1 Community Liaison Council Orientation Guide

2 Table of Contents SR-710 Fact Sheet Item #1 CLC Roles and Responsibilities...Item #2 SR-710 Scoping Executive Summary...Item #3 Alternatives Analysis Process...Item #4 Public Participation Process...Item #5 Save-the-Date Open Houses...Item #6

3 In June 2010, Metro in coordination with Caltrans, authorized moving forward with the environmental review phase of the State Route (SR) 710 Study and broadening the search for multi-modal solutions for the study area. The Initial Study Area is generally bounded by State Route 2, Interstate 10, Interstate 210, and Interstate 605 and is depicted below. In spring 2011, the public participated in a series of meetings that resulted in a scoping process that identified a range of project alternatives, mitigation measures and other significant factors to be analyzed in-depth once an environmental study phase was initiated. The stakeholder comments from that phase were carried forward to reflect the multi-modal alternatives for Metro and Caltrans to consider in this environmental study: Traffic Systems Management/Traffic Demand Management low build Surface, subsurface and elevated structures Transit (bus and rail options) Street improvements Freight management systems Supporting advanced technologies No build

4 Metro and Caltrans recently launched the next step for the State Route 710 Environmental Study: the Alternatives Analysis Phase in order to: Define the Project s Purpose and Need Develop the Project s Goals and Objectives Develop criteria for evaluating each Alternative Identify Alternatives for Environmental Documentation The evaluation process that takes place during the Alternatives Analysis Phase will determine which alternatives will be further studied in the Project s Draft Environmental Impact Statement/Report. 更多中文信息請撥打

5 Community Liaison Council Roles and Responsibilities Thank you for your interest in joining a Community Liaison Council being formed in your area to support the SR-710 Environmental Study team in providing feedback on the technical study and overall outreach efforts. Community Liaison Councils (CLCs) will play an important role in the study process. Each CLC will be comprised of stakeholders within a specific study-area community. The CLCs may include local residents, business owners, community-based organizations, chambers of commerce, institutions, major employers, among others. As a CLC participant, you will act as a liaison between the study team and your community by: Sharing updates with others Providing feedback to the study team Remaining current on the alternatives screening process as it affects your community and the study area Gathering feedback received from others in your community and sharing this with the outreach team Recommending outreach activities and making suggestions to enhance the public participation program, including the need for technical information. The success of each CLC depends on active participation! To that end, CLC participants should make every effort to attend CLC meetings consistently and to provide continuity in moving the dialogue on the SR-710 Environmental Study forward. If you choose to participate in a CLC, please sign-up today and a member of the SR-710 Outreach Team will contact you with information specific to your designated CLC. Thank you for your commitment to improving transportation in our region!

6 710 North Gap Closure Project Scoping Summary Report Volume I 9/30/2011 California Department of Transportation Division of Environmental Planning (MS-16A) 100 S. Main St. Los Angeles, CA SCH No.: Caltrans Project No.: (EA: )

7 Executive Summary Introduction The State Route 710 North Gap Closure Project is being undertaken by the California Department of Transportation (Caltrans) in coordination with the Los Angeles County Metropolitan Transportation Authority (Metro) and other partner agencies. The proposed project, depending on the results of a thorough environmental analysis of all possible transportation improvements during the NEPA/CEQA process, may include, but not be limited to: surface and subsurface highway/freeway construction, heavy rail and bus/light rail systems, local street upgrades, traffic management systems and a no build alternative. There currently is a gap in the I-710 corridor, for a distance of approximately 4.5 miles (7.2km), which extends between Valley Boulevard to the south and Del Mar Boulevard to the north. As originally identified in the April 13, 1998 Record of Decision for the Meridian Variation alignment, this gap contributes to congestion on local streets and the regional freeway system. The objective of this project is to relieve congestion and improve mobility within the study area. To comply with the requirements of the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA), an Environmental Impact Report/Statement (EIR/EIS) is being prepared. CEQA and NEPA both encourage public participation throughout the development of an EIR/EIS. Scoping is a means of soliciting input, early in the development process, concerning the project purpose and need, the range of alternatives to be analyzed, and the scope of the analysis to be included in the environmental document. This Scoping Summary Report (SSR) has been prepared to document the scoping activities conducted to solicit input from the public and government agencies, to identify public and agency concerns and to define the environmental issues and alternatives to be examined in the EIR/EIS. This report covers public outreach conducted during the formal scoping period of March 4, 2011 to April 14, Public and agency outreach efforts will continue throughout the project development process. Pre-Scoping and Formal Scoping Activities Extensive efforts have been made to encourage public and agency participation in the scoping process. These efforts included: Page 2 Three (3) series of Community Meetings designed to educate the public on the project development and approval process. These series of meetings consisted of:

8 Series 1: Transportation Where have we been? Where are we going? Consisted of 6 meetings held February 15-26, 2011, in the cities of San Gabriel, Alhambra, Pasadena, South Pasadena, El Sereno, and Glendale. Series 2: Protecting Communities through an Environmental Process CEQA/NEPA Consisted of 6 meetings held March 1-17, 2011, in the cities of Pasadena, San Gabriel, Alhambra, South Pasadena, Glendale, and El Sereno. Series 3: Going on the Record Consisted of 8 formal scoping meetings and a Virtual Scoping Meeting as described below. Eight (8) formal scoping meetings were held at the following locations from 6pm to 8pm: San Gabriel, March 15, 2011, Jefferson Middle School, 1372 East Las Tunas Drive, CA Alhambra, March 16, 2011, Civic Center Library, 101 S. First Street, CA Glendale, March 22, 2011, Glendale Community College, 1500 North Verdugo Road, California South Pasadena, March 23, 2011, South Pasadena High School, 1401 Fremont Ave., El Sereno, March 29, 2011, LA Christian Presbyterian Church, 2241 N. Eastern Ave., Pasadena, March 30, 2011, Lake Avenue Church, 393 N. Lake Ave., La Canada, April 5, 2011, La Canada High School, La Canada Flintridge. Page 3 Los Angeles, April 6, 2011, Ramona Hall Community Center, Los Angeles, CA. A virtual scoping meeting was webcast on March 21, 2011 and on-demand at through April 14, Mailing notification to appropriate local, state and federal agencies and elected officials Website developed at Posted Scoping Notices at public libraries.

