1 Ohio Canal Interceptor Tunnel Tunnel Contractor Pre-SOQ & Networking Meeting February 17, 2015 February 17, 2015
2 Welcome and Program Overview OCIT Tunnel Contractor Pre-SOQ Meeting Page 2
3 Service Area City of Akron is 62 square miles Including Joint Economic Development Districts (JEDD s) - service area is 110 square miles There are approximately 85,000 active accounts serving 300,000 citizens OCIT Tunnel Contractor Pre-SOQ Meeting Page 3
4 System Sewer Components 700 miles of sanitary sewers 160 miles of combined sewers 22 miles of force mains 19,224 manholes 36 pump stations 34 CSO racks 2 CSO storage basins 10 master meter locations OCIT Tunnel Contractor Pre-SOQ Meeting Page 4
5 Where are We Now Akron has spent $300 million to date to improve its sewer system Challenge facing the City; overall cost of program has grown to $1.4 billion and is no longer affordable EPA Consent Decree Sewer Rates Integrated Planning Green Infrastructure OCIT Tunnel Contractor Pre-SOQ Meeting Page 5
6 Community Akron Residents Local Contractors and Suppliers COMMUNITY Akron Engineering Bureau (AEB) Stakeholders Program Management Team (PMT) OCIT Tunnel Contractor Pre-SOQ Meeting Page 6
7 Our Mission Mayor s Charge Goals: 50% local workforce participation Goals: 15% inclusion of local WBE/MBE/DBE/EDGE firms OCIT Opportunities Eng. Estimate: Over $200M Single largest project in Akron s history Completion by 12/31/18 Local Firms Our Mission lies in building infrastructure that will protect public health and maintain water of the highest quality in the most costeffective manner while providing local jobs OCIT Tunnel Contractor Pre-SOQ Meeting Page 7
8 Introductions Designer DLZ / McMillen Jacobs / Jenny Program Management Team MWH / HMM / G. Stephens Construction Management Team Parsons-Welty-Thomarios City of Akron OCIT Tunnel Contractor Pre-SOQ Meeting Page 8
9 Project Summary OCIT System Overview Tunnel flows south to north and will convey dry weather sanitary flow by gravity to the Little Cuyahoga Interceptor (LCI) sewer. System conveys combined sanitary and storm flow during wet weather events. The main tunnel will be 27 finished inside diameter and 6,220 long. Construction will require a closedface TBM and single-pass lining system using pre-cast segments. Five baffle drop shafts; diameters vary from 18 to 45 ; depths vary from 70 to 160. OCIT Tunnel Contractor Pre-SOQ Meeting Page 9
10 OCIT Profile OCIT Tunnel Contractor Pre-SOQ Meeting Page 10
11 OCIT-1 Site and Portal OCIT Tunnel Contractor Pre-SOQ Meeting Page 11
12 SOQ Procurement Schedule The full schedule is listed on Page 8 of the Tunnel Contractor RFQ. For purposes of the SOQ, the key dates are: Deadline for Questions to the City February 26, 2015 Responses to Questions by the City March 6, 2015 SOQ Submission Due Date March 13, 2015 Notification of Pre-Qualification Status March 27, 2015 OCIT Tunnel Contractor Pre-SOQ Meeting Page 12
13 SOQ Package Checklist Section Description Individual Firm Joint Venture The checklist can be found on Page 30 of the Tunnel Contractor RFQ. 8.B.i. & ii. Statement of Qualifications Form Form A: Project Experience (maximum of 5 per Individual Firm or JV) (at least one firm in the JV) 8.B.iii. Stop Work Orders (each firm) 8.C.i.a. Organizational Chart of Proposer s Team 8.C.i.b. Organizational Chart of Key Personnel 8.C.iii. Subcontractors 8.C.iv & v. 8.D. 8.E. Key Personnel Resumes & Experience Form B: Project References (minimum of 2, maximum 4 per Individual Firm or JV) Form C: EHS Questionnaire Form (C) (at least one firm in the JV) (each firm) 8.F. Overview of QA/QC Program (each firm) and two (2) QA / QC Manuals 8.G.i. Annual Financial Statements (3 (each firm) years) 8.G.ii. Bond Certification 8.G.iii. Liabilities (each firm) 8.G.iv. List of Cases, Disputes or (each firm) Circumstances 8.G.v. Compliance (each firm) 8.G.vi. Labor Relations (each firm) 8.G.vii. EEO, Anti-Discrimination Laws, D/M/WBE Participation, and Local Workforce (each firm) 8.H. Insurance (each firm) OCIT Tunnel Contractor Pre-SOQ Meeting Page 13
