2 NATO IMPROVED LINK ELEVEN (NILE) PROGRAM THIRD PARTY SALES (3PS) PRESENTATION LCdr Troy Richard (CAN) CAN Rep/3PS Officer LCdr Alessandro Battaglia ITA Rep/Technical Lead INFORMATION NOT RELEASEABLE FOR COMMERCIAL USE OR BEYOND IMMEDIATE AUDIENCE WITHOUT PRIOR PERMISSION OF THE NILE PMO 2

3 OBJECTIVE Provide an update on the NILE Project and Link 22 implementation and testing activities for the purpose of furthering interest in Link 22 as a vital tool in Network Centric Warfare (NCW) and in building global interoperability Demonstrate that Link 22 is real and being implemented today 3

4 Background Functional Architecture LINK 22 Operational Characteristics NILE/Link 22 Working Groups National Developments and System Testing National Implementation Strategies Third Party Sales Q&A OUTLINE 4

5 Objective Design a New Tactical Data Link System (Link 22) consisting of a computer-to-computer digital data link among tactical data systems equipped ships, submarines, aircraft and shore sites which will meet the requirements of the NATO Staff Requirement, dated 9 March 1990 Develop flexible and operational BLOS means to exchange Tactical Data amongst platforms and to obtain better overall tactical connectivity and coordination Requirements BACKGROUND Operational: NATO Staff Requirement, revised Mar 90 System, Functional and Performance: NATO Elementary Requirements Document, 12 Dec 94 5

6 Goals Replace Link 11 Complement Link 16 LINK 22 BACKGROUND Improve Allied Interoperability Enhance Commanders War-Fighting Capability 6

7 BACKGROUND Developed collaboratively by 7 Nations under the aegis of a Memorandum of Understanding (MOU) NILE Nations currently conducting the In-Service Support (ISS) Phase under MOU (effective Jul 2002), Amendment 3 (effective Jun 2007 to Jan 2014) Current ISS contract with Northrop Grumman to cover MOU period (until January 2014) Spain replaced Netherlands as part of the NILE ISS Phase in 2004 United States is Host Nation NILE Nation representatives form Steering Committee (SC) which governs the direction and future growth/distribution of Link 22 7

8 BACKGROUND Nov June 1992 June 1996 July 2002 Jan PD Phase D&D - SP1 D&D - SP2 ISS Phase SNC V9.2 8

9 BACKGROUND Project and System Governance provided by: Project documents Interface/System design documents, requirements specifications, etc Release of NILE Project Information available to NILE Nations and approved 3PS nations (following payment of levies/maintenance fees) Link 22 Guidebook under development NATO Documents NATO Standardization Agreements (STANAGS) (ie. 5522) NATO Allied Data Publications (ADatP) (ie. ADatP-33) 9

10 BACKGROUND Concept of mutual operation governed principally by: ACO Joint Concept of Employment (COE) for Tactical Data Links in NATO describes how NATO commanders will employ TDLs in a joint multi-link environment in pursuit of operational objectives Applies to coalition operations involving NATO and non- NATO nations Allied Data Publication (ADatP-33) Multi-Link SOPs for Tactical Data Systems employing Link 11, Link 11B, Link 16, IJMS and Link 22 10

11 FUNCTIONAL ARCHITECTURE Host system Signal Processing Controller HF FF Radio HF FF and Data Link Processor System Network Controller Link Level COMSEC Link Level COMSEC Signal Processing Controller UHF FF Signal Processing Controller HF EPM Radio UHF FF Radio HF EPM Signal Processing Controller UHF EPM Radio UHF EPM Application, Presentation and Session layers (OSI 7, 6, 5) Transport layer (OSI 4) Network layer (OSI 3) Data Link layer (OSI 2) Physical layer (OSI 1) 11

12 OPERATIONAL CHARACTERISTICS Link 22 overcomes the following Link 11 deficiencies: Lack of Electronic Protective Measures (EPM) Insufficient capacity in terms of Tactical Message Throughput Insufficient robustness (i.e. over-reliance on NCS) Insufficient error detection and correction Inflexible and slow data link procedures Message standard limitations Limited routing 12

13 OPERATIONAL CHARACTERISTICS Differences Link 22 has no Net Control Station Link 11 does not distinguish between Urgent and Routine Information Link 22 has built in Relay Commonalities The same frequencies (HF and UHF Fixed frequency) The same radios (HF and UHF FF) That s it! 13

14 OPERATIONAL CHARACTERISTICS Link 22 as a complement to Link 16: Provides a multi-media TDL BLOS capability, but without the requirement for satellite connectivity Uses the same dictionary elements and 70% message format commonality to Link 16 to facilitate data forwarding Maintains in excess of 95% commonality of DFIs/DUIs 14

15 OPERATIONAL CHARACTERISTICS Link 22 Operations SN NU5 NU3 NU2 NU1 NN1 - HF NU6 NU12 NU7 Interrupt Slot NU9 NU7 NU16 NU8 NU9 NU17 NU26 NN3 - UHF NU24 NU18 IS NU2 NU11 NU6 NU13 IS NN2 HF EPM NU14 NU16 NU15 NU9 NU20 NU9 NU17 NU15 NU21 NU24 NN4 UHF EPM NU 23 NU10 NU19 15

