ROOM 1315 NONE DETECTED 30 Sq. Ft. 80 ROOM 1314 NONE DETECTED 260 Sq. Ft. Page 5

23 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total 85 ROOM 1312 NONE DETECTED 260 Sq. Ft. 90 ROOM 1309 NONE DETECTED 110 Sq. Ft. 95 ROOM 1310 NONE DETECTED 260 Sq. Ft. 106 ROOM 1301 NONE DETECTED 30 Sq. Ft. 110 ROOM 1303 NONE DETECTED 30 Sq. Ft. 114 ROOM 1304 NONE DETECTED 100 Sq. Ft. 119 ROOM 1305 NONE DETECTED 30 Sq. Ft. 123 ROOM 1322 NONE DETECTED 30 Sq. Ft. 128 ROOM 1321 NONE DETECTED 30 Sq. Ft. 133 ROOM 1324 NONE DETECTED 30 Sq. Ft. 138 ROOM 1323 NONE DETECTED 30 Sq. Ft. 143 ROOM 1326 NONE DETECTED 30 Sq. Ft. 148 ROOM 1325 NONE DETECTED 30 Sq. Ft. 157 ROOM 1330 NONE DETECTED 30 Sq. Ft. 167 ROOM 1332 NONE DETECTED 30 Sq. Ft. 172 ROOM 1331 NONE DETECTED 1300 Sq. Ft. 177 ROOM 1334 NONE DETECTED 30 Sq. Ft. 183 ROOM 1335 NONE DETECTED 30 Sq. Ft. 187 ROOM 1336 NONE DETECTED 30 Sq. Ft. 191 ROOM 1337 NONE DETECTED 30 Sq. Ft. Page 6

24 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total K3A K3B L0A M0A M0B M0C N0A Miscellaneous Flooring Black Flooring Mastic Total : 10 Sq. Ft. 29 ROOM CH ML Sq. Ft. Miscellaneous Flooring 2' x 2' Brown w/raised Squares Total : 360 Sq. Ft. 207 THROUGHOUT 1996 ADDITION ENTRIES NONE DETECTED ML-12 ENTRY NEAR CAFETERIA. 360 Sq. Ft. Fabric Isolation Joints Total : 200 Sq. Ft. Black Vinyl 8 THROUGHOUT BUILDING NSM 200 Sq. Ft. Plaster Total : Original Building 11 THROUGHOUT 1964 ORIGINAL BUILDING NONE DETECTED 511U1 800 Plaster Total : 100 Wall Plaster Patch ORIGINAL BUILDING TUNNEL SYSTEM NONE DETECTED M2045-2A, B, C SAMPLE TAKEN BY NOVA. 100 Plaster Total : 500 Sq. Ft Addition 201 THROUGHOUT 1996 ADDITION NONE DETECTED ML-13 EAST STAIRWELL LANDING NEAR CAFETERIA. 500 Sq. Ft. Sheetrock & Taping Compound Total : 5,000 Sq. Ft. 1 THROUGHOUT BUILDING NONE DETECTED 422-1; : OUTSIDE CAFETERIA : OUTSIDE ROOM Sq. Ft. P0A Fire Doors Metal - 1-1/2 Hr Rating (Underwriter's Laboratories) Total : 30 Sq. Ft. 15 BOILER ROOM (1101) ASSUMED 20 Sq. Ft. 20 TUNNEL SYSTEM ASSUMED 10 Sq. Ft. Page 7

25 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total Q0A Q0B Q0C Q0D Q0E Q0F Carpet Mastic Brown w/multi-colors Carpet Total : 8,000 Sq. Ft. 3 THROUGHOUT BUILDING NONE DETECTED ML-18 ROOM Sq. Ft. Carpet Mastic Multi-Shaded Blue Carpet (1996) Total : 6,520 Sq. Ft ORIGINAL BUILDING RAMPS NONE DETECTED BC 3000 Sq. Ft. 26 ROOM 1103 NONE DETECTED 520 Sq. Ft ADDITION RAMPS NONE DETECTED 3000 Sq. Ft. Carpet Mastic Multi-Colored Carpet Total : 8,000 Sq. Ft. 4 THROUGHOUT BUILDING NONE DETECTED ML-22 ROOM Sq. Ft. Carpet Mastic Violet w/multi-colored Carpet Total : 9,500 Sq. Ft. 105 ROOMS 1310, 1312, 1314 & 1316 NONE DETECTED 1500 Sq. Ft. 202 THROUGHOUT 1996 ADDITION NONE DETECTED ML-08 ROOM Sq. Ft. Carpet Mastic Tan w/green Carpet Total : 1,100 Sq. Ft. 164 ROOM 1329 NONE DETECTED ML Sq. Ft. Carpet Mastic Purple Multi-Colored (2001) Total : 2,130 Sq. Ft. 198 ROOMS 1216, 1217, 1218 & 1219 NONE DETECTED ML-37 ROOM Sq. Ft. 210 STORAGE 1205 NONE DETECTED 130 Sq. Ft. Page 8

26 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total R0A R0B R0C S0A T0A Baseboard/Mopboard Mastic Total : 100 Sq. Ft. 4" Gray Baseboard 5 THROUGHOUT BUILDING NONE DETECTED ML-14 CAFETERIA. 100 Sq. Ft. Baseboard/Mopboard Mastic Total : 200 Sq. Ft. 4" Tan Baseboard 6 THROUGHOUT BUILDING NONE DETECTED ML-15 HALLWAY OUTSIDE ROOM Sq. Ft. Baseboard/Mopboard Mastic Total : 200 Sq. Ft. 4" Black Baseboard 7 THROUGHOUT BUILDING NONE DETECTED ML-21 ROOM Sq. Ft. Wood Floor Mastic / Felt / Vapor Barrier Total : 800 Sq. Ft Original Building 41 STAGE (1108) ASSUMED 800 Sq. Ft. Light Cord Insulation Total : 500 Lin. Ft. V0A Sink Undercoating Black (1964) 12 THROUGHOUT 1964 ORIGINAL BUILDING 50 CH Lin. Ft. Total : 80 Sq. Ft. 31 ROOM CH 4 Sq. Ft. 35 ROOM CH 4 Sq. Ft. 39 ROOM CH 4 Sq. Ft. 49 MAIN OFFICE WORK ROOM (1003) 3 CH 4 Sq. Ft. 69 ROOM CH ML-25 4 Sq. Ft. 74 ROOM CH 4 Sq. Ft. 79 ROOM CH 4 Sq. Ft. 83 ROOM CH 4 Sq. Ft. 88 ROOM CH 4 Sq. Ft. Page 9

