Regional: Supporting the Cities Development Initiative for Asia

Size: px
Start display at page:

Download "Regional: Supporting the Cities Development Initiative for Asia"

Transcription

1 Technical Assistance Report Project Number: Regional Capacity Development Technical Assistance (R-CDTA) November 2013 Regional: Supporting the Cities Development Initiative for Asia (Cofinanced by the Government of Sweden, Government of Austria, and the Urban Climate Change Resilience Trust Fund under the Urban Financing Partnership Facility) The views expressed herein are those of the consultant and do not necessarily represent those of ADB s members, Board of Directors, Management, or staff, and may be preliminary in nature.

2 CURRENCY EQUIVALENTS (as of 25 October 2013) Currency unit Swedish krona (SKr) SKr1.00 = $0.16 $1.00 = SKr6.35 ABBREVIATIONS ADB Asian Development Bank CDIA Cities Development Initiative for Asia DMC developing member country PPP public private partnership SBP strategy and business plan TA technical assistance TECHNICAL ASSISTANCE CLASSIFICATION Type Regional capacity development technical assistance (R-CDTA) Targeting General intervention classification Sector (subsectors) Multisector (urban sector development, water supply and sanitation, waste management, urban transport) Themes Economic growth, environmental sustainability, private sector development, capacity development Climate change Urban environmental improvement, climate change mitigation and adaptation Location (impact) Urban (high), regional and national (medium), rural (low) Partnerships Governments of Austria, and Government of Sweden, Urban Climate Change Resilience Trust Fund under the Urban Financing Partnership Facility NOTE In this report, "$" refers to US dollars. Vice-President Director General Director Team leader Team member B. Lohani, Knowledge Management and Sustainable Development W. Um, Officer-in-Charge, Regional and Sustainable Development Department (RSDD) G. Kim, Sustainable Infrastructure Division, RSDD S. Sampath, Principal Urban Development Specialist, RSDD A. Vogl, Urban Development Specialist, RSDD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

3 CONTENTS Page I. INTRODUCTION 1 II. ISSUES 1 III. THE PROPOSED TECHNICAL ASSISTANCE 2 A. Impact and Outcome 2 B. Methodology and Key Activities 2 C. Cost and Financing 3 D. Implementation Arrangements 4 IV. THE PRESIDENT'S RECOMMENDATION 5 APPENDIXES 1. Design and Monitoring Framework 6 2. Cost Estimates and Financing Plan 9 3. Outline Terms of Reference for Consultants 11

4

5 I. INTRODUCTION 1. The Cities Development Initiative for Asia (CDIA) was established in February 2007 as a joint initiative of the Asian Development Bank (ADB); the governments of Austria, Germany, Spain, Sweden, and Switzerland; the Nordic Development Fund; and the Shanghai Municipal Government; with additional funding from KfW. 1 This technical assistance (TA) will channel development partners funds to support the implementation of the CDIA Strategy and Business Plan (SBP), to enable it to expand its support to cities in undertaking urban infrastructure development focusing on pro-poor and environmentally sustainable projects. 2 The framework is provided in Appendix The proposed regional capacity development TA aims to attract about $ million in development partners funding for CDIA activities. The contributions will come from the governments of Austria and Sweden, the Department for International Development of the United Kingdom, and the Rockefeller Foundation (through the Urban Climate Change Resilience Trust Fund under the Urban Financing Partnership Facility [UFPF]). 4 Additional funding to support CDIA activities from current and other development partners is also anticipated. II. ISSUES 3. It is estimated that by 2050, over 66% of Asia s population would be living in urban areas. 5 Overall, the rate of urban growth will be more than double the rate of national average population growth across all of Asia. To respond to the needs of its developing member countries (DMCs), ADB must help them maximize the development opportunities arising from urbanization while addressing the escalating negative social and environmental impacts. Underserviced urban growth often leads to congestion, pollution, and a decline in environmental quality. Nearly one-third of the region s urban poor lack access to safe water; almost half do not have adequate sanitation services; and about the same proportion live in dangerous environments. It is estimated that at least 900 million urban dwellers living in low- and middleincome countries will be at risk from the direct and indirect impacts of climate change over the next 5 10 years. These challenges make urban development increasingly difficult for many DMCs to manage At the apex of the Cities Development Initiative for Asia (CDIA) governance structure is the multidonor CDIA Program Review Committee, which is its governing body. The day-to-day operations are led by a management team that includes program coordinators from ADB and GIZ. The CDIA SBP builds upon the experience gained in the first 5 years of CDIA operations, incorporates input from an external midterm review mission (October 2011), and benefits from the reflections of CDIA s program review committee on this experience. The key focus of the SBP includes (i) strengthening service delivery processes to cities to bridge the capacity gap by working with partner organizations (national and regional) to support cities in preparing infrastructure investment projects; (ii) strengthening the link to finance to bridge the planning financing gap by enhancing city capacities to access finance for sustainable urban infrastructure projects; and (iii) strengthening the CDIA as a catalyst for innovation to bridge the institutional gap by providing knowledge and innovation support for sustainable urban infrastructure investment to stakeholders. The TA first appeared in the business opportunities section of ADB s website on 31 October Urban Financing Partnership Facility (UFPF) was approved by the Board (i) to establish the Urban Infrastructure Fund (UIF), a multi-donor fund to support technical assistance (TA), grant components of investment projects, and any other activities that may be agreed upon between financing partners and ADB; (ii) establish bilateral urban infrastructure trust funds substantially upon the terms and conditions of this paper; and (iii) accept and administer contributions by bilateral, multilateral, and individual sources to the UIF and urban infrastructure trust funds. United Nations Human Settlements Programme (UN-Habitat) State of the World's Cities 2010/2011 Bridging the Urban Divide. London: Earthscan. p. 5.

6 2 4. ADB s Strategy 2020 sets the goal of making Asia s cities livable. 6 The overall aim is to help DMCs establish a sustainable pattern of development that will enable people to satisfy their basic needs and enjoy a better quality of life without compromising the quality of life of future generations. ADB s Urban Operational Plan, seeks to define an effective and responsive approach to supporting cities in this role. 7 One of the main components of such an approach is for ADB to focus its interventions on specific urban regions, especially secondary cities, which have limited capacity but will come under proportionately greater population stress, and where ADB can have more impact and larger demonstration effects to foster systemic change toward sustainability.8 It has been projected that by 2015, nearly 60% of the total urban population will be living in secondary cities. 5. While urban planning has improved across the region, many cities in Asia and the Pacific lack the (i) resources to undertake adequate infrastructure investment financing and structuring, and prepare bankable projects; and (ii) institutional capacity to effectively manage the programming and prioritization of these strategic investments. Therefore there is a gap between cities strategic development plans that typically present a wish-list of projects, and the requirements of financiers for well-formulated infrastructure projects. Many city governments in the region also lack the necessary funding to deliver critical infrastructure to make them competitive. 6. With the emphasis on project preparation and linking proposed projects to finance, the CDIA is viewed as a key initiative that will help implement ADB s Urban Operational Plan, , together with the UFPF. III. THE PROPOSED TECHNICAL ASSISTANCE A. Impact and Outcome 7. The impact of the TA will be enhanced management of secondary cities in DMCs. The outcome will be improvement in operational support for management of cities in DMCs. B. Methodology and Key Activities 8. The CDIA is a flagship international partnership developed by ADB with financial support from development partners to help medium-sized cities in the Asia and Pacific region bridge the gap between their development plans and the implementation of their infrastructure investments. The CDIA uses a demand-driven approach to support the identification and development of urban infrastructure investment projects within the framework of existing city development plans that emphasize one or more of the following impact areas: (i) urban environmental improvement, (ii) urban poverty reduction, (iii) climate change mitigation and adaptation, and (iv) improved governance ADB Strategy 2020: The Long-Term Strategic Framework of the Asian Development Bank, Manila. ADB Urban Operational Plan, Manila. Second-tier cities generally have populations of approximately 250,000 to 3,000,000. The preference for secondary cities does not preclude interventions in megacities where significant environmental and social issues need to be addressed, and where there is demonstrable commitment to effective, integrated approaches to implementation.

