|
|
- Aileen Agatha Cameron
- 5 years ago
- Views:
Transcription
1
2
3
4
5
6 Page 3 of 3 September 18, 2018 Addendum #1 CUY-DOCK-REHAB Cleveland-Cuyahoga County Port Authority PID Notice to all Bidders and Suppliers to please be advised of Addendum #1. Please use the attached revised bid form. Addenda amendments must be acknowledged and included with the bid. Please sign below acknowledging your receipt and acceptance of this Addendum. Signature Print Name Title Firm Name
7
8
9
10 Item ODOT Item PROJECT BID FORM REVISED ADDENDUM 1 Cleveland Bulk Terminal Maritime Infrastructure Rehabilitation CUY Dock Rehab (80987) Unit Item Description Quantity Unit Price Cleveland Bulk Terminal Maritime Infrastructure Rehabilitation Item Total ROADWAY PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY AND PROPERTY DAMAGE 1 LS LIABILITY INSURANCE CLEARING AND GRUBBING, AS PER PLAN 1 LS STUMP REMOVED, 18" 1 EACH EXCAVATION, FOR DRAINAGE BMP CONSTRUCTION 1080 CY EMBANKMENT 3 CY EXCAVATION, AS PER PLAN 188 CY EROSION CONTROL EROSION CONTROL 5000 EA $1.00 $5, ROCK CHANNEL PROTECTION, TYPE D WITH FILTER FABRIC 59 CY TOPSOIL 186 CY SEEDING AND MULCHING 1680 SY COMMERCIAL FERTILIZER 0.25 TON LIME 0.35 ACRE WATER 0.02 MGAL SLOPE EROSION PROTECTION 600 SY DRAINAGE " CONDUIT, TYPE B: PVC, LF WATER QUALITY BASIN, RETENTION, AS PER PLAN 2 EA WATER WORK, MISC.: BACKFLOW PREVENTER 2 EA PAVEMENT AGGREGATE BASE, AS PER PLAN 700 CY LIGHTING LIGHT POLE FOUNDATION, AS PER PLAN 33 EA LUMINAIRE MISC.: MARINE, TYPE V, LED, 277V 33 EA LIGHT POLE, MISC.: MARINE 33 EA CONDUIT, 1-1/2", , AS PER PLAN 3,089 FT TRENCH, 36" DEEP, AS PER PLAN 475 FT LIGHTING, MISC.: FOUNDATION TEST HOLES 33 EA
11 PULL BOX, , SIZE 30, AS PER PLAN0 2 EA NO. 8 AWG 600 VOLT DISTRIBUTION CABLE, AS PER PLAN 16,479 FT NO. 10 AWG POLE AND BRACKET CABLE, 1000 VOLT 1,188 FT CONNECTION, FUSED PULL APART 33 EA GROUND ROD, SUPPLEMENTAL GROUNDING 33 EA LUMINAIRE REMOVED 20 EA LIGHT POLE REMOVED 20 EA DISTRIBUTION CABLE REMOVED AND CONDUIT REMOVED 946 FT MISCELLANEOUS STRUCTURE PORTIONS OF STRUCTURE REMOVED, CUT & REMOVE SHEET PILE, CAP, WALER & 1 LS FENDERS PORTIONS OF STRUCTURE REMOVED, SHEET PILE EXTRACTION 1 LS PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, CONC. CAP REMOVAL, AREA C 60 CY PORTIONS OF STRUCTURE REMOVED, CONCRETE CAP, AREA D 100 CY PORTIONS OF STRUCTURE REMOVED, HULETT FOUNDATION 350 CY PORTIONS OF STRUCTURE REMOVED, STONE AND RUBBLE REMOVED 200 CY PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, MOORING BOLLARD REMOVED 16 EACH STRUCTURES, MISC. SHEET PILE REPAIRS 2 EACH STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN BULKHEAD 82,350 SF STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN DEADMAN WALLS 4,640 SF STRUCTURAL STEEL, MISC.: WALER BEAMS, BULKHEAD 1,185 FT STRUCTURAL STEEL, MISC.: WALER BEAMS, DEADMAN 578 FT STRUCTURAL STEEL, MISC.: WALER BEAMS, W14X90 50 FT STRUCTURAL STEEL MISC.: CAP CHANNEL 1,185 FT STRUCTURAL STEEL MISC.: TIE RODS 7,926 FT CONDUIT, BORED OR JACKED, AS PER PLAN 6 INCH DIAMETER 5,280 FT LOW STRENGTH MORTAR BACKFILL 5,700 CY POROUS BACKFILL 4,740 CY
12 CLASS QC2 CONCRETE, SIDEWALK, AS PER PLAN STRUCTURES, MOORING BOLLARDS MOUNTED TO CONCRETE CAP STRUCTURES, MOORING BOLLARDS MOUNTED WITH PILE SUPPORTED FOUNDATIONS STRUCTURES, MARINE CYLINDRICAL FENDERING STRUCTURES, MARINE COMPOSITE FENDERING STRUCTURES, MARINE COMPOSITE FENDERING, TRANSITION SECTION STRUCTURAL SURVEY AND MONITORING OF VIBRATION MAINTENANCE OF TRAFFIC STRUCTURES, TEMPORARY MORRING BOLLARDS INCIDENTALS 875 CY 14 EACH 3 EACH 410 FT 890 FT 40 FT 1 LS 14 EACH PILE DRIVING EQUIPMENT MOBILIZATION 1 LS CONSTRUCTION LAYOUT STAKES AND SURVEYING 1 LS MOBILIZATION 1 LS PRE-CONSTRUCTION VIDEO 1 LS FIELD OFFICE, TYPE A, AS PER PLAN 8 MNTH UTILITY COORDINGATION AND RELOCATION 1 LS AS-BULT CONSTRUCTION PLANS 1 LS PREMIUM FOR CONTRACT PERFORMANCE BOND AND PAYMENT BOND FENCE, MISC.: RAILROAD EASEMENT MARKING 1 LS 3000 FT TOTAL PROJECT COST:
13 CLEVELAND BULK TERMINAL MARITIME REHABILITATION PROJECT CUY DOCK REHAB (80987) BID FORM CONT. Please provide a list of all major Subcontractors, Scope of Work, Estimated Contract Dollar Value, & Past Project Experience: Estimated Contract Past Project Experience & ODOT Company Scope of Work Dollar Value Prequalifications BIDDER AFFIDAVITS: EEO CERTIFICATION: The bidder hereby certifies that by signing and submitting this bid he has..., has not..., participated in a previous contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925, 11114, or 11246, and that he has..., has not..., filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements. The Bidder must circle the appropriate has or has not above. BIDDER: Signature: Title: Company: Address: City/State/Zip Code: Phone ADDITIONAL BID INFORMATION & QUESTIONS: 1.) Does General Contractor Have Experience Working on Similar Types of Projects? YES / NO * REQUIRED- Please supply experience w/ client reference contact information. 