1 ASIAN DEVELOPMENT BANK JFPR:PHI PROPOSED GRANT ASSISTANCE (Financed by the Japan Fund for Poverty Reduction) TO THE REPUBLIC OF THE PHILIPPINES FOR THE RENEWABLE ENERGY AND LIVELIHOOD DEVELOPMENT PROJECT FOR THE POOR IN NEGROS OCCIDENTAL December 2003
2
3 CURRENCY EQUIVALENTS (as of 24 November 2003) Currency Unit - peso (P) P1.00 = $0.018 $1.00 = P55.68 ABBREVIATIONS ADB Asian Development Bank AMORE Alliance for Mindanao Off-Grid Renewable Energy BAPA barangay power association CBO community-based organization DA Department of Agriculture DENR Department of Environment and Natural Resources DOE Department of Energy EPIRA Energy Power Industry Reform Act JBIC Japan Bank for International Cooperation JFPR Japan Fund for Poverty Reduction JICA Japan International Cooperation Agency kw kilowatt kwh kilowatt-hour LGU local government unit MW megawatt NEDA National Economic Development Authority NGO nongovernment organization NPC National Power Corporation PAC project advisory committee PIM project implementation manual PIU project implementation unit PNOC Philippine National Oil Company PNOC-EDC Philippine National Oil Company Energy Development Corporation PSC project steering committee PSRP Power Sector Restructuring Program PV photovoltaic USAID United States Agency for International Development VPA village power association NOTES (i) (ii) The fiscal year of the Government ends on 31 December. In this report, $ refers to US dollars.
4 I. Basic Data Name of Proposed Activity Country Grant Amount Requested JAPAN FUND FOR POVERTY REDUCTION (JFPR) JFPR Grant Proposal Renewable Energy and Livelihood Development for the Poor in Negros Occidental Philippines $1.5 million Regional Project Yes / (X) No Grant Type (X) Project / Capacity building II. Grant Development Objective(s) and Expected Key Performance Indicators Grant Development Objectives (GDO): The overall goal of the JFPR Project is to achieve poverty reduction through the provision and efficient use of renewable energy supply to promote sustainable livelihood systems for poor local communities in off-grid areas of the Philippines within the framework of public-private-civil society partnership. Expected Key Performance Indicators: The following five key performance indicators will be monitored under the JFPR Project: 1 setup and operation of eight renewable energy systems in off-grid areas, and extension of renewable energy use by a total of about 200 kilowatts (kw); percentage of the community serviced with electricity from renewable energy systems; setup and operation of two sustainable revolving fund mechanisms for electricity connection to household of the poor and for livelihood development; number and percentage of poor households below the regional poverty threshold (average per capita income of $0.27 per day) connected to renewable energy systems; and number and value of renewable energy-based livelihood activities developed. III. Grant Categories of Expenditure, Amounts, and Percentage of Expenditures Category Amount of Grant Allocated ($) Percentage of Expenditures (%) 1. Civil Works 160, Goods 240, Training, Workshops, and Seminars 223, Consulting Services 139, Project Management 247, Other Project Inputs (including revolving funds) 350, Contingencies 139, TOTAL 1,500, Incremental Cost (ADB) 75, Quantitative targets for monitoring the performance indicators will be set under the project implementation manual, which is to be prepared after project approval.
5 2 JAPAN FUND FOR POVERTY REDUCTION JFPR Grant Proposal Background Information A. Other Data Date of Submission of Application Project Officer (Name, Position) Project Officer s Division, , Phone) Other Staff Who Will Need Access to Edit/Review the Report (Enter the names of all staff, e.g., team members, who will need access to this application.) Sector Theme Name of Associated ADB- Financed Operation(s) Executing Agency Grant Implementing Agency(ies) (Names, Exact Address, Contact Persons, , Phone, Fax) 6 October 2003 Ms. Xinning Jia Project Economist Southeast Asia Infrastructure Division (SEID) jiaxinning@adb.org Mr. Y. Zhai, SEID Mr. T. Hayakawa, SEID Infrastructure Economic Growth/ Poverty Reduction ADB Loan 1662-PHI: Power Sector Restructuring Program Department of Energy Winrock Unit 1501, Jollibee Plaza, Emerald Avenue, Ortigas Center, Pasig City 1600, Philippines Ms. Katrina V. Ignacio nignacio@winrock.org / (fax) B. Details of the Proposed Grant 1. Description of the Components, Monitorable Deliverables/Outcomes, and Implementation Timetable Component A Component Name Renewable Energy Development and Efficient Use of Energy Cost ($) 643,890 Component Description This component includes, among others, (i) holding dialogues with stakeholders; (ii) forming and accrediting the community-based organizations (CBOs) among the beneficiary groups; (iii) developing information, education, and communication materials to promote the community s understanding of the project component, stimulate the sense of ownership, and encourage participation; (iv) preparing detailed technical design of the eight selected renewable energy systems such as micro hydropower, solar, biomass, and wind systems; (v) installing eight off-grid renewable energy systems; (vi) strengthening the existing barangay power associations (BAPAs) or village power associations (VPAs), and setting up BAPAs/VPAs where no such associations exist, to operate and maintain the renewable energy systems; (vii) developing information, education, and training programs for BAPAs/VPAs on installation, operation,
6 3 Monitorable Deliverables/Outputs Implementation of Major Activities: Number of months for grant activities Component B Component Name maintenance, and management; (viii) developing a funds collection mechanism for operating, maintaining, and expanding the renewable energy systems; (ix) installing energy-efficient lighting, devices, tools, and equipment; and (x) connecting households to renewable energy-based electricity. A revolving fund will be established and maintained by the implementing agency, in close collaboration with existing or newly created BAPAs/VPAs, to meet basic household electricity requirements. Eight renewable energy systems set up in off-grid areas and extension of renewable energy use by a total of about 200 kw Number of households connected to renewable energy systems Number and percentage of poor households below regional poverty threshold (average per capita income of $0.27 per day) connected to renewable energy-based electricity Percentage of the community serviced with electricity from the renewable energy systems One revolving fund set up for connection of poor households to electricity 48 months Energy-Based Livelihood Development Cost ($) 418,650 Component Description Monitorable Deliverables/Outputs Implementation of Major Activities: Number of months for grant activities To ensure productive use and sustainable operation of the installed renewable energy sources, financial and technical support will be provided for developing renewable energy-based livelihood opportunities. Support includes, among others, (i) holding dialogues with stakeholders; (ii) forming and accrediting CBOs among the beneficiary groups; (iii) developing information, education, and communication materials to promote the community s understanding of the project component, stimulate the sense of ownership, and encourage participation; (iv) setting up a sustainable livelihood development revolving fund for renewable energy-based livelihood initiatives (for instance, installation of community-owned rice mills to increase rice production value or mini ice plants for cold storage of fish products, as well as small power tools and sewing machines for individual livelihood); (v) providing skills development and on-site training to optimize the use of electricity for income generation; and (vi) identifying potential markets, and promoting/marketing products from such livelihood projects. Number of barangays/sitios (small towns)/ households covered Number and percentage of beneficiary groups formed Number and value of renewable energy-based livelihood activities Number of loans processed and disbursed One revolving fund set up for livelihood development Number of training sessions conducted for renewable energy and livelihood development 36 months
7 4 Component C Component Name Project Management and Poverty Impact Assessment. Cost ($) 298,442 Component Description This component will support overall project coordination and reporting, ensure a highly participatory management approach, and monitor efficiency and effectiveness of project implementation. The implementing agency will design a community-based monitoring system in which the CBOs will directly participate in project monitoring and evaluation. A poverty impact assessment will be conducted around 6 months before the Project is completed, to evaluate incremental benefits of the Project and assess the ability of the households in the target communities to meet their own basic needs. For this purpose, a control area for evaluating project incremental benefits will be identified, and baseline data and indicators will be developed to measure the actual Project impacts on poverty reduction. Monitorable Deliverables/Outputs Inception report Quarterly progress reports Semiannual project review reports (for the first year of implementation) Annual project review reports (for the succeeding years) Monthly financial reports Annual audited financial reports Project completion report Poverty reduction impact report Implementation of Major Activities: 48 months Number of months for grant activities 2. Financing Plan for Proposed Project to be Supported by JFPR Financier Amount ($) JFPR 1,500, Government 239, Other Sources (Please identify) 3. Genesis Total 1,978, , (contributions from private sector and civil society) The Government of the Philippines, through the Department of Energy (DOE), aims to achieve 100% electrification at barangay level by the year However, it is expected that not all households can be electrified within the said period due to technical as well as financial constraints to on-grid expansion and connections. It is anticipated that some households, especially those located in island and upland communities will remain unelectrified due to their remoteness and economic non-viability. Interest in exploring and developing the application of renewable energy sources for off-grid electrification is therefore growing. But the technical, managerial, and financial sustainability of such off-grid electrification programs remains an issue, considering that the poorest of the poor live in those areas. The challenge therefore is how to build up local capacity for developing and implementing development programs that link poverty reduction, sustainable energy development, and livelihood activities promotion with the active participation of key stakeholders.