16 OPERATIONAL CHARACTERISTICS Key Features Multi-Media/Multi-Network 1 globally-maintained Super Network (SN) Seamless connection of up to 8 simultaneous physical networks (each platform on up to 4 physical networks) A SN can be: As simple as 2 units communicating over an RF link As comprehensive as 125 units on 8 different medias (HF/UHF FF/EPM) Depending on national implementation, Link 22 is capable of operating in fixed frequency or EPM mode, in either the HF or UHF bands Selected waveforms have further parameters that allow tailoring to the prevailing RF channel conditions 16

17 OPERATIONAL CHARACTERISTICS Key Features Dynamic Time Division Multiple Access (DTDMA) TDMA protocols allocate dedicated transmission capacity to each active unit and avoids dependence on a single net control node DTDMA allows a unit to request and receive more bandwidth on a physical network in order to accommodate increased transmission requirements Accomplished without service interruption and without operator intervention Dynamic Congestion Management Allows the management units to monitor network congestion and take any necessary steps to rectify problems 17

18 OPERATIONAL CHARACTERISTICS Key Features Routing and Relay Each SNC keeps an internal routing table, updated in realtime and based on technical feedback transmitted on the networks Allows decision on which NNs will relay messages (relay responsibility) to which NNs based on the best route Allows units to relay messages between NUs that are not within direct RF range of each other The SNMU uses its knowledge of the operational requirements, the location and movements of NUs and their communication requirements, to tailor the operation of the SN routing capability 18

19 Participation in: LINK 22 NILE/Link 22 Working Groups Communications and Interoperability Working Group (C&IWG) NILE Configuration Control Board (CCB) NATO Data Link Working Group (DLWG) NATO Tactical Data Links Interoperability and Testing Syndicate (TDLITS) NATO Tactical Data Links Symposium (NTDLS) NATO Radio Working Groups International Data Link Symposium (IDLS) 19

20 C&IWG NILE/Link 22 Working Groups O&IWG (NATO controlled) major goals accomplished including NATO Multi-TADIL COE (including Link 22), approved Jan O&IWG suspended by unanimous consent C&IWG Terms of Reference (TORs) Established under the NILE SC Remaining L22 OIWG items (STANAG 5522, COMSEC Issues), potential future Link 22 waveform improvements, Interoperability Testing, etc 2 nd C&IWG conducted May 2008 in UK Link 22 Portal for the C&IWG, open to all nations (individual registration must still be approved): 20

21 CCB LINK 22 NILE/Link 22 Working Groups Responsible for configuration of the NILE software and specifications Attended by PMO and representatives from NILE Nations Technical and Secretarial support provided by the PMO Annually, one in-person and several virtual meetings 3PS Nations are able to submit issues and are represented by their Sponsor Nation DLWG PMO attends to advise/report on and remain aware of Link 22-relevant issues/activities 21

22 TDLITS LINK 22 NILE/Link 22 Working Groups Assist in the incorporation of the Link 22 system and protocols into the SIMPLE Testing protocols, as defined in STANAG 5602 Will continue to be involved as we progress towards national implementations and in-the-field interoperability NTDLS An international forum open to NATO and partner nations Provides an opportunity to exchange experiences, introduce national approaches and discuss general concepts on NATO TDLs on an expert level in order to improve knowledge and enhance interoperability 22

23 NILE/Link 22 Working Groups NATO Radio Working Groups As required/requested to remain aware of current issues and provide input. For example: IDLS To concur in the development of new waveforms To provide input towards NILE-related STANAGs (ie. 4539, 4205, 4444, 4372) To avoid discrepancies between STANAGs and NILE documents Provides a forum to bring together government and industry/military and civilian within the international data links community Provides the PMO the opportunity to educate and showcase Link 22 and has proven invaluable in making contacts WRT 3PS 23

24 National Developments and System Testing As a project, we have taken a sharp turn towards implementation and multi-national cooperation Tremendous Spirit of cooperation and Leadership role exercised by nations and industry Sharing of information by participating nations (NILE and 3PS Nations) will benefit the community at large As a system, Link 22 is at a stable level of maturity Transitioning to an actual field-tested, multi-national system System Implementations are commencing 24

25 National Developments and System Testing IDLS 2007 Demonstrations (Oct 2007) Finland/Germany Ship/Shore Live Trial (Nov 2007) FRA/DEU Industry Live Experiment (Nov 2007) NILE SPC Compatibility Testing (Dec 07 and Beyond) FRA and GBR Deployed Ship-to-Shore Trial (Jun 08) FRA/DEU Interoperability Testing (Sep 08) CV CAVOUR (ITA) Implementation (Sep 08) French LUCID Live Reference Platform (TBD) 25

26 NATIONAL IMPLEMENTATION STRATEGIES Italy 2008 France 2009 Germany 2010 Spain 2010 Canada 2011 US TBD UK

27 NATIONAL IMPLEMENTATION STRATEGIES 2008 CV CAVOUR (1) (2008) CV GARIBALDI (1) (2009) DDG ORIZZONTE (2) (TBD) DDG DE LA PENNE (2) (2010) FREMM Frigates (6) (2011) Link 22 DLP is already available Link M-DLP (with Data Forwarding) already available On going fusion among different DLP segments Installation in CV Cavour completed, testing through remainder of 2008 Completion of Link M-DLP (inclusive of all data forwarding capabilities) expected in second half of

