1 Regional Logistics Development Project (RRP MON ) Project Administration Manual Project Number: Proposed Loan: MON: Regional Logistics Development Project November 2010 Mongolia: Regional Logistics Development Project
2 Table of Contents I. PROJECT DESCRIPTION... 1 II. IMPLEMENTATION PLANS... 2 A. Project Readiness Activities... 2 B. Overall Project Implementation Plan... 3 C. Implementation Schedule... 4 III. PROJECT MANAGEMENT ARRANGEMENTS... 5 A. Project Implementation Organizations Roles and Responsibilities... 5 B. Key Persons Involved in Implementation... 6 C. Project Organization Structure... 7 IV. COSTS AND FINANCING... 8 A. Detailed Cost Estimates by Expenditure Category... 8 B. Allocation and Withdrawal of Loan and Grant Proceeds C. Detailed Cost Estimates by Financier a D. Detailed Cost Estimates by Year a E. Contract Awards and Disbursement S-curves F. Funds Flow Diagram V. FINANCIAL MANAGEMENT A. Financial Management Assessment B. Disbursement C. Accounting and Auditing VI. PROCUREMENT AND CONSULTING SERVICES A. Advance Contracting and Retroactive Financing B. Procurement of Civil Works, Goods and Consulting Services C. Procurement Plan D. Consultant s Terms of Reference VII. SAFEGUARDS A. Environment B. Land Acquisition and Resettlement C. Execution of Goods Contracts for Terminal Equipment and Systems VIII. GENDER AND SOCIAL DIMENSIONS IX. PERFORMANCE MONITORING, EVALUATION, REPORTING AND COMMUNICATION A. Project Design and Monitoring Framework B. Monitoring C. Evaluation D. Reporting E. Disclosure of Documents X. ANTICORRUPTION POLICY XI. ACCOUNTABILITY MECHANISM XII. RECORD OF PAM CHANGES... 35
3 PROJECT ADMINISTRATION MANUAL (PURPOSE AND PROCESS) The Project administration manual (PAM) describes the essential administrative and management requirements to implement the project on time, within budget, and in accordance with Government and Asian Development Bank (ADB) policies and procedures. The Ministry of Road, Transportation, Construction and Urban Development (MRTCUD) is wholly responsible for the implementation of ADB financed Regional Logistics Development Project, as agreed jointly between the Beneficiary and ADB, and in accordance with Government and ADB s policies and procedures. ADB staff is responsible to support implementation including compliance by MRTCUD of its obligations and responsibilities for project implementation in accordance with ADB s policies and procedures. At Loan and Grant Negotiations, the Beneficiary and ADB agreed to the PAM and ensured consistency with the financing agreement. In the event of any discrepancy or contradiction between the PAM and the Financing Agreement, the provisions of the Financing Agreement shall prevail. After ADB Board approval of the project's report and recommendation of the President (RRP), changes in implementation arrangements are subject to agreement and approval pursuant to relevant Government and ADB administrative procedures (including the Project Administration Instructions) and upon such approval they will be subsequently incorporated in the PAM.
4 Abbreviations ADB CAREC DFR EA EIA FS GDP HA IA IEE IFI IRR KM Kph M MM MNET MOF MRA MRTCUD MT NGO NPV O/D ODA PIA PKM PRC RF RFP RP Sq. Km TA TKM TOR UBTZ USD ZULC Asian Development Bank Central Asian Regional Economic Cooperation draft final report executing agency environmental impact assessment feasibility study gross domestic product hectare implementing agency initial environmental examination international financing institution internal rate of return kilometer kilometers per hour meter Millimeter Ministry of Nature, Environment and Tourism Ministry of Finance Mongolian Railway Authority Ministry of Road, Transportation, Construction and Urban Development metric tons non-government organization net present value origin-destination official development assistance project impact area passenger-kilometer People s Republic of China Russian Federation request for proposal resettlement plan square kilometer technical assistance ton-kilometer terms of reference Ulaanbaatar Tumur Zam U.S. dollar Zamyn Uud Logistics Center
5 I. PROJECT DESCRIPTION 1. Mongolia is a historical land bridge between north and south (from the People s Republic of China [PRC] to the Russian Federation (RF) on the way to Europe). The transport sector, which mainly consists of road transport and railways, is a key driver of economic development in Mongolia. The road network, including state and local roads, totals approximately 49,250 kilometers (km) connecting 21 major cities and towns and 160 smaller villages (soums and bags). The 1,810 km Mongolian railway system carries over 90% of freight. The main-line connecting the PRC rail system in the south with the Russian Trans-Siberian line in the north, was completed in It is the lifeline of the economy and most of the economic development in the country during the last 55 years has taken place along this corridor. The strategic location of Mongolia as a transit country between the PRC and the RF has contributed to the demand for transport. In recent years, high economic growth has led to increased transport demand. Although the volume of transportation has risen, the transport sector is unable to meet all of the increasing demand. This constrains Mongolia s ability to achieve its full economic growth potential. 2. Mongolia is also a landlocked country and such countries face greater transportation challenges. Located between two large neighbors, Mongolia has no direct access to seaports and has to depend upon the RF and the PRC for access to seaports. In recent years, trade flows have been reoriented from the RF so that most of the imports (over 80%) are now coming from the PRC through th.e border point in Zamyn Uud in the southeast of the country. The bulk of Mongolia s exports also transit through Zamyn Uud on their way to Tianjin port, the only PRC port available to Mongolia for purposes of international trade. As a consequence, the traffic handled at Zamyn Uud witnessed high growth rates in recent years. However, Zamyn Uud is now badly congested, 1 and this is affecting imports, exports, and transit traffic. Though a number of reasons contribute to these delays (non availability of rolling stock, change of gauge, delays at customs), the main reason is the grossly inadequate logistics at Zamyn Uud in particular and in Mongolia in general. 3. Recognizing the need for development of intermodal transport and a strong logistics network in the country to enhance Mongolia s global competitiveness, the Government has requested ADB financing for design and construction of a logistics center in Zamyn Uud with integrated Customs and Quarantine facilities to remove current congestion at the border. The Zamyn Uud Logistics Center (ZULC) will include a computerized terminal management system for efficient, safe, and secure intermodal container operations. 4. ADB strategy for Mongolia identifies the underdeveloped transport network and inefficient cross border transport as major transport sector issues. Its regional cooperation strategy and program update for CAREC identifies multimodal transport as a strategically important priority and developing multimodal facilities at Zamyn Uud as a key intervention for possible ADB assistance. The recent ADB sector assistance program evaluation (SAPE) also identifies logistics as a key area for future support Impact: International and regional trade is promoted in Mongolia. 6. Outcome: An efficient, competitive, and reliable multimodal transport system at Zamyn Uud. 1 Discussions with different stakeholders revealed that import cargoes could take anywhere between 10 to 60 days for clearance at Zamyn Uud. 2 ADB Sector Assistance Program Evaluation of the Asian Development Bank Assistance for Roads and Railways in Mongolia. Manila.
6 2 7. Outputs: 1. A multimodal facility, complete with facilities for road to road, road to rail, and rail to rail transshipment is developed at Zamyn Uud. 2. Terminal equipment and management system are procured and installed to support efficient operations. 3. Institutional capacity of the Implementing Agency improved and project implementation management support provided. II. IMPLEMENTATION PLANS A. Project Readiness Activities 8. MRTCUD designated the Mongolian Railway Authority (MRA) as the Implementing Agency (IA). The IA will establish a Project Implementation Unit (PIU) on 10 November 2010, which will be supported by the staff of MRTCUD s Roads and Transport Policy Department; Finance, Investment and International Cooperation Department; and Internal Auditing, Monitoring and Evaluation Department on as-needed basis. 9. Draft safeguards document (Initial Environment Examination) has been completed. Approval of the Ministry of Nature, Environment and Tourism (MNET) has been obtained to commence construction of ZULC based on the Initial Environment Examination (IEE). Assistance proposed for project implementation will include recruitment of a procurement consultant to assist the IA in the preparation of bidding documents for all contract packages for goods and civil works as well as the request for proposal (RFP) for implementation consultants. Bid invitations are expected by early January Similarly the consultant selection process for project management, construction supervision, and MRA s institutional capacity improvement will commence from early January 2011 using advance contracting. Overall program readiness activities are shown in Table 1. Table 1: Project Readiness Activities Activities Aug or Prior Months Sep Oct Nov Dec 10 Feb. 11 May Who responsible Designation of Implementing Agency MRTCUD Loan Fact Finding Mission and MOU Signing ADB and Government Completion of the bidding documents for all contracts MRTCUD/MRA and TA Consultant Advance contracting actions: A. Project Management consultants Recruitment MRTCUD/MRA Commencement Completion
7 3 B. Civil Works and Goods bidding Invitation for bids for ICB Contract Award MRTCUD/MRA ADB Board approval ADB Loan signing ADB and Government Issuance of legal opinion Government Loan effectiveness Government ADB = Asian Development Bank, ICB = International Competitive Bidding, MOF = Ministry of Finance, MRTCUD = Ministry of Road, Transportation, Construction and Urban Development, PPTA = Project preparatory technical assistance. Source: MRTCUD and Asian Development Bank estimates. B. Overall Project Implementation Plan 10. Physical implementation will be completed by 31 December 2015 and loan account will close by 30 June Overall project implementation plan is shown in Figure The project duration is 5 years, and the overall implementation plan will be updated annually and submitted to ADB.
