2 Love Field Concessions Proposal Process and Recommendation Economic Development City Council Committee February 21, 2012

3 Purpose Provide background on the Concessions program Describe the Council s approved plan for selection of new contracts and implementation Present results of the Request for Proposal process Make recommendation for awards of contracts Present next steps

4 Background Goal: Make Love Field the finest mid size airport in the nation Some of the efforts to achieve this goal include: investing over $1 billion in new terminal and runway improvements having concessions provide highest quality and best value products and services to the traveling public expanding services currently offered passengers generating more Airport revenues providing small and minority businesses opportunities 3

5 Background Recent challenges include accommodating significant changes: construction of new terminal occurring from 2010 to 2014 concession contracts, in place since 1994, were set to expire during this disruptive construction period Concerns existed regarding difficulty of attracting new concessionaires Incumbents provided high quality services and were in a good position to continue their service during period Considerable good will existed with the incumbent concessionaires 4

6 Background There was also the desire to: have a robust competitive process to identify concessionaires for the new terminal areas, and structure a solicitation which would promote the objectives in our Airport Concession Disadvantaged Business Enterprise (ACDBE) program 5

7 Background June 2007, Transportation and Environment committee (TEC) rejected a plan to extend existing concession contracts through period of construction and to have open bids for new terminal spaces April 2009, TEC rejected a revised plan and asked that staff negotiate with incumbent vendors February 2010, TEC unanimously approved (10 0) modified plan that included awarding contracts to incumbents for half of program and bidding the other half 6

8 Background March 2010, plan not supported at Council meeting June 2010, Mayor formed ad hoc committee compromise plan was developed to provide for an extension of existing concessions contracts through the construction period and provide a right of first refusal for 27% of concessions in the new terminal August 2010, compromise plan was briefed and approved by Council 7

9 Background As a compromise, the plan included a number of adjustments, including: A first right of refusal for incumbents on a certain value Specific criteria for match Direct Airport management control of all individual spaces necessitating inventory storage and delivery coordination Airport control of several commodities 8

10 Compromise Plan Core Element If incumbents chose to extend current contracts through construction period, they would be granted a first right of refusal for 27% of the bid space value in the new terminal Selection of the 27% value is to be random If incumbents exercised their right, they would have to match a competing high score proposal on the basis of Rent, Capital Investment, Operational Commitments, Comparable Brands and MAG Numerous other provisions as described below 9

11 Implementation Objective To implement the plan keeping to the letter an/or spirit of the Council approved process, creating the best possible outcome and keeping this process within the overall terminal construction schedule 10

12 Plan and Implementation Plan elements Evaluation process and criteria First right of refusal ACDBE General terms Ongoing Contract management Implementation Selection team and scoring process Values, percentages, lottery Vendor Recruitment Contract development Ongoing Inventory & delivery Results 11

13 Evaluation process and criteria 12

14 Evaluation process and criteria Approved criteria was included in the RFP and used for evaluation : Scoring Factors: Brands 26%* Economics/Financial return 23% Operational Plan 12% Financial Capability 12% ACDBE 15% Experience 12% * As presented to Council on December 15,

15 Evaluation process and criteria Three separate evaluation processes were used for both the Food and Beverage RFP and the Retail RFP Financial Capability & Economics were evaluated by formulas developed by Office of Financial Services and City consultant Operational Plans, Brands, & Experience were evaluated by staff committee and representative from Southwest Airlines ACDBE participation was evaluated by Office of Business Development and Procurement Services using the City s BID process and scoring No single group or individual scored all portions of any proposal Formulas were used wherever possible to maintain objectivity in the evaluation process. 14

16 Evaluation process and criteria Operational Plan, Brands, and Experience were evaluated by staff committees Mid management level, diverse F & B evaluated by Aviation, Parks, Convention Services, Library, Equipment and Building Services, and DWU Retail evaluated by Aviation, Parks, Economic Development, Housing, and Public Works Southwest Airlines, as a major stakeholder, also evaluated as one vote on each committee 15

17 Evaluation process and criteria Scoring Factors: Brands 26% Economics/Financial return 23% Operational Plan 12% Financial Capability 12% ACDBE 15% Experience 12% 16

18 Evaluation process and criteria Brands 26% Evaluation based on the following: Concept, brands (local, regional, national) and theme development Quality, variety and creativity of offerings Visual presentation of offerings Creative and innovative design, design theme, quality of finishes and graphics Compliance with the Concessions Design Guidelines 17

19 Evaluation process and criteria Economics/Financial return 23% Proposals were scored based on highest Minimum Annual Guarantee (MAG), Percentage rent and Capital investment receiving maximum points Proposals for each package were compared to the highest scoring proposal for each package and awarded a percentage of the maximum points based on the differential between their financial offers and the highest scoring proposers 18

20 Evaluation process and criteria Sales projections for each proposer were compared to the City s consultant estimates and capped at no more than 10% of that estimate Tempered the revenue projections presented in proposals Percentage rental rates applied to inflated or unreasonable sales figures would give such proposals an unfair advantage 19

21 Evaluation process and criteria Operational Plan 12% Evaluation based on the following: Experience of proposed on site management staff Staffing Plan Customer service and employee training programs Delivery and stocking logistics, inventory and cash control methods Marketing efforts Retention plan for existing employees 20

22 Evaluation process and criteria Financial Capability 12% Evaluation based on the following formulas: Investment Capacity Ratio deduction of points for lack of plan, documentation, and cash investment Ratio of capital on hand as a factor of monthly operating expense History of profitability points given for years of demonstrated profitability History of no canceled or forfeited surety 21

23 Evaluation process and criteria ACDBE 15% Evaluation based on the following: ACDBE Plan or Policy submitted by the Proposer Proposer s Historical Utilization of DBEs/ACDBEs in previous contracts Meaningful roles and participation of ACDBE/DBE firms in the operation, structure of management/ownership, joint ventures and or secured contracts for goods and/or services, both existing and proposed Acknowledgement of Federal ACDBE Requirements 22

24 Evaluation process and criteria Experience 12% Evaluation based on the following: Experience with development, operation and management of food service establishments similar to those being proposed Experience with the development, operation and management of an airport concession Quality of existing facilities operated by respondent Business references Experience of the architectural/design team in comparable facilities 23

25 Right of First Refusal (ROFR) 24

26 Right of First Refusal In order to implement this provision of the plan, it was necessary to develop: Values of spaces that would constitute a basis for establishing the 27% right of refusal A selection process for randomly allocating the 27% 25

27 Right of First Refusal The City worked with its consultant to create a formula to determine the value of each package (store location) of concessions in the terminal The formula was based on weighted factors to determine values of each package Estimates included industry averages for each retail concept for each package Estimates took into account locations and exposure to passenger traffic counts 26

28 Right of First Refusal As presented to Council on December 15 th 2010, the value of the packages were based on the following weighted criteria: Total square footage 10% Sales estimates 40% EBIT(Earnings Before Interest& Taxes) 50% This represents earnings minus operating expense and depreciation Calculated values were rounded to the nearest 3% to help achieve the 27% ROFR 27

29 Right of First Refusal Since the F&B had 15 packages and the retail had 10 packages: Packages had to be valued in a way that would allow the total for ROFR to equal 27% exactly While not all packages had equal value, by using multiples of 3, the various combinations could add to 27 exactly However, if packages were selected individually, the chances of drawing short of or drawing over the 27% were possible in many scenarios Like the game Black Jack, the incumbents could bust and be short of the full 27% 28

