1 ABATEMENT / DEMOLITION CONSULTING Project Name: Baker Hall Renovation - Abatement Owner: University of Colorado - Boulder Contact Information: Ms. Heidi Roge, CU-B H&D Project Manager Mr. Tim Lockhart, CU-B EH&S Industrial Hygienist Abatement/Demolition Contractor: Environmental Demolition, Inc. Abatement/Demolition Cost: $2,078,500 Construction Manager/General Contractor: Whiting-Turner Construction Co. Teal Pace Construction Cost: $32,945,000 Project Description: RLH Engineering was selected by CU-Boulder to provide a comprehensive environmental survey of the facility (including asbestos, lead-based paint and other regulated building materials) and complete abatement design services. Beyond these services, RLH was retained to provide abatement contract administration, project management and onsite project observation/air monitoring. Baker Hall, originally constructed in 1936, was scheduled for complete architectural and MEP renovation. The project would leave the core-andshell of the historic residence hall intact, but completely reconfigure the interior layout and distribution of building utilities. RLH coordinated a team to provide the environmental survey field work in a short time window before the building became occupied with students in the fall of Upon completion of the survey, RLH provided abatement Schematic Design, coordinating this work with the Owner, Architect and CM/GC. RLH worked with this team to determine the necessary abatement scope and identify the abatement cost estimate. Abatement Construction Documents were then developed, and issued for bidding by abatement/demolitions contractors, as part of the CM/GC s scope of work. The facility offered many unique challenges, including the assessment and determination of abatement/demolition scope for OSHA-regulated trace-asbestos plaster, determination of hidden wall chases for abatement of TSI on hydronic piping, and complex abatement enclosure phasing to accommodate and an aggressive abatement/construction schedule. CUB Bakr Hall

2 ABATEMENT CONSULTING Project Name: Willard O. Eddy Hall - Abatement Owner: Colorado State University Contact Information: Mr. Tony Flores, CSU C&P Project Manager Mr. Eric March, CSU EH&S Abatement/Demolition Contractor: Peak Environmental, Inc. Abatement/Demolition Cost: $607, General Contractor: Pinkard Construction Co. Troy Bohlender Construction Cost: $12,000,000 Project Description: RLH Engineering was selected by Colorado State University to provide a comprehensive environmental survey of the facility (including asbestos, lead-based paint and other regulated building materials) and complete abatement design services. Beyond these services, RLH was retained to provide abatement contract administration, project management and onsite project observation/air monitoring. Eddy Hall, originally constructed in 1963, was scheduled for complete architectural and MEP renovation. The project would leave the shell intact with dramatic alterations to office and classroom spaces. RLH coordinated a team to provide the environmental survey field work in a narrow time-frame in December Upon completion of the survey, RLH provided abatement Schematic Design, coordinating this work with the Owner, Architect and GC. RLH worked with this team to determine the necessary abatement scope and identify the abatement cost estimate. Abatement Construction Documents were then developed, and issued for bidding by general abatement contractors, separate from the GC s scope of work. The facility offered many unique challenges, including variance recommendations so that the GAC could hasten the abatement process, intricate temporal coordination with on-site subcontractors to facilitate building access, and strict contract administration/oversight which ultimately resulted in a significant deductive change order for the Owner. CUB Bakr Hall

3 ABATEMENT CONSULTING Project Name: John Evans Middle School Asbestos Abatement and Demolition Consulting Client: Weld County School District Six Contact Information: Mr. Brad Johnson Abatement Cost: $939, Date Completed: December 2015 Architect: RB+B Architects General Contractor: FCI Constructors Abatement Contractor: Peak Environmental Project Description: The Scope of Work included design and oversight of approximately 46,000 SF of asbestos containing acoustical spray on concrete; 28,000 SF of asbestos containing block filler; 33,000 SF of asbestos containing floor tile. The Scope of Work included demolition of existing masonry and brick walls in order to access all areas of the ceiling system. A structural demolition design was completed to safely remove the walls during the abatement process. As part of the work, mercury lights and PCB ballasts were removed as part of the abatement process. RLH Engineering designed the abatement project as part of the design team assembled by Weld County School District Six. The design included phasing of abatement after the new Prairie Heights Middle School was completed this allowed abatement to be completed during off-peak hours to maximize the abatement and demolition schedule and budget. Heath

4 JEFFREY M. CHAMBERLIN, LEED AP Principal and Partner Jeff s primary responsibilities with RLH Engineering include owner s representative services for education and healthcare clients. His combined business education and years of field experience is an asset on complex projects where occupant safety, tight budgets, and aggressive schedules are common. His use of available technology, ability to manage conflicts, and his enthusiasm for accomplishing team goals have contributed to numerous successful projects. Jeff joined the firm in 1992 and acquired an ownership interest in RELEVANT EXPERIENCE Salida School District R32J - $45.1 million 2010& 2012 Bond/BEST Grant Owner s Representative for design and construction of a new two story 91,110 SF LEED Gold high school, a partial renovation of the historic 1922 classroom building, and construction of a new track, soccer/football field and practice field. Retained in 2012 to manage design and construction of a new 52,260 SF LEED Gold elementary school with site development. YMCA of the Rockies, Estes Park Center - $44.4 Million Core Development Project Owner s Representative for design and construction of three new lodges with 202 guest rooms, $4.6 million 1,000 guest capacity conference center, and $5.8 million in infrastructure, utility, and support facilities. A USGBC LEED Gold Certified project. Monte Vista School District C-8 $30.8 Million 2010 Bond/BEST Grant Owner s Representative for successful 2010 BEST Application to construct a new 73,300 SF HS, 46,000 SF addition and renovation for Bill Metz ES, and bond work to renovate the Marsh Primary School and Monte Vista MS. Yuma District Hospital - $24.5 Million USDA Financed Project Owner s Representative for 68,000 SF full replacement facility. Design and construction complete in 2 years. Project included; 12 patient rooms, 2 LDRP s, 2 OR s with pre/post op, ED, imaging department with 64 slice CT and 1.5 MRI, family and specialty clinic, physical therapy with hydrotherapy pool, laboratory, administration areas, cafeteria, and support areas Lewis Palmer School District 38 - $68 Million 2006 Bond Issue Owner s Representative for new $45 million Palmer Ridge High School at Monument Hill, $6.0 million athletic complex and site improvements at Lewis Palmer High School Kit Carson County Memorial Hospital - $14.0 Million 2006 Project Owner s Representative for 27,000 SF addition and remodel of hospital, including 16 new patient rooms, 2 LDRP, imaging department, laboratory, ED, support services, and sitework YEARS OF PROFESSIONAL EXPERIENCE Twenty Three EDUCATION Bachelor of Science in Management, Georgia Institute of Technology, 1991 Certificate in Building Construction, Georgia Institute of Technology, 1991 ACCREDITATIONS AND PROFESSIONAL AFFILIATIONS US Green Building Council LEED Accredited Professional Green Building Certificate Program, Colorado State University, 2005 CEFPI, Council of Educational Facility Planners International Building Inspector and Asbestos Project Designer, U.S. EPA and State of Colorado American Society of Healthcare Engineers Member