9 Published Scoping Notices in 39 different newspapers in the project study area (a list of all participating newspapers can be found on page 9). One formal agency scoping meeting was held on March 14, 2011 at Caltrans District 7 Headquarters, 100 S. Main Street, Los Angeles. Comments 109 written comment letters were received during the formal scoping period. A total of 114 verbal comments and 29 comment cards were received during the formal scoping meetings. These comments are summarized in the Comment Matrix and all written comments are also included in their entirety in Volume II. Public comments covered a wide range of issues. Primary areas of concern included the project s purpose and need, the alternatives to be included in the EIR/EIS, health and safety concerns with any and all possible tunnel options, potential placement of tunnel ventilation shafts, project cost, and general statements for and against the project. Agency comments focused on the jurisdictional responsibilities of the particular commenting agency and included issues such as potential project alternatives, traffic impacts, and potential permitting requirements. All agencies requested that all future project information be provided as it becomes available. The scoping process provided a wide array of public comments and has provided invaluable guidance that will help the development of the project and preparation of the environmental document. Caltrans goal is to ensure that all relevant CEQA/NEPA resource issues are fully analyzed and documented in the EIR/EIS. Caltrans and its partner agencies will continue with their outreach efforts in an attempt to fully engage the public and agencies in the development of the project. For More information please visit: Page 4

10 Predominant Scoping Comment Themes Comment theme # of Sub-theme Comments Project Opposition 78 Project Support 66 Items to be included in EIR/EIS analysis 40 Wide range of technical study recommendations to be included in Environmental Document. Air Quality 20 Health Impact Assessment/Health Risk Assessment (HIA/HRA), Tunnel ventilation concerns, MSATS, Hot Spot Analysis Tunnel Concerns 10 Safety, Constructability, Cost, groundwater quality Information requests 6 Project alternatives/costs/tolling Project Definition 6 More specific alternative discussion Rail Alternative advocacy 6 Request for Cost/Benefit 5 Analysis Historic Resources 3 Other Transportation 2 Rail/Transit Recommendations GRID solutions 1 San Gabriel River Infrastructure Development (GRID) * Due to the wide-range of comment letters with multiple topics, there is some overlap. For instance, many of the support/opposition letters also included requests for items to be included in EIR/EIS analysis. The above table summarizes the predominant comment themes received during scoping. These comments include all submittal methods (oral, written, electronic). In summary, we received a wide range of comments with the majority of themes revolving around the importance of completing a thorough EIR/EIS. Geographically, project support and opposition was roughly split with the study area s southern cities expressing support and the northern cities expressing opposition. Support was expressed strongest in the southernmost cities of Alhambra, San Gabriel, Monterey Park, Rosemead, El Monte and San Marino. The northern cities of La Canada, Glendale, Pasadena, and South Pasadena expressed opposition. Page 5

11 PART 1 ALTERNATIVES ANALYSES Project Initiation!""#$%&'f(")**+$,-!""./0$,$1+23+$',!""4$+*23+52*"6*7$*8!""9.:;<;.=4>"9*%+$',"?@@A!"".-*,%B"4*++*21 Develop Public Involvement/ Community Outreach Program!"".HH2'3%I"3,/"O,+*-23+$',!""6'E*1"3,/"6*1H',1$K$E$+$*1!""M''2/$,3+$',"3,/"M'005,$%3+$',"LE3, Refine Purpose and Need Establish Objectives & Evaluation Criteria/Measures Refine Study Area Develop Transportation Systems Analysis Approach Modal Alternatives Analysis Full Range!""C'"D5$E/!""<9)F<G)!""D51"63H$/"<23,1$+!""4$-I+"63$E"<23,1$+!""J*37B"63$E!"":2**83B"952(3%*F:2**83B"95K152(3%*!""./73,%*/"<*%I,'E'-B First Screen!"">1*"L*2('203,%*")*3152*1!"";73E53+*".E+*2,3+$7*1!""6*/5%*"63,-*"'(".E+*2,3+$7*1!""C'"D5$E/!""D5$E/ """.E+*2,3+$7*1!""./73,%*/ """<*%I,'E'-B Second Screen!""6*($,*";73E53+$',"M2$+*2$3!""D31*/"',".K$E$+B"+'")**+"L52H'1* """3,/"C**/N"D2'3/";,7$2',0*,+3E """O0H3%+1N"3,/"PH*23+$',3E """;f(*%+$7*,*11!""g*7*e'h":$,3e"4$1+"'(".e+*2,3+$7*1 """+'"K*"9+5/$*/"$,"L.F;G!""6*/5%*"63,-*"'(".E+*2,3+$7*1 Perform Transporation Systems Analysis Alternatives Analyses Screening Report Approval of Part 1 Conceptual Engineering to Further Define Impacts Public Involvement and Community Outreach PART 2 PROJECT REPORT Engineering Studies Prepare Draft Project Report Draft Project Report Approved Select Preferred Alternative Final Project Report PART 3 ENVIRONMENTAL STUDIES AND DOCUMENTATION PA/ED Approval Initiate Environmental Technical Studies Prepare Draft EIR/EIS Approve Draft EIR/EIS Circulate Draft EIR/EIS Public Hearing Respond to Public Comments Final EIR/EIS Record of Decision/ Notice of Determination Notice of Availability Prepare Record of Public Hearing Public Involvement and Community Outreach

12

13 Mark Your Calendar! SR-710 Study Open Houses Save the date. bring a friend and learn more about the alternative concepts under study for the SR-710. Both the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA) encourage public participation and to that end Metro and Caltrans as part of the ongoing Alternatives Analysis process of the SR-710 Study are presenting a series of Open Houses in the Month of May. The Open Houses are scheduled over a two week period across the SR-710 Study area. Each of the Open Houses will present the same format/information.there will be no formal presentation allowing for quality one-on-one dialogue with the study team. The focus will be on the alternative concepts presented at each of the CLC meetings. They will be available for viewing and comment via large interactive boards where you will be asked to post comments on the merits and drawbacks of each alternative concept. This is an opportunity to share your thoughts with the technical team and comment on selected alternatives. UPDATED DATES AND LOCATIONS May 14 6:00-8pm El Sereno Senior Center May 17 6:00-8pm Eagle Rock Elementary May 19 10:00 am -12 pm La Canada a High School May 22 6:00-8pm El Monte Community Center May 23 6:00-8pm South Pasadena Library- Community Room May 24 6:00-8pm First Baptist Church of Alhambra 4818 Klamath Place, Los Angeles, CA Fair Park Ave. Los Angeles, CA Oak Grove Drive La Canada, CA Tyler Ave., El Monte, CA El Centro St., So. Pasadena, CA S. Atlantic Blvd., Alhambra, CA For more information, please visit or call (855) 4-SR / (855)