30 Right of First Refusal To ensure both incumbents received an opportunity for the full 27%, City engaged a mathematician to calculate all of the possible combinations of packages that totaled 27% This prevented either incumbent from drawing packages in a sequence that could leave them with less than 27% with no remaining packages small enough to get to 27% 29

31 Right of First Refusal All combinations that add up to 27% were determined mathematically The incumbents then selected a specific combination of packages See Appendix for specific methodology 30

32 Right of First Refusal All possible combinations were numbered F & B had 769 possible combinations Retail had 34 possible combinations Separate, equal sized slips for each number representing a specific combination were printed Accounting firm of Frazier and Gills was engaged to verify all slips were put into container for drawing 31

33 Right of First Refusal Lottery was held January 12, 2012 publicly and on the webcast Lottery containers were immediately taken by security to the Police Property room for protective custody Incumbents were then given the terms of the highest scoring proposal for each of the packages they selected Both were given 30 days to make their decision 32

34 Right of First Refusal Per the amendment, the incumbents must match the terms of the highest scoring proposal Minimum annual guarantee Percentage rental rate Minimum capital investment Operational commitments Comparable brands 33

35 ACDBE 34

36 ACDBE Council s approved plan repeated the City s goal for enhanced business opportunities for the community Airport Concessions Disadvantaged Business Enterprise (ACDBE) established goal 23.5% Overall participation goal for all components of terminal design & construction established goal 26% Currently exceeding goals set for terminal construction with planned participation thus far at 35% Using lessons learned from Convention Center Hotel Focus on meaningful participation by sub firms to significant work K Strategies retained to assist in identifying and recruiting M/WBE firms 35 35

37 ACDBE Major Outreach efforts were made prior to solicitation Pre solicitation outreach events; notice of events ed to entire City vendor database and additional vendors provided by Love Field, approximately 350 vendors were notified December 9, 2010 at the Dallas City Hall Auditorium L1FN, December 16, 2010 at the Dallas Executive Airport January 6, 2011 at the Frontiers of Flight Museum, January 13, 2011 at the Dallas Fire Rescue Training Note: during the outreach events, vendors were asked to register as vendors with the City and they were provided with the specific commodity codes to be used for solicitation notifications. 36

38 ACDBE Advertised in the Dallas Morning News February 17 & 24, 2011 March 8, 2011 Pre proposal Meeting 322 vendors noticed by Advantage Financial procurement system 81 vendors attended RFP was open for 17 weeks for many questions and enough time to prepare quality proposals City answered 268 vendor questions City issued 8 addenda 37

39 General Terms 38

40 Plan called for various contract terms to be included Contract Lengths General Terms Term will be 7 to 9 years, plus 2 one year extensions at the City s option for the F&B Term will be 7 years, plus 2 one year extensions at the City s option for the Retail Depends on concession start dates Products to be sold at street pricing with emphasis on brand names 39

41 General Terms Keep Wi Fi/ Broadband rights for the City of Dallas Establish procedures to ensure good customer service Secret Shopper program Establish strong customer satisfaction measurements Short cure period (time allowed to fix problem) Non alcoholic beverages can be sold at both Retail and Food and Beverage locations Evaluation of performance to include peer airport and vendor comparison to be added to other criteria 40

42 General terms Reserve rights regarding certain products to be offered in the terminal Water brand (except National franchise accounts) Pouring brand rights (except National franchise accounts) Coffee brand (except National franchise accounts) Maintain alcoholic beverage sales rights within the terminal common areas (not at the F & B locations) 41

43 General Terms Miscellaneous Cancellation for convenience/compensation terms Providing for proper transition terms at end of contract Vending rights remain with the City of Dallas Future product determination rights remain with City of Dallas 42

44 Ongoing Contract Management 43

45 Ongoing Contract Management A team has been assembled to facilitate the build out of the concession spaces City staff, Hensel Phelps, Corgan, and Project Management group will work with concessionaires to coordinate all aspects of finishing spaces All activities will be closely monitored to ensure concession spaces open and operating by Spring 2013 opening of first 11 gates in new terminal 44

46 Ongoing Contract Management Will conduct employee/contractor screening Implement secret shopper program City will finalize inventory storage and delivery coordination Centralized receiving/inspection point to be constructed as part of LFMP Ongoing audit and contract compliance 45

47 Results 46

48 Results Proposals closed July 22, proposals were received 85 F&B 25 Retail Oct. 31 Nov. 16 All vendors were given the opportunity to give a presentation to evaluation committee members Neither Incumbent, Dallas Love Field Joint Venture Ltd nor Hudson Retail Dallas Joint Venture submitted proposals 47

49 Results Per the contract amendments with each incumbent for an extension of operation into the construction period, both exercised their Right of First Refusal 48

50 Results Dallas Love Field Joint Venture Selected Food and Beverage Packages 2a, 3, 10, and 11 Offered match for all four packages Hudson Retail Dallas Joint Venture selected Retail Packages 4, 6, 7, 9, and 10 Offered match for all five packages 49

51 Results After right of first refusal decisions were made, the evaluation process was completed and the highest scoring proposals finalized Process yielded strong proposals and met financial goals City Sales Projection $57.5million Vendor Sales Projection $57.7million Proposals represent both local vendors as well as National firms 50

52 Results Minority and Women Owned businesses goals were exceeded Established Goal for Minority and DBE participation 23.5% Recommended F&B participation 64% Recommended Retail participation 31% 51

53 Recommendation Staff recommends the following awards for Food & Beverage Concessions: Concessionaire Gina Puente Ventures, Inc. 1 Package(s) Dallas Love Field Joint Venture, Ltd 2a, 3, 10, 11 Host International, Inc. 4, 6, 8, 9 Pop Four Love Field, JV 2b, HG Multiplex Regali Dallas JV 5, 7 The Grove 12, 13 Dickey s Barbecue Restaurants, Inc

54 ACDBE Participation Food and Beverage Package(s) Concessionaire ACDBE Participation 1 Gina Puente Ventures, Inc. 100% 2a, 3, 10, 11 Dallas Love Field Joint Venture, Ltd 100% 4, 6, 8, 9 Host International, Inc. 49% 2b, Pop Four Love Field, JV 23.5% 5, 7 HG Multiplex Regali Dallas JV 25% 12, 13 The Grove 100% 14 Dickey s Barbecue Restaurants, Inc. 40% 53

55 Brands/Concepts Food and Beverage Package(s) Concessionaire Brand/Concept 1 Gina Puente Ventures, Inc. Sky Ranch 2a, 3, 10, 11 Dallas Love Field Joint Venture, Ltd Chili s Too, Cantina Laredo, Campisi s Pizza and Sonic 4, 6, 8, 9 Host International, Inc. Cool River, La Madeleine, Paciugo Gelato, Starbucks and Chick Fil A 2b, Pop Four Love Field, JV Cru Wine Bar and Brueggers Bagels 5, 7 HG Multiplex Regali Dallas JV Jason s deli, Baskin Robbins, Texpress Gourmet and Dunkin Donuts 12, 13 The Grove Moe s Southwest Grill and Manchu Wok 14 Dickey s Barbecue Restaurants, Inc. Dickey s Barbecue 54

