Enclosed please find the inspection report for the above-referenced location.

Size: px
Start display at page:

Download "Enclosed please find the inspection report for the above-referenced location."

Transcription

1 February 18, 2010 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN RE: American Indian Magnet (Mounds Park) Asbestos Inspection IEA Project # Dear Ted, Enclosed please find the inspection report for the above-referenced location. If you have any questions or require additional information, please do not hesitate to contact me. Sincerely, IEA, INC. Jeff Carlson Director of Inspection Services JC/wb Enclosures cc File

2 ASBESTOS INSPECTION PROFILE American Indian Magnet (Mounds Park) 1075 Third Street East Saint Paul, MN Submitted to: Ted Sherman Saint Paul Public Schools Submitted by: Institute for Environmental Assessment 9201 West Broadway North, Suite 600 Brooklyn Park, MN / Client #2001 IEA Project #

3 INDEX SECTION I Asbestos Summary and Inspection Report SECTION II Floor Plans SECTION III Asbestos Laboratory Report SECTION IV Asbestos Inspector and Management Planner Licenses

4 SECTION I Asbestos Summary and Inspection Report

5 Asbestos Summary American Indian Magnet (Mounds Park) 1075 Third Street East Saint Paul, MN On February 1-2, 2010, an inspection for asbestos-containing materials (ACM) was performed at the above-referenced location. The scope of the inspection included all accessible suspect ACM within the building. Since this was a limited inspection, there may be additional materials not identified on the report located within wall cavities, pipe chases and/or other inaccessible locations. Suspect ACM was identified and sampled for asbestos content. Identified materials confirmed to be ACM include the following: Black flooring mastic The following suspect materials were not sampled as part of the inspection. These materials are assumed to contain asbestos and shall be treated as ACM or sampled prior to disturbance to determine if they are ACM or not. Identified materials assumed to be ACM include the following: Pipe/valve flange gaskets Chalkboard adhesive Tackboard adhesive See the attached report for specific quantities and locations. Destructive sampling was not performed as a part of this inspection. This inspection does not meet the requirements of the Minnesota Pollution Control Agency (MPCA) or Minnesota OSHA (MNOSHA) for an asbestos demolition/renovation inspection. Bulk Samples of accessible suspect material were collected and analyzed in accordance with Environmental Protection Agency (EPA) sampling and analytical procedure requirements. Sampling was conducted in a manner determined by the inspector to be sufficient to identify whether the suspect materials are asbestos containing. Where deemed appropriate, prior sample results were used and are referenced in the report. Roof samples were not collected as part of this inspection. Suspect roofing materials should be handled as asbestos or sampled prior to disturbance to determine if they are ACM or not. Specific locations of these materials, as well as those suspect materials which were analyzed and were found not to contain asbestos, are identified in the attached report. IEA, INC Page 1 of 1

6 American Indian Magnet (Mounds Park) 1075 Third Street East, Saint Paul, MN Inspection Dates: 2/1/2010 to 2/2/2010 Chart B - Assessment of Asbestos-Containing Building Materials (ACBM) All asbestos-containing events listed here are to be inspected during each six-month periodic surveillance inspection for changes in condition. The Institute for Environmental Assessment (IEA) highly recommends an in depth "front end" inspection prior to any general renovation or remodeling to determine if those activities may disrupt building materials that may involve existing or undiscovered asbestos. Potentially inaccessible or exempt asbestos-containing materials not included in this plan may include: adhesives, caulking, putty, woven blankets, curtains, gloves and gaskets, electrical wiring insulation and heat shields above lights, paints and coatings, roofing felts, flashings and shingles, and mineral core fire doors. Damaged materials which require corrective action to reduce a potential hazard are indicated on Chart A. All non-damaged ACBM identified in Chart B should be monitored through scheduled inspections and removed prior to renovation or demolition activities, or when their condition deteriorates. District administration will direct another formal inspection by a federally certified inspector within three (3) years, and will maintain an ongoing file for each building. Specific recommendations on how to manage the different types of asbestos-containing material are identified in the Asbestos Management Plan. PLEASE NOTE: Based on EPA recommendations, materials analyzed utilizing PLM and found to contain between 0% and 10% should be assumed asbestos containing unless building owner wishes the laboratory to utilize "point counting." For samples analyzed prior to 1994 containing 1% or less (trace) of asbestos, resampling utilizing the 1993 EPA Test Method or point counting is strongly recommended for purposes of demolition or renovation before treating these materials as non-asbestos containing. Contact your local IEA office for questions or additional information. EPA ASSESSMENT CATEGORIES: 1 = Damaged or significantly damaged TSI ACM. 5 = ACBM w/potential for damage. 2 = Damaged friable surfacing ACM. 6 = ACBM w/potential for significant damage. 3 = Significantly damaged friable surfacing ACM. 7 = Any remaining friable ACBM or friable suspected ACBM. 4 = Damaged or significantly damaged friable miscellaneous ACM. IEA Event No. IEA Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 2 X0B Miscellaneous Material THROUGHOUT BUILDING 400 Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1991) 8 X0A Miscellaneous Material BASEMENT STORAGE ROOM TA5 24 Sq. Ft. N ASSUMED 5 Pipe/Valve Flange Gaskets APPROXIMATELY TWENTY-FOUR (24) GASKETS. American Indian Magnet (Mounds Park) Page 1

7 American Indian Magnet (Mounds Park) 1075 Third Street East, Saint Paul, MN Inspection Dates: 2/1/2010 to 2/2/2010 IEA Event No. IEA Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 63 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) 69 X0C Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1930) 70 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) 83 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1924) 84 X0F Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1924) 91 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1924) 92 X0F Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1924) 93 X0H Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive ON NORTH WALL. APPEARS NEWER. 99 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) American Indian Magnet (Mounds Park) Page 2

8 American Indian Magnet (Mounds Park) 1075 Third Street East, Saint Paul, MN Inspection Dates: 2/1/2010 to 2/2/2010 IEA Event No. IEA Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 100 X0C Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1930) 101 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) 105 X0C Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1930) 106 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) 107 X0C Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1930) 108 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) 124 X0C Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1930) 125 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) 126 X0C Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1930) American Indian Magnet (Mounds Park) Page 3

9 American Indian Magnet (Mounds Park) 1075 Third Street East, Saint Paul, MN Inspection Dates: 2/1/2010 to 2/2/2010 IEA Event No. IEA Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 127 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) 129 X0C Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1930) 130 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) 134 X0C Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1930) 135 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) 138 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) 142 X0D Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1930) 147 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1924) 148 X0F Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1924) American Indian Magnet (Mounds Park) Page 4

10 American Indian Magnet (Mounds Park) 1075 Third Street East, Saint Paul, MN Inspection Dates: 2/1/2010 to 2/2/2010 IEA Event No. IEA Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 151 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1924) 152 X0F Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1924) 156 K3D Miscellaneous Flooring OFFICE CLOSET UP STAIRWELL ACROSS FROM Black Mastic (1924) ROOM 309 UNDER CARPET. 20 Sq. Ft. N 5 CH X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1924) BEHIND WHITEBOARD. 158 X0F Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1924) 163 X0G Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1924) 164 X0F Miscellaneous Material ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1924) 170 K3D Miscellaneous Flooring OFFICE CLOSET UP STAIRWELL ACROSS FROM Black Mastic (1924) ROOM 312 UNDER CARPET. 20 Sq. Ft. N 5 CH 5 American Indian Magnet (Mounds Park) Page 5