7 3 9. Since 2007, under ADB s leadership, the CDIA has become an international partnership through the Technical Assistance for Managing the Cities in Asia 9. This TA was originally approved in 2007 and has gone through scope changes to accommodate funding from development partners as well as from ADB s Technical Assistance Special Fund, ADB has raised almost $23.72 million for the CDIA since its inception 10. As of October 2013, 83 prefeasibility studies have been initiated for 55 Asian cities in 14 countries. 11 Of these, 58 prefeasibility studies have already been completed, of which 26 have been linked to a financial source for downstream project implementation The outputs of the proposed TA will be (i) project preparatory interventions in the form of prefeasibility studies with a view to attracting downstream financing in 50 cities; (ii) International good practices involving innovative financing approaches for sustainable urban development adopted in ADB urban operations; and (iii) strengthening of CDIA networking activities, in particular with national partner organizations. Subject to the demand from city governments and availability of appropriate partner institutions, efforts would be made to identify possible centers of excellence to promote sustainable urban development in the Asia and Pacific region. 11. Building on the achievement of Managing the Cities in Asia, this TA also aims to raise and deploy cofinancing from development partners to support the implementation of the CDIA SBP, This TA will be an umbrella operational arrangement to accommodate in an efficient manner development partners contributions, and enhance administrative coordination and efficiency. Because this TA is a funding channel for CDIA activities, any future increases in the amount for this TA will be processed through changes in scope, based on the established procedures to incorporate such increases in the TA budget. 12. The project design is based on the following assumptions: (i) DMC stakeholders and policy makers support improvement in the management of cities, (ii) better knowledge and policy dialogue translate into more effective management of cities, (iii) there is continued interest by financial institutions in funding urban infrastructure in Asia, (iv) there is effective engagement of some key regional and DMC resource people, and (v) CDIA program review committee members financial commitments toward the CDIA SBP are fulfilled on time. Potential risks relate to nonavailability of suitable experts and institutions for involvement in the analytical work. C. Cost and Financing 13. This TA is estimated to cost $14,084,000 of which (i) $7,084,000 will be financed on a grant basis by the Government of Sweden, (ii) $2,000,000 will be financed on a grant basis by ADB Technical Assistance for Managing the Cities in Asia. Manila (TA 6293-REG). Prior to the approval of the Swiss Government contribution to CDIA, about 97% of TA funds had been utilized. Following the Board approval (early September 2013) to receive Swiss Government funding to CDIA, and subsequent to receiving the first tranche of $2 million) from the Swiss Government (received on 18 October 2013), the utilization figures are at 86%. Bangladesh, Cambodia, the People s Republic of China, Fiji, India, Indonesia, the Lao People s Democratic Republic, Mongolia, Myanmar, Nepal, Pakistan, the Philippines, Thailand, and Viet Nam. Representative sample of successful prefeasibility studies include: Pakse, Laos Urban Environmental Project ($35 million investment) on solid waste management, green infrastructure, and sewerage/drainage system improvement which has been included in the ADB loan; Khulna (Bangladesh), Pro-Poor and Green Urban Transport ($14 million investment) which has been included in KfW financing; and Metro Iloilo-Guimaras, Philippines, CBD revitalization ($30 million investment) which is being implemented through a PPP arrangement.

8 4 the Government of Austria, (iii) $5,000,000 will be financed on a grant basis by the Urban Climate Change Resilience Trust Fund under the UFPF 13 and administered by ADB. 14. ADB has already held discussions with a number of development partners and anticipates that more funds from development partners may be available to finance CDIA activities in support of its SBP. It is expected that all such funds raised from the development partners will be administered by ADB. The cost estimates and financing plan is in Appendix Participating DMC governments will provide counterpart support in the form of equipment, office and housing accommodations, office supplies, secretarial assistance, domestic transport, resource persons, and other in-kind contributions. D. Implementation Arrangements 16. ADB will be the executing agency of this TA, which will start in November 2013 and end in December The TA will finance consulting services; workshops and training, including resource persons; report preparation and communications; miscellaneous administration and support costs; and equipment and surveys. Resource persons will be engaged on an individual basis. A multidisciplinary team of national and international experts, led by an international senior municipal or environmental engineering and urban infrastructure specialist or a project finance specialist, will be required to successfully execute the assignments. Consultants may be recruited on an individual basis or through firms, using quality- and cost-based selection, quality-based selection, or fixed budget selection methods with indefinite delivery contract assignment, as appropriate. 14 Key expertise will include waste and wastewater management, flood and drainage management, urban economics, transport planning, urban planning, water supply and sanitation, environment, climate change, social development, public financial management, infrastructure finance, public private partnerships (PPP), urban governance, organizational and institutional development, communications, and capacity development. All consultants will be engaged by ADB in accordance with the Guidelines on the Use of Consultants (2013, as amended from time to time). Terms of reference for consultants are in Appendix 3. All procurement under the TA will be carried out in accordance with ADB s Procurement Guidelines (2013, as amended from time to time). 15 The TA will be disbursed in accordance with ADB s Technical Assistance Disbursement Handbook (2010, as amended from time to time). 17. The input of 370 person-months of international consultants is envisaged with the input of 584 person-months of national consultants. The international consultants the municipal or environmental engineering and urban infrastructure specialist (185 person-months), urban planner (55 person-months), and PPP specialists and financial analysts (130 person-months) will be responsible for providing the strategic and technical direction for the prefeasibility studies, quality assurance for the inputs, program management, and all key reporting related to the Contributors: the Government of the United Kingdom and the Rockefeller Foundation. This TA builds on an earlier regional TA, which obtained approval from the principal director of ADB s Operations Services and Financial Management Department on 11 February 2009 regarding the use of indefinite delivery contracts. The objective of the proposed indefinite delivery contracts is to streamline the process of consultant procurement, thereby improving the accountability of project teams while retaining the required flexibility and responsiveness of demand-driven CDIA operations. A procurement plan will be prepared and updated in accordance with ADB s guidelines. The plan will contain details of procurement; i.e., the number of contracts, procurement methods, estimated contract values, and threshold amounts. To decide on the most economical ways to procure the contracts, the Regional and Sustainable Development Department will consult ADB s Office of Administrative Services, which will procure the contracts for the projects as part of ADB s institutional procurement contract.

9 5 CDIA. They will coordinate closely with the DMCs, ensuring that key institutions and civil society are at all times engaged in the process of the prefeasibility studies development. 18. The national consultants urban and infrastructure national specialists (40 consultants, 584 person-months) will provide high-quality assistance and inputs for the international consultants, backed, where needed, by strong data analysis. The national consultants will support the activities of international consultants in the field, reviewing documents and literature, collecting data and information, and performing research and analysis (both quantitative and qualitative). The national consultants will coordinate with governments, other donors, and other ADB projects as needed. As additional development partner funding is secured for this TA, the person-months will be increased accordingly. IV. THE PRESIDENT'S RECOMMENDATION 19. The President recommends that the Board approve (i) ADB administering technical assistance not exceeding the equivalent of $7,084,000 to be financed on a grant basis by the Government of Sweden, (ii) ADB administering technical assistance not exceeding the equivalent of $2,000,000 to be financed on a grant basis by the Government of Austria, and (iii) ADB administering technical assistance not exceeding the equivalent of $5,000,000 to be financed on a grant basis by the Urban Climate Change Resilience Trust Fund under the Urban Financing Partnership Facility, for Supporting the Cities Development Initiative for Asia.

