May 15, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Wilson School Asbestos Inspection IEA Project #

Size: px
Start display at page:

Download "May 15, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Wilson School Asbestos Inspection IEA Project #"

Transcription

1 May 15, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN RE: Wilson School Asbestos Inspection Project # Dear Ted, Enclosed please find the inspection report for the above-referenced location. If you have any questions or require additional information, please do not hesitate to contact me. Sincerely,, INC. Jeff Carlson Director of Inspection Services JC/wb Enclosures cc File

2 ASBESTOS INSPECTION PROFILE Wilson School 631 Albert Street North Saint Paul, MN Submitted to: Ted Sherman Saint Paul Public Schools Submitted by: Institute for Environmental Assessment 9201 West Broadway North, Suite 600 Brooklyn Park, MN / Client #2001 Project #

3 INDEX SECTION I Asbestos Summary and Inspection Report SECTION II Floor Plans SECTION III Asbestos Laboratory Report SECTION IV Asbestos Inspector and Management Planner Licenses

4 SECTION I Asbestos Summary and Inspection Report

5 Asbestos Summary Wilson School 631 Albert Street North Saint Paul, MN On April 22-23, 2009, an inspection for asbestos-containing materials (ACM) was performed at the above-referenced location. The scope of the inspection included all accessible suspect ACM within the building. Since this was a limited inspection, there may be additional materials not identified on the report located within wall cavities, pipe chases and/or other inaccessible locations. Suspect ACM was identified and sampled for asbestos content. Identified materials confirmed to be ACM include the following: Mudded fittings on fiberglass insulation Air cell pipe insulation Pre-formed pipe insulation Transite pegboard Black lab tabletops 9 x 9 vinyl floor tile and associated mastic Light pad insulation Sink undercoating Exterior window caulk The following suspect materials were not sampled as part of the inspection. These materials are assumed to contain asbestos and shall be treated as ACM or sampled prior to disturbance to determine if they are ACM or not. Identified materials assumed to be ACM include the following: Millboard pipe insulation and associated mudded fittings Wood composite fire door Wood floor mastic/felt/vapor barrier Pipe/valve flange gaskets Interior water heater insulation Slate chalkboard adhesive Tackboard adhesive Marble adhesive See the attached report for specific quantities and locations. Destructive sampling was not performed as a part of this inspection. This inspection does not meet the requirements of the Minnesota Pollution Control Agency (MPCA) or Minnesota OSHA (MNOSHA) for an asbestos demolition/renovation inspection. Bulk Samples of accessible suspect material were collected and analyzed in accordance with Environmental Protection Agency (EPA) sampling and analytical procedure requirements. Sampling was conducted in a manner determined by the inspector to be sufficient to identify whether the suspect materials are asbestos containing. Where deemed appropriate, prior sample results were used and are referenced in the report., INC Page 1 of 2

6 Roof samples were not collected as part of this inspection. Suspect roofing materials should be handled as asbestos or sampled prior to disturbance to determine if they are ACM or not. Specific locations of these materials, as well as those suspect materials which were analyzed and were found not to contain asbestos, are identified in the attached report., INC Page 2 of 2

7 Wilson School 631 Albert Street North, Saint Paul, MN Inspection Dates: 4/22/2009 to 4/23/2009 Chart B - Assessment of Asbestos-Containing Building Materials (ACBM) All asbestos-containing events listed here are to be inspected during each six-month periodic surveillance inspection for changes in condition. The Institute for Environmental Assessment () highly recommends an in depth "front end" inspection prior to any general renovation or remodeling to determine if those activities may disrupt building materials that may involve existing or undiscovered asbestos. Potentially inaccessible or exempt asbestos-containing materials not included in this plan may include: adhesives, caulking, putty, woven blankets, curtains, gloves and gaskets, electrical wiring insulation and heat shields above lights, paints and coatings, roofing felts, flashings and shingles, and mineral core fire doors. Damaged materials which require corrective action to reduce a potential hazard are indicated on Chart A. All non-damaged ACBM identified in Chart B should be monitored through scheduled inspections and removed prior to renovation or demolition activities, or when their condition deteriorates. District administration will direct another formal inspection by a federally certified inspector within three (3) years, and will maintain an ongoing file for each building. Specific recommendations on how to manage the different types of asbestos-containing material are identified in the Asbestos Management Plan. PLEASE NOTE: Based on EPA recommendations, materials analyzed utilizing PLM and found to contain between 0% and 10% should be assumed asbestos containing unless building owner wishes the laboratory to utilize "point counting." For samples analyzed prior to 1994 containing 1% or less (trace) of asbestos, resampling utilizing the 1993 EPA Test Method or point counting is strongly recommended for purposes of demolition or renovation before treating these materials as non-asbestos containing. Contact your local office for questions or additional information. EPA ASSESSMENT CATEGORIES: 1 = Damaged or significantly damaged TSI ACM. 5 = ACBM w/potential for damage. 2 = Damaged friable surfacing ACM. 6 = ACBM w/potential for significant damage. 3 = Significantly damaged friable surfacing ACM. 7 = Any remaining friable ACBM or friable suspected ACBM. 4 = Damaged or significantly damaged friable miscellaneous ACM. Event No. Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 7 X0E THROUGHOUT 1924 ORIGINAL BUILDING 200 Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1924) Comments: 8 X0F THROUGHOUT 1924 ORIGINAL BUILDING 2000 Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1924) Comments: Wilson School Page 1

8 Wilson School 631 Albert Street North, Saint Paul, MN Inspection Dates: 4/22/2009 to 4/23/2009 Event No. Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 9 S0A Wood Floor Mastic / Felt / Vapor Barrier THROUGHOUT 1924 ORIGINAL BUILDING Sq. Ft. N ASSUMED Original Building Comments: 12 X0H THROUGHOUT 1924 ORIGINAL BUILDING Marble Adhesive RESTROOMS 60 Sq. Ft. N ASSUMED 5 Comments: 13 X0A BOILER ROOM (0207) 40 Sq. Ft. N ASSUMED 5 Pipe/Valve Flange Gaskets Comments: APPROXIMATELY FORTY (40) GASKETS. 14 X0B BOILER ROOM (0207) 50 Sq. Ft. N ASSUMED 5 Interior Water Heater Insulation Comments: INACCESSIBLE TO VERIFY. 15 P0A Fire Door BOILER ROOM (0207) 20 Sq. Ft. N ASSUMED 5 Weldwood Composite Comments: ONE (1) DOOR. 17 X0A BASEMENT MECHANICAL ROOM (0207A) 12 Sq. Ft. N ASSUMED 5 Pipe/Valve Flange Gaskets Comments: APPROXIMATELY TWELVE (12) GASKETS. 22 J1A Transite Panels BASEMENT ROOM Sq. Ft. Y 10 CH 4 2' x 2' Pegboard Comments: DEBRIS ALONG PERIMETER OF ROOM. ASSUMED PRESENT BEHIND WALLS. 24 A4B Mudded Pipe Joints on Fiberglass Insulation BASEMENT ROOM Joints Y 65 CH Addition Comments: SOUTHEAST CORNER BEHIND WALL. 1/2 FITTING. INACCESSIBLE BUILD-OUT. 25 K0A 9" x 9" Vinyl Floor Tile & Mastic BASEMENT ROOM Sq. Ft. N 5 CH (TILE & 5 Red w/white Streaks Comments: REMAINS UNDER ELECTRICAL BOX & WATER PIPING SUPPORTS. Wilson School Page 2

9 Wilson School 631 Albert Street North, Saint Paul, MN Inspection Dates: 4/22/2009 to 4/23/2009 Event No. Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 27 K0B 9" x 9" Vinyl Floor Tile & Mastic STAIRWELL LANDING OUTSIDE BOILER ROOM 60 Sq. Ft. N 5 CH (TILE) Dark Gray w/salmon, Black & Beige Streaks 10 CH ( 5 Comments: INCLUDES PATCHED TILES. 29 K0C 9" x 9" Vinyl Floor Tile & Mastic STAIRWELL OUTSIDE BOILER ROOM 100 Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: ON LANDING OUTSIDE MECHANICAL ROOM TA6. 33 X0A MECHANICAL ROOM (0100) 1 Sq. Ft. N ASSUMED 5 Pipe/Valve Flange Gaskets Comments: ONE (1) GASKET. 47 K0C 9" x 9" Vinyl Floor Tile & Mastic BASEMENT LOCKER ROOM HALLWAY (0302D) 150 Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: 48 U0A Light Pad Insulation BASEMENT LOCKER ROOM HALLWAY (0302D) 4 Sq. Ft. N 65 CH 5 Round Light Fixtures Comments: FOUR (4) LIGHTS W/FOIL BACKING. 49 B2A Millboard Pipe Insulation GIRLS' LOCKER ROOM (0205) PIPE CHASE 35 Lin. Ft. Y ASSUMED Original Building Comments: ONE (1) OPEN END VISIBLE. VERY DIRTY CHASE. ESTIMATED. 50 A2A Mudded Pipe Joints on Millboard Insulation GIRLS' LOCKER ROOM (0205) PIPE CHASE 8 Joints Y ASSUMED Original Building Comments: ONE (1) LOOSE FITTING. VERY DIRTY CHASE. ESTIMATED. 51 B1A Air Cell Pipe Insulation GIRLS' LOCKER ROOM (0205) PIPE CHASE 1 Lin. Ft. Y 20 CH Original Building Comments: ONE (1) LOOSE PIECE OF INSULATION JUST INSIDE HATCH. VERY DIRTY CHASE. ESTIMATED. 57 K0C 9" x 9" Vinyl Floor Tile & Mastic ROOM 1204 (AUDITORIUM) 2500 Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: Wilson School Page 3