2.) Does Contractor Have Experience Working on Active Maritime Transportation & Cargo Handling Facilities? YES / NO * REQUIRED- Please supply experience w/ client reference contact information. 3.) Total Estimated DBE Participation Percentage: *Please copy of DBE Utilization Plan to Port Authority with bid and follow ODOT DBE Utilization Plan per ODOT's requirements. 4.) Please confirm that the Project was estimated using Davis Bacon prevailing wage rates. YES / NO 5.) Do you have experience working with the Cleveland-Cuyahoga County Port Authority? YES / NO *If yes, please provide a list of projects. 6.) Does Contractor Have Experience Driving Pile Near Sensitive Infrastrucutre & Implementing Vibration Monitoring Programs? YES / NO * REQUIRED- Please supply experience w/ client reference contact information. 7.) Please confirm if the Contracotr or any major subcontractors are "ODOT Prequalified". YES / NO * If yes, please provide a list of the applicable qualifications for this Project. 1
14 CLEVELAND BULK TERMINAL MARITIME REHABILITATION PROJECT CUY DOCK REHAB (80987) BID FORM CONT. 8.) Please verify the Contractor reviewed and familiarized themselves with the the geotechnical reports? YES / NO 9.) Do you have experience working adjacent to active Norfolk Southern rail tracks? YES / NO *If yes, please provide a list of projects. 10.) Does the Contractor have Standard Form 100 (EEO-1) on file with the Federal government for last period? YES / NO * If yes, please record/verification, see Section A-30 of the Bid Instructions. 11.) Contractor complies with Ohio Adminstrative Code 9.47 regarding Affirmative Action Programs? YES / NO * Contractor is required to submit a valid Certificate of Compliance w/ Affirmative Action Programes issued by the State EEO Coordinator with Bid. 12.) Please confirm Contractor is in good standing with an OBWC-approved Drug Free Workplace Program? YES / NO * Contractor must provide record of enrollment and good standing with bid. 13.) Please verify Contractor undestand's this is an ODOT LPA Project and verify the contractor understands the YES / NO FHWA 1273 Contract Provisions for Projects involving Federal Aid. 14.) Please verify Contractor has submitted DBE Utilizaiton Plan to ODOT using Formstack and if the Contractor is YES / NO is the lowest, reponsive, & responsible bidder they will submit DBE Affirmation Forms within 5 calendar days of bid opening. 15.) Please verify the contractor has fully reviewed and fully understands the requirements of Norfolk Southern's YES / NO Special Provisions for Protection of Railway Interest. 16.) Please provide the Port Authority with the Contractor's EEO Officer's Contact Information. Name: Phone: 17.) Please provide completion deadline for the Project: RIVERCLASS NAVIGATION IMPACT: PILE DRIVING & MARITIME WORK (STA to STA 11+15): LAKER FLEET NAVIGATION IMPACT: PILE DRIVING & MARITIME WORK (STA to STA 6+00): SUBSTANTAIL COMPLETION: FINAL COMPLETION: 18.) I acknowledge receipt of the following addenda (if any):
15 CLEVELAND BULK TERMINAL ANNUAL RAIL & MARITIME TRAFFIC TACONITE AGGREGATE MONTH BERTH DURATION BERTH DURATION TOTAL AVERGE MONTHLY HOURS BERTH BERTH DURATION TOTAL TRAINS LOADED OUT (EA.) Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
16 MONTHLY SUMMARY - IRON ORE Sep-17 09/01/17 Pathfinder 8 09/02/17 Pathfinder 8 09/04/17 Erie Trader 8 09/06/17 Buffalo 8 09/07/17 Buffalo 8 09/10/17 Herbert C Jackson 4 09/12/17 Pathfinder 8 09/16/17 Great Lakes Trader 8 09/16/17 Herbert C Jackson 4 09/21/17 John J Boland 4 09/23/17 Pathfinder 8 09/24/17 Pathfinder 8 09/25/17 Great Lakes Trader 8 09/26/17 Buffalo 8 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) Sep-17 Train Load (EA.) 09/05/17 Rail Out 1 09/11/17 Joseph H Thompson 10 09/13/17 Rail Out 1 09/20/17 Rail Out
17 MONTHLY SUMMARY - IRON ORE Oct-17 10/01/17 Balance forward 10/01/17 Ashtabula 8 10/03/17 Buffalo 8 10/04/17 Great Lakes Trader 8 10/04/17 Buffalo 8 10/04/17 Herbert C Jackson 4 10/05/17 Erie Trader 8 10/06/17 Buffalo 8 10/07/17 John J Boland 8 10/08/17 Buffalo 8 10/09/17 John J Boland 8 10/09/17 Buffalo 8 10/10/17 Mesabi Miner 14 10/10/17 Buffalo 8 10/11/17 Buffalo 8 10/12/17 Buffalo 8 10/14/17 Buffalo 8 10/16/17 Buffalo 8 10/17/17 Mesabi Miner 14 10/18/17 Buffalo 8 10/19/17 Pathfinder 8 10/20/17 Pathfinder 8 10/20/17 Buffalo 8 10/21/17 Great Lakes Trader 8 10/22/17 Buffalo 8 10/23/17 Buffalo 8 10/26/17 Buffalo 8 10/28/17 Indiana Harbor 14 10/29/17 Sam Laud 8 10/30/17 Buffalo 8 10/31/17 Buffalo 8 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) Oct-17 Train Load (EA.) 10/02/17 Rail Out 1 10/06/17 John J Boland 10 10/10/17 Rail Out 1 10/18/17 Rail Out 1 10/24/17 Joseph H Thompson 10 10/28/17 Rail Out 1 10/29/17 Sam Laud
