1 Attendees: reference sign-in sheet. Tom Brown, Coordinator Design & Construction, opened meeting at 9:30 AM. Welcomed attendees Meeting recorded; mandatory meeting, sign-in required; leave business cards end of meeting VCS staff introductions Tom Brown: Coordinator, my team take the lead at construction Saralee Morrissey: Planning Director, lead for Master Plan, will work up to CDs Attendees introductions Key dates: (IMPORTANT: reference the RFP for dates associated with this project submittal) Submittal Questions to my attention, my information is in the RFP, Deadline: 3:00 PM, Feb. 22 Submittals to the attention of Janice Lucas, Due: 3:00 PM, March 22 (IMPORTANT NOTE: THIS DATE IS ACTUALLY FRIDAY - MARCH 2); contact information included in RFP Firm Shortlisting: anticipating March 22 Interviews: tentatively set for April 2 (IMPORTANT NOTE: THIS DATE IS ACTUALLY APRIL 4) Recommendation to the Board at the April 24 th Board Meeting Have not set a date to negotiate the contract with the CM Firm, anticipate sometime in the fall Are there any questions? Q: Tom you said the submittals are due when? A: March 2 by 3:00 PM Saralee Morrissey, Planning Director Appreciate your interest; the architect for the project is CT Hsu; CT will participate in the interviews as a non-voting member Just started working on the project in January; we aren t even at schematics yet; currently working with Dr. Inge, his faculty and community involvement; identifying priorities Started advertising process early; want CM on board to help work on the documents by this fall Budget associated with the project is $50 million, that is not construction, it includes construction; if you thought there s $50 million for construction want to let you know that is not the case First middle school in quite some time; devoting substantial time to programming; concern for construction cost per student station, narrowest interpretation tells us we must meet it Have not determined if there s any remodeling to be done on this campus; deliberately called this project master plan as a mechanism to legislation; evaluating pros and cons as to appropriate space for remodeling that fits in with the plan for this school Page 1 of 6
2 Questions as I will not be joining the tour as I have a planning meeting with faculty and staff: (No questions at this time.) Dr. Rick Inge, Principal, Deltona Middle (Background of school programming and demographics) 85% live in poverty; 65% minority; 45% Hispanic; 48 homeless; 1 of 3 have disabilities; housed in a 50-year old building; 6 academies first middle school in area with academies This school to be an example to other (middle) schools Saralee Morrissey, Planning Director Any questions? Q: How many students do you have? A: About 1100; influx of students from Puerto Rico; we re not planning to add capacity, student stations, perhaps a few additional during programming. Q: Do you have an anticipated notice to proceed date? A: No; may get started around August 2019, which is optimistic; we re anticipating phased construction Q: Is there any swing space available here now? A: You will decide that as you walk around; Rob: student seating capacity, no, there may be a couple of portables (Deltona Water, across the street) city now owns the utility system; parking can be explored across the street To Rob: anything you d like to add: Rob Brinson, Planning Specialist Anyone who wants to, we ll start the tour at cafeteria then work our way around the campus Meeting closed Begin Tour / Q & A Answers and comments by Rob Brinson unless otherwise indicated. Cafeteria: outdoor covered area; some students eat in classrooms; Q: Is this the whole cafeteria for 1100 students? A: Yes, we do some outdoor dining and have 3-4 lunches; ESE students pickup lunch then eat in the classroom Continue to hallway Page 2 of 6
3 Q: Will restroom be converted to ESE while we re in construction? A: Those are recent restroom that were added to take care of added attendance This wing is just additional classrooms; were science which has been turned to FFE/Ag Q: Once they renovated the cafeteria (rest of question not discernable from background noise)? A: There were a couple of renovations to the dining room / cafeteria; kitchen in 2000; ceiling and lighting in 2002; walk-in freezer cooler in 2004; most work is years old We run a double loop for buses; hopefully new design will condense into one usable loop Notice on your map there s a layout for the portables; portables on this side a being refurbed now, other portables are on the other side of the gym Q: How many students can be housed in portables? A: Between 2 and 25 depending on the program Q: Do you own these portables? A: Yes, these are school district owned Q: Will you use Mobile Modular stackable? A: Yes, that s who we re using now One of the chiller plants had some renovations done recently, think it was 2000 and 2014 Q: Full replacement? A: Just those units Q: So, the tower replacement, not the chillers? A: The chillers themselves I think