Master Plan Development for Safety Harbor Waterfront Park
|
|
- Darlene Edwards
- 6 years ago
- Views:
Transcription
1 SCOPE OF WORK Master Plan Development for Safety Harbor Waterfront Park 1.0 PROJECT OVERVIEW On February 29, 2012, the City purchased approximately 13 acres of waterfront property from the Safety Harbor Resort and Spa for general public use and enjoyment. The acquisition area is currently unimproved. About six acres of the site is classified as uplands consisting of grassy open space and palm trees. The upland area includes a rectangular shaped (200 ft. x 220 ft.), one acre parcel fronting Veteran's Memorial that will be set aside for partnered development. The balance of the upland area will be transformed into a venue for community events, leisure and recreational activities. The Bayshore Linear Greenway Trail that is being widened along South Bayshore Boulevard will be extended through the property and make a connection to the North Bayshore Trail which leads to Philippe Park. The project will also seek to integrate Veterans Memorial and Marina Park in the overall master planning of the property. The jurisdictional wetland areas along Old Tampa Bay and Mullet Creek will be left in a natural state with exotics and invasive species being removed. Opportunities for enhancing public views and low impact access points will be explored. SITE RELATIONSHIPS [1]
2 The initial focus of the master planning effort will concentrate on removing encroachments and surveying and clearing undesirable vegetation from upland and wetland areas north of the tennis courts and providing suitable access to the site. The second part will be developing a vision for the overall, long range development of the park. The community driven process will be facilitated by a team of City Staff. The goal is to reach a public consensus on the overall vision and preferred conceptual design framework by this fall with construction documents being completed next year. An implementation schedule and funding strategy will be developed for future inclusion into the 5 Year Schedule of Capital Improvement Projects in the City's Annual Budget and Comprehensive Plan. 2.0 PROPOSED WORK PROGRAM 2.1 CITY APPROVAL OF SCOPE OF WORK AND SCHEDULE Key to the project's success will be a shared understanding of expectations at the outset. Prior to beginning, Staff will receive confirmation from the City Commission on the project organization, roles and responsibilities, schedule and scope, and approach to public involvement. 2.2 PUBLIC INVOLVEMENT Appointment of Steering Committee Staff recommends that the City Commission appoint a diverse Steering Committee consisting of community stakeholders to guide the process and shape the outcome in the form of a recommendation to the City Commission on the preferred alternative. The membership may include representatives from the City Commission, Parks and Recreation Advisory Board, Downtown Redevelopment Board (Planning and Zoning Board), Public Art Committee, Chamber of Commerce, Safety Harbor Boat Club, Safety Harbor Resort and Spa, Tampa Bay Estuary Staff and Pinellas County Establishment of Project Goals and Objectives Staff will facilitate a dialogue with the Steering Committee to arrive at "big picture" goals and specific objectives. This will include broad discussions on the level and focus of activity that is appropriate for the site, intended users and service area, functional and design relationship to surrounding uses and community, and other relevant topics. Staff will research and share best practices and success stories on waterfront park development projects. These initial ideas will be discussed and refined in [2]
3 subsequent workshops to establish a guiding framework for evaluating future proposals Project Webpage The City's Public Information Officer will develop a project webpage that provides information and updates about the project, a feedback loop, and opportunities to get involved Web Survey Staff will solicit community input through the use of a web survey tool that will ask questions on the design and use of the property and how it should be improved Planning and Design Workshops 2.3 SITE ANALYSIS In addition to the continuous feedback that is received through the project website, the City will hold public workshops at major milestones in the planning process to gain insight and opinions on the work completed to date and establishing priorities. Staff will inventory and evaluate the general conditions of the property including natural features, drainage patterns, view corridors, site improvements, access and circulation, etc. Staff will also list the use restrictions attached to the property. The information will be summarized in narrative and graphic form. 2.4 KEY COMPONENTS AND PROGRAMMING ANALYSIS Staff will compile and present survey results and other community input for consideration by the Steering Committee on desired improvements and activities as part of a brainstorming session. The ideas and suggestions will be evaluated in terms of meeting project goals and objectives, recreational needs, site suitability, creativity, cost, revenue generation potential, and other relevant considerations. Following this review, the Steering Committee will rank the desired components of activities. Staff will conduct a programming analysis. [3]