10 6 Appendix 1 DESIGN AND MONITORING FRAMEWORK Design Summary Impact Enhanced management of secondary cities in DMCs Performance Targets and Indicators with Baselines Infrastructure, service delivery, and environmental parameters in DMC cities, along with financial management of municipalities, supported in most of the 50 cities supported by the CDIA Data Sources and Reporting Mechanisms Urban and sector or thematic reports of DMC governments and international organizations Regional progress on the Millennium Development Goals Assumptions and Risks Assumptions DMC stakeholders and policy makers support improvement in the management of cities. Better knowledge and policy dialogue translate into more effective management of cities. Outcome Improvement in operational support for management of cities in DMCs Outputs 1. Project preparatory interventions in the form of prefeasibility studies with a view to attracting downstream financing in 50 cities 2. International good practices involving innovative financing approaches for sustainable urban development adopted in ADB urban operations Project prefeasibility studies preparation by cities with CDIA intervention improved by 2017 Link to ADB operations related to management and development of cities improved, and demonstrated through the linking of at least 10 projects to ADB downstream financing by 2017 Prefeasibility project reports for 50 cities. Achievement of milestones as per the agreement between the city and CDIA CDIA to work with an additional 50 cities by 2017, including on infrastructure investment prioritization and prefeasibility studies for inclusive and sustainable urban development Documentation of lessons from urban infrastructure planning and prioritization, project prefeasibility Assessment of prefeasibility studies outputs by funders and consequent funding commitments CPS and DMC feedback received through various formal and informal channels Project processing information systems and CPS Periodic progress reports provided to the task force Communications from related external experts and institutions Assumptions There is continued interest by financial institutions in funding Asian urban infrastructure. There is effective engagement of some key regional and DMC resource people. Risks Suitable experts and institutions are not available for involvement in this analytical work. CDIA program review committee members financial commitments toward the CDIA SBP are fulfilled on time.

11 Appendix 1 7 Design Summary Performance Targets and Indicators with Baselines studies, innovative financing, and private sector participation and dissemination through workshops, knowledge partnership, and operational application Data Sources and Reporting Mechanisms Assumptions and Risks 3. Strengthening of CDIA networking activities, in particular with national partner organizations Increased number and extent of involvement of related national and regional experts and institutions in the projects developed by the CDIA Activities with Milestones 1.1 Preparation of the detailed outline of the work plan and engagement of managing consultants (December 2013) 1.2 Fieldwork in project preparation (March 2014) 1.3 Knowledge development and capacity building activities (October 2014) 2.1 Review of activities 2.2 Structuring reports for projects capable of being financed (initial reports for selected cities by December 2014) 3.1 Capacity development activities (initial reports for selected cities by December 2014) 3.2 Strengthening of CDIA networking activities (ongoing) Inputs Government of Sweden: $7.084 million (SKr 45.0 million) Amount ($ 000) Item International consultants 3,000 National consultants 1,300 International and national travel 830 Reports and communications 136 Equipment 192 Workshops, training, seminars, conferences and training programs (i) Facilitator (ii) Training program External audit 80 Surveys 90 Miscellaneous administration and support costs 120 Contingencies 1,000

12 8 Appendix 1 Government of Austria: $2.0 million Amount ($ 000) Item International consultants 1,000 National consultants 350 International and national travel 100 Reports and communications 50 Equipment 130 Workshops, training, seminars, conferences, and training programs (i) Facilitator (ii) Training program Surveys 20 Miscellaneous administration and support costs 50 Contingencies 200 Urban Climate Change Resilience Trust Fund under the Urban Financing Partnership Facility: $5.0 million Amount ($ 000) Item International consultants 2,700 National consultants 800 International and national travel 400 Reports and communications 60 Equipment 100 Workshops, training, seminars, conferences, and training programs (i) Facilitator (ii) Training program Surveys 40 Miscellaneous administration and support costs 100 Contingencies 650 ADB = Asian Development Bank, CDIA = Cities Development Initiative for Asia, CPS = country partnership strategy, DMC = developing member country. Source: Asian Development Bank

13 Appendix 2 9 COST ESTIMATES AND FINANCING PLAN ($'000) Item Amount a A. Government of Sweden b 1. Consultants a. Remuneration and per diem i. International consultants 3,000.0 ii. National consultants 1,300.0 b. International and local travel c. Reports and communications Equipment Training, seminars, and conferences a. Facilitators b. Training program 4. External audit c Surveys Miscellaneous administration and support costs Contingencies 1,000.0 Subtotal (A) 7,084.0 B. Government of Austria b 1. Consultants a. Remuneration and per diem i. International consultants 1,000.0 ii. National consultants b. International and local travel c. Reports and communications Equipment Training, seminars, and conferences a. Facilitators 75.0 b. Training program Surveys Miscellaneous administration and support costs Contingencies Subtotal (B) 2,000.0 C. Urban Climate Change Resilience Trust Fund under the Urban Partnership Facility d 1. Consultants a. Remuneration and per diem i. International consultants 2,700.0 ii. National consultants b. International and local travel c. Reports and communications Equipment Training, seminars, and conferences a. Facilitators b. Training program Surveys Miscellaneous administration and support costs Contingencies Subtotal (C) 5,000.0 Total (A, B, and C) 14,084.0

14 10 Appendix 2 a Financed by the governments of Austria and Sweden and the Urban Climate Change Resilience Trust Fund under the Urban Financing Partnership Facility. b Administered by ADB. This amount also includes ADB s administration fee, audit costs, bank charges, and a provision for foreign exchange fluctuations (if any) to the extent that these items are not covered by the interest and investment income earned on this grant. c This line item is included at the request of the Government of Sweden. d Contributors: the Government of the United Kingdom and the Rockefeller Foundation. Administered by ADB. This amount also includes ADB s administration fee, audit costs, bank charges, and a provision for foreign exchange fluctuations (if any) to the extent that these items are not covered by the interest and investment income earned on this grant, or any additional grant from the Urban Climate Change Resilience Trust Fund under the Urban Financing Partnership Facility. Source: Asian Development Bank estimates.

15 Appendix 3 11 OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The technical assistance (TA) team will work with the staff of the Regional and Sustainable Development Department of the Asian Development Bank (ADB) and GIZ staff engaged in the Cities Development Initiative for Asia (CDIA) to prepare projects and enhance the capacity of cities to manage them. 2. A multidisciplinary team of national and international experts, led by an international senior municipal or environmental engineering and urban infrastructure specialist, will be required to successfully execute the assignments. The experts will perform the following tasks. (i) (ii) (iii) (iv) (v) (vi) (vii) Review pertinent documentation, including the listing of relevant documentation. Analyze current urban development constraints and projections. Define and propose the prefeasibility studies study area boundaries, based on technical criteria related to key urban environmental infrastructure. Review integrated improvement requirements within the prefeasibility studies area and contrast this with improvements already undertaken or programmed. Identify priority investments that will (a) have maximum environmental benefits, including socially inclusive investments; (b) reduce the city s ecological footprint; (c) help mitigate and adapt to climate change; and (d) reduce inequalities. Ensure that the identified investments benefit the poorer people and sections of the city to the greatest extent possible. Conduct the prefeasibility studies in a participatory manner, involving all stakeholder agencies as well as civil society throughout the study by conducting participatory planning and design workshops at critical junctures. For this purpose, an operational working group will be formed in which representatives from the main agencies involved and from civil society will participate. 3. The overall combined implementation package is likely to be financed by a combination of international and national financing in accordance with the applicable infrastructure financing formula. The prefeasibility studies work for these projects is therefore envisaged to establish the initial case for taking projects identified by participating cities to prefeasibility studies level under standard arrangements with a financing institution. The prefeasibility studies reports to be prepared must therefore adhere to a standard acceptable to national and international financing institutions, with particular attention to requirements for possible ADB funding. This will include flagging potential issues requiring in-depth review in accordance with ADB s safeguards guidelines at the subsequent feasibility study stage. A. International Urban Infrastructure Consultants 4. The international specialists will be responsible for providing the strategic and technical direction for the prefeasibility studies, quality assurance for the inputs, and all key reporting to the CDIA. They will coordinate closely with the client, ensuring that key institutions and civil society are at all times engaged in the process of the prefeasibility studies development as partners.