27 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total V0B V0C Sink Undercoating Pink Sink Undercoating Black (1966) 92 ROOM CH 4 Sq. Ft. 99 ROOM CH 4 Sq. Ft. 127 ROOM CH 4 Sq. Ft. 132 ROOM CH 4 Sq. Ft. 137 ROOM CH 4 Sq. Ft. 142 ROOM CH 4 Sq. Ft. 147 ROOM CH 4 Sq. Ft. 152 ROOM CH 4 Sq. Ft. 162 ROOM CH 4 Sq. Ft. 171 ROOM CH 4 Sq. Ft. 182 ROOM CH 4 Sq. Ft. Total : 14 Sq. Ft. 43 ROOM 1113 NONE DETECTED ML-27 2 Sq. Ft. 186 ROOM 1335 NONE DETECTED 4 Sq. Ft. 190 ROOM 1336 NONE DETECTED 4 Sq. Ft. 194 ROOM 1337 NONE DETECTED 4 Sq. Ft. Total : 16 Sq. Ft. 109 ROOM CH ML-34 4 Sq. Ft. 113 ROOM CH 4 Sq. Ft. 117 ROOM CH 4 Sq. Ft. 122 ROOM CH 4 Sq. Ft. Page 10

28 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total V0D V0E X0A X0B X0C Sink Undercoating Gray (1996) Sink Undercoating White Miscellaneous Material Tan Penetration Putty Miscellaneous Material Tan Mastic Puck Miscellaneous Material Black Mastic Puck Total : 30 Sq. Ft. 206 THROUGHOUT 1996 ADDITION NONE DETECTED ML-09 ROOM Sq. Ft. Total : 8 Sq. Ft. 176 ROOM 1331 NONE DETECTED ML-36 8 Sq. Ft. Total : 50 Sq. Ft ORIGINAL BUILDING TUNNEL SYSTEM 25 CH M2045-3A, B, C 50 Sq. Ft. 61 GIRLS' HAND WASHING/DRINKING FOUNTAIN CHASE EAST OF ROOM BOYS' HAND WASHING/DRINKING FOUNTAIN CHASE EAST OF ROOM BOYS' HAND WASHING/DRINKING FOUNTAIN CHASE WEST OF ROOM GIRLS' HAND WASHING/DRINKING FOUNTAIN CHASE WEST OF ROOM GIRLS' HAND WASHING/DRINKING FOUNTAIN CHASE EAST OF ROOM BOYS' HAND WASHING/DRINKING FOUNTAIN CHASE EAST OF ROOM BOYS' HAND WASHING/DRINKING FOUNTAIN CHASE WEST OF ROOM GIRLS' HAND WASHING/DRINKING FOUNTAIN CHASE WEST OF ROOM 1329 Total : 40 Sq. Ft. 5 CH ML Sq. Ft. 5 CH 10 Sq. Ft. 5 CH 10 Sq. Ft. 5 CH 10 Sq. Ft. Total : 40 Sq. Ft. 25 CH ML Sq. Ft. 25 CH 10 Sq. Ft. 25 CH 10 Sq. Ft. 25 CH 10 Sq. Ft. Page 11

29 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total X0D X0E X0F X0G Miscellaneous Material Total : 100 Sq. Ft. Red Fire Stop 9 THROUGHOUT BUILDING NONE DETECTED ML Sq. Ft. Miscellaneous Material Total : 100 Sq. Ft. Dark Gray Duct Caulk 10 THROUGHOUT BUILDING NONE DETECTED ML-16 ROOM 1102A. 100 Sq. Ft. Miscellaneous Material Mastic Associated w/cork Ceiling Tiles Total : 600 Sq. Ft. 13 THROUGHOUT 1964 ORIGINAL BUILDING HALLWAYS NONE DETECTED Sq. Ft. 23 GYMNASIUM (1110) NONE DETECTED 300 Sq. Ft. Miscellaneous Material Metal Frame Chalkboard Adhesive (1964) Total : 395 Sq. Ft. 32 ROOM 1104 ASSUMED 20 Sq. Ft. 36 ROOM 1105 ASSUMED 20 Sq. Ft. 40 ROOM 1106 ASSUMED 20 Sq. Ft. 66 ROOM 1317 ASSUMED 20 Sq. Ft. 71 ROOM 1316 ASSUMED 20 Sq. Ft. 76 ROOM 1315 ASSUMED 20 Sq. Ft. 81 ROOM 1314 ASSUMED 20 Sq. Ft. 86 ROOM 1312 ASSUMED 20 Sq. Ft. 93 ROOM 1313 ASSUMED 15 Sq. Ft. 96 ROOM 1310 ASSUMED 20 Sq. Ft. 124 ROOM 1322 ASSUMED 20 Sq. Ft. 129 ROOM 1321 ASSUMED 20 Sq. Ft. 134 ROOM 1324 ASSUMED 20 Sq. Ft. 139 ROOM 1323 ASSUMED 20 Sq. Ft. Page 12