4 2.5 CONCEPT ALTERNATIVES DEVELOPMENT AND PUBLIC DESIGN REVIEW The planning and design team will develop a conceptual framework to support the desired activities and provide alternative scenarios on how they could be accommodated at various scales and levels of design. This will include an opportunities and constraints analysis. At least three alternatives will be posted on the project webpage and presented at a public forum for review and comment. 2.6 SELECTION OF PREFERRED ALTERNATIVE Staff will present the alternatives along with strengths and weaknesses of each concept for consideration by the Steering Committee. The Steering Committee will decide which alternative, or blend of alternatives, to recommend to the City Commission. 2.7 PRELIMINARY COST ESTIMATES AND FUNDING STRATEGY Staff will prepare preliminary cost estimates for each element of the project and identify current and potential sources of revenue and outside grants that could be used to fund the implementation. 2.8 PHASING PLAN A short and long range implementation schedule will be developed. The first phase of the Master Plan will be added to the City's 5 Year Schedule of Capital Projects. [4]
5 3.0 PROJECT SCHEDULE The proposed project schedule shown in Exhibit "A" provides an aggressive timetable for developing the Master Plan. The Steering Committee and Public Involvement workshops are scheduled throughout the summer. Staff will provide monthly progress reports to the City Commission. EXHIBIT "A" 2012 SAFETY HARBOR WATERFRONT PARK WORK SCHEDULE PROGRAM TASK APRIL MAY JUNE JULY AUG SEPT OCT 2.1 SCOPE OF WORK Commission Approval/Appointment of Steering Committee 2.2 PUBLIC INVOLVEMENT Project Webpage and Updates Site Analysis and Review of Best Practices Project Kick-Off and Goal Setting Session Community Survey Key Components and Programming Analysis Preliminary Conceptual Design Alternatives Final Design Alternatives Selection of Preferred Conceptual Alternative Preliminary Cost Estimates and Funding Strategies Phasing Plan City Commission Presentation City Commission Steering Committee Public Involvement [5]
6 4.0 PROJECT TEAM The Master Plan will be developed in house with roles and responsibilities determined by area of expertise. The Steering Committee will serve in an advisory capacity to the City Commission. The Principal In Charge will ensure that the expectations of the City Commission are being met throughout the process. The Project Manager will coordinate the work effort, manage the schedule and facilitate public involvement. The Project Team will serve as technical advisors to the Steering Committee in developing the Master Plan. [6]
Boston Harbor Islands National and State Park
Boston Harbor Islands National and State Park Peddocks Islands Management & Conceptual Development Plan REQUEST FOR EXPRESSIONS OF INTEREST Boston Harbor Now (BHN) works in partnership with public agencies,
More informationMETHODOLOGY - Scope of Work
The scope of work for the Truckee West River Site Redevelopment Feasibility Study will be undertaken through a series of sequential steps or tasks and will comprise four major tasks as follows. TASK 1:
More informationREQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway
REQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway Issue Date: November 21, 2008 Proposal Submission Deadline: December 31, 2008 Description of Work: The Bronx
More informationDEVELOPMENT AUTHORITY OF CLAYTON COUNTY REQUEST FOR PROPOSALS MASTER PLANNING CONSULTING SERVICES
DEVELOPMENT AUTHORITY OF CLAYTON COUNTY REQUEST FOR PROPOSALS MASTER PLANNING CONSULTING SERVICES Development Authority of Clayton County Attn: Ricky L. Clark, Jr., Treasurer 124 North Avenue Jonesboro,
More informationINDUSTRY LEADERS INTRODUCTION
INDUSTRY LEADERS Hammes Company is a full-service real estate development and investment firm. We have been directly involved in leading several of the largest and most complex sports and entertainment
More informationREPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016
