MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

Size: px
Start display at page:

Download "MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot."

Transcription

1 National Fire Protection Association 1 Batterymarch Park, Quincy, MA Phone: Fax: MEMORANDUM To: NEC Code-Making Panel 11 From: Kimberly Shea, Project Administrator Date: April 16, 2015 Subject: NEC First Draft TC FINAL Ballot Results (A2016) According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. 15 Members Eligible to Vote 0 Members Ballots Not Returned 2 Members voted Affirmative with Comment on one or more Revision (Folz, Powell) 3 Members voted Negative on one or more Revision (Cole, Thompson, Wright) 0 Members Abstained on one or more Revision The attached report shows the number of affirmative, negative, and abstaining votes as well as the explanation of the vote for each first revision. There are two criteria necessary for each first revision to pass ballot: (1) simple majority and (2) affirmative 2 / 3 vote. The mock examples below show how the calculations are determined. (1) Example for Simple Majority: Assuming there are 20 vote eligible committee members, 11 affirmative votes are required to pass ballot. (Sample calculation: 20 members eligible to vote 2 = = 11) (2) Example for Affirmative 2 / 3 : Assuming there are 20 vote eligible committee members and 1 member did not return their ballot and 2 members abstained, the number of affirmative votes required would be 12. (Sample calculation: 20 members eligble to vote 1 not returned 2 abstentions = 17 x 0.66 = = 12 ) As always please feel free to contact me if you have any questions.

2 of 44 4/15/2015 1:06 PM First Revision No NFPA [ New Section after ] Available Fault Current. When an industrial control panel is required to be marked with a short circuit current rating in accordance with (4), the available short circuit current at the industrial control panel and the date the short circuit current calculation was performed shall be documented and made available to those authorized to inspect the installation. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 10:30:50 EST 2015 Committee Statement Committee Statement: This change provides much needed information to aid the electrical inspector when enforcing It will help the inspector ensure that the industrial control panel is installed within its short-circuit current rating. Response Message: Public Input No NFPA [New Section after ] Public Input No NFPA [New Section after ] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 12 Affirmative All 2 Affirmative with Comments 1 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Page 1 of 46

3 of 44 4/15/2015 1:06 PM Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Affirmative with Comment Folz, Stanley J. In addition to the AHJ this information should also be made available to anyone servicing the control panel. Powell, Charles L. For consistency with code language in 110.9, , etc. and the section title, I suggest the following wording Available Fault Current. When an industrial control panel is required to be marked with a short circuit current rating in accordance with (4), the available fault current at the industrial control panel and the date the fault current calculation was performed shall be documented and made available to those authorized to inspect the installation. Negative with Comment Cole, Terry D. There are numerous reasons to oppose requiring additional field labeling of equipment that is located downstream of the main service: 1. Article and Interrupting Rating already requires that equipment intended to interrupt current at fault levels shall have an interrupting rating sufficient for the current that is available. 2. How far down stream is this requirement going to be carried? It is already required by Article for the service and Article and state that the equipment must be applied correctly. The code seems to be repeating itself if we add this change. Further, the exception found in (A) and (B) excludes industry. This would seem to be a correlation issue since the majority of this type of equipment is found in industrial environments. 3. The argument has been made that this would be easier for the inspectors to verify the right equipment is being used. Jurisdictions have the right to require one line diagrams that would require this information for enforcement purposes. 4. The liability to the installer is a major concern because they do not have the ability to control modifications after the initial installation. In a potential lawsuit fingers would be pointed at the installer first. If the owner denies making any modifications or does not have knowledge of any modifications, such as maintenance making changes that were not documented or maintenance people that made changes and left their job, then the installer is left holding the responsibility. This would be true whether the date of the installation is recorded or not. For these reasons this proposal should be resolved. Page 2 of 46

4 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No ] Marking. An industrial control panel shall be marked with the following information that is plainly visible after installation: (1) Manufacturer's name, trademark, or other descriptive marking by which the organization responsible for the product can be identified. (2) Supply voltage, number of phases, frequency, and full-load current for each incoming supply circuit. (3) Industrial control panels supplied by more than one power electrical source such that more than one disconnecting means is required to disconnect all power circuits within the control panel shall be marked to indicate that more than one disconnecting means is required to de-energize the equipment. The location of the means necessary to disconnect all circuits 50-volts and over shall be documented and available. (4) Short-circuit current rating of the industrial control panel based on one of the following: a. Short-circuit current rating of a listed and labeled assembly b. Short-circuit current rating established utilizing an approved method Informational Note: ANSI/UL 508A, Standard for Industrial Control Panels, Supplement SB, is an example of an approved method. Exception to (4): Short-circuit current rating markings are not required for industrial control panels containing only control circuit components. (5) If the industrial control panel is intended as service equipment, it shall be marked to identify it as being suitable for use as service equipment. (6) Electrical wiring diagram or the identification number of a separate electrical wiring diagram or a designation referenced in a separate wiring diagram. (7) An enclosure type number shall be marked on the industrial control panel enclosure. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 09:36:15 EST 2015 Committee Statement Committee Statement: This change addresses a gap in worker safety for voltages over 50V. The current wording warns a service technician that multiple sources of power are present, but provides no guidance in how to locate those sources of power. If an emergency arises Page 3 of 46

5 of 44 4/15/2015 1:06 PM which necessitates disconnection of power but the technician is unfamiliar with the facility there could be a risk to both personnel and property. The error in the Informational Note has been corrected. UL 508A is the standard for industrial control panels that includes Supplement SB. UL 508 is the standard for industrial control equipment. Response Message: Public Input No NFPA [Section No ] Public Input No NFPA [Section No ] Public Input No NFPA [Section No ] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 4 of 46

6 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No ] Part-Winding Motors. Where separate overload devices are used with a standard part-winding start induction motor, each half of the motor winding shall be individually protected in accordance with and with a trip current one-half that specified. Each motor-winding connection shall have branch-circuit short-circuit and ground-fault protection rated at not more than one-half that specified by Exception: A short-circuit and ground-fault protective device shall be permitted for both windings if the device will allow the motor to start. Where time-delay (dual-element) fuses are used, they shall be permitted to have a rating not exceeding 150 percent of the motor full-load current. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 14:01:08 EST 2015 Committee Statement Committee Statement: Response Message: The first half of is a definition and should according to the NEC format be placed in definitions Public Input No. 487-NFPA [Section No ] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Page 5 of 46

7 of 44 4/15/2015 1:06 PM Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 6 of 46

8 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No (A)(1) ] (1) Table Values. Other than for motors built for low speeds (less than 1200 RPM) or high torques, and for multispeed motors, the values given in Table , Table , Table , and Table shall be used to determine the ampacity of conductors or ampere ratings of switches, branch-circuit short-circuit and ground-fault protection, instead of the actual current rating marked on the motor nameplate. Where a motor is marked in amperes, but not horsepower, the horsepower rating shall be assumed to be that corresponding to the value given in Table , Table , Table , and Table , interpolated if necessary. Motors built for low speeds (less than 1200 RPM) or high torques may have higher full-load currents, and multispeed motors will have full-load current varying with speed, in which case the nameplate current ratings shall be used. Exception No. 1: Multispeed motors shall be in accordance with (B) (B)430.22(B) (A) and Exception No. 2: For equipment that employs a shaded-pole or permanent-split capacitor-type fan or blower motor that is marked with the motor type, the full load current for such motor marked on the nameplate of the equipment in which the fan or blower motor is employed shall be used instead of the horsepower rating to determine the ampacity or rating of the disconnecting means, the branch-circuit conductors, the controller, the branch-circuit short-circuit and ground-fault protection, and the separate overload protection. This marking on the equipment nameplate shall not be less than the current marked on the fan or blower motor nameplate. Exception No. 3: For a listed motor-operated appliance that is marked with both motor horsepower and full-load current, the motor full-load current marked on the nameplate of the appliance shall be used instead of the horsepower rating on the appliance nameplate to determine the ampacity or rating of the disconnecting means, the branch-circuit conductors, the controller, the branch-circuit short-circuit and ground-fault protection, and any separate overload protection. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 14:02:51 EST 2015 Committee Statement Committee Statement: Editorial revision to correct an error. Response Message: Public Input No. 488-NFPA [Section No (A)(1)] Ballot Results Page 7 of 46

