1 Standard Operating Procedure: Stormwater BMP Inspections Issue Date: 12/20/2016* Version: 2 Review Frequency: Annual Reasons for Procedure The University of Virginia (UVA) has a permit to operate a Municipal Separate Storm Sewer System (MS4) issued by the Virginia Department of Environmental Quality. This permit authorizes UVA to discharge stormwater pursuant to the Virginia Stormwater Management Program and the Virginia Stormwater Management Act (VSMA). UVA has installed best management practices (BMPs) that reduce the flow of storm runoff and reduce the amount of pollutants leaving the practice. In order for these BMPs to operate efficiently, they must be periodically inspected and have maintenance performed on them. 1.0 Purpose The purpose of this procedure is to outline the process involved with setting up and conducting inspections of stormwater BMPs and initiating follow-up maintenance. 2.0 Scope This procedure applies to staff in Environmental Resources, Landscaping, and Utility Systems Distribution. 3.0 Responsibility 3.1 Environmental Resources Staff The SWM and E&SC Program Administrator, with support from the Civil Engineer, is responsible for keeping these procedures up-to-date, overseeing the BMP maintenance program for compliance with regulatory requirements, and providing periodic training on conducting thorough BMP inspection, and providing technical support for maintenance activities. 3.2 Supervisors Supervisors are responsible for ensuring their staff s compliance with this procedure. Supervisors are to train their employees on how to follow these procedures, using the most recent version of the SOP. 3.3 BMP Inspectors Personnel must follow the correct procedures in accordance with the latest version of this SOP. Specific responsibilities are explained in the procedures described below.

2 4.0 Procedures 4.1 Add New BMPs to Inventory Once record drawings are available for each new BMP installed on Grounds, the Program Administrator must ensure that the BMP is added to our GIS system and AiM. These databases must contain the following information: A UVA-specific, unique identifier in the following format: SB##-BLDG-N o SB## is the watershed sub-basin, e.g., ME06 or MO3A o BLDG is the four digit building number the BMP is associated with o N is a sequentially assigned number. BMP type A general description of the BMP s location, including latitude and longitude (to be determined by GIS staff) Acres treated by the BMP, including total acres, as well as a breakdown of pervious and impervious areas The date the BMP was brought online (MM/YYYY). The sixth order hydrologic unit code (HUC) in which the BMP is located. Meadow Creek watershed is JR14; Moores Creek watershed is JR15; and Ivy Creek watershed is JR07. The name of the impaired water segments within each HUC (e.g., Meadow Creek, Moores Creek or Ivy Creek) The date of the most recent inspection conducted on the BMP. 4.2 General Inspection Frequencies and Responsible Parties UVA FM has developed BMP inspection checklists tailored to each type of BMP and also the group performing the inspection (Landscaping or Utilities). Below is a list of the frequencies at which inspections are established in AiM: BMP Type Landscaping Inspections Utilities Inspections Biofilter Monthly, Semi-Annual Semi-Annual Extended Detention (Dry) Pond Monthly, Semi-Annual Semi-Annual Grass Channel Monthly, Semi-Annual Annual Infiltration Monthly, Semi-Annual Semi-Annual Page 2

3 BMP Type Landscaping Inspections Utilities Inspections Permeable Pavers Monthly, Annual Semi-Annual Rip Rap Channels Monthly, Semi-Annual Annual Underground/Manufactured (specific to practice, location) n/a Monthly, Quarterly, Semi-Annual, Annual Vegetated Roofs Semi-Annual n/a Wet Ponds & Wetlands Monthly, Semi-Annual Monthly, Semi-Annual Other timing recommendations include: Conduct semi-annual inspections within 72 hours after a significant rain event to look for signs of ponding water. Conduct semi-annual inspections in spring and fall before/after plants are in full foliage so as to better see any erosion problems. If possible, conduct at least one inspection per year during a rain event. 4.3 Pre-Inspection Preparation AiM provides reminders of when the inspections should be conducted, and includes the detailed inspection checklists tailored to the group and frequency. The inspector should print semi-annual and annual inspection checklists to take into the field; monthly checklists may be printed or viewed on a mobile device. If unfamiliar with a BMP, the inspector should review the annotated maps available for each BMP that highlights contributing drainage area, inlets, forebays, outlets and other key features. These maps are available electronically in AiM and/or in the network folder G:\\PERMITTING\Stormwater\BMP Inspection Reports\_BMP Maps\. The inspector may need the following tools during their inspection: PPE (boots, sunscreen, bug spray, etc.) Clipboard with checklists and pen Camera Container for trash Shovel and/or rake and container for collected debris Cleanout pipe opening tool, Manhole puller Flashlight, and Page 3

