Completion Report. Pakistan: Balochistan Devolved Social Services Program

Size: px
Start display at page:

Download "Completion Report. Pakistan: Balochistan Devolved Social Services Program"

Transcription

1 Completion Report Project Number: Loan Numbers: 2202, 2203, and 2204 Grant Number: 0028 December 2011 Pakistan: Balochistan Devolved Social Services Program

2 CURRENCY EQUIVALENTS Currency Unit Pakistan rupee/s (PRs) At Appraisal At Program Completion 10 September December 2009 PRs1.00 = $ $ $1.00 = PRs PRs ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund BLGO Balochistan Local Government Ordinance BPGR Balochistan Performance Grant Rules OCR ordinary capital resources MIS management information system PETS public expenditure tracking survey PFC provincial finance commission PHE public health engineering PHED Public Heath Engineering Department PPO provincial program office PPP public private partnership PSC provincial steering committee QSDS quantitative service delivery survey TA technical assistance TMA tehsil or town municipal administration WSS water supply and sanitation NOTES (i) The fiscal year (FY) of the Government of Pakistan and its agencies ends on 30 June. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2010 ends on 30 June (ii) In this report, "$" refers to US dollars. Vice President X. Zhao, Operations Group 1 Director General J. Miranda, Central and West Asia Department Country Director W. Liepach, Pakistan Resident Mission Sector Director D. Kertzman, Public Management, Financial Sector, and Trade Division, Central and West Asia Department Team leader Team members O. Bin Zia, Project Officer (Public Management), Pakistan Resident Mission M. Abro, Senior Project Officer, Pakistan Resident Mission I. Ali Memon, Associate Project Analyst, Pakistan Resident Mission In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

3 CONTENTS BASIC DATA Page i I. PROGRAM DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 1 A. Relevance of Design and Formulation 1 B. Program Outputs 3 C. Program Costs 7 D. Disbursements 7 E. Program Schedule 8 F. Implementation Arrangements 8 G. Conditions and Covenants 8 H. Related Technical Assistance 9 I. Consultant Recruitment and Procurement 9 J. Performance of Consultants, Contractors, and Suppliers 10 K. Performance of the Borrower and the Executing Agency 10 L. Performance of the Asian Development Bank 11 III. EVALUATION OF PERFORMANCE 11 A. Relevance 11 B. Effectiveness in Achieving Outcome 12 C. Efficiency in Achieving Outcome and Outputs 12 D. Preliminary Assessment of Sustainability 12 E. Institutional Development and Impact 13 IV. OVERALL ASSESSMENT AND RECOMMENDATIONS 13 A. Overall Assessment 13 B. Lessons 13 C. Recommendations 14 APPENDIXES 1. Design and Monitoring Framework Implementation Status of Policy Matrix under the Program Release and Utilization of Performance Grants Implementation Arrangements Status of Compliance with Loan Covenants Technical Assistance Completion Report of TA 4673 PAK Overall Assessment of the Balochistan Devolved Social Services Program 36

4

5 A. Loan Identification BASIC DATA (ORDINARY CAPITAL RESOURCES LOAN) 1. Country 2. Loan Number 3. Program Title 4. Borrower 5. Executing Agency 6. Amount of Loan 7. Program Completion Report Number Pakistan 2202 Balochistan Devolved Social Services Program Islamic Republic of Pakistan Planning & Development Department, Balochistan $130 million PCR: PAK 1296 B. Loan Data 1. Appraisal Date Started Date Completed 2. Loan Negotiations Date Started Date Completed 3. Date of Board Approval 4. Date of Loan Agreement 5. Date of Loan Effectiveness In Loan Agreement Actual Number of Extensions 6. Closing Date In Loan Agreement Actual Number of Extensions 7. Terms of Loan Interest Rate Maturity (number of years) Grace Period (number of years) 5 September September October October December August November November 2006 none 31 December December 2009 none ADB s London interbank offered rate (LIBOR)- based lending facility 15 years 3 years

6 ii 8. Disbursements a. Dates Initial Disbursement 14 December 2006 Effective Date 16 November 2006 Final Disbursement 14 December 2006 Original Closing Date 31 December 2009 Time Interval 0 Time Interval 37 months b. Amount ($ million) Category or Subloan Original Allocation Last Revised Allocation Amount Canceled Net Amount Available Amount Disbursed Undisbursed Balance 1. BDSSP Total BDSSP = Balochistan Devolved Social Services Program C. Program Data 1. Program Cost ($ million) Cost Appraisal Estimate Actual Foreign Exchange Cost Local Currency Cost 0 0 Total Program Schedule Item Appraisal Estimate Actual First tranche Second tranche Program Performance Report Ratings Implementation Period Development Objectives Ratings Implementation Progress From 31 December 2005 to 30 December 2006 Satisfactory Satisfactory From 31 December 2006 to 30 December 2007 Satisfactory Satisfactory From 31 December 2007 to 30 December 2008 Satisfactory Satisfactory From 31 December 2008 to 30 December 2009 Partly satisfactory Partly satisfactory

7 iii D. Data on Asian Development Bank Missions Name of Mission Date No. of Persons No. of Person-Days Specialization of Members Loan fact-finding 4 15 Jul a, b, c, e, f, g, i, j, k, l Loan appraisal 4 10 Sep b, c, l Loan negotiations Oct c, l, m Review Mar b, c Review Jul a, b, f, I Review Apr a, b Review May a, b a = senior social sectors specialist, b = consultant, c = health specialist, d = project analyst, e = environment specialist, f = education specialist, g = senior governance specialist, h = education advisor, i = economist, j = project economist, k = program officer (Pakistan Resident Mission), l = counsel, m = country program specialist Note: The Pakistan Resident Mission provided support to the missions in the field.

8 iv BASIC DATA (ASIAN DEVELOPMENT FUND LOAN) A. Loan Identification 1. Country 2. Loan Number 3. Program Title 4. Borrower 5. Executing Agency 6. Amount of Loan 7. Program Completion Report Number Pakistan 2203 Balochistan Devolved Social Services Program Islamic Republic of Pakistan Planning & Development Department, Balochistan SDR45,056,000 (equivalent to $65 million) from ADB s Special Funds resources PCR: PAK 1296 B. Loan Data 1. Appraisal Date Started Date Completed 2. Loan Negotiations Date Started Date Completed 3. Date of Board Approval 4. Date of Loan Agreement 5. Date of Loan Effectiveness In Loan Agreement Actual Number of Extensions 6. Closing Date In Loan Agreement Actual Number of Extensions 7. Terms of Loan Interest Rate Maturity (number of years) Grace Period (number of years) 5 September September October October December August November November 2006 none 31 December December 2009 none 1% per annum during the grace period and 1.5% thereafter 24 years 8 years 8. Disbursements a. Dates Initial Disbursement 14 December 2006 Effective Date 16 November 2006 Final Disbursement 14 December 2006 Original Closing Date 31 December 2009 Time Interval 0 Time Interval 37 months

9 v b. Amount (SDR) Category or Subloan Original Allocation Last Revised Allocation Amount Canceled Net Amount Available Amount Disbursed 1. BDSSP 45,056,000 29,460,000 15,596,000 15,596, ,000,000 23,488,980 a 0 Total ($ Equivalent) BDSSP = Balochistan Devolved Social Services Program C. Program Data 1. Program Cost (SDR) Cost Appraisal Estimate Actual Undisbursed Balance Foreign Exchange Cost 45,056,000 15,596,000 Local Currency Cost 0 0 Total 45,056,000 15,596, Program Schedule ($) Item Appraisal Estimate Actual First tranche 22,500,000 23,488,980 Second tranche 42,500, Program Performance Report Ratings Implementation Period Development Objectives Ratings Implementation Progress From 31 December 2005 to 30 December 2006 Satisfactory Satisfactory From 31 December 2006 to 30 December 2007 Satisfactory Satisfactory From 31 December 2007 to 30 December 2008 Satisfactory Satisfactory From 31 December 2008 to 30 December 2009 Partly satisfactory Partly satisfactory D. Data on Asian Development Bank Missions Name of Mission Date No. of Persons No. of Person-Days Specialization of Members Loan Fact-finding 4 15 Jul a, b, c, e, f, g, i, j, k, l Loan Appraisal 4 10 Sep b, c, l Loan Negotiations Oct c, l, m Review Mar b, c Review Jul a, b, f, I Review Apr a, b Review May a, b a = senior social sectors specialist, b = consultant, c = health specialist, d = project analyst, e = environment specialist, f = education specialist, g = senior governance specialist, h = education advisor, i = economist, j = project economist, k = program officer (Pakistan Resident Mission), l = counsel, m = country program specialist a At historical rate. Note: The Pakistan Resident Mission provided support to the missions in the field.

10 vi BASIC DATA (ASIAN DEVELOPMENT FUND TECHNICAL ASSISTANCE LOAN) A. Loan Identification 1. Country 2. Loan Number 3. Program Title 4. Borrower 5. Executing Agency 6. Amount of Loan 7. Program Completion Report Number Pakistan 2204 Balochistan Devolved Social Services Program Islamic Republic of Pakistan Planning & Development Department, Balochistan SDR3,466,000 (equivalent to $5 million) from ADB s Special Funds resources PCR: PAK 1296 B. Loan Data 1. Appraisal Date Started Date Completed 2. Loan Negotiations Date Started Date Completed 3. Date of Board Approval 4. Date of Loan Agreement 5. Date of Loan Effectiveness In Loan Agreement Actual Number of Extensions 6. Closing Date In Loan Agreement Actual Number of Extensions 7. Terms of Loan Interest Rate Maturity (number of years) Grace Period (number of years) 5 September September October October December August November November 2006 none 31 December June 2011 none a 1% per annum during the grace period of and 1.5% thereafter 32 years 8 years a The delay in actual closing was due to delayed refund of outstanding imprest balance. See para. 28 of main report.

11 vii 8. Disbursements a. Dates Initial Disbursement 3 August 2007 Effective Date 16 November 2006 Final Disbursement 30 June 2011 Original Closing Date 31 December 2010 Time Interval 47 months Time Interval 49 months Category or Subloan b. Amount (SDR) Original Allocation Amount Canceled Last Revised Allocation Net Amount Available Amount Disbursed Undisbursed Balance 1. Training and capacity building 745, ,037 3,963 3,963 3, Workshop and seminars 173, ,284 15,716 15,716 15, Equipment, vehicle, surveys, and studies 510, ,300 24,700 24,700 24, Operating costs 507, ,960 7,040 7,040 7, Consulting services 1,365,000 1,329,605 35,395 35,395 35, Unallocated 166, , Impress Account Total SDR 3,466,000 3,379,186 86,814 86,814 86,814 0 $ Equivalent 5,000, ,154 a 0 a At historical rate. C. Project Data 1. Project Cost ($) Cost Appraisal Estimate Actual Foreign Exchange Cost 183,750 0 Local Currency Cost 6,066, ,355 Total 6,250, ,355 a a Amount includes government counterpart share of $170,201 (as per government program completion report), at historical rate. Item 2. Project Schedule Date of Contract with Consultants Actual Contract 0004: Altaf Bhatti 10 May 2007 Contract 0005: Abdul Quayyum 31 May 2007 Contract 0006: Aqeel Taj 11 July 2008

12 viii Item Actual Contract 0007: Noor Ahmed 20 September 2007 Contract 0008: Abdul Malik Sherani 11 July 2008 Equipment and Supplies Dates First Procurement 7 July 2008 Last Procurement 25 August 2008 Workshop and Seminars Workshops for midterm and annual plans 18 August 2008 Trainings and Capacity Building Trainings 7 July Project Performance Report Ratings Implementation Period Development Objectives Ratings Implementation Progress From 31 December 2005 to 30 December 2006 Satisfactory Satisfactory From 31 December 2006 to 30 December 2007 Satisfactory Satisfactory From 31 December 2007 to 30 December 2008 Satisfactory Satisfactory From 31 December 2008 to 30 December 2009 Partly satisfactory Partly satisfactory From 31 December 2009 to 30 December 2010 Unsatisfactory Unsatisfactory D. Data on Asian Development Bank Missions Name of Mission Date No. of Persons No. of Person-Days Specialization of Members Loan fact-finding 4 15 Jul a, b, c, e, f, g, i, j, k, l Loan appraisal 4 10 Sep b, c, l Loan negotiations Oct c, l, m Review Mar b, c Review Jul a, b, f, I Review April a, b Review May a, b a = senior social sectors specialist, b = consultant, c = health specialist, d = project analyst, e = environment specialist, f = education specialist, g = senior governance specialist, h = education advisor, i = economist, j = project economist, k = program officer (Pakistan Resident Mission), l = counsel, m = country program specialist Note: The Pakistan Resident Mission provided support to the missions in the field.

13 ix BASIC DATA (ASIAN DEVELOPMENT FUND GRANT) A. Grant Identification 1. Country 2. Grant Number 3. Program Title 4. Borrower 5. Executing Agency 6. Amount of Grant 7. Program Completion Report Number B. Grant Data 1. Appraisal Date Started Date Completed 2. Negotiations Date Started Date Completed 3. Date of Board Approval 4. Date of Agreement 5. Date of Effectiveness In Agreement Actual Number of Extensions 6. Closing Date In Agreement Actual Number of Extensions Pakistan 0028 Balochistan Devolved Social Services Program Islamic Republic of Pakistan Planning & Development Department, Balochistan US$5 million from ADB s Special Funds resources PCR: PAK September September October October December August November November 2006 none 31 December December 2009 none 7. Disbursements a. Dates Initial Disbursement 14 December 2006 Effective Date 16 November 2006 Final Disbursement 14 December 2006 Original Closing Date 31 December 2009 Time Interval 0 Time Interval 37 months Category or Subgrant b. Amount (US$) Last Revised Allocation Net Amount Available Original Allocation Amount Canceled Amount Disbursed 1. BDSSP 5,000,000 2,500,000 2,500,000 2,500,000 2,500,000 0 Total 2,500,000 0 BDSSP = Balochistan Devolved Social Services Program Undisbursed Balance

14 x C. Grant Data 1. Program Cost (US$) Cost Appraisal Estimate Actual Foreign Exchange Cost 5,000,000 2,500,000 Local Currency Cost 0 0 Total 5,000,000 2,500, Grant Schedule ($) Item Appraisal Estimate Actual First tranche 2,500,000 2,500,000 Second tranche 2,500, Program Performance Report Ratings Ratings Implementation Period Development Objectives Implementation Progress From 31 December 2005 to 30 December 2006 Satisfactory Satisfactory From 31 December 2006 to 30 December 2007 Satisfactory Satisfactory From 31 December 2007 to 30 December 2008 Satisfactory Satisfactory From 31 December 2008 to 30 December 2009 Partly satisfactory Partly satisfactory D. Data on Asian Development Bank Missions Name of Mission Date No. of Persons No. of Person-Days Specialization of Members Loan Fact-finding 4 15 Jul a, b, c, e, f, g, i, j, k, l Loan Appraisal 4 10 Sep b, c, l Loan Negotiations Oct c, l, m Review Mar b, c Review Jul a, b, f, I Review Apr a, b Review May a, b a = senior social sectors specialist, b = consultant, c = health specialist, d = project analyst, e = environment specialist, f = education specialist, g = senior governance specialist, h = education advisor, i = economist, j = project economist, k = program officer (Pakistan Resident Mission), l = counsel, m = country program specialist a At historical rate. Note: The Pakistan Resident Mission provided support to the missions in the field.