11 American Indian Magnet (Mounds Park) 1075 Third Street East, Saint Paul, MN Inspection Dates: 2/1/2010 to 2/2/2010 Chart C - All Materials List The following list contains all events observed by the inspector, whether or not they actually contained asbestos, and are grouped by homogeneous area (material type). Homogeneous Area ID Code (Material Type) IEA Event No. Location % Asbestos Sample No. Sample Location Estimated Total Amount H1A I1A I1B I1C I2A I3A Sprayed-On Structural Fireproofing Cellulose (1991) 1' x 1' Acoustical Ceiling Tile Pegboard (1924) 1' x 1' Acoustical Ceiling Tile Pegboard (1930) 1' x 1' Acoustical Ceiling Tile Pin & Nail Holes (1991) 2' x 2' Acoustical Ceiling Tile Glacial w/revealed Edge (1991) 2' x 4' Ceiling Tile Gouges & Pin Holes (1991) 3 THROUGHOUT BUILDING NONE DETECTED MV-02,03,04,05,06, 15,16 MV-02,03,04,05: BASEMENT STORAGE TA11. MV-06: ROOM TA40. MV-15: ROOM 135. MV-16: ROOM 73. Total Amount: 30,000 Sq. Ft Sq. Ft. Total Amount: 300 Sq. Ft. 24 ROOM G-13 (MEDIA CENTER) NONE DETECTED MV-18 MV-18: ROOM G-13 (MEDIA CENTER). 300 Sq. Ft. Total Amount: 10 Sq. Ft. 67 ROOM 104 NONE DETECTED MV-27 MV-27: ROOM Sq. Ft. Total Amount: 5,400 Sq. Ft. 13 GYMNASIUM (G-03) NEW 5400 Sq. Ft. Total Amount: 4,900 Sq. Ft. 23 ROOM G-13 (MEDIA CENTER) NONE DETECTED MV-17 MV-17: ROOM G-13 (MEDIA CENTER) Sq. Ft. 46 MAIN LOBBY NONE DETECTED 2500 Sq. Ft. Total Amount: 70,000 Sq. Ft. 5 THROUGHOUT BUILDING NONE DETECTED MV-08 MV-08: HALLWAY NEAR ROOM G Sq. Ft. American Indian Magnet (Mounds Park) Page 1

12 Chart C - All Materials List - American Indian Magnet (Mounds Park) (cont.) Homogeneous Area ID Code (Material Type) IEA Event No. Location % Asbestos Sample No. Sample Location Estimated Total Amount I3B I3C I3D I3E J1A J3A 2' x 4' Ceiling Tile Pin Holes & Craters 2' x 4' Ceiling Tile Vinyl-Coated Gypsum (1991) 2' x 4' Ceiling Tile Widthwise Fissures w/pin Holes 2' x 4' Ceiling Tile Gouges & Pin Holes in Concentric Pattern Cementitious Panels Fume Hood Miscellaneous Cementitious Material 1" Black Window Sills Total Amount: 160 Sq. Ft. 104 STAFF RESTROOM BY ROOM 205 NONE DETECTED 80 Sq. Ft. 139 STAFF RESTROOM BY ROOM 305 NONE DETECTED MV-09 MV-09: STAFF RESTROOM BY ROOM Sq. Ft. Total Amount: 1,200 Sq. Ft. 44 KITCHEN NSM 1200 Sq. Ft. Total Amount: 80 Sq. Ft. 34 COMMUNICATIONS CLOSET 32 OFF ROOM G-08 NONE DETECTED MV-10 MV-10: CLOSET 32 OFFROOM G Sq. Ft. Total Amount: 120 Sq. Ft. 47 MAIN OFFICE AREA NONE DETECTED MV-43 MV-43: OFFICE RECEPTION. 120 Sq. Ft. Total Amount: 30 Sq. Ft. 168 ROOM 312 NONE DETECTED MV-40 MV-40: ROOM Sq. Ft. Total Amount: 161 Sq. Ft. 42 ROOM G-04 NONE DETECTED 25 Sq. Ft. 73 ROOM 102 NONE DETECTED 10 Sq. Ft. 76 ROOM 101 NONE DETECTED MV-29 MV-29: ROOM Sq. Ft. 111 ROOM 203 NONE DETECTED 15 Sq. Ft. 112 ROOM 202 NONE DETECTED 10 Sq. Ft. 115 ROOM 201 NONE DETECTED 15 Sq. Ft ND FLOOR STAIRWELL & HALLWAY BY ROOM 201 NONE DETECTED 8 Sq. Ft RD FLOOR STAIRWELL & HALLWAY BY ROOM 301 NONE DETECTED 8 Sq. Ft. American Indian Magnet (Mounds Park) Page 2

13 Chart C - All Materials List - American Indian Magnet (Mounds Park) (cont.) Homogeneous Area ID Code (Material Type) IEA Event No. Location % Asbestos Sample No. Sample Location Estimated Total Amount 122 ROOM 301 NONE DETECTED 15 Sq. Ft. 128 ROOM 302 NONE DETECTED 10 Sq. Ft. 133 ROOM 303 NONE DETECTED 15 Sq. Ft. J3B J3C K1A K2A Miscellaneous Cementitious Material 3/4" Black Sill Miscellaneous Cementitious Material Black Epoxy Tabletop Sheet Vinyl Flooring & Mastic Brown w/white Spots 12" x 12" Vinyl Floor Tile & Mastic White w/blue-green Flecks w/black Mastic (1991) Total Amount: 3 Sq. Ft. 123 ROOM 301 NONE DETECTED MV-37 MV-37: ROOM Sq. Ft. Total Amount: 30 Sq. Ft. 167 ROOM 312 NSM 30 Sq. Ft. Total Amount: 1,000 Sq. Ft. 74 ROOM 101 NONE DETECTED MV-28 MV-28: ROOM Sq. Ft. Total Amount: 22,520 Sq. Ft. 10 GROUND FLOOR HALLWAYS NONE DETECTED 6000 Sq. Ft. 12 GYMNASIUM (G-03) NONE DETECTED MV-19 MV-19: GYMNASIUM Sq. Ft. 20 ROOM 025C NONE DETECTED 70 Sq. Ft. 26 ROOM G-10 NONE DETECTED 30 Sq. Ft. 36 ROOM G-02B (STAFF LOUNGE) NONE DETECTED 520 Sq. Ft. 38 COPY ROOM OFF OF ROOM G-02B (STAFF LOUNGE) NONE DETECTED 110 Sq. Ft ADDITION STORAGE ROOM 17 NONE DETECTED 350 Sq. Ft. 45 CAFETERIA NONE DETECTED 2850 Sq. Ft. 48 HEALTH OFFICE NONE DETECTED 300 Sq. Ft ORIGINAL BUILDING 1ST FLOOR HALLWAY NONE DETECTED 1120 Sq. Ft ADDITION 1ST FLOOR HALLWAY NONE DETECTED 750 Sq. Ft ORIGINAL BUILDING 2ND FLOOR HALLWAY NONE DETECTED MV-30 MV-30: OUTSIDE ROOM Sq. Ft. American Indian Magnet (Mounds Park) Page 3

14 Chart C - All Materials List - American Indian Magnet (Mounds Park) (cont.) Homogeneous Area ID Code (Material Type) IEA Event No. Location % Asbestos Sample No. Sample Location Estimated Total Amount ADDITION 2ND FLOOR HALLWAY NONE DETECTED 750 Sq. Ft. 113 ROOM 201 NONE DETECTED 280 Sq. Ft ADDITION 3RD FLOOR HALLWAY NONE DETECTED 750 Sq. Ft ORIGINAL BUILDING 3RD FLOOR HALLWAY NONE DETECTED 1120 Sq. Ft. 166 ROOM 312 NONE DETECTED 1000 Sq. Ft. K2B 12" x 12" Vinyl Floor Tile & Mastic White w/multi-colored Flecks Total Amount: 1,032 Sq. Ft. 21 ROOM G-11 NONE DETECTED MV-23 MV-23: ROOM G Sq. Ft. 30 ROOM G-07 NONE DETECTED 24 Sq. Ft. 32 ROOM G-06 NONE DETECTED 24 Sq. Ft. 40 ROOM G-05 NONE DETECTED 24 Sq. Ft. 52 ROOM 112 NONE DETECTED 160 Sq. Ft. 54 ROOM 111 NONE DETECTED 130 Sq. Ft. 56 ROOM 108 NONE DETECTED 160 Sq. Ft. 62 ROOM 106 NONE DETECTED 24 Sq. Ft. 64 ROOM 105 NONE DETECTED 24 Sq. Ft. 71 ROOM 103 NONE DETECTED 24 Sq. Ft. 79 ROOM 212 NONE DETECTED 24 Sq. Ft. 81 ROOM 211 NONE DETECTED 24 Sq. Ft. 85 ROOM 210 NONE DETECTED 24 Sq. Ft. 87 ROOM 209 NONE DETECTED 24 Sq. Ft. 89 ROOM 208 NONE DETECTED 24 Sq. Ft. 97 ROOM 206 NONE DETECTED 24 Sq. Ft. 102 ROOM 205 NONE DETECTED 24 Sq. Ft. 109 ROOM 203 NONE DETECTED 30 Sq. Ft. American Indian Magnet (Mounds Park) Page 4