28 NATIONAL IMPLEMENTATION STRATEGIES 2009 Multi-Mission Frigate (FREMM) CV Charles De Gaulle Anti-Air Frigate Amphibious Assault and Command Ships Mistral and Tonnerre La Fayette Class Frigates SSN Barracuda 2 Link 22 Fixed and 1 Mobile Station currently available. Link 22 operational implementation will occur in the Multi-Mission Frigate (FREMM) in Future Link 22 operational implementation is planned for the Carrier Vessel Charles de Gaulle, the Anti-Air Frigate, and the Amphibious Assault and Command ships Mistral and Tonnerre, but not before Additional ships are planned for later integration including AD destroyers, Amphibious Assault and Command ships, La Fayette Class frigates and the Submarine SSN Barracuda. As for airborne Link 22 integration, studies are in process for the HELO NH90, and the Maritime Patrol Aircraft ATL2 28

29 NATIONAL IMPLEMENTATION STRATEGIES 2010 F123 class F125 class Ground facilities in place Germany has stated that they planned for implementation in four F 123 class ships between 2011 and 2014 Implementation in four F 125 class ships between 2012 and

30 NATIONAL IMPLEMENTATION STRATEGIES 2010 LPDs Galicia and Castilla Aircraft Carrier Príncipe de Asturias F-100 frigates LHD Juan Carlos I BAC Cantabria S-80 submarines BAM ships Land Training Center, CPT/CIA Spain is planning for the first Link 22 Spanish ship by 2010, with Link-22 implementation in all Spanish Navy ships, based on an overall Spanish Navy Data Link Migration Strategy that includes Link 11, Link 16, and Link 22. There will be two types of integration, based on the C2 technology: F-100 with C2P technology, and the remaining platforms (LPDs, S-80 and SCOMBA units) via the multi-link processor LINPRO Mobile Shore facilities to be in place in

31 NATIONAL IMPLEMENTATION STRATEGIES 2011 Halifax Class Frigates Canada will employ a multi-tdl implementation approach: leverage existing technology to acquire a DLP capable of hosting Link 11, Link 16, Link 22 and JREAP. Starting in 2011, this would provide Canada operational link capability across a wide range of interoperability, and provide a wide spectrum of link capability 31

32 NATIONAL IMPLEMENTATION STRATEGIES TBD TBD Link 22 is an unfunded requirement. 32

33 NATIONAL IMPLEMENTATION STRATEGIES 2014 Data Link System for Maritime Platforms In-Service Date (ISD) for 2 platforms by Dec

34 NATIONAL IMPLEMENTATION STRATEGIES Per Platform Transition Costs/Strategy Cannot be determined by PMO Factors to be considered: Anticipated host system (Platform, Tactical Data System, Data Link Processor) Required level of integration Current Link capability Ability to regenerate SPCs and Radios for L22 etc 34

35 THIRD PARTY SALES (3PS) All requests for Link 22 are processed by the NILE PMO and forwarded to the NILE SC for consideration/approval Background The NILE Third Party Sales (3PS) Document was Approved by the NILE Steering Committee (SC) 21 May 2002 currently under revision Provides for the sale and/or transfer of NILE products to third parties IAW provisions of the NILE Design and Development (D&D) and In-Service Support (ISS) Memoranda of Understanding (MOUs) 35

36 THIRD PARTY SALES (3PS) Background (cont.) Governing Principle: No NILE Nation will sell, transfer title to, disclose, or transfer possession of NILE project foreground information without prior written consent of all NILE Nations via the NILE SC Exception: COMSEC (Link Level COMSEC) Transfer must have prior US approval Types Government-to-Government (FMS) or Direct Commercial Sales (DCS) Sales can be conducted by any NILE Nation 3PS Process remains the same 36

37 Process LINK 22 THIRD PARTY SALES (3PS) NILE Nation sponsors Request to Transfer NILE Products Application sent to NILE PMO for technical review/processing NILE PMO sends reviewed application to the NILE Nations for approval Once unanimous approval is granted, 3PS may commence Fee Calculation Levy/Maintenance fees calculated as part of sale Levy per Link 22 system (SNC software) sold Maintenance fee on annual basis per third party nation Fees do not include hardware and integration costs 37

38 THIRD PARTY SALES (3PS) Country DLP Integration LLC SPC Radios Tools Training Canada France Thales DCNS Atos Origin Rockwell-Collins France Thales Atos Origin Atos Origin Germany ATLAS ELEKTRONIK ATLAS ELEKTRONIK Telefunken RACOMS Rohde & Schwarz Hagenuk Marinekommunikation ATLAS ELEKTRONIK Italy Elsag-Datamat Elsag-Datamat SELEX Comms Spain TECNOBIT TECNOBIT CIDA UK IBM UK Aerosystems International IBM UK Aerosystems International 3SDL SyntheSys LM/STASYS US Northrop Grumman Northrop Grumman ViaSat DRS Northrop Grumman Northrop Grumman 38

39 NILE Nations: LINK 22 Access to NILE Information Contact Steering Committee Member or refer to Link 22 Portal: The Portal is the main source for Link 22 documentation, configuration management and knowledge management Questions posted to the forums will always be answered by the NILE PMO Access is permitted to NILE Nations (Government and Industry) following approval by the sponsoring Nation s Steering Committee (SC) Representative 39

