1 Effect of a 100-year Flood on River Stability: Case Study of Kulim River CHANG CHUN KIAT, Research Officer, River Engineering and Urban Drainage Research Centre (REDAC), Universiti Sains Malaysia, Engineering Campus, Seri Ampangan, Nibong Tebal, Penang, Malaysia AMINUDDIN AB. GHANI, Deputy Director, REDAC, Universiti Sains Malaysia, Engineering Campus, Seri Ampangan, Nibong Tebal, Penang, Malaysia ROZI ABDULLAH, Research Associate, REDAC, Universiti Sains Malaysia, Engineering Campus, Seri Ampangan, Nibong Tebal, Penang, Malaysia ABSTRACT This paper describes analyses on river stability for Kulim River catchment which is located in the southern part of the state of Kedah in the northwestern corner of Peninsular Malaysia. Frequently floods that occur in Kulim River Catchment has caused extensive damage and inconvenience to the community especially floods event in October 2003 which exceeds 100 year ARI. Previous study for Kulim River (DID 1996, Yahaya 1999, Lee 2001, Koey 2003) are limited to a flood event, therefore it is not able to predict river stability efficiency. Thus, a long-term simulation by using two computer models (FLUVIAL-12 and InfoWorks RS) is proposed for this river stability study. A design of stable channel will be carried out based on the results of the long-term simulation. Keywords: River stability, long-term simulation, FLUVIAL-12, InfoWorks RS. 1 Introduction The study area is located at the southern part of the state of Kedah in the northwestern corner of Peninsular Malaysia (Figure 1). It lies within the district of Kulim and upstream of Seberang Perai in Penang. Kulim River catchment consists of 15 subcatchments, with the total catchment area of 130km 2 (Table 1). Kulim river tributaries, namely Tebuan River, Kilang Sago Monsoon Drain, Wang Pinang River, Keladi River and Klang Lama River drain the urban conurbation of Kulim extending from town to the north. Downstream of Kulim town, the catchment comprises mainly rubber and oil palm estate located mainly at the confluences of rivers. The Kulim Structure Plan, has outlined development strategies for the region. Rapid urbanization at Kulim River catchment especially construction for housing estate and on-going 1450 ha Kulim Hi-Tech industrial Park will cause impacts to the catchment become more impervious. However, these impacts are much greater when the impervious areas of a catchment are connected to the streams by efficient stormwater drainage systems. Flooding at Kulim River has been attributed to overbank spill from rivers and tributaries arising from a number of causes, such as undersized river channel and drains to cater flood discharge, high channel roughness, bank irregularity and in-river vegetation, siltation, blockages by debris and refuse. Siltation at study area has been identified as one of the common causes of such flooding brought about by soil erosion at constructions sites. Department of Irrigation and Drainage (DID) Kedah has reported that the rivers have to be desilted typically every 2 to 3 years with removal of one metre thick of silt. 473

2 Peninsular Malaysia Study Area Figure 1 Kulim River Catchment and Subcatchment (DID, 1996). Table 1 Kulim River Subcatchment. Subcatchment Area (km 2 ) Water Cause Kulim River Kulim River Kulim River Ular River Kulim River Kilang Lama River Kulim River Wang Pinang River Tebuan River Keladi River Keladi River Ayer Merah Tengah River Kulim River & Badak River Lembu River Kulim River 2 Study Sites The study reach covers 15km of Kulim River (Figure 2), from the upstream (ch ) to the state boundary between Kedah and Penang (Ch. 00) and futher 2.5km downstream at the Ara Kuda gauging station. Figure 3 shows the photos taken along Kulim River during site visit on Kulim River arises on the western slopes of Gunung Bongsu Range and flowing in a north-westerly direction, and joined Keladi River in the vicinity of Kulim town. At the headwaters, the Kulim catchment is hilly and densely forested. The river slopes are steep and the channel elevation drops from 500m to 20m average mean sea level (amsl) over a distance of 9km. The central area of the catchment is undulating with elevations ranging from 100m down to 18m average mean sea level. Currently the catchment area is undergoing rapid urban development with oil palm and rubber plantation being replaced by housing estate. The lower area of the catchment is within the coastal plain with elevation down to 5m average mean sea level. 474

3 Ch Ch Ara Kuda Ch Ch Ch Figure 2 Kulim River Study Reach. Ch Ch where property damage is move compared with that in agricultural areas. Figure 4(a) shows the extent of flooding as derived from field investigation and interviews at Kulim River catchment. Subcatchment 8, 9 and 10 in Kulim River Catchment shows the visible flood incidences reported. Flood depth ranges are reported from 0.8m to 1.2m. However, the flood map of Kulim River Catchment (Figure 4(b)) shows the extent of flooding under future land use condition due to 100 year flood. This map was correlated with the flood information shown in Figure 4(a). Areas flooded are relatively well defined. The areas at subcatchment 5, 8, 9 and 10 are where extensive flooding occurs. Moreover, flooding at subcatchment 7, 13 and 15 is widespread. Frequently floods occurs in Kulim River Catchment caused extensive damage and inconvenience to the community. This is illustrated by the examples floods event in October 2003 (Figure 5). According to the information given by the DID, floods have occurred in 1-5 October 1989, 31 May - 2 Jun 1991, 24 April 1994, October 1997, Jan 2001, April 2001 and October Ch Ch Ch Ara Kuda Gauging Station Figure 3 Kulim River. 3 Historical Flood Conditions The effects of flooding are felt most in built-up areas such as residential and commercial areas within the urban confine Figure 5 October 2003 Flood (After DID Kulim/Bandar Bahru). 475