9 of 44 4/15/2015 1:06 PM This item has passed ballot 15 Eligible Voters 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 8 of 46

10 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No (B) ] (B) Wire-Bending Space in Enclosures. Minimum wire-bending space within the enclosures for motor controllers shall be in accordance with Table (B) where measured in a straight line from the end of the lug or wire connector (in the direction the wire leaves the terminal) to the wall or barrier. Where alternate wire termination means are substituted for that supplied by the manufacturer of the controller, they shall be of a type identified by the manufacturer for use with the controller and shall not reduce the minimum wire-bending space. Table (B) Minimum Wire-Bending Space at the Terminals of Enclosed Motor Controllers Wires per Terminal * Size of Wire (AWG or kcmil) 1 2 mm in. mm in and smaller Not specified / / /0 4/ * Where provision for three or more wires per terminal exists, the minimum wire-bending space shall be in accordance with the requirements of Article 312. Supplemental Information File Name B_FR_3012_LM.docx Description Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: Page 9 of 46

11 0 of 44 4/15/2015 1:06 PM State: Zip: Submittal Date: Thu Jan 15 14:09:40 EST 2015 Committee Statement Committee Statement: Response Message: Smaller gauge conductors have been added into the table, as these conductors are allowed in (G)(1)&(2). Public Input No NFPA [Section No (B)] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 10 of 46

12 (B) Wire-Bending Space in Enclosures. Minimum wire-bending space within the enclosures for motor controllers shall be in accordance with Table (B) where measured in a straight line from the end of the lug or wire connector (in the direction the wire leaves the terminal) to the wall or barrier. Where alternate wire termination means are substituted for that supplied by the manufacturer of the controller, they shall be of a type identified by the manufacturer for use with the controller and shall not reduce the minimum wire-bending space. Table (B) Minimum Wire-Bending Space at the Terminals of Enclosed Motor Controllers Size of Wire (AWG or kcmil) Wires per Terminal * 1 2 mm in. mm in and smaller Not specified ½ ½ / / /0 4/ * Where provision for three or more wires per terminal exists, the minimum wire-bending space shall be in accordance with the requirements of Article 312. Page 11 of 46

13 1 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No (C) ] (C) Dimensions and Space Fixed Terminal Connections. Where these terminal housings enclose rigidly mounted motor terminals, the terminal housing shall be of sufficient size to provide minimum terminal spacings and usable volumes in accordance with Table (C)(1) and Table (C)(2). Table (C)(1) Terminal Spacings Fixed Terminals Minimum Spacing Nominal Volts or less Over Between Line Terminals Between Line Terminals and Other Uninsulated Metal Parts mm in. mm in Table (C)(2) Usable Volumes Fixed Terminals Power-Supply Conductor Size (AWG) Minimum Usable Volume per Power-Supply Conductor cm 3 in and and Supplemental Information File Name C1_FR_3019_LM.docx Description Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 17:11:40 EST 2015 Committee Statement Committee Statement: This change eliminated the gap between the nominal voltages in the table. Page 12 of 46

14 2 of 44 4/15/2015 1:06 PM Response Message: Public Input No. 333-NFPA [Global Input] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 13 of 46

15 (C) Dimensions and Space Fixed Terminal Connections. Where these terminal housings enclose rigidly mounted motor terminals, the terminal housing shall be of sufficient size to provide minimum terminal spacings and usable volumes in accordance with Table (C)(1) and Table (C)(2). Nominal Volts Table (C)(1) Terminal Spacings Fixed Terminals Between Line Terminals Minimum Spacing Between Line Terminals and Other Uninsulated Metal Parts mm in. mm in or less 6 ¼ 6 ¼ Over Power-Supply Conductor Size (AWG) Table (C)(2) Usable Volumes Fixed Terminals Minimum Usable Volume per Power-Supply Conductor cm 3 in and ¼ 8 and ¼ Page 14 of 46

16 13 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No (F) ] (F) Separate Terminal Enclosure. The conductors between a stationary motor rated 1 hp or less and the separate terminal enclosure permitted in (B) shall be permitted to be smaller than 14 AWG but not smaller than 18 AWG, provided they have an ampacity as specified in (A). Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 14:17:44 EST 2015 Committee Statement Committee Statement: Response Message: The change eliminates (A) from in this section to properly reference all motors in (A) (G). Public Input No. 489-NFPA [Section No (F)] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Page 15 of 46

17 4 of 44 4/15/2015 1:06 PM Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 16 of 46

18 5 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No (D) ] (D) Single Motor Taps. For group installations described above, the conductors of any tap supplying a single motor shall not be required to have an individual branch-circuit short-circuit and ground-fault protective device, provided they comply with one of the following: (1) No conductor to the motor shall have an ampacity less than that of the branch-circuit conductors. (2) No conductor to the motor shall have an ampacity less than one-third that of the branchcircuit conductors, with a minimum in accordance with The conductors from the point of the tap to the motor overload device shall be not more than 7.5 m (25 ft) long and be protected from physical damage by being enclosed in an approved raceway or by use of other approved means. (3) Conductors from the point of the tap from the branch-circuit branch circuit short-circuit and ground-fault protective device to a listed manual motor controller additionally marked Suitable for Tap Conductor Protection in Group Installations, or to a branch-circuit protective device, shall be permitted to have an ampacity not less than one-tenth the rating or setting of the branch-circuit short-circuit and ground-fault protective device. The conductors from the controller to the motor shall have an ampacity in accordance with The conductors from the point of the tap to the controller(s) shall (1) be suitably protected from physical damage and enclosed either by an enclosed controller or by a raceway and be not more than 3 m (10 ft) long or (2) have an ampacity not less than that of the branch-circuit conductors. (4) Conductors from the point of the tap from the branch circuit to a listed manual motor controller additionally marked Suitable for Tap Conductor Protection in Group Installations, or to a branch-circuit protective device, shall be permitted to have an ampacity not less than one-third that of the branch-circuit conductors. The conductors from the controller to the motor shall have an ampacity in accordance with The conductors from the point of the tap to the controller(s) shall (1) be suitably protected from physical damage and enclosed either by an enclosed controller or by a raceway and be not more than 7.5 m (25 ft) long or (2) have an ampacity not less than that of the branch-circuit conductors. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 14:27:03 EST 2015 Committee Statement Committee The change provides consistency within the language of this section. Page 17 of 46

19 6 of 44 4/15/2015 1:06 PM Statement: The new subsection allows 25 taps with the same conditions as is allowed in other areas of the NEC. Public Input No NFPA [Section No (D)] Public Input No NFPA [New Section after (D)] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 18 of 46

20 7 of 44 4/15/2015 1:06 PM First Revision No NFPA [ New Section after ] Available Fault Current. The available short circuit current at the motor control center and the date the short circuit current calculation was performed shall be documented and made available to those authorized to inspect the installation. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 15:03:36 EST 2015 Committee Statement Committee Statement: Inspectors are having an extremely difficult time enforcing proper short circuit current ratings of Motor Control Centers because there is typically no information on the job site as to the available short circuit current at the Motor Control Center. If documentation of the available short circuit current were provided to the electrical inspector, it would be much easier for the inspector to assure that the equipment was being properly protected. Response Message: Public Input No NFPA [Section No (A)] Public Input No NFPA [New Section after ] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 12 Affirmative All 2 Affirmative with Comments 1 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cosic, Zivorad Fahey, Robert G. Page 19 of 46