15 Chart C - All Materials List - American Indian Magnet (Mounds Park) (cont.) Homogeneous Area ID Code (Material Type) IEA Event No. Location % Asbestos Sample No. Sample Location Estimated Total Amount 120 ROOM 301 NONE DETECTED 24 Sq. Ft. 131 ROOM 303 NONE DETECTED 30 Sq. Ft. 136 ROOM 305 NONE DETECTED 24 Sq. Ft. 140 ROOM 306 NONE DETECTED 24 Sq. Ft. 150 ROOM 308 NONE DETECTED 24 Sq. Ft. 154 ROOM 309 NONE DETECTED 30 Sq. Ft. 160 ROOM 310 NONE DETECTED 24 Sq. Ft. 161 ROOM 311 NONE DETECTED 30 Sq. Ft. K2E K3A K3C K3D 12" x 12" Vinyl Floor Tile & Mastic Tan Mottle (1991) Miscellaneous Flooring Black Mastic Miscellaneous Flooring Black Mastic Miscellaneous Flooring Black Mastic (1924) Total Amount: 40 Sq. Ft. 41 ELEVATOR NONE DETECTED MV-25 MV-25: ELEVATOR. 40 Sq. Ft. Total Amount: 100 Sq. Ft. 15 GYMNASIUM STORAGE 41 NONE DETECTED MV-20 MV-20; GYMANSIUM STORAGE Sq. Ft. Total Amount: 3 Sq. Ft. 143 HALLWAY OUTSIDE ROOM 306 NONE DETECTED MV-38 MV-38: HALLWAY OUTSIDE ROOM Sq. Ft. 156 OFFICE CLOSET UP STAIRWELL ACROSS FROM ROOM OFFICE CLOSET UP STAIRWELL ACROSS FROM ROOM 312 Total Amount: 40 Sq. Ft. 5 CH 20 Sq. Ft. 5 CH MV-39 MV-39: OFFICE CLOSET. 20 Sq. Ft. American Indian Magnet (Mounds Park) Page 5

16 Chart C - All Materials List - American Indian Magnet (Mounds Park) (cont.) Homogeneous Area ID Code (Material Type) IEA Event No. Location % Asbestos Sample No. Sample Location Estimated Total Amount M0A M0B M0C Plaster 1924 Original Building Plaster 1930 Addition Plaster 1939 Addition 7 THROUGHOUT 1924 ORIGINAL BUILDING BASEMENT NONE DETECTED MV-01; MP-1 9 THROUGHOUT 1924 ORIGINAL BUILDING GROUND FLOOR MV-01: ROOM TA12 (CEILING). MP1: TA12 EAST WALL IN HALL TO CRAWL SPACE Total Amount: 42,000 Sq. Ft Sq. Ft. NONE DETECTED MV-11,12 MV-11: ROOM G-13. MV-12: ROOM G Sq. Ft. 50 THROUGHOUT 1924 ORIGINAL BUILDING 1ST FLOOR NONE DETECTED MV-13 MV-13: HALLWAY WALL BY ROOM Sq. Ft. 77 THROUGHOUT 1924 ORIGINAL BUILDING 2ND FLOOR NONE DETECTED MV-14 MV-14: HALLWAY BY BOYS' RESTROOM Sq. Ft. 145 THROUGHOUT 1924 ORIGINAL BUILDING 3RD FLOOR NONE DETECTED MV-22 MV-22: HALLWAY BY ROOM Sq. Ft. 31 THROUGHOUT 1930 ADDITION GROUND FLOOR NONE DETECTED MV-31,34 MV-31: HALLWAY OUTSIDE ELEVATOR. MV-34: ROOM G-06. Total Amount: 40,000 Sq. Ft Sq. Ft. 59 THROUGHOUT 1930 ADDITION 1ST FLOOR NONE DETECTED MV-32 MV-32: ROOM 101 BEAM Sq. Ft. 94 THROUGHOUT 1930 ADDITION 2ND FLOOR NONE DETECTED MV-33; MV-33: 2ND FLOOR STAFF RESTROOM Sq. Ft. 118 THROUGHOUT 1930 ADDITION 3RD FLOOR NONE DETECTED MV-35,36 MV-35: ROOM 306. MV-36: HALLWAY BY ROOM Sq. Ft. Total Amount: 6,500 Sq. Ft ADDITION HALLWAY TO GYMNASIUM NONE DETECTED 1500 Sq. Ft. 14 GYMNASIUM (G-03) NONE DETECTED 3000 Sq. Ft. 16 GYMNASIUM STORAGE 41 NONE DETECTED MV-41 MV-41: GYMNASIUM STORAGE Sq. Ft. 17 GYMNASIUM STORAGE 42 NONE DETECTED 800 Sq. Ft. 18 GYMNASIUM STORAGE 040A NONE DETECTED 200 Sq. Ft. 19 GYMNASIUM LOCKER AREAS (43-46) NONE DETECTED MV-21 MV-21: ROOM 043A. 500 Sq. Ft. American Indian Magnet (Mounds Park) Page 6

17 Chart C - All Materials List - American Indian Magnet (Mounds Park) (cont.) Homogeneous Area ID Code (Material Type) IEA Event No. Location % Asbestos Sample No. Sample Location Estimated Total Amount N0A N0B Q0A R0A S0A V0A Drywall/Joint Compound 1991 Addition/Installation Drywall/Joint Compound 1991 Addition Carpet Mastic Various Berber Carpet Baseboard/Mopboard Adhesive Tan Baseboard (1991) Wood Floor Mastic / Felt / Vapor Barrier 1924 Original Building Sink Undercoating Gray Total Amount: 60,000 Sq. Ft. 4 THROUGHOUT BUILDING NONE DETECTED MV-07 MV-07: CUSTODIAL OFFICE (B1) Sq. Ft. Total Amount: 600 Sq. Ft. 66 ROOM 135 (MECHANICAL) NONE DETECTED MV-42 MV-42: ROOM Sq. Ft. 1 THROUGHOUT BUILDING NONE DETECTED MV-39 MV-39: OFFICE CLOSET UP STAIRWELL ACROSS FROM ROOM 312. Total Amount: 60,000 Sq. Ft Sq. Ft. Total Amount: 2,000 Sq. Ft. 6 THROUGHOUT BUILDING NONE DETECTED MV-26 MV-26: ROOM Sq. Ft. Total Amount: 140 Sq. Ft. 155 OFFICE UP STAIRWELL FROM ROOM 309 NSM 70 Sq. Ft. 169 OFFICE UP STAIRWELL FROM ROOM 312 NSM 70 Sq. Ft. Total Amount: 199 Sq. Ft. 22 ROOM G-11 NONE DETECTED MV-24 MV-24: ROOM G Sq. Ft. 27 ROOM G-10 NONE DETECTED 5 Sq. Ft. 28 ROOM G-09 NONE DETECTED 5 Sq. Ft. 29 ROOM G-07 NONE DETECTED 5 Sq. Ft. 33 ROOM G-06 NONE DETECTED 5 Sq. Ft. 35 ROOM 36 OFF ROOM G-08 NONE DETECTED 5 Sq. Ft. 37 ROOM G-02B (STAFF LOUNGE) NONE DETECTED 6 Sq. Ft. 39 ROOM G-05 NONE DETECTED 5 Sq. Ft. American Indian Magnet (Mounds Park) Page 7