18 MONTHLY SUMMARY - IRON ORE Nov-17 11/01/17 Buffalo 8 11/02/17 Walter J McCarthy Jr 14 11/03/17 Pathfinder 8 11/03/17 Buffalo 8 11/04/17 Buffalo 8 11/05/17 James R Barker 14 11/07/17 Buffalo 8 11/08/17 Buffalo 8 11/09/17 Buffalo 8 11/10/17 Mesabi Miner 14 11/13/17 Herbert C Jackson 4 11/13/17 Buffalo 8 11/14/17 Buffalo 8 11/14/17 Buffalo 8 11/16/17 John J Boland 8 11/17/17 Buffalo 8 11/21/17 Great Lakes Trader 8 11/22/17 Buffalo 8 11/22/17 Buffalo 8 11/23/17 Buffalo MONTHLY SUMMARY - LIMESTONE Nov-17 Train Load (EA.) (AVG. HRS.) 11/13/17 Rail Out 1 11/21/17 Rail Out 1-2
19 MONTHLY SUMMARY - IRON ORE Dec-17 12/01/17 Balance forward 12/02/17 Mesabi Miner 14 12/03/17 Buffalo 8 12/03/17 Buffalo 8 12/08/17 Great Lakes Trader 8 12/08/17 Buffalo 8 12/09/17 Buffalo 8 12/10/17 Ashtabula 8 12/10/17 Erie Trader 8 12/11/17 Ashtabula 8 12/11/17 Sam Laud 8 12/13/17 Sam Laud 8 12/18/17 Mesabi Miner 14 12/19/17 Sam Laud 8 12/19/17 Sam Laud 8 12/20/17 Sam Laud 8 12/21/17 Sam Laud 8 12/22/17 American Spirit 14 12/23/17 Great Lakes Trader 8 12/23/17 Sam Laud 8 12/24/17 Pathfinder 8 12/24/17 Sam Laud 8 12/25/17 Erie Trader 8 12/26/17 Pathfinder 8 12/27/17 Pathfinder 8 12/27/17 Pathfinder 8 12/28/17 Pathfinder 8 12/29/17 Herbert C Jackson 4 12/29/17 Sam Laud 8 12/30/17 Sam Laud 8 12/31/18 American Century MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) 12/11/17 Sam Laud 10 Dec-17 Train Load (EA.) 10 -
20 MONTHLY SUMMARY - IRON ORE Jan-18 01/03/18 Sam Laud 8 01/03/18 Hon James L Oberstar 14 01/04/18 Sam Laud 8 01/05/18 Sam Laud 8 01/06/18 Sam Laud 8 01/07/18 Sam Laud 8 01/08/18 Sam Laud 8 01/09/18 Sam Laud 8 01/10/18 Sam Laud 8 01/11/18 Sam Laud 8 01/12/18 Joseph H Thompson 8 01/14/18 Sam Laud 8 01/15/18 Sam Laud 8 01/17/18 Sam Laud 8 01/18/18 Sam Laud 8 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) Jan-18 Train Load (EA.) - -
21 MONTHLY SUMMARY - IRON ORE Feb-18 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) - - Feb-18 Train Load (EA.) - -
22 MONTHLY SUMMARY - IRON ORE Mar-18 03/01/18 Pathfinder 8 03/05/18 Pathfinder 8 03/06/18 Pathfinder 8 03/07/18 Pathfinder 8 03/09/18 Pathfinder 8 03/10/18 Pathfinder 8 03/11/18 Pathfinder 8 03/12/18 Pathfinder 8 03/13/18 Pathfinder 8 03/14/18 Pathfinder 8 03/15/18 Pathfinder 8 03/16/18 Pathfinder 8 03/17/18 Pathfinder 8 03/18/18 Pathfinder 8 03/19/18 Pathfinder 8 03/22/18 Pathfinder 8 03/23/18 Pathfinder 8 03/24/18 Pathfinder 8 03/25/18 Pathfinder 8 03/26/18 Pathfinder 8 03/27/18 Pathfinder 8 03/30/18 American Century 14 03/31/18 Sam Laud MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) Mar-18 Train Load (EA.) - -
23 MONTHLY SUMMARY - IRON ORE Apr-18 04/01/18 Mesabi Miner 14 04/02/18 Great Lakes Trader 8 04/06/18 Sam Laud 8 04/06/18 Sam Laud 8 04/07/18 John J Boland 8 04/07/18 Herbert C Jackson 4 04/07/18 Sam Laud 8 04/08/18 Sam Laud 8 04/09/18 Sam Laud 8 04/10/18 Mesabi Miner 14 04/10/18 H Lee White 4 04/11/18 Sam Laud 8 04/11/18 Sam Laud 8 04/12/18 Erie Trader 8 04/13/18 Sam Laud 8 04/13/18 Sam Laud 8 04/14/18 Sam Laud 8 04/15/18 Sam Laud 8 04/16/18 American Integrity 14 04/19/18 Sam Laud 8 04/20/18 Sam Laud 8 04/20/18 Sam Laud 8 04/21/18 Herbert C Jackson 4 04/21/18 H Lee White 4 04/22/18 Lee A Tregurtha 8 04/22/18 Sam Laud 8 04/23/18 Sam Laud 8 04/24/18 John J Boland 4 04/24/18 Sam Laud 8 04/27/18 Sam Laud 8 04/28/18 Sam Laud 8 04/29/18 Sam Laud 8 04/30/18 American Integrity 14 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) Apr-18 Train Load (EA.) 04/05/18 Rail Out 1 04/08/18 Manitowoc 10 04/12/18 Rail Out 1 04/23/18 Rail Out
24 MONTHLY SUMMARY - IRON ORE May-18 05/01/17 H Lee White 8 05/03/17 H Lee White 8 05/04/17 Walter J McCarthy Jr 14 05/04/17 Buffalo 8 05/06/17 Erie Trader 8 05/09/17 Pathfinder 8 05/10/17 Buffalo 4 05/11/17 Buffalo 8 05/11/17 Buffalo 8 05/12/17 Buffalo 8 05/13/17 Buffalo 8 05/14/17 Buffalo 8 05/14/17 Mesabi Miner 14 05/15/17 Buffalo 8 05/16/17 Buffalo 8 05/16/17 American Century 14 05/17/17 John J Boland 8 05/18/17 Buffalo 8 05/19/17 Buffalo 8 05/19/17 Buffalo 8 05/20/17 Buffalo 8 05/24/17 Buffalo 8 05/25/17 Buffalo 8 05/26/17 Erie Trader 8 05/27/17 Buffalo 8 05/28/17 Buffalo 8 05/29/17 American Century 14 05/30/17 Buffalo 8 05/30/17 Buffalo MONTHLY SUMMARY - LIMESTONE May-18 Train Load (EA.) (AVG. HRS.) 05/01/17 Balance forward 05/04/17 Rail Out 1 05/10/17 Joseph H Thompson 10 05/11/17 Rail Out 1 05/16/17 American Mariner 10 05/16/17 Rail Out 1 05/22/17 Rail Out 1 05/25/17 H Lee White 10 05/28/17 Rail Out