30 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total 144 ROOM 1326 ASSUMED 20 Sq. Ft. 149 ROOM 1325 ASSUMED 20 Sq. Ft. 159 ROOM 1330 ASSUMED 20 Sq. Ft. 163 ROOM 1329 ASSUMED 20 Sq. Ft. 173 ROOM 1331 ASSUMED 20 Sq. Ft. 179 ROOM 1334 ASSUMED 20 Sq. Ft. X0H X0I Miscellaneous Material Wired Window Glaze (1964) Total : 1 Sq. Ft. 46 CONFERENCE ROOM (1111) NONE DETECTED ML-31 1 Sq. Ft. Miscellaneous Material Wired Side Light Window Glaze (1964) Total : 32 Sq. Ft. 68 ROOM CH ML-32 2 Sq. Ft. 72 ROOM CH 2 Sq. Ft. 77 ROOM CH 2 Sq. Ft. 91 ROOM CH 2 Sq. Ft. 97 ROOM CH 2 Sq. Ft. 125 ROOM CH 2 Sq. Ft. 130 ROOM CH 2 Sq. Ft. 135 ROOM CH 2 Sq. Ft. 140 ROOM CH 2 Sq. Ft. 145 ROOM CH 2 Sq. Ft. 150 ROOM CH 2 Sq. Ft. 160 ROOM CH 2 Sq. Ft. 165 ROOM CH 2 Sq. Ft. 169 ROOM CH 2 Sq. Ft. Page 13

31 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total 174 ROOM CH 2 Sq. Ft. 180 ROOM CH 2 Sq. Ft. X0J X0K X0L X0M Miscellaneous Material Metal Frame Chalkboard Adhesive (1966) Total : 140 Sq. Ft. 107 ROOM 1301 ASSUMED 20 Sq. Ft. 111 ROOM 1303 ASSUMED 20 Sq. Ft. 115 ROOM 1304 ASSUMED 20 Sq. Ft. 120 ROOM 1305 ASSUMED 20 Sq. Ft. 184 ROOM 1335 ASSUMED 20 Sq. Ft. 188 ROOM 1336 ASSUMED 20 Sq. Ft. 192 ROOM 1337 ASSUMED 20 Sq. Ft. Miscellaneous Material Air Handling Seam Gasket (1966) Total : 2 Sq. Ft ADDITION WEST TUNNEL SYSTEM NONE DETECTED 1 Sq. Ft ADDITION EAST TUNNEL SYSTEM NONE DETECTED ML-04 1 Sq. Ft. Miscellaneous Material Total : 40 Sq. Ft. Black Window Sills (2001) 199 ROOMS 1216, 1217, 1218 & 1219 NONE DETECTED ML-38 ROOM Sq. Ft. Miscellaneous Material Total : 80 Sq. Ft. Black Window Sill (1996) 203 THROUGHOUT 1996 ADDITION NONE DETECTED ML-10 ROOM Sq. Ft. Page 14

32 Chart C - All Materials List - (cont.) Homogeneous Area ID Code (Material Type) Location % Asbestos Sample New Sample Location Total X0N X0O X0P Miscellaneous Material Total : 15 Sq. Ft. Wired Window Glaze (1996) 204 THROUGHOUT 1996 ADDITION NONE DETECTED ML-11 ROOM Sq. Ft. Miscellaneous Material Total : 120 Sq. Ft. Metal Frame Chalkboard Adhesive (1996) 205 THROUGHOUT 1996 ADDITION ASSUMED 120 Sq. Ft. Miscellaneous Material Total : 4 Sq. Ft. Air Handling Unit Seam Gasket (1996) ADDITION UPPER LEVEL MECHANICAL ROOM NONE DETECTED ML-05 4 Sq. Ft. Page 15

33 SECTION II Floor Plans

34

35 SECTION III Asbestos Laboratory Report

36

37

38

39

40

41

42

43

44

45

46

47 SECTION IV Asbestos Inspector and Management Planner Licenses

48

49

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. February 19, 2010 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Farnsworth Aerospace Magnet Asbestos Inspection Project #0924022 Dear Ted, Enclosed please find the

More information

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. February 18, 2010 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: American Indian Magnet (Mounds Park) Asbestos Inspection IEA Project #0924022 Dear Ted, Enclosed please

More information

May 15, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Wilson School Asbestos Inspection IEA Project #

May 15, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Wilson School Asbestos Inspection IEA Project # May 15, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Wilson School Asbestos Inspection Project #0824003 Dear Ted, Enclosed please find the inspection report for

More information

HS16 Asbestos Management

HS16 Asbestos Management HS16 Asbestos Management Occupational Health, Safety and Injury Prevention Subject Matter Expert Greg Smith GJS25 CONTENTS 1.0 INTRODUCTION... 3 2.0 OBJECTIVES AND METRICS... 3 3.0 APPLICABILITY... 3 4.0

More information

EXISTING CONDITIONS

EXISTING CONDITIONS 02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal 02 01 80 Maintenance of Facility

More information

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011 Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969 Proposed Library for the Future Library Overview Stoughton Public Library opened in 1969

More information

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION Detroit Hispanic Development Corporation REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION Detroit Hispanic Development Corporation 1211 Trumbull St Detroit, Michigan 48216 Phone:

More information

Facilities Services Division

Facilities Services Division Facilities Services Division Frequently Asked Questions Asbestos 1. What does the head custodian do with the completed 6 month asbestos surveillance report? 2. What is asbestos containing material (ACM)

More information

Asbestos - Duty to Manage & Learning From its Mismanagement

Asbestos - Duty to Manage & Learning From its Mismanagement Asbestos - Duty to Manage & Learning From its Mismanagement Presented by Tim Harrison Health and Safety Manager Hywel Dda Health Board Presentation Contents The problem What is asbestos? Why is it dangerous?