Public-Private Partnership Program May 2015 Transit Coalition Update

Public-Private Partnership Program May 2015 Transit Coalition Update Public-Private Partnership Program May 2015 Transit Coalition Update Los Angeles County Metropolitan Transportation Authority Mark Linsenmayer Director Presentation Agenda Overview of Metro Public Private

More information

Public and Agency Involvement. 8.1 Scoping Meetings and Noticing. Chapter 8

Public and Agency Involvement. 8.1 Scoping Meetings and Noticing. Chapter 8 8.1 Scoping Meetings and Noticing Chapter 8 As described in Chapter 1, Section 1.7, Scope and Content of this Environmental Impact Report, the scoping process for this EIR was formally initiated on June

More information

Long Range Transportation Plan

Long Range Transportation Plan Summary of Policy Governor in 2000. The baseline can The purpose of the Long Range also be considered as the scenario in Transportation Plan (LRTP) is to which no new transportation projects provide decision

More information

CHAPTER 6 PUBLIC AND AGENCY OUTREACH

CHAPTER 6 PUBLIC AND AGENCY OUTREACH CHAPTER 6 PUBLIC AND AGENCY OUTREACH This chapter documents the Westside Purple Line Extension Project (the Project) Public Participation Plan for the Draft Supplemental Environmental Impact Statement

More information

SUBJECT: STATE ROUTE 710 GAP ENVIRONMENTAL DOCUMENT

SUBJECT: STATE ROUTE 710 GAP ENVIRONMENTAL DOCUMENT 9 Los Angeles County One Gateway Plaza zi3.gzz.zooo Tel Metropolitan Transportation Authority Los Angeles, CA gooiz-zg5~ metro.net REVISED PLANNING AND PROGRAMMING COMMITTEE SEPTEMBER 14,201 1 SUBJECT:

More information

Corridor Advisory Committee Meeting #52. February 16, :00 PM - 8:00 PM Progress Park Downey Ave, Paramount, CA MEETING SUMMARY

Corridor Advisory Committee Meeting #52. February 16, :00 PM - 8:00 PM Progress Park Downey Ave, Paramount, CA MEETING SUMMARY Corridor Advisory Committee Meeting #52 February 16, 2017 6:00 PM - 8:00 PM Progress Park 15500 Downey Ave, Paramount, CA 90723 INTRODUCTION On Thursday, February 16, 2017, the Corridor Advisory Committee

More information

TO: FROM: RECOMMENDATION: BACKGROUND: May 19, Honorable Mayor and City Council. Department of Transportation

TO: FROM: RECOMMENDATION: BACKGROUND: May 19, Honorable Mayor and City Council. Department of Transportation May 19, 2014 TO: FROM: SUBJECT: Honorable Mayor and City Council Department of Transportation Authorization to Execute a Memorandum of Understanding with the Los Angeles County Metropolitan Transportation

More information

APP NVITAT ON LETTERS COOPERATING AGENCY - Agency Categories:

APP NVITAT ON LETTERS COOPERATING AGENCY - Agency Categories: APP COOPERATING AGENCY - NVITAT ON LETTERS Agency Categories: U.S. Environmental Protection Agency, Region 9 U.S. Army Corps of Engineers Federal Highway Administration California Department of Transportation

More information

2017 Water Is Life Student Art Contest Packet

2017 Water Is Life Student Art Contest Packet 2017 Water Is Life Student Art Contest Packet K 12 STUDENT ART CONTEST Sponsored by Foothill Municipal Water District Co-sponsored by Metropolitan Water District of Southern California *3 AWARD CATEGORIES*:

More information

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue DEPARTMENT OF PUBLIC WORKS Matt Machado Director 1010 10 th Street, Suite 3500, Modesto, CA 95354-0847 Phone: 209.525.6550 Date «FirstName» «LastName» «Company» «Address1» «City», «State» «PostalCode»

More information

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF PURPLE LINE EXTENSION PROJECT BY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY Project No. 16-34 CITY

More information

Puget Sound Gateway Program

Puget Sound Gateway Program Puget Sound Gateway Program SR 167 Completion Project Tacoma Transportation Commission April 18, 2018 THOMAS SLIMAK, PE SR 167 ASSISTANT PROJECT MANAGER Agenda Puget Sound Gateway Program Overview Program

More information

ATTACHMENT A: DRAFT PROPOSED SCOPE OF WORK

ATTACHMENT A: DRAFT PROPOSED SCOPE OF WORK 6 Harris Court Monterey, CA 93940 831 649-5225 Fax 831 373-5065 ATTACHMENT A: DRAFT PROPOSED SCOPE OF WORK FORA has prepared this proposed scope of work to be used as a guide for consultants as they submit

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY FEASIBILITY REPORT In November 2008, Measure R was approved by a significant two-thirds majority, committing a projected $40 billion to traffic relief and transportation upgrades

More information

Project Budget and Schedule Status

Project Budget and Schedule Status Program Management Project Budget and Schedule Status Highway Program Planning & Programming Committee June 19, 2013 Highway Program Project Schedules EIR/EIS Construction Various project stages Engineering

More information

CALIFORNIA HIGH-SPEED RAIL DIANA GOMEZ

CALIFORNIA HIGH-SPEED RAIL DIANA GOMEZ CALIFORNIA HIGH-SPEED RAIL HIGH-SPEED RAIL PROJECT OVERVIEW P R E S E N T E D B Y DIANA GOMEZ CENTRAL VALLEY REGIONAL DIRECTOR FRESNO COUNTY EMPLOYEES RETIREMENT ASSOCIATION SEPTEMBER 18, 2013 FRESNO,

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: May 17, 2016 To: The Honorable City Council c/o City Clerk, Room 395 Attention: Honorable Mike Bonin, Chair, Transportation Committee From: Seleta

More information

SAN IPSE CAPITAL OF SILICON VALLEY ?/2W/(T. Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL. FROM: Kim Walesh Jim Ortbal