were 2014; we have some others in 2016 The parking is in 6 different locations; that will be some difficulty in how we do our construction phasing; we don t have any swing space for parking; we may be able to utilize grass area as some options to look at We have a wet pond on this side; ag building out in far corner; there s some wetlands along this side which will be in the survey; the architect has part of the survey and condition assessment done We re not looking at remodeling as a complete package; there are some buildings to be reviewed under Castaldi; buildings 9, 10 and 11 don t meet the age criteria, we re also looking at condition assessments, may do renovation if we re not in concurrence with removal; building 11 is ESE wing Q: Do you know the age? A: I think it s 82 or 88 on these and a 91; we can walk down the center hall, they connect through this way We can capture these covered walks, there were elevation changes when they were put in; the little building is being used as a kiln room Q: You said 9, 10 and 11 are too new to Castaldi? Page 3 of 6
4 A: We re not sure yet, depending on DOE; we ll be looking at age and condition This building has science classrooms, English lit and math This section was remodeled for offices; renovated in early 90s We have some field space back here; typically we use for roofing or other projects for staging, it s accessible past the track and coming down the ridge Note: bell, student class change Q: No roadway access back here? A: No, there s not; we have about yards of space behind the wooded area Q:.. something about wetland A: No, we haven t noted wetland here Basically, most of our trucks use this ridge then take it down past the other side of the portables and ball courts Q: Is it stabilized? A: No, just compacted down from trucks using it Cooing towers for these buildings were 2014 renovations; some parts are fairly new, controls, those type issues Q: Is this a continuation of the wetlands through here? A: Basically it goes around back; we ve done our survey but are waiting for some issues with the property on the side; we ll do an EPA assessment for the wetland boundary line; want to maintain a buffer with other properties Q: What about irrigation? A: Well over here, gas lines for classroom wings, chilled water lines running down here and through the courtyards also; we have access to as builts to help define lines as we get into project Note: class change ends Everyone we ll continue down the halls Some of our main connections are down Enterprise Road; storm water runs to the pond; sanitary going to the gym from that side; some is outdated, some not, not sure By date, building 8, for Castaldi, building 8 is fused with building 1 hallway, the forth wall of building 8 is actually the hallway of building 1; building 8 doesn t meet the age criteria for Castaldi; we re doing condition assessment to evaluate this building Band room and chorus room are here; rooms are crowded, you can look in if you like (walked through classroom spaces) This way, we ll walk between the gym and the ball courts Q: Is there an underground sanitary system? Page 4 of 6
5 A: I think we re on the treatment plant Tennis courts, ball courts were redesigned in 2011; basketball courts in 2001 Opened up parking lot which is now the parent loop Original gym added mechanical storage, old ventilation fans and louvers were capped off, air conditioned; rubber floor replaced with hardwood; locker rooms not used to small size; (walked through gym); mechanical loft on left side; thought to possible repurposing to some other use, maybe preforming arts; only gym and building 1 have sprinkler system done in 2006; group restrooms on end (Walked outside) this is the addition here, done in 2004 Q: Not really defined when you guys are going to start? A: We re still looking at topo and defining student seating area; we don t have intention of putting further portables out here; discussion with school to give up using the track area in construction; depending on what we re going to do with 9, 10 and 11 they block access to this part of the property Let s head out the front and walk through the center of the campus, that will be it Q: Where s the main transformer? A: It s over by the cafeteria, that s where the main MDP comes in; also service that comes in by the gym; backflows come in from that side; front fire and water, gas that comes in the front and the back Q: (voice undiscernible) A: We do all of it quarterly with Simplex; before we do anything, will do a fire flow test also for impact at peak time This is the other chiller that does the gym, building 2 which is the music/chorus area, and part of building 1; part of building 8 connect may come off this one, not 100% sure; we will determine that as we go through the plans to determine cutoff lines Basically these are 3 copycat wings; classrooms are about the same size; next wing over is food/culinary; just outside the media are typical buildings; all block construction inside / outside