More information

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017 Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017 Introduction This is the Northern Arizona University Asbestos Operations and Maintenance guide. This document

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ADMINISTRATIVE PROCEDURE Approval Date 2014 Review Date 2019 Contact Person/Department Human Resources Administrator Replacing All Previous Procedures Page 1 of 6 Identification HR - 4206 ASBESTOS MANAGEMENT

More information

FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us

FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us 1 Facilities and Technology Long- Term Facilities Maintenance (LTFM) FY 2017 MDE > School Support > School Finance > Facilities and

More information

Asbestos Management Procedure

Asbestos Management Procedure Asbestos Management Procedure 1.0 General It is the policy of Hitchin Boys School not to allow staff, employees or pupils to sample, remove or work with Asbestos Containing Materials (ACMs). Asbestos products

More information

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M.

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M. CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 2018 @ 4:30 P.M. Call to order. Roll call. Old Business. 1. Ron Ziegler CEDA- Recommendations for 3 Sisters Project a. Project Memo b.

More information

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW PROCEDURE Management of Asbestos Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of risk Document

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 32-1052 24 DECEMBER 2014 Civil Engineering FACILITY ASBESTOS MANAGEMENT COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications

More information

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM For Official Use Only Date Received 1 Date Received

More information

Hospital Construction, Renovation, and Demolition

Hospital Construction, Renovation, and Demolition 01.38 - Hospital Construction, Renovation, and Demolition Purpose Infection Control Risk Assessment (ICRA) To provide infection control guidelines for hospital construction, renovation, and demolition.

More information

Asbestos Notification Form ANF-001 Instructions and Supporting Materials

Asbestos Notification Form ANF-001 Instructions and Supporting Materials Instructions and Supporting Materials Table of Contents Introduction Permit fact sheet Contact list Introduction The Asbestos Notification Form (ANF-001) must be submitted to the Massachusetts Department

More information

ASBESTOS POLICY PROCEDURES & GUIDANCE

ASBESTOS POLICY PROCEDURES & GUIDANCE Academy name: ASBESTOS POLICY PROCEDURES & GUIDANCE Aim: Academy name: Asbestos Policy, Procedures and Guidance to comply with current Health and Safety Legislation -wide Health and Safety Management procedures

More information

Asbestos Management Plan for an Essex County Council premises

Asbestos Management Plan for an Essex County Council premises Asbestos Management Plan for an Essex County Council premises An electronic copy of this document is available on the ECC intranet and the Essex Schools Infolink. The Control of Asbestos Regulations 2006

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN (insert title/site) ASBESTOS MANAGEMENT PLAN (insert date) This document primarily contains non-intrusive management survey information. Note: any refurbishment or maintenance projects must be individually

More information

Asbestos Management Plan Commercial Services and Development, University of Tasmania

Asbestos Management Plan Commercial Services and Development, University of Tasmania Asbestos Management Plan Commercial Services and Development, University of Tasmania Prepared by: Alan Mason Risk and Compliance Officer Infrastructure Planning and Compliance Unit Commercial Services

More information

Training Course Catalog

Training Course Catalog 2018-2019 Training Course Catalog Asbestos, Lead Paint, Mold, OSHA Chem Scope, Inc. 15 Moulthrop Street, North Haven CT 06473 203-865-5605 Fax 203-498-1610 www.chem-scope.com chem.scope@snet.net Table

More information

ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID #

ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID # ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID # 2013-049 Prepared for: City of Lewiston 27 Pine Street Lewiston, Maine 04240 Prepared by:

More information

Instructions to Bidders Asbestos Abatement

Instructions to Bidders Asbestos Abatement Quinault Indian Nation P.O Box 189 Taholah, WA. 98587 Instructions to Bidders Asbestos Abatement BID DATE TIME Locations and legal address of project: 1. 411 Queets Ave. Queets, WA 98331 (survey attached).

More information

Weatherization Installer Certification

Weatherization Installer Certification The Pennsylvania Department of Labor & Industry, in cooperation with the Pennsylvania Department of Community and Economic Development and Penn College, has developed this process for providing Weatherization

More information

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES TESTING APPLICATION STANDARD (TAS) 201-94 IMPACT TEST PROCEDURES 1. 2. Scope: 1.1 This protocol covers procedures for conducting the impact test of materials as required by Section 1626 of the Florida

More information

LOOSE FORMS PACKAGE TECHNICAL RFP No F; Confucius Institute at the University of Maryland, College Park Project No.

LOOSE FORMS PACKAGE TECHNICAL RFP No F; Confucius Institute at the University of Maryland, College Park Project No. LOOSE FORMS PACKAGE TECHNICAL RFP No. 63973-F; Project No. 16-676-207-00 1. GENERAL CONTRACTOR EXPERIENCE FORM 2. KEY PERSONNEL FORM 3. PROJECT APPROACH/PRELIMINARY SCHEDULE 5. COMPANY PROFILE 6. ANNUAL

More information

Attitudes to Residential Asbestos Assessments

Attitudes to Residential Asbestos Assessments Attitudes to Residential Asbestos Assessments Conference presentation EY Sweeney contacts: Date: November 2015 Stuart Attwood, Head of Quantitative Research Page 1 Agenda Background and objectives Overview

More information

Wilmington Downtown Incorporated. Facade Improvement Program POLICIES AND PROCEDURES Updated 8/30/17

Wilmington Downtown Incorporated. Facade Improvement Program POLICIES AND PROCEDURES Updated 8/30/17 Wilmington Downtown Incorporated Facade Improvement Program POLICIES AND PROCEDURES Updated 8/30/17 Wilmington Downtown Incorporated (WDI) has designed a pilot Facade Improvement Program to stimulate new

More information

Asbestos Management Policy

Asbestos Management Policy Asbestos Management Policy Drafted by: Malcolm Chalmers Approved by the Governing Body: March 2011 Date of next review: March 2014 Person to initiate review: Business Manager Asbestos Management Policy

More information

Frequently Asked Questions May 8, 2018 Sinking Fund Election

Frequently Asked Questions May 8, 2018 Sinking Fund Election When is the election? Frequently Asked Questions May 8, 2018 Sinking Fund Election Tuesday, May 8, 2018. The polls will be open from 7 a.m. until 8 p.m. Absentee ballots will be available after March 24th.

