1 07 December 2017 FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #5 Notes Meeting Date: 07 December :30 AM FCPS Central Office Building Current Design Phase: Site Selection Attendees: FCPS Educational Planning Team Roger Fritz Director Construction Management Brian Staiger FCPS Construction Management Beth Pasierb Supervisor of Facilities Planning Mary Malone Principal Rock Creek School Keith Harris FCPS Executive Director Carol Breeze FCPS Special Education Programs Rachel Ablondi Parent of Rock Creek Student Amy Boehman Pollitt FCPS ACT Team Leader Steve Buckley Frederick County Gov. OTPT Sara Scovitch OTPT Therese Pelicano FCPS Transportation Manager Ted Gardner Director of Technology Infrastructure Design Team Sandra Carpenter Becker Morgan Group Kori Purdum Matheis Proffitt & Associates 5.0 Project Status Updates a. Area Summary Update (Note: No revisions proposed since the last meeting) i. Current Base Bid Ed Spec Area = 81,103 GSF ii. All co located spaces have been removed from the scope of work. iii. Potential Add Alternate Ed Spec Area = 17,221 GSF iv. All four of the add alternates (Greenhouse, Future Capacity, Parks & Rec Gymnasium, and Alternative Education Program) are currently pending design funding approval from the Board of Education. This will be voted on during the Dec 13 meeting. Once design funding is approved, then additional discussion can be had regarding the program needs for the alternates. Inclusion of the Alt Ed program is still pending review because of implications with
2 Design Meeting #5 Notes Rock Creek School Replacement PAA Project #17 22 Meeting Date December 7, 2017 Page 2 of 4 regulatory compliance. Once the final site is selected, then Parks & Rec can provide a more definitive answer as to whether they are interested in partnering with FCPS on a community use gym. v. Total Base Bid + Add Alternate Ed Spec Area = 98,324 (still reflects only 3 alternates, does not include Parks & Rec Gym SF) b. Budget Update (Note: No revisions proposed since the last meeting) i. Total Project Budget (including soft costs) = $46,959,762 ii. Total Site, Testing, & Construction Budget = $37,070,262 c. Schedule Update Architect provided a brief project schedule overview. There are no proposed schedule changes since the last meeting. d. LEED Update No updates since the last meeting. e. Summary of Activities for the past Four Weeks i. Site existing conditions exhibits and site concepts were refined and finalized. ii. Site rubric scoring was completed. iii. Site selection recommendation was provided to the Board of Education. iv. Site visit conducted to River Terrace School in DC on December General/Admin. Beth Pasierb reported that the State did not want feasibility study submitted previously without the site selected, but they did ask a month or so ago when FCPS met with them for FCPS to go ahead and submitted it. The study is currently under review by the State. The project is included in request for local planning approval. 5.2 Site Selection and Design a. The final site exhibits and concepts were reviewed. Ballenger Creek Middle was presented and some discussion was had regarding overall site design and scoring considerations. The design team tried to level the playing field by using consistent site parameters for all sites where possible. For instance, the site buildable areas generally exclude the paved play areas. This method was chosen because if the paved play areas are disturbed as part of the new school development, then they will need to be replaced in kind elsewhere on site, which means that an equivalent amount of area would need to be set aside for that use. In the interest of time, it was determined that the committee should review the two highest scoring sites in the most detail. The Walkersville and Monocacy sites scored the highest, within 1 point of each other so they were reviewed in depth. b. Overview of rubric scoring. The scores for Walkersville and Monocacy were discussed. The architect explained how some of the scoring was derived and explained scores for a few criteria that were of interest to the committee. Scoring was based on the detailed point distribution that was developed by the committee at the very beginning of this phase of the project. Beth Pasierb mentioned that Walkersville Middle is located in a wellhead protection area and that this will need to be considered as part of the development plans, she thinks that it is possible that any new SWM facilities may need to be lined. Beth asked about opportunities for inclusion and shared spaces on
3 Design Meeting #5 Notes Rock Creek School Replacement PAA Project #17 22 Meeting Date December 7, 2017 Page 3 of 4 the various sites she wondered if this still a strongly desired design feature? It is, and should be highlighted as part of the presentation to the Board, including discussion of features that could be shared between Rock Creek and the existing building on campus. There was some discussion about how close the scores ended up for Walkersville and Monocacy and the tolerance for error in scoring. Some members of the committee felt that the two sites basically were tied and should be evaluated or put to a tie breaker based upon the criteria that seemed most important to student success. Because of the timing of the Board deadline and missing our last regular design team meeting due to the Thanksgiving holiday, the design team s recommendation was already made to the Board. The recommendation was to select Walkersville Middle based strictly upon its receiving the highest rubric score. The site selection recommendation s executive summary does discuss the fact that both Walkersville and Monocacy would be appropriate sites due to the available land area and overall site features and strengths. c. Parking requirements does the 160 number need to be updated for Future Capacity add alternate inclusion? ( ) Ran out of meeting time prior to getting to this item will table this for a future meeting to discuss site planning. 5.3 Building Design Ed Spec Overview a. Discuss Future Capacity spaces verify if they are to be base bid versus add alternate? This will impact their layout. ( ) Ran out of meeting time prior to getting to this item will review at next meeting during Ed Spec discussion. b. Review River Terrace Site visit likes, dislikes, and overall impressions. ( ) Didn t have time for a full discussion of the River Terrace visit, however the attached PDF of the meeting PowerPoint presentation has some photos from the visit for review and future discussion. c. Discuss things to think about for next meeting main agenda topic will be Ed Spec discussion. ( ) Kori distributed the Space Summary pages from the Ed Specs which outline the basic spaces and square footages to be provided in the new facility. She also passed out a comparison chart from the feasibility study showing how the existing Rock Creek building room square footages compare to the proposed Ed Spec square footages. The next meeting will focus on reviewing the specific spaces, adjacencies, square footages, and program needs. 5.4 Two Week Projection a. Site Selection Recommendation presentation to Board of Education on December 13. b. Prepare for Educational Specifications verification. 5.5 Public Comment No Public Comment was made.