14 Discussion Items EDGE/MBE Participation Plan Local Hiring and Workforce Participation Plan OCIT Tunnel Contractor Pre-SOQ Meeting Page 14
15 Additional Items Draft 100% Plans (20 finished inside diameter tunnel) will be available for viewing immediately after the Networking Session that follows, and will remain so until 4:00 PM. No photos of the plans will be allowed. Contractors are welcome to make site visits on their own. All questions shall be submitted to Michelle DiFiore via at OCIT Tunnel Contractor Pre-SOQ Meeting Page 15
CITY OF AKRON DEPARTMENT OF PUBLIC SERVICE BUREAU OF ENGINEERING TUNNEL CONTRACTOR REQUEST FOR QUALIFICATIONS (RFQ)
CITY OF AKRON DEPARTMENT OF PUBLIC SERVICE BUREAU OF ENGINEERING TUNNEL CONTRACTOR REQUEST FOR QUALIFICATIONS (RFQ) OHIO CANAL INTERCEPTOR TUNNEL (OCIT) PROJECT CSO LONG-TERM CONTROL PLAN (LTCP) ISSUE
More informationREQUEST FOR QUALIFICATIONS FOR INFORMATION TECHNOLOGY AND SUPPORT SERVICES MASTER SERVICE AGREEMENT(S)
REQUEST FOR QUALIFICATIONS FOR INFORMATION TECHNOLOGY AND SUPPORT SERVICES MASTER SERVICE AGREEMENT(S) January 29, 2013 METROPOLITAN SEWER DISTRICT OF GREATER CINCINNATI 1081 Woodrow Street, Room 106 Cincinnati,
More informationWastewater Master Plan Request for Proposals May 20, 2014
Wastewater Master Plan Request for Proposals May 20, 2014 City of Oak Grove 1300 S. Broadway Street Oak Grove, MO 64075 (816) 690-3773 cityofoakgrove.com 1.0 INTRODUCTION The City of Oak Grove, Missouri
More informationCHESAPEAKE BAY BRIDGE AND TUNNEL DISTRICT PARALLEL THIMBLE SHOAL TUNNEL REQUEST FOR QUALIFICATIONS #PTST-15-1
CHESAPEAKE BAY BRIDGE AND TUNNEL DISTRICT PARALLEL THIMBLE SHOAL TUNNEL REQUEST FOR QUALIFICATIONS #PTST-15-1 TO: FROM: All Offerors Chesapeake Bay Bridge and Tunnel District SUBJECT: Addendum No. 1 Request
More informationFY 2017 Proposed Capital Improvement Program
FY 2017 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2017 Capital Improvement Program Proposed Engineering Services Rich Unverferth, P.E. Director of Engineering January
More informationPRE-PROPOSAL CONFERENCE REQUEST FOR COMPETITIVE SEALED PROPOSAL (RFCSP)
PRE-PROPOSAL CONFERENCE REQUEST FOR COMPETITIVE SEALED PROPOSAL (RFCSP) PROJECT NO. 699 SOLICITATION NO. HWC-SEWER-2018-008 Warren Ching Sr. Procurement Specialist Houston Airports Thursday, May 17, 2018,
More informationREQUEST FOR QUALIFICATIONS MUNICIPAL ENGINEERING SERVICES
CITY OF CASTLE HILLS TEXAS REQUEST FOR QUALIFICATIONS MUNICIPAL ENGINEERING SERVICES PROPOSED AWARD SCHEDULE December 6, 2017 December 20, 2017 January 16, 2018 January 23, 2018 January 30, 2018 February
More informationFigure 1: ALCOSAN ORGANIZATION CHART
Allegheny County Sanitary Authority (ALCOSAN) REQUEST FOR QUALIFICATIONS For Engineering and Architectural Design Services, As Needed Various Small to Mid-Size Capital Projects March 2018 1.0 INTRODUCTION
More informationCITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS
CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS The City of Hondo requests the submission of qualifications statements, which will lead to the possible award of a contract to provide planning, design
More informationCUYAHOGA COMMUNITY COLLEGE CAPITAL AND CONSTRUCTION DEPARTMENT
CUYAHOGA COMMUNITY COLLEGE CAPITAL AND CONSTRUCTION DEPARTMENT REQUEST FOR QUALIFICATIONS FOR PROJECT MANAGEMENT SERVICES COLLEGE-WIDE PROJECT NUMBER C20171130 BACKGROUND College Mission to provide high
More informationClean Water 2020 Program
Clean Water 2020 Program WASTEWATER TREATMENT PLANT TRAINING PROGRAM Updated May 2016 Table of Contents Wastewater Treatment Plant Training Program 2016 List of Tables... 1 Program Summary and Intent...