More information

City of Waterbury Safety & Security Assessment

City of Waterbury Safety & Security Assessment City of Waterbury Safety & Security Assessment Dear School Official, Pursuant to guidelines set forth by the Department of Justice, Office of Domestic Preparedness and the Department of Homeland Security,

More information

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins Part I: Summary PHA Name: Housing Authority of the City of Warner Robins Date of CFFP: FFY of Grant: 2009 FFY of Grant Approval: Type of Grant Original Annual Statement Reserve for Disasters/Emergencies

More information

An electronic copy of this document is available on the SC intranet and the Learning Gateway.

An electronic copy of this document is available on the SC intranet and the Learning Gateway. Shropshire Council Premises Plan for Asbestos Management An electronic copy of this document is available on the SC intranet and the Learning Gateway. The Control of Asbestos Regulations 2012 requires

More information

BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION

BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION The City of Zion is requesting an alternate bid for cleaning and maintenance services to be performed at: Zion City Hall, 2828 Sheridan

More information

Façade Improvement Program Application for Participation

Façade Improvement Program Application for Participation The Friends of SW 9 th and Des Moines East and South Chamber of Commerce (DMESC) Façade Improvement Program is funded by the City of Des Moines and administered by the DMESC. For information regarding

More information

FORT RUCKER Environmental Document

FORT RUCKER Environmental Document Approved by: Melissa Lowlavar/Johnny Buchanan 1.0 PURPOSE This procedure defines the requirements for submitting abatement plans and close-out documents for asbestos projects on Fort Rucker. Control of

More information

METROPOLITAN COUNCIL LIVABLE COMMUNITIES TAX BASE REVITALIZATION ACCOUNT CONTAMINATION CLEANUP GRANT APPLICATION GUIDE

METROPOLITAN COUNCIL LIVABLE COMMUNITIES TAX BASE REVITALIZATION ACCOUNT CONTAMINATION CLEANUP GRANT APPLICATION GUIDE METROPOLITAN COUNCIL LIVABLE COMMUNITIES TAX BASE REVITALIZATION ACCOUNT CONTAMINATION CLEANUP GRANT APPLICATION GUIDE 2015 Contents: CLEANUP GRANT APPLICATION GUIDE TOPICS... II WHAT IS THE PURPOSE OF

More information

ASBESTOS MANAGEMENT. Policy and Arrangements. Oxfordshire County Council December 2013

ASBESTOS MANAGEMENT. Policy and Arrangements. Oxfordshire County Council December 2013 ASBESTOS MANAGEMENT Policy and Arrangements Oxfordshire County Council December 2013 Document Control 2013/V2e Draft Review Date: December 2015 TABLE OF CONTENTS 1.0 Asbestos Policy Statement 1.1 Policy

More information

IMR Plan. IMR Funds available for 2017/2018 are as follows:

IMR Plan. IMR Funds available for 2017/2018 are as follows: 2018-2020 IMR Plan The Infrastructure Maintenance and Renewal (IMR) Program of Alberta Education/Alberta Infrastructure provides funding to school divisions for three purposes: 1. To replace building and

More information

Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy.

Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy. Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy. 1. Overview of the scheme The application for a grant is made

More information

2018 TRAINING SCHEDULE

2018 TRAINING SCHEDULE SITE LOCATION: ALBANY, NY OSHA COMPLIANCE COURSES 40-Hr. HAZWOPER $675.00 HAZWOPER Refresher (1 Day) $150.00** 24-Hr. HAZWOPER (Limited Site Worker) $365.00 8-Hr. HAZWOPER Supervisor $150.00 ** 30-Hr.

More information

November 7, 2013 November 7, To establish an asbestos management program for County facilities and projects.

November 7, 2013 November 7, To establish an asbestos management program for County facilities and projects. TO: FROM: PREPARED BY: SUBJECT: PPM#: ALL COUNTY PERSONNEL ROBERT WEISMAN COUNTY ADMINISTRATOR RISK MANAGEMENT ASBESTOS MANAGEMENT PROGRAM CW-L-010 ISSUE DATE EFFECTIVE DATE November 7, 2013 November 7,

More information

HOME RENOVATION TAX CREDIT (HRTC)

HOME RENOVATION TAX CREDIT (HRTC) HOME RENOVATION TAX CREDIT (HRTC) The Home Renovation Tax Credit applies to eligible expenses of more than $1,000, but not more than $10,000, resulting in a maximum non-refundable tax credit of $1,350

More information

3. Mission. To publish instructions for the conduct, recordkeeping, and reporting of the Asbestos Control Program.

3. Mission. To publish instructions for the conduct, recordkeeping, and reporting of the Asbestos Control Program. UNITED STATES MARINE CORPS MARINE AIR GROUND TASK FORCE TRAINING COMMAND MARINE CORPS AIR GROUND COMBAT CENTER BOX 788100 TWENTYNINE PALMS, CA 92278-8100 COMBAT CENTER ORDER 5100. 2B ceo 5100.2B 4 From:

More information

McCracken Power Plant

McCracken Power Plant McCracken Power Plant Herrick Archives Number 069 A. IDENTIFICATION & LOCATION 1. Name 1.1 Officially named "McCracken Power Plant" by Board of Trustees on May 5, 1960. 1.2 Alternate names noted: Power

More information

SPECIAL ISSUE CAPITAL PROJECT VOTE

SPECIAL ISSUE CAPITAL PROJECT VOTE Schuylerville CENTRAL SCHOOL DISTRICT SPECIAL ISSUE - 2016 CAPITAL PROJECT VOTE District capital project vote Dec. 6 O n Tuesday, Dec. 6, voters in the Schuylerville Central School District will decide