18 Chart C - All Materials List - American Indian Magnet (Mounds Park) (cont.) Homogeneous Area ID Code (Material Type) IEA Event No. Location % Asbestos Sample No. Sample Location Estimated Total Amount 49 HEALTH OFFICE NONE DETECTED 5 Sq. Ft. 53 ROOM 112 NONE DETECTED 5 Sq. Ft. 55 ROOM 111 NONE DETECTED 5 Sq. Ft. 57 ROOM 108 NONE DETECTED 5 Sq. Ft. 58 ROOM 107 NONE DETECTED 5 Sq. Ft. 61 ROOM 106 NONE DETECTED 5 Sq. Ft. 65 ROOM 105 NONE DETECTED 5 Sq. Ft. 72 ROOM 103 NONE DETECTED 5 Sq. Ft. 75 ROOM 101 NONE DETECTED 5 Sq. Ft. 80 ROOM 212 NONE DETECTED 5 Sq. Ft. 82 ROOM 211 NONE DETECTED 5 Sq. Ft. 86 ROOM 210 NONE DETECTED 5 Sq. Ft. 88 ROOM 209 NONE DETECTED 5 Sq. Ft. 90 ROOM 208 NONE DETECTED 5 Sq. Ft. 96 ROOM 207 NONE DETECTED 5 Sq. Ft. 98 ROOM 206 NONE DETECTED 5 Sq. Ft. 103 ROOM 205 NONE DETECTED 5 Sq. Ft. 110 ROOM 203 NONE DETECTED 5 Sq. Ft. 114 ROOM 201 NONE DETECTED 5 Sq. Ft. 121 ROOM 301 NONE DETECTED 5 Sq. Ft. 132 ROOM 303 NONE DETECTED 5 Sq. Ft. 137 ROOM 305 NONE DETECTED 5 Sq. Ft. 141 ROOM 306 NONE DETECTED 5 Sq. Ft. 144 ROOM 307 NONE DETECTED 5 Sq. Ft. 149 ROOM 308 NONE DETECTED 5 Sq. Ft. American Indian Magnet (Mounds Park) Page 8

19 Chart C - All Materials List - American Indian Magnet (Mounds Park) (cont.) Homogeneous Area ID Code (Material Type) IEA Event No. Location % Asbestos Sample No. Sample Location Estimated Total Amount 153 ROOM 309 NONE DETECTED 5 Sq. Ft. 159 ROOM 310 NONE DETECTED 5 Sq. Ft. 162 ROOM 311 NONE DETECTED 5 Sq. Ft. 165 ROOM 312 NONE DETECTED 18 Sq. Ft. W1A W1B X0A X0B X0C 1' x 1' Ceiling Tile Mastic Associated w/i1a 1' x 1' Ceiling Tile Mastic Associated w/i1b Miscellaneous Material Pipe/Valve Flange Gaskets Miscellaneous Material Slate Chalkboard Adhesive (1991) Miscellaneous Material Slate Chalkboard Adhesive (1930) Total Amount: 300 Sq. Ft. 25 ROOM G-13 (MEDIA CENTER) NONE DETECTED MV-18 MV-18: ROOM G-13 (MEDIA CENTER). 300 Sq. Ft. Total Amount: 10 Sq. Ft. 68 ROOM 104 NONE DETECTED MV-27 MV-27: ROOM Sq. Ft. Total Amount: 24 Sq. Ft. 8 BASEMENT STORAGE ROOM TA5 ASSUMED 24 Sq. Ft. Total Amount: 400 Sq. Ft. 2 THROUGHOUT BUILDING ASSUMED 400 Sq. Ft. Total Amount: 87 Sq. Ft. 69 ROOM 103 ASSUMED 15 Sq. Ft. 100 ROOM 205 ASSUMED 6 Sq. Ft. 105 ROOM 204 ASSUMED 10 Sq. Ft. 107 ROOM 203 ASSUMED 15 Sq. Ft. 124 ROOM 301 ASSUMED 8 Sq. Ft. 126 ROOM 302 ASSUMED 8 Sq. Ft. 129 ROOM 303 ASSUMED 15 Sq. Ft. 134 ROOM 304 ASSUMED 10 Sq. Ft. American Indian Magnet (Mounds Park) Page 9

20 Chart C - All Materials List - American Indian Magnet (Mounds Park) (cont.) Homogeneous Area ID Code (Material Type) IEA Event No. Location % Asbestos Sample No. Sample Location Estimated Total Amount X0D X0F Miscellaneous Material Tackboard Adhesive (1930) 63 ROOM 106 ASSUMED 60 Sq. Ft. 70 ROOM 103 ASSUMED 60 Sq. Ft. 99 ROOM 206 ASSUMED 100 Sq. Ft. 101 ROOM 205 ASSUMED 12 Sq. Ft. 106 ROOM 204 ASSUMED 20 Sq. Ft. 108 ROOM 203 ASSUMED 30 Sq. Ft. 125 ROOM 301 ASSUMED 16 Sq. Ft. 127 ROOM 302 ASSUMED 16 Sq. Ft. 130 ROOM 303 ASSUMED 36 Sq. Ft. 135 ROOM 304 ASSUMED 20 Sq. Ft. 138 ROOM 305 ASSUMED 50 Sq. Ft. 142 ROOM 306 ASSUMED 100 Sq. Ft. Miscellaneous Material Tackboard Adhesive (1924) Total Amount: 520 Sq. Ft. Total Amount: 110 Sq. Ft. 84 ROOM 211 ASSUMED 12 Sq. Ft. 92 ROOM 208 ASSUMED 30 Sq. Ft. 148 ROOM 308 ASSUMED 32 Sq. Ft. 152 ROOM 309 ASSUMED 6 Sq. Ft. 158 ROOM 310 ASSUMED 20 Sq. Ft. 164 ROOM 311 ASSUMED 10 Sq. Ft. American Indian Magnet (Mounds Park) Page 10

21 Chart C - All Materials List - American Indian Magnet (Mounds Park) (cont.) Homogeneous Area ID Code (Material Type) IEA Event No. Location % Asbestos Sample No. Sample Location Estimated Total Amount X0G X0H Miscellaneous Material Slate Chalkboard Adhesive (1924) Miscellaneous Material Slate Chalkboard Adhesive Total Amount: 45 Sq. Ft. 83 ROOM 211 ASSUMED 6 Sq. Ft. 91 ROOM 208 ASSUMED 8 Sq. Ft. 147 ROOM 308 ASSUMED 15 Sq. Ft. 151 ROOM 309 ASSUMED 3 Sq. Ft. 157 ROOM 310 ASSUMED 8 Sq. Ft. 163 ROOM 311 ASSUMED 5 Sq. Ft. Total Amount: 5 Sq. Ft. 93 ROOM 208 ASSUMED 5 Sq. Ft. American Indian Magnet (Mounds Park) Page 11

22 SECTION II Floor Plans

23 Mounds Park Elementary - Basement TA11 TA9 TA12 TA7 TA10 B1A TA6 TA8 B1 TA1 TA40 TA4 TE3 TA3 TA2 TA5

24 Mounds Park Elementary - Ground Floor G A A C G TA1 039A B B 044A A B 046C G G A G13 16 G A A 023A 025A G09 G10 G11 025E B 025D 025C A 027B TE2 027C