4 Design Meeting #5 Notes Rock Creek School Replacement PAA Project #17 22 Meeting Date December 7, 2017 Page 4 of 4 The next meeting is scheduled for 21 December 2017 at 9:30am at Rock Creek School, in the Library. This summarizes the topics discussed at the meeting. Please review and address any comments and corrections to the Architect within 5 days of receipt of these minutes. Kori Purdum Matheis, RA, LEED AP BD+C Distribution via all attendees and Design Committee Members Attachments: PDF of Meeting Presentation
5 ROCK CREEK SCHOOL REPLACEMENT AND FINAL SITE SELECTION
6 PROJECT STATUS UPDATES Area Summary Update Current Base Bid Ed Spec Area = 81,103 GSF All co-located spaces have been removed from the scope of work. Potential Add Alternate Ed Spec Area = 17,221 GSF (includes 3 alts, but Alt Ed is under review) Two of the four add alternates (Greenhouse and Future Capacity) are currently pending final approval. Acceptance of the other two alternates, Alternative Education Program and Parks & Rec Gymnasium, are still under review. Total Base Bid + Add Alternate Ed Spec Area (3 Alternates only) = 98,324 Budget Update Total Project Budget (including soft costs) = $46,959,762 Total Site, Testing, & Construction Budget = $37,070,262 FCPS Project Information Webpage:
7 PROJECT MILESTONES Site Selection Recommendation & Ed Spec Updates to Board of Education December 1, 2017 Board of Education Reviews Site Recommendation & Ed Spec Updates December 13, 2017 Site Selection to State Clearinghouse January 2018 Site Selection & Ed Specs to IAC March 2018 Schematic Design to IAC May 2018 Design Development to IAC Prior to November 1, 2018 Construction Documents to IAC August 2019 Project out for Bids, Stage 1 October 2019 Start Site Construction February/March 2020 Project out for Bids, Stage 2 February/March 2020 Start Building Construction July 2020 School Ready for Occupancy - August 2021
8 SITE SELECTION PROCESS NEW NEW NEW MAP OF 7 POTENTIAL SITE LOCATIONS
9 EXISTING SITE AERIAL FIELDS BUILDABLE AREA = 10.7 ACRES LOW PT HIGH PT BALLENGER CREEK MIDDLE
10 POTENTIAL SITE CONCEPT Opportunities: Good possibilities for meaningful connection between Middle School and Rock Creek school building and site amenities. Rock Creek car and bus traffic is well separated. Construction costs are anticipated to be lower than most other sites. Compromises: Development will leave little space on site for future expansion of either school. Trade-offs may need to be made between program elements i.e. achieving Rock Creek programmed parking capacity or retaining existing Tennis Courts. Proposed remaining athletic field space is fairly limited for a Middle School program. There are some traffic congestion concerns along Ballenger Creek Pike. Site does not have access to public transportation and has only average access to vocational and employment opportunities and community services. Site has longer than average travel times to locations in the northern end of the County. BALLENGER CREEK MIDDLE
11 EXISTING SITE AERIAL BUILDABLE AREA = 6.6 ACRES HIGH PT LOW PT DEARBOUGHT SITE
12 POTENTIAL SITE CONCEPT Opportunities: Site can be developed to optimize function for Rock Creek School without needing to consider the needs of a co-located school on site or impacts of construction on an existing school. Public transportation access is readily available. All three vocational and employment opportunities are located in close proximity and there are multiple categories of community services within walking distance. Compromises: Site will not fit all program elements and leaves no room for future expansion. There is no other school building on site and no school within walking distance to provide regular and convenient inclusionary opportunities. On-site circulation will be difficult due to single shared entry/exit point and lack of space for separated bus loop and parking areas. Fiber telecom service is not readily available and will need to be extended at high cost to serve the site. DEARBOUGHT SITE
13 EXISTING SITE AERIAL LOW PT FIELDS BUILDABLE AREA = 7.8 ACRES HIGH PT THOMAS JOHNSON MIDDLE
14 POTENTIAL SITE CONCEPT Opportunities: Good possibilities for meaningful connection between Middle School and Rock Creek school building and site amenities. Rock Creek and existing building car and bus traffic are well separated. Existing bus loop can be utilized with little or no modification, queuing space accommodates the largest number of buses with best opportunity for covered loading/unloading zone of all sites. Public transportation access is readily available. All three vocational and employment opportunities are located in close proximity and there are multiple categories of community services within walking distance. Site is more centralized within the County and has shorter average travel times than most other sites. Compromises: Development will leave little space on site for future expansion of either school. Trade-offs may need to be made between program elements i.e. achieving Rock Creek programmed parking capacity or retaining existing forestation areas (if impacted, these would need to be replaced or have fees paid if not replaced). Proposed remaining athletic field space is extremely limited for a Middle School program. Limited right-in, right-out Rock Creek parking access is not optimal. THOMAS JOHNSON MIDDLE
15 EXISTING SITE AERIAL LOW PT EXIST. PUBLIC SANITARY LINE WITH EASEMENT FIELDS BUILDABLE AREA = ACRES HIGH PT MONOCACY MIDDLE & ELEMENTARY