walls; couple of the offices have drywall, rest are typical block; door swings to hallway; mostly group restrooms; individual restrooms are mostly in the ESE wing Shop lab is now auto tech lab; ag building is in question; surveyed possible areas for construction entrances; students have animals they need to bring in and out Enterprise Road traffic to the elementary comes by here; traffic on Rhode Island also; need to look at the logistics with CM Q:. Technology.? A: Technology is not the greatest, has been retrofitted; wireless is getting better; as far as how we re wiring it in, most if fiber overhead; challenge keeping all that technology working while we re renovating school Don t know total load coming in, waiting to hear back from Duke Page 5 of 6
6 Have some standing water issues at the courtyard area; usually gone within a couple days Any more questions? Be sure to make the deadline; send your questions directly to Tom Brown Q: When did you say the new floor was put in gym? A: Did that in 2001 Q: You mentioned the survey a couple times, will that be issued with the proposal documents? A: Still waiting for title search for the survey to be complete; did complete a condition assessment by building, whoever is awarded will get that; we will have a full survey available; contacted Duke to find out main service feeds; contacted Deltona Water, we redid the piping here, not sure about the right-of-way; may be additional civil work No further question. Page 6 of 6
BCPS 2017 Bond Issue Frequently Asked Questions
BCPS 2017 Bond Issue Frequently Asked Questions The Beal City Public Schools Board of Education formally approved the ballot language for a proposal to be put forward to the community for a bond issue
More informationSPECIAL ISSUE CAPITAL PROJECT VOTE
Schuylerville CENTRAL SCHOOL DISTRICT SPECIAL ISSUE - 2016 CAPITAL PROJECT VOTE District capital project vote Dec. 6 O n Tuesday, Dec. 6, voters in the Schuylerville Central School District will decide
More informationBond Projects Update A. R. Rucker Middle
Bond Projects Update A. R. Rucker Middle Sound system added in gym Doors & locks 10/28/16 Facilities being assessed for needs & sizes, developing replacement schedule for interior hardware & doors & for
More informationSeptember 5, 2018 FREQUENTLY ASKED QUESTIONS (FAQs) EPS REFERENDUM 18 VOTE, Tuesday, October 2, 2018
September 5, 2018 FREQUENTLY ASKED QUESTIONS (FAQs) EPS REFERENDUM 18 VOTE, Tuesday, October 2, 2018 On Tuesday, October 2 nd, The Ewing Public Schools will ask the community to vote on a $59.3 million
More informationPROPOSAL FOR REVIEW AND COMMENT
PROPOSAL FOR REVIEW AND COMMENT August 1, 2017 SUBMITTED TO: MINNESOTA DEPARTMENT OF EDUCATION SUBMITTED BY: RICHFIELD PUBLIC SCHOOLS INDEPENDENT SCHOOL DISTRICT #280 7001 Harriet Avenue South Richfield,
More informationREQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA MASTER PLAN PROJECT NO.
REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES FOR DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA 32725 MASTER PLAN PROJECT NO. 184620 School Board of Volusia County Florida Facilities Services
More informationWaterford School District 2003 Bond Update
Waterford School District 2003 Bond Update Presented by: Thomas W. Wiseman, C.P.A. Assistant Superintendent Business and Operations William Holbrook, C.P.A. Director of Business Services January 17, 2013
More informationBerne Knox Westerlo Central School District
Berne Knox Westerlo Central School District Proposed Capital Project Progress Summary Report to the Board of Education May 8, 2017 Proposed Capital Project Background In 2015 the Board of Education and
More informationI TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I
I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I 1 Sum of Prior Years and Estimate to Complete Project Estimates: PlanningIDesign 1 Sum of FY 2013--FY 2017 FY 2012 1 Sum of FY 2013-~uture
More informationLUTHER BURBANK HIGH SCHOOL ATHLETIC SPORTS CENTER Progress Meeting 2/4/10
LUTHER BURBANK HIGH SCHOOL ATHLETIC SPORTS CENTER Progress Meeting 2/4/10 Date: Time: Location: Attendees: CC: February 4, 2010 1:00 P.M. Luther Burbank High School Burbank Room Minutes taken by: Eric
More information2018 Facility Master Plan
2018 Facility Master Plan 1 Contact Information District LEA: 6302 District Physical Address: 207 W. Conway Benton, AR 72015 District Mailing Address: PO Box 939 Benton, AR 72018 District Phone Number:
More informationFrequently Asked Questions
Frequently Asked Questions about the May 2, 2017 School Bond Election When is the election? Tuesday, May 2, 2017. The polls will be open from 7 a.m. until 8 p.m. Absentee ballots will be available after
More informationRecommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature
Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness Report to the Governor and to the Legislature 1999 Recommended Physical Plant Improvements to Existing Nursing
More informationAdditionally, the committee was opened to anyone who wanted to participate.