5 TRAVIS B. GUERETTE Principal and Partner Travis joined RLH Engineering with a degree in Environmental Health. His college training, strong communication skills and solid background in construction have equipped him for work in the firm s environmental remediation projects. Travis has performed IAQ investigation, building surveys, abatement design, on-site air monitoring, and preparation of plans, specifications, project oversight and quality control during the abatement phase of removal projects. He joined the firm in 1999 and acquired an ownership interest in RELEVANT EXPERIENCE Mapleton Public Schools Skyview HS 2012 Provided design documents, air monitoring, project management to remove acoustical spray, block filler, pipe fittings, TSI materials, and contaminated soil. Abatement hard cost of $1,900,000. Bertha Heid, Clayton, and Western Hills Provided design documents, air monitoring, and project management to remove ACM flooring. Abatement hard cost of $350,000. We also provided specifications, drawings, and project management for flooring put-back in all areas. Weld County School District Present Designer/overseer for over 100 asbestos abatement projects John Evans Middle School 2009 Provided design documents, air monitoring, and project management services for abatement of asbestos containing acoustical spray and floor tile. Abatement hard cost of $90,000. Heath Middle School 2005 Provided design documents, air monitoring, and project management. Abatement was completed over three summers to remove acoustical spray, floor tile and contaminated soil. Abatement hard cost of $810,000. Douglas County School District 1999 Present Designer/overseer for over 50 asbestos abatement projects. Provided design documents, air monitoring, and project management services for the removal of asbestos containing materials. St. Vrain Valley School District Present Designer/overseer for over 20 asbestos abatement projects. Provided design documents, air monitoring, and project management services for the removal of asbestos containing materials. Executive Tower Inn 2005 Provided design documents, air monitoring, project management to remove asbestos containing acoustical spray and drywall texture from high rise building on floors four through sixteen. Abatement hard cost of $1,500,000. YEARS OF PROFESSIONAL EXPERIENCE Fifteen EDUCATION, Bachelor of Science in Environmental Health, Colorado State University, 1998 Project Management Certificate Program, Villanova University, 2003 Construction Management Certificate Program, Colorado State University, 2005 ACCREDITATIONS, LICENSES AND PROFESSIONAL AFFILIATIONS Asbestos Project Designer, U.S. EPA and State of Colorado, 1999 to present Building Inspector, U.S. EPA and State of Colorado, 1999 to present Management Planner, U.S. EPA and State of Colorado, 2003 to present Air Monitoring Specialist - NIOSH 582E, U.S. EPA and State of Colorado, 1999 to present Environmental Health and Safety for Hazardous Waste Site Operations Training, 1999 to present Leadership in Environmental Energy Design (LEED) Accredited Professional National Radon Proficiency Program (NRPP) Measurement Provider, 2011 to present Leadership Northern Colorado Graduate 2012

6 JEFFREY C. KIRTLEY, LEED AP Senior Project Manager/Partner Jeff divides his time between the firm s environmental and owner s representative projects. He has gained wide experience in the company s asbestos hazardous materials and demolition project services, providing building inspections, abatement/demolition project design, air monitoring, and Phase I/II Environmental Site Assessments. Jeff s good technical writing, communication and problem solving skills also make him a valuable asset for our program management services. Jeff s experience in this area also comes from employment by a higher education institution, working as a project manager for design and construction of university facilities. RELEVANT EXPERIENCE St. Vrain School District RE-1J Projects Performed asbestos abatement design services on multiple projects as part of the District s $9 million bond program, including work to coordinate the abatement scope with the District s architects, project managers and contractors on renovations of existing schools. Projects involve 10 schools including Longmont HS, Frederick HS, Burlington ES and Mountain View ES. LHS, FHS and MVES are CDE/BEST funded cash grants for the abatement work. University of Colorado Boulder Baker Hall Renovation - Provided comprehensive environmental survey of the facility (including asbestos, lead-based paint and other regulated building materials) and complete abatement design services. Also provided abatement contract administration, project management and onsite project observation/air monitoring for the $2.1M abatement/demolition project. The facility offered many unique challenges, including the assessment and determination of abatement/demolition scope for OSHA-regulated trace-asbestos plaster, determination of hidden wall chases for abatement of TSI on hydronic piping, and complex abatement enclosure phasing to accommodate and an aggressive abatement/construction schedule. Colorado School of Mines Hall of Justice Abatement and Demolition Survey, design, and oversight for the abatement and demolition of a five-story, 87,500 SF facility. Abatement included ACM fireproofing throughout the facility and significant interior demolition due to asbestos contamination Abatement and demolition hard cost - $1.24 million. University of Northern Colorado Parking Lot Houses Survey, design and oversight for the abatement of twenty-four university-owned residential structures, in preparation for demolition and parking lot construction. Approximate abatement hard cost - $75,000. YEARS OF PROFESSIONAL EXPERIENCE Fifteen EDUCATION Bachelor of Arts in Earth Science, Environmental Science emphasis, Univ. of No. CO, 2000 ACCREDITATIONS, LICENSES AND PROFESSIONAL AFFILIATIONS Asbestos Project Designer, U.S. E.P.A. and State of Colorado, 2001 to present Air Monitoring Specialist - NIOSH 582E, U.S. E.P.A., 2001, Colorado, 2003 to present Asbestos Building Inspector, U.S. E.P.A. and State of Colorado, 2001 to present Environmental Site Assessments for Commercial Real Estate, ASTM, December 2002 Phase II Environmental Site Assessment Process, ASTM, May 2003 USGBC LEED Accredited Professional Colorado Environmental Professionals Association (CEPA) Board of Directors 2012

