1 Facilities Master Plan 2011 Update A Facilities Master Plan is a dynamic document that is intended to identify those improvements to the University s buildings and grounds that are needed to support the approved strategic business plan - NU2019. As the items identified in an existing facilities master plan are addressed and as the strategic plan evolves, updates to the facilities master plan are required. Throughout 2010 a committee of representatives from the Norwich community as well as outside consultants worked to update the plan. Numerous opportunities for the entire Norwich community to give input were also provided. The updated Facilities Master Plan was presented to the Board of Trustees in January A key goal of the Facilities Master Plan is to ensure projects that are undertaken are done so in a logical, properly staged order so the University s facilities related needs are met in a manner that is both cost effective and minimizes disruptions to campus operations. Also, this plan will be utilized to identify projects to be considered for inclusion in upcoming capital fundraising campaigns. President Schneider and the Board of Trustees stated, prior to the start of the update, that the facilities needs of the Schools of Business & Management, and Humanities and Social Sciences would be a high priority. As such, consultants spent considerable time with the deans and faculty of these schools to better understand and accommodate their program requests and requirements. The master plan committee ended up recommending 42 separate projects. The result of this planning work is an incremental but holistic plan that will serve as the guide for facilities development/renovation to 2019 and beyond. Some of the keystone projects of this Facilities Master Plan include: the renovation and expansion of Webb Hall, the renovation of Ainsworth and Dewey, the construction of Phase 2 of the civilian housing complex, the construction of the Bicentennial Stairs, a new Admissions building and continuation of the dormitory renovation program.
2 Norwich University Campus Master Plan Update January 2011 Volume One Perry Dean Rogers Partners Architects
3 2
4 Volume One Overview: Getting from 2010 to Executive Summary 9 Survey Results 19 List of Projects and Campus Map, 2010 to Detailed Project Descriptions Details: New Academic Buildings 107 Program Needs Assessment 116 Site Analysis - Dewey, Webb & Ainsworth and South Precinct 121 Option 1B Cost and Schedule 127 Domino Schedule and Cost Summary Volume Two Appendices 137 A: Preliminary Documentation of Dewey Hall, Webb Hall and Ainsworth Hall 161 B: Webb Hall Architectural Assessment 195 C: Webb Hall Structural Assessment 199 D: Alternative Options 1A, 1C, E: Summary of Higher Education Trends 225 F: One Stop Shop Survey 229 G: Meeting Minutes - Library and Academic Achievement Center Discussion 1Contents
5 Campus Map Norwich University Campus Plan, present day
6 Executive Summary In January 2005, Perry Dean Rogers Partners Architects worked with Norwich University on a Master Plan Update. We are pleased to be back fi ve years later, working with the University again to update the master plan as we look out to the 2019 bicentennial. Guiding Principles The guiding principles established in the master plan update of 2005 still ring true today and are reflected in the 2010 Update. A master plan is not simply a means of identifying physical growth. Rather, the plan must embody the ideals and mission of the institution. Students must understand their place in the natural and constructed world, as CPT Alden Partridge was convinced in his day when he stressed practical and everyday knowledge of the world, which can never be derived from books. Partridge encouraged excursions as a supplement to classroom instruction as a means of accomplishing this, and the manner in which Norwich University is engaged in the natural landscape of Vermont is central to its sense of place and the character of the campus. Good master plans take a holistic look at the issues, and strike a balance between soaring aspirations, long term vision, fi duciary responsibility, sustainability, and daily operations and maintenance. In so doing, the master plan is conceived as a tool kit a living document that not only shapes the physical future of the campus, but stakes out a road map to get there as well. The integration of landscape and building is central to our master planning. The organization of exterior space provides an armature for the buildings, not the other way around; nowhere is this more true than the Upper Parade. The relationship of interior spaces to exterior spaces furthers this integrated sensibility; as in the dining rooms at the Wise Campus Center that overlook the lawn to the west. Our planning approach continues to reinforce the guiding principles established during the 2010 Update. From 2005 to 2010 Although the guiding principles have remained constant, much has changed at Norwich University in the past fi ve years. Harmon Hall has been renovated and the Wise Campus Center addition was completed in South Hall and the Class of 1959 bridge connecting the Upper Parade to this new civilian housing precinct were fi nished for fall 2009 occupancy. Doyle Hall was opened this fall, thereby completing the second phase of the Athletic Complex. Planning is also underway for a number of projects: renovations to Sabine Field, continuation of the dorm renovation program, and construction of the fi rst phase of the Outdoor Recreation Center with a system of outdoor trails and, at this time, a modest building. From a student body standpoint, in 2005, the master plan update assumed a 2019 target population of 2000 residents and approximately 200 commuter students. The resident student population was to be composed of 1250 cadets and 750 resident civilian students. The fall 2010 student population is 1860 resident students and approximately 400 commuter students. The resident student population is composed of 1400 cadets and 460 resident civilian students. The goal of 1250 cadets by 2019 has already been attained, which is a great achievement. The continued transition of resident civilian students can be achieved, as planned, through phases two and three of the civilian housing project at Upper Disney. In regard to cadet housing stock, this 2010 Update includes several options for providing modest levels of additional bed capacity (additions to Ransom Hall and repurposing Dewey Hall as a dormitory) while relieving the present overcrowing of dorm rooms. It would be wise to evaluate the current population of 2260 students (exceeding the original 2019 target of 2200), and determine whether continued growth is in the best interest of the University, or whether this needs to be capped. Obviously, the size of the student population being served has a signifi cant impact on the facilities 3Executive Summary
7 Campus Map Norwich University Campus Plan, projected to
8 planning. NU 2019 and the 2005 Facilities Master Plan settled upon a student population of 2,000 residents and approximately 200 commuter students because enrollment signifi cantly above this level would trigger, just from a facilities standpoint, the need for extremely large investments in additional academic, housing, dining and support facilities. From an academic standpoint, many of the projects that were important in 2005 continue to be important in The approaching accreditation of the School of Business and Management would benefi t greatly from a commitment to the physical plant; not to mention that they need new, different types of space than they currently have in Dewey Hall. The Schools of Humanities and Social Sciences (currently housed in Webb and Ainsworth Halls, respectively) also are in need of updated and new facilities. These projects remain an imperative in the outlook to 2019, and considerable thought was given to them over the course of the planning this summer. Process Initially, Perry Dean worked with the Facilities Operations group to review progress since the 2005 update, and to identify potential next steps. Subsequent to that, meetings were held with President Schneider to review an action list of projects, and to hear his concerns and interests. Online surveys of the President s Master Plan Committee, and the University community at large were conducted to further frame the investigation. The results of these surveys are contained herein as an appendix, but in short, the pressures of overcrowding in the residence halls, and a shortfall of quality academic space for the Schools identifi ed above, rose to the top. A handful of other infrastructural issues also emerged, most prominently the need for an improvement to the wireless capacity at the University. These surveys underscored the outcomes from some of the changes in the past fi ve years. In particular, the increased student residential population, particularly on the cadet side, has strained the residential capacity beyond the point of overcrowding. Workshops were held several times with the President s Master Plan Committee, and with the Facilities Operations group. In addition, two open house sessions for the University community were held. We had several hundred students, faculty, and staff come to the open house sessions in the Wise Campus Center. This document is organized into three major sections. First, Overview: Getting from 2010 to 2019 outlines the list of projects that have been discussed as part of the planning process. It also provides a detailed glimpse into some of the specifi c issues that each project will need to address: program, phasing and swing space implications, cost, and other issues. Second, Details: New Academic Buildings dives into some detail on addressing the shortfalls of the Schools of Business and Management, Graduate and Continuing Studies, Humanities, and Social Sciences, and outlines the preferred solution. Last, the Appendices include much of the supporting material used in the development of the master plan update. Cost Modeling Each project page includes preliminary cost data. This conceptual cost per square foot number was provided by Norwich University s Director of Construction Services for Perry Dean s use in developing some early estimated construction cost numbers. It is current, reflecting 1Q, 2011 pricing, and will need to be escalated accordingly for projects that are further out. In addition, depending on the level of renovation, the program for new construction, material fi nishes, market conditions, and a host of other factors, these cost models will need to be tested as these projects are studied in greater detail. Executive Summary 5
