CAPABILITIES LIST PRODUCTS/PARTS/APPLIANCES MANUFACTURED BY: COX & COMPANY, INC Old Country Road Plainview, New York 11803
|
|
- Mavis Johnston
- 5 years ago
- Views:
Transcription
1 D-9575 Rev.: U PAGE: 1 OF 9 DATE: Dec. 4, 2017 CAPABILITIES LIST PRODUCTS/PARTS/APPLIANCES MANUFACTURED BY: CO & COMPANY, INC Old Country Road Plainview, New York ASSIGNMENT: FAA FSDO FARMINGDALE, NEW YORK Approved: Ada Karalekas Accountable Manager
2 CAPABILITIES LIST D-9575 REV.: U REVISION RECORD PAGE: 2 OF 9 DATE: DEC. 4, 2017 REVISION DESCRIPTION DATE - Original Release 08/05/98 A Added Cox P/N: 6060 to Capabilities List (page 6) 08/13/98 B Added Cox P/N: 2977 & 3402 to Capabilities List (page 5) 02/05/99 C Added Cox P/N: & & 2981 to Capabilities List (page 7) 06/09/00 Revised (page 3), Capabilities List Distribution Chart, removing the following names of former employees of Cox & Co. (1) Frank Ortiz, (2)George Papaliberios, & (3) Herman Rivera. Please reference Cox=s Excor # 647, & # 679, sent to your FSDO dated June 14, 1999 and November 24, Added two (2) names, Muneshwar Persaud, Manufacturing Manager, and Nick Amendola, Manufacturing Engineer. Repairmen Status Change. Revised Repairman Status per the following: Appendix A Certified Repairman Signature Roster. Revised Capabilities List and Distribution Chart. De-icing Manager responsibilities (section 2) revised. Update Organizational Chart to reflect Repairman changes. Added updated company floor plan (ECN #3297) D Added Cox P/N=s: 3427, , 2616, 3413 to capabilities list 12/04/01 (page 7) Revised pages 1,3,5 - Deleted Robert Allred; added personnel title changes; P/N2888* added all models. ECN 3550 E Added Cox P/N=s: 3425 * and to capabilities list. Deleted 08/01/02 Mr. John Smith, from distribution chart (page 3 of 7) F Added Cox P/N's: 6500 *, 6501 *, 6502 *, 6503 *, 6504 *, 6505 * to 07/15/03 capabilities list (page 8) Added A*@ Next to Cox P/N A2432" on pg. 4 of 8, Repaginated entire document. G Added the following people to distribution list (pg. 3) 05/26/04 Joe Declemente, Pablo Hernandez, Craig Nelson, Constantine Karalekas and Dan Smith, deleted from distribution list: Nicholas Amendola, Carsten Seyer and Milton Meinck (pg. 3) Added to page 8 of Capabilities List the following Cox Part Numbers: 3432, 3433, 3434, 3435, 3443 with applicable descriptions. H Correct titles of Robert Guardiano and Dan Smith on Page 1 and 3. 02/10/05 Added to page 7 the following Cox part numbers: 3074*" and 2774*"along with applicable descriptions of same. J Rewritten entire document in Excell Spread Sheet Format. Also added to 07/13/05 Capability List the following P/N 6513, 6514, 6515, 6516, 6517, 6518, (see page 8 of 8). Changed page titles from "FAA PMA Components/accessories Manufactured by Cox & Company, Inc." to "Products/Parts/ Appliances Manufactured bycox & Company, Inc." K Added Cox P/N 3457* and revised job titles for: Frank DeBlanco, 1/23/2006 Muneshwar Persaud, Constantine Karalekas and Steve Landry. L Added P/N:6011,T. Ferguson,Steve Landry,H. Shichtman title changes 8/7/2008 M Changed Cox address page 1, Changed H. Shichtman title all (8) pages 1/7/2009 Changed FSDO address page 1, removed John Schnell from capabilities list distribution chart page 3 and added Fernando Medina. N removed:2250, 2251, 2272, 2291, 2719, 2845, 6050, 6051, 6052, 5/15/2015 Removed No from page 1, remove distribution list from page 2 Changed Approval authority from Director of Quality to Accountable Manager Added PN 3436, ,6780,6781,6782 8G7160V00131, 8G7160V00331, 8G7160V00231, 8G7160V00431, 8G7160V00531 P Added Cox PN /22/2015 R Added Cox PN /2/2015 T Added Cox PN 6521-,6523-, /31/2016 U Added Cox PN , , , , , , , , 8G7160V02131, 8G7160V02231, 8G7160V02831, 8G7160V03031, 8G7160V02931, 8G7160V /4/2017
3 CO & COMPANY, INC. D-9575 REV.: U PRODUCTS/PARTS/APPLIANCES MANUFACTURED BY CO & COMPANY, INC. PAGE: 3 OF 9 CAPABILITIES LIST DATE: Dec 4, 2017 CAPABILITIES LIST DISTRIBUTION CHART DISTRIBUTION LIST NO. FAA Flight Standards District Office, Farmingdale, New York 001
4 PRODUCTS/PARTS/APPLIANCES MANUFACTURED BY CO & COMPANY, INC. D-9575 Rev.:U CAPABILITIES LIST Page: 4 of 9 Date: Dec. 4, 2017 Part Number Valve Surface Gasket Tape Heated Hose Battery Air Inner Line * 2174* * 2375* 2432* * 2831* 2841* 2875*
5 PRODUCTS/PARTS/APPLIANCES MANUFACTURED BY CO & COMPANY, INC. D-9575 Rev.: U CAPABILITIES LIST Page: 5 of 9 Date: Dec. 4, 2017 Flight Deck Crew Temp. Rest Sensor Lower Deck Crew Rest Htr. Ribbon System Part Number Inner Line Gasket WHCU Electronic ler Analog Selector Digital Selector 2880 * 2888 * 2915 * 2927 * 2941 * 2950 * 2951 * 2952 * 2953 * 2959 * 2970 * 2971 * 2973 * 3043 * 3044 * 3046 * 3051 * 3052 * 3053 * 3457 NOTES: 1. All parts defined on the above Capabilities List are the only Products/Parts/Appliances Cox can return to service.
