International Data Link Symposium 2006 National brief - Norway
|
|
- Bernice Jenkins
- 5 years ago
- Views:
Transcription
1 Norwegian Defence C I S C E N T R E International Data Link Symposium 2006 National brief - Norway Flemming Weber Jensen Lieutenant Colonel Tactical data Link Department 19 September 2006
2 Scope: Status on the Link 16 procurement programme in Norway Norwegian Ground Infrastructure for Link 16 (NORGIL) Establishment of a Joint TDL training area Future training and exercise opportunities in Norway
3 Status on the Link 16 procurement programme in Norway Nansen Class frigates F-16 b a r y t li i NASAMS e Interopera-p bilityro NORGIL Skjold Class e t n i n o Procedures i t Training Tacticsli a o C
4 Norwegian Defence CIS Centre TDL department TDL Department Lt COL Jensen, Flemming W Tlf: Mail: fljensen@mil.no Staff officer Maj Gregersen Tlf: Mail: stgregersen@mil.no TDL Training & Education Maj Kjønø, Dag Tlf: Mail: dkjono@mil.no Instructor Instructor Instructor Instructor Instructor Staff officer Maj Joint Datalink Operation Centre (DLOC) Maj Samuelsen, Roger Tlf: Mail: rogsamuelsen@mil.no Network Manager Network Manager NetworkManager Manager Network Network Manager NetworkDesigner Designer Network Network Designer Configuration & Interoperability Maj Staff officer Capt Engineer
5 Fridtjof Nansen Class frigates Status: Under Contract with Navantia (SP), Lockheed Martin and USN (FMS) 5 Multi-Link (11/16) platforms under contract with the first ship delivered this year. Last ship to be delivered in 2010
6 Skjold Class - Littoral Combat Vessel Status: Under contract with Skjold Prime Consortium, Umoe (NO), Kongsberg Defense and Aerospace (NO), DCN (FR) 6 Multi-Link (11/16) platforms with the first ship delivered in 2008 and the last in 2009
7 NASAMS II Status: Under contract with Kongsberg Defense and Aerospace (NO) 2 Multi-Link Units (11B/16/JREAP/ATDL-1) To be fielded early 2007
8 F-16 Status: As a part of EPAF under contract with Lockheed Martin (US) 57 platforms upgraded with programs M3, M4, M5, M6 M6 requirements/specification process to be completed late 2006/early Integration to be done by Lockheed Martin EPAF has support contract with ESC at Hanscom AFB, as well as MIDS FSE support from DLS/ViaSat
9 NORGIL Status: Under contract with Thales, to be fielded in 2008 The NORwegian Ground Infrastructure for Link 16 training in Norway, and for deployable out of area operations consists of: 2 MASE Interface Units (MIU) for CRCs 1 MIU for an Air Control Unit 3 Link 16 management systems 3 Fixed Ground Buffers 4 Mobile Ground Buffers JREAP (buffer NMC MIU)
10 Link 16 to Ground Forces not yet specified/contracted Norwegian Defense Joint C2IS - not yet specified/contracted
11 NMC Net Design Norwegian Ground infrastructure for Link 16 (NORGIL) OPTASK Link Network Management Voice Comm Panels Voice Comm System FGB/MGB Crypto NM Displays NDDN / TADKOM Crypto Terminal Management C2 GPS Antenna MIDSMIDS-LVT MIDS Antenna Subsystem Terminal Interface Voice Interface MASE/MIU Displays MASE GPS Time Reference Power Convertion Crypto MASE Translator MIU C2 Capability MIDS Cabinet Data Link I/F Processing MIU Voice System Opnet Management System Data Link Handling System GFE
12 Mobile Ground Buffers A modular part of the Norwegian Armed Forces CIS Task Group
13 The NORGIL Concept CRC (Interim Link 16 C2) FGB Joint DLOC Deployable Link Management (2) FGB Air Control Unit (Interim Link 16 C2) Fixed Ground Buffer (FGB) Mobile Ground Buffer (4+2) Army/C2 systems Link 16 RF NJHQ Joint DLOC Link Management CRC Maageroe (Interim Link 16 C2) NDDN TADCOM
14 TDL training area Vaeroey Vaeroey Bodoe Traena Kopparen Oerland