August 2013 Ted Moore, Superintendent Lovejoy Independent School District 259 Country Club Road Allen, Texas 75002 Re: Long Range Facilities Planning Committee Recommendation Dear Mr. Moore, On April 16,
More informationADDENDUM NO. 1. Architectural Services for Orange Coast College Student Union Project. Coast Community College District Purchasing Department PROJECT:
ADDENDUM NO. 1 Coast Community College District Purchasing Department PROJECT: Architectural Services for Orange Coast College Student Union Project RFP NO: 2076 NOTICE TO PROPOSERS ON THE ABOVE PROJECT:
More informationRequest for Qualifications
Request for Qualifications Architectural & Engineering Services for HUTTON ELEMENTARY SCHOOL Modernization and Additions Project Submittal Deadline: August 24, 2012, 4:00 P.M. Spokane Public Schools 2815
More informationOwner s Meeting Minutes /03/08
Owner s Meeting Minutes 234 Attendees: L. Spink L. McKenzie M. Bishop L. Heimgartner C. Jackson J. Smith M. Schoeppner A. Patterson A. Tomlinson B. Englert B. Young C. Muldoon B. McNeel Child Development
More informationGREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated
GREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated 07.21.2015 1. Why is the Greene County School District considering a bond referendum? The Greene County School District is considering
More informationBond Issue Update. Board of Education Meeting June 5, 2014 Thomas Wiseman Assistant Superintendent Business & Operations
Bond Issue Update Board of Education Meeting June 5, 2014 Thomas Wiseman Assistant Superintendent Business & Operations 1 2003 Bond History June 9, 2003 Waterford School District voters approved a $100
More informationCapital Projects Levy
Bonds-vs-Levies Bond = Building Bond proceeds purchase new buildings, renovate existing buildings, add infrastructure, new equipment and technology Bonds require 60% + 1 vote to pass Levies = Learning
More informationOrange County Public Schools WINNER. Site 84-E-W-4 Design Community Meeting March 30, 2016
WIER Site 84-E-W-4 Design Community Meeting March 30, 2016 Site 84-E-W-4 Elementary School Meeting Agenda March 30, 2016: MetroWest Elementary School, 6:00 pm Welcome School Board Member Pam Gould Introductions
More informationREQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES WESTSIDE ELEMENTARY 1210 JIMMY ANN DRIVE DAYTONA BEACH, FLORIDA 32117
REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES FOR WESTSIDE ELEMENTARY 1210 JIMMY ANN DRIVE DAYTONA BEACH, FLORIDA 32117 RENOVATIONS & ADDITIONS PROJECT NO. 174582 School Board of Volusia County
More information2013 Bond Election Presentation
2013 Bond Election Presentation Promises Kept: The 2003 Bond Voters approved a $78 million bond issue. Five projects were completed on time and within budget: 1. Richland High School total modernization
More informationDAVIS JOINT UNIFIED SCHOOL DISTRICT BOND MEASURE FULL BALLOT TEXT
DAVIS JOINT UNIFIED SCHOOL DISTRICT BOND MEASURE FULL BALLOT TEXT By approval of this measure by at least fifty-five percent (55%) of the registered voters voting thereon, the Davis Joint Unified School
More informationRebuilding Albany High School Facilities referendum Tuesday, Feb. 9
Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9 Community Forum January 14, 2016 Agenda Welcome Presentation: New proposal What s changed? What s stayed the same? Benefits for students
More informationWhile eating in Tiger Hall, please:
ASSEMBLIES Walk DIRECTLY from class to the gym, NOT stopping at your locker or going to another area of the building to meet others Immediately sit down in the section for your grade level (SEE MAP ON
More information8, 2018 REQUEST FOR PROPOSALS (RFP): G
ADDENDUM NO. 2 DATE: June 8, 2018 REQUEST FOR PROPOSALS (RFP): G180026673 Design Professional Services Richmond Public Schools George Mason Elementary School DATED: May 15, 2018 PROPOSAL DUE DATE & TIME:
More informationQ. What are we voting on? Q. How was the referendum developed?
Q. What are we voting on? A. On April 3rd, the voters of the Peshtigo School District will have the opportunity to vote on two referendum questions. The first question will approve $29,960,000 for the
More information(No persons wishing to speak, the Chair closed the public comment period.)
CITY OF SAN MATEO PLANNING COMMISSION MINUTES OF THE REGULAR MEETING OCTOBER 23, 2012 APPROVED The Study Session convened at 5:30 p.m. in Conference Room C and was called to order by Chair Whitaker. Those
More informationThoroughgood and Hermitage Shared Campus Update. School Board Workshop February 13, 2018
Thoroughgood and Hermitage Shared Campus Update School Board Workshop February 13, 2018 Stakeholder Involvement 15 Design Charrettes with Thoroughgood students, staff and community January May 2017 School
More informationSALADO INDEPENDENT SCHOOL DISTRICT
SALADO INDEPENDENT SCHOOL DISTRICT Request for Qualifications The Salado Independent School District ( District ) is seeking Submissions in response to this Request for Qualifications ( RFQ ) for architectural
More informationCity of Waterbury Safety & Security Assessment
City of Waterbury Safety & Security Assessment Dear School Official, Pursuant to guidelines set forth by the Department of Justice, Office of Domestic Preparedness and the Department of Homeland Security,
More informationREQUEST FOR PROPOSALS. Cleaning for Victory Ridge Academy
REQUEST FOR PROPOSALS Cleaning for Victory Ridge Academy For the period of August 6, 2018 July 31, 2019 427 & 501 Burns Avenue Lake Wales, FL 33853 Phone: (863)679-3338 (863)679-3944 kay.west@victoryridge.org
More informationFrequently Asked Questions May 8, 2018 Sinking Fund Election
When is the election? Frequently Asked Questions May 8, 2018 Sinking Fund Election Tuesday, May 8, 2018. The polls will be open from 7 a.m. until 8 p.m. Absentee ballots will be available after March 24th.