56 55

57 56

58 Recommendation Staff recommends the following awards for Retail Concessions: Concessionaire Host International, Inc. 1 Package(s) HG Multiplex Regali Dallas JV 2, 3, 8 Hudson Retail Dallas JV 4, 6, 7, 9, 10 Two Podners TPS, LLC 5 57

59 ACDBE Participation Retail Package(s) Concessionaire ACDBE Participation 1 Host International, Inc. 49% 2, 3, 8 HG Multiplex Regali Dallas JV 25% 4, 6, 7, 9, 10 Hudson Retail Dallas JV 25% 5 Two Podners TPS, LLC 51% 58

60 Brands/Concepts Retail Package(s) Concessionaire Brand/Concept 1 Host International, Inc. D Magazine News, Texas Monthly News and Creative Kidstuff 2, 3, 8 HG Multiplex Regali Dallas JV Hudson News, Fair Park Tx, Billy Bob s Texas and Fire CZ 4, 6, 7, 9, 10 Hudson Retail Dallas JV CNN Newsstand Dallas, Mallasadi Men s Boutique, Tech On The Go, Spectacles, Travel & Leisure Travel Store and The Cowboy Shop Famous Texas Boots 5 Two Podners TPS, LLC EA Sports 59

61 60

62 61

63 Next Steps After award by City Council, staff will: Issue notice to proceed to approved vendors to complete and submit design and architectural plans to City for review and approval Meet with Management team to move forward with finish out Coordinate receiving and delivery process Assist in design and construction activity 62

64 Appendix 63

65 Option 4 As briefed to City Council August

66 65

67 66

68 67

69 68

70 69

71 70

72 71

73 Member Composition of Evaluation Committees 72

74 Food and Beverage Concept Committee Member Composition Department Aviation Aviation Equipment & Building Service Park & Recreation Dallas Water Utilities Convention Center Library Southwest Airlines Position Real Estate Manager Contract Compliance Manager Assistant Director Capital Financial Manager Assistant Director Assistant Director Assistant Director Manager Properties 73

75 Retail Concept Committee Member Composition Department Aviation Aviation Economic Development Public Works & Transportation Housing Park & Recreation Southwest Airlines Position Assistant Director Facilities Superintendent Assistant Director Assistant Director Assistant Director Senior Park Manager Manager Properties 74

76 Financial Evaluation Committee Member Composition Aviation Aviation Financial Services Financial Services Department Position Budget Manager III Business Manager III Assistant City Controller Budget Manager 75

77 Lottery Combinations Calculation Help 76

78 77

Love Field Concessions Theming

Love Field Concessions Theming Love Field Concessions Theming City Council Briefing Department of Aviation December15, 2010 Purpose Review schedule Present concessions theme plan Receive Council direction on plan Next steps 2 Schedule

More information

Denver International Airport Request for Qualifications (RFQ) Gate Holdroom Concession Services Concourse C West Expansion

Denver International Airport Request for Qualifications (RFQ) Gate Holdroom Concession Services Concourse C West Expansion Denver International Airport Request for Qualifications (RFQ) Gate Holdroom Concession Services Concourse C West Expansion I. OVERVIEW / SCOPE OF WORK A. DESCRIPTION The City and County of Denver ( CCD

More information

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISES GOAL SETTING METHODOLOGY

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISES GOAL SETTING METHODOLOGY LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISES GOAL SETTING METHODOLOGY FEDERAL FISCAL YEARS 2014 2016 1 NEW ORLEANS AVIATION BOARD (NOAB) AIRPORT

More information

Dallas Fort Worth International Airport Concessions Pre-Proposal Conference

Dallas Fort Worth International Airport Concessions Pre-Proposal Conference Dallas Fort Worth International Airport Concessions Pre-Proposal Conference 5.5.2017 1 2 Welcome Cristen Mosley, Project Manager Concessions Agenda Overview of DFW Airport & Concessions Program ACDBE and

More information

Concession Program Business Opportunities. Presented by Denver International Airport October 2014

Concession Program Business Opportunities. Presented by Denver International Airport October 2014 Concession Program Business Opportunities Presented by Denver International Airport October 2014 Today s Message House Rules Restrooms Refreshments Today s Agenda Short presentations made by Subject Matter

More information

ACI-NA Business of Airports Conference Agenda Business Diversity Track Joint Ventures Ensuring Commercial and Regulatory Success

ACI-NA Business of Airports Conference Agenda Business Diversity Track Joint Ventures Ensuring Commercial and Regulatory Success 4.25.17 2017 ACI-NA Business of Airports Conference Agenda Business Diversity Track Joint Ventures Ensuring Commercial and Regulatory Success 1 2 Tamela Lee Vice President Business Diversity and Development

More information

DIA CONCESSION POLICY

DIA CONCESSION POLICY CONCESSION POLICY DENVER INTERNATIONAL AIRPORT DIA CONCESSION POLICY July 18, 2007 First Revision, Effective October 9, 2013 First Revision, Effective October 9, 2013 CITY AND COUNTY OF DENVER DEPARTMENT

More information

AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISE (ACDBE) PROGRAM

AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISE (ACDBE) PROGRAM AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISE (ACDBE) PROGRAM Non-Car Rental GOAL SETTING METHODOLOGY FFY 2017-2018-2019 49 CFR Part 23 DATED: September 29, 2017 Goal effective October 1, 2016

More information

The airport s non-rental car concession opportunities are detailed below.

The airport s non-rental car concession opportunities are detailed below. LAFAYETTE AIRPORT COMMISSION (LAC) AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISE (ACDBE) PROGRAM Non-Car Rental Goal Setting Methodology and Calculations Federal Fiscal Years 2017, 2018 and 2019

More information

IND Concessions Refresh Program Information & Networking Session

IND Concessions Refresh Program Information & Networking Session IND Concessions Refresh Program Information & Networking Session November 8, 2017 10:00am South Ticketing Hall Indianapolis International Airport https://www.ind.com/business/concessions-refresh-program

More information

Teaming Up: Working with a Concessions Prime or Joint Venture

Teaming Up: Working with a Concessions Prime or Joint Venture Teaming Up: Working with a Concessions Prime or Joint Venture Agenda Learning Objectives About SFO Overview of Partnering/Joint Ventures How the Airport Reviews and Monitors a Joint Venture Panel Discussion

More information

Q & A MANDATORY SESSION PASSENGER LOUNGE SERVICES OPERATOR(S) REQUEST FOR INTEREST (RFI) NO

Q & A MANDATORY SESSION PASSENGER LOUNGE SERVICES OPERATOR(S) REQUEST FOR INTEREST (RFI) NO Q & A MANDATORY SESSION PASSENGER LOUNGE SERVICES OPERATOR(S) REQUEST FOR INTEREST (RFI) NO. 201735212 PRESENTED BY APRIL HANNON DENVER INTERNATIONAL AIRPORT SEPTEMBER 14, 2017 AGENDA Welcome DEN s Vision

More information

Foreign Currency Exchange and Passenger Amenities

Foreign Currency Exchange and Passenger Amenities Foreign Currency Exchange and Passenger Amenities Request for Proposal (RFP) Solicitation No. HBH-FCEB-2016-034 BJ Hubbard Procurement Specialist Houston Airport System Thursday, December 29, 2016, 10:00