15 Norwegian TDL School Overall education model Participants foundation L-16, September 2006 Description Participants Provider Management & design, Technical Joint/Combined, TDL Training C2 platforms & Education Technicians Multilink Possibilities and responsibilities (mainly L11 and L16) Joint/Combined, TDL Training C2 platforms & Education Operator Hands on, platform specific TDL operators, technicians A basic introduction on all Links Joint/Combined, TDL Training all Link & Education personnel Advanced Foundation Single services
16 TDL Training & Education Responsible for joint education Basic Link, all types Multilink (mainly L11 and L16) Advanced Link, operational and technical Supporting Link education in the branches Operator (hands on) Overall management of Education Certification Documentation
17 1500 ATO/ACO approval JHQ Battle Rhythm 1000 ATO feed 0930 IO/T WG 1900 ATO/ACO release 1030 DARB 1230 JCOWG 0900 ROE meeting 1630 COM HQ Conf & VTC 1200 SACEUR VTC 0815 BC Coord ASAP Changeover brief ACC ATO handover 0730 CG-meeting 1500 AOD approval 1230 JCB 1400 AOD release Staff Update 0945 Staff Update 0300 Air- and ACM request 0600 COM Inbrief TBD Input to Assesrep Handover AOD ASAP Changeover brief ACC 2200 BC Coord ATO handover 1900 ATO/ACO change
18 NATO Air Meet 05 E-3A E-3D USAF Belgium Norway E-2C DEPT VAN E-3F JPC NAMOC Link-16 picture
19 Weapons Instructor Meet 05 E-3A Belgium Norway Denmark The Netherlands JPC
20 Link-16 net Cold Response 2006 JPC CRC 1 GBAD Link-11 net RHQNN NJHQ
21 Norwegian Defence Communication Information Systems Centre Any Questions? Norwegian Link 16 POCs: NDCISD/TDL Systems Office (technical): Mr. Knut Erik Sletten NDPD/Link 16 Procurement Program: LTC Håvard Nordengen NDCCISC/TDL Office (operational): LTC Flemming Jensen
22 ACU CIS CRC DLOC FGB IT LVT MGB MIDS MIU MOS NASAMS NBD NORGIL NMC TDL Abbreviations Air Control Unit Communication and Information Systems Control and Reporting Centre Data Link Operations Centre Fixed Ground Buffer Information Technology Low Volume Terminal Mobile Ground Buffer Multifunctional Information Distribution System MASE Interface Unit MIDS On Ships Norwegian Advanced Surface to Air Missiles System Network Based Defence NORwegian Ground Infrastructure for Link 16 Network Management Cell Tactical Data Link
16 Oct 2007 National Status Netherlands
National Status Netherlands Major A. Remmelzwaal Head of Office of TDL (RNLAF) 1 Maj Bram Remmelzwaal Biography +31(0)76-5447351 tdl@clsk.af.dnet.mindef.nl NLD / Royal Netherlands Air Force Command Head
More informationSupporting Nations With Acquisition of Multi-functional Information Distribution System (MIDS) Capability
Supporting Nations With Acquisition of Multi-functional Information Distribution System (MIDS) Capability September 20, 2006 Presented to IDLS Copenhagen, Denmark Lockheed Martin Proprietary Information
More informationJADE An Experiment in Distributed Simulation Based Joint Tactical Training
Simulation Based Joint Tactical Training Mr. Ole Martin Mevassvik, Mr. Karsten Bråthen and Mr. Richard Moe Gustavsen Information Management Division FFI Forsvarets forskningsinstitutt P.O. Box 25, NO-2027
More informationARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2)
ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2) Joint ACAT ID Program (Navy Lead) Total Number of Systems: Total Program Cost (TY$): Average Unit Cost (TY$): Low-Rate
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207445F PE TITLE: FIGHTER TACTICAL DATA Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013
More informationC4I System Solutions.