More informationVista Ridge Project Technical Advisor
Tim Skoglund, P.E. Senior Director Vista Ridge Maria Franco Contract Administrator SOQ Pre-Submittal Meeting Disclaimer Oral statements or discussion during the SOQ Pre-Submittal Meeting will not be binding,
More informationTIME ITEM PRESENTERS/SPEAKERS
TIME ITEM PRESENTERS/SPEAKERS 1:00 1:05 pm Opening Remarks/Introductions Marki Johnson, PMT Program Controls Manager 1:05 1:10 pm Welcome Address John Moore, Service Director 1:10 1:25 pm Municipal Income
More informationVista Ridge Integration Project Owner s Representative
Vista Ridge Integration Project Owner s Representative Andrea Beymer, P.E. Director Plants & Major Projects Rosalee Arcos Contract Administrator Marisol Robles SMWB Program Administrator SOQ Pre-Submittal
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS OWNER S ADVISOR ALEXANDRIA RENEW ENTERPRISES WEST SIDE WET WEATHER PROGRAM Issue Date August 11, 2017 RFP #: 17-022 Date/Time of Submission: Location of Submission: September 22,
More informationColquitt Regional Medical Center
March 21 st, 2018 REQUEST FOR QUALIFICATIONS (PHASE I) And REQUEST FOR PROPOSAL (PHASE II) To Provide CONSTRUCTION MANAGEMENT AT-RISK SERVICES For The Hospital Authority of Colquitt County At Colquitt
More informationCity of Defiance Construction Management & Observation Services
City of Defiance Construction Management & Observation Services REQUEST FOR QUALIFICATIONS January 5, PURPOSE The City of Defiance intends to contract for construction management & observation services
More informationDOTHAN CLEAN WATERS PROGRAM CITY COMMISSION UPDATE
City of Dothan, Alabama DOTHAN CLEAN WATERS PROGRAM CITY COMMISSION UPDATE PRESENTED : February 19, 2013 Program Overview MOM Programs Capacity Assurance Program Information Management System Omussee WWTP
More informationCity of Waterloo, Wisconsin. Request for Proposals. Municipal Engineering Services
City of Waterloo, Wisconsin Request for Proposals Municipal Engineering Services Submission Date: December 1, 2011 @ 4:00 p.m. Issued by: Mo Hansen, Clerk/Treasurer City of Waterloo 136 N. Monroe Street
More informationRequest for Qualifications Construction Manager at Risk Contract
Request for Qualifications Construction Manager at Risk Contract Project Owner: The MetroHealth System Project Name: Hybrid Operating Room (OR) CM 15.17 and OR Renovation Upgrade CM 16.06 Project Location:
More informationK Sewer Inspection, Operation, and Reporting Services
K600-17 Sewer Inspection, Operation, and Reporting Services Fred Szabo, Interim Director Department of Port Control PRE-QUALIFICATION MEETING AGENDA 1. Introduction 2. Project Description 3. Scope of Services
More informationGreen Infrastructure Challenge
Green Infrastructure Challenge $ BRIEFING DOCUMENT Practical green infrastructure solutions for: Public Private Governmental Institutions Award distribution: Design Construction... that s a lot of green
More information3-Party Consent Decree Status Report: Quarter No
DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Serving the Public Protecting the Environment 3-Party Consent Decree Status Report: Quarter No. 1-2018 Civil Action No. 1:00CV00183TFH Civil Action No. 02-2511
More informationI-66 Vienna/Fairfax-GMU Metrorail Station Accessibility Improvement RFQ Information Meeting
I-66 Vienna/Fairfax-GMU Metrorail Station Accessibility Improvement RFQ Information Meeting Steve Kindy, PE APD Project Manager and POC Khalid Gandhi, PE L&D Project Manager May 30, 2014 Introduction Project
More informationOffice of Business and Financial Services Procurement and Contracts Division Section SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES
2510.8 SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES :1 OBJECTIVE: To establish a uniform policy and procedure for the acquisition of construction services for the City of Orlando (City), including, but
More informationREQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION
REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION FOR THE COUNTY OF RIVERSIDE TRANSPORTATION DEPARTMENT Table of Contents I. Events Calendar
More informationRequest for Qualifications DRPA Solar Photovoltaic Systems
Request for Qualifications DRPA Solar Photovoltaic Systems To Finance, Design, Construct, Install, Operate, and Maintain New Rooftop, Ground, and Canopy-Mounted Solar Generation at Facilities Owned and
More informationREQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION
REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION FOR THE COUNTY OF RIVERSIDE TRANSPORTATION DEPARTMENT Table of Contents ADDENDUM NO. 2 March
More informationREQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G
REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ #14-002 ARCHITECTURAL SERVICES Bond Measure G The Solano Community College District ( District ) is requesting qualified persons, firms, partnerships,
More informationREQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT
REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR FM 471 (CULEBRA ROAD) KALLISON LANE TO FM 1560 CSJ: 0849-01-046 PASS-THROUGH FINANCE PROJECT Bexar County Public
More informationWBS# M506. I-X Center Storm and Sanitary Cross-Connection to NASA. PRE-Qualification Meeting
WBS# M506 I-X Center Storm and Sanitary Cross-Connection to NASA PRE-Qualification Meeting Fred Szabo Interim Director Pre-Qualification Meeting Agenda Introduction... Project General Scope. Safety....