15 I. PROGRAM DESCRIPTION 1. On 8 December 2005, Asian Development Bank (ADB) approved the Balochistan Devolved Social Services Program (Program) for $205 million to support the government of Balochistan Province in implementing reforms to improve the delivery of health, education, and water supply and sanitation (WSS) services by public and private providers. 1 The Program included (i) a program loan of $130 million from ADB s ordinary capital resources (OCR) to meet Program adjustment costs, (ii) a program loan of $65 million from ADB s Special Fund resources to finance performance grants to districts, (iii) a technical assistance (TA) loan of $5 million from Special Fund resources to support Program implementation, and (iv) a grant of $5 million from Special Fund resources to finance the control of HIV/AIDS and other infectious diseases. The program loans and grant were to be disbursed in two tranches. The first tranche was valued at $135 million and second at $65 million (see para. 24). Noncompliance with most second tranche actions prevented the release of this tranche. 2. The education, health, and WSS indicators for Balochistan province were much lower than for the country as a whole, with wide variations between districts and rural urban disparities. 2 The Program aimed to accelerate the province s progress towards the Millennium Development Goals (MDGs) and the social sector targets of the government of Balochistan s poverty reduction strategy by utilizing opportunities for enhancing the role of local governments in social service delivery provided by the Balochistan Local Government Ordinance (BLGO), Program outputs were designed to strengthen (i) provincial and district government relationships through provincial efficiency incentives for local governments; (ii) the relationship between district governments and social service delivery providers by devolving managerial powers to district governments; (iii) relationships between citizens and provincial and district policy makers; and (iv) private sector participation in service delivery. The Program design and monitoring framework is in Appendix 1. II. EVALUATION OF DESIGN AND IMPLEMENTATION A. Relevance of Design and Formulation 4. The Program s design was relevant at appraisal but diminished with weakened political commitment to devolution, which was inconsistent with Program design. The Program was aligned with the human development goals of the government of Balochistan s poverty reduction strategy for education, health, and WSS. The Program design supported reforms to strengthen local governments and introduce stakeholder participation in managing social facilities in line with the BLGO. 5. The Program design was consistent with ADB s country strategy and program updates for 2004 and 2005, which maintained the strategic focus on good governance and social sectors 1 ADB Report and Recommendation of the President to the Board of Directors: Proposed Program Loans, Technical Assistance Loan, and Asian Development Fund Grant to the Islamic Republic of Pakistan for the Balochistan Devolved Social Services Program. Manila (Loans 2202, 2203[SF], 2204[SF], and grant 0028[SF]-PAK for $205 million equivalent, approved on 8 December 2005). 2 Government of Pakistan, Federal Bureau of Statistics Pakistan Integrated Household Survey. Islamabad; Government of Balochistan, Bureau of Statistics Multiple Indicator Cluster Survey. Quetta. 3 Government of Balochistan Balochistan Poverty Reduction Strategy Paper. Quetta; Government of Balochistan Balochistan Local Government Ordinance, 2001 (Ordinance XVIII of 2001). Quetta.

16 2 to support Pakistan s progress toward the MDGs. 4 A program preparatory TA was approved on 8 July 2004 to design support mechanisms through a program loan and a TA project for building government capacity in social service delivery. 5 The team processing the program and TA consulted closely with the program management units of the Balochistan Resource Management Program and Decentralization Support Program to ensure the Program s complementarity, fiscal prudence, and efficient resource allocation. 6 The Program s design benefitted from stakeholder consultation and lessons learned from performance grant mechanisms established by the Sindh and Punjab devolved social services programs However, despite the planned synergies with existing strategies and programs of both ADB and the government of Balochistan, the risk of diminished political commitment to decentralization was unforeseen at Program design. Despite the constitutional protection provided to the local government system, the elected provincial assemblies brought amendments to the BLGO in 2005, tilting the balance of power toward the provincial executive. 8 The Balochistan Local Government Act, 2010 substantially reversed the devolution of social sectors. 9 This act abolished the Provincial Finance Commission and the Local Government Commission, among other new institutions, upon which Program reforms had relied for strengthening local governments. The Program s design contained no mechanisms to address such changes. 7. The Program aimed to improve service delivery in multiple sectors, reform governance in multiple tiers of government, and add new reforms to the unevaluated reform agenda of the Balochistan Resource Management Program. Capacity constraints in Balochistan and limited experience in implementing a range of reforms through the program loan modality were not adequately considered in the multisector program design. The sequencing of reforms under the policy matrix was back loaded, with outputs to be realized at the end of the Program. The TA loan design envisaged recruiting consultants and establishing Program support units in provincial and local governments. The government s commitment to implementing a comprehensive reform agenda wavered, as it decided not to recruit consultants or contract staff for the Program units under the TA loan (para. 37). 4 ADB Country Strategy and Program Update: Pakistan, Manila; ADB Country Strategy and Program Update: Pakistan, Manila. 5 ADB Technical Assistance to Pakistan for Preparing the Balochistan Devolved Social Services Program. Manila. 6 ADB Report and Recommendation of the President to the Board of Directors on Proposed Program Loans and Technical Assistance Grants to the Islamic Republic of Pakistan for the Balochistan Resource Management Program. Manila (Loans 2107 and 2108[SF]-PAK); ADB Report and Recommendation of the President to the Board of Directors on Proposed Program and Technical Assistance Loans to the Islamic Republic of Pakistan for the Decentralization Support Program. Manila (Loan 1935 and1936-pak). 7 ADB Report and Recommendation of the President to the Board of Directors on Proposed Program and Technical Assistance Loans to the Islamic Republic of Pakistan for the Sindh Devolved Social Services Program. Manila (Loan 2049-PAK, for $220 million, approved 12 December); ADB Report and Recommendation of the President to the Board of Directors on Proposed Program Loans and Technical Assistance Grant to the Islamic Republic of Pakistan for the Punjab Devolved Social Services Program. Manila (Loans 2144 and 2145[SF]-PAK, for $150 million equivalent, approved 20 December). 8 For example, see the 2005 amendment to section 25 of the BLGO, The power to suspend an order or decision of the elected chief executive of the district was transferred to the chief executive of the province from the local government commission, an institution with broad representation of the government, technocrats, and civil society. 9 Government of Balochistan Balochistan Local Government Act, 2010 (Act No. V of 2010). Quetta.

17 3 B. Program Outputs 8. Program outputs were structured around four areas: (i) provincial efficiency incentives to strengthen and clarify intergovernmental relationships and roles; (ii) strengthened managerial powers in local governments to improve relationships between local governments and providers of social services; (iii) enhanced citizens voice and empowerment to strengthen relationships between citizens and provincial and district policy makers; and (iv) enhanced engagement of the private sector and nonprofit organizations in social service delivery. TA loan outputs comprising the development of sector strategies, strengthened capacity of social sector managers and service providers, and improved monitoring and evaluation tools, were envisioned to support related policy reforms. 9. As discussed below and noted in para. 1, most Program outputs were not achieved due to the government s noncompliance with second tranche actions. Appendix 2 reflects the implementation status of reforms under the policy matrix. 1. Provincial Efficiency Incentives 10. Budget certainty for social sectors. The Program did not succeed in making the performance grants system a source of predictable transfers to local governments for social sectors. Under the first tranche of the Program, the Provincial Finance Commission (PFC) award and performance grant system were established, and performance grants amounting to PRs million were released to 19 of the 29 districts governments by May Counterpart funds amounting to PRs1, million generated from the proceeds of the Asian Development Fund (ADF) loan of $22.50 million equivalent and PRs million generated from the proceeds of the ADF grant of $2.50 million equivalent were made available for transfer to local governments as performance grants during financial year (FY) 2008 and FY The release and utilization of performance grants were slowed by the limited absorptive capacity of local governments and inadequate technical support and coordination from provincial sector departments toward preparing utilization proposals in accordance with grant objectives. 11 The Finance Department did not agree to include tehsil (subdistrict) or town municipal administrations (TMAs) in the performance grant system to sidestep capacity constraints and fiduciary risk from enhanced funding at that level. The government requested a partial waiver of the related second tranche action, to which ADB did not agree. Reporting requirements under rule 9 of the Balochistan Performance Grant Rules (BPGR), 2005 were not fully implemented as the districts did not provide key information to the provincial program office, despite requests. The BPGR required local governments to comply with eligibility criteria and contract conditions and submit applications to the PFC Secretariat. 12 Because local governments had difficulty understanding the application process, by the end of the FY2008, 12 of the 30 district governments had not applied for the second installment and, by the end of FY2009, only 6 district governments had accessed the second installment of performance grants. Subsequently, PRs1, million was released from counterpart funds to all the districts. As of the end of October 2010, utilization stood at only PRs million, only 44% of the counterpart funds available under the ADF loan. See Table A3.1 in Appendix 3 on the 10 These performance grants were financed from counterpart funds generated from the first tranche of the Balochistan Resource Management Program. Subsequent releases increased the amount of first installment of performance grants for fiscal year 2006 to PRs million. 11 ADB Completion Report: Balochistan Resource Management Program in Pakistan. Manila 12 Schedule III to the BPGR, 2005.

18 4 release and utilization of performance grants by district. The achievement of this output was therefore only partly successful. 12. Autonomy in budget preparation and administrative actions. Program actions to redefine the roles and responsibilities of provincial departments and local governments for the social sectors in line with the BLGO were only partly implemented. Proposals for rationalizing the roles of the education, health, and public health engineering (PHE) departments were developed by departmental working groups and made available on government website during the first tranche. Education and health proposals were comprehensive and included job descriptions for district managers and supervisors, staffing requirements, and proposals for further devolving administrative powers in line with the BLGO. The devolution of the PHE Department was only partly achieved, and its proposal for rationalizing its role and staffing reflected incomplete devolution. These proposals remained unapproved. The government requested a partial waiver for the second tranche action, to which ADB did not agree. A draft of the revised rules of business of the government was prepared in 2008, but this, too, was not approved by the government because of impending changes in devolution under the new local government framework. 13 The achievement of this output was therefore unsuccessful. 13. Improved quality of social services. The envisaged outputs of approved sector strategies for health, education, and WSS complete with approved expenditure-allocation norms in line with minimum standards for social sectors were only partly achieved for health and sanitation. Sector strategies for education and water supply were not finalized, and the expenditure allocation norms remained under revision. A component under this output requiring the notification of clinical laboratory regulatory rules and safe blood transfusion rules for Balochistan was completed with both the rules notified and published in the official gazette and on the government website. The first drafts of sector strategies were prepared as a prior action for the release of the first tranche. However, because specialists were not recruited, the provincial education strategy could not be finalized. Work on a provincial drinking water supply strategy was subsequently initiated with the support of the United Nations Children s Fund. Awareness of the sector strategies remained limited, as did their budget implications for implementing expenditure norms in line departments. The achievement of this output was therefore unsuccessful. 2. Managerial Power 14. District governments authority to appoint and transfer staff. Policy actions aimed to provide local governments with managerial authority to appoint, transfer, provide incentives to, and otherwise manage staff in the education, health, and PHE sectors. However, the provincial cabinet did not approve sector departments proposals for amending the Balochistan Removal from Services Ordinance, 2001 and granting to district governments the power to appoint and transfer staff in basic scales Draft proposals for an incentive system for each of the three sectors were developed and posted on the government website in November 2006, prior to the release of the first tranche. However, the financial implications of implementing the incentive system delayed the seeking of chief minister s approval until January Only a few incentives were implemented in education and health, such as introducing a timescale for promoting teachers, providing transportation and residential facilities for female teachers, and, in some instances, providing residential accommodation to health staff. However, these incentives were not based on a comprehensive policy. The government requested the waiver of 13 A comparison of the roles of the health and education departments in the 2006 notified rules of business and the 2008 revised draft reveals few changes that could align the department s role with the BLGO, 2001.