6 D-9575 Rev.: U PRODUCTS/PARTS/APPLIANCES MANUFACTURED BY CO & COMPANY, INC. Page: 6 of 9 CAPABILITIES LIST Date: Dec. 4, 2017 Part Number Engine Inlet Inlet Fairing Starter Cover Expansion Joint Ring Ring Lower Upper Particle Separator Exhaust Nozzle Engine Inlet Icing Protective System Tailstrike * * 6060 * 6011* G7160V G7160V G7160V G7160V NOTES: 1. All parts defined on the above Capabilities List are the only Products/Parts/Appliances Cox can return to service.
7 D-9575 Rev.: U PRODUCTS/PARTS/APPLIANCES MANUFACTURED BY CO & COMPANY, INC. Page: 7 of 9 CAPABILITIES LIST Date: Dec. 4, 2017 Part Number Engine Inlet Inlet Fairing G7160V G7160V G7160V G7160V G7160V G7160V03131 Starter Cover Expansion Joint Ring Ring Lower Upper Particle Separator Exhaust Nozzle Engine Inlet Icing Protective System Tailstrike NOTES: 1. All parts defined on the above Capabilities List are the only Products/Parts/Appliances Cox can return to service.
8 D-9575 Rev.: U PRODUCTS/PARTS/APPLIANCES MANUFACTURED BY CO & COMPANY, INC. Page: 8 of 9 CAPABILITIES LIST Date: Dec. 4, 2017 Timer Monitor Unit Galley Unit Cuff/ Clamp Windshiel d Rain Removal System Pump Water Heated Tape Part Number Air Unit System Floor Mat 2616 * 2774 * 2977 * 2981 * * * 3413 * 3425 * 3427 * G7160V G7160V x NOTES: 1. All parts defined on the above Capabilities List are the only Products/Parts/Appliances Cox can return to service.
9 PRODUCTS/PARTS/APPLIANCES MANUFACTURED BY CO & COMPANY, INC. D-9575 Rev.: U CAPABILITIES LIST Page: 9 of 9 Date: Dec. 4, 2017 Part Number Panel Innerline ler Remote Sensor Leading Edge DeIce System Energy Storage Bank Actuator Housing Deicing Unit (LH & RH) LE Housing LE Skin Inboard & Outboard (LH & RH) 3432 * 3433 * 3434 * 3435* 3443 * 6500 * 6501 * 6502 * 6503 * 6504 * 6505 * 6513* 6514* 6515* 6516* 6517* 6518* 6523** 6521* 6522* NOTES: 1. All parts defined on the above Capabilities List are the only Products/Parts/Appliances Cox can return to service.