25 Mounds Park Elementary - First Floor TA JC1 111A A A 126A 112

26 Mounds Park Elementary - Second Floor TA18 232A A 211B 211A A

27 Mounds Park Elementary - Third Floor A A 311D 311A 311B 312A C B A

28 SECTION III Asbestos Laboratory Report

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44 SECTION IV Asbestos Inspector & Management Planner Licenses

45

46 Inspector State Certification/Accreditation Inspector State Certification/Accreditation Management Planner State Certification/Accreditation

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. February 19, 2010 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Farnsworth Aerospace Magnet Asbestos Inspection Project #0924022 Dear Ted, Enclosed please find the

More information

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. November 25, 2008 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Asbestos Inspection Project #0824003 Dear Ted: Enclosed please find the inspection report for the above-referenced

More information

May 15, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Wilson School Asbestos Inspection IEA Project #

May 15, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Wilson School Asbestos Inspection IEA Project # May 15, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Wilson School Asbestos Inspection Project #0824003 Dear Ted, Enclosed please find the inspection report for

More information

HS16 Asbestos Management

HS16 Asbestos Management HS16 Asbestos Management Occupational Health, Safety and Injury Prevention Subject Matter Expert Greg Smith GJS25 CONTENTS 1.0 INTRODUCTION... 3 2.0 OBJECTIVES AND METRICS... 3 3.0 APPLICABILITY... 3 4.0

More information

Facilities Services Division

Facilities Services Division Facilities Services Division Frequently Asked Questions Asbestos 1. What does the head custodian do with the completed 6 month asbestos surveillance report? 2. What is asbestos containing material (ACM)

More information

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011 Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969 Proposed Library for the Future Library Overview Stoughton Public Library opened in 1969

More information

EXISTING CONDITIONS

EXISTING CONDITIONS 02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal 02 01 80 Maintenance of Facility

More information

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017 Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017 Introduction This is the Northern Arizona University Asbestos Operations and Maintenance guide. This document

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 32-1052 24 DECEMBER 2014 Civil Engineering FACILITY ASBESTOS MANAGEMENT COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications

More information

Asbestos Management Plan Commercial Services and Development, University of Tasmania

Asbestos Management Plan Commercial Services and Development, University of Tasmania Asbestos Management Plan Commercial Services and Development, University of Tasmania Prepared by: Alan Mason Risk and Compliance Officer Infrastructure Planning and Compliance Unit Commercial Services

More information

Training Course Catalog

Training Course Catalog 2018-2019 Training Course Catalog Asbestos, Lead Paint, Mold, OSHA Chem Scope, Inc. 15 Moulthrop Street, North Haven CT 06473 203-865-5605 Fax 203-498-1610 www.chem-scope.com chem.scope@snet.net Table

More information

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M.

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M. CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 2018 @ 4:30 P.M. Call to order. Roll call. Old Business. 1. Ron Ziegler CEDA- Recommendations for 3 Sisters Project a. Project Memo b.

More information

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins Part I: Summary PHA Name: Housing Authority of the City of Warner Robins Date of CFFP: FFY of Grant: 2009 FFY of Grant Approval: Type of Grant Original Annual Statement Reserve for Disasters/Emergencies

More information

Asbestos Management Procedure

Asbestos Management Procedure Asbestos Management Procedure 1.0 General It is the policy of Hitchin Boys School not to allow staff, employees or pupils to sample, remove or work with Asbestos Containing Materials (ACMs). Asbestos products

More information

FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us

FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us 1 Facilities and Technology Long- Term Facilities Maintenance (LTFM) FY 2017 MDE > School Support > School Finance > Facilities and

More information

Asbestos - Duty to Manage & Learning From its Mismanagement

Asbestos - Duty to Manage & Learning From its Mismanagement Asbestos - Duty to Manage & Learning From its Mismanagement Presented by Tim Harrison Health and Safety Manager Hywel Dda Health Board Presentation Contents The problem What is asbestos? Why is it dangerous?

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ADMINISTRATIVE PROCEDURE Approval Date 2014 Review Date 2019 Contact Person/Department Human Resources Administrator Replacing All Previous Procedures Page 1 of 6 Identification HR - 4206 ASBESTOS MANAGEMENT

More information

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM For Official Use Only Date Received 1 Date Received

More information

City of Waterbury Safety & Security Assessment

City of Waterbury Safety & Security Assessment City of Waterbury Safety & Security Assessment Dear School Official, Pursuant to guidelines set forth by the Department of Justice, Office of Domestic Preparedness and the Department of Homeland Security,

More information

SENIOR FOOD PRODUCTION UTILITY WORKER

SENIOR FOOD PRODUCTION UTILITY WORKER PERSONNEL COMMISSION SENIOR FOOD PRODUCTION UTILITY WORKER Class Code: 0478 Salary Range: 19 (C1) JOB SUMMARY Under general supervision, lead a small crew and perform a variety of general grounds maintenance

More information

Asbestos Notification Form ANF-001 Instructions and Supporting Materials

Asbestos Notification Form ANF-001 Instructions and Supporting Materials Instructions and Supporting Materials Table of Contents Introduction Permit fact sheet Contact list Introduction The Asbestos Notification Form (ANF-001) must be submitted to the Massachusetts Department

More information

BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION

BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION The City of Zion is requesting an alternate bid for cleaning and maintenance services to be performed at: Zion City Hall, 2828 Sheridan

More information

ASBESTOS POLICY PROCEDURES & GUIDANCE

ASBESTOS POLICY PROCEDURES & GUIDANCE Academy name: ASBESTOS POLICY PROCEDURES & GUIDANCE Aim: Academy name: Asbestos Policy, Procedures and Guidance to comply with current Health and Safety Legislation -wide Health and Safety Management procedures

More information

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW PROCEDURE Management of Asbestos Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of risk Document

More information

An electronic copy of this document is available on the SC intranet and the Learning Gateway.

An electronic copy of this document is available on the SC intranet and the Learning Gateway. Shropshire Council Premises Plan for Asbestos Management An electronic copy of this document is available on the SC intranet and the Learning Gateway. The Control of Asbestos Regulations 2012 requires

More information

Asbestos Management Plan for an Essex County Council premises

Asbestos Management Plan for an Essex County Council premises Asbestos Management Plan for an Essex County Council premises An electronic copy of this document is available on the ECC intranet and the Essex Schools Infolink. The Control of Asbestos Regulations 2006

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN (insert title/site) ASBESTOS MANAGEMENT PLAN (insert date) This document primarily contains non-intrusive management survey information. Note: any refurbishment or maintenance projects must be individually

More information

Attitudes to Residential Asbestos Assessments

Attitudes to Residential Asbestos Assessments Attitudes to Residential Asbestos Assessments Conference presentation EY Sweeney contacts: Date: November 2015 Stuart Attwood, Head of Quantitative Research Page 1 Agenda Background and objectives Overview

More information

3. Mission. To publish instructions for the conduct, recordkeeping, and reporting of the Asbestos Control Program.

3. Mission. To publish instructions for the conduct, recordkeeping, and reporting of the Asbestos Control Program. UNITED STATES MARINE CORPS MARINE AIR GROUND TASK FORCE TRAINING COMMAND MARINE CORPS AIR GROUND COMBAT CENTER BOX 788100 TWENTYNINE PALMS, CA 92278-8100 COMBAT CENTER ORDER 5100. 2B ceo 5100.2B 4 From:

More information

FORT RUCKER Environmental Document

FORT RUCKER Environmental Document Approved by: Melissa Lowlavar/Johnny Buchanan 1.0 PURPOSE This procedure defines the requirements for submitting abatement plans and close-out documents for asbestos projects on Fort Rucker. Control of

More information

IMR Plan. IMR Funds available for 2017/2018 are as follows:

IMR Plan. IMR Funds available for 2017/2018 are as follows: 2018-2020 IMR Plan The Infrastructure Maintenance and Renewal (IMR) Program of Alberta Education/Alberta Infrastructure provides funding to school divisions for three purposes: 1. To replace building and

More information

Hospital Construction, Renovation, and Demolition

Hospital Construction, Renovation, and Demolition 01.38 - Hospital Construction, Renovation, and Demolition Purpose Infection Control Risk Assessment (ICRA) To provide infection control guidelines for hospital construction, renovation, and demolition.