www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,
More informationDATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY
APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11
Exhibit P-27, Ship Production Schedule: PB 2017 Navy Date: February 2016 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date LCS 7 LOCKHEED MARTIN 2011 Mar 2011 Apr 2012 Jun
More informationThe Integral TNO Approach to NAVY R&D
NAVAL PLATFORMS The Integral TNO Approach to NAVY R&D TNO Knowledge for Business Source: AVDKM Key elements to TNO s integral approach in support of naval platform development are operational effectiveness,
More informationThe Transformation of Danish Air Power
Centre for Military Studies The Transformation of Danish Air Power Dr. Gary Schaub, Jr. Centre for Military Studies 1 Overview The Cold War Context RDAF Pre-History Enter the F-16 Farewell F-35 Draken
More informationJoint Coordinated Implementation of Digitally-Aided CAS Capability
Joint Coordinated Implementation of Digitally-Aided CAS Capability International Data Link Symposium 2009 DISTRIBUTION A - Approved for public release; distribution is unlimited. Marsha Mullins J89 Capability
More informationDATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY
BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207434F PE TITLE: Link 16 Support and Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY
More informationARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast
Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived
More informationNaval Electronic Warfare Solutions Ensuring your mission success.
> Naval Electronic Warfare Solutions Ensuring your mission success www.thalesgroup.com >> NAVAL ELECTRONIC WARFARE: FRO Thales supplies multispectral electronic warfare (EW) capabilities to the world s
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service
More informationNotification of Intent to Invite International Competitive Bids
Acquisition Directorate viktorija.navikaite@ncia.nato.int Telephone: +32 (0)2 707 820 AGE Fax: +32 (0)2 707 8770 NCIAIACQ/208/974 23 February 208 Notification of Intent to Invite International Competitive
More informationImplementation and Integration of TDL's in Maritime Platforms (AWD). CAPT James Nash SEA 4000 FMS Director
Implementation and Integration of TDL's in Maritime Platforms (AWD). CAPT James Nash SEA 4000 FMS Director Synopsis DDG Combat System Mission Architecture DDG Tactical Data Links and Interoperability interfaces
More informationUNCLASSIFIED FY Quantity of RDT&E Articles
COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 5 R-1 Line #159 Cost To Complete Total Program Element - 1.447 1.406 1.782-1.782 1.770
More informationFIGHTER DATA LINK (FDL)
FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average
More informationAFCEA/GMU Symposium "Critical Issues in C4I"
AFCEA/GMU Symposium "Critical Issues in C4I" Lt Gen (Ret) Robert Elder System Architectures Lab () May 22, 2012 1 OEF/OIF Timeline OEF Campaign Start: 7 Oct 2001 Initial SOF Entry AFG: 19 Oct 2001 Mazar-e-Sharif
More informationThis publication is available digitally.
BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION -103 ADDENDA-U 23 DECEMBER 05 COMPLIANCE WITH THIS PUBLICATION IS MANDATORY Maintenance EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING
More informationBusiness Opportunities in Network Services and IT Infrastructure
Business Opportunities in Network Services and IT Infrastructure Antonio Calderon, Chief Network Services and IT Infrastructure antonio.calderon@ncia.nato.int Network Services and IT Infrastructure Service
More informationTactical Data Links IPT
TACTICAL DATA LINKS IPT IDLS 2005 UK TDL INTEROPERABILITY IN THE LITTORAL ENVIRONMENT LT CDR DAVID WILLIAMS TDLR1 INTRODUCTION Lead Requirements Manager in the UK TDL IPT Six RMs 1 x RN, 2 x Army & 3 x
More informationSSC Pacific is making its mark as
5.3 FEATURE FROM THE SPAWAR SYSTEMS CENTER PACIFIC INTERNAL NEWSLETTER SSC Pacific C4I scoring direct hit for shore-based ballistic missile defense SSC Pacific is making its mark as a valued partner in
More informationAFCEA Industry Days LTC Anthony K. Whitfield Product Manager, Wideband Enterprise Satellite Systems (PdM WESS) 9351 Hall Road (Bldg.
