MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

Size: px
Start display at page:

Download "MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot."

Transcription

1 National Fire Protection Association 1 Batterymarch Park, Quincy, MA Phone: Fax: MEMORANDUM To: NEC Code-Making Panel 10 From: Kimberly Shea, Project Administrator Date: April 16, 2015 Subject: NEC First Draft TC FINAL Ballot Results (A2016) According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. 12 Members Eligible to Vote 0 Members Ballots Not Returned 3 Members voted Affirmative with Comment on one or more Revision (Fredericks, Hidaka, Vance) 1 Members voted Negative on one or more Revision (Fredericks) 0 Members Abstained on one or more Revision The attached report shows the number of affirmative, negative, and abstaining votes as well as the explanation of the vote for each first revision. There are two criteria necessary for each first revision to pass ballot: (1) simple majority and (2) affirmative 2 / 3 vote. The mock examples below show how the calculations are determined. (1) Example for Simple Majority: Assuming there are 20 vote eligible committee members, 11 affirmative votes are required to pass ballot. (Sample calculation: 20 members eligible to vote 2 = = 11) (2) Example for Affirmative 2 / 3 : Assuming there are 20 vote eligible committee members and 1 member did not return their ballot and 2 members abstained, the number of affirmative votes required would be 12. (Sample calculation: 20 members eligble to vote 1 not returned 2 abstentions = 17 x 0.66 = = 12 ) As always please feel free to contact me if you have any questions.

2 First Revision No NFPA [ Definition: Coordination (Selective). ] Coordination, Selective (Selective Coordination ). Localization of an overcurrent condition to restrict outages to the circuit or equipment affected, accomplished by the selection and installation of overcurrent protective devices and their ratings or settings for the full range of available overcurrents, from overload to the maximum available fault current, and for the full range of overcurrent protective device opening times associated with those overcurrents. Submitter Information Verification Submitter Full Name: CMP 10 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Jan 12 08:40:35 EST 2015 Committee Statement Committee Statement: Response Message: This first revision is an editorial correction for the purposes of clarity, usability and correlation with other definition titles that include a descriptor. Public Input No NFPA [Definition: Coordination (Selective).] Ballot Results This item has passed ballot 12 Eligible Voters 0 Not Returned 11 Affirmative All 1 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Blizard, Scott A. Burns, Julian R. Darling, Dennis M. Dollard, Jr., James T. Fredericks, Carl Page 1

3 Kauer, Robert J. Mount, Jr., Robert W. Rempe, Kenneth J. Saporita, Vincent J. Sobel, Richard Vance, Christopher R. Affirmative with Comment Hidaka, Jeffrey H. none Page 2

4 First Revision No NFPA [ Definition: Tap Conductors. ] Tap Conductors Conductor. As used in this article, a tap conductor is defined as a conductor A conductor, other than a service conductor, that has overcurrent protection ahead of its point of supply that exceeds the value permitted for similar conductors that are protected as described elsewhere in Submitter Information Verification Submitter Full Name: CMP 10 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Jan 12 09:32:54 EST 2015 Committee Statement Committee Statement: Response Message: This first revision is editorial in nature in compliance with the NEC style manual. Public Input No NFPA [Definition: Tap Conductors.] Ballot Results This item has passed ballot 12 Eligible Voters 0 Not Returned 11 Affirmative All 1 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Blizard, Scott A. Burns, Julian R. Darling, Dennis M. Dollard, Jr., James T. Fredericks, Carl Kauer, Robert J. Mount, Jr., Robert W. Rempe, Kenneth J. Page 3

5 Saporita, Vincent J. Sobel, Richard Vance, Christopher R. Affirmative with Comment Hidaka, Jeffrey H. none Page 4

6 First Revision No NFPA [ Section No (A) ] (A) Fuses and Fixed-Trip Circuit Breakers. The standard ampere ratings for fuses and inverse time circuit breakers shall be considered 15, 20, 25, 30, 35, 40, 45, 50, 60, 70, 80, 90, 100, 110, 125, 150, 175, 200, 225, 250, 300, 350, 400, 450, 500, 600, 700, 800, 1000, 1200, 1600, 2000, 2500, 3000, 4000, 5000, and 6000 amperes as shown in Table 240.6(A). Additional standard ampere ratings for fuses shall be 1, 3, 6, 10, and 601. The use of fuses and inverse time circuit breakers with nonstandard ampere ratings shall be permitted. Table 240.6(A) Standard Ampere Ratings for Fuses and Inverse Time Circuit Breakers Standard Ampere Ratings Submitter Information Verification Submitter Full Name: CMP 10 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Jan 12 10:00:33 EST 2015 Committee Statement Committee Statement: Response Message: This first revision editorially revises the standard ampere ratings for fuses and inverse time circuit breakers into a table format for clarity and usability. Public Input No NFPA [Section No (A)] Public Input No NFPA [Section No (A)] Ballot Results This item has passed ballot Page 5

7 12 Eligible Voters 0 Not Returned 11 Affirmative All 1 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Blizard, Scott A. Burns, Julian R. Darling, Dennis M. Dollard, Jr., James T. Fredericks, Carl Kauer, Robert J. Mount, Jr., Robert W. Rempe, Kenneth J. Saporita, Vincent J. Sobel, Richard Vance, Christopher R. Affirmative with Comment Hidaka, Jeffrey H. none Page 6