25 MONTHLY SUMMARY - IRON ORE Jun-18 06/01/17 Balance forward 06/01/17 John J Boland 4 06/02/17 Buffalo 8 06/02/17 Great Lakes Trader 8 06/02/17 Buffalo 8 06/03/17 Herbert C Jackson 4 06/04/17 Sam Laud 8 06/05/17 Sam Laud 8 06/05/17 Buffalo 8 06/06/17 Indiana Harbor 14 06/07/17 Buffalo 8 06/07/17 Buffalo 8 06/08/17 Buffalo 8 06/08/17 Great Lakes Trader 8 06/09/17 Buffalo 8 06/10/17 Buffalo 8 06/11/17 Herbert C Jackson 4 06/14/17 Buffalo 8 06/14/17 H Lee White 4 06/14/17 Buffalo 8 06/15/17 Buffalo 8 06/18/17 American Integrity 14 06/19/17 Buffalo 8 06/20/17 Buffalo 8 06/21/17 Herbert C Jackson 4 06/27/17 Buffalo 8 06/27/17 Buffalo 8 06/28/17 Great Lakes Trader 8 06/30/17 Buffalo 8 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) Jun-18 Train Load (EA.) 06/01/17 Balance forward 06/06/17 Rail Out 1 06/12/17 Rail Out 1 06/18/17 Calumet 10 06/19/17 Rail Out 1 06/26/17 Rail Out
26 MONTHLY SUMMARY - IRON ORE Jul-18 07/01/18 Pathfinder 8 07/01/18 Erie Trader 8 07/02/18 Pathfinder 8 07/07/18 Sam Laud 8 07/08/18 Sam Laud 8 07/09/18 Sam Laud 8 07/09/18 Herbert C Jackson 4 07/10/18 Sam Laud 8 07/10/18 Sam Laud 8 07/11/18 Sam Laud 8 07/12/18 John J Boland 4 07/14/18 Erie Trader 8 07/17/18 Pathfinder 8 07/18/18 Pathfinder 8 07/19/18 American Century 14 07/24/18 Sam Laud 8 07/25/18 John J Boland 4 07/26/18 Sam Laud 8 07/27/18 Great Lakes Trader 8 07/27/18 Sam Laud 8 07/28/18 Sam Laud 8 07/29/18 Sam Laud 8 07/30/18 Herbert C Jackson 8 07/31/18 Sam Laud MONTHLY SUMMARY - LIMESTONE JULY Train Load (EA.) (AVG. HRS.) 07/02/18 Rail Out 1 07/06/18 American Mariner 10 07/10/18 Rail Out 1 07/14/18 Joseph H Thompson 10 07/19/18 Rail Out
27 MONTHLY SUMMARY - IRON ORE Aug-18 08/01/18 Sam Laud 8 08/02/18 Sam Laud 8 08/03/18 Erie Trader 8 08/04/18 Great Lakes Trader 8 08/05/18 Pathfinder 8 08/06/18 Pathfinder 8 08/09/18 Sam Laud 8 08/10/18 Sam Laud 8 08/14/18 Mesabi Miner 14 08/15/18 Sam Laud 8 08/16/18 Sam Laud 8 08/17/18 Sam Laud 8 08/18/18 Sam Laud 8 08/19/18 Sam Laud 8 08/21/18 Mesabi Miner 14 08/22/18 Sam Laud 8 08/28/18 Paul R Tregurtha 14 08/29/18 Sam Laud 8 08/30/18 Sam Laud 8 08/30/18 Sam Laud MONTHLY SUMMARY - LIMESTONE Aug-18 Train Load (EA.) (AVG. HRS.) 08/06/18 Rail Out 1 08/14/18 Rail Out 1 08/23/18 Rail Out 1-3
28 CUY DOCK REHAB Test Pit Photographs Please note: The numbering of the test pits in the archeological report (as shown on the plaque in the photos) differs from the numbering shown on the drawings. Test Pit #1
29 Test Pit #2
30
31 Test Pit #3
32
33 Test Pit #4
34
35 Test Pit #5
36
37 Test Pit #6
38
39 Test Pit #7
40 Test Pit #8
41 Test Pit #9
42 Test Pit #10
43
44 Test Pit #11
45
Disadvantaged Business Enterprise (DBE) Utilization on City Projects. Division of Affirmative Action
Disadvantaged Business Enterprise (DBE) Utilization on City Projects Division of Affirmative Action 1 DBE Program Summary Annual gross receipts of: General contractor: $16.6M Specialty contractor: $7M
More informationAWARD OF CONSTRUCTION CONTRACT CONTRACTOR: REYES CONSTRUCTION, INC. BERTH 100 WHARF SOUTH EXTENSION AND BACKLANDDEVELOPMENT SPECIFICATION NO.
THE PORT OF LOS ANGELES Executive Director's Report to the Board of Harbor Commissioners MAY 10,2012 FROM: SUBJECT: CONSTRUCTION RESOLUTION NO. AWARD OF CONSTRUCTION CONTRACT CONTRACTOR: REYES CONSTRUCTION,
More informationSECTION 3 POLICY & PROGRAM
SECTION 3 POLICY & PROGRAM 8120 Kinsman Road, Cleveland, Ohio 44104 Phone: 216-348-5000 Jeffery K. Patterson Chief Executive Officer TABLE OF CONTENTS Section Page # Section 3 POLICY Statement of Policy
More informationMississippi State Port Authority Port of Gulfport Restoration Program Pre-Bid Meeting Ship to Shore Rail Mounted Gantry Cranes, Project No.
! Mississippi State Port Authority Port of Gulfport Restoration Program Pre-Bid Meeting Ship to Shore Rail Mounted Gantry Cranes, Project No. 034 Joe Conn, P.E., Director of Port Restoration January 22,
More informationMembrane Pre-Selection Request For Proposal
Membrane Pre-Selection Request For Proposal City of San Luis Obispo Water Resource Recovery Facility Project Mandatory Pre-proposal Conference - July 7, 2017 Water Resource Recovery Facility Project Community
More informationFLORIDA INLAND NAVIGATION DISTRICT INTRACOASTAL WATERWAY MAINTENANCE DREDGING SOUTH OF PORT OF PALM BEACH PALM BEACH COUNTY, FLORIDA
GENERAL SCHEDULE: FLORIDA INLAND NAVIGATION DISTRICT INTRACOASTAL WATERWAY MAINTENANCE DREDGING SOUTH OF PORT OF PALM BEACH PALM BEACH COUNTY, FLORIDA MANDATORY PRE-BID MEETING AGENDA TIME ALLOTMENT SCHEDULE
More informationREQUEST FOR SEALED PROPOSAL. ADVERTISEMENT for SIDEWALK INSTALLATION
REQUEST FOR SEALED PROPOSAL ADVERTISEMENT for SIDEWALK INSTALLATION RFP SIDEWALK INSTALLATION - 091118 The City of College Park is accepting sealed proposals from qualified vendors for SIDEWALK INSTALLATION.