16 12 Appendix 3 1. Senior Municipal or Environmental Engineering and Urban Infrastructure Specialist a. Technical Responsibilities 5. This specialist (international, 185 person-months) will manage the preparation of prefeasibility reports, adhering to a standard acceptable to national and international financing institutions, with particular reference to requirements for a possible capital investment project. This will include flagging potential issues requiring in-depth review in accordance with ADB s safeguards guidelines at the subsequent feasibility study stage. 6. Under the supervision of the ADB CDIA manager and the GIZ CDIA program coordinator, the consultant will take part in the day-to-day operational activities of the CDIA core management team. With a focus on urban good governance and effective city-level public sector management for infrastructure development, the main tasks of the consultant will be to support the following activities of the CDIA: (i) broad organizational and institutional development, (ii) development and evaluation of project support applications from cities, and (iii) prefeasibility studies phase project preparation and city-to-city networking. 7. Contributing from his or her disciplinary background, the specialist will perform the following tasks. (i) (ii) (iii) (iv) (v) Determine study area boundaries. Verify previous sector studies undertaken and conduct a detailed analysis of the present development situation of the study area, identifying constraints and issues. Identify and define possible design options that have emerged and comment on their likely feasibility and sustainability. Recommend a preferred design option and financial structure for investment projects. Highlight any major environmental issue that needs to be reviewed in depth at the subsequent stage of feasibility work. b. Qualifications and Experience 8. The international senior municipal or environmental engineering and urban infrastructure specialist will preferably have the following qualifications and experience. (i) (ii) (iii) (iv) A master s degree in environmental engineering, urban transport, or energy (with specialization in municipal sectors such as drainage and flood protection, sewerage, or solid waste management; urban transport such as bus rapid transit; parking management; and district energy systems) or in a related discipline, with experience in preparing and implementing infrastructure projects in large metropolitan cities. A minimum of 10 years of project-related experience in Asia years of project management experience in Asia. The capability to lead multidisciplinary teams and to work with a range of different stakeholders.

17 Appendix Urban Planner a. Technical Responsibilities 9. The consultant (international, 55 person-months) will provide urban planning inputs for projects, assisting in the development of options and agreeing on the preferred designs with the local government. She or he will assist in the preparation of the prefeasibility studies, complying with the minimum CDIA requirements. The urban planner will coordinate with the financial analyst in proposing and agreeing on the financial structure. Among other specific tasks, the urban planning specialist will perform the following functions. (i) (ii) (iii) (iv) (v) (vi) (vii) Prepare prefeasibility studies reports, adhering to a standard acceptable to national and international financing institutions, with particular attention to requirements for possible ADB project financing that include flagging potential issues requiring in-depth review in accordance with the various safeguards guidelines at the subsequent feasibility study stage. Verify previous prioritization activity and confirm priority projects. Undertake a detailed analysis of the development situation in which the activities will be carried out, identifying the constraints and issues. Identify and define possible design options that have emerged and comment on their likely feasibility and sustainability. Recommend preferred designs or structures for investment projects. Develop terms of reference for a feasibility design study and required capacity development programs. Highlight any major social, economic, financial, and environmental issues that need to be reviewed in depth at the subsequent stage of feasibility work. b. Qualifications and Experience 10. The specialist is preferred to have the following qualifications and experience. (i) (ii) (iii) At least a master s degree in urban planning or related discipline, with experience in regional urban planning in large metropolitan cities. At least 15 years of related project experience. A demonstrated ability to work congenially and productively with a consultant team, counterparts, and other project stakeholders. 3. Public Private Partnership Specialists and Financial Analysts a. Technical Responsibilities 11. The specialists (international, 130 person-months, intermittent) will develop and assess options for project finance and agree on the preferred options with the local government. They will prepare presentation documents and the information memorandum for these options. The specialists will agree on and document financing plans, conditional on satisfactory feasibility study outcomes, with potential primary financiers. They will also perform the following tasks. (i) Make a preliminary assessment of the viability of investment options identified by CDIA prefeasibility studies assessments, opportunities for public private partnerships (PPP), and contrast and compare their likely feasibility and benefits.

18 14 Appendix 3 (ii) (iii) (iv) (v) (vi) (vii) (viii) Make a preliminary identification of likely risks to feasibility and benefits, including risks to sustainability, and assess the importance of these risks. Review the preliminary financial and economic analysis, including risk analysis of the project, with a view to developing bankable projects downstream. Review the preliminary financing plan, including conducting a sensitivity analysis. Help the team leader recommend a preferred PPP option based on bankability criteria. Review potential options for financing of investments, define options for organizing investment operations, and recommend preferred options for both to be considered in detail in subsequent feasibility work. Identify potential financial sources for financing of the project, including where it may be possible to attract limited recourse financing. Liaise with identified financiers to secure financing for identified projects and, where applicable, prepare terms of reference for additional due diligence and procurement, or for structuring the project for a possible PPP. b. Qualifications and Experience 12. The specialists should preferably have the following qualifications and experience. (i) (ii) (iii) (iv) (v) (vi) At least a master s degree in finance and economics. At least 10 years of experience in finance or economics project monitoring and evaluation. Demonstrated success in structuring limited recourse project financing as well as PPPs across a number of sectors and in many jurisdictions. A high degree of literacy in finance and financial modelling of infrastructure projects in Asia. Proven competence in project economic and financial analysis. Fluency in both written and spoken English. B. National Urban and Infrastructure Consultants 13. The main task of the national consultants (40 consultants, 584 person-months in total) will be to provide high-quality assistance and inputs for the international consultants, backed where needed by strong data analysis. Consultants will be required in the fields of urban planning, municipal engineering, economic and financial analysis, social development, and institutional development. The tasks of the national consultants will include supporting the activities of international consultants in the field, reviewing documents and literature, collecting data and information, conducting research and analysis (both quantitative and qualitative), and preparing notes and briefs. The national consultants will provide technical and administrative support to assist the international consultant teams. The national consultants will coordinate with governments, other donors, and other ADB projects as needed. The consultants will undertake other support tasks required by the CDIA secretariat. 14. The specialists should preferably have the following qualifications and experience. (i) (ii) A master s degree in urban planning, finance and economics, or environmental engineering or related discipline; and project experience working in Asia with government agencies and on donor-funded projects. A minimum 10 years of related project experience.

19 Appendix 3 15 (iii) A demonstrated ability to review documents and literature, collect data and information, conduct research and analysis (both quantitative and qualitative), and prepare notes and briefs. C. Report Submissions 15. The consultants will submit progress reports 2 months after the initiation of their assignment, and a draft final report after the fifth month of their engagement, together with required reports and inputs relating to city project formulation, as agreed on with ADB s Regional and Sustainable Development Department.

This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.