19 5 two of the three second tranche policy actions under this output, to which ADB did not agree as it considered the policy actions essential for improving devolved social services. The output was therefore not achieved. 15. Adequate deployment of staff. The Program intended to achieve adequate staffing through a system of contract appointments at the facility level in the three sectors to reflect demand and provide greater accountability to communities. While the education, health, and PHE departments made many appointments of service delivery staff at social service facilities, filling up to 90% of the vacant posts, guidelines for contractual appointments were not implemented. The output was therefore only partly achieved. 16. Improved capacity of district and facility managers. While the government developed draft management information system strategies and human resource action plans for the social sectors, it was unable to finalize the management support systems required to implement them. A draft strategy for developing a management information system for WSS was developed, but no evidence was provided regarding its approval or implementation. Draft strategies for strengthening the management information systems for education and health were uploaded to the government website before the release of the first tranche, but the government did not provide any evidence of implementation. Over 26% of the TA loan was allocated to training and workshops, of which only 2% was utilized. Only six trainings were organized: for developing district capacity in medium-term and annual plans, financial management, and school management. The output was therefore not achieved. 3. Citizens Voice and Empowerment 17. Grievance-redress mechanism. The Program did not succeed in institutionalizing a grievance-redress mechanism at facilities or in implementing a local government monitoring mechanism through elected local representatives. For 60% of the districts, the government provided lists with names and contact details of facility managers and, in some cases, certification by executive district officers regarding the setting up of complaint cells. For WSS the complaint cells were set up at the tehsil (subdistrict) and district level. No evidence was provided on how effective the grievance-redress system was. ADB s April 2008 review mission noted that few service users were aware of the mechanism. 18. Program actions included the development, notification, and implementation of local government monitoring committees rules. Completing a first tranche action, the government notified the local government monitoring rules in August The rules comprehensively described procedures for electing monitoring committees, their functions and responsibilities, and reporting and follow-up actions for implementing their recommendations. The monitoring committees were notified, but no evidence of their functioning was provided before the Balochistan Local Government Act, 2010 reversed the monitoring committee system. The output was therefore not achieved. 19. Community management of facilities. The Program was unable to strengthen the role of communities in managing social service facilities. The communication strategy developed as a first tranche condition was not approved until Program closure. The provincial government used its own strategy to publicize development activities without strengthening communities. District governments were not provided with the resources or capacity to implement a communication strategy for enhancing the role of communities in managing health and education facilities. The Education Department established 4,234 parent teacher school management committees in 24 districts in 2002 under a program funded by the United States

20 6 Agency for International Development. The intent of the Program action was to activate and train these school management committees. The lists of committees constituted in 2002 were provided as evidence, but they were not updated and there was no indication of their being operational. The Health Department issued notifications in June 2007 constituting hospital management committees for all district headquarters hospitals and two other 50-bed hospitals. However, no evidence was provided regarding their functioning or the selection of private members from civil society, nongovernment organizations, or private general practitioners. The output was therefore not achieved. 20. Civil society monitoring of social service delivery and citizen oversight. The Program was unable to institutionalize citizen oversight and monitoring programs through the implementation of public expenditure tracking surveys, quantitative service delivery surveys, and citizen report cards. While drafts of the surveys were developed under the first tranche, subsequently the government requested waivers for all the three actions, saying that the surveys and report cards were not required. ADB did not agree to the request, as the Program included these activities to pursue community empowerment under the BLGO. The BPGR included the utilization of the surveys and citizen report cards as tools for monitoring and verifying performance indicators for improvements in public service delivery. 14 The government s reasons for not conducting these surveys did not appear to be relevant. 15 The provisions of the Balochistan Local Government Act, 2010 are indicative of the limited role envisaged for community monitoring and oversight of public service delivery. The output was therefore not achieved. 4. Private Sector Engagement 21. Private sector participation. The Program was unable to leverage the advantages that private sector participation in social services delivery could have contributed. Draft strategies for public-private partnerships (PPP) and strengthening private sector participation in social service delivery were developed and placed on the government website under the first tranche. However, there is no evidence that such strategies were approved by a competent forum or implemented. Line departments put forward arrangements pre-dating the Program as examples of PPPs. The Health Department provided examples of quasi-ppp programs, such as the Balochistan Health Foundation and federally funded President s Primary Healthcare Initiative, which contracted out the management of some basic health units to a nongovernment organization. The Education Department reported the Balochistan Education Foundation s operation of some community schools. 16 The output was therefore not achieved. 22. Regulation of private social services delivery. The Program was unable to promote private sector self-regulation in health and education. While draft proposals for self-regulation in health and education were prepared under the first tranche, the April 2008 review found little awareness of these strategies in the departments. The preliminary proposals were basic and 14 Section 10 and schedule VIII of the BPGR, In requesting waivers for the implementation of PETSs, the government stated that an expenditure tracking system between the Finance Department and the accountant general of Balochistan was already functional, so there was no need for introducing another such system at the district and facility level. The reason given for not conducting the QSDS was that a similar survey had already been conducted on the health sector back in 1999 and 2000, with the report published in a scientific journal. The pilot of the citizen report card for Quetta was for the WSS and street lighting services, which the government did not want to conduct, arguing that the acute shortage of water supply in Quetta was already publicly known. 16 The Balochistan health and education foundations were autonomous bodies set up under acts of the provincial parliament in Their activities include providing assistance to private institutions in the sector, but they remain funded by the government, including some direct assistance from development partners.

21 7 provided theoretical and definitional aspects of self-regulation. The situation on the ground did not reflect any inclusion of the concept of self-regulation in the social sectors under the Program. The provincial Health Regulatory Authority established under an ordinance promulgated in 2001 had started functioning, but it lacked the vigor envisaged under the proposed self-regulatory approach. The output was therefore not achieved. 5. Technical Assistance Loan 23. The Program design included a TA loan estimated at $6.25 million equivalent, with $5 million coming from ADB s Special Fund resources and $1.25 million from the government. The TA loan was provided to support sector work on the following policy reforms: strengthening sector planning, management, and monitoring; developing local government and community capacity in social service governance; and implementing policy reforms and performance grants. Only $126,154, or 2.52% of the $5 million allocation, was utilized: to hire five contracted support staff for the provincial program office; train 190 government functionaries of the education, health, PHE, local government, and rural development departments; and procure some office equipment (see paras ). The intended outputs under the TA loan were therefore not achieved. C. Program Costs 24. Total funding for the Program was $205 million, of which $200 million was a loan and $5 million a grant. The Program amount was to be released in two tranches once the government fulfilled certain policy actions. The first tranche consisted of $135 million ($110 million from OCR and $25 million from ADF), and the second tranche was $65 million ($20 million from OCR and $45 million from ADF). The $5 million ADF grant for controlling HIV/AIDS and other infectious diseases was to be released in two tranches of $2.5 million each. The $5 million TA loan was to be disbursed to cover eligible expenditures incurred. 25. Counterpart funds generated from the ADF program loan and grant were meant to support performance grants to finance local government expenditures in education, health, and WSS until 30 June This was partly implemented through transfers to local governments (paras ). Counterpart funds generated from the entire OCR loan were paid by Balochistan to the federal government to refinance its high-interest debt. The fiscal space thus created was to be dedicated to providing current budget support in devolved social sectors and transfers to the local governments under the PFC award. This was partly implemented until FY2010, after which the PFC was abolished and grants to local governments stopped. D. Disbursements 26. As appraised, the first tranche of $135 million was disbursed in accordance with ADB s standard disbursement procedures. The release of the first tranche was originally scheduled for July 2006, but delayed compliance with certain prior actions delayed the release to December As per the original design, the provincial government paid $110 million out of the first tranche release to the federal government to retire high-interest debt, which freed up PRs815 million annually for the government beginning in FY2009. The ADF component of PRs1,350 million meant for performance grants was allocated by the Finance Department to all 30 districts of the province to finance their various social sector schemes. However, the actual amount released to the districts was PRs1,051 million, of which the districts were able to spend, as of October 2010, only PRs million, or 57%. Similarly, of the ADF grant funds of PRs135 million withdrawn by the government as part of the first tranche, PRs121 million was released to

22 8 the districts for preventing the spread of HIV/AIDS and other infectious diseases. Weak absorptive capacity meant the districts were able to utilize, as of October 2010, only PRs57.90 million, or 48% (see Table A3.2 in Appendix 3). The support provided as a TA loan was minimally utilized, with the government spending only $126,000, or 2.5% of the $5 million. 27. Second tranche release depended on the government fulfilling 21 policy actions. However, finding it difficult to meet certain policy actions, the government requested a number of waivers (para. 32). ADB did not agree, so the second tranche was not released. Subsequently, the government requested ADB to bring forward the closing date of the TA loan from 31 December 2010 to 24 May 2010, which was accordingly effected. E. Program Schedule 28. The original Program period was from 1 July 2006 to 30 June Both program loans and the TA loan became effective on 16 November 2006, a week earlier than scheduled in the loan agreement. The first tranche was released on 14 December 2006, about 6 months later than planned. The second tranche was scheduled for release in July 2008, but noncompliance with policy actions prevented tranche release. The two program loans closed on 31 December 2009 as per the original plan, and the TA loan closed early, on 24 May 2010, at the government s request. Financial closure of the TA loan, on 30 June 2011, was delayed by the government s delayed refund of the outstanding imprest balance. There were considerable delays in the government s disbursing of funds to districts under the performance grant mechanism and in districts utilization of funds to implement social sector schemes. F. Implementation Arrangements 29. The Planning and Development Department was the executing agency for the Program. The structure of Program implementation arrangement consisted of (i) a program-specific mechanism; (ii) provincial arrangements; and (iii) arrangements at the district, tehsil, and community level (Appendix 4). 30. The provincial steering committee (PSC) was the highest Program authority and responsible for providing policy guidance to the Program, supervising Program activities, approving the annual work plan and budget for the TA component, monitoring the performance of the provincial program office (PPO) and program units, and ensuring coordination with other programs and projects. The PSC met 11 times from December 2005 to June It tried to expedite the completion of second tranche actions by approving a number of incomplete proposals, which the government did not approve. 31. The multiple layers of implementation units and supervisory bodies were too complex and ambitious. Because the government decided not to set up program units in districts and TMAs, districts achieved very little improvement in service delivery. Changes in key project staff, senior management s lack of ownership or support, and the uncertain future of the devolution framework under the BLGO were major factors slowing implementation. Implementation arrangements were therefore unsatisfactory. G. Conditions and Covenants 32. The Program had 41 tranche conditions, 20 for the release of the first tranche and 21 for the second. All the first tranche conditions were met prior to tranche release on 11 December

23 At the time of the scheduled release of the second tranche in July 2008, the government had achieved full compliance with one policy condition, partial compliance with 13 policy actions, and noncompliance with 7 policy actions, which the government requested ADB to waive. ADB did not agree, as the actions were essential to achieving the Program outcome, so the second tranche was not released. Appendix 2 summarizes the status of compliance with policy actions. 33. The program and TA loans had 33 covenants, only 2 of which were fully met. Among the 14 covenants not complied with was the establishment of TMA program committees and program units, as envisaged under paras. 6 and 11 of schedule 5. Among the 17 covenants partly complied with was the setting up of the PPO, but without full staffing. Loan covenants were overambitious and unrealistic and generally incongruent with social, political, and economic conditions, as well as provincial government capacity. Appendix 5 provides an overview of the status of compliance with loan covenants. H. Related Technical Assistance 34. A project preparatory TA grant for $400,000, approved by ADB on 8 July 2004 and signed with the government in October 2004, was to fund the designing of a program loan to strengthen devolved social services and improve service delivery to the poor. 17 The TA disbursed $380,522, or 95% of the approved amount, and succeeded in achieving the outputs of (i) designing support mechanisms for making social services devolved to local governments and communities more effective, efficient, equitable, and sustainable; (ii) planning a program loan to establish these support mechanisms and a related policy reform agenda; and (iii) planning technical support to improve social services to meet local needs. Consultant recruitment under the TA was timely, and a team of consultants mobilized in Quetta in February 2005 carried out stakeholder consultations, sector-specific workshops, briefings on the program for the districts heads, and a consultative workshop for senior policy makers. 18 The TA team carried out participatory planning sessions for performance grants with representatives and officials of all three tiers of the local government in 13 districts outside Quetta. The feedback from these stakeholder interactions and sector work helped develop the program framework, policy matrix, and design. This TA was thus successful in achieving its outcome. 35. An advisory TA grant of $300,000 for capacity building was approved on 26 October 2005 and signed with the government on 15 December 2005 to serve a bridging TA before the PPO was fully established. 19 This TA was rated partly successful, as it provided the foundation for policy reforms under the Program. The TA specifically supported the executing agency in preparing compliance documents for the first tranche, developed a training program for local governments on accessing and implementing performance grants, and developing a hybrid survey of public expenditure and service delivery. 20 Appendix 6 is the TA completion report. I. Consultant Recruitment and Procurement 36. At appraisal, the TA loan envisaged the input of 8.3 person-months of international consultancy and 104 person-months of domestic consultancy. None of these consultants was 17 ADB Technical Assistance to Pakistan for Preparing the Balochistan Devolved Social Services Program. Manila (TA-4356-PAK). 18 Quetta is the capital of Balochistan Province. 19 ADB Technical Assistance to Pakistan for Capacity Building of Balochistan for Devolved Social Services. Manila (TA 4673 PAK). 20 ADB Technical Assistance Completion Report for Capacity Building of Balochistan for Devolved Social Services. Manila (TA 4673 PAK).

24 10 mobilized. In addition, 4,242 person-months of contract staffing was to be hired to help the PPO and the provincial and district program units implement the Program. 37. The proposal for recruiting 7 domestic consultants instead of the originally planned 14 was initiated by the PPO in February 2008, 15 months after loan effectiveness. Recognizing the delay in consultant recruitment and slow progress in implementing second tranche conditions, ADB offered to help the government with recruitment under the TA loan if the government showed commitment to complying with all conditions by mid The government did not respond to the suggestion and decided not to recruit any consultants. 38. Of the 101 contracted staff intended for the provincial and local government program units, only 5 were recruited, to provide operational support at the PPO. The government decided not to recruit program staff for the program units at the Finance Department, Bureau of Statistics, or districts and tehsils. All contract staff were selected in accordance with ADB s Guidelines on the Use of Consultants (2010, as amended from time to time). A total of $54,499 was disbursed for consultants, against the original allocation of $1,969,525. National consulting for contracted staff totaled 132 person-months, hired on an individual basis. 39. Procurement was restricted to office equipment for the PPO and sector line departments, with $30,644 disbursed to procure computers, printers, photocopiers, and fax machines, against the original allocation of $735,975. Procurement was carried out in accordance with ADB s Procurement Guidelines (2010, as amended from time to time). Similarly, no substantial progress was made toward training and capacity building, and few workshop and seminars were held. A total of $30,183 was disbursed for both the categories, against the original allocation of $1,325,000. The limited recruitment of contract staff and procurement carried out under the TA loan was satisfactory. J. Performance of Consultants, Contractors, and Suppliers 40. No substantial progress was made under the TA loan, as only 2.5% of the loan amount was utilized. Except for the recruitment of five domestic consultants as contract staff for the PPO, the procurement of some office equipment for the PPO and provincial line departments, and a few training and capacity-building events, the TA loan remained unutilized. No domestic and international consultants were recruited. However, the performance of contracted staff in carrying out day-to-day activities and coordinating for the PPO was satisfactory. K. Performance of the Borrower and the Executing Agency 41. The performance of the borrower and the Planning and Development Department is rated partly satisfactory. First tranche actions were completed as per Program design but with some delay. Changed political commitment to the BLGO prevented the completion of second tranche actions and tranche release. 42. The PSC s supervision, monitoring, and coordination of Program implementation was less effective (paras ). While the PPO facilitated program actions for the release of the first tranche, it was ineffective in completing second tranche actions as per Program design. At a critical period in implementing second tranche actions, the PPO was without a full-time program coordinator, which adversely affected the PPO s ability to carry out effective coordination of program reforms.