40 Access to NILE Information Non-NILE Nations: Contact the Acting Program Manager CDR Francisco Cornago Phone: (858) Fax: (619)

41 QUESTIONS? 41

42 ACRONYMS 3PS ACO ADatP AP BLOS C&IWG C2P CCB CG CJCSI CMS COE Third Party Sales Allied Command Operation Allied Data Publication Adjunct Processor Beyond Line Of Sight Communications and Interoperability Working Group Command and Control Processor Configuration Control Board Guided Missile Cruiser Chairman of the Joint Chiefs of Staff Instruction Combat Management System Concept Of Employment 42

43 ACRONYMS COMSEC COTS CV D&D DCS DDG DF DFI/DUI DLP DLWG DTDMA DTS Communications Security Commercial Off The Shelf Carrier Vessel / Multi-purpose Aircraft Carrier Design and Development Direct Commercial Sales Guided Missile Destroyer Data Forwarding Data Field Identifier / Data Use Identifier Data Link Processor Data Link Working Group Dynamic Time Division Multiple Access Data Terminal Set 43

44 ACRONYMS EPM FFF FMS FREMM HF HF FF HF EPM HMI IDD IDLS IO IRS Electronic Protection Measures Form Fit Function Foreign Military Sales Frigate European Multi-Mission High Frequency High Frequency Fixed Frequency High Frequency Electronic Protection Measures Human-Machine Interface Interface Design Document International Data Link Symposium Interoperability Interface Requirement Specification 44

45 ACRONYMS ISS JREAP LHD LINPRO LLC LMS LNE LPDs LUCID MASN M-DLP MLST3 In-Service Support Joint Range Extension Application Protocol Landing Helicopter Dock/Amphibious Assault Ship Link Processor Link Level COMSEC Link Monitoring System Late Net Entry Landing Platform Dock/Amphibious Transport Dock Link 22 Unit Controller and Interoperability Demonstrator Mission Area Sub-Network Multi-Data Link Processor Multi-Link System Test and Training Tool 45

46 ACRONYMS MS NATO NCE NCS NCSTI NILE NMU NN NMT NRS NSA NTDLS Media Simulator North Atlantic Treaty Organization NILE Communications Equipment Net Control Station / Network Cycle Structure US Naval Center for Tactical System Interoperability NATO Improved Link Eleven Network Management Unit NILE Network Network Management Tool NILE Reference System National Security Agency NATO Tactical Data Link Symposium 46

47 ACRONYMS NU OIWG ONCS OSI PMO RF RIP RIS SC SIMPLE SN SNC NILE Unit / Link 22 Unit Operations and Interoperability Working Group Operational Network Cycle Structure Open System Interconnection Program Management Office Radio Frequency Release In Principle Release In Specific Steering Committee Standard Interface for Multiple Platform Link Evaluation Super Network System Network Controller 47

48 ACRONYMS SNMU SOP SPC STANAG TDL TDLITS TDMA TDS TOD TOR UHF UHF EPM UHF FF Super Network Management Unit Standard Operating Procedure Signal Processing Controller NATO Standardization Agreement Tactical Data Link Tactical Data Link Interoperability Test Syndicate Time Division Multiple Access Tactical Data System Time Of Day Terms Of Reference Ultra High Frequency Ultra High Frequency Electronic Protection Measures Ultra High Frequency Fixed Frequency 48

NATO IMPROVED LINK ELEVEN (NILE) PROGRAM STATUS PRESENTATION

NATO IMPROVED LINK ELEVEN (NILE) PROGRAM STATUS PRESENTATION NILE PMO 2002 1 NATO IMPROVED LINK ELEVEN (NILE) PROGRAM STATUS PRESENTATION Dr. Kevin Buck NILE Program Manager INFORMATION NOT RELEASEABLE FOR COMMERCIAL USE OR BEYOND IMMEDIATE AUDIENCE WITHOUT PRIOR

More information

NATO Improved Link Eleven (NILE) Project Update. -Link 22

NATO Improved Link Eleven (NILE) Project Update. -Link 22 Slide 1 NATO Improved Link Eleven (NILE) Project Update -Link 22 LCDR Peter Duffley Third Party Sales Officer / Canadian Representative Statement A: Approved for public release; distribution is unlimited

More information

Implementation and Integration of TDL's in Maritime Platforms (AWD). CAPT James Nash SEA 4000 FMS Director

Implementation and Integration of TDL's in Maritime Platforms (AWD). CAPT James Nash SEA 4000 FMS Director Implementation and Integration of TDL's in Maritime Platforms (AWD). CAPT James Nash SEA 4000 FMS Director Synopsis DDG Combat System Mission Architecture DDG Tactical Data Links and Interoperability interfaces

More information

Supporting Nations With Acquisition of Multi-functional Information Distribution System (MIDS) Capability

Supporting Nations With Acquisition of Multi-functional Information Distribution System (MIDS) Capability Supporting Nations With Acquisition of Multi-functional Information Distribution System (MIDS) Capability September 20, 2006 Presented to IDLS Copenhagen, Denmark Lockheed Martin Proprietary Information

More information

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Information Systems Agency : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11

UNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11 Exhibit P-27, Ship Production Schedule: PB 2017 Navy Date: February 2016 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date LCS 7 LOCKHEED MARTIN 2011 Mar 2011 Apr 2012 Jun