N890PM Aircraft Status Sheet
Aircraft Status Sheet Template Name: "A36 Bonanza Template" 1985 Piper PA-46 Malibu S/N: 1890PM Equipment Make/Model Serial # Install Info. Current Info. Propeller Hartzell PHF-389C/FJE83 BMV-2912 Feb
More informationIntroduction - General
FEDERAL AVIATION REGULATION PART 65 OVERVIEW CERTIFICATION: AIRMEN OTHER THAN FLIGHT CREWMEMBERS Introduction - General 65.15 - Duration of certificates. 65.16 - Change of name: Replacement of lost or
More informationAMT 101 Mechanic Certificate. Chapter 13
AMT 101 Mechanic Certificate Chapter 13 A&P s Job in 1 Sentence or less? Insure Airworthiness A&P Testing Project Title Testing Resources Your Name & Date (mm/dd/yyyy) Written test center v FSDO info and
More informationAdvisory Circular. Date: 9/28/05 Initiated by: AFS-305. Subject: Aviation Maintenance Technician Awards Program. AC No: 65-25C
Advisory Circular Subject: Aviation Maintenance Technician Awards Program Date: 9/28/05 Initiated by: AFS-305 AC No: 65-25C Advisory Circular Subject: Aviation Maintenance Technician Awards Program Date:
More informationLIST OF EFFECTIVE PAGES. Cover Sheet 0 LEP 0 Table of Contents 0 4 thru 9 0. AG-009 Rev. 0 Page 2 of 19
LIST OF EFFECTIVE PAGES EFFECTIVE PAGE REVISION Cover Sheet 0 LEP 0 Table of Contents 0 4 thru 9 0 AG-009 Rev. 0 Page 2 of 19 TABLE OF CONTENTS SECTION TITLE 1.0 Purpose 2.0 References 3.0 Definitions
More informationAirworthiness Directive
Airworthiness Directive AD No.: 2017-0045 Issued: 09 March 2017 EASA AD No.: 2017-0045 Note: This Airworthiness Directive (AD) is issued by EASA, acting in accordance with Regulation (EC) 216/2008 on behalf
More informationVOLUME 5 AIRMAN CERTIFICATION CHAPTER 5 TITLE 14 CFR PART 65 AIRMEN OTHER THAN FLIGHT CREWMEMBERS. Section 8 Renew a Part 65 Inspection Authorization
VOLUME 5 AIRMAN CERTIFICATION CHAPTER 5 TITLE 14 CFR PART 65 AIRMEN OTHER THAN FLIGHT CREWMEMBERS Section 8 Renew a Part 65 Inspection Authorization 5-1306 PROGRAM TRACKING AND REPORTING SUBSYSTEM (PTRS)
More informationPage 1 of 6 July 24, 2013
TABLE 1.0: STC LIST Transport Canada SA96-110 1(copy) Aug 1, 1996 DHC-6-00 Installation of PTA6A- Engines Derated to 60 SHP in Lieu of PT6A- 7 Engines SA065NY - FMS96601 Aug 01, 1996 MMS96601 Rev- Aug
More informationDistribution Statement A: Approved for public release; distribution is unlimited.
TECHNICAL MANUAL OPERATOR'S, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL OPERATING INSTRUCTIONS 2-1 OPERATOR PREVENTIVE 2-5 MAINTENANCE CHECKS AND SERVICES (PMCS) OPERATOR 3-1 TROUBLESHOOTING
More information3.03 Functions of support services personnel Name
3.03 Functions of support services personnel Name Date Directions: Record notes and classroom discussion about the function and responsibilities of support services personnel. Create a therapeutic environment
More informationInstructions for Use and Disposal
Instructions for Use and Disposal IONSYS fentanyl iontophoretic transdermal system, 40mcg/activation For single use only. Up to 24 hours or 80 doses, whichever comes first. Refer to the Prescribing Information
More informationClinical. Prescribing Medicines SOP. Document Control Summary. Contents
Clinical Prescribing Medicines SOP Document Control Summary Status: Version: Author/Owner/Title: Approved by: Ratified: Related Trust Strategy and/or Strategic Aims Implementation Date: Review Date: Key
More informationU.S. Coast Guard 17 th Coast Guard District
U.S. Coast Guard 17 th Coast Guard District Un-Inspected Passenger Vessel (UPV) and 5 Star Safety Dockside Examination Form January 2008 Edition January 2008 Edition USCGD17 UPV 5 Star Examination Form
More informationACSS ANNOUNCES CUSTOMER TRAINING FOR 2016
ACSS ANNOUNCES CUSTOMER TRAINING FOR 2016 Aviation Communication and Surveillance Systems (ACSS), an L-3 Communications and Thales Company, is pleased to announce the following training courses to be held
More informationDEPARTMENT OF THE ARMY TECHNICAL MANUAL *TM DEPARTMENT OF THE AIR FORCE TECHNICAL ORDER TECHNICAL MANUAL
DEPARTMENT OF THE ARMY TECHNICAL MANUAL *TM 5-6115-593-12 DEPARTMENT OF THE AIR FORCE TECHNICAL ORDER TO-35C2-3-463-1 TECHNICAL MANUAL Operator and Organizational Maintenance Manual GENERATOR SET, DIESEL
More informationTM ARMY AH-64A HELICOPTER HELLFIRE MISSILE EQUIPMENT AVIATION INTERMEDIATE MAINTENANCE MANUAL TECHNICAL MANUAL
TECHNICAL MANUAL AVIATION INTERMEDIATE MAINTENANCE MANUAL ARMY AH-64A HELICOPTER HELLFIRE MISSILE EQUIPMENT This copy is a reprint which includes current pages from Changes 1 through 6. HEADQUARTERS, DEPARTMENT
More informationU.S. Coast Guard 17 th Coast Guard District
U.S. Coast Guard 17 th Coast Guard District Un-Inspected Passenger Vessel (UPV) and 5 Star Safety Dockside Examination Form Web Site: www.alaska5star.us January 2010 Edition January 2009 Edition USCGD17
More informationF60CET 06 (6C52) 1E6C5-280E /3/31 NEWS NO. DATE COMMENT PE0-OM March,2,2009 MOD:FIG.24 PTT(6C D) P/No.