10 Wilson School 631 Albert Street North, Saint Paul, MN Inspection Dates: 4/22/2009 to 4/23/2009 Event No. Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 61 K0C 9" x 9" Vinyl Floor Tile & Mastic ROOM 1204A 225 Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: 62 B3A Pre-Formed Pipe Insulation ROOM 1204A 2 Lin. Ft. N AM Original Building Comments: ENCAPSULATED END BEHIND DUCTWORK AT CEILING. ADDITIONAL MATERIAL ABOVE CEILING. 63 K0C 9" x 9" Vinyl Floor Tile & Mastic AUDITORIUM HALLWAY (1100B) 140 Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: 65 K0K 9" x 9" Vinyl Floor Tile & Mastic MUSIC HALLWAY (1200A) 65 Sq. Ft. N 12 CH (TILE) Light Brown w/dark Brown & Beige Streaks 10 CH ( 5 Comments: 67 K0M 9" x 9" Vinyl Floor Tile & Mastic ROOM Sq. Ft. N 3 CH (TILE) Light Brown 12 CH ( 5 Comments: UNDER SHEET VINYL FLOORING. UNABLE TO VERIFY SIZE OF TILES. 69 K0K 9" x 9" Vinyl Floor Tile & Mastic ROOM Sq. Ft. N 12 CH (TILE) Light Brown w/dark Brown & Beige Streaks 10 CH ( 5 Comments: UNDER CARPET. 74 K0C 9" x 9" Vinyl Floor Tile & Mastic ROOM Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: UNDER CARPET & OVER WOOD FLOOR. 76 K0A 9" x 9" Vinyl Floor Tile & Mastic ROOM Sq. Ft. N 5 CH (TILE & 5 Red w/white Streaks Comments: UNDER CARPET & OVER WOOD FLOOR. 77 V0A Sink Undercoating ROOM Sq. Ft. N 5 CH 5 Black Comments: TWO (2) SINKS. Wilson School Page 4

11 Wilson School 631 Albert Street North, Saint Paul, MN Inspection Dates: 4/22/2009 to 4/23/2009 Event No. Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 79 V0A Sink Undercoating ROOM Sq. Ft. N 5 CH 5 Black Comments: TWO (2) SINKS. 80 K0A 9" x 9" Vinyl Floor Tile & Mastic ROOM Sq. Ft. N 5 CH (TILE & 5 Red w/white Streaks Comments: UNDER CARPET & OVER WOOD FLOOR. 83 V0A Sink Undercoating ROOM Sq. Ft. N 5 CH 5 Black Comments: TWO (2) SINKS. 84 K0A 9" x 9" Vinyl Floor Tile & Mastic ROOM Sq. Ft. N 5 CH (TILE & 5 Red w/white Streaks Comments: UNDER CARPET & OVER WOOD FLOOR. 85 K0I 9" x 9" Vinyl Floor Tile & Mastic ROOM 1103A 25 Sq. Ft. N <1 CH (TILE) Light Gray w/black Streaks 10 CH ( 5 Comments: 88 X0Y ROOMS 1101 & Sq. Ft. N 5 CH 5 Gray Exterior Window Caulk Comments: NINE (9) WINDOWS ABOVE KITCHEN "CAGE" AREA. MAY EXTEND TO UPPER FLOORS. 89 U0A Light Pad Insulation STAIRWELL TO ROOM Sq. Ft. N 65 CH 5 Round Light Fixtures Comments: TWO (2) LIGHTS. 90 K0C 9" x 9" Vinyl Floor Tile & Mastic ROOMS 2201 & Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: 95 X0X ROOMS 2201 & Sq. Ft. N ASSUMED 5 Tackboard Adhesive Comments: Wilson School Page 5

12 Wilson School 631 Albert Street North, Saint Paul, MN Inspection Dates: 4/22/2009 to 4/23/2009 Event No. Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 97 A4B Mudded Pipe Joints on Fiberglass Insulation ROOM Joints N 65 CH Addition Comments: FORMER BALCONY. FITTINGS HIGH UP AT FRONT. 103 V0A Sink Undercoating ROOM Sq. Ft. N 5 CH 5 Black Comments: ONE (1) SINK. 113 X0I 1966 ADDITION ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1966) Comments: 114 X0J 1966 ADDITION ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1966) Comments: 116 K0C 9" x 9" Vinyl Floor Tile & Mastic 1966 ADDITION ROOM Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: 118 K0C 9" x 9" Vinyl Floor Tile & Mastic 1966 ADDITION ROOM 2106 & RESTROOM 500 Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: UNDER CARPET EXCEPT IN RESTROOM. 122 B1A Air Cell Pipe Insulation 1966 ADDITION ROOM Lin. Ft. Y 20 CH Original Building Comments: LOOSE ON CEILING ADJACENT TO HALLWAY. OPEN ENDS. 123 X0M 1966 ADDITION ROOM Sq. Ft. N ASSUMED 5 Wood Frame Slate Chalkboard Adhesive Comments: 144 K0F 9" x 9" Vinyl Floor Tile & Mastic ROOM Sq. Ft. N 3 CH (TILE) Tan w/white & Brown Streaks 5 CH ( 5 Comments: INCLUDES PATCHED TILES. CRACKING & CHIPPING THROUGHOUT. Wilson School Page 6

13 Wilson School 631 Albert Street North, Saint Paul, MN Inspection Dates: 4/22/2009 to 4/23/2009 Event No. Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 150 J3A Miscellaneous Cementitious Material ROOM Sq. Ft. N 10 CH 5 Black Lab Tabletops w/o Drip Edge Comments: 155 J3A Miscellaneous Cementitious Material KILN ROOM OFF OF ROOM Sq. Ft. N 10 CH 5 Black Lab Tabletops w/o Drip Edge Comments: 156 V0A Sink Undercoating KILN ROOM OFF OF ROOM Sq. Ft. N 5 CH 5 Black Comments: ONE (1) SINK. 161 K0C 9" x 9" Vinyl Floor Tile & Mastic HALLWAY ENTRY TO ROOM Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: 163 K0C 9" x 9" Vinyl Floor Tile & Mastic ROOM Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: UNDER CARPET. 165 X0I ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1966) Comments: ONE WALL. COVERED W/CORK. 166 X0J ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1966) Comments: 167 K0C 9" x 9" Vinyl Floor Tile & Mastic HALLWAY ENTRY TO ROOM Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: 169 X0I ROOM Sq. Ft. N ASSUMED 5 Slate Chalkboard Adhesive (1966) Comments: Wilson School Page 7

14 Wilson School 631 Albert Street North, Saint Paul, MN Inspection Dates: 4/22/2009 to 4/23/2009 Event No. Material Type Location Estimated Amount Total Friable? % Asbestos EPA Assess. Category 170 X0J ROOM Sq. Ft. N ASSUMED 5 Tackboard Adhesive (1966) Comments: 171 K0C 9" x 9" Vinyl Floor Tile & Mastic ROOM Sq. Ft. N 4-10 CH (TILE & Tan w/brown & White Streaks 5 Comments: UNDER CARPET. 183 X0P COURTYARD 20 Sq. Ft. N 3 CH 5 Gray Exterior Window Caulk Comments: TEN (10) WINDOWS. 187 X0T COURTYARD 12 Sq. Ft. N 3 CH 5 Gray Exterior Window Caulk Comments: SIX (6) METAL-FRAMED WINDOWS. TWO (2) ALONG EAST HALLWAY, THREE (3) FOR STAIRWELL & ONE (1) AT SOUTH HALLWAY. Wilson School Page 8

15 Wilson School 631 Albert Street North, Saint Paul, MN Inspection Dates: 4/22/2009 to 4/23/2009 Chart C - All Materials List The following list contains all events observed by the inspector, whether or not they actually contained asbestos, and are grouped by homogeneous area (material type). Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount A2A A4B B1A B2A B3A Mudded Pipe Joints on Millboard Insulation 1924 Original Building Total Amount: 8 Joints 50 GIRLS' LOCKER ROOM (0205) PIPE CHASE ASSUMED 8 Joints Mudded Pipe Joints on Fiberglass Insulation 1966 Addition Total Amount: 3 Joints 24 BASEMENT ROOM CH 205-CW-A (NOVA) 1 Joints 97 ROOM CH 2 Joints Air Cell Pipe Insulation 1924 Original Building Total Amount: 11 Lin. Ft. 51 GIRLS' LOCKER ROOM (0205) PIPE CHASE 20 CH 206G-3A 1 Lin. Ft ADDITION ROOM CH 10 Lin. Ft. Millboard Pipe Insulation 1924 Original Building Total Amount: 35 Lin. Ft. 49 GIRLS' LOCKER ROOM (0205) PIPE CHASE ASSUMED 35 Lin. Ft. Pre-Formed Pipe Insulation Total Amount: 2 Lin. Ft Original Building 62 ROOM 1204A AM 355-JJT-3; 206G-6A 3 & 6A: FORMER ROOM Lin. Ft. Wilson School Page 1

16 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount I1A I1B I2A 1' x 1' Acoustical Ceiling Tile Pegboard Total Amount: 6,805 Sq. Ft. 37 CAFETERIA (0201) NONE DETECTED 2500 Sq. Ft. 42 ROOM 0203 NONE DETECTED 150 Sq. Ft. 127 ROOM 2001 NONE DETECTED 150 Sq. Ft. 129 ROOM 2001C NONE DETECTED 355-JJT-9 JJT-9: ABOVE SPEAKER. 120 Sq. Ft. 131 ROOM 2001D NONE DETECTED 120 Sq. Ft. 133 ROOM 2001E NONE DETECTED 120 Sq. Ft. 135 ROOM 2002 NONE DETECTED 250 Sq. Ft. 137 ROOM 2003 & OFFICES NONE DETECTED 700 Sq. Ft. 158 ROOM 3202 NONE DETECTED 206G-2A 1200 Sq. Ft. 173 ROOM 3205 NONE DETECTED 870 Sq. Ft. 181 ROOM 3304 NONE DETECTED 625 Sq. Ft. 1' x 1' Acoustical Ceiling Tile Pegboard (Fibrous) Total Amount: 500 Sq. Ft. 177 ROOM 3302 NONE DETECTED MV Sq. Ft. 179 ROOM 3303 NONE DETECTED 70 Sq. Ft. 2' x 2' Acoustical Ceiling Tile Clustered Pin & Nail Holes Total Amount: 3,572 Sq. Ft. 64 MUSIC HALLWAY (1200A) NONE DETECTED 84 Sq. Ft. 68 ROOM 1201 NONE DETECTED MV Sq. Ft ADDITION ROOM 2107 NONE DETECTED 420 Sq. Ft ADDITION ROOM 2106 NONE DETECTED 355-JJT-11 JJT-11: ABOVE MAIN DOOR. 468 Sq. Ft. 164 ROOM 3201 NONE DETECTED 800 Sq. Ft. 172 ROOM 3203 NONE DETECTED MV-11; 206G-1A 800 Sq. Ft. Wilson School Page 2