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED (U) COST: (Dollars in Thousands) PROJECT NUMBER & TITLE FY 2000 ACTUAL FY 2001 ESTIMATE FY 2002 ESTIMATE ** ** 83,557 CONT. ** The Science and Technology Program Elements (PEs) were restructured in FY

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207434F PE TITLE: Link 16 Support and Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207434F PE TITLE: Link 16 Support and Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

Joint Program Executive Office Joint Tactical Radio System

Joint Program Executive Office Joint Tactical Radio System (24 APRIL 2006) Joint Program Executive Office Joint Tactical Radio System MIDS International Review Board JTRS Moving Forward JPEO JTRS 5 May 2006 Mr. Howard Pace Deputy JPEO JTRS 619-524-4498 Howard.Pace@navy.mil

More information

WikiLeaks Document Release

WikiLeaks Document Release WikiLeaks Document Release February 2, 2009 Congressional Research Service Report RS20557 Navy Network-Centric Warfare Concept: Key Programs and Issues for Congress Ronald O Rourke, Foreign Affairs, Defense,

More information

ROBUST NATO BALLISTIC MISSILE DEFENSE

ROBUST NATO BALLISTIC MISSILE DEFENSE ROBUST NATO BALLISTIC MISSILE DEFENSE Dr. Mitch Stevison Vice President Air and Missile Defense Systems Raytheon Missile Systems April 2016 Copyright 2016 Raytheon Company. All rights reserved. Missile

More information

NATO SEASPARROW Case Study: Taking International Cooperation to the Next Level

NATO SEASPARROW Case Study: Taking International Cooperation to the Next Level NATO SEASPARROW Case Study: Taking International Cooperation to the Next Level 25 January 2011 10.RB.1/14/2011 1 Theme for ComDef West 2011: Architecture for Coalition Cooperation NATO SEASPARROW Case

More information

16 Oct 2007 National Status Netherlands

16 Oct 2007 National Status Netherlands National Status Netherlands Major A. Remmelzwaal Head of Office of TDL (RNLAF) 1 Maj Bram Remmelzwaal Biography +31(0)76-5447351 tdl@clsk.af.dnet.mindef.nl NLD / Royal Netherlands Air Force Command Head

More information

Yemen ISR CONOPS and Capabilities

Yemen ISR CONOPS and Capabilities Yemen ISR CONOPS and Capabilities THIS INFORMATION WAS APPROVED FOR PUBLISHING PER THE ITAR AS BASIC MARKETING INFORMATION OF DEFENSE ARTICLES OR PER THE EAR AS ADVERTISING PRINTED MATTER. harris.com Yemen

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tactical Data Links. FY 2011 OCO Estimate. FY 2011 Total Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tactical Data Links. FY 2011 OCO Estimate. FY 2011 Total Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 4.053 14.948 28.854 0.000 28.854 65.152

More information

OPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS

OPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 9420.2A N2/N6 OPNAV INSTRUCTION 9420.2A From: Chief of Naval Operations Subj: NAVY

More information

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION J-6 CJCSI 6240.01E DISTRIBUTION: A, B, and C RESPONSIBILITIES FOR THE JOINT TACTICAL OPERATIONS INTERFACE TRAINING PROGRAM 1. Purpose. This instruction

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

Department of Defense DIRECTIVE. SUBJECT: Electronic Warfare (EW) and Command and Control Warfare (C2W) Countermeasures

Department of Defense DIRECTIVE. SUBJECT: Electronic Warfare (EW) and Command and Control Warfare (C2W) Countermeasures Department of Defense DIRECTIVE NUMBER 3222.4 July 31, 1992 Incorporating Through Change 2, January 28, 1994 SUBJECT: Electronic Warfare (EW) and Command and Control Warfare (C2W) Countermeasures USD(A)

More information

Technological Advances in TDL Training. Mike Smith - BAE Systems AeI

Technological Advances in TDL Training. Mike Smith - BAE Systems AeI Technological Advances in TDL Training Mike Smith - BAE Systems AeI Overview Plan a Complete Training Package Training DLOD RN Handbook As NEC concepts develop collective, joint and combined training will

More information

UNCLASSIFIED CLASSIFICATION:

UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY/BA-7 R-1 ITEM NOMENCLATURE 0205604N Tactical Data Links COST ($ in Millions) FY 2006

More information

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION J-6 CJCSI 3320.03C DISTRIBUTION: A, B, C, S JOINT COMMUNICATIONS ELECTRONICS OPERATING INSTRUCTIONS References: a. DoDD 5230.11, 16 June 1992, Disclosure

More information

SSC Pacific is making its mark as

SSC Pacific is making its mark as 5.3 FEATURE FROM THE SPAWAR SYSTEMS CENTER PACIFIC INTERNAL NEWSLETTER SSC Pacific C4I scoring direct hit for shore-based ballistic missile defense SSC Pacific is making its mark as a valued partner in

More information

A d. e P. nc e. a A. M d. e G. - P h ase 2 - M e d. r the ADF

A d. e P. nc e. a A. M d. e G. - P h ase 2 - M e d. r the ADF AIR6500t Battle Management System sile Defe is M d n a ir A d e -Phase 1 - Join und-bas ro G e g n a R m iu - P h ase 2 - M e d sile Defence fo is M d n a ir A d te istent Integra rs e P d se a B d n a