9 Campus Map Norwich University Campus Plan, projected to
10 Recommendations The survey of the University community provided key insights into our process; some predictable, some unexpected. Obviously, our recommendations cannot support the survey in lock step. The needs articulated in the survey must be taken as one perspective in the broad spectrum of considerations: need, fi duciary responsibility, phasing, implementation process, daily operations and maintenance, code requirements, public support, development and fundraising potential, political will, among a host of others. In summary, we have outlined the key recommendations of each program type here for reference. In regard to Academics, the Schools of Business & Management, Humanities, and Social Sciences remain the fundamental imperative of the 2019 plan. It is our recommendation that funding a new South Academic Precinct together with renovations and additions to Webb Hall should be the linchpin of the Bicentennial Campaign. In regard to Administration, the One Stop Shop in a renovated Jackman Hall should be the priority. Although the One Stop Shop did not rate highly in the survey, we attribute this to the students not knowing what they don t know. This is a well-established trend in higher education (ref. Appendix F), and contributes to recruitment, retention, and overall student satisfaction. In regard to Athletics / Recreation, the planned Sabine Field renovation is an imperative, and this was reinforced by the Facilities Planning Subcommittee of the Board of Trustees in our presentation to them in October The Outdoor Recreation Trails have a donor in place and are in the early planning stages. It makes sense that the Outdoor Recreation Center to support the trail system would be a useful addition. The third phase of the Athletics Complex would be benefi cial in that it will not only provide improved recreation space, but will open up space in Plumley Armory for the consolidation of ROTC. In regard to Campus Life, the perceived need was not so strongly reinforced in the survey. However, repurposing Ainsworth Hall for an array of student-oriented programs is a logical backfi ll project once the School of Social Sciences has a new home. In regard to Infrastructure, two major surprises appeared in the survey. First, the urgency of the need for an improved wireless communication network was voiced by the students. This is a relatively simple project and should be triggered as soon as possible as a good faith effort. Second, there was broad support for consideration of a second, alternative fuel source at the central plant, to reduce the University s reliance on oil. A study to analyze the viability of a wood pellet or wood chip plant would be benefi cial. It is also important to note that the Parking Garage fi gures prominently in the addition of bed capacity outlined in the Residence Hall section below. The need for additional parking will also likely be triggered by the construction of a new academic facility. In regard to Residence Halls, there has been the most strident and angry response from students. From articles in the Guidon, to survey responses, to comments heard at open house sessions, there has been a clear demand for relief from overcrowding and improved accommodations. The master plan lays out a multipronged response to this demand. First, there is an existing annual revitalization program of the existing dorms on the Upper Parade, which has been well-received by students, and should continue. Second, we have looked at additions to Ransom Hall and repurposing Dewey Hall to add capacity for Cadets. Third, continued development of Upper Disney for phases two and three of the Civilian Housing will relieve overcrowding, and bring additional civilian students onto campus. Executive Summary 7
11 8
12 Survey Results As part of the master plan process, several surveys were conducted, both at the scale of the master plan committee alone, as well as the entire University community. One question stands out as representative of campus priorities. Following a question wherein respondents were asked to rank projects from not important to very important, they were presented with the same list of projects, and told that they had $100 to allocate. This requires applicants to prioritize the initiatives and projects in question. Survey Results Respondent Pool The survey went to over 3800 recipients, in addition to being posted on the website for the general University community (alumni, etc). There were 979 respondents (26%), which reflects a phenomenal interest level on the part of the community. Some 61% of the respondents were students (see graphic at right for a breakdown by type). Results On the following pages, you will fi nd the results of the pool broken down by use-type: Academic (24%), Administrative (5%), Athletic/ Recreation (18%), Campus Life (12%), Infrastructure (21%), and Residential (20%). Each of the projects included herein as part of the 2019 plan are included in the list of potential projects distributed with the survey. Breakdown of Respondent Pool to University-wide Survey 9
13 You have $100 to spend. How would you distribute this money? Corps Student Housing Wireless Data Communication - Expand Capability Webb Hall - Major Renovation Dorm Renovation - Continue Upgrade Program Academic Facility - New Shooting Range Parking - Additional On Campus Athletic Complex Phase 3 - Exercise, Weight, Wrestling Dewey Hall - Major Renovation Civilian Student New Housing - Next Phase(s) Sabine Field Renovation - Synthetic Turf, Grandstand Central Power Plant - 2nd/Alternate Fuel Source Ainsworth Hall - Major Renovation Outdoor Recreation Trails/Paint Ball at Old Ski Area Campus Beauti cation (Trees, Entrances) Architecture School - Create Design/Build Space Athletic Fields - Rehab Natural Turf Fields (Not Sabine) Outdoor Recreation Center at Base of Outdoor Trails Indoor Recreation Space Roads and Walkways - Upgrade Admissions - New Building One Stop Shop for Student Support Operations Student Hang-Out Space Veterans Outreach Program Space Bicentennial Stairs CISBE/Sustainability Teaching Lab Facility ROTC - Consolidate ROTC Units in One Area Jackman Hall - Major Renovation SGCS - Renovate, Expand Existing Space or New Student Club/Organization Space Communications - Renovate Existing Space or New Memorial Plaza Leadership Development Center Storage - Additional (Not for Student Possessions) International Program Space Student Services Building - Renovate Existing Alumni House - Renovate/Expand Existing Space or New Multi-Cultural Center Student Class Club Space $5,730 : 9.17% $4,167 : 6.67% $3,716 : 5.95% $3,609 : 5.78% $3,434 : 5.5% $3,243 : 5.19% $3,225 : 5.16% $3,124 : 5% $2,765 : 4.43% $2,626 : 4.2% $2,488 : 3.98% $2,179 : 3.49% $1,823 : 2.92% $1,665 : 2.67% $1,586 : 2.54% $1,426 : 2.28% $1,384 : 2.22% $1,358 : 2.17% $1,163 : 1.86% $1,157 : 1.85% $1,147 : 1.84% $923 : 1.48% $836 : 1.34% $772 : 1.24% $697 : 1.12% $684 : 1.1% $635 : 1.02% $562 : 0.9% $525 : 0.84% $517 : 0.83% $484 : 0.77% $461 : 0.74% $420 : 0.67% $397 : 0.64% $380 : 0.61% $371 : 0.59% $321 : 0.51% $239 : 0.38% $217 : 0.35% Academic Administrative Athletics / Recreation Campus Life Infrastructure Residential 10