More information

WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY. House as a System

WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY. House as a System WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY House as a System WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM August 2010 1 WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM August 2010

More information

Regional Healthcare Hygiene and Cleanliness Audit Tool

Regional Healthcare Hygiene and Cleanliness Audit Tool Regional Healthcare Hygiene and Cleanliness Audit Tool Organisation Name: Area Inspected/ Speciality: Auditors: Date: Contents Guidance 4 Audit Tool 4 Scoring 5 Section 0 - Organisational Systems and Governance

More information

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

Associated with the District s Measure A Bond Program and Facilities Improvement Projects Request for Qualifications / Proposal (RFQ/P) for Hazardous Material Assessment, Abatement Plan, Cost Estimating, and Monitoring Services Associated with the District s Measure A Bond Program and Facilities

More information

2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs

2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs 2016 SCHEDULE 2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs ASBESTOS * Abatement Worker/Supervisor Air Sampling Technician (NYS) Allied Trades

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ASBESTOS MANAGEMENT PLAN Engage a Qualified Inspector to perform an inspection of the site and establish if disturbed material contains asbestos Prepared for: The Corporation of the Synod of the Diocese

More information

NICU Lighting Redesign

NICU Lighting Redesign NICU Lighting Redesign Space Description The Neonatal Intensive Care Unit is located on the third floor of the new addition. Instead of looking at this area as a whole, it was broken down into two separate

More information

GREEN SHEET. SACRAMENTO FIRE DEPARTMENT Informational Summary Report of Serious SFD Injuries, Illnesses, Accidents and Near-Miss Incidents

GREEN SHEET. SACRAMENTO FIRE DEPARTMENT Informational Summary Report of Serious SFD Injuries, Illnesses, Accidents and Near-Miss Incidents GREEN SHEET SACRAMENTO FIRE DEPARTMENT Informational Summary Report of Serious SFD Injuries, Illnesses, Accidents and Near-Miss Incidents Structure Fire Burn Injuries October 7 th 2008 Stilt Court Fire

More information

TELECOMMUTING WORK AGREEMENT

TELECOMMUTING WORK AGREEMENT TELECOMMUTING WORK AGREEMENT The following Telecommuting Agreement ( Agreement ) is made and entered into as of the day of, 20 (the Effective ) by and between William & Mary in Virginia (the University

More information

Designated Heritage Property Grant Program

Designated Heritage Property Grant Program 2018 Guidelines Designated Heritage Property Grant Program Grant applications are due Friday, March 23, 2018 by 4:30 PM Table of Contents Eligible Properties... 4 Application Checklist... 5 Eligible Projects...

More information

TELECOMMUTING AGREEMENT

TELECOMMUTING AGREEMENT TELECOMMUTING AGREEMENT Telecommuting is a work option which, when properly implemented and administered, benefits both the staff member and Pepperdine. Telecommuting is not a right, but rather, a privilege

More information

2016 Residential Energy Efficiency Programs

2016 Residential Energy Efficiency Programs 2016 Residential Energy Efficiency Programs 1 2016 BUDGETS Program 2016 Incentive Budget Home Energy Efficiency PR Incentive Range (Weekly) $15,302,058 $500 - $25,000 Reserve $500 - $50,000 - HVAC Low

More information

Request for Proposal CLEANING SERVICES FOR FAIR HAVEN COMMUNITY HEALTH CENTER. Fair Haven Health Community Health Center, Inc.

Request for Proposal CLEANING SERVICES FOR FAIR HAVEN COMMUNITY HEALTH CENTER. Fair Haven Health Community Health Center, Inc. Request for Proposal CLEANING SERVICES FOR FAIR HAVEN COMMUNITY HEALTH CENTER Fair Haven Health Community Health Center, Inc. Fair Haven Community Health Clinic, Inc. 374 Grand Avenue Fair Haven, Connecticut

More information

I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I 1 Sum of Prior Years and Estimate to Complete Project Estimates: PlanningIDesign 1 Sum of FY 2013--FY 2017 FY 2012 1 Sum of FY 2013-~uture

More information

PROGRAM GUIDE. ELIGIBLE APPLICANTS To be eligible to apply to the program:

PROGRAM GUIDE. ELIGIBLE APPLICANTS To be eligible to apply to the program: PROGRAM GUIDE PROGRAM PURPOSE AND GOAL The City of Williams Lake is pleased to provide the business façade improvement program with funding from Northern Development Initiative Trust. The purpose of the

More information

City of Cambridge. Designated Heritage Property Grant Program

City of Cambridge. Designated Heritage Property Grant Program City of Cambridge Designated Heritage Property Grant Program Table of Contents 1. Eligible Properties 1 2. Projects 1 3. Eligible Projects 1 a) General Conservation Projects 3 b) Repair or Restoration

More information

Commercial White Box Grant Program

Commercial White Box Grant Program Commercial White Box Grant Program City of Racine 730 Washington Ave. Program Contact: Ken Plaski Chief Building Official (262) 636-9161 The White Box Program is targeted to currently vacant, first-floor

More information

YOU MUST HAVE ALL ITEMS LISTED BELOW:

YOU MUST HAVE ALL ITEMS LISTED BELOW: Dear Housewarming Applicant: We look forward to serving you under the Housewarming Program. However, in order to begin the process there are documents that we must have. Please review the list below and

More information

Waterford School District 2003 Bond Update

Waterford School District 2003 Bond Update Waterford School District 2003 Bond Update Presented by: Thomas W. Wiseman, C.P.A. Assistant Superintendent Business and Operations William Holbrook, C.P.A. Director of Business Services January 17, 2013

More information

Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca

Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca CSC Student Design Competition 2017 2018 Document: 00 01 01 r1, issued: 2017 11 28 cscdesignchallenge.ca Page 1 Student