17 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount I2B I2C I2D I3A I3B I3C I4A 2' x 2' Acoustical Ceiling Tile Pin Holes & Gouges in Concentric Pattern 2' x 2' Acoustical Ceiling Tile Light Texture 2' x 2' Acoustical Ceiling Tile Powdered Texture w/revealed Edge (2004) 2' x 4' Ceiling Tile Cuts & Pin Holes in Circular Pattern 2' x 4' Ceiling Tile Gouges & Pin Holes 2' x 4' Ceiling Tile Powdered Texture w/revealed Edge (2004) Acoustical Ceiling Tile Tectum Total Amount: 360 Sq. Ft. 60 ROOM 1112 NONE DETECTED MV Sq. Ft. Total Amount: 610 Sq. Ft. 34 FOOD STORAGE ROOM OFF OF ROOM 0202 NONE DETECTED 200 Sq. Ft. 35 KITCHEN (0202) NONE DETECTED B Sq. Ft. Total Amount: 2,700 Sq. Ft. 106 ROOM 1205 (MEDIA) NEW 2700 Sq. Ft. 93 ROOMS 2201 & 2202 NONE DETECTED 355-JJT-15; 206G-5A; B-22 JJT-15: ABOVE SPEAKER B-22: REPLACEMENT. Total Amount: 600 Sq. Ft. 600 Sq. Ft. Total Amount: 1,140 Sq. Ft. 98 ROOM 1001 & ASSOCIATED ROOMS NONE DETECTED MV Sq. Ft. 100 ROOM 1004/1005 NONE DETECTED 240 Sq. Ft. Total Amount: 870 Sq. Ft ADDITION HALLWAY (1400) NEW 750 Sq. Ft. 111 ROOM 1406 OFFICE NEW 120 Sq. Ft. Total Amount: 20,000 Sq. Ft. 2 THROUGHOUT BUILDING NONE DETECTED 355-JJT-8 JJT-8: OFFICE BREAK ROOM Sq. Ft. Wilson School Page 3

18 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount J1A J3A J3B J3C K0A K0B Transite Panels 2' x 2' Pegboard Miscellaneous Cementitious Material Black Lab Tabletops w/o Drip Edge Miscellaneous Cementitious Material Black Lab Tabletops w/drip Edge Miscellaneous Cementitious Material Black Plastic Lab Tabletops 9" x 9" Vinyl Floor Tile & Mastic Red w/white Streaks 9" x 9" Vinyl Floor Tile & Mastic Dark Gray w/salmon, Black & Beige Streaks Total Amount: 1 Sq. Ft. 22 BASEMENT ROOM CH MV-02 1 Sq. Ft. Total Amount: 115 Sq. Ft. 150 ROOM CH 75 Sq. Ft. 155 KILN ROOM OFF OF ROOM CH MV Sq. Ft. Total Amount: 200 Sq. Ft. 143 ROOM 2302 NONE DETECTED MV Sq. Ft. Total Amount: 85 Sq. Ft. 145 ROOM 2302 NSM 85 Sq. Ft. 25 BASEMENT ROOM CH (TILE & 76 ROOM CH (TILE & 80 ROOM CH (TILE & 84 ROOM CH (TILE & 27 STAIRWELL LANDING OUTSIDE BOILER ROOM 5 CH (TILE) 10 CH ( FF MV-03 Total Amount: 1,524 Sq. Ft. 4 Sq. Ft. 520 Sq. Ft. 500 Sq. Ft. 500 Sq. Ft. Total Amount: 60 Sq. Ft. 60 Sq. Ft. Wilson School Page 4

19 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount K0C K0F 9" x 9" Vinyl Floor Tile & Mastic Tan w/brown & White Streaks 9" x 9" Vinyl Floor Tile & Mastic Tan w/white & Brown Streaks 29 STAIRWELL OUTSIDE BOILER ROOM 4-10 CH (TILE & 47 BASEMENT LOCKER ROOM HALLWAY (0302D) 4-10 CH (TILE & 57 ROOM 1204 (AUDITORIUM) 4-10 CH (TILE & 61 ROOM 1204A 4-10 CH (TILE & 63 AUDITORIUM HALLWAY (1100B) 4-10 CH (TILE & 74 ROOM CH (TILE & 90 ROOMS 2201 & CH (TILE & ADDITION ROOM CH (TILE & ADDITION ROOM 2106 & RESTROOM 4-10 CH (TILE & 161 HALLWAY ENTRY TO ROOM CH (TILE & 163 ROOM CH (TILE & 167 HALLWAY ENTRY TO ROOM CH (TILE & 171 ROOM CH (TILE & 144 ROOM CH (TILE) 5 CH ( 355-JJT-26 Total Amount: 6,415 Sq. Ft. 100 Sq. Ft. 150 Sq. Ft Sq. Ft. 225 Sq. Ft. 140 Sq. Ft. 440 Sq. Ft. 355-JJT-16 JJT-16: SOUTHWEST CORNER. 300 Sq. Ft. 420 Sq. Ft. 355-JJT-10 JJT-10: BENEATH SINK. 500 Sq. Ft MV-27; B-12,13 20 Sq. Ft. 800 Sq. Ft. 20 Sq. Ft. 800 Sq. Ft. Total Amount: 930 Sq. Ft. 930 Sq. Ft. Wilson School Page 5

20 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount K0I K0K K0M K1A 9" x 9" Vinyl Floor Tile & Mastic Light Gray w/black Streaks 9" x 9" Vinyl Floor Tile & Mastic Light Brown w/dark Brown & Beige Streaks 9" x 9" Vinyl Floor Tile & Mastic Light Brown Sheet Vinyl Flooring & Mastic Beige w/dark Yellow Dots 85 ROOM 1103A <1 CH (TILE) 10 CH ( 65 MUSIC HALLWAY (1200A) 12 CH (TILE) 10 CH ( 69 ROOM CH (TILE) 10 CH ( 67 ROOM CH (TILE) 12 CH ( MV MV MV-30 Total Amount: 25 Sq. Ft. 25 Sq. Ft. Total Amount: 1,165 Sq. Ft. 65 Sq. Ft Sq. Ft. Total Amount: 120 Sq. Ft. 120 Sq. Ft. Total Amount: 845 Sq. Ft. 46 CENTRAL ELEVATOR (TA8) NONE DETECTED 30 Sq. Ft. 59 ROOM 1111 & STORAGE NONE DETECTED 160 Sq. Ft. 66 ROOM 1202 NONE DETECTED 120 Sq. Ft. 102 ROOM 1302 NONE DETECTED 120 Sq. Ft. 139 ROOM 2003 STORAGE NONE DETECTED 60 Sq. Ft. 141 ROOM 2003E NONE DETECTED 355-JJT-6 JJT-6: BENEATH COUNTER AT NORTHEAST CORNER. 25 Sq. Ft. 153 ROOM 3103 NONE DETECTED 170 Sq. Ft. 154 KILN ROOM OFF OF ROOM 3102 NONE DETECTED 140 Sq. Ft. 175 ROOM 3206 NONE DETECTED 20 Sq. Ft. Wilson School Page 6

21 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount K2B K2C K2E K2F K2G 12" x 12" Vinyl Floor Tile & Mastic Tan w/gray & White Flecks (1992) 12" x 12" Vinyl Floor Tile & Mastic Tan w/brown & White Streaks 12" x 12" Vinyl Floor Tile & Mastic Pink w/beige & Dark Pink Flecks 12" x 12" Vinyl Floor Tile & Mastic Gray w/dark & Light Gray Flecks 12" x 12" Vinyl Floor Tile & Mastic Tan/Beige/Brown Mottle Total Amount: 2,500 Sq. Ft. 40 CAFETERIA (0201) NONE DETECTED 1000 Sq. Ft. 45 CAFETERIA ELEVATOR AREA (1102) NONE DETECTED 355-JJT-28 JJT-28: NORTHWEST CORNER OF ELEVATOR ROOM. 85 Sq. Ft. 54 1ST FLOOR CENTRAL ELEVATOR AREA NONE DETECTED 150 Sq. Ft. 55 STAGE HALLWAY (1200B) NONE DETECTED 65 Sq. Ft ADDITION 1ST FLOOR HALLWAY NONE DETECTED 350 Sq. Ft ADDITION 2ND FLOOR HALLWAY NONE DETECTED 350 Sq. Ft ADDITION 3RD FLOOR HALLWAY NONE DETECTED 355-JJT-5 JJT-5: NORTHWEST CORNER OF HALLWAY OUTSIDE ROOM Sq. Ft. Total Amount: 240 Sq. Ft. 99 ROOM 1004/1005 NONE DETECTED B-14 B-14: UNDER HEATER IN ROOM Sq. Ft. Total Amount: 300 Sq. Ft. 41 CAFETERIA (0201) NONE DETECTED B-18 B-18: BY WALL OF FREEZER. 300 Sq. Ft. Total Amount: 2,200 Sq. Ft. 31 BASEMENT HALLWAY (0200) NONE DETECTED 350 Sq. Ft. 39 CAFETERIA (0201) NONE DETECTED 355-JJT-24 JJT-24: NORTHWEST CORNER Sq. Ft. 44 ROOM 0203 NONE DETECTED 150 Sq. Ft ORIGINAL BUILDING 1ST FLOOR HALLWAYS (1000,1100,1200,1300) ORIGINAL BUILDING 2ND FLOOR HALLWAYS (2000,2100,2300) ORIGINAL BUILDING 3RD FLOOR HALLWAYS (3100,3200,3300) NEW NEW NEW Total Amount: 5,400 Sq. Ft Sq. Ft Sq. Ft Sq. Ft. Wilson School Page 7

