Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project

Size: px
Start display at page:

Download "Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project"

Transcription

1 Trust Fund Project Administration Manual Project Number: Grant Numbers: GXXXX October 2016 Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project (Financed by the Japan Fund for Poverty Reduction)

2 ABBREVIATIONS PROJECT AT A GLANCE CONTENTS I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION PLANS 3 A. Project Readiness Activities 3 B. Overall Project Implementation Plan 4 III. PROJECT MANAGEMENT ARRANGEMENTS 6 A. Project Implementation Organizations Roles and Responsibilities 6 B. Key Persons Involved in Implementation 8 C. Project Organization Structure 9 D. Grant Management 10 IV. COSTS AND FINANCING 11 A. Cost Estimates and Financing Plan 11 B. Allocation and Withdrawal of Grant Proceeds 11 C. Detailed Cost Estimates by Financier 13 D. Detailed Cost Estimates by Outputs 14 E. Detailed Cost Estimates by Expenditure Categories 15 F. Detailed Cost Estimates by Year 16 G. Estimated Disbursement Schedule by Year 17 H. Contract and Disbursement S-curve 17 I. Funds Flow Diagram 18 V. FINANCIAL MANAGEMENT 19 A. Financial Management Assessment 19 B. Disbursement Disbursement Arrangements for ADB Disbursement Arrangements for Counterpart Fund 22 C. Accounting 22 D. Auditing and Public Disclosure 22 VI. PROCUREMENT AND CONSULTING SERVICES 24 A. Advance Contracting and Retroactive Financing 24 B. Procurement of Goods, Works, and Consulting Services 24 C. Procurement Plan 25 D. Consultant's Terms of Reference 31 VII. SAFEGUARDS 53 VIII. GENDER AND SOCIAL DIMENSIONS 55 IX. PERFORMANCE MONITORING, EVALUATION, REPORTING AND COMMUNICATION 59 A. Project Design and Monitoring Framework 59 B. Monitoring 61 C. Evaluation 62 D. Reporting 63 E. Stakeholder Communication Strategy 64

3 X. ANTICORRUPTION POLICY 65 XI. ACCOUNTABILITY MECHANISM 65 XII. RECORD OF PAM CHANGES 65 APPENDICES 1. Environmental Safety Guidelines for Project Implementation 2. Determination of Overall Grant Implementation Rating 3. Japan Fund for Poverty Reduction Guidance Note on Visibility of Japan 4. Japan Fund for Poverty Reduction Guidance Note on Coordination with the Embassy of Japan 5. Stakeholder Communication Strategy

4 Project Administration Manual Purpose and Process The project administration manual (PAM) describes the essential administrative and management requirements to implement the Japan Fund for Poverty Reduction (JFPR)-funded project on time, within budget, and in accordance with the government and Asian Development Bank (ADB) policies and procedures. The PAM should include references to all available templates and instructions either through linkages to relevant URLs or directly incorporated in the PAM. The Ministry of Environment and Tourism (MET) (the executing agency) is wholly responsible for the implementation of the project, as agreed jointly between the grant recipient and ADB, and in accordance with the government and ADB s policies and procedures. ADB staff is responsible to support implementation including compliance by MET of their obligations and responsibilities for project implementation in accordance with ADB s policies and procedures. The MET and ADB shall agree to the PAM and ensure consistency with the Grant Agreement. In the event of any discrepancy or contradiction between the PAM and the Grant Agreement, the provisions of the Grant Agreement shall prevail. After ADB Board approval of the project's grant assistance report changes in implementation arrangements are subject to agreement and approval pursuant to relevant government and ADB administrative procedures (including ADB s Project Administration Instructions) and upon such approval they will be subsequently incorporated in the PAM.

5 ADB CSO DEIA DENR DLMIWPC ABBREVIATIONS Asian Development Bank civil society organization detailed environment impact assessment Department of Environment and Natural Resources Management Department of Land Management and Integrated Water Policy Coordination design and monitoring framework environmental impact assessment Embassy of Japan environmental management plan general environmental impact assessment Government of Japan DMF EIA EOJ EMP GEIA GOJ GOM Government of Mongolia GRM grievance redress mechanism M&E monitoring and evaluation MET Ministry of Environment and Tourism O&M operation and maintenance PMU project management unit PPMS project performance monitoring system PSC project steering committee SGAP social and gender action plan SPS safeguard policy statement UMG Ulaanbaatar Municipal Government WASH Water, sanitation and hygiene

6 Project Classification Information Status: Complete PROJECT AT A GLANCE 1. Basic Data Project Number: Project Name Managing Soil Pollution in Ger Areas Department EARD/EAER through Improved On-site Sanitation Project /Division Country Mongolia Executing Agency Ministry of Environment and Borrower Government of Mongolia Tourism 2. Sector Subsector(s) ADB Financing ($ million) Water and other urban Urban sanitation 0.00 infrastructure and services Agriculture, natural resources and rural development Land-based natural resources management 0.00 Total Strategic Agenda Subcomponents Climate Change Information Inclusive economic growth (IEG) Pillar 2: Access to economic opportunities, including jobs, made more inclusive Climate Change impact on the Project Environmentally Natural resources conservation sustainable growth (ESG) Urban environmental improvement Low 4. Drivers of Change Components Gender Equity and Mainstreaming Governance and capacity Civil society participation Effective gender mainstreaming development (GCD) Institutional systems and political economy (EGM) Knowledge solutions (KNS) Application and use of new knowledge solutions in key operational areas Knowledge sharing activities Pilot-testing innovation and learning Partnerships (PAR) Civil society organizations Implementation 5. Poverty and SDG Targeting Location Impact Project directly targets Yes poverty and SDGs Geographic targeting (TI-G) Yes.. 6. Risk Categorization: Low 7. Safeguard Categorization Environment: C Involuntary Resettlement: C Indigenous Peoples: C 8. Financing Modality and Sources Amount ($ million) ADB 0.00 Cofinancing 2.80 Japan Fund for Poverty Reduction - Grant 2.80 Counterpart 0.00 None 0.00 Total Effective Development Cooperation Use of country procurement systems Use of country public financial management systems No Yes Source: Asian Development Bank This document must only be generated in eops Generated Date: 20-Oct :49:17 PM

7 I. PROJECT DESCRIPTION 1. Around one-quarter of Mongolia s population resides on the outskirts of Ulaanbaatar, the national capital, within peri-urban communities termed ger areas characterized by limited or no access to urban infrastructure, inadequate disposal of human fecal waste, sanitation-related diseases, and increasing risks of soil and water contamination. The grant will support local livelihoods through improved household sanitation and strengthening the lifecycle for on-site (de-centralized) fecal waste management, including the collection, transport and composting of waste, in collaboration with communities, the private sector, and civil society organizations (CSOs). The project will serve as a model to scale up on-site sanitation in Mongolia and which complements infrastructure development in core urban areas. 2. Impact and outcome. The expected project impact is improved public health conditions and reduced soil pollution in ger areas. The expected project outcome is that a model for on-site sanitation and the prevention of soil pollution from human waste in ger areas is demonstrated. 3. Description of outputs. The project will have three outputs: (i) planning for on-site sanitation strengthened, (ii) on-site sanitation lifecycle piloted, and (iii) sustainability for on-site sanitation improved. Activities under outputs 1 and 2 will be piloted in three khoroos of two districts of Ulaanbaatar Output 1: Planning for on-site sanitation strengthened. This output will develop mechanisms for planning of the on-site sanitation lifecycle, to be piloted in output 2, comprising procedures and costs for waste containment at households, collection and transport of the waste, treatment, composting, sale of the compost, and monitoring. Procedures will build upon tested approaches in Mongolia and elsewhere, and focus on addressing the remaining gaps in the lifecycle, especially arrangements between communities and small and medium sized enterprises (SMEs) for waste collection, transport, and composting. This will include: (i) roles and responsibilities for stakeholders in each stage of the on-site sanitation lifecycle, tailored to the conditions of the project districts; (ii) the procedures, costs, and financial incentives for waste collection (between contractors and communities), including fees and rates affordable for households; 2 (iii) the development of pilot agreements between SMEs for waste collection and composting; (iv) strengthening the capacity of SMEs for the marketing and sale of the composted products; and (v) the establishment of two monitoring programs in selected project sites, one for soil quality and one for the occurrence and incidence of sanitation-related diseases, to provide baseline data for the target areas. These will be the first long-term monitoring programs for soil quality pollution from human waste and sanitation in Ulaanbaatar. 5. Output 2: On-site sanitation lifecycle piloted. This output will: (i) implement a community outreach program to facilitate and support beneficiary selection, training, and installation and operation and maintenance (O&M) of on-site sanitation units; (ii) establish three community management groups (one per khoroo) to mobilize household participation; 3 (iii) th Khoroo (Bayanzurkh District) and 12th and 13th khoroos (Chingeltei District). Khoroos were selected based on socio-economic status, severity of sanitation and/or soil pollution issues, and absence of urban development plans. Preliminary payment mechanisms, approximate number of participating households, and cost estimates for toilet installation and fecal waste collection were developed during the design phase, based on project surveys of household affordability and willingness-to-pay and actual costs from other donor projects and surveys. The groups will represent the participating households, establish contracts with waste contractors for waste collection, and coordinate the payment of household waste collection fees. Participating households will be identified based on poverty status, severity of sanitation and/or soil pollution issues, and community feedback obtained during the first stages of the community outreach program.