21 8 of 44 4/15/2015 1:06 PM Fahey, James M. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Affirmative with Comment Folz, Stanley J. In addition to the AHJ this information should also be made available to anyone servicing the MCC. Powell, Charles L. For consistency with code language in 110.9, , etc. and the section title, I suggest the following wording Available Fault Current. The available fault current at the motor control center and the date the fault current calculation was performed shall be documented and made available to those authorized to inspect the installation. Negative with Comment Cole, Terry D. There are numerous reasons to oppose requiring additional field labeling of equipment that is located downstream of the main service: 1. Article and Interrupting Rating already requires that equipment intended to interrupt current at fault levels shall have an interrupting rating sufficient for the current that is available. 2. How far down stream is this requirement going to be carried? It is already required by Article for the service and Article and state that the equipment must be applied correctly. The code seems to be repeating itself if we add this change. Further, the exception found in (A) and (B) excludes industry. This would seem to be a correlation issue since the majority of this type of equipment is found in industrial environments. 3. The argument has been made that this would be easier for the inspectors to verify the right equipment is being used. Jurisdictions have the right to require one line diagrams that would require this information for enforcement purposes. 4. The liability to the installer is a major concern because they do not have the ability to control modifications after the initial installation. In a potential lawsuit fingers would be pointed at the installer first. If the owner denies making any modifications or does not have knowledge of any modifications, such as maintenance making changes that were not documented or maintenance people that made changes and left their job, then the installer is left holding the responsibility. This would be true whether the date of the installation is recorded or not. For these reasons this proposal should be resolved. Page 20 of 46

22 9 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No (A) ] (A) Circuits Containing Power Conversion Equipment. Circuits containing power conversion equipment shall be protected by a branch-circuit shortcircuit and ground-fault protective device in accordance with the following: (1) The rating and type of protection shall be determined by (C)(1), (C)(3), (C)(5), or (C)(6), using the full-load current rating of the motor load as determined by (2) Where maximum branch-circuit short-circuit and ground-fault protective ratings are stipulated for specific device types in the manufacturer's instructions for the power conversion equipment or are otherwise marked on the equipment, they shall not be exceeded even if higher values are permitted by (A)(1). (3) A self-protected combination controller shall only be permitted where specifically identified in the manufacturer s instructions for the power conversion equipment or if otherwise marked on the equipment. Informational Note: The type of protective device, its rating, and its setting are often marked on or provided with the power conversion equipment. (4) Where an instantaneous trip circuit breaker or semiconductor fuses are permitted in accordance with the drive manufacturer s instructions for use as the branch-circuit shortcircuit and ground-fault protective device for listed power conversion equipment, they shall be provided as an integral part of a single listed assembly incorporating both the protective device and power conversion equipment. Informational Note: The type of protective device, its rating, and its setting are often marked on or provided with the power conversion equipment. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 16:38:31 EST 2015 Committee Statement Committee Statement: Response Message: The inclusion of the short circuit ground fault device within the power conversion equipment from the Manufacturer will assure the proper devices are installed. Public Input No NFPA [New Section after (A)] Ballot Results This item has passed ballot Page 21 of 46

23 0 of 44 4/15/2015 1:06 PM 15 Eligible Voters 0 Not Returned 14 Affirmative All 0 Affirmative with Comments 1 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Negative with Comment Cole, Terry D. Protection of the equipment does not require incorporating the protective device within the enclosure. This requirement would take away the ability to protect equipment with external methods and reduce installation flexibility. Article 110.3(B) already requires that the manufactures instructions must be complied with which makes this requirement unnecessary. The NEC is a safety document and this does not seem to be a safety issue, but rather limiting the protection options. Page 22 of 46

24 1 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No ] General. Part XII specifies that live parts shall be protected in a an approved manner judged adequate for the hazard involved. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Fri Jan 16 12:48:34 EST 2015 Committee Statement Committee Statement: The Panel has modified the language for clarification. Response Message: Public Input No NFPA [Section No ] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Page 23 of 46

25 2 of 44 4/15/2015 1:06 PM Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 24 of 46

26 3 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Definition: Rated-Load Current. ] Rated-Load Current. The rated-load current for of a hermetic refrigerant motor-compressor is the current resulting when the motor-compressor it is operated at the rated load, rated voltage, and rated frequency of the equipment it serves. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 12:20:03 EST 2015 Committee Statement Committee Statement: The NEC Style Manual requires that the term being defined not be included in the definition. Response Message: Public Input No NFPA [Definition: Rated-Load Current.] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Page 25 of 46

27 4 of 44 4/15/2015 1:06 PM Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 26 of 46

28 5 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No (B) ] (B) Multimotor and Combination-Load Equipment. Multimotor and combination-load equipment shall be provided with a visible nameplate marked with the maker's name, the rating in volts, frequency and number of phases, minimum supply circuit conductor ampacity, the maximum rating of the branch-circuit short-circuit and ground-fault protective device, and the short-circuit current rating of the motor controllers or industrial control panel. The ampacity shall be calculated by using Part IV and counting all the motors and other loads that will be operated at the same time. The branch-circuit short-circuit and ground-fault protective device rating shall not exceed the value calculated by using Part III. Multimotor or combination-load equipment for use on two or more circuits shall be marked with the above information for each circuit. Exception No. 1: Multimotor and combination-load equipment that is suitable under the provisions of this article for connection to a single 15- or 20-ampere, 120-volt, or a 15-ampere, 208- or 240-volt, single-phase branch circuit shall be permitted to be marked as a single load. Exception No. 2: The minimum supply circuit conductor ampacity and the maximum rating of the branch-circuit short-circuit and ground-fault protective device shall not be required to be marked on a room air conditioner complying with (A). Exception No. 3: Multimotor and combination-load equipment used in one- and two-family dwellings, or cord-and-attachment-plug-connected equipment, or equipment supplied from a branch circuit protected at 60 A or less shall not be required to be marked with a shortcircuit current rating. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 12:22:17 EST 2015 Committee Statement Committee Statement: Equipment rated 60 amperes and smaller should have the short-circuit current rating marked on the nameplate so that installers can insure the appropriate rated equipment is installed. Response Message: Public Input No NFPA [Section No (B)] Public Input No NFPA [Section No (B)] Ballot Results This item has passed ballot Page 27 of 46

29 6 of 44 4/15/2015 1:06 PM 15 Eligible Voters 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 28 of 46

30 7 of 44 4/15/2015 1:06 PM First Revision No NFPA [ New Section after ] Grounding and Bonding. Where multimotor and combination-load equipment is installed outdoors on a roof, an equipment grounding conductor of the wire type shall be installed in outdoor portions of metallic raceway systems that use non-threaded fittings. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 12:24:40 EST 2015 Committee Statement Committee Statement: Non-threaded conduit systems on rooftops supplying HVACR equipment are subject to movement and damage that results in separation of non threaded conduit or tubing resulting in loss of equipment grounding unless a wire type equipment ground is provided. Rather than ban the use of EMT or non threaded conduit on rooftops, as suggested by PI 1800, adding this requirement satisfactorily addresses the problem. The Panel does not agree with the exception for industrial installations with qualified persons as it does not assure the conduit on the roof will be inspected or observed on a regular basis any more than on a commercial roof. Response Message: Public Input No. 836-NFPA [New Section after 440.8] Public Input No NFPA [New Section after 440.8] Public Input No NFPA [New Section after 440.8] Public Input No NFPA [New Section after 440.8] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 13 Affirmative All 0 Affirmative with Comments 2 Negative with Comments 0 Abstention Page 29 of 46

31 8 of 44 4/15/2015 1:06 PM Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Widup, Ron Negative with Comment Thompson, John M. All UL certified metallic conduit, including EMT, is evaluated for its ability to bond the conduit to the connecting fittings thereby ensuring the bonding and grounding of the equipment. The testing in the Standards goes beyond electrical tests and includes rigorous mechanical stress tests. This Panel Action does not address the root cause that is driving this First Revision, and that is the maintenance of all installed equipment regardless of type and location. The forces needed to dislocate conduit from the conduit- fitting is equally likely to dislocate the additional grounding conductor. Adding additional grounding and bonding, a belts and suspenders approach, is allowed in the Code, but will not address what is reported to be poor or ineffective maintenance practices. Wright, James R. The NEC is a minimum standard and does not prevent the use of an equipment grounding conductor in metallic raceways systems. There was inadequate substantiation provided to require the use of an equipment grounding conductor in outdoor portions of metallic raceway systems that use non-threaded fittings. Since the NEC FR reports are often used for research and training, it is problematic that the Panel Statement is inaccurate. The statement includes the following: Non-threaded conduit systems on rooftops supplying HVACR equipment are subject to movement and damage that results in separation of non-threaded conduit or tubing resulting in loss of equipment grounding unless a wire type equipment ground is provided. That is a blanket statement that infers that this situation is a standard occurrence. A PI on which this FR is based PI 4312 refers to those rare instances that the wiring system installation has been damaged and the wire-type EGC is not installed. There is no assurance that the wire type equipment grounding conductor could not also be subject to damage. Page 30 of 46