SAN IPSE CAPITAL OF SILICON VALLEY ?/2W/(T. Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL. FROM: Kim Walesh Jim Ortbal CITY OF 7 S3 SAN IPSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL STUDY SESSION: 3/30/2017 Memorandum FROM: Kim Walesh Jim Ortbal SUBJECT: DIRIDON STATION PLAN AND REGIONAL RAIL PROJECTS

More information

Public Meeting #5 Summary

Public Meeting #5 Summary Public Meeting #5 Summary Pulaski County, Arkansas February 4, 2016 TABLE OF CONTENTS 1.0 Introduction... 1 2.0 Public Meeting #5... 1 2.1 Public Meeting Advertising and Outreach... 2 2.2 Public Meeting

More information

Eastside Transit Corridor Phase 2 Draft EIS/EIR Public Hearings

Eastside Transit Corridor Phase 2 Draft EIS/EIR Public Hearings Eastside Transit Corridor Phase 2 Draft EIS/EIR Public Hearings Agenda Registration/Open House (30 minutes) Draft EIS/EIR Presentation (30 minutes) Public Comment (90 minutes) 1 Purpose of Today s Meeting

More information

Grant Line Road Corridor Study Open House Meeting #2 March 5, :30-7:30PM Mission City Church 5555 W. Grant Line Road, Tracy CA 95304

Grant Line Road Corridor Study Open House Meeting #2 March 5, :30-7:30PM Mission City Church 5555 W. Grant Line Road, Tracy CA 95304 Open House Meeting #2 March 5, 2015 5:30-7:30PM 5555 W. Grant Line Road, Tracy CA 95304 Project Introduction San Joaquin County has identified the need to improve Grant Line Road between Interstate 5 and

More information

Metro. Board Report. File #: , File Type:Informational Report

Metro. Board Report. File #: , File Type:Informational Report Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #:2015-1743, File Type:Informational Report Agenda Number:56. PLANNING

More information

Addendum. Final Environmental Impact Report for North Campus Project. California State University Los Angeles SCH# March 2018.

Addendum. Final Environmental Impact Report for North Campus Project. California State University Los Angeles SCH# March 2018. Addendum Final Environmental Impact Report for North Campus Project to SCH#2016111038 California State University Los Angeles March 2018 Lead Agency The Board of Trustees of the California State University

More information

Meeting Minutes. Project: Subject: Date: Wednesday, December 16, 2015 Location: Attendees:

Meeting Minutes. Project: Subject: Date: Wednesday, December 16, 2015 Location: Attendees: Meeting Minutes Project: Subject: DART D2 Stakeholder Work Group for D2 Date: Wednesday, December 16, 2015 Location: Attendees: DART, 1401 Pacific Avenue, Dallas, TX Steve Salin, DART Ernie Martinez, DART

More information

Crenshaw/LAX Transit Corridor Community Leadership Council (CLC) Business Sustainability (During Construction) POD Meeting

Crenshaw/LAX Transit Corridor Community Leadership Council (CLC) Business Sustainability (During Construction) POD Meeting MEETING NOTES Subject: Date: Location: Crenshaw/LAX Transit Corridor Community Leadership Council (CLC) Business Sustainability (During Construction) POD Meeting Tuesday, February 19, 2013; 10 a.m. - 12

More information

State Project No. XXXXXX City Project No. c401807

State Project No. XXXXXX City Project No. c401807 June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad

More information

APPENDIX B.3 SCOPING SUMMARY REPORT

APPENDIX B.3 SCOPING SUMMARY REPORT APPENDIX B.3 SCOPING SUMMARY REPORT Solid Waste Integrated Resources Plan Program Environmental Impact Report Scoping Meetings Summary Report August 26, 2010 1:30 p.m. and 6: 30 p.m. City of Los Angeles,

More information

3. Award and execute contract modifications for up to $1,200,000.

3. Award and execute contract modifications for up to $1,200,000. One Gateway Plaza Los Angeles, CA 90012-2952 213 922.2C metro.net REGULAR BOARD MEETING SEPTEMBER 23,2010 SUBJECT: ACTION: 1-605 "HOT SPOTS" FEASIBILITY STUDY AND PROJECT STUDY REPORTS (PSRs) APPROVE RECOMMENDATIONS

More information

Appendix B. Public Involvement

Appendix B. Public Involvement Appendix B. Public Involvement B-1 Overview The Pueblo Area Council of Governments (PACOG) 2040 Long Range Transportation Plan (LRTP) was prepared through a process that relied on the participation of

More information

Project Deliverable 4.1.3e Individual City Report - City of Pomona

Project Deliverable 4.1.3e Individual City Report - City of Pomona Pomona Valley ITS Project Project Deliverable 4.1.3e Individual City Report - City of Pomona Prepared by: May 29, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS INDIVIDUAL

More information

In developing the program, as directed by the Board (Attachment A), staff used the following framework:

In developing the program, as directed by the Board (Attachment A), staff used the following framework: _... ~ Los Angeles County ~ T~"'-"- Metro One Gateway Plaza Los Angeles, CA 90012-2952 213.922.200C metro. net 15 REVISED PLANNING AND PROGRAMMING COMMITTEE SEPTEMBER 18, 2013 SUBJECT: ACTION: OPEN STREETS

More information

Re: Comments on the Draft Guidelines for the Low-Carbon Transit Operations Program

Re: Comments on the Draft Guidelines for the Low-Carbon Transit Operations Program December 10, 2014 Bruce Roberts, Chief Division of Rail and Mass Transportation California Department of Transportation P.O. Box 942873 Sacramento, CA 94273-0001 Re: Comments on the Draft Guidelines for

More information

MOBILITY PARTNERSHIP AGENDA

MOBILITY PARTNERSHIP AGENDA 1. CALL TO ORDER/ROLL CALL MOBILITY PARTNERSHIP Wednesday, October 11, 2017 9:00 a.m. to 10:30 a.m. Gilroy City Council Chambers 7351 Rosanna Street, Gilroy, CA AGENDA 2. PUBLIC PRESENTATIONS: This portion

More information

CRENSHAW/LAX TRANSIT CORRIDOR PROJECT: A New Beginning for the Crenshaw Corridor Through Use of Innovative Procurement Strategies