4 (a) (b) Figure 4 Flooding Extent Map (DID, 1996). 4 Study Approach Development which takes place in river catchment areas will result in the increase of discharge, bed erosion and deposition and it will caused river channel instability. When this happens, there will be failures to the river bank or in the river protection structure and reduce the channel capacity to flow the flood to downstream. Therefore, it is necessary to predict the river channel stability that will happen due to the existing development or will take place in the future development in a river catchment area. However, previous studies (Yahaya 1999, Lee 2001, Koey 2003) in Kulim River were limited to a single storm event. As a result, it is not enough to predict river stability for the Kulim River. Hence, the main purpose of the study is to evaluate river stability for a long period by considering the effect of changes in cross section and flow capacity. Two models will be used to study Kulim River stability are FLUVIAL-12 (Chang 1993) and InfoWorks RS (River Simulation) developed by Wallingford Software, UK (2003). The main factor to make the study successful is the availability of information and data. The models input data includes river geometry data for year 1991 survey (Figure 6) and historical hydrological data such as rainfall data, flow data (Figure 7) and water level data (Figure 8) for year 1991 and year 1997 to Long-term simulations (from year 1997 until 2003) by using two computer models stated above will be analyzed but three year events were selected for calibration including year 1991 (initial condition), year 1997 and 2003 (Figure 9). The end results from the simulation will be compared to the on-site survey which will be carried on year Figure 10 shows one of the river geometry surveys at Ara Kuda during May Conclusion Rapid development takes place at river catchment area will result high discharge, erosion and deposition which will cause river instability. The 100-year flood occurs during October 2003 caused extensive damage and inconvenience to the community. Therefore, it is necessary to 476

5 predict the river channel stability that will happen due to the existing and future development in Kulim River catchments area. As a result, a design for stable channel for Kulim River based on the long-term simulation by using FLUVIAL- 12 and InfoWorks RS model will be made. Figure 6 Kulim River Cross Section Ch (After DID Kulim/Bandar Bahru). /s) Discharge, Q(m Kulim River Hydrograph Hour Figure 7 Hydrograph for Kulim River (After DID Hydrology & Water Resources Division). Water Level, D (m) Danger Level Alert Level Water Level for Kulim River Year Hour Figure 8 Water Level Chart for Kulim River (After DID Hydrology & Water Resources Division). 477

6 and all information in the completion of this paper. They are also grateful to DID Hydrology & Water Resources Division for providing hydrology data in this stidies. References Figure 9 Flow Chart of Computer Modeling for Kulim River Stability Study. Figure 10 Cross Section Ara Kuda (May 2004). Acknowledgments The authors gratefully acknowledge Department of Irrigation and Drainage (DID) Kulim/Bandar Bahru for providing river survey geometry data, flooded photo 1. Chang, H. H., FLUVIAL-12: Mathematical Model for Erodible Channel. San Diego, California. 2. Department of Irrigation and Drainage Malaysia. (1996). Kajian Pelan induk Saliran Untuk Bandar Kulim Dan Sekirta, Kedah Darul Aman. 3. Koay, B. C. (2004). River Equilibium: Case Study of Kulim River Final Year Project Thesis. Penang : Universiti Sains Malaysia. 4. Lee, C. B., (2001). Application of River Modeling (Fluvial-12): Case Studies of Kulim River and Melaka River. Final Year Project Thesis. Penang : Universiti Sains Malaysia. 5. Yahaya, N. K. (1999). Development of Sediment Rating Curves for Rivers In Malaysia: Case Studies of Pari, Kerayong and Kulim Rivers. MSc. Thesis. Penang : Universiti Sains Malaysia. 478

Issues for Urban Design and Master Planning in Seberang Perai

Issues for Urban Design and Master Planning in Seberang Perai Issues for Urban Design and Master Planning in Seberang Perai 3 July 2013 Lim Hooi Siang This paper is written to highlight the planning paradigm for what is now popularly known as corridor development.

More information

MY HOMETOWN SUSTAINABILITY. JULIANIZA ARIFFIN Land of origin : Pulau Pinang

MY HOMETOWN SUSTAINABILITY. JULIANIZA ARIFFIN Land of origin : Pulau Pinang MY HOMETOWN SUSTAINABILITY JULIANIZA ARIFFIN Land of origin : Pulau Pinang MPPP 297 sq km 2 districts MPSP 738 sq km 3 districts AREA : 1031 KM2 Penang is located in northwestern Peninsular Malaysia. This

More information

Non Investment Properties Appendix B

Non Investment Properties Appendix B Property, Plant and Equipment Lot Nos. 1108 and 1133, Title Nos. GM 177 and GM200, respectively, Mukim of Relau, District of Bandar Baharu, State of Kedah (RM) (RM) (RM) 1,600,000 1,147,000 453,000 290,000-290,000

More information

City of Jersey Village

City of Jersey Village City of Jersey Village Long-Term Flood Recovery Consultant Request for Qualifications A. INTRODUCTION The City of Jersey Village is seeking consultant services for the development of a Long- Term Flood

More information

Site Description. CCR Rule (a)(3), Emergency Action Plan (EAP)

Site Description. CCR Rule (a)(3), Emergency Action Plan (EAP) Site Description Kentucky Utilities Company (KU) owns and operates the E.W. Brown Auxiliary Pond, a CCR surface impoundment, at the E.W. Brown Generating Station in Mercer County, Kentucky. The Auxiliary

More information

Standard Training Prospectus.

Standard Training Prospectus. Power, efficiency, stability. Explore the possibilities that 12d Model delivers to your civil surface modelling projects. Standard Training Prospectus. Design software is only effective when the operator

More information

THE HILLS OF PENANG. What is happening?