32 9 of 44 4/15/2015 1:06 PM First Revision No NFPA [ New Section after ] Short-Circuit Current Rating. (A) Installation. Motor controllers of multimotor and combination-load equipment shall not be installed where the available fault current exceeds its short-circuit current rating as marked in accordance with 440.4(B). (B) Documentation. When motor controllers or industrial control panels of multimotor and combination load equipment are required to be marked with a short circuit current rating, the available short circuit current and the date the short circuit current calculation was performed shall be documented and made available to those authorized to inspect the installation. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 12:37:31 EST 2015 Committee Statement Committee Statement: Section 440.4(B) requires that the equipment short-circuit current rating be marked on certain HVAC equipment. This new section specifically requires that the marked HVAC equipment not be installed where the available short-circuit current exceeds the marked short-circuit current rating. This requirement is similar to (industrial machinery) and (industrial control panels). Inspectors are having an extremely difficult time enforcing proper short-circuit current ratings of HVACR equipment because there is typically no information on the job site as to the available fault current at the HVACR equipment. If documentation of the available fault current were provided to the electrical inspector, it would be much easier for the inspector to assure that the equipment was being properly protected. This change provides that fault current information to the AHJ. Per Exception #3 to 440.4(B) this new requirement does not apply to one and two family dwellings or cord-and-attachment -plug connected equipment. The Panel chose so that it would be in Part I, General. Response Message: Public Input No NFPA [New Section after ] Public Input No NFPA [New Part after II.] Public Input No NFPA [New Section after 440.8] Public Input No NFPA [New Section after ] Page 31 of 46

33 0 of 44 4/15/2015 1:06 PM Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 14 Affirmative All 1 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Affirmative with Comment Folz, Stanley J. In addition to the AHJ this information should also be made available to anyone servicing this equipment. Page 32 of 46

34 1 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No ] Location. Disconnecting means shall be located within sight from, and readily accessible from the air-conditioning or refrigerating equipment. The disconnecting means shall be permitted to be installed on or within the air-conditioning or refrigerating equipment. The disconnecting means shall not be located on panels that are designed to allow access to the air-conditioning or refrigeration equipment or to obscure the equipment nameplate(s). Exception No. 1: Where the disconnecting means provided in accordance with (A) is lockable in accordance with and the refrigerating or air-conditioning equipment is essential to an industrial process in a facility with written safety procedures, and where the conditions of maintenance and supervision ensure that only qualified persons service the equipment, a disconnecting means within sight from the equipment shall not be required. Exception No. 2: Where an attachment plug and receptacle serve as the disconnecting means in accordance with , their location shall be accessible but shall not be required to be readily accessible. Informational Note No. 1: See Parts VII and IX of Article 430 for additional requirements. Informational Note No. 2: See Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 13:12:38 EST 2015 Committee Statement Committee Statement: The existing Code text requires the disconnecting means to be mounted so that it is readily accessible from the equipment. Punctuation was added for clarification. Response Message: Public Input No. 20-NFPA [Section No ] Ballot Results This item has passed ballot 15 Eligible Voters Page 33 of 46

35 2 of 44 4/15/2015 1:06 PM 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 34 of 46

36 3 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No ] Motor-Compressor(s) With or Without Additional Motor Loads. Conductors supplying one or more motor-compressor(s) with or without an additional motor load(s) shall have an ampacity not less than the sum of each of the following: (1) The sum of the rated-load or branch-circuit selection current ratings, whichever is larger greater, of all the motor-compressor( s) (2) plus The sum of the full-load currents current rating of the all other motors, (3) plus 25 percent of the highest motor or motor-compressor rating or motor full load current in the group. Exception No. 1: Where the circuitry is interlocked so as to prevent the starting and running of a second motor-compressor or group of motor-compressors, the conductor size shall be determined from the largest motor-compressor or group of motor-compressors that is to be operated at a given time. Exception No. 2: The branch-circuit conductors for room air conditioners shall be in accordance with Part VII of Article 440. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Jan 15 13:19:52 EST 2015 Committee Statement Committee Statement: The proposed change provides a list format which enhances the usability of this section, as it has enhanced the usability of , and does not change the calculation. Exception No. 1 and 2 to remain unchanged. This section does not include non-motor loads. Response Message: Public Input No NFPA [Section No ] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 15 Affirmative All Page 35 of 46

37 4 of 44 4/15/2015 1:06 PM 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 36 of 46

38 5 of 44 4/15/2015 1:06 PM First Revision No NFPA [ Section No ] Leakage-Current Detector-Interrupter (LCDI) and Arc-Fault Circuit Interrupter (AFCI) Protection Devices. Single-phase cord- and plug-connected room air conditioners shall be provided with one of the following factory-installed LCDI or AFCI protection. The LCDI or AFCI protection devices: (1) Leakage-current detector-interruptor (LCDI) (2) Arc-fault circuit interrupter (AFCI) (3) Heat detecting circuit interrupter (HDCI) The protection device shall be an integral part of the attachment plug or be located in the power supply cord within 300 mm (12 in.) of the attachment plug. Submitter Information Verification Submitter Full Name: CMP 11 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Fri Jan 16 13:02:57 EST 2015 Committee Statement Committee Statement: Response Message: This change recognizes the addition of a new type of protection. The addition of an Informational Note describing an HDCI is not necessary. Public Input No NFPA [Section No ] Ballot Results This item has passed ballot 15 Eligible Voters 0 Not Returned 15 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Bas, Luis M. Page 37 of 46

39 6 of 44 4/15/2015 1:06 PM Cole, Terry D. Cosic, Zivorad Fahey, Robert G. Fahey, James M. Folz, Stanley J. Guidry, Paul E. Missildine, Jr., James C. Neubauer, Arthur S. Ockuly, George J. Powell, Charles L. Smith, III, Arthur J. Thompson, John M. Widup, Ron Wright, James R. Page 38 of 46

40 9 of 44 4/15/2015 1:06 PM Table Full-Load Current in Amperes, Direct-Current Motors The following values of full-load currents * are for motors running at base speed. Horsepower Armature Voltage Rating * 90 Volts 120 Volts 180 Volts 240 Volts 500 Volts 550 Volts *These are average dc quantities. Table Full-Load Currents in Amperes, Single-Phase Alternating-Current Motors The following values of full-load currents are for motors running at usual speeds and motors with normal torque characteristics. The voltages listed are rated motor voltages. The currents listed shall be permitted for system voltage ranges of 110 to 120 and 220 to 240 volts Horsepower Volts Volts Volts Volts Page 41 of 46

41 40 of 44 4/15/2015 1:06 PM Horsepower 115 Volts 200 Volts 208 Volts Table Full-Load Current, Two-Phase Alternating-Current Motors (4-Wire) 230 Volts The following values of full-load current are for motors running at speeds usual for belted motors and motors with normal torque characteristics. Current in the common conductor of a 2-phase, 3-wire system will be 1.41 times the value given. The voltages listed are rated motor voltages. The currents listed shall be permitted for system voltage ranges of 110 to 120, 220 to 240, 440 to 480, and 550 to volts. Horsepower 115 Volts Induction-Type Squirrel Cage and Wound Rotor (Amperes) 230 Volts 460 Volts 575 Volts 2300 Volts Table Full-Load Current, Three-Phase Alternating-Current Motors The following values of full-load currents are typical for motors running at speeds usual for belted motors and motors with normal torque characteristics. The voltages listed are rated motor voltages. The currents listed shall be permitted for system voltage ranges of 110 to 120, Page 42 of 46