14 Academic - 24% You have $100 to spend. How would you Corps Student Housing Wireless Data Communication - Expand Capability Webb Hall - Major Renovation Dorm Renovation - Continue Upgrade Program Academic Facility - New Shooting Range Parking - Additional On Campus Athletic Complex Phase 3 - Exercise, Weight, Wrestling Dewey Hall - Major Renovation Civilian Student New Housing - Next Phase(s) Sabine Field Renovation - Synthetic Turf, Grandstand Central Power Plant - 2nd/Alternate Fuel Source Ainsworth Hall - Major Renovation Outdoor Recreation Trails/Paint Ball at Old Ski Area Campus Beauti cation (Trees, Entrances) Architecture School - Create Design/Build Space Athletic Fields - Rehab Natural Turf Fields (Not Sabine) Outdoor Recreation Center at Base of Outdoor Trails Indoor Recreation Space Roads and Walkways - Upgrade Admissions - New Building One Stop Shop for Student Support Operations Student Hang-Out Space Veterans Outreach Program Space Bicentennial Stairs CISBE/Sustainability Teaching Lab Facility ROTC - Consolidate ROTC Units in One Area Jackman Hall - Major Renovation SGCS - Renovate, Expand Existing Space or New Student Club/Organization Space Communications - Renovate Existing Space or New Memorial Plaza Leadership Development Center Storage - Additional (Not for Student Possessions) International Program Space Student Services Building - Renovate Existing Alumni House - Renovate/Expand Existing Space or New Multi-Cultural Center Student Class Club Space $5,730 : 9.17% $4,167 : 6.67% $3,716 : 5.95% $3,609 : 5.78% $3,434 : 5.5% $3,243 : 5.19% $3,225 : 5.16% $3,124 : 5% $2,765 : 4.43% $2,626 : 4.2% $2,488 : 3.98% $2,179 : 3.49% $1,823 : 2.92% $1,665 : 2.67% $1,586 : 2.54% $1,426 : 2.28% $1,384 : 2.22% $1,358 : 2.17% $1,163 : 1.86% $1,157 : 1.85% $1,147 : 1.84% $923 : 1.48% $836 : 1.34% $772 : 1.24% $697 : 1.12% $684 : 1.1% $635 : 1.02% $562 : 0.9% $525 : 0.84% $517 : 0.83% $484 : 0.77% $461 : 0.74% $420 : 0.67% $397 : 0.64% $380 : 0.61% $371 : 0.59% $321 : 0.51% $239 : 0.38% $217 : 0.35% distribute this money? Academic Administrative Athletics / Recreation Campus Life Infrastructure Residential 11Survey Results
15 Administrative - 5% You have $100 to spend. How would you distribute this money? Corps Student Housing Wireless Data Communication - Expand Capability Webb Hall - Major Renovation Dorm Renovation - Continue Upgrade Program Academic Facility - New Shooting Range Parking - Additional On Campus Athletic Complex Phase 3 - Exercise, Weight, Wrestling Dewey Hall - Major Renovation Civilian Student New Housing - Next Phase(s) Sabine Field Renovation - Synthetic Turf, Grandstand Central Power Plant - 2nd/Alternate Fuel Source Ainsworth Hall - Major Renovation Outdoor Recreation Trails/Paint Ball at Old Ski Area Campus Beauti cation (Trees, Entrances) Architecture School - Create Design/Build Space Athletic Fields - Rehab Natural Turf Fields (Not Sabine) Outdoor Recreation Center at Base of Outdoor Trails Indoor Recreation Space Roads and Walkways - Upgrade Admissions - New Building One Stop Shop for Student Support Operations Student Hang-Out Space Veterans Outreach Program Space Bicentennial Stairs CISBE/Sustainability Teaching Lab Facility ROTC - Consolidate ROTC Units in One Area Jackman Hall - Major Renovation SGCS - Renovate, Expand Existing Space or New Student Club/Organization Space Communications - Renovate Existing Space or New Memorial Plaza Leadership Development Center Storage - Additional (Not for Student Possessions) International Program Space Student Services Building - Renovate Existing Alumni House - Renovate/Expand Existing Space or New Multi-Cultural Center Student Class Club Space $5,730 : 9.17% $4,167 : 6.67% $3,716 : 5.95% $3,609 : 5.78% $3,434 : 5.5% $3,243 : 5.19% $3,225 : 5.16% $3,124 : 5% $2,765 : 4.43% $2,626 : 4.2% $2,488 : 3.98% $2,179 : 3.49% $1,823 : 2.92% $1,665 : 2.67% $1,586 : 2.54% $1,426 : 2.28% $1,384 : 2.22% $1,358 : 2.17% $1,163 : 1.86% $1,157 : 1.85% $1,147 : 1.84% $923 : 1.48% $836 : 1.34% $772 : 1.24% $697 : 1.12% $684 : 1.1% $635 : 1.02% $562 : 0.9% $525 : 0.84% $517 : 0.83% $484 : 0.77% $461 : 0.74% $420 : 0.67% $397 : 0.64% $380 : 0.61% $371 : 0.59% $321 : 0.51% $239 : 0.38% $217 : 0.35% Academic Administrative Athletics / Recreation Campus Life Infrastructure Residential 12
16 Athletics / Recreation - 18% You have $100 to spend. How would you Corps Student Housing Wireless Data Communication - Expand Capability Webb Hall - Major Renovation Dorm Renovation - Continue Upgrade Program Academic Facility - New Shooting Range Parking - Additional On Campus Athletic Complex Phase 3 - Exercise, Weight, Wrestling Dewey Hall - Major Renovation Civilian Student New Housing - Next Phase(s) Sabine Field Renovation - Synthetic Turf, Grandstand Central Power Plant - 2nd/Alternate Fuel Source Ainsworth Hall - Major Renovation Outdoor Recreation Trails/Paint Ball at Old Ski Area Campus Beauti cation (Trees, Entrances) Architecture School - Create Design/Build Space Athletic Fields - Rehab Natural Turf Fields (Not Sabine) Outdoor Recreation Center at Base of Outdoor Trails Indoor Recreation Space Roads and Walkways - Upgrade Admissions - New Building One Stop Shop for Student Support Operations Student Hang-Out Space Veterans Outreach Program Space Bicentennial Stairs CISBE/Sustainability Teaching Lab Facility ROTC - Consolidate ROTC Units in One Area Jackman Hall - Major Renovation SGCS - Renovate, Expand Existing Space or New Student Club/Organization Space Communications - Renovate Existing Space or New Memorial Plaza Leadership Development Center Storage - Additional (Not for Student Possessions) International Program Space Student Services Building - Renovate Existing Alumni House - Renovate/Expand Existing Space or New Multi-Cultural Center Student Class Club Space $5,730 : 9.17% $4,167 : 6.67% $3,716 : 5.95% $3,609 : 5.78% $3,434 : 5.5% $3,243 : 5.19% $3,225 : 5.16% $3,124 : 5% $2,765 : 4.43% $2,626 : 4.2% $2,488 : 3.98% $2,179 : 3.49% $1,823 : 2.92% $1,665 : 2.67% $1,586 : 2.54% $1,426 : 2.28% $1,384 : 2.22% $1,358 : 2.17% $1,163 : 1.86% $1,157 : 1.85% $1,147 : 1.84% $923 : 1.48% $836 : 1.34% $772 : 1.24% $697 : 1.12% $684 : 1.1% $635 : 1.02% $562 : 0.9% $525 : 0.84% $517 : 0.83% $484 : 0.77% $461 : 0.74% $420 : 0.67% $397 : 0.64% $380 : 0.61% $371 : 0.59% $321 : 0.51% $239 : 0.38% $217 : 0.35% distribute this money? Academic Administrative Athletics / Recreation Campus Life Infrastructure Residential 13Survey Results
17 Campus Life - 12% You have $100 to spend. How would you distribute this money? Corps Student Housing Wireless Data Communication - Expand Capability Webb Hall - Major Renovation Dorm Renovation - Continue Upgrade Program Academic Facility - New Shooting Range Parking - Additional On Campus Athletic Complex Phase 3 - Exercise, Weight, Wrestling Dewey Hall - Major Renovation Civilian Student New Housing - Next Phase(s) Sabine Field Renovation - Synthetic Turf, Grandstand Central Power Plant - 2nd/Alternate Fuel Source Ainsworth Hall - Major Renovation Outdoor Recreation Trails/Paint Ball at Old Ski Area Campus Beauti cation (Trees, Entrances) Architecture School - Create Design/Build Space Athletic Fields - Rehab Natural Turf Fields (Not Sabine) Outdoor Recreation Center at Base of Outdoor Trails Indoor Recreation Space Roads and Walkways - Upgrade Admissions - New Building One Stop Shop for Student Support Operations Student Hang-Out Space Veterans Outreach Program Space Bicentennial Stairs CISBE/Sustainability Teaching Lab Facility ROTC - Consolidate ROTC Units in One Area Jackman Hall - Major Renovation SGCS - Renovate, Expand Existing Space or New Student Club/Organization Space Communications - Renovate Existing Space or New Memorial Plaza Leadership Development Center Storage - Additional (Not for Student Possessions) International Program Space Student Services Building - Renovate Existing Alumni House - Renovate/Expand Existing Space or New Multi-Cultural Center Student Class Club Space $5,730 : 9.17% $4,167 : 6.67% $3,716 : 5.95% $3,609 : 5.78% $3,434 : 5.5% $3,243 : 5.19% $3,225 : 5.16% $3,124 : 5% $2,765 : 4.43% $2,626 : 4.2% $2,488 : 3.98% $2,179 : 3.49% $1,823 : 2.92% $1,665 : 2.67% $1,586 : 2.54% $1,426 : 2.28% $1,384 : 2.22% $1,358 : 2.17% $1,163 : 1.86% $1,157 : 1.85% $1,147 : 1.84% $923 : 1.48% $836 : 1.34% $772 : 1.24% $697 : 1.12% $684 : 1.1% $635 : 1.02% $562 : 0.9% $525 : 0.84% $517 : 0.83% $484 : 0.77% $461 : 0.74% $420 : 0.67% $397 : 0.64% $380 : 0.61% $371 : 0.59% $321 : 0.51% $239 : 0.38% $217 : 0.35% Academic Administrative Athletics / Recreation Campus Life Infrastructure Residential 14
18 Infrastructure - 21% You have $100 to spend. How would you distribute this money? Survey Results Corps Student Housing Wireless Data Communication - Expand Capability Webb Hall - Major Renovation Dorm Renovation - Continue Upgrade Program Academic Facility - New Shooting Range Parking - Additional On Campus Athletic Complex Phase 3 - Exercise, Weight, Wrestling Dewey Hall - Major Renovation Civilian Student New Housing - Next Phase(s) Sabine Field Renovation - Synthetic Turf, Grandstand Central Power Plant - 2nd/Alternate Fuel Source Ainsworth Hall - Major Renovation Outdoor Recreation Trails/Paint Ball at Old Ski Area Campus Beauti cation (Trees, Entrances) Architecture School - Create Design/Build Space Athletic Fields - Rehab Natural Turf Fields (Not Sabine) Outdoor Recreation Center at Base of Outdoor Trails Indoor Recreation Space Roads and Walkways - Upgrade Admissions - New Building One Stop Shop for Student Support Operations Student Hang-Out Space Veterans Outreach Program Space Bicentennial Stairs CISBE/Sustainability Teaching Lab Facility ROTC - Consolidate ROTC Units in One Area Jackman Hall - Major Renovation SGCS - Renovate, Expand Existing Space or New Student Club/Organization Space Communications - Renovate Existing Space or New Memorial Plaza Leadership Development Center Storage - Additional (Not for Student Possessions) International Program Space Student Services Building - Renovate Existing Alumni House - Renovate/Expand Existing Space or New Multi-Cultural Center Student Class Club Space $5,730 : 9.17% $4,167 : 6.67% $3,716 : 5.95% $3,609 : 5.78% $3,434 : 5.5% $3,243 : 5.19% $3,225 : 5.16% $3,124 : 5% $2,765 : 4.43% $2,626 : 4.2% $2,488 : 3.98% $2,179 : 3.49% $1,823 : 2.92% $1,665 : 2.67% $1,586 : 2.54% $1,426 : 2.28% $1,384 : 2.22% $1,358 : 2.17% $1,163 : 1.86% $1,157 : 1.85% $1,147 : 1.84% $923 : 1.48% $836 : 1.34% $772 : 1.24% $697 : 1.12% $684 : 1.1% $635 : 1.02% $562 : 0.9% $525 : 0.84% $517 : 0.83% $484 : 0.77% $461 : 0.74% $420 : 0.67% $397 : 0.64% $380 : 0.61% $371 : 0.59% $321 : 0.51% $239 : 0.38% $217 : 0.35% Academic Administrative Athletics / Recreation Campus Life Infrastructure Residential 15