16 POTENTIAL SITE CONCEPT Opportunities: Site is shared with both a Middle School and an Elementary School. FCPS Career and Technology Center and Frederick Community College are directly across Opossumtown Pike from the site, which makes this the only site with close walkable proximity to other students from ages 3-21 for full integration opportunities. Buildable area size allows for all program elements to be included and provides lots of design flexibility to optimize site and building layouts, plus allows flexibility for future expansion. Rock Creek car and bus traffic are well separated. Public transportation access is readily available. All three vocational and employment opportunities are located in close proximity. Site is more centralized within the County and has shorter average travel times than most other sites. POTENTIAL BASE BID BUILDING FOOTPRINT Compromises: Costs are anticipated to be higher than average due to larger work area, the need to improve traffic flows on the existing site, and potential off-site improvements. It is possible that car and bus traffic may not be able to be fully separated from both the Elementary School and Middle School depending upon final site circulation design. New development reduces available field space. Adequate field space will still be provided for school use, however community use field space will decrease from the existing. MONOCACY MIDDLE & ELEMENTARY
17 EXISTING SITE AERIAL LOW PT BUILDABLE AREA = 7.1 ACRES FIELDS MID PT ALAN LINTON BLVD HIGH PT TUSCARORA ELEMENTARY
18 POTENTIAL SITE CONCEPT Opportunities: Good possibilities for meaningful connection between Elementary School and Rock Creek school building and site amenities. Compromises: Development will leave little space on site for future expansion of either school. Trade-offs may need to be made between program elements i.e. achieving Rock Creek programmed site amenities or providing adequate athletic fields for the existing school. Proposed remaining athletic field space is fairly limited for an Elementary School program. Existing elevation change creates major accessibility challenges. Site does not have access to public transportation and has only average access to vocational and employment opportunities and community services. Site has longer than average travel times to locations in the northern end of the County. TUSCARORA ELEMENTARY
19 EXISTING SITE AERIAL BUILDABLE AREA = 15.3 ACRES FIELDS LOW PT EXIST. GAS EASEMENT HIGH PT VALLEY ELEMENTARY
20 POTENTIAL SITE CONCEPT Opportunities: Buildable area size allows for all program elements to be included and provides lots of design flexibility to optimize site and building layouts, plus allows flexibility for future expansion. Rock Creek car and bus traffic are well separated. Development has minimal impact on existing school site amenities, very few components will be lost. Site area will allow for plenty of space for construction access and staging. 1 SOFTBALL Compromises: Existing elevation variations and slopes create accessibility challenges. Site does not have access to public transportation and is farthest away compared to all sites considered from vocational and employment opportunities and community services. Site has longer than average travel times to locations in the northern end of the County. Transportation costs are higher and bus travel times longer than most other sites considered. Sharing of play areas is difficult due to central low point and potential wetlands. Relocated athletic fields are remote from the existing school. VALLEY ELEMENTARY
21 EXISTING SITE AERIAL EXIST. PUBLIC SANITARY LINE LOW PT BUILDABLE AREA = ACRES FIELDS HIGH PT EXISTING LIBRARY WALKERSVILLE MIDDLE
22 POTENTIAL SITE CONCEPT Opportunities: Buildable area size allows for all program elements to be included and provides lots of design flexibility to optimize site and building layouts, plus allows flexibility for future expansion. Public transportation access is readily available. All three vocational and employment opportunities are located within average proximity. There are multiple categories of community services within walking distance. Accessibility will be more easily achieved than on most other sites due to lack of steep slopes. Walkersville Elementary School and Walkersville High School are located southwest along W. Frederick Street, only about a mile away, providing some additional integration opportunities with varied grade level students. Compromises: Proposed remaining athletic field space is fairly limited for a Middle School program. Site circulation is not optimal due to existing constraints and the need to mix buses and cars. Site is not as centrally located in the County as those located in the City of Frederick. Sharing and layout of play areas and fields is not optimal due to relationship of the new building to the existing and access to the loading/service area that must remain. WALKERSVILLE MIDDLE
23 SITE RUBRIC SCORING
24 SITE RUBRIC SCORING
25 SITE RUBRIC SCORING
26 SITE RUBRIC SCORING
27 SITE RUBRIC SCORING
28 ED SPEC SITE ELEMENTS Bus drop-off under covered walkway for 6 buses at a time and queuing for 19 buses in the bus drop-off area. Car drop-off space with covered walkway for 2 cars and space to allow for car queuing. Car parking at a minimum for cars to include faculty, staff, partners and visitors. There shall be a greater amount of handicap parking spaces than required by code located at the main entrance of the school to help facilitate student pick up and drop off. All of the parking spaces are for the ultimate build-out of the school. If add alternates are not accepted, this number could fluctuate. Grass or synthetic surface accessible play field of a minimum size of 50x50yds (150 x150 ). Three hard paved play areas of a minimum size of 40 x40. The two hard paved play areas that are designated for the younger students may be adapted for activities that would require a hard surface, such as a walking track or an area to ride adapted bikes. The third hard paved play space that is designated for the older students shall have space for students to play basketball. Two soft play areas with play structures. Areas are to be provided for both lower and upper grade sized students with separation between the two. Surface should allow accessibility and structure should be designed for wheelchair access. Shaded outdoor play area that could be used for a classroom with permanently installed seating and worktables. Secure walking path that connects all elements of the outdoor program. The path should facilitate independence and create experiences and interactions with the natural environment. Pathway could be contiguous with the internal pathway system of the school. Pathway should allow for walking, wheelchairs, and some ride on vehicles such as tricycles.