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: NEC Code-Making Panel 10 From: Kimberly Shea, Project Administrator

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: NEC Code-Making Panel 2 From: Kimberly Shea, Project Administrator

More information

Kimberly Shea, Administrator, Technical Projects. SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016)

Kimberly Shea, Administrator, Technical Projects. SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: NEC Code-Making Panel 12 FROM: Kimberly Shea, Administrator, Technical

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: NEC Code-Making Panel 1 From: Kimberly Shea, Project Administrator

More information

SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016)

SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: NEC Code-Making Panel 15 FROM: Kimberly Shea, Administrator, Technical

More information

I. THE PROPOSED RULE: The proposed rule, including the analysis and text, are attached. REFERENCE TO APPLICABLE FORMS:

I. THE PROPOSED RULE: The proposed rule, including the analysis and text, are attached. REFERENCE TO APPLICABLE FORMS: STATE OF WISCONSIN DEPARTMENT OF SATETY AND PROFESSIONAL SERVICES ---------------------------------------------------------------------------------------------------------------------------- IN THE MATTER

More information

MEMORANDUM. NFPA 85 BCS-SBB First Draft TC FINAL Ballot Results (F2014 Cycle)

MEMORANDUM. NFPA 85 BCS-SBB First Draft TC FINAL Ballot Results (F2014 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Single Burner Boilers

More information

ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS

ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS c t ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to June

More information

A. General provisions and other electrical systems are specified in other Sections of Division 26.

A. General provisions and other electrical systems are specified in other Sections of Division 26. PART 1: GENERAL 1.01 DESCRIPTION: A. General provisions and other electrical systems are specified in other Sections of Division 26. B. Commissioning is an ongoing process and shall be performed throughout

More information

Buck & Boost Transformer Installation Instructions

Buck & Boost Transformer Installation Instructions Buck & Boost Installation Instructions 120 V x 240 V - 12/24 V Class 7414 Introduction This manual provides installation, operation, and maintenance instructions for the 2847 Buck & Boost transformer,

More information

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES TESTING APPLICATION STANDARD (TAS) 201-94 IMPACT TEST PROCEDURES 1. 2. Scope: 1.1 This protocol covers procedures for conducting the impact test of materials as required by Section 1626 of the Florida

More information

BUILDING OFFICIALS ASSOCIATION OF FLORIDA CROSS TRAINING PROGRAM SYLLABUS. Electrical Plans Examiner Training Program

BUILDING OFFICIALS ASSOCIATION OF FLORIDA CROSS TRAINING PROGRAM SYLLABUS. Electrical Plans Examiner Training Program BUILDING OFFICIALS ASSOCIATION OF FLORIDA CROSS TRAINING PROGRAM SYLLABUS PROGRAM NAME: PROGRAM NUMBER: PROVIDER: Electrical Plans Examiner Training Program 5007984 #0001001 Building Officials Association

More information

Rulemaking Hearing Rules of Department of Commerce and Insurance Division of Fire Prevention. Chapter Electrical Installations.

Rulemaking Hearing Rules of Department of Commerce and Insurance Division of Fire Prevention. Chapter Electrical Installations. Page 1 of 6 pages Rulemaking Hearing Rules of Department of Commerce and Insurance Division of Fire Prevention Chapter 0780-02-01 Electrical Installations Amendments Rule 0780-02-01-.01 Scope is amended

More information

M E M O R A N D U M. NFPA 1122 First Draft Technical Committee FINAL Ballot Results (A2017)

M E M O R A N D U M. NFPA 1122 First Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Pyrotechnics Yvonne

More information

Choosing Regulatory-Compliant Power Strips for Every Area of a Healthcare Facility

Choosing Regulatory-Compliant Power Strips for Every Area of a Healthcare Facility www.tripplite.com Choosing Regulatory-Compliant Power Strips for Every Area of a Healthcare Facility WHITE PAPER 95-2883 Executive Summary The tangled web of regulatory compliance governing healthcare

More information

NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE. AGENDA October 23, 2013 Teleconference/Web Meeting

NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE. AGENDA October 23, 2013 Teleconference/Web Meeting National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-104101 Phone: 6110-10100-3000 Fax: 6110-10100-01000 www.nfpa.org NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE AGENDA October

More information

Continuing Education Credits

Continuing Education Credits Understanding the hazards and qualifications involved with arc flash analysis fieldwork Steven J Abbott Stark Safety Consultants Continuing Education Credits NECA has been accredited as an Authorized Provider

More information

B. All of the documents in this RFP form the Basis-of-Design for this project.

B. All of the documents in this RFP form the Basis-of-Design for this project. SECTION 01 91 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

Title 32: PROFESSIONS AND OCCUPATIONS

Title 32: PROFESSIONS AND OCCUPATIONS Title 32: PROFESSIONS AND OCCUPATIONS Chapter 17: ELECTRICIANS Table of Contents Subchapter 1. GENERAL PROVISIONS... 3 Section 1101. DEFINITIONS... 3 Section 1102. EXCEPTIONS... 4 Section 1102-A. EXCEPTIONS

More information

The University of Texas at San Antonio

The University of Texas at San Antonio The University of Texas at San Antonio Job Description Job Title: Electrician III Code: 15211 Salary Grade: 60 FLSA Status: Non-Exempt Department/Division: Office of Facilities Reports To: Maintenance

More information

AN ORDINANCE TO AMEND CERTAIN PROVISIONS IN THE RAPID CITY ELECTRICAL CODE BY AMENDING SECTION OF THE RAPID CITY MUNICIPAL CODE

AN ORDINANCE TO AMEND CERTAIN PROVISIONS IN THE RAPID CITY ELECTRICAL CODE BY AMENDING SECTION OF THE RAPID CITY MUNICIPAL CODE Ordinance No. 6105 AN ORDINANCE TO AMEND CERTAIN PROVISIONS IN THE RAPID CITY ELECTRICAL CODE BY AMENDING SECTION 15.16.020 OF THE RAPID CITY MUNICIPAL CODE WHEREAS, the City of Rapid City has adopted

More information

Medical Grade Power Strips

Medical Grade Power Strips Product Bulletin for Medical Grade Power Strips For use in Patient Care Areas of Health Care Facilities Conforms to UL 60601-1, UL 60950-1 and UL 1363A Leviton s family of medical-grade power strips are

More information

ELECTRONICS TECHNICIAN I ELECTRONICS TECHNICIAN II

ELECTRONICS TECHNICIAN I ELECTRONICS TECHNICIAN II CITY OF ROSEVILLE ELECTRONICS TECHNICIAN I ELECTRONICS TECHNICIAN II DEFINITION To perform work in the installation, testing, maintenance, calibration, repair and modification of electrical and electronic

More information

ASSE International Seal Control Board Procedures

ASSE International Seal Control Board Procedures ASSE International Seal Control Board Procedures 2014 PREAMBLE Written operating procedures shall govern the methods used for maintaining the product listing program and shall be available to any interested

More information

INFORMATION BULLETIN OPERATING PERMITS

INFORMATION BULLETIN OPERATING PERMITS OPERATING PERMITS This guide supplements Directive NO: D-E3 070801 7 revised on May 4, 2015. The following document provides guidance on the application of policy for BCSA. Please check with municipal

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0800 - COMMISSIONING OF ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. The purpose of this section is to specify the Division 26 responsibilities and participation in the commissioning process.