More informationApril 13, 2007 SUBJECT: GEOMETRIC IMPROVEMENTS OF CITY CONNECTING LINKS OF THE STATE HIGHWAY SYSTEM - FISCAL YEAR 2011
April 13, 2007 SUBJECT: GEOMETRIC IMPROVEMENTS OF CITY CONNECTING LINKS OF THE STATE HIGHWAY SYSTEM - FISCAL YEAR 2011 The Kansas Department of Transportation is announcing the continuation of its Geometric
More informationSTANDARD DRAWINGS INDEX
STANDARD DRAWINGS INDEX DESCRIPTION GENERAL DRAWING NO. Typical Layout for Improvement Plans... 1 City of Stockton Standard Border and Title Block for 8.5 x 11 Sheet.. 1A City of Stockton Standard Map
More informationPRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ)
PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ) FAA HOT SPOTS ELIMINATING DESIGN SERVICES PROJECT NO. 770 SOLICITATION NO. HWC-HOUHSE-2017-025 Warren Ching Sr. Procurement Specialist Houston
More informationHARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana
HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana Harbor Location: Calumet Harbor is located on the southwest shore of Lake Michigan in Chicago, Cook County, Illinois and the approach
More informationREQUEST FOR PROPOSALS
COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF SANTA ANA REQUEST FOR PROPOSALS RELOCATION OF TWO RESIDENTIAL STRUCTURES PROPOSALS DUE: Monday, May 9, 2011 at 11:00 AM 1. INTRODUCTION REQUEST FOR PROPOSALS
More informationAttachment A SCOPE OF WORK FOR THE CITIZEN SCRAP TIRE DROP-OFF DAY PROJECT
Attachment A SCOPE OF WORK FOR THE CITIZEN SCRAP TIRE DROP-OFF DAY PROJECT PURPOSE Overview The Maryland Environmental Service ( MES ) and the Board of County Commissioners of Washington County, Maryland
More informationOHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION REQUEST FOR PROPOSALS ( RFP ) PROFESSIONAL ENGINEERING AND CONSTRUCTION ADMINISTRATION AND INSPECTION SERVICES REF: REHABILITATION OF VARIOUS BRIDGES AT MILEPOSTS
More informationI SAVANNAH GA 11 JUN 89
AD-A152 225 COOPER RIVER REDIVERSION PROJECT LAKE MOULTRIE AM in SANTEE RIVER SOUTH CR (U) ARMY ENGINEER DISTRICT I SAVANNAH GA 11 JUN 89 UNCLASSIFIED F/G 13/2 M .- I "MIMI Lj35 - IIIII 1.41 11111 1.6
More informationSeawall Earthquake Safety + Disaster Prevention Program Community Meeting June 21, 2018
Seawall Earthquake Safety + Disaster Prevention Program Community Meeting June 21, 2018 WELCOME! This is our first Seawall Community Meeting, so, we ll start at the beginning Tonight, I will present a
More informationGuidance for Locally Administered Projects. Funded Through the NJDOT/MPO Program Funds Exchange. August 27, Revised September 15, 2014
1 Guidance for Locally Administered Projects Funded Through the NJDOT/MPO Program Funds Exchange August 27, 2013 Revised September 15, 2014 This document establishes guidelines for administering the program
More informationOctober 6, The proposal due date and time scheduled for Friday, November 3, at 04:30 P.M. remains unchanged.
October 6, 2017 Dear Sir/Madam Enclosed is Addendum No. 1 to SEPTA's Sealed Bid No. 17-00206-AMJP Elwyn to Wawa R3-2 Right of Way Improvements. The proposal due date and time scheduled for Friday, November
More informationCUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS POLICY ON CONSULTANT SELECTION. October 2011
CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS POLICY ON CONSULTANT SELECTION October 2011 CONTENTS SECTION PAGE INTRODUCTION...1 OBJECTIVE...1 A. Determination of Need to Use Consultant Services...2 B. Consultant
More informationSan Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form
San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form FY 2004/05 Project Name: Implementing Agency: Illinois Street Inter-modal Bridge over Islais Creek
More informationProcedures for Local Public Agency Project Administration (Revised 5/2014)
Procedures for Local Public Agency Project Administration (Revised 5/2014) OVERVIEW A Local Public Agency (LPA) is defined as a county, municipal corporation, state or local authority, board, commission,
More informationCITY OF GOLDEN, COLORADO Parks and Recreation Department
CITY OF GOLDEN, COLORADO Parks and Recreation Department Accredited by the Commission for Accreditation of Park and Recreation Agencies Rod Tarullo, Parks & Recreation Director REQUEST FOR QUALIFICATIONS
More informationAddendum No.3 to ITB Wakulla County Fire and EMS Station Issued: November 1, 2017
Addendum No.3 to ITB 2017-33 Wakulla County Fire and EMS Station Issued: November 1, 2017 MANDATORY PRE-BID CONFERENCE RFI 1. ITB Section 2.0 Schedule of Events Bids are due November 20, 2017 @ 2:00 P.M.
More informationEnlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):
Enlisted Professional Military Education FY 18 Academic Calendar Table of Contents STAFF NON-COMMISSIONED OFFICER ACADEMIES: SNCO Academy Quantico SNCO Academy Camp Pendleton SNCO Academy Camp Lejeune
More informationPRE-PROPOSAL CONFERENCE REQUEST FOR COMPETITIVE SEALED PROPOSAL (RFCSP)
PRE-PROPOSAL CONFERENCE REQUEST FOR COMPETITIVE SEALED PROPOSAL (RFCSP) PROJECT NO. 699 SOLICITATION NO. HWC-SEWER-2018-008 Warren Ching Sr. Procurement Specialist Houston Airports Thursday, May 17, 2018,
More informationBOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS
BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS BE IT RESOLVED, by the Mayor and Borough Council of the Borough of Roselle,
More informationRequest for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Project Name East Campus Quad Town Center Project Number C20182091 Project Location 4250 Richmond Road Project Manager Phillip Pallone City / County Highland Hills / Cuyahoga Owner Cuyahoga Community College
More informationADDENDUM NO. 1 SECURITY CAMERA SYSTEM AT 4 HIGH SCHOOLS AND 1 BRIDGES LEARNING CENTER BID NO
ADDENDUM NO. 1 SECURITY CAMERA SYSTEM AT 4 HIGH SCHOOLS AND 1 BRIDGES LEARNING CENTER BID NO. 15-06-05 Moreno Valley Unified School District Moreno Valley, California 10/08/2015 GO ARCHITECTS, INC. 276
More informationCOUNTY OF LOS ANGELES
COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS JAMES A. NOYES, Director 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 ADDRESS ALL CORRESPONDENCE TO: P.O. BOX 1460
More informationREQUEST FOR PROPOSAL CITY OF PORT ARANSAS GAS DEPARTMENT FOR NATURAL GAS SUPPLY. RFP # Gas
REQUEST FOR PROPOSAL BY CITY OF PORT ARANSAS GAS DEPARTMENT FOR NATURAL GAS SUPPLY RFP # Gas-20170501 Issue Date May 1, 2017 Questions Due Thursday, May 25, 2017 by 3pm Due Date & Time for Proposals Friday,
More informationCHESAPEAKE BAY BRIDGE AND TUNNEL DISTRICT PARALLEL THIMBLE SHOAL TUNNEL REQUEST FOR QUALIFICATIONS #PTST-15-1
CHESAPEAKE BAY BRIDGE AND TUNNEL DISTRICT PARALLEL THIMBLE SHOAL TUNNEL REQUEST FOR QUALIFICATIONS #PTST-15-1 TO: FROM: All Offerors Chesapeake Bay Bridge and Tunnel District SUBJECT: Addendum No. 1 Request
More informationBRF-009-9(73) IA 9 Black Hawk Bridge
BRF-009-9(73) 38-03 IA 9 Black Hawk Bridge Request for Proposal Iowa Department of Transportation Introduction The Iowa Department of Transportation s Office of Location and Environment (Department), in
More information2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:
CENAN-PP-H 12 March 2013 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting 1. The regularly scheduled monthly interagency coordination meeting was held on March 12 th at 10:00
More informationFlorida Department of Transportation 605 Suwannee Street Tallahassee, FL
RICK SCOTT GOVERNOR Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 JIM BOXOLD SECRETARY October 28, 2016 Ms. Hue T. Reynolds Executive Director Office of Supplier Diversity
More informationU.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT
PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT NOTICE OF AVAILABILITY (NOA) For FINAL ENVIRONMENTAL IMPACT STATEMENT (EIS) and DRAFT GENERAL CONFORMITY DETERMINATION (GCD)
More informationREQUEST FOR PROPOSALS FOR AS-NEEDED TRAFFIC ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019
Board of Commissioners of the Port of New Orleans REQUEST FOR PROPOSALS FOR AS-NEEDED TRAFFIC ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019 June 17, 2016 Deadline for proposals is no
More informationLPA PARTICIPATION REQUIREMENTS
LPA Participation Requirements LPA PARTICIPATION REQUIREMENTS The Federal Highway Administration (FHWA) permits the Ohio Department of Transportation (ODOT) to delegate project activities on Federal-aid
More informationISABELLA COUNTY REQUEST FOR PROPOSALS COMMISSION ON AGING CATV AND HEADEND EQUIPMENT
ISABELLA COUNTY REQUEST FOR PROPOSALS COMMISSION ON AGING CATV AND HEADEND EQUIPMENT ISSUED BY ISABELLA COUNTY BOARD OF COMMISSIONERS ISSUE DATE: February 4, 2008 ISABELLA COUNTY REQUEST FOR PROPOSALS
More informationREQUEST FOR PROPOSALS EMERGENCY GENERATOR INSTALL AT THE NEGAUNEE SERVICE CENTER (NSC)
REQUEST FOR PROPOSALS EMERGENCY GENERATOR INSTALL AT THE NEGAUNEE SERVICE CENTER (NSC) The County of Marquette (County), seeks proposals from Electrical Contractors to install 30KW, 3 Phase, natural gas,
More informationJANUARY 2018 (21 work days) FEBRUARY 2018 (19 work days)
AND CORRESPONDING DATES FOR JANUARY AND FEBRUARY 2018 JANUARY 2018 ( work days) Deadline* 12-27 12-28 12-29 1-2 1-3 1-4 1-5 1-8 1-9 1-10 Benefit Hold ** 12-28 12-29 1-2 1-3 1-4 1-5 1-8 1-9 1-10 1-11 Mailing
More informationSUBCONTRACTING ON CDOT CONSTRUCTION PROJECTS Ramp Up Ridgway!