22 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount K2H K2I K2J K3A K3B K3C K3D 12" x 12" Vinyl Floor Tile & Mastic Beige w/brown Flecks Total Amount: 75 Sq. Ft. 86 ROOM 1102 NONE DETECTED MV Sq. Ft. 12" x 12" Vinyl Floor Tile & Mastic White Mottle (2004) Total Amount: 495 Sq. Ft ADDITION HALLWAY (1400) NEW 375 Sq. Ft. 110 ROOM 1406 OFFICE NEW 120 Sq. Ft. 12" x 12" Vinyl Floor Tile & Mastic Dark Gray Mottle (2004) Total Amount: 375 Sq. Ft ADDITION HALLWAY (1400) NEW 375 Sq. Ft. Miscellaneous Flooring Brown w/orange & White Swirls Stair Treads Total Amount: 90 Sq. Ft. 28 STAIRWELL OUTSIDE BOILER ROOM NONE DETECTED B-17 B-17: BY RAILING. 90 Sq. Ft. Miscellaneous Flooring Yellow-Tan Stair Treads Total Amount: 70 Sq. Ft. 96 ROOMS 2201 & 2202 NONE DETECTED MV-44 MV-44: ROOM Sq. Ft. Miscellaneous Flooring 16" Speckled Blue Tiles (2004) Total Amount: 180 Sq. Ft. 105 ROOM 1205 (MEDIA) NEW 180 Sq. Ft. Miscellaneous Flooring 16" Speckled Tan Tiles (2004) Total Amount: 200 Sq. Ft. 104 ROOM 1205 (MEDIA) NEW 200 Sq. Ft. Wilson School Page 8

23 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount L0A L0B L0C L0D M0A M0B Fabric Isolation Joints Dark Green Fabric Fabric Isolation Joints Painted Gray Fabric Isolation Joints Painted White Fabric Isolation Joints Black Fabric Plaster 1924 Original Building Plaster 1966 Addition Total Amount: 20 Sq. Ft. 16 BOILER ROOM (0207) NONE DETECTED MV Sq. Ft. 52 ROOM 0206 NONE DETECTED 355-JJT-23 JJT-23: HEAT UNIT WEST SIDE. 5 Sq. Ft. Total Amount: 40 Sq. Ft. 18 BASEMENT MECHANICAL ROOM (0207A) NONE DETECTED Sq. Ft. 19 BASEMENT MECHANICAL ROOM (0301) NONE DETECTED FF1 20 Sq. Ft. 30 MECHANICAL ROOM TA6 NONE DETECTED 10 Sq. Ft. Total Amount: 2 Sq. Ft. 32 MECHANICAL ROOM (0100) NONE DETECTED 355-JJT-25 JJT-25: EAST SIDE OF AHU. 2 Sq. Ft. Total Amount: 4 Sq. Ft. 92 ROOMS 2201 & 2202 NONE DETECTED 355-JJT-13 JJT-13: ABOVE CEILING IN CENTER OF ROOM. 4 Sq. Ft. 6 THROUGHOUT 1924 ORIGINAL BUILDING NONE DETECTED MV-32,46; ; 510Z-3; 355-JJT-23 Total Amount: 100,000 Sq. Ft. MV-32: KITCHEN CEILING. MV-46: ROOM 1001 CEILING : 3RD FLOOR HALLWAY OUTSIDE ROOMS JJT-23: BASEMENT LOCKER ROOM Sq. Ft. Total Amount: 14,900 Sq. Ft. 23 BASEMENT ROOM 0208 NONE DETECTED MV Sq. Ft ADDITION STAIRWELL 1112 & STORAGE 1110A NONE DETECTED 600 Sq. Ft. 56 ROOM 1204B STAGE NONE DETECTED MV-52 MV-52: WALL Sq. Ft. 58 ROOM 1204 (AUDITORIUM) NONE DETECTED 5000 Sq. Ft. 70 ROOM 1201 NONE DETECTED 1000 Sq. Ft ADDITION ROOM 2107 NONE DETECTED MV Sq. Ft. Wilson School Page 9

24 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount ADDITION ROOM 2106 NONE DETECTED MV-19 MV-19: CEILING Sq. Ft. 162 ROOM 3201 NONE DETECTED MV-22 MV-22: WALL Sq. Ft. 168 ROOM 3203 NONE DETECTED 1000 Sq. Ft. N0A P0A P0B Q0A R0A R0C R0D Sheetrock & Taping Compound 199X- 200X Renovation Fire Door Weldwood Composite Fire Door Metal w/solid Wood Core Carpet Mastic Various Berber Carpets Baseboard/Mopboard Mastic 4" Light Tan Baseboard Baseboard/Mopboard Mastic 4" Black Baseboard Baseboard/Mopboard Mastic 4" Dark Brown Baseboard Total Amount: 15,000 Sq. Ft. 1 THROUGHOUT BUILDING NONE DETECTED B-11; 355-JJT-17 B-11: ROOM 211. JJT-17: ROOM 111 STORAGE Sq. Ft. Total Amount: 20 Sq. Ft. 15 BOILER ROOM (0207) ASSUMED 20 Sq. Ft. Total Amount: 40 Sq. Ft. 20 BASEMENT MECHANICAL ROOM (0301) NSM 40 Sq. Ft. Total Amount: 25,000 Sq. Ft. 3 THROUGHOUT BUILDING NONE DETECTED 355-JJT-19 JJT-19: ROOM Sq. Ft. Total Amount: 275 Sq. Ft. 4 THROUGHOUT BUILDING NONE DETECTED MV-14 14: ROOM Sq. Ft. 5 THROUGHOUT BUILDING NONE DETECTED 355-JJT-12 JJT-12: ROOM 2106 AT NORTHEAST CORNER SOUTH SIDE. Total Amount: 140 Sq. Ft. 140 Sq. Ft. Total Amount: 35 Sq. Ft. 82 ROOM 1105 NONE DETECTED 15 Sq. Ft ADDITION ROOM 2107 NONE DETECTED MV Sq. Ft. Wilson School Page 10

25 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount R0E S0A U0A V0A V0B V0C Baseboard/Mopboard Mastic Total Amount: 45 Sq. Ft. 4" Brown Baseboard 91 ROOMS 2201 & 2202 NONE DETECTED MV Sq. Ft. Wood Floor Mastic / Felt / Vapor Barrier Total Amount: 30,000 Sq. Ft Original Building 9 THROUGHOUT 1924 ORIGINAL BUILDING ASSUMED Sq. Ft. Light Pad Insulation Round Light Fixtures Total Amount: 6 Sq. Ft. 48 BASEMENT LOCKER ROOM HALLWAY (0302D) 65 CH MV-05 4 Sq. Ft. 89 STAIRWELL TO ROOM CH 2 Sq. Ft. Sink Undercoating Black Total Amount: 48 Sq. Ft. 77 ROOM CH 12 Sq. Ft. 79 ROOM CH 12 Sq. Ft. 83 ROOM CH 12 Sq. Ft. 103 ROOM CH 6 Sq. Ft. 156 KILN ROOM OFF OF ROOM CH MV-16 6 Sq. Ft. Sink Undercoating Rough Gray Total Amount: 12 Sq. Ft. 73 ROOM 1109 NONE DETECTED 5 Sq. Ft. 151 ROOM 3103 NONE DETECTED MV-17 7 Sq. Ft. Sink Undercoating White Total Amount: 6 Sq. Ft. 152 ROOM 3103 NONE DETECTED MV-18 6 Sq. Ft. Wilson School Page 11

26 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount V0D V0E W1A Sink Undercoating Gray Total Amount: 5 Sq. Ft. 140 ROOM 2003E NONE DETECTED MV-25 5 Sq. Ft. Sink Undercoating White Total Amount: 2 Sq. Ft. 87 ROOM 1102 NONE DETECTED MV-48 2 Sq. Ft. 1' x 1' Ceiling Tile Mastic Brown Adhesive Associated w/i1a Total Amount: 1,290 Sq. Ft. 38 CAFETERIA (0201) NONE DETECTED 500 Sq. Ft. 43 ROOM 0203 NONE DETECTED MV Sq. Ft. 128 ROOM 2001 NONE DETECTED MV Sq. Ft. 130 ROOM 2001C NONE DETECTED 30 Sq. Ft. 132 ROOM 2001D NONE DETECTED 30 Sq. Ft. 134 ROOM 2001E NONE DETECTED 30 Sq. Ft. 136 ROOM 2002 NONE DETECTED 60 Sq. Ft. 159 ROOM 3202 NONE DETECTED 350 Sq. Ft. 174 ROOM 3205 NONE DETECTED 200 Sq. Ft. W1AA 1' x 1' Ceiling Tile Mastic Caramel Adhesive Associated w/i1a Total Amount: 20 Sq. Ft. 182 ROOM 3304 NONE DETECTED MV Sq. Ft. W1B 1' x 1' Ceiling Tile Mastic Brown Adhesive Associated w/i1b Total Amount: 115 Sq. Ft. 178 ROOM 3302 NONE DETECTED MV Sq. Ft. 180 ROOM 3303 NONE DETECTED 15 Sq. Ft. Wilson School Page 12