4 Sludge judge or other tool for gauging sediment building up in underground structures. 4.4 Inspection Process Monthly - The inspector should review the monthly checklist/routine maintenance items for completeness. The checklist does not need to be turned in, but the monthly inspection must be marked as completed in AiM. Quarterly/Semi-Annual/Annual Inspections - The inspector should review each checklist item, rate the severity of any problems identified, and attempt to fix them. Items that should be reviewed during the inspection and potential remedies to common problems are provided on the checklists. The inspector should clearly indicate on the inspection checklist if a problem was fixed, is scheduled to be fixed at another time (e.g., mowing or invasives removal), or requires engineering or funding support to be completed. If follow-up work is recommended, refer to the procedures in Section 4.5 of this SOP. Completed quarterly, semi-annual, and annual checklists must be submitted to the Program Administrator and the task marked as completed in AiM. General - Trash removed from the BMP should be taken to an appropriate dumpster near the BMP or in the FM Yard. Leaves, sticks, and other naturally derived organic matter can be taken to the compost yard on Observatory Hill and placed in the leaf composting area. There cannot be any other litter or trash in this material and it cannot contain free liquids (i.e., it cannot be dripping wet). Do not leave this material piled adjacent to the outlet structure or other areas in or near the BMP. 4.5 Follow-up Maintenance Process The Program Administrator reviews the completed inspection checklists for follow-up maintenance needs. All problems identified on the checklists will be summarized in a tracking spreadsheet located at G:\\PERMITTING\Stormwater\BMP Inspection Reports\ SWM BMP inspection results.xlsx. Checklist items are ranked by the inspector using a scale of 0 to 3 where: 0 = Good condition. Well maintained, no action required. 1 = Moderate condition. Adequately maintained, routine maintenance needed. 2 = Degraded condition. Poorly maintained, routine maintenance and repair needed. 3 = Serious condition. Immediate need for repair or replacement. The Program Administrator or Civil Engineer should field verify any problems ranked 2 or 3. If these rankings are confirmed, they will work with the Landscaping and Utilities Department to develop a maintenance plan, identify the needed resources (e.g., materials, outside contractors, etc.), and secure the project funding. Problems ranked 1 require routine maintenance that in-house staff should be able to perform or contract for directly. Separate phases shall be created in AiM to track inspections, routine maintenance, and nonroutine maintenance. All inspection and maintenance work performed on a BMP should be Page 4

5 billed against the BMP so the Program Administrator and Supervisors gain a better understanding of the true costs of maintaining the practices. Post-inspection follow-on work can either be set up as a new phase in AiM under the associated PM template or a new work order can be set up, but ensure it is associated with the BMP s asset number and asset funding method. If the inspector has any questions related to the BMPs and especially if they are uncertain of how to maintain the practices, they are to contact the Program Administrator or Civil Engineer. 4.6 Documentation and Reporting Completed quarterly, semi-annual, and annual inspection checklists must be turned into the Program Administrator for scanning and filing. Inspection records must be retained for five years from the date of inspection. Staff should also provide to Environmental Resources estimates of the quantity of sediment removed from BMPs during maintenance activities for inclusion in the annual MS4 permit report. Additional information to include in the annual MS4 permit report includes: Information on each new or modified BMP installed during the fiscal year, Number of BMP inspections completed. Construction record drawings for a BMP must be maintained in perpetuity or until the BMP is removed. 5.0 Annual Review of Procedure/Training The Supervisors for Environmental Resources, Landscaping, and Utility Systems Distribution are responsible for conducting annual training and annual reviewing of this procedure with the appropriate staff as referenced in Section Regulatory impacts Minimum Control Measure 5 in UVA s MS4 Permit 1 requires adequate long-term operation and maintenance of the stormwater BMPs in accordance with written inspection and maintenance procedures. The BMPs shall be inspected at least once per year, and maintenance shall be performed on them as necessary. *Printed versions of SOPs with previous review dates are considered current as long as the version number is the same as the current version. Current versions of all SOPs are maintained on the UVA Environmental Resources website. 1 General Permit No: VAR040073, General Permit for Discharges of Stormwater from Small Municipal Separate Storm Sewer Systems. Page 5

LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS

LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS The Department of Environmental Protection

More information

Water Quality Improvement Program. Funding Application Guide

Water Quality Improvement Program. Funding Application Guide Water Quality Improvement Program Funding Application Guide October 2018 Table of Contents I. Introduction... 2 II. Eligibility... 3 II.1 Eligible Projects... 3 II.2 Eligible Recipients... 4 III. Funding

More information

BMPs eligible for funding under the Grants in Aid pilot project were based on the draft MRGP, and included the following:

BMPs eligible for funding under the Grants in Aid pilot project were based on the draft MRGP, and included the following: GRANTS IN AID PILOT PROJECT State Fiscal Year 2018- FINAL REPORT INTRODUCTION The Grants-in-Aid pilot project provided funding for municipalities to construct best management practices on municipal roads

More information

ANNUAL STANDARDS AND SPECIFICATIONS

ANNUAL STANDARDS AND SPECIFICATIONS ANNUAL STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT Submitted: September 2011 Revised: October 2011 Subject: GEORGE MASON UNIVERSITY ANNUAL STANDARDS AND SPECIFICATIONS

More information

1. MS4 Operator Name: ST. CLAIR TOWNSHIP & ROAD DISTRICT. 2. MS4 Operator Mailing Address: 107 SERVICE STREET SWANSEA IL Street City State Zip

1. MS4 Operator Name: ST. CLAIR TOWNSHIP & ROAD DISTRICT. 2. MS4 Operator Mailing Address: 107 SERVICE STREET SWANSEA IL Street City State Zip ILLINOIS ENVIRONMENTAL PROTECTION AGENCY NOTICE OF INTENT FOR NEW OR RENEWAL OF GENERAL PERMIT FOR DISCHARGES FROM SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4s) Part 1. General Information Input

More information

EXHIBIT "A" SCOPE OF SERVICES FOR DISTRICT WIDE NPDES CONSULTANT SERVICES FINANCIAL PROJECT NO

EXHIBIT A SCOPE OF SERVICES FOR DISTRICT WIDE NPDES CONSULTANT SERVICES FINANCIAL PROJECT NO EXHIBIT "A" SCOPE OF SERVICES FOR DISTRICT WIDE NPDES CONSULTANT SERVICES FINANCIAL PROJECT NO. 259401 1 72 11 Revised: 07/10/18 07/09/18 i TABLE OF CONTENTS I. PURPOSE... A-1 II. SERVICES... A-1 A. Facilities