This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. Technical Assistance Report Project Number: 51336-001 Knowledge and Support Technical Assistance (KSTA) February 2018 Capacity Building Support for Asia-Pacific Economic Cooperation Financial Regulators

More information

Republic of Indonesia: Water Supply and Sanitation Sector Development Project

Republic of Indonesia: Water Supply and Sanitation Sector Development Project Technical Assistance Report Project Number: 43304-022 Capacity Development Technical Assistance (CDTA) November 2011 Republic of Indonesia: Water Supply and Sanitation Sector Development Project (Financed

More information

Pacific Urban Development Investment Planning and Capacity Development Facility

Pacific Urban Development Investment Planning and Capacity Development Facility Technical Assistance Report Project Number: 51175-001 Transaction Technical Assistance Facility (F-TRTA) July 2017 Pacific Urban Development Investment Planning and Capacity Development Facility This document

More information

Papua New Guinea: Implementation of the Electricity Industry Policy

Papua New Guinea: Implementation of the Electricity Industry Policy Technical Assistance Report Project Number: 46012 December 2012 Papua New Guinea: Implementation of the Electricity Industry Policy The views expressed herein are those of the consultant and do not necessarily

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 12 Appendix 5 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is needed for preparing the investment program and conducting technical, economic,

More information

ADB Official Cofinancing with UNITED KINGDOM. Working together for development in Asia and the Pacific

ADB Official Cofinancing with UNITED KINGDOM. Working together for development in Asia and the Pacific ADB Official Cofinancing with UNITED KINGDOM Working together for development in Asia and the Pacific ABOUT THE UNITED KINGDOM (UK) The Department for International Development (DFID) is the UK Government

More information

People s Republic of China: Strategy for Inclusive and Green Development of Small Cities, Towns, and Villages in Jiangxi Province

People s Republic of China: Strategy for Inclusive and Green Development of Small Cities, Towns, and Villages in Jiangxi Province Technical Assistance Report Project Number: 49024-001 Policy and Advisory Technical Assistance (PATA) December 2015 People s Republic of China: Strategy for Inclusive and Green Development of Small Cities,

More information

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing Technical Assistance Report Project Number: 51022-001 Knowledge and Support Technical Assistance (KSTA) December 2017 People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction

More information

People s Republic of China: Study of the Belt and Road Initiative

People s Republic of China: Study of the Belt and Road Initiative Technical Assistance Report Project Number: 50141-001 Policy and Advisory Technical Assistance (PATA) June 2016 People s Republic of China: Study of the Belt and Road Initiative This document is being

More information

Implementing the Regional Cooperation and Integration Operational Plan (Cofinanced by the Government of the United Kingdom)

Implementing the Regional Cooperation and Integration Operational Plan (Cofinanced by the Government of the United Kingdom) Technical Assistance Report Project Number: 51155-001 Knowledge and Support Technical Assistance (KSTA) July 2017 Implementing the Regional Cooperation and Integration Operational Plan (Cofinanced by the

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. A project preparatory technical assistance (PPTA) is required to support the Ministry of New and Renewable Energy (MNRE) and Solar Energy Corporation

More information

(Financed by the Japan Fund for Poverty Reduction)

(Financed by the Japan Fund for Poverty Reduction) Technical Assistance Report Project Number: 49276-001 Capacity Development Technical Assistance (CDTA) December 2015 India: Supporting Rajasthan s Productive Clusters in the Delhi Mumbai Industrial Corridor

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing project. A PPTA is necessary to provide sound

More information

Developing Cross-Border Economic Zones between the People's Republic of China and Viet Nam

Developing Cross-Border Economic Zones between the People's Republic of China and Viet Nam Technical Assistance Report Project Number: 43077-01 Regional Policy and Advisory Technical Assistance (R-PATA) September 2009 Developing Cross-Border Economic Zones between the People's Republic of China

More information

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC Greater Dhaka Sustainable Urban Transport Project (RRP BAN 42169) TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC A. TA Description 1. The Government of Bangladesh has requested

More information

Promoting South Asian Regional Economic Cooperation II

Promoting South Asian Regional Economic Cooperation II Technical Assistance Report Project Number: 40371-01 Regional Capacity Development Technical Assistance (R-CDTA) December 2008 Promoting South Asian Regional Economic Cooperation II The views expressed

More information

Proposed Extension of Pilot Period for the Project Design Facility

Proposed Extension of Pilot Period for the Project Design Facility November 2017 Proposed Extension of Pilot Period for the Project Design Facility Distribution of this document is restricted until it has been approved by the Board of Directors. Following such approval,

More information

Project Design Advance. Nauru: Port Development Project. Project Number: December 2015

Project Design Advance. Nauru: Port Development Project. Project Number: December 2015 Project Design Advance Project Number: 48480-002 December 2015 Nauru: Port Development Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. There is an urgent need to support the government in the development of the urban water supply and sanitation sector in Cambodia

More information

Lao People s Democratic Republic: Strengthening Urban Water Supply Regulation

Lao People s Democratic Republic: Strengthening Urban Water Supply Regulation Technical Assistance Report Project Number: 45298 Capacity Development Technical Assistance (CDTA) November 2011 Lao People s Democratic Republic: Strengthening Urban Water Supply Regulation The views

More information

Papua New Guinea: Support for Water and Sanitation Sector Management

Papua New Guinea: Support for Water and Sanitation Sector Management Technical Assistance Report Project Number: 49454-001 Capacity Development Technical Assistance (CDTA) February 2017 Papua New Guinea: Support for Water and Sanitation Sector Management This document is

More information

Mainstreaming Low Carbon Path in the Transport Sector in the National and Local Levels

Mainstreaming Low Carbon Path in the Transport Sector in the National and Local Levels Mainstreaming Low Carbon Path in the Transport Sector in the National and Local Levels By: ANNELI R. LONTOC (Undersecretary, Department of Transportation and Communications) Research Fellow/ Lecturer,

More information

ADB Business Opportunities Seminar

ADB Business Opportunities Seminar ADB Business Opportunities Seminar 4 November 2016 Vienna, Austria Presented by Walter Poick Director, Procurement Division 2 (East Asia, Southeast Asia and Pacific Operations) Operations Services and

More information

Republic of Indonesia: Scaling Up Energy Efficiency

Republic of Indonesia: Scaling Up Energy Efficiency Sustainable and Inclusive Energy Program (Subprogram 2) (RRP INO 49043-002) Technical Assistance Report Project Number: 49043-006 Transaction Technical Assistance (TRTA) August 2017 Republic of Indonesia:

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section E2/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction JAPAN FUND

More information

Evaluation of the Global Humanitarian Partnership between Save the Children, C&A and C&A Foundation

Evaluation of the Global Humanitarian Partnership between Save the Children, C&A and C&A Foundation Evaluation of the Global Humanitarian Partnership between Save the Children, C&A and C&A Foundation Terms of Reference Contents: I. INTRODUCTION 2 II. GLOBAL HUMANITARIAN PARTNERSHIP 3 III. SCOPE 4 IV.

More information

TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR. 19 October 2017

TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR. 19 October 2017 TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR A) General Background Information 19 October 2017 Appendix 1 The United Nations Industrial Development Organization

More information

Country Operations Business Plan. Maldives July 2017

Country Operations Business Plan. Maldives July 2017 Country Operations Business Plan July 2017 Maldives 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 20

More information

OED'S PROPOSED WORK PROGRAM FOR OED's Proposed Work Program for 2009 Alignment with Strategy 2020

OED'S PROPOSED WORK PROGRAM FOR OED's Proposed Work Program for 2009 Alignment with Strategy 2020 OED'S PROPOSED WORK PROGRAM FOR 2009 2011 OED's Proposed Work Program for 2009 (i) DERIVED PROGRAM: OPERATIONS Country Operations 1 CAPE Nepal 2 CAPE Bangladesh 3 CAPE Viet Nam 4 CAPE Cambodia 1 RCS-CR

More information

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN. FRAMEWORK FINANCING AGREEMENT (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 29 October 2005 FRAMEWORK FINANCING

More information

PROSPEROUS INCLUSIVE RESILIENT SUSTAINABLE ASIA AND THE PACIFIC

PROSPEROUS INCLUSIVE RESILIENT SUSTAINABLE ASIA AND THE PACIFIC PROSPEROUS INCLUSIVE RESILIENT SUSTAINABLE ASIA AND THE PACIFIC WHY A NEW STRATEGY FOR ADB? Asia and the Pacific has made great strides in poverty reduction and economic growth in the last 50 years, but

More information

with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks

with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks READINESS AND PREPARATORY SUPPORT PAGE 1 OF 14 ver. 19 August 2016 Readiness and Preparatory

More information

Rajasthan Urban Sector Development Program

Rajasthan Urban Sector Development Program India: Rajasthan Urban Sector Development Program Project Name Rajasthan Urban Sector Development Program Project Number 42267-026 Country Project Status Project Type / Modality of Assistance Source of