THE HILLS OF PENANG. What is happening? THE HILLS OF PENANG What is happening? Presentation to YAB Lim Guan Eng KetuaMenteriNegeriPulauPinang The Penang Forum 11 January 2016 The Penang Forum reiterates that: In raising these issues we have

More information

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert: 1.1... moves to amend H.F. No. 1731 as follows: 1.2 Delete everything after the enacting clause and insert: 1.3 "Section 1. CLEAN WATER FUND APPROPRIATIONS. 1.4 The sums shown in the columns marked "Appropriations"

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018 DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 September 21, 2018 Regulatory Branch SAS-2013-00077 EXTENSION REGIONAL PERMIT

More information

Introduction: Malaysia

Introduction: Malaysia IWRM-IHP Conference 2008 and 2 nd Africa Regional Meeting of the National Committees Of UNESCO s IHP Cape Town ICC, South Africa, 10-12 March 2008 Contents Case Study: Management Instruments for Langat

More information

Mount St. Helens Long-Term Sediment Management Plan

Mount St. Helens Long-Term Sediment Management Plan Mount St. Helens Long-Term Sediment Management Plan Revised Draft Supplemental Environmental Impact Statement September 2017 Sediment retention structure and upstream sediment plain on the North Fork Toutle

More information

REQUEST FOR PROPOSALS FOR THE PROVISION OF DAM BREAK ANALYSES AND INUNDATION MAPPING SERVICES FOR SOUTH FEATHER WATER AND POWER AGENCY S

REQUEST FOR PROPOSALS FOR THE PROVISION OF DAM BREAK ANALYSES AND INUNDATION MAPPING SERVICES FOR SOUTH FEATHER WATER AND POWER AGENCY S REQUEST FOR PROPOSALS FOR THE PROVISION OF DAM BREAK ANALYSES AND INUNDATION MAPPING SERVICES FOR SOUTH FEATHER WATER AND POWER AGENCY S LITTLE GRASS VALLEY, SLY CREEK AND LOST CREEK DAMS Issued: December

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018 DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 September 21, 2018 Regulatory Branch SAS-2012-00797 EXTENSION REGIONAL PERMIT

More information

Capacity Building for Geospatial Information Management in Malaysia (Case Studies in JUPEM)

Capacity Building for Geospatial Information Management in Malaysia (Case Studies in JUPEM) The Third UN-GGIM-AP Plenary Meeting Capacity Building for Geospatial Information Management in Malaysia (Case Studies in JUPEM) Bali Indonesia 10 November 2014 Hasan Jamil Department of Survey and Mapping

More information

PUBLIC NOTICE. Michael Baker International Mr. Edward Smail 4425 Belle Oaks Drive North Charleston, South Carolina 29405

PUBLIC NOTICE. Michael Baker International Mr. Edward Smail 4425 Belle Oaks Drive North Charleston, South Carolina 29405 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: October 3, 2018 Comment Deadline: October 17, 2018 Corps Action ID Number: SAW-2009-01114 The Wilmington District, Corps of Engineers

More information

King County Flood Control District 2017 Work Program

King County Flood Control District 2017 Work Program Attachment A 2017 Budget Work Program November 7, 2016 FCD2016-20 Attach A King County Flood Control District 2017 Work Program The District work program is comprised of three categories: district oversight

More information

AWMEC. Alberta Water Management and Erosion Control Program. Introduction. Who May Apply? Grant Assistance

AWMEC. Alberta Water Management and Erosion Control Program. Introduction. Who May Apply? Grant Assistance AWMEC Alberta Water Management and Erosion Control Program Introduction Who May Apply? Grant Assistance Conditions for Project Approval and Priorities Eligibility Criteria Special Policies Northern Alberta

More information

US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009

US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009 US Army Corps of Engineers Periodic Inspection Report 9 Update Dallas City Council June 3, 2009 1 Briefing Overview Flood Protection is of primary importance to the City. The Dallas Floodway System protects

More information

Northern Corridor Economic Region (NCER) Regional Impacts, Opportunities & Prospects

Northern Corridor Economic Region (NCER) Regional Impacts, Opportunities & Prospects Northern Corridor Economic Region (NCER) Regional Impacts, Opportunities & Prospects Presentation by: Hasri Hasan Northern Corridor Implementation Authority (NCIA) 5 Regional Corridors were established

More information

MONITORING SHORELINE CHANGE USING IKONOS IMAGE AND AERIAL PHOTOGRAPHS: A CASE STUDY OF KUALA TERENGGANU AREA, MALAYSIA

MONITORING SHORELINE CHANGE USING IKONOS IMAGE AND AERIAL PHOTOGRAPHS: A CASE STUDY OF KUALA TERENGGANU AREA, MALAYSIA MONITORING SHORELINE CHANGE USING IKONOS IMAGE AND AERIAL PHOTOGRAPHS: A CASE STUDY OF KUALA TERENGGANU AREA, MALAYSIA A. Chalabi, H. Mohd-Lokman, I. Mohd-Suffian, Masoud Karamali, V. Karthigeyan, M. Masita

More information

UTAR NEW VILLAGE COMMUNITY PROJECT REPORT NAME OF NEW VILLAGE: GEMAS BARU 金马士峇鲁 JOHOR

UTAR NEW VILLAGE COMMUNITY PROJECT REPORT NAME OF NEW VILLAGE: GEMAS BARU 金马士峇鲁 JOHOR UTAR NEW VILLAGE COMMUNITY PROJECT REPORT NAME OF NEW VILLAGE: GEMAS BARU 金马士峇鲁 JOHOR Project carried out by: Student Name ID Number Course Year / Trimester 1. Chang Li Jing 1101082 2. Yee Sok Quan 1201511

More information

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator.

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator. Vanderburgh County Surveyor s Rule 13 Workbook Chapter 15.13.15 Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator. Introduction

More information

Assessment on Students Socio-Scientific Understanding: A Research Report

Assessment on Students Socio-Scientific Understanding: A Research Report Assessment on Students Socio-Scientific Understanding: A Research Report NUR JAHAN AHMAD Southeast Asian Ministers of Education Organisation Regional Centre for Education in Science and Mathematics i Copyright

More information

Senate Bill 379 Land use: general plan: safety element: climate adaptation Senator Hannah-Beth Jackson

Senate Bill 379 Land use: general plan: safety element: climate adaptation Senator Hannah-Beth Jackson Senate Bill 379 Land use: general plan: safety element: climate adaptation Senator Hannah-Beth Jackson SUMMARY Under current law, every city and county must adopt a general plan with seven mandatory elements:

More information

STORMWATER UTILITY. CREDIT MANUAL and GRANT PROGRAM DRAFT MAY credit_manual_v7.2.docx

STORMWATER UTILITY. CREDIT MANUAL and GRANT PROGRAM DRAFT MAY credit_manual_v7.2.docx STORMWATER UTILITY CREDIT MANUAL and GRANT PROGRAM DRAFT MAY 2018 credit_manual_v7.2.docx TABLE OF CONTENTS 1. A CITY GOING GREEN 1 1.1 The Green Domino Effect 1 2. LEARN THE ISSUES 2 2.1 Support for the

More information

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 7 February

More information

Recent Legislation Trends in Taiwan in Response to Hazardous Weather

Recent Legislation Trends in Taiwan in Response to Hazardous Weather 2015 International Workshop on Typhoon and Flood (IWTF) APEC Experience Sharing on Hazardous Weather Events and Risk Management Recent Legislation Trends in Taiwan in Response to Hazardous Weather Fang

More information

The Daily Erosion (and Runoff) Project: Summary and Lessons Learned

The Daily Erosion (and Runoff) Project: Summary and Lessons Learned The Daily Erosion (and Runoff) Project: Summary and Lessons Learned Brian Gelder, Daryl Herzmann, Rick Cruse, David James Iowa State University, USDA-ARS-NLAE What Is NRI Telling Us? USDA/NRCS National

More information

DELAWARE COUNTY COMPREHENSIVE EMERGENCY MANAGEMENT PLAN RISK REDUCTION

DELAWARE COUNTY COMPREHENSIVE EMERGENCY MANAGEMENT PLAN RISK REDUCTION DELAWARE COUNTY COMPREHENSIVE EMERGENCY MANAGEMENT PLAN Section II RISK REDUCTION A. Designation of County Hazard Mitigation Coordinator 1. The Delaware County Planning Director has been designated by

More information

What is MITIGATION? An action that reduces or eliminates long-term risk to people and property from natural hazards and their effects.

What is MITIGATION? An action that reduces or eliminates long-term risk to people and property from natural hazards and their effects. What is MITIGATION? An action that reduces or eliminates long-term risk to people and property from natural hazards and their effects. Hurricane Andrew (1992) Flagler Co. Wildfires (1997) Port St. Lucie

More information

REVIEW PLAN. Savannah Harbor DMCA 12A Dike Raising

REVIEW PLAN. Savannah Harbor DMCA 12A Dike Raising REVIEW PLAN For Savannah Harbor DMCA 12A Dike Raising Jasper County, South Carolina Savannah District November 25, 2011 THE INFORMATION CONTAINED IN THIS REVIEW PLAN IS DISTRIBUTED SOLELY FOR THE PURPOSE

More information

LAND JUDGING CONTEST

LAND JUDGING CONTEST LAND JUDGING CONTEST Revised 6/009 Purpose and Standards The land event seeks to effectively make students aware of the value of soils in production agriculture, environment and society. Foundation Standards:

More information

REGIONAL PERMIT. Effective date: August 15, 2013 Expiration Date: August 15, 2018

REGIONAL PERMIT. Effective date: August 15, 2013 Expiration Date: August 15, 2018 U.S. Army Corps Of Engineers Norfolk District Fort Norfolk, 803 Front Street Norfolk, Virginia 23510-1096 CENAO-REG 13-RP-15 REGIONAL PERMIT Effective date: August 15, 2013 Expiration Date: August 15,

More information

Midpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017

Midpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017 Request for Qualifications and Proposals (RFQP) for Design Consulting Services for the Webb Creek Bridge Replacement Project, Bear Creek Redwood Open Space Preserve Midpeninsula Regional Open Space District

More information

HYDROGRAPHER II Range B55/B75 BOD 07/25/18

HYDROGRAPHER II Range B55/B75 BOD 07/25/18 HYDROGRAPHER I HYDROGRAPHER II Range B55/B75 BOD 07/25/18 Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are

More information

THE 1ST UNIVERSITY METROPOLIS arrives in the heart of new penang

THE 1ST UNIVERSITY METROPOLIS arrives in the heart of new penang THE 1ST UNIVERSITY METROPOLIS arrives in the heart of new penang 2nd Penang Bridge Batu Kawan Industrial Park KDU Penang University College Design Village Outlet Mall AN EVERGREEN ADDRESS PULSATING with

More information

KULIM (M) BERHAD A SNAPSHOT KULIM (M) BERHAD

KULIM (M) BERHAD A SNAPSHOT KULIM (M) BERHAD KULIM (M) BERHAD A SNAPSHOT KULIM (M) BERHAD KULIM (M) BERHAD - A SNAPSHOT KULIM (M) BERHAD OPERATION & BUSINESS Plantations is main profit centre, hence Kulim s profitability intimately tied to CPO price

More information

NATIONAL HYDROGRAPHIC CENTRE SEA LEVEL ACTIVITIES IN MALAYSIA

NATIONAL HYDROGRAPHIC CENTRE SEA LEVEL ACTIVITIES IN MALAYSIA NATIONAL HYDROGRAPHIC CENTRE SEA LEVEL ACTIVITIES IN MALAYSIA 1 OUTLINES NATIONAL TIDE GAUGE NETWORK LIST OF GAUGE SITES TIDE GAUGE TECHNOLOGY OVERVIEW OF THE DATA AVAILABILITY SEA LEVEL PRODUCT TIDAL

More information

UNITED STATES ARMY CORPS OF ENGINEERS, BALTIMORE DISTRICT

UNITED STATES ARMY CORPS OF ENGINEERS, BALTIMORE DISTRICT FINAL OPERATIONAL RANGE ASSESSMENT PROGRAM PHASE I QUALITATIVE ASSESSMENT REPORT NEW HAMPSHIRE NATIONAL GUARD TRAINING SITE CENTER STRAFFORD, NEW HAMPSHIRE APRIL 2008 Prepared for: UNITED STATES ARMY CORPS