More information

NYC S GREEN INFRASTRUCTURE PROGRAM AND USE OF GRANT FUNDING FOR DESIGN & CONSTRUCTION

NYC S GREEN INFRASTRUCTURE PROGRAM AND USE OF GRANT FUNDING FOR DESIGN & CONSTRUCTION NYC S GREEN INFRASTRUCTURE PROGRAM AND USE OF GRANT FUNDING FOR DESIGN & CONSTRUCTION June 19, 2013 Nitin Katiyar, P.E. (HDR Engineering) nitin.katiyar@hdrinc.com William Leo, P.E. (HDR Engineering) william.leo@hdrinc.com

More information

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson 1. Purpose: This document is to provide a summary of regulations that Fort Jackson and associated consultants,

More information

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator.

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator. Vanderburgh County Surveyor s Rule 13 Workbook Chapter 15.13.15 Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator. Introduction

More information

Submission, Review, and Approval Procedures

Submission, Review, and Approval Procedures CHAPTER 2 Submission, Review, and Approval Procedures 2.0 Introduction Chapter 2, Submission, Review, and Approval Procedures, outlines the steps required to obtain Philadelphia Water Department (PWD)

More information

STORMWATER UTILITY. CREDIT MANUAL and GRANT PROGRAM DRAFT MAY credit_manual_v7.2.docx

STORMWATER UTILITY. CREDIT MANUAL and GRANT PROGRAM DRAFT MAY credit_manual_v7.2.docx STORMWATER UTILITY CREDIT MANUAL and GRANT PROGRAM DRAFT MAY 2018 credit_manual_v7.2.docx TABLE OF CONTENTS 1. A CITY GOING GREEN 1 1.1 The Green Domino Effect 1 2. LEARN THE ISSUES 2 2.1 Support for the

More information

I. Introduction. II. Goals of the Program

I. Introduction. II. Goals of the Program 2017 Chesapeake Bay Trust- Anne Arundel County Watershed Restoration Grant Program Application Package www.chesapeakebaytrust.org / 410-974-2941 I. Introduction The Watershed Restoration Grant Program

More information

Lexington s Stormwater Quality Projects Incentive Grant Program

Lexington s Stormwater Quality Projects Incentive Grant Program Lexington s Stormwater Quality Projects Incentive Grant Program PRESENTED BY: Gregory S. Lubeck, P.E., CFM, ENGINEERING SECTION MANAGER LEXINGTON-FAYETTE URBAN COUNTY GOVERNMENT Discussion Topics EPA Consent

More information

Section 5 BMP Implementation and Evaluation 5.1 Introduction

Section 5 BMP Implementation and Evaluation 5.1 Introduction 5.1 Introduction As noted in Section 1 each municipality regulated under stormwater NPDES permits, whether categorized as a Phase I or Phase II municipality, is required to implement a stormwater management

More information

NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form

NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form Instructions for completing this form: ARR040000 requires that this form be used when submitting annual reports. You may request approval

More information

TOWN OF GREENWICH Annual Department Operational Plan (FY )

TOWN OF GREENWICH Annual Department Operational Plan (FY ) TOWN OF GREENWICH Annual Department Operational Plan (FY 2012 2013) 1. Department: Inland Wetlands and Watercourses Agency 2. Divisions: N/A 3. Department Mission Statement: The Inland Wetlands and Watercourses

More information

PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY

PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY John R. Kasich, Governor Mary Taylor, Lt. Governor Scott J. Nally, Director PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY REQUEST FOR PROPOSALS Surface Water Improvement Fund

More information

SECTION 4. Construction Site Runoff Control Program

SECTION 4. Construction Site Runoff Control Program SECTION 4 Construction Site Runoff Control Program SECTION 4 Construction Site Runoff Control Program (Permit Part D.1.d.) I. Introduction The purpose of the (USAG HI) Construction Site Runoff Control

More information

Presentation Outline

Presentation Outline Lealman Central Area Improvements Preliminary Engineering Study Public Meeting No. 1 April 4, 2012 1 Presentation Outline Welcome History Within the Study Area Study Overview Public Involvement / Public

More information

Skipp kropp Steptoe & Johnson PLLC

Skipp kropp Steptoe & Johnson PLLC Skipp kropp Steptoe & Johnson PLLC S. Ct. decision May 31, 2016 U.S. Army Corps of Engineers v. Hawkes (578 U. S. (2016) Hawkes, owner of peat mining company in North Dakota, seeks to expand operations

More information

HENRICO COUNTY ENVIRONMENTAL COMPLIANCE MANUAL CHAPTER 13

HENRICO COUNTY ENVIRONMENTAL COMPLIANCE MANUAL CHAPTER 13 CHAPTER 13 13.1 INTRODUCTION A Stormwater Pollution Prevention (SWPPP) is a required component of the General Virginia Pollutant Discharge Elimination System Permit for Discharges of Stormwater from Construction

More information

Instructions on Filling out the Western WA Phase II Municipal Stormwater Permit Annual Report Form for Cities and Counties

Instructions on Filling out the Western WA Phase II Municipal Stormwater Permit Annual Report Form for Cities and Counties Instructions on Filling out the Western WA Phase II Municipal Stormwater Permit Annual Report Form for Cities and Counties 1. Complete all TABS in the worksheet: (1) Permittee Information; (2) Certification;

More information

1. The purpose of this Program is to provide a framework for asset management of separate sanitary sewer systems to meet the following goals:

1. The purpose of this Program is to provide a framework for asset management of separate sanitary sewer systems to meet the following goals: ARTICLE 8. INFILTRATION / INFLOW CONTROL PROGRAM 800. Introduction The separate sanitary sewers within the District s service area are designed and intended to receive and convey only domestic and industrial

More information

Construction Site TPDES Inspector Workshop. Erik Hobson EPSIII/Resource Protection and Compliance

Construction Site TPDES Inspector Workshop. Erik Hobson EPSIII/Resource Protection and Compliance Construction Site TPDES Inspector Workshop Erik Hobson EPSIII/Resource Protection and Compliance Page 1 Topics Changes to TXR150000 Inspections Edwards Aquifer Program Changes to the Permit Page 2 Revisions

More information

FY 2018 Watershed-Based Funding Pilot Program Policy

FY 2018 Watershed-Based Funding Pilot Program Policy FY 2018 Watershed-Based Funding Pilot Program Policy From the Board of Water and Soil Resources, State of Minnesota Version: FY2018 Effective Date: 12/20/2017 Approval: Board Resolution #17-94 Policy Statement

More information

Georgia FOG Alliance Awards Program Inspection Form

Georgia FOG Alliance Awards Program Inspection Form Georgia FOG Alliance Awards Program Inspection Form A. Administration 1 Is there a copy of the Sewer Use Ordinance available? 0 1 2 3 4 ( Written 2, Web 3, Downloadable 4 ) 2 Does the program have a written

More information

ANNUAL REPORT FORM FOR INDIVIDUAL NPDES PERMITS FOR MUNICIPAL SEPARATE STORM SEWER SYSTEMS (RULE (2), F.A.C.)

ANNUAL REPORT FORM FOR INDIVIDUAL NPDES PERMITS FOR MUNICIPAL SEPARATE STORM SEWER SYSTEMS (RULE (2), F.A.C.) ANNUAL REPORT FORM FOR INDIVIDUAL NPDES PERMITS FOR MUNICIPAL SEPARATE STORM SEWER SYSTEMS (RULE 62-624.600(2), F.A.C.) This Annual Report Form must be completed and submitted to the Department to satisfy

More information

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 MONITORING AND MAINTENANCE 2 3.1 Final Cover Maintenance 2 3.2 Groundwater Monitoring System 2 4.0 POST-CLOSURE CONTACT 2

More information

City of Culver City. Staff Report

City of Culver City. Staff Report City of Culver City City Hall 9770 Culver Blvd. Culver City, CA 90232 (310) 253-5851 Staff Report File #: 18-0499, Version: 1 CC - Approval of Professional Services Agreement with Tetra Tech for the Design

More information

Plan of Development Review Process County of Henrico, Virginia

Plan of Development Review Process County of Henrico, Virginia Plan of Development Review Process County of Henrico, Virginia October 27, 2000 (Revised January 8, 2007, December 7, 2007) (Revised September 11, 2015, effective September 14, 2015) POF011 TABLE OF CONTENTS

More information

Cumberland County Conservation District Strategic Plan Adopted June 23, 2009

Cumberland County Conservation District Strategic Plan Adopted June 23, 2009 Cumberland County Conservation District Strategic Plan Adopted June 23, 2009 Strategic Planning process and purpose This strategic plan is intended to provide a clear and realistic view of the Cumberland

More information

Virginia Clean Water Revolving Loan Fund (VCWRLF) Water Quality Improvement Fund (WQIF) Stormwater Local Assistance Fund (SLAF)

Virginia Clean Water Revolving Loan Fund (VCWRLF) Water Quality Improvement Fund (WQIF) Stormwater Local Assistance Fund (SLAF) 1 Virginia Clean Water Revolving Loan Fund (VCWRLF) Water Quality Improvement Fund (WQIF) Stormwater Local Assistance Fund (SLAF) Stormwater Local Assistance Fund History Enabled by the General Assembly

More information

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10)

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10) SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10) Catskill Watershed Corporation PO Box 569 Margaretville, NY 12455 (845) 586-1400 Approved by the Board of Directors October 28, 2003 Revised August 2, 2016

More information

MEETING DATE: December 8, 2016 ITEM TYPE: Action Consent Discussion. TITLE: Authorization of Cost Share Funding 2016 Fall Non-Homeowner Projects

MEETING DATE: December 8, 2016 ITEM TYPE: Action Consent Discussion. TITLE: Authorization of Cost Share Funding 2016 Fall Non-Homeowner Projects Minnehaha Creek Watershed District REQUEST FOR BOARD ACTION MEETING DATE: December 8, 2016 ITEM TYPE: Action Consent Discussion TITLE: Authorization of Cost Share Funding 2016 Fall Non-Homeowner Projects

More information

Need for Private Investment

Need for Private Investment Need for Private Investment Most municipal retrofit investments tend to be largescale and on publicly-owned land Often high capital costs Limited efficiencies due to geographic locations Limited opportunities

More information

Bureau of Point and Non-Point Source Management

Bureau of Point and Non-Point Source Management Bureau of Point and Non-Point Source Management Standard Operating Procedure (SOP) 1 for Clean Water Program New and Reissuance Individual Site Permit Applications for Beneficial Use of Biosolids SOP No.

More information

MASSACHUSETTS WATER RESOURCES AUTHORITY

MASSACHUSETTS WATER RESOURCES AUTHORITY MASSACHUSETTS WATER RESOURCES AUTHORITY REGIONAL INFILTRATION/INFLOW SEPTEMBER 2002 Table of Contents 1. Introduction 1.1. Background...1 1.2. Description of the Regional I/I Problem...1 1.3. MWRA Initial

More information

The City of Franklin has already expressed its intention to opt-in and administer the program locally.