More information

Subj: ELECTRONIC WARFARE DATA AND REPROGRAMMABLE LIBRARY SUPPORT PROGRAM

Subj: ELECTRONIC WARFARE DATA AND REPROGRAMMABLE LIBRARY SUPPORT PROGRAM DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3430.23C N2/N6 OPNAV INSTRUCTION 3430.23C From: Chief of Naval Operations Subj: ELECTRONIC

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 19.873 20.466 20.954 0.000 20.954 21.254 21.776 22.071 22.305 Continuing Continuing 771: Link-16

More information

2016 Major Automated Information System Annual Report

2016 Major Automated Information System Annual Report 2016 Major Automated Information System Annual Report Teleport Generation 3 (Teleport Gen 3) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents Common Acronyms

More information

Notification of Intent to Invite International Competitive Bids

Notification of Intent to Invite International Competitive Bids Acquisition Directorate viktorija.navikaite@ncia.nato.int Telephone: +32 (0)2 707 820 AGE Fax: +32 (0)2 707 8770 NCIAIACQ/208/974 23 February 208 Notification of Intent to Invite International Competitive

More information

Joint Tactical Radio System (JTRS)

Joint Tactical Radio System (JTRS) C4I - Command, Control, Communications, Computers & Intelligence Forecast Outlook On September 30, 2012, the Joint Tactical Radio System program was officially closed Forecast International expects "residual"

More information

Sea Viper Maritime Missile Defence

Sea Viper Maritime Missile Defence Sea Viper Maritime Missile Defence Dr. David McDowell MBDA UK RUSI Missile Defence Conference London 12-13 April 2016 Overview This presentation represents solely an MBDA view of the potential future evolution

More information

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION J-6 CJCSI 6241.04C DISTRIBUTION: A, B, C, S POLICY AND PROCEDURES FOR MANAGEMENT AND USE OF UNITED STATES MESSAGE TEXT FORMATTING Reference(s): See Enclosure

More information

Exhibit R-2, RDT&E Budget Item Justification February 2004

Exhibit R-2, RDT&E Budget Item Justification February 2004 PE NUMBER: 33131F PE TITLE: Minimum Essential Emergency Communications Network Exhibit R-2, RDT&E Budget Item Justification February 24 7 Operational System Development 33131F Minimum Essential Emergency

More information

UNCLASSIFIED. FY 2011 Total Estimate

UNCLASSIFIED. FY 2011 Total Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 The Joint Staff DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 for the Warrior (C4IFTW) FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete

More information

Sea Air Space. Sea Power to the Hands of Our Sailors. RDML Jon Hill April 13, 2015

Sea Air Space. Sea Power to the Hands of Our Sailors. RDML Jon Hill April 13, 2015 Sea Air Space Sea Power to the Hands of Our Sailors RDML Jon Hill April 13, 2015 Sea Power to the Hands of Our Sailors AMOD IAMD Flight III AMDR Lethality & Commonality Activation Romania Poland Lethality

More information

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/COMBAT SYSTEM INTEGRATION

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/COMBAT SYSTEM INTEGRATION APPROPRIATION/BUDGET ACTIVITY RDTEN/BA 4 COST (In Millions) Total PE Cost 0164 / COMBAT SYSTEM INTEGRATION 9999 / CONGRESSIONAL ADDS EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION R-1 ITEM NOMENCLATURE 0603582N/COMBAT

More information

The Verification for Mission Planning System

The Verification for Mission Planning System 2016 International Conference on Artificial Intelligence: Techniques and Applications (AITA 2016) ISBN: 978-1-60595-389-2 The Verification for Mission Planning System Lin ZHANG *, Wei-Ming CHENG and Hua-yun

More information

Business Opportunities in Network Services and IT Infrastructure

Business Opportunities in Network Services and IT Infrastructure Business Opportunities in Network Services and IT Infrastructure Antonio Calderon, Chief Network Services and IT Infrastructure antonio.calderon@ncia.nato.int Network Services and IT Infrastructure Service

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 33.896 32.015 43.986-43.986 42.760 41.790

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 174.037 11.276 8.610 1.971-1.971

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #161

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #161 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2013 FY

More information

Update from the NATO EOD Working Group

Update from the NATO EOD Working Group Update from the NATO EOD Working Group Wg Cdr Ron Ousby EOD WG Chairman Global EOD Conference 2 May 2012 1 Scope Introduction to the NSO and NSA Military Committee Land standardization Board (MCLSB) Working

More information

Naval Mission Solutions

Naval Mission Solutions Naval Mission Solutions Guaranteed mission system performance with Thales on Board Going beyond performance of individual subsystems Covering total Sensor to Shooter performance guarantee The Naval Mission

More information

ARCHIVED REPORT. Battlefield Airborne Communications Node (BACN)

ARCHIVED REPORT. Battlefield Airborne Communications Node (BACN) C4I - Command, Control, Communications, Computers & Intelligence Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Battlefield

More information

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM Air Force ACAT ID Program Prime Contractor Total Number of Systems: 6 satellites Lockheed Martin Total Program Cost (TY$): N/A Average Unit

More information

French response to air and ballistic missile threats

French response to air and ballistic missile threats Pulaski Policy Papers Komentarz Międzynarodowy Pułaskiego ISSN 2080-8852 Warsaw, 20.10.2016 Author: Rafał Ciastoń French response to air and ballistic missile threats France has had no need to possess