25 The government did not effectively utilize the capacity-building opportunities provided by the TA. The executing agency did not recruit specialist consultants or set up program units in sector departments and local governments as envisaged under the program and TA loan design. The disbursement and utilization of performance grants remained slow and were not monitored in accordance with the BPGR. The PPO shared progress and implementation issues regularly with ADB, which helped ADB provide appropriate guidance to the executing agency. The Planning and Development Department did not submit the project completion report as required under the loan agreement. L. Performance of the Asian Development Bank 44. The performance of ADB is rated partly satisfactory. ADB carried out detailed situation and stakeholder analysis when designing the Program. The planned multisector interventions and simultaneous introduction of governance reforms at the provincial and local level made program design complex. ADB did not, however, assess the executing agency s capacity to implement multisector reforms through program loan modality and to administer a TA loan. The commitment and interventions of other development partners in the sectors were not adequately assessed. 21 ADB fielded two missions to review compliance with first tranche actions and two missions to review progress on second tranche actions. ADB compliance assessment for the first tranche actions and the performance ratings in ADB s project performance monitoring system were generally liberal, which failed to highlight implementation problems sufficiently. Issues vis-à-vis second tranche actions were adequately identified through the missions and the review of regular progress reports from the PPO. ADB took adequate steps to resolve outstanding issues (para. 37), but the changed political commitment to devolution a key outcome of local government strengthening was beyond ADB s control or effective influence. Changes of ADB program officers during the first 2 years of the Program period contributed to the long gap between ADB review missions after the release of the first tranche. ADB regularly engaged with the executing agency in regard to completing the second tranche actions and provided guidance for resolving implementation challenges. III. EVALUATION OF PERFORMANCE A. Relevance 45. The program is rated partly relevant. At appraisal the Program design was consistent with ADB and government of Balochistan s strategy for improving governance and social indicators. However, the multisector design of the Program which relied on decentralization under the BLGO became partly relevant at completion, due to repeal of the BLGO by the Balochistan Local Government Act, 2010, substantially reversing devolution. The design underestimated capacity constraints and political commitment to the reform agenda. While the first tranche actions were successfully completed, the Program was able to complete only one of the 21 second tranche actions, resulting in unsatisfactory outputs. Program design recognized the risk of diminished political commitment to decentralization but assumed that sustained political commitment to human development could outweigh the risk (paras. 4 7). 21 The Program anticipated the provision of TA for strengthening management information systems for the education and health departments and developing one for PHE Department with support coming from other development partners. The United Nations Children s Fund supported the management information system for WSS, and the Japanese International Cooperation Agency supported a district health information system. The development of a management information system for PHE was not completed, and the ones for the health and education departments were not strengthened by the program (para. 16).

26 12 B. Effectiveness in Achieving Outcome 46. The Program was ineffective in achieving its planned outcome. It aimed to make the delivery of devolved education, health, and WSS services by public and private providers broader and more equitable, mainly by strengthening district governments. Except for a few partly completed reforms under the first tranche, the Program was ineffective in implementing policy actions; completion of first tranche actions had limited bearing on the overall outcome of the Program. Changing political commitment to devolution and the lack of capacity to administer the TA loan caused the general failure of policy reforms critical to achieving the outcome. The effectiveness of the Program was diminished by several issues and implementation challenges: (i) the predictable financing of local governments and the implementation of a performance grant system were only partly implemented and subsequently reversed, (ii) the limited absorptive capacity of local governments stymied the utilization of grants, (iii) sector strategies and expenditure norms were not implemented, (iv) administrative and managerial devolution for social sectors was not implemented, (v) grievance-redress and local government monitoring mechanisms were not institutionalized, (vi) public expenditure and service delivery surveys intended to provide citizen feedback were not implemented, and (vii) PPP policies for the social sector were not approved or implemented. C. Efficiency in Achieving Outcome and Outputs 47. Program management and the utilization of Program resources are rated inefficient. While the PSC and PPO facilitated the completion of the first tranche actions with TA support, the PSC was not able to subsequently supervise and guide Program activities as per design. After first tranche release and the closure of the bridging TA, the PPO was unable to facilitate Program implementation. The absence of local program units hampered program implementation. While the TA loan was available to support Program implementation, only 2.5% was utilized and no specialist consultant was recruited. These problems and noncompliance with policy actions caused cancellation of the second tranche. Additional resources provided under the first tranche successfully created fiscal space for the government through refinancing high-interest debt with counterpart funds generated from proceeds of the OCR loan. However, this fiscal space was not used to continually fund the social sectors through local governments. Only part of the first tranche of the ADF loan and grant was used to provide performance grants to local governments, and disbursement lagged behind schedule. 48. Returns to the public in terms of improved service delivery were minimal, and the intended outcome was not achieved. Given the non-compliance of second tranche actions, policy reversal of the government of Balochistan, and precarious security situation in the province, comprehensive financial and economic analyses were not undertaken. Even if they were computed it is unlikely that high rates of return were obtained. D. Preliminary Assessment of Sustainability 49. The sustainability of the Program, as per its design, is unlikely. Social service delivery during the Program period was limited. Since the local government system was subsequently abolished, the sustainability of Program reform is irrelevant. The Balochistan Local Government Act, 2010 has substantially reversed devolution and limited social sector functions of local governments.

27 13 E. Institutional Development and Impact 50. The contribution of the Program to institutional development is negligible. With the cancellation of the undisbursed amount of the loan because second tranche actions were not completed, Program outputs were generally not achieved. As per the design of the policy matrix, outputs would have been able to contribute to better institutional arrangements only if second tranche actions had been fulfilled. Sector strategies and expenditure norms were not approved. Performance grants, though initially implemented through the PFC, became irrelevant after the new local government system was introduced in Although the increase in public expenditure for promoting gender equality across sectors was effected through performance grants, the implementation of the gender reform action plan was weak, marginally improving life for women. The net enrollment rate for girls in middle school increased slightly from 13% in 2004/05 to 15% in 2008/ IV. OVERALL ASSESSMENT AND RECOMMENDATIONS A. Overall Assessment 51. The program is rated unsuccessful with an overall score of 0.2 (Appendix 7). Program design was rated partly relevant as it aligned with the ADB country partnership strategy and the human development goals of the Balochistan poverty reduction strategy. However, its multisector approach and primary reliance on the BLGO as a mechanism for strengthening devolved social service delivery proved to be problematic. Changing political commitment to local government reform in line with the BLGO and capacity constraints were major factors contributing to the Program s unsuccessful outcome. At the provincial level, this adversely affected the administration of the TA loan. At the district level, capacity constraints hindered the effective implementation of the local government framework and the efficient and timely utilization of additional financial resources provided under the Program. 52. Program oversight by the PSC and coordination by the PPO remained weak. Reporting on the release and utilization of performance grants by districts, the PPO, and the Finance Department was irregular. The government s commitments at the time of Program design and loan signing were not sustained during implementation. Policy reversals and failure to utilize the TA loan made achieving the outcome improbable. At Program closing, 7 of the 21 policy actions for the second tranche required waivers and 13 were only partly complied with. B. Lessons 53. Executing agency capacity. Capacity in the executing and implementing agencies was expected to be built through the accompanying TA loan. Program outputs like developing sector strategies, implementing expenditure tracking and service delivery surveys, training communities to manage and monitor social service delivery, and other outputs critical to achieving Program outcome depended on effective TA loan administration. However, executing agency capacity to administer the TA loan was inadequate. Given the capacity constraints in the province, more frequent and regular TA review missions and direct support through ADBadministered TA could have improved Program implementation. However, security concerns made it difficult to attract and retain good consultants. 22 Government of Pakistan, Federal Bureau of Statistics Pakistan Social and Living Standards Measurement Survey Islamabad.

28 Sector focus of policy reform. Given provincial and district capacity limitations, a Program focusing on a single sector would have had a better chance of success. Sustained support in one sector can be less demanding for both the government and ADB. Multi-sector policy reform interventions involving governance reform are difficult to manage, and a new system of local political governance imposed by the federal government added further complications. 55. Reform sequence. The sequence of reforms in the policy matrix was such that all substantial results could be achieved only after the completion of second tranche actions. In addition, liberal assessment of compliance allowed the release of the first tranche without achieving much toward sustainable outputs. More result-oriented sequencing of policy actions for the first tranche could have achieved some sustainable improvements in social service delivery. C. Recommendations 1. Program Related 56. As agreed by the government, counterpart funds generated from the proceeds of the ADF program loan and grant were to be transferred as performance grants for investments in the social sectors. The government should obtain full utilization reports from the districts for the funds that were transferred as performance grants, providing complete details of activities undertaken using counterpart funds generated from the proceeds of the ADF loan and grant. 2. General 57. For programs involving governance reform, it is important to carry out a more comprehensive assessment of political commitment and dynamics through wider stakeholder consultation at the fact-finding stage. A comprehensive assessment of capacity in the executing and implementing agencies can improve the design of TA accompanying a program loan. The scope of program interventions should be adjusted in line with assessed capacity. Further, it is important that program reforms are scheduled in a sequence that reflects measureable and sustainable progress at each milestone, such as tranche release or subprogram.

29 DESIGN AND MONITORING FRAMEWORK Design Summary A. Program Impact Balochistan Province accelerating progress toward MDGs and Balochistan s poverty reduction strategy relating to education, health, and WSS Performance Targets/Indicators By 2010, in Balochistan Province: Net primary school enrollment rate increased from 24% in 2004 to 40% Infant mortality rate reduced from 104 per 1,000 live births in 2004 to 80 Total fertility rate reduced from 7 in 2004 to 4 Full child immunization increased from 24% in 2004 to 70% Delivery by skilled attendants increased from 21% in 2004 to 35% Access to excreta disposal increased from 40% in 2004 to 56% Data Sources/Reporting Mechanisms Economic and social sector statistics PIHS and other household surveys including MICS Third-party assessments & validation Assumptions and Risks Assumptions Macroeconomic stability and growth Sustained political commitment to human development Risks Diminished political commitment to decentralization Attention diverted by security situation Comments MICS 2010 final report is not available. Comparison of PIHS 2001/02 and PSLM 2004/05 and 2008/09 show some improvement in the following indicators: (i) net primary school enrolment from 37% in PSLM 2004/05 to 44% in PSLM ; (ii) full child immunization from 24% in PIHS 2001/02 to 43% in PSLM 2008/09; and (iii) access to improved sanitation from 67% in PSLM to 80% in PSLM B. Program Outcome Broader supply and more equitable delivery of devolved education, health, and WSS services by public and private providers in Balochistan Province, achieved mainly by strengthened district governments By 2010 in Balochistan Province: income, gender, ethnicity, and geographic inequities in access to social services reduced by 5% from baseline in 2004 Local governments receiving predictable transfers of finances for social sector delivery in accordance with the BLGO, 2001 Local governments with power to post, transfer, and discipline frontline service providers in PIHS and other household surveys including MICS Education and health information systems and reports of provincial line departments Third-party assessments & validations Special surveys for some indicators PFC annual report on performance grants Assumptions Effective targeting of social services to the poor and females Demand-side factors adequately addressed Adequate capacity of district sector managers and frontline service providers Availability of qualified frontline providers in public The MICS 2010 final report is not available. Appendix 1 15

30 Design Summary Performance Targets/Indicators accordance with the BLGO, 2001 Private sector with increased role in delivering publicly funded social services Civil society (NGOs, CBOs, CCBs, SMCs) given active role in social sector service delivery Awareness of HIV/AIDS increases by 10% from baseline Malaria incidence reduced by 10% from baseline Tuberculosis detection rate improved by 10% and cure rate improved by 5% from baseline Data Sources/Reporting Mechanisms Annual budget documents Notification of local governments transfer, posting, and disciplinary power Annual reports of district governments on actions taken Provincial program office reports, including program unit feedback Assumptions and Risks and private sectors, particularly female providers Active involvement of NGOs, CCBs, CBO, and SMCs Risks Fiduciary risks Major natural disasters Performance grant mechanism subjected to bureaucratic wrangles and red tape Comments 16 Appendix 1 C. Policy Reform Outputs 1. Provincial efficiency incentives to strengthen and clarify the relationship between provincial and local governments PFC award announced consistent with fiscal needs of local governments for the devolved social sectors, including salary and non-salary recurrent and development expenditures PFC award, annual budget documents, and annual PSDP documents Assumptions Government committed to strengthening devolved social service delivery Outputs are discussed in detail in the main report s Program Outputs section II.B and in Appendix 2. Financial allocations to highpriority social sector services increased Performance grants to local governments for social sectors initiated and expanded Overlapping functions of provincial and local governments in devolved social service delivery eliminated, and government departments and devolved agencies realigned with respect to devolved social services Roles and staffing of provincial government departments pertaining to social sectors Annual budget documents PFC annual report on performance grants Progress reports from provincial program office Adequate and timely provision of skilled staff and facilities Program ownership by government agencies and civil society Active dialogue with civil society and NGO support

31 Design Summary Performance Targets/Indicators rationalized Data Sources/Reporting Mechanisms Assumptions and Risks Comments Sector strategies, policy frameworks, and action plans prepared by provincial departments and local governments to improve equity, efficiency, effectiveness, and quality of social service delivery Administrative orders and progress reports from provincial program office Continued and consistent government, NGO, and civil society support Review of strategy papers Timely implementation of effective, predictable performance grant flow, and smooth cash flow to local governments Risks Political and bureaucratic instability Possible deterioration in security situation Major natural disasters 2. Managerial power aligned to strengthen the relationship between the local governments and providers of social services Local governments authorized to make postings and transfers in social sector Education and health staff better recruited and deployed; accountability of social service providers enhanced; and steps taken to strengthen the monitoring and evaluation of social services MIS for social sectors is improved Performance grants provided for in-service training of service Notification of rules and administrative orders Notification of disciplinary powers of local governments Appendix 1 17

32 Design Summary 3. Citizens voice and empowerment to strengthen the relationship between citizens and policy makers (voice) and citizens and service providers (empowerment) Performance Targets/Indicators providers: teachers and supervisors in education; and nurses, dispensers, paramedics, and technicians in health Grievance-redress mechanisms developed at all tiers of government, especially at service delivery level Stakeholders increasingly involved in managing social sector facilities PTSMCs, CCBs, and water user committees formed, empowered, and strengthened, and hospital boards introduced in district and 50-bed hospitals Data Sources/Reporting Mechanisms Notification of grievance-redress procedures Complaint cells in all local governments as required under the BLGO; annual report of local government commission Assumptions and Risks Comments 18 Appendix 1 4. Private sector engagement, including nonprofit organizations, in social service delivery Actions taken to promote selfregulation by private education and health sectors Provincial program office report Provincial program office report Strategy and action plan prepared and implemented to promote public private partnership and develop incentives for increased private sector participation in social service delivery Innovative steps taken in social sector delivery, especially with the help of the private sector Provincial program office report PFC annual report on performance grants D. Performance Grant Outputs 5.1 Policy support MDGs: 5.2 Municipal infrastructure grants Fewer underweight children (MDG 1) District governments monthly, quarterly, and annual reports to the PFC and/or the Finance Department PFC annual report on performance Assumptions Performance grants lead to See comments against A. Program Impact above.