SUBCONTRACTING ON CDOT CONSTRUCTION PROJECTS Ramp Up Ridgway! Connect2DOT Colorado Small Business Development Center Network (SBDC) program funded by CDOT Free training, consulting, and resources for small
More informationA: STATEMENT OF ACTIVITIES
A: STATEMENT OF ACTIVITIES 1. TYPE OF CONDITIONS FOR FINANCIAL ASSISTANCE The County of Fresno is applying to USDA, Rural Development for Housing Preservation Grant (HPG) program funds in the amount of
More informationNew Hope Crushed Stone. Monthly Update Solebury Communications Group November 2017
New Hope Crushed Stone Monthly Update Solebury Communications Group November 2017 Tom Wolf, Governor Patrick McDonnell, Secretary November 2017 Project Status STATUS AS OF: December 4, 2017 PROJECT START
More informationREQUEST FOR PROPOSALS RFP # December 7, 2010 Proposals Due on January 7, 2011 at 4:00 pm
4800 N. Broadway, Boulder, CO 80304 REQUEST FOR PROPOSALS RFP #29-2010 December 7, 2010 Proposals Due on January 7, 2011 at 4:00 pm TO: FROM: RE: Geotechnical Firms Liz Wolfert, Planning Assistant Subsurface
More informationOCTOBER 1, 2015 ADDENDUM NO. 1 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR DESIGN CONSULTING SERVICES (TARGET MARKET) SPECIFICATION NO.
OCTOBER 1, 2015 ADDENDUM NO. 1 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR DESIGN CONSULTING SERVICES (TARGET MARKET) SPECIFICATION NO. 132366 For which proposals are scheduled to open in the Bid & Bond
More informationADDENDUM NO. 1 Date of Issue: 1/15/2010 CONSTRUCTION PROPOSAL LAKE CHARLES HARBOR AND TERMINAL DISTRICT. for PLC PROJECT NO.
ADDENDUM NO. 1 Date of Issue: 1/15/2010 to CONSTRUCTION PROPOSAL LAKE CHARLES HARBOR AND TERMINAL DISTRICT for PLC PROJECT NO. CP09004 WESTLAKE WAREHOUSE SHORE STABILIZATION PREPARED BY LAKE CHARLES HARBOR
More informationPort of Portland FY11-13 Disadvantaged Business Enterprise (DBE) Goal
Port of FY11-13 Disadvantaged Business Enterprise (DBE) Goal During Federal Fiscal Years FY11, FY12, FY13, October 1, 2010 September 30, 2013, the Port of plans to solicit bids/proposals for the following
More informationJefferson County International Airport. AWOS Installation Project
Jefferson County International Airport AIP No. 3-53-0134-014 prepared for Federal Aviation Administration and Port of Port Townsend Engineer s Design Report July 2014 prepared by Vincent Castro Project
More informationCHC-A Continuity Dashboard. All Sites Continuity - Asthma. 2nd Qtr-03. 2nd Qtr-04. 2nd Qtr-06. 4th Qtr-03. 4th Qtr-06. 3rd Qtr-04.
PPC1: ACCESS AND COMMUNICATION Element B: Access and Communication Results Item 1: Visits with assigned PCP Continuity data is reviewed each month at our Office Redesign Committee (ORDC). The data is collected
More informationAvoiding the Cap Trap What Every Hospice Needs to Know. Matthew Gordon, CPA Principal Consultant / Founder Cap Doctor Associates, Inc.
Avoiding the Cap Trap What Every Hospice Needs to Know Matthew Gordon, CPA Principal Consultant / Founder Cap Doctor Associates, Inc. Overview 11% of hospices exceeded the cap in 2012 with an average overage
More information2018 Community Crossings Matching Grant Program
2018 Community Crossings Matching Grant Program Launched in 2016, the Community Crossings Matching Grant Program provides funding to cities, towns, and counties across Indiana to make improvements to local
More informationFebruary 12, Request for Proposal Overview Pre-bid Conference
February 12, 2014 I-495 Northern Section Shoulder Use Project Request for Proposal Overview Pre-bid Conference I-495 Northern Section Shoulder Use Project Scope of Work Major Items Mill and overlay - Light
More informationCity of Mount Rainier
Department of Public Works 3715 Wells Avenue, Mount Rainier, MD 20712 Telephone: (301) 985-6583: Fax (301) 779-4485 Street Improvement and Neighborhood Revitalization Project CDBG PY42 Invitation to Bid
More informationREQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016
MAYOR GARY O. PHILLIPS VICE MAYOR KATE COLIN COUNCILMEMBER MARIBETH BUSHEY COUNCILMEMBER JOHN GAMBLIN COUNCILMEMBER ANDREW CUYUGAN MCCULLOUGH PUBLIC WORKS DEPARTMENT: (415)485-3355 FAX: (415)485-3334 Bill
More informationInformational Workshop How to do Business with the City of Irvine March 31, 2011
Informational Workshop How to do Business with the City of Irvine March 31, 2011 Presented by Brian D. Brown, CPSM Buyer City of Irvine About the City of Irvine The City of Irvine has an annual budget
More informationCorporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,
Corporate Services Employment Report: January Employment by Staff Group Jan (Jan 20 figure: 1,462) Jan % Overall 1,520 +58 +4.0% 8 Management (VIII+) 403 +52 4.8% Clerical & Supervisory (III to VII) 907
More informationThe American Recovery and Reinvestment Act of Enacted February 17, 2009
The American Recovery and Reinvestment Act of 2009 http://www.dot.gov/recovery/ Enacted February 17, 2009 A Rose by any other name The American Recovery and Reinvestment Act of 2009 Was commonly referred
More informationWayne County Community College District District Office Building 801 W. Fort Street Fourth Floor Purchasing Conference Room Detroit, MI 48226
March 8, 2017 Attention Construction Contractors: Wayne County Community College District is hosting a Pre-Bid Conference on Wednesday, March 15, 2017 at 10:30 a.m. The District is inviting your company
More informationRequest for Qualifications B Geotechnical Investigations / Professional Services Firms. RFQ Due Date: October 8, :00 P.M.