F60CET 06 () 1E6C5-280E1 ( ) 2009/3/31 NEWS DATE COMMENT PE0-OM-090024 March,2,2009 MOD:FIG.24 PTT(6C5-43800-01-8D) P/No. REVISION F60CET PARTS CATALOGUE 2006 by Yamaha Motor Co., Ltd. 1st edition, August
More informationASSIGNMENT 2. Textbook Assignment: "Publications." Pages 2-1 through
ASSIGNMENT 2 Textbook Assignment: "Publications." Pages 2-1 through 2-40. 2-1. What is the primary purpose of technical publications? 2-2. 1. To train nonmaintenance personnel 2. To replace technical training
More informationREQUEST FOR PROPOSALS FOR COMMERICAL GENERATOR MAINTENANCE & REPAIR. Released February 3, 2017 Submissions Due February 28, 2017
PUBLIC SERVICES DEPARTMENT 15 School Street Rangeley, Maine 04970 207-864-2294 publicworks@rangeleyme.org REQUEST FOR PROPOSALS FOR COMMERICAL GENERATOR MAINTENANCE & REPAIR Released February 3, 2017 Submissions
More informationAttire and Footwear in Client Service Areas Policy
Attire and Footwear in Client Service Areas Policy Occupational Health and Safety Version 2 Strategic Human Resources Ageing, Disability & Home Care August 2010 Document approval The Attire and Footwear
More informationMaintenance Managers Conference 2015
Maintenance Managers Conference 2015 Rich Bean 28 Years in Aviation 21 Years Active Duty Military E&E Technician QA Field Instructor Director, Operations Session Time 1:30 pm 2:20 pm Electrical Wiring
More informationF-35 Program Information Export Controlled Information (When Filled In)
F-35 PHYSIOLOGICAL EVENT (PE) AIRCREW DATA SHEET PART B: Rev COMPLETE THIS FORM AND SUBMIT THROUGH THE CUSTOMER RELATIONSHIP MANAGER (CRM) TOOL The procedures below are the preliminary steps to inspect,
More informationGENERATOR SET, SKID MOUNTED, TACTICAL QUIET
MARINE CORPS TM 9249A/09246A-14 TECHNICAL MANUAL OPERATOR, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL HOW TO USE THIS MANUAL PAGE viii EQUIPMENT DESCRIPTION AND DATA PAGE 1-4 PRINCIPLES
More informationApproved for public release. Distribution is unlimited.
TM 55-1 905-223-24-11 TECHNICAL MANUAL UNIT, INTERMEDIATE DIRECT SUPPORT AND INTERMEDIATE GENERAL SUPPORT MAINTENANCE INSTRUCTIONS MARINE SANITATION SYSTEM FOR LANDING CRAFT UTILITY (LCU) NSN 1905-01-154-1191
More informationGUIDE FOR ASME REVIEW TEAMS FOR REVIEW OF APPLICANTS FOR ASME CERTIFICATES OF AUTHORIZATION (V, HV, UD, UV, UV3, UD3, TD, TV)
GUIDE FOR ASME REVIEW TEAMS FOR REVIEW OF APPLICANTS FOR ASME CERTIFICATES OF AUTHORIZATION (V, HV, UD, UV, UV3, UD3, TD, TV) The American Society of Mechanical Engineers Two Park Avenue New York, NY 10016
More informationTECHNICAL MANUAL OPERATOR'S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL
TECHNICAL MANUAL OPERATOR'S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL AIR CONDITIONER, HORIZONTAL, COMPACT, 36,000 BTU/HR, MULTI-POWER INPUT 208V, 3 PHASE, 50/60/400 HZ MODEL MH-40-MP
More informationSummary Report for Individual Task TROUBLESHOOT THE AVIATION GROUND POWER UNIT (AGPU) Status: Approved
Summary Report for Individual Task 552-816-3103 TROUBLESHOOT THE AVIATION GROUND POWER UNIT (AGPU) Status: Approved Report Date: 09 Jun 2014 Distribution Restriction: Approved for public release; distribution
More informationMVCC A&P Test Preparation Course Contacts and Study Material
Page 1 of 8 MVCC A&P Test Preparation Course Contacts and Study Material Enrollment Information: 315-792-5349 Angela Elias aelias@mvcc.edu VA Benefit Questions: 315-792-5326 Thomas Zenon tzenon@mvcc.edu
More informationSDML Workers Compensation Fund ICS Saw 2018 Grant Application
SDML Workers Compensation Fund ICS Saw 2018 Grant Application In partnership with Stan Houston Equipment *To be considered for the SDML WC FUND GRANT, this application must be completed and received or
More informationRespiratory Protection Plan
Respiratory Protection Plan Contents: Sample Respiratory Protection Plan Introduction... ii Plan Cover Sheet... 1 Policy... 2 Responsibility... 2 Plan Elements... 3 Organizational Responsibility Chart...
More informationDEPARTMENT OF THE ARMY HEADQUARTERS U.S. ARMY MANEUVER SUPPORT CENTER AND FORT LEONARD WOOD FORT LEONARD WOOD, MISSOURI
*FLW Reg 672-11 DEPARTMENT OF THE ARMY HEADQUARTERS U.S. ARMY MANEUVER SUPPORT CENTER AND FORT LEONARD WOOD FORT LEONARD WOOD, MISSOURI 65473-5000 FLW Regulation 19 June 2002 No 672-11 Decorations, Awards
More informationB. All of the documents in this RFP form the Basis-of-Design for this project.