CRENSHAW/LAX TRANSIT CORRIDOR PROJECT: A New Beginning for the Crenshaw Corridor Through Use of Innovative Procurement Strategies CRENSHAW/LAX TRANSIT CORRIDOR PROJECT: A New Beginning for the Crenshaw Corridor Through Use of Innovative Procurement Strategies Robert Ball, PE Kimberly Ong, PE Los Angeles Metropolitan Transportation

More information

May 17, To: From: Subject: Program continues to. Overview. Step Two. fixed-guideway. Program. for. Background

May 17, To: From: Subject: Program continues to. Overview. Step Two. fixed-guideway. Program. for. Background May 17, 2010 To: From: Subject: Transportation 2020 Committee Will Kempton, Chief Executive Officer Go Local Fixed-Guideway Program Update Overview The Go Local Fixed-Guidewaof the program, the City of

More information

Authorize the Chief Executive Officer to award and execute the following contracts for the Eastside Phase I1 Transit Corridor Project:

Authorize the Chief Executive Officer to award and execute the following contracts for the Eastside Phase I1 Transit Corridor Project: @ Metro lob Los Angeles County One Gateway Plaza 213.922 2000 Tt Metropolitan Transportation Authority Los Angeles, CA 90012-2952 rnetro.net PLANNING AND PROGRAMMING COMMIlTEE June 20,2007 SUBJECT: ACTION:

More information

2018 Regional Solicitation for Transportation Projects

2018 Regional Solicitation for Transportation Projects 2018 Regional Solicitation for Transportation Projects Regional Solicitation Workshop April 17 2018 Regional Solicitation Purpose To distribute federal Surface Transportation Block Grant Program (STBGP)

More information

APPENDIX 5. Funding Plan

APPENDIX 5. Funding Plan STUDY: FINAL REPORT APPENDIX 5 Funding Plan May 2015 V:\2073\active\2073009060\report\DRAFT Final Report\rpt_MalPCH_DRAFTFinalReport-20150515.docx Pacific Coast Highway Safety Study: Funding Plan City

More information

Met r 0 Met"'fKK'ibn Transportation Authority

Met r 0 Met'fKK'ibn Transportation Authority ~ Los Angeles County Met r 0 Met"'fKK'ibn Transportation Authority One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro.net CONSTRUCTION COMMITTEE MARCH 19, 2015 SUBJECT: ACTION: ROSECRANS/MARQUARDT

More information

New Medi-Cal Rules For People with Disabilities and Seniors In Los Angeles County

New Medi-Cal Rules For People with Disabilities and Seniors In Los Angeles County New Medi-Cal Rules For People with Disabilities and Seniors In Los Angeles County Most people with disabilities and seniors must enroll in a Medi-Cal Health Plan. You must enroll by the end of your birthday

More information

ATTACHMENT G-1 LOS ANGELES COUNTY REGIONAL ITS ARCHITECTURE CONSISTENCY SELF-CERTIFICATION FORM

ATTACHMENT G-1 LOS ANGELES COUNTY REGIONAL ITS ARCHITECTURE CONSISTENCY SELF-CERTIFICATION FORM ATTACHMENT G-1 LOS ANGELES COUNTY REGIONAL ITS ARCHITECTURE CONSISTENCY SELF-CERTIFICATION FORM This form should be completed and executed for all ITS Projects or Projects with ITS elements. The form should

More information

Draft Community Outreach Plan for the Climate Action Plan Update

Draft Community Outreach Plan for the Climate Action Plan Update Draft Community Outreach Plan for the Climate Action Plan Update PREPARED FOR 201 North Broadway Escondido, CA 92025 Project Contact Mike Strong, Assistant Planning Director (760) 839-4556 mstrong@escondido.org

More information

AGENDA ITEM H-3 PAGE 57 STAFF REPORT. City Council Meeting Date: 5/8/2018 Staff Report Number: CC

AGENDA ITEM H-3 PAGE 57 STAFF REPORT. City Council Meeting Date: 5/8/2018 Staff Report Number: CC AGENDA ITEM H-3 STAFF REPORT City Council Meeting Date: 5/8/2018 Staff Report Number: 18-104-CC Regular Business: Identify a preferred alternative for the Ravenswood Avenue Railroad Crossing study appropriate

More information

Appendix B Meeting Presentation. PowerPoint Presentation Informational Boards

Appendix B Meeting Presentation. PowerPoint Presentation Informational Boards Appendix B Meeting Presentation PowerPoint Presentation Informational Boards PowerPoint Presentation VTA s BART Silicon Valley Program VTA s BART Silicon Valley Phase II Extension Project Environmental

More information

Agenda. 6:00 p.m. - 6:45 p.m. - Registration & Open House. 6:45 p.m. - 6:55 p.m. - Welcome & Opening Remarks

Agenda. 6:00 p.m. - 6:45 p.m. - Registration & Open House. 6:45 p.m. - 6:55 p.m. - Welcome & Opening Remarks Agenda 6:00 p.m. - 6:45 p.m. - Registration & Open House 6:45 p.m. - 6:55 p.m. - Welcome & Opening Remarks 6:55 p.m. - 7:15 p.m. - Formal Presentation 7:15 p.m. - 7:30 p.m. - Questions/Answer Session &

More information

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary Loop 9 Southeast Corridor/Feasibility Study Appendix F Public Meeting Summaries F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary Loop 9 Southeast Corridor/Feasibility Study

More information

PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR

PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR 29 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 l metro. net PLANNING AND PROGRAMMING COMMITTEE MARCH 20, 2013 SUBJECT: ACTION: PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR RECEIVE

More information

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018.