19 Residential - 20% You have $100 to spend. How would you distribute this money? Corps Student Housing Wireless Data Communication - Expand Capability Webb Hall - Major Renovation Dorm Renovation - Continue Upgrade Program Academic Facility - New Shooting Range Parking - Additional On Campus Athletic Complex Phase 3 - Exercise, Weight, Wrestling Dewey Hall - Major Renovation Civilian Student New Housing - Next Phase(s) Sabine Field Renovation - Synthetic Turf, Grandstand Central Power Plant - 2nd/Alternate Fuel Source Ainsworth Hall - Major Renovation Outdoor Recreation Trails/Paint Ball at Old Ski Area Campus Beauti cation (Trees, Entrances) Architecture School - Create Design/Build Space Athletic Fields - Rehab Natural Turf Fields (Not Sabine) Outdoor Recreation Center at Base of Outdoor Trails Indoor Recreation Space Roads and Walkways - Upgrade Admissions - New Building One Stop Shop for Student Support Operations Student Hang-Out Space Veterans Outreach Program Space Bicentennial Stairs CISBE/Sustainability Teaching Lab Facility ROTC - Consolidate ROTC Units in One Area Jackman Hall - Major Renovation SGCS - Renovate, Expand Existing Space or New Student Club/Organization Space Communications - Renovate Existing Space or New Memorial Plaza Leadership Development Center Storage - Additional (Not for Student Possessions) International Program Space Student Services Building - Renovate Existing Alumni House - Renovate/Expand Existing Space or New Multi-Cultural Center Student Class Club Space $5,730 : 9.17% $4,167 : 6.67% $3,716 : 5.95% $3,609 : 5.78% $3,434 : 5.5% $3,243 : 5.19% $3,225 : 5.16% $3,124 : 5% $2,765 : 4.43% $2,626 : 4.2% $2,488 : 3.98% $2,179 : 3.49% $1,823 : 2.92% $1,665 : 2.67% $1,586 : 2.54% $1,426 : 2.28% $1,384 : 2.22% $1,358 : 2.17% $1,163 : 1.86% $1,157 : 1.85% $1,147 : 1.84% $923 : 1.48% $836 : 1.34% $772 : 1.24% $697 : 1.12% $684 : 1.1% $635 : 1.02% $562 : 0.9% $525 : 0.84% $517 : 0.83% $484 : 0.77% $461 : 0.74% $420 : 0.67% $397 : 0.64% $380 : 0.61% $371 : 0.59% $321 : 0.51% $239 : 0.38% $217 : 0.35% Academic Administrative Athletics / Recreation Campus Life Infrastructure Residential 16
20 Survey Results 17
21 18
22 List of Projects to 2019 Some forty-two (42) projects were identifi ed for study in the spring of 2010 through conversation with President Schneider, Dave Magida, and the master plan committee. Over the course of the summer, these individual projects were reviewed and discussed through surveys; meetings with faculty, deans, students, staff, and administration. They were evaluated on the basis of campus planning benefi ts, academic or campus life benefi ts, fi nancial economies, and phasing and implementation challenges or opportunities. On the following pages, you will fi nd each of these projects illustrated and described in some detail. Each project page includes a key map, a detailed map of the area in question, a project description, key project data (cost, size, building type), and phasing considerations. List of Projects 2010 to 2019 In addition, the second section in this report, Details: New Academic Buildings expands in greater detail on potential solutions for projects three through six (School of Business and Management, School of Graduate and Continiung Studies, School of Humanities, and School of Social Sciences). 19
23 20 List of Projects to 2019 ACADEMICS 1 Center for the Integrated Study of the Built Environment 2 School of Architecture & Art, Design-Build Space 3 School of Business & Management 4 School of Graduate and Continuing Studies 5 School of Humanities 6 School of Social Sciences ADMINISTRATION 7 Admissions 8 Jackman Hall Renovation 9 Norwich University Applied Research Institute 10 One-Stop Shop 11 Student Service Center ATHLETICS / RECREATION 12 Athletics, Phase 3 13 Doyle Hall 14 Indoor Recreation Space for Intramurals 15 Outdoor Recreation Center 16 Outdoor Recreation Trails 17 Plumley Renovation 18 Rehabilitate Natural Turf Fields 19 Sabine Field Renovation 20 Shooting Range 21 Softball/Baseball Field Upgrades CAMPUS LIFE 22 Consolidate ROTC Programs 23 International Programs 24 Leadership Development Center 25 Multi-cultural center 26 Student Hang-out Space 27 Veteran s Outreach Program INFRASTRUCTURE 28 Additional On-campus Parking: Garage 29 Bicentennial Stairs 30 Campus Entrances 31 Central Heating Plant Second Fuel Source 32 Facility Operations Support Buildings 33 General Campus Beautifi cation: Bury above-ground lines, Improve accessibility, Improve consistency of landscape and site furnishings, Improve infrastructure, Separate pedestrian and vehicular traffi c 34 Improve (Wireless) Data Communication 35 Memorial Plaza 36 Remote Storage for Cadets/Facilities 37 Replace Upper Parade Trees RESIDENCE HALLS 38 Civilian Housing, Phase 2 39 Civilian Housing, Phase 3 40 Corps Housing Expansion 41 Residence Hall Recurring Maintenance Program: Crawford Hall 42 Residence Hall Revitalization Program: Dodge Hall, Ransom Hall, Wilson Hall, Patterson Hall, Goodyear Hall, Alumni Hall, Hawkins Hall, Gerard Hall
24 List of Projects 2010 to 2019 Campus Map
25 22 1 Center for the Integrated Study of the Built Environment (CISBE)
26 Project Description The Center for the Integrated Study of the Built Environment (CISBE) is an interdisciplinary effort bringing together students from Business & Management, Architecture & Art, and Engineering. The work is projectbased, and focuses on four key factors: sustainability, interdisciplinary collaboration, development of energy-effi cient independent structures and education. CISBE requires high-bay workshop space (approximately 40x40 workshop plus 15x40 storage) suitable for construction of full-scale mock-ups and structures. This workshop needs large-scale garage door access, and an accessory outdoor yard space. It is a dirty activity and should be given due consideration as to visibility and service access. At the same time, it is an incredible demonstration of interdisciplinary collaboration, and Norwich s values: We are dedicated to learning, emphasizing teamwork, leadership, creativity, and critical thinking. This embodiment of Norwich s values is an opportunity to feature CISBE as a recruitement and retention tool. As noted above, it needs to be located proximal to service access, and has a workshop or dirty presence. This isn t a negative connotation; it just needs to be understood and contained. In addition, as a subset of the School of Business & Management it would be benefi cially located proximal to the new South Precinct. With the consolidation of facility support buildings (project #33) along the south edge of campus, we recommend incorporating CISBE as a high-bay workshop space into the proposed facility garage building. This will sit opposite the new Business & Management building in the south precinct, but still provide discreet service access and an outdoor workspace. Project Data Estimated GSF: 2500 Estimated Cost/SF: $250 Estimated Construction Cost (2011 dollars): $625,000 Type: New Construction, Academic, Lab/Workshop Phasing Considerations CISBE is incorporated into the facility support buildings (project #33) from a phasing standpoint. This project is part of the facilitation project that will make room for the development of a new South Precinct. Summer 2010 CISBE Project, EMBARC solar powered lab; photo from Norwich Guidon website Project 1 23
27 24 2 School of Architecture & Art, Design-Build Space
28 Project Description The Design-Build program at the School of Architecture and Art is an instrumental part of the 3rd and 4th year instruction sequence. This program offers students an opportunity to get hands-on experience, through building some of the things that they design. It is an opportunity for students to learn to work in groups, build consensus, and learn to rely on one another s strengths. 1 Similar to the CISBE space (project #1), a workshop environment is most suitable for this project-based instruction - high-bay space, large access doors, accessory outdoor yard space. We have assumed a 25x40 workshop space, and recommend sharing the 15x40 storage space indicated in CISBE (project #1). We recommend incorporating the design-build space for the School of Architecture & Art into the consolidated facility support buildings (project #33) along the south edge of campus, adjacent to the CISBE workshop (project #1). This will provide discreet service access and an outdoor workspace, as well as potential pedagogical synergies with the CISBE program. Project Data Estimated GSF: 1250 Estimated Cost/SF: $250 Estimated Construction Cost (2011 dollars): $312,500 Type: New Construction, Academic, Lab/Workshop Phasing Considerations The Design-Build Space is incorporated into the facility support buildings (project #33) from a phasing standpoint. This project is part of the facilitation project that will make room for the development of a new South Precinct. Project 2 1 Portions paraphrased from Norwich University s School of Architecture Design-Build website Spring 2010 Project, Thoreau Box for Fundraising Auction; Construction Photo from Norwich University School of Architecture Design-Build website 25