8 5 The Government requested the Asian Development Bank (ADB) to prepare, through the Japan Fund for Poverty Reduction (JFPR), an innovative poverty reduction project to pilot renewable energy and livelihood development in poor off-grid rural communities in Negros Occidental. The Renewable Energy and Livelihood Development for the Poor in Negros Occidental (the JFPR Project) was prepared through a participatory process involving various stakeholders. The proposal is based on the findings of the Appraisal Mission and understanding reached during local and national consultations with representatives from central, provincial, and district government agencies; key agencies and companies in the energy sector; relevant aid agencies; nongovernment organizations (NGOs); and other civil society groups. The JFPR Project will target the low-income groups in eight off-grid villages in Negros Occidental, who depend mainly on the use of kerosene, batteries, and candles for their current energy requirements. The expected household beneficiaries total about 2,480, around 35% of whom live below the regional poverty threshold. 4. Innovation The JFPR Project highlights the innovation of sustaining rural electrification through the community participator approach by (i) providing renewable energy sources in poor off-grid communities; (ii) mobilizing communities; (iii) promoting the communities understanding of the project and stimulating their sense of ownership; (iv) promoting income-generating activities to reduce poverty in the areas; (v) building local capacities to manage, maintain, and operate the JFPR Project; and (vi) supporting publicprivate-community partnership essential for implementation success. 5. Sustainability For technical sustainability, local stakeholders (local government units [LGUs], beneficiary communities, and existing or newly formed BAPAs/VPAs) will be involved in project design, implementation, and management throughout the Project s life. Central to the sustainability of the Project are the commitment and readiness of the beneficiary communities to operate, maintain, use, and expand the renewable energy systems installed and livelihood activities developed under the Project. The Project will cultivate a sense of ownership among its beneficiary communities through focused information, education, and communication programs; and intensively prepare the beneficiary communities to sustain the renewable energy systems and livelihood activities themselves through technical and administrative skills development, funds build up, and promotion of renewable energy applications in village-based livelihood opportunities. After the assistance period ends, the Project will be turned over to the beneficiary communities who will then take responsibility for operating and maintaining the renewable energy systems, and promoting livelihood development. For financial sustainability, the Project will be sustained by the beneficiaries willingness to pay arising from the additional income that will be realized at the household level due to (i) productivity improvements and increased production value with the availability of electricity; (ii) creation of livelihood opportunities in the areas; and (iii) savings from forgone fossil-fuel consumption, hauling and transportation cost. An energy service charge will therefore be recommended for cost recovery, comparable with current alternative energy costs that the targeted households pay. The recommended fee, varying for subprojects in the range of P10-35 per kilowatt-hour (kwh) or about $ per kwh, is much lower than the existing expenditures incurred by the target beneficiaries for their energy consumption, which are about P60-75 per kwh or about $ per kwh. In addition, the Project can tap contributions from the universal charge 2 imposed under the Energy Power Industry Reform Act (EPIRA) to support missionary electrification, 3 since it could be 2 Universal charge is a charge embedded in the power rates imposed to all electricity end-users, and is dedicated to recover stranded costs and finance electrification efforts in financially nonviable areas. 3 Missionary electrification refers to government-private partnership electrification initiatives in financially nonviable villages and barangays in the Philippines.
9 6 considered a government-private partnership for electrification in nonviable areas. Further, since some of the subproject sites are located in an energy resource development zone in Negros Occidental, as stated in DOE Regulation 1-94, 4 these subprojects can source financial support of P0.01 per kwh from electricity generators. Such financial support will contribute much to the sustainability of the Project. 6. Participatory Approach The Project emphasizes close stakeholder cooperation among central government, LGUs, NGOs, private sector, and communities. The community-based approach has been applied from the very start of project design and preparation. The eight subproject sites were selected through stakeholder consultations involving LGUs, NGOs, private sector, and communities, where the selection criteria were developed. During implementation, the implementing agency is to promote the community s understanding of the project, stimulate the sense of ownership, and encourage participation. The communities will contribute to renewable energy installation, and community-based cooperatives will be established for livelihood development. The BAPAs/VPAs will be established where no such association exists, and the capacity to operate and manage the renewable energy systems as well as the revolving fund for electrifying poor households will be built up. DOE, in cooperation with LGUs, will oversee project implementation and provide guidance. Primary Beneficiaries and Other Affected Groups and Relevant Description Unelectrified communities of eight off-grid villages in Negros Occidental, which rural electric cooperatives considered technically and financially nonviable, with more than 100 households and about 2,480 beneficiaries, most of whom live below the regional poverty threshold (average per capita income of $0.27 per day) Sitio Cabayabasan, Montilla, Moises Padilla Sitio Bais, Yubo, La Carlota City Barangay Bunga, Don Salvador Benedicto Barangay Gawahon, Victorias City Refugio Island, San Carlos City Lakawon Island, Cadiz City Molocaboc Island, Sagay City Sitio Tabadiang, Minoyan, Murcia Other Key Stakeholders and Brief Description National government represented by National Economic Development Authority (NEDA), DOE, and Technology Livelihood Resource Center under Department of Science and Technology (DOST) Provincial government of Negros Occidental Local government units of Bacolod City, Victorias, San Carlos City, Sagay City, Don Salvador Benedicto, La Carlota City, Moises Padilla, Bago City, Minoyan, Gawahon, Cauayan Philippines National Oil Company Energy Development Corporation (PNOC-EDC), government-owned energy corporation with energy exploration activities in Negros Occidental Existing community organizations and BAPAs/VPAs based in the target communities Beneficiary communities NGOs to be involved in project implementation 7. Coordination The JFPR Project was developed in close consultation with other multilateral and bilateral assistance agencies including the World Bank, the Japan Bank for International Cooperation (JBIC), and the Japan International Cooperation Agency (JICA). The World Bank is preparing a rural power project in the Philippines focusing on policy reform and strengthening of rural electric cooperatives. JBIC has an ongoing initiative on geothermal development in the Philippines. JICA is active in supporting renewable energy for rural electrification in the Philippines. During project preparation, the JFPR Project concept 4 DOE Regulation 1-94 imposes on power producers and energy resource developers a one-centavo per kilowatt-hour of the electricity sales to recompense the LGUs or regions hosting such energy undertakings. The fund can be used in the area for electrification, development and livelihood, reforestation, watershed management, health and/or environment enhancement.
10 7 was shared with the concerned staff of the World Bank, JBIC, and JICA. All showed interest in the Project, particularly the innovation of sustaining rural electrification by providing renewable energy sources, promoting income-generating activities, building the capacity of the private sector and community, as well as supporting public-private-community partnership. The Project will continue information exchange with the agencies during project implementation. During project preparation, other ongoing rural electrification and livelihood development programs were consulted, including the sustainable rural enterprise program in Visayas in partnership with the United States; the Alliance for Mindanao off-grid renewable energy in Mindanao funded by the United States Agency for International Development (USAID); and the renewable energy program in Palawan funded by Pilipinas Shell Foundation. The experiences as well as lessons learned were considered in designing and preparing the Project. 8. Detailed Cost Table Please refer to Appendix 1 for the detailed cost estimates. C. Linkage to ADB Strategy and ADB Financed Operations 1. Linkage to ADB Strategy and Relevant Technical Assistance Document Country Strategy and Program Update ( ) Poverty Partnership Agreement TA 3422-PHI: Rural Electrification Institutional Strengthening (TA Completion Report) TA 4151-PHI: Promotion of Good Governance in the Restructured Power Sector Document Number Date of Last Discussion Objective(s) Sec.M October 2002 ADB supports rural infrastructure including power and assists in accelerating development in rural areas by focusing on improvement of rural livelihood, using a community-based, demanddriven participatory approach (which the JFPR Project has complied with). October 2001 ADB supports the Philippine Government s development priorities emphasizing infrastructure development and comprehensive human development, and recognizes the high quality of participation of civil society in the development of the principles of poverty reduction (which the JFPR Project has complied with). IN February The TA aims to upgrade, develop and strengthen 2003 institutional capabilities in rural energy planning, policy and program formulation, and project implementation. The TA recommends major changes to the rural electrification approach in the Philippines, among them, developing capacities of new and renewable energy technologies as well as testing integration of livelihood programs into the rural electrification program to help reduce poverty and enhance the sustainability of projects (which the JFPR Project has complied with). July 2003 One of the main components of the TA will develop a 5-year missionary electrification development plan (which supports the JFPR Project providing policy, regulatory framework, and incentive structure to promote missionary electrification development).