More information

DENVER INTERNATIONAL AIRPORT REQUEST FOR PROPOSALS FOOD AND BEVERAGE CONCESSION CASUAL DINING BAR STEAK AND SEAFOOD ADDENDUM NO. 1

DENVER INTERNATIONAL AIRPORT REQUEST FOR PROPOSALS FOOD AND BEVERAGE CONCESSION CASUAL DINING BAR STEAK AND SEAFOOD ADDENDUM NO. 1 DENVER INTERNATIONAL AIRPORT REQUEST FOR PROPOSALS FOOD AND BEVERAGE CONCESSION CASUAL DINING BAR STEAK AND SEAFOOD ADDENDUM NO. 1 CORRECTIONS/REVISIONS: FOOD AND BEVERAGE CONESSION REQUEST FOR PROPOSALS

More information

REQUEST FOR PROPOSAL CONCESSIONS OPPORTUNITY

REQUEST FOR PROPOSAL CONCESSIONS OPPORTUNITY REQUEST FOR PROPOSAL CONCESSIONS OPPORTUNITY September 29, 2017 Updated December 4, 2017 TABLE OF CONTENTS I. INTRODUCTION... 2 II. OVERVIEW... 7 III. SCHEDULES... 8 IV. GLOSSARY OF TERMS... 10 V. TERM...

More information

South Terminal Complex Food & Beverage Package 1 Concession Pre-Proposal Conference January 10, 2018

South Terminal Complex Food & Beverage Package 1 Concession Pre-Proposal Conference January 10, 2018 South Terminal Complex Food & Beverage Package 1 Concession Pre-Proposal Conference Agenda Introduction of Participants South Terminal Phase 1 Overview Overview of Food & Beverage Package 1 Concession

More information

2013 ANNUAL REPORT. Office of Economic Development Division of Small Business Opportunity. Revised edition, 11/24/14

2013 ANNUAL REPORT. Office of Economic Development Division of Small Business Opportunity. Revised edition, 11/24/14 2013 ANNUAL REPORT Office of Economic Development Division of Small Business Opportunity Revised edition, 11/24/14 A Message from the DSBO Director A series of challenges and victories for Denver s certification

More information

ABC S of DBE & ACDBE Programs

ABC S of DBE & ACDBE Programs ABC S of DBE & ACDBE Programs Project Take Off: Community Partnerships and Economic Growth Conference Presented to: By: Broward County Aviation Department Anthony W. Brown, FAA Date: Presentation Overview

More information

Welcome to the City of Chicago. Department of Procurement Services

Welcome to the City of Chicago. Department of Procurement Services Welcome to the Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer Doing Business with the Mission Statement Laws Governing the Procurement Process Types of Procurement Certification Contract Monitoring

More information

The Contractor s Handbook

The Contractor s Handbook The Contractor s Handbook a guide to business opportunities with the City of Los Angeles brought to you by the Department of Public Works and the Office of Finance The Contractors Handbook Your guide to

More information

How to Do Business as a Concessionaire. June 2, 2017

How to Do Business as a Concessionaire. June 2, 2017 How to Do Business as a Concessionaire June 2, 2017 1 Agenda Doing Business at DFW Carolyn Phillips, Food and Beverage Manager Tenant Design and Construction Michael Morford, Advertising and Sponsorship

More information

Consultant for the Development of Specifications Management and Operation of Dallas Fair Park Request for Proposals BBZ1702

Consultant for the Development of Specifications Management and Operation of Dallas Fair Park Request for Proposals BBZ1702 Consultant for the Development of Specifications Management and Operation of Dallas Fair Park Request for Proposals BBZ1702 INTRODUCTION The City of Dallas (City) is soliciting proposals from vendors with

More information

O HARE INTERNATIONAL AIRPORT MULTIMODAL FACILITY CONCESSIONS PRE-PROPOSAL MEETING DECEMBER 18, 2017

O HARE INTERNATIONAL AIRPORT MULTIMODAL FACILITY CONCESSIONS PRE-PROPOSAL MEETING DECEMBER 18, 2017 O HARE INTERNATIONAL AIRPORT MULTIMODAL FACILITY CONCESSIONS PRE-PROPOSAL MEETING DECEMBER 18, 2017 AGENDA I. Welcome and Introduction Kathleen Verret, Senior Director-Unison Retail Management II. III.

More information

Disadvantaged Business Enterprise (DBE) and Airport Concessions Disadvantaged Business Enterprise (ACDBE) Certification Workshop

Disadvantaged Business Enterprise (DBE) and Airport Concessions Disadvantaged Business Enterprise (ACDBE) Certification Workshop Disadvantaged Business Enterprise (DBE) and Airport Concessions Disadvantaged Business Enterprise (ACDBE) Certification Workshop Welcome to the Introduction Disadvantaged Business Enterprise (DBE) and

More information

REQUEST FOR QUALIFICATIONS PITTSBURGH INTERNATIONAL AIRPORT PROFESSIONAL ARCHITECTURAL AND ENGINEERING DESIGN AND CONSTRUCTION PHASE SERVICES FOR THE

REQUEST FOR QUALIFICATIONS PITTSBURGH INTERNATIONAL AIRPORT PROFESSIONAL ARCHITECTURAL AND ENGINEERING DESIGN AND CONSTRUCTION PHASE SERVICES FOR THE REQUEST FOR QUALIFICATIONS PITTSBURGH INTERNATIONAL AIRPORT PROFESSIONAL ARCHITECTURAL AND ENGINEERING DESIGN AND CONSTRUCTION PHASE SERVICES FOR THE TERMINAL MODERNIZATION PROGRAM The Allegheny County

More information

Status of Convention Center Hotel Project. Briefing to the Economic Development Committee August 15, 2008

Status of Convention Center Hotel Project. Briefing to the Economic Development Committee August 15, 2008 Status of Convention Center Hotel Project Briefing to the Economic Development Committee August 15, 2008 Purpose 2 Bring Committee up to date on negotiations with Matthews Southwest (MSW) Update Good Faith

More information

Attraction Development Grant Program Guidelines & Application

Attraction Development Grant Program Guidelines & Application Attraction Development Grant Program Guidelines & Application Mission: To assist the development of a critical mass of sustainable, market-driven travel experiences within the state that will influence

More information

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority

More information

A CALL TO ARTISTS January 7, The Love Field Airport Modernization Program celebrates the Spirit of Flight

A CALL TO ARTISTS January 7, The Love Field Airport Modernization Program celebrates the Spirit of Flight CITY OF DALLAS PUBLIC ART PROGRAM SUBMISSION DEADINE A CALL TO ARTISTS January 7, 2016 The Love Field Airport Modernization Program celebrates the Spirit of Flight Celebrating the Spirit of Flight, new

More information

REQUEST FOR PROPOSAL. Conduct a Resident Satisfaction Survey. City of Hyattsville, Maryland

REQUEST FOR PROPOSAL. Conduct a Resident Satisfaction Survey. City of Hyattsville, Maryland REQUEST FOR PROPOSAL Conduct a Resident Satisfaction Survey City of Hyattsville, Maryland Date Issued: April 29, 2013 Date Due: May 17, 2013 at 4:00 PM Date of Proposal Opening: May 21, 2013 Page 1 of