8 2 install around 1,500 on-site sanitation units (one per household), utilizing one of at least two technologies, ecological sanitation toilets, and holding tanks (simple storage tanks). 4 Unit designs and materials will be based on simple, tested technology, site conditions, and costeffective local materials. The ecological sanitation toilets will pilot the principle of resource recovery (from waste to composting) embodied by the ecological sanitation approach. Holding tanks will be applied for households in areas with shallow aquifers and/or adjacent to surface water, where the risks of soil and water contamination are highest; (iv) implement pilot agreements between the waste contractors and communities, including procedures for waste collection, fees, 5 O&M of the completed toilet units, and an O&M manual; and (v) strengthen the management capacity of SMEs for composting to market and sell composted products, while applying the technical composting procedures already developed and tested in Mongolia. 6 Each step in the lifecycle will be accompanied by a strong participatory approach and extended project support for local skill development, employment, and project ownership. 6. Output 3: This output will strengthen the replication and scaling up of on-site sanitation in Mongolia beyond the project. The project will: (i) establish the first national working group for on-site sanitation, 7 which will guide planning for sanitation in ger areas and support an integrated approach with urban development plans; (ii) implement training programs and technical support for households, contractors, and line ministries for on-site sanitation; (iii) disseminate the results of the project to line ministries, private sector, and civil society, to promote on-site sanitation for other ger areas; and (iv) prepare the first national road map for sanitation planning for ger areas. This will consolidate the lessons learned from project outputs 1 3 and provide a model for on-site sanitation in Mongolia. It will include a five-year scale-up strategy and investment plan, which identifies other ger areas of high priority for on-site sanitation and the management of soil pollution, specific follow-up actions, roles and responsibilities, costs, financing mechanisms, and work schedules Technologies preventing or reducing soil pollution was identified through a review of on-site sanitation in cold countries, including designs tested and adapted to Mongolian conditions. Selection criteria included the need for simple and replicable designs, dry (non-flushing) systems, design life, improved hygiene, and costs of installation and maintenance. In the event that new technologies are developed in Mongolia or elsewhere which are suitable to local conditions and compatible with the project social and safeguard objectives, these may also be piloted. The estimated cost of waste collection is $5.3 per household per collection. The project will subsidize 100% of the cost of toilet installation (based on lessons learned from previous projects, in which lack of initial project support caused delays) for all recipient households and, for poor (including female-headed) households, 50% of the waste collection fee, for up to 12 collections (3 years). To strengthen ownership, households will be required to pay the waste collection fees prior to toilet installation. Waste collection will be quarterly, based on mean household size, container dimensions, and cost. The community outreach program will support households to continue planning for waste collection fees after the 3-year project subsidy has ended. Project support will include training and limited provision of specialist equipment to contractors for waste collection and/or composting. Equipment will initially be leased to contractors and then handed over at project completion. The group will include representatives from relevant line ministries and other stakeholders.

9 3 II. IMPLEMENTATION PLANS A. Project Readiness Activities Indicative Activities Responsible Sep Oct Nov Dec Jan Feb Agency(s) Grant negotiations ADB, MOF, MET Establish project implementation arrangements MET, MOF ADB approval ADB Grant signing ADB, MOF Government legal opinion provided MOF Grant effectiveness ADB ADB = Asian Development Bank, MET = Ministry of Environment and Tourism, MOF = Ministry of Finance.

10 4 B. Overall Project Implementation Plan Activities A. Design and Monitoring Framework Output 1: Planning for on-site sanitation strengthened 1.1 Identify key stakeholders in each project khoroo for on-site sanitation lifecycle 1.2 Prepare consultation program to design each stage of the lifecycle Fecal waste collection 1.3 Review existing collection systems in each project sub-district 1.4 Conduct CNA with contractors - existing costs, equipment, and training needs Design and implement training program for contractors - on-site sanitation, 1.5 procedures, costs, transport methods, safeguards Composting and sale of treated waste 1.6 Review existing procedures and business management capacity of stakeholders Conduct CNA with contractors - existing costs, equipment, and training needs Design and implement training program for composting agences - procedures, costs, 1.7 business management, marketing, customers, sales 1.8 Support composting agencies to develop business and marketing plans Links between communities, waste contractors, composting agencies 1.9 Plan and facilitate meetings between waste contractors and communities 1.10 Develop pilot agreement on fees, procedures, and other terms and conditions 1.11 Plan and facilitate meetings between waste contractors and composting agencies 1.12 Develop pilot agreement on fees, procedures, and other terms and conditions Monitoring of soil quality and sanitation 1.13 Implement health and sanitation monitoring system (prepared in design phase) 1.14 Implement soil and water quality monitoring program (prepared in design phase) Output 2: On-site sanitation lifecycle piloted 2.1 Prepare and implement community outreach program Train khoroo officers in roles, responsibilities, environmental guidelines and EMP, 2.2 SGAP, and eco-toilet installation 2.3 Establish community management groups 2.4 Community consultations (PMU/khoroo teams) to select participating households 2.5 Identify specific eco-toilet design for each household and required materials 2.6 Finalize pilot agreement between communities and waste contractors ( ) 2.7 Finalize pilot agreement between waste contractors and compost agencies ( ) 2.8 Prepare O&M manual and costs for participating households and khoroo agencies 2.9 Establish community bank accounts (1 per community management group) 2.10 Participating households pay waste collection fees up-front, into the account 2.11 Provide subsidy for collection fees to poor and women-headed households 2.12 Contract companies to build and install the eco-toilet units 2.13 Install eco-toilets in participating households 2.14 Waste collection contractor collects fecal waste from households 2.15 Waste collection contractor delivers it to composting agencies 2.16 Composting agency produces products from the fecal waste compost 2.17 Ongoing community consultations and training by PMU and khoroo teams 2.18 Monitoring (community acceptance, O&M of units) by PMU and khoroo teams Output 3: Sustainability for on-site sanitation improved 3.1 Establish national working group for on-site sanitation 3.2 Develop group charter, vision, objectives, and meeting and reporting schedule 3.3 Implement 1st group meeting - assign roles, responsibilities, identify key outputs 3.4 Prepare and implement training program for khoroo health clinics 3.5 Prepare and implement training program for government, private sector, civil society 3.6 Identify next steps within the project sub-districts after project completion 3.7 Identify new target khoroos, districts, and other areas for scale-up after project

11 5 Activities 3.8 Prepare 5-year scale-up strategy and investment plan Prepare Action Plan for sanitation lifecycle for ger areas, incorporating results of 3.9 output 1-3: actions, costs, work schedule, funding sources 3.10 Stakeholder workshops to review and revise Action Plan 3.11 Inclusion of Action Plan in schedules, budgets of government and other stakeholders 3.12 Prepare and disseminate project knowledge products B. Management Activities Establish project office space Establish project steering committee and PMU (consultant recruitment) Assign district and khoroo government and community counterparts Train executing and implementing agencies in ADB project management requirements Review (update if necessary) and implement procurement plan Review (update if necessary) project stakeholder communication strategy Implement SGAP and EMP Monitor project progress - including DMF, EMP, SGAP Submit semi-annual progress reports (including for safeguards) Submit audited annual financial statements Inception, midterm, final, and annual review missions Prepare and disseminate project materials and knowledge products Project completion report DMF = design and monitoring framework, O&M = operations and maintenance, PMU = project management unit, SGAP = social and gender action plan