SECTION 01 91 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationF115TR 08/TRG (68V7) LF115TR 08/TRG (68W7) F115AET 08 (68V7) FL115AET 08 (68W7)
F115TR 08/TRG () LF115TR 08/TRG () F115AET 08 () FL115AET 08 () 1G68V-100E1 ( 2G68V-100E1 ) 2008/10/3 NEWS DATE COMMENT PE0-OM-080003 Feb./7/2008 MOD:FIG.17 BOTTOM COWLING FLUSHING KIT REVISION PE0-OM-080021
More informationF-35 Lightning II. 5 th Generation True Stealth for Korea From 2016 and Beyond
F-35 Lightning II 5 th Generation True Stealth for Korea From 2016 and Beyond A11-33765B_1 The Evolving Threat... SA-10 SA-12 SA-20 HQ-9 Shipborne SAM Double Digit Surface-to-Air Missiles SD-10/PL-12 AA-11
More information1.5 to 5 Tons INDOOR COILS C33. Upflow - Cased and Uncased PRODUCT SPECIFICATIONS C A - 2 F MODEL NUMBER IDENTIFICATION FEATURES
INDOOR COILS C33 PRODUCT SPECIFICATIONS Upflow - Cased and Uncased Bulletin No. 20280 September 203 Supersedes June 202 MODEL NUMBER IDENTIFICATION FEATURES WARRANTY Unit Type C = Indoor Coil - Upflow
More informationCity of Biddeford Fire Department Emergency Services. Response time information
City of Biddeford Fire Department Emergency Services Response time information Emergency Calls by Response Time Dispatched to Arrived This map does not take into consideration time from call received until
More informationAction Plan for Kingfisher Lodge
Action Plan for Kingfisher Lodge Dear Sir or Madam, We thought it might be useful to residents, potential residents, their relatives and friends to summarise our response to the Care Quality Commission
More informationJHU Civil Engineering Laboratory Manual Contents
JHU Civil Engineering Laboratory Manual Contents 1. About the Manual... 2 2. THE JHU CE Laboratories... 2 3. Emergency Contacts... 3 4. Safety Regulations... 4 5. Laboratory Policy... 5 6. Annual Cleaning...
More information1. General. 2. Background
Port State Control guidance for examination of fixed CO2 firefighting systems and conducting fire drills onboard Cruise Ships during scheduled examinations. (CG-CVC-2 / July 2013) 1. General These guidelines
More informationF225AET 06 (69J5) FL225AET 06 (69K5) 1E69J-280E1
F225AET 06 () FL225AET 06 () 1E69J-280E1 ( ) F225AET/FL225AET PARTS CATALOGUE 2006 by Yamaha Motor Co., Ltd. 1st edition, August 2006 All rights reserved. Any reprinting or unauthorized use without the
More information*TM &P INTRODUCTION PAGE 1-1
*TM 9-2540-205-24&P INTRODUCTION PAGE 1-1 *TM 9-2540-205-24&P Technical Manual HEADQUARTERS DEPARTMENT OF THE ARMY NO. 9-2540-205-2481P Washington D. C., 10 April 1992 ORGANIZATIONAL, DIRECT SUPPORT, AND
More informationINSTRUMENTATION TECHNICIAN I/II/III
I/II/III I. Position Identification: A) Title: Instrumentation Technician I/II/III B) Bargaining Unit: Public Employees Union, Local #1 C) Customary Work Hours: Within the hours of 6:00am to 6:00pm D)
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS RFP # 17-02-04 Window & Portable AC Units & Parts PART II The Houston Independent School District ( HISD and/or the District ) is soliciting proposals for Window & Portable AC Units
More information6-3 [D5A0] WIRING DIAGRAM. 5. Wiring Diagram. 5. Wiring Diagram A: POWER SUPPLY ROUTING
6-3 [D5A0] WIRING DIAGRAM A: POWER SUPPLY ROUTING 12 WIRING DIAGRAM [D5A0] 6-3 13 6-3 [D5A0] WIRING DIAGRAM No. Load No. Load MB-1 MB-2 MB-3 MB-4 MB-5 MB-6 MB-7 MB-8 MB-9 MB-10 MB-11 SBF-7 ALT ST FB-1
More informationDepartment of Environmental Health & Safety 11/ of 15
Respiratory Protection Plan Department of Environmental Health & Safety 1 of 15 Author(s): James H. Nelson, M.S.,REHS/RS Director, Environmental Health & Safety Revisions: Rev. Date Change Details Reference
More informationErgonomics Issues In Paramedic Duties: A Case Study. Steve Morrissey Ergonomics Consultant Oregon OSHA Consultation
Ergonomics Issues In Paramedic Duties: A Case Study Steve Morrissey Ergonomics Consultant Oregon OSHA Consultation Introduction Non-binding ergonomic consultation with a large ambulance service in the
More informationMOTOR CONTROL WIRING DIAGRAMS EPUB