11 8 2. Linkage to Specific ADB-Financed Operation Project Name Project Number Power Sector Restructuring Program (PSRP) ADB Loan 1662-PHI Date of Board Approval 24 November 1998 Loan Amount ($ million) State the above-mentioned project s development objective The principal objective of the PSRP is to create competitive electricity markets by unbundling generation and transmission, and providing open and equal access to transmission and distribution. The PSRP will achieve operational improvements and increased efficiencies in distribution operations. The program loan will help finance the adjustment costs associated with power sector restructuring. Actions under the PSRP will support the objectives: (i) creating an enabling legal and regulatory environment to support competitive markets in electricity; and (ii) unbundling and corporatizing the operations of National Power Corporation (NPC) to facilitate the introduction of competitive markets in electricity. Recognizing that potential rural consumers are inaccessible to economically viable electrification, the PSRP promotes sustained rural electrification. In this connection, the JFPR Project will be conceptually linked to the PSRP through a pro-poor equitable energy distribution mechanism and use of renewable energy in nonelectrified off-grid areas to encourage livelihood and sustained rural development. The JFPR Project will complement the ongoing power sector reform by promoting renewable energy for off-grid applications in nonelectrified areas, specifically targeting the rural poor households in these areas. 4. List the project s main components 5 No. Component Name Brief Description 1. Create an enabling legal and regulatory framework 2. Unbundle and corporatize NPC s operations 5. Rationale for Grant Funding versus ADB Lending The component aims to implement policy reforms including the enactment of EPIRA, which extends assistance to financially and technically nonviable areas for grid connection, as well as the application of renewable energy sources for electricity generation. This component aims to unbundle NPC s operations and strengthen the Strategic Power Utilities Group (SPUG) in undertaking missionary electrification, especially in off-grid poor communities. The JFPR Project is expected to integrate livelihood development in the application of renewable energy systems in off-grid areas. It will demonstrate poverty reduction in remote communities through promotion of public-private-community partnership, enhancement of local capacities, and development of livelihood activities. Such an intervention is a new area for the Government to invest in. Familiarization in operation and management of such activities is necessary through pilot testing using grant funds. 5 The components related to the JFPR Project are highlighted.
12 9 D. Implementation of the Proposed Grant 1. Provide the Name of the Implementing Agency Winrock will be recruited by ADB under direct selection procedures in accordance with ADB s Guidelines on the Use of Consultants, and it will be responsible for the dayto-day implementation of the project components. Established in 1985, Winrock is a recognized NGO in promoting clean and reliable energy services, using renewable energy technologies, improving livelihoods, and enhancing economic and social development. In the past few years alone, Winrock, in coordination with its network of Renewable Energy Project Support Offices, has been instrumental in bringing on-line more than 720 megawatts (MW) of biomass, wind, and hydropower capacity, and in installing more than 10,000 off-grid solar photovoltaic (PV), wind, and small hydro systems. The Alliance for Mindanao Off-Grid Renewable Energy (AMORE) Program in Mindanao highlights Winrock s performance in promoting renewable energy and sustainable development in the Philippines. AMORE is an ongoing program of $8.0 million funded by USAID. It aims to electrify remote rural communities in western and central Mindanao and the Autonomous Region of Muslim Mindanao by installing renewable energy systems in the chosen communities, and preparing the communities to continually run, maintain, and benefit from these systems as full owners. After over 1-year of implementation since April 2002, renewable systems have been installed in 94 barangays, while installation is still ongoing in additional 59 barangays. In all the target barangays, livelihood opportunities have already been identified and skills development is being undertaken. Winrock's major sources of international financial support include, among others, (i) multilateral financial institutions such as the World Bank and ADB; (ii) governments, foundations, and/or international NGOs of Denmark, Netherlands, and United States; and (iii) United Nations agencies including UN Foundation. The major local financial sources in the Philippines include, among others, the DOE, the Department of Environment and Natural Resources (DENR), and the Department of Agriculture (DA). For the year 2002, Winrock had total net assets amounting to $74,642,436, and generated a total revenue of $39,000,275.
13 10 2. Risks Affecting Grant Implementation Type of Risk Brief Description Measure to Mitigate the Risk Institutional The scheduled national election in mid- DOE underwent an institutional 2004 and consequent likely reshuffling reorganization in 2002 and dedicated of government agencies that may result an Electric Power Industry in undesirable delays in project Management Bureau (EPIMB) to implementation ensure proper implementation of missionary electrification. The relatively stable positioning of the working-level staff will ensure continuity of project implementation. Governance Political will and commitment of national government and LGUs to support the JFPR Project Uneasiness of individuals and residents working with NGOs Limited community understanding that may affect the effective mobilization and organization of residents in the area Duplication and overlapping of functions among LGUs, communities, and NGOs Transparency and accountability of the implementing agency in undertaking the JFPR Project Effectiveness and efficiency of the implementing agency in implementing the JFPR Project Level of acceptance and participation of household beneficiaries that may not be strong enough in the initial stages of Foster government, particularly LGUs, participation in project design, preparation, and implementation, and encourage their contribution Good track record of the implementing agency working in the subproject areas, and its effectiveness in communicating with local residents Engage communities in project design, preparation, and implementation for a sense of ownership Clearly defined project organizational structure and cooperation of all parties Regular reviews and monitoring of project progress and performance Approval of annual work programs and financial plans by Project Steering Committee. Submission of monthly financial reports, annual audited financial reports, quarterly progress reports, and semiannual/ annual project review reports. Review of accomplishment performance Set up of Project Steering Committee and Project Advisory Committee that will advise and guide the project implementation unit for efficient and effective project implementation Engage communities, particularly targeted beneficiaries, in project design, preparation, and
14 11 Infrastructure project implementation, particularly during rainy season Bad road condition may delay transport of equipment and machineries Peace and order situation implementation for a sense of ownership Develop local resources that can be used as alternatives Encourage local volunteers in the delivery and transport of hardware Central and local governments assured security stability in the project area. JFPR appraisal mission further verified through field visits. The implementing agency s experience in Mindanao attests to its credibility in mitigating unexpected situations related to peace and order. 3. Incremental ADB Costs Component Incremental Bank Cost Amount requested $75,000 Justification While the JFPR Project is linked to the counterpart loan (Loan 1662-PHI), the nature of implementation is different, and the project areas are not necessarily bound to the same geographic areas (the counterpart loan is a Program Loan, and is managed from the capital Manila, while the proposed JFPR project is located in Negros Occidental, an island province). The incremental costs are deemed necessary to cover (i) a staff consultant in the inception phase to expedite project start (3 person-months), and (ii) a JFPR liaison officer during project implementation to assist in coordinating and monitoring (10 person-months intermittently over 4 years). Type of work to be rendered by ADB A staff consultant is to be hired by ADB under ADB s Guidelines on the Use of Consultants in the inception phase, to assist the responsible project officer in (i) developing a project implementation manual (PIM); (ii) developing a work plan and implementation schedule; (iii) setting up the project implementation unit (PIU) based in Negros Occidental Province; (iv) guiding the implementing agency and the targeted community based organizations and groups in familiarization with relevant ADB guidelines and procedures; and (v) conducting consultation and information workshops. A JFPR liaison officer is to be hired by ADB under ADB s Guidelines on the Use of Consultants during the project implementation period, to assist the implementing agency in facilitating community participation and NGO collaboration following the relevant ADB guidelines and procedures, and assist the responsible ADB project officer in (i) coordinating
15 12 project implementation among ADB, DOE, and PIU; (ii) monitoring project performance; (iii) supervising implementation progress; (iv) reviewing the project progress; and (v) undertaking semiannual/ annual review missions with ADB and DOE. The ADB project officer, in collaboration with DOE, will conduct the JFPR inception mission byaround 3 months after the Project starts. JFPR annual review missions will be conducted by the ADB project officer, in collaboration with DOE. 4. Monitoring and Evaluation Key Performance Indicator Reporting Mechanism Plan and Timetable for Monitoring & Evaluation Setup and operation of eight renewable energy systems in offgrid Inception report areas, and extension of Quarterly progress reports renewable energy use by a total of about 200 kw Percentage of the community serviced with electricity from renewable energy systems Setup and operation of two sustainable revolving fund mechanisms for electricity connection of the poor and for livelihood development Number and percentage of poor households below the regional poverty threshold (average per capita income of $0.27 per day) connected to renewable energy systems Semiannual/annual project review reports Project completion report Project poverty impact report The PIM, to be developed during the inception phase, will outline the work plan and implementation schedule, as well as detail deliverables and outputs for monitoring and evaluation. The implementing agency is to submit to DOE and ADB, with copies to the Project Steering Committee and Project Advisory Committee, (i) a progress report every quarter, (ii) a semiannual review report in the first year of implementation and annual review report in the succeeding years, and (iii) project completion report and poverty impact report at the end of the assistance. Number and value of renewable energy-based livelihood activities developed ADB and DOE will review the reports, and undertake (i) a project inception mission around 3 months after the project starts, (ii) annual project review missions, and (iii) project completion review mission at the end of the assistance.