29 RIVER TERRACE SCHOOL
30 RIVER TERRACE SCHOOL OFFICE HEALTH ENTRY
31 RIVER TERRACE SCHOOL SENSORY ROOM
32 RIVER TERRACE SCHOOL POOL LOCKERS
33 RIVER TERRACE SCHOOL MOVEMENT ROOM
34 RIVER TERRACE SCHOOL ART MEDIA STORE OFFICES
35 RIVER TERRACE SCHOOL LIFE SKILLS
36 RIVER TERRACE SCHOOL CORRIDORS
37 RIVER TERRACE SCHOOL CORRIDORS
38 RIVER TERRACE SCHOOL WORKFORCE DEVELOPMENT
39 RIVER TERRACE SCHOOL OUTDOOR PLAY AREAS
40 RIVER TERRACE SCHOOL OUTDOOR COURTYARD
41 ROCK CREEK SCHOOL REPLACEMENT AND FINAL SITE SELECTION QUESTIONS AND ANSWERS
Off-Campus Recreation, Intercollegiate Athletics, College of Education and Human Performance, and Facilities and Open Spaces.
In order to provide a comprehensive count of all existing recreation and open space facilities, an inventory of such facilities is organized based on the following chart. Activity-based facilities are
More informationMontgomery County Public Schools. Auburn Strand Schools Blacksburg High School. School Board Presentation January 26, 2012
Montgomery County Public Schools Auburn Strand Schools Blacksburg High School School Board Presentation January 26, 2012 Where are we in the PPEA process? School Board Update October 3 Site Work is on
More informationBerne Knox Westerlo Central School District
Berne Knox Westerlo Central School District Proposed Capital Project Progress Summary Report to the Board of Education May 8, 2017 Proposed Capital Project Background In 2015 the Board of Education and
More informationNew School at the Wilson Site Community Meeting. April 19, 2017
New School at the Wilson Site Community Meeting April 19, 2017 Agenda Project information Construction hours and schedule Construction vehicle routing Construction worker parking Temporary pedestrian and
More informationLa Veta Facilities Taskforce. January 5, 2018
La Veta Facilities Taskforce January 5, 2018 Facilities Taskforce Convened In January 2017, the Board of Education convened a Facilities Taskforce to study our schools and the needs we have for our buildings
More informationEfforts to Date for Short and Long-Term Planning of the Career Center Site
Career Center Working Group Joint Work Session: April 17, 2018 Efforts to Date for Short and Long-Term Planning of the Career Center Site Agenda 1. Welcome and Opening Remarks 2. Members and Organizations
More informationDouglas P. Stanley County Administrator
COUNTY OF WARREN County Administrator s Office Warren County Government Center 220 North Commerce Avenue, Suite 100 Front Royal, Virginia 22630 Phone: (540) 636-4600 FAX: (540) 636-6066 Email: dstanley@warrencountyva.net
More informationMETHODOLOGY - Scope of Work
The scope of work for the Truckee West River Site Redevelopment Feasibility Study will be undertaken through a series of sequential steps or tasks and will comprise four major tasks as follows. TASK 1:
More informationEducational Specifications Guidelines
JON. S. CORZINE Governor LUCILLE E. DAVY Commissioner Educational Specifications Guidelines Issued by the Office of School Facilities July 21, 2009 The following provides content guidelines for educational
More informationPROPOSAL FOR REVIEW AND COMMENT
PROPOSAL FOR REVIEW AND COMMENT August 1, 2017 SUBMITTED TO: MINNESOTA DEPARTMENT OF EDUCATION SUBMITTED BY: RICHFIELD PUBLIC SCHOOLS INDEPENDENT SCHOOL DISTRICT #280 7001 Harriet Avenue South Richfield,
More informationRequest for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado
Request for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado PURPOSE The Clear Creek Board of County Commissioners
More informationGreater Cambridge Partnership Executive Board. Chris Tunstall Interim Transport Director. Western Orbital
Report To: Lead Officer: Greater Cambridge Partnership Executive Board Chris Tunstall Interim Transport Director 20 September 2017 Purpose Western Orbital 1. This report updates the Greater Cambridge Partnership
More informationOrange County Public Schools WINNER. Site 84-E-W-4 Design Community Meeting March 30, 2016
WIER Site 84-E-W-4 Design Community Meeting March 30, 2016 Site 84-E-W-4 Elementary School Meeting Agenda March 30, 2016: MetroWest Elementary School, 6:00 pm Welcome School Board Member Pam Gould Introductions
More informationCOMMUNITY MEETING 3 February 15, Mission Bay Phase Two
COMMUNITY MEETING 3 February 15, 2011 Mission Bay Phase Two Agenda Welcome, Study Scope and Schedule Feedback Received Campus Environment Concepts Active Zones, Pedestrian Environment and Vehicular Circulation
More informationDATE IS ACTUALLY FRIDAY - MARCH 2); contact information included in RFP
Attendees: reference sign-in sheet. Tom Brown, Coordinator Design & Construction, opened meeting at 9:30 AM. Welcomed attendees Meeting recorded; mandatory meeting, sign-in required; leave business cards
More information22. Long-Range Capital Improvement Planning
Background The City continues to refine the parks and recreation system through the capital improvement component of the Comprehensive Parks & Recreation System Plan Update. These capital improvements
More informationProfessional Design Services for Memorial Field. City Of Scranton Lackawanna County
Proposal to Provide: Statement of Qualifications for: General Engineering Consulting s Environmental and Geotechnical Engineering s Professional Design s for Memorial Field Submitted to: Submitted to:
More informationGREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated
GREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated 07.21.2015 1. Why is the Greene County School District considering a bond referendum? The Greene County School District is considering
More informationSOUTHWEST LRT (METRO GREEN LINE EXTENSION)
10 Joint Development This chapter describes potential long-term direct and indirect and short-term (construction) direct and indirect effects that would result from the Southwest Light Rail Transit (LRT)
More informationCOMMUNITY MEETING NOTES UCSF Mission Bay Phase 2 Study. Meeting Date: June 17, 2010 Genentech Hall Mission Bay campus Subject: Community Meeting 1
COMMUNITY MEETING NOTES UCSF Mission Bay Phase 2 Study Meeting Date: June 17, 2010 Location: Genentech Hall Mission Bay campus Subject: Community Meeting 1 Attendees: Neighbors UCSF staff San Francisco
More informationMOHAWK VALLEY HEALTH SYSTEM INTEGRATED HEALTH CAMPUS UTICA, NY
MOHAWK VALLEY HEALTH SYSTEM INTEGRATED HEALTH CAMPUS UTICA, NY 1 MAJOR PROJECT MILESTONES 2 MAJOR PROJECT MILESTONES MVHS announces it is exploring opportunities to fund and build a new, combined hospital
More informationGreen Transit Incentives Program
Green Transit Incentives Program (GreenTRIP) These guidelines provide a description of the Green Transit Incentives Program and describe the submission and administrative process. PLEASE READ THESE GUIDELINES
More informationQ. What are we voting on? Q. How was the referendum developed?