REPORT To the Honorable Mayor and City Council From the City Manager May 9, 2016 SUBJECT Study Session for Consideration of the Draft Inner Harbor Specific Plan, Draft Inner Harbor Specific Plan Environmental
More informationTransforming Hamilton s Waterfront. Presented By: Chris Phillips
Transforming Hamilton s Waterfront Presented By: Chris Phillips Hamilton By the Numbers Current and Projected Population 2015 520,000 2031 660,000 10 th largest in Canada 5 th in Ontario Hamilton by the
More informationProject Priority Scoring System Texas Recreation & Parks Account Non-Urban Indoor Recreation Grant Program (Effective May 1, 2014)
Project Priority Scoring System Texas Recreation & Parks Account Non-Urban Indoor Recreation Grant Program (Effective May 1, 2014) Applicant Eligibility All previously completed Recreation Grant Projects
More informationNORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS
NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS CITY OF CEDAR HILL CITY CENTER TRANSIT-ORIENTED DEVELOPMENT PLAN August 19, 2011 REQUEST FOR PROPOSALS
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE
FORM GEN. 160 CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: August 27, 2015 To: Attn: Municipal Facilities Committee Miguel A. Santana, Chair From: Josh Rohmer, Principal Project Coordinator
More informationAquidneck Island Transportation Study Public Participation Work Plan. July 6, 2009
Aquidneck Island Transportation Study Public Participation Work Plan July 6, 2009 OVERVIEW The Public Participation Work Plan provides a framework for undertaking a comprehensive outreach process for the
More informationINSTRUCTIONS & APPLICATIONS
BERGEN COUNTY OPEN SPACE, RECREATION, FLOODPLAIN PROTECTION, FARMLAND & HISTORIC PRESERVATION TRUST FUND THE BERGEN COUNTY OPEN SPACE, RECREATION, FLOODPLAIN PROTECTION, FARMLAND & HISTORIC PRESERVATION
More informationRequest for Proposals
Request for Proposals Big Bethel AME Church Campus Development Strategy October 21, 2013 Big Bethel AME Church 220 Auburn Avenue NE Atlanta, Georgia 30303 Introduction Big Bethel AME Church and Bethel
More informationPublic Information Plan
Metcalf Shawnee Mission Parkway Bus Corridors Transit Improvements Public Information Plan Prepared by 1 Plan Purpose The public information plan for the Metcalf Avenue/Shawnee Mission Parkway Bus Corridor
More informationNORTHWEST SECTOR STUDY PHASE I REPORT. Approved 17 February 2015 (Resolution )
EMBRACE ENHANCE EXPAND NORTHWEST SECTOR STUDY PHASE I REPORT Approved 17 February 2015 (Resolution 2015-02-022) This plan has been prepared by Parsons Brinckerhoff and their subconsultants for the City
More informationCity of Edina, Minnesota GrandView Phase I Redevelopment, 5146 Eden Avenue Request for Interest for Development Partner
City of Edina, Minnesota GrandView Phase I Redevelopment, 5146 Eden Avenue Request for Interest for Development Partner The City of Edina has a rich history of innovative developments that have become
More informationREQUEST FOR PROPOSALS/QUALIFICATIONS Clallam County Shoreline Master Program Update
REQUEST FOR PROPOSALS/QUALIFICATIONS Clallam County Shoreline Master Program Update PROJECT DESCRIPTION SUMMARY The Contractor will assist Clallam County to complete an update of the Shoreline Master Program
More informationCity of Palm Bay, Florida. BAYFRONT COMMUNITY REDEVELOPMENT AGENCY Regular Meeting No
BAYFRONT COMMUNITY REDEVELOPMENT AGENCY Held on Tuesday, the 18 th day of July 2017, at RiverView Senior Resort, 3490 Gran Avenue, NE, Palm Bay, Florida. This meeting was properly noticed pursuant to law;
More informationTown of Frisco, Colorado Request for Proposals 2018 Community Plan Update
Town of Frisco, Colorado Request for Proposals 2018 Community Plan Update Release Date: March 14, 2018 Submittal Deadline: April 4, 2018 Introduction Purpose and Goals The Town of Frisco is accepting proposals
More informationSOUTHWEST LRT (METRO GREEN LINE EXTENSION)
10 Joint Development This chapter describes potential long-term direct and indirect and short-term (construction) direct and indirect effects that would result from the Southwest Light Rail Transit (LRT)
More informationPUBLIC FACILITIES FINANCING
9. Public Facilities Financing Brisbane Baylands Specific Plan 257 9 PUBLIC FACILITIES FINANCING 9.1 PURPOSE The Baylands is planned to accommodate a variety of uses including retail at a range of types
More informationSPORTS INTERNATIONAL SAN PEDRO YOUTH COALITION COMPLEX. Port of Los Angeles A proposal by the. To widen the horizons of the Youth of the Harbor area
Port of Los Angeles A proposal by the INTERNATIONAL SPORTS COMPLEX SAN PEDRO YOUTH COALITION To widen the horizons of the Youth of the Harbor area and to promote Economic Health of the Local business community.