More informationREGIONAL WATER & SEWER DISTRICT FEASIBILITY STUDY, PETITION, AND PLAN OF OPERATION REQUEST FOR PROPOSALS
REGIONAL WATER & SEWER DISTRICT FEASIBILITY STUDY, PETITION, AND PLAN OF OPERATION REQUEST FOR PROPOSALS This Request for Proposal (RFP) is for professional legal services required to prepare and furnish
More informationCity of Los Angeles Department of Public Works Bureau of Sanitation (LASAN) On-call Consultant Services Contract
City of Los Angeles Department of Public Works Bureau of Sanitation (LASAN) On-call Consultant Services Contract Task Order Solicitation (TOS) SN-93 for Concept Report Revisions for Three Downtown and
More informationLIFT STATION 41 SCADA UPGRADE RTU REPLACEMENT DESIGN SERVICES
CITY OF PHOENIX, ARIZONA STREET TRANSPORTATION DEPARTMENT REQUEST FOR QUALIFICATIONS LIFT STATION 41 SCADA UPGRADE RTU REPLACEMENT DESIGN SERVICES PROJECT NO. WS90400069 MAYOR GREG STANTON CITY COUNCIL
More informationORANGE & ROCKLAND UTILITIES, INC. REQUEST FOR INFORMATION FOR ENTITIES WISHING TO SUBMIT DISTRIBUTED GENERATION PROPOSALS February 2003
ORANGE & ROCKLAND UTILITIES, INC. REQUEST FOR INFORMATION FOR ENTITIES WISHING TO SUBMIT DISTRIBUTED GENERATION PROPOSALS February 2003 Orange and Rockland Utilities, Inc. (ORU) will be soliciting bids
More informationREQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN
REQUEST FOR PROPOSAL (RFP) #1314-15 CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN Request for Proposal must be received no later than January 3, 2014 at 2:00 pm CARRI MATSUMOTO
More informationThe University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)
The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ) DESIGNER for Energy and Environmental Science Research Bldg. (Ellington) (Planning) SBC No. 540/001-04-2013 UT Institute of Agriculture August
More informationREQUEST FOR QUALIFICATIONS
REQUEST FOR QUALIFICATIONS ENGINEERING DESIGN SERVICES FOR FREEDOM TRAIL PHASE II Board of Park Commissioners Metro Parks, Serving Summit County Roland H. Bauer Chairman Frances S. Buchholzer Vice Chairman
More informationVDOT. Virginia Department of Transportation REQUEST FOR QUALIFICATIONS A DESIGN-BUILD PROJECT
VDOT Virginia Department of Transportation REQUEST FOR QUALIFICATIONS A DESIGN-BUILD PROJECT I-64 Widening and Route 623 Interchange Improvements From: 0.99 Miles West of Route 623 (WB Route 622, EB Route
More informationCAYUGA COUNTY, NEW YORK REQUEST FOR QUALIFICATIONS STERLING NATURE CENTER CONCEPTUAL DESIGN & DESIGN SERVICES. Issue Date: March 27, 2018
CAYUGA COUNTY, NEW YORK REQUEST FOR QUALIFICATIONS STERLING NATURE CENTER CONCEPTUAL DESIGN & DESIGN SERVICES Issue Date: March 27, 2018 Qualifications Due: April 24, 2018, 3:00PM Respond to: Cayuga County
More informationNew Pacific Rim Aquarium Project (Phase 2)
Project (Phase 2) GC/CM Package No. #08 Request for Qualifications (RFQ) for Interpretive Exhibits & Graphics Subcontractor Responses Due: March 24, 2016, 2:00 p.m. PDT Metropolitan Park District of Tacoma
More informationRequest for Qualifications Construction Manager
Midland Community Unit School District #7 Request for Qualifications Construction Manager April 6, 2016 MIDLAND ELEMENTARY SCHOOL LACON, ILLINOIS Page 1 of 11 Construction Management Statement of Qualifications
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Local Support for a Senior Affordable Housing Development Application for low income housing tax credits from the Florida Housing Finance Corporation SUBMISSION DEADLINE: Noon, Thursday,
More informationREQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON. October 2, 2018
REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON October 2, 2018 The Port of Walla Walla, owner and operator of the Walla Walla Regional Airport,
More informationPRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ)
PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ) ON-CALL AVIATION DESIGN SERVICES PROJECT NO. 715 D-E-F SOLICITATION NO. HWC-HASDS-2017-027 Warren Ching Sr. Procurement Specialist Houston Airports
More informationAttention Design Firms
Attention Design Firms If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal may cause your submittal to be
More informationANAHUAC INDEPENDENT SCHOOL DISTRICT
ANAHUAC INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS Architectural and Engineering Services for Future Potential Bond Projects INTRODUCTION: Anahuac Independent School District ( District ) is
More informationREQUEST FOR QUALIFICATIONS CONSULTING ENGINEERING SERVICES LLANO COUNTY
REQUEST FOR QUALIFICATIONS FOR CONSULTING ENGINEERING SERVICES 18-401-02 LLANO COUNTY LLANO COUNTY 1447 E. State Highway 71, Unit B Llano, TX 78643 325-247-3783 1 TABLE OF CONTENTS Page Introduction 3
More informationREQUEST FOR QUALIFICATIONS. Design Professional Services
REQUEST FOR QUALIFICATIONS Design Professional Services Return Completed Qualifications To: Bonneville Joint School District No. 93 3497 North Ammon Road Idaho Falls, Idaho 83401 TO BE CONSIDERED, QUALIFICATIONS
More informationBASIN CITY WATER AND SEWER DISTRICT Request for Qualifications
BASIN CITY WATER AND SEWER DISTRICT for: LEON DRIVE AND ESTELLA DRIVE WATERLINE REPLACEMENT PROJECT Basin City Water and Sewer District (hereinafter called District ) is requesting Statements of Qualifications
More informationREQUEST FOR QUALIFICATIONS DESIGN-BUILD SERVICES
REQUEST FOR QUALIFICATIONS FOR DESIGN-BUILD SERVICES FOR UNION COUNTY CIRCUIT COURT BUILDING UNION COUNTY La Grande, Oregon 97850 (541)963-1001 MARCH 25, 2014 TABLE OF CONTENTS Page Introduction 3 Section
More informationRequest for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project
Request for Qualifications No. 7-1718 Architectural & Engineering Services for LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project Submittal Deadline: November 10, 2017, 2:00 P.M. Spokane Public Schools
More informationREQUEST FOR QAULIFICATONS. General Contractor Construction Manager (GC/CM) Wallace and Lexington Elementary Schools Replacement Project.
REQUEST FOR QAULIFICATONS General Contractor Construction Manager (GC/CM) Wallace and Lexington Elementary Schools Replacement Project Kelso, WA Submittal Deadline: August 23, 2018 3:00 pm REQUEST FOR
More informationPRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ)
PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ) FAA HOT SPOTS ELIMINATING DESIGN SERVICES PROJECT NO. 770 SOLICITATION NO. HWC-HOUHSE-2017-025 Warren Ching Sr. Procurement Specialist Houston
More informationREQUEST FOR QUALIFICATIONS FOR OWNER REPRESENTATIVE PROFESSIONAL SERVICES DURING PROCUREMENT AND CONSTRUCTION FOR
REQUEST FOR QUALIFICATIONS FOR OWNER REPRESENTATIVE PROFESSIONAL SERVICES DURING PROCUREMENT AND CONSTRUCTION FOR UPGRADES AND EXPANSION PROJECTOF HAYS WASTEWATER TREATMENT PLANT CITY OF HAYS, KANSAS DECEMBER
More informationHosted by the SLMBE Office
Hosted by the SLMBE Office Women Presidents Educational Organization - DC Sandra Eberhard, Executive Director Washington Suburban Sanitary Commission - WSSC David Malone, Chief Procurement Officer Carlnetta
More informationAssociated with the District s Measure A Bond Program and Facilities Improvement Projects
Request for Qualifications / Proposal (RFQ/P) for Hazardous Material Assessment, Abatement Plan, Cost Estimating, and Monitoring Services Associated with the District s Measure A Bond Program and Facilities
More informationDALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6. (February 14, 2012)
DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6 (February 14, 2012) RFQ 1. Part A, Section 4.2(a), Page 6 2. Part A, Sections 4.2(b) & 4.2(c) Please confirm that financial requirements are to be provided
More informationJanuary 19, To Whom It May Concern:
January 19, 2018 To Whom It May Concern: The Airport South Community Improvement District and the Airport West Community Improvement District, collectively known as the Aerotropolis Atlanta Community Improvement
More informationRequest for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Project Name East Campus Quad Town Center Project Number C20182091 Project Location 4250 Richmond Road Project Manager Phillip Pallone City / County Highland Hills / Cuyahoga Owner Cuyahoga Community College
More informationGuaranteed Energy Savings Performance Contracting
GEORGIA ENVIRONMENTAL FINANCE AUTHORITY WATER & SEWER FINANCING ENERGY EFFICIENCY LAND CONSERVATION RENEWABLE ENERGY FUEL STORAGE David Godfrey State Utilities Program Manager Guaranteed Energy Savings
More informationREQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC)
REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) Ricardo Flores Magón Academy (Owner) 5301 Lowell Boulevard Denver, CO 80122 Phone (303) 412-7610 PROPOSAL
More informationPRE-SUBMITTAL CONFERENCE AGENDA ITRP Enabling Utilities Landside Progressive Design-Build Services RFQ NO. H37-EUTLDB
PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATION (RFQ) ITRP ENABLING UTILITIES LANDSIDE PROGRESSIVE DESIGN-BUILD SERVICES RFQ NO. H37-EUTLDB-2016-004 Andre Morrow, C.P.M., CPPB Sr. Procurement Specialist
More informationELDERLY & FAMILY HOUSING LOW-INCOME WEATHERIZATION 1650 Port Drive, Burlington, Washington (360) FAX: (360)
JOB TITLE: Energy Auditor/Quality Control Inspector MAJOR FUNCTION AND PURPOSE: This is a Non-Exempt, Full-Time position with typical business hours from Monday through Friday, 8:00 a.m. to 5:00 p.m. This
More informationState Project No. XXXXXX City Project No. c401807
June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad
More informationMASSACHUSETTS WATER RESOURCES AUTHORITY
MASSACHUSETTS WATER RESOURCES AUTHORITY REGIONAL INFILTRATION/INFLOW SEPTEMBER 2002 Table of Contents 1. Introduction 1.1. Background...1 1.2. Description of the Regional I/I Problem...1 1.3. MWRA Initial
More informationRequest for Qualifications (RFQ) December 2014
Request for Qualifications (RFQ) December 2014 Issued by: Funded by: www.delta-institute.org 35 E. Wacker Drive Suite 1200 Chicago, IL 60601 Vanessa Roanhorse vroanhorse@delta-institute.org Matt Harrison
More informationREQUEST FOR QUALIFICATIONS WASTEWATER FACILITY PLAN
REQUEST FOR QUALIFICATIONS WASTEWATER FACILITY PLAN Proposals due: Thursday, September 17 th, 2015 No later than 10:00 a.m. Deliver to: James Roach, City Administrator 101 Court St. Jackson, Missouri 63755
More information2018 Pipelines Engineering Services Boerne Stage Road, West Avenue, and Highway 90 & General McMullen
2018 Pipelines Engineering Services Boerne Stage Road, West Avenue, and Highway 90 & General McMullen M. Antonio Leyva, P.E. Manager Engineering Angelica Mata Manager Contract Administration Marisol V.
More informationCity of Provo, Utah Parks and Recreation Department. Request for Proposal (RFP) Architectural Services for a New Community Recreation Center
City of Provo, Utah Parks and Recreation Department Request for Proposal (RFP) Architectural Services for a New Community Recreation Center RFP No. 14065 I. GENERAL OVERVIEW AND DESCRIPTION OF PROJECT
More informationREQUEST FOR QUALIFICATIONS (RFQ)
REQUEST FOR QUALIFICATIONS (RFQ) Public-Private Partnership Legal Advisor Services for the Diversion Channel and Associated Infrastructure Work Package of the Fargo-Moorhead Area Diversion Project Issue
More informationEast Harlem Commercial Opportunity RFP
East Harlem Commercial Opportunity RFP Site Description 2321-2325 3rd Avenue (MN Block 1791 Lot 46) Convenient access via subway, Metro North, bus, and highway Located in a fast growing neighborhood Component
More informationBoulder Housing Partners Request for Qualifications: RFQ # Architectural Services for Canyon Pointe and Glen Willow Renovation Projects