8 C. Implementation Schedule 4 Figure 1: Implementation Schedule Item 1 Project Procurement Schedule for Civil Works Packages Time (weeks) Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 1 st H 2 nd H 1 st H 2 nd H A. General Procurement Notice and Invitation for Bids 13 B. Receive and Evaluate Bids, ADB Approval 13 C. Award Bid, Sign Contract 5 D. Mobilization and Construction for Civil Works Procurement Schedule for Goods Packages 233 A. General Procurement Notice and Invitation for Bids 13 B. Receive and Evaluate Bids, ADB Approval 13 C. Award Bid, Sign Contract 5 D. Mobilization, Delivery, Installation of Goods A. B. Recruitment Schedule for Design, Implementation Supervision, and Capacity Improvement Consultant CSRN Announcement, Receipt of EOIs and Shorlisting Receipt and Evaluation of Technical Proposals 267 C. Public Opening of Financial Proposals and Computation of Final Evaluated Scores 3 D. Contract Negotiation and Award 4 E. Mobilization of Consultant and Delivery of Services Civil Works Defects Liability Period 52 6 Goods Warranty Period and Trial Operations Source: PPTA Consultant ADB - Asian Development Bank; CSRN - Consultant services recruitment notice; EOI - Expression of Interest; Qtr - Calendar quarter.
9 5 III. PROJECT MANAGEMENT ARRANGEMENTS A. Project Implementation Organizations Roles and Responsibilities Project Implementation Organizations Ministry of Road, Transportation, Construction and Urban Development (MRTCUD) -the Executing Agency Management Roles and Responsibilities timely provision of agreed counterpart funds for project activities; monitoring and evaluation of project activities and outputs, including periodic review, preparation of review reports reflecting issues and time-bound actions taken (or to be taken); involving beneficiaries and civil society representatives in all stages of project design and implementation; public disclosure of project outputs; quality assurance of works, and services of consultants and counterpart staff; establishing strong financial management system and submitting timely withdrawal applications to ADB, conducting timely financial audits as per agreed timeframe and taking recommended actions; complying with all loan covenants; preparing regular periodic progress reports, and project completion reports and their timely submission to ADB; and ensuring project s sustainability during post implementation stage and reporting to ADB on the assessed development impacts. the existing PSC for PPTA implementation will continue under the Project. The PSC will meet Project Steering Committee quarterly and be responsible for (i) approving the annual Project budget and activity plan, and (ii) reviewing and advising on implementation progress Ministry of Finance (MOF) signing the Financing Agreement for the Project; monitoring of the project implementation and providing respective coordination and facilitation; timely provision of agreed counterpart funds for project activities; allocating and releasing counterpart funds; endorsing to ADB the authorized staff with approved signatures for WAs processing; and processing and submitting to ADB any request, when required, for reallocating the loan proceeds. recruiting project management consultants (PMC); finalizing surveys, design, bidding documents, and Mongolian Railway Authority MRA (Implementing Agency and PIU) contract awards; overall construction supervision with the Project Management Consultants, quantity and quality validation of installation of civil works, equipment and procured machinery; involving beneficiaries and civil society representatives in all stages of project design and implementation; public disclosure of project outputs; quality assurance of works, and services of consultants and counterpart staff; complying with all loan covenants; preparing regular periodic progress reports,
10 6 monitoring and evaluation reports, and project completion report and their timely submission to ADB; and ensuring projects' sustainability during post implementation stage and reporting to ADB on the assessed development impacts. MRTCUD s Roads and Transport Policy primarily responsible for supporting MRA, PIU in the Department; Finance, Investment and International implementation of the project; Cooperation Department; and Internal Auditing, practical (on-the-job) training of MRA PIU staff on Monitoring and Evaluation Department (organization ADB documentation requirements, as needed. units supporting the Implementing Agency) Asian Development Bank (ADB) assist the MRTCUD and its project implementing agency in providing timely guidance at each stage of the project for smooth implementation in accordance with the agreed implementation arrangements; review all the documents that require ADB approval; conduct regular loan review missions, a mid-term review, and project completion mission ensure compliance with all loan covenants including safeguards; timely process withdrawal applications and release eligible funds; ensure the compliance with financial audit recommendations; regularly update the project performance review reports with the assistance of MRTCUD and MRA; regularly post on ADB web the updated project information documents for public disclosure, and also the safeguards documents as per disclosure provisions of the ADB safeguards policy statement B. Key Persons Involved in Implementation Executing Agency Ministry of Road, Transportation, Construction and Urban Development (MRTCUD - the executing agency) Asian Development Bank Division Director Mission Leader T. Purevdorj Vice Minister Telephone: Office Address: MRTCUD Building, Barilgachdiin Talbai 3 Chingeltei District 15170, Ulaanbaatar, Mongolia Tyrrell Duncan Director, Transport Division East Asia Department (EATC) Telephone No: address: tduncan@adb.org 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Manmohan Parkash Advisor, Knowledge Management and Capacity Development East Asia Department (EARD) Telephone: address: mparkash@adb.org 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines
11 7 C. Project Organization Structure 12. The Project Steering Committee for the PPTA 3 will be retained for Project implementation. It will be established based on the new Guidelines for the Implementation and Administration of Loans to be issued by the Ministry of Finance. The PSC will meet quarterly and be responsible for (i) approving the annual Project budget and activity plan, and (ii) reviewing and advising on implementation issues. 13. The MRTCUD will be the executing agency (EA) and its Mongolian Railway Authority (MRA), which has the mandate for all intermodal transport and logistics projects of MRTCUD, will be the implementing agency (IA). Day-to-day implementation of the Project will be performed by a Project Implementation Unit (PIU) to be established under MRA. An international firm will be engaged as project management consultants (PMC) with responsibility for detailed design and implementation supervision. Contract modalities will include civil works and procurement and installation of terminal equipment and systems, hence the PMC s role will be to manage contracts with IA and PIU and give hands-on training in project management and oversight, financial management, ADB disbursement procedures including use of imprest accounts, operation and maintenance, asset management, and reporting. Since this will be MRA s first IFI-funded project, the direct involvement of MRTCUD s related departments in project execution will result in effective capacity improvement for implementing externally-funded projects. Figure 2: Project Organization Chart MOF Steering Committee ADB MRTCUD (EA) MRA (IA) Design and Implementation Supervision Consultant PIU Contractor(s) ADB - Asian Development Bank MOF - Ministry of Finance MRTCUD - Ministry of Road, Transportation, Construction and Urban Development MRA - Mongolian Railway Authority PIU - Project Implementation Unit 3 ADB Technical Assistance to Mongolia for Preparing the Regional Logistics Development Project. Manila.
12 8 IV. COSTS AND FINANCING A. Detailed Cost Estimates by Expenditure Category 14. The project is estimated to cost $71.6 million, including taxes and duties, contingencies, and interest and other charges during implementation. Table 2 summarizes the total investment plan. The cost estimates are based on quantities derived from preliminary engineering designs and unit rates reflecting market prices for goods and materials. Table 2: Project Investment Plan ($ million) Item Amounts A. Base Cost a 1. Civil works, materials, and equipment b Project management, consulting services, and environmental mitigation 3.11 Subtotal (A) B. Contingencies c 8.95 C. Financing Charges During Implementation d 1.37 Total (A+B+C) a In July 2010 prices. b Including taxes and duties of $1.95 million. c Physical contingencies are estimated at 6% and price contingencies computed at 10% for local currency costs for and 3% for foreign exchange components for d Interest during implementation for the Asian Development Bank loan is based on Asian Development Fund rate of 1% during the grace period. Source: Asian Development Bank estimates. 15. The Government has requested financing of up to an equivalent of $40 million from ADB s Asian Development Fund (ADF) loan and $5 million from ADF grant for a total of $45 million from ADB s Special Funds resources to help finance the Project. 4 The ADF loan will have a term of 32 years, including a grace period of 8 years, with an interest charge of 1% per annum during the grace period and 1.5% per annum thereafter and such other terms and conditions set forth in the draft loan and grant agreements. The Beneficiary will be Mongolia. A summary of the financing plan is in Table 3. Table 3: Financing Plan ($ million) Source Total % Asian Development Bank (Loan) Asian Development Bank (Grant) Government Total Source: Asian Development Bank estimates. 4 Including transportation and insurance cost.