29 26 3 School of Business & Management (B&M)
30 Project Description Project 3 The School of Business & Management is in need of new or renovated facilities. Dewey Hall, their current home, does not provide adequate space for instruction, particularly in regard to the space type that is needed for this growing program. Beyond the quantitative and qualitative space issues fully documented in the Detail: New Academic Buildings section, our conversations with B&M yielded some specifi c imperatives that have a signifi cant impact on planning: New or renovated space should be a physical manifestation of collaboration demonstrating Norwich s ability to bring people together across disciplinary boundaries (e.g. CISBE). Current classroom sizes limit capacity to students. A better model, more consistent with the pedagogic style would be 60 person classrooms for lower-level classes and 15 person classrooms for upper level classes. A top priority for the School is case study rooms. They will be used for computing and management classes, and would satisfy this 60 person class size need. Centrally located common areas for students to use for formal and informal study will facilitate the collaborative endeavor. The School needs a strong face to the public to support its outreach efforts to connect to industry in Vermont; to serve as a bridge to commerce and as an engine of economic activity. The School of Business & Management will form the anchor of the new South Precinct. This location will give it a public identity from Route 12. Engineering, Math, and Science flanks the north side of the library, so it also will promote synergy with these programs, key partners in the collaborative effort that B&M supports. The space type (case study rooms with tiered floors) is not one easily satisfi ed in a renovation project, so this program is prime for a new building. Accreditation of the program is scheduled within the next fi ve years, and a commitment to the physical plant is a consideration in this process. Care will need to be taken with the development of this northfacing quad. In good weather, this quad would provide a nice space, shielded from Route 12, for casual social activity, or outdoor classes. Long winter seasons in Northfi eld will create issues for snow and ice in this quad. Solar analysis will need to be conducted, and there may be good reason to hold the southern leg of this precinct at a lower elevation to allow solar trespass. Project Data Estimated ASF: 24,475 Estimated GSF: 40,792 (0.6 effi ciency) Estimated Cost/SF: $350 Estimated Construction Cost (2011 dollars): $14,277,200 Type: New Construction, Academic, Classroom/Lab/Offi ce Phasing Considerations A new South Precinct is one of the big dominoes in the overall phasing plan. It needs to be preceded by the consolidation of the facility support buildings, CISBE, and the Architecture Design- Build Space (projects #1, 2, 33). Consolidating facilities along the south edge of campus will free up the necessary space for this development. Once complete, B&M will evacuate Dewey Hall, allowing it to be used as swing space for other projects. Parking is another phasing consideration for expanding the School of Business & Management at the south precinct location. 27
31 28 4 School of Graduate & Continuing Studies (SGCS)
32 Project Description An initial charge to the committee was to evaluate moving SGCS onto the main campus. After detailed interviews, development of cost estimates and discussions with President Schneider it was decided that, at this time, all of SGCS facilities needs are being met at their present facility. The School of Graduate & Continuing Studies (SGCS) is the online graduate and continuing studies program at Norwich University. In the summer of 2010, OnlineDegreeReviews.org reviewed and ranked over 2000 online degree programs, and ranked Norwich University as the top online education provider in the United States. Norwich University has built a leading-edge online campus, using the consistent and integrated efforts of faculty, support staff, administrators, students and alumni. We have built an environment that promotes networking, peersupport and one-on-one contact with Norwich faculty. The online learning environment takes the traditional classroom to the next level through the following strategies: focus is on the student, online discussion, writing, access to Kreitzberg Library s extensive resources, immediate response and feedback, flexibility, small group work, and networking. 1 The SGCS program maintains a strong affi liation with the School of Business & Management, particularly given the number of business and administration degrees offered by SGCS. In addition, during the one-week on-campus residency portion of the SGCS, the B&M case study classrooms will be highly utilized. Project Data If it were to be conceived as new space rather than leased space, then the following project data would be appropriate. Estimated ASF: 8,108 Estimated GSF: 14,742 (o.6 effi ciency) Estimated Cost/SF: $250 Estimated Construction Cost (2011 dollars): $3,685,500 Type: New Construction, Academic, Offi ce Phasing Considerations There are no phasing considerations required to keep SGCS in their currnet leased space in downtown Northfi eld. Were they to be combined with B&M on campus, then a new South Precinct is one of the big dominoes in the overall phasing plan. It needs to be preceded by the consolidation of the facility support buildings, CISBE, and the Architecture Design-Build Space (projects #1, 2, 33). Consolidating facilities along the south edge of campus will free up the necessary space for this development. Once complete, SGCS will evacuate their currently leased space in downtown Northfi eld, allowing it to be used as swing space for other projects, or to be taken offline. Project 4 1 Portions paraphrased from Norwich SGCS website SGCS students hiking in the Dog River during Residency Week 29
33 30 5 School of Humanities
34 Project Description The School of Humanities, currently housed in Webb Hall, is in need of new or renovated facilities (see Appendix B and C for a facilities assessment). Humanities and Social Sciences (project #6) serve a large number of students in service courses, as well as supporting majors in their own right. Webb Hall does not provide adequate space for contemporary instruction methods. Beyond the quantitative and qualitative space issues fully documented in the Detail: New Academic Buildings section, our conversations with Humanities yielded some specifi c imperatives that have a signifi cant impact on planning: Students must have a space on campus where they are not on stage and where they can relax between classes. Formal and informal spaces for students and faculty are a real need. Humanities is concerned about the condition of Dole Auditorium and see an upgrade as a major need. It is actively used by the English Department s Pegasus Players. Webb is heavily programmed and utilized year-round. Construction phasing will be a key challenge. Coupled with the School of Social Sciences (project #6), Humanities will anchor a revitalized academic precinct in the heart of campus. There are many benefi ts to this approach. An expansion and renovation of Webb Hall will allow access to the Upper Parade, the lower parking lot to the north, and the south approach from the Memorial Plaza. This centralized location will serve the highly subscribed courses of Humanities; the proposed solution should allow students to move easily to and through Webb Hall. Building additions and renovations to Webb Hall will increase density in the heart of campus without compromising important green spaces and the character of the campus, giving Humanities a strong identity internal to the campus. Project Data Estimated ASF: 35,425 Estimated GSF: 59,042 (o.6 effi ciency) Estimated Cost/SF: $350 Estimated Construction Cost (2011 dollars): $20,644,700 Type: New and Renovation, Academic, Classroom/Lab/Offi ce Phasing Considerations Following the completion of the new South Precinct, Dewey Hall will be evacuated by the School of Business & Management. Dewey could be used as swing space for School of Humanities offi ce space and limited classrooms while renovations and additions to Webb are in process. The new classrooms in the South Precinct are predominately case study rooms, which are not necessarily appropriate for Humanities. As part of future planning, an assessment of how the gap in classroom space will be met during the renovation of Webb Hall should be conducted. One approach would be to build and occupy the addition to Webb before renovating the existing building. South Facade of Webb Hall, facing Memorial Plaza Project 5 31
State University Construction Fund Binghamton University Facilities Master Plan. Open Forum Session: Final Plan Recommendation. 13 April 2011, 3:00pm
State University Construction Fund Binghamton University Facilities Master Plan Open Forum Session: Final Plan Recommendation 13 April 2011, 3:00pm SUCF project no. 07839 1 PRESENTATION /30min Q+A /20min