7 University of Colorado at Boulder Department of Environmental Health and Safety Asbestos and Lead Consulting Services Pre Registration Form Company Name _RLH Engineering, Inc. Contact Name_Jeffrey Kirtley Phone_ or Introduction The University of Colorado Boulder (UCB) Requests a Statement of Qualifications (RFQ) for providing as-needed Industrial Hygiene (IH) services related to asbestos and lead projects on the University of Colorado, Boulder campus. A qualified firm shall have certified staff and experience in at least one of the following asbestos/lead disciplines: Asbestos building inspections Asbestos project design Asbestos project management Air monitoring specialist Lead inspector Lead risk assessments Qualified IH firms working on the UCB campus must be: Registered Asbestos consulting firm with the Colorado Department of Public Health and Environment (CDPHE) o CDPHE Registration #_ACF Expiration Date_January 30, 20 o # Years working in asbestos and lead field? _27 In good standing with CDPHE with no recorded Notices of Violation in the past 5 years Trained and authorized by CU EHS to access the Material Management Database Selection process IH Firms will be evaluated and qualified based on CDPHE Asbestos Consultant Registration and personnel currently certified by CDPHE for each discipline. Each firm will be required to provide proof of State certified staff on a yearly basis to maintain current status on the qualified IH provider list. It is the responsibility of all qualified firms to Department of Environmental Health & Safety 1000 Regent Drive, UCB 413 Boulder, Colorado (303) FAX: (303) Page 1 of 3

8 University of Colorado at Boulder Department of Environmental Health and Safety remain certified by CDPHE until the next required submittal date. If there is an increase or decrease to a consulting Firm s asbestos and lead capabilities the IH Firm is responsible for contacting CU EHS (ehslead@colorado.edu) with an update of the changes. All IH firms providing asbestos and lead services on campus must fully understand the requirements and expectations set forth in the campus Asbestos program, IH specifications and General Abatement Contractor specifications. Additionally, IH firms must comply with UCB standards/policies and all other applicable state and federal regulations when working on campus. Submittal requirement Check the box for each of the disciplines your firm is qualified by CDPHE to perform: Asbestos/Lead Discipline Qualified to Provide X Asbestos Building Inspections X Asbestos Air Monitoring X Asbestos Project Design X Asbestos Project Management X Lead Inspector Lead Risk Assessments CU EHS Approval EHS Use only Populate the following table for each team member who would be assigned to projects at UCB: Employee Name Asbestos Building Inspector Jeffrey C. Kirtley /22/ Richard L. Huwa /21/ Jeffrey M. Chamberlin /19/ Travis B. Guerette 41 05/25/ Fred W. Voseipka /22/ Dave W. Kahler // 16 Derek D. Spinuzzi /04/ Chuck F. Jordan /24/ Zachary C. Minniear /16/ Air Monitoring Specialist Asbestos Project Designer Lead Inspector Lead Risk Assessor Cert # Expiration Cert # Expiration Cert # Expiration Cert # Expiration Cert # Expiration /01/ 41 05/25/ /09/ /24/ /21/ /21/ /19/ 41 05/25/ /22/ /22/ /24/ /16/ # of Years in Industry Department of Environmental Health & Safety 1000 Regent Drive, UCB 413 Boulder, Colorado (303) FAX: (303) Page 2 of 3

9 University of Colorado at Boulder Department of Environmental Health and Safety Matthew C. Little /16/ Sydni S. Barnhart /22/ /20/ /30/ /01/ 2 1 Has your firm been trained on proper use of Material Management database and has been given authorization by CU EHS? Yes X No Upon completion, submit this document with the As-Needed Consultant Registration Form to The University of Colorado s Planning Design and Construction Department. Department of Environmental Health & Safety 1000 Regent Drive, UCB 413 Boulder, Colorado (303) FAX: (303) Page 3 of 3

Salida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201

Salida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201 Request for Qualifications for Environmental Consulting Services at: Salida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201 Request for Qualifications

More information

HS16 Asbestos Management

HS16 Asbestos Management HS16 Asbestos Management Occupational Health, Safety and Injury Prevention Subject Matter Expert Greg Smith GJS25 CONTENTS 1.0 INTRODUCTION... 3 2.0 OBJECTIVES AND METRICS... 3 3.0 APPLICABILITY... 3 4.0

More information

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services REQUEST FOR QUALIFICATIONS Architectural/Engineering Design Services Logistics DISTRICT CONTACTS FOR QUESTIONS Jeff Collum Superintendent Phone: 903-668-5990 Email: jcollum@hisd.com REQUEST FOR STATEMENT

More information

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

Associated with the District s Measure A Bond Program and Facilities Improvement Projects Request for Qualifications / Proposal (RFQ/P) for Hazardous Material Assessment, Abatement Plan, Cost Estimating, and Monitoring Services Associated with the District s Measure A Bond Program and Facilities

More information

UTAH STATUTES : (2) UTAH CODE: TITLE 34A: UTAH LABOR CODE CHAPTER 2: WORKERS COMPENSATION ACT

UTAH STATUTES : (2) UTAH CODE: TITLE 34A: UTAH LABOR CODE CHAPTER 2: WORKERS COMPENSATION ACT UTAH STATUTES : (2) UTAH CODE: TITLE 34A: UTAH LABOR CODE CHAPTER 2: WORKERS COMPENSATION ACT TITLE 59: REVENUE AND TAXATION CHAPTER 9: TAXATION OF ADMITTED INSURERS Terms References Industrial Hygiene

More information

Training Course Catalog

Training Course Catalog 2018-2019 Training Course Catalog Asbestos, Lead Paint, Mold, OSHA Chem Scope, Inc. 15 Moulthrop Street, North Haven CT 06473 203-865-5605 Fax 203-498-1610 www.chem-scope.com chem.scope@snet.net Table

More information

KENTUCKY STATUTES : (0) (None)

KENTUCKY STATUTES : (0) (None) KENTUCKY STATUTES : (0) (None) Terms References Industrial Hygiene 0 Industrial Hygienist 0 Certified Industrial Hygienist - CIH 0 Certified Associate Industrial Hygienist 0 Construction Health and Safety

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS S CONSULTING EXECUTIVE ARCHITECT FOR UREY HALL JULIO BARREIRO LASER LABORATORY FD&C Project No. 5166 Proposals due APRIL 7, 2017 Issue Date March 17, 2017 I. INTRODUCTION The UC San Diego Department of

More information

LOOSE FORMS PACKAGE TECHNICAL RFP No F; Confucius Institute at the University of Maryland, College Park Project No.