The City of Franklin has already expressed its intention to opt-in and administer the program locally. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i April 28, 2014 13. VIRGINIA STORMWATER MANAGEMENT PROGRAM CONSIDERATION IN OPTING-IN During its 2014 session, the General Assembly reversed course

More information

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert: 1.1... moves to amend H.F. No. 1731 as follows: 1.2 Delete everything after the enacting clause and insert: 1.3 "Section 1. CLEAN WATER FUND APPROPRIATIONS. 1.4 The sums shown in the columns marked "Appropriations"

More information

REQUEST FOR PROPOSALS Town of Brattleboro, VT

REQUEST FOR PROPOSALS Town of Brattleboro, VT REQUEST FOR PROPOSALS Town of Brattleboro, VT June 22, 2010 BACKGROUND: The Town of Brattleboro has conducted an extensive planning process for the reconstruction of the Putney Road (US Route 5) corridor

More information

PUBLIC NOTICE. Michael Baker International Mr. Edward Smail 4425 Belle Oaks Drive North Charleston, South Carolina 29405

PUBLIC NOTICE. Michael Baker International Mr. Edward Smail 4425 Belle Oaks Drive North Charleston, South Carolina 29405 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: October 3, 2018 Comment Deadline: October 17, 2018 Corps Action ID Number: SAW-2009-01114 The Wilmington District, Corps of Engineers

More information

Watershed-based Funding: Pilot program

Watershed-based Funding: Pilot program Watershed-based Funding: Pilot program Background In 2017, the Board of Water and Soil Resources (BWSR), in partnership with the Local Government Water Round Table, began working with local governments

More information

1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines

1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines 1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines District s Project Overview To assist the municipalities served by the Milwaukee Metropolitan Sewerage District (District) with Total

More information

King County Flood Control District 2017 Work Program

King County Flood Control District 2017 Work Program Attachment A 2017 Budget Work Program November 7, 2016 FCD2016-20 Attach A King County Flood Control District 2017 Work Program The District work program is comprised of three categories: district oversight

More information

NPDES ANNUAL REPORT Phase II MS4 Permit ID # FLR04E_0 9_-_4_

NPDES ANNUAL REPORT Phase II MS4 Permit ID # FLR04E_0 9_-_4_ PHASE II MS4 ANNUAL REPORT for Permit Year : 1 2 3 4 5 Other: Instructions for completing this form: Complete Sections I through V and submit to the Department to fulfill the annual reporting requirement

More information

DGLVR Program Attachment E Approved March 22, 2018

DGLVR Program Attachment E Approved March 22, 2018 YORK COUNTY CONSERVATION DISTRICT DIRT, GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM QUALITY ASSURANCE BOARD POLICY AND PROCEDURES Purpose The purpose of the Quality Assurance Board (QAB) in York County

More information

PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update September 2011

PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update September 2011 Non-Regulatory Efforts PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update September 2011 Page 82 Chesapeake Bay Implementation Grant Special Projects Funding

More information

IMPLEMENTATION SCHEDULES

IMPLEMENTATION SCHEDULES This Section provides implementation schedules for the required management measures for local governments included in this Plan in Section 5, as well as schedules for the recommendations for the regional

More information

ORDINANCE NO. 640 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF FRUITLAND, IDAHO:

ORDINANCE NO. 640 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF FRUITLAND, IDAHO: ORDINANCE NO. 640 AN ORDINANCE OF THE CITY OF FRUITLAND, IDAHO, AMENDING TITLE 9, CHAPTER 3, SECTION 2, DRAINAGE STANDARDS; AMENDING TITLE 10, CHAPTER 7A, SECTION 19, STORM DRAINAGE; AMENDING TITLE 10,

More information

Expanding Visibility for Coastal San Luis RCD. Coastal San Luis Resource Conservation District (CSLRCD) 1203 Morro Bay, Suite B, Morro Bay, CA, 93442

Expanding Visibility for Coastal San Luis RCD. Coastal San Luis Resource Conservation District (CSLRCD) 1203 Morro Bay, Suite B, Morro Bay, CA, 93442 Community Grant Program Application Submit application by email to staff@mbnep.org or mail to the Morro Bay National Estuary Program s offices by 4pm on the due date. Please be sure to include the summary

More information

Stormwater Management Incentives Program Grant Manual

Stormwater Management Incentives Program Grant Manual Stormwater Management Incentives Program Grant Manual TABLE OF CONTENTS General Information Background Information... 3 Application Submission Information... Grant Requirements Eligibility Criteria...

More information

Tennessee Department of Agriculture--Water Resources Program

Tennessee Department of Agriculture--Water Resources Program Tennessee Department of Agriculture--Water Resources Program I. Introduction: The Tennessee Department of Agriculture (TDA) is authorized by T.C.A. 67-4-409(l) to administer the Agricultural Resources

More information

Standard Training Prospectus.