More information

City and County of Denver International Airport. Airport Concession Disadvantaged Business Enterprise Program. Table of Contents

City and County of Denver International Airport. Airport Concession Disadvantaged Business Enterprise Program. Table of Contents City and County of Denver International Airport Airport Concession Disadvantaged Business Enterprise Program Table of Contents Policy Statement SUBPART A Section 23.1 Section 23.3 Section 23.5 Section

More information

PAKISTAN CIVIL AVIATION AUTHORITY REQUEST FOR PROPOSAL ENERGY PERFORMANCE CONTRACT AT JINNAH INTERNATIONAL AIRPORT

PAKISTAN CIVIL AVIATION AUTHORITY REQUEST FOR PROPOSAL ENERGY PERFORMANCE CONTRACT AT JINNAH INTERNATIONAL AIRPORT PAKISTAN CIVIL AVIATION AUTHORITY REQUEST FOR PROPOSAL ENERGY PERFORMANCE CONTRACT AT JINNAH INTERNATIONAL AIRPORT DISCLAIMER The information contained in this Request for Proposal (RFP) document or information

More information

HILLSBOROUGH COUNTY AVIATION AUTHORITY THREE YEAR OVERALL DISADVANTAGED BUSINESS ENTERPRISE GOAL Federal Fiscal Years 2017, 2018 and 2019

HILLSBOROUGH COUNTY AVIATION AUTHORITY THREE YEAR OVERALL DISADVANTAGED BUSINESS ENTERPRISE GOAL Federal Fiscal Years 2017, 2018 and 2019 I. Introduction HILLSBOROUGH COUNTY AVIATION AUTHORITY THREE YEAR OVERALL DISADVANTAGED BUSINESS ENTERPRISE GOAL Federal Fiscal Years 2017, 2018 and 2019 The United States Congress has determined that

More information

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services REQUEST FOR QUALIFICATIONS Architectural/Engineering Design Services Logistics DISTRICT CONTACTS FOR QUESTIONS Jeff Collum Superintendent Phone: 903-668-5990 Email: jcollum@hisd.com REQUEST FOR STATEMENT

More information

Prospective firms may also arrange a 15-minute conversation prior to the deadline.

Prospective firms may also arrange a 15-minute conversation prior to the deadline. REQUEST FOR PROPOSAL Magazine design and production January 3, 2018 Submit Proposals to: Kris Mattera, Executive Director Basalt Chamber of Commerce PO Box 514 Basalt, CO 51621 970-927-4031 director@basaltchamber.org

More information

REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSAL (RFP) REQUEST FOR PROPOSAL (RFP) ILLINOIS CENTRAL COLLEGE FOOD SERVICES Issue Date: September 12, 2017 Responses Deadline: Wednesday, October 25, 2017, 2:30 p.m. Submit responses to: Illinois Central College

More information

The SoNo Collection Norwalk, CT

The SoNo Collection Norwalk, CT The SoNo Collection Norwalk, CT Norwalk Common Council 04.17.17 Planning Committee Table of Contents 1 Project Site 2 Requested Approvals 3 Updated Conceptual Renderings 4 Economic Impacts 1 Project Site

More information

RFQ 12-06: Marketing and Advertising Services Town of Addison Overview: Background: Types of Projects: Questions:

RFQ 12-06: Marketing and Advertising Services Town of Addison Overview: Background: Types of Projects: Questions: RFQ 12-06: Marketing and Advertising Services Overview: Thank you for your interest in working with the. Addison is looking for an advertising agency to help with marketing, advertising, and press relations

More information

ACI AIRPORT SERVICE QUALITY (ASQ) SURVEY SERVICES

ACI AIRPORT SERVICE QUALITY (ASQ) SURVEY SERVICES DRAFTED BY ACI WORLD SECRETARIAT Table of Contents Table of Contents... 2 Executive Summary... 3 1. Introduction... 4 1.1. Overview... 4 1.2. Background... 5 1.3. Objective... 5 1.4. Non-binding Nature...

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL FOR Four Separate Food & Beverage Concessions Opportunities at Oakland International Airport AVIATION PROPERTIES DEPARTMENT OAKLAND INTERNATIONAL AIRPORT 1 AIRPORT DRIVE TERMINAL 1,

More information

City of Phoenix Aviation Department

City of Phoenix Aviation Department City of Phoenix Aviation Department Revising the Solicitation Process to increase Small & Disadvantaged Business Participation at Valerie Churchwell Small Business Engagement Manager Race and Gender Neutral

More information

The SoIN Tourism staff will supply editorial content and direction, as well as photographs to illustrate the content.

The SoIN Tourism staff will supply editorial content and direction, as well as photographs to illustrate the content. Visitor Guide RFP Purpose The Clark-Floyd Counties Convention & Tourism Bureau, doing business as SoIN Tourism, is requesting proposals for its 2018 SoIN Visitor Guide ( Visitor Guide ) for advertising

More information

AIRPORT CONCESSION DISADVANTAGED BUSINESS ENTERPRISE (ACDBE)

AIRPORT CONCESSION DISADVANTAGED BUSINESS ENTERPRISE (ACDBE) CITY OF BILLINGS LOGAN INTERNATIONAL AIRPORT AIRPORT CONCESSION DISADVANTAGED BUSINESS ENTERPRISE (ACDBE) PROGRAM NOVEMBER 2015 SUBPART A GENERAL REQUIREMENTS Section 23.1 Objectives The objectives are

More information

Planning Sustainable Places Program

Planning Sustainable Places Program Planning Sustainable Places Program ADVANCING A SUSTAINABLE REGION PLACE BY PLACE 2019 Pre-Bid Workshop October 8, 2019 PSP Schedule Reminder Meeting Agenda Welcome RFP General Overview RFP Specifics Overview

More information

December, 2017 Request for Proposals for Airport Business and Financial Consultant At Savannah/Hilton Head International Airport

December, 2017 Request for Proposals for Airport Business and Financial Consultant At Savannah/Hilton Head International Airport December, 2017 Request for Proposals for Airport Business and Financial Consultant At Savannah/Hilton Head International Airport Dear Proposer: The Savannah Airport Commission is requesting proposals for

More information

Airport Concessions Redevelopment Program

Airport Concessions Redevelopment Program Airport Concessions Redevelopment Program Concessions Outreach Meeting August 11, 2015 Agenda Welcome and Introductions Airport Overview Master Plan Airport Concessions Redevelopment Program Upcoming Solicitations

More information

CITY OF SAN ANTONIO AVIATION DEPARTMENT 49 CFR PARTS 26 & 23 DBE AND SBEDA PROGRAMS OVERVIEW

CITY OF SAN ANTONIO AVIATION DEPARTMENT 49 CFR PARTS 26 & 23 DBE AND SBEDA PROGRAMS OVERVIEW CITY OF SAN ANTONIO AVIATION DEPARTMENT 49 CFR PARTS 26 & 23 DBE AND SBEDA PROGRAMS OVERVIEW January 11, 2017 BACKGROUND San Antonio Airport System San Antonio Airport System is composed of the San Antonio

More information

Historically Underutilized Business (HUB) Strategic Plan

Historically Underutilized Business (HUB) Strategic Plan The University of Texas MD Anderson Cancer Center Historically Underutilized Business (HUB) Strategic Plan Fiscal Years 2011 2012 Prepared June 2010 page 1 of 7 EXTERNAL AND INTERNAL ASSESSMENT The University