LOOSE FORMS PACKAGE TECHNICAL RFP No F; Confucius Institute at the University of Maryland, College Park Project No. LOOSE FORMS PACKAGE TECHNICAL RFP No. 63973-F; Project No. 16-676-207-00 1. GENERAL CONTRACTOR EXPERIENCE FORM 2. KEY PERSONNEL FORM 3. PROJECT APPROACH/PRELIMINARY SCHEDULE 5. COMPANY PROFILE 6. ANNUAL

More information

REQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES

REQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES REQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES Owner s Representative: 541 East Garden Drive, Unit S Windsor, Colorado 80550 970-686-5695

More information

ANNUAL REQUEST FOR QUALIFICATIONS Design Related Consulting & Support Services

ANNUAL REQUEST FOR QUALIFICATIONS Design Related Consulting & Support Services 2015 ANNUAL REQUEST FOR QUALIFICATIONS Design Related Consulting & Support Services THE UNIVERSITY OF ARIZONA Planning, Design & Construction 220 West Sixth Street Tucson, Arizona 85701 www.pdc.arizona.edu

More information

2018 TRAINING SCHEDULE

2018 TRAINING SCHEDULE SITE LOCATION: ALBANY, NY OSHA COMPLIANCE COURSES 40-Hr. HAZWOPER $675.00 HAZWOPER Refresher (1 Day) $150.00** 24-Hr. HAZWOPER (Limited Site Worker) $365.00 8-Hr. HAZWOPER Supervisor $150.00 ** 30-Hr.

More information

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M.

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M. CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 2018 @ 4:30 P.M. Call to order. Roll call. Old Business. 1. Ron Ziegler CEDA- Recommendations for 3 Sisters Project a. Project Memo b.

More information

HARRIETT FULLER RUST FACADE PROGRAM

HARRIETT FULLER RUST FACADE PROGRAM HARRIETT FULLER RUST FACADE PROGRAM APPLICATION GUIDELINES The City of Bloomington has committed itself to the continued revitalization of its central business district. This commitment manifests itself

More information

INDIANA STATUTES : (3) INDIANA CODE (STATUTES):

INDIANA STATUTES : (3) INDIANA CODE (STATUTES): INDIANA STATUTES : (3) INDIANA CODE (STATUTES): TITLE 24: TRADE REGULATION ARTICLE 4: REGULATED BUSINESSES CHAPTER 11: REGULATION OF INDUSTRIAL HYGIENISTS TITLE 22: LABOR AND SAFETY ARTICLE 3: WORKERS

More information

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E)

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E) REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E) Hinsdale County School District RE-1 PO Box 39 614 N. Silver St. Lake City, CO 81235 (970) 944-2314 PROPOSAL DUE DATE/DELIVERY REQUIREMENTS-

More information

SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE

SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE CHAPTER 822 X 1 REGISTRATION AND ACCREDITATION OF LEAD TRAINING PROGRAMS AND INDIVIDUALS ENGAGED IN LEAD HAZARD REDUCTION ACTIVITIES TABLE OF CONTENTS

More information

LOCKHART INDEPENDENT SCHOOL DISTRICT

LOCKHART INDEPENDENT SCHOOL DISTRICT LOCKHART INDEPENDENT SCHOOL DISTRICT Request for Qualifications #14-011 The Lockhart Independent School District ( District ) is seeking Submissions in response to this Request for Qualifications ( RFQ

More information

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC)

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) Ricardo Flores Magón Academy (Owner) 5301 Lowell Boulevard Denver, CO 80122 Phone (303) 412-7610 PROPOSAL

More information

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017 Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017 Introduction This is the Northern Arizona University Asbestos Operations and Maintenance guide. This document

More information

Boulder Housing Partners Request for Qualifications: RFQ # Architectural Services for Canyon Pointe and Glen Willow Renovation Projects

Boulder Housing Partners Request for Qualifications: RFQ # Architectural Services for Canyon Pointe and Glen Willow Renovation Projects 4800 N. Broadway, Boulder, CO 80304 Phone: 720-564-4610 Fax: 303-939-9569 www.boulderhousing.org Hearing Assistance: 1-800-659-3656 Boulder Housing Partners Request for Qualifications: RFQ #4-2017 Architectural

More information

CITY OF GOLDEN, COLORADO Parks and Recreation Department

CITY OF GOLDEN, COLORADO Parks and Recreation Department CITY OF GOLDEN, COLORADO Parks and Recreation Department Accredited by the Commission for Accreditation of Park and Recreation Agencies Rod Tarullo, Parks & Recreation Director REQUEST FOR QUALIFICATIONS

More information

North Dakota State University. Minard Hall Project Status Summary As of September 30, 2011

North Dakota State University. Minard Hall Project Status Summary As of September 30, 2011 North Dakota State University Minard Hall Project Status Summary As of September 30, 2011 Overview Minard Hall is the largest academic facility located in the historical district on NDSU s campus. The

More information

City of Provo, Utah Parks and Recreation Department. Request for Proposal (RFP) Architectural Services for a New Community Recreation Center

City of Provo, Utah Parks and Recreation Department. Request for Proposal (RFP) Architectural Services for a New Community Recreation Center City of Provo, Utah Parks and Recreation Department Request for Proposal (RFP) Architectural Services for a New Community Recreation Center RFP No. 14065 I. GENERAL OVERVIEW AND DESCRIPTION OF PROJECT

More information

SOMERSET COUNTY, MARYLAND

SOMERSET COUNTY, MARYLAND SOMERSET COUNTY, MARYLAND REQUEST FOR PROPOSAL ***** ARMORY FEASIBILITY STUDY TO EVALUATE THE CURRENT CONDITIONS OF THE CRISFIELD ARMORY, LOCATED AT 8 EAST MAIN STREET IN THE CITY OF CRISFIELD, MD., INCLUDING

More information

FAÇADE RENOVATION GRANT PROGRAM DESCRIPTION

FAÇADE RENOVATION GRANT PROGRAM DESCRIPTION PROGRAM DESCRIPTION The Façade Renovation Grant is designed for large scale renovation projects to the façade of a building within the boundaries of the Longmont Downtown Development Authority (LDDA).