More information

2017 July. The impact of Penang Transport Master Plan on its real estate

2017 July. The impact of Penang Transport Master Plan on its real estate 2017 July The impact of Penang Transport Master Plan on its real estate Background of Penang Located off the north-western coast of Peninsular Malaysia, Penang Island is Malaysia s most heavily populated

More information

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT October 19, 2016 REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT ON APPLICATIONS TO THE CLEAN WATER AND WASTEWATER FUND PURPOSE To seek Council's authorization

More information

UNIVERSITY OF CALIFORNIA, SANTA CRUZ

UNIVERSITY OF CALIFORNIA, SANTA CRUZ UNIVERSITY OF CALIFORNIA, SANTA CRUZ BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ PHYSICAL PLANNING, DEVELOPMENT & OPERATIONS UC SANTA CRUZ, CALIFORNIA

More information

Memorandum. Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso

Memorandum. Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso Memorandum DATE October 7, 2010 TO Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso Mayor Pro Tern Dwaine Caraway

More information

PUBLIC NOTICE.

PUBLIC NOTICE. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: January 19, 2017 Comment Deadline: February 17, 2017 Corps Action ID Number: SAW-2011-01243 The Wilmington District, Corps of Engineers

More information

Whanganui Catchment Strategy Operational Plan

Whanganui Catchment Strategy Operational Plan Whanganui Catchment Strategy July 2016 Endorsed by Council at the Catchment Operations meeting on xxx Author Sarah Nicholson, Environmental Management Officer Land Grant Cooper, Environmental Manager (Land)

More information

-2SD +2SD -3SD -2SD -3SD -2SD

-2SD +2SD -3SD -2SD -3SD -2SD Local 1980 RURAL 0. -5.99 462 0.2 4.7 1.3 14.1 43.9 3.9 37.0 Poor rural kampungs 00322 RURAL 0. -0.99 73 1.4 2.7 8.2 6.9 26.0 0.0 13.7 Poor rural kampungs RURAL 1 94 0.0 6.4 0.0 12.8 37.2 1.1 33.0 Poor

More information

Rock Cut-Slope Design and Construction Grundy Redevelopment Site E Steve Spagna Project Geologist

Rock Cut-Slope Design and Construction Grundy Redevelopment Site E Steve Spagna Project Geologist Rock Cut-Slope Design and Construction Grundy Redevelopment Site E Steve Spagna Project Geologist Project Description Redevelopment site Area B Ringwall including levee construction and US 460 upgrade

More information

DELFI WAREHOUSE PROPERTY INFORMATION SPACE PROPOSAL. PLO 563, Jalan Keluli 8, Pasir Gudang Industrial Estate, Pasir Gudang, Johor

DELFI WAREHOUSE PROPERTY INFORMATION SPACE PROPOSAL. PLO 563, Jalan Keluli 8, Pasir Gudang Industrial Estate, Pasir Gudang, Johor DELFI WAREHOUSE PROPERTY INFORMATION SPACE PROPOSAL PLO 563, Jalan Keluli 8, Pasir Gudang Industrial Estate, 81700 Pasir Gudang, Johor September 2017 ABOUT AXIS-REIT Mission of the Fund To provide consistent

More information

Structural Flood Mitigation

Structural Flood Mitigation Community Emergency Preparedness Fund Structural Flood Mitigation 1. Introduction 2018 Program & Application Guide The Community Emergency Preparedness Fund (CEPF) is a suite of funding programs intended

More information

Hazard Mitigation Assistance Programs

Hazard Mitigation Assistance Programs Mississippi Emergency Management Agency Lee Smithson, Executive Director Hazard Mitigation Assistance Programs Overview Introduction A few words from those who made this webinar possible: Jana Henderson,

More information

Section 4.2 Tahoe EIP Individual Project Summaries

Section 4.2 Tahoe EIP Individual Project Summaries Section 4.2 Tahoe EIP Individual Project Summaries Page 1 of 63 Angora Creek Road Damage CIP Project Summary Project No: 78723 Type: Emergency Click for Interactive Map Project Description: Angora Creek

More information

APPENDIX J FUNDING SOURCES

APPENDIX J FUNDING SOURCES APPENDIX J FUNDING SOURCES Existing Programs and Funding Sources There are numerous options available to Dane County for the financing of a flood mitigation program. The identification of potential funding

More information

First Annual RCRA CCR Unit Inspection Report January 2016 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT

First Annual RCRA CCR Unit Inspection Report January 2016 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT NORTHERN INDIANA PUBLIC SERVICE COMPANY R.M. SCHAHFER GENERATING STATION First Annual RCRA CCR Unit Inspection Report January 2016 REPORT WASTE DISPOSAL AREA SURFACE IMPOUNDMENT Submitted To: Northern

More information

Broward County LMS Working Group Proposed Mitigation Project (Page 1 of 7)

Broward County LMS Working Group Proposed Mitigation Project (Page 1 of 7) (Page 1 of 7) Date of Submittal: Project Identification Number (Internally Assigned): Proposing Jurisdiction/Organization: Contact Name: Address: Address: Telephone: Fax Number: Email Address: The Proposal

More information

Alabama Course of Study SEVENTH GRADE Geography

Alabama Course of Study SEVENTH GRADE Geography McDOUGAL LITTELL correlated to the Alabama Course of Study SEVENTH GRADE Geography McDougal Littell World Cultures and Geography: Eastern Hemisphere correlated to the Alabama Course of Study SEVENTH GRADE

More information

Expanding Visibility for Coastal San Luis RCD. Coastal San Luis Resource Conservation District (CSLRCD) 1203 Morro Bay, Suite B, Morro Bay, CA, 93442

Expanding Visibility for Coastal San Luis RCD. Coastal San Luis Resource Conservation District (CSLRCD) 1203 Morro Bay, Suite B, Morro Bay, CA, 93442 Community Grant Program Application Submit application by email to staff@mbnep.org or mail to the Morro Bay National Estuary Program s offices by 4pm on the due date. Please be sure to include the summary