Q. What are we voting on? A. On April 3rd, the voters of the Peshtigo School District will have the opportunity to vote on two referendum questions. The first question will approve $29,960,000 for the
More informationRebuilding Albany High School Facilities referendum Tuesday, Feb. 9
Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9 Community Forum January 14, 2016 Agenda Welcome Presentation: New proposal What s changed? What s stayed the same? Benefits for students
More informationFuture Land Use Supporting Data
4 Supporting Data The purpose of the Land Use Element is to describe the existing and future land use patterns to be developed on the University and to address how this land use pattern will be coordinated
More informationRequest for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents
Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name BGSU Ice Arena Space Study Response Deadline
More informationLUTHER BURBANK HIGH SCHOOL ATHLETIC SPORTS CENTER Progress Meeting 2/4/10
LUTHER BURBANK HIGH SCHOOL ATHLETIC SPORTS CENTER Progress Meeting 2/4/10 Date: Time: Location: Attendees: CC: February 4, 2010 1:00 P.M. Luther Burbank High School Burbank Room Minutes taken by: Eric
More informationRequest for Proposals (RFP) for Professional Planning Services Burlington VT, Downtown/Waterfront Plan Transportation Study
Department of Planning and Zoning 149 Church Street Burlington, VT 05401 Telephone: (802) 865-7188 (802) 865-7195 (FAX) (802) 865-7142 (TTY) www.ci.burlington.vt.us David E. White, AICP, Director Ken Lerner,
More informationPart B - Health Facility Briefing and Planning. PLANNING Functional Areas Functional Relationships
545 INDEX PALLIATIVE CARE UNIT 545.1.00 Description INTRODUCTION Description PLANNING Functional Areas Functional Relationships COMPONENTS OF THE UNIT Introduction Standard Components Non-Standard Components
More informationRecreation Facilities Planning & Implementation
Northwestern University Athletics and Recreation Master Plan Recreation Facilities Planning & Implementation Presenters: Daniel M. Bulfin Director of Recreational Sports, Northwestern University Greg Wachalski
More informationMarion Local Facility Expansion. Marion Local School District April 30, 2018
Marion Local Facility Expansion Marion Local School District April 30, 2018 1 Meeting Goals An opportunity to share information: Factual information about the proposed facility Rationale for design choices
More informationDRAFT GUIDANCE FOR SUGGESTED DEVELOPMENT FUND PROJECTS
DRAFT GUIDANCE FOR SUGGESTED DEVELOPMENT FUND PROJECTS 5/1/2018 GPC Strategic Review Suggestions from all Sources Feasibility Studies to be performed by TDA Staff and Consultants McGlashan Springs Parcel
More informationState University Construction Fund Binghamton University Facilities Master Plan. Open Forum Session: Final Plan Recommendation. 13 April 2011, 3:00pm
State University Construction Fund Binghamton University Facilities Master Plan Open Forum Session: Final Plan Recommendation 13 April 2011, 3:00pm SUCF project no. 07839 1 PRESENTATION /30min Q+A /20min
More informationCITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS
CITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS Date: May 1, 2018 Subject: Z18-009 BELLWOOD LAKE & LOOP 323 LLLP (178.05 ACRE TRACT) Request that the Planning and Zoning Commission consider
More informationRFP Design and Field Improvements for Outdoor Track and Athletic Area Addendum #2 dated 02/2/2018
DATE: February 2, 2018 TO: FROM: RE: All Prospective Proposers Beth Kirk Director, Office of Procurement 301-546-0007 RFP 18-04 Design and Field Improvements for Outdoor Track and Athletic Area Addendum
More informationBackground Project Description
UNIVERSITY OF CALIFORNIA, RIVERSIDE REQUEST FOR PROPOSAL PRE-DESIGN AND ARCHITECTURAL PROGRAMMING COMMONS MALL AND BOOKSTORE RENOVATION & ENHANCEMENT DPP Introduction The University of California, Riverside
More informationADDENDUM NO. 1. Architectural Services for Orange Coast College Student Union Project. Coast Community College District Purchasing Department PROJECT:
ADDENDUM NO. 1 Coast Community College District Purchasing Department PROJECT: Architectural Services for Orange Coast College Student Union Project RFP NO: 2076 NOTICE TO PROPOSERS ON THE ABOVE PROJECT:
More informationSTATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS
STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES For The University of Colorado Colorado Springs For
More informationThe Park at Fields of Medina Playground Equipment
The Park at Fields of Medina Playground Equipment Request for Proposals Issue Date: April 16, 2014 Deadline for RFP Submittals: May 5, 2014 at 4:30 p.m. at Medina City Hall. City of Medina 2052 County
More informationProject/Program Profile
Project/Program Profile Name: (BoLA) Organization: Little Tokyo Service Center Community Development Corporation (Little Tokyo Service Center CDC) Location of Project/Program: 237-249 S. Los Angeles Street,
More informationFunding Source. Ranking
Projects Summary Project Title Priority Ranking Funding Source Project Requests for State Funds 2016 2018 2020 National Sports Center 1 GO $ 4,450 $ 0 $ 0 Northwest Regional Sports Center 2 GO $ 4,000
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Town of Hope Mills Multi-Modal Congestion Management Plan September 19, 2016 Fayetteville Area Metropolitan Planning Organization Proposal Due Date: 3:00 PM Eastern Time, 28 th October,
More informationREQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility
REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility 1 Borough of Kennett Square Request for Proposals (RFP) Feasibility Study
More informationCORPORATE BUSINESS PARK N.W.C. - VALLEY BLVD. & TEMPLE AVE. POMONA, CA
OFFICE + RESEARCH & DEVELOPMENT ENTITLED LAND AVAILABLE FOR 450,000 SF BUILD TO SUIT CORPORATE BUSINESS PARK N.W.C. - VALLEY BLVD. & TEMPLE AVE. POMONA, CA LOCATION FOR SALE OR LEASE ON-SITE AMENITIES
More informationREQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL / ENGINEERING SERVICES JPS HEALTH NETWORK RESPONSES DUE: Wednesday, September 30, :00 P.M.
REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL / ENGINEERING SERVICES JPS HEALTH NETWORK RESPONSES DUE: Wednesday, September 30, 2015 2:00 P.M. (CST) Specifications Prepared by: Design and Construction Department
More informationGold Rush Circulator Study Charlotte, North Carolina REQUEST FOR PROPOSALS
Gold Rush Circulator Study Charlotte, North Carolina REQUEST FOR PROPOSALS September 25, 2012 for the Gold Rush Circulator Study A. Purpose Charlotte Center City Partners (CCCP) and the City of Charlotte
More informationRESOLUTION FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)
TPC Agenda Item 6A Mailout 10/20/16 RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) Amendment Summary Amendment
More informationREQUEST FOR PROPOSALS
Wilmington Area Planning Council 850 Library Avenue, Suite 100 Newark, Delaware 19711 302-737-6205; Fax 302-737-9584 From Cecil County: 888-808-7088 e-mail: wilmapco@wilmapco.org web site: www.wilmapco.org
More informationMorgan Hill Unified School District
Facilities Department 15600 Concord Circle, Morgan Hill, CA 95037 Phone: (408) 201-6087 Fax (408) 776-0175 REQUEST FOR ARCHITECTURAL SERVICES PROPOSALS for a New Britton MS Campus and Site Master Plan
More informationConducting a Comprehensive Feasibility Study
2004 Athletic Business Conference Conducting a Comprehensive Feasibility Study Presented By: Brad Noyes Presentation Outline Introductions The Planning Process Seeing the Big Picture Evaluating your Starting
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Downtown Triangle Redevelopment 1 st Street North, East Jackson Street, and Market Street City of Wisconsin Rapids 444 West Grand Avenue, Wisconsin Rapids, WI 54495 February 2017
More informationWaterford School District 2003 Bond Update
Waterford School District 2003 Bond Update Presented by: Thomas W. Wiseman, C.P.A. Assistant Superintendent Business and Operations William Holbrook, C.P.A. Director of Business Services January 17, 2013
More informationSPECIAL ISSUE CAPITAL PROJECT VOTE
Schuylerville CENTRAL SCHOOL DISTRICT SPECIAL ISSUE - 2016 CAPITAL PROJECT VOTE District capital project vote Dec. 6 O n Tuesday, Dec. 6, voters in the Schuylerville Central School District will decide
More informationREQUEST FOR PROPOSAL. No Public Art at the Goodman Swimming Pool
REQUEST FOR PROPOSAL No. 7742 Public Art at the Goodman Swimming Pool Issue Date: April 11, 2005 Planning & Development Department MADISON ARTS COMMISSION 215 Martin Luther King, Jr., Blvd. Room 200 Madison,
More informationProgram & Funding Source Responsible Party Status
GENERAL FUND PROJECTS Purchase 5 Replacement Vehicles for Purchasing Dept.& DA ($30,000), Facilities ($30,000), Respective Departments ($30,000), IT ($30,000), Public Works ($30,000) for a total of $150,000
More informationProgram & Funding Source Responsible Party Status
GENERAL FUND PROJECTS Purchase 5 Replacement Vehicles for Purchasing Dept.& On bid. Bid opening is 5-27-16. DA ($30,000), Facilities ($30,000), Respective Departments ($30,000), IT ($30,000), Public Works
More informationPast and Present Campus Recreation Facilities
Past and Present Campus Recreation Facilities School Map Photo courtesy of the Department of Archives & Special Collections Before the Malley Center or the Leavey Center were constructed, students used
More informationDallas County Community College District Bond Program. July 10, 2007
Dallas County Community College District 2004 Bond Program July 10, 2007 1 2004 Bond Program Eastfield College 2 Industrial Technology Site Plan Workforce Development Eastfield College Learning Center
More informationGreenCommute. The Nortel Networks Transportation Demand Management (TDM) Program. Presented by: Sharon Lewinson July 11, 2003
GreenCommute The Nortel Networks Transportation Demand Management (TDM) Program Presented by: Sharon Lewinson July 11, 2003 What is a TDM program? A TDM, or commuter options program, is any collection
More informationAppendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary
Loop 9 Southeast Corridor/Feasibility Study Appendix F Public Meeting Summaries F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary Loop 9 Southeast Corridor/Feasibility Study
More informationFLORIDA STATE UNIVERSITY MASTER PLAN 6 Support Facilities
SUPPORT FACILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well
More informationWelcome back. Welcome to our second public exhibition for Cheshunt Lakeside. We are now presenting our updated and more detailed proposals.