AFCEA Industry Days LTC Anthony K. Whitfield Product Manager, Wideband Enterprise Satellite Systems (PdM WESS) 9351 Hall Road (Bldg. 1456), Fort Belvoir, Virginia 22060 April 2018 Wideband Enterprise Satellite
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 27448F PE TITLE: C2ISR Tactical Data Link Exhibit R-2, RDT&E Budget Item Justification 27448F C2ISR Tactical Data Link 23 24 25 26 27 28 29 Total Actual Complete Total Program Element (PE) Cost
More informationAirspace Control in the Combat Zone
Airspace Control in the Combat Zone Air Force Doctrine Document 2-1.7 4 June 1998 BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE DOCTRINE DOCUMENT 2 1.7 4 JUNE 1998 OPR: HQ AFDC/DR (Maj Chris Larson,
More informationNATO SEASPARROW Case Study: Taking International Cooperation to the Next Level
NATO SEASPARROW Case Study: Taking International Cooperation to the Next Level 25 January 2011 10.RB.1/14/2011 1 Theme for ComDef West 2011: Architecture for Coalition Cooperation NATO SEASPARROW Case
More informationCURRICULUM OUTLINE OF INSTRUCTION SURFACE WARFARE OFFICER DEPARTMENT HEAD COURSE CIN: A-4H-0107 CDP: 9545 VER: 2.0 CHANGE: 3
1-2-1-1 Introduction to IO & Information Warfare Commander (IWC) Organization, Roles, & Responsibilities TO 1-2-1.1 APPLY the core, supporting, and related capabilities of Information Operations (IO) at
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationSupport to Operations Assessment in the 1 German/Netherlands Corps
Support to Operations Assessment in the 1 German/Netherlands Corps Presentation to 32nd ISMOR Royal Holloway, 2015-07-21 Mr Joachim Reitan Norwegian Defence Research Establishment (FFI) Joachim.reitan@ffi.no
More informationJoint Terminal Control Training & Rehearsal System (JTC TRS)
Joint Terminal Control Training & Rehearsal System (JTC TRS) Lt Col Dan Hodgkiss 677 AESG/TO 937 255 3801 daniel.hodgkiss@wpafb.af.mil Date: 15 May 2007 Government disclaimer: all information is provided
More informationFixed Wing Targeting Lockheed Martin Missiles and Fire Control 2015 Supplier Summit
Fixed Wing Targeting Lockheed Martin Missiles and Fire Control 2015 Supplier Summit CLEARED PENDING FOR PUBLIC RELEASE TM1409-0107-1 Fixed Wing Programs Passive Attack and Survivability Programs Infrared
More informationSaab Press Briefing CANSEC May John Belanger V.P. Communications Saab North America
Saab Press Briefing CANSEC 2018 30 May 2018 John Belanger V.P. Communications Saab North America 2 IN 1937 WE TOOK OFF A history from the 17th century through Alfred Nobel (Bofors) and the shipyard in
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationIntegrating Innovative Air Power
Centre for Military Studies Integrating Innovative Air Power Facing 21 st Century Strategic Challenges Learning From the F-16 Dr. Gary Schaub, Jr. Centre for Military Studies Overview Denmark s Combat
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207434F PE TITLE: Link 16 Support and Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012
More informationThis publication is available digitally on the AFDPO WWW site at:
BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 13-216 5 MAY 2005 Space, Missile, Command, and Control EVALUATION OF AIR TRAFFIC CONTROL AND LANDING SYSTEMS (ATCALS) COMPLIANCE WITH THIS
More informationThales on the Naval Defence market