33 Design Summary 5.3 Capacity-building grants Performance Targets/Indicators Higher net enrollment in primary education and increased primary school completion (MDG 2) Data Sources/Reporting Mechanisms grants Assumptions and Risks more efficient use of resources and effective social service delivery Comments 5.4 ADF grant for controlling HIV/AIDS and other infectious diseases Less gender disparity in primary and secondary education and increased middle school enrollment for girls (MDG 3) Lower child mortality (MDG 4) Improved maternal health (MDG 5) Improved access to safe drinking water and basic sanitation (MDG 7) in the rural areas PIHS, MICS, and QSDS PETS Third-party assessment & validation Effective monitoring and financial management of performance grants Risk Delayed release of funds to district governments Improved access to safe drinking water and basic sanitation (MDG 7) in urban areas Reports of provincial program office Training of permanent staff to improve capacity of district sector managers and service delivery staff Audit reports Systems improvements implemented HIV/AIDS, tuberculosis, malaria, and other infectious diseases brought under control (MDG 6): (i) increased awareness of HIV/AIDS pandemic and measures to control its spread; (ii) improved tuberculosis case detection and treatment through DOTS; (iii) improved control of malaria vectors, and detection and treatment of malaria cases; and (iv) Childhood infectious diseases controlled through improved child immunization, treatment Reports of provincial program office Appendix 1 19

34 Design Summary Performance Targets/Indicators of ARI, and control of childhood diarrhea 6. Technical Assistance Outputs 6.1 Studies Sector strategies, rationalized roles and staffing, performance criteria and incentives, recruitment and contract appointments, integration of vertical programs, private sector self-regulation, expenditure allocation yardsticks, essential health services package, and strategy and action plan for public private partnership and private sector 6.2 Other TA support Participation in delivering social services and capacity-building activities for social sector managers and service providers, expanded performance grants, MIS and monitoring evaluation systems, public expenditure tracking surveys, quantitative service delivery surveys, thirdparty assessment & validation, citizen report cards Data Sources/Reporting Mechanisms PPO annual report on BDSSP Quarterly and annual progress reports of TA regular review missions Assumptions and Risks Assumptions D. Activities and Milestones E. Inputs Provincial steering committee established and meeting at least quarterly PPO (December 2005) Program units in provincial Finance Department and Bureau of Statistics (December 2005) Consultants start working with PPO; program units; and, where required, provincial departments of education, health and PHE (June 2006) Program units in 28 districts and selected TMAs (June 2006) 1st tranche conditions fulfilled & 1st tranche released (by July 2006) 2nd tranche conditions fulfilled & 2nd tranche released (by July 2008) Performance grants released to districts: (i) 1st year grants, annual installment for single-tranche grants, and quarterly installments (beginning July 2006) (ii) 2nd year grants, annual installment for single-tranche grants, and quarterly installments High-quality work by consultants hired under TA Timely hiring of TA consultant and procurement Risk Delayed approval of PC II ADB: $130 million OCR ADB: $65 million ADF loan ADB: $5 million TA loan ADB: $5 million ADF grant Government resources (TA): $1.25 million ADB: staff time for support and review (1 person-month per year) Government of Balochistan counterpart staff support: program coordinator and Comments No output achieved, as no consultant was recruited under the TA loan. Only 190 social sector and district staff were provided training under the TA loan. Only $110 million from OCR, $22.5 million from ADF loan, $0.126 million from TA loan, and $2.5 million from ADF grant disbursed. 20 Appendix 1

35 Design Summary Performance Targets/Indicators Data Sources/Reporting Mechanisms (FY2008) (iii) 3rd year grants, annual installment for single-tranche grants, and quarterly installments (FY2009) (iv) 4th year grants, annual installment for single-tranche grants, and quarterly installments (FY2010) TA activities (July 2006 June 2010) Program review: periodic reviews & midterm review 18 months after loan effectiveness Continued dialogue with stakeholders to effectively promote social service delivery (September 2005 June 2010) Assumptions and Risks other staff for 4 years. Comments ADB = Asian Development Bank, ADF = Asian Development Fund, ARI = acute respiratory infection, BLGO = Balochistan Local Government Ordinance, BDSSP = Balochistan Devolved Social Services Program, CBO = community-based organization, CCB = citizen community board, DOTS = directly observed treatment strategy (for tuberculosis), FY = fiscal year, HIV/AIDS = human immunodeficiency virus/acquired immunodeficiency syndrome, MDG = Millennium Development Goal, MICS = multiple indicator cluster survey, MIS = management information system, NGO = nongovernment organization, OCR = ordinary capital resources, PC II = Planning Commission Form 2, PETS = public expenditure tracking survey, PFC = provincial finance commission, PHE = public health engineering, PIHS = Pakistan integrated household survey, PPO = provincial program office, PSDP = public sector development program, PSLM = Pakistan social and living standards measurement survey, PTSMC = parent teacher school management committee, QSDS = quantitative service delivery survey, SMC = school management committee, TA = technical assistance, TMA = tehsil or town municipal administration, WSS = water supply and sanitation. Appendix 1 21

36 IMPLEMENTATION STATUS OF POLICY MATRIX UNDER THE PROGRAM Policy Reform Area First Tranche Actions Second Tranche Actions Documentation Provided & Remarks Policy Outcome 1: Provincial Efficiency Incentives 1.1. Budget certainty for education, health, and WSS (social sectors) 1.2. Autonomy in budgets and administrative actions 1.3. Improved quality of social services A The Government of Balochistan disburses the performance grants for the social sectors to most district governments. A The government develops proposals for rationalizing the roles and staffing of social sector departments in line with the BLGO, A Provincial education, health, and PHE departments develop, in consultation with district governments, sector strategies that will expand access to basic social services for the poor and females. A The government prepares expenditure allocation norms in line with minimum standards for social sectors that will have direct benefits for the poor and females. B The government disburses the performance grants for the social sectors in all district governments and enhances the scope of performance grants. B The government (i) notifies the amended government rules of business and (ii) rationalizes the roles and staffing of social sector departments in line with the BLGO, B The government approves education, health, and WSS sector strategies. B The government approves expenditure allocation norms in line with minimum standards for social sectors that will directly benefit the poor and females. T.1: Of the 29 program districts, performance grants were disbursed to 19 districts (notification of the Finance Department on 16 May 2006). The performance grants include allocations for health, education, and water supply and sanitation sectors. T.2: Performance grants were disbursed to only 6 districts. Program units were asked to demonstrate that districts complied with the BPGR, 2005 on eligibility and access. The government requested a partial waiver, to which ADB did not agree. T.1: Working groups have been constituted (notification of the secretary of health on 13 January 2006, secretary of the PHED on 11 January 2006, and secretary of education on 30 March 2006). First draft proposals from social sector departments finalized in line with the Balochistan Local Government Ordinance, Draft proposals are available on the government website. T.2: Rules of business amendment and the proposals for rationalizing the roles and staffing of social sector departments remained in draft form. T.1: Working groups are constituted (notification of the secretary of health on 5 April 2006, secretary of the PHED on 11 January 2006, and secretary of education on 30 March 2006). A consultation workshop is undertaken with district governments, civil society, and key stakeholders on 7 8 June The first draft of sector strategies is finalized and available on the government website. T.2: Not complied with for education. ADB requested the PPO to send evidence of approval for Health and WSS sector strategies. T.1: Working groups are constituted (notification of the secretary of health on 4 April 2006 and the secretary of education on 30 March 2006). First draft expenditure allocation norms are prepared and available on the government website. T.2: Approval submitted only through PSC minutes, 22 Appendix 2

37 Policy Reform Area First Tranche Actions Second Tranche Actions Documentation Provided & Remarks which is insufficient. Government approval is not received. The Finance Department did not approve the norms due to quality concerns. A The government notifies clinical laboratory rules and develops safe blood transfusion rules. Policy Outcome 2: Managerial Power 2.1. Authority in staff-related matters devolved to district governments 2.2. Adequate deployment of staff A The government undertakes a review of district governments existing powers to take actions under Balochistan Removal from Services Ordinance, 2001 for regular and contract employees in the education, health, and PHE departments. A The government, in consultation with local governments, develops an incentive system for sector managers and service delivery staff, including residential benefits for female staff. A The government establishes, in consultation with district governments, facility-specific nonregularizable contractual appointment guidelines. B The government notifies safe blood transfusion rules. B The government, based on the review, notifies powers for district governments to take actions under Balochistan Removal from Services Ordinance, 2001 for regular and contract employees in the education, health, and PHE departments. B The government notifies powers devolved to district governments for the posting and transfer of staff with basic scale 1 16 in the education, health, and PHE departments. B The government approves the incentive system for sector managers and service delivery staff, and the government and local governments implement it. B The government and district governments fill at least 25% of vacant positions identified as of July 2006 in the education and health sectors through these contractual appointment guidelines. Clinical Laboratory Rules, 2005 notified and published in the Balochistan Gazette on 20 August The first draft of safe blood transfusion rules is finalized, notified as the Blood Transfusion Rules, 2005, and published in the Balochistan Gazette on 24 September 2005 (and is available on the government website). T.2: The government notified safe blood transfusion rules. T.1: The working group is constituted (notification of the secretary of education on 30 March 2006). The first draft of the amendments is finalized by the Services and General Administration Department and is available at the government website. T.2: Waiver was requested by the government, but ADB did not agree. T.2: Waiver was requested by the government, but ADB did not agree. T.1: Working groups are constituted (notification of secretary of the PHED on 11 January 2006 and the secretary of education on 30 March 2006). Consultation workshop with local governments conducted on 7 8 June The first draft proposal was finalized and is available on the government website. T.2: Evidence of approval and implementation was not provided. T.1: Consultations with district governments were conducted on 7 8 June The first draft guidelines were finalized by the Services and General Administration Department in April 2006 and are available on the government website. T.2: The PPO submitted documentation indicating that the required number of positions had been filled but not through the newly established contractual Appendix 2 23

38 Policy Reform Area First Tranche Actions Second Tranche Actions Documentation Provided & Remarks appointments mode. The government requested a partial waiver, but ADB did not agree Improved capacity of district and facility managers in the social sector A The government develops, in consultation with district governments, a strategy for a WSS MIS and initiates strengthening the MISs for health and education. A The government develops, in consultation with district governments, a human resource development action plan for district and facility social service managers and providers, both in-service and pre-service. B The government approves and implements the MIS strategy for WSS and strengthens the MISs for health and education. B The government approves the human resource development action plan for district and facility social service managers, and the government and most district governments initiate implementing the action plan. T.1: The working group is constituted (notification of the secretary of education on 30 March 2006). Consultations with district governments were conducted on 7 8 June The first draft strategy for WSS and an action plan for health and education were finalized. The draft strategy is available on the government website. T.2: The approved MIS strategy for WSS was not provided, nor was evidence of implementation. Supporting documentation showing strengthened health and education sectors was not submitted. T.1: Working groups are constituted (notification of the secretary of health on 4 April 2006, secretary of education on 30 March 2006, and secretary of the PHED on 11 January 2006). Consultations with district governments were conducted on 7 8 June The first draft action plan was finalized and is available on the government website. T.2: Approved plans were not submitted. 24 Appendix 2 Policy Outcome 3: Citizens Voice and Empowerment 3.1. Grievanceredress mechanism A At least 50% of district governments establish complaintredress mechanisms in social service facilities. A The government takes steps to strengthen local government monitoring committees by (i) notifying monitoring rules including those relating to the inclusion of women B All district governments establish complaint-redress mechanisms in social service facilities. B (i) Most local governments observe the monitoring rules introduced by the government. (ii) Local government councils approve the bylaws, and local government monitoring committees T.1: Working groups are constituted (notification of the secretary of health on 3 January 2006 and secretary of education on 30 March 2006). Instructions to district governments were issued (letter of the director of education on 14 July 2006 and letter of the provincial coordinator on 28 April 2006). Complaint-redress mechanisms were established in facilities in most program districts, and compliance is being reported and monitored. Information is available at the government website. T.2: District officers provided certification for health and WSS, but supporting documentation for education was not provided. T.1: Monitoring rules were notified by the secretary of the Balochistan Local Government Board through the Balochistan Local Government (Monitoring) Rules, 2006, published in the Balochistan Gazette on 4 August Model bylaws were disseminated

39 Policy Reform Area First Tranche Actions Second Tranche Actions Documentation Provided & Remarks members and making their role effective and (ii) developing and disseminating draft bylaws for local government monitoring committees. observe the bylaws. to district governments for adoption through the BLGO, 2001, as amended from time to time. T.2: Evidence of approval of bylaws and their implementation was required. Meetings records and minutes were not submitted Community management of social service facilities 3.3. Civil society monitoring of social service delivery and citizen oversight A The government develops, in consultation with district governments, a communication strategy to strengthen community involvement in the management of social service facilities. A In at least 30% of districts, most PTSMCs have been formed and trained. A The government develops, in consultation with district governments, guidelines for hospital management boards for district and 50-bed hospitals. A The government develops PETS as provided for in the BPGR, B The government approves and, along with district governments, implements the communication strategy to strengthen community involvement in the management of social sector facilities. B In most districts, most PTSMCs have been formed and trained. B The government notifies guidelines, and most district governments establish hospital management boards in district and 50-bed hospitals. B The government implements the first PETS as provided for in the BPGR, 2005 and makes their results available to the public. T.1: Consultation workshop with district governments conducted on 7 8 Jun First draft strategy finalized on 11 Feb 2006 and is available at the government website. T.2: Evidence on communication strategy approval by the provincial government and the districts was not provided. It was approved only by the PSC. T.1: The working group was constituted (notification of the secretary of education on 30 March 2006). Committees have been formed and trained in nine districts. Information is available at the government website. T.2: Evidence of PTSMCs being formed predated the program period. A proposal for training was submitted, but ADB did not approve certain activities under the TA in response to limited compliance and government commitment to the program. T.1: Consultation workshop with district governments conducted on 7 8 June The Health Department finalized first draft guidelines, which are available at the government website. T.2: Generic instructions from the provincial Health Department for the constitution of hospital management boards and/or committees were provided as evidence. Evidence of district management boards and/or committees including electing the private sector or civil society members was not provided. T.1: The Finance Department finalized the public expenditure tracking survey, and a draft is available on the government website. T.2: Waiver was requested by the government, but ADB did not agree. Appendix 2 25