More informationFrequently Asked Questions 2018 Bond Program
HISTORY AND FEATURES Frequently Asked Questions 2018 Bond Program 1. What is on the May 8, 2018 ballot? On May 8, 2018, voters in the Jackson Public Schools District will be asked to consider a bond proposal
More informationUNDERSTANDING THE BOND REFERENDUM HELPING YOU PREPARE FOR THE NOVEMBER 8 VOTE
UNDERSTANDING THE BOND REFERENDUM HELPING YOU PREPARE FOR THE NOVEMBER 8 VOTE ELECTION DAY BOND REFERENDUM This November 8, a question will appear on the general election ballot asking voters to vote YES
More informationSTANDARD DRAWINGS INDEX
STANDARD DRAWINGS INDEX DESCRIPTION GENERAL DRAWING NO. Typical Layout for Improvement Plans... 1 City of Stockton Standard Border and Title Block for 8.5 x 11 Sheet.. 1A City of Stockton Standard Map
More informationThe Nickel Tax ESTILL COUNTY SCHOOL DISTRICT
The Nickel Tax ESTILL COUNTY SCHOOL DISTRICT WHAT IS THE NICKEL? In the 1990s, the Kentucky State legislature passed a law to establish how school districts can fund their facilities. All school districts
More informationThe Operations Committee of the Board will meet on the above date, time and location to discuss the following:
Laredo I.S.D. Board of Trustees Operations Committee Meeting Tuesday, May 05, 2015-11:30 A.M. Amber Yeary Board Room - 1620 Houston St. Laredo, TX 78040 The Operations Committee of the Board will meet
More informationQ & A from November 1st Tour
State College of Florida Manatee-Sarasota Contracted Custodial Services ITN Question & Answer Questions and Answers originally posted on November 2, 2012, dates of changes and additions noted below Q &
More informationVISION AND RECOMMENDATIONS
Sunnyvale Independent School District Facilities Planning Committee VISION AND RECOMMENDATIONS July, 2014 FACILITIES PLANNING COMMITTEE Community Members Sean Curry Chair Charles Christopher Scott Fitzgerald
More informationTHIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 15-BS-2552 as follows:
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 15-BS-2552 CM GC ADDENDUM NUMBER ONE September 9, 2015 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
More informationFacilities Condition Assessment
Facilities Condition Assessment (O&M 16 018) Date Issued: January 29, 2016 Date Due: Contact: March 3, 2016 at 4:00:00 pm Paul Acosta, Program Manager III paul.acosta@stocktonca.gov City of Stockton Public
More informationSURREY COUNTY COUNCIL. PUBLIC ASSISTANCE COMMITTEE. THE LOCAL GOVERNMENT ACT, THE POOR LAW INSTITUTIONS IN SURREY REPORT OF THE
SURREY COUNTY COUNCIL. PUBLIC ASSISTANCE COMMITTEE. THE LOCAL GOVERNMENT ACT, 1929. THE POOR LAW INSTITUTIONS IN SURREY. ------------ REPORT OF THE COUNTY MEDICAL OFFICER. ---------- 9/7/30. EPSOM GUARDIANS
More informationREQUEST for INTEREST. Building & Parking Redevelopment Project. Travis Park United Methodist Church. TABLE of CONTENTS
REQUEST for INTEREST & Parking Redevelopment Project TABLE of CONTENTS Overview... 2 The Sites... 3 a. Youth... 4 b. Children s... 5 c. Education... 6 d. Surface Parking Lot... 6 Special Considerations...
More informationRFP Design and Field Improvements for Outdoor Track and Athletic Area Addendum #2 dated 02/2/2018
DATE: February 2, 2018 TO: FROM: RE: All Prospective Proposers Beth Kirk Director, Office of Procurement 301-546-0007 RFP 18-04 Design and Field Improvements for Outdoor Track and Athletic Area Addendum
More informationCity Manager Briefing Report
City Manager Briefing Report January 2010 Eric M. Soroka, ICMA-CM City Manager This report is prepared in order to inform the City Commission of the status of major projects and ongoing matters. If you
More informationSTATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS
STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES For The University of Colorado Colorado Springs For
More informationArchitectural & Engineering Services for Cath Lab RFP
Architectural & Engineering Services for Cath Lab RFP 2016-004 Questions to be submitted by March 14. Proposals due March 28, 2016. The following questions were submitted with regards to RFP 2016-004.