More information

REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING EXECUTIVE ARCHITECT

REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING EXECUTIVE ARCHITECT REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING EXECUTIVE ARCHITECT For the TORREY PINES CENTER SOUTH (TPCS) FACILITY UNIVERSITY OF CALIFORNIA, SAN DIEGO OFFICES OF FACILITIES DESIGN & CONSTRUCTION Issue

More information

CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT

CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT Residential Sound Insulation Program A. PROGRAM NARRATIVE The City of Fresno

More information

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT DUE: May 4, 2018 4:00 P.M. Walla Walla Public Schools 364 S. Park Street Walla Walla, WA 99362 District Representative/Contact:

More information

Morgan Hill Unified School District

Morgan Hill Unified School District Facilities Department 15600 Concord Circle, Morgan Hill, CA 95037 Phone: (408) 201-6087 Fax (408) 776-0175 REQUEST FOR ARCHITECTURAL SERVICES PROPOSALS for a New Britton MS Campus and Site Master Plan

More information

EXISTING CONDITIONS

EXISTING CONDITIONS 02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal 02 01 80 Maintenance of Facility

More information

IOWA STATUTES : (2) IOWA CODE (STATUTES):

IOWA STATUTES : (2) IOWA CODE (STATUTES): IOWA STATUTES : (2) IOWA CODE (STATUTES): TITLE III: PUBLIC SERVICES AND REGULATION SUBTITLE 2: EMPLOYMENT SERVICES CHAPTER 85A: OCCUPATIONAL DISEASE COMPENSATION TITLE XI: NATURAL RESOURCES SUBTITLE 1:

More information

TOWN OF PLAINVILLE REQUEST FOR QUALIFICATIONS AND PROPOSALS

TOWN OF PLAINVILLE REQUEST FOR QUALIFICATIONS AND PROPOSALS TOWN OF PLAINVILLE REQUEST FOR QUALIFICATIONS AND PROPOSALS Department of Economic & Community Development Brownfield Assessment Grant One and Sixty-Three West Main Street, Plainville, CT 1. PURPOSE The

More information

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. February 19, 2010 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Farnsworth Aerospace Magnet Asbestos Inspection Project #0924022 Dear Ted, Enclosed please find the

More information

FORT RUCKER Environmental Document

FORT RUCKER Environmental Document Approved by: Melissa Lowlavar/Johnny Buchanan 1.0 PURPOSE This procedure defines the requirements for submitting abatement plans and close-out documents for asbestos projects on Fort Rucker. Control of

More information

ANAHUAC INDEPENDENT SCHOOL DISTRICT

ANAHUAC INDEPENDENT SCHOOL DISTRICT ANAHUAC INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS Architectural and Engineering Services for Future Potential Bond Projects INTRODUCTION: Anahuac Independent School District ( District ) is

More information

May 18, 2016 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

May 18, 2016 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES May 18, 2016 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES I. Project Forsyth County Clemmons Branch Library II. Goal Forsyth County seeks an innovative design team to create a

More information

Cheyenne Mountain Charter Academy 1832 South Wahsatch Avenue Colorado Springs, CO (719)

Cheyenne Mountain Charter Academy 1832 South Wahsatch Avenue Colorado Springs, CO (719) Cheyenne Mountain Charter Academy 1832 South Wahsatch Avenue Colorado Springs, CO 80905 (719) 471-1999 www.cmca12.com REQUEST FOR QUALIFICATIONS FOR General Contractor Please review this Request for Qualifications

More information

Instructions to Bidders Asbestos Abatement

Instructions to Bidders Asbestos Abatement Quinault Indian Nation P.O Box 189 Taholah, WA. 98587 Instructions to Bidders Asbestos Abatement BID DATE TIME Locations and legal address of project: 1. 411 Queets Ave. Queets, WA 98331 (survey attached).

More information

REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT CANYON VISTA DINING RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO. CPM Project No.

REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT CANYON VISTA DINING RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO. CPM Project No. EXECUTIVE ARCHITECT FOR THE CANYON VISTA DINING RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO CPM Project No. 5289 Proposals due JUNE 11, 2018 Issue date May 24, 2018 I. INTRODUCTION The University of

More information

Design/Builder Qualifications Supplement (DBQS) Instructions. GENERAL INSTRUCTIONS UF-583, Ground Floor Renovation (Basic Science Bldg)

Design/Builder Qualifications Supplement (DBQS) Instructions. GENERAL INSTRUCTIONS UF-583, Ground Floor Renovation (Basic Science Bldg) BUSINESS AFFAIRS www.facilities.ufl.edu PLANNING DESIGN & CONSTRUCTION Design/Builder Qualifications Supplement (DBQS) Instructions GENERAL INSTRUCTIONS UF-583, Ground Floor Renovation (Basic Science Bldg)

More information

Facilities Services Division

Facilities Services Division Facilities Services Division Frequently Asked Questions Asbestos 1. What does the head custodian do with the completed 6 month asbestos surveillance report? 2. What is asbestos containing material (ACM)

More information

Attention Design Firms

Attention Design Firms Attention Design Firms If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal may cause your submittal to be

More information

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. February 18, 2010 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: American Indian Magnet (Mounds Park) Asbestos Inspection IEA Project #0924022 Dear Ted, Enclosed please

More information

REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced

REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES The is soliciting Statements of Qualifications from architecture firms interested in providing architectural services for the following project:

More information

Galesburg Public Library, Galesburg, IL

Galesburg Public Library, Galesburg, IL Galesburg Public Library, Galesburg, IL Request for Qualifications ( RFQ ) Architectural, Engineering, Construction Management and Related Services I. OVERVIEW The Galesburg Public Library is seeking architectural,

More information

2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs

2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs 2016 SCHEDULE 2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs ASBESTOS * Abatement Worker/Supervisor Air Sampling Technician (NYS) Allied Trades

More information

CUYAHOGA COMMUNITY COLLEGE CAPITAL AND CONSTRUCTION DEPARTMENT

CUYAHOGA COMMUNITY COLLEGE CAPITAL AND CONSTRUCTION DEPARTMENT CUYAHOGA COMMUNITY COLLEGE CAPITAL AND CONSTRUCTION DEPARTMENT REQUEST FOR QUALIFICATIONS FOR PROJECT MANAGEMENT SERVICES COLLEGE-WIDE PROJECT NUMBER C20171130 BACKGROUND College Mission to provide high

More information

TSI TSI. TSItraining.com. Check out our multi-state approvals and recognition U.S. POSTAGE PAID WILLOUGHBY, OH PERMIT NO.

TSI TSI.  TSItraining.com. Check out our multi-state approvals and recognition U.S. POSTAGE PAID WILLOUGHBY, OH PERMIT NO. 2011 Check out our multi-state approvals and recognition www. training.com 1-866 866-666 666-8438 TM PRESORTED STANDARD MAIL U.S. POSTAGE PAID WILLOUGHBY, OH PERMIT NO. 414 Corporate Office 33150 Lakeland

More information

Downtown Waukesha Façade, Sign and Awning Matching Grant Program

Downtown Waukesha Façade, Sign and Awning Matching Grant Program Downtown Waukesha Façade, Sign and Awning Matching Grant Program City of Waukesha Community Development Department - 201 Delafield Street, Suite 200, Waukesha, WI 53188 262-524-3750 Program Highlights

More information

REDEVELOPING BROWNFIELDS IN KANSAS CITY

REDEVELOPING BROWNFIELDS IN KANSAS CITY REDEVELOPING BROWNFIELDS IN KANSAS CITY A GENERAL OVERVIEW JUNE 26, 2018 Presented by Andrew Bracker Brownfields Coordinator City of Kansas City, Missouri Overview Program Summary Case Studies Incentives

More information

CHAPTER 08 - ENGINEERING AND BUILDING CODES DIVISION SECTION GENERAL PROVISIONS SECTION NORTH CAROLINA STATE BUILDING CODE

CHAPTER 08 - ENGINEERING AND BUILDING CODES DIVISION SECTION GENERAL PROVISIONS SECTION NORTH CAROLINA STATE BUILDING CODE CHAPTER 08 - ENGINEERING AND BUILDING CODES DIVISION SECTION.0100 - GENERAL PROVISIONS 11 NCAC 08.0101 PURPOSE OF THE DIVISION 11 NCAC 08.0102 DEPUTY COMMISSIONER 11 NCAC 08.0103 DIVISION PERSONNEL 11

More information

CSU CONSTRUCTION. The California State University Office of Audit and Advisory Services. California State University, East Bay

CSU CONSTRUCTION. The California State University Office of Audit and Advisory Services. California State University, East Bay CSU The California State University Office of Audit and Advisory Services CONSTRUCTION California State University, East Bay Warren Hall Replacement Building Audit Report 16-10 August 15, 2016 EXECUTIVE

More information

Kansas Healthy Homes and Lead Hazard Prevention Program Annual Report

Kansas Healthy Homes and Lead Hazard Prevention Program Annual Report Kansas Healthy Homes and Lead Hazard Prevention Program 2010 Annual Report Protecting the health and environment of all Kansans by promoting responsible choices Kansas Healthy Homes and Lead Hazard Prevention

More information

Construction Manager Qualifications Supplement (CMQS)

Construction Manager Qualifications Supplement (CMQS) BUSINESS AFFAIRS PLANNING DESIGN & CONSTRUCTION www.facilities.ufl.edu Construction Manager Qualifications Supplement (CMQS) GENERAL INSTRUCTIONS UF-620, IFAS Bee Unit Facility Modifications Highlighted

More information

Chabot-Las Positas Community College District

Chabot-Las Positas Community College District Chabot-Las Positas Community College District REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ) ARCHITECTURAL/ENGINEERING DESIGN SERVICES FOR THE CHABOT AND LAS POSITAS COLLEGES RFQ B-18 Proposal Due: WEDNESDAY,

More information

2018 CDBG Application Workshop Downtown Revitalization Program. Program Overview CDBG Downtown Revitalization Program. Impactful Photo Examples (1)

2018 CDBG Application Workshop Downtown Revitalization Program. Program Overview CDBG Downtown Revitalization Program. Impactful Photo Examples (1) 2018 CDBG Application Workshop Downtown Revitalization Program Joe Bohlke, Project Manager Iowa Economic Development Authority Joseph.Bohlke@iowaeda.com 725-3011 Ed Basch, Project Manager Iowa Economic

More information

Issued: Thursday, October 15, City of Grand Blanc, 203 E. Grand Blanc Road, Grand Blanc, MI 48439, Attn: Bethany Smith, City Clerk

Issued: Thursday, October 15, City of Grand Blanc, 203 E. Grand Blanc Road, Grand Blanc, MI 48439, Attn: Bethany Smith, City Clerk CITY OF GRAND BLANC REQUEST FOR PROPOSAL FOR PRE-DEMOLITION INVESTIGATION AND SURVEY OF ASBESTOS AND HAZARDOUS MATERIALS FOR THE STRUCTURE AT 113 REID ROAD, GRAND BLANC, MICHIGAN 48439 Issued: Thursday,

More information

Ohio Weatherization Training Center/ Ohio Center for Lead Abatement 2017 CHIP Lead Hazard TRAINING Program SCHEDULE