More information

Generator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1

Generator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1 Generator Interconnection System Impact Study Report Carteret County, NC 120.8 MW Queue #297 Original Submittal Revision 1 PURPOSE The purpose of this study is to assess the impacts of a combined wind/solar

More information

New Maintenance Requirements from CMS. Intermountain Clinical Instrumentation Society

New Maintenance Requirements from CMS. Intermountain Clinical Instrumentation Society New Maintenance Requirements from CMS Conditions of Participation (COPs) Interpretive Guidelines State Operations Manual 482.41(c)(2): Buildings Facilities, supplies, and equipment must be maintained to

More information

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness Report to the Governor and to the Legislature 1999 Recommended Physical Plant Improvements to Existing Nursing

More information

M E M O R A N D U M. Technical Committee on Industrial Fire Brigade Personnel Professional Qualifications

M E M O R A N D U M. Technical Committee on Industrial Fire Brigade Personnel Professional Qualifications National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Industrial Fire Brigade

More information

TECHNICAL MANUAL OPERATOR'S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

TECHNICAL MANUAL OPERATOR'S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL TECHNICAL MANUAL OPERATOR'S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL AIR CONDITIONER, HORIZONTAL, COMPACT, 36,000 BTU/HR, MULTI-POWER INPUT 208V, 3 PHASE, 50/60/400 HZ MODEL MH-40-MP

More information

GE Energy Connections

GE Energy Connections GE Energy Connections Contents Industrial Services External Training Schedule...3 Industrial Services LV7000 Drives... 4 Industrial Services DC2100e Drives... 5 Industrial Services P80i Software Training...6

More information

M E M O R A N D U M. NFPA 1801 Second Draft Technical Committee FINAL Ballot Results (A2017)

M E M O R A N D U M. NFPA 1801 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Electronic Safety

More information

CERTIFICATES OF ELECTRICAL SAFETY RESPONSIBILITY OF RECs AND ELECTRICIANS

CERTIFICATES OF ELECTRICAL SAFETY RESPONSIBILITY OF RECs AND ELECTRICIANS OFFICE OF THE CHIEF ELECTRICAL INSPECTOR Level 3, Building 2, 4 Riverside Quay, Southbank PO Box 262, Collins Street West, Melbourne, Vic, 8007 ABN 33 592 662 340 CERTIFICATES OF ELECTRICAL SAFETY RESPONSIBILITY

More information

ARMY TM AIR FORCE TO 35C MARINE CORPS TM 10155A-13/1

ARMY TM AIR FORCE TO 35C MARINE CORPS TM 10155A-13/1 OPERATOR S, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL OPERATING INSTRUCTIONS 2-1 OPERATOR TROUBLESHOOTING 3-3 UNIT LEVEL PMCS 4-7 UNIT LEVEL TROUBLESHOOTING 4-12 UNIT MAINTENANCE PROCEDURES 4-27 DIRECT

More information

Bristol Regional Wastewater Treatment Plant Arc Flash Study Engineering Services City of Bristol Tennessee RFP 18004

Bristol Regional Wastewater Treatment Plant Arc Flash Study Engineering Services City of Bristol Tennessee RFP 18004 Bristol Regional Wastewater Treatment Plant Arc Flash Study Engineering Services City of Bristol Tennessee March 2018 I. Introduction The City of Bristol Tennessee, herein after referred to as City, is

More information

Specifications, Performance & Submittal

Specifications, Performance & Submittal Presents Specifications, Performance & Submittal Multi Zone Condenser ( Heat Pump) Model: Multi Zone Condenser M Z H D A A M=Multi Z= Zone 2= Zone 3=Zone 4=Zone 5=Zone Operation: [H=Heat Pump] Voltage:

More information

TECHNICAL MANUAL UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

TECHNICAL MANUAL UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL TECHNICAL MANUAL UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL GENERATOR SET, SKID MOUNTED, TACTICAL QUIET 15 KW, 50/60 AND 400 Hz MEP-804A (50/60 Hz) 6115-01-274-7388 MEP-814A (400 Hz) 6115-01-274-7393

More information

Undergraduate Research Competition

Undergraduate Research Competition Undergraduate Research Competition PROCEDURES AND RULES (Failure to comply with any of the rules of the competition may result in disqualification.) Purpose 1. To encourage and stimulate interest in undergraduate

More information

VFD and Pump Incentive Application for Business Customers

VFD and Pump Incentive Application for Business Customers 2017 VFD and Pump Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the Terms and

More information

[PDF] STAR DELTA STARTER THEORY ARCHIVE

[PDF] STAR DELTA STARTER THEORY ARCHIVE 21 April, 2018 [PDF] STAR DELTA STARTER THEORY ARCHIVE Document Filetype: PDF 366 KB 0 [PDF] STAR DELTA STARTER THEORY ARCHIVE Time Sw Star Contactor Main Contactor Delta Contactor Over Load 2) POWER CIRCUIT

More information

M E M O R A N D U M. Technical Committee on Aircraft Rescue and Fire Fighting. NFPA 403 Second Draft Technical Committee FINAL Ballot Results (A2017)

M E M O R A N D U M. Technical Committee on Aircraft Rescue and Fire Fighting. NFPA 403 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Aircraft Rescue and

More information

Adult Family Care Home Top Ten Health Deficiency Citations Statewide October 8, 2009 Year Date Range: January 1, 2008 through December 31, 2008

Adult Family Care Home Top Ten Health Deficiency Citations Statewide October 8, 2009 Year Date Range: January 1, 2008 through December 31, 2008 Rank Tag Count Description Adult Family Care Home 1 F0401 182 Personnel records must include verification of freedom from communicable disease for the AFCH provider, each relief person, each adult household

More information

CALIFORNIA STATE UNIVERSITY, OFFICE OF THE CHANCELLOR Telecommuting Policy and Guidelines For CSUEU Employees

CALIFORNIA STATE UNIVERSITY, OFFICE OF THE CHANCELLOR Telecommuting Policy and Guidelines For CSUEU Employees TELECOMMUTER S AGREEMENT For CSUEU Represented Employees This Telecommuter s Agreement is between the Chancellor s Office and (Employee). The employee s normal work location is, the employee s department

More information

First Revision No. 2-NFPA [ Sections 1.1, 1.2, 1.3 ]

First Revision No. 2-NFPA [ Sections 1.1, 1.2, 1.3 ] First Revision No. 2-NFPA 1091-2013 [ Sections 1.1, 1.2, 1.3 ] 1.1 Scope. This standard identifies the minimum job performance requirements (JPRs) necessary to perform temporary traffic control duties

More information

XC16. ELITE SERIES R 410A Two Stage Compressor SilentComfort Technology A I R C O N D I T I O N E R S

XC16. ELITE SERIES R 410A Two Stage Compressor SilentComfort Technology A I R C O N D I T I O N E R S E N G I N E E R I N G D A T A A I R C O N D I T I O N E R S XC16 ELITE SERIES R 410A Two Stage Compressor SilentComfort Technology Bulletin No. 210465 June 2008 Supersedes July 2007 SEER up to 16.50 2

More information

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description TAHOE CITY PUBLIC UTILITY DISTRICT Job Description Job Title: Department: Utilities Supervised By: Utilities Superintendent FLSA Status: Non-Exempt Revised as of: January 2015 JOB SUMMARY To oversee and

More information

Approved for public release. Distribution is unlimited.

Approved for public release. Distribution is unlimited. TECHNICAL MANUAL UNIT, INTERMEDIATE DIRECT SUPPORT AND INTERMEDIATE GENERAL SUPPORT MAINTENANCE INSTRUCTIONS BILGE / BALLAST PUMP FOR LANDING CRAFT UTILITY (LCU ) NSN 1905-01-154-1191 INTRODUCTION 1-1

More information

WarmWise Business Custom Rebates Program Manual

WarmWise Business Custom Rebates Program Manual WarmWise Business Custom Rebates Program Manual January, 2015 Contents CONTENTS... 1 SECTION 1 INTRODUCTION... 2 1.1 PROGRAM OVERVIEW... 2 SECTION 2 ELIGIBILITY REQUIREMENTS... 3 2.1 QUALIFYING CUSTOMERS...