Welcome back Welcome to our second public exhibition for. We are now presenting our updated and more detailed proposals. We previously held an exhibition in July. Attendees were positive about the planned
More informationUCSF Long Range Development Plan (LRDP)
UCSF Long Range Development Plan (LRDP) Further information: Lori Yamauchi Assistant Vice Chancellor Campus Planning Commission on Community Investment and Infrastructure August 20, 2013 UCSF Overview
More informationFlorida Job Growth Grant Fund Public Infrastructure Grant Proposal
Florida Job Growth Grant Fund Public Infrastructure Grant Proposal Proposal Instructions: The Florida Job Growth Grant Fund Proposal (this document) must be completed by the governmental entity applying
More informationCOMMUNITY ENGAGEMENT PLAN Project Title: Northeast Athletic Field Park Phase 2 - Recreation Building
Board Plan Approval/Review Date: 8/6/2014 Last Plan Revision Date: 10/3/2014 COMMUNITY ENGAGEMENT PLAN Project Title: Northeast Athletic Field Park Phase 2 - Recreation Building MPRB Division: Planning
More informationFaçade Improvement Program Fiscal Year Program Description
Façade Improvement Program Fiscal Year 2016-2017 Program Description The Façade Improvement Program (FIP) is a reimbursement grant program provided to business and/or property owners for the improvement
More informationUniversity of San Francisco 2012 Institutional Master Plan. SUPPLEMENT A Proposed Student Residence Hall December 2013
123 a The purpose of this Institutional Master Plan (IMP) Supplement A is to provide (1) a summary of compliance with Planning Code Section 304.5(c) requirements regarding the required format and substance
More informationMANAGING RISK v. REWARD HOW TO BALANCE CREATIVE DESIGN WITH THE REALITIES OF PROJECT BUDGETS, SCHEDULES & SCOPE. Panel
MANAGING RISK v. REWARD HOW TO BALANCE CREATIVE DESIGN WITH THE REALITIES OF PROJECT BUDGETS, SCHEDULES & SCOPE 38 th Annual Conference on School Facilities Panel Moderator: Brian Whitmore, AIA, LEED AP
More informationRequest for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents
Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Research Laboratory Renovations Response Deadline
More informationClient: Boulder County Transportation Project: SH 119 Bus Rapid Transit & Bikeway Facility Design
Client: Boulder County Transportation Project: SH 119 Bus Rapid Transit & Bikeway Facility Design I. Applicant (Client) Information Organization Name and Address Boulder County Transportation, 2525 13th
More informationHOUGHTON PARK COMMUNITY CENTER OUTREACH MEETING - FILTER
HOUGHTON PARK COMMUNITY CENTER OUTREACH MEETING - FILTER NOVEMBER 9, 2015 C Workshop #1: Councilmember Rex Richardson City of COG Long Beach 1-year pla Workshop #1: Councilmember Rex Richardson Restoration
More informationDISCUSSION ITEM EXECUTIVE SUMMARY
F4 Office of the President TO THE MEMBERS OF THE COMMITTEE ON FINANCE: For the Meeting of DISCUSSION ITEM UPDATE ON THE 2020 PROJECT, MERCED CAMPUS EXECUTIVE SUMMARY Twenty years ago, the Regents of the
More informationEXHIBIT 2 Page 1 of 9
EXHIBIT 2 Page 1 of 9 Page 2 of 9 Page 3 of 9 EXHIBIT 2 Page 4 of 9 Page 5 of 9 PROJECT NARRATIVE The purpose for applying for these funds is to advance the City's revitalization efforts in Historic Miramar.
More informationTASK FORCE REPORTS CAMPUS MASTER PLAN
` TASK FORCE REPORTS CAMPUS MASTER PLAN Table of Contents ACADEMIC NEEDS & SPACE UTILIZATION 1 COMMUNITY PARTNERSHIPS 2 EAST CAMPUS VISION 3 LIVING/LEARNING ENVIRONMENTS 4 NORTH OF BOULDER CREEK 5 RECREATION,
More information7/23/2013. Downtown Greenville s Success. Downtown Greenville s Success
Downtown Greenville s Success What makes Greenville unique and successful? Community development Public space Partnerships Greenville s experience is not just about downtown Jumping off place to surrounding
More informationWestside Community Schools Request for Qualifications Architectural Design and Engineering Services Prairie Lane Elementary School March 1, 2018
Westside Community Schools Prairie Lane Elementary School March 1, 2018 NOTICE Westside Community Schools ( the District ) is accepting Statements of Qualifications (SOQ s) for Architectural Design and
More informationAttention Design Firms
Attention Design Firms If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal may cause your submittal to be
More informationREQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017
SECTION I: SUMMARY REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER September 21, 2017 The University of Maine (UMaine), located in Orono, Maine, desires to procure
More informationTraffic Impact Analysis (TIA) POLICY
Ascension Parish Planning Commission Traffic Impact Analysis (TIA) POLICY This policy establishes requirements for studies that provide information on traffic projected to be generated by all proposed
More informationCity of Edina, Minnesota GrandView Phase I Redevelopment, 5146 Eden Avenue Request for Interest for Development Partner
City of Edina, Minnesota GrandView Phase I Redevelopment, 5146 Eden Avenue Request for Interest for Development Partner The City of Edina has a rich history of innovative developments that have become
More informationFrom: To: Cc: Subject: Date: Attachments: Dave Baker Wolff, Greg Coe, Tony Sidewalk Monday, March 2, 2015 5:21:13 PM Hungry Hunter sidewalk 10 feet from face of curb, 1.JPG Hungry Hunter sidewalk 10 feet
More informationVISION AND RECOMMENDATIONS
Sunnyvale Independent School District Facilities Planning Committee VISION AND RECOMMENDATIONS July, 2014 FACILITIES PLANNING COMMITTEE Community Members Sean Curry Chair Charles Christopher Scott Fitzgerald
More informationB. Pre-planning and follow-up activities must occur in conjunction with all field trips.