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018. COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, FEBRUARY 14, 2018, 9:00 AM BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY, SAN DIEGO, CALIFORNIA Order of Business

More information

ATTACHMENT H Community Outreach Summary & Public Engagement Plan

ATTACHMENT H Community Outreach Summary & Public Engagement Plan ATTACHMENT H Community Outreach Summary & Public Engagement Plan I. II. III. APPENDIX A: OUTREACH MATERIALS I. Postcard Mailing Last Chance Grade - Summary of March 2016 Community Town Halls Page

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS Community Development Department Planning & Zoning Division REQUEST FOR PROPOSALS COMBINED ACTIVE TRANSPORTATION/ SAFE ROUTES TO SCHOOL PLAN State Project No. ATPL-5169 (048) RELEASE DATE: SEPTEMBER 23,

More information

Transit-Oriented Development and Land Use Subarea Plan for Central Lake Forest Park

Transit-Oriented Development and Land Use Subarea Plan for Central Lake Forest Park CITY OF LAKE FOREST PARK REQUEST FOR PROPOSALS Transit-Oriented Development and Land Use Subarea Plan for Central Lake Forest Park PROJECT DESCRIPTION The City of Lake Forest Park is seeking qualified

More information

RESOLUTION NO. -- The applicant, PPF OFF 100 West Walnut, LP ("Applicant"),

RESOLUTION NO. -- The applicant, PPF OFF 100 West Walnut, LP (Applicant), RESOLUTION NO. -- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PASADENA CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT, ADOPTING FINDINGS PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, AND

More information

Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for

Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for 2012-2015 Part II: TIP Development and Project Selection Processes MPO Planning Process The NIRPC Board of Commissioners

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Consultant Service to Conduct a Visioning Study and Prepare Recommendations for the Culver City Transit Oriented Development (TOD) District September 2016 RFP Released: September

More information

State Route 91 Corridor Improvement Project Update. State Route 91 Advisory Committee June 4, 2010

State Route 91 Corridor Improvement Project Update. State Route 91 Advisory Committee June 4, 2010 State Route 91 Corridor Improvement Project Update State Route 91 Advisory Committee June 4, 2010 Presentation Agenda Recent Project Milestones Project Development Schedule Environmental Permitting Design-Build

More information

Pecue Lane/I-10 Interchange Project Public Meeting Transcript

Pecue Lane/I-10 Interchange Project Public Meeting Transcript Pecue Lane/I-10 Interchange Project Public Meeting Transcript Thursday, November 4, 2010 Associated Builders & Contractors 19251 Highland Road 4:30pm 7:30pm 20 attendees Representatives from the Louisiana

More information

City of Scotts Valley INTEROFFICE MEMORANDUM. Taylor Bateman, Acting Community Development Director

City of Scotts Valley INTEROFFICE MEMORANDUM. Taylor Bateman, Acting Community Development Director Agenda Item No. Date: March 2, 2016 City of Scotts Valley INTEROFFICE MEMORANDUM DATE: March 2, 2016 TO: FROM: Mayor Lind and Members of the City Council Taylor Bateman, Acting Community Development Director

More information

ENVIRONMENTAL JUSTICE IN ACTION

ENVIRONMENTAL JUSTICE IN ACTION THE NORTHWEST LOUISIANA COUNCIL OF GOVERNMENTS AND PROVIDENCE PRESENT: ENVIRONMENTAL JUSTICE IN ACTION I-49 INNER CITY CONNECTOR (ICC) 2013 Louisiana Transportation Conference WHAT IS ENVIRONMENTAL JUSTICE?

More information

ENVIRONMENTAL IMPACT REPORT

ENVIRONMENTAL IMPACT REPORT City of Redlands General Plan Update and Climate Action Plan ENVIRONMENTAL IMPACT REPORT Final July 21, 2017 SCH: #2016081041 City of Redlands General Plan Update and Climate Action Plan ENVIRONMENTAL

More information

Community Advisory Panel Meeting #

Community Advisory Panel Meeting # Community Advisory Panel Meeting # 3 10.10.18.. Agenda Welcome and Introductions Community Conversations Review mailing in anticipation of next two community meetings Work Plan / Schedule Alternatives

More information

In-Step, In Line, On Time. Robert F. Tally Jr. FHWA Indiana Division Administrator Monday, November 16, 2009

In-Step, In Line, On Time. Robert F. Tally Jr. FHWA Indiana Division Administrator Monday, November 16, 2009 In-Step, In Line, On Time Robert F. Tally Jr. FHWA Indiana Division Administrator Monday, November 16, 2009 I-69 Corridor 1 I-69 Corridor I-69 is expected to create more than 27,000 new jobs by 2025, resulting

More information

I-15 Corridor System Master Plan San Diego, California to Utah/Idaho border

I-15 Corridor System Master Plan San Diego, California to Utah/Idaho border Breakout Group 3: Collaboration for Integrated Planning: Forming Effective Partnerships I-15 Corridor System Master Plan San Diego, California to Utah/Idaho border 1 The Beginning of the Partnership The

More information

To: From: Subject: Program continues to. Overview. the City of. Background. began the. As part of with both

To: From: Subject: Program continues to. Overview. the City of. Background. began the. As part of with both September 8, 2010 To: From: Subject: Transportation 2020 Committee Will Kempton, Chief Executive Officer Go Local Fixed-Guideway Program Update Overview The Go Local Fixed-Guideway Program continues to

More information

Local Taxes and Highway Tolls: The New Normal

Local Taxes and Highway Tolls: The New Normal Local Taxes and Highway Tolls: The New Normal Los Angeles County Metropolitan Transportation Authority Public-Private Partnership Program August 16, 2012 Transportation and Infrastructure Summit Michael

More information

ADJOURNMENT TO THE REGULAR MEETING, 5 P.M., MONDAY, January 23, 2016, in Room 101, Community Services Building, 150 N.

ADJOURNMENT TO THE REGULAR MEETING, 5 P.M., MONDAY, January 23, 2016, in Room 101, Community Services Building, 150 N. CITY OF BURBANK AGENDA FOR THE TRANSPORTATION COMMISSION MEETING Monday, December 12, 2016, 5:00 p.m. Community Services Building, Room 101, 150 North Third Street This agenda contains a summary of each

More information

Methodist Hospital. Community Health Needs Assessment Implementation Strategy 2017 to 2019

Methodist Hospital. Community Health Needs Assessment Implementation Strategy 2017 to 2019 Methodist Hospital Community Health Needs Assessment Implementation Strategy 2017 to 2019 Introduction Hospital Community Methodist Hospital serves the communities of Arcadia, Monrovia, Bradbury, Duarte,

More information

C I TY OF GLENDALE, CAL I FORN I A REPORT TO C ITY COUNC IL

C I TY OF GLENDALE, CAL I FORN I A REPORT TO C ITY COUNC IL C I TY OF GLENDALE, CAL I FORN I A REPORT TO C ITY COUNC IL October 20, 2009 AGENDA ITEM Report regarding proposed grant application to the Los Angeles Regional Park and Open Space District. (1) Resolution