More information

ROLLING RIVER SCHOOL DIVISION REGULATION

ROLLING RIVER SCHOOL DIVISION REGULATION ROLLING RIVER SCHOOL DIVISION REGULATION Cleaner Job Description GDASA/R Position Title: Reports To: Cleaner School Principal and Maintenance Supervisor Receives Duties / Workload Assignment and Direction

More information

Quality Assurance. Monitoring

Quality Assurance. Monitoring Quality Assurance State and Local Level Monitoring National DOE Conference New Orleans, LA December 14, 2011 Hoyt O Brien Wisconsin Division of Energy Services 1 ARRA Monitoring Staffing Wisconsin Quality

More information

Heritage guidelines designated Heritage ProPerty grant Program Grant applications due March 31, 2015 by 4:30 pm CULTUREDIVISION

Heritage guidelines designated Heritage ProPerty grant Program Grant applications due March 31, 2015 by 4:30 pm CULTUREDIVISION 2015 guidelines designated Heritage ProPerty grant Program Grant applications due March 31, 2015 by 4:30 pm ProPerties Heritage 15059 CULTUREDIVISION PUBLIC ART + MUSEUMS AND HERITAGE + MEADOWVALE THEATRE

More information

Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery

Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery Jacqueline Berger, APPRISE ABSTRACT This paper reports on an observational study of energy efficiency service

More information

REQUEST FOR QUOTATION For Renovation of Juvenile Court Administrative Office

REQUEST FOR QUOTATION For Renovation of Juvenile Court Administrative Office REQUEST FOR QUOTATION For Renovation of Juvenile Court Administrative Office QUOTE NUMBER: 13-0001-3 The Number Must Appear On All Quotations and Related Correspondence. Pre-Proposal meeting 10:00AM on

More information

TECHNICAL MANUAL OPERATORS AND ORGANIZATIONAL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) DEMOLITION MATERIALS

TECHNICAL MANUAL OPERATORS AND ORGANIZATIONAL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) DEMOLITION MATERIALS TECHNICAL MANUAL OPERATORS AND ORGANIZATIONAL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) DEMOLITION MATERIALS HEADQUARTERS, DEPARTMENT OF THE ARMY MARCH 1973 * TM 9--1375-213-12

More information

STATE OF ALASKA-2018 Weatherization Health and Safety Plan

STATE OF ALASKA-2018 Weatherization Health and Safety Plan ` 1 STATE OF ALASKA-2018 Weatherization Health and Safety Plan Budgeting (Check one): The grantee is encouraged to budget health and safety costs as a separate category and, thereby, excludes such costs

More information

City Wide Signage Grant Program

City Wide Signage Grant Program City Wide Signage Grant Program Contact: Rhonda Manuel 809 N. Broadway APPLICATION Milwaukee, WI 53202 414-286-8201 APPLICANT INFORMATION Name: FOR OFFICE USE ONLY Application Date: Phone: Approval Date:

More information

Amber Mahaffey

Amber Mahaffey Lead Hazards April 2004 Amber Mahaffey amber@goodvaluation.com About the Author: Amber Mahaffey is the director of research for Good Valuation, Inc. She has conducted many studies that concern common real

More information

Business Façade Improvement Program Available

Business Façade Improvement Program Available MEDIA RELEASE City of Williams Lake For Immediate Release March 1, 2017 Tel: 250-392-2311 Fax: 250-392-4408 450 Mart Street Williams Lake, BC V2G 1N3 Business Façade Improvement Program Available Northern

More information

BLAINE SCHOOL DISTRICT CAPITAL LEVY DETAIL REVIEW. April 24, 2018 Special Election

BLAINE SCHOOL DISTRICT CAPITAL LEVY DETAIL REVIEW. April 24, 2018 Special Election BLAINE SCHOOL DISTRICT CAPITAL LEVY DETAIL REVIEW April 24, 2018 Special Election Urgent Needs and Related Program Implications The Facility Needs Review Committee was charged with considering projects

More information

P rivate Duty! A g r e a t o p p o r t u n i t y t o f i n d o u t m o r e

P rivate Duty! A g r e a t o p p o r t u n i t y t o f i n d o u t m o r e Asbury Communities, Inc. Asbury Methodist Village Human Resources Department J o i n u s a t t h e Asbury at Home Open House f o r P rivate Duty! A g r e a t o p p o r t u n i t y t o f i n d o u t m o

More information

ABATEMENT / DEMOLITION CONSULTING. Project Name: Baker Hall Renovation - Abatement. Owner: University of Colorado - Boulder

ABATEMENT / DEMOLITION CONSULTING. Project Name: Baker Hall Renovation - Abatement. Owner: University of Colorado - Boulder ABATEMENT / DEMOLITION CONSULTING Project Name: Baker Hall Renovation - Abatement Owner: University of Colorado - Boulder Contact Information: Ms. Heidi Roge, CU-B H&D Project Manager 303-492-2465 Mr.

More information

Sponsor; However, none proposed.

Sponsor; However, none proposed. GEORGIA INSTITUTE OF TECHNOLOGY PROJECT ADMINISTRATION DATA SHEET OFFICE OF CONTRACT ADMINISTRATION Project No, A-3807 Project Director: Sponsor: Bill Ewing TRW Incorporated ORIGINAL GTRI/IiiKR Mil:IRA/Lab

More information

Worcester Public Schools

Worcester Public Schools Page 1 Worcester Public Schools District s Environmental Management System Best Management Practices Timeline Summary of Work Completed and Planned Future Work January 2017 EPA Guidance for PCBs: Remove

More information

PLATTE COUNTY MEMORIAL NURSING HOME FACILITY EVALUATION REPORT JUNE 2011 N E L S O N ARCHITECTS, LLC.