13 Detailed Cost Estimates by Expenditure Category a $'000 MNT Million Foreign Local Total Foreign Local Total % of Total Item Exchange Currency Cost Exchange Currency Cost Base Cost A. Base Costs 1. Track materials 5, , , , Trackwork 1, , , , , Pavement 8, , , , , , Lighting Safety and security 2, , , , Buildings 2, , , , , , Facilities Sitework, cleaning, and earthworks , , , , Site utilities (electric, water, field office communication lines) 1, , , , Access road and bridge 5, , , , , , Terminal equipment 16, , , , Subtotal (A) 44, , , , , , B. Project Management, Consulting Services, and Environmental Mitigation 1, , , , , , C. Licenses, Taxes, and Duties 0.0 3, , , , D. Contingencies 1. Physical b 2, , , , Price c 3, , , , , , Subtotal (D) 5, , , , , , E. Financing Charges during Implementation d Interest during implementation 1, , , , Subtotal (E) 1, , , , Total Project Cost (A+B+C+D+E) 52, , , , , , a Base costs are in July 2010 market prices and exclude taxes, duties, and license fees. b c d Physical contingency is estimated at 6% of subcomponents A.1 A.11. Price contingency for local currency costs based on 10% for For foreign exchange components based on 3% for Interest during implementation for the Asian Development Bank loan is based on Asian Development Fund rate of 1% during the grace period. Source: Asian Development Bank estimates. 9
14 10 B. Allocation and Withdrawal of Loan and Grant Proceeds 16. Table 4 shows allocation and withdrawal of funds under all the categories of Project scope. Project management and consulting services, environmental mitigation, and part of civil works will be financed out of the ADF Grant of $5.0 million. Table 4: Allocation and Withdrawal of Loan and Grant Proceeds ALLOCATION AND WITHDRAWAL OF LOAN PROCEEDS (Regional Logistics Development Project) CATEGORY Number Item Total Amount Allocated for ADB Financing (SDR) Category 1 Works 33,544,700 2 Equipment 6,110,000 ADB FINANCING Percentage and Basis for Withdrawal from the Loan Account 100 percent of total expenditure claimed a 100 percent of total expenditure claimed a 3 Unallocated 345,300 a Total 40,000,000 Excluding taxes and duties. ALLOCATION AND WITHDRAWAL OF GRANT PROCEEDS (Regional Logistics Development Project) CATEGORY Number Item Total Amount Allocated for ADB Financing Category a 1 Works 2 Project management, consulting services, and environmental mitigation Total Excluding taxes and duties. 1,887,600 3,112,400 5,000,000 ADB FINANCING Percentage and Basis for Withdrawal from the Grant Account 100 percent of total expenditure claimed a 100 percent of total expenditure claimed a
15 C. Detailed Cost Estimates by Financier a ($ 000) ADB Loan ADB Grant Government Total Item % of % of Cost % of Cost % of Total Description $ $ $ $ Cost Category Category Project Cost A. Base Costs 1. Track materials 6, , Trackwork 2, , Pavement 8, , , Lighting Safety and security 3, , Buildings 3, , Facilities Sitework, cleaning, and earthworks , Site utilities (electric, water, field office communication lines) 1, , Access road and bridges 7, , Terminal equipment 6, , , Subtotal (A) 39, , , , B. Project Management, Consulting Services, and Environmental Mitigation , , C. Licenses, Taxes, and Duties , , D. Contingencies 1. Physical b , , Price c , , Subtotal (D) , , E. Financing Charges during Implementation d 0.0 Interest during implementation 0.0 1, , Subtotal (E) , , Total Project Cost (A+B+C+D+E) 40, , , ,639.1 % Total Project Costs a Base costs are in July 2010 market prices and exclude taxes, duties, license fees. All cost categories are financed 100% in parallel by Asian Development Bank (ADB) loan, grant b c d and/or government. Physical contingency is estimated at 6% of subcomponents A.1 A.11. Price contingency for local currency costs based on 10% for For foreign exchange components based on 3% for Interest during implementation for the ADB loan is based on Asian Development Fund rate of 1% during the grace period. Source: Asian Development Bank estimates. 11
16 D. Detailed Cost Estimates by Year a ($ 000) Total Item Cost A. Base Costs Track materials 6, , , Trackwork 2, , Pavement 10, , , , , Lighting Safety and security 3, Buildings 3, , , Facilities Sitework, cleaning, and earthworks 2, , Site utilities (electric, water, field office communication lines) 1, Access road and bridge 7, , , , Terminal equipment 17, , , Subtotal (A) 54, , , , , B. Project Management, Consulting Services, and Environmental Mitigation 3, C. Licenses, Taxes, and Duties 3, , , D. Contingencies 1. Physical b 3, , Price c 5, , , Subtotal (D) 8, , , , E. Financing Charges during Implementation d Interest during implementation 1, Subtotal (E) 1, Total Project Cost (A+B+C+D+E) 71, , , , , a Base costs are in July 2010 market prices and exclude taxes, duties, license fees. All cost categories are financed 100% in parallel by Asian Development Bank (ADB) loan, grant and/or government. b c d Physical contingency is estimated at 6% of subcomponents A.1 A.11. Price contingency for local currency costs based on 10% for For foreign exchange components based on 3% for Interest during implementation for the ADB loan is based on Asian Development Fund rate of 1% during the grace period. Source: Asian Development Bank estimates. 12
17 13 E. Contract Awards and Disbursement S-curves Figure 3: ZULC Contract Awards and Disbursement S-Curves $ Million Time Elapse Project Cumulative Cumulative Disbursements ADB Cumulative Contract Awards F. Funds Flow Diagram 17. Figure 4 shows how the funds will flow from ADB and the Government to implement the Project. Funds coming from MOF to MRTCUD will relate to counterpart funds only. ADB will disburse to the imprest account or to the contractors directly. Imprest account will be set up at a commercial bank acceptable to ADB. Figure 4: Funds Flow Diagram Borrower (Ministry of Finance of Mongolia) Counterpart funds Payment to Imprest Account Payment to Imprest Account ADB Direct Payment Executing Agency (Ministry of Roads, Transport, Construction, and Urban Development) Counterpart Funds - Contractors - Consultants Flow of funds Lending Loan repayment
18 14 A. Financial Management Assessment V. FINANCIAL MANAGEMENT 18. Key findings of the financial management assessment undertaken for the MRTCUD during project preparation are as follows: Particulars A. Funds Flow Arrangements Table 5: Summary of the Financial Management Assessment Conclusions To date, various international financing projects have been implemented by MRTCUD, with most projects financed by ADB, the World Bank, European Bank for Reconstruction and Development (EBRD), and bilateral assistance organizations from Germany, Japan, and United States. MRTCUD has enough capability to smoothly work under the proposed project with the training for MRA s PIU staff designed through ADB TAs in procurement and preparation of terminal management contract bidding package and by the project implementation consultant during project implementation. B. Staffing MRTCUD s Finance, Investment and International Cooperation Department, which oversees funds flow, is staffed with experienced financial specialists who are experts in managing the internal finance. All employees are full time with formal job descriptions for each position. Experienced staff in this Department will provide the necessary support to the PIU. C. Accounting Policies and Procedures D. Internal and External Audits E. Reporting and Monitoring F. Information Systems Source: PPTA consultants. The chart of accounts based on the state standard format has been in use by the Financial Department for many years. Segregation of duties is specified in the comments on the questionnaire including budgeting system, payments, policies and procedures, cash and bank, safeguard over assets, other offices and implementing entities. A separate financial management manual is planned to be established for the Project to be used by the PIU in accordance with ADB requirements. An Internal Audit function is available through the Internal Auditing, Monitoring and Evaluation Department of MRTCUD. For the external Audit, the independent government auditor is the Mongolian National Audit Office. Annual audited report by this agency for 2008 has been received and reviewed by the PPTA consultant. Financial statements are currently prepared for MRTCUD on monthly, quarterly and annual basis. Existing reporting system can be linked with the financial information of physical project progress but with the help of financial management specialist of the consultants. Financial management system is computerized and it produces the necessary financial reports of the ongoing development works. The staff is adequately trained to maintain the system and the management organization and processing system safeguard the confidentiality, integrity, and availability of data. 19. Actions required to be taken by the MRTCUD are as follows: (i) MRA, PIU s financial staff must undergo training on ADB financial management procedures and ADB disbursement procedures to fully understand ADB s reporting requirements and strengthen their internal audit capacity.