thalesgroup.com Innovation - Civil aerospace - Defence aerospace - Transportation - Defence - Security Thales on the Naval Defence market Captas-1 Thales With more than 50 years of experience as a provider
More informationAccelerating Networked Sensors & Fires
Accelerating Networked Sensors & Fires October 19, 2005 Precision Engagement Strategic Business Area Providing the Warfighter timely, effective and affordable Mission Solutions that span the breadth and
More informationof Communications-Electronic s AFI , Requirements Development and Processing AFI , Planning Logistics Support
[ ] AIR FORCE INSTRUCTION 10-901 1 MARCH 1996 BY ORDER OF THE SECRETARY OF THE AIR FORCE Operations LEAD OPERATING COMMAND-- COMMAND, CONTROL, COMMUNICATIONS, COMPUTERS, AND INTELLIGENCE (C4I) SYSTEMS
More informationSCCOA program(s) (1) Meeting with NAO, March SPAé 27-Apr-05 Diapositive N 1 / 000 MINISTÈRE DE LA DÉFENSE
SCCOA program(s) Meeting with NAO, March 2 2004 (1) SPAé 27-Apr-05 Diapositive N 1 / 000 Summary What is SPAé? What is the system SCCOA? How do we manage this SCCOA complexity? What are our tools? How
More informationAAC Welcome & Perspective
30 th Air Armament Symposium AAC Welcome & Perspective Robert Chedbob Chedister, Major General, USAF Program Executive Officer for for Weapons and and Commander, Air Air Armament Center Overview Why I
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 22.756 - - - - - - - - Continuing Continuing 675043: Fighter Tactical
More informationCapability Integration
SoS/Interoperability IPT Integrating Lockheed Martin Strengths Realizing Military Value Integration Framework for Developing C4ISTAR Solutions Dr David Sundstrom Director, Network Centric 21 September
More informationA d. e P. nc e. a A. M d. e G. - P h ase 2 - M e d. r the ADF
AIR6500t Battle Management System sile Defe is M d n a ir A d e -Phase 1 - Join und-bas ro G e g n a R m iu - P h ase 2 - M e d sile Defence fo is M d n a ir A d te istent Integra rs e P d se a B d n a
More informationALTBMD. Dave Kiefer ALTBMD Deputy Programme Manager NATO UNCLASSIFIED
ALTBMD Dave Kiefer ALTBMD Deputy Programme Manager Dave.kiefer@tmd.nato.int NATO UNCLASSIFIED Agenda Who we are Where we are today Where we re headed ALTBMD PO July 2011 NATO UNCLASSIFIED 2 ALTBMD Still
More informationEnhancing tactical communications with more cohesive solutions
Photo courtesy of US Department of Defense Enhancing tactical communications with more cohesive solutions There s no need to state the importance of tactical communications to defence forces the world
More informationEvolution to a 5th Generation Air Force
Chief of the Royal Norwegian Air Force s Air Power Conference 2017 Evolution to a 5th -Norway s Shield and Sword? Royal Norwegian Air Force Academy 7 February - 9 February 2017 1 RNoAF Academy Welcome
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Prior Years FY 2018 FY 2019 FY 2020 FY 2021 To Complete Program Element - 130.376 166.297 132.795 0.000
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0401132F PE TITLE: C-130J PROGRAM Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0401132F C-130J PROGRAM Cost ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 16 R-1 Line #227 To Program