16 13 5. Estimated Disbursement Schedule Fiscal Year (FY) Amount ($) FY ,000 FY ,000 FY ,000 FY ,000 Total Disbursements 1,500,000 E. Clearances Cleared By Name / Division / Signature Comments Mr. Khaja Moinuddin 1. Director General of the relevant regional department [X] Cleared / Not Cleared Comments: 2. Director of the division in the relevant regional department or resident mission Mr. Patrick Giraud Name / Division 3. Staff Review Committee (SRC) Ms. S. Akhtar, Deputy Director members General, SERD (Chair) Mr. P. Giraud, Director, SEID Ms. E.L. Araneta, OGC Mr. M. Ahmed, RSFI Mr. P. Choynowski, EREA Mr. T. Dojima, COPP Mr. M. Araki, OCO Mr. B. van Ommen, OCO 4. Other reviewers Mr. L. B. Sondjaja, COCS Ms. H. Huang, CTL Mr. H. Wang, OED Mr. R.S. Ondrik, PhCO Mr. G. Curtis, NGOC Ms. I. J. Simbolon, RSES Ms. N. Ikemoto, RSES Ms. S. K. Price, RSES Mr. P. Abeygunawardena, ECID Mr. S. Tumiwa, SAID Mr. M. Minc, PhCO 5. CC list Mr. Y. Zhai, SEID [X] Cleared / Not Cleared Comments: Comments [X] Cleared / Not Cleared Comments: [X] Cleared / Not Cleared Comments: F. Checklist OCO will use the answers you provide to the following questions to evaluate the application s eligibility for funding. After answering yes or no to questions 1 to 7 below, refer to the section number in the application where the question is fully addressed. DO NOT provide detailed description below as details should be included in the relevant sections of page 1 and sections B to D. 1. Does the application support activities that will assist the poorest and most vulnerable groups eligible for JFPR funding? (X) Yes / No
17 14 Response is found in Section B3. 2. Do the proposed activities fit within at least one of the following basic purposes of the JFPR: a. Support innovative social programs that directly respond to the needs of poor and vulnerable groups in recipient countries and have high potential for ameliorating their destitute living conditions? b. Provide relatively rapid, demonstrable benefits for affected populations through initiatives and mechanisms with positive prospects for sustainability over the long term? c. Provide direct assistance to programs designed and implemented by local populations, civil society, and NGOs to facilitate their empowerment and enhance their participation in the development process? (X) Yes / No Response is found in Section B3/4/5. 3. Are the proposed activities designed and expected to be implemented with the full participation of local community groups and NGOs? (X) Yes / No Response is found in Section B6 4. Do the activities support interventions that will have a catalytic effect or magnify the impact of ADBfinanced operation(s)? (X) Yes / No Response is found in Section C. 5. Does the application identify methods to monitor and evaluate outcomes, implementation progress, and the impact of the grant on the beneficiaries? (X) Yes / No Response is found in Section D4. 6. Are Japanese NGOs participating in this JFPR activity? Yes / (X) No No direct participation in the JFPR Project is anticipated. 7. Have Japanese aid agencies (e.g., JBIC, JICA, etc.) been consulted in the development of the JFPR application? (X) Yes / No Response is found in Section B7. Please confirm statements 8-16 below. 8. Proposed JFPR activities are not eligible or cannot be funded under loans, or through other sources of funding available to ADB. (X) Confirmed 9. Proposed JFPR activities are not being used to prepare projects or grants, or supplement existing project or grant preparation activities being funded through JSF or other project/grant preparation funds. (X) Confirmed 10. The application does not include pilot activities that are not linked to ADB-funded operations in the pipeline or under implementation. (X) Confirmed / Not Applicable 11. The application includes an exit strategy or a mechanism to ensure long-term sustainability. (X) Confirmed 12. The legal status, financial soundness, track record, and arrangements for use and accounting of grant funds have been checked for grants that are expected to be executed by community groups or NGOs.
18 15 (X) Confirmed / Not Applicable 13. Where funding of incremental costs (staff or consultants) for grant preparation and/or implementation is requested, a full justification is provided. (X) Confirmed / Not Applicable 14. The grant will not include study tours or foreign training. (X) Confirmed 15. The application does not include support for academic training, research work, and core program activities of global/regional programs. (X) Confirmed / Not Applicable 16. The director-general and the director of the relevant regional department have endorsed the grant activity. (X) Confirmed Appendixes 1. Detailed Cost Estimates 2. Fund Flow Arrangement 3. Implementation Arrangements
19 DETAILED COST ESTIMATES 16 Code Supplies and Services Rendered Unit Costs Contributions ($) Quantity Cost Total JFPR Units Component 1. Renewable Energy Development and Energy Efficiency Subtotal: Per Unit ($) Amount Method of Procurement Government Private Sector Communities 857, , ,569 32,720 60, Civil Works Subtotal: 310, , , , Land acquisition, right-of-way for RE sites 110, ,000 10, Concrete foundations, powerhouses, shafts, channels, and related support structures for the installation of wind turbines, micro hydropower systems and larger size PV panels (20% community contribution, in kind) 1.2 Equipment, furniture and Furnishings Subtotal: Lump sum 200, ,000 Direct purchase 40, RE equipments and electrical supplies Lump sum 200, ,000 Direct purchase RE O&M basic tool 5 basic kits per RE site Basic kit 5 *8 50 2,000 2,000 Direct purchase 219, ,500 4, Furniture and furnishing of training rooms Lump sum 4,500 4,500 RE equipment, miniturbines, etc. for technical training and demonstration Training equipment, such as, LCD & OH projectors and screen, photo/video cameras, audio/video-system, computer sets, printers, copier, etc. 1.3 Goods and Consumables Subtotal: General training aids and materials such as stationery, writing tools, publications, blackboards, etc RE training books, manuals, 50 pax x 8 RE sites (10% contribution from the Government) Lump sum 3,500 3,500 Direct purchase Lump sum 9,000 9,000 Direct purchase Lump sum per year 13,389 12, ,500 4,500 4,500 Direct purchase Sets 50*8 20 8,889 8,000 Direct purchase Training, Workshops, Seminars Subtotal: 47,400 43, , Renewable energy technical training, workshops and seminars (incl. costs for resource persons, venue and 10 participants per course x 4 days x 8 project sites, of which 10% community contribution for local venue and logistics) Activities 10*4* ,800 43,200 3,600 Appendix 1
20 Code 1.5 Supplies and Services Rendered Energy-efficient systems trainings (including costs for resource persons, training materials, venue, and logistics, etc., of which 30% contribution from the Government) Unit Costs Quantity Cost Total JFPR Units Per Unit ($) Amount Method of Procurement Contributions ($) Government Days 2* Private Sector Communities Consulting Services Subtotal: 118,190 63,270 15,000 32,720 7, Assessment of social, economic, political viability of proposed 30 person-days (in a team of 2 domestic consultants) per site FS 30 person-days Per diems ( pax) Person-day 30* ,800 16,800 Person-day 30*4 28 3,360 3, EE technical consultant Person-day Technical Consultant for Energy Efficiency One renewable energy specialist (micro-hydro, solar, wind, biomass) One community organizer supervisor Community organizers (2 organizers per sites) Local community organizers/volunteers (monthly allowance only), of which 20% is community contribution (in kind) - 2 per site X 8 sites Local community technicians/volunteers (monthly allowance only), of which 20% is community contribution (in kind) - 1 per site X 8 sites Personmonth Personmonth Personmonth Personmonth Personmonth Personmonth 10 1,200 12,000 12, , ,750 3,750 8* ,720 30,720 8*2* ,000 19, * ,000 9, Other Project Inputs Subtotal: 150, , Revolving credit fund for investments in RE material, devices and equipment and connection of local households to RE-based 150, ,000 electricity Component 2 - Sustainable Livelihood Development Subtotal: 604, ,650 40, ,500 29, Goods and Consumable Supplies Subtotal: 3,000 3, General training aids and materials, blackboards, publications and supplies Lump sum/year ,000 3,000 Direct purchase 2.2 Training, workshops, seminars Subtotal: 276, ,000 40,500 40,500 27,000 17