More informationIMPLEMENTATION CENTRAL STATE UNIVERSITY CAMPUS WIDE MASTER PLAN
The core implementation of this master plan, Phases 1-3, will occur incrementally over the next ten years and will provide the appropriate facilities to support an enrollment of 5,000 students at the main
More informationUpdate Report on the Capital Outlay Plan for JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE
Update Report on the Capital Outlay Plan for 2018-2024 JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE August 1, 2017 Background: At its April 2017 meeting, the Board
More informationOFFICE OF THE CENTRAL AREA CENTRAL AREA COMMUNITY IMPROVEMENT PLAN DOWNTOWN BRAMPTON BUILDING IMPROVEMENT PROGRAM PROGRAM IMPLEMENTATION GUIDELINES
OFFICE OF THE CENTRAL AREA CENTRAL AREA COMMUNITY IMPROVEMENT PLAN DOWNTOWN BRAMPTON BUILDING IMPROVEMENT PROGRAM PROGRAM CENTRAL AREA COMMUNITY IMPROVEMENT PLAN DOWNTOWN BRAMPTON BUILDING IMPROVEMENT
More informationFY 2013 Annual Capital Plan
FY 2013 Annual Capital Plan DRAFT: FY 2013 Annual Capital Improvement Plan June 5th, 2012 (Dollars in millions) Capital Projects Estimated Budget Debt State Capital O & M Public Private Gifts Grants Deferred
More informationMOHAWK VALLEY HEALTH SYSTEM INTEGRATED HEALTH CAMPUS UTICA, NY
MOHAWK VALLEY HEALTH SYSTEM INTEGRATED HEALTH CAMPUS UTICA, NY 1 MAJOR PROJECT MILESTONES 2 MAJOR PROJECT MILESTONES MVHS announces it is exploring opportunities to fund and build a new, combined hospital
More informationCommunity Integrated Master Plan Workshop 4: CIMP Consensus Elements
Community Integrated Master Plan Workshop 4: CIMP Consensus Elements 22 May 2010 Headquarters Marine Corps Naval Facilities Engineering Command 1 What is a CIMP? A Community Integrated Master Plan is the
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Downtown Triangle Redevelopment 1 st Street North, East Jackson Street, and Market Street City of Wisconsin Rapids 444 West Grand Avenue, Wisconsin Rapids, WI 54495 February 2017
More informationTrustee Business Affairs Committee Facilities Action Items and Update. April 20, 2017
Trustee Business Affairs Committee Facilities Action Items and Update April 20, 2017 Campus Development Impact Map Page 2 ACTION ITEM #1: On-Campus Housing Development Page 3 Recommended Action Item: The
More informationMETHODOLOGY - Scope of Work
The scope of work for the Truckee West River Site Redevelopment Feasibility Study will be undertaken through a series of sequential steps or tasks and will comprise four major tasks as follows. TASK 1:
More informationBerne Knox Westerlo Central School District
Berne Knox Westerlo Central School District Proposed Capital Project Progress Summary Report to the Board of Education May 8, 2017 Proposed Capital Project Background In 2015 the Board of Education and
More informationUAA Master Plan Update
UAA Master Plan Update Draft Master Plan June 2013 ECI/Hyer Architecture ZGF Architects CRW Engineering Corvus Design Landscape Architecture Kittelson & Associates Ira Fink & Associates Key Themes Consolidation
More informationTASK FORCE REPORTS CAMPUS MASTER PLAN
` TASK FORCE REPORTS CAMPUS MASTER PLAN Table of Contents ACADEMIC NEEDS & SPACE UTILIZATION 1 COMMUNITY PARTNERSHIPS 2 EAST CAMPUS VISION 3 LIVING/LEARNING ENVIRONMENTS 4 NORTH OF BOULDER CREEK 5 RECREATION,
More informationReport of the Justice Center Study Committee. Photos 2010 Bill Fink Communications, LLC
Report of the Justice Center Study Committee Photos 2010 Bill Fink Communications, LLC 20100904 1 In late 2009, the Houghton County Commissioners asked their Law Enforcement Committee to conduct a study
More informationCOMMUNITY MEETING 3 February 15, Mission Bay Phase Two
COMMUNITY MEETING 3 February 15, 2011 Mission Bay Phase Two Agenda Welcome, Study Scope and Schedule Feedback Received Campus Environment Concepts Active Zones, Pedestrian Environment and Vehicular Circulation
More information2018 CDBG Application Workshop Downtown Revitalization Program. Program Overview CDBG Downtown Revitalization Program. Impactful Photo Examples (1)
2018 CDBG Application Workshop Downtown Revitalization Program Joe Bohlke, Project Manager Iowa Economic Development Authority Joseph.Bohlke@iowaeda.com 725-3011 Ed Basch, Project Manager Iowa Economic
More informationPRESIDENT MISSISSIPPI STATE UNIVERSITY
PRESIDENT MISSISSIPPI STATE UNIVERSITY The President of Mississippi State University is the chief executive officer of the University, reporting to the Commissioner of Higher Education, who is responsible
More informationTO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS ACTION ITEM
GB3 Office of the President TO MEMBERS OF THE COMMITTEE ON For Meeting of ACTION ITEM APPROVAL OF DESIGN PURSUANT TO CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE STILES STUDENT RESIDENCE HALL PROJECT,
More informationEXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY
ES-1 1.0 EXECUTIVE SUMMARY The University of California, Riverside (UCR) retained Brailsford & Dunlavey (B&D) in association with Cannon Dworsky Architects (Cannon Dworsky) in November 2000, to complete
More informationRiNo Park Buildings Business Case Analysis. July 10, 2017
RiNo Park Buildings Business Case Analysis July 10, 2017 1 Purpose and Goal The public indicated a strong desire to keep and reuse RiNo Park buildings during the park planning process. The City of Denver
More informationREQUEST FOR ARCHITECTURAL & ENGINEERING PRE-DESIGN SERVICES
REQUEST FOR ARCHITECTURAL & ENGINEERING PRE-DESIGN SERVICES ACADEMIC BUILDINGS 2011-2013 September 2012 Project No. (CPB will obtain) TABLE OF CONTENTS PAGE Project Background and Purpose...2 Project Description...3
More informationOff-Campus Recreation, Intercollegiate Athletics, College of Education and Human Performance, and Facilities and Open Spaces.
In order to provide a comprehensive count of all existing recreation and open space facilities, an inventory of such facilities is organized based on the following chart. Activity-based facilities are
More informationMITCHELL COLLEGE. Master Plan Work Session
Master Plan Work Session Agenda Review Master Plan Process, Schedule, and Goals Space Analysis Summary Site Analysis Summary Alternatives #1 - #3 Composite Alternative Phasing Discussion Master Plan Process
More informationFACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS
GAINESVILLE COMMUNITY REDEVELOPMENT AGENCY DOWNTOWN COMMUNITY REDEVELOPMENT AREA FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS 802 NW 5th Avenue Suite 200 Gainesville, FL 32601
More informationSummary of Focus Groups Lycoming County 2016 Comprehensive Plan Update April May 2016
Summary of Focus Groups Lycoming County 2016 Comprehensive Plan Update April May 2016 Focus Group Overview As part of the 2016 Comprehensive Plan community outreach strategy, Lycoming County conducted
More informationBRANDON UNIVERSITY DOWNTOWN PROJECT REQUEST FOR EXPRESSION OF INTEREST (REOI)
BRANDON UNIVERSITY DOWNTOWN PROJECT REQUEST FOR EXPRESSION OF INTEREST (REOI) 1. Project Description Brandon University seeks expressions of interest from private parties who will partner with the University
More informationstrengthening organizations
Guide to applying for health care grants page 1 of 7 Through its health care work to strengthen organizations, The Duke Endowment invests in building the infrastructure of effective enterprises and institutions.
More informationCOMMUNITY ENGAGEMENT PLAN Project Title: Northeast Southeast Service Area Master Plan also known as East of the River Park Master Plan
Board Plan Approval/Review Date: June 28, 2017 Last Plan Revision Date: 6/28/17 COMMUNITY ENGAGEMENT PLAN Project Title: Northeast Southeast Service Area Master Plan also known as East of the River Park
More informationORIENTATION FALL 2017
ORIENTATION FALL 2017 T HURSDAY, A UGUST 31, 2017 WELCOME 8:00 a.m. 5:30 p.m. IT Help Desk Open, Location: 2nd floor, Library Our Information Technology staff will be available to answer questions or help
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance REVISED AGENDA ITEM: 7 L DATE: May 8-10, 2018 ****************************************************************************** SUBJECT University Center Sioux
More informationFive-Year Strategic Plan GOAL VERSION Draft 2017
Five-Year Strategic Plan GOAL VERSION 2017-2021 Draft 2017 Five-Year Long-Range Plan 2017-2021 Contents: Mission, History & Planning Background page 3 Organizational Tenents page 5 Goal 1: Tourism, Destination
More informationMCKINSTRY INNOVATION CENTER
MCKINSTRY INNOVATION CENTER SEATTLE, Washington MCKINSTRY INNOVATION CENTER Seattle, Washington A HIVE FOR GREEN BUSINESS Set on the dynamic McKinstry campus, the Innovation Center provides flexible office
More informationIMPACT REPORT. Redefining ROI: The Campaign for Craig Hospital
IMPACT REPORT Redefining ROI: The Campaign for Craig Hospital 2010-2015 BY THE NUMBERS 85,000 square feet of new space 135,000 square feet of renovated space 52 new private patient rooms 22.59% increase
More informationFIRST IMPRESSIONS COMMUNITY EXCHANGE TEAM MEMBER S GUIDE BOOKLET. Seeing things in a whole new light
FIRST IMPRESSIONS COMMUNITY EXCHANGE TEAM MEMBER S GUIDE BOOKLET Seeing things in a whole new light Table of Contents Visiting Team Member Information... 1 Prior to Your Visit... 5 The Five Minute Impression...