19 15 (ii) A separate financial management manual for the Project should be established in accordance with the Government and ADB requirements before loan effectivity; and MRA should maintain separate accounts by funding source for the Project and have such accounts audited annually, in accordance with appropriate auditing standards consistently applied by independent auditors whose qualifications, experience, and terms of reference are acceptable to ADB. 20. Risk Analysis: During the implementation phase, the MRTCUD and MRA might face some risks that can generally be divided in two main categories: (i) country level; and (ii) organization/project level. Delay in the release of counterpart funds can be attributed as a country specific risk for the Project. Further, all the contracts with foreign suppliers/consultants financed out of loan and grant funds are subject to approval by the MRTCUD, MOF, and other cognizant agencies, which takes considerable time and eventually it could affect the project implementation. These, together with project-specific risks and the activities to mitigate them, are summarized as follows. Financial management risks shall need to be re-assessed and updated throughout the life of the investment program. Risk mitigation measures shall also be updated accordingly. Table 6: Risk Assessment and Mitigation Measures Risk Risk Assessment* Risk-Mitigation Measures Inherent Risk 1. Country-specific Risks M MOF and MRTCUD shall ensure the timely release of counterpart funds, as per loan covenants 2. Entity-specific Risks M MRA is new to ADB procurement guidelines and disbursement procedures. Involvement of MRTCUD staff and international procurement specialist at the initial stage of project implementation until all contract awards and consultant s recruitment, and on-the-job training on ADB procedures shall be carried out. ADB has committed to provide necessary support and training to staff of MRA. Overall Inherent Risk M Control Risk 1. Implementing Entity N The Steering Committee will provide overall guidance in project implementation. Organizational capacity of MRTCUD to oversee the implementation is satisfactory. 2. Funds Flow S Government has provided assurance on timely availability of counterpart funds starting For 2011 however, budgetary exercise has been completed and Government requested ADB assistance to finance startup activities, and the PIU. 3. Staffing M Implementation consultant shall assist the MRTCUD to design and implement the training program for PIU staff of MRA especially for ADB financial reporting requirements including disbursement procedures and their integration into overall national financial reporting requirements. 4. Accounting Policies and Procedures N Accounting Policy and Procedures Manual for PIU shall be drafted taking into account the national accounting standards and the requirements of ADB.
20 16 Risk Risk Assessment* Risk-Mitigation Measures 5. Internal Audit N MRTCUD s Internal Auditing, Monitoring and Evaluation Department will provide internal control services. The implementation consultants will also review and assess the adequacy of this arrangement. 6. External Audit M Annual audit of the project accounts shall be done in accordance with the International Standards of Auditing by an external auditor acceptable to ADB. Audited project accounts are required to be submitted to ADB within 6 months after the end of calendar year. 7. Reporting and Monitoring M MRTCUD, MRA through the PIU and implementation consultants shall regularly report in accordance with ADB requirements on adequacy of control mechanisms. 8. Information Systems S Appropriate computerized information systems shall be installed at MRA, PIU to strengthen the efficiency of existing information system and reporting. Overall Control Risk M * H High, S Substantial, M Moderate, N Negligible or Low. Source: PPTA consultants. B. Disbursement 21. The loan and grant proceeds will be disbursed in accordance with ADB s Loan Disbursement Handbook (2007, as amended from time to time) 5 and detailed arrangements agreed upon by the Government and ADB. 22. Pursuant to ADB's Safeguard Policy Statement (2009) (SPS), 6 ADB funds may not be applied to the activities described on the ADB Prohibited Investment Activities List set forth at Appendix 5 of the SPS. All financial institutions will ensure that their investments are in compliance with applicable national laws and regulations and will apply the prohibited investment activities list to subprojects financed by ADB. 23. Direct payment procedures will generally be used for all goods and civil works contracts, which are designed as large, and also for consulting services since there are very few expenditures envisaged other than civil works and goods contracts and consulting services, as shown in detailed cost estimates. MOF will establish two imprest accounts, 7 one for the loan and one for the grant at a commercial bank acceptable to ADB. The maximum amount to be deposited in the imprest account will not exceed the estimated expenditures to be financed from the imprest account or 10% of the respective loan and grant amount, whichever is lower. The request for initial advance to the imprest account should be accompanied by an Estimate of Expenditure Sheet setting out the estimated expenditures for the first six (6) months of project implementation, and submission of evidence satisfactory to ADB that the imprest account has been duly opened. For every liquidation and replenishment request of the imprest account, the Government will furnish to the ADB (a) Statement of Account (Bank Statement) where the imprest account is maintained, and (b) the Imprest Account Reconciliation Statement (IARS) reconciling the above mentioned bank statement against the EA s records. 24. ADB s statement-of-expenditure (SOE) procedure will be used for liquidation and 5 Available at: 6 Available at: 7 Bank charges for imprest accounts will be financed from ADB loan and grant.
21 17 replenishment of the imprest accounts, and for reimbursement of eligible expenditures not exceeding $100,000 per individual transaction. The payments in excess of the SOE ceiling will be reimbursed, liquidated, or replenished based on full supporting documentation. SOE records should be maintained and made readily available for review by ADB mission or upon ADB s request. Before the submission of the first withdrawal application, the Government should submit to ADB sufficient evidence of the authority of the person (s) who will sign the withdrawal applications on behalf of the borrower, together with the authenticated specimen signatures of each authorized person. The minimum value per withdrawal application is $100,000, unless otherwise approved by ADB. The MRTCUD will consolidate claims to meet this limit for reimbursement and imprest account claims. Withdrawal applications and supporting documents will demonstrate, among other things that the goods, and/or services were produced in or from ADB members, and are eligible for ADB financing. 25. MRTCUD will be responsible for (i) preparing disbursement projections, (ii) requesting budgetary allocations from MOF for counterpart funds (on behalf of MRA for the Project), (iii) collecting supporting documents, and (iv) preparing and sending withdrawal applications to ADB. 26. All disbursements under government financing will be carried out in accordance with regulations of Mongolia relevant to counterpart financing of the projects financed by the Multilateral Financing Organizations. The MRA shall open and maintain a separate account for government co-financing funds. C. Accounting and Auditing 27. The MRTCUD and MRA will (i) maintain separate accounts and records by funding source (loan and grant) following accounting principles prescribed by the Government of Mongolia Accounting Law. The Law requires financial statements to be prepared following internationally recognized accounting standards; (ii) have such accounts audited annually, in accordance with appropriate auditing standards consistently applied by independent auditors whose qualifications, experience, and terms of reference are acceptable to ADB; (iii) furnish to ADB as soon as available but in any event not later than 6 months after the end of each related fiscal year, certified copies of such audited project accounts and the report of the auditors relating thereto (including the auditors separate opinions on the use of the imprest accounts and statement of expenditures which will be submitted together with a signed Management Letter), and (iv) furnish to ADB such other information concerning such accounts and the audit thereof as ADB shall from time to time reasonably request. The independent auditors will be engaged and financed under the Project. 28. The MOF will cause the detailed consolidated project accounts to be audited annually in accordance with International Standards on Auditing by an auditor acceptable to ADB. The Government and MRTCUD have been made aware of ADB s policy on delayed submission, and the requirements for satisfactory and acceptable quality of the audited accounts. ADB reserves the right to verify the project's financial accounts to confirm that the share of ADB s financing is used in accordance with ADB s policies and procedures. VI. PROCUREMENT AND CONSULTING SERVICES A. Advance Contracting and Retroactive Financing 29. The Government of Mongolia requested for approval of advance procurement action. All