Instructional Field Trips An instructional field trip is a school-supervised activity involving one or more students investigating or participating in educational experiences away from the school campus.
More informationOn Ramps to the Regional Trail System Three Rivers Park District TAP Funding Proposal
December 20, 2013 To: Local Cities/Agencies From: Kelly Grissman, Director of Planning RE: On Ramps to the Regional Trail System Three Rivers Park District TAP Funding Proposal Three Rivers Park District
More informationSMART SCALE Application Guide
SMART SCALE Application Guide prepared for Commonwealth Transportation Board Date, revised September 9, 2016 Table of Contents 1.0 Introduction... 3 1.1 Purpose of this Document... 3 1.2 Application Process...
More informationCity of Sacramento City Council 915 I Street, Sacramento, CA,
City of Sacramento City Council 915 I Street, Sacramento, CA, 95814 www.cityofsacramento.org Meeting Date: 2/22/2011 Report Type: Public Hearing Title: Pell Circle Billboard Relocation (P10-065) Report
More informationKANSAS CITY REGIONAL TIGER PROJECT MONTHLY PROGESS REPORT
KANSAS CITY REGIONAL TIGER PROJECT MONTHLY PROGESS REPORT November 2011 Submitted December 15, 2011 PROJECT TYPE: Multimodal(bicycle, pedestrian, roadway, transit) LOCATION: Kansas City metropolitan area
More informationGUIDELINES / RULES FOR OUTDOOR SPACE USE ON GEORGIA INSTITUTE OF TECHNOLOGYCAMPUS
GUIDELINES / RULES FOR OUTDOOR SPACE USE ON GEORGIA INSTITUTE OF TECHNOLOGYCAMPUS The Georgia Institute of Technology encourages chartered student organizations to express their artistic, educational,
More informationREQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT
REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT The Town of Cromwell is seeking written responses to a Request
More informationMinutes 2012 Bond Project Advisory Team (PAT) Meeting Davis High School
MEETING #: 29 LOCATION: DATE / TIME: ATTENDEES: Minutes 2012 Bond Project Advisory Team (PAT) Meeting Davis High School Davis High School October 19, 2015 at 3:45pm (those marked with a check were present)
More informationProposed Project The selected consultant will work closely with the project management team and the appointed committee for:
UNIVERSITY OF CALIFORNIA, RIVERSIDE REQUEST FOR PROPOSALS PRE-DESIGN, ARCHITECTURAL PROGRAMMING AND FULL ARCHITECTURAL DESIGN SERVICES FOR A 600 BED DUNDEE RESIDENCE HALLS PROJECT Updated 3-17-09 Introduction
More informationBAKERSFIELD COLLEGE 2016 BOND PRESENTATION SESSION #1
BAKERSFIELD COLLEGE 2016 BOND PRESENTATION SESSION #1 1 1913.1955. 2 Welcome Center Bakersfield College does not have a central location on its campus to welcome first-time visitors. Visitors of the college
More informationReport of the Justice Center Study Committee. Photos 2010 Bill Fink Communications, LLC
Report of the Justice Center Study Committee Photos 2010 Bill Fink Communications, LLC 20100904 1 In late 2009, the Houghton County Commissioners asked their Law Enforcement Committee to conduct a study
More informationCity of Fort St. John Special Council 1:30 pm Council Chambers October 31, 2011
City of Fort St. John Special Council 1:30 pm Council Chambers October 31, 2011 Page 1. Call to Order: 2. Notice of New Business: Mayor's List Councillors' Additions City Manager's Additions 3. Adoption
More informationDear Parents/Guardians and Members of the Class of 2018:
January 2018 Dear Parents/Guardians and Members of the Class of 2018: The graduation ceremony for the Winton Woods High School Class of 2018 will be held Thursday evening, May 24, 2018, at 7:30 P.M. at
More informationAdditionally, the committee was opened to anyone who wanted to participate.
August 2013 Ted Moore, Superintendent Lovejoy Independent School District 259 Country Club Road Allen, Texas 75002 Re: Long Range Facilities Planning Committee Recommendation Dear Mr. Moore, On April 16,
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: March 6, 2017 TO: FROM: ACTION TRANSMITTAL No. 2017-08 Transportation Advisory Board Technical Advisory Committee PREPARED
More informationFebruary 12, Request for Proposal Overview Pre-bid Conference
February 12, 2014 I-495 Northern Section Shoulder Use Project Request for Proposal Overview Pre-bid Conference I-495 Northern Section Shoulder Use Project Scope of Work Major Items Mill and overlay - Light
More informationCSU Dominguez Hills & DH Foundation University Village-Mixed-Use Development/Market Rate Housing LETTER OF INVITATION REQUEST FOR QUALIFICATIONS
CSU Dominguez Hills & DH Foundation University Village-Mixed-Use Development/Market Rate Housing Date: February 20, 2018 LETTER OF INVITATION REQUEST FOR QUALIFICATIONS Subject: Development Opportunity
More informationMaster Plan Development for Safety Harbor Waterfront Park
SCOPE OF WORK Master Plan Development for Safety Harbor Waterfront Park 1.0 PROJECT OVERVIEW On February 29, 2012, the City purchased approximately 13 acres of waterfront property from the Safety Harbor