More informationForeign Military Sales (FMS) Checklist for Developing Acquisition of Advanced Medium-Range Air-to-Air Missile (AMRAAM) Letter of Request (LOR)
Foreign Military Sales (FMS) Checklist for Developing Acquisition of Advanced Medium-Range Air-to-Air Missile (AMRAAM) Letter of Request (LOR) THIS AMRAAM FMS CHECKLIST WILL BE USED IN DEVELOPMENT OF THE
More informationPrecision Strike Winter Roundtable
Create and Deliver Superior Products Through Innovative Minds Precision Strike Winter Roundtable Long Range Strike Weapons Frank Cappuccio, February 1, 2007 An Industry Perspective 1. What LRS Capabilities
More informationPositioning, Navigation and Timing. a Warfighter s Perspective! AVM Kym Osley AM, CSC, Joint Capability Group
Positioning, Navigation and Timing. a Warfighter s Perspective! AVM Kym Osley AM, CSC, Joint Capability Group Position, Navigation, and Timing are as essential as oxygen for our military operators Briefing
More informationTechnological Advances in TDL Training. Mike Smith - BAE Systems AeI
Technological Advances in TDL Training Mike Smith - BAE Systems AeI Overview Plan a Complete Training Package Training DLOD RN Handbook As NEC concepts develop collective, joint and combined training will
More informationLittoral OpTech-West. Panel 4: Seeing Through the Clutter: On the Surface & Over the Shore
Littoral OpTech-West Panel 4: Seeing Through the Clutter: On the Surface & Over the Shore Experience of the Sea Giraffe in the USN The requirements for the USN s Littoral Combat Ship created a challenging
More informationJoint Tactical Radio System (JTRS)
C4I - Command, Control, Communications, Computers & Intelligence Forecast Outlook On September 30, 2012, the Joint Tactical Radio System program was officially closed Forecast International expects "residual"
More informationDoD and Defense Partner Wargaming at the Naval Postgraduate School
DoD and Defense Partner Wargaming at the Naval Postgraduate School NPS Wargaming Activity Hub Dr. Jeff Appleget Dr. Rob Burks Graduate School of Operational and Information Sciences Mr. Fred Cameron (Formerly
More informationAfloat Electromagnetic Spectrum Operations Program (AESOP) Spectrum Management Challenges for the 21st Century
NAVAL SURFACE WARFARE CENTER DAHLGREN DIVISION Afloat Electromagnetic Spectrum Operations Program (AESOP) Spectrum Management Challenges for the 21st Century Presented by: Ms. Margaret Neel E 3 Force Level
More informationUNCLASSIFIED. Cost To Complete Total Program Element : R/SAOC MODERNIZATION. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationTRIDENT JAGUAR By Inci Kucukaksoy
2017 TRIDENT JAGUAR By Inci Kucukaksoy JWC Public Affairs Office O N 29 MARCH, almost on the heels of the conclusion of the first iteration, which certified Rapid Reaction Corps France as Joint Task Force
More informationDepartment of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 4660.3 April 29, 1996 ASD(C3I) SUBJECT: Secretary of Defense Communications References: (a) Title 10, United States Code (b) National Security Decision Directive,
More informationBallistic Missile Defence
Ballistic Missile Defence Mr Andrew Dean Deputy Programme Director Ballistic Missile Defence 2 BMD Program Director s Job Modify existing and planned NATO C2 systems to enable the NATO Commander to perform