27 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount X0A X0B X0C X0D X0E X0F X0G Pipe/Valve Flange Gaskets Total Amount: 53 Sq. Ft. 13 BOILER ROOM (0207) ASSUMED 40 Sq. Ft. 17 BASEMENT MECHANICAL ROOM (0207A) ASSUMED 12 Sq. Ft. 33 MECHANICAL ROOM (0100) ASSUMED 1 Sq. Ft. Interior Water Heater Insulation Total Amount: 50 Sq. Ft. 14 BOILER ROOM (0207) ASSUMED 50 Sq. Ft. Total Amount: 15 Sq. Ft. Corkboard Adhesive 53 ROOM 0206 NONE DETECTED MV Sq. Ft. Total Amount: 10 Sq. Ft. Gray & Beige Countertop 21 BASEMENT ROOM 0301 NONE DETECTED MV Sq. Ft. Slate Chalkboard Adhesive (1924) Total Amount: 200 Sq. Ft. 7 THROUGHOUT 1924 ORIGINAL BUILDING ASSUMED 200 Sq. Ft. Tackboard Adhesive (1924) Total Amount: 2,000 Sq. Ft. 8 THROUGHOUT 1924 ORIGINAL BUILDING ASSUMED 2000 Sq. Ft. Pink Interior Window Glazing Total Amount: 4 Sq. Ft. 157 NORTH PENTHOUSE NONE DETECTED 2 Sq. Ft. 176 SOUTH PENTHOUSE NONE DETECTED MV-10 2 Sq. Ft. Wilson School Page 13

28 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount X0H X0I X0J X0K X0L X0M Marble Adhesive Total Amount: 60 Sq. Ft. 12 THROUGHOUT 1924 ORIGINAL BUILDING RESTROOMS ASSUMED 60 Sq. Ft. Slate Chalkboard Adhesive (1966) Total Amount: 35 Sq. Ft ADDITION ROOM 2107 ASSUMED 5 Sq. Ft. 165 ROOM 3201 ASSUMED 15 Sq. Ft. 169 ROOM 3203 ASSUMED 15 Sq. Ft. Tackboard Adhesive (1966) Total Amount: 105 Sq. Ft ADDITION ROOM 2107 ASSUMED 5 Sq. Ft. 166 ROOM 3201 ASSUMED 50 Sq. Ft. 170 ROOM 3203 ASSUMED 50 Sq. Ft. Red Interior Window Caulk Total Amount: 50 Sq. Ft. 10 THROUGHOUT 1924 ORIGINAL BUILDING NONE DETECTED MV-12 MV-12: HALLWAY BY ROOM Sq. Ft. Total Amount: 400 Sq. Ft. White Exterior Window Caulk 11 THROUGHOUT 1924 ORIGINAL BUILDING NONE DETECTED MV-13,34 MV-13: ROOM MV-34: ROOM Sq. Ft. Total Amount: 6 Sq. Ft. Wood Frame Slate Chalkboard Adhesive ADDITION ROOM 2106 ASSUMED 6 Sq. Ft. Wilson School Page 14

29 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount X0N X0O X0P X0Q X0R X0S X0T X0U Total Amount: 700 Sq. Ft. Ceiling Tar Paper 138 ROOM 2003 & OFFICES NONE DETECTED MV Sq. Ft. Total Amount: 16 Sq. Ft. Exterior Window Glazing 36 KITCHEN (0202) NONE DETECTED MV Sq. Ft. Gray Exterior Window Caulk Total Amount: 20 Sq. Ft. 183 COURTYARD 3 CH MV Sq. Ft. White Exterior Window Glaze Total Amount: 10 Sq. Ft. 184 COURTYARD NONE DETECTED MV Sq. Ft. Gray Exterior Window Glazing Total Amount: 2 Sq. Ft. 185 COURTYARD NONE DETECTED MV-38 2 Sq. Ft. Tan Exterior Window Glazing Total Amount: 8 Sq. Ft. 186 COURTYARD NONE DETECTED MV-39 8 Sq. Ft. Gray Exterior Window Caulk Total Amount: 12 Sq. Ft. 187 COURTYARD 3 CH MV Sq. Ft. Black Window Glaze/Seal Total Amount: 6 Sq. Ft. 188 COURTYARD NONE DETECTED MV-41 6 Sq. Ft. Wilson School Page 15

30 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount X0V X0W X0X X0Y X1B X1D X1E Total Amount: 20 Sq. Ft. Brown Interior Perimeter Window Caulk ADDITION ROOMS 3201 & 3203 NONE DETECTED MV-43 MV-43: ROOM 3203 NORTHWEST CORNER. 20 Sq. Ft. Total Amount: 8 Sq. Ft. Chalkboard Adhesive 94 ROOMS 2201 & 2202 NONE DETECTED MV-42 MV-42: ROOM 2201 CHALKBOARD REMOVED. 8 Sq. Ft. Total Amount: 60 Sq. Ft. Tackboard Adhesive 95 ROOMS 2201 & 2202 ASSUMED 60 Sq. Ft. Total Amount: 18 Sq. Ft. Gray Exterior Window Caulk 88 ROOMS 1101 & CH MV-35 MV-35: ROOM Sq. Ft. Tannish/Pink Countertop Total Amount: 75 Sq. Ft. 149 ROOM 3103 NONE DETECTED 355-JJT-1 JJT-1: NEXT TO SOUTH STOVE. 75 Sq. Ft. Gray w/white & Dark Gray Streaks Countertop Total Amount: 110 Sq. Ft. 126 ROOM 2102A NONE DETECTED 20 Sq. Ft. 146 ROOM 2305 NONE DETECTED 90 Sq. Ft. Total Amount: 35 Sq. Ft. Light Blue Countertop 142 ROOM 2003E NONE DETECTED 355-JJT-7 35 Sq. Ft. Wilson School Page 16

31 Chart C - All Materials List - Wilson School (cont.) Homogeneous Area ID Code (Material Type) Event No. Location % Asbestos Sample No. New Sample Location Estimated Total Amount X1F X1G Blue Countertop Total Amount: 65 Sq. Ft. 78 ROOM 1106 NONE DETECTED 355-JJT-20 JJT-20: SOUTH SIDE OF COUNTERTOP. 15 Sq. Ft. 81 ROOM 1105 NONE DETECTED 15 Sq. Ft. 101 ROOM 1302 NONE DETECTED 15 Sq. Ft ADDITION ROOM 2106 NONE DETECTED 20 Sq. Ft. White w/tan Design Countertop Total Amount: 15 Sq. Ft. 75 ROOM 1107 NONE DETECTED 355-JJT-21 JJT-21: SOUTHWEST CORNER OF COUNTERTOP. 15 Sq. Ft. Wilson School Page 17

32 SECTION II Floor Plans

33 Wilson - Basement TA13 TA A A 0207B A 0302C TA D TA8 TA6 TA5 0099B 1102A 0299B C A D 0206B A A 1106A C B TA4 0203A 0202A

34 Wilson - 1st Floor 1402 TE A A C 1201A B A B 1200B C B B A A 107A A A 1310B A B 1200D D A A

35 Wilson - 2nd Floor 2199A A TE A TA B 2001C F 2099A 2001E A E 2003C 2301 TA TA17

36 Wilson - 3rd Floor 3199A A 3103B 3299A C 3300 TA A

37 SECTION III Asbestos Laboratory Report

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55 SECTION IV Asbestos Inspector & Management Planner Licenses

56

57

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. February 18, 2010 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: American Indian Magnet (Mounds Park) Asbestos Inspection IEA Project #0924022 Dear Ted, Enclosed please

More information

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. February 19, 2010 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Farnsworth Aerospace Magnet Asbestos Inspection Project #0924022 Dear Ted, Enclosed please find the

More information

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. November 25, 2008 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Asbestos Inspection Project #0824003 Dear Ted: Enclosed please find the inspection report for the above-referenced

More information

HS16 Asbestos Management

HS16 Asbestos Management HS16 Asbestos Management Occupational Health, Safety and Injury Prevention Subject Matter Expert Greg Smith GJS25 CONTENTS 1.0 INTRODUCTION... 3 2.0 OBJECTIVES AND METRICS... 3 3.0 APPLICABILITY... 3 4.0

More information

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011 Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969 Proposed Library for the Future Library Overview Stoughton Public Library opened in 1969

More information

EXISTING CONDITIONS

EXISTING CONDITIONS 02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal 02 01 80 Maintenance of Facility

More information

City of Waterbury Safety & Security Assessment

City of Waterbury Safety & Security Assessment City of Waterbury Safety & Security Assessment Dear School Official, Pursuant to guidelines set forth by the Department of Justice, Office of Domestic Preparedness and the Department of Homeland Security,

More information

FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us

FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us 1 Facilities and Technology Long- Term Facilities Maintenance (LTFM) FY 2017 MDE > School Support > School Finance > Facilities and

More information

Facilities Services Division

Facilities Services Division Facilities Services Division Frequently Asked Questions Asbestos 1. What does the head custodian do with the completed 6 month asbestos surveillance report? 2. What is asbestos containing material (ACM)

More information

ASBESTOS POLICY PROCEDURES & GUIDANCE

ASBESTOS POLICY PROCEDURES & GUIDANCE Academy name: ASBESTOS POLICY PROCEDURES & GUIDANCE Aim: Academy name: Asbestos Policy, Procedures and Guidance to comply with current Health and Safety Legislation -wide Health and Safety Management procedures

More information

ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID #

ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID # ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID # 2013-049 Prepared for: City of Lewiston 27 Pine Street Lewiston, Maine 04240 Prepared by:

More information

Asbestos Management Procedure

Asbestos Management Procedure Asbestos Management Procedure 1.0 General It is the policy of Hitchin Boys School not to allow staff, employees or pupils to sample, remove or work with Asbestos Containing Materials (ACMs). Asbestos products

More information

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins Part I: Summary PHA Name: Housing Authority of the City of Warner Robins Date of CFFP: FFY of Grant: 2009 FFY of Grant Approval: Type of Grant Original Annual Statement Reserve for Disasters/Emergencies

More information

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW PROCEDURE Management of Asbestos Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of risk Document

More information

Asbestos Management Plan Commercial Services and Development, University of Tasmania

Asbestos Management Plan Commercial Services and Development, University of Tasmania Asbestos Management Plan Commercial Services and Development, University of Tasmania Prepared by: Alan Mason Risk and Compliance Officer Infrastructure Planning and Compliance Unit Commercial Services

More information

School Safety Audit Checklist

School Safety Audit Checklist School Safety Audit Checklist Based on work done by Virginia State Education Department and modified by the New York State Police as a resource for school personnel. Components of the Audit Process School

More information

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M.