More information

Document Control. Author Control. Reviewer Control. Version Date Author Purpose V1.0 23/4/2015 Jeeva Rubine To format the Location List

Document Control. Author Control. Reviewer Control. Version Date Author Purpose V1.0 23/4/2015 Jeeva Rubine To format the Location List Document Control Author Control Version Date Author Purpose V1.0 23/4/2015 Jeeva Rubine To format the Location List Reviewer Control Version Date Reviewer Comments V1.0 23/4/2015 Lucy Ling Approved. OUR

More information

Grant All-Detail Report Clean Water Assistance

Grant All-Detail Report Clean Water Assistance Grant All-Detail Report 2011 - Clean Water Assistance Grant Title - 2011 - Clean Water Assistance - St. Louis, South (SWCD) Grant ID - C13-0259 Organization - St Louis, South SWCD Grant Awarded Amount

More information

BMPs eligible for funding under the Grants in Aid pilot project were based on the draft MRGP, and included the following:

BMPs eligible for funding under the Grants in Aid pilot project were based on the draft MRGP, and included the following: GRANTS IN AID PILOT PROJECT State Fiscal Year 2018- FINAL REPORT INTRODUCTION The Grants-in-Aid pilot project provided funding for municipalities to construct best management practices on municipal roads

More information

STATE OF NEW JERSEY. SENATE, No SENATE BUDGET AND APPROPRIATIONS COMMITTEE STATEMENT TO. with committee amendments DATED: NOVEMBER 9, 2015

STATE OF NEW JERSEY. SENATE, No SENATE BUDGET AND APPROPRIATIONS COMMITTEE STATEMENT TO. with committee amendments DATED: NOVEMBER 9, 2015 SENATE BUDGET AND APPROPRIATIONS COMMITTEE STATEMENT TO SENATE, No. 2769 with committee amendments STATE OF NEW JERSEY DATED: NOVEMBER 9, 2015 The Senate Budget and Appropriations Committee reports favorably

More information

CANADA CARIBBEAN DISASTER RISK MANAGEMENT FUND. Country Snapshot. Belize

CANADA CARIBBEAN DISASTER RISK MANAGEMENT FUND. Country Snapshot. Belize Country Snapshot Belize About the CCDRMF The Canada Caribbean Disaster Risk Management Fund (CCDRMF) is one component of Global Affairs Canada s 1 (GAC) larger regional Caribbean Disaster Risk Management

More information

Request for Qualifications (RFQ) Environmental and Permitting Services

Request for Qualifications (RFQ) Environmental and Permitting Services Request for Qualifications (RFQ) Environmental and Permitting Services Responses Due: City of Banning Public Works Department 99 E. Ramsey Street Banning, CA 92220 (951) 922-3130 May, 2015 05/19/15 i TABLE

More information

INTERNATIONAL HYDROGRAPHIC ORGANIZATION CAPACITY BUILDING COMMITTEE

INTERNATIONAL HYDROGRAPHIC ORGANIZATION CAPACITY BUILDING COMMITTEE INTERNATIONAL HYDROGRAPHIC ORGANIZATION CAPACITY BUILDING COMMITTEE EAHC TECHNICAL VISIT TO THE WATERWAYS DEPARTMENT MINISTRY OF PUBLIC WORKS AND TRANSPORT KINGDOM OF CAMBODIA -REPORT- DECEMBER / 2013

More information

BRANCH LOCATIONS. OCBC Bank Head Office Menara OCBC No. 18 Jalan Tun Perak Kuala Lumpur

BRANCH LOCATIONS. OCBC Bank Head Office Menara OCBC No. 18 Jalan Tun Perak Kuala Lumpur BRANCH LOCATIONS Head Office Menara OCBC No. 18 Jalan Tun Perak 50050 Kuala Lumpur Head Office 25th Floor, Wisma Lee Rubber 1 Jalan Melaka 50100 Kuala Lumpur For West Malaysia Branches 9:30am to 4:00pm

More information

WATER SUPPLY AND DEMAND STATUS IN MALAYSIA SURUHANJAYA PERKHIDMATAN AIR NEGARA SPAN

WATER SUPPLY AND DEMAND STATUS IN MALAYSIA SURUHANJAYA PERKHIDMATAN AIR NEGARA SPAN WATER SUPPLY AND DEMAND STATUS IN MALAYSIA 2010 2020 SURUHANJAYA PERKHIDMATAN AIR NEGARA SPAN 1 Introduction: Managing our Water Resources 2 Introduction: Managing our Water Resources 3 Introduction: Managing

More information

NO REGION OUTLETS ADDRESS OPERATION HOURS Lot No. S40, Second Floor, AEON Jusco Bukit Tinggi 1

NO REGION OUTLETS ADDRESS OPERATION HOURS Lot No. S40, Second Floor, AEON Jusco Bukit Tinggi 1 NO REGION OUTLETS ADDRESS OPERATION HOURS Lot No. S40, Second Floor, AEON Jusco Bukit Tinggi 1 Blue Cube Jusco Bukit Shopping, Persiaran Tinggi Batu Nilam 1, KS, Bandar Bukit 10.00am - 10.30pm Tinggi 2,

More information

Prepared for CITY OF STAGECOACH Boot Hill Road Stagecoach, Texas 77355

Prepared for CITY OF STAGECOACH Boot Hill Road Stagecoach, Texas 77355 LAKE HARDIN DAM CITY OF STAGECOACH TX05829 EMERGENCY ACTION PLAN Prepared for CITY OF STAGECOACH 16930 Boot Hill Road Stagecoach, Texas 77355 Prepared by City Emergency Manager Michael C. Wethington and

More information

Dakota County Soil and Water Conservation District Annual Plan

Dakota County Soil and Water Conservation District Annual Plan Dakota County Soil and Water Conservation District 2007 Annual Plan TABLE OF CONTENTS Section I Introduction Organization Background... 2 Annual Plan Purpose and Mission Statement....2-3 Organizational