21 Code 2.3 Supplies and Services Rendered Five social preparatory training courses and activities, (incl. costs for resource persons, venue and 50 pax x 8 RE sites, of which 10% community contribution for local venue and local logistics and 30% government and private sector contribution) Project orientation & planning Development mapping & community needs assessment Basic leadership & organizational management Basic course on development cooperation & advocacy Others (gender, conflict management, group building, etc) Training programs on energy-based livelihood development with 4 courses, at 8 sites, 50 pax including, resource persons, meals, accommodation, transport and honorarium (10% community contributions for logistics and venues, 30% government and private sector contribution) Project development and management and feasibility study preparation Basic financial management Social enterprise and entrepreneurship development Livelihood technology packages (3) Exposure/field trips Unit Costs Contributions ($) Quantity Cost Total JFPR Units Per Unit ($) Amount Method of Procurement Government Private Sector Communities Activities 5*50* ,000 90,000 22,500 22,500 15,000 Activities Lump sum/year 4*50* ,000 72,000 18,000 18,000 12, ,000 6,000 6,000 Consulting Services Subtotal: 125,050 47, ,000 2, Appendix Microfinance specialist (for 30 person-months intermittently for 4 implementation years) Training specialist (2 pax per 30 pms) Livelihood specialist (2 pax per 30 pms) Lump sum 10,000 10,000 Personmonth Personmonth 30* ,000 30,000 30* ,000 30, Microfinance specialist (1 pax per 30 pms) Person- 30* ,000 15,000
22 Code Supplies and Services Rendered One economic and social specialist (livelihood development) One community organizer supervisor One community organizer for 2 sites Local community organizers/volunteers (monthly allowance only), of which 20% is community contribution (in kind) - 1 per site X 8 sites Unit month Personmonth Personmonth Personmonth Personmonth Costs Quantity Cost Total JFPR Units Per Unit ($) Amount ,000 15, ,450 3,450 1*4* ,600 9,600 Method of Procurement Contributions ($) Government Private Sector Communities 1*8* ,000 9, Other Project Inputs Subtotal: 200, , Revolving fund for RE-based livelihood activities Lump sum 200, ,000 Component 3 - Project Management and Poverty Impact Assessment Subtotal: 377, ,442 78, Equipment, Furniture and Furnishings Subtotal: Desktop computer with printer Unit 5 1,000 5,000 5,000 Direct purchase Laptop computer Unit 2 2,000 4,000 4,000 Direct purchase Computer software Unit Direct purchase Flat bed scanner Unit Direct purchase Fax machine Unit Direct purchase 12,500 10,500 2, Office furniture (tables, chairs, etc.) Unit ,000 2, Photocopying machine Unit 1 1,000 1,000 1,000 Direct purchase 3.2 Workshops, Training, Seminars, Conferences, Publications Subtotal: Project Management Trainings Staff development Project planning & assessment Lump sum/year Lump sum/year 20,342 11,542 8, ,000 4,000 4, ,600 2, PME systems development Lump sum Media liaison and coordination meetings (quarterly) Meetings 4* ,800 4,800 19
23 Code Supplies and Services Rendered Dissemination workshops and conferences with local government units and other relevant agencies (Negros Occidental), 50% from government contribution Unit Costs Contributions ($) Quantity Cost Total JFPR Units Per Unit ($) Amount Method of Procurement Government Meetings 4 2,000 8,000 4,000 4,000 Private Sector Communities 3.3 Consulting Services Subtotal: 28,600 28, Poverty impact assessment Lump sum 20,000 20, Financial auditing Audits/year 4 1,500 6,000 6, Web site expert Project management expert Personmonths Personmonths 3.4 Management and Coordination of this Component Subtotal: Component 3 - Staff 2 1,000 2,000 2, Project manager Month ,800 28, Project assistant Month ,200 19, Policy specialist Month ,000 8, MIS specialist Month ,000 3, PME specialist Month ,000 9, Information education & communications specialist Month ,000 6, Administrative/ finance officer Month ,400 14, Accountant Month ,000 5, Bookkeeper Month ,600 9, Secretary/administrative assistant Month ,200 7, Driver Month ,200 7, , ,800 67, DOE project officer Month ,600 33, Travel and per diem PIU project staff for site visits (4pax x 15 days/quarter x 4 yrs.) PIU project staff coordination to Manila HQ (2 pax x 5 days/trip x 4 trips) Per diem/ day Per diem/ day 4*15*4* ,000 48,000 2*5*4 40 1,600 1, Appendix 1
24 Costs Contributions ($) Code Supplies and Services Rendered Unit Quantity Cost Total JFPR Units Per Unit ($) Amount Method of Procurement Government Private Sector Communities PIU project staff coordination to Manila HQ (2 pax x 5 days/trip x 4 trips) Air fare/ year 2* ,200 1, IA visit field (4 pax x 5 days/trip x 5 Per diem/ 4*5*5 35 3,500 3,500 trips) day IA visit field (4 pax x 5 days/trip x 5 Air fare/ year 4* ,000 3,000 trips) EA review mission (4 pax x 5 days/trip x Per diem/ 4*5*5 35 3,500 3,500 5 trips) day EA review mission (4 pax x 5 days/trip x Air fare/ year 4* ,000 3,000 5 trips) Operational costs Report preparation (documentation and publication) Office space Land transportation cost Office operating costs (supplies, utilities, communications) Lump sum/year Lump sum/month Lump sum/month Lump sum/month ,400 2, ,200 31, ,400 38, ,800 28,800 Components Subtotal (1)-(3) 1,839,071 1,360, , ,220 90,200 Contingency (9.4% of JFPR Contribution) 139, ,018 Total Project Cost 1,978,089 1,500, , ,220 90,200 DOE=Department of Energy; EA=executing agency; EE=energy efficiency; FS=feasibility study; LCD=liquid crystal display; MIS=management information system; OH=overhead projector; O&M=operation and maintenance; pax=persons; PIU=project implementation unit; PME=project monitoring and evaluation; RE=renewable energy. 21
25 22 Appendix 3 FUND FLOW ARRANGEMENTS To facilitate day-to-day local expenditures of the JFPR Project, the Asian Development Bank (ADB) will channel the JFPR funds directly to a JFPR imprest account, which will be opened and maintained by the project implementation unit (PIU) in Bacolod City, Negros Occidental, at a bank endorsed by the Department of Energy (DOE) and acceptable to ADB. DOE and DOF will be kept informed by the PIU about all transactions and will receive copies of all financial statements and audit reports. The imprest account, which will be managed by the PIU on the principles of cosignatory arrangement with the chairman of the Project Steering Committee (PSC), will be based initially on the first 6-month activity plan and related budget, and afterwards on the approved annual work plan and budget. ADB will initially channel $100,000 to the imprest account as advance for day-to-day project implementation during the inception period, and will replenish the funds every 3-6 months, based on replenishment requests from the PIU through DOE and in accordance with ADB s statement of expenditures procedure. The replenishment will be based on the fund release criteria to be specified in the project implementation manual (PIM), which will be prepared after project approval, and consistent with the target implementation schedule. The statement of expenditures procedure will apply for all payments and transactions under $10,000 to ensure speedy project implementation. Detailed implementation arrangements, such as the flow, replenishment, and administrative procedures, will be established by ADB and the Government through the JFPR Letter of Agreement, and detailed in the PIM. The schematic fund flow for the Project is shown in Figure A2. Figure A2. Fund Flow Arrangements for JFPR Project Asian Development Bank $1,500,000 Project Imprest Account at Project Implementation Unit Component 1: Component 3: Energy-Based $643,890 $298,442 Project Management Livelihood and Poverty Impact Development and Assessment Energy Efficiency Component 2: Renewable Energy Systems Development and Installation $418,650 $139,018 Contingencies
Proposed Grant Assistance Kyrgyz Republic: Improving Livelihoods of Rural Women through Development of Handicrafts Industry
Grant Assistance Report Project Number: 40539 November 2006 Proposed Grant Assistance Kyrgyz Republic: Improving Livelihoods of Rural Women through Development of Handicrafts Industry (Financed by the
More informationPapua New Guinea: Implementation of the Electricity Industry Policy
Technical Assistance Report Project Number: 46012 December 2012 Papua New Guinea: Implementation of the Electricity Industry Policy The views expressed herein are those of the consultant and do not necessarily
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK JFPR: INO 32176 PROPOSED GRANT ASSISTANCE (Financed by the Japan Fund for Poverty Reduction) TO THE REPUBLIC OF INDONESIA FOR THE SUSTAINABLE LIVELIHOOD DEVELOPMENT FOR POOR COASTAL
More informationOPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.