More information

1 Introduction. 1.1 Specific Plan Background

1 Introduction. 1.1 Specific Plan Background Introduction 1 Introduction This document is an Environmental Impact Report (EIR) that evaluates the potential environmental effects associated with implementation of the Bay Fair Transit Oriented Development

More information

Exhibit B. Plumas County Non-Motorized Transportation Plan SCOPE OF WORK

Exhibit B. Plumas County Non-Motorized Transportation Plan SCOPE OF WORK Exhibit B Plumas County Non-Motorized Transportation Plan SCOPE OF WORK PROJECT INTRODUCTION: The proposed project is the development of a legally compliant Plumas County Non- Motorized Transportation

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE DOWNTOWN SPECIFIC PLAN COMMENT PERIOD

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE DOWNTOWN SPECIFIC PLAN COMMENT PERIOD DATE: February 15, 2017 TO: FROM: RE: Interested Persons Tom Buford, Senior Planner Community Development Department NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE

More information

APPEND PARTICIPATING AGENCY - INVITATION LETTER. Sample Letter - Federal Sample Letter - Non-Federal

APPEND PARTICIPATING AGENCY - INVITATION LETTER. Sample Letter - Federal Sample Letter - Non-Federal APPEND PARTICIPATING AGENCY - INVITATION LETTER Sample Letter - Federal Sample Letter - Non-Federal Metro Los Angeles County One Gateway Plaza zi~.g22.2000 Tel Metropolitan Transportation Authority Los

More information

Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC

Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC 16-006 A. INTRODUCTION California State Polytechnic University, Pomona ( Cal Poly Pomona ), is

More information

SAN JOSE CAPITAL OF SILICON VALLEY

SAN JOSE CAPITAL OF SILICON VALLEY CITY OF "3 SAN JOSE CAPITAL OF SILICON VALLEY COUNCIL AGENDA: 11/29/16 ITEM: Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL FROM: Barry Ng Jim Ortbal SUBJECT: 7652 - ST. JOHN STREET MULTI MODAL IMPROVEMENTS

More information

PUBLIC INPUT PROCESS GUIDELINES FOR SIX-YEAR TRANSPORTATION PLAN PROJECTS

PUBLIC INPUT PROCESS GUIDELINES FOR SIX-YEAR TRANSPORTATION PLAN PROJECTS PUBLIC INPUT PROCESS GUIDELINES FOR SIX-YEAR TRANSPORTATION PLAN PROJECTS Clallam County.1 PURPOSE The Clallam County Six-Year Transportation Improvement Plan (Six-Year TIP) serves as a multiyear financing

More information

Martin Pastucha, Director of Public Works David Martin, Director of Planning and Community Development

Martin Pastucha, Director of Public Works David Martin, Director of Planning and Community Development Information Item To: Mayor and City Council Date: November 13, 2013 From: Subject: Martin Pastucha, Director of Public Works David Martin, Director of Planning and Community Development 2013 Call For Projects

More information

CITY OF HAWAIIAN GARDENS COMMUNITY DEVELOPMENT DEPARTMENT

CITY OF HAWAIIAN GARDENS COMMUNITY DEVELOPMENT DEPARTMENT CITY OF HAWAIIAN GARDENS COMMUNITY DEVELOPMENT DEPARTMENT REQUEST FOR PROPOSALS FOR BUILDING INSPECTION AND PLAN CHECK FOR THE CITY OF HAWAIIAN GARDENS BUILDING DIVISION SUBMITTAL DEADLINE: On or before

More information

PLANNING AND PROGRAMMING COMMITTEE NOVEMBER 5, 2014 CHAVEZ AND SOTO JOINT DEVELOPMENT

PLANNING AND PROGRAMMING COMMITTEE NOVEMBER 5, 2014 CHAVEZ AND SOTO JOINT DEVELOPMENT One Gateway Plaza Los Angeles. CA 90012-2952 213-922.2000 Tel metro. net 15 PLANNING AND PROGRAMMING COMMITTEE NOVEMBER 5, 2014 SUBJECT: ACTION: CHAVEZ AND SOTO JOINT DEVELOPMENT AUTHORIZE EXECUTION OF

More information

County Executive Office/Legislative Affairs. County of Orange Report on Grant Applications/Awards

County Executive Office/Legislative Affairs. County of Orange Report on Grant Applications/Awards AttachmentA County Executive Office/Legislative Affairs DRAFT September 27, 2016 Item No. 41 Vol. XXXlX, No. 17 County of Orange Report on Grant Applications/Awards The Grants Report is a condensed list

More information

METHODOLOGY - Scope of Work

METHODOLOGY - Scope of Work The scope of work for the Truckee West River Site Redevelopment Feasibility Study will be undertaken through a series of sequential steps or tasks and will comprise four major tasks as follows. TASK 1:

More information

8. Coordination and Consultation

8. Coordination and Consultation 8. Coordination and Consultation A Public Involvement Strategy was developed for this project. The strategy was prepared following interviews with 10 key stakeholders to assess information needs and appropriate

More information

CITY OF DANA POINT AGENDA REPORT KYLE BUTTERWICK, DIRECTOR OF COMMUNITY DEVELOPMENT BRAD FOWLER, DIRECTOR OF PUBLIC WORKS DEPARTMENT

CITY OF DANA POINT AGENDA REPORT KYLE BUTTERWICK, DIRECTOR OF COMMUNITY DEVELOPMENT BRAD FOWLER, DIRECTOR OF PUBLIC WORKS DEPARTMENT 01/17/12 Page 1 Item #14 CITY OF DANA POINT AGENDA REPORT Reviewed By: DH _X CM _X CA X DATE: JANUARY 17, 2012 TO: FROM: THE HONORABLE CITY COUNCIL KYLE BUTTERWICK, DIRECTOR OF COMMUNITY DEVELOPMENT BRAD

More information

Memorandum. Date: RE: Plans and Programs Committee

Memorandum. Date: RE: Plans and Programs Committee Memorandum Date: 02.05.09 RE: Plans and Programs Committee February 10, 2009 To: From: Through: Subject: Summary Plans and Programs Committee: Commissioners Chu (Chair), Campos (Vice Chair), Chiu, Elsbernd,

More information

International Right of Way Association Chapter 1 Los Angeles County July 2002 Newsletter