More information

Cook Islands

Cook Islands \ Country Operations Business Plan October 2016 Cook Islands 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: OTH 38459 TECHNICAL ASSISTANCE FOR PROMOTING SOUTH ASIAN REGIONAL ECONOMIC COOPERATION September 2004 2 ABBREVIATIONS ADB Asian Development Bank ASEAN Association of Southeast

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS TERMS OF REFERENCE FOR CONSULTANTS A. Consulting Firm The Asian Development Bank (ADB) will engage a consulting firm in accordance with its Guidelines on the Use of Consultants (2013, as amended from time

More information

Evaluation Study. Financing Partnership Facilities. Independent Evaluation Department

Evaluation Study. Financing Partnership Facilities. Independent Evaluation Department Evaluation Study Reference Number: SES: OTH 2010-74 Special Evaluation Study December 2010 Financing Partnership Facilities Independent Evaluation Department ABBREVIATIONS ADB Asian Development Bank ACEF

More information

SECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines

SECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines GMS 4 5 July 2018 Manila, Philippines Working Group Section 2: Review of Concept and Approach to the Ongoing and Planned ipsum GMS que Corridor moluptam Towns sum Development que moluptam Projects sum

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) (P128748) OTHER World

More information

Guidelines for Completing the Grant Application Form

Guidelines for Completing the Grant Application Form Guidelines for Completing the Grant Application Form ESCAP Trust Fund for Tsunami, Disaster and Climate Preparedness in Indian Ocean and Southeast Asian Countries This document is intended to assist organizations

More information

Nepal: Small Towns Water Supply and Sanitation Sector Project

Nepal: Small Towns Water Supply and Sanitation Sector Project Validation Report Reference Number: PVR 193 Project Number: 31402 Loan Number: 1755(SF) November 2012 Nepal: Small Towns Water Supply and Sanitation Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Terms of Reference for Resource Mobilization Support to IPPF Member Association in Nepal, (Family Planning Association of Nepal-FPAN)

Terms of Reference for Resource Mobilization Support to IPPF Member Association in Nepal, (Family Planning Association of Nepal-FPAN) Terms of Reference for Resource Support to IPPF Member Association in Nepal, (Family Planning Association of Nepal-FPAN) 1. Situational Analysis Funding for international aid in general and for IPPF in

More information

United Nations/India Workshop

United Nations/India Workshop United Nations/India Workshop Use of Earth Observation Data in Disaster Management and Risk Reduction: Sharing the Asian Experience Organized by United Nations Office for Outer Space Affairs (UNOOSA) Indian

More information

Financing Development, Transfer, and Dissemination of Clean and Environmentally Sound Technologies

Financing Development, Transfer, and Dissemination of Clean and Environmentally Sound Technologies Financing Development, Transfer, and Dissemination of Clean and Environmentally Sound Technologies UN General Assembly Structured Dialogues on Technology Facilitation Mechanism April 30, 2014 CIF - BACKGROUND

More information

HUMAN DEVELOPMENT FELLOWSHIPS

HUMAN DEVELOPMENT FELLOWSHIPS HUMAN DEVELOPMENT FELLOWSHIPS The IC4HD Human Development (HD) Fellowships aim to encourage mid-career professionals (academics, civil servants, and civil society practitioners) to analyze critical development

More information

Republic of Indonesia: Improving Access to Finance in Aceh and North Sumatra

Republic of Indonesia: Improving Access to Finance in Aceh and North Sumatra Technical Assistance Report Project Number: 45266 Capacity Development Technical Assistance (CDTA) November 2012 Republic of Indonesia: Improving Access to Finance in Aceh and North Sumatra (Financed by

More information

ASEAN Mutual Recognition Arrangement on Medical Practitioners

ASEAN Mutual Recognition Arrangement on Medical Practitioners ASEAN Mutual Recognition Arrangement on Medical Practitioners PREAMBLE The Governments of Brunei Darussalam, the Kingdom of Cambodia, the Republic of Indonesia, Lao People s Democratic Republic, Malaysia,

More information

Evaluation Study. ADB s Japan Funds: Japan Fund for Poverty Reduction. Operations Evaluation Department

Evaluation Study. ADB s Japan Funds: Japan Fund for Poverty Reduction. Operations Evaluation Department Evaluation Study Reference Number: SES: REG 2007-10 Special Evaluation Study August 2007 ADB s Japan Funds: Japan Fund for Poverty Reduction Operations Evaluation Department ABBREVIATIONS ADB Asian Development

More information

Gender and Development Cooperation Fund Thirteenth Progress Report (2016)

Gender and Development Cooperation Fund Thirteenth Progress Report (2016) Annual Progress Report March 2017 Gender and Development Cooperation Fund Thirteenth Progress Report (2016) Thematic Advisory Services Cluster Sustainable Development and Climate Change Department ABBREVIATIONS

More information

Annex Template for the call for input

Annex Template for the call for input Submission by Asian Development Bank on Actions undertaken by accredited observer organizations relevant to the in performing its functions 30 July 2012 (TEC) at it third Session made a decision to call

More information

The health workforce: advances in responding to shortages and migration, and in preparing for emerging needs

The health workforce: advances in responding to shortages and migration, and in preparing for emerging needs SIXTY-SIXTH WORLD HEALTH ASSEMBLY A66/25 Provisional agenda item 17.4 12 April 2013 The health workforce: advances in responding to shortages and migration, and in preparing for emerging needs Report by

More information

Country Operations Business Plan. Samoa October 2016

Country Operations Business Plan. Samoa October 2016 Country Operations Business Plan October 2016 Samoa 2017 2019 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (As of 26

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 44304-01 October 2010 Proposed Loan and Administration of Grant Papua New Guinea: Microfinance Expansion Project CURRENCY

More information

Terms of Reference (TOR) for Independent End of Project Evaluation

Terms of Reference (TOR) for Independent End of Project Evaluation Terms of Reference (TOR) for Independent End of Project Evaluation Project Name Increasing the provision of clean energy in Uganda hereafter referred to as Clean Energy Project Project Number(s) ESARPO0218;

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: Energy Efficiency Project Development Specialist Project Name : Advancing Indonesia s Lighting Market to High Efficient Technologies (ADLIGHT) Reports to:

More information

Outputs of the ASEAN ESC Model Cities Programme

Outputs of the ASEAN ESC Model Cities Programme Outputs of the ASEAN ESC Model Cities Programme INTRODUCTION Plenary Session 1 3 rd High Level Seminar on Environmentally Sustainable Cities 6 th March 2012 Siem Reap, Cambodia Masnellyarti Hilman Chairperson

More information

REPORT OF THE SIXTH SESSION OF THE TECHNICAL COMMITTEE OF THE UNITED NATIONS ASIAN AND PACIFIC CENTRE FOR AGRICULTURAL ENGINEERING AND MACHINERY

REPORT OF THE SIXTH SESSION OF THE TECHNICAL COMMITTEE OF THE UNITED NATIONS ASIAN AND PACIFIC CENTRE FOR AGRICULTURAL ENGINEERING AND MACHINERY UNITED NATIONS ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC UNITED NATIONS ASIAN AND PACIFIC CENTRE FOR AGRICULTURAL ENGINEERING AND MACHINERY Sixth Session of the Technical Committee of UNAPCAEM

More information

GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES

GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES As Adopted by the GIF Governing Council on 20 April, 2015 And Revised on 16 June, 2016 A. INTRODUCTION 1. The Global Infrastructure Facility ( GIF )

More information

Regional Brief: ICP for Asia and the Pacific

Regional Brief: ICP for Asia and the Pacific Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Regional Brief: ICP for Asia and the Pacific 3nd Inter-Agency Coordinating Group Meeting New York 5 March 2017 Asian

More information

33 C. General Conference 33rd session, Paris C/74 11 October 2005 Original: English. Item 5.20 of the agenda

33 C. General Conference 33rd session, Paris C/74 11 October 2005 Original: English. Item 5.20 of the agenda U General Conference 33rd session, Paris 2005 33 C 33 C/74 11 October 2005 Original: English Item 5.20 of the agenda PROPOSAL FOR THE ESTABLISHMENT OF THE REGIONAL CENTRE ON URBAN WATER MANAGEMENT FOR

More information

SUMMARY. CONTENTS I. Background.2 II. Decision and Recommendations of the Meeting 2 III. Summary of Proceedings 4 IV. Organization of the Meeting..