More information

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook This Guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate

More information

This Letter. Re: PC Guide For Power System Protection Testing

This Letter. Re: PC Guide For Power System Protection Testing Approval Letter 1 of 2 8/11/2005 9:47 AM 11 August 2005 Email This Letter Jeffrey G Gilbert PPL Electric Utilities Corp 2 N 9th Street, GENN 4 Allentown, PA 18101-1179 jggilbert@pplweb.com Re: PC37.233

More information

Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions

Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions Thi Updated: ebook provides an overview of the eligibility Page 1 of 11 requirements, available funding, and process

More information

MULTIFAMILY UPGRADE CUSTOMER HANDBOOK

MULTIFAMILY UPGRADE CUSTOMER HANDBOOK MULTIFAMILY UPGRADE CUSTOMER HANDBOOK PACIFIC GAS AND ELECTRIC COMPANY PACIFIC GAS AND ELECTRIC P.O. Box 997300, Sacramento, CA 95899-7300 This page is intentionally left blank. 23 i Table of Contents

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Health & Safety Policy for Winton Primary School 1. Policy Statement The aim of the governing body and the headteacher is to provide a safe and healthy working and learning environment

More information

The University of Texas at San Antonio

The University of Texas at San Antonio The University of Texas at San Antonio Job Description Job Title: Electrician II Code: 15212 Salary Grade: 58 FLSA Status: Non-Exempt Department/Division: Office of Facilities Reports To: Maintenance Supervisor

More information

CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS

CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS ADDENDUM #1 ISSUSED ON May 13, 2005 REQUEST FOR PROPOSALS FOR A NEW VOTING SYSTEM RFP#NVS0305 1) Please add and substitute the following Addendum

More information

New Fire Safety Rules Summary Evvie Munley, LeadingAge

New Fire Safety Rules Summary Evvie Munley, LeadingAge New Fire Safety Rules Summary Evvie Munley, LeadingAge Following is the link to the Centers for Medicare and Medicaid Services (CMS) Final Rule, Medicare and Medicaid Programs; Fire Safety Requirements

More information

PPL s Business Energy Efficiency Program Direct Discount for Small Commercial & Industrial

PPL s Business Energy Efficiency Program Direct Discount for Small Commercial & Industrial PPL s Business Energy Efficiency Program Direct Discount for Small Commercial & Industrial 2018 Program Manual PPL Electric Utilities Business Energy Efficiency Program 3 Park Plaza, Suite 101, Wyomissing,

More information

YOU MUST HAVE ALL ITEMS LISTED BELOW:

YOU MUST HAVE ALL ITEMS LISTED BELOW: Dear Housewarming Applicant: We look forward to serving you under the Housewarming Program. However, in order to begin the process there are documents that we must have. Please review the list below and

More information

INTERNET DOCUMENT INFORMATION FORM

INTERNET DOCUMENT INFORMATION FORM INTERNET DOCUMENT INFORMATION FORM A. Report Title: Hellfire Missile System Remote Control Circuit Breakers on the AH-64A Apache Attack Helicopter B. DATE Report Downloaded From the Internet: 09/22/99

More information

1 Customer and Contact Information

1 Customer and Contact Information Appalachian Power C&I Program Rebate Application Before you start Review the eligibility detail requirements and terms and conditions at the end of this application to verify that you are eligible for

More information

CUSTOM COMMERCIAL & INDUSTRIAL (C&I) Program Application

CUSTOM COMMERCIAL & INDUSTRIAL (C&I) Program Application CUSTOM COMMERCIAL & INDUSTRIAL (C&I) ENERGY IS PRECIOUS. LET S NOT WASTE IT. TABLE OF CONTENTS TERMS AND CONDITIONS... 2 CUSTOM C&I PROJECT SPECIFICATIONS... 3 STEPS FOR SUBMITTING YOUR APPLICATION...

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy Compass Disability Services Units 11 12 Belvedere Trading Estate Taunton TA1 1BH September 2015 Review Date: September 2018 Introduction Compass Disability Services believes that

More information

Solar Electricity For Community Buildings Pilot Program. Workbook

Solar Electricity For Community Buildings Pilot Program. Workbook Solar Electricity For Community Buildings Pilot Program Workbook Index What is the Solar Electricity for Community Buildings Pilot Program? An Overview 1 How to use this workbook 2 Section 1 Are you eligible

More information

N.J.A.C. 5: New Jersey Register, Vol. 49 No. 12, June 19, 2017

N.J.A.C. 5: New Jersey Register, Vol. 49 No. 12, June 19, 2017 -1.1 SUBCHAPTER 1. GENERAL PROVISIONS 5:12-1.1 Title and citation This regulation shall be known and may be cited as N.J.A.C. 5:12, Ski Lifts. Page 2 of 30 N.J.A.C. 5:12-1.2 SUBCHAPTER 1. GENERAL PROVISIONS

More information

(1) Electrical Arc Flash Safety Standing Operating Procedures (SOP)

(1) Electrical Arc Flash Safety Standing Operating Procedures (SOP) AIR STATION ORDER 9077.1 W(.,\1 l UNITED STATES MARINE CORPS MARINE CORPS AIR STATION POSTAL SERVICE CENTER BOX 8003 CHERRY POINT, NORTH CAROLINA 28533-0003 ASO 9077.1 SS From: To: Commanding Officer,

More information

COMDTPUB P16721 NVIC August 25, 2014

COMDTPUB P16721 NVIC August 25, 2014 Commandant United States Coast Guard 2703 Martin Luther King Jr. Ave. SE Washington, DC 20593-7501 Staff Symbol: CG-CVC-4 Phone: (202) 372-2357 E-Mail: MMCPolicy@uscg.mil NAVIGATION AND VESSEL INSPECTION

More information

NOTE ON PERFORMANCE TESTING

NOTE ON PERFORMANCE TESTING NOTE ON PERFORMANCE TESTING Performance Profile Sheet(s) are included in a format that can be easily photocop ied for each trainee. Performance tests are designed to mea sure competency in the s taught

More information

Department of Health Update

Department of Health Update PACAH Spring 2016 Department of Health Update Presented by: Susan Williamson, Director Division of Nursing Care Facilities Charlie Schlegel, Director Division of Safety Inspection Facility and Survey Data

More information

Risk assessment forms are kept in the nursery office, and the Headteacher s office.

Risk assessment forms are kept in the nursery office, and the Headteacher s office. Health and Safety General Arrangements Risk Assessment We recognise the fundamental importance of risk assessment in identifying hazards, developing a planned approach to providing a safe and healthy environment,

More information

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E)

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E) REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E) Hinsdale County School District RE-1 PO Box 39 614 N. Silver St. Lake City, CO 81235 (970) 944-2314 PROPOSAL DUE DATE/DELIVERY REQUIREMENTS-

More information

RFP for 2015 E-Rate Funded Wireless Upgrade Project at Four Locations In Thomasville City Schools RFP Reference# 2015Wireless Cabling Contact Mike

RFP for 2015 E-Rate Funded Wireless Upgrade Project at Four Locations In Thomasville City Schools RFP Reference# 2015Wireless Cabling Contact Mike RFP for 2015 E-Rate Funded Wireless Upgrade Project at Four Locations In Thomasville City Schools RFP Reference# 2015Wireless Cabling Contact Mike Ingram Chief Information Officer Thomasville City Schools

More information

/ I N S T I T U T E t r a i n i n g c a t a l o g s p r i n g 2018

/ I N S T I T U T E t r a i n i n g c a t a l o g s p r i n g 2018 INSTITUTE t r a i n i n g c a t a l o g / spring 2018 / TABLE OF CONTENTS spring 2018 training catalog Why Train At RSC? Award Winning Instructors Spring Semester Courses (12 week courses) Air Conditioning

More information

MEMORANDUM. NFPA Technical Committee on Fire Service Training. NFPA 1403 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Fire Service Training. NFPA 1403 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Service Training

More information

RG 102 Accreditation for the Inspection of Non-public High Voltage Electrical Systems

RG 102 Accreditation for the Inspection of Non-public High Voltage Electrical Systems This publication contains policy, recommendations and guidance applicable to UKAS accredited inspection bodies RG 102 Accreditation for the Inspection of Non-public High Voltage Electrical Systems Contents

More information

By now, everyone should be very familiar with the H&S Guidance contained in WPN For that reason, we won t review the entire WPN 17-7, but just

By now, everyone should be very familiar with the H&S Guidance contained in WPN For that reason, we won t review the entire WPN 17-7, but just 1 2 By now, everyone should be very familiar with the H&S Guidance contained in WPN 11-6. For that reason, we won t review the entire WPN 17-7, but just go over the updates that changed from 11-6 to 17-7.