12 6 III. PROJECT MANAGEMENT ARRANGEMENTS A. Project Implementation Organizations Roles and Responsibilities Executing agency: MET DLMIWPC Assumes overall accountability and responsibility for project planning, management, and implementation Ensures timely and effective execution of the grant agreement Co-signs approval for withdrawal application from project imprest account (with MOF) Reviews PMU progress reports Submits progress reports to ADB and MOF Facilitates auditing of project accounts Chairs the PSC Overall coordination and guidance of PMU Facilitate project stakeholder activities e.g., meetings and trainings with khoroo government, communities, tour operators Address any environment assessments if required Help establish and contribute to the national working group on sanitation under output 3 Provides timely policy and coordination support Oversight body: PSC Comprises around five members: Director General of DLMIWPC (Chair), MOF (1), MOHS (1), UMG (1), GASI (1), CSO (1) Reviews and assesses project implementation progress and plans Provides advice on policy matters related to the project, especially advocacy and facilitation for integrated approach for sanitation between ger and urban areas Meets at least semi-annually MOF Signs grant agreement and project approval on behalf of GOM Co-signs withdrawal applications from project imprest account together with MET PMU: based at MET office in Ulaanbaatar Reviews project progress and/or audit reports as needed Comprising a project manager, implementation specialist, accountant, procurement officer, and other specialists Coordinate and implement project activities, including consultant recruitment, procurement, financial management, disbursement, contract administration, monitoring, and reporting Administration of the grant imprest account Maintain on behalf of the executing agency the imprest account; and prepare and submit withdrawal applications and supporting documents, quarterly and annual reports, annual audit reports, and financial statements Monitors project progress against the DMF, PAM, and SGAP Ensures compliance with the project safeguard requirements in the environmental safety guidelines and SGAP, including periodic site inspections Prepares semi-annual project progress reports to MET Input relevant project documents in the ODA MIS system

13 7 ADB Oversees project administration and timely execution of the grant agreement by the executing agency Disburses grant proceeds Reviews and, as needed, approves procurement, consultant recruitment, progress reports, and audit reports Reviews project compliance and targets against the DMF, environmental safety guidelines, SGAP, PAM, and community funds screening criteria Monitors project progress and conducts review missions Disclose monitoring reports on ADB public website Observer to the project steering committee Coordination with EOJ in Mongolia, JICA, and ADB s OCO Japan team Invite EOJ in Mongolia, JICA, and OCO Japan team to project events and missions (for OCO, inform up to 4 months ahead) Inform on project progress and provide key reports and materials Inform and/or discuss potential changes in scope Respond to inquiries and/or information requests Support donor visibility for dissemination of outcomes and lessons Other participating agencies UMG Department for UMG-level support and coordination Environment, Green Coordination of the participating khoroo sub-districts Development and Participation in the PSC Tourism Preparation and/or enforcement of relevant policies and regulations for soil and water protection MET EFPD Provides oversight support to the executing agencies for project financial management Facilitates independent financial auditing of the project MET Department of Environment and Natural Responsible for national environmental planning, conducting GEIAs, and assessment of DEIAs Resources For this project, will assess the need for GEIA for project activities Khoroo government officers sanitation, solid Each project khoroo will be represented by at least one counterpart officer waste, environment Participate in project planning and training Facilitate coordination between khoroo, community, and project Support households to implement the EMP during installation of toilet facilities Report project progress to the khoroo governments GASI environment, Inspect project facilities and issue completion certificates health and safety inspectors Conduct intermittent inspections and soil and/or water testing in project areas CSOs and other donors Project will collaborate and coordinate with existing donor efforts for sanitation CSO(s) will be a member(s) of the project steering committee Civil works contractors To be identified during project implementation Ensure that bidding documents respond to the requirements of

14 8 the environmental safety guidelines and SGAP as relevant for construction works EOJ in Mongolia Represents the Government of Japan and JFPR fund Observer to the steering committee May choose to attend project events, meetings, and field sites Guidance and feedback on Japanese visibility in project activities ADB = Asian Development Bank, CSO = civil society organization, DEIA = detailed environmental impact assessment, DMF = design and monitoring framework, DLMIWPC = Department of Land Management and Integrated Water Policy Coordination, EFPD = Economic, Financial and Planning Division, EMP = environmental management plan, EOJ = Embassy of Japan, GASI = General Agency for Specialized Inspection, GEIA = general environmental impact assessment, GOM = Government of Mongolia, JFPR = Japan Fund for Poverty Reduction, JICA = Japan International Cooperation Agency, MET = Ministry of Environment and Tourism, MIS = management information system, MOF = Ministry of Finance, MOHS = Ministry of Health and Sports, OCO = Office of Cofinancing Operations, ODA = official development assistance, PAM = project administration manual, PMU = project management unit, PSC = project steering committee, SGAP = social and gender action plan, UMG = Ulaanbaatar Municipal Government. B. Key Persons Involved in Implementation Executing Agency Department of Land Management and Integrated Water Policy Coordination (DLMIWPC) of the Ministry of Environment and Tourism (MET) Ministry of Finance Development Financing and Debt Management Department (MOF) Project management unit: Working on behalf of the executing agency Asian Development Bank Project Officer Mr. G. Nyamdavaa Director General Telephone: Fax No.: munkherdem@mne.gov.mn Address: Government Building 2, United Nations Street 5/2, Ulaanbaatar-15160, Mongolia Mr. Gantulga Badamkhatan Director General Address: Government Building 2, S.Danzan Street, Ulaanbaatar 15160, Mongolia [to be recruited] Project Manager Telephone: Fax No.: [to be added] Address: c/o Government Building 2, United Nations Street 5/2, Ulaanbaatar-15160, Mongolia Mr. Qingfeng Zhang Director, Environment, Natural Resources, and Agriculture Division (EAER), East Asia Department (EARD) Telephone No.: Fax No.: qingfengzhang@adb.org Mr. Mark Bezuijen Environmental Specialist, EAER, EARD Telephone No.: Fax No.: mbezuijen@adb.org

15 C. Project Organization Structure Asian Development Bank Grant agreement Ministry of Finance (MOF) Ministry of Environment and Tourism (MET) Department of Land Management and Integrated Water Policy Coordination (Director General) (executing agency) Ulaanbaatar Municipal Government Project Steering Committee (PSC) 1. Chairman (Director General, MET DLMIWPC) 2. Member (MOF) 3. Member (Director, ENRM Division of UMG DEGDT) 4. Member (MOHS) 5. Member (CSO) project management unit (project manager) Division of Environment and Natural Resource Management Observers: Embassy of Japan in Mongolia Asian Development Bank communities civil society organizations khoroo governments Legend: Coordination Reporting Cooperation/Information exchange Structures established for this project DEGDT = Department for Environment, Green Development and Tourism, DLMIWPC = Department of Land Management and Integrated Water Policy Coordination, ENRM = Environment and Natural Resource Management Division, MOHS = Ministry of Health and Sports, UMG = Ulaanbaatar Municipal Government. 9

16 10 D. Grant Management 7. The project will be implemented over 4 years, from 2017 to The project field activities are located within two districts of Ulaanbaatar, Bayanzurkh and Chingeltei. 8. The Ministry of Environment and Tourism (MET), acting through the Department of Land Management and Integrated Water Policy Coordination (DLMIWPC), will be the executing agency. 9. Project implementation will be led by a project management unit (PMU) on behalf of the executing agency. The PMU will comprise a team of 11 full-time and part-time consultants recruited for the project, comprising a project manager, field coordinator, accountant, procurement specialist, and technical specialists (Section VI.D). The PMU will lead the coordination, planning, and implementation of the project targets and requirements for administration, monitoring, and reporting. The PMU team will be based at MET s offices in Ulaanbaatar. 10. A project steering committee (PSC) chaired by the executing agency will be established and provide oversight and policy guidance for the project and meet at least semiannually. The PSC will meet at least semiannually. The committee will include representatives from the Ulaanbaatar Municipal Government (UMG) and CSOs. The PSC will be established after project effectiveness. ADB and the Embassy of Japan in Mongolia (EOJ) will be invited to participate as observers. 11. The executing agency and PMU team will work closely with other stakeholders, including: (i) the Environment and Natural Resources Department of the UMG, which will coordinate UMG involvement in the project. The department was involved in project design and selection of the project districts and sub-districts. During implementation, the department will: (a) facilitate the involvement of the khoroo (sub-district) agencies that will work with the PMU team to implement the project field activities; and (b) coordinate with relevant government agencies for the project components involving soil and groundwater monitoring, inspection of the completed toilet facilities, and community and agency training; and (ii) CSOs involved in water, sanitation, and hygiene in Ulaanbaatar. The project will build upon existing technical experience and lessons learned for improved sanitation from previous programs.