More information

Request for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype

Request for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype 1.0 Purpose Request for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype This Request for Solutions is seeking a demonstratable system that balances computer processing for modeling and

More information

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION J-6 CJCSI 6232.01 DISTRIBUTION: A,B,C,J,S DECONFLICTING JTIDS/LINK 16 OPERATIONS 1. Purpose. This instruction implements policy, ensuring the operational

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 6.021 8.312 7.963-7.963 8.046 8.146 8.194

More information

CURRICULUM OUTLINE OF INSTRUCTION SURFACE WARFARE OFFICER DEPARTMENT HEAD COURSE CIN: A-4H-0107 CDP: 9545 VER: 2.0 CHANGE: 3

CURRICULUM OUTLINE OF INSTRUCTION SURFACE WARFARE OFFICER DEPARTMENT HEAD COURSE CIN: A-4H-0107 CDP: 9545 VER: 2.0 CHANGE: 3 1-2-1-1 Introduction to IO & Information Warfare Commander (IWC) Organization, Roles, & Responsibilities TO 1-2-1.1 APPLY the core, supporting, and related capabilities of Information Operations (IO) at

More information

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION J-6 CJCSI 5721.01B DISTRIBUTION: A, B, C, J, S THE DEFENSE MESSAGE SYSTEM AND ASSOCIATED LEGACY MESSAGE PROCESSING SYSTEMS REFERENCES: See Enclosure B.

More information

-Ts& Ser ADMIN/ Feb 92

-Ts& Ser ADMIN/ Feb 92 h d DEPARTMENT OF f i~ USS MONTEREY (CG 61) FLEET POST OFFICE AA 34092-1181 From: Commanding Officer USS MONTEREY (CG 61) To: Director of Naval History (OP-O9BH) Subj : COMMAND HISTORY FOR 1991 Ref: OPNAVINST

More information

Defense Daily Open Architecture Summit EMS Panel

Defense Daily Open Architecture Summit EMS Panel Defense Daily Open Architecture Summit EMS Panel 4 November 2014 Dr. Richard Wittstruck PEO IEW&S Acting DPEO Defense Daily Open Architecture Summit 4 NOV 2014 1 IEWS Concept of Operations IEWS CONOPS:

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 2: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 25 FY 26 R Program Element

More information

NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018

NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018 NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018 THE ARMY WILL FIELD A NETWORK THAT IS EASY TO USE, WORKS IN ALL ENVIRONMENTS,

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

MEADS DoD Budget FY2013-FY2017. RDT&E U.S. Army

MEADS DoD Budget FY2013-FY2017. RDT&E U.S. Army MEADS DoD Budget FY2013-FY2017 RDT&E U.S. Army Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 BA 5: Development & Demonstration (SDD) FY 2013 FY 2013 FY 2013 Cost To COST

More information

Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet

Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet 1 LandWarNet (LWN) Initial Capabilities Document (ICD) / Network Enabled Mission Command (NeMC) ICD LandISRNet Intel Appendices

More information

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

More information

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO C C2I 15 Jun 89

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO C C2I 15 Jun 89 DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC 20380-0001 MCO 3093.1C C2I MARINE CORPS ORDER 3093.1C From: Commandant of the Marine Corps To: Distribution List Subj: INTRAOPERABILITY

More information

2016 Major Automated Information System Annual Report

2016 Major Automated Information System Annual Report 2016 Major Automated Information System Annual Report Global Combat Support System-Marine Corps Logistics Chain Management Increment 1 (GCSS-MC LCM Inc 1) Defense Acquisition Management Information Retrieval

More information

SECURE GLOBAL COMBAT AWARENESS

SECURE GLOBAL COMBAT AWARENESS SECURE GLOBAL COMBAT AWARENESS CAYMAN INTEGRATED BATTLE COMMAND INTELLIGENCE & CYBER SECURITY GLOBAL COMBAT NETWORKS AIR DEFENCE BORDER, FACILITIES & FORCE PROTECTION BUSINESS SOLUTIONS BUSINESS SERVICES

More information

Tactical Data Links IPT

Tactical Data Links IPT TACTICAL DATA LINKS IPT IDLS 2005 UK TDL INTEROPERABILITY IN THE LITTORAL ENVIRONMENT LT CDR DAVID WILLIAMS TDLR1 INTRODUCTION Lead Requirements Manager in the UK TDL IPT Six RMs 1 x RN, 2 x Army & 3 x

More information

LETTER OF INTENT BETWEEN THE FEDERAL MINISTER OF DEFENCE OF THE FEDERAL REPUBLIC OF GERMANY AND THE

LETTER OF INTENT BETWEEN THE FEDERAL MINISTER OF DEFENCE OF THE FEDERAL REPUBLIC OF GERMANY AND THE BS2016ee2325 / 822016 LETTER OF INTENT BETWEEN THE FEDERAL MINISTER OF DEFENCE OF THE FEDERAL REPUBLIC OF GERMANY AND THE MINISTER OF DEFENCE OF THE KINGDOM OF THE NETHERLANDS REGARDING SECURE MILITARY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 214 Navy DATE: April 213 COST ($ in Millions) Years FY 212 FY 213 # ## FY 215 FY 216 FY 217 FY 218 To Program Element 378.884 24.75 19.28 21.729-21.729