More information

METROPOLITAN COUNCIL LIVABLE COMMUNITIES TAX BASE REVITALIZATION ACCOUNT CONTAMINATION CLEANUP GRANT APPLICATION GUIDE

METROPOLITAN COUNCIL LIVABLE COMMUNITIES TAX BASE REVITALIZATION ACCOUNT CONTAMINATION CLEANUP GRANT APPLICATION GUIDE METROPOLITAN COUNCIL LIVABLE COMMUNITIES TAX BASE REVITALIZATION ACCOUNT CONTAMINATION CLEANUP GRANT APPLICATION GUIDE 2015 Contents: CLEANUP GRANT APPLICATION GUIDE TOPICS... II WHAT IS THE PURPOSE OF

More information

2018 TRAINING SCHEDULE

2018 TRAINING SCHEDULE SITE LOCATION: ALBANY, NY OSHA COMPLIANCE COURSES 40-Hr. HAZWOPER $675.00 HAZWOPER Refresher (1 Day) $150.00** 24-Hr. HAZWOPER (Limited Site Worker) $365.00 8-Hr. HAZWOPER Supervisor $150.00 ** 30-Hr.

More information

ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID #

ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID # ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID # 2013-049 Prepared for: City of Lewiston 27 Pine Street Lewiston, Maine 04240 Prepared by:

More information

ASBESTOS MANAGEMENT. Policy and Arrangements. Oxfordshire County Council December 2013

ASBESTOS MANAGEMENT. Policy and Arrangements. Oxfordshire County Council December 2013 ASBESTOS MANAGEMENT Policy and Arrangements Oxfordshire County Council December 2013 Document Control 2013/V2e Draft Review Date: December 2015 TABLE OF CONTENTS 1.0 Asbestos Policy Statement 1.1 Policy

More information

November 7, 2013 November 7, To establish an asbestos management program for County facilities and projects.

November 7, 2013 November 7, To establish an asbestos management program for County facilities and projects. TO: FROM: PREPARED BY: SUBJECT: PPM#: ALL COUNTY PERSONNEL ROBERT WEISMAN COUNTY ADMINISTRATOR RISK MANAGEMENT ASBESTOS MANAGEMENT PROGRAM CW-L-010 ISSUE DATE EFFECTIVE DATE November 7, 2013 November 7,

More information

Instructions to Bidders Asbestos Abatement

Instructions to Bidders Asbestos Abatement Quinault Indian Nation P.O Box 189 Taholah, WA. 98587 Instructions to Bidders Asbestos Abatement BID DATE TIME Locations and legal address of project: 1. 411 Queets Ave. Queets, WA 98331 (survey attached).

More information

School Safety Audit Checklist

School Safety Audit Checklist School Safety Audit Checklist Based on work done by Virginia State Education Department and modified by the New York State Police as a resource for school personnel. Components of the Audit Process School

More information

Boulder Housing Partners Request for Qualifications: RFQ # Architectural Services for Canyon Pointe and Glen Willow Renovation Projects

Boulder Housing Partners Request for Qualifications: RFQ # Architectural Services for Canyon Pointe and Glen Willow Renovation Projects 4800 N. Broadway, Boulder, CO 80304 Phone: 720-564-4610 Fax: 303-939-9569 www.boulderhousing.org Hearing Assistance: 1-800-659-3656 Boulder Housing Partners Request for Qualifications: RFQ #4-2017 Architectural

More information

Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery

Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery Jacqueline Berger, APPRISE ABSTRACT This paper reports on an observational study of energy efficiency service

More information

Weatherization Installer Certification

Weatherization Installer Certification The Pennsylvania Department of Labor & Industry, in cooperation with the Pennsylvania Department of Community and Economic Development and Penn College, has developed this process for providing Weatherization

More information

RFQ RW Asbestos Abatement Services Addendum 2

RFQ RW Asbestos Abatement Services Addendum 2 1.0 Purpose of the Addendum AUSTIN COMMUNITY COLLEGE DISTRICT ADDENDUM NO. 2 REQUEST FOR QUALIFICATIONS FOR Asbestos Abatement Services Firm RFQ No. 926-15041RW In accordance with ACC's Request for Qualifications

More information

Asbestos Management Policy

Asbestos Management Policy Asbestos Management Policy Drafted by: Malcolm Chalmers Approved by the Governing Body: March 2011 Date of next review: March 2014 Person to initiate review: Business Manager Asbestos Management Policy

More information

ABATEMENT / DEMOLITION CONSULTING. Project Name: Baker Hall Renovation - Abatement. Owner: University of Colorado - Boulder

ABATEMENT / DEMOLITION CONSULTING. Project Name: Baker Hall Renovation - Abatement. Owner: University of Colorado - Boulder ABATEMENT / DEMOLITION CONSULTING Project Name: Baker Hall Renovation - Abatement Owner: University of Colorado - Boulder Contact Information: Ms. Heidi Roge, CU-B H&D Project Manager 303-492-2465 Mr.

More information

YOU MUST HAVE ALL ITEMS LISTED BELOW:

YOU MUST HAVE ALL ITEMS LISTED BELOW: Dear Housewarming Applicant: We look forward to serving you under the Housewarming Program. However, in order to begin the process there are documents that we must have. Please review the list below and

More information

WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY. House as a System

WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY. House as a System WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY House as a System WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM August 2010 1 WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM August 2010

More information

Frequently Asked Questions May 8, 2018 Sinking Fund Election

Frequently Asked Questions May 8, 2018 Sinking Fund Election When is the election? Frequently Asked Questions May 8, 2018 Sinking Fund Election Tuesday, May 8, 2018. The polls will be open from 7 a.m. until 8 p.m. Absentee ballots will be available after March 24th.

More information

2018 Facility Master Plan

2018 Facility Master Plan 2018 Facility Master Plan 1 Contact Information District LEA: 6302 District Physical Address: 207 W. Conway Benton, AR 72015 District Mailing Address: PO Box 939 Benton, AR 72018 District Phone Number:

More information

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION Detroit Hispanic Development Corporation REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION Detroit Hispanic Development Corporation 1211 Trumbull St Detroit, Michigan 48216 Phone:

More information

STATE OF ALASKA-2018 Weatherization Health and Safety Plan

STATE OF ALASKA-2018 Weatherization Health and Safety Plan ` 1 STATE OF ALASKA-2018 Weatherization Health and Safety Plan Budgeting (Check one): The grantee is encouraged to budget health and safety costs as a separate category and, thereby, excludes such costs

More information

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES TESTING APPLICATION STANDARD (TAS) 201-94 IMPACT TEST PROCEDURES 1. 2. Scope: 1.1 This protocol covers procedures for conducting the impact test of materials as required by Section 1626 of the Florida

More information

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

Associated with the District s Measure A Bond Program and Facilities Improvement Projects Request for Qualifications / Proposal (RFQ/P) for Hazardous Material Assessment, Abatement Plan, Cost Estimating, and Monitoring Services Associated with the District s Measure A Bond Program and Facilities

More information

Facilities Condition Assessment

Facilities Condition Assessment Facilities Condition Assessment (O&M 16 018) Date Issued: January 29, 2016 Date Due: Contact: March 3, 2016 at 4:00:00 pm Paul Acosta, Program Manager III paul.acosta@stocktonca.gov City of Stockton Public

More information

Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9

Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9 Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9 Community Forum January 14, 2016 Agenda Welcome Presentation: New proposal What s changed? What s stayed the same? Benefits for students

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions about the May 2, 2017 School Bond Election When is the election? Tuesday, May 2, 2017. The polls will be open from 7 a.m. until 8 p.m. Absentee ballots will be available after