17 11 IV. COSTS AND FINANCING A. Cost Estimates and Financing Plan 12. The project will be funded by a $2.8 million grant from a trust fund of the Government of Japan, to be administered by ADB. Financial conditions for the grant are set forth in the draft grant agreement 8 and this project administration manual (PAM). 13. The project cost estimates were prepared by the executing agency, a project design team funded by ADB (comprising international and national financial and technical consultants), and ADB project team. For any proposed revisions to the project budget during project implementation, the Government of Mongolia (GOM) will submit a request for project cost reallocation to ADB for review and endorsement. If the revision is endorsed, the PMU will revise the cost estimates under the guidance of ADB project officer. B. Allocation and Withdrawal of Grant Proceeds 14. The grant covers three categories: civil works, goods and services; training, consulting services, and project management; and, contingencies. Taxes and duties are included in the base cost and were determined on the basis that (i) the amount is within the reasonable threshold identified during the country partnership strategy (CPS) preparation process, (ii) the amount does not represent an excessive share of the project investment plan, (iii) the taxes and duties apply only to the grant-financed expenditures, and (iv) the financing of taxes and duties is relevant to the success of the project. There is no land acquisition or resettlement under the project. The central and local governments will provide in-kind counterpart support in the form of office space for the PMU and salaries and travel costs of counterpart staff. These costs will be included in the annual budgets of the relevant government agencies. There are no parallel or joint-financing arrangements. 15. The following table summarizes the allocation and withdrawal of grant proceeds and is from the project grant agreement. Number ALLOCATION AND WITHDRAWAL OF GRANT PROCEEDS (Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project) Item Total Amount Allocated for ADB Financing ($) Percentage and Basis for Withdrawal from the Grant Account 1 Works and Goods* 1,266, % of total expenditure 2 Consulting Services, Training, Project Management* 1,126, % of total expenditure 3 Unallocated (Contingencies) 407, % of total expenditure Total 2,800,000 * No withdrawals shall be made from the grant account until the executing agency has certified to ADB that a project manager, accountant, and procurement specialist meeting the requirements set out in the PAM has been engaged. Note: In this table, contingencies are presented as a single line item (unallocated), while in the procurement plan (Section VI.C), contingencies are included in each individual package. ADB = Asian Development Bank. 8 Grant Agreement (accessible from the list of linked documents in Appendix 2 of the grant assistance report).

18 The following table describes the specific cost items under each cost category. See Section VI.C (procurement plan) for details of the packages for works, goods, and consulting services, and Section VI.D for the terms of reference for consultant services and major procurement packages. The procurement plan does not include all of the costs listed below, including operating costs and vehicle rental and taxi costs for the project management unit. Category Description Works: (i) build and install toilet units. Goods: (i) equipment for waste contractor(s) to pilot household toilet Works and Goods waste collection system; (ii) equipment for compost firm(s) to pilot composting system; (iii) office equipment (computers, printers, copiers); (iv) office furniture and cabinets; and, (v) PMU vehicle rental and taxis. Consulting services: (i) soil pollution monitoring program; (ii) community outreach program; (iii) health and sanitation monitoring program; (iv) supervise and inspect toilet construction; and (iv) 6 individual consultants (1 international compost specialist and 5 national consultants social, gender, and community specialist, soil and water pollution specialist, health and sanitation specialist, finance and business specialist, and sanitation technology engineer). Consulting Training: (i) training for households on O&M of toilets; (ii) training for Services, Training, government officials on on-site sanitation; (iii) training program by khoroo and Project health clinics; (iv) knowledge products on improved sanitation. Management Project Management: (i) finalize designs for toilet units; (ii) project subsidy to poor and female-headed households; (iii) national working group for on-site sanitation (establishment and operation); (iv) scale-up strategy and investment plan; (v) PMU office operations; (vi) stakeholder communication strategy; (vii) translation services; (viii) 5 administrative staff positions project manager; accountant; procurement specialist; implementation and field coordinator; and, M&E specialist; and (ix) financial audit services. This category refers to the physical and price contingencies for the individual project costs. Price contingencies were computed on all costs except international and national consultants, based on cost escalation Unallocated factors of 7.0% for for local currency costs; 1.4% for 2017, and 1.5% for on foreign exchange costs; and 10.0% for national consultant fee rates in the final 2 years of project implementation. M&E = monitoring and evaluation; O&M = operation and maintenance; PMU = project management unit.

19 C. Detailed Cost Estimates by Financier Item A. Base Costs b Amount % Amount % Amount % 1 Works 1,024, ,024, Goods and services 2a Vehicles b Equipment 212, , c Other Goods and Services 29, , Subtotal Goods and Services 242, ,020 3 Training 39, , a Consulting Services 4a Local 599, , b International 77, , Subtotal Consulting Services 676, ,940 5 Project management 5a PMU consultants 307, , b Other project management 102, , Subtotal Project Management 410, ,075 Subtotal A 2,392, ,392, B. Contingencies c a ADB Government Physical 57, , Price 350, , Subtotal B 407, , Total Project Cost (A+B) 2,800, ,800, Includes (i) taxes and duties of $136,000 to be financed by the Japan Fund for Poverty Reduction and administered by the Asian Development Bank. The amount of taxes and duties is determined on the basis that (a) the amount will be within the reasonable threshold identified during the country partnership strategy preparation process, (b) the amount will not represent an excessive share of the project investment plan, (c) the taxes and duties apply only to the grant-financed expenditures, and (d) the financing of taxes and duties is relevant to the success of the project; (ii) costs associated with implementing relevant safeguards and social and gender action plans; and (iii) estimated cost for annual auditing ($40,381). b In 2016 prices as of 15 April Price contingencies computed on all costs except international and national consultants, based on cost escalation factors of 7.0% for c for local currency costs; 1.4% for 2017, and 1.5% for on foreign exchange costs; and 10.0% for national consultant fee rates in the final 2 years of project implementation. Source: Asian Development Bank estimates. Total a 13

20 14 D. Detailed Cost Estimates by Outputs Item 1. Planning for on-site sanitation strengthened 2. On-site sanitation lifecycle piloted 3. Sustainability for on-site sanitation improved Project management Total a A. Base Costs b 1 Works 1,024,200 1,024,200 2 Goods and services 2a Vehicles 2b Equipment 181,500 30, ,100 2c Other Goods and Services 8,800 21,120 29,920 Subtotal Goods and Services 181,500 8,800 51, ,020 3 Training 5,000 34,000 39,000 4 Consulting Services 4a Local 195, ,000 21, ,000 4b International 77,940 77,940 Subtotal Consulting Services 195, ,940 21, ,940 5 Project management 5a PMU consultants 307, ,500 5b Other project management 8,800 25,575 26,400 41, ,575 Subtotal Project Management 8,800 25,575 26, , ,075 Subtotal A 203,800 1,697,215 90, ,020 2,392,235 B. Contingencies c Physical 54, ,410 57,615 Price 30, ,481 19,243 41, ,150 Subtotal B 30, ,286 19,643 43, ,765 C. Total (A+B) 233,960 2,011, , ,696 2,800,000 a Includes (i) taxes and duties of $136,000 to be financed by the Japan Fund for Poverty Reduction and administered by the Asian Development Bank. The amount of taxes and duties is determined on the basis that (a) the amount will be within the reasonable threshold identified during the country partnership strategy preparation process, (b) the amount will not represent an excessive share of the project investment plan, (c) the taxes and duties apply only to the grant-financed expenditures, and (d) the financing of taxes and duties is relevant to the success of the project; (ii) costs associated with implementing relevant safeguards and social and gender action plans; and (iii) estimated cost for annual auditing ($40,381). b c In 2016 prices as of 15 April Price contingencies computed on all costs except international and national consultants, based on cost escalation factors of 7.0% for for local currency costs; 1.4% for 2017, and 1.5% for on foreign exchange costs; and 10.0% for national consultant fee rates in the final 2 years of project implementation. Source: Asian Development Bank estimates.

21 15 E. Detailed Cost Estimates by Expenditure Categories Item A. Base Costs b Local Currency Foreign Currency Total a 1 Works 1,024,200 1,024,200 2 Goods and services 2a Vehicles 2b Equipment 212, ,100 2c Other Goods and Services 29,920 29,920 Subtotal Goods and Services 242, ,020 3 Training 39,000 39,000 4 Consulting Services 4a Local 599, ,000 4b International 77,940 77,940 Subtotal Consulting Services 599,000 77, ,940 5 Project management 5a PMU consultants 307, ,500 5b Other project management 102, ,575 Subtotal Project Management 410, ,075 Subtotal A 2,314,295 77,940 2,392,235 B. Contingencies c 1 Physical 57,615 57,615 2 Price 350, ,150 Subtotal B 407, ,765 C. Total Project Cost (A+B) 2,722,060 77,940 2,800,000 a Includes (i) taxes and duties of $136,000 to be financed by the Japan Fund for Poverty Reduction and administered by the Asian Development Bank. The amount of taxes and duties is determined on the basis that (a) the amount will be within the reasonable threshold identified during the country partnership strategy preparation process, (b) the amount will not represent an excessive share of the project investment plan, (c) the taxes and duties apply only to the grant-financed expenditures, and (d) the financing of taxes and duties is relevant to the success of the project; (ii) costs associated with implementing relevant safeguards and social and gender action plans; and (iii) estimated cost for annual auditing ($40,381). b In 2016 prices as of 15 April c Price contingencies computed on all costs except international and national consultants, based on cost escalation factors of 7.0% for for local currency costs; 1.4% for 2017, and 1.5% for on foreign exchange costs; and 10.0% for national consultant fee rates in the final 2 years of project implementation. Source: Asian Development Bank estimates.