More informationUNDERSTANDING THE BOND REFERENDUM HELPING YOU PREPARE FOR THE NOVEMBER 8 VOTE
UNDERSTANDING THE BOND REFERENDUM HELPING YOU PREPARE FOR THE NOVEMBER 8 VOTE ELECTION DAY BOND REFERENDUM This November 8, a question will appear on the general election ballot asking voters to vote YES
More informationEXISTING CONDITIONS
02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal 02 01 80 Maintenance of Facility
More informationMINNESOTA STATE COLLEGES AND UNIVERSITIES
MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State Community and Technical College Center for Student and Workforce Success REQUEST FOR PROPOSAL (RFP) FOR ARCHITECTURAL AND ENGINEERING DESIGN SPECIAL
More informationPresent: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers
MINUTES CAPITAL COMMITTEE February 3, 2014 Black Hawk Room 2:00 p.m. Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers 1. Core Value: Responsibility
More informationAtkins Library Study Request for Proposal
The University of North Carolina at Charlotte Facilities Planning Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0512 PROJECT: UNC Charlotte Atkins Library Study
More informationGreater Victoria s #1 Private Industry
WE RE HIRING Greater Victoria s #1 Private Industry Greater Victoria enjoys a thriving advanced technology sector with a global outreach. The region s technology sector continues to grow, innovate and
More informationWEATHERIZATION ENERGY AUDITOR SINGLE FAMILY. House as a System
WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY House as a System WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM August 2010 1 WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM August 2010
More informationA PROMISE MADE, A PROMISE KEPT. Cape Fear Valley s New Hospital Finally Delivers
A PROMISE MADE, A PROMISE KEPT Cape Fear Valley s New Hospital Finally Delivers It wasn t long after his arrival that Cape Fear Valley CEO Mike Nagowski began turning his attention westward toward Hoke
More informationGUIDELINES / RULES FOR OUTDOOR SPACE USE ON GEORGIA INSTITUTE OF TECHNOLOGYCAMPUS
GUIDELINES / RULES FOR OUTDOOR SPACE USE ON GEORGIA INSTITUTE OF TECHNOLOGYCAMPUS The Georgia Institute of Technology encourages chartered student organizations to express their artistic, educational,
More informationREQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT
REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT DUE: May 4, 2018 4:00 P.M. Walla Walla Public Schools 364 S. Park Street Walla Walla, WA 99362 District Representative/Contact:
More informationFCPS Rock Creek School Replacement and Final Site Selection Design Meeting #5 Notes
07 December 2017 FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #5 Notes Meeting Date: 07 December 2017 9:30 AM FCPS Central Office Building Current Design Phase: Site Selection
More informationFAQ s HISTORY AND FEATURES. 1. What is on the May 8, 2018 ballot? 2. How was this bond program developed?
FAQ s HISTORY AND FEATURES 1. What is on the May 8, 2018 ballot? On May 8, 2018, voters in the Jackson Public Schools District will be asked to consider a bond proposal to implement improvements and renovations
More informationReferendum Review and Report. School Board Meeting, July 11, 2016
Referendum Review and Report School Board Meeting, July 11, 2016 Presentation Outcomes Board members will: be informed of information requested from the June 27 Board Study Session; provide direction
More informationConference Room Reservation Policy Packet
Conference Room Reservation Policy Packet Opening Our Doors to the Community 3919 W. Newberry Road, Suite 3 Gainesville, FL 32607 352.367.0060 Phone www.cfncf.org 1 Policies and Procedures for Conference
More informationPROJECT DASHBOARD BUDGET SCHEDULE SCOPE COMMUNITY
PROJECT DASHBOARD Monthly Rating BUDGET SCHEDULE SCOPE COMMUNITY JAN APR 2017 MILESTONES Education Specifications School Program Finalized School Tours MAY 2017 TARGET MILESTONES Path to Net Zero GO/NO
More informationLa Veta Facilities Taskforce. January 5, 2018
La Veta Facilities Taskforce January 5, 2018 Facilities Taskforce Convened In January 2017, the Board of Education convened a Facilities Taskforce to study our schools and the needs we have for our buildings
More informationBuilding for Life at St Paul s