40 Policy Reform Area First Tranche Actions Second Tranche Actions Documentation Provided & Remarks A The government develops a QSDS. A The government and Quetta district government develop citizen report card in Quetta city district. Policy Outcome 4: Private Sector Engagement 4.1. Private sector participation in social service delivery 4.2. Regulation of private social services delivery A The government develops, in consultation with district governments, a strategy to promote public private partnership in social service delivery. A The government develops, in consultation with district governments, a strategy for the selfregulation of the private sector in education and health. B The government implements the QSDS and makes the result available to the public. B The Quetta city district government implements the citizen report card and makes results available to the public. B The government approves and, along with district governments, initiates the implementation of the strategy to promote public private partnership in social service delivery. B The government approves and, along with district governments, initiates the implementation of the strategy for the self-regulation of the private sector in education and health. T.1: The QSDS is finalized by the Planning and Development Department s Bureau of Statistics, and a draft is available at the government website. T.2: Waiver was requested by the government, but ADB did not agree. T.1: The first draft of the citizen report card is developed by Local Government Department and a draft is available on the government website. T.2: Waiver was requested by the government, but ADB did not agree. T.1: Working groups are constituted (notification of the secretary of education on 30 March 2006, secretary of health on 4 April, and secretary of the PHED on 18 March 2006). A consultation workshop with district governments and other stakeholders was conducted on 7 8 June The first draft proposals for government consideration were prepared and are available at the government website. T.2: The PPO submitted an unapproved strategy to promote PPPs in health but no evidence of implementation. No strategy linked to education or WSS was submitted. T.1: Working groups in education and health departments were constituted (notification of the secretary of education on 30 March 2006 and the secretary of health on 4 April 2006). A consultation workshop with district governments and other stakeholders was conducted on 7 8 June The first draft proposal for health has been prepared, and a draft proposal for education is being finalized. T.2: Evidence submitted for health predates the loan agreement. Nothing was submitted for the private sector in education. Asian Development Bank, ADF = Asian Development Fund, BLGO = Balochistan Local Government Ordinance, BPGR = Balochistan Performance Grant Rules, 2005, MIS = management information system, PETS = public expenditure tracking survey, PHED = public health engineering department, PPO = provincial program office, PTSMC = parent teacher school management committee, QSDS = quantitative service delivery survey, T.1 = first tranche, T.2 = second tranche, TA = technical assistance, WSS = water supply and sanitation. Source: Asian Development Bank. 26 Appendix 2

41 Appendix 3 27 RELEASE AND UTILIZATION OF PERFORMANCE GRANTS Table A3.1: Details on the Release and Utilization of Performance Grants by District, as of 31 October 2010 Funds Released (PRs million) Financial Utilization (PRs million) Utilization (%) District Khuzdar Kech Nasirabad Pishin Killa Abdullah Killa Saifullah Zhob Kohlu Mastung Kalat Panjgur Kharan Awaran Jaffarabad Bolan/Kachhi Changi/Dalbandin Gawadar Ziarat Sibi Shirani Jhal Magsi Nushki Dera Bugti Musakhail Loralai Lasbela Harnai Quetta Washuk Barkhan Total 1, = data not available. Note: Counterpart funds generated from the proceeds of Loan 2203 PAK(SF) totaled PRs1,350 million. Source: Government of Balochistan Completion Report: Balochistan Devolved Social Services Program in Pakistan. Manila.

42 28 Appendix 3 Table A3.2: Details on the Release and Utilization of Performance Grants for HIV/AIDS and Other Infectious Diseases, as of 31 October 2010 Funds Released (PRs million) Financial Utilization (PRs million) Utilization (%) District Khuzdar Kech Nasirabad Pishin Killa Abdullah Killa Saifullah Zhob Kohlu Mastung Kalat Panjgur Kharan Awaran Jaffarabad Bolan/Kachhi Changi/Dalbandin Gawadar Ziarat Sibi Shirani Jhal Magsi Nushki Dera Bugti Harnai Loralai Lasbela Harnai Quetta Washuk Barkhan Total = data not available. Note: Counterpart funds generated from the proceeds of ADF Grant 0028 PAK totaled PRs135 million. Source: Government of Balochistan Completion Report: Balochistan Devolved Social Services Program in Pakistan. Manila.

43 Appendix 4 29 IMPLEMENTATION ARRANGEMENTS Figure A4: Program Organization

44 30 Appendix 5 STATUS OF COMPLIANCE WITH LOAN COVENANTS Covenants Program Steering Committee. The Program Steering Committee (PSC) shall be established to (i) provide policy guidance for the Program; (ii) provide oversight function for the Program activities; (iii) monitor the performance of the Provincial Program Office (PPO) and the Program Units; and (iv) ensure the Program coordination with DSP, BRMP and other programs and projects. The Provincial Program Office. Within two weeks of the Effective Date, Balochistan shall have established the Provincial Program Office (PPO), which shall (i) plan, coordinate, facilitate and monitor the implementation of the Program; (ii) coordinate activities, particularly capacity building, with DSP, BRMP and other programs; (iii) interact, communicate and coordinate on (a) policy reforms with provincial departments, and (b) the implementation of the Performance Grants through the Finance Department, and as required, the PFC; (iv) institute appropriate monitoring mechanisms through the Bureau of Statistics, Finance Department and third party validation through contracted NGOs; and (v) prepare reports documenting, analyzing and reviewing the progress and results of the Program and make such reports publicly available. The PPO shall be headed by a Program coordinator who shall be an officer with basic grade of 19 or 20. The Program coordinator shall be assisted by one Program officer with basic grade of 17 or 18, two Program assistants, each with basic grade of 15 and support staff, as required. The Program coordinator, the Program officer, the two Program assistants and the support staff shall be working full-time at the PPO. Program Committees. Within two weeks of the Effective Date, Balochistan shall ensure that a District Program Committee (DPC) shall have been established in each district government to oversee all matters in connection with the implementation of (i) the policy reforms under the Program as they relate to the district administration; and (ii) the Performance Grants. The committee shall meet at least once a month. Within two weeks of the date a TMA has been declared eligible for the Performance Grant, Balochistan shall ensure that a TMA Program Committee shall have been established. PUs. Within two months of the Effective Date, Balochistan shall ensure that a PU shall have been established in (i) the Finance Department; (ii) the Bureau of Statistics; and (iii) each of the 28 district governments. In the Finance Department, the PU shall be headed by an additional secretary who shall be assisted by a Program officer and a database operator. It shall have the functions to (i) implement the Performance Grants using the framework of the BPGR 2005 and in accordance with the Program design and agreed upon fund allocation, distribution and management procedure; (ii) prepare, according to the Program design and targets, an annual plan for the Performance Grants for the following fiscal year to be approved by the PSC by the end February of each year; (iii) periodically review the Performance Grants and make such improvements as are necessary; (iv) pilot and institutionalize, with the assistance of the contracted NGO, public expenditure tracking surveys with third party validation and make such survey publicly available; (v) liaise with the PFC with regards to the Reference in Loan Agreement Schedule 5, para. 2 Schedule 5, para. 3 Schedule 5, para. 4 Schedule 5, para. 5 Schedule 5, para. 6 Schedule 5, para. 7 Schedule 5, para. 8 Status of Compliance 1 Complied with. Partly complied with. Partly complied with. Partly complied with. Not complied with. Partly complied with. Partly complied with. 1 Assessment of compliance with covenants is based on review of program files and progress reports

45 Covenants Reference in Loan Agreement Appendix 5 31 Status of Compliance 1 administration of the Performance Grants; (vi) ensure timely release of funds under the Performance Grants to local governments; (vii) prepare and submit to PSC an annual report on the Performance Grants and make such report publicly available; and (viii) establish linkage of the Program with BRMP and DSP. In the Bureau of Statistics, the PU shall be headed by the director of the Bureau of Statistics who shall be assisted by a Program officer and one account assistant. Its functions shall be to (i) strengthen survey, data collection and analysis, monitoring and evaluation processes at the provincial level and in the district governments and establish channels for reporting and feedback from grass root levels; and (ii) pilot and institutionalize, with the assistance of the contracted NGO, quantitative service delivery surveys with third-party validation and make such survey publicly available. In each district, the PU shall be headed by the EDO finance and planning who shall be assisted by a Program officer and a database operator. Its functions shall be to (i) utilize the Performance Grants in accordance with the specific criteria and conditions of the Program and follow the process and procedures laid down for monitoring accounting and reporting in the BPGR 2005 and the specific conditions of the terms of partnership; (ii) ensure transparency, equity and accountability in the participatory planning, allocation and use of the Performance Grants; and (iii) encourage and facilitate citizen participation and involvement and public-private partnership in planning, monitoring and implementation of service delivery. Within two months of the date, a TMA has been declared eligible for the Performance Grant, Balochistan shall ensure that a PU shall have been established. Policy Dialogue. The Borrower shall continue timely policy dialogue with ADB on problems and constraints encountered during implementation of the Program and on desirable changes to overcome or mitigate such problems and constraints, and on further reforms to strengthen the social services sector. The Borrower shall keep ADB informed of policy discussions with other multilateral and bilateral agencies that have implications for the implementation of the Program, and shall provide ADB with an opportunity to comment on any resulting policy proposals. The Borrower shall take ADB s views into consideration before finalizing and implementing any such proposals. Continuity of Reforms. The Borrower shall ensure (a) that the objectives achieved, policies adopted, and actions taken prior to the date of the Agreements, as set forth in the development policy letter and accompanying Policy Matrix shall continue to be in full force and effect for the duration of the Program period and subsequently; (b) proper and timely achievement, adoption, compliance and implementation of the objectives, policies, and actions to be achieved, adopted, complied with, and implemented as set forth in the development policy letter and accompanying Policy Matrix; and (c) that once achieved, adopted, complied with, and implemented, such objectives, policies, and actions shall continue to be in full force and effect during and subsequent to the Program period. Counterpart Funds. The Borrower and Balochistan shall ensure that the Counterpart Funds to be generated out of the proceeds of the Loan shall be used to restructure the Balochistan provincial debt through retirement of high-interest cash development loans. Reform Undertakings. Balochistan shall provide devolved social services appropriate administrative, financial, and operational autonomy and agrees that for areas where powers have not yet been Schedule 5, para. 9 Schedule 5, para. 10 Schedule 5, para. 11 Schedule 5, para. 12 Schedule 5, para. 13 Schedule 5, para. 14 Schedule 5, para. 15 Schedule 5, para. 16 Partly complied with. Not complied with. Not complied with. Not complied with. Not complied with. Not complied with. Complied with. Not complied with.

46 32 Appendix 5 Covenants devolved, within eighteen months of the Effective Date, a transition arrangement shall be formulated indicating when and how such powers shall be devolved. Within eighteen months of the Effective Date, Balochistan shall undertake appropriate actions to achieve clarity on the roles, responsibilities, and accountabilities of the provincial social sector departments in the context of the BLGO 2001 to ensure clear distinctions with the mandates of social sector departments in the district governments. Reform Commitments. Balochistan shall undertake long-term commitment towards the improvement of the delivery of the social services in the Program area. Balochistan shall ensure that none of the functions and responsibilities devolved to the local government shall be recentralized. Balochistan shall ensure that the performance grant mechanisms and procedures including on the eligibility of local governments, award of grant, and timely transfer of grant, monitoring, reporting, audit and other aspects shall be consistent with the BPGR Balochistan shall ensure continuous support and assistance to the local governments to improve their (a) capacity in budgeting and financial management; (b) planning, programming and design of development schemes and projects; (c) supervision and implementation of development works; (d) operation and maintenance; and (e) monitoring and evaluation. Program Implementation. Balochistan shall take all steps and actions, including provision of staff resources to ensure satisfactory completion in a timely manner of all Program outputs. Balochistan shall also implement the Program and monitor and evaluate its performance in line with the Program administration memorandum as agreed with ADB. Technical Assistance Loan Agreement. Balochistan shall ensure that in carrying out the policy measures and activities included under the Program, due consideration is given to the findings and recommendations of the activities under the Technical Assistance Loan Agreement. The Borrower and Balochistan shall allow ADB to provide comments on the findings and recommendations of the activities under the Technical Assistance Loan Agreement, for consideration in policy measures for this and upcoming programs in Balochistan or program of similar nature in Pakistan. Auditing, Reporting, Monitoring and Evaluation. Without limiting the generality of Section 4.05 of this Agreement, Balochistan shall ensure that PPO submit to ADB quarterly and annual reports on the implementation of the Program, including the accomplishment of the targets and carrying out of the actions set out in the Policy Letter. Without limiting the generality of Section 4.05 of this Agreement, within two (2) months of the Effective Date, Balochistan shall ensure that the PPO prepare and submit to ADB, the Program inception report which shall summarize actions so far taken and the further actions required for the implementation of the policy reforms under the Program. Within three (3) months of the completion of the Program, Balochistan shall ensure that the PPO prepare and submit the Program completion report to ADB. Within two months of the Effective Date, Balochistan shall set up a Program performance management system to assess and evaluate the scope, implementation arrangements, benefits monitoring, progress and achievements of the Program as agreed with ADB and cause it to be operated within the Program period. Reference in Loan Agreement Schedule 5, para. 17 Schedule 5, para. 18 Schedule 5, para. 19 Schedule 5, para. 20 Schedule 5, para. 21 Schedule 5, para. 22 Schedule 5, para. 23 Schedule 5, para. 24 Schedule 5, para. 25 Schedule 5, para. 25 Schedule 5, para. 26 Status of Compliance 1 Not complied with. Partly complied with. Not complied with. Partly complied with. Not complied with. Not complied with. Not complied with. Partly complied with. Partly complied with. Not complied with. Partly complied with.

47 Covenants Reference in Loan Agreement Appendix 5 33 Status of Compliance 1 The local governments that received the Performance Grants shall maintain accounting, reporting and auditing procedures as prescribed in the BPGR Program Review. ADB and Balochistan shall undertake regular review missions, at least on semi-annual basis, to (i) evaluate compliance with the policy reforms under the Program; (ii) advise on actions required to keep Program implementation on course; and (iii) review the coordination and collaborations of the Program implementation with other ongoing reforms including DSP and BRMP. ADB and Balochistan shall also conduct a comprehensive mid-term review in the second year of Program implementation to evaluate progress on policy reforms and the investments under the Performance Grants. Environment. Balochistan shall ensure that the Program shall be carried out in accordance with the environmental rules and regulations applicable under the Borrower s laws and regulations and ADB s Environmental Policy (2002). Balochistan shall ensure that adequate environmental protection and safety measures shall be included in the design of the Program facilities and that the Program facilities shall be constructed, operated, and maintained in accordance with ADB s Environmental Policy. Balochistan shall ensure that (i) the implementation of environmental monitoring and mitigation measures and the environmental plan; and (ii) the environmental criteria for the Performance Grants activities shall adhere to overall selection requirements and sector-specific requirements, shall be as agreed with ADB. Loan 2203 and Grant 0028 (in addition to above) The Borrower and Balochistan shall ensure that the Counterpart Funds to be generated out of the proceeds of the Loan shall be used as Performance Grants in the social sectors until June 2010 in accordance with BPGR Balochistan further ensures that the performance Grant shall be transferred in addition to the regular PFC award transfers to the local governments, in which each eligible local government shall allocate a minimum of 20% of this Performance grant in each of the social sectors. The Borrower and Balochistan shall ensure that the Counterpart Funds to be generated out of the proceeds of the Grant shall be used as Performance Grants until June 2010 to be utilized exclusively for any of the following activities (i) increase awareness of HIV/AIDS and measures to control its spread; (ii) improve case detection of tuberculosis and increase the access to tuberculosis treatment, mainly through directly observed therapy; (iii) control of malaria vectors, and detection and treatment of malaria cases; and (iv) control of childhood infectious diseases by increasing access to expanded immunization program. Loan 2204 (in addition to above) Balochistan shall ensure that certified copies of the audited accounts and financial statements and the report of the auditors (including the auditors opinion on the use of the proceeds of the Loan and compliance with the financial covenants of the Loan Agreement, as well as on the use of the procedures for imprest account/statement of expenditures) shall be submitted to ADB in English within six months after the end of each fiscal year. Schedule 5, para. 27 Schedule 5, para. 28 Schedule 5, para. 29 Schedule 5, para. 32 Schedule 5, para. 15 Schedule 5, para. 16 Schedule 6, para.16 Partly complied with. Partly complied with. Not complied with. Partly complied with. Partly complied with. Partly complied with. Partly complied with.