More information

L1-CHE-SPE-305 SIGNAL IDENTIFICATION AND GENERAL INFORMATION

L1-CHE-SPE-305 SIGNAL IDENTIFICATION AND GENERAL INFORMATION Engineering Specification Signalling L1-CHE-SPE-305 SIGNAL IDENTIFICATION AND GENERAL INFORMATION Version: 1 ENGINEERING SPECIFICATION SIGNAL IDENTIFICATION AND GENERAL INFORMATION L1-CHE-SPE-305 Version:

More information

ELECTRICAL TECHNICIAN I/II/III

ELECTRICAL TECHNICIAN I/II/III I. Position Identification: A) Title: Electrical Technician I/II/III B) Bargaining Unit: Yuba City Employee s Association C) Customary Work Hours: As outlined in the department schedule. D) Customary Work

More information

700R4 LOCKUP WIRING TOGGLE SWITCH DOCUMENT

700R4 LOCKUP WIRING TOGGLE SWITCH DOCUMENT 31 October, 2017 700R4 LOCKUP WIRING TOGGLE SWITCH DOCUMENT Document Filetype: PDF 425.06 KB 0 700R4 LOCKUP WIRING TOGGLE SWITCH DOCUMENT Find great deals on ebay for 700r4 lockup switch. Stainless steel

More information

SUP 08 Operational procedures for Medical Gas Pipeline Systems (MGPS) Unified procedures for use within NHS Scotland

SUP 08 Operational procedures for Medical Gas Pipeline Systems (MGPS) Unified procedures for use within NHS Scotland SUP 08 Operational procedures for Medical Gas Pipeline Systems (MGPS) Unified procedures for use within NHS Scotland May 2015 Contents Page Acknowledgements... 4 Introduction... 5 1. Aim and scope... 6

More information

[FILE] SERIES OUTLET WIRING DIAGRAM EBOOK

[FILE] SERIES OUTLET WIRING DIAGRAM EBOOK 12 November, 2017 [FILE] SERIES OUTLET WIRING DIAGRAM EBOOK Document Filetype: PDF 534.01 KB 0 [FILE] SERIES OUTLET WIRING DIAGRAM EBOOK Wiring diagram outlets in series also stack light wiring diagram

More information

M E M O R A N D U M. Technical Committee on Fire Service Occupational Safety and Health

M E M O R A N D U M. Technical Committee on Fire Service Occupational Safety and Health National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Fire Service Occupational

More information

Smart Energy New Homes Program

Smart Energy New Homes Program Smart Energy New Homes Program 2015-2016 Certification Guidelines TM Program Overview...Page 2 How To Participate...Page 4 FAQs...Page 6 2015-2016 Participation Application & Agreement...Page 8 2015-2016

More information

2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES

2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES 2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES WELCOME TO THE POWER MOVES C&I PROCESS VFD PROGRAM. We look forward to working with you. If you have questions after reading this application,

More information

AMENDMENT OF SOLICITATION

AMENDMENT OF SOLICITATION 1. SOLICITATION NO.: 2. AMENDMENT NO.: DALLAS AREA RAPID TRANSIT DALLAS, TEXAS AMENDMENT OF SOLICITATION 3. EFFECTIVE DATE: 4. BRIEF SOLICITATION DESCRIPTION: B-1022113 1 September 21, 2012 5. REVISED

More information

2018 CATAPULT. PURPOSE: To build a catapult that will propel a standard golf ball to hit targets at 30 ft and 40 ft.

2018 CATAPULT. PURPOSE: To build a catapult that will propel a standard golf ball to hit targets at 30 ft and 40 ft. PURPOSE: To build a catapult that will propel a standard golf ball to hit targets at 30 ft and 40 ft. GENERAL INFORMATION: 1. A team will consist of 1 or 2 individual(s) working together to accomplish

More information

TECHNICAL MANUAL OPERATOR, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

TECHNICAL MANUAL OPERATOR, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) TECHNICAL MANUAL OPERATOR, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) POWER UNIT, 2 1/2 TON DIESEL ENGINE DRIVEN, TRAILER MOUNTED, 60 kw, 50/60 Hz, PU-805

More information

THE HEALTHCARE ENVIRONMENT

THE HEALTHCARE ENVIRONMENT 2015 THE HEALTHCARE ENVIRONMENT Anne M. Guglielmo, Engineer Department of Engineering The Joint Commission 2013/2014 CHALLENGING STANDARDS THE TOP 20 ISSUES Department of Engineering 2014-2 TOP SCORED

More information

Generator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377

Generator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377 Generator Impact Study Report Bladen County, NC 75.0 Solar Farm Queue #377 Table of Contents 1 PURPOSE... 3 2 ASSUMPTIONS... 3 3 RESULTS... 4 3.1 Power-flow Analysis Results... 4 3.2 Stability Analysis

More information

Electrical Safety and Testing Components published in Gazette Notice 1 December 2011

Electrical Safety and Testing Components published in Gazette Notice 1 December 2011 Provider: Date: Approved Competence Programme Provider Site Audit Checklist (Line Mechanic, Cable Jointer and persons engaged on works ) Electrical Safety and Testing Components published in Gazette Notice

More information

DC in the Home. Industry Connections Activity Initiation Document (ICAID) Version: 1.2, 12 June 2013

DC in the Home. Industry Connections Activity Initiation Document (ICAID) Version: 1.2, 12 June 2013 DC in the Home Industry Connections Activity Initiation Document (ICAID) Version: 1.2, 12 June 2013 Instructions Instructions on how to fill out this form are shown in red. It is recommended to leave the

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1041 ASPHALT CONCRETE QUALITY ASSURANCE PROGRAM ADMINISTRATION.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1041 ASPHALT CONCRETE QUALITY ASSURANCE PROGRAM ADMINISTRATION. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1041 ASPHALT CONCRETE QUALITY ASSURANCE PROGRAM ADMINISTRATION January 15, 2016 1041.01 Scope 1041.02 Administration 1041.03 Personnel Approval 1041.04

More information

Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384

Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384 Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384 Table of Contents 1 PURPOSE... 3 2 ASSUMPTIONS... 3 3 RESULTS... 4 3.1 Power-flow Analysis Results...

More information

AIR CONDITIONING AND REFRIGERATION Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 75

AIR CONDITIONING AND REFRIGERATION Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 75 AIR CONDITIONING AND REFRIGERATION Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 75 TABLE OF CONTENTS 75.1. Authority... 1 75.10. Definitions...

More information

TELECOMMUTING AGREEMENT

TELECOMMUTING AGREEMENT TELECOMMUTING AGREEMENT Telecommuting is a work option which, when properly implemented and administered, benefits both the staff member and Pepperdine. Telecommuting is not a right, but rather, a privilege

More information

Telergon DC Isolators. for Photovoltaic applications

Telergon DC Isolators. for Photovoltaic applications Telergon DC Isolators for Photovoltaic applications Photovoltaic Switches up to 1800A Telergon DC isolators are the ideal switch range for photovoltaic installations, with a high DC switching capability,

More information

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN 3.5.1.4 MISSILES GENERATED BY EXTREME WINDS REVIEW RESPONSIBILITIES Primary - Organization responsible for the review of plant design

More information

2018 Festival in the Park - Craft/Art Vendor Application

2018 Festival in the Park - Craft/Art Vendor Application 2018 Festival in the Park - Craft/Art Vendor Application PLEASE READ CAREFULLY AND IN FULL You are invited to participate in the 40th Annual Festival in the Park (FIP) July 20-22, 2018 in Spearfish, SD.

More information

Perform Primary Voltage Live-Line Testing Status: Approved

Perform Primary Voltage Live-Line Testing Status: Approved Report Date: 09 Mar 2018 052-204-2303 Perform Primary Voltage Live-Line Testing Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign

More information