22 16 F. Detailed Cost Estimates by Year Item A. Base Costs b Total a 1 Works 68, , ,820 68,280 1,024,200 2 Goods and services 2a Vehicles 2b Equipment 212, ,100 2c Other Goods and Services 5,280 5,280 14,080 5,280 29,920 Subtotal Goods and Services 217,380 5,280 14,080 5, ,020 3 Training 5,000 6,000 14,000 14,000 39,000 4 Consulting Services 4a Local 124, , , , ,000 4b International 77,940 77,940 Subtotal Consulting Services 201, , , , ,940 5 Project management 5a PMU consultants 75,000 78,000 78,000 76, ,500 5b Other project management 33,935 24,805 24,805 19, ,575 Subtotal Project Management 108, , ,805 95, ,075 Subtotal A 601, , , ,090 2,392,235 B. Contingencies c 1 Physical 13,044 20,414 20,814 3,344 57,615 2 Price 17,713 90, ,429 85, ,150 Subtotal B 30, , ,243 88, ,765 C. Total Project Cost (A+B) 632, , , ,830 2,800,000 a Includes (i) taxes and duties of $136,000 to be financed by the Japan Fund for Poverty Reduction and administered by the Asian Development Bank. The amount of taxes and duties is determined on the basis that (a) the amount will be within the reasonable threshold identified during the country partnership strategy preparation process, (b) the amount will not represent an excessive share of the project investment plan, (c) the taxes and duties apply only to the grant-financed expenditures, and (d) the financing of taxes and duties is relevant to the success of the project; (ii) costs associated with implementing relevant safeguards and social and gender action plans; and (iii) estimated cost for annual auditing ($40,381). b c In 2016 prices as of 15 April Price contingencies computed on all costs except international and national consultants, based on cost escalation factors of 7.0% for for local currency costs; 1.4% for 2017, and 1.5% for on foreign exchange costs; and 10.0% for national consultant fee rates in the final 2 years of project implementation. Source: Asian Development Bank estimates.

23 17 G. Estimated Disbursement Schedule by Year Fiscal Year (FY) Amount ($) , , , ,830 Total 2,800,000 H. Contract and Disbursement S-curve 17. The projected contract awards and disbursements under the grant and the corresponding S-curves are presented below. Schedule of Disbursement and Contract Awards Years Contract Awards ($ million) Disbursement ($ million) Q1 Q2 Q3 Q4 Total Q1 Q2 Q3 Q4 Total , ,456 1,573,618 90,776 2,721,512 32, , , , , , , , , , , , , , , , , , , , , ,234 95, ,830 Total 2,800,000 2,800,000 S-curve 9 4,000,001 Contract Awards and Disbursement ($) 3,500,001 3,000,001 2,500,001 2,000,001 1,500,001 1,000, , Q Q Q Q Q Q Q Q Q Q Q Q4 Contract Award Disbursement 9 The steep S-curve reflects the need for completion of consultant recruitment within the first year of the project.

24 18 I. Funds Flow Diagram Ministry of Finance (MOF) Establishment of imprest account and co-signing of withdrawal applications Ministry of Environment and Tourism (MET) Department of Land Management and Integrated Water Policy Coordination (executing agency) Asian Development Bank Imprest Account Commercial Bank Project Management Unit USD sub-account MNT sub-account Output 1 (Planning for on-site sanitation strengthened) Output 2 (On-site sanitation lifecycle piloted) Output 3 (Sustainability for on-site sanitation improved) Project Management Contractors and agencies Communities Legend: Coordination Reporting MNT = Mongolian togrog, USD = US dollars. The project management unit will administer the imprest account on behalf of the executing agency. See paragraph 21 for details.

25 19 A. Financial Management Assessment V. FINANCIAL MANAGEMENT 18. Financial management assessment (FMA) of the executing agency (MET s DLMIWPC) was conducted in April 2016 in accordance with ADB s Financial Management Assessment Guidelines and Financial Due Diligence A Methodology Note. Assessment of overall premitigation financial management risk is based on the definitions provided in ADB s Financial Management Technical Guidance Note Financial Management Assessment (May 2015). Staff of MET s DLMIWPC and Economic, Financial and Planning Division (EFPD) participated in the FMA. The FMA considered the capacity of the executing agency, including funds-flow arrangements, staffing, accounting and financial reporting systems, financial information systems, and internal and external auditing arrangements. The FMA was conducted within the overall framework of ADB s country partnership strategy (CPS) for Mongolia, , 10 which summarizes key issues for public financial management. The full results of the FMA are available as Supplementary Document 7 (SD 7) for the project The overall pre-mitigation financial management risk of the executing agency is concluded to be medium (defined as likely to occur, will have low impact if occurs ). 12 This conclusion is based on: (i) MET s DLMIWPC has low in-house financial capacity, as it comprises technical staff which are not qualified in accounting or financial management, and the EFPD will have a supporting (but not full time) role in the project; hence even with the inclusion of a qualified accountant in the PMU team, it is possible that some errors or deficiencies in project financial management may occur; and (ii) given the small size and budget of the project, it is likely that such errors will be quickly identified and corrected, with limited impact to project operations and viability. A ranking of medium risk requires the preparation of a financial management action plan, which is presented in the following table. A key condition is that no withdrawals shall be made from the grant account until the executing agency has certified to ADB that a project manager, accountant, and procurement specialist meeting the requirements set out in the terms of reference for each position (Section VI.D) have been recruited. Table 3: Financial Management Action Plan Risk Action Responsibility Timing EFPD provide limited Confirm inclusion of project in EFPD EFPD, executing 3 months before internal support to executing agency due to existing workloads work plan; clarify EFPD support including internal auditing of project agency grant effectiveness (~Q4 2016) Executing agency (DLMIWPC) lacks in-house qualified financial and procurement staff Executing agency (DLMIWPC) lacks experience in ADB financial management procedures Excel often used by executing agencies for ADB Recruit a full-time project accountant and a procurement specialist before any withdrawals from the grant account Training on ADB requirements and procedures, including accounting, auditing, and disbursement Establish a secure project accounting system: procure and use financial executing agency ADB executing agency, project Within 3 months of grant effectiveness (~Q1 2017) Within 3 months of grant effectiveness (~Q1 2017) Within 3 months of grant ADB Country Partnership Strategy: Mongolia, , Manila; which includes World Bank Mongolia: Consolidating the Gains, Managing Booms and Busts, and Moving to Better Service Delivery A Public Expenditure and Financial Management Review. Washington, D.C. Financial Management Assessment (accessible from: ADB Financial Management Technical Guidance Note. Financial Management Assessment. Manila.

Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project

Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project Semi-Annual Progress Report June 2016 Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project Prepared by the project management unit and project implementation

More information

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing Technical Assistance Report Project Number: 51022-001 Knowledge and Support Technical Assistance (KSTA) December 2017 People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction

More information

People s Republic of China: Strategy for Inclusive and Green Development of Small Cities, Towns, and Villages in Jiangxi Province

People s Republic of China: Strategy for Inclusive and Green Development of Small Cities, Towns, and Villages in Jiangxi Province Technical Assistance Report Project Number: 49024-001 Policy and Advisory Technical Assistance (PATA) December 2015 People s Republic of China: Strategy for Inclusive and Green Development of Small Cities,

More information

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing)

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) GRANT NUMBER 0426-CAM (SCF) GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) (Cambodia Component) between KINGDOM

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 1.01 Page 1 of 5 INITIAL PROJECT ADMINISTRATION ACTIVITIES A. Introduction 1. The Project Administration Instructions (PAIs) outline ADB s policies and procedures

More information

This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.