Standard Training Prospectus. Power, efficiency, stability. Explore the possibilities that 12d Model delivers to your civil surface modelling projects. Standard Training Prospectus. Design software is only effective when the operator

More information

Grant All-Detail Report Drainage Ditch Inventory and Inspection (SEDLCP) 2014

Grant All-Detail Report Drainage Ditch Inventory and Inspection (SEDLCP) 2014 Grant All-Detail Report Drainage Ditch Inventory and Inspection (SEDLCP) 2014 Grant Title - Inventory Chisago County Public Ditch System Grant ID - C14-4843 Organization - Chisago County Grant Awarded

More information

Erosion Control and Water Management Program Policy

Erosion Control and Water Management Program Policy Erosion Control and Water Management Program Policy From the Board of Water and Soil Resources, State of Minnesota Version: 2017 Effective Date: 7/1/2017 Approval: Board Resolution #17-39 Policy Statement

More information

MASONVILLE COVE ENVIRONMENTAL EDUCATION CENTER AND ENVIRONMENTAL EDUCATION OUTREACH PROGRAMS

MASONVILLE COVE ENVIRONMENTAL EDUCATION CENTER AND ENVIRONMENTAL EDUCATION OUTREACH PROGRAMS American Association of Port Authorities 2010 Environmental Improvement Award Application MASONVILLE COVE ENVIRONMENTAL EDUCATION CENTER AND ENVIRONMENTAL EDUCATION OUTREACH PROGRAMS Applicant: Maryland

More information

Chesapeake Bay Program Partnership s Basinwide BMP Verification Framework. CBP Partnership s Principals Staff Committee September 22, 2014

Chesapeake Bay Program Partnership s Basinwide BMP Verification Framework. CBP Partnership s Principals Staff Committee September 22, 2014 Chesapeake Bay Program Partnership s Basinwide BMP Verification Framework CBP Partnership s Principals Staff Committee September 22, 2014 Verification Definition Verification: the process through which

More information

2008 Combined Clean Water Legacy Grant Application Id#: Use TAB key to move from field to field

2008 Combined Clean Water Legacy Grant Application Id#: Use TAB key to move from field to field cwl funds - CWL_FY08Application 4Corner2.doc Page 1 2008 Combined Clean Water Legacy Grant Application Id#: Use TAB key to move from field to field 1. Applicant Organization Applicant Organization:KANABEC

More information

1. Select the proper auth type code. For renewals, ensure the auth type code matches the primary facility (PF) fee category.

1. Select the proper auth type code. For renewals, ensure the auth type code matches the primary facility (PF) fee category. Bureau of Clean Water Standard Operating Procedure (SOP) 1 for Clean Water Program New and Reissuance PAG-13 NOIs (Stormwater Discharges from Regulated Small MS4s) SOP No. BCW-PMT-019 Final, November 9,

More information

Educational Facility Solutions Group May 2018

Educational Facility Solutions Group May 2018 Educational Facility Solutions Group May 2018 Joanne Branch, School Facility Planning Coordinator San Diego County Office of Education John Quenzer D-MAX Engineering, Inc. MWELO and AB 854 SMS4 Voluntary

More information

AUG JOINT PUBLIC NOTICE Savannah District/State of Georgia

AUG JOINT PUBLIC NOTICE Savannah District/State of Georgia DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA 30260-1777 AUG 1 6 2018 Regulatory Division SAS-2017-00407 JOINT PUBLIC NOTICE Savannah

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Rick Scott Governor Carlos Lopez-Cantera Lt. Governor Jonathan

More information

Chesapeake Bay Restoration Strategy FAQs

Chesapeake Bay Restoration Strategy FAQs Chesapeake Bay Restoration Strategy FAQs Updated February 23, 2016 Q: What happens if Pennsylvania does not meet its Chesapeake Bay goals? A: The U.S. Environmental Protection Agency (EPA) has notified

More information

Michigan s Volunteer River, Stream, and Creek Cleanup Program Grant Application Package Fiscal Year 2018

Michigan s Volunteer River, Stream, and Creek Cleanup Program Grant Application Package Fiscal Year 2018 Michigan s Volunteer River, Stream, and Creek Cleanup Program Grant Application Package Fiscal Year 2018 Administered by the Great Lakes Commission for the Michigan Department of Environmental Quality

More information

Conservation Partners Legacy Grant Application

Conservation Partners Legacy Grant Application CPL Applications (Total to date: 129) Spreadsheet Conservation Partners Legacy Grant Application CPL1000110 Name and Contact Project Identifier: CPL1000110 Project Name: Willow Reserve Restoration Plan

More information

Ontario Community Environment Fund (OCEF) Application Guide 2017 Grants

Ontario Community Environment Fund (OCEF) Application Guide 2017 Grants Ontario Community Environment Fund (OCEF) Application Guide 2017 Grants Table of Contents The Ontario Community Environment Fund... 3 Eligibility... 4 Affected Watersheds... 4 Eligible Projects... 4 Ineligible

More information

Transportation Alternatives (TA) Northeast Minnesota Workshop

Transportation Alternatives (TA) Northeast Minnesota Workshop Transportation Alternatives (TA) Northeast Minnesota Workshop October 4 th, 2016 1 What are TA Projects? Federally funded community based projects o Expand travel choices o Integrate modes o Improve cultural,

More information

I. NPDES Permits BUREAU OF MINING PROGRAMS

I. NPDES Permits BUREAU OF MINING PROGRAMS BUREAU OF MINING PROGRAMS Standard Operating Procedure (SOP) 1 for District Mining Operations Enforcing NPDES Permit Requirements for Mining Operations SOP No. BMP-004 The NPDES program for mining is implemented

More information

PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update February 2012

PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update February 2012 Non-Regulatory Efforts PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update February 2012 Page 82 Best Management Practices (BMP) Tracking National Association

More information

Chesapeake Bay Trust Grant Opportunities: Stormwater, Watersheds, and Floodplain Management