Building for Life at St Paul s Dear friends, An exciting vision Summer 2017 Thank you for reading this booklet. It explains a hugely important development for St Paul s. We are asking for your support,
More informationFigure 1: ALCOSAN ORGANIZATION CHART
Allegheny County Sanitary Authority (ALCOSAN) REQUEST FOR QUALIFICATIONS For Engineering and Architectural Design Services, As Needed Various Small to Mid-Size Capital Projects March 2018 1.0 INTRODUCTION
More informationATWOOD MEMORIAL CENTER ANNUAL REPORT
St. Cloud State University Student Life and Development Division ATWOOD MEMORIAL CENTER ANNUAL REPORT FY 2013-2014 2013-2014 was a year of planning and transition. TABLE OF CONTENTS Table of Contents Executive
More informationHerricks Union Free School District Capital Improvements Bond Update. July 20, 2017
Herricks Union Free School District 2016 Capital Improvements Bond Update July 20, 2017 Timeline to Date December 6, 2016 Successful Bond Referendum Vote December, 2016 BBS conducts field survey of existing
More informationRequest for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents
Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name BGSU Ice Arena Space Study Response Deadline
More informationA Blueprint for New School Construction and Capital Improvement for New Bedford Public Schools
A Blueprint for New School Construction and Capital Improvement for New Bedford Public Schools February 2013 Office of Mayor Jon Mitchell, City of New Bedford Office of Superintendent Michael Shea, New
More informationREQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services
REQUEST FOR QUALIFICATIONS Architectural/Engineering Design Services Logistics DISTRICT CONTACTS FOR QUESTIONS Jeff Collum Superintendent Phone: 903-668-5990 Email: jcollum@hisd.com REQUEST FOR STATEMENT
More informationRequest for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17
Request for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17 Introduction: This Request for Proposals (RFP) solicitation is to provide to
More informationRequest for Proposal No. RFP Consultant Services. for. Building Condition Assessment. Submittal Deadline: Date: March 1, Time: 10:00 a.m.
Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 contractingservices@seattleschools.org Request for Proposal No. RFP01838
More informationPlan of Development Review Process County of Henrico, Virginia
Plan of Development Review Process County of Henrico, Virginia October 27, 2000 (Revised January 8, 2007, December 7, 2007) (Revised September 11, 2015, effective September 14, 2015) POF011 TABLE OF CONTENTS
More informationRider Guide. » June 7 9, Bike MS: C.H. Robinson MS 150 RIDE 150 miles» Riding toward a world free of ms
Special thanks to our sponsors ////////////////////////////////////////////////////////////////////////////// Rest stop food donated by Bike MS: C.H. Robinson MS 150 RIDE 150 miles» Riding toward a world
More informationREQUEST FOR PROPOSAL #B STRATEGIC PLANNING STUDY OF BERLIN ELEMENTARY SCHOOLS
REQUEST FOR PROPOSAL #B2018-1 STRATEGIC PLANNING STUDY OF BERLIN ELEMENTARY SCHOOLS Town of Berlin Berlin Public Schools Ms. Eva Gallupe Director of Business Operations 238 Kensington Road Berlin, Connecticut
More informationCANYONS DISTRICT FACILITY USE
Facility Use All activities will be scheduled through the District Facilities Scheduler. The District Facilities Scheduler is responsible for coordination of all school rentals and after-hour facility
More informationUpdate Report on the Capital Outlay Plan for JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE
Update Report on the Capital Outlay Plan for 2018-2024 JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE August 1, 2017 Background: At its April 2017 meeting, the Board
More informationEdmonton SIGN*A*RAMA. Signs of Support. Grant Program. For Local Charitable Organizations. Application and Signage Request Forms
1 Edmonton SIGN*A*RAMA Grant Program For Local Charitable Organizations Application and Signage Request Forms Applications accepted until March 30, 2012 or scan and email to mreid@edmontonsignarama.com
More informationThe Killeen ISD Board of Trustees unanimously approved calling a $426 million bond election, consisting of two propositions, to be held on May 5,
The Killeen ISD Board of Trustees unanimously approved calling a $426 million bond election, consisting of two propositions, to be held on May 5, 2018. 2 What is a bond? A bond is similar to a home mortgage.