More informationFY 2016 President's Budget February Electronics (NOTIONAL): N/A. RCS (Radio Communication System) Turnkey 216 M CANES 32 M
APPROPRIATION/BUDGET ACTIVITY /BA 5 Auxiliaries, Craft and Prior Year Program Costs (Dollars in Millions) QUANTITY End Cost Full Funding TOA Total Obligational Authority Plus Outfitting / Plus Post Delivery
More informationSECURE GLOBAL COMBAT AWARENESS
SECURE GLOBAL COMBAT AWARENESS CAYMAN INTEGRATED BATTLE COMMAND INTELLIGENCE & CYBER SECURITY GLOBAL COMBAT NETWORKS AIR DEFENCE BORDER, FACILITIES & FORCE PROTECTION BUSINESS SOLUTIONS BUSINESS SERVICES
More informationRussian defense industrial complex s possibilities for development of advanced BMD weapon systems
134 Russian defense industrial complex s possibilities for development of advanced BMD weapon systems 135 Igor KOROTCHENKO Editor-in-Chief of the National Defense magazine The main task handled by the
More informationBY ORDER OF THE COMMANDER ELLSWORTH AFB AIR FORCE INSTRUCTION ELLSWORTH AIR FORCE BASE Supplement 5 JANUARY 2016
BY ORDER OF THE COMMANDER ELLSWORTH AFB AIR FORCE INSTRUCTION 10-703 ELLSWORTH AIR FORCE BASE Supplement 5 JANUARY 2016 Operations ELECTRONIC WARFARE INTEGRATED REPROGRAMMING COMPLIANCE WITH THIS PUBLICATION
More informationCode 25 Submarine Network Support Services. Pre-Solicitation Conference
Code 25 Submarine Network Support Services Pre-Solicitation Conference NUWC Division Newport Undersea Collaboration & Technology Outreach Center (UCTOC) June 17, 2014 1 Agenda Introduction/Ground Rules
More informationNATO UNCLASSIFIED. Meeting Name: NATO UNCLASSIFIED
Meeting Name: Meeting Name: NATO Bi-SC Space Working Group # 6 Location: NCI Agency, The Hague The Netherlands Dates: 3-5 June 2014 Report Originators (Name / Phone): LTC Jerome Durieux /+ 1 757 747 3346
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)
More informationEW Modeling and Simulation: Meeting the Challenge
EW Modeling and Simulation: Meeting the Challenge Dr. George Kailiwai III Director, Resources and Assessment (J8) United States Pacific Command July 2009 Rio Hotel, Las Vegas, Nevada Today s EW Threat
More informationThe World Military Market for Connectors
The World Military Market for Connectors Bishop & Associates Inc. has just released a new report providing a quantitative analysis of the World Military Connector Market. This 16 chapter, 315-page research
More informationABCA Armies CIS Update. MilCIS 2016
ABCA Armies CIS Update MilCIS 2016 1 Scope The America, British, Canadian, Australian and New Zealand (ABCA) Armies' Program mitigates interoperability gaps, leverages opportunities and informs modernization
More informationMILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM
MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM Air Force ACAT ID Program Prime Contractor Total Number of Systems: 6 satellites Lockheed Martin Total Program Cost (TY$): N/A Average Unit
More informationUNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 6 R-1 Line #29
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development
More informationUnit: 1-4 Surface Warfare
Unit: 1-4 Surface Warfare Cell Lead SWOS_NWPT_N73DHinfo@navy.mil (401) 841-4965 Homework: Assignments shall be completed before the respective class. Quizzes cover assigned homework, required reading,
More informationCompany presentation Who is AIM Group?