More information

Insert in subject line: Proposal for Developing and Producing a Forest-PLUS Program Video

Insert in subject line: Proposal for Developing and Producing a Forest-PLUS Program Video Tetra Tech ARD (a trade name of ARD, INC.,) Forest PLUS Program 53 Lodi Estate 1st Floor, New Delhi 110003, India. To: From: Offerors Tetra Tech ARD Date: 20 January 2015 Subject: Reference: Request for

More information

LEXINGTON-FAYETTE URBAN COUNTY AIRPORT BOARD REQUEST FOR PROPOSALS. to provide INVESTMENT MANAGEMENT SERVICES. for BLUE GRASS AIRPORT

LEXINGTON-FAYETTE URBAN COUNTY AIRPORT BOARD REQUEST FOR PROPOSALS. to provide INVESTMENT MANAGEMENT SERVICES. for BLUE GRASS AIRPORT LEXINGTON-FAYETTE URBAN COUNTY AIRPORT BOARD REQUEST FOR PROPOSALS to provide INVESTMENT MANAGEMENT SERVICES for BLUE GRASS AIRPORT DATED: March 5, 2017 TABLE OF CONTENTS 1. NOTICE AND REQUEST FOR PROPOSALS...

More information

REQUEST FOR QUALIFICATIONS: RFQ PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS

REQUEST FOR QUALIFICATIONS: RFQ PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS REQUEST FOR QUALIFICATIONS: RFQ 2018-100-1 PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS The City of Cedar Hill, Texas is soliciting statements of

More information

ONTARIO INTERNATIONAL AIRPORT

ONTARIO INTERNATIONAL AIRPORT ONTARIO INTERNATIONAL AIRPORT AIRPORT CONCESSION DISADVANTAGED BUSINESS ENTERPRISE (ACDBE) PROGRAM ONTARIO INTERNATIONAL AIRPORT AUTHORITY 1923 E. Avion Street Ontario, CA 91761 Phone (909) 544-5300 TDD

More information

Pre-Bid Conference RCC Employee Parking Lot Contract Number /22/18

Pre-Bid Conference RCC Employee Parking Lot Contract Number /22/18 Pre-Bid Conference RCC Employee Parking Lot Contract Number 9500599 02/22/18 1 Agenda Pre-Bid Conference Presentation Solicitation Logistics, RFB review, BDDD 1:00-1:30 Project Details 1:30-2:00 Q&A throughout

More information

CAPITAL REGION AIRPORT COMMISSION RICHMOND INTERNATIONAL AIRPORT REQUEST FOR PROPOSALS #

CAPITAL REGION AIRPORT COMMISSION RICHMOND INTERNATIONAL AIRPORT REQUEST FOR PROPOSALS # Draft of02/02/05 RP edit 020905 vs8, vs9 CAPITAL REGION AIRPORT COMMISSION RICHMOND INTERNATIONAL AIRPORT Vs. 8 SP edit 2/9/05 REQUEST FOR PROPOSALS # 05-1067 FOR A CONCESSIONAIRE TO DEVELOP AND OPERATE

More information

FLORIDA DEPARTMENT OF ECONOMIC OPPORTUNITY

FLORIDA DEPARTMENT OF ECONOMIC OPPORTUNITY FLORIDA DEPARTMENT OF ECONOMIC OPPORTUNITY Sports Development Program Application Application Number/ Date Received (DEO Use Only) Pursuant to s. 288.11625(1), F.S., the Department of Economic Opportunity

More information

REPORT TO THE DULLES CORRIDOR COMMITTEE RECOMMENDATION TO AWARD A CONTRACT FOR CLAIMS CONSULTING SERVICES FOR THE DULLES CORRIDOR METRORAIL PROJECT

REPORT TO THE DULLES CORRIDOR COMMITTEE RECOMMENDATION TO AWARD A CONTRACT FOR CLAIMS CONSULTING SERVICES FOR THE DULLES CORRIDOR METRORAIL PROJECT REPORT TO THE DULLES CORRIDOR COMMITTEE RECOMMENDATION TO AWARD A CONTRACT FOR CLAIMS CONSULTING SERVICES FOR THE DULLES CORRIDOR METRORAIL PROJECT FEBRUARY 2018 PURPOSE Staff requests that the Dulles

More information

FOLLOW-UP REPORT Denver International Airport Airport Concession Disadvantaged Business Enterprise Program

FOLLOW-UP REPORT Denver International Airport Airport Concession Disadvantaged Business Enterprise Program FOLLOW-UP REPORT Denver International Airport Airport Concession Disadvantaged Business Enterprise Program April 2017 Office of the Auditor Audit Services Division City and County of Denver The Auditor

More information

Request for Proposal

Request for Proposal Request for Proposal 2021 Michigan Works! Annual Conference Due Date: June 27, 2018, 12:00 pm (EDT) Inquiries and Proposals Should Be Directed To: Anisa Mazuca Director of Operations mazucaa@michiganworks.org

More information

REQUEST FOR QUALIFICATIONS FOR Energy Services Master Agreement

REQUEST FOR QUALIFICATIONS FOR Energy Services Master Agreement Request for Qualifications for Page 1 of 8 REQUEST FOR QUALIFICATIONS FOR For the RFQ Submittal Deadline: October 17, 2017 at 3:00 PM 1.1 INTRODUCTION: The is soliciting Statements of Qualifications (SOQ)

More information

Doing Business. with

Doing Business. with Doing Business with SEPTEMBER 2016 CONTACTING VIA Procurement Department Equipment, Materials, Supplies, Professional Services, Rolling Stock, Construction, Engineering, and Architectural Design 800 W.

More information

REQUEST FOR PROPOSALS PACKAGE #2 SPECIALTY BRANDED COFFEE KIOSK PACKAGE WEST. RFP No

REQUEST FOR PROPOSALS PACKAGE #2 SPECIALTY BRANDED COFFEE KIOSK PACKAGE WEST. RFP No REQUEST FOR PROPOSALS PACKAGE #2 SPECIALTY BRANDED COFFEE KIOSK PACKAGE WEST RFP No. 201630947 October 27, 201616 CITY AND COUNTY OF DENVER DEPARTMENT OF AVIATION NOTICE OF REQUEST FOR PROPOSALS PACKAGE

More information

REQUEST FOR PROPOSAL (RFP) Concession Operations for Concession Stand at JOHNSTON HIGH SCHOOL ATHLETIC COMPLEX

REQUEST FOR PROPOSAL (RFP) Concession Operations for Concession Stand at JOHNSTON HIGH SCHOOL ATHLETIC COMPLEX REQUEST FOR PROPOSAL (RFP) Concession Operations for Concession Stand at JOHNSTON HIGH SCHOOL ATHLETIC COMPLEX The objective of this Request for Proposal is to award a Concession Agreement at Johnston

More information

REQUEST FOR PROPOSALS. Design-Build of General Aviation Terminal Building. RFP# AIR/17-012, page 1

REQUEST FOR PROPOSALS. Design-Build of General Aviation Terminal Building. RFP# AIR/17-012, page 1 REQUEST FOR PROPOSALS Design-Build of General Aviation Terminal Building RFP# AIR/17-012, page 1 RFP# AIR/17-012 REQUEST FOR PROPOSALS ISSUE DATE: November 22, 2017 TITLE: DUE: Design-Build of General