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M. CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 2018 @ 4:30 P.M. Call to order. Roll call. Old Business. 1. Ron Ziegler CEDA- Recommendations for 3 Sisters Project a. Project Memo b.

More information

WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY. House as a System

WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY. House as a System WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY House as a System WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM August 2010 1 WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM August 2010

More information

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION Detroit Hispanic Development Corporation REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION Detroit Hispanic Development Corporation 1211 Trumbull St Detroit, Michigan 48216 Phone:

More information

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017 Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017 Introduction This is the Northern Arizona University Asbestos Operations and Maintenance guide. This document

More information

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES TESTING APPLICATION STANDARD (TAS) 201-94 IMPACT TEST PROCEDURES 1. 2. Scope: 1.1 This protocol covers procedures for conducting the impact test of materials as required by Section 1626 of the Florida

More information

Hospital Construction, Renovation, and Demolition

Hospital Construction, Renovation, and Demolition 01.38 - Hospital Construction, Renovation, and Demolition Purpose Infection Control Risk Assessment (ICRA) To provide infection control guidelines for hospital construction, renovation, and demolition.

More information

Attitudes to Residential Asbestos Assessments

Attitudes to Residential Asbestos Assessments Attitudes to Residential Asbestos Assessments Conference presentation EY Sweeney contacts: Date: November 2015 Stuart Attwood, Head of Quantitative Research Page 1 Agenda Background and objectives Overview

More information

Asbestos - Duty to Manage & Learning From its Mismanagement

Asbestos - Duty to Manage & Learning From its Mismanagement Asbestos - Duty to Manage & Learning From its Mismanagement Presented by Tim Harrison Health and Safety Manager Hywel Dda Health Board Presentation Contents The problem What is asbestos? Why is it dangerous?

More information

Asbestos Notification Form ANF-001 Instructions and Supporting Materials

Asbestos Notification Form ANF-001 Instructions and Supporting Materials Instructions and Supporting Materials Table of Contents Introduction Permit fact sheet Contact list Introduction The Asbestos Notification Form (ANF-001) must be submitted to the Massachusetts Department

More information

Asbestos Management Plan for an Essex County Council premises

Asbestos Management Plan for an Essex County Council premises Asbestos Management Plan for an Essex County Council premises An electronic copy of this document is available on the ECC intranet and the Essex Schools Infolink. The Control of Asbestos Regulations 2006

More information

Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca

Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca CSC Student Design Competition 2017 2018 Document: 00 01 01 r1, issued: 2017 11 28 cscdesignchallenge.ca Page 1 Student

More information

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM For Official Use Only Date Received 1 Date Received

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ADMINISTRATIVE PROCEDURE Approval Date 2014 Review Date 2019 Contact Person/Department Human Resources Administrator Replacing All Previous Procedures Page 1 of 6 Identification HR - 4206 ASBESTOS MANAGEMENT

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 32-1052 24 DECEMBER 2014 Civil Engineering FACILITY ASBESTOS MANAGEMENT COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications

More information

YOU MUST HAVE ALL ITEMS LISTED BELOW:

YOU MUST HAVE ALL ITEMS LISTED BELOW: Dear Housewarming Applicant: We look forward to serving you under the Housewarming Program. However, in order to begin the process there are documents that we must have. Please review the list below and

More information

Designated Heritage Property Grant Program

Designated Heritage Property Grant Program 2018 Guidelines Designated Heritage Property Grant Program Grant applications are due Friday, March 23, 2018 by 4:30 PM Table of Contents Eligible Properties... 4 Application Checklist... 5 Eligible Projects...

More information

Weatherization Installer Certification

Weatherization Installer Certification The Pennsylvania Department of Labor & Industry, in cooperation with the Pennsylvania Department of Community and Economic Development and Penn College, has developed this process for providing Weatherization

More information

Training Course Catalog

Training Course Catalog 2018-2019 Training Course Catalog Asbestos, Lead Paint, Mold, OSHA Chem Scope, Inc. 15 Moulthrop Street, North Haven CT 06473 203-865-5605 Fax 203-498-1610 www.chem-scope.com chem.scope@snet.net Table

More information

Regional Healthcare Hygiene and Cleanliness Audit Tool

Regional Healthcare Hygiene and Cleanliness Audit Tool Regional Healthcare Hygiene and Cleanliness Audit Tool Organisation Name: Area Inspected/ Speciality: Auditors: Date: Contents Guidance 4 Audit Tool 4 Scoring 5 Section 0 - Organisational Systems and Governance

More information

Infection Prevention and Control Checklist for LTCHs Suggestions for Use

Infection Prevention and Control Checklist for LTCHs Suggestions for Use s Suggestions for Use This checklist is designed to assist you to complete an Infection Prevention and Control walkabout in your facility. Some suggestions for use include: Set aside an hour to tour your

More information

SPECIAL ISSUE CAPITAL PROJECT VOTE

SPECIAL ISSUE CAPITAL PROJECT VOTE Schuylerville CENTRAL SCHOOL DISTRICT SPECIAL ISSUE - 2016 CAPITAL PROJECT VOTE District capital project vote Dec. 6 O n Tuesday, Dec. 6, voters in the Schuylerville Central School District will decide

More information

November 7, 2013 November 7, To establish an asbestos management program for County facilities and projects.

November 7, 2013 November 7, To establish an asbestos management program for County facilities and projects. TO: FROM: PREPARED BY: SUBJECT: PPM#: ALL COUNTY PERSONNEL ROBERT WEISMAN COUNTY ADMINISTRATOR RISK MANAGEMENT ASBESTOS MANAGEMENT PROGRAM CW-L-010 ISSUE DATE EFFECTIVE DATE November 7, 2013 November 7,

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ASBESTOS MANAGEMENT PLAN Engage a Qualified Inspector to perform an inspection of the site and establish if disturbed material contains asbestos Prepared for: The Corporation of the Synod of the Diocese

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN (insert title/site) ASBESTOS MANAGEMENT PLAN (insert date) This document primarily contains non-intrusive management survey information. Note: any refurbishment or maintenance projects must be individually

More information

Asbestos Management Policy

Asbestos Management Policy Asbestos Management Policy Drafted by: Malcolm Chalmers Approved by the Governing Body: March 2011 Date of next review: March 2014 Person to initiate review: Business Manager Asbestos Management Policy

More information

IMR Plan. IMR Funds available for 2017/2018 are as follows:

IMR Plan. IMR Funds available for 2017/2018 are as follows: 2018-2020 IMR Plan The Infrastructure Maintenance and Renewal (IMR) Program of Alberta Education/Alberta Infrastructure provides funding to school divisions for three purposes: 1. To replace building and

More information

Minnesota State Colleges and Universities $110 million HEAPR List as of 4/4/2016

Minnesota State Colleges and Universities $110 million HEAPR List as of 4/4/2016 Alexandria Technical and Community College Alexandria Main Campus Buildings (100, 200, 300, 400, 500 & 600 Wings) HVAC Replacement $2,875,785 Alexandria Technical and Community College Alexandria 100 and

More information

SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE

SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE CHAPTER 822 X 1 REGISTRATION AND ACCREDITATION OF LEAD TRAINING PROGRAMS AND INDIVIDUALS ENGAGED IN LEAD HAZARD REDUCTION ACTIVITIES TABLE OF CONTENTS

More information

METROPOLITAN COUNCIL LIVABLE COMMUNITIES TAX BASE REVITALIZATION ACCOUNT CONTAMINATION CLEANUP GRANT APPLICATION GUIDE

METROPOLITAN COUNCIL LIVABLE COMMUNITIES TAX BASE REVITALIZATION ACCOUNT CONTAMINATION CLEANUP GRANT APPLICATION GUIDE METROPOLITAN COUNCIL LIVABLE COMMUNITIES TAX BASE REVITALIZATION ACCOUNT CONTAMINATION CLEANUP GRANT APPLICATION GUIDE 2015 Contents: CLEANUP GRANT APPLICATION GUIDE TOPICS... II WHAT IS THE PURPOSE OF

More information

Façade Improvement Program Application for Participation

Façade Improvement Program Application for Participation The Friends of SW 9 th and Des Moines East and South Chamber of Commerce (DMESC) Façade Improvement Program is funded by the City of Des Moines and administered by the DMESC. For information regarding

More information

City of Cambridge. Designated Heritage Property Grant Program

City of Cambridge. Designated Heritage Property Grant Program City of Cambridge Designated Heritage Property Grant Program Table of Contents 1. Eligible Properties 1 2. Projects 1 3. Eligible Projects 1 a) General Conservation Projects 3 b) Repair or Restoration

More information

Customer Guide. Colorado Historic Preservation Income Tax Credit

Customer Guide. Colorado Historic Preservation Income Tax Credit Colorado Historic Preservation Income Tax Credit Overview of Residential Program (CRS 39-22-514.5 of 2014, as amended) Colorado offers a state income tax credit for preservation and rehabilitation work

More information

BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION

BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION The City of Zion is requesting an alternate bid for cleaning and maintenance services to be performed at: Zion City Hall, 2828 Sheridan