This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. Technical Assistance Report Project Number: 51336-001 Knowledge and Support Technical Assistance (KSTA) February 2018 Capacity Building Support for Asia-Pacific Economic Cooperation Financial Regulators

More information

Republic of Marshall Islands: Ebeye Water Supply and Sanitation Project

Republic of Marshall Islands: Ebeye Water Supply and Sanitation Project Ebeye Water Supply and Sanitation Project (RRP RMI 46346-002) Project Administration Manual Project Number: 46346-002 Grant Numbers: GXXXX; GXXXX September 2015 Republic of Marshall Islands: Ebeye Water

More information

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN. FRAMEWORK FINANCING AGREEMENT (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 29 October 2005 FRAMEWORK FINANCING

More information

Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project Additional Financing

Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project Additional Financing Small and Medium-Sized Enterprises Line of Credit Project-Additional Financing (RRP SRI 49273-003) Project Administration Manual Project Number: 49273-003 Loan Number: 3370 Technical Assistance Number:

More information

(Financed by the Japan Fund for Poverty Reduction)

(Financed by the Japan Fund for Poverty Reduction) Technical Assistance Report Project Number: 49276-001 Capacity Development Technical Assistance (CDTA) December 2015 India: Supporting Rajasthan s Productive Clusters in the Delhi Mumbai Industrial Corridor

More information

Papua New Guinea: Support for Water and Sanitation Sector Management

Papua New Guinea: Support for Water and Sanitation Sector Management Technical Assistance Report Project Number: 49454-001 Capacity Development Technical Assistance (CDTA) February 2017 Papua New Guinea: Support for Water and Sanitation Sector Management This document is

More information

Mongolia: Regional Logistics Development Project

Mongolia: Regional Logistics Development Project Regional Logistics Development Project (RRP MON 41192-01) Project Administration Manual Project Number: 41192-01 Proposed Loan: MON: Regional Logistics Development Project November 2010 Mongolia: Regional

More information

Ulaanbaatar Urban Services and Ger Areas Development Investment Program

Ulaanbaatar Urban Services and Ger Areas Development Investment Program Ulaanbaatar Urban Services and Ger Areas Development Investment Program 2016, 2 nd Quarter EA Progress Report Project Number: 45007-003 Loan: 3099-MON Period covered: April - June 2016 Ulaanbaatar Urban

More information

Rajasthan Urban Sector Development Program

Rajasthan Urban Sector Development Program India: Rajasthan Urban Sector Development Program Project Name Rajasthan Urban Sector Development Program Project Number 42267-026 Country Project Status Project Type / Modality of Assistance Source of

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49202-001 September 2015 Proposed Administration of Grant Nepal: Disaster Risk Reduction and Livelihood Restoration

More information

Papua New Guinea: Implementation of the Electricity Industry Policy

Papua New Guinea: Implementation of the Electricity Industry Policy Technical Assistance Report Project Number: 46012 December 2012 Papua New Guinea: Implementation of the Electricity Industry Policy The views expressed herein are those of the consultant and do not necessarily

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 47354-003 April 2015 Proposed Results-Based Loan and Administration of Technical Assistance Grant India: Supporting

More information

Administration of Grant Mongolia: Strengthening Community Resilience to Dzud and Forest and Steppe Fires Project

Administration of Grant Mongolia: Strengthening Community Resilience to Dzud and Forest and Steppe Fires Project Grant Assistance Report Project Number: 48236-001 September 2016 Administration of Grant Mongolia: Strengthening Community Resilience to Dzud and Forest and Steppe Fires Project (Financed by the Japan

More information

ARTICLE I. Grant Regulations; Definitions

ARTICLE I. Grant Regulations; Definitions 3 ARTICLE I Grant Regulations; Definitions Section 1.01. All provisions of the Special Operations Grant Regulations of ADB, dated 7 February 2005 (the Grant Regulations ), are hereby made applicable to

More information

Project Administration Manual. Islamic Republic of Afghanistan: Road Asset Management Project

Project Administration Manual. Islamic Republic of Afghanistan: Road Asset Management Project Project Administration Manual Project Number: 50062-001 Grant Numbers: {GXXXX; GXXXX} Draft as of October 2016 Islamic Republic of Afghanistan: Road Asset Management Project CONTENTS ABBREVIATIONS I. PROJECT

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 12 Appendix 5 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is needed for preparing the investment program and conducting technical, economic,

More information

People s Republic of China: Hebei Elderly Care Development Project

People s Republic of China: Hebei Elderly Care Development Project Project Administration Manual Project Number: 49028-002 Loan Number: LXXXX-PRC May 2017 People s Republic of China: Hebei Elderly Care Development Project ABBREVIATIONS ADB Asian Development Bank CAB civil

More information

GRANT AGREEMENT (Special Operations) (Hairatan to Mazar-e-Sharif Railway Project) between ISLAMIC REPUBLIC OF AFGHANISTAN. and ASIAN DEVELOPMENT BANK

GRANT AGREEMENT (Special Operations) (Hairatan to Mazar-e-Sharif Railway Project) between ISLAMIC REPUBLIC OF AFGHANISTAN. and ASIAN DEVELOPMENT BANK GRANT NUMBER 0161-AFG(SF) GRANT AGREEMENT (Special Operations) (Hairatan to Mazar-e-Sharif Railway Project) between ISLAMIC REPUBLIC OF AFGHANISTAN and ASIAN DEVELOPMENT BANK DATED 30 SEPTEMBER 2009 GAS:

More information

Project Design Advance. Nauru: Port Development Project. Project Number: December 2015

Project Design Advance. Nauru: Port Development Project. Project Number: December 2015 Project Design Advance Project Number: 48480-002 December 2015 Nauru: Port Development Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing project. A PPTA is necessary to provide sound

More information

EU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project)

EU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project) Public Disclosure Authorized DOC8UMEW GRANT NUMBER TF0A2379 Public Disclosure Authorized Public Disclosure Authorized EU Grant Agreement (Access to Sustainable Energy Project) between INTERNATIONAL BANK

More information

United Nations Peace Building Fund Grant Agreement

United Nations Peace Building Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS Public Disclosure Authorized GRANT NUMBER TF018255 United Nations Peace Building Fund Grant Agreement (Additional Financing for the Productive Social Safety

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Public Disclosure Authorized GPOBA GRANT NUMBER TF010757 Public Disclosure Authorized Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Philippines Public Health Project)

More information

Pacific Urban Development Investment Planning and Capacity Development Facility

Pacific Urban Development Investment Planning and Capacity Development Facility Technical Assistance Report Project Number: 51175-001 Transaction Technical Assistance Facility (F-TRTA) July 2017 Pacific Urban Development Investment Planning and Capacity Development Facility This document

More information

Project Administration Memorandum. Republic of Uzbekistan: Surkhandarya Water Supply and Sanitation Project

Project Administration Memorandum. Republic of Uzbekistan: Surkhandarya Water Supply and Sanitation Project Project Administration Memorandum Project Number: 40007 February 2009 Republic of Uzbekistan: Surkhandarya Water Supply and Sanitation Project This Project administration manual (PAM) is an active document,

More information

Rural Enterprise Finance Project. Negotiated financing agreement

Rural Enterprise Finance Project. Negotiated financing agreement Document: EB 2018/123/R.8/Sup.1 Agenda: 5(a)(i) Date: 6 April 2018 Distribution: Public Original: English E Republic of Mozambique Rural Enterprise Finance Project Negotiated financing agreement Executive

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 44304-01 October 2010 Proposed Loan and Administration of Grant Papua New Guinea: Microfinance Expansion Project CURRENCY

More information

Nepal: Small Towns Water Supply and Sanitation Sector Project

Nepal: Small Towns Water Supply and Sanitation Sector Project Validation Report Reference Number: PVR 193 Project Number: 31402 Loan Number: 1755(SF) November 2012 Nepal: Small Towns Water Supply and Sanitation Sector Project Independent Evaluation Department ABBREVIATIONS

More information

SECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines

SECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines GMS 4 5 July 2018 Manila, Philippines Working Group Section 2: Review of Concept and Approach to the Ongoing and Planned ipsum GMS que Corridor moluptam Towns sum Development que moluptam Projects sum

More information

Regional: Supporting the Cities Development Initiative for Asia

Regional: Supporting the Cities Development Initiative for Asia Technical Assistance Report Project Number: 47285 Regional Capacity Development Technical Assistance (R-CDTA) November 2013 Regional: Supporting the Cities Development Initiative for Asia (Cofinanced by

More information

Lao Peoples Democratic Republic: Vientiane Sustainable Urban Transport Project

Lao Peoples Democratic Republic: Vientiane Sustainable Urban Transport Project Vientiane Sustainable Urban Transport Project (RRP LAO 45041) Project Administration Manual Project Number: 45041-002 Loan and Grant Number(s): LXXXX; GXXXX February 2015 Lao Peoples Democratic Republic:

More information

India: Agribusiness Infrastructure Development Investment Program (Tranche 2)

India: Agribusiness Infrastructure Development Investment Program (Tranche 2) Completion Report Project Number: 37091-033 Loan Number: 2837 August 2017 India: Agribusiness Infrastructure Development Investment Program (Tranche 2) This document is being disclosed to the public in

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. A project preparatory technical assistance (PPTA) is required to support the Ministry of New and Renewable Energy (MNRE) and Solar Energy Corporation

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. There is an urgent need to support the government in the development of the urban water supply and sanitation sector in Cambodia

More information

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA.