OM Section E2/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction JAPAN FUND
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 3 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing project. A PPTA is necessary to provide sound
More informationFRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.
FRAMEWORK FINANCING AGREEMENT (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 29 October 2005 FRAMEWORK FINANCING
More information(Financed by the Japan Fund for Poverty Reduction)
Technical Assistance Report Project Number: 49276-001 Capacity Development Technical Assistance (CDTA) December 2015 India: Supporting Rajasthan s Productive Clusters in the Delhi Mumbai Industrial Corridor
More informationRepublic of Indonesia: Water Supply and Sanitation Sector Development Project
Technical Assistance Report Project Number: 43304-022 Capacity Development Technical Assistance (CDTA) November 2011 Republic of Indonesia: Water Supply and Sanitation Sector Development Project (Financed
More informationPeople s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing
Technical Assistance Report Project Number: 51022-001 Knowledge and Support Technical Assistance (KSTA) December 2017 People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction
More informationTHE MINISTER OF ENERGY AND MINERAL RESOURCES THE REPUBLIC OF INDONESIA
THE MINISTER OF ENERGY AND MINERAL RESOURCES THE REPUBLIC OF INDONESIA REGULATION OF THE MINISTER OF ENERGY AND MINERAL RESOURCES THE REPUBLIC OF INDONESIA NUMBER 38 OF 2016 ON ACCELERATING ELECTRIFICATION
More informationGrant Assistance Republic of the Philippines: Southern Leyte Landslide Disaster Assistance Project (Financed by the Japan Fund for Poverty Reduction)
Grant Assistance Report Project Number: 40217 November 2006 Grant Assistance Republic of the Philippines: Southern Leyte Landslide Disaster Assistance Project (Financed by the Japan Fund for Poverty Reduction)
More informationThis document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.
Technical Assistance Report Project Number: 51336-001 Knowledge and Support Technical Assistance (KSTA) February 2018 Capacity Building Support for Asia-Pacific Economic Cooperation Financial Regulators
More informationMicrofinance for Rural Piped Water Services in Kenya
Policy Note No.1 Microfinance for Rural Piped Water Services in Kenya Using an Output-based Aid Approach for Leveraging and Increasing Sustainability by Meera Mehta and Kameel Virjee The water sector in
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK JFICT: LAO 36589 GRANT ASSISTANCE (Financed by the Japan Fund for Information and Communication Technology) TO THE LAO PEOPLE S DEMOCRATIC REPUBLIC FOR BANKING AUTOMATION TO SUPPORT
More informationPhilippines: ASEM Country Strategy Note April 2003
Philippines: ASEM Country Strategy Note April 2003 1. The ASEM Trust Fund (TF) has played a critical role in supporting government activities to mitigate the adverse effprilects of the Asian financial
More informationSupplementary Appendix D 1
Supplementary Appendix D 1 ENVIRONMENTAL ASSESSMENT OF FINANCIAL INTERMEDIATION LOANS AND EQUITY INVESTMENTS A. Description of the Development Bank of the Philippines (DBP) 1. DBP was established in 1947
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
12 Appendix 5 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is needed for preparing the investment program and conducting technical, economic,
More informationProject Overview and Description. August Overview. Project Description. Monitoring and Evaluation. Reporting Arrangements.
Project Overview and Description (More detailed information about the project) August 2009 Overview Project Description Monitoring and Evaluation Reporting Arrangements More Information Overview The US$1.45
More informationPacific Urban Development Investment Planning and Capacity Development Facility
Technical Assistance Report Project Number: 51175-001 Transaction Technical Assistance Facility (F-TRTA) July 2017 Pacific Urban Development Investment Planning and Capacity Development Facility This document
More informationTechnical Assistance to the Republic of Philippines for the Support for Health Sector Reform
Technical Assistance TAR: PHI 39066 Technical Assistance to the Republic of Philippines for the Support for Health Sector Reform September 2005 CURRENCY EQUIVALENTS (as of 5 August 2005) Currency Unit
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK JFPR: CAM 38107 PROPOSED GRANT ASSISTANCE (Financed by the Japan Fund for Poverty Reduction) TO THE KINGDOM OF CAMBODIA FOR IMPROVING PRIMARY SCHOOL ACCESS IN DISADVANTAGED COMMUNES
More informationDeveloping Cross-Border Economic Zones between the People's Republic of China and Viet Nam
Technical Assistance Report Project Number: 43077-01 Regional Policy and Advisory Technical Assistance (R-PATA) September 2009 Developing Cross-Border Economic Zones between the People's Republic of China
More informationGrant Assistance JFPR: INO 39116
Grant Assistance JFPR: INO 39116 Proposed Grant Assistance to the Republic of Indonesia for the Sustainable Livelihood Development for Coastal Communities in the Special Province of Nanggroe Aceh Darussalam
More informationRepublic of Indonesia: Improving Access to Finance in Aceh and North Sumatra
Technical Assistance Report Project Number: 45266 Capacity Development Technical Assistance (CDTA) November 2012 Republic of Indonesia: Improving Access to Finance in Aceh and North Sumatra (Financed by
More informationMongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project
Semi-Annual Progress Report June 2016 Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project Prepared by the project management unit and project implementation
More informationTA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC
Greater Dhaka Sustainable Urban Transport Project (RRP BAN 42169) TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC A. TA Description 1. The Government of Bangladesh has requested
More informationProject Design Advance. Nauru: Port Development Project. Project Number: December 2015
Project Design Advance Project Number: 48480-002 December 2015 Nauru: Port Development Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. A project preparatory technical assistance (PPTA) is required to support the Ministry of New and Renewable Energy (MNRE) and Solar Energy Corporation
More informationGlobal Partnership on Output-based Aid Grant Agreement
Public Disclosure Authorized GPOBA GRANT NUMBER TF010757 Public Disclosure Authorized Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Philippines Public Health Project)
More informationPeople s Republic of China: Strategy for Inclusive and Green Development of Small Cities, Towns, and Villages in Jiangxi Province
Technical Assistance Report Project Number: 49024-001 Policy and Advisory Technical Assistance (PATA) December 2015 People s Republic of China: Strategy for Inclusive and Green Development of Small Cities,
More informationDRAFT FOR COMMENT PHILIPPINES RURAL POWER PROJECT PROJECT IMPLEMENTATION PLAN AND OPERATIONS MANUAL PREPARED BY
DRAFT FOR COMMENT PHILIPPINES RURAL POWER PROJECT PROJECT IMPLEMENTATION PLAN AND OPERATIONS MANUAL PREPARED BY PHILIPPINES DEPARTMENT OF ENERGY AND DEVELOPMENT BANK OF THE PHILIPPINES MANILA, PHILIPPINES
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. There is an urgent need to support the government in the development of the urban water supply and sanitation sector in Cambodia
More informationTERMS OF REFERENCE FOR CONSULTANTS
TERMS OF REFERENCE FOR CONSULTANTS A. Consulting Firm The Asian Development Bank (ADB) will engage a consulting firm in accordance with its Guidelines on the Use of Consultants (2013, as amended from time
More informationProposed Grant Assistance Kingdom of Thailand: Community-Based Flood Risk Management and Disaster Response in the Chao Phraya Basin
Grant Assistance Report Project Number: 46270 September 2014 Proposed Grant Assistance Kingdom of Thailand: Community-Based Flood Risk Management and Disaster Response in the Chao Phraya Basin (Financed
More informationENERGY FOR ALL Elmar Elbling Access to Energy Specialist. Picture: ADB Pilot Project Cobrador Island, Philippines
ENERGY FOR ALL Elmar Elbling Access to Energy Specialist Picture: ADB Pilot Project Cobrador Island, Philippines ENERGY ACCESS SITUATION IN ASIA-PACIFIC 3.8 Billion Population in ADB s DMCs 2 Billion People
More informationEnergy Subsidies in Developing Countries: Can we make it for those whom it is intended?