More information

INSIGNIA OF APPROVAL INFORMATION BOOKLET

INSIGNIA OF APPROVAL INFORMATION BOOKLET INSIGNIA OF APPROVAL INFORMATION BOOKLET Arnold Schwarzenegger, Governor Sunne Wright McPeak, Secretary Business, Transportation and Housing Agency Judy Nevis, Acting Director Department of Housing and

More information

Heritage guidelines designated Heritage ProPerty grant Program Grant applications due March 31, 2015 by 4:30 pm CULTUREDIVISION

Heritage guidelines designated Heritage ProPerty grant Program Grant applications due March 31, 2015 by 4:30 pm CULTUREDIVISION 2015 guidelines designated Heritage ProPerty grant Program Grant applications due March 31, 2015 by 4:30 pm ProPerties Heritage 15059 CULTUREDIVISION PUBLIC ART + MUSEUMS AND HERITAGE + MEADOWVALE THEATRE

More information

ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION REGULATION 25 ARKANSAS LEAD-BASED PAINT-HAZARD

ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION REGULATION 25 ARKANSAS LEAD-BASED PAINT-HAZARD ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION REGULATION 25 ARKANSAS LEAD-BASED PAINT-HAZARD EFFECTIVE MARCH 28, 1998 TABLE OF CONTENTS CHAPTER ONE: STATEMENT OF PURPOSE 1-1 Section 25.101 Authority

More information

Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9

Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9 Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9 Community Forum January 14, 2016 Agenda Welcome Presentation: New proposal What s changed? What s stayed the same? Benefits for students

More information

Frequently Asked Questions May 8, 2018 Sinking Fund Election

Frequently Asked Questions May 8, 2018 Sinking Fund Election When is the election? Frequently Asked Questions May 8, 2018 Sinking Fund Election Tuesday, May 8, 2018. The polls will be open from 7 a.m. until 8 p.m. Absentee ballots will be available after March 24th.

More information

SAMPLE. Child Care Center Sanitation Inspection Form

SAMPLE. Child Care Center Sanitation Inspection Form Child Care Center Sanitation Inspection Form OAR numbers generally refer to numbers in the Office of Child Care s Rules for the Certification of Child Care Centers REMOVE THIS COVER AND INSERT UNDER EACH

More information

HOME RENOVATION TAX CREDIT (HRTC)

HOME RENOVATION TAX CREDIT (HRTC) HOME RENOVATION TAX CREDIT (HRTC) The Home Renovation Tax Credit applies to eligible expenses of more than $1,000, but not more than $10,000, resulting in a maximum non-refundable tax credit of $1,350

More information

Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery

Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery Jacqueline Berger, APPRISE ABSTRACT This paper reports on an observational study of energy efficiency service

More information

Arapahoe County Weatherization Income Guidelines for Traditional Weatherization Services

Arapahoe County Weatherization Income Guidelines for Traditional Weatherization Services Arapahoe County Weatherization Income Guidelines for Traditional Weatherization Services Arapahoe County Weatherization has been providing energy conservation services to homes for over twenty-five years.

More information

An electronic copy of this document is available on the SC intranet and the Learning Gateway.

An electronic copy of this document is available on the SC intranet and the Learning Gateway. Shropshire Council Premises Plan for Asbestos Management An electronic copy of this document is available on the SC intranet and the Learning Gateway. The Control of Asbestos Regulations 2012 requires

More information

2018 TRAINING SCHEDULE

2018 TRAINING SCHEDULE SITE LOCATION: ALBANY, NY OSHA COMPLIANCE COURSES 40-Hr. HAZWOPER $675.00 HAZWOPER Refresher (1 Day) $150.00** 24-Hr. HAZWOPER (Limited Site Worker) $365.00 8-Hr. HAZWOPER Supervisor $150.00 ** 30-Hr.

More information

PROGRAM GUIDE. ELIGIBLE APPLICANTS To be eligible to apply to the program:

PROGRAM GUIDE. ELIGIBLE APPLICANTS To be eligible to apply to the program: PROGRAM GUIDE PROGRAM PURPOSE AND GOAL The City of Williams Lake is pleased to provide the business façade improvement program with funding from Northern Development Initiative Trust. The purpose of the

More information

FOOD SAFETY EVALUATION REPORT

FOOD SAFETY EVALUATION REPORT (559) 300-5742 PR0000349 January 30, 2018 CONNIE CASARES EP DATE: 4/30/2019 Lupe Tapia RESTROOM FACILITIES NOT MAINTAINED [HSC 114250 & 114276] -Install a self-closing device to restroom door -Maintain

More information

EPISCOPAL CHURCH OF OUR SAVIOUR REQUEST FOR PROPOSAL FOR JANITORIAL AND CLEANING SERVICES FOR CHURCH SANTUARY, CHURCH OFFICE AND UNDERCROFT

EPISCOPAL CHURCH OF OUR SAVIOUR REQUEST FOR PROPOSAL FOR JANITORIAL AND CLEANING SERVICES FOR CHURCH SANTUARY, CHURCH OFFICE AND UNDERCROFT EPISCOPAL CHURCH OF OUR SAVIOUR REQUEST FOR PROPOSAL FOR JANITORIAL AND CLEANING SERVICES FOR CHURCH SANTUARY, CHURCH OFFICE AND UNDERCROFT SEPTEMBER 4, 2017 P a g e 1 8 II. SCOPE OF SERVICES Janitorial

More information

GREEN SHEET. SACRAMENTO FIRE DEPARTMENT Informational Summary Report of Serious SFD Injuries, Illnesses, Accidents and Near-Miss Incidents

GREEN SHEET. SACRAMENTO FIRE DEPARTMENT Informational Summary Report of Serious SFD Injuries, Illnesses, Accidents and Near-Miss Incidents GREEN SHEET SACRAMENTO FIRE DEPARTMENT Informational Summary Report of Serious SFD Injuries, Illnesses, Accidents and Near-Miss Incidents Structure Fire Burn Injuries October 7 th 2008 Stilt Court Fire

More information

ADDENDUM TO INVITATION FOR BIDS Southern Humboldt Unified School District Proposition 39 LED Lighting Upgrade Project Bid No.

ADDENDUM TO INVITATION FOR BIDS Southern Humboldt Unified School District Proposition 39 LED Lighting Upgrade Project Bid No. ADDENDUM TO INVITATION FOR BIDS Southern Humboldt Unified School District Proposition 39 LED Lighting Upgrade Project Bid No. 17-006 Addendum #1 March 22, 2017 To All Prospective Bidders: The Southern

More information

DATE IS ACTUALLY FRIDAY - MARCH 2); contact information included in RFP

DATE IS ACTUALLY FRIDAY - MARCH 2); contact information included in RFP Attendees: reference sign-in sheet. Tom Brown, Coordinator Design & Construction, opened meeting at 9:30 AM. Welcomed attendees Meeting recorded; mandatory meeting, sign-in required; leave business cards

More information

Business Façade Improvement Program Available

Business Façade Improvement Program Available MEDIA RELEASE City of Williams Lake For Immediate Release March 1, 2017 Tel: 250-392-2311 Fax: 250-392-4408 450 Mart Street Williams Lake, BC V2G 1N3 Business Façade Improvement Program Available Northern

More information

Department of Veterans Affairs VHA HANDBOOK HOME IMPROVEMENTS AND STRUCTURAL ALTERATIONS (HISA) PROGRAM

Department of Veterans Affairs VHA HANDBOOK HOME IMPROVEMENTS AND STRUCTURAL ALTERATIONS (HISA) PROGRAM Department of Veterans Affairs VHA HANDBOOK 1173.14 Veterans Health Administration Transmittal Sheet Washington, DC 20420 October 30, 2000 HOME IMPROVEMENTS AND STRUCTURAL ALTERATIONS (HISA) PROGRAM 1.

More information

Instructions to Bidders Asbestos Abatement

Instructions to Bidders Asbestos Abatement Quinault Indian Nation P.O Box 189 Taholah, WA. 98587 Instructions to Bidders Asbestos Abatement BID DATE TIME Locations and legal address of project: 1. 411 Queets Ave. Queets, WA 98331 (survey attached).

More information

I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I 1 Sum of Prior Years and Estimate to Complete Project Estimates: PlanningIDesign 1 Sum of FY 2013--FY 2017 FY 2012 1 Sum of FY 2013-~uture

More information

Waterford School District 2003 Bond Update

Waterford School District 2003 Bond Update Waterford School District 2003 Bond Update Presented by: Thomas W. Wiseman, C.P.A. Assistant Superintendent Business and Operations William Holbrook, C.P.A. Director of Business Services January 17, 2013

More information

ASBESTOS MANAGEMENT. Policy and Arrangements. Oxfordshire County Council December 2013

ASBESTOS MANAGEMENT. Policy and Arrangements. Oxfordshire County Council December 2013 ASBESTOS MANAGEMENT Policy and Arrangements Oxfordshire County Council December 2013 Document Control 2013/V2e Draft Review Date: December 2015 TABLE OF CONTENTS 1.0 Asbestos Policy Statement 1.1 Policy

More information

ROLLING RIVER SCHOOL DIVISION REGULATION

ROLLING RIVER SCHOOL DIVISION REGULATION ROLLING RIVER SCHOOL DIVISION REGULATION Cleaner Job Description GDASA/R Position Title: Reports To: Cleaner School Principal and Maintenance Supervisor Receives Duties / Workload Assignment and Direction

More information

University of Akron College of Nursing 370-Care of Older Adult Home Safety Checklist

University of Akron College of Nursing 370-Care of Older Adult Home Safety Checklist University of Akron College of Nursing 370-Care of Older Adult Home Safety Checklist Patient: 1. 2. 3. 4. Living Room/- Family Room Yes No Can you turn on a light without having to walk into a dark room?