More informationOCEAN BREEZE GOLF COURSE ARCHITECT REQUEST FOR PROPOSAL AND RESPONSES TO RFI S
OCEAN BREEZE GOLF COURSE ARCHITECT REQUEST FOR PROPOSAL AND RESPONSES TO RFI S 1. We have received the RFI link and 7-page document outlining the project. Is there additional information to receive? There
More informationBLAINE SCHOOL DISTRICT CAPITAL LEVY DETAIL REVIEW. April 24, 2018 Special Election
BLAINE SCHOOL DISTRICT CAPITAL LEVY DETAIL REVIEW April 24, 2018 Special Election Urgent Needs and Related Program Implications The Facility Needs Review Committee was charged with considering projects
More informationReports for Committee Members / University Campuses
Reports for Committee Members / University Campuses Name of Institution: University of North Carolina Wilmington Date: March 31, 2008 Contact: David C. Girardot 1. Total Amount of Bond Dollars Allocated
More informationRFP for Canteen and Catering Service for Green One UN House (GOUNH). (Date: 10 June 2014)
Addendum 1: RFP for Canteen and Catering Service for Green One UN House (GOUNH). (Date: 10 June 2014) This addendum provides a revision in the Request for Proposal (RFP) under point 1 below and answers
More informationLexington Center Corporation Request for Proposal for Convention Center Naming Rights Request for Proposals
Request for Proposal for Convention Center Naming Rights Request for Proposals Title: Naming Rights for the Lexington Center Corporation, New Convention Center, Lexington Kentucky Issue Date: December
More informationWeill Hall Space Reservation and Use Policy
Weill Hall Space Reservation and Use Policy Weill Hall is the cornerstone of Cornell s Life Sciences Initiative, providing state of the art facilities to advance research in the life sciences and to facilitate
More informationFlorida International University
PROJECT DESCRIPTION The Parkview II Housing project will provide 656 beds of student housing at the Modesto A. Maidique Campus as well as parking for 300 cars. It is expected to be completed for fall term
More informationBond Frequently Asked Questions
Bond Frequently Asked Questions Q: This Bond program totals $680 million. How does that compare with prior BSD Bond programs? A: The proposed 2014 Bond is quite comparable with recent Bond programs considering
More informationSchool Board of Brevard County, Florida Half-Cent Sales Surtax Internal Audit Fiscal Year
School Board of Brevard County, Florida Half-Cent Sales Surtax Internal Audit Fiscal Year 2015-16 Prepared By: Internal Auditors April 12, 2016 Table of Contents Transmittal Letter... 1 Overview... 2-6
More informationThe Furniture Effect. By Sherrie Negrea November 1st, 2014 PHOTOS COURTESY OF STREET DIXON RICK ARCHITECTURE
The Furniture Effect By Sherrie Negrea November 1st, 2014 PHOTOS COURTESY OF STREET DIXON RICK ARCHITECTURE When Sewanee: The University of the South began planning a renovation of an historic residence
More informationWinter Mountain 2018 Schedule of Activities/Supervision Tuesday January 23, 2018 Time Activity Location Person Parking Lot/Set-up Traffic Flow
Tuesday January 23, 2018 6:30 a.m. /Set-up (ASB Arrives Caution Tape & Signs) Traffic Flow 7:00 a.m. 8:00 a.m. Student Check-In (Wilson, Iacoboni, Hilling) Arrival & Load Luggage LCS Gym Iacoboni Ortega
More informationRequest for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado
Request for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado PURPOSE The Clear Creek Board of County Commissioners
More informationNORWIN SCHOOL DISTRICT JOB DESCRIPTION. Head Custodian First Shift (Class II)
NORWIN SCHOOL DISTRICT JOB DESCRIPTION Head Custodian First Shift (Class II) JOB ANALYSIS The Head Custodian (Daylight) will provide leadership for the building custodial staff and perform a variety of
More informationPart B - Health Facility Briefing and Planning. PLANNING Functional Areas Functional Relationships
545 INDEX PALLIATIVE CARE UNIT 545.1.00 Description INTRODUCTION Description PLANNING Functional Areas Functional Relationships COMPONENTS OF THE UNIT Introduction Standard Components Non-Standard Components
More informationState University Construction Fund Binghamton University Facilities Master Plan. Open Forum Session: Final Plan Recommendation. 13 April 2011, 3:00pm
State University Construction Fund Binghamton University Facilities Master Plan Open Forum Session: Final Plan Recommendation 13 April 2011, 3:00pm SUCF project no. 07839 1 PRESENTATION /30min Q+A /20min
More informationCommunity Integrated Master Plan Workshop 4: CIMP Consensus Elements
Community Integrated Master Plan Workshop 4: CIMP Consensus Elements 22 May 2010 Headquarters Marine Corps Naval Facilities Engineering Command 1 What is a CIMP? A Community Integrated Master Plan is the
More informationFrequently Asked Questions
Frequently Asked Questions Roseville Community Schools May 8, 2018 Bond Election When is the election? Tuesday, May 8, 2018. The polls will be open from 7 a.m. until 8 p.m. Absentee ballots will be available
More informationFirst, decide which block you want to close for Thursday, June 21st. Keep the following guidelines in mind:
HOW TO APPLY FOR A MMNY BLOCK PARTY Updated March, 2018. Send questions to info@makemusicny.org. It s easy to close a street for Make Music New York. But it s often hard to figure out how. This document
More informationRequest for Qualifications & Proposal
Town of Warner, NH Request for Qualifications & Proposal Architect Services for Municipal Fire Station Town of Warner, NH 1 August 11, 2016 Contents I.INTRODUCTION...4 *some dates may be subject to change
More information