More informationUNIVERSITY OF CALIFORNIA, SANTA CRUZ
UNIVERSITY OF CALIFORNIA, SANTA CRUZ BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ PHYSICAL PLANNING, DEVELOPMENT & OPERATIONS UC SANTA CRUZ, CALIFORNIA
More informationHawthorne Community Redevelopment Agency Facade Beautification Grant Program 2012
Hawthorne Community Redevelopment Agency Facade Beautification Grant Program 2012 I. Purpose The Hawthorne Community Redevelopment Agency (CRA) is offering a grant program as an incentive to owners of
More informationHARRIETT FULLER RUST FACADE PROGRAM
HARRIETT FULLER RUST FACADE PROGRAM APPLICATION GUIDELINES The City of Bloomington has committed itself to the continued revitalization of its central business district. This commitment manifests itself
More informationC A M P A I G N NEYLAND STADIUM. Master Plan Update WINTER Preparing College Football s Greatest Stadium for Future Generations of Service
C A M P A I G N NEYLAND STADIUM Master Plan Update WINTER 2009 Preparing College Football s Greatest Stadium for Future Generations of Service Dear Vol Fan, As we enter an exciting new era of Volunteer
More informationREPORT OF THE CHIEF LEGISLATIVE
REPORT OF THE CHIEF LEGISLATIVE ANALYST DATE: December 4, 2013 TO: FROM: Honorable Members of the Economic Development GerryF.Miller ~~~ L. Chief Legi a ive Committee A TERNATIVE MODERNIZATION OPTIONS
More informationFaçade Improvement Program
Policy Guidelines for the Façade Improvement Program Neighborhood Economic Development Entrepreneurs Discovering Opportunities Through Neighborhood Revitalization Community Development Department 2008
More informationFlorida Job Growth Grant Fund Public Infrastructure Grant Proposal
Florida Job Growth Grant Fund Public Infrastructure Grant Proposal Proposal Instructions: The Florida Job Growth Grant Fund Proposal (this document) must be completed by the governmental entity applying
More informationHealthcare. Healthcare Transformation Services: revitalizing the vision of compassionate care. Consulting
Healthcare Consulting Healthcare Transformation Services: revitalizing the vision of compassionate care Who/where A large regional health network in the Northeast region of the United States is expanding
More informationREQUEST FOR QUALIFICATIONS CAMPUS MASTER PLAN UPDATE MOBILITY AND WAYFINDING
REQUEST FOR QUALIFICATIONS CAMPUS MASTER PLAN UPDATE MOBILITY AND WAYFINDING San Francisco State University (SF State) Department of Physical Planning and Development is requesting qualification statements
More informationAdaptive Re-use of the. Rowlett, Texas
Adaptive Re-use of the Historic i Coyle Farmstead Rowlett, Texas Project Goals and Activities: Develop appropriate adaptive re-use concepts for the historic Coyle Farmstead that provide for community groups,
More informationCAREER OPPORTUNITY ANNOUNCEMENT DIRECTOR OF ATHLETICS
CAREER OPPORTUNITY ANNOUNCEMENT DIRECTOR OF ATHLETICS THE UNIVERSITY Overview Mercyhurst University is a fully accredited, Catholic, comprehensive institution founded in 1926 by the Sisters of Mercy. With
More informationTHE ROLE AND VALUE OF THE PACKARD FOUNDATION S COMMUNICATIONS: KEY INSIGHTS FROM GRANTEES SEPTEMBER 2016
THE ROLE AND VALUE OF THE PACKARD FOUNDATION S COMMUNICATIONS: KEY INSIGHTS FROM GRANTEES SEPTEMBER 2016 CONTENTS Preface 3 Study Purpose and Design 4 Key Findings 1. How the Foundation s Communications
More informationLong Range Campus Plan 3.0. Town Hall Meeting
Long Range Campus Plan 3.0 Town Hall Meeting Campus Aerial View 2 Overview/Agenda 3 Campus Plan Summary Project Description 333 Golden Gate State Appropriations Project Management Department of General
More informationGreen Building Incentive Program Guidelines & Procedures
Green Building Incentive Program Guidelines & Procedures A program of Andersonville Special Service Area #22 Administered by Andersonville Development Corporation 5153 N. Clark St., Suite 204 Chicago,
More informationProfessional Design Services for Memorial Field. City Of Scranton Lackawanna County
Proposal to Provide: Statement of Qualifications for: General Engineering Consulting s Environmental and Geotechnical Engineering s Professional Design s for Memorial Field Submitted to: Submitted to:
More informationChildren's Hospital of Richmond Pavilion
OWNER/AFFILIATION Virginia Commonwealth University COMPLETION DATE March, 2016 ARCHITECT(S) HKS GLASS/SKIN SKY TERRACE GARAGE GARDEN SQ FT 632,989 BGSF with 323,452 GSF parking RIVER CONCEPT RIVERS EDGE
More informationReport on the Health Forum-First American Healthcare Finance Technology Investment Survey. Drivers of Healthcare Technology Investment
Report on the Health Forum-First American Healthcare Finance Technology Investment Survey Drivers of Healthcare Technology Investment White Paper: Expectations for Quality & Compliance Improvement Driving
More informationRE: Request for Proposal for the Triangle Park Café leased and managed by Downtown Lexington Partnership.
April 17, 2018 RE: Request for Proposal for the Triangle Park Café leased and managed by Downtown Lexington Partnership. To Whom It May Concern: The enclosed Request for Proposal (RFP) invites your Business
More informationCentralia Downtown Association Facade Improvement Grant Program
Centralia Downtown Association Facade Improvement Grant Program 1 P age Centralia Downtown Association Facade Improvement Grant Program INTRODUCTION & INSTRUCTIONS The Downtown Facade Grant is offered
More informationDowntown Revitalization. Strategic Action Plan
Downtown Revitalization Strategic Action Plan COLLABORATION! CIP Boundary Background Stage 1 Organizing and Scoping Organizational Development - Sep 2011 Jan 2012 Self-Assessment(s) - Nov 2011 Jan 2012
More informationEconomic Development Journal
ED j The IEDC Economic Development Journal 734 15th Street, NW Suite 900 Washington, DC 20005 Volume 15 / Number 1 / Winter 2016 Public Spaces Community Places A Crowdfunding Initiative By Katharine Czarnecki
More informationDDA FAÇADE GRANT PROGRAM OVERVIEW & GUIDELINES
DDA FAÇADE GRANT PROGRAM OVERVIEW & GUIDELINES What is the Greeley DDA Façade Grant Program? The program offers grants to businesses and/or property owners in the Downtown Development Authority Tax Increment
More informationWelcome Master Plan Process Working Goals and Principles DRAFT Master Plan Development Concepts Comments and Suggestions
www.calpoly.edu CAL POLY MASTER PLAN UPDATE APRIL/MAY 2015 Welcome Master Plan Process Working Goals and Principles DRAFT Master Plan Development Concepts Comments and Suggestions 5/6/2015 www.calpoly.edu
More informationPike Place MarketFront: A 40-Year Vision to Complete the Market Historic District
Pike Place Market PDA CONTACT Emily Crawford Pike Place Market 85 Pike Street, Room 500 Seattle, Wash. 98101 Phone: (206) 774-5278 emily.crawford@pikeplacemarket.org www.pikeplacemarket.org/marketfront
More informationPast and Present Campus Recreation Facilities
Past and Present Campus Recreation Facilities School Map Photo courtesy of the Department of Archives & Special Collections Before the Malley Center or the Leavey Center were constructed, students used
More informationOBTAINING STEM SUPPORT FROM PRIVATE FOUNDATIONS: A TEAM APPROACH
New resources are always needed to help colleges and universities begin new science, technology, engineering, and mathematics (STEM) projects. As faculty and administrative leaders conceive and develop
More informationReprint of an article from "ECHOCARDIOGRAPHY UPDATE" Newsletter By Judy Rosenbloom Author of The Cardiovascular Coding Reference Guide.