Ohio Weatherization Training Center/ Ohio Center for Lead Abatement 2017 CHIP Lead Hazard TRAINING Program SCHEDULE Ohio Weatherization Training Center/ Ohio Center for Lead Abatement 2017 CHIP Lead Hazard 2014 Reduction CHIP PROVIDER Training TRAINING Program SCHEDULE Completed registration forms must be mailed, e-mailed

More information

Attention Design Firms

Attention Design Firms Attention Design Firms If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal may cause your submittal to be

More information

Lead Abatement Grants

Lead Abatement Grants 1) Eligibility a. Abatement Eligibility b. Ineligible c. Mixed Lead Abatement and Lead Remediation Projects 2) Lead Abatement Definition- HUD Guidance Chapter 12 and 13 3) Lead Hazard Evaluation and Abatement

More information

STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS

STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES For The University of Colorado Colorado Springs For

More information

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES I. Project Forsyth County Courthouse & Administrative Building II. Goal Forsyth County requests responses from licensed

More information

Facade Grant Program Information

Facade Grant Program Information East Chicago City-Wide Facade Grant Program Information Introduction East Chicago is undertaking an ambitious citywide revitalization plan in an effort to draw more people back to the businesses throughout

More information

Request for Qualifications

Request for Qualifications Request for Qualifications Architectural & Engineering Services for HUTTON ELEMENTARY SCHOOL Modernization and Additions Project Submittal Deadline: August 24, 2012, 4:00 P.M. Spokane Public Schools 2815

More information

LEADing THE Way Since 1989

LEADing THE Way Since 1989 PREMIER GENERAL CONTRACTOR LEADing THE Way Since 1989 Over the years we have built a STRONG reputation we are proud to stand behind. OUR MAIN SERVICES Facilities Contracting, Inc. is a Class-A Commercial

More information

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES REQUEST FOR QUALIFICATIONS # 1206-18/19 FOR ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES Issue Date: June 26, 2018 Pre-Bid July 9, 2018 at 10:00 A.M. Conference: 1515 West Mission Road,

More information

Chabot-Las Positas Community College District

Chabot-Las Positas Community College District Chabot-Las Positas Community College District REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ) ARCHITECTURAL/ENGINEERING DESIGN SERVICES FOR THE CHABOT AND LAS POSITAS COLLEGES RFQ C-14 Proposal Due: TUESDAY,

More information

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION Detroit Hispanic Development Corporation REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION Detroit Hispanic Development Corporation 1211 Trumbull St Detroit, Michigan 48216 Phone:

More information

Lexington Center Corporation Request for Qualifications for PROJECT COORDINATOR SERVICES

Lexington Center Corporation Request for Qualifications for PROJECT COORDINATOR SERVICES Lexington Center Corporation Request for Qualifications for PROJECT COORDINATOR SERVICES Lexington Convention Center Renovation and Expansion I. Description of Project The Lexington Center Corporation

More information

PROJECT DASHBOARD BUDGET SCHEDULE SCOPE COMMUNITY

PROJECT DASHBOARD BUDGET SCHEDULE SCOPE COMMUNITY PROJECT DASHBOARD Monthly Rating BUDGET SCHEDULE SCOPE COMMUNITY JAN APR 2017 MILESTONES Education Specifications School Program Finalized School Tours MAY 2017 TARGET MILESTONES Path to Net Zero GO/NO

More information

CMGT 380 Green Building Practices and LEED Certification Department of Construction Management California State University, Chico

CMGT 380 Green Building Practices and LEED Certification Department of Construction Management California State University, Chico CMGT 380 Green Building Practices and LEED Certification Department of Construction Management California State University, Chico Discussion #4 LEED Process GA05 Guide to LEED Certification: Commercial

More information

RFQ RW Asbestos Abatement Services Addendum 2

RFQ RW Asbestos Abatement Services Addendum 2 1.0 Purpose of the Addendum AUSTIN COMMUNITY COLLEGE DISTRICT ADDENDUM NO. 2 REQUEST FOR QUALIFICATIONS FOR Asbestos Abatement Services Firm RFQ No. 926-15041RW In accordance with ACC's Request for Qualifications

More information

Request for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project

Request for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project Request for Qualifications No. 7-1718 Architectural & Engineering Services for LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project Submittal Deadline: November 10, 2017, 2:00 P.M. Spokane Public Schools

More information

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011 Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969 Proposed Library for the Future Library Overview Stoughton Public Library opened in 1969

More information

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Research Laboratory Renovations Response Deadline

More information

ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION REGULATION 25 ARKANSAS LEAD-BASED PAINT-HAZARD

ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION REGULATION 25 ARKANSAS LEAD-BASED PAINT-HAZARD ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION REGULATION 25 ARKANSAS LEAD-BASED PAINT-HAZARD EFFECTIVE MARCH 28, 1998 TABLE OF CONTENTS CHAPTER ONE: STATEMENT OF PURPOSE 1-1 Section 25.101 Authority

More information

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM For Official Use Only Date Received 1 Date Received

More information

Statement. of Qualifications

Statement. of Qualifications Statement..... of.... Qualifications Pacific EH&S Services, Inc. January 2007 Table of Contents Introduction... 1 Statement of Services and Capabilities... 2 Personnel Qualifications... 8 Project Experience...10

More information

Low Income Radon Mitigation Assistance (LIRMA) Program. Policy and Procedures Manual

Low Income Radon Mitigation Assistance (LIRMA) Program. Policy and Procedures Manual Low Income Radon Mitigation Assistance (LIRMA) Program Policy and Procedures Manual Revised November 27, 2017 Colorado Department of Public Health and Environment (CDPHE) Low Income Radon Mitigation Assistance

More information

Vista Ridge Project Technical Advisor

Vista Ridge Project Technical Advisor Tim Skoglund, P.E. Senior Director Vista Ridge Maria Franco Contract Administrator SOQ Pre-Submittal Meeting Disclaimer Oral statements or discussion during the SOQ Pre-Submittal Meeting will not be binding,

More information

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW PROCEDURE Management of Asbestos Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of risk Document

More information

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 15-BS-2552 as follows:

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 15-BS-2552 as follows: Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 15-BS-2552 CM GC ADDENDUM NUMBER ONE September 9, 2015 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

REQUEST FOR QUALIFICATIONS. General Contractor Construction Manager (GC/CM) Services. Modernization Project