22 October, 2017 MOTOR CONTROL WIRING DIAGRAMS EPUB Document Filetype: PDF 471.59 KB 0 MOTOR CONTROL WIRING DIAGRAMS EPUB MOTOR control and wiring diagram. 6.6K likes. Motor control wiring diagram ppt
More information(S)200FETO 08 (64E8) L200FETO 08 (64H8)
(S)FETO 08 (64E8) FETO 08 (64H8) 1G64E-700E1 ( ) 8/6/27 NEWS DATE COMMENT PE0-OM-080015 Mar.,17,8 MOD:FIG.23 CAM, TRIM SENDER P/No. REVISION PE0-OM-080048 MAY,22,8 MOD:FIG.24 PTT P/No. REVISION (S)FETO/FETO
More informationVAN WERT COUNTY HOSPITAL. Policy/Procedure: Departmental No.: N 1-11A. Issue Date: 5-90 By: Nursing No. of Pages: 5
VAN WERT COUNTY HOSPITAL Policy/Procedure: Departmental No.: Issue Date: 5-90 By: Nursing No. of Pages: 5 Reviewed: 2-07, 1-05, 1-04 Revised: 1-11 Distribution List: All Nursing Departments Concurrence:
More informationST. VINCENT AND THE GRENADINES
ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N MLC 004 MANAGEMENT OF OCCUPATIONAL SAFETY AND HEALTH TO: APPLICABLE TO: EFFECTIVE AS FROM: RECOGNIZED ORGANIZATIONS, FLAG STATE SURVEYORS,
More informationIsolette TI500 Neonatal Transport
Isolette TI500 Neonatal Transport Transport neonates safely, comfortably and with a minimum of stress with a fully-featured, high-performance transport incubator. D-1587-2009 02 Isolette TI500 Benefits
More informationF200DET 13 (6CD5) F225DET 13 (6CC5) F250CET 13 (6CB5)
F200DET 13 () F225DET 13 () F250CET 13 () 1M6CD-700E1 ( ) 2013/11/20 NEWS DATE COMMENT PE0-OM-130047 Oct.,29,2013 MOD:FIG.3,6 LIST/ILLUSTRATION REVISION PE0-OM-130050 Nov.,20,2013 COR:FIG.13 ILLUSTRATION
More informationSafety Information Book. For. Academic and Administrative Units
For Academic and Administrative Units Department: Prepared by: Date prepared: Approval signature of unit head: Approval date: Revision date(s): Revision 1. 3/17/94. Revision 2. 3/19/95. Revision 3. 11-3-2003
More informationTECHNICAL MANUAL UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL
TECHNICAL MANUAL UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL GENERATOR SET, SKID MOUNTED, TACTICAL QUIET 15 KW, 50/60 AND 400 Hz MEP-804A (50/60 Hz) 6115-01-274-7388 MEP-814A (400 Hz) 6115-01-274-7393
More informationThank you for purchasing the Actuator Systems NextBolt fingerprint deadbolt.
PREFACE Thank you for purchasing the Actuator Systems NextBolt fingerprint deadbolt. Please read the documentation carefully before installation & use. The manual details all installation procedures and
More information320- HAZARD COMMUNICATION
320.1 PURPOSE A. To ensure the safe use of hazardous chemicals and to comply with the requirements of OSHA 1910.1200. 320.2 SCOPE A. This program is applicable to all CNM employees who may be exposed to
More informationJOHN DEERE 200 and 900 series headers with 3" guard point spacing Optional Retail Price Total Kit FG 537 14 4 3 14 14 40 $432.73 26 $141.50 $574.23 FG 577 15 1 7 16 16 43 $476.13 28 $152.38 $628.51 FG
More informationSpinal Cord Injury T10-L2
Patient and Family Education Spinal Cord Injury T10-L2 A Guide for Families You are an important member of your child s recovery team. Use this checklist to monitor your child s progress. Our goal is to
More informationUniversity of Maryland Maryland Fire and Rescue Institute. Report To. Maryland State Firemen s Association Executive Committee
University of Maryland Maryland Fire and Rescue Institute Report To Maryland State Firemen s Association Executive Committee The following report is a synopsis of significant events that have occurred
More informationANNEX 2 RESOLUTION MSC.216(82) (adopted on 8 December 2006)
RESOLUTION MSC.216(82) (adopted on 8 December 2006) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS AMENDED THE MARITIME SAFETY COMMITTEE, RECALLING Article
More informationSUNY ONEONTA RESPIRATORY PROTECTION PROGRAM
SUNY ONEONTA RESPIRATORY PROTECTION PROGRAM PURPOSE The elements described in this program are designed to ensure the safe and effective usage of respiratory protection at SUNY Oneonta. PROGRAM ADMINISTRATION
More informationSymptoms may appear anywhere from 2 to 21 days after exposure to Ebola virus, although 8-10 days is most common.