More information

Water Quality Improvement Program. Funding Application Guide

Water Quality Improvement Program. Funding Application Guide Water Quality Improvement Program Funding Application Guide October 2018 Table of Contents I. Introduction... 2 II. Eligibility... 3 II.1 Eligible Projects... 3 II.2 Eligible Recipients... 4 III. Funding

More information

Positioning Your SME Business for Expansion with a Corporate Factory

Positioning Your SME Business for Expansion with a Corporate Factory Positioning Your SME Business for Expansion with a Corporate Factory Freehold Super Link & Semi D units 12,000 sq.ft Built Up Land Area 6,000 to 15,000 sq ft Private Front Compound with Guard House Major

More information

GULF COAST RESTORATION CORPS

GULF COAST RESTORATION CORPS THE CORPS NETWORK 1100 G STREET, NW, SUITE 1000, WASHNIGTON, DC 20005 TEL 202.737.6272 FAX 202.737.6277 WWW.CORPSNETWORK.ORG Project Summary The Corps Network (TCN) stands ready and willing to assist the

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE DOWNTOWN SPECIFIC PLAN COMMENT PERIOD

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE DOWNTOWN SPECIFIC PLAN COMMENT PERIOD DATE: February 15, 2017 TO: FROM: RE: Interested Persons Tom Buford, Senior Planner Community Development Department NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE

More information

Cumberland County Conservation District Strategic Plan Adopted June 23, 2009

Cumberland County Conservation District Strategic Plan Adopted June 23, 2009 Cumberland County Conservation District Strategic Plan Adopted June 23, 2009 Strategic Planning process and purpose This strategic plan is intended to provide a clear and realistic view of the Cumberland

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM Environmental Management Chapter 335-13-14 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM CHAPTER 335-13-14 COMPOSITING FACILITIES TABLE OF CONTENTS 335-13-14-.01 Purpose

More information

REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH DATE FEBRUARY 1, 2016

REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH DATE FEBRUARY 1, 2016 REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH 03580 DATE FEBRUARY 1, 2016 TABLE OF CONTENTS 1. SUMMARY AND BACKGROUND... 2 2. PROPOSAL GUIDELINES...

More information

WHOLE WATERSHED RESTORATION INITIATIVE Request for Proposals for Community-based Habitat Restoration Projects in Oregon and Washington

WHOLE WATERSHED RESTORATION INITIATIVE Request for Proposals for Community-based Habitat Restoration Projects in Oregon and Washington WHOLE WATERSHED RESTORATION INITIATIVE 2014 Request for Proposals for Community-based Habitat Restoration Projects in Oregon and Washington Proposal Deadline January 9, 2014 at 5:00 PM Pacific Standard

More information

Pre- and Post-Katrina Planning in Pearl River County. Pearl River County

Pre- and Post-Katrina Planning in Pearl River County. Pearl River County Pre- and Post-Katrina Planning in Pearl River County A Proactive Approach to Staying Ahead of Development and Regulatory Curves Harold Holmes Pearl River County Planning and Development David Spector -

More information

BOROUGH OF POOLE COUNCIL. 15 December 2015

BOROUGH OF POOLE COUNCIL. 15 December 2015 AGENDA ITEM 21 BOROUGH OF POOLE COUNCIL 15 December 2015 ACCESS STRATEGY FOR THE PORT OF POOLE & REGENERATION AREA GRAVEL HILL IMPROVEMENTS (INCLUDING DUNYEATS JUNCTION) REPORT OF THE HEAD OF TRANSPORTATION

More information

Ferrard House EMI Unit. Ferrard House is a statutory residential home for the Elderly Mentally Infirm located on the Station Road, Antrim.

Ferrard House EMI Unit. Ferrard House is a statutory residential home for the Elderly Mentally Infirm located on the Station Road, Antrim. Ferrard House EMI Unit 1.0 Background Ferrard House is a statutory residential home for the Elderly Mentally Infirm located on the Station Road, Antrim. On Wednesday 27 June 2012 flood waters entered the

More information

SUBJECT: South Atlantic Division Regional Programmatic Review Plan for the Continuing Authorities Program

SUBJECT: South Atlantic Division Regional Programmatic Review Plan for the Continuing Authorities Program DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA 30303-8801 CESAD-CG MEMORANDUM FOR Commander, Charleston District Commander, Jacksonville

More information

UTAR NEW VILLAGE COMMUNITY PROJECT REPORT NAME OF VILLAGE: TANAH MERAH SITE C 丹那美拉 'C' NEGERI SEMBILAN

UTAR NEW VILLAGE COMMUNITY PROJECT REPORT NAME OF VILLAGE: TANAH MERAH SITE C 丹那美拉 'C' NEGERI SEMBILAN UTAR NEW VILLAGE COMMUNITY PROJECT REPORT NAME OF VILLAGE: TANAH MERAH SITE C 丹那美拉 'C' NEGERI SEMBILAN Project carried out by: Student Name ID Number Course Year/Semester 1. Cheok Tuan Shen 10UKB01122

More information

Pennsylvania Dirt, Gravel, and Low- Volume Road Maintenance Program 2016 Annual Summary Report

Pennsylvania Dirt, Gravel, and Low- Volume Road Maintenance Program 2016 Annual Summary Report Pennsylvania Dirt, Gravel, and Low- Volume Road Maintenance Program 2016 Annual Summary Report June 2017 Photo: A French Mattress, consisting of clean stone wrapped in separation fabric, is being installed

More information

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017 DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 JANUARY 25, 2017 Regulatory Division SAS-2003-23580 PUBLIC NOTICE ISSUANCE OF PROGRAMMATIC

More information

Table of Contents. October 2016 i

Table of Contents. October 2016 i October 2016 i 1663066 Table of Contents 1.0 INTRODUCTION... 1 2.0 POST-CLOSURE PLAN... 2 2.1 Inspection... 2 2.2 Maintenance... 2 2.3 Monitoring... 3 2.4 Contact Information... 3 2.5 Planned Uses... 3

More information

FEEL-LITE LED LIGHTING MALAYSIA

FEEL-LITE LED LIGHTING MALAYSIA FEEL-LITE LED LIGHTING MALAYSIA KEDAH OUTLET-4 KEDAH JITRA AIRCORD & LIGHTING 32,JALAN BAHAGIA 1, TAMAN BAHAGIA 2, 06000 JITRA, KEDAH. TEL: 019-475 1389-KHOR KEDAH OUTLET-3 KEDAH BFC LIGHTING CENTRE (SG.PETANI)

More information

Gary McAlpin. Naples, FL Dear Gary: This letter is. caused by. problem and. current. the existing. reports. nts. will be. edge of.