48 34 Appendix 6 TECHNICAL ASSISTANCE COMPLETION REPORT OF TA 4673 PAK

49 Appendix 6 35

Completion Report. Project Number: Loan Number: 2230-PAK October Pakistan: Rural Enterprise Modernization Project

Completion Report. Project Number: Loan Number: 2230-PAK October Pakistan: Rural Enterprise Modernization Project Completion Report Project Number: 38447 Loan Number: 2230-PAK October 2010 Pakistan: Rural Enterprise Modernization Project CURRENCY EQUIVALENTS Currency Unit Pakistan rupee/s (PRe/PRs) At Appraisal At

More information

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN. FRAMEWORK FINANCING AGREEMENT (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 29 October 2005 FRAMEWORK FINANCING

More information

Uzbekistan: Woman and Child Health Development Project

Uzbekistan: Woman and Child Health Development Project Validation Report Reference Number: PVR-331 Project Number: 36509 Loan Number: 2090 September 2014 Uzbekistan: Woman and Child Health Development Project Independent Evaluation Department ABBREVIATIONS

More information

Nepal: Small Towns Water Supply and Sanitation Sector Project

Nepal: Small Towns Water Supply and Sanitation Sector Project Validation Report Reference Number: PVR 193 Project Number: 31402 Loan Number: 1755(SF) November 2012 Nepal: Small Towns Water Supply and Sanitation Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Kyrgyz Republic: Investment Climate Improvement Program

Kyrgyz Republic: Investment Climate Improvement Program Validation Report Reference Number: PVR-423 Project Numbers: 41544-022, 41544-082, 41544-084 Grant Numbers: 0120, 0319, and 0393 October 2015 Kyrgyz Republic: Investment Climate Improvement Program Independent

More information

Pakistan: Punjab Community Water Supply and Sanitation Sector Project

Pakistan: Punjab Community Water Supply and Sanitation Sector Project Validation Report Reference Number: PCV: PAK 2009-48 Project Number: 35314 Loan Number: 1950-PAK(SF) December 2009 Pakistan: Punjab Community Water Supply and Sanitation Sector Project Independent Evaluation

More information

Completion Report. Project Number: Loan Number: 2449-INO(SF) October Indonesia: Rural Infrastructure Support to the PNPM Mandiri Project

Completion Report. Project Number: Loan Number: 2449-INO(SF) October Indonesia: Rural Infrastructure Support to the PNPM Mandiri Project Completion Report Project Number: 40247 Loan Number: 2449-INO(SF) October 2012 Indonesia: Rural Infrastructure Support to the PNPM Mandiri Project CURRENCY EQUIVALENTS Currency Unit rupiah (Rp) At Appraisal

More information

Viet Nam: Second Small and Medium-Sized Enterprises Development Program

Viet Nam: Second Small and Medium-Sized Enterprises Development Program Validation Report December 2017 Viet Nam: Second Small and Medium-Sized Enterprises Development Program Reference Number: PVR-544 Program Numbers: 41360-013 and 41360-014 Loan Numbers: 2680 and 3050 ABBREVIATIONS

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK PPA: PAK 26373 PROJECT PERFORMANCE AUDIT REPORT ON THE POPULATION PROJECT (Loan 1277-PAK[SF]) IN PAKISTAN December 2003 CURRENCY EQUIVALENTS Currency Unit Pakistan rupee/s (PRe/PRs)

More information

Papua New Guinea: Implementation of the Electricity Industry Policy

Papua New Guinea: Implementation of the Electricity Industry Policy Technical Assistance Report Project Number: 46012 December 2012 Papua New Guinea: Implementation of the Electricity Industry Policy The views expressed herein are those of the consultant and do not necessarily

More information

India: Madhya Pradesh State Roads Sector Project II

India: Madhya Pradesh State Roads Sector Project II Completion Report Project Number: 37328-013 Loan Number: 2330 September 2015 India: Madhya Pradesh State Roads Sector Project II This document is being disclosed to the public in accordance with ADB s

More information

Papua New Guinea: Support for Water and Sanitation Sector Management

Papua New Guinea: Support for Water and Sanitation Sector Management Technical Assistance Report Project Number: 49454-001 Capacity Development Technical Assistance (CDTA) February 2017 Papua New Guinea: Support for Water and Sanitation Sector Management This document is

More information

India: Agribusiness Infrastructure Development Investment Program (Tranche 2)

India: Agribusiness Infrastructure Development Investment Program (Tranche 2) Completion Report Project Number: 37091-033 Loan Number: 2837 August 2017 India: Agribusiness Infrastructure Development Investment Program (Tranche 2) This document is being disclosed to the public in

More information

Rajasthan Urban Sector Development Program

Rajasthan Urban Sector Development Program India: Rajasthan Urban Sector Development Program Project Name Rajasthan Urban Sector Development Program Project Number 42267-026 Country Project Status Project Type / Modality of Assistance Source of

More information

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing Technical Assistance Report Project Number: 51022-001 Knowledge and Support Technical Assistance (KSTA) December 2017 People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 1.01 Page 1 of 5 INITIAL PROJECT ADMINISTRATION ACTIVITIES A. Introduction 1. The Project Administration Instructions (PAIs) outline ADB s policies and procedures

More information

Republic of Indonesia: Water Supply and Sanitation Sector Development Project

Republic of Indonesia: Water Supply and Sanitation Sector Development Project Technical Assistance Report Project Number: 43304-022 Capacity Development Technical Assistance (CDTA) November 2011 Republic of Indonesia: Water Supply and Sanitation Sector Development Project (Financed

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing project. A PPTA is necessary to provide sound

More information

Technical Assistance to the Republic of Philippines for the Support for Health Sector Reform

Technical Assistance to the Republic of Philippines for the Support for Health Sector Reform Technical Assistance TAR: PHI 39066 Technical Assistance to the Republic of Philippines for the Support for Health Sector Reform September 2005 CURRENCY EQUIVALENTS (as of 5 August 2005) Currency Unit

More information

This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.

This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. Technical Assistance Report Project Number: 51336-001 Knowledge and Support Technical Assistance (KSTA) February 2018 Capacity Building Support for Asia-Pacific Economic Cooperation Financial Regulators

More information

PAKISTAN DEVELOPMENT FORUM 2005 IMPACT OF DEVOLUTION ON SERVICE DELIVERY PRESENTATION BY MR. DANIYAL AZIZ, CHAIRMAN NRB

PAKISTAN DEVELOPMENT FORUM 2005 IMPACT OF DEVOLUTION ON SERVICE DELIVERY PRESENTATION BY MR. DANIYAL AZIZ, CHAIRMAN NRB PAKISTAN DEVELOPMENT FORUM 2005 IMPACT OF DEVOLUTION ON SERVICE DELIVERY PRESENTATION BY MR. DANIYAL AZIZ, CHAIRMAN NRB Islamabad, the 26 th April, 2005 1 OUTLINE OF PRESENTATION 1. UPDATE ON DEVOLUTION

More information

tama Technical Assistance Management Agency

tama Technical Assistance Management Agency TORS for SP21 Health MSDS for Tertiary Hospitals Office: Tel: Fax: Email: 37 Sarwar Road Lahore Cantt., Pakistan +92 (0) 42 6603123-4 +92 (0) 42 6603124 info@pdssp-tama.org pd.pdssp@gmail.com tama Technical

More information

Regional: Supporting the Cities Development Initiative for Asia

Regional: Supporting the Cities Development Initiative for Asia Technical Assistance Report Project Number: 47285 Regional Capacity Development Technical Assistance (R-CDTA) November 2013 Regional: Supporting the Cities Development Initiative for Asia (Cofinanced by

More information

(Financed by the Japan Fund for Poverty Reduction)

(Financed by the Japan Fund for Poverty Reduction) Technical Assistance Report Project Number: 49276-001 Capacity Development Technical Assistance (CDTA) December 2015 India: Supporting Rajasthan s Productive Clusters in the Delhi Mumbai Industrial Corridor

More information

Philippines: Health Sector Development Program

Philippines: Health Sector Development Program Completion Report Project Number: 33278 Loan Number: 2136/2137 August 2014 Philippines: Health Sector Development Program This document is being disclosed to the public in accordance with ADB's Public

More information

Proposed Extension of Pilot Period for the Project Design Facility

Proposed Extension of Pilot Period for the Project Design Facility November 2017 Proposed Extension of Pilot Period for the Project Design Facility Distribution of this document is restricted until it has been approved by the Board of Directors. Following such approval,

More information

Local Government Unit Private Infrastructure Project Development Facility (Loan 1729-PHI) in the Philippines

Local Government Unit Private Infrastructure Project Development Facility (Loan 1729-PHI) in the Philippines Project Completion Report PCR: PHI 32485 Local Government Unit Private Infrastructure Project Development Facility (Loan 1729-PHI) in the Philippines June 2005 CURRENCY EQUIVALENTS Currency Unit peso/s

More information

Rural Community Finance Project. Negotiated financing agreement

Rural Community Finance Project. Negotiated financing agreement Document: EB 2015/LOT/P.37/Sup.1 Date: 17 December 2015 Distribution: Public Original: English E Republic of Liberia Rural Community Finance Project Negotiated financing agreement For: Information Negotiated

More information

Cook Islands

Cook Islands \ Country Operations Business Plan October 2016 Cook Islands 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

People s Republic of China: Strategy for Inclusive and Green Development of Small Cities, Towns, and Villages in Jiangxi Province

People s Republic of China: Strategy for Inclusive and Green Development of Small Cities, Towns, and Villages in Jiangxi Province Technical Assistance Report Project Number: 49024-001 Policy and Advisory Technical Assistance (PATA) December 2015 People s Republic of China: Strategy for Inclusive and Green Development of Small Cities,

More information

The World Bank Romania Secondary Education Project (P148585)

The World Bank Romania Secondary Education Project (P148585) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ROMANIA SECONDARY EDUCATION PROJECT APPROVED ON MARCH 16, 2015 TO ROMANIA

More information

Rural Enterprise Finance Project. Negotiated financing agreement

Rural Enterprise Finance Project. Negotiated financing agreement Document: EB 2018/123/R.8/Sup.1 Agenda: 5(a)(i) Date: 6 April 2018 Distribution: Public Original: English E Republic of Mozambique Rural Enterprise Finance Project Negotiated financing agreement Executive

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section E2/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction JAPAN FUND

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project Additional Financing

Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project Additional Financing Small and Medium-Sized Enterprises Line of Credit Project-Additional Financing (RRP SRI 49273-003) Project Administration Manual Project Number: 49273-003 Loan Number: 3370 Technical Assistance Number:

More information

GRANT AGREEMENT (Special Operations) (Strengthening Public Management Program) between NEPAL. and ASIAN DEVELOPMENT BANK DATED 27 DECEMBER 2012

GRANT AGREEMENT (Special Operations) (Strengthening Public Management Program) between NEPAL. and ASIAN DEVELOPMENT BANK DATED 27 DECEMBER 2012 GRANT NUMBER 0305-NEP(SF) GRANT AGREEMENT (Special Operations) (Strengthening Public Management Program) between NEPAL and ASIAN DEVELOPMENT BANK DATED 27 DECEMBER 2012 NEP 36172 GRANT AGREEMENT (Special

More information

Completion Report. Project Number: Loan Number: 1762(SF) September Bhutan: Health Care Reform Program

Completion Report. Project Number: Loan Number: 1762(SF) September Bhutan: Health Care Reform Program Completion Report Project Number: 33071 Loan Number: 1762(SF) September 2006 Bhutan: Health Care Reform Program CURRENCY EQUIVALENTS Currency Unit Ngultrum (Nu) At Appraisal At Program Completion 25 May

More information

OBA Urban Sanitation Facility for the Greater Accra Metropolitan Area (GAMA) (P145139)

OBA Urban Sanitation Facility for the Greater Accra Metropolitan Area (GAMA) (P145139) Public Disclosure Authorized AFRICA Ghana Water Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 3 ARCHIVED on 10-May-2017 ISR25522 Implementing Agencies: Public

More information

OFFICIAL DOCUMENTS.I

OFFICIAL DOCUMENTS.I Public Disclosure Authorized OFFICIAL DOCUMENTS.I Public Disclosure Authorized PPIN MULTI-DONOR TRUST FUND GRANT NUMBER TF018108 Pakistan Partnership for Improved Nutrition Multi-Donor Trust Fund Grant

More information

HRITF GRANT NUMBER: TF between. and. and

HRITF GRANT NUMBER: TF between. and. and Public Disclosure Authorized OFFICIAL DOCUMENTS HRITF GRANT NUMBER: TF015283 Public Disclosure Authorized Health Results Innovation Trust Fund Grant Agreement (Punjab Health Sector Reform Project) between

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22379 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Rwanda Dairy Development Project. Negotiated financing agreement

Rwanda Dairy Development Project. Negotiated financing agreement Document: EB 2016/118/R.19/Sup.1 Agenda: 11(b)(ii) Date: 31 August 2016 Distribution: Public Original: English E Republic of Rwanda Rwanda Dairy Development Project Negotiated financing agreement Executive

More information

Country Operations Business Plan. Samoa October 2016

Country Operations Business Plan. Samoa October 2016 Country Operations Business Plan October 2016 Samoa 2017 2019 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (As of 26

More information

ASIAN DEVELOPMENT BANK PCR:BAN 18036

ASIAN DEVELOPMENT BANK PCR:BAN 18036 ASIAN DEVELOPMENT BANK PCR:BAN 18036 PROJECT COMPLETION REPORT ON THE SECOND HEALTH AND FAMILY PLANNING SERVICES PROJECT (Loan No. 1074-BAN[SF]) IN BANGLADESH July 2001 CURRENCY EQUIVALENTS Currency Unit