Energy Subsidies in Developing Countries: Can we make it for those whom it is intended? Joint UNEP and UNECE Expert Meeting on Energy Subsidies 15-16 November 2007 International Environment House Châtelaine-Geneva,
More informationCook Islands
\ Country Operations Business Plan October 2016 Cook Islands 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as
More informationSpeech by United Nations Development Programme
2015/SOM3/IEG/DIA/004 Session: 1 Speech by United Nations Development Programme Submitted by: United Nations Development Programme Public Private Dialogue on Inclusive Business Cebu, Philippines 27 August
More informationSomalia Growth, Enterprise, Employment & Livelihoods (GEEL) Project
Annual Program Statement (APS) Call for Applications to Participate in Economic Growth and Employment Partnerships Gums and Resins and Natural Products sector Growth, Enterprise, Employment & Livelihoods
More informationThe African Development Bank Group: A Partner of Choice. GHANA TRADE AND INVESTMENT FORUM Rome, Italy October 31st, 2014
The African Development Bank Group: A Partner of Choice GHANA TRADE AND INVESTMENT FORUM Rome, Italy October 31st, 2014 1 AFRICAN AFRICAN DEVELOPMENT DEVELOPMENT BANK BANK GROUP GROUP PRIVATE SECTOR OPERATIONS
More information(Energy Development and Access Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and ARB APEX BANK LIMITED
Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4356-GH Public Disclosure Authorized Project Agreement (Energy Development and Access Project) between Public Disclosure Authorized INTERNATIONAL
More informationGrant Assistance Report
Grant Assistance Report Project Number: 44129 October 2011 Proposed Grant Assistance Republic of Indonesia and Republic of the Philippines: Developing Sustainable Alternative Livelihoods in Coastal Fishing
More informationRepublic of Uzbekistan: Samarkand Solar Power Project
Samarkand Solar Power Project (RRP UZB 45120) Project Administration Manual Project Number: 45120 Loan Numbers: 3058/3059 Updated May 2016 Republic of Uzbekistan: Samarkand Solar Power Project 2 TABLE
More informationEU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project)
Public Disclosure Authorized DOC8UMEW GRANT NUMBER TF0A2379 Public Disclosure Authorized Public Disclosure Authorized EU Grant Agreement (Access to Sustainable Energy Project) between INTERNATIONAL BANK
More informationSECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines
GMS 4 5 July 2018 Manila, Philippines Working Group Section 2: Review of Concept and Approach to the Ongoing and Planned ipsum GMS que Corridor moluptam Towns sum Development que moluptam Projects sum
More informationCambodia, Lao PDR, Viet Nam: GMS Biodiversity Conservation Corridor Project
Initial Poverty and Social Assessment Project Number: 40253 September 2009 Cambodia, Lao PDR, Viet Nam: GMS Biodiversity Conservation Corridor Project Appendix 5 1 INITIAL POVERTY AND SOCIAL ANALYSIS
More informationCORPORATE SOCIAL RESPONSIBILITY POLICY March, 2017 Version 1.2
CORPORATE SOCIAL RESPONSIBILITY POLICY March, 2017 Version 1.2 Name of document Corporate Social Responsibility Policy Policy Version 1.2 Issued by CSR Committee Amendment date 22.03.2017 Effective Date
More informationWildlife Conservation Society 12/24/08 to 12/31/13 (72 months)
PNPM Green Quarterly Progress Report: July 2012 to September 2012 Summary Information Status Active Activity Number Task Team Leader(s) Executing Agency(ies) TF090912, TF090977, TF011930, TF093076, TF096887,
More informationProject Information Document/ Identification/Concept Stage (PID)
Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:
More informationMongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project
Trust Fund Project Administration Manual Project Number: 49113 Grant Numbers: GXXXX October 2016 Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project (Financed by
More informationFunding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants
Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants Table of Contents INTRODUCTION... 1 1. Who can apply for STDF funding?... 1 2. What type of
More informationA case study on subsidizing rural electrification in Chile
9 A case study on subsidizing rural electrification in Chile Alejandro Jadresic Message from the editors Reform of the energy sector and reform of subsidies ideally go hand in hand. Structural, ownership,
More informationRajasthan Urban Sector Development Program
India: Rajasthan Urban Sector Development Program Project Name Rajasthan Urban Sector Development Program Project Number 42267-026 Country Project Status Project Type / Modality of Assistance Source of
More informationAssessing Energy Needs, Market Opportunities, and Distribution Strategies. Eric Verploegen D-Lab s Off-Grid Energy Group February 22 nd 2016
Assessing Energy Needs, Market Opportunities, and Distribution Strategies Eric Verploegen D-Lab s Off-Grid Energy Group February 22 nd 2016 Outline Overview of D-Lab Perspectives for scaling energy access
More informationSee Notes on Agenda Items, following pages.
Draft AGENDA CITIES ALLIANCE STEERING COMMITTEE 22 June 2006, 6:30 p.m. 9:30 p.m. Hong Kong Room Metropolitan Hotel (phone: 1-604-687-1122) 645 Howe Street Vancouver, Canada A light buffet dinner will
More informationRural Electrification Strategy and Implementation Plan of the Federal Republic of Nigeria. prepared for the
Rural Electrification Strategy and Implementation Plan of the Federal Republic of Nigeria prepared for the Power Sector Reform Team Bureau of Public Enterprises Econ One Research, Inc. in association with
More informationTrade Ally WPS Bonus Bid Program
Trade Ally WPS Bonus Bid Program Table of Contents Introduction... 3 I. Program Goals... 3 II. Anticipated Funding... 3 III. Timeline... 4 IV. Definitions... 5 Program Information... 7 I. Program Introduction...
More informationProject Application Webinar
Green Infrastructure Phase II Emerging Renewable Power Program Project Application Webinar March 9, 2018 2 Contents Background Applicant Guide Overview: Eligibility and funding Application process Project
More informationMyanmar Country Partnership Framework (CPF) Background Material
Myanmar Country Partnership Framework (CPF) Background Material June 2014 The World Bank Group What is the World Bank Group? The World Bank is a vital source of financial and technical assistance to developing
More informationTERMS OF REFERENCE. Regional Off-Grid Electrification Project
Regional Off-Grid Electrification Project Development of implementation frameworks for private investment in the off-grid electrification of public institutions and to promote productive uses of electricity
More informationTerms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following.
Note: Bank solar home systems projects receiving grant funds from the Global Environment Facility (GEF) are normally required to have their records and accounts audited by an independent entity each fiscal
More informationSponsorship Agreement/Sub-Grant Posted Date June 6, 2016 Due Date for Applications Cycle 1: Cycle 2: July 15, 2016 January 13, 2017
REQUEST FOR PROPOSALS Xcel Energy Renewable Development Fund MnSCU Block Grant Award Type Sponsorship Agreement/Sub-Grant Posted Date June 6, 2016 Due Date for Applications Cycle 1: Cycle 2: July 15, 2016
More informationGrant Assistance Report
Grant Assistance Report Project Number: 41659 July 2008 Proposed Grant Assistance Mongolia: Poverty Reduction through Community-Based Natural Resource Management (Financed by the Japan Fund for Poverty
More informationLocal Government Unit Private Infrastructure Project Development Facility (Loan 1729-PHI) in the Philippines
Project Completion Report PCR: PHI 32485 Local Government Unit Private Infrastructure Project Development Facility (Loan 1729-PHI) in the Philippines June 2005 CURRENCY EQUIVALENTS Currency Unit peso/s
More informationOVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia. Jakarta, 3 rd February 2015
OVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia Jakarta, 3 rd February 2015 Disclaimer This presentation is to facilitate the Q&A by providing an overview
More informationWorking with the new Instruments for Cooperation Brussels 25/11/2008
Working with the new Instruments for Cooperation Brussels 25/11/2008 luc.bagur@ec.europa.eu 1 1. Overview of EU & EC aid implementation 2. s external cooperation Instruments 3. Sustainable energy in s
More informationGrant Assistance Report. Proposed Grant Assistance. Kingdom of Cambodia: Women s Development Centers
Grant Assistance Report Project Number: 39037 November 2005 Proposed Grant Assistance Kingdom of Cambodia: Women s Development Centers (Financed by the Japan Fund for Poverty Reduction) CURRENCY EQUIVALENTS
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7052
Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared Estimated Date of Appraisal Completion Estimated Date of Board
More informationIntroduction to Results-Based Financing and Output-Based Aid
Introduction to Results-Based Financing and Output-Based Aid Luis Tineo GPOBA Oliver Knight ESMAP What is results-based financing? Payment for outputs delivered Used to incentivize deployment, market creation,
More informationResettlement Planning Document
Resettlement Planning Document Resettlement Framework Document Stage: Final Project Number: 40247 May 2008 Republic of Indonesia: Rural Infrastructure Support for PNPM Mandiri Prepared by Directorate General
More informationNepal: Small Towns Water Supply and Sanitation Sector Project
Validation Report Reference Number: PVR 193 Project Number: 31402 Loan Number: 1755(SF) November 2012 Nepal: Small Towns Water Supply and Sanitation Sector Project Independent Evaluation Department ABBREVIATIONS
More informationRegional: Supporting the Cities Development Initiative for Asia
Technical Assistance Report Project Number: 47285 Regional Capacity Development Technical Assistance (R-CDTA) November 2013 Regional: Supporting the Cities Development Initiative for Asia (Cofinanced by
More informationTFM Social Community Fund Instructions for Grant Application
TFM Social Community Fund Instructions for Grant Application The completion of the Grant Application is the basic requirement for the submission of an application to the TFM Social Community Fund for consideration.