More informationPUBLIC PROJECT 2011 APPLICATION FOR URBAN DESIGN REVIEW BOARD City of Des Moines, Iowa
PUBLIC PROJECT 2011 APPLICATION FOR URBAN DESIGN REVIEW BOARD City of Des Moines, Iowa Date Submitted: _March 25, 2011 Project Information PROJECT NAME & ADDRESS:_Jaama Kwa Africa Blank Park Zoo, 7401
More informationTOWN OF REHOBOTH COMMUNITY PRESERVATION COMMITTEE
The Town of Rehoboth recently adopted the provisions of the Community Preservation Act ( CPA ), Mass. Gen. Laws Chapter 44B, by virtue of public referendum and by adoption of a Town Bylaw in 2009. In accordance
More informationM E M O. Rev. 30 Sep Re: Irishtown Bend Site Restoration Planning and Restoration Strategy and Goals
M E M O Re: Irishtown Bend Site Restoration Planning and Restoration Strategy and Goals Rev. 30 Sep 2016 This memo is offered to the Project Partners and Project Associates as a summary of the current
More informationTED WHITE, COMMUNITY DEVELOPMENT DIRECTOR DOWNTOWN PARKING NIGHTTIME PAID PARKING PILOT PROGRAM
Agenda Report Fullerton City Council MEETING DATE: AUGUST 21, 2018 TO: SUBMITTED BY: PREPARED BY: SUBJECT: CITY COUNCIL / SUCCESSOR AGENCY KENNETH A. DOMER, CITY MANAGER TED WHITE, COMMUNITY DEVELOPMENT
More informationCal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC
Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC 16-006 A. INTRODUCTION California State Polytechnic University, Pomona ( Cal Poly Pomona ), is
More informationNeeds & Opportunities Review
Needs & Opportunities Review Preliminary lists created by the Steering Committee Your input will help prioritize items that should be pursued or addressed as part of this plan Place dots besides the highest
More information***DRAFT*** Chapter 1: Introduction
***DRAFT*** Chapter 1: Introduction The Park, Arts, Recreation, Culture & Conservation (PARCC) Plan is the functional plan for the Parks & Recreation Department, which is adopted by amendment into the
More informationWest Market Redevelopment Plan UPDATE
West Market Redevelopment Plan UPDATE Creation of a competitive and unique location with choices for living, working, shopping, education, employment and leisure time opportunities in a sustainable form.
More informationFort Erie Economic Preparedness Study
Fort Erie Economic Preparedness Study Tuesday, February 13, 2017 EDTC Mission: Prime directive is to create opportunities for business, employment and assessment growth. EDTC: Research Region/ Team Niagara:
More informationExecutive Summary. Purpose
ES Executive Summary The purpose of the Wake County Consolidated Open Space Plan is to protect and conserve county land and water for current residents and future generations. Open space is defined as
More informationI-195 Redevelopment District Providence, RI
REQUEST FOR PROPOSAL For A Design and Development Frameworks DUE DATE July 12, 2013 Background The Commission was created in late 2011 to serve as the responsible authority for the sale, marketing and
More informationPlanning Sustainable Places Program
Planning Sustainable Places Program ADVANCING A SUSTAINABLE REGION PLACE BY PLACE Pre-application Workshop May 17, 2016 Planning Sustainable Places Background Program to build on previous regional planning
More informationREQUEST FOR QUALIFICATIONS. Request for Qualifications for Paces Mill/ Palisades Facility Rehabilitation Concept Design
REQUEST FOR QUALIFICATIONS Date: March 17 th, 2017 To: Re: Qualified Consulting Firms Request for Qualifications for Paces Mill/ Palisades Facility Rehabilitation Concept Design The Cumberland Community
More informationHighest and Best Land Use Study for Kingston s Norman Rogers airport. Second Public Information Centre (PIC) and online survey results
Highest and Best Land Use Study for Kingston s Norman Rogers airport Second Public Information Centre (PIC) and online survey results Public Information Centre The Public Information Centres, held at two
More informationCONNECTED CITY FREQUENTLY ASKED QUESTIONS
1) What is the Connected City project? CONNECTED CITY FREQUENTLY ASKED QUESTIONS The Connected City Corridor is a State-initiated pilot program that is unique to Pasco County, and will be the first planned
More informationREQUESTS FOR QUALIFICATION STATEMENTS FOR ALEXANDRIA ZOO MASTER PLAN UPDATE CITY OF ALEXANDRIA PUBLIC WORKS DAVID GILL PUBLIC WORKS DIRECTOR
REQUESTS FOR QUALIFICATION STATEMENTS FOR ALEXANDRIA ZOO MASTER PLAN UPDATE - 2017 CITY OF ALEXANDRIA PUBLIC WORKS DAVID GILL PUBLIC WORKS DIRECTOR ALEXANDRIA ZOOLOGICAL PARK 3016 MASONIC DRIVE ALEXANDRIA,
More informationSouth Dakota Transportation Alternatives
South Dakota Transportation Alternatives Program Summary and Application Guide Updated March 2018 Connecting South Dakota and the Nation 1 Transportation Alternatives (TA) Summary 1. Overview Transportation
More informationREQUEST FOR PROPOSALS TO DEVELOP CONCEPTUAL PLANS FOR CALDER PLAZA
REQUEST FOR PROPOSALS TO DEVELOP CONCEPTUAL PLANS FOR CALDER PLAZA Grand Rapids, MI PROJECT SUMMARY Downtown Grand Rapids Inc. (DGRI), in collaboration with the City of Grand Rapids (City) and Kent County
More informationExhibit B. Plumas County Non-Motorized Transportation Plan SCOPE OF WORK
Exhibit B Plumas County Non-Motorized Transportation Plan SCOPE OF WORK PROJECT INTRODUCTION: The proposed project is the development of a legally compliant Plumas County Non- Motorized Transportation
More informationDelhi Township Community & Economic Development. A Presentation to: Delhi Township Trustees March 25, 2015
Delhi Township Community & Economic Development A Presentation to: Delhi Township Trustees March 25, 2015 Delhi Township Strategic Redevelopment Plan Township Trustees approved this process in Autumn 2014.