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 47354-003 April 2015 Proposed Results-Based Loan and Administration of Technical Assistance Grant India: Supporting

More information

Public Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933)

Public Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933) Public Disclosure Authorized AFRICA Lesotho Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 08-May-2018 ISR30476 Implementing

More information

Pacific Urban Development Investment Planning and Capacity Development Facility

Pacific Urban Development Investment Planning and Capacity Development Facility Technical Assistance Report Project Number: 51175-001 Transaction Technical Assistance Facility (F-TRTA) July 2017 Pacific Urban Development Investment Planning and Capacity Development Facility This document

More information

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Liberia Education Global Practice Recipient Executed Activities Specific Investment

More information

Country Operations Business Plan. Maldives July 2017

Country Operations Business Plan. Maldives July 2017 Country Operations Business Plan July 2017 Maldives 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 20

More information

Developing Cross-Border Economic Zones between the People's Republic of China and Viet Nam

Developing Cross-Border Economic Zones between the People's Republic of China and Viet Nam Technical Assistance Report Project Number: 43077-01 Regional Policy and Advisory Technical Assistance (R-PATA) September 2009 Developing Cross-Border Economic Zones between the People's Republic of China

More information

Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project

Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project Semi-Annual Progress Report June 2016 Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project Prepared by the project management unit and project implementation

More information

AUDIT UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA. Report No Issue Date: 15 January 2014

AUDIT UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA. Report No Issue Date: 15 January 2014 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA Report No. 1130 Issue Date: 15 January 2014 Table of Contents

More information

Promoting South Asian Regional Economic Cooperation II

Promoting South Asian Regional Economic Cooperation II Technical Assistance Report Project Number: 40371-01 Regional Capacity Development Technical Assistance (R-CDTA) December 2008 Promoting South Asian Regional Economic Cooperation II The views expressed

More information

Lao People s Democratic Republic: Strengthening Urban Water Supply Regulation

Lao People s Democratic Republic: Strengthening Urban Water Supply Regulation Technical Assistance Report Project Number: 45298 Capacity Development Technical Assistance (CDTA) November 2011 Lao People s Democratic Republic: Strengthening Urban Water Supply Regulation The views

More information

Global Financing Facility Grant Agreement

Global Financing Facility Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GFF GRANT NUMBER TF0A2561 Public Disclosure Authorized Global Financing Facility Grant Agreement (Transforming Health Systems for Universal Care Project)

More information

Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project

Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project PD 0002-TJK June 6, 2016 PROJECT DOCUMENT Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project This document has a restricted distribution and may be used by recipients only in performance

More information

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA.

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4201-ET Public Disclosure Authorized Financing Agreement (Rural Capacity Building Project) Public Disclosure Authorized between FEDERAL DEMOCRATIC

More information

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement GPOBA GRANT NUMBER TF092629 DOCUMENTS Global Partnership on Output-based Aid Grant Agreement (Extending Telecommunications in Rural Indonesia Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

FEDERAL REPUBLIC OF NIGERIA

FEDERAL REPUBLIC OF NIGERIA Supplemental Letter No. 1 (Lagos Urban Transport Project) Section 9.02 of the General Conditions Financial and Economic Data In connection with the above Credit to the Republic of Nigeria for the Lagos

More information

See Notes on Agenda Items, following pages.

See Notes on Agenda Items, following pages. Draft AGENDA CITIES ALLIANCE STEERING COMMITTEE 22 June 2006, 6:30 p.m. 9:30 p.m. Hong Kong Room Metropolitan Hotel (phone: 1-604-687-1122) 645 Howe Street Vancouver, Canada A light buffet dinner will

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 44304-01 October 2010 Proposed Loan and Administration of Grant Papua New Guinea: Microfinance Expansion Project CURRENCY

More information

PPIAF Assistance in Nepal

PPIAF Assistance in Nepal Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PPIAF Assistance in Nepal June 2012 The Federal Democratic Republic of Nepal (Nepal)

More information

People s Republic of China: Hebei Elderly Care Development Project

People s Republic of China: Hebei Elderly Care Development Project Project Administration Manual Project Number: 49028-002 Loan Number: LXXXX-PRC May 2017 People s Republic of China: Hebei Elderly Care Development Project ABBREVIATIONS ADB Asian Development Bank CAB civil

More information

People s Republic of China: Study of the Belt and Road Initiative

People s Republic of China: Study of the Belt and Road Initiative Technical Assistance Report Project Number: 50141-001 Policy and Advisory Technical Assistance (PATA) June 2016 People s Republic of China: Study of the Belt and Road Initiative This document is being

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 06-Dec-2017 ISR30229 Implementing Agencies: National Bank

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE MULTI DONOR TRUST FUND FO THE INSTITUTIONAL REFORM AND CAPACITY BUILDING PROJECT TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE MULTI DONOR TRUST FUND FO THE INSTITUTIONAL REFORM AND CAPACITY BUILDING PROJECT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Republic of Indonesia: Improving Access to Finance in Aceh and North Sumatra

Republic of Indonesia: Improving Access to Finance in Aceh and North Sumatra Technical Assistance Report Project Number: 45266 Capacity Development Technical Assistance (CDTA) November 2012 Republic of Indonesia: Improving Access to Finance in Aceh and North Sumatra (Financed by

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SINDH GLOBAL PARTNERSHIP FOR EDUCATION PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SINDH GLOBAL PARTNERSHIP FOR EDUCATION PROJECT Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: (RES20635) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012

COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012 COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012 CONCERNING SUPPORT FOR FEASIBILITY IN PARTIAL CONSTRUCTION EXPENSES IN COOPERATION PROJECTS BETWEEN THE GOVERNMENT

More information

United Nations Peace Building Fund Grant Agreement

United Nations Peace Building Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS Public Disclosure Authorized GRANT NUMBER TF018255 United Nations Peace Building Fund Grant Agreement (Additional Financing for the Productive Social Safety

More information

GRANT AGREEMENT (Special Operations) (Hairatan to Mazar-e-Sharif Railway Project) between ISLAMIC REPUBLIC OF AFGHANISTAN. and ASIAN DEVELOPMENT BANK

GRANT AGREEMENT (Special Operations) (Hairatan to Mazar-e-Sharif Railway Project) between ISLAMIC REPUBLIC OF AFGHANISTAN. and ASIAN DEVELOPMENT BANK GRANT NUMBER 0161-AFG(SF) GRANT AGREEMENT (Special Operations) (Hairatan to Mazar-e-Sharif Railway Project) between ISLAMIC REPUBLIC OF AFGHANISTAN and ASIAN DEVELOPMENT BANK DATED 30 SEPTEMBER 2009 GAS:

More information

World Bank Iraq Trust Fund Grant Agreement

World Bank Iraq Trust Fund Grant Agreement Public Disclosure Authorized Conformed Copy GRANT NUMBER TF054052 Public Disclosure Authorized World Bank Iraq Trust Fund Grant Agreement Public Disclosure Authorized (Emergency Disabilities Project) between

More information

INNOVATIONS IN FINANCE INDONESIA

INNOVATIONS IN FINANCE INDONESIA INNOVATIONS IN FINANCE INDONESIA Confronting challenges with new approaches The Global Partnership on Output-Based Aid (GPOBA) and its partners apply innovative results-based financing solutions that align

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. A project preparatory technical assistance (PPTA) is required to support the Ministry of New and Renewable Energy (MNRE) and Solar Energy Corporation

More information

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4293-TA Public Disclosure Authorized Financing Agreement (Zanzibar Basic Education Improvement Project) between Public Disclosure Authorized THE

More information

Republic of Indonesia: Scaling Up Energy Efficiency

Republic of Indonesia: Scaling Up Energy Efficiency Sustainable and Inclusive Energy Program (Subprogram 2) (RRP INO 49043-002) Technical Assistance Report Project Number: 49043-006 Transaction Technical Assistance (TRTA) August 2017 Republic of Indonesia:

More information

Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project

Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project Trust Fund Project Administration Manual Project Number: 49113 Grant Numbers: GXXXX October 2016 Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project (Financed by

More information

Afghanistan Reconstruction Trust Fund Grant Agreement

Afghanistan Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS ARTF GRANT NUMBER TFOAO730 Public Disclosure Authorized Public Disclosure Authorized Afghanistan Reconstruction Trust Fund Grant Agreement (Higher Education

More information

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC Greater Dhaka Sustainable Urban Transport Project (RRP BAN 42169) TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC A. TA Description 1. The Government of Bangladesh has requested

More information

Proposed Grant Assistance Kyrgyz Republic: Improving Livelihoods of Rural Women through Development of Handicrafts Industry

Proposed Grant Assistance Kyrgyz Republic: Improving Livelihoods of Rural Women through Development of Handicrafts Industry Grant Assistance Report Project Number: 40539 November 2006 Proposed Grant Assistance Kyrgyz Republic: Improving Livelihoods of Rural Women through Development of Handicrafts Industry (Financed by the

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Public Disclosure Authorized GPOBA GRANT NUMBER TF010757 Public Disclosure Authorized Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Philippines Public Health Project)

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 12 Appendix 5 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is needed for preparing the investment program and conducting technical, economic,

More information

ENHANCED INTEGRATED FRAMEWORK EXECUTIVE SECRETARIAT FOR THE EIF (ES) AND EIF TRUST FUND MANAGER (TFM) PROCEDURES FOR FEASIBILITY STUDIES.

ENHANCED INTEGRATED FRAMEWORK EXECUTIVE SECRETARIAT FOR THE EIF (ES) AND EIF TRUST FUND MANAGER (TFM) PROCEDURES FOR FEASIBILITY STUDIES. ENHANCED INTEGRATED FRAMEWORK EXECUTIVE SECRETARIAT FOR THE EIF (ES) AND EIF TRUST FUND MANAGER (TFM) PROCEDURES FOR FEASIBILITY STUDIES October 2012 Selected EIF countries have requesting the undertaking

More information

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867)

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867) Public Disclosure Authorized SOUTH ASIA India Education Global Practice IBRD/IDA Program-for-Results FY 2017 Seq No: 1 ARCHIVED on 27-Jun-2017 ISR28685 Implementing Agencies: Ministry of Skill Development

More information

KECAMATAN DEVELOPMENT PROJECT *

KECAMATAN DEVELOPMENT PROJECT * Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Abstract KECAMATAN DEVELOPMENT PROJECT * The World Bank aided Kecamatan Development

More information

SECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines

SECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines GMS 4 5 July 2018 Manila, Philippines Working Group Section 2: Review of Concept and Approach to the Ongoing and Planned ipsum GMS que Corridor moluptam Towns sum Development que moluptam Projects sum

More information

Harmonization for Health in Africa (HHA) An Action Framework

Harmonization for Health in Africa (HHA) An Action Framework Harmonization for Health in Africa (HHA) An Action Framework 1 Background 1.1 In Africa, the twin effect of poverty and low investment in health has led to an increasing burden of diseases notably HIV/AIDS,

More information

Completion Report. Project Number: Loan Number: 1538 March Bangladesh: Urban Primary Health Care Project

Completion Report. Project Number: Loan Number: 1538 March Bangladesh: Urban Primary Health Care Project Completion Report Project Number: 29033 Number: 1538 March 2007 Bangladesh: Urban Primary Health Care Project CURRENCY EQUIVALENTS Currency Unit taka (Tk) At Appraisal At Project Completion (15 July 1997

More information

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing)

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) GRANT NUMBER 0426-CAM (SCF) GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) (Cambodia Component) between KINGDOM

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22380 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Project Administration Manual. Islamic Republic of Afghanistan: Road Asset Management Project

Project Administration Manual. Islamic Republic of Afghanistan: Road Asset Management Project Project Administration Manual Project Number: 50062-001 Grant Numbers: {GXXXX; GXXXX} Draft as of October 2016 Islamic Republic of Afghanistan: Road Asset Management Project CONTENTS ABBREVIATIONS I. PROJECT

More information

Cities Alliance: Standard Operating Procedures

Cities Alliance: Standard Operating Procedures Document Version Final Date Last updated Prepared by Approved by Cities Alliance Secretariat Cities Alliance Management Board and Assembly Table of Contents Abbreviations and Acronyms...4 Glossary of Terms...5

More information

Financing Agreement CREDIT NUMBER 4205-IND. (Early Childhood Education and Development Project) between REPUBLIC OF INDONESIA. and

Financing Agreement CREDIT NUMBER 4205-IND. (Early Childhood Education and Development Project) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4205-IND Public Disclosure Authorized Financing Agreement (Early Childhood Education and Development Project) Public Disclosure Authorized between

More information

Targeted Regeneration Investment. Guidance for local authorities and delivery partners

Targeted Regeneration Investment. Guidance for local authorities and delivery partners Targeted Regeneration Investment Guidance for local authorities and delivery partners 20 October 2017 0 Contents Page Executive Summary 2 Introduction 3 Prosperity for All 5 Programme aims and objectives

More information

Sri Lanka: Tsunami-Affected Areas Rebuilding Project

Sri Lanka: Tsunami-Affected Areas Rebuilding Project Validation Report Reference Number: PVR-328 Project Number: 39144 Loan/Grant Numbers: 2167 and 0006 October 2014 Sri Lanka: Tsunami-Affected Areas Rebuilding Project Independent Evaluation Department ABBREVIATIONS

More information

ADB Business Opportunities Seminar

ADB Business Opportunities Seminar ADB Business Opportunities Seminar 4 November 2016 Vienna, Austria Presented by Walter Poick Director, Procurement Division 2 (East Asia, Southeast Asia and Pacific Operations) Operations Services and

More information

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696 The World Bank INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION 1818 H Street N.W. Washington, D.C. 20433 U.S.A. (202) 473-1000 Cable Address: INTBAFRAD Cable

More information

NATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS FOR APPROVED ON NOVEMBER 20, 2012 REPUBLIC OF INDONESIA

NATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS FOR APPROVED ON NOVEMBER 20, 2012 REPUBLIC OF INDONESIA The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES25530 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS FOR 2012-2015 APPROVED ON

More information

between ARAB REPUBLIC OF EGYPT and

between ARAB REPUBLIC OF EGYPT and Public Disclosure Authorized GRANT NUMBER TF0A1553 Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA TRANSITION FUND Grant Agreement Public Disclosure Authorized Public Disclosure Authorized EQUAL

More information

Attracting Private Sector Investment in Infrastructure Experiences from India

Attracting Private Sector Investment in Infrastructure Experiences from India UNESCAP High-level Expert Group Meeting on Infrastructure Public-Private Partnerships for Sustainable Development Attracting Private Sector Investment in Infrastructure Experiences from India Cherian Thomas

More information