SUMMARY. CONTENTS I. Background.2 II. Decision and Recommendations of the Meeting 2 III. Summary of Proceedings 4 IV. Organization of the Meeting.. REPORT OF THE SECOND MEETING OF THE NETWORK FOR THE COORDINATION OF STATISTICAL TRAINING IN ASIA AND THE PACIFIC 4 March 2016 SIAP, 4 TH Floor JETRO-IDE Building, Chiba, Japan SUMMARY In March 2016, the

More information

F I S C A L Y E A R S

F I S C A L Y E A R S PORTFOLIO STATISTICAL SUMMARY F I S C A L Y E A R S 2 0 0 0-201 2 17 October 2012 Portfolio Statistical Summary for Fiscal Years 2000-2012 2 Table of Contents REPORT HIGHLIGHTS 5 1. INTRODUCTION 6 2. PORTFOLIO

More information

Concept Paper. Project Number: November Lao People s Democratic Republic: Vientiane Sustainable Urban Transport

Concept Paper. Project Number: November Lao People s Democratic Republic: Vientiane Sustainable Urban Transport Concept Paper Project Number: 45041 November 2011 Lao People s Democratic Republic: Vientiane Sustainable Urban Transport I. THE PROJECT A. Rationale 1. The proposed project will support the piloting

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. for individual consultant and consultant assigned by consulting firm/institution

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. for individual consultant and consultant assigned by consulting firm/institution Date: 26 May 2017 INDIVIDUAL CONSULTANT PROCUREMENT NOTICE for individual consultant and consultant assigned by consulting firm/institution Country: Description of the assignment: Project name: Estimated

More information

Regional HEA Manager, Asia Pacific

Regional HEA Manager, Asia Pacific Regional HEA Manager, Asia Pacific Location: [Asia & Pacific] [Thailand] Town/City: Bangkok Category: Project Management Job Type: Fixed term, Full-time *Position location to be determined by home country

More information

Climate Investment Funds: Financing Low-Emissions and Climate-Resilient Activities

Climate Investment Funds: Financing Low-Emissions and Climate-Resilient Activities Climate Investment Funds: Financing Low-Emissions and Climate-Resilient Activities Accessing Finance for Green Growth and LEDS: An Asia LEDS Partnership Workshop Hanoi, March 12-14, 2014 CIF - BACKGROUND!

More information

Framework and main outputs of the ESC Model Cities Programme in ASEAN

Framework and main outputs of the ESC Model Cities Programme in ASEAN Framework and main outputs of the ESC Model Cities Programme in ASEAN COP19 Side Event 16 Nov. 2013 Warsaw, Poland Toshizo Maeda, Deputy Director, Kitakyushu Urban Centre, Institute for Global Environmental

More information

Terms of Reference. Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC)

Terms of Reference. Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC) Terms of Reference Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC) 1. Introduction August 2016 to August 2018 1. Supporting Kenya s devolution

More information

7 th Model ASEM in conjunction with the 11 th ASEM Summit (ASEM11) 20 Years of ASEM: Partnership for the Future through Connectivity

7 th Model ASEM in conjunction with the 11 th ASEM Summit (ASEM11) 20 Years of ASEM: Partnership for the Future through Connectivity FAQ 7 th Model ASEM in conjunction with the 11 th ASEM Summit (ASEM11) 20 Years of ASEM: Partnership for the Future through Connectivity 6-10 July 2016 Ulaanbaatar, Mongolia Organised by In partnership

More information

The health workforce: advances in responding to shortages and migration, and in preparing for emerging needs

The health workforce: advances in responding to shortages and migration, and in preparing for emerging needs EXECUTIVE BOARD EB132/23 132nd session 14 December 2012 Provisional agenda item 10.4 The health workforce: advances in responding to shortages and migration, and in preparing for emerging needs Report

More information

1. Invitation. 2. Background

1. Invitation. 2. Background Critical Ecosystem Partnership Fund Call for Proposals Evaluation of Lessons Learned to Inform Reinvestment in the Caribbean Islands Biodiversity Hotspot Opening date: Friday, 8 December 2017 Closing date:

More information

Workshop with SE Asian research agencies Goals and objectives

Workshop with SE Asian research agencies Goals and objectives Workshop with SE Asian research agencies Goals and objectives Dr. Barbara Becker, Director Global Transformation Affairs, ETH Zürich Workshop, Singapore, Nov 2-3, 2016 1 Overview Mandate Bilateral programmes

More information

Technical Assistance to the Republic of Philippines for the Support for Health Sector Reform

Technical Assistance to the Republic of Philippines for the Support for Health Sector Reform Technical Assistance TAR: PHI 39066 Technical Assistance to the Republic of Philippines for the Support for Health Sector Reform September 2005 CURRENCY EQUIVALENTS (as of 5 August 2005) Currency Unit

More information

Evaluative Review 2008 Final Report

Evaluative Review 2008 Final Report United Nations Economic and Social Commission for Asia and the Pacific (ESCAP) Multi-donor Voluntary Trust Fund on Tsunami Early Warning Arrangements in the Indian Ocean and Southeast Asia Evaluative Review

More information

SADC-DFRC CEO s Forum. Progress on DBSA-JICA s Africa-Asia DFI Networking

SADC-DFRC CEO s Forum. Progress on DBSA-JICA s Africa-Asia DFI Networking SADC-DFRC CEO s Forum Progress on DBSA-JICA s Africa-Asia DFI Networking Walvis Bay, Namibia December 6, 2012 Tetsuya FUKUNAGA TICAD Advisor to DBSA from JICA Japan s ODA and JICA Technical Cooperation

More information

INNOVATIONS IN FINANCE INDONESIA

INNOVATIONS IN FINANCE INDONESIA INNOVATIONS IN FINANCE INDONESIA Confronting challenges with new approaches The Global Partnership on Output-Based Aid (GPOBA) and its partners apply innovative results-based financing solutions that align

More information

Completion Report. Pakistan: Balochistan Devolved Social Services Program

Completion Report. Pakistan: Balochistan Devolved Social Services Program Completion Report Project Number: 37218 Loan Numbers: 2202, 2203, and 2204 Grant Number: 0028 December 2011 Pakistan: Balochistan Devolved Social Services Program CURRENCY EQUIVALENTS Currency Unit Pakistan

More information

Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project

Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project Trust Fund Project Administration Manual Project Number: 49113 Grant Numbers: GXXXX October 2016 Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project (Financed by

More information

REQUEST FOR CONSULTANCY SERVICES INDIVIDUAL CONTRACT (IC) CODE: MEXX Evaluator (Crime Expert) Senior Specialist

REQUEST FOR CONSULTANCY SERVICES INDIVIDUAL CONTRACT (IC) CODE: MEXX Evaluator (Crime Expert) Senior Specialist REQUEST FOR CONSULTANCY SERVICES INDIVIDUAL CONTRACT (IC) CODE: MEXX35-2017-008 Evaluator (Crime Expert) Senior Specialist Organization: United Nations Office on Drugs and Crime Project: Location: Estimated

More information

Report on EIA twinning project between Lao PDR and Japan

Report on EIA twinning project between Lao PDR and Japan Report on EIA twinning project between Lao PDR and Japan TA 7566-REG: Strengthening and Use of Country Safeguards System: Sub-project: EIA Clearinghouse and Capacity Strengthening through Twinning Consultation

More information

IED'S PROPOSED WORK PROGRAM FOR by Year of Approval by DG, IED. IED's Proposed Work Program for 2011 Alignment with Strategy 2020

IED'S PROPOSED WORK PROGRAM FOR by Year of Approval by DG, IED. IED's Proposed Work Program for 2011 Alignment with Strategy 2020 IED'S PROPOSED WORK PROGRAM FOR 2011 2013 by Year of Approval by DG, IED IED's Proposed Work Program for 2011 (i) DERIVED PROGRAM: OPERATIONS Country Operations a 1 CAPE Uzbekistan 2 CAPE Kyrgyz Republic

More information

Pakistan s Public Private Partnership (PPP) Program

Pakistan s Public Private Partnership (PPP) Program Capacity Building and Training under Infrastructure Project Development Facility (IPDF) 23 rd September 2014 Pakistan s Public Private Partnership (PPP) Program Presentation Outline 1. Facilitation 2.