International Right of Way Association Chapter 1 Los Angeles County July 2002 Newsletter Upcoming Events August, Dark September 24, 2002, SR/WA Special Luncheon and Membership Regular Luncheon Membership Luncheon July 23, 2002, 11:30am Guest speaker is Min Saysay from the Orange County Transportation

More information

ATTACHMENT A PDA PLANNING GRANT PROGRAM Information and Evaluation Criteria

ATTACHMENT A PDA PLANNING GRANT PROGRAM Information and Evaluation Criteria PDA PLANNING GRANT PROGRAM The Santa Clara Valley Transportation Authority (VTA) has created a planning grant program for Santa Clara County jurisdictions that will provide significant support for Priority

More information

Proposed Connector between Airline Highway (US 61) and Interstate 10 in St. John the Baptist Parish

Proposed Connector between Airline Highway (US 61) and Interstate 10 in St. John the Baptist Parish DRAFT COORDINATION PLAN Proposed Connector between Airline Highway (US 61) and Interstate 10 in St. John the Baptist Parish OCTOBER 2, 2009 State Project No. 70-48-0101 Federal Aid No. HP-TO21(517) RPC

More information

REQUEST FOR CONSULTANT SERVICES. Economic Development Consultant. Town of Cortlandt 1 Heady Road, Cortlandt Manor NY, 10567

REQUEST FOR CONSULTANT SERVICES. Economic Development Consultant. Town of Cortlandt 1 Heady Road, Cortlandt Manor NY, 10567 REQUEST FOR CONSULTANT SERVICES Economic Development Consultant Town of Cortlandt 1 Heady Road, Cortlandt Manor NY, 10567 Prepared By Town of Cortlandt Department of Technical Services Engineering Division

More information

Fire Protection Administration

Fire Protection Administration California State University, Los Angeles California State University, Los Angeles College of Engineering, Computer Science, and Technology 1999-2001 University Catalog Fire Protection Administration Bachelor

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 JAMES A. NOYES, Director www.ladpw.org ADDRESS ALL CORRESPONDENCE TO:

More information

MULTIMODAL TRANSPORTATION DISTRICT ALTERNATIVES ANALYSIS. Executive Summary

MULTIMODAL TRANSPORTATION DISTRICT ALTERNATIVES ANALYSIS. Executive Summary MULTIMODAL TRANSPORTATION DISTRICT ALTERNATIVES ANALYSIS Executive Summary February 2015 Executive Summary 1. Define the Problem This Alternatives Analysis report is submitted as a deliverable for the

More information

PHILLIP A. WASHINGTON CHIEF EXECUTIVE OFFICER

PHILLIP A. WASHINGTON CHIEF EXECUTIVE OFFICER Metro Los Angeles County One Gateway Plaza 213.922.2000 Tel Metropolitan Transportation Authority Los Angeles, CA 90012-2952 metro.net February 9, 2018 TO: THROUGH: BOARD OF DIRECTORS PHILLIP A. WASHINGTON

More information

Commonwealth Transportation Board Briefing

Commonwealth Transportation Board Briefing Hampton Roads Crossing Study (HRCS) (SEIS) Commonwealth Transportation Board Briefing September 20, 2016 Angel Deem VDOT, Environmental Division Director HRCS History 1991: Federal funding allocated for

More information

Travel Times. Newsletter of the Pasadena Department of Transportation

Travel Times. Newsletter of the Pasadena Department of Transportation Travel Times Newsletter of the Pasadena Department of Transportation Cit y of Pasaden a Inside this issue: Traffic 2 Parking 3 Transit 4 Administration 5 Updates 6 Calendar 6 Message from the Director

More information

Build America Transportation Investment Center. Office of the Secretary U.S. Department of Transportation

Build America Transportation Investment Center. Office of the Secretary U.S. Department of Transportation Build America Transportation Investment Center Office of the Secretary U.S. Department of Transportation Background On July 17, 2014 the President announced the Build America Investment Initiative: a government-wide

More information

Fixing America s Surface Transportation Act: FAST Act Implications for the Region

Fixing America s Surface Transportation Act: FAST Act Implications for the Region Fixing America s Surface Transportation Act: FAST Act Implications for the Region Connie Kozlak Metropolitan Transportation Services Mark Fuhrmann Metro Transit Ed Petrie Metro Transit Metropolitan Council

More information

Appendix H Invitation Letters

Appendix H Invitation Letters Appendix H Invitation Letters Mr. Title Agency Address City, CA 90zip Re: Invitation to Participate in the Environmental Review Process for the Regional Connector Transit Corridor Project Dear Mr. : The

More information

CHAPTER ONE PURPOSE AND NEED. 1.1 Context

CHAPTER ONE PURPOSE AND NEED. 1.1 Context CHAPTER ONE PURPOSE AND NEED This Final Environmental Impact Statement/Report (FEIS/R) incorporates the entire South Access to the Golden Gate Bridge - Doyle Drive Project Draft Environmental Impact Statement/Report

More information

SILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING MINUTES

SILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING MINUTES SILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING Wednesday, April 25, 2007 MINUTES 1. The Regular Meeting of the Silicon Valley Rapid

More information

Diridon Station Joint Policy Advisory Board MINUTES

Diridon Station Joint Policy Advisory Board MINUTES CALL TO ORDER Diridon Station Joint Policy Advisory Board Friday, December 17, 2010 MINUTES The Regular Meeting of the Diridon Station Joint Policy Advisory Board ( Committee ) was called to order at 3:06

More information

DEPARTMENT OF TRANSPORTATION. Notice of Intent to Prepare Environmental Impact Statement, I-495 & I-270 Managed

DEPARTMENT OF TRANSPORTATION. Notice of Intent to Prepare Environmental Impact Statement, I-495 & I-270 Managed This document is scheduled to be published in the Federal Register on 03/16/2018 and available online at https://federalregister.gov/d/2018-05354, and on FDsys.gov DEPARTMENT OF TRANSPORTATION [4910-22-P]

More information

Downtown Oakland Specific Plan Frequently Asked Questions

Downtown Oakland Specific Plan Frequently Asked Questions Downtown Oakland Specific Plan Frequently Asked Questions 1. What is the Downtown Oakland Specific Plan? A Specific Plan is a regulatory tool that local governments can use to implement the general plan

More information