4800 N. Broadway, Boulder, CO 80304 Phone: 720-564-4610 Fax: 303-939-9569 www.boulderhousing.org Hearing Assistance: 1-800-659-3656 Boulder Housing Partners Request for Qualifications: RFQ #4-2017 Architectural
More informationCALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SANTA ANA REGION ORDER NO. R
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SANTA ANA REGION ORDER NO. R8-2002-0014 GENERAL WASTE DISCHARGE REQUIREMENTS For SEWAGE COLLECTION AGENCIES IN ORANGE COUNTY WITHIN THE SANTA ANA REGION
More informationTOWN OF FAIRVIEW, TEXAS REQUEST FOR QUALIFICATIONS (RFQ) REWRITE/UPDATE OF THE COMPREHENSIVE ZONING AND SUBDIVISION ORDINANCES PROPOSAL DUE DATE:
TOWN OF FAIRVIEW, TEXAS REQUEST FOR QUALIFICATIONS (RFQ) REWRITE/UPDATE OF THE COMPREHENSIVE ZONING AND SUBDIVISION ORDINANCES PROPOSAL DUE DATE: 4:30 PM Central Time March 3, 2017 ISSUED BY: TOWN OF FAIRVIEW
More informationwilliams mullen Effective March 24, 2014 Lynn F. Jacob, Partner Richmond, VA
williams mullen Technical Phases of OFCCP s Regulations Regarding Individuals with Disabilities, Disabled Veterans, Recently Separated Veterans, Other Protected Veterans and Armed Forces Service Medal
More informationRequest for Proposals for Interior Renovations for the Aldrich Public Library June 25, 2018
Request for Proposals for Interior Renovations for the June 25, 2018 Reply to: Sarah Costa Library Consultant 6 Washington St. Barre, VT 05641 Schedule RFP Distribution: July 3, 2018 Site Visit and Pre-proposal
More informationREQUEST FOR QUALIFICATIONS FOR PUBLIC RELATIONS SERVICES. CITY OF BIDDEFORD, MAINE September 13, 2018
REQUEST FOR QUALIFICATIONS FOR PUBLIC RELATIONS SERVICES CITY OF BIDDEFORD, MAINE September 13, 2018 Contact: Brian Phinney, Chief Operating Officer, City of Biddeford Date of Issue: Thursday, September
More informationThe Park at Fields of Medina Playground Equipment
The Park at Fields of Medina Playground Equipment Request for Proposals Issue Date: April 16, 2014 Deadline for RFP Submittals: May 5, 2014 at 4:30 p.m. at Medina City Hall. City of Medina 2052 County
More informationPIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) for FAR PART 150 NOISE COMPATIBILITY STUDY for PIEDMONT TRIAD INTERNATIONAL AIRPORT The Piedmont Triad Airport Authority (PTAA) will receive
More informationREQUEST FOR PROPOSAL (RFP)
REQUEST FOR PROPOSAL (RFP) Project TOW-PRC-2015-03 (Phase 2) OPERATION AND MANAGEMENT PARTNER FOR THE CRC WELLNESS CENTER COMMUNITY RECREATION CENTER EXPANSION TOWN OF WINDSOR, COLORADO April 2, 2015 Issued
More informationCity of Malibu Request for Proposal
Request for Proposal North Santa Monica Bay Coastal Watersheds Monitoring Services Date Issued: April 26, 2016 Date Due: May 17, 2016, 4:00 P.M. The Qualifications Proposal and Cost Proposal must be submitted
More informationENVIRONMENTAL RETAINER CONTRACT PRESENTATION
October 30, 2015 ENVIRONMENTAL RETAINER CONTRACT PRESENTATION New York City Mayor s Office of Environmental Remediation Economic Development Corporation ENVIRONMENTAL SERVICES Environmental Assessment
More informationRequest for Qualifications/Proposals LAND ACQUISITION DUE DILIGENCE & PROFESSIONAL TECHNICAL SERVICES ADDENDUM #1: FEBRUARY 1, 2018
ADDENDUM #1: FEBRUARY 1, 2018 Unless explicitly noted herein, all requirements will remain as originally prepared. Any variations or claims of equality or superiority must be demonstrated, proven and tested
More informationGILLSON PARK BEACH HOUSE AND PARKING LOT CONSTRUCTION MANAGEMENT SERVICES
WILMETTE PARK DISTRICT REQUEST FOR QUALIFICATIONS PROPOSAL GILLSON PARK BEACH HOUSE AND PARKING LOT CONSTRUCTION MANAGEMENT SERVICES Wilmette Park District 3555 Lake Avenue Wilmette, Illinois 60091-1016
More informationProposals due May 18 th, 2018 at 4:30 PM. Indicate on the Sealed Envelope Do Not Open with Regular Mail.