Gary McAlpin. Naples, FL Dear Gary: This letter is. caused by. problem and. current. the existing. reports. nts. will be. edge of. 1 of 8 CB&I Coastal Planning & Engineering, Inc. 2481 NW Boca Raton Blvd. Boca Raton, FL 33431 Tel: +1 561 391 8102 Fax: +1 561 391 9116 www.cbi.com October 22, 2014 Gary McAlpin Collier County Government

More information

I. Introduction. II. Goals of the Program

I. Introduction. II. Goals of the Program 2017 Chesapeake Bay Trust- Anne Arundel County Watershed Restoration Grant Program Application Package www.chesapeakebaytrust.org / 410-974-2941 I. Introduction The Watershed Restoration Grant Program

More information

IMPERIAL COUNTY CLASS TITLE: SENIOR ENGINEER - PUBLIC WORKS (OPTION CLASS)

IMPERIAL COUNTY CLASS TITLE: SENIOR ENGINEER - PUBLIC WORKS (OPTION CLASS) IMPERIAL COUNTY CLASS TITLE: SENIOR ENGINEER - PUBLIC WORKS (OPTION CLASS) BASIC FUNCTION: Under the direction of the Deputy Director of Public Works-Engineering, plan, organize and direct Design Engineering,

More information

LAND AT LOWER ROAD, STALBRIDGE PUBLIC CONSULTATION. Proposed Residential Development

LAND AT LOWER ROAD, STALBRIDGE PUBLIC CONSULTATION. Proposed Residential Development LAND AT LOWER ROAD, STALBRIDGE PUBLIC CONSULTATION Proposed Residential Development YOUR VIEW MATTERS TO US PROPOSED RESIDENTIAL DEVELOPMENT AREA Thank you for taking the time to read this information

More information

Determining Residual Flood Risk Associated with a

Determining Residual Flood Risk Associated with a Determining Residual Flood Risk Associated with a Complex Levee System in Fort Bend County, TX NAFSMA Annual Meeting 2017, Charleston, SC Andre McDonald & Richard Lewis Outline 1. The Fort Bend levee system

More information

WINDSHIELD SURVEY REPORT

WINDSHIELD SURVEY REPORT Florida Department of Environmental Protection (DEP) Division of Water Resource Management Bureau of Beaches and Coastal Systems 3900 Commonwealth Boulevard, Mail Station 300 Tallahassee, Florida 32399-3000

More information

CRS Floodplain Management Plan Annual Report

CRS Floodplain Management Plan Annual Report CRS Floodplain Management Plan Annual Report 2018 This report is a summary of the Floodplain Management Committee review of activities outlined in Step 8, of the Grand Prairie Floodplain Management Plan

More information

WHOLE WATERSHED RESTORATION INITIATIVE

WHOLE WATERSHED RESTORATION INITIATIVE WHOLE WATERSHED RESTORATION INITIATIVE 2015 Request for Proposals for Community-based Habitat Restoration Projects in Oregon Proposal Deadline is February 10, 2015 at 5:00 PM Pacific Standard Time Funding

More information

APPLICATION FOR FUNDING BUSHKILL STREAM & STREAMBANK REHABILITATION PROJECT

APPLICATION FOR FUNDING BUSHKILL STREAM & STREAMBANK REHABILITATION PROJECT STATE OF NEW YORK TOWN OF OLIVE NY STATE CDBG-DISASTER RECOVERY PROGRAM APPLICATION FOR FUNDING BUSHKILL STREAM & STREAMBANK REHABILITATION PROJECT FEBRUARY, 2016 PREPARED BY HUNT, GUILLOT, & ASSOCIATES,

More information

SUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1

SUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1 SUMMARY REPORT OPERATIONS and MAINTENANCE PLANS and CRITERIA HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1 ANSONIA and DERBY, CONNECTICUT December 2010 MMI #1560-119 and #3118-03

More information

2:00 p.m. on Monday, August 11, 2014

2:00 p.m. on Monday, August 11, 2014 SAN DIEGUITO RIVER PARK JOINT POWERS AUTHORITY REQUEST FOR PROPOSAL TO PREPARE A FEASIBILITY STUDY FOR A TRAIL BRIDGE OVER THE SAN DIEGUITO RIVER (POLO/MORGAN RUN) I. INVITATION You are invited to submit

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-OM Regulation No. 1130-2-530 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Project Operations FLOOD CONTROL OPERATIONS AND MAINTENANCE POLICIES ER 1130-2-530 Distribution

More information

Presentation Outline

Presentation Outline Lealman Central Area Improvements Preliminary Engineering Study Public Meeting No. 1 April 4, 2012 1 Presentation Outline Welcome History Within the Study Area Study Overview Public Involvement / Public

More information

METHODOLOGY - Scope of Work

METHODOLOGY - Scope of Work The scope of work for the Truckee West River Site Redevelopment Feasibility Study will be undertaken through a series of sequential steps or tasks and will comprise four major tasks as follows. TASK 1:

More information

Standard Operating Procedure: Stormwater BMP Inspections

Standard Operating Procedure: Stormwater BMP Inspections Standard Operating Procedure: Stormwater BMP Inspections Issue Date: 12/20/2016* Version: 2 Review Frequency: Annual Reasons for Procedure The University of Virginia (UVA) has a permit to operate a Municipal

More information