More information

A Health and Safety Tip Sheet for School Custodians. Did you know? Step 1. Identify job hazards. Step 2. Work towards solutions

A Health and Safety Tip Sheet for School Custodians. Did you know? Step 1. Identify job hazards. Step 2. Work towards solutions A health and safety tip sheet for INSPECTION Health for SCHOOL Custodians and CHECKLIST Safety Committees SCHOOL MAINTENANCE custodians of STAFF safety: A Health and Safety Tip Sheet for School Custodians

More information

Waterford School District 2003 Bond Update

Waterford School District 2003 Bond Update Waterford School District 2003 Bond Update Presented by: Thomas W. Wiseman, C.P.A. Assistant Superintendent Business and Operations William Holbrook, C.P.A. Director of Business Services January 17, 2013

More information

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Head Custodian First Shift (Class II)

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Head Custodian First Shift (Class II) NORWIN SCHOOL DISTRICT JOB DESCRIPTION Head Custodian First Shift (Class II) JOB ANALYSIS The Head Custodian (Daylight) will provide leadership for the building custodial staff and perform a variety of

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ASBESTOS MANAGEMENT PLAN Engage a Qualified Inspector to perform an inspection of the site and establish if disturbed material contains asbestos Prepared for: The Corporation of the Synod of the Diocese

More information

Sponsor; However, none proposed.

Sponsor; However, none proposed. GEORGIA INSTITUTE OF TECHNOLOGY PROJECT ADMINISTRATION DATA SHEET OFFICE OF CONTRACT ADMINISTRATION Project No, A-3807 Project Director: Sponsor: Bill Ewing TRW Incorporated ORIGINAL GTRI/IiiKR Mil:IRA/Lab

More information

I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I 1 Sum of Prior Years and Estimate to Complete Project Estimates: PlanningIDesign 1 Sum of FY 2013--FY 2017 FY 2012 1 Sum of FY 2013-~uture

More information

2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs

2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs 2016 SCHEDULE 2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs ASBESTOS * Abatement Worker/Supervisor Air Sampling Technician (NYS) Allied Trades

More information

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Head Custodian First Shift High School (Class II)

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Head Custodian First Shift High School (Class II) NORWIN SCHOOL DISTRICT JOB DESCRIPTION Head Custodian First Shift High School (Class II) JOB ANALYSIS The Head Custodian (Daylight) will provide leadership for the building custodial staff and perform

More information

SENIOR/ASSISTED LIVING FACILITY SPECIFIC QUESTIONNAIRE

SENIOR/ASSISTED LIVING FACILITY SPECIFIC QUESTIONNAIRE Corporate/Parent Name: SENIOR/ASSISTED LIVING FACILITY SPECIFIC QUESTIONNAIRE (please provide the following for each facility) Facility Specific Questionnaire Facility Description 1. Facility name: Location

More information

TECHNICAL MANUAL OPERATORS AND ORGANIZATIONAL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) DEMOLITION MATERIALS

TECHNICAL MANUAL OPERATORS AND ORGANIZATIONAL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) DEMOLITION MATERIALS TECHNICAL MANUAL OPERATORS AND ORGANIZATIONAL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) DEMOLITION MATERIALS HEADQUARTERS, DEPARTMENT OF THE ARMY MARCH 1973 * TM 9--1375-213-12

More information

Los Rios Community College District NEW EMPLOYEE TRAINING CHECK LIST

Los Rios Community College District NEW EMPLOYEE TRAINING CHECK LIST Los Rios Community College District NEW EMPLOYEE TRAINING CHECK LIST This form is to be completed during the processing as a new employee or new job assignment if the assignment falls in a new JOB SAFETY

More information

REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSAL (RFP) 38 Liberty Street Concord, New Hampshire 03301 REQUEST FOR PROPOSAL (RFP) Flooring Replacement 2016 Broken Ground, Beaver Meadow, and Rundlett Middle School The Concord School District is looking to replace

More information

SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE

SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE CHAPTER 822 X 1 REGISTRATION AND ACCREDITATION OF LEAD TRAINING PROGRAMS AND INDIVIDUALS ENGAGED IN LEAD HAZARD REDUCTION ACTIVITIES TABLE OF CONTENTS

More information

HOME RENOVATION TAX CREDIT (HRTC)

HOME RENOVATION TAX CREDIT (HRTC) HOME RENOVATION TAX CREDIT (HRTC) The Home Renovation Tax Credit applies to eligible expenses of more than $1,000, but not more than $10,000, resulting in a maximum non-refundable tax credit of $1,350

More information

CHEMICAL HYGIENE PLAN

CHEMICAL HYGIENE PLAN SAMPLE WRITTEN CHEMICAL HYGIENE PLAN For Compliance With 29 CFR 1910.1450 Wyoming General Rules and Regulations Wyoming Department of Workforce Services OSHA Division Consultation Program ACKNOWLEDGEMENTS

More information

Regional Healthcare Hygiene and Cleanliness Audit Tool

Regional Healthcare Hygiene and Cleanliness Audit Tool Regional Healthcare Hygiene and Cleanliness Audit Tool Organisation Name: Area Inspected/ Speciality: Auditors: Date: Contents Guidance 4 Audit Tool 4 Scoring 5 Section 0 - Organisational Systems and Governance

More information

National Standards for the Prevention and Control of Healthcare Associated Infections. Quality Improvement Plan (QIP)

National Standards for the Prevention and Control of Healthcare Associated Infections. Quality Improvement Plan (QIP) National Standards for the Prevention and of Healthcare Associated s Quality Improvement Plan (QIP) QIP based on unannounced inspection: 16 August 2016 Coombe Women and Infants University Hospital Prepared

More information

TELECOMMUTING WORK AGREEMENT

TELECOMMUTING WORK AGREEMENT TELECOMMUTING WORK AGREEMENT The following Telecommuting Agreement ( Agreement ) is made and entered into as of the day of, 20 (the Effective ) by and between William & Mary in Virginia (the University

More information

65, Administration (may not exceed 10% of line 21) 65, Audit Liquidated Damages Fees and Costs

65, Administration (may not exceed 10% of line 21) 65, Audit Liquidated Damages Fees and Costs Expires 06/30/207 Part I: Summary PHA Name: Des Moines Municipal Housing Agency Des Moines, IA, 5030 Capital Fund Program Grant No: IA0P020508 of CFFP: FFY of Grant: 208 FFY of Grant Approval: Type of

More information

Designated Heritage Property Grant Program

Designated Heritage Property Grant Program 2018 Guidelines Designated Heritage Property Grant Program Grant applications are due Friday, March 23, 2018 by 4:30 PM Table of Contents Eligible Properties... 4 Application Checklist... 5 Eligible Projects...