22 18 advance contracting will be undertaken in conformity with ADB s Procurement Guidelines (2010, as amended from time to time) 8 and ADB s Guidelines on the Use of Consultants (2010, as amended from time to time) 9. The issuance of invitations to bid under advance contracting will be subject to ADB approval. 30. Two contract packages are currently proposed under advance contracting Package 1 for civil works; and Package 2 for design and implementation supervision consulting services. Advance contracting will include (i) preparation of tender documents; (ii) evaluation of bids; and (iii) recruitment of consultants. 31. The Government was informed that retroactive financing should (i) specifically be discussed and agreed between ADB and the Beneficiary, (ii) that the amount to be retroactively financed does not exceed 20% of the loan and grant amount, and (iii) the expenditures must have been incurred before effectiveness but no earlier than 12 months before signing of the Financing Agreement. The Government of Mongolia has been advised that approval of advance contracting and retroactive financing does not commit ADB to finance the Project. B. Procurement of Civil Works, Goods and Consulting Services 32. All procurement of civil works and goods will be undertaken in accordance with ADB s Procurement Guidelines (2010, as amended from time to time). International Competitive Bidding (ICB) will be used for civil works and goods contracts estimated to cost more than $1 million and $500,000, respectively. National Competitive Bidding (NCB) will be used for civil works and goods contracts estimated to cost below ICB thresholds but more than $100,000. All ICB contracts are subject to prior review. Prior review and approval of ADB of the procurement documents (bidding and contract) is required. For NCB, prior review for first English language version of bidding documents which will be used as a model for subsequent procurement. 33. All consulting services will be recruited according to ADB's Guidelines on the Use of Consultants (2010, as amended from time to time). A total of 172 person months of consulting services (60 international, 112 national) grouped into one package will be funded under the Project, to support the EA in (i) Preparation of detailed design and implementation supervision; (ii) training of PIU staff; (iii) terminal operations management; (iv) environmental monitoring; (v) procurement management; and (vi) project implementation and institutional capacity improvement. Consultants will be engaged using QCBS, with the standard ratio of 80: An 18-month procurement plan indicating thresholds and review procedures, and civil works, goods and consulting service contract packages, is in Section C below. 8 Available at: 9 Available at:
23 19 C. Procurement Plan Table 7: Procurement Plan and Tentative Contract Packages Project Information Country Mongolia Name of Beneficiary Mongolia Project Name Regional Logistics Development Project Loan Reference TBD Date of Effectiveness TBD Project Cost Amount $71.6 million Of which ADB-Financed Amount $45 million Executing Agency Ministry of Road, Transportation, Construction and Urban Development (MRTCUD) Approval Date of Original Procurement Plan October 2010 Approval of Most Recent Procurement Plan TBD Publication for Local Advertisement TBD Period Covered by this Plan 4 October March 2012 TBD = to be determined. Procurement Thresholds for Civil Works, Goods and Related Services, Supply and Install Method Threshold International Competitive Bidding (Civil Works) > $1,000,000 International Competitive Bidding (Goods) > $500,000 National Competitive Bidding (Civil Works) > $100,000 National Competitive Bidding (Goods) > $100,000 Shopping for Works and Goods $100,000 or less List of Contract Packages in Excess of $100,000 Goods and Consulting Services Ref Contract Description Estimated Prior Procurement Date of Costs Review ($ million) a Methods Advertisement Y/N 1. Civil works and associated 35.4 goods (4 lots) ICB Jan 2011 Y 2. Terminal Equipment and 6.1 Systems (2 lots) ICB Jan 2013 Y 3. Services 3.1 (2 lots) QCBS b Jan 2011 Y ADB = Asian Development Bank, ICB = international competitive bidding, N = no, NCB = national competitive bidding, QCBS = quality- and cost-based selection, Y = yes. a Cost estimates do not include taxes and duties, and physical contingencies. b A 80:20 weighting will be applied. Sources: MRTCUD and ADB estimates.
24 National Competitive Bidding. The procedures to be followed for national competitive bidding shall be those set forth in the Public Procurement Law of Mongolia of 1 December 2005, effective 1 February 2006, as amended on 6 February 2007 and 16 July 2009 (hereinafter referred to as PPLM), with the clarifications and modifications described in the following paragraphs required for compliance with the provisions of ADB's Procurement Guidelines (April 2010, as amended from time to time). (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) The Standard Bidding Documents of Mongolia for Goods and Works that have been approved by ADB as acceptable for ADB-financed projects, together with ADB's clarifications and modifications thereto, shall be used. Government-owned enterprises in Mongolia shall be eligible for projects only if they can establish that they: (i) are legally and financially autonomous; (ii) operate under the principles of commercial law; and (iii) are not dependent agencies of the Executing Agency and/or the Implementing Agency. If a bid security is required, the bid security shall be in any of the following forms at the bidder's option: (i) a bank guarantee; or (ii) a cashier's or certified check. Bidders must be nationals of member countries of ADB, and offered Goods and Works must be produced in and supplied from member countries of ADB. Bidders or potential bidders shall not be required to register with the taxation and other registration authorities of the government as a condition or requirement of bidding or award, leaving these requirements for after award and before signing of contract. Foreign bidders from eligible countries of ADB shall be allowed to participate in bidding under the same conditions as local bidders and without any domestic preference. Prequalification shall not be required, except in the case of large or complex works, and with prior written concurrence of ADB. Qualification criteria shall be clearly specified in the bidding documents, and all criteria so specified shall be used to determine whether a bidder is qualified. The evaluation of a bidder's qualifications shall only take into account the bidder's capacity and resources to perform the contract, in particular its experience and past performance on similar contracts, capabilities with respect to personnel, equipment and construction or manufacturing facilities, and financial position. The evaluation of the bidder's qualifications shall be conducted separately from the technical and commercial evaluation of the bid. Evaluation and qualification criteria, and submission requirements, to be used in each bidding activity shall be clearly specified in the bidding documents. The evaluation of bids shall be done in strict adherence to the criteria specified in the bidding documents. The invitation to bid and the bidding documents shall be prepared in the Mongolian language. If another language will be used, then such other language shall be English. Bidders shall be requested to extend the validity of their bids only under exceptional circumstances and the Executing or Implementing Agency, as the case may be, shall communicate such request for extension to all bidders before the date of expiry of their bids. When the procurement is subject to ADB's prior review, the Executing or Implementing Agency, as the case may be, shall obtain in a timely manner the prior written concurrence of ADB for the extension of the bid validity period. All bids shall not be rejected or new bids invited without ADB's prior written concurrence. No bid shall be rejected merely on the basis of a comparison with
Lao Peoples Democratic Republic: Vientiane Sustainable Urban Transport Project
Vientiane Sustainable Urban Transport Project (RRP LAO 45041) Project Administration Manual Project Number: 45041-002 Loan and Grant Number(s): LXXXX; GXXXX February 2015 Lao Peoples Democratic Republic:
More informationGRANT AGREEMENT (Special Operations) (Hairatan to Mazar-e-Sharif Railway Project) between ISLAMIC REPUBLIC OF AFGHANISTAN. and ASIAN DEVELOPMENT BANK
GRANT NUMBER 0161-AFG(SF) GRANT AGREEMENT (Special Operations) (Hairatan to Mazar-e-Sharif Railway Project) between ISLAMIC REPUBLIC OF AFGHANISTAN and ASIAN DEVELOPMENT BANK DATED 30 SEPTEMBER 2009 GAS:
More informationRepublic of Marshall Islands: Ebeye Water Supply and Sanitation Project
Ebeye Water Supply and Sanitation Project (RRP RMI 46346-002) Project Administration Manual Project Number: 46346-002 Grant Numbers: GXXXX; GXXXX September 2015 Republic of Marshall Islands: Ebeye Water
More informationARTICLE I. Grant Regulations; Definitions
3 ARTICLE I Grant Regulations; Definitions Section 1.01. All provisions of the Special Operations Grant Regulations of ADB, dated 7 February 2005 (the Grant Regulations ), are hereby made applicable to
More informationPROCUREMENT PLAN. Procurement of Goods and Works
PROCUREMENT PLAN Basic Data Project Name: CAREC Corridor 1 (Bishkek-Torugart Road) Project 2 Country: Kyrgystan Executing Agency: Ministry of Transport & Communication Loan Amount: SDR18.492 million/$22
More informationWorld Bank Iraq Trust Fund Grant Agreement
Public Disclosure Authorized Conformed Copy GRANT NUMBER TF054052 Public Disclosure Authorized World Bank Iraq Trust Fund Grant Agreement Public Disclosure Authorized (Emergency Disabilities Project) between
More informationFRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.
FRAMEWORK FINANCING AGREEMENT (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 29 October 2005 FRAMEWORK FINANCING
More informationProject Administration Manual. Islamic Republic of Afghanistan: Road Asset Management Project
Project Administration Manual Project Number: 50062-001 Grant Numbers: {GXXXX; GXXXX} Draft as of October 2016 Islamic Republic of Afghanistan: Road Asset Management Project CONTENTS ABBREVIATIONS I. PROJECT
More informationProject Administration Manual. Project Number: November Vanuatu: Interisland Shipping Support Project
Project Administration Manual Project Number: 42392-01 November 2011 Vanuatu: Interisland Shipping Support Project Contents ABBREVIATIONS 4 I. PROJECT DESCRIPTION 1 A. Impact, Outcome and Outputs 2 II.
More informationGRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing)
GRANT NUMBER 0426-CAM (SCF) GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) (Cambodia Component) between KINGDOM
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. A project preparatory technical assistance (PPTA) is required to support the Ministry of New and Renewable Energy (MNRE) and Solar Energy Corporation
More informationProject Administration Manual
Road Rehabilitation Project Additional Financing (RRP KIR 44281-014) Project Administration Manual Project Number: 44281-014 Grant Number: November 2016 Republic of Kiribati: Road Rehabilitation Project
More informationProject Administration Instructions
Project Administration Instructions PAI 1.01 Page 1 of 5 INITIAL PROJECT ADMINISTRATION ACTIVITIES A. Introduction 1. The Project Administration Instructions (PAIs) outline ADB s policies and procedures
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 3 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing project. A PPTA is necessary to provide sound
More informationIslamic Republic of Afghanistan: Proposed Grant for Qaisar Dari Bum Road Project
Qaisar-Dari Bum Road Project (RRP AFG 37075-023) Project Administration Manual Project Number: 37075-023 Loan and/or Grant Number(s): GXXXX 24 October 2017 Islamic Republic of Afghanistan: Proposed Grant
More informationMongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project
Trust Fund Project Administration Manual Project Number: 49113 Grant Numbers: GXXXX October 2016 Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project (Financed by
More informationDOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement
GPOBA GRANT NUMBER TF092629 DOCUMENTS Global Partnership on Output-based Aid Grant Agreement (Extending Telecommunications in Rural Indonesia Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK
More informationUnited Nations Peace Building Fund Grant Agreement
Public Disclosure Authorized OFFICIAL DOCUMENTS Public Disclosure Authorized GRANT NUMBER TF018255 United Nations Peace Building Fund Grant Agreement (Additional Financing for the Productive Social Safety
More informationRepublic of Uzbekistan: Samarkand Solar Power Project
Samarkand Solar Power Project (RRP UZB 45120) Project Administration Manual Project Number: 45120 Loan Numbers: 3058/3059 Updated May 2016 Republic of Uzbekistan: Samarkand Solar Power Project 2 TABLE
More informationRepublic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project
PD 0002-TJK June 6, 2016 PROJECT DOCUMENT Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project This document has a restricted distribution and may be used by recipients only in performance
More informationFinancing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and
Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4293-TA Public Disclosure Authorized Financing Agreement (Zanzibar Basic Education Improvement Project) between Public Disclosure Authorized THE
More informationSri Lanka: Small and Medium-Sized Enterprises Line of Credit Project Additional Financing
Small and Medium-Sized Enterprises Line of Credit Project-Additional Financing (RRP SRI 49273-003) Project Administration Manual Project Number: 49273-003 Loan Number: 3370 Technical Assistance Number:
More informationFinancing Agreement CONFORMED COPY CREDIT NUMBER 4322-MOT. (Sustainable Tourism Development Project) between REPUBLIC OF MONTENEGRO.
Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4322-MOT Public Disclosure Authorized Financing Agreement Public Disclosure Authorized (Sustainable Tourism Development Project) between REPUBLIC
More informationGlobal Partnership on Output-based Aid Grant Agreement
Public Disclosure Authorized CONFORMED COPY GPOBA GRANT NUMBER TF096551-BD Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Rural Electrification and Renewable Energy
More informationGlobal Environment Facility Trust Fund Grant Agreement
CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF099857 Global Environment Facility Trust Fund Grant Agreement (Nyika Transfrontier Conservation Area Project) between REPUBLIC OF MALAWI and INTERNATIONAL BANK
More informationPapua New Guinea: Implementation of the Electricity Industry Policy
Technical Assistance Report Project Number: 46012 December 2012 Papua New Guinea: Implementation of the Electricity Industry Policy The views expressed herein are those of the consultant and do not necessarily
More informationTrust Fund Grant Agreement
Public Disclosure Authorized CONFORMED COPY GRANT NUMBER TF094521 GZ Public Disclosure Authorized Trust Fund Grant Agreement (Additional Financing for the Palestinian NGO-III Project) Public Disclosure
More informationProject Administration Memorandum. Republic of Uzbekistan: Surkhandarya Water Supply and Sanitation Project
Project Administration Memorandum Project Number: 40007 February 2009 Republic of Uzbekistan: Surkhandarya Water Supply and Sanitation Project This Project administration manual (PAM) is an active document,
More informationEU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project)
Public Disclosure Authorized DOC8UMEW GRANT NUMBER TF0A2379 Public Disclosure Authorized Public Disclosure Authorized EU Grant Agreement (Access to Sustainable Energy Project) between INTERNATIONAL BANK
More informationTF ID (PEACH Grant for Sub-National Public Financial Management Capacity Building Project)
Public Disclosure Authorized CONFORMED COPY Letter No. CD-490/UGM/XI/2010 November 15, 2010 Public Disclosure Authorized Prof. Ir. Sudjarwadi M.Eng, Phd Rector Universitas Gadjah Mada Bulaksumur Yogyakarta
More information1. Basic Data Project Name: Improved Sanitary and Phytosanitary (SPS) Handling in Greater Mekong Subregion (GMS) Trade Project
A. Procurement Plan 39 1. Basic Data Project Name: Improved Sanitary and Phytosanitary (SPS) Handling in Greater Mekong Subregion (GMS) Trade Project Country: Viet Nam Executing Agency: Ministry of Health
More informationFEDERAL REPUBLIC OF NIGERIA
Supplemental Letter No. 1 (Lagos Urban Transport Project) Section 9.02 of the General Conditions Financial and Economic Data In connection with the above Credit to the Republic of Nigeria for the Lagos
More informationPROCUREMENT PLAN N/A. Date of First Procurement Plan: 31 May 2017 Date of this Procurement Plan: 3 September 2018, Version 2
PROCUREMENT PLAN Basic Data Project Name: Northern Rural Infrastructure Development Sector Project - Additional Financing Project : 42203-025 Approval : 0534 Country: Lao People's Democratic Republic Executing
More informationTrust Fund Grant Agreement
Public Disclosure Authorized CONFORMED COPY GRANT NUMBER TF057872-GZ Public Disclosure Authorized Trust Fund Grant Agreement (Palestinian NGO-III Project) Public Disclosure Authorized between INTERNATIONAL
More informationSuffolk COUNTY COMMUNITY COLLEGE PROCUREMENT POLICY
Suffolk COUNTY COMMUNITY COLLEGE PROCUREMENT POLICY A. INTENT Community colleges must procure commodities and services in accordance with Article 5-A of the New York State General Municipal Law. This law
More informationPROCUREMENT PLAN. Procurement of Goods and Works Method Threshold Comments. Consulting Services
PROCUREMENT PLAN Basic Data Project Name: Java-Bali 500-Kilovolt Power Transmission Crossing Project : 42362-013 Approval : 3083/8276 Country: Indonesia Executing Agency: P.T. Perusahaan Listrik Negara
More information(Energy Development and Access Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and ARB APEX BANK LIMITED
Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4356-GH Public Disclosure Authorized Project Agreement (Energy Development and Access Project) between Public Disclosure Authorized INTERNATIONAL
More informationGlobal Environment Facility Trust Fund Grant Agreement
CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF091937 ALB Global Environment Facility Trust Fund Grant Agreement (Lake Skadar-Shkoder Integrated Ecosystem Management Project) between ALBANIA and INTERNATIONAL
More informationFinancing Agreement CREDIT NUMBER 4205-IND. (Early Childhood Education and Development Project) between REPUBLIC OF INDONESIA. and
Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4205-IND Public Disclosure Authorized Financing Agreement (Early Childhood Education and Development Project) Public Disclosure Authorized between
More informationAfghanistan Reconstruction Trust Fund Grant Agreement
Public Disclosure Authorized OFFICIAL DOCUMENTS ARTF GRANT NUMBER TFOAO730 Public Disclosure Authorized Public Disclosure Authorized Afghanistan Reconstruction Trust Fund Grant Agreement (Higher Education
More informationPROCUREMENT PLAN. Basic Data
PROCUREMENT PLAN Basic Data Project Name: Education for Knowledge Society Project Country: Sri Lanka Executing Agency: Ministry of Education (MOE) Loan (Grant) Amount: $70 million / $15 million Loan (Grant)
More informationGlobal Partnership on Output-based Aid. Grant Agreement. GPOBA GRANT NUMBER TF I1rD
GPOBA GRANT NUMBER TF091511-I1rD Global Partnership on Output-based Aid Grant Agreement (Expanding Piped Water Supply to Surabaya's Urban Poor Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK
More informationUlaanbaatar Urban Services and Ger Areas Development Investment Program
Ulaanbaatar Urban Services and Ger Areas Development Investment Program 2016, 2 nd Quarter EA Progress Report Project Number: 45007-003 Loan: 3099-MON Period covered: April - June 2016 Ulaanbaatar Urban
More informationGOVERNMENT OF MAURITIUS MANUFACTURING AND SERVICES DEVELOPMENT AND COMPETITIVENESS PROJECT (MSDC) LOAN NO MU PROCUREMENT PLAN FOR THE PERIOD
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF MAURITIUS MINISTRY OF BUSINESS, ENTERPRISES AND COOPERATIVES MANUFACTURING
More informationPROCUREMENT PLAN. Date of First Procurement Plan: 17 May 2012 Date of this Procurement Plan: 21 September 2012
PROCUREMENT PLAN APPENDIX 4 Basic Data Project Name: Ho Chi Minh City Urban Mass Rapid Transit Line 2 Investment Program tranche 2 Country: Viet Nam Executing Agency: HCMC Peoples Committee (HCMC PC).