Request for Qualifications B13.017 Geotechnical Investigations / Professional Services Firms RFQ Due Date: October 8, 2013 2:00 P.M. Mr. Dale Switzer Senior Director of Facilities Planning, Development
More informationPROCUREMENT PLAN. Implementing Agency: N/A. Date of First Procurement Plan: 28 January 2008 Date of this Procurement Plan: 26 March 2014, Rev.
PROCUREMENT PLAN Basic Data Project Name: Information and Communications Technology (ICT) Development Project Project : 38347-022 Approval : 0106 Country: Nepal Executing Agency: Office of the Prime Minister&Council
More informationADDENDUM #2 FOR CONSTRUCTION MANAGEMENT CONSULTANT (CMC) THIS ADDENDUM #2 IS ISSUED: AUGUST 15, 2017
ADDENDUM #2 FOR 17-054 CONSTRUCTION MANAGEMENT CONSULTANT (CMC) THIS ADDENDUM #2 IS ISSUED: AUGUST 15, 2017 QUESTIONS AND ANSWERS The following questions were posed by firms that indicated an interest
More informationTRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016
Regional Transportation Commission TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Contents 1.0 Purpose and Eligibility... 2 2.0 Process... 5 3.0 Implementation of Funded Projects... 5 Attachment
More informationCITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS
CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS The City of Hondo requests the submission of qualifications statements, which will lead to the possible award of a contract to provide planning, design
More informationGOVERNMENT OF INDIA MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION CENTRAL STATISTICS OFFICE New Delhi Dated: March 10, 2017 PRESS RELEASE
GOVERNMENT OF INDIA MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION CENTRAL STATISTICS OFFICE New Delhi Dated: March 10, 2017 PRESS RELEASE QUICK ESTIMATES OF INDEX OF INDUSTRIAL PRODUCTION AND USE-
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not
More informationProgram Community Development Block Grant (CDBG) Downtown Revitalization Program- Tier II
Business/Building Owner 3/12/09 CDBG DT FY08 Program City of Celina / Poggemeyer Design Group Program Community Development Block Grant (CDBG) Downtown Revitalization Program- Tier II Federally funded
More informationGreat Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues
Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues Marie Strum U.S. Army Corps of Engineers Great Lakes Navigation Team Leader April 10, 2018 The views, opinions and findings
More informationFlorida Department of Transportation (FDOT) Business Participation Plan FY 13/14
(FDOT) FY 13/14 1. Mission, Vision, and Statement of Commitment for Enhancing Supplier Diversity FDOT is responsible for the state highway systems and public transportation systems including air, transit,
More informationNotice to Bidders Page 1 of 5
Page 1 of 5 -WELL ANODES ON THE PACHECO CONDUIT PROJECT Project No. 91214010 Contract No. C0623 1. Notice. Notice is hereby given that sealed Proposals will be accepted by the Construction Program of the
More informationRFP - PW FDR. ADVERTISEMENT for FUEL DISPENSER REPLACEMENTS
RFP - PW - 033116 - FDR ADVERTISEMENT for FUEL DISPENSER REPLACEMENTS The City of College Park is accepting Sealed Proposals from qualified vendors for FUEL DISPENSER REPLACEMENTS (both gas and diesel)
More informationRFP #WS NEWSMI IMPROVEMENTS
RFP #WS-100411-NEWSMI ADVERTISEMENT for NORTHEAST WATER/SEWER MAIN IMPROVEMENTS The City of College Park is accepting Sealed Bids from qualified vendors for Northeast Water / Sewer Main Improvements. Sealed
More informationREQUEST FOR PROPOSALS (RFP)
REQUEST FOR PROPOSALS (RFP) TO: All Prospective Providers FROM: Kevin Keller, Planning and Development Director RE: Request for Proposals Streetscape Improvements Consulting and Engineering Services for
More informationSmithsonian Institution
Smithsonian Institution Recovery Act, 2009 Agency-wide and Program-specific Plan Updated May 2010 Smithsonian Institution American Recovery and Reinvestment Act of 2009 Agency-wide and Program-specific
More informationREQUEST FOR QUALIFICATIONS Construction Engineering Services for On-Call Consulting Services. and
REQUEST FOR QUALIFICATIONS Construction Engineering Services for On-Call Consulting Services and REQUEST FOR TECHNICAL PROPOSALS Construction Engineering Services for 1. Moraga Road Underground Utility
More informationA Lee County Economic Impact Study. Construction of the New Spring Training Baseball Stadium for Use by the Boston Red Sox
A Lee County Economic Impact Study Construction of the New Spring Training Baseball Stadium for Use by the Boston Red So Prepared for Sports Authority Dr. Gary Jackson Director, Regional Economic Research
More informationAMENDMENT OF SOLICITATION
1. SOLICITATION NO.: 2. AMENDMENT NO.: DALLAS AREA RAPID TRANSIT DALLAS, TEXAS AMENDMENT OF SOLICITATION 3. EFFECTIVE DATE: 4. BRIEF SOLICITATION DESCRIPTION: B-1022113 1 September 21, 2012 5. REVISED
More informationWater Infrastructure Funding Opportunities through The NYS Environmental Facilities Corporation
Water Infrastructure Funding Opportunities through The NYS Environmental Facilities Corporation Genesee/Finger Lakes Regional Council Fall Local Government Workshop November 16, 2016 EFC Overview 2 Public
More informationDated: 8/29/17. IFB No. B For Purchase & Installation of Manufactured Home
SOUTHERN NEVADA REGIONAL HOUSING AUTHORITY IFB No. B17031 DKMHP Purchase & Installation of Manufactured Home This addendum must be noted on the Bid Form, initialed and submitted under Tab 4 with the bid
More informationDALTON PUBLIC SCHOOLS REQUEST FOR PROPOSAL. RFP FY18 Drivers Education RFP
DALTON PUBLIC SCHOOLS PURCHASING DEPARTMENT REQUEST FOR PROPOSAL FOR RFP FY18 Drivers Education RFP RFP NUMBER (FY18 Drivers Education) ISSUED February 5th, 2018 Request for Proposal To: All Proposers
More informationSUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 January Q. New Year s Day Holiday CTC Term 3 On-Site College Classes Begins
JANUARY 2014 KEY DANTES DATES FOR USEUCOM 1 January Q 2 Q 3 Q 4 Q Term 3 [2013-2014] Classes Begins New Year s Day CTC Term 3 On-Site UO Term 3 On-Site 5 Q closes today. Mail, fax or scan quarterly inventories.