More information

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Custodian/Shop Utility Worker (Class III)

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Custodian/Shop Utility Worker (Class III) NORWIN SCHOOL DISTRICT JOB DESCRIPTION Custodian/Shop Utility Worker (Class III) JOB ANALYSIS The is responsible for general warehouse operations and maintaining District supplies. In addition, this position

More information

SPECIAL ISSUE CAPITAL PROJECT VOTE

SPECIAL ISSUE CAPITAL PROJECT VOTE Schuylerville CENTRAL SCHOOL DISTRICT SPECIAL ISSUE - 2016 CAPITAL PROJECT VOTE District capital project vote Dec. 6 O n Tuesday, Dec. 6, voters in the Schuylerville Central School District will decide

More information

NORTH CAROLINA A&T STATE UNIVERSITY Chemical Hygiene Plan

NORTH CAROLINA A&T STATE UNIVERSITY Chemical Hygiene Plan North Carolina Agricultural and Technical State University OFFICE OF ENVIRONMENTAL HEALTH & SAFETY Safety Manual Subject: Chemical Hygiene Plan Number: 5-1 Date February 1, 2009 Amends: None Supersedes:

More information

Pest Elimination for LONG TERM CARE. I CHOOSE ECOLAB Because my reputation matters

Pest Elimination for LONG TERM CARE. I CHOOSE ECOLAB Because my reputation matters Pest Elimination for LONG TERM CARE I CHOOSE ECOLAB Because my reputation matters Pests can damage your reputation Appearance is the second most important factor considered by families when selecting a

More information

NICU Lighting Redesign

NICU Lighting Redesign NICU Lighting Redesign Space Description The Neonatal Intensive Care Unit is located on the third floor of the new addition. Instead of looking at this area as a whole, it was broken down into two separate

More information

LIVESMART BC: EFFICIENCY INCENTIVE PROGRAM TERMS AND CONDITIONS EFFECTIVE APRIL 1, 2013

LIVESMART BC: EFFICIENCY INCENTIVE PROGRAM TERMS AND CONDITIONS EFFECTIVE APRIL 1, 2013 LIVESMART BC: EFFICIENCY INCENTIVE PROGRAM TERMS AND CONDITIONS EFFECTIVE APRIL 1, 2013 The LiveSmart BC Efficiency Incentive Program is a partnership between BC Hydro, FortisBC, and the Province of BC

More information

ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION REGULATION 25 ARKANSAS LEAD-BASED PAINT-HAZARD

ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION REGULATION 25 ARKANSAS LEAD-BASED PAINT-HAZARD ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION REGULATION 25 ARKANSAS LEAD-BASED PAINT-HAZARD EFFECTIVE MARCH 28, 1998 TABLE OF CONTENTS CHAPTER ONE: STATEMENT OF PURPOSE 1-1 Section 25.101 Authority

More information

City of Cambridge. Designated Heritage Property Grant Program

City of Cambridge. Designated Heritage Property Grant Program City of Cambridge Designated Heritage Property Grant Program Table of Contents 1. Eligible Properties 1 2. Projects 1 3. Eligible Projects 1 a) General Conservation Projects 3 b) Repair or Restoration

More information

St. Michael s Lutheran Church Church Custodian

St. Michael s Lutheran Church Church Custodian St. Michael s Lutheran Church Church Custodian Position Listing St. Michael s Lutheran Church in Roseville, Minnesota, is hiring a part-time church custodian. The responsibilities for this position include:

More information

Customer Guide. Colorado Historic Preservation Income Tax Credit

Customer Guide. Colorado Historic Preservation Income Tax Credit Colorado Historic Preservation Income Tax Credit Overview of Residential Program (CRS 39-22-514.5 of 2014, as amended) Colorado offers a state income tax credit for preservation and rehabilitation work

More information

REQUEST FOR PROPOSALS. Cleaning for Victory Ridge Academy

REQUEST FOR PROPOSALS. Cleaning for Victory Ridge Academy REQUEST FOR PROPOSALS Cleaning for Victory Ridge Academy For the period of August 6, 2018 July 31, 2019 427 & 501 Burns Avenue Lake Wales, FL 33853 Phone: (863)679-3338 (863)679-3944 kay.west@victoryridge.org

More information

TELECOMMUTING AGREEMENT

TELECOMMUTING AGREEMENT TELECOMMUTING AGREEMENT Telecommuting is a work option which, when properly implemented and administered, benefits both the staff member and Pepperdine. Telecommuting is not a right, but rather, a privilege

More information

Amber Mahaffey

Amber Mahaffey Lead Hazards April 2004 Amber Mahaffey amber@goodvaluation.com About the Author: Amber Mahaffey is the director of research for Good Valuation, Inc. She has conducted many studies that concern common real

More information

CUBICLE/STUDIO SPACE POLICIES AND GUIDELINES FALL & SPRING BID STUDIO CONTRACT

CUBICLE/STUDIO SPACE POLICIES AND GUIDELINES FALL & SPRING BID STUDIO CONTRACT Name: Room Number: Cubicle Number: ID# CUBICLE/STUDIO SPACE POLICIES AND GUIDELINES FALL & SPRING 2011-12 BID STUDIO CONTRACT The use of a cubicle/studio is a privilege provided by the Pratt Industrial

More information

RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS

RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER 1200-1-18 LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS 1200-1-18-.01 Lead-Based Paint Abatement 1200-1-18-.04

More information

Additionally, the committee was opened to anyone who wanted to participate.

Additionally, the committee was opened to anyone who wanted to participate. August 2013 Ted Moore, Superintendent Lovejoy Independent School District 259 Country Club Road Allen, Texas 75002 Re: Long Range Facilities Planning Committee Recommendation Dear Mr. Moore, On April 16,

More information

Policy on Managing Asbestos

Policy on Managing Asbestos Policy on Managing Asbestos Lead Directorate and Service: Corporate Resources - Human Resources, Safety Services Effective Date: January 2015 Date Due for Review: January 2018 Contact Officer/Number Rob

More information

Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca

Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca CSC Student Design Competition 2017 2018 Document: 00 01 01 r1, issued: 2017 11 28 cscdesignchallenge.ca Page 1 Student

More information

Heritage guidelines designated Heritage ProPerty grant Program Grant applications due March 31, 2015 by 4:30 pm CULTUREDIVISION

Heritage guidelines designated Heritage ProPerty grant Program Grant applications due March 31, 2015 by 4:30 pm CULTUREDIVISION 2015 guidelines designated Heritage ProPerty grant Program Grant applications due March 31, 2015 by 4:30 pm ProPerties Heritage 15059 CULTUREDIVISION PUBLIC ART + MUSEUMS AND HERITAGE + MEADOWVALE THEATRE

More information

Occupational and Environmental Health Guidelines for the Evaluation and Control of Asbestos Exposure

Occupational and Environmental Health Guidelines for the Evaluation and Control of Asbestos Exposure Department of the Army Pamphlet 40 513 Medical Services Occupational and Environmental Health Guidelines for the Evaluation and Control of Asbestos Exposure Headquarters Department of the Army Washington,

More information

Laboratory Safety Coordinator Meeting. Fall 2011

Laboratory Safety Coordinator Meeting. Fall 2011 Laboratory Safety Coordinator Meeting Fall 2011 Last Meeting- LSC Summer Interactive Different groups within EHS presented services to the labs Fischer Sci: Gathering lists of PPE and other common items

More information

TSI TSI. TSItraining.com. Check out our multi-state approvals and recognition U.S. POSTAGE PAID WILLOUGHBY, OH PERMIT NO.

TSI TSI.  TSItraining.com. Check out our multi-state approvals and recognition U.S. POSTAGE PAID WILLOUGHBY, OH PERMIT NO. 2011 Check out our multi-state approvals and recognition www. training.com 1-866 866-666 666-8438 TM PRESORTED STANDARD MAIL U.S. POSTAGE PAID WILLOUGHBY, OH PERMIT NO. 414 Corporate Office 33150 Lakeland

More information

SAMPLE: Environmental Rounds and Safety Assessment Tool

SAMPLE: Environmental Rounds and Safety Assessment Tool SAMPLE: Environmental Rounds and Safety Assessment Tool Area/Department Evaluated: Date: Security and Incident Management Y N N/A Comments 1. Are emergency telephone numbers posted by all stationary phones?

More information

PLATTE COUNTY MEMORIAL NURSING HOME FACILITY EVALUATION REPORT JUNE 2011 N E L S O N ARCHITECTS, LLC.

PLATTE COUNTY MEMORIAL NURSING HOME FACILITY EVALUATION REPORT JUNE 2011 N E L S O N ARCHITECTS, LLC. PLATTE COUNTY MEMORIAL NURSING HOME FACILITY EVALUATION REPORT JUNE 2011 N E L S O N ARCHITECTS, LLC. 110 North 6 th East. P.O. Box 1244 R I v e r t o n, W Y 8 2 5 0 1 3 0 7. 8 5 6. 6 1 5 5 p. nelsonarchitects@wyoming.com

More information