More information

FEDERAL REPUBLIC OF NIGERIA

FEDERAL REPUBLIC OF NIGERIA Supplemental Letter No. 1 (Lagos Urban Transport Project) Section 9.02 of the General Conditions Financial and Economic Data In connection with the above Credit to the Republic of Nigeria for the Lagos

More information

INTERNATIONAL AGRICULTURE AND FORESTRY EXPERT TERMS OF REFERENCE

INTERNATIONAL AGRICULTURE AND FORESTRY EXPERT TERMS OF REFERENCE INTERNATIONAL AGRICULTURE AND FORESTRY EXPERT TERMS OF REFERENCE Country/Location: UNDP Office, Vientiane, Lao PDR Description of assignment: Short Term to develop the Environmental Impact Assessment Agriculture

More information

TERMS OF REFERENCE. East Jerusalem with travel to Gaza and West Bank. June 2012 (flexible depending on consultant availability between June-July 2012)

TERMS OF REFERENCE. East Jerusalem with travel to Gaza and West Bank. June 2012 (flexible depending on consultant availability between June-July 2012) TERMS OF REFERENCE THE DEVELOPMENT OF TRAINING FOR WASH CLUSTER PARTNERS IN THE DEVELOPMENT & DESIGN OF KNOWLEDGE, ATTITUDE, PRACTICE SURVEYS IN THE OCCUPIED PALESTINIAN TERRITORY. Summary Title Purpose

More information

Supplementary Appendix D 1

Supplementary Appendix D 1 Supplementary Appendix D 1 ENVIRONMENTAL ASSESSMENT OF FINANCIAL INTERMEDIATION LOANS AND EQUITY INVESTMENTS A. Description of the Development Bank of the Philippines (DBP) 1. DBP was established in 1947

More information

PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS

PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS The GEF initial support on the implementation of the Stockholm Convention focuses on assisting Vietnam to

More information

56 MANAGEMENT OF TECHNICAL CO-OPERATION FOR DEVELOPMENT

56 MANAGEMENT OF TECHNICAL CO-OPERATION FOR DEVELOPMENT $2 913 585 $4 496 711 $5 563 818 Co-ordination and control Technical co-operation programmes Technical co-operation implementation The Agency s technical co-operation programme has moved in new directions

More information

OPEN GOVERNMENT DATA TO MONITOR SDGS PROGRESS

OPEN GOVERNMENT DATA TO MONITOR SDGS PROGRESS OPEN GOVERNMENT DATA TO MONITOR SDGS PROGRESS Alexey Kravchenko Associate Economic Affairs Officer ICT and Development Section ICT and Disaster Risk Reduction Division ESCAP 2 Millennium Development Goals

More information

Demo Environment Information for Applicants January 2017

Demo Environment Information for Applicants January 2017 Demo Environment 2016-2018 Information for Applicants January 2017 1(11) Content Financing innovative technology for new markets... 3 Planning Grants... 4 Eligibility... 4 Funding... 4 Ineligible Costs...

More information

Lao People s Democratic Republic and Viet Nam: Greater Mekong Subregion: Sustainable Tourism Development Project

Lao People s Democratic Republic and Viet Nam: Greater Mekong Subregion: Sustainable Tourism Development Project Validation Report December 2017 Lao People s Democratic Republic and Viet Nam: Greater Mekong Subregion: Sustainable Tourism Development Project Reference Number: PVR-542 Project Number: 38015-013 Loan

More information

DRAFT INSARAG AP Strategy and Workplan for Proposed Actions:

DRAFT INSARAG AP Strategy and Workplan for Proposed Actions: Annex D DRAFT INSARAG AP Strategy and Workplan for 2018 - Proposed Actions: GOAL 1(Facilitated by Japan, Australia, Sam and Olga-OCHA) : Objective Action Plan Asia-Pacific Regional Actions Objective 1.1:

More information

Overview of ADB Business Opportunities

Overview of ADB Business Opportunities Asian Development Bank ADB Business Opportunities Seminar AICEP Portugal Global Av. 5 de Outubro, 101 1050-051 Lisboa 4 October 2012 Overview of ADB Business Opportunities BOS 1 Presented by Ahmadou Barry

More information

International Peer-Learning Workshop. Call for Expression of Interest

International Peer-Learning Workshop. Call for Expression of Interest International Peer-Learning Workshop Building a Local Government Alliance for Localising the Sendai Framework for Disaster Risk Reduction (SFDRR) 2015-2030 in the Asia-Pacific Region in the frame of the

More information

Viet Nam: Second Small and Medium-Sized Enterprises Development Program

Viet Nam: Second Small and Medium-Sized Enterprises Development Program Validation Report December 2017 Viet Nam: Second Small and Medium-Sized Enterprises Development Program Reference Number: PVR-544 Program Numbers: 41360-013 and 41360-014 Loan Numbers: 2680 and 3050 ABBREVIATIONS

More information

Global Strategy IMPROVING AG-STATISTICS IN ASIA PACIFIC

Global Strategy IMPROVING AG-STATISTICS IN ASIA PACIFIC Global Strategy IMPROVING AG-STATISTICS IN ASIA PACIFIC Implementation of the Global Strategy to Improve Agricultural and Rural Statistics in Asia and the Pacific Reports from Implementing Partners on

More information

Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project

Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project PD 0002-TJK June 6, 2016 PROJECT DOCUMENT Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project This document has a restricted distribution and may be used by recipients only in performance

More information

Overview of the Workshop Objectives, Expected Outcomes and Impacts Mr. Hongpeng Liu, Chief, Energy Security & Water Resources Section Environment and

Overview of the Workshop Objectives, Expected Outcomes and Impacts Mr. Hongpeng Liu, Chief, Energy Security & Water Resources Section Environment and Overview of the Workshop Objectives, Expected Outcomes and Impacts Mr. Hongpeng Liu, Chief, Energy Security & Water Resources Section Environment and Development Division Economic and Social Commission

More information

AID FOR TRADE EXPERT DIALOGUE BANGKOK, 18 th Nov Case study: Bangladesh Presented by: Mohammad Farhad Bangladesh Foreign Trade Institute

AID FOR TRADE EXPERT DIALOGUE BANGKOK, 18 th Nov Case study: Bangladesh Presented by: Mohammad Farhad Bangladesh Foreign Trade Institute AID FOR TRADE EXPERT DIALOGUE BANGKOK, 18 th Nov. 2013 Case study: Bangladesh Presented by: Mohammad Farhad Bangladesh Foreign Trade Institute Outline of presentation Preparation Stage Implementation Stage

More information

Kyrgyz Republic: Investment Climate Improvement Program

Kyrgyz Republic: Investment Climate Improvement Program Validation Report Reference Number: PVR-423 Project Numbers: 41544-022, 41544-082, 41544-084 Grant Numbers: 0120, 0319, and 0393 October 2015 Kyrgyz Republic: Investment Climate Improvement Program Independent

More information