PLATTE COUNTY MEMORIAL NURSING HOME FACILITY EVALUATION REPORT JUNE 2011 N E L S O N ARCHITECTS, LLC. PLATTE COUNTY MEMORIAL NURSING HOME FACILITY EVALUATION REPORT JUNE 2011 N E L S O N ARCHITECTS, LLC. 110 North 6 th East. P.O. Box 1244 R I v e r t o n, W Y 8 2 5 0 1 3 0 7. 8 5 6. 6 1 5 5 p. nelsonarchitects@wyoming.com

More information

Policy on Managing Asbestos

Policy on Managing Asbestos Policy on Managing Asbestos Lead Directorate and Service: Corporate Resources - Human Resources, Safety Services Effective Date: January 2015 Date Due for Review: January 2018 Contact Officer/Number Rob

More information

SENIOR/ASSISTED LIVING FACILITY SPECIFIC QUESTIONNAIRE

SENIOR/ASSISTED LIVING FACILITY SPECIFIC QUESTIONNAIRE Corporate/Parent Name: SENIOR/ASSISTED LIVING FACILITY SPECIFIC QUESTIONNAIRE (please provide the following for each facility) Facility Specific Questionnaire Facility Description 1. Facility name: Location

More information

Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers

Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers MINUTES CAPITAL COMMITTEE February 3, 2014 Black Hawk Room 2:00 p.m. Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers 1. Core Value: Responsibility

More information

Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9

Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9 Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9 Community Forum January 14, 2016 Agenda Welcome Presentation: New proposal What s changed? What s stayed the same? Benefits for students

More information

Maintenance Mechanic I/II

Maintenance Mechanic I/II Date Established: 01-21-93 Revised: 07-17-08 Classification Code: 072/073 Unit: SLCEA FLSA: Non-exempt Range: 63/68 EEOC: 007 Maintenance Mechanic I/II Definition: Performs routine and general maintenance

More information

Weatherization Program Update

Weatherization Program Update Weatherization Program Update A Briefing to the Housing Committee Housing/Community Services Department January 18, 2011 1 Purpose Provide an update on the State Weatherization Program funded through the

More information

A Health and Safety Tip Sheet for School Custodians. Did you know? Step 1. Identify job hazards. Step 2. Work towards solutions

A Health and Safety Tip Sheet for School Custodians. Did you know? Step 1. Identify job hazards. Step 2. Work towards solutions A health and safety tip sheet for INSPECTION Health for SCHOOL Custodians and CHECKLIST Safety Committees SCHOOL MAINTENANCE custodians of STAFF safety: A Health and Safety Tip Sheet for School Custodians

More information

School Safety Audit Checklist

School Safety Audit Checklist School Safety Audit Checklist Based on work done by Virginia State Education Department and modified by the New York State Police as a resource for school personnel. Components of the Audit Process School

More information

May 4, The Honorable John Conyers, Jr. United States House of Representatives Washington, DC Dear Representative Conyers:

May 4, The Honorable John Conyers, Jr. United States House of Representatives Washington, DC Dear Representative Conyers: Your Essential Connection May 4, 2005 The Honorable John Conyers, Jr. United States House of Representatives Washington, DC 20515-2214 Dear Representative Conyers: The American Industrial Hygiene Association

More information

Facilities Condition Assessment

Facilities Condition Assessment Facilities Condition Assessment (O&M 16 018) Date Issued: January 29, 2016 Date Due: Contact: March 3, 2016 at 4:00:00 pm Paul Acosta, Program Manager III paul.acosta@stocktonca.gov City of Stockton Public

More information

SAMPLE. Child Care Center Sanitation Inspection Form

SAMPLE. Child Care Center Sanitation Inspection Form Child Care Center Sanitation Inspection Form OAR numbers generally refer to numbers in the Office of Child Care s Rules for the Certification of Child Care Centers REMOVE THIS COVER AND INSERT UNDER EACH

More information

National Standards for the Prevention and Control of Healthcare Associated Infections. Quality Improvement Plan (QIP)

National Standards for the Prevention and Control of Healthcare Associated Infections. Quality Improvement Plan (QIP) National Standards for the Prevention and of Healthcare Associated s Quality Improvement Plan (QIP) QIP based on unannounced inspection: 16 August 2016 Coombe Women and Infants University Hospital Prepared

More information

Ballot Measures-J Section

Ballot Measures-J Section J, Anaheim Elementary Schools Repair/Improvement Measure To repair and modernize classrooms and older neighborhood schools to support reading, math, science, technology, arts, replace deteriorating roofs,

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions about the May 2, 2017 School Bond Election When is the election? Tuesday, May 2, 2017. The polls will be open from 7 a.m. until 8 p.m. Absentee ballots will be available after

More information

TOP 10 DEFICIENCIES, SECOND QUARTER FY 2015.xls

TOP 10 DEFICIENCIES, SECOND QUARTER FY 2015.xls STATE TOTAL NFPA 101 153 1 483.65 146 2 483.60(a),(b) 126 3 483.35(i) 119 4 0226 DEVELOP/IMPLMENT ABUSE/NEGLECT, ETC POLICIES The facility must develop and operationalize policies and procedures for screening

More information

MINUTES OF THE SAANICH HERITAGE FOUNDATION MEETING HELD AT SAANICH MUNICIPAL HALL COMMITTEE ROOM #2 TUESDAY, APRIL 14, 2015 AT 5:30 P.M.

MINUTES OF THE SAANICH HERITAGE FOUNDATION MEETING HELD AT SAANICH MUNICIPAL HALL COMMITTEE ROOM #2 TUESDAY, APRIL 14, 2015 AT 5:30 P.M. MINUTES OF THE SAANICH HERITAGE FOUNDATION MEETING HELD AT SAANICH MUNICIPAL HALL COMMITTEE ROOM #2 TUESDAY, APRIL 14, 2015 AT 5:30 P.M. Present: Regrets: Staff: Brad Shuya, President; Ross O Connell,

More information