Introduction: This protocol is intended to address the transport and PPE requirements of patients with a positive Ebola screen. The 2014 Ebola outbreak is one of the largest Ebola outbreaks in history
More informationWe Have Your Back A Worker Safety Collaborative An Initiative of the Florida Hospital Association
1 We Have Your Back A Worker Safety Collaborative An Initiative of the Florida Hospital Association WORKER SAFETY WEDNESDAY WEBINAR SERIES: LIFT TEAMS: MYTHS AND FACTS ABOUT LIFT TEAM PROGRAMS WEDNESDAY,
More informationARCHITECT - ENGINEER QUALIFICATIONS
1. TITLE AND LOCATION (City and State) ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER 4. NAME
More informationLos Rios Community College District NEW EMPLOYEE TRAINING CHECK LIST
Los Rios Community College District NEW EMPLOYEE TRAINING CHECK LIST This form is to be completed during the processing as a new employee or new job assignment if the assignment falls in a new JOB SAFETY
More informationTESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES
TESTING APPLICATION STANDARD (TAS) 201-94 IMPACT TEST PROCEDURES 1. 2. Scope: 1.1 This protocol covers procedures for conducting the impact test of materials as required by Section 1626 of the Florida
More informationHeatrae Sadia Design Awards 2018
1 Heatrae Sadia Design Awards 2018 2 Contents Submission Checklist... 2 Brief... 3 Background... 3 Scope... 4 Examples of Ideas... 4 Who can take part?... 4 Entry requirements... 5 Grading your entry...
More informationENGINEERING COUNCIL OF SOUTH AFRICA Standards and Procedures System
ENGINEERING COUNCIL OF SOUTH AFRICA Standards and Procedures System Diplomas Accredited as Meeting the Educational Requirement for Registration as a Candidate and Professional Engineering Technician Status:
More informationINDIAN ASSOCIATION FOR THE CULTIVATION OF SCIENCE 2A & 2B Raja S.C.Mullick Road Jadavpur, Kolkata
INDIAN ASSOCIATION FOR THE CULTIVATION OF SCIENCE 2A & 2B Raja S.C.Mullick Road Jadavpur, Kolkata 700032 Tender Notice No.: IACS/PC/BBD/WELLCOME-DBT/14/38 dated: 4.09.2014 Sub: Specification for CO2 Incubator
More informationResearch Access to the Washingtoniana Collection at the Albert H. Small Center for National Capital Area Studies Reading Room
Research Access to the Washingtoniana Collection at the Albert H. Small Center for National Capital Area Studies Reading Room The George Washington University Museum fosters the study and appreciation
More information2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES
2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES WELCOME TO THE POWER MOVES C&I PROCESS VFD PROGRAM. We look forward to working with you. If you have questions after reading this application,
More informationLouisiana State University
Revision: 3 Effective Date: December 1, 2010 Page 1 of 9 Louisiana State University Office of Facility Services Operating Instruction 4006 SUBJECT: RESPIRATOR PROTECTION PROGRAM I. General A. In compliance
More information[FILE] SERIES OUTLET WIRING DIAGRAM EBOOK
12 November, 2017 [FILE] SERIES OUTLET WIRING DIAGRAM EBOOK Document Filetype: PDF 534.01 KB 0 [FILE] SERIES OUTLET WIRING DIAGRAM EBOOK Wiring diagram outlets in series also stack light wiring diagram
More informationRelease Notes - Version (DRAFT) Release Date: 09/03/2011
Release Notes - Version 3.0.8 (DRAFT) Release Date: 09/03/2011 Please Sync all Off-Line Charting Prior to the Release Human Resources Tracking - Enhanced Human Resources Related Links have been added to
More informationHealth and Safety Policy
Lower Earley Baptist Church To be a community where Jesus is encountered and lives are transformed Health and Safety Policy To all employees, voluntary helpers and contractors: The success of this policy
More informationOPERATOR, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL
TECHNICAL MANUAL ARMY TM 9-6115-672-14 OPERATOR, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL HOW TO USE THIS MANUAL PAGE ix EQUIPMENT DESCRIPTION AND DATA PAGE 1-4 PRINCIPLES OF OPERATION
More informationNonprofit Facility Grant Program
LANSING BOARD OF WATER & LIGHT Nonprofit Facility Grant Program Program Description & Grant Application Form January 1, 2018 Table of Contents I. PROGRAM DESCRIPTION... 3 a. Qualifying Organizations...