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4201-ET Public Disclosure Authorized Financing Agreement (Rural Capacity Building Project) Public Disclosure Authorized between FEDERAL DEMOCRATIC

More information

Republic of Indonesia: Water Supply and Sanitation Sector Development Project

Republic of Indonesia: Water Supply and Sanitation Sector Development Project Technical Assistance Report Project Number: 43304-022 Capacity Development Technical Assistance (CDTA) November 2011 Republic of Indonesia: Water Supply and Sanitation Sector Development Project (Financed

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section E2/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction JAPAN FUND

More information

Islamic Republic of Afghanistan: Proposed Grant for Qaisar Dari Bum Road Project

Islamic Republic of Afghanistan: Proposed Grant for Qaisar Dari Bum Road Project Qaisar-Dari Bum Road Project (RRP AFG 37075-023) Project Administration Manual Project Number: 37075-023 Loan and/or Grant Number(s): GXXXX 24 October 2017 Islamic Republic of Afghanistan: Proposed Grant

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Public Disclosure Authorized CONFORMED COPY GPOBA GRANT NUMBER TF096551-BD Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Rural Electrification and Renewable Energy

More information

Global Financing Facility Grant Agreement

Global Financing Facility Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GFF GRANT NUMBER TF0A2561 Public Disclosure Authorized Global Financing Facility Grant Agreement (Transforming Health Systems for Universal Care Project)

More information

Proposed Grant Assistance Kyrgyz Republic: Improving Livelihoods of Rural Women through Development of Handicrafts Industry

Proposed Grant Assistance Kyrgyz Republic: Improving Livelihoods of Rural Women through Development of Handicrafts Industry Grant Assistance Report Project Number: 40539 November 2006 Proposed Grant Assistance Kyrgyz Republic: Improving Livelihoods of Rural Women through Development of Handicrafts Industry (Financed by the

More information

People s Republic of China: Study of the Belt and Road Initiative

People s Republic of China: Study of the Belt and Road Initiative Technical Assistance Report Project Number: 50141-001 Policy and Advisory Technical Assistance (PATA) June 2016 People s Republic of China: Study of the Belt and Road Initiative This document is being

More information

THE WORLD BANK IBRD * IDA WORLD BANK GROUP

THE WORLD BANK IBRD * IDA WORLD BANK GROUP Public Disclosure Authorized RODRIGO A. CHAVES Country Director, Indonesia THE WORLD BANK IBRD * IDA WORLD BANK GROUP Letter No. CD/I 04/ WB-REKOMPAK/V/2016 May 9, 2016 Public Disclosure Authorized Public

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF TF GRANT NUMBER TF097126 Public Disclosure Authorized Global Environment Facility Grant Agreement (Financing Energy Efficiency at MSMEs Project) Public Disclosure

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan Republic of Uzbekistan: Primary Health Care Improvement Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan Republic of Uzbekistan: Primary Health Care Improvement Project Report and Recommendation of the President to the Board of Directors Project Number: 50190-002 November 2017 Proposed Loan Republic of Uzbekistan: Primary Health Care Improvement Project Distribution of

More information

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC Greater Dhaka Sustainable Urban Transport Project (RRP BAN 42169) TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC A. TA Description 1. The Government of Bangladesh has requested

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS TERMS OF REFERENCE FOR CONSULTANTS A. Consulting Firm The Asian Development Bank (ADB) will engage a consulting firm in accordance with its Guidelines on the Use of Consultants (2013, as amended from time

More information

World Bank Iraq Trust Fund Grant Agreement

World Bank Iraq Trust Fund Grant Agreement Public Disclosure Authorized Conformed Copy GRANT NUMBER TF054052 Public Disclosure Authorized World Bank Iraq Trust Fund Grant Agreement Public Disclosure Authorized (Emergency Disabilities Project) between

More information

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696 The World Bank INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION 1818 H Street N.W. Washington, D.C. 20433 U.S.A. (202) 473-1000 Cable Address: INTBAFRAD Cable

More information

Global Environment Facility Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF091937 ALB Global Environment Facility Trust Fund Grant Agreement (Lake Skadar-Shkoder Integrated Ecosystem Management Project) between ALBANIA and INTERNATIONAL

More information

Implementing the Regional Cooperation and Integration Operational Plan (Cofinanced by the Government of the United Kingdom)

Implementing the Regional Cooperation and Integration Operational Plan (Cofinanced by the Government of the United Kingdom) Technical Assistance Report Project Number: 51155-001 Knowledge and Support Technical Assistance (KSTA) July 2017 Implementing the Regional Cooperation and Integration Operational Plan (Cofinanced by the

More information

With the Global Green Growth Institute (GGGI) for Mongolia. 05 June 2017 Strategic Frameworks

With the Global Green Growth Institute (GGGI) for Mongolia. 05 June 2017 Strategic Frameworks With the Global Green Growth Institute (GGGI) for Mongolia 05 June 2017 Strategic Frameworks PAGE 1 OF 18 ver. 13 February 2017 Readiness and Preparatory Support Proposal How to complete this document?

More information

Project Administration Manual. Project Number: November Vanuatu: Interisland Shipping Support Project

Project Administration Manual. Project Number: November Vanuatu: Interisland Shipping Support Project Project Administration Manual Project Number: 42392-01 November 2011 Vanuatu: Interisland Shipping Support Project Contents ABBREVIATIONS 4 I. PROJECT DESCRIPTION 1 A. Impact, Outcome and Outputs 2 II.

More information

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement GPOBA GRANT NUMBER TF092629 DOCUMENTS Global Partnership on Output-based Aid Grant Agreement (Extending Telecommunications in Rural Indonesia Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7052

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7052 Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared Estimated Date of Appraisal Completion Estimated Date of Board

More information

Global Environment Facility Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF099857 Global Environment Facility Trust Fund Grant Agreement (Nyika Transfrontier Conservation Area Project) between REPUBLIC OF MALAWI and INTERNATIONAL BANK

More information

with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks

with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks READINESS AND PREPARATORY SUPPORT PAGE 1 OF 14 ver. 19 August 2016 Readiness and Preparatory

More information

Trust Fund Grant Agreement

Trust Fund Grant Agreement Public Disclosure Authorized CONFORMED COPY GRANT NUMBER TF057872-GZ Public Disclosure Authorized Trust Fund Grant Agreement (Palestinian NGO-III Project) Public Disclosure Authorized between INTERNATIONAL

More information

OFFICIAL DOCUMENTS. Global Agriculture and Food Security Program Trust Fund Grant Agreement

OFFICIAL DOCUMENTS. Global Agriculture and Food Security Program Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GAFSP GRANT NUMBER TF0A2869 Public Disclosure Authorized Public Disclosure Authorized Global Agriculture and Food Security Program Trust Fund Grant Agreement

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Bangladesh Padma Multipurpose

More information

Proposed Grant Assistance Kingdom of Thailand: Community-Based Flood Risk Management and Disaster Response in the Chao Phraya Basin

Proposed Grant Assistance Kingdom of Thailand: Community-Based Flood Risk Management and Disaster Response in the Chao Phraya Basin Grant Assistance Report Project Number: 46270 September 2014 Proposed Grant Assistance Kingdom of Thailand: Community-Based Flood Risk Management and Disaster Response in the Chao Phraya Basin (Financed

More information

GOVERNMENT OF MAURITIUS MANUFACTURING AND SERVICES DEVELOPMENT AND COMPETITIVENESS PROJECT (MSDC) LOAN NO MU PROCUREMENT PLAN FOR THE PERIOD

GOVERNMENT OF MAURITIUS MANUFACTURING AND SERVICES DEVELOPMENT AND COMPETITIVENESS PROJECT (MSDC) LOAN NO MU PROCUREMENT PLAN FOR THE PERIOD Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF MAURITIUS MINISTRY OF BUSINESS, ENTERPRISES AND COOPERATIVES MANUFACTURING

More information

OFFICIAL DOCUMENTS I

OFFICIAL DOCUMENTS I Public Disclosure Authorized OFFICIAL DOCUMENTS I GPEF GRANT NUMBER TF016558 Public Disclosure Authorized Global Partnership for Education Grant Agreement (Second Education Sector Support Project) Public

More information

Global Partnership on Output-based Aid. Grant Agreement. GPOBA GRANT NUMBER TF I1rD