More informationUNMANNED AIRCRAFT SYSTEMS CORRIDOR STUDY
Scope of Work The Joint Land Use Study Implementation (JLUS) will be a series of projects that will address the recommendations in the Fort Riley Joint Land Use Study. The corridor between Fort Riley Army
More informationSPECIFIC AND MASTER PLANS
CHAPTER 14: SPECIFIC AND MASTER PLANS 14.1. PURPOSE In accordance with the Goals and Policies, TRPA may adopt area-wide specific plans or project-oriented master plans to augment plan area statements or
More informationREQUEST FOR PROPOSAL (RFP) PLANNING CONSULTING SERVICES FOR THE TOWN OF TOPSHAM S COMPREHENSIVE PLAN UPDATE
REQUEST FOR PROPOSAL (RFP) PLANNING CONSULTING SERVICES FOR THE TOWN OF TOPSHAM S COMPREHENSIVE 1. Purpose PLAN UPDATE The Town of Topsham, seeks proposals from professional planning consultants to prepare
More informationRaystown Lake Master Plan Revision. Stakeholders Meeting February 8, 2018
Raystown Lake Master Plan Revision Stakeholders Meeting February 8, 2018 Objectives of Stakeholder Meeting Get advice on how best to shape public meetings to achieve our goals Learn what ideas and concerns
More informationBACKGROUND, PURPOSE & SCOPE 1.0 BACKGROUND 1.1
MATURE NEIGHBOURHOOD OVERLAY PROJECT CHARTER JULY 2016 1.0 BACKGROUND, PURPOSE & SCOPE 1.1 BACKGROUND The review of the Mature Neighbourhood Overlay (MNO) is identified as an action in Edmonton s Infill
More informationREGIONAL TRANSIT FEASIBILITY PLAN
REGIONAL TRANSIT FEASIBILITY PLAN The Regional Transit Feasibility Plan continues to make progress, having completed Steps One and Two of the process to evaluate opportunities for premium transit within
More informationCity Council / Planning Commission Joint Meeting #2
City Council / Planning Commission Joint Meeting #2 March 30, 2010 Meeting Agenda AIGM Introduction/Refresher 2009 AIGM Update How the AIGM and CompPlan 2030 work together Recent CompPlan activity Vision
More informationPURPOSE Appendix A BACKGROUND
PURPOSE Big Sky Economic Development Authority ("BIG SKY EDA") is issuing this Request for Proposals ("RFP") to select a consultant team ("Consultant Team") to provide Master Planning Consulting Services
More informationTransit-Oriented Development and Land Use Subarea Plan for Central Lake Forest Park
CITY OF LAKE FOREST PARK REQUEST FOR PROPOSALS Transit-Oriented Development and Land Use Subarea Plan for Central Lake Forest Park PROJECT DESCRIPTION The City of Lake Forest Park is seeking qualified
More informationFMFADA Deputy Director, Operations
FMFADA Deputy Director, Operations Fort Monroe Federal Area Development Authority Ft. Monroe, VA Deadline for Applications Due 2 pm EDT, Monday, February 1, 2010 FMFADA APPLICATION COVERSHEET Posting Date:
More informationPUBLIC NOTICE PROFESSIONAL CONSULTING SERVICES CITY OF OLEAN NORTHWEST BROWNFIELD OPPORTUNITY AREA STEP 2 NOMINATION STUDY
PUBLIC NOTICE REQUEST FOR PROPOSALS (RFP) PROFESSIONAL CONSULTING SERVICES CITY OF OLEAN NORTHWEST BROWNFIELD OPPORTUNITY AREA STEP 2 NOMINATION STUDY Requests for Proposals are being solicited by the
More informationCHAPTER 3: ECONOMIC DEVELOPMENT
CHAPTER 3: ECONOMIC DEVELOPMENT GOAL 9: ECONOMY ECONOMIC DEVELOPMENT BACKGROUND SUMMARY INTRODUCTION This chapter addresses Statewide Planning Goal 9: "To provide adequate opportunities throughout the
More informationCreating an L.A. Waterfront