Chesapeake Bay Trust Grant Opportunities: Stormwater, Watersheds, and Floodplain Management Chesapeake Bay Trust Grant Opportunities: Stormwater, Watersheds, and Floodplain Management Tom Leigh, Director of Programs and Partnerships Sadie Drescher, Senior Program Officer MAFSM Conference, October

More information

SUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1

SUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1 SUMMARY REPORT OPERATIONS and MAINTENANCE PLANS and CRITERIA HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1 ANSONIA and DERBY, CONNECTICUT December 2010 MMI #1560-119 and #3118-03

More information

Clean Water Assistance - Todd (SWCD)

Clean Water Assistance - Todd (SWCD) 2011 - Clean Water Assistance - Todd (SWCD) Fund Report Todd Fund Information Fund Name Fund Year Budgeted Spent Date Last Spent 2011 - Clean Water Assistance - Todd (SWCD) 2011 $318,372.13 $31,433.74

More information

SCOPE OF WORK/WORK PLAN

SCOPE OF WORK/WORK PLAN TASK 1: PROJECT ADMINISTRATION SCOPE OF WORK/WORK PLAN Objective: To manage all administrative functions required to support the CRP Contract, including: Informative and timely Progress Reports (PR); Participation

More information

I. Preliminary Data Management and Fee Processing (Administrative Staff)

I. Preliminary Data Management and Fee Processing (Administrative Staff) Bureau of Clean Water Standard Operating Procedure (SOP) 1 for Clean Water Program New and Reissuance MS4 Individual NPDES Permit Applications SOP No. BCW-PMT-004 Final, November 9, 2012 Version 1.7 This

More information

Jefferson Parish Department of Drainage. Emergency Plan

Jefferson Parish Department of Drainage. Emergency Plan Jefferson Parish Department of Drainage Emergency Plan Emergency Plan Purpose, Pre-Storm Plan, Approaching Storm/Hurricane Plan and Recovery Plan I. Purpose The Drainage Department is responsible for all

More information

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017 DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 JANUARY 25, 2017 Regulatory Division SAS-2003-23580 PUBLIC NOTICE ISSUANCE OF PROGRAMMATIC

More information

GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW PACKET

GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW PACKET GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW PACKET Last Updated: May 15, 2015 1 GSI Process Workflow Introduction This packet provides summary workflows, detailed workflows, and expanded process

More information

Illicit Discharge Detection and Elimination MCM #3

Illicit Discharge Detection and Elimination MCM #3 Illicit Discharge Detection and Elimination MCM #3 Part II.C.7.c Responsible Person Identify the responsible person(s) for implementing this MCM. If there is more than one person or department responsible

More information

FAIRFAX WATER WATER SUPPLY STAKEHOLDER OUTREACH PROGRAM GRANT APPLICATION GUIDELINES AND FORMS FISCAL YEAR 2018

FAIRFAX WATER WATER SUPPLY STAKEHOLDER OUTREACH PROGRAM GRANT APPLICATION GUIDELINES AND FORMS FISCAL YEAR 2018 FAIRFAX WATER WATER SUPPLY STAKEHOLDER OUTREACH PROGRAM GRANT APPLICATION GUIDELINES AND FORMS I. ELIGIBILITY A. Eligible Projects FISCAL YEAR 2018 The project or activity for which the funding is to be

More information

This Approval does not cover the use of the Exceptional Quality biosolid in a trial composting with "green waste".

This Approval does not cover the use of the Exceptional Quality biosolid in a trial composting with green waste. Mr. Tony Blouin Halifax Regional Water Commission 450 Cowie Hill Road Halifax, NS I ' 7 5 inr:r B3P 2V3 Dear Mr. Blouin: RE: Approval Transfer - Sludge Treatment Facility Approval No. 2010-070726 )i I

More information

Full Proposal Due Date: Thursday, April 12, 2018 by 11:59 PM Eastern Time

Full Proposal Due Date: Thursday, April 12, 2018 by 11:59 PM Eastern Time 2018 REQUEST FOR PROPOSALS Full Proposal Due Date: Thursday, April 12, 2018 by 11:59 PM Eastern Time OVERVIEW The National Fish and Wildlife Foundation (NFWF) is soliciting proposals to restore the water

More information

Procedures for Reporting BMP Implementation Data to the Chesapeake Bay Program Office

Procedures for Reporting BMP Implementation Data to the Chesapeake Bay Program Office Procedures for Reporting BMP Implementation Data to the Chesapeake Bay Program Office Prepared by the Interstate Waters Office Pennsylvania Department of Environmental Protection Updated January 2015 i

More information

Rio Grande Water Fund Request for Proposals 2018

Rio Grande Water Fund Request for Proposals 2018 1 Rio Grande Water Fund Request for Proposals 2018 1. Proposal Deadlines... 2 2. Available Funds... 2 3. How to Apply... 2 4. Scope... 2 5. Eligible Applicants... 2 6. Project Categories... 3 7. Review

More information

CONSERVATION DISTRICT (SWCD)

CONSERVATION DISTRICT (SWCD) `CORTLAND COUNTY SOIL AND WATER CONSERVATION DISTRICT (SWCD) 2017 ANNUAL PLAN OF ACTION VISION STATEMENT: Assist with the wise use and conservation of Cortland County s natural resources, and the maintenance

More information

CAPITOL REGION COUNCIL OF GOVERNMENTS REQUEST FOR INFORMATION (RFI) FOR STORMWATER MANAGEMENT PLANNING SERVICES

CAPITOL REGION COUNCIL OF GOVERNMENTS REQUEST FOR INFORMATION (RFI) FOR STORMWATER MANAGEMENT PLANNING SERVICES CAPITOL REGION COUNCIL OF GOVERNMENTS REQUEST FOR INFORMATION (RFI) FOR STORMWATER MANAGEMENT PLANNING SERVICES Issue Date: Wednesday, August 3, 2016 Response Date/Time: Wednesday August 31, 2016 2:00