More information

Automated Airport Parking Project

Automated Airport Parking Project Automated Airport Parking Project RFP 2017-03 I. INTRODUCTION This solicitation is being offered by Texarkana Airport Authority. The Airport is a public entity owned by the Cities of Texarkana, AR and

More information

Strategic Transportation Infrastructure Program

Strategic Transportation Infrastructure Program Strategic Transportation Infrastructure Program Guidelines Community Airport Program Local Road Bridge Program Resource Road Program Local Municipal Initiatives Updated: September 2017 Government STIP

More information

PPEA Guidelines and Supporting Documents

PPEA Guidelines and Supporting Documents PPEA Guidelines and Supporting Documents APPENDIX 1: DEFINITIONS "Affected jurisdiction" means any county, city or town in which all or a portion of a qualifying project is located. "Appropriating body"

More information

Dallas Fort Worth International Airport Concessions Pre-Proposal Conference

Dallas Fort Worth International Airport Concessions Pre-Proposal Conference Dallas Fort Worth International Airport Concessions Pre-Proposal Conference 10.17.2017 1 2 Welcome Zenola Campbell, Vice President Concessions 3 Meeting Name & Date (Optional) Agenda Overview of DFW Airport

More information

Policies and Procedures. Unsolicited Proposals. Western Lands

Policies and Procedures. Unsolicited Proposals. Western Lands Metropolitan Washington Airports Authority Real Estate Development Policies Policies and Procedures Regarding Unsolicited Proposals for Western Lands at Washington Dulles International Airport March 3,

More information

Disparity Study Action Plan June 10, 2009 Recommendation: 10-1 Emerging Small Business (ESB) Program Action: Impact: Timeline:

Disparity Study Action Plan June 10, 2009 Recommendation: 10-1 Emerging Small Business (ESB) Program Action: Impact: Timeline: 10-1 Emerging Small Business (ESB) Program - The Port should consider expanding its ESB program. First, broadening the definition of a small business to include other certified small businesses. Second,

More information

REQUEST FOR PROPOSALS SALT LAKE CITY CORPORATION DEPARTMENT OF AIRPORTS AIRPORT FOOD AND BEVERAGE CONCESSIONS. Sample Document

REQUEST FOR PROPOSALS SALT LAKE CITY CORPORATION DEPARTMENT OF AIRPORTS AIRPORT FOOD AND BEVERAGE CONCESSIONS. Sample Document REQUEST FOR PROPOSALS SALT LAKE CITY CORPORATION DEPARTMENT OF AIRPORTS AIRPORT FOOD AND BEVERAGE CONCESSIONS AUGUST 2010 SECTION 1 RFP Contents Section 1... RFP Contents Section 2... Notice to Respondents

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS TO MANAGE, OPERATE, AND MAINTAIN THE MOBILE CONVENTION CENTER IN MOBILE, ALABAMA DEADLINE: August 1, 2008 City of MOBILE Government Plaza 205 Government Street Mobile, Alabama 36602

More information

Request for Proposals City of Oberlin, Ohio Branding and Cultural Wayfinding Signage Plan

Request for Proposals City of Oberlin, Ohio Branding and Cultural Wayfinding Signage Plan Request for Proposals City of Oberlin, Ohio Branding and Cultural Wayfinding Signage Plan Introduction The City of Oberlin, Ohio, in association with the Firelands Association for the Visual Arts (FAVA),

More information

TAX PHASE-IN GUIDELINES FOR BEXAR COUNTY AND CITY OF SAN ANTONIO

TAX PHASE-IN GUIDELINES FOR BEXAR COUNTY AND CITY OF SAN ANTONIO TAX PHASE-IN GUIDELINES FOR BEXAR COUNTY AND CITY OF SAN ANTONIO Effective June 15, 2006 through June 14, 2008 BEXAR COUNTY CITY OF SAN ANTONIO Economic Development Department Economic Development Department

More information

Lexington Center Corporation Request for Proposal for Convention Center Naming Rights Request for Proposals

Lexington Center Corporation Request for Proposal for Convention Center Naming Rights Request for Proposals Request for Proposal for Convention Center Naming Rights Request for Proposals Title: Naming Rights for the Lexington Center Corporation, New Convention Center, Lexington Kentucky Issue Date: December

More information

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT 2016-2021 GENERAL The intent and purpose of this Request for Qualifications (RFQ) is

More information

NEW ORLEANS AVIATION BOARD (NOAB) DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM Goal Setting Methodology and Calculations

NEW ORLEANS AVIATION BOARD (NOAB) DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM Goal Setting Methodology and Calculations NEW ORLEANS AVIATION BOARD (NOAB) DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM Goal Setting Methodology and Calculations Goal Overview Federal Fiscal Year 2011 (October 1, 2010 to September 30, 2011)

More information

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS The City of Hondo requests the submission of qualifications statements, which will lead to the possible award of a contract to provide planning, design

More information

City of Arlington, Texas LOCAL & MWBE POLICY

City of Arlington, Texas LOCAL & MWBE POLICY City of Arlington, Texas LOCAL & MWBE POLICY December 3, 2013 LOCAL & MWBE POLICY TABLE OF CONTENTS SECTION HEADING PAGE NO. 1.0 Governing Authority 2 2.0 Purpose and Scope 2 3.0 Objectives 2 3.1 General

More information

Commerce Hub September 2016

Commerce Hub September 2016 Denver International Airport Colorado sent this bulletin at 0 09:37 AM MDT View in browser Subscribe to Updates September 2016 Page 2 of 13 Denver International Airport, the sixth-most-traveled airport

More information

Park and Recreation Board April 19, Michael Frosch, Director Office of Procurement Services

Park and Recreation Board April 19, Michael Frosch, Director Office of Procurement Services Purchasing Process Overview Park and Recreation Board April 19, 2018 Michael Frosch, Director Office of Procurement Services Purpose Review Procurement Services mission Discuss the procurement processes

More information

NOTICE TO AUDITORS SOLICITATION OF AUDIT SERVICES

NOTICE TO AUDITORS SOLICITATION OF AUDIT SERVICES NOTICE TO AUDITORS SOLICITATION OF AUDIT SERVICES June 20, 2017 The Friedman Memorial Airport Authority, Hailey, Idaho is soliciting proposals for audit services for the year ending September 30, 2017.

More information

Port Small Business Development Program

Port Small Business Development Program Port Small Business Development Program April 11, 2013 Angela Watkins Small Business Development Program Manager 1 Purpose The purpose of the Port small business development program is to enhance the opportunity

More information

Addendum No. 2 April 15, 2015 Architectural Design Services Requirements Contracts Request for Qualifications Project No.