More informationAl /.V/ I le, D6c/ Ls--- NOC web page updated Vessel acks recorded. Notice of Change to Controlled Documents # / 15 Dec 2015
Notice of Change to Controlled Documents #280-282 / 15 Dec 2015 Summary of Changes Revisions managed by: Shannon Smith Purpose: [280] Ch 13 was always just a restatement of a subsection of the ISM describing
More information(2) A specialist officer is one who has the necessary qualifications to undertake the duties mentioned in (1) above, by virtue of:
41/4 41 OFFICER RESPONSIBILITIES AT INCIDENTS 41/1 INCIDENT COMMAND - (1) The Appliance Manager of the first appliance to arrive at an incident is responsible for command of the incident until relieved
More informationProtocol for patient controlled analgesia (PCA) with morphine in obstetrics (CG567)
Protocol for patient controlled analgesia (PCA) with morphine in obstetrics (CG567) Approval Approval Group Job Title, Chair of Committee Date Maternity & Children s Services Clinical Governance Committee
More informationApprenticeship Curriculum Standard. Pool & Spa Hot Tub Installer. Level 2. Trade Code: 237T
Apprenticeship Curriculum Standard Pool & Spa Hot Tub Installer Level 2 Trade Code: 237T Date: 2010 Please Note: Apprenticeship Training and Curriculum Standards were developed by the Ministry of Training,
More informationDepartment of Health Update
PACAH Spring 2016 Department of Health Update Presented by: Susan Williamson, Director Division of Nursing Care Facilities Charlie Schlegel, Director Division of Safety Inspection Facility and Survey Data
More informationPatient Centric Model (PCM)
Patient Centric Model (PCM) Operations Manual A product of your state pharmacy association For more information, contact: PCM Project Manager 804-285-4431 PCM@naspa.us Background The typical pharmacy model
More informationMCKINLEY SYRINGE DRIVER COMPETENCY FOR THE THEORY AND PRACTICAL ASSESSMENT FOR REGISTERED NURSES
COMPETENCIES MCKINLEY SYRINGE DRIVER COMPETENCY FOR THE THEORY AND PRACTICAL ASSESSMENT FOR REGISTERED NURSES (REGISTERED NURSES UPDATE EVERY TWO YEARS) New Registered Nurses to the Trust COMPETENT TO
More informationControlling Scalding Risks from Bathing and Showering
UKHCA Guidance Controlling Scalding Risks from Bathing and Showering August 2016 Prepared for UKHCA member organisations by: Colin Angel, Policy and Campaigns Director United Kingdom Homecare Association
More informationFAMILIARIZATION AND ONBOARD TRAINING
EXERCISES FAMILIARIZATION AND ONBOARD TRAINING Written By Verified By Approved )RU NAME AND SURNAME NAME AND SURNAME NAME AND SURNAME Safety & Quality Department Manager Technical Department Director Managing
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER 442D FIGHTER WING 442D FIGHTER WING INSTRUCTION 21-132 26 DECEMBER 2013 Maintenance AIRCRAFT FUEL SYSTEMS MAINTENANCE AND REPAIR COMPLIANCE WITH THIS PUBLICATION IS MANDATORY
More informationREGULAR MEETING. November 17, 2008
REGULAR MEETING November 17, 2008 PRESENT: Mayor Treutlein, Trustees Appleton, Benedict, Hollister and Robinson, Building Inspector Williams, Superintendent Stearns and Clerk Hoffmeister Others Present:
More informationLand/Ocean Biogeochemical Observatories (LOBOs) for Water Quality Sampling in the St. Lucie Estuary and Indian River Lagoon (DEP Agreement S0770)
Land/Ocean Biogeochemical Observatories (LOBOs) for Water Quality Sampling in the St. Lucie Estuary and Indian River Lagoon (DEP Agreement S0770) Introduction Site Selection & Installation Plan M. Dennis
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER 482D FIGHTER WING 482D FIGHTER WING INSTRUCTION 21-104 11 APRIL 2018 Maintenance FLIGHTLINE AND AIRCRAFT MAINTENANCE SEVERE WEATHER PROCEDURES COMPLIANCE WITH THIS PUBLICATION
More informationApplying QIPP to Ageing skin
Applying QIPP to Ageing skin E45-UK-72-10 Dec 2010 Dr. Edward Vining PhD BPharm MRPharmS Applying QIPP to Ageing Skin Normal skin and barrier function Pathophysiology of ageing skin Complications Considerations
More informationHEADQUARTERS, DEPARTMENT OF THE ARMY
TECHNICAL MANUAL OPERATOR/CREW, ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) SUPERLITE 17B DIVING HELMET NSN 4220-01-128-4386 TABLE
More information7.0 Joint Occupational Health and Safety Committee Occupational Health and Safety Forms
Sect 7.0 -i- 7.0 Joint Occupational Health and Safety Committee Occupational Health and Safety Forms 7.0 JOHSC Report/Form Index.... Sect 7.0 - i - 6.1.A Concern/Complaint Report (Section 6.1)...Sect 7.0-1-
More informationCHAPTER 19 3/21/2017 Small Unmanned Aircraft Systems
CHAPTER 19 3/21/2017 Small Unmanned Aircraft Systems Purpose This policy is intended to provide personnel who are assigned responsibilities associated with the deployment and use of small unmanned aircraft
More informationTerma and F-35 Global supplier to the Joint Strike Fighter program
Terma and F-35 Global supplier to the Joint Strike Fighter program The world s largest defense industrial project The F-35 project is headed by Lockheed Martin, with Northrop Grumman and BAE Systems as
More informationMaintenance Review Board PR.MRB
Name Validation Date Prepared by: Caroline RUGA Validated 08/06/2010 Verified by: Francis JOUVARD Validated 08/06/2010 Reviewed by: Véronique MAGNIER Validated 08/06/2010 Approved by: Evan NIELSEN Validated
More informationDoD Directive , Climate Change Adaptation and Resilience
1 DoD Directive 4715.21, Climate Change Adaptation and Resilience Issued January 14, 2016 Policy: The DoD must be able to adapt current and future operations to address the impacts of climate change in
More informationGRANT APPLICATION FORM TELEPHONE:
(OFFICE USE) GRANT APPLICATION NUMBER: NAME: GRANT APPLICATION FORM TELEPHONE: ADDRESS: FAX: EMAIL: QUALIFICATIONS AND PROFESSIONAL MEMBERSHIP: TITLE OF GRANT REQUEST: SUMMARY OF WHAT THE GRANT IS FOR:
More informationEXISTING CONDITIONS
02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal 02 01 80 Maintenance of Facility
More information