More information1. Enclosure (1) is forwarded in accordance, with reference (a).
DEPARTMENT OF THE NAVY US8 PROVIDENCE (SSN 719) / FLEET POST OFFICE NEW YORK 09502-2399 From: Commanding Officer, USS PROVIDENCE (SSN 719) To : Chief of Naval Operations Subj: ANNUAL COMMAND HISTORY FOR
More informationREQUEST FOR SEALED PROPOSAL. ADVERTISEMENT for STREET CONSTRUCTION SERVICES. RFP STREET WIDENING and TRAFFIC SIGNAL INSTALLATION
REQUEST FOR SEALED PROPOSAL ADVERTISEMENT for STREET CONSTRUCTION SERVICES RFP STREET WIDENING and TRAFFIC SIGNAL INSTALLATION - 100918 The City of College Park is accepting sealed proposals from qualified
More informationO HARE INTERNATIONAL AIRPORT MULTIMODAL FACILITY CONCESSIONS PRE-PROPOSAL MEETING DECEMBER 18, 2017
O HARE INTERNATIONAL AIRPORT MULTIMODAL FACILITY CONCESSIONS PRE-PROPOSAL MEETING DECEMBER 18, 2017 AGENDA I. Welcome and Introduction Kathleen Verret, Senior Director-Unison Retail Management II. III.
More informationREQUEST FOR PROPOSALS FOR AS-NEEDED CIVIL ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019
Board of Commissioners of the Port of New Orleans REQUEST FOR PROPOSALS FOR AS-NEEDED CIVIL ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019 June 30, 2016 Deadline for proposals is no
More informationST. JOSEPH COUNTY, INDIANA REQUEST FOR PROPOSALS ST. JOSEPH COUNTY ELECTION BOARD ELECTRONIC POLL-BOOKS. RELEASED January 19, 2016
ST. JOSEPH COUNTY, INDIANA REQUEST FOR PROPOSALS ST. JOSEPH COUNTY ELECTION BOARD ELECTRONIC POLL-BOOKS RELEASED January 19, 2016 PROPOSALS DUE February 2, 2016 ST. JOSEPH COUNTY, INDIANA REQUEST FOR PROPOSALS
More informationSalida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201
Request for Qualifications for Environmental Consulting Services at: Salida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201 Request for Qualifications
More informationPRE-PROPOSAL CONFERENCE
PRE-PROPOSAL CONFERENCE RFP No. LRT-12-180-TPOT POTHOLING SERVICES FOR TEMPE STREETCAR PROJECT December 1, 2011 Agenda Introductions / Opening Remarks Loralei Poll Project Overview / Scope Roy Alvarado
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11
Exhibit P-27, Ship Production Schedule: PB 2017 Navy Date: February 2016 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date LCS 7 LOCKHEED MARTIN 2011 Mar 2011 Apr 2012 Jun
More informationOn-call Geotechnical Consultant
On-call Geotechnical Consultant Request for Proposal Iowa Department of Transportation Introduction The Office of Design for the Iowa Department of Transportation (the Department) is interested in securing
More information2017 Statewide On-Call Design Request for Proposal
2017 Statewide On-Call Design Request for Proposal Iowa Department of Transportation Introduction The Office of Design for the Iowa Department of Transportation (the Department) is interested in selecting
More informationPROJECT SPONSOR INFORMATION
Page 1 of 2 PROJECT SPONSOR INFORMATION Sponsoring Agency: ODOT District 6 Project Contact Steve Fellenger, PE, Project Manager Address 400 E. William Street City Delaware State Ohio Zip Code 43015 Phone:
More informationIs a dry-dock and internal structural exam required prior to the Coast Guard issuing the initial Certificate of Inspection?
137-000 Is a dry-dock and internal structural exam required prior to the Coast Guard issuing the initial Certificate of Inspection? No, a Coast Guard or Third Party Organization (TPO) credit dry-dock or
More informationSECTION II. Collection and Analysis of Metro Contract Data
SECTION II. Collection and Analysis of Metro Contract Data Section II describes the procurement areas and the relevant geographic market area defined for the Metro disparity study. BBC also identifies
More information1/8/2013. IMPORTANT Dates
Purpose Workforce Connections (WC) seeks a Construction Manager at Risk (CMAR) for preconstruction and potential future construction services for the Workforce Connections One Stop Career Center and Administrative
More informationNOTICE OF PRE-QUALIFICATION OF CONTRACTORS FOR THE INSTALLATION, REPLACEMENT AND/OR RELOCATION OF STORMWATER CULVERTS, PIPES AND APPURTENANCES
April 03, 2014 NOTICE OF PRE-QUALIFICATION OF CONTRACTORS FOR THE INSTALLATION, REPLACEMENT AND/OR RELOCATION OF STORMWATER CULVERTS, PIPES AND APPURTENANCES Gwinnett County is soliciting applications
More informationRequest for Proposals VoIP E-Rate Project Perry County School District. 105 Main Street. New Augusta, MS
Request for Proposals 2013 2014 VoIP E-Rate Project Perry County School District 105 Main Street New Augusta, MS 39462 January 31, 2013 Notice to Bidders Notice is hereby given to interested bidders that
More informationLoyola University Chicago ~ Archives and Special Collections
UA1980.04-.16, 1980.18-.23 Treasurer s Office Records - Ledgers Dates: 1904-1969 Creator: Loyola University (1870-) Extent: 124 volumes Level of description: Item Processor & date: John L. Daniels, June
More informationMANDATORY PRE-BID MEETING MINUTES JUN 16, 2014 ITB All individuals in attendance are noted on the attached sign-in sheet.
MANDATORY PRE-BID MEETING MINUTES JUN 16, 2014 ITB 14-053 SEBRING PARKAY PHASE II. IMPROVEMENTS AND INSTALLATION OF DRAINAGE PIPE PER JACK AND BORE METHOD, HIGHLANDS COUNTY PROJECT NO. 01101. Meeting called
More informationENABLING CONSTRUCTION PROJECTS FOR THE SOUTH TERMINAL REDEVELOPMENT PROGRAM CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR (CM/GC) CONTRACT NO.
D ENVER INTERNATIONAL AIRPORT ENABLING CONSTRUCTION PROJECTS FOR THE SOUTH TERMINAL REDEVELOPMENT PROGRAM CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR (CM/GC) CONTRACT NO. CE 06010 ADDENDUM NUMBER ONE Scope
More informationOffice of Business and Financial Services Procurement and Contracts Division Section SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES
2510.8 SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES :1 OBJECTIVE: To establish a uniform policy and procedure for the acquisition of construction services for the City of Orlando (City), including, but
More information