Global Partnership on Output-based Aid. Grant Agreement. GPOBA GRANT NUMBER TF I1rD GPOBA GRANT NUMBER TF091511-I1rD Global Partnership on Output-based Aid Grant Agreement (Expanding Piped Water Supply to Surabaya's Urban Poor Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

Afghanistan Reconstruction Trust Fund Grant Agreement

Afghanistan Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS ARTF GRANT NUMBER TFOAO730 Public Disclosure Authorized Public Disclosure Authorized Afghanistan Reconstruction Trust Fund Grant Agreement (Higher Education

More information

Rural Community Finance Project. Negotiated financing agreement

Rural Community Finance Project. Negotiated financing agreement Document: EB 2015/LOT/P.37/Sup.1 Date: 17 December 2015 Distribution: Public Original: English E Republic of Liberia Rural Community Finance Project Negotiated financing agreement For: Information Negotiated

More information

Completion Report. Project Number: Loan Number: 2230-PAK October Pakistan: Rural Enterprise Modernization Project

Completion Report. Project Number: Loan Number: 2230-PAK October Pakistan: Rural Enterprise Modernization Project Completion Report Project Number: 38447 Loan Number: 2230-PAK October 2010 Pakistan: Rural Enterprise Modernization Project CURRENCY EQUIVALENTS Currency Unit Pakistan rupee/s (PRe/PRs) At Appraisal At

More information

Trust Fund Grant Agreement

Trust Fund Grant Agreement Public Disclosure Authorized CONFORMED COPY GRANT NUMBER TF094521 GZ Public Disclosure Authorized Trust Fund Grant Agreement (Additional Financing for the Palestinian NGO-III Project) Public Disclosure

More information

Project Administration Manual

Project Administration Manual Road Rehabilitation Project Additional Financing (RRP KIR 44281-014) Project Administration Manual Project Number: 44281-014 Grant Number: November 2016 Republic of Kiribati: Road Rehabilitation Project

More information

Country Operations Business Plan. Maldives July 2017

Country Operations Business Plan. Maldives July 2017 Country Operations Business Plan July 2017 Maldives 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 20

More information

Grant Assistance Report

Grant Assistance Report Grant Assistance Report Project Number: 41659 July 2008 Proposed Grant Assistance Mongolia: Poverty Reduction through Community-Based Natural Resource Management (Financed by the Japan Fund for Poverty

More information

Country Operations Business Plan. Samoa October 2016

Country Operations Business Plan. Samoa October 2016 Country Operations Business Plan October 2016 Samoa 2017 2019 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (As of 26

More information

Embassy of Canada to Croatia and Kosovo Canada Fund for Local Initiatives (CFLI)

Embassy of Canada to Croatia and Kosovo Canada Fund for Local Initiatives (CFLI) Embassy of Canada to Croatia and Kosovo Canada Fund for Local Initiatives (CFLI) 2017-2018 I. General Presentation Guidelines II. III. IV. Eligible Organizations Requirements for Application Eligible Expenses

More information

Republic of Uzbekistan: Samarkand Solar Power Project

Republic of Uzbekistan: Samarkand Solar Power Project Samarkand Solar Power Project (RRP UZB 45120) Project Administration Manual Project Number: 45120 Loan Numbers: 3058/3059 Updated May 2016 Republic of Uzbekistan: Samarkand Solar Power Project 2 TABLE

More information

GOVERNMENT OF MAHARASHTRA

GOVERNMENT OF MAHARASHTRA GOVERNMENT OF MAHARASHTRA Project Management Unit (PMU), Agribusiness Infrastructure Development Investment Program (AIDIP) Maharashtra State Agriculture Marketing Board (MSAMB) PUNE 411 037 REQUEST FOR

More information

Financing Agreement CONFORMED COPY GRANT NUMBER H603-AF. (Third Emergency National Solidarity Project) between ISLAMIC REPUBLIC OF AFGHANISTAN.

Financing Agreement CONFORMED COPY GRANT NUMBER H603-AF. (Third Emergency National Solidarity Project) between ISLAMIC REPUBLIC OF AFGHANISTAN. Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H603-AF Public Disclosure Authorized Financing Agreement (Third Emergency National Solidarity Project) between Public Disclosure Authorized ISLAMIC

More information

Grant Agreement for Republic of Sudan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF

Grant Agreement for Republic of Sudan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF The World Bank INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION 1818 H Street NW. Washington, D.C. 20433 U.S.A. (202) 473-1000 Cable Address: INTBAFRAD Cable

More information

Public Private Partnerships (PPPs) to promote Cluster Development and Research and Skills Development. PPP Implementation Manual

Public Private Partnerships (PPPs) to promote Cluster Development and Research and Skills Development. PPP Implementation Manual Public Private Partnerships (PPPs) to promote Cluster Development and Research and Skills Development PPP Implementation Manual May, 2015 i Contents List of Acronyms... iii Clarification of Terms... iv

More information

: Ulaanbaatar Urban Services and Ger Areas Development Investment Program Project 1

: Ulaanbaatar Urban Services and Ger Areas Development Investment Program Project 1 45007-001: Ulaanbaatar Urban Services and Ger Areas Development Investment Program Project 1 Improved Urban Planning and Subcenter Development Consulting Services Package OUTLINE TERMS OF REFERENCE 1.

More information

(Energy Development and Access Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and ARB APEX BANK LIMITED

(Energy Development and Access Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and ARB APEX BANK LIMITED Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4356-GH Public Disclosure Authorized Project Agreement (Energy Development and Access Project) between Public Disclosure Authorized INTERNATIONAL

More information

Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project

Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project PD 0002-TJK June 6, 2016 PROJECT DOCUMENT Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project This document has a restricted distribution and may be used by recipients only in performance

More information

ADB Business Opportunities Seminar

ADB Business Opportunities Seminar ADB Business Opportunities Seminar 4 November 2016 Vienna, Austria Presented by Walter Poick Director, Procurement Division 2 (East Asia, Southeast Asia and Pacific Operations) Operations Services and

More information

Lao People s Democratic Republic: Strengthening Urban Water Supply Regulation

Lao People s Democratic Republic: Strengthening Urban Water Supply Regulation Technical Assistance Report Project Number: 45298 Capacity Development Technical Assistance (CDTA) November 2011 Lao People s Democratic Republic: Strengthening Urban Water Supply Regulation The views

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Global Partnership on Output-based Aid GRANT NUMBERS TF057614 AND TF057615 Global Partnership on Output-based Aid Grant Agreement (Kenya - Microfinance for Community-Managed Water Projects) between K-REP

More information

The World Bank Kenya GPE Primary Education Development Project (P146797)

The World Bank Kenya GPE Primary Education Development Project (P146797) Public Disclosure Authorized AFRICA Kenya Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 01-Nov-2017 ISR29517 Implementing Agencies:

More information

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4293-TA Public Disclosure Authorized Financing Agreement (Zanzibar Basic Education Improvement Project) between Public Disclosure Authorized THE

More information

Trust Fund Grant Agreement

Trust Fund Grant Agreement Public Disclosure Authorized Public Disclosure Authorized GRANT NUMBER TF016392 Trust Fund Grant Agreement (Co-financing of the Women Entrepreneurship Development Project) Public Disclosure Authorized

More information

PPEA Guidelines and Supporting Documents

PPEA Guidelines and Supporting Documents PPEA Guidelines and Supporting Documents APPENDIX 1: DEFINITIONS "Affected jurisdiction" means any county, city or town in which all or a portion of a qualifying project is located. "Appropriating body"

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22379 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES

GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES As Adopted by the GIF Governing Council on 20 April, 2015 And Revised on 16 June, 2016 A. INTRODUCTION 1. The Global Infrastructure Facility ( GIF )

More information

DEVELOPING A PACIFIC REGIONAL PROJECT FOR COMMUNITY-LED WATER RESOURCES MANAGEMENT

DEVELOPING A PACIFIC REGIONAL PROJECT FOR COMMUNITY-LED WATER RESOURCES MANAGEMENT Date: 18th June 2010 Original: English Second Meeting of the Regional Project Steering Committee and Inception Workshop for the SOPAC/UNDP/UNEP/GEF Project: Implementing Sustainable Water Resource and

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF TF GRANT NUMBER TF056981 GUI Public Disclosure Authorized Global Environment Facility Grant Agreement Public Disclosure Authorized (Coastal, Marine, and

More information

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following.

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following. Note: Bank solar home systems projects receiving grant funds from the Global Environment Facility (GEF) are normally required to have their records and accounts audited by an independent entity each fiscal

More information

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Liberia Education Global Practice Recipient Executed Activities Specific Investment

More information

04f'33- OFFICIAL DOCUMENTS

04f'33- OFFICIAL DOCUMENTS Public Disclosure Authorized OFFICIAL DOCUMENTS 04f'33- The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD

More information