Addendum No. 2 April 15, 2015 Architectural Design Services Requirements Contracts Request for Qualifications Project No. Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 16 th Floor New York, NY 10019 Tel: 646-664-2700 Addendum 2 April 15, 2015 Architectural

More information

AIRPORT CONCESSION DISADVANTAGED BUSINESS ENTERPRISE PLAN. CITY OF PORTLAND, MAINE, dba PORTLAND INTERNATIONAL JETPORT (PWM)

AIRPORT CONCESSION DISADVANTAGED BUSINESS ENTERPRISE PLAN. CITY OF PORTLAND, MAINE, dba PORTLAND INTERNATIONAL JETPORT (PWM) AIRPORT CONCESSION DISADVANTAGED BUSINESS ENTERPRISE PLAN CITY OF PORTLAND, MAINE, dba PORTLAND INTERNATIONAL JETPORT (PWM) Goals - FAA FISCAL YEAR 2015 TABLE OF CONTENTS I. OBJECTIVES AND POLICY STATEMENT

More information

ACI-NA SMALL AIRPORTS CONFERENCE FAA CIVIL RIGHTS - DBE REGULATORY UPDATE. Federal Aviation Administration

ACI-NA SMALL AIRPORTS CONFERENCE FAA CIVIL RIGHTS - DBE REGULATORY UPDATE. Federal Aviation Administration ACI-NA SMALL AIRPORTS CONFERENCE FAA CIVIL RIGHTS - DBE REGULATORY UPDATE Presented to: 2011 Small Airports Conference By: Wilbur Barham Director, National Airports Civil Rights Policy and Compliance Date:

More information

Disadvantaged Business Enterprise (DBE) Program and Goals for LSCOG

Disadvantaged Business Enterprise (DBE) Program and Goals for LSCOG Disadvantaged Business Enterprise (DBE) Program and Goals for LSCOG Lower Savannah Council of Governments has an overall goal of DBE participation for the three federal fiscal years of 2017-2019 (beginning

More information

Request for Proposal Qualified Management Partner for Como Park Lakeside Pavilion Lexington Parkway North, Saint Paul, Minnesota 55103

Request for Proposal Qualified Management Partner for Como Park Lakeside Pavilion Lexington Parkway North, Saint Paul, Minnesota 55103 Request for Proposal Qualified Management Partner for Como Park Lakeside Pavilion 1360 Lexington Parkway North, Saint Paul, Minnesota 55103 December 11, 2017 1 Summary The City of Saint Paul, Minnesota,

More information

REQUEST FOR INFORMATION (RFI) AUTOMATED PARK ENTRY TECHNOLOGY SOLUTIONS DEP RFI Number: C

REQUEST FOR INFORMATION (RFI) AUTOMATED PARK ENTRY TECHNOLOGY SOLUTIONS DEP RFI Number: C Request for Information for Automated Park Entry RFI No.: 2017018C REQUEST FOR INFORMATION (RFI) AUTOMATED PARK ENTRY TECHNOLOGY SOLUTIONS DEP RFI Number: 2017018C Pursuant to s. 287.012 (22), Florida

More information

Dakota County Technical College. Pod 6 AHU Replacement

Dakota County Technical College. Pod 6 AHU Replacement MINNESOTA STATE COLLEGES AND UNIVERSITIES Dakota County Technical College Pod 6 AHU Replacement REQUEST FOR PROPOSAL (RFP) FOR MECHANICAL ENGINEERING SERVICES JULY 16, 2018 SPECIAL NOTE: This Request for

More information

REQUEST FOR QUALIFICATIONS FOR A PROFESSIONAL ARCHITECTURAL FIRM TO PROVIDE ARCHITECTURAL SERVICES FOR THE BZN YELLOWSTONE INTERNATIONAL AIRPORT

REQUEST FOR QUALIFICATIONS FOR A PROFESSIONAL ARCHITECTURAL FIRM TO PROVIDE ARCHITECTURAL SERVICES FOR THE BZN YELLOWSTONE INTERNATIONAL AIRPORT REQUEST FOR QUALIFICATIONS FOR A PROFESSIONAL ARCHITECTURAL FIRM TO PROVIDE ARCHITECTURAL SERVICES FOR THE BZN YELLOWSTONE INTERNATIONAL AIRPORT TERMINAL EXPANSION PROJECT FEBRUARY 2018 MORRISON-MAIERLE,

More information

Port of Portland Small Business Program FFY16

Port of Portland Small Business Program FFY16 Port of Portland Small Business Program FFY16 June 21, 2017 Kimberly Mitchell-Phillips Small Business Development Program Manager 1 Small Business Development Program MWVESB Program ACDBE Program Small

More information

CITY OF RANCHO SANTA MARGARITA CITY COUNCIL STAFF REPORT

CITY OF RANCHO SANTA MARGARITA CITY COUNCIL STAFF REPORT Page 1 CITY OF RANCHO SANTA MARGARITA CITY COUNCIL STAFF REPORT DATE: TO: FROM: BY: SUBJECT: June 8, 2016 City Council of the City of Rancho Santa Margarita Jennifer M. Cervantez, City Manager~ _ Cheryl

More information

Request for Proposal For Pre-Employment Screening Services. Allegheny County Airport Authority

Request for Proposal For Pre-Employment Screening Services. Allegheny County Airport Authority Request for Proposal Request for Proposal P a g e 2 Table of Contents Confidentiality Statement... 3 Submission Details... 3 Submission Deadlines... 3 Submission Delivery Address... 3 Submission Questions

More information

Security Guard Contract Vendor Selection Process and Recommendation. Finance, Audit and Accountability Committee August 15, 2006

Security Guard Contract Vendor Selection Process and Recommendation. Finance, Audit and Accountability Committee August 15, 2006 Security Guard Contract Vendor Selection Process and Recommendation Finance, Audit and Accountability Committee August 15, 2006 Purpose Brief the committee on the solicitation process for a new citywide

More information

RiNo Park Buildings Business Case Analysis. July 10, 2017

RiNo Park Buildings Business Case Analysis. July 10, 2017 RiNo Park Buildings Business Case Analysis July 10, 2017 1 Purpose and Goal The public indicated a strong desire to keep and reuse RiNo Park buildings during the park planning process. The City of Denver

More information

Southern Dallas GO Bond Program Public/Private Partnership Amendment

Southern Dallas GO Bond Program Public/Private Partnership Amendment Southern Dallas GO Bond Program Public/Private Partnership Amendment A Briefing to the Economic Development Committee Economic Development and Housing Department December 3, 2007 1 KEY FOCUS AREA: ECONOMIC

More information

On-Call Environmental Engineering Support Services Contract Number 8500362 05.09.18 1 2 Travis Sanderfer, Program Solicitations Manager Design, Code and Construction Solicitation Schedule Deadline for

More information

Request for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017

Request for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017 Request for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017 Attention: Purchasing Agent Address: City School District of Albany 1 Academy

More information

Request for Proposals. Airport Management Services

Request for Proposals. Airport Management Services City of Hermiston 180 NE 2nd Street Hermiston Oregon 97838 www.hermiston.or.us Request for Proposals The City of Hermiston is seeking proposals to provide Airport Management Services Proposals due by June

More information

REQUEST FOR SEALED PROPOSAL. ADVERTISEMENT for STREET CONSTRUCTION SERVICES. RFP STREET WIDENING and TRAFFIC SIGNAL INSTALLATION

REQUEST FOR SEALED PROPOSAL. ADVERTISEMENT for STREET CONSTRUCTION SERVICES. RFP STREET WIDENING and TRAFFIC SIGNAL INSTALLATION REQUEST FOR SEALED PROPOSAL ADVERTISEMENT for STREET CONSTRUCTION SERVICES RFP STREET WIDENING and TRAFFIC SIGNAL INSTALLATION - 100918 The City of College Park is accepting sealed proposals from qualified

More information