More informationUse of External Consultants
Summary Introduction The Department of Transportation and Works (the Department) is responsible for the administration, supervision, control, regulation, management and direction of all matters relating
More informationProject Design Advance. Nauru: Port Development Project. Project Number: December 2015
Project Design Advance Project Number: 48480-002 December 2015 Nauru: Port Development Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.
More informationWHEREAS, the Transit Operator provides mass transportation services within the Madison Urbanized Area; and
COOPERATIVE AGREEMENT FOR CONTINUING TRANSPORTATION PLANNING FOR THE MADISON, WISCONSIN METROPOLITAN AREA between STATE OF WISCONSIN, DEPARTMENT OF TRANSPORTATION and the MADISON AREA TRANSPORTATION PLANNING
More informationOFFICIALf DOCUMENTS. Re: REPUBLIC OF DJIBOUTI JSDF Grant for Enhancing Income Opportunities Project Grant No. TFOAO350
Public Disclosure Authorized OFFICIALf DOCUMENTS The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL
More informationOFFICIAL DOCUMENTS. Global Agriculture and Food Security Program Trust Fund Grant Agreement
Public Disclosure Authorized OFFICIAL DOCUMENTS GAFSP GRANT NUMBER TF0A2869 Public Disclosure Authorized Public Disclosure Authorized Global Agriculture and Food Security Program Trust Fund Grant Agreement
More informationGlobal Financing Facility Grant Agreement
Public Disclosure Authorized OFFICIAL DOCUMENTS GFF GRANT NUMBER TF0A2561 Public Disclosure Authorized Global Financing Facility Grant Agreement (Transforming Health Systems for Universal Care Project)
More informationProject Administration Manual. Viet Nam: Central Mekong Delta Region Connectivity Project
Project Administration Manual Project Number: 40255 Loan and/or Grant Number(s): {LXXXX; GXXXX; TAXXXX} 11 June 2013 (NEGOTIATED) Viet Nam: Central Mekong Delta Region Connectivity Project CONTENTS ABBREVIATIONS
More informationMarch 9, Honourable Winston Dookeran Minister of Finance Eric Williams Finance Building Independence Square Port of Spain Trinidad and Tobago
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFM'CIAL (116 3Y) The World Bank e NW. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION
More informationPacific Urban Development Investment Planning and Capacity Development Facility
Technical Assistance Report Project Number: 51175-001 Transaction Technical Assistance Facility (F-TRTA) July 2017 Pacific Urban Development Investment Planning and Capacity Development Facility This document
More informationAFGHANISTAN Afghanistan Reconstruction Trust Fund (Ref: TF050576)
Public Disclosure Authorized CONFORMED COPY June 27, 2002 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Mr. Jukka Valtasaari Ambassador Embassy of Finland 3301
More informationTerms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following.
Note: Bank solar home systems projects receiving grant funds from the Global Environment Facility (GEF) are normally required to have their records and accounts audited by an independent entity each fiscal
More informationNetherlands Grant for the Water Resources and Irrigation Reform Implementation Program Grant Number TF
Public Disclosure Authorized August 30, 2001 His Excellency DR. Boediono Minister of Finance Ministry of Finance Jakarta, Indonesia Dear Mr. Minister: Public Disclosure Authorized Public Disclosure Authorized
More informationGrant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696
The World Bank INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION 1818 H Street N.W. Washington, D.C. 20433 U.S.A. (202) 473-1000 Cable Address: INTBAFRAD Cable
More informationGlobal Environment Facility Grant Agreement
Public Disclosure Authorized CONFORMED COPY GEF TF GRANT NUMBER TF097126 Public Disclosure Authorized Global Environment Facility Grant Agreement (Financing Energy Efficiency at MSMEs Project) Public Disclosure
More informationPROCUREMENT PLAN. Implementing Agency: N/A. Date of First Procurement Plan: 28 January 2008 Date of this Procurement Plan: 26 March 2014, Rev.
PROCUREMENT PLAN Basic Data Project Name: Information and Communications Technology (ICT) Development Project Project : 38347-022 Approval : 0106 Country: Nepal Executing Agency: Office of the Prime Minister&Council
More informationCARIBBEAN DEVELOPMENT BANK GUIDELINES FOR THE SELECTION AND ENGAGEMENT OF CONSULTANTS BY RECIPIENTS OF CDB FINANCING
CARIBBEAN DEVELOPMENT BANK GUIDELINES FOR THE SELECTION AND ENGAGEMENT OF CONSULTANTS BY RECIPIENTS OF CDB FINANCING October 2011 These guidelines apply to CDB-financed projects approved after October
More informationPROCUREMENT PLAN. Consulting Services
PROCUREMENT PLAN Basic Data Project Name: Greater Mekong Subregion Northern Power Transmission Project Project : 3868-0 Approval : 0195 Country: Lao People's Democratic Republic Project Financing Amount:
More informationPROCUREMENT PLAN. Procurement of Goods and Works Method Threshold Comments International Competitive Bidding (ICB) for Works $25,000,00
PROCUREMENT PLAN Basic Data Project Name: Metropolitan Sanitation Management Investment Project Project Number: 43251-025 Approval Number: 3123/8280 Country: INDONESIA Executing Agency: Directorate General
More information04f'33- OFFICIAL DOCUMENTS
Public Disclosure Authorized OFFICIAL DOCUMENTS 04f'33- The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD
More informationTERMS OF REFERENCE FOR CONSULTANTS
TERMS OF REFERENCE FOR CONSULTANTS A. Consulting Firm The Asian Development Bank (ADB) will engage a consulting firm in accordance with its Guidelines on the Use of Consultants (2013, as amended from time
More informationGlobal Partnership on Output-based Aid Grant Agreement
Global Partnership on Output-based Aid GRANT NUMBERS TF057614 AND TF057615 Global Partnership on Output-based Aid Grant Agreement (Kenya - Microfinance for Community-Managed Water Projects) between K-REP
More informationGlobal Partnership on Output-based Aid Grant Agreement
Public Disclosure Authorized GPOBA GRANT NUMBER TF010757 Public Disclosure Authorized Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Philippines Public Health Project)
More informationFinancing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA.
Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4201-ET Public Disclosure Authorized Financing Agreement (Rural Capacity Building Project) Public Disclosure Authorized between FEDERAL DEMOCRATIC
More informationCOPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012
COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012 CONCERNING SUPPORT FOR FEASIBILITY IN PARTIAL CONSTRUCTION EXPENSES IN COOPERATION PROJECTS BETWEEN THE GOVERNMENT
More informationMongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project
Semi-Annual Progress Report June 2016 Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project Prepared by the project management unit and project implementation
More informationOFFICIAL DOCUMENTS.I
Public Disclosure Authorized OFFICIAL DOCUMENTS.I Public Disclosure Authorized PPIN MULTI-DONOR TRUST FUND GRANT NUMBER TF018108 Pakistan Partnership for Improved Nutrition Multi-Donor Trust Fund Grant
More informationFinancing Agreement CONFORMED COPY GRANT NUMBER H603-AF. (Third Emergency National Solidarity Project) between ISLAMIC REPUBLIC OF AFGHANISTAN.
Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H603-AF Public Disclosure Authorized Financing Agreement (Third Emergency National Solidarity Project) between Public Disclosure Authorized ISLAMIC
More informationMulti-Donor Trust Fund for Aceh and North Sumatra Grant Agreement
Public Disclosure Authorized CONFORMED COPY GRANT NUMBER TF057657 Public Disclosure Authorized Public Disclosure Authorized Multi-Donor Trust Fund for Aceh and North Sumatra Grant Agreement (Infrastructure
More informationRegulation on the implementation of the European Economic Area (EEA) Financial Mechanism
the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed
More informationGLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES
GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES As Adopted by the GIF Governing Council on 20 April, 2015 And Revised on 16 June, 2016 A. INTRODUCTION 1. The Global Infrastructure Facility ( GIF )
More informationPROCUREMENT PLAN. Basic Data Project Name: Transport Connections in the Northern Mountainous Provinces Project
PROCUREMET PLA Basic Data Project ame: Transport Connections in the orthern Mountainous Provinces Project Country: Socialist Republic of Viet am Executing Agency: 6 Provinces Loan Amount: $80,000,000 Loan
More informationFinancing Agreement CONFORMED COPY CREDIT NUMBER 4247-BO. (Urban Infrastructure Project) between REPUBLIC OF BOLIVIA. and
Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4247-BO Public Disclosure Authorized Financing Agreement (Urban Infrastructure Project) between Public Disclosure Authorized REPUBLIC OF BOLIVIA
More informationbetween ARAB REPUBLIC OF EGYPT and
Public Disclosure Authorized GRANT NUMBER TF0A1553 Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA TRANSITION FUND Grant Agreement Public Disclosure Authorized Public Disclosure Authorized EQUAL
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
12 Appendix 5 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is needed for preparing the investment program and conducting technical, economic,
More informationRegional Greenhouse Gas Initiative, Inc. Request for Proposals #18-01 RGGI Auction Services Contractor. June 18, 2018
Regional Greenhouse Gas Initiative, Inc. Request for Proposals #18-01 RGGI Auction Services Contractor June 18, 2018 PROPOSAL DUE DATE: July 23, 2018, 5:00 p.m. Eastern Daylight Time The Regional Greenhouse
More informationRural Community Finance Project. Negotiated financing agreement
Document: EB 2015/LOT/P.37/Sup.1 Date: 17 December 2015 Distribution: Public Original: English E Republic of Liberia Rural Community Finance Project Negotiated financing agreement For: Information Negotiated
More informationOFFICIAL DOCUMENTS I
Public Disclosure Authorized OFFICIAL DOCUMENTS I GPEF GRANT NUMBER TF016558 Public Disclosure Authorized Global Partnership for Education Grant Agreement (Second Education Sector Support Project) Public
More informationIndia: Madhya Pradesh State Roads Sector Project II
Completion Report Project Number: 37328-013 Loan Number: 2330 September 2015 India: Madhya Pradesh State Roads Sector Project II This document is being disclosed to the public in accordance with ADB s
More informationProcurement Plan. I. General. 1. Project Information Country: Malawi Project Name: Lilongwe Water and Sanitation Project Project ID: P163794
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Project Information Country: Malawi Project Name: Lilongwe
More information(Ist Phase 18 months )
World Bank Assisted National Agricultural Higher Education Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Education Division Indian Council of Agricultural
More informationREDEVELOPMENT AUTHORITY OF ALLEGHENY COUNTY GAMING ECONOMIC DEVELOPMENT FUND PROGRAM GUIDELINES 2017
REDEVELOPMENT AUTHORITY OF ALLEGHENY COUNTY GAMING ECONOMIC DEVELOPMENT FUND PROGRAM GUIDELINES 2017 Rich Fitzgerald County Executive William Brooks Chairman, RAAC TABLE OF CONTENTS I. Purpose ---------------------------------------------------------------------------------------
More informationTHE WORLD BANK BANKGROUP. DOCUMENTS 15 ap
Public Disclosure Authorized THE WORLD BANK BANKGROUP DOCUMENTS 15 ap Public Disclosure Authorized Hon. Patrick Anthony Chinamasa Minister of Finance and Economic Development Ministry of Finance and Economic
More informationOFFICIAL r0 4 DOCUMENTS
Public Disclosure Authorized OFFICIAL r0 4 DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD
More information49469-IND: Mumbai Metro Rail Investment Project. 12 June 2018, 15:00 hours Indian Standard Time (IST)
Invitation for Bids Date: 18 April 2018 Loan No. and Title: Contract No. and Title: Deadline for Submission of Bids: 49469-IND: Mumbai Metro Rail Investment Project MRS1: Design, Manufacture, Supply, Testing,
More informationRequest for Proposal Hydraulic Rescue Tools. Date Issued: September 28 th, 2016
Date Issued: September 28 th, 2016 Due Date: 12:00:00 p.m. (noon local time), October 13 th, 2016 Part 1 Introduction The Town of Okotoks is inviting the submission of proposals for the provision of Hydraulic
More informationREQUEST FOR PROPOSALS SERVICES FOR. [Federal Media Network Training] Prepared by. IOM Somalia. [Somalia Stabilization Initiative - SSI]
REQUEST FOR PROPOSALS SERVICES FOR [Federal Media Network Training] Prepared by IOM Somalia [Somalia Stabilization Initiative - SSI] [25 January 2018] REQUEST FOR PROPOSALS RFP No.: [MOG020] IOM Somalia
More informationBOARD OF FINANCE REQUEST FOR PROPOSALS FOR PROFESSIONAL AUDITING SERVICES
TOWN OF KILLINGWORTH BOARD OF FINANCE REQUEST FOR PROPOSALS FOR PROFESSIONAL AUDITING SERVICES DATE: February 14, 2018 1 I. INTRODUCTION A. General Information The Town of Killingworth is requesting proposals
More informationNorwegian Trust Fund Grant Agreement
Public Disclosure Authorized CONFORMED COPY GRANT NUMBER TF097013 Public Disclosure Authorized Norwegian Trust Fund Grant Agreement (Co-financing of the Regional Transmission Development Project) Between
More informationKENYA ROADS BOARD FOR FINANCIAL YEARS 2018/19 TO 2020/21. TENDER No. KRB/922/2018/2019 JULY 2018
KENYA ROADS BOARD RE-ADVERTISEMENT FOR EXPRESSION OF INTEREST (EOI) FOR PROVISION OF TECHNICAL, FINANCIAL AND PERFORMANCE AUDIT CONSULTANCY SERVICES FOR KENYA ROADS BOARD FOR FINANCIAL YEARS 2018/19 TO
More informationOFFICIAL DOCUMENTS, Democratic Republic of Congo: IDF Grant for the Private Sector Development and Competitiveness Project IDF Grant No.
Public Disclosure Authorized OFFICIAL DOCUMENTS, Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK
More informationAPPENDIX A. I. Background & General Guidance. A. Public-private partnerships create opportunities for both the public and private sectors
APPENDIX A POLICY AND RULES CONCERNING THE RECEIPT OF AND AWARD OF CONTRACTS PURSUANT TO UNSOLICITED PROPOSALS FOR PUBLIC-PRIVATE PARTNERSHIP INFRASTRUCTURE PROJECTS I. Background & General Guidance A.
More informationRajasthan Urban Sector Development Program
India: Rajasthan Urban Sector Development Program Project Name Rajasthan Urban Sector Development Program Project Number 42267-026 Country Project Status Project Type / Modality of Assistance Source of
More informationPART V BASIC PRINCIPLES FOR SELECTION OF CONSULTANTS
PART V BASIC PRINCIPLES FOR SELECTION OF CONSULTANTS Invitatio n of s 42.-(1) The procuring entity shall invite proposals from five to ten qualified and experienced consultants, and through a suitable
More informationGRANT AGREEMENT (Special Operations) (Strengthening Public Management Program) between NEPAL. and ASIAN DEVELOPMENT BANK DATED 27 DECEMBER 2012
GRANT NUMBER 0305-NEP(SF) GRANT AGREEMENT (Special Operations) (Strengthening Public Management Program) between NEPAL and ASIAN DEVELOPMENT BANK DATED 27 DECEMBER 2012 NEP 36172 GRANT AGREEMENT (Special
More informationArmenia: Sustainable Urban Development Investment Program
Sustainable Urban Development Investment Program (RRP ARM 42417) Facility Administration Manual Project Number: 42417 Loan Number: LXXXX March 2011 Armenia: Sustainable Urban Development Investment Program
More information