REIMBURSEMENT 1999 - RIDING THE ROLLER COASTER Reprint of an article from "ECHOCARDIOGRAPHY UPDATE" Newsletter By Judy Rosenbloom Author of The Cardiovascular Coding Reference Guide. Margaret Hansen is
More informationFACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS
GAINESVILLE COMMUNITY REDEVELOPMENT AGENCY COLLEGE PARK/UNIVERSITY HEIGHTS COMMUNITY REDEVELOPMENT AREA FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS 802 NW 5th Avenue Suite 200
More informationDestination Discovery: UA Tech Park at The Bridges. Technology Precinct and Innovation and Technology Complex
Destination Discovery: UA Tech Park at The Bridges Technology Precinct and Innovation and Technology Complex Request for Proposals: Solicitation for Master Developer November 2017 CONTENTS SECTION ONE:
More informationBuilding Facade Improvement Program GUIDELINES
Building Facade Improvement Program GUIDELINES The Building Façade Improvement Program is designed to retain and enhance the original architectural character of buildings in the downtown area. Many of
More informationGreen Building Incentive Guidelines
Green Building Incentive Guidelines A program of Andersonville Special Service Area #22 Administered by Andersonville Development Corporation 5314 N. Clark St., 2 nd Fl. Chicago, Illinois 60640 Phone:
More informationRequest for Proposals for Economic Development Consultant. Downtown Revitalization Initiative Durkee Street City of Plattsburgh, NY
Request for Proposals for Economic Development Consultant Downtown Revitalization Initiative Durkee Street City of Plattsburgh, NY Date of Issuance: March 23 rd, 2018 Proposal Deadline: April 26 th, 2018
More informationFacilities. Guide M ANAGEMENT. Facilities Management Directory of Services
Facilities M ANAGEMENT Guide Sinclair Community College Facilities Management Directory of Services Administration Director 4529 Administrative Assistant 4529 Information Systems and 4529 Programs and
More informationBoard of Trustees - Agenda
Board of Trustees - Agenda University of Central Florida Board of Trustees Special Meeting October 5, 2018 9:15 a.m. (or at the conclusion of the Finance and Facilities Committee Meeting) President s Boardroom,
More informationGalesburg Public Library, Galesburg, IL
Galesburg Public Library, Galesburg, IL Request for Qualifications ( RFQ ) Architectural, Engineering, Construction Management and Related Services I. OVERVIEW The Galesburg Public Library is seeking architectural,
More informationBLAINE SCHOOL DISTRICT CAPITAL LEVY DETAIL REVIEW. April 24, 2018 Special Election
BLAINE SCHOOL DISTRICT CAPITAL LEVY DETAIL REVIEW April 24, 2018 Special Election Urgent Needs and Related Program Implications The Facility Needs Review Committee was charged with considering projects
More informationVice President for University Advancement
Position Description Vice President for University Advancement An exciting opportunity for an experienced fundraiser and leader to join CSU Channel Islands and provide the vision, strategic direction,
More informationebook 6Six Steps to Developing a Successful Clinical Smartphone Strategy
ebook 6Six Steps to Developing a Successful Clinical Smartphone Strategy Introduction Clinical smartphones are designed to meet the critical communication needs of caregivers. On any given day, nurses
More informationWhat has been accomplished to date? Spring 2008: Sanford Submitted 4 applications to the State for prioritization in for SRTC/SHS, and 3 elementary
Frequently Asked Questions Is there State funding for this project? Yes. Based on our needs, the State of Maine, Department of Education has ranked this project #2 on their Major Capital Improvement Program
More informationPathway to Business Model Innovation Getting to Fueling Impact
SHARING KNOWLEDGE. GROWING IMPACT. Pathway to Business Model Innovation Getting to Fueling Impact February, 2011 cfinsights.org the IDEA BEHIND IS SIMPLE What if EACH community foundation could know what
More informationPALMER LAND TRUST AT ITS FORTY YEAR ANNIVERSARY STRATEGIC PLAN 2020 Updated April 2018
PALMER LAND TRUST AT ITS FORTY YEAR ANNIVERSARY STRATEGIC PLAN 2020 Updated April 2018 2 Introduction & Context Never let a good crisis go to waste. original attribution disputed, some say Winston Churchill
More informationDEVELOPMENT INCENTIVE PROGRAMS
DEVELOPMENT INCENTIVE PROGRAMS The Joliet City Center Partnership seeks to promote a healthy and expanding business climate in the Downtown Core Area. Utilizing revenues from an economic development special
More informationAPA/PAW 2013 Joint Awards Program Submittal
May 30, 2013 APA/PAW Awards Committee Washington APA Office 603 Stewart Street, Suite 610 Seattle, WA 98101 Dear APA/PAW Awards Committee: RE: APA/PAW 2013 Joint Awards Program Submittal Enclosed is a
More informationAHIP and Habitat for Humanity: Block by Block Initiative
AHIP and Habitat for Humanity: Block by Block Initiative Community Outreach for the 10th and Page Neighborhood Emily Broadwell Dave Matthews Sarah Mercer Bella Purdy 12/10/2011 TA: Nick Wickersham 1 Table
More information2012 PUBLIC PARTICIPATION PLAN
2012 PUBLIC PARTICIPATION PLAN Planning for Greater Akron September 2012 AMATS [am - ats] - noun 1. acronym for Akron Metropolitan Area Transportation Study. 2. serves Summit County, Portage County, and
More informationFrankfort Historic Landmarks Arts Center
Michigan Municipal League Frankfort Historic Landmarks Arts Center Better Communities. Better Michigan. PROJECT DETAILS: NAME: Elizabeth Lane Oliver Center for the Arts DATE: 2005-present CATEGORIES: Cultural
More informationFive-Year Capital Program Non-State and State Funds to
C49822_FINAL_Nonstate 10/18/05 1:50 PM Page 1 Five-Year Capital Program Non-State and State Funds 2005-2006 to 2009-2010 Teaching Research Public Service University of California Office of the President
More informationMission City Corporate Center
2385 2365 2375 2355 SAN DIEGO Mission Valley s premier campus environment 2355-2385 Northside Drive Property overview The opportunity to locate your company and its employees within San Diego s premier
More informationPark and Recreation Department Strategic Plan Dallas Park and Recreation Board October 1, 2015
Park and Recreation Department Strategic Plan Dallas Park and Recreation Board October 1, 2015 1 Agenda Process Review Action Plan Contents Strategic Directions & Actions Next Steps 2 Park & Recreation
More informationCOMMUNITY ENGAGEMENT PLAN Project Title: Wirth Park Silent Sports and Welcome Center. MPRB Division: Planning Project Manager: Adam Arvidson
Board Plan Approval/Review Date: 6/4/2014 Last Plan Revision Date: 5/20/2014 COMMUNITY ENGAGEMENT PLAN Project Title: MPRB Division: Planning Project Manager: Adam Arvidson As required by the Minneapolis
More informationComprehensive Planning Grant. Comprehensive Plan Checklist
Comprehensive Planning Grant Comprehensive Plan Checklist This form was updated April 2010 Comprehensive Planning Grant Program Department of Administration Division of Intergovernmental Relations 101
More informationDallas County Community College District Bond Program. July 10, 2007
Dallas County Community College District 2004 Bond Program July 10, 2007 1 2004 Bond Program Eastfield College 2 Industrial Technology Site Plan Workforce Development Eastfield College Learning Center
More informationOpportunity Winona Redevelopment 60 Main Street Lot #7 Winona, MN. Issuance Date: November 3, 2016 Proposals Due: December 31, 2016
Opportunity Winona Redevelopment 60 Main Street Lot #7 Winona, MN Issuance Date: November 3, 2016 Proposals Due: December 31, 2016 Port Authority of Winona 207 Lafayette Street Winona, MN 55987 www.portofwinona.com
More informationGREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated
GREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated 07.21.2015 1. Why is the Greene County School District considering a bond referendum? The Greene County School District is considering
More informationBUSINESS AND ECONOMICS
This preliminary draft element was prepared by City staff on the basis of input from the CAC and members of the public received from January 2017 through February 2017. The Element will be reviewed by
More informationTOWN OF NEWMARKET 395 Mulock Drive NEWMARKET DOWNTOWN DEVELOPMENT SUBCOMMITTEE FINANCIAL INCENTIVE PROGRAM APPLICATION
TOWN OF NEWMARKET 395 Mulock Drive www.newmarket.ca P.O. Box 328 info@newmarket.ca Newmarket, ON L3Y 4X7 905.895.5193 NEWMARKET DOWNTOWN DEVELOPMENT SUBCOMMITTEE FINANCIAL INCENTIVE PROGRAM APPLICATION
More informationCarthage Downtown Restoration
Carthage Downtown Restoration Started With A Goal-Make Carthage a Community of Choice Recognized that the Downtown is the entrance to the Village, and the future of the community depended on peoples first
More informationCOMMUNITY MEETING NOTES UCSF Mission Bay Phase 2 Study. Meeting Date: June 17, 2010 Genentech Hall Mission Bay campus Subject: Community Meeting 1
COMMUNITY MEETING NOTES UCSF Mission Bay Phase 2 Study Meeting Date: June 17, 2010 Location: Genentech Hall Mission Bay campus Subject: Community Meeting 1 Attendees: Neighbors UCSF staff San Francisco
More informationMeasure H Update CITIZEN S BOND OVERSIGHT COMMITTEE (CBOC) JANUARY 11, 2016
Measure H Update CITIZEN S BOND OVERSIGHT COMMITTEE (CBOC) JANUARY 11, 2016 Presentations PDA Day (August 2015, February 2016) 2030 Plan Steering Committee (Monthly from July 2015 through January 2016,
More informationM E M O R A N D U M. Response to your inquiries regarding Coles Sports and Recreation Center and Nonclassroom space for student use.
Office of the Vice Chancellor Elmer Holmes Bobst Library 70 Washington Square South, 12 th Floor New York, New York 10012-1091 Telephone: 212 998 8015 Facsimile: 212 995 4208 Linda G. Mills Vice Chancellor
More informationActivity Recreation Cultural Center
Activity Recreation Cultural Center (ARCC) The Campbell City Schools maximizes educational opportunities for all learners by responding to the needs of the community with leading-edge, high-quality, cost-effective
More informationEdward Jones St. Louis, MO. Project Case Study: Financial
Knoll Workplace Research Project Case Study: Financial Edward Jones St. Louis, MO As a leader in the financial services industry, Edward Jones takes a highly personal approach to business and its clients.
More informationUON Alumni Centre Project brief UNIVERSITY OF NAIROBI SCHOOL OF ARCHITECTURE AND ENGINEERING DEPARTMENT OF REAL ESTATEAND CONSTRUCTION MANAGEMENT
UNIVERSITY OF NAIROBI SCHOOL OF ARCHITECTURE AND ENGINEERING DEPARTMENT OF REAL ESTATEAND CONSTRUCTION MANAGEMENT BCM 410 CONSTRUCTION IMPLIMENTATION PORTFOLIO LECTURER: ARCH. RALWARA PETER AMBROSE MUTHINI
More informationE-J Industrial Spine BOA Nomination Study
Section VII. Major Recommendations A. Introduction The E-J BOA Study Area provides a number of unique opportunities to develop large-scale properties in a highly accessible urban setting. Considering the
More informationNeighborhood Outreach Workshop Report Comments The Process
Neighborhood Outreach Workshop Report Comments Below is a description of comments received in response to the January 20, 2004 release of the LMDC and City of New York Neighborhood Outreach Workshop report.
More informationMaster Plan and Zone Change Public Meeting. Graduate & Research Center November 15, 2017
Master lan and Zone Change ublic Meeting Graduate & Research Center November 15, 2017 Agenda Introductions + urpose University + Community Context OSU-Cascades Master lan Transportation + arking Closing
More information