REQUEST FOR QUALIFICATIONS. General Contractor Construction Manager (GC/CM) Services. Modernization Project REQUEST FOR QUALIFICATIONS General Contractor Construction Manager (GC/CM) Services Centralia High School Modernization Project Centralia High School 813 Eshom Rd Centralia, WA 98531 Submit Proposals to:

More information

Galt Joint Union High School District Marengo Rd Galt, CA Elizabeth Kaufman, Superintendent REQUEST FOR QUALIFICATIONS / PROPOSALS

Galt Joint Union High School District Marengo Rd Galt, CA Elizabeth Kaufman, Superintendent REQUEST FOR QUALIFICATIONS / PROPOSALS 12936 Marengo Rd Galt, CA 95632 Elizabeth Kaufman, Superintendent May 24, 2017 REQUEST FOR QUALIFICATIONS / PROPOSALS ENVIRONMENTAL CONSULTING SERVICES ASBESTOS / LEAD / PCB The is seeking a Statement

More information

REQUEST FOR QUALIFICATIONS AS-NEEDED EXECUTIVE ARCHITECTS

REQUEST FOR QUALIFICATIONS AS-NEEDED EXECUTIVE ARCHITECTS AS-NEEDED EXECUTIVE ARCHITECTS FOR INFRASTRUCTURE PROJECTS UC SAN DIEGO HEALTH SYSTEM - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO OFFICES OF CAPITAL PROGRAM MANAGEMENT Proposals due June 5, 2018 Issue

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 32-1052 24 DECEMBER 2014 Civil Engineering FACILITY ASBESTOS MANAGEMENT COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications

More information

RIGHT RENOVATE THE LEAD SAFE CERTIFIED GUIDE TO LEAD (5323) epa.gov/getleadsafe EPA-740-K Revised September 2011

RIGHT RENOVATE THE LEAD SAFE CERTIFIED GUIDE TO LEAD (5323) epa.gov/getleadsafe EPA-740-K Revised September 2011 THE LEAD SAFE CERTIFIED GUIDE TO RENOVATE RIGHT 1-800-424-LEAD (5323) epa.gov/getleadsafe EPA-740-K-10-001 Revised September 2011 Important lead hazard information for families, child care providers and

More information

Request for Qualifications Construction Manager

Request for Qualifications Construction Manager Midland Community Unit School District #7 Request for Qualifications Construction Manager April 6, 2016 MIDLAND ELEMENTARY SCHOOL LACON, ILLINOIS Page 1 of 11 Construction Management Statement of Qualifications

More information

REQUEST FOR QUALIFICATIONS RFQ NO Orange Coast College Classroom Modernization Project

REQUEST FOR QUALIFICATIONS RFQ NO Orange Coast College Classroom Modernization Project REQUEST FOR QUALIFICATIONS RFQ NO. 001-10 Orange Coast College Classroom Modernization Project COAST COMMUNITY COLLEGE DISTRICT Facilities and Planning Department 1370 Adams Avenue, Costa Mesa, CA 92626

More information

Qualification Package

Qualification Package Qualification Package Company Profile Hina Environmental Solutions, LLC, is a Columbus; Ohio based environmental company focusing on Testing and Abatement of Asbestos, Lead-Based Paint, Meth Clean-up and

More information

RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS

RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER 1200-1-18 LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS 1200-1-18-.01 Lead-Based Paint Abatement 1200-1-18-.04

More information

ACTIVE BUSINESS IMPROVEMENT AREAS COMMERCIAL PROPERTY IMPROVEMENT GRANT PROGRAM APPLICANT INFORMATION

ACTIVE BUSINESS IMPROVEMENT AREAS COMMERCIAL PROPERTY IMPROVEMENT GRANT PROGRAM APPLICANT INFORMATION Name of Applicant: Contact Name: Mailing Address: City & Postal Code: Telephone Number: Cell Phone Number: Email: Planning and Economic Development Department Urban Renewal Section 71 Main Street West,

More information

Universal City Storefront Improvement Program

Universal City Storefront Improvement Program Universal City Storefront Improvement Program To encourage the enhancement of storefronts on commercial, professional, and retail buildings in Universal City. Grant Funds Available Painting Doors Windows

More information

Project number: Project Title: Recreation Center Expansion and Student Wellness Center

Project number: Project Title: Recreation Center Expansion and Student Wellness Center STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING CONSTRUCTION MANAGEMENT/GENERAL CONTRACTING SERVICES FOR

More information

EXHIBIT A SCOPE OF WORK

EXHIBIT A SCOPE OF WORK EXHIBIT A SCOPE OF WORK Asbestos Abatement Services for the Florida Department of Transportation FM 227775-1 / State Road 7 (SR-7) from Fillmore Street to South of Stirling Road Hollywood, Broward County,

More information

L AK E S TRE ET V E N T U R E S 1

L AK E S TRE ET V E N T U R E S 1 L AK E S TRE ET V E N T U R E S 1 Welcome to Lake Street With each opportunity we welcome challenges, because they bring out our best. Every day we adapt to the diversity of our business with creative

More information

City of Philadelphia: Child Care Facility Fund

City of Philadelphia: Child Care Facility Fund City of Philadelphia: Child Care Facility Fund Application Period Opens: Monday, October 9, 2017 Application Deadline: Wednesday, November 15, 2017, 5pm EST About Public Health Management Corporation (PHMC)

More information

REQUEST FOR QAULIFICATONS. General Contractor Construction Manager (GC/CM) Wallace and Lexington Elementary Schools Replacement Project.

REQUEST FOR QAULIFICATONS. General Contractor Construction Manager (GC/CM) Wallace and Lexington Elementary Schools Replacement Project. REQUEST FOR QAULIFICATONS General Contractor Construction Manager (GC/CM) Wallace and Lexington Elementary Schools Replacement Project Kelso, WA Submittal Deadline: August 23, 2018 3:00 pm REQUEST FOR

More information

Ballot Measures-J Section

Ballot Measures-J Section J, Anaheim Elementary Schools Repair/Improvement Measure To repair and modernize classrooms and older neighborhood schools to support reading, math, science, technology, arts, replace deteriorating roofs,