More information( 30%) Special committee report, 1968, % MMDA %(1985), 40.2%(1988), 39.9%(1991), 35.5% (1994), 31.8% (1997), 33.
2004/11/05 1902 1. 2. 1968 110 ( 30%) Special committee report, 1968, 1973 14.9% MMDA 1996 1970 415276(1992) NHA 2001 236(415)(Zonal improvement program) 1980 415,000 ( 37%), Ocampo, 1985 1990 30.6% MMDA
More informationGuidelines for applicants
Guidelines for applicants Supporting Energy Transition IRENA and ADFD 2016 About IRENA The International Renewable Energy Agency (IRENA) is an intergovernmental organisation that supports countries in
More informationLoan No INO: POOR FARMERS INCOME IMPROVEMENT THROUGH INNOVATION PROJECT. INCEPTION MISSION May 21 June 5, 2003 MEMORANDUM OF UNDERSTANDING
Loan No. 1909-INO: POOR FARMERS INCOME IMPROVEMENT THROUGH INNOVATION PROJECT I. INTRODUCTION INCEPTION MISSION May 21 June 5, 2003 MEMORANDUM OF UNDERSTANDING 1. An ADB Inception Mission (the Mission)
More informationGRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing)
GRANT NUMBER 0426-CAM (SCF) GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) (Cambodia Component) between KINGDOM
More informationThe Narragansett Electric Company d/b/a National Grid
The Narragansett Electric Company d/b/a National Grid Rhode Island Renewable Energy Growth Program Solicitation and Enrollment Process Rules for Solar (Greater than 25 kw), Wind, Hydro and Anaerobic Digester
More informationInitial Proposal Approval Process, Including the Criteria for Programme and Project Funding (Progress Report)
Initial Proposal Approval Process, Including the Criteria for Programme and Project Funding (Progress Report) GCF/B.06/08 11 February 2014 Meeting of the Board 19 21 February 2014 Bali, Indonesia Agenda
More informationAnnex Template for the call for input
Submission by Asian Development Bank on Actions undertaken by accredited observer organizations relevant to the in performing its functions 30 July 2012 (TEC) at it third Session made a decision to call
More informationCanada and the Role of the Private Sector in Development in the Philippines. Presentation to: Canadian Chamber of Commerce October 2014
2014 Canada and the Role of the Private Sector in Development in the Philippines Presentation to: Canadian Chamber of Commerce October 2014 2 Outline Overview of Canada s international development priorities
More informationRepublic of Indonesia: Scaling Up Energy Efficiency
Sustainable and Inclusive Energy Program (Subprogram 2) (RRP INO 49043-002) Technical Assistance Report Project Number: 49043-006 Transaction Technical Assistance (TRTA) August 2017 Republic of Indonesia:
More informationAnti Poverty Interventions through Community-based Programs (PNPM) and Direct Cash Support (PKH)
Anti Poverty Interventions through Community-based Programs (PNPM) and Direct Cash Support (PKH) INDONESIA UPDATE Australia National University, 24-25 September 2010 Viviyulaswati@bappenas.go.id psumadi@bappenas.go.id
More informationThe World Bank Group, Solomon Islands Portfolio Overview
The World Bank Group, Solomon Islands Portfolio Overview The World Bank Group works to assist the Government and people of Solomon Islands by supporting projects aimed at improving prospects for economic
More informationPPIAF Assistance in Nepal
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PPIAF Assistance in Nepal June 2012 The Federal Democratic Republic of Nepal (Nepal)
More informationPowering Our Communities. Grant Guidelines
Powering Our Communities Grant Guidelines Powering Our Communities Grant Guidelines The Northeast Ohio Public Energy Council, Inc. ( NOPEC ) is pleased to invite its electric member communities of The
More informationADB Official Cofinancing with UNITED KINGDOM. Working together for development in Asia and the Pacific
ADB Official Cofinancing with UNITED KINGDOM Working together for development in Asia and the Pacific ABOUT THE UNITED KINGDOM (UK) The Department for International Development (DFID) is the UK Government
More informationReport and Recommendation of the President to the Board of Directors
Report and Recommendation of the President to the Board of Directors Project Number: 49202-001 September 2015 Proposed Administration of Grant Nepal: Disaster Risk Reduction and Livelihood Restoration
More information10 th Anniversary African Union Private Sector Forum. Draft Concept Note
10 th Anniversary African Union Private Sector Forum Draft Concept Note 10 th African Union Private Sector Forum 9-11May 2018 Cairo, Egypt Theme: Made in Africa towards realizing Africa's economic Transformation
More informationEmpowering African Women to Manage 100 Multipurpose Community Telecentres (MCTs) in 20 African Countries
Main WSIS site UN Millennium Development Goals WSIS Working Group Visions of the Information Society Empowering African Women to Manage 100 Multipurpose Community Telecentres (MCTs) in 20 African Countries
More informationPage. II. TECHNICAL ASSISTANCE PROJECT DESCRIPTIONS.. 3 A. Introduction... B. Technical Assistance Areas.. 1. Rate Design Consumer Programs...
TABLE OF CONTENTS I. INTRODUCTION............... Page 1 II. TECHNICAL ASSISTANCE PROJECT DESCRIPTIONS.. 3 A. Introduction.... 4 B. Technical Assistance Areas.. 5 1. Rate Design.... 5 2. Consumer Programs...
More informationNRECA Experience with Productive Use Programs: Lessons from the Field
Maputo Rural Electrification Workshop NRECA Experience with Productive Use Programs: Lessons from the Field Daniel Waddle NRECA International June 10, 2009 1 Overview of Presentation Historic perspective
More informationFiduciary Arrangements for Grant Recipients
Table of Contents 1. Introduction 2. Overview 3. Roles and Responsibilities 4. Selection of Principal Recipients and Minimum Requirements 5. Assessment of Principal Recipients 6. The Grant Agreement: Intended
More informationLao People s Democratic Republic: Strengthening Urban Water Supply Regulation
Technical Assistance Report Project Number: 45298 Capacity Development Technical Assistance (CDTA) November 2011 Lao People s Democratic Republic: Strengthening Urban Water Supply Regulation The views
More informationSADC-DFRC CEO s Forum. Progress on DBSA-JICA s Africa-Asia DFI Networking
SADC-DFRC CEO s Forum Progress on DBSA-JICA s Africa-Asia DFI Networking Walvis Bay, Namibia December 6, 2012 Tetsuya FUKUNAGA TICAD Advisor to DBSA from JICA Japan s ODA and JICA Technical Cooperation
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK PROJECT ADMINISTRATION MEMORANDUM FOR THE JFPR GRANT ASSISTANCE TO THE LAO PEOPLE S DEMOCRATIC REPUBLIC FOR COMMUNITY ACTION FOR PREVENTING HIV/AIDS 1/ (JFPR: REG-9006) DRAFT 29
More informationGrant Assistance JFICT: OTH 39080
Grant Assistance JFICT: OTH 39080 Grant Assistance for Empowering the Rural Areas through Community e-centers under the South Asia Subregional Economic Cooperation Program (Financed by the Japan Fund for
More informationProject Administration Instructions
Project Administration Instructions PAI 1.01 Page 1 of 5 INITIAL PROJECT ADMINISTRATION ACTIVITIES A. Introduction 1. The Project Administration Instructions (PAIs) outline ADB s policies and procedures
More informationRenewable Energy Initiatives by Infrastructure Development Company Ltd. (IDCOL)
Renewable Energy Initiatives by Infrastructure Development Company Ltd. (IDCOL) Nazmul Haque Director & Head of Investment Nairobi, Kenya March 05, 2012 IDCOL At a Glance IDCOL is a Government-owned financial
More informationReport and Recommendation of the President to the Board of Directors
Report and Recommendation of the President to the Board of Directors Project Number: 44304-01 October 2010 Proposed Loan and Administration of Grant Papua New Guinea: Microfinance Expansion Project CURRENCY
More information