More information

DEPARTMENT OF THE NAVY MARINE CORPS POLICY FOR COORDINATED IMPLEMENTATION OF MILITARY STANDARDS 6017, , AND

DEPARTMENT OF THE NAVY MARINE CORPS POLICY FOR COORDINATED IMPLEMENTATION OF MILITARY STANDARDS 6017, , AND DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC 20350 3000 MCO 3093.3 C4 MARINE CORPS ORDER 3093.3 From: To: Subj: Ref: Encl: Commandant of the

More information

UNCLASSIFIED. PROGRAM ELEMENT TITLE: Satellite Communications (Space)

UNCLASSIFIED. PROGRAM ELEMENT TITLE: Satellite Communications (Space) EXHIBIT R-2, FY2001 RDT&E,N BUDGET ITEM JUSTIFICATION BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0303109N PROGRAM ELEMENT TITLE: Satellite Communications (Space) (U) ($ in Thousands) FY 1999 FY 2000 FY 2001 FY

More information

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 48 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2010 Mr.

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Net Centricity FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Net Centricity FY 2012 OCO COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 1.425 29.831 14.926-14.926 24.806 25.592 26.083

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481

More information

Thales on the Naval Defence market

Thales on the Naval Defence market thalesgroup.com Innovation - Civil aerospace - Defence aerospace - Transportation - Defence - Security Thales on the Naval Defence market Captas-1 Thales With more than 50 years of experience as a provider

More information

US Navy Ships. Surface Warfare Officer First Tours

US Navy Ships. Surface Warfare Officer First Tours US Navy Ships Surface Warfare Officer First Tours CVN Carriers Nimitz Class: Class Size 10 ships Built 1975-2009 Cost - $8.5 Billion Crew Size 200 officers, 3,000 enlisted Air Wing - 500 officers, 2,300

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2017 Navy Date: February 2016 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program

More information

OPNAVINST F N4 5 Jun 2012

OPNAVINST F N4 5 Jun 2012 DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 4440.19F N4 OPNAV INSTRUCTION 4440.19F From: Chief of Naval Operations Subj: POLICIES

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 Air Force Page 1 of 22 R-1 Line #64 To Program

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED Exhibit R-2, RDT&E Budget Item Justification : FEBRUARY 1999 : RDT&E,N/B. A. 5 R-1 ITEM NOMENCLATURE Program Element (PE) Name and No.: Navy Tactical Computer Resources 0604574N COST ($ in Millions) FY

More information

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP SELF DEFENSE (ENGAGE: SOFT KILL/EW)

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP SELF DEFENSE (ENGAGE: SOFT KILL/EW) APPROPRIATION/BUDGET ACTIVITY RDTEN/BA 5 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION R-1 ITEM NOMENCLATURE 0604757N/SHIP SELF DEFENSE (ENGAGE: SOFT KILL/EW) COST (In Millions) Total PE Cost 0954 / Shipboard

More information

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ARCHIVED REPORT. For data and forecasts on current programs please visit  or call Airborne Electronics Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Outlook The will soon leave production in favor

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207581F PE TITLE: JOINT STARS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207581F JOINT STARS Cost ($ in Millions) FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

SPS-TA THALES AIRBORNE SYSTEMS INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT.

SPS-TA THALES AIRBORNE SYSTEMS INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT. THALES AIRBORNE SYSTEMS ELECTRONIC WARFARE SYSTEMS SPS-TA INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT www.thales-airbornesystems.com THALES AIRBORNE SYSTEMS ELECTRONIC WARFARE

More information

COMMON AVIATION COMMAND AND CONTROL SYSTEM

COMMON AVIATION COMMAND AND CONTROL SYSTEM Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation

More information

SPECTRUM & SERVICES ENTERPRISE CAPABILITIES

SPECTRUM & SERVICES ENTERPRISE CAPABILITIES SPECTRUM ENTERPRISE CAPABILITIES & SERVICES Today, access to the electromagnetic spectrum enables our warfighters to use many Spectrum is a finite resource and its use must be carefully managed. DISA's

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 125.44 31.649 4.876-4.876 25.655

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Integrated Broadcast Service (DEM/VAL) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Integrated Broadcast Service (DEM/VAL) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 24.438 20.580 20.046-20.046 19.901

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) # FY

More information

Calling Note. Thirteenth NATO Tactical Data Link Symposium with Partner Nations

Calling Note. Thirteenth NATO Tactical Data Link Symposium with Partner Nations 08 December 2009 NOTE SSDL 24A/68 INFORMATION SERVICES SUB-COMMITTEE NATO DATA LINK WORKING GROUP (DLWG) WITH PARTNER NATIONS EAPC(AC/322-SC/5-WG/1) 1. Purpose Calling Note for the Thirteenth NATO Tactical

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

Subj: CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT

Subj: CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 3120.28D N96 OPNAV INSTRUCTION 3120.28D From: Chief of Naval Operations Subj: CERTIFICATION

More information

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0203761N PROGRAM ELEMENT TITLE: RAPID TECHNOLOGY TRANSITION (RTT) COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010 FY 2011

More information

B. Program Change Summary: RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

B. Program Change Summary: RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160427BB Mission Training and Preparation

More information

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014 Navy ManTech Program ManTech Update Tom Hite CTC 15 October 2014 Navy ManTech Overview Agenda CNST Recompete Update Navy ManTech Support Recompete FY16 Investment Strategy Affordability Assessment Update

More information