Creating an L.A. Waterfront PR & GR Cross-Teaming Success AAPA Communications Seminar Wednesday June 22, 2011 2 3 San Pedro Waterfront Project 4 City Dock No. 1 City Dock No.1 5 San Pedro Waterfront Project
More informationThe SoNo Collection Norwalk, CT
The SoNo Collection Norwalk, CT Norwalk Common Council 04.17.17 Planning Committee Table of Contents 1 Project Site 2 Requested Approvals 3 Updated Conceptual Renderings 4 Economic Impacts 1 Project Site
More informationJANA NICOLE JEANSONNE 14 YEARS SERVING SOUTH FLORIDA OVER A BILLION IN SALES 200+ REALTORS WITH GLOBAL EXPOSURE. Lu x ury P o rt f oli o
4 Bed. / 4.1 Baths, Living.area: 6,556 sq. ft. Offered at $4,499,000 4 Bed / 3.1 Bath, Living area: 4,221 sq. ft. Offered at $3,900,000 Offered at $1,795,000 BOYNTON ISLES, BOYNTON BEACH 3 Bed./ 2.1 Baths,
More informationTOWN OF GREENWICH Annual Department Operational Plan (FY )
TOWN OF GREENWICH Annual Department Operational Plan (FY 2012 2013) 1. Department: Inland Wetlands and Watercourses Agency 2. Divisions: N/A 3. Department Mission Statement: The Inland Wetlands and Watercourses
More informationBLUE HILLS MASTER PLAN RFP OUTLINE
BLUE HILLS MASTER PLAN RFP OUTLINE Introduction The City of Hartford is soliciting responses from qualified individuals/firms to provide professional services for creation of a Master Plan for the Blue
More informationEnterprise Zone Application. The Town of Chestertown. and The County of Kent
Enterprise Zone Application The Town of Chestertown and The County of Kent 2016 Enterprise Zone Application_Chestertown_Kent County Page 2 Page 2 04/14/2016 Enterprise Zone Application_Chestertown_Kent
More informationUpper Harbor Terminal Phase 1 Redevelopment Request for Qualifications
Upper Harbor Terminal Phase 1 Redevelopment Request for Qualifications RFQ issued on behalf of the joint initiative of City of Minneapolis and Minneapolis Park and Recreation Board by: City of Minneapolis
More informationPart IV. Appendix C: Funding Sources
Part IV Appendix C: Funding Sources FUNDING SOURCES FUNDING SOURCE FUNDING PROGRAM PROGRAM DESCRIPTION ADDITIONAL INFORMATION LAND ACQUISITION / ENVIRONMENTAL RESTORATION FEDERAL US Department of the Interior,
More informationFLORIDA-ALABAMA TRANSPORTATION PLANNING ORGANIZATION 2017 PEDESTRIAN BICYCLE MASTER PLAN UPDATE Scope of Work
FLORIDA-ALABAMA TRANSPORTATION PLANNING ORGANIZATION 2017 PEDESTRIAN BICYCLE MASTER PLAN UPDATE Scope of Work Project Name: Purpose: Florida-Alabama TPO 2017 Pedestrian Bicycle Master Plan Update To provide
More informationStrategic Plan
2018-2021 Strategic Plan TOWN OF STONY PLAIN Strategic Plan 2018-2021 As your Town Council, we work with you, for you and in the spirit of our community. We consider our work as true servant leadership.
More informationD A Y ON THE B A Y TITLE SPONSOR CONTEXT \ VOL. 3
A D A Y ON THE B A Y TITLE SPONSOR CONTEXT \ VOL. 3 CONTEXT VOL. 3 EVENT SCHEDULE Join the San Diego Architectural Foundation (SDAF) in hosting A Day on the Bay, a forum open to the public to promote discussion
More informationFuture Land Use Supporting Data
4 Supporting Data The purpose of the Land Use Element is to describe the existing and future land use patterns to be developed on the University and to address how this land use pattern will be coordinated
More informationParks and Recreation Department Anchorage: Performance. Value. Results.