Company presentation Who is AIM Group? This presentation contains no technical data subject to EAR or ITAR; F-35 Program. Releasable to US Gov, NO MoD Revenue 2016 USD 130 m Employees 530 Ownership 100
More informationStrong. Secure. Engaged: Canada s New Defence Policy
Strong. Secure. Engaged: Canada s New Defence Policy Putting People First Long-term Capability Investments Spending Growth and Financial Transparency Bold New Vision 2 Putting People First People are the
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement ADDENDUM_JJ 17 MAY 2012 Maintenance EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING SYSTEM/A-10C
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research,, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2014
More informationNATO Force Integration Unit LATVIA NATO HQ for NATO s new challenges, providing security for business growth and investments
NATO Force Integration Unit LATVIA NATO HQ for NATO s new challenges, providing security for business growth and investments Political Context 2 From Wales to Warsaw Decision - to establish 6 NFIUs at
More informationCapabilities Presentation
Capabilities Presentation Corporate Profile Established in 1977 Small Business (FAR subpart 19.001) Over 300 Professional Staff Members DUNS Number - 094744138 Cage Code - 1W582 Primary NAICS (541330,
More informationDepartment of Defense DIRECTIVE. SUBJECT: Participation in the North Atlantic Treaty Organization (NATO) Infrastructure Program
Department of Defense DIRECTIVE NUMBER 2010.5 June 24, 1992 SUBJECT: Participation in the North Atlantic Treaty Organization (NATO) Infrastructure Program ASD(P&L) References: (a) DoD Directive 2010.5,
More informationPossible technology domains and project categories of EDIDP Industrial Forum
Possible technology domains and project categories of EDIDP Industrial Forum Andrea Barbagelata, (Leonardo), ASD Task Force on the European Defence Fund 30 May, 2018 Table of Contents Rational and purpose
More informationOgden Air Logistics Center
Ogden Air Logistics Center Munitions Executive Summit STEVEN G. LAVOYE, COL, USAF AF/A4LW (Pentagon) 4 Feb 09 Overview Air Force Key Points Air Force Armament Enterprise Current Focus Areas AF Requirements
More informationTERMA UPDATE. JUNE/JULY Contents. Mission Customized / 4. Extensive Surveillance Capability to the U.S. Coast Guard / 5
TERMA UPDATE. JUNE/JULY 2005 update North American Business Expansion Initiative In this Update issue In mid-2003, Terma A/S launched a new business expansion program in the United States to provide increased
More informationDATE: FY 2012 President's Budget February 2011
APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships (Dollars in Millions) QUANTITY End Cost Less Advance Procurement (1) BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: February 2011 P-1 LINE ITEM NOMENCLATURE
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program
More informationArmament Directorate
Armament Directorate War-Winning Capabilities On Time, On Cost Schmooze and Snooze Weapons Lunch & Learn Maj Gen Ken Merchant AFPEO (Weapons) 13 November 2012 96ABW-2012-0496 Integrity! Service! Excellence
More informationChristine Anderson, SES Program Director MILSATCOM Joint Program Office
MJPO Lockheed Martin Transformational TRW Boeing Communications March 14, 2002, Rev 5 Christine Anderson, SES Program Director MILSATCOM Joint Program Office ... the ability of forces to communicate and
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete
More information641 st Electronic System Squadron. 23 April ELSS Overview Brief for the CNS/ATM Conference
641 st Electronic System Squadron 641 ELSS Overview Brief for the CNS/ATM Conference 23 April 07 1st Lt Juan Gherardy JPALS Deputy Program Manager Hanscom AFB, MA 1 641 ELSS Where We Fit = Group = Squadron
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Soldier Systems - Warrior Dem/Val
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 20.602 20.886 48.309-48.309 60.003 53.434
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement ADDENDUM_X 16 OCTOBER 2013 Maintenance EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING SYSTEM/MQ-1
More informationAGENCY: Defense Security Cooperation Agency, Department of Defense.
This document is scheduled to be published in the Federal Register on 11/14/2017 and available online at https://federalregister.gov/d/2017-24622, and on FDsys.gov Billing Code: 5001-06 DEPARTMENT OF DEFENSE
More informationSpectrum contest: RAAF boosts electronic warfare capabilities
Spectrum contest: RAAF boosts electronic warfare capabilities Jane's Defence Industry As the Royal Australian Air Force (RAAF) begins to beef up its capabilities in the electronic warfare spectrum, Charles
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost
More informationNATO IMPROVED LINK ELEVEN (NILE) PROGRAM THIRD PARTY SALES (3PS) PRESENTATION
1 NATO IMPROVED LINK ELEVEN (NILE) PROGRAM THIRD PARTY SALES (3PS) PRESENTATION LCdr Troy Richard (CAN) CAN Rep/3PS Officer LCdr Alessandro Battaglia ITA Rep/Technical Lead INFORMATION NOT RELEASEABLE
More information