More information

SAMPLE: Environmental Rounds and Safety Assessment Tool

SAMPLE: Environmental Rounds and Safety Assessment Tool SAMPLE: Environmental Rounds and Safety Assessment Tool Area/Department Evaluated: Date: Security and Incident Management Y N N/A Comments 1. Are emergency telephone numbers posted by all stationary phones?

More information

2018 Program Review and Certification Standards J. Facilities

2018 Program Review and Certification Standards J. Facilities 2018 Review and Certification Standards New requirements are in red text and do not apply for the 2018 PR&C review. These requirements will be applicable in 2019. Minor adjustments and clarifications and

More information

SENIOR FOOD PRODUCTION UTILITY WORKER

SENIOR FOOD PRODUCTION UTILITY WORKER PERSONNEL COMMISSION SENIOR FOOD PRODUCTION UTILITY WORKER Class Code: 0478 Salary Range: 19 (C1) JOB SUMMARY Under general supervision, lead a small crew and perform a variety of general grounds maintenance

More information

PLATTE COUNTY MEMORIAL NURSING HOME FACILITY EVALUATION REPORT JUNE 2011 N E L S O N ARCHITECTS, LLC.

PLATTE COUNTY MEMORIAL NURSING HOME FACILITY EVALUATION REPORT JUNE 2011 N E L S O N ARCHITECTS, LLC. PLATTE COUNTY MEMORIAL NURSING HOME FACILITY EVALUATION REPORT JUNE 2011 N E L S O N ARCHITECTS, LLC. 110 North 6 th East. P.O. Box 1244 R I v e r t o n, W Y 8 2 5 0 1 3 0 7. 8 5 6. 6 1 5 5 p. nelsonarchitects@wyoming.com

More information

Tile Moving And Handling Assessment Nursing

Tile Moving And Handling Assessment Nursing Tile Moving And Handling Assessment Nursing Risk Assessments. The Moving And Handling Of The Deceased Patient. Manual Handling Operations Regulations 1992 (MHORegs) Amended 2002 Types of flooring thick

More information

STATE OF ALASKA-2018 Weatherization Health and Safety Plan

STATE OF ALASKA-2018 Weatherization Health and Safety Plan ` 1 STATE OF ALASKA-2018 Weatherization Health and Safety Plan Budgeting (Check one): The grantee is encouraged to budget health and safety costs as a separate category and, thereby, excludes such costs

More information

RIGHT RENOVATE THE LEAD SAFE CERTIFIED GUIDE TO LEAD (5323) epa.gov/getleadsafe EPA-740-K Revised September 2011

RIGHT RENOVATE THE LEAD SAFE CERTIFIED GUIDE TO LEAD (5323) epa.gov/getleadsafe EPA-740-K Revised September 2011 THE LEAD SAFE CERTIFIED GUIDE TO RENOVATE RIGHT 1-800-424-LEAD (5323) epa.gov/getleadsafe EPA-740-K-10-001 Revised September 2011 Important lead hazard information for families, child care providers and

More information

TELECOMMUTING WORK AGREEMENT

TELECOMMUTING WORK AGREEMENT TELECOMMUTING WORK AGREEMENT The following Telecommuting Agreement ( Agreement ) is made and entered into as of the day of, 20 (the Effective ) by and between William & Mary in Virginia (the University

More information

Christiana Care Visiting Nurse Association. Safety In The Home. Helpful tips to lower your risk of accidents. Visiting Nurse Association

Christiana Care Visiting Nurse Association. Safety In The Home. Helpful tips to lower your risk of accidents. Visiting Nurse Association Christiana Care Visiting Nurse Association Safety In The Home Helpful tips to lower your risk of accidents Visiting Nurse Association Christiana Care Visiting Nurse Association Each year three out of every

More information

St. Michael s Lutheran Church Church Custodian

St. Michael s Lutheran Church Church Custodian St. Michael s Lutheran Church Church Custodian Position Listing St. Michael s Lutheran Church in Roseville, Minnesota, is hiring a part-time church custodian. The responsibilities for this position include:

More information

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

Associated with the District s Measure A Bond Program and Facilities Improvement Projects Request for Qualifications / Proposal (RFQ/P) for Hazardous Material Assessment, Abatement Plan, Cost Estimating, and Monitoring Services Associated with the District s Measure A Bond Program and Facilities

More information

Facilities Condition Assessment

Facilities Condition Assessment Facilities Condition Assessment (O&M 16 018) Date Issued: January 29, 2016 Date Due: Contact: March 3, 2016 at 4:00:00 pm Paul Acosta, Program Manager III paul.acosta@stocktonca.gov City of Stockton Public

More information

Los Rios Community College District NEW EMPLOYEE TRAINING CHECK LIST

Los Rios Community College District NEW EMPLOYEE TRAINING CHECK LIST Los Rios Community College District NEW EMPLOYEE TRAINING CHECK LIST This form is to be completed during the processing as a new employee or new job assignment if the assignment falls in a new JOB SAFETY

More information

NICU Lighting Redesign

NICU Lighting Redesign NICU Lighting Redesign Space Description The Neonatal Intensive Care Unit is located on the third floor of the new addition. Instead of looking at this area as a whole, it was broken down into two separate

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions about the May 2, 2017 School Bond Election When is the election? Tuesday, May 2, 2017. The polls will be open from 7 a.m. until 8 p.m. Absentee ballots will be available after

More information

Standard Operating Procedure (SOP)

Standard Operating Procedure (SOP) Standard Operating Procedure (SOP) Maintaining a Clean Environment on the Health Bus DOCUMENT CONTROL: Version: 1 Ratified by: Clinical Effectiveness Committee Date ratified: 6 August 2013 Name of originator/author:

More information

McCracken Power Plant

McCracken Power Plant McCracken Power Plant Herrick Archives Number 069 A. IDENTIFICATION & LOCATION 1. Name 1.1 Officially named "McCracken Power Plant" by Board of Trustees on May 5, 1960. 1.2 Alternate names noted: Power

More information

RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS

RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER 1200-1-18 LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS 1200-1-18-.01 Lead-Based Paint Abatement 1200-1-18-.04

More information

LIVESMART BC: EFFICIENCY INCENTIVE PROGRAM TERMS AND CONDITIONS EFFECTIVE APRIL 1, 2013

LIVESMART BC: EFFICIENCY INCENTIVE PROGRAM TERMS AND CONDITIONS EFFECTIVE APRIL 1, 2013 LIVESMART BC: EFFICIENCY INCENTIVE PROGRAM TERMS AND CONDITIONS EFFECTIVE APRIL 1, 2013 The LiveSmart BC Efficiency Incentive Program is a partnership between BC Hydro, FortisBC, and the Province of BC

More information

MINUTES OF THE SAANICH HERITAGE FOUNDATION MEETING HELD AT SAANICH MUNICIPAL HALL COMMITTEE ROOM #2 TUESDAY, APRIL 14, 2015 AT 5:30 P.M.

MINUTES OF THE SAANICH HERITAGE FOUNDATION MEETING HELD AT SAANICH MUNICIPAL HALL COMMITTEE ROOM #2 TUESDAY, APRIL 14, 2015 AT 5:30 P.M. MINUTES OF THE SAANICH HERITAGE FOUNDATION MEETING HELD AT SAANICH MUNICIPAL HALL COMMITTEE ROOM #2 TUESDAY, APRIL 14, 2015 AT 5:30 P.M. Present: Regrets: Staff: Brad Shuya, President; Ross O Connell,

More information

Quality Assurance. Monitoring

Quality Assurance. Monitoring Quality Assurance State and Local Level Monitoring National DOE Conference New Orleans, LA December 14, 2011 Hoyt O Brien Wisconsin Division of Energy Services 1 ARRA Monitoring Staffing Wisconsin Quality

More information

ABUDHABI INDIAN SCHOOL DISASTER MANAGEMENT POLICY-STANDARD OPERATING PROCEDURES FOR EVICTION

ABUDHABI INDIAN SCHOOL DISASTER MANAGEMENT POLICY-STANDARD OPERATING PROCEDURES FOR EVICTION ABUDHABI INDIAN SCHOOL DISASTER MANAGEMENT POLICY-STANDARD OPERATING PROCEDURES FOR EVICTION DISASTER MANAGEMENT POLICY Name of Policy : Disaster Management Policy- Standard Operating procedures for Eviction

More information

SURREY COUNTY COUNCIL. PUBLIC ASSISTANCE COMMITTEE. THE LOCAL GOVERNMENT ACT, THE POOR LAW INSTITUTIONS IN SURREY REPORT OF THE

SURREY COUNTY COUNCIL. PUBLIC ASSISTANCE COMMITTEE. THE LOCAL GOVERNMENT ACT, THE POOR LAW INSTITUTIONS IN SURREY REPORT OF THE SURREY COUNTY COUNCIL. PUBLIC ASSISTANCE COMMITTEE. THE LOCAL GOVERNMENT ACT, 1929. THE POOR LAW INSTITUTIONS IN SURREY. ------------ REPORT OF THE COUNTY MEDICAL OFFICER. ---------- 9/7/30. EPSOM GUARDIANS

More information

ASBESTOS MANAGEMENT PLAN:

ASBESTOS MANAGEMENT PLAN: ASBESTOS MANAGEMENT PLAN: 2017 2018 The University of Edinburgh has a statutory duty to provide a safe place of work and a healthy working environment so far as is reasonably practicable. We understand

More information

Weatherization Program Update

Weatherization Program Update Weatherization Program Update A Briefing to the Housing Committee Housing/Community Services Department January 18, 2011 1 Purpose Provide an update on the State Weatherization Program funded through the

More information

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Custodian/Shop Utility Worker (Class III)

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Custodian/Shop Utility Worker (Class III) NORWIN SCHOOL DISTRICT JOB DESCRIPTION Custodian/Shop Utility Worker (Class III) JOB ANALYSIS The is responsible for general warehouse operations and maintaining District supplies. In addition, this position

More information