Anchorage: Performance. Value. Results. Mission Provide for Healthy Parks, Healthy People, Healthy Future through ensuring Anchorage parks, facilities and programs are well maintained, safe, accessible
More informationTreasure Coast 2010 Comprehensive Economic Development Strategy
ACTION PLAN This section of the report outlines a series of programs and projects designed to implement the desired vision for the Region s future. The action plan prioritizes program activities and identifies
More informationRevised January 6, The Park Master Planning Process
Revised January 6, 2004 Resolution (2003) 735 A RESOLUTION TO REVISE THE PROCESS FOR APPROVAL OF MASTER PLANS FOR PARK AND RELATED PROJECTS PURPOSE: To develop a total program for a park which will best
More informationPresentation Outline
Lealman Central Area Improvements Preliminary Engineering Study Public Meeting No. 1 April 4, 2012 1 Presentation Outline Welcome History Within the Study Area Study Overview Public Involvement / Public
More informationRequest for Proposals # P12-044A. Pre-Qualification - Purchase and. Development of Bloomfield Property
Request for Proposals # P12-044A Pre-Qualification - Purchase and Development of Bloomfield Property Bloomfield is a dynamic hub where community, cultural, social, and economic activities converge. Good
More informationLANE COUNTY PARKS & OPEN SPACE MASTER PLAN
LANE COUNTY PARKS & OPEN SPACE MASTER PLAN SEA TO SUMMIT: Creating the Future of Lane County Parks Board of County Commissioners October 10, 2017 Purpose of Meeting Provide Master Plan status report and
More informationEconomic Development Element
Economic Development A. INTRODUCTION Purpose of the The overall purpose of the is to improve the local economy through diversification and integration with the regional economy. While the State Growth
More informationAtlanta BeltLine, Inc.
Atlanta BeltLine, Inc. Quarterly Briefing Agenda Welcome & Open House ABI CEO Update Community Engagement Update Design & Construction Update Transit Update Atlanta BeltLine Partnership Update Q&A June
More informationVOLUNTEER STEWARDSHIP MANUAL
Wildlife Trust Fund VOLUNTEER STEWARDSHIP MANUAL TABLE OF CONTENTS 1. INTRODUCTION...1 2. PARTNERS IN CONSERVATION...1 3. HOW TO CONTRIBUTE TO THE WILDLIFE TRUST FUND GOALS...1 4. ACHIEVING OUR GOALS THROUGH
More information5.1 EXISTING REVENUE/FUNDING SOURCES
5.0 OVERVIEW - FUNDING SOURCES Chapter 5 This chapter focuses on identifying existing and potential revenue sources to renovate, expand and maintain Cape Coral's parks and recreation system. Historically,
More informationMADISON COUNTY, IOWA RFP
INTRODUCTION Madison County, Iowa, is seeking to prepare a new comprehensive plan using the ten Iowa Smart Planning Principles and the applicable thirteen elements as outlined in the Iowa Smart Planning
More informationCOMMUNITY ENGAGEMENT PLAN Project Title: Northeast Southeast Service Area Master Plan also known as East of the River Park Master Plan
Board Plan Approval/Review Date: June 28, 2017 Last Plan Revision Date: 6/28/17 COMMUNITY ENGAGEMENT PLAN Project Title: Northeast Southeast Service Area Master Plan also known as East of the River Park
More informationCOMMUNITY MEETING 3 February 15, Mission Bay Phase Two
COMMUNITY MEETING 3 February 15, 2011 Mission Bay Phase Two Agenda Welcome, Study Scope and Schedule Feedback Received Campus Environment Concepts Active Zones, Pedestrian Environment and Vehicular Circulation
More informationProfessional Planning Services to Complete Recreation Plan Update
Professional Planning Services to Complete Recreation Plan Update Deadline to Submit: August 15, 2013 @ 4:00 PM City of Monroe Attn. Loretta LaPointe Recreation Department 120 East First Street Monroe,
More informationEconomic Development Strategic Plan Executive Summary Delta County, CO. Prepared By:
Economic Development Strategic Plan Executive Summary Delta County, CO Prepared By: 1 Introduction In 2015, Region 10, a 501(c)(3) Economic Development District that services six counties in western Colorado,
More informationOKEE-TANTIE CAMPGROUND AND MARINA RFP # 2014-??? Page 0 of 16
OKEE-TANTIE CAMPGROUND AND MARINA RFP # 2014-??? Page 0 of 16 TABLE OF CONTENTS GENERAL INFORMATION AND REQUIREMENTS PAGE Invitation to Submit a Request for Proposal 2 Purpose and Executive Summary 2 General
More informationBUSINESS AND ECONOMICS
This preliminary draft element was prepared by City staff on the basis of input from the CAC and members of the public received from January 2017 through February 2017. The Element will be reviewed by
More informationAnnual Plan