More information

Section 2 Public Engagement and Participation

Section 2 Public Engagement and Participation Section 2 Public Engagement and Participation 2.1 Public Participation Overview Capital Region Water s (CRW) challenge is not unlike those of the nearly 800 other combined sewer overflow (CSO) cities across

More information

Hurricane Sandy Coastal Resiliency Competitive Grants Program

Hurricane Sandy Coastal Resiliency Competitive Grants Program Hurricane Sandy Coastal Resiliency Competitive Grants Program Request for Proposals Proposal Due Date: Friday, January 31, 2014 On behalf of the Department of the Interior, the National Fish and Wildlife

More information

2016 REQUEST FOR PROPOSALS

2016 REQUEST FOR PROPOSALS 2016 REQUEST FOR PROPOSALS Full Proposal Due Date: Tuesday, March 29, 2016 by 11:59 PM Eastern Time OVERVIEW The National Fish and Wildlife Foundation (NFWF) is soliciting proposals to restore the water

More information

FUNDING OPPORTUNITIES SUSAN HARRIS MONTGOMERY COUNTY CONSERVATION DISTRICT

FUNDING OPPORTUNITIES SUSAN HARRIS MONTGOMERY COUNTY CONSERVATION DISTRICT FUNDING OPPORTUNITIES SUSAN HARRIS MONTGOMERY COUNTY CONSERVATION DISTRICT TreeVitalize Watershed Grants Private/Public collaboration in Southeastern Pennsylvania Coordinated by Pennsylvania Horticultural

More information

NPDES PERMIT NO. The authority granted by coverage under this General Permit is subject to the following further qualifications:

NPDES PERMIT NO. The authority granted by coverage under this General Permit is subject to the following further qualifications: COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF POINT AND NON-POINT SOURCE MANAGEMENT PAG-13 AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION

More information

2019 Outreach and Restoration Grant Program Application Package

2019 Outreach and Restoration Grant Program Application Package 2019 Outreach and Restoration Grant Program Application Package The 2019 Outreach and Restoration Grant Program encourages outreach and community engagement activities that increase stewardship of natural

More information

FY 2016 Clean Water Fund Competitive Grants Policy

FY 2016 Clean Water Fund Competitive Grants Policy FY 2016 Clean Water Fund Competitive Grants Policy Purpose The Clean Water Fund was established to implement part of Article XI, Section 15, of the Minnesota Constitution, and M.S. 114D with the purpose

More information

Flip Your Strip Park Strip Lawn Conversion Program MEMBER AGENCY TURN-KEY WATER CONSERVATION PROGRAM

Flip Your Strip Park Strip Lawn Conversion Program MEMBER AGENCY TURN-KEY WATER CONSERVATION PROGRAM Flip Your Strip Park Strip Lawn Conversion Program MEMBER AGENCY TURN-KEY WATER CONSERVATION PROGRAM Member Agency Grant Assistance Background For several years, Jordan Valley Water Conservancy District

More information

Conservation Partners Legacy Grant Application

Conservation Partners Legacy Grant Application CPL Applications (Total to date: 129) Spreadsheet Conservation Partners Legacy Grant Application CPL1000024 Name and Contact Project Identifier: CPL1000024 Project Name: Nyroca Flats WMA Water Control

More information

CITY OF TACOMA STORMWATER MANAGEMENT PROGRAM

CITY OF TACOMA STORMWATER MANAGEMENT PROGRAM CITY OF TACOMA STORMWATER MANAGEMENT PROGRAM NPDES Phase I S5.C.3 - Coordination NEBC Conference March 8, 2018 Merita Trohimovich, PE S5.C.3 Coordination (Phase I Permit Language) The SWMP shall include

More information

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 July 5, 2018 Regulatory Branch SAS-2015-00235 JOINT PUBLIC NOTICE Savannah District/State

More information

Job Description City of St. Clair

Job Description City of St. Clair 1 Job Description City of St. Clair An Equal Opportunity Employer Title: Reports to: Employment Status: FLSA Status: Wastewater System Employee Wastewater Superintendent Full-Time Non-Exempt Qualifications:

More information

APPENDIX J FUNDING SOURCES

APPENDIX J FUNDING SOURCES APPENDIX J FUNDING SOURCES Existing Programs and Funding Sources There are numerous options available to Dane County for the financing of a flood mitigation program. The identification of potential funding

More information

Department of Environmental Quality

Department of Environmental Quality Department of Environmental Quality Matt Mead, Governor To protect, conserve, and enhance the Quality of Wyoming s environment for the benefit of current and future generations Todd Parfitt, Director TO:

More information

CAMDEN COUNTY SOIL CONSERVATION DISTRICT 423 COMMERCE LANE, SUITE #1 WEST BERLIN, NJ (FAX) MEETING AGENDA

CAMDEN COUNTY SOIL CONSERVATION DISTRICT 423 COMMERCE LANE, SUITE #1 WEST BERLIN, NJ (FAX) MEETING AGENDA CAMDEN COUNTY SOIL CONSERVATION DISTRICT 423 COMMERCE LANE, SUITE #1 WEST BERLIN, NJ 08091 856-767-6299 856-767-1676 (FAX) MEETING AGENDA JUNE 18, 2012 CALL TO ORDER MINUTES OF THE PREVIOUS MEETING SOIL

More information