April 26, 2018 Subject: RFP2M18-06: Request for Proposal Construction Management and Inspection Services for the Sewer Plant #7 Replacement Project. The City of Alhambra is requesting proposals from experienced,
More informationCITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING
To all Potential Respondents: CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING REQUEST FOR QUALIFICATIONS (RFQ) ON-CALL WASTEWATER AND ENVIRONMENTAL ENGINEERING CONSULTANTS LIST VARIOUS
More informationWAM v2 Upgrade Readiness Assessment & Pre-Implementation Plan
REQUEST FOR PROPOSALS The Madison Metropolitan Sewerage District requests proposals for WAM v2 Upgrade: Readiness Assessment & Pre-Implementation Plan PROPOSAL The Madison Metropolitan Sewerage District
More informationPLANT GROWTH ENVIRONMENTS FACILITY PROJECT NO
DESIGN BUILDER (CONTRACTOR) PREQUALIFICATION QUESTIONNAIRE Design Build Delivery PLANT GROWTH ENVIRONMENTS FACILITY PROJECT NO. 950558 MANDATORY PREQUALIFICATION CONFERENCE: THURSDAY, JUNE 22, 2017 SUBMITTAL
More informationCAMPBELL UNION HIGH SCHOOL DISTRICT
CAMPBELL UNION HIGH SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS PROPOSITION 39 ENERGY CONSERVATION AND ENERGY EFFICIENCY SERVICES OWNER CAMPBELL UNION HIGH SCHOOL DISTRICT 3235 Union Avenue San Jose, CA
More informationRequest for Qualifications. Architectural Firms
Request for Qualifications Architectural Firms Housing Authority of the City of Vancouver 2500 Main Street Vancouver, Washington 98660-2697 November 2017 Request for Qualifications Architectural Firms
More informationDesign Build Phase II Service Center Project
Design Build Phase II Service Center Project Diana L. Woltersdorf Manager, Contract Administration Julie Valadez, AIA Project Manager, Vertical Construction September 30, 2016 Pre-Submittal Meeting Pre-Submittal
More informationGovernance Committee Meeting - 1. Call to Order - Alethia Nancoo, Chairperson. 1. Call to Order.Alethia Nancoo, Chairperson
Governance Committee Meeting - 1. Call to Order - Alethia Nancoo, Chairperson DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors Governance Committee June 8, 2011 9:30 a.m. 1. Call to Order.Alethia
More information1. Authorize the City Engineer to issue and advertise the transmitted RFQ to wastewater and environmental engineering consultants (Transmittal No. 1).
Joint Report No. 3 CD Nos. All REQUEST FOR AUTHORITY TO ISSUE A REQUEST FOR QUALIFICATIONS (RFQ) AND NEGOTIATE PERSONAL SERVICES CONTRACTS FOR ON-CALL WASTEWATER AND ENVIRONMENTAL ENGINEERING CONSULTANTS
More informationREQUEST FOR QUALIFICATIONS
FACILITIES MANAGEMENT 4202 EAST FOWLER AVENUE / OPM 100 TAMPA, FL 33620-7550 EDITION: NOVEMBER 1, 2016 PHONE: (813) 974-2845 FAX: (813) 974-3542 REQUEST FOR QUALIFICATIONS PROJECT NAME: USF CPT REPLACE
More informationRequest for Qualifications
Request for Qualifications Architectural & Engineering Services for HUTTON ELEMENTARY SCHOOL Modernization and Additions Project Submittal Deadline: August 24, 2012, 4:00 P.M. Spokane Public Schools 2815
More informationOCTOBER 1, 2015 ADDENDUM NO. 1 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR DESIGN CONSULTING SERVICES (TARGET MARKET) SPECIFICATION NO.
OCTOBER 1, 2015 ADDENDUM NO. 1 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR DESIGN CONSULTING SERVICES (TARGET MARKET) SPECIFICATION NO. 132366 For which proposals are scheduled to open in the Bid & Bond
More informationSouthern Kern Unified School District
Southern Kern Unified School District REQUEST FOR QUALIFICATIONS 18-01 FOR Energy Program Professional Services RESPONSES DUE BY November 8, 2017 SUBMIT TO Southern Kern Unified School District 2601 Rosamond
More informationREQUEST FOR PROPOSALS City of Sandusky Combined Sewer Flow Monitoring System
REQUEST FOR PROPOSALS City of Sandusy Combined Sewer Flow Monitoring System Issued by: The City of Sandusy, Ohio Issued: Thursday, June 21, 2018 Contact Person: Aaron M. Klein, P.E. c/o Department of Public
More informationREQUEST FOR QUALIFICATIONS HONDO, TEXAS CITY ENGINEERING SERVICES
REQUEST FOR QUALIFICATIONS HONDO, TEXAS CITY ENGINEERING SERVICES 1. REQUEST FOR STATEMENT OF QUALIFICATIONS: The City of Hondo, hereinafter referred to as the City, is soliciting Statement of Qualifications
More information