2015-2020 Annual Plan 712 South Highway 6, Oakland, Iowa 51560 Our mission: Golden Hills Resource Conservation and Development is dedicated to conserving the community, cultural and environmental assets
More informationREQUEST FOR PROPOSALS
Wilmington Area Planning Council 850 Library Avenue, Suite 100 Newark, Delaware 19711 302-737-6205; Fax 302-737-9584 From Cecil County: 888-808-7088 e-mail: wilmapco@wilmapco.org web site: www.wilmapco.org
More informationCITY OF MADISON, ALABAMA
CITY OF MADISON, ALABAMA Request for Proposals No.02-10 Consulting Services for Madison Growth Plan Madison, Alabama 100 Hughes Road Madison, Alabama 35758 www.madisonal.gov Improving the Quality of Life
More informationRequest for Proposals (RFP) General Plan Update Town of Windsor Community Development Department
(RFP) 2013-2015 General Plan Update Town of Windsor Community Development Department Circulation Date: November 22, 2013 Submission Date: Thursday January 23, 2014 by 5:00 pm PST Page 2 of 20 Table of
More informationCity of Palo Alto (ID # 4425) Planning & Transportation Commission Staff Report
City of Palo Alto (ID # 4425) Planning & Transportation Commission Staff Report Report Type: Meeting Date: 1/29/2014 Summary Title: Review of the Business and Economics Element of the Comprehensive Plan
More informationGuide to Rezoning. Step 1. Step 2. Step 5. Step 6. Step 7. Step 8
Guide to Rezoning Introduction The Douglas County (DCD) is committed to providing an open, transparent application process to the public. This Guide has been developed to assist anyone with interest in
More informationParks & Recreation Department Anchorage: Performance. Value. Results.
Anchorage: Performance. Value. Results. Mission Provide for Healthy Parks, Healthy People, Healthy Future through ensuring Anchorage parks, facilities and programs are well maintained, safe, accessible
More informationCITY OF GILROY ARTS AND CULTURE COMMISSION
CITY OF GILROY ARTS AND CULTURE COMMISSION Strategic Plan OCTOBER 18, 2010 City of Gilroy Arts and Culture Commission Strategic Plan October 18, 2010 Approved Arts and Culture Commission 10/18/2010 Acknowledgements
More informationAPA/PAW 2013 Joint Awards Program Submittal
May 30, 2013 APA/PAW Awards Committee Washington APA Office 603 Stewart Street, Suite 610 Seattle, WA 98101 Dear APA/PAW Awards Committee: RE: APA/PAW 2013 Joint Awards Program Submittal Enclosed is a
More information6 ECONOMIC DEVELOPMENT
6 ECONOMIC DEVELOPMENT This element provides a policy framework for ensuring Pittsburg s long-term economic competitiveness in the region. This element reflects business trends and available resources,
More informationRare Opportunity to acquire 9 Lot Parcel in Bellevue.
76,309 Sq.Ft. Rare Opportunity to acquire 9 Lot Parcel in Bellevue. The Bellevue Medical District has two hospitals and is the center for all medical needs on the Eastside. Presented by: Bob Baldridge
More informationPlanning Sustainable Places Program
Planning Sustainable Places Program ADVANCING A SUSTAINABLE REGION PLACE BY PLACE 2019 Pre-Bid Workshop October 8, 2019 PSP Schedule Reminder Meeting Agenda Welcome RFP General Overview RFP Specifics Overview
More informationRegional Sustainable Infrastructure Planning Grant Program Cycle 1. FINAL Draft
Regional Sustainable Infrastructure Planning Grant Program Cycle 1 FINAL Draft Fresno Council of Governments January 2018 1 Introduction Fresno Council of Governments is simultaneously soliciting Regional
More informationRESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No Applicant Name:
RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No. 1505-0250 Applicant Name: Citrus County, Florida 1. MULTIYEAR PLAN VERSION (INITIAL OR AMENDMENT NUMBER):
More informationCentral City Line Kick-off and Tour
Central City Line Kick-off and Tour Phase C Preliminary Engineering, Environmental Documentation and Small Starts Submittal Kickoff Meeting Agenda Time Item 1:00 PM Welcome, Introductions and Agenda Review
More informationOff-Campus Recreation, Intercollegiate Athletics, College of Education and Human Performance, and Facilities and Open Spaces.
In order to provide a comprehensive count of all existing recreation and open space facilities, an inventory of such facilities is organized based on the following chart. Activity-based facilities are
More informationTOWN OF LEXINGTON COMMUNITY PRESERVATION COMMITTEE
TOWN OF LEXINGTON COMMUNITY PRESERVATION COMMITTEE Guidelines for Project Submission 1. Each project request must be submitted to the Community Preservation Committee using the Project Application Summary
More information