8 First Revision No NFPA [ Section No (C)(4) ] (4) Outside Secondary Conductors. Where the conductors are located outdoors outside of a building or structure, except at the point of load termination, and comply with all of the following conditions: (1) The conductors are protected from physical damage in an approved manner. (2) The conductors terminate at a single circuit breaker or a single set of fuses that limit the load to the ampacity of the conductors. This single overcurrent device shall be permitted to supply any number of additional overcurrent devices on its load side. (3) The overcurrent device for the conductors is an integral part of a disconnecting means or shall be located immediately adjacent thereto. (4) The disconnecting means for the conductors is installed at a readily accessible location complying with one of the following: a. Outside of a building or structure b. Inside, nearest the point of entrance of the conductors c. Where installed in accordance with 230.6, nearest the point of entrance of the conductors Submitter Information Verification Submitter Full Name: CMP 10 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Jan 12 11:38:44 EST 2015 Committee Statement Committee Statement: The title of the section is "Outside Secondary Conductors". The body of the text should align. Revision is presented in the attached word file. Response Message: Public Input No. 432-NFPA [Section No (C)(4)] Ballot Results This item has passed ballot 12 Eligible Voters 0 Not Returned Page 7

9 11 Affirmative All 1 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Blizard, Scott A. Burns, Julian R. Darling, Dennis M. Dollard, Jr., James T. Fredericks, Carl Kauer, Robert J. Mount, Jr., Robert W. Rempe, Kenneth J. Saporita, Vincent J. Sobel, Richard Vance, Christopher R. Affirmative with Comment Hidaka, Jeffrey H. none Page 8

10 First Revision No NFPA [ Section No (A) ] (A) Accessibility. Overcurrent Switches containing fuses, and circuit breakers devices shall be readily accessible and shall be installed so that the center of the grip of the operating handle of the switch or circuit breaker, when in its highest position, is not more than 2.0 m (6 ft 7 in.) above the floor or working platform, unless one of the following applies: (1) For busways, as provided in (C). (2) For supplementary overcurrent protection, as described in (3) For overcurrent devices, as described in and (4) For overcurrent devices adjacent to utilization equipment that they supply, access shall be permitted to be by portable means. Exception: The use of a tool shall be permitted to access overcurrent devices located within listed industrial control panels or similar enclosures. Submitter Information Verification Submitter Full Name: CMP 10 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Jan 12 13:57:32 EST 2015 Committee Statement Committee Statement: The first sentence has been revised and an exception added to clarify the requirement. This is necessary because of the change to the definition of Accessible, Readily in the 2014 NEC. This clarifies that a screwdriver (a tool) is permissible to be used to open the enclosure in order to gain access to the overcurrent device. For PI 4105, the proposed requirement for an externally operating disconnect means would be more appropriately located in Article 409. The Correlating Committee is requested to appoint a Task Group to review the definition and global usage of Accessible, Readily. Response Message: Public Input No NFPA [Section No (A)] Public Input No NFPA [Section No (A)] Ballot Results Page 9

11 0 This item has passed ballot 12 Eligible Voters 0 Not Returned 10 Affirmative All 2 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Blizard, Scott A. Burns, Julian R. Darling, Dennis M. Dollard, Jr., James T. Kauer, Robert J. Mount, Jr., Robert W. Rempe, Kenneth J. Saporita, Vincent J. Sobel, Richard Vance, Christopher R. Affirmative with Comment Fredericks, Carl I m voting affirmative on the panel action, but would suggest that in the next available revision we remove the word listed from this new exception text. Non-listed control panels that are compliant with NEC Article 409 will have the same issues that this exception addresses, and it would seem more logical for the code to have the exception text in one location. The Task Group as suggested by the panel statement to review the definition and global usage of Accessible, Readily may be the best way to completely address this issue. Hidaka, Jeffrey H. The comma after fuses and the word "devices" should be deleted. Page 10

12 1 First Revision No NFPA [ New Section after ] Arc Energy Reduction. Where the ampere rating of the fusible switch is 1200 A or higher, (A) and (B) shall apply. This requirement shall become effective January 1, (A) Documentation. Documentation shall be available to those authorized to design, install, operate, or inspect the installation as to the location of the fusible switch(es). (B) Method to Reduce Clearing Time. One of the following shall be provided: (1) Differential relaying (2) Energy-reducing maintenance switching with local status indicator (3) Energy-reducing active arc flash mitigation system (4) A fuse that would open the circuit in 0.07 seconds or less, at or below the available arcing current (5) An approved equivalent means Informational Note No. 1: An energy-reducing maintenance switch allows a worker to set a disconnect switch to reduce the clearing time while the worker is working within an arc-flash boundary as defined in NFPA 70E -2015, Standard for Electrical Safety in the Workplace, and then to set the disconnect switch back to a normal setting after the potentially hazardous work is complete. Informational Note No. 2: An energy-reducing active arc flash mitigation system helps in reducing arcing duration in the electrical distribution system. No change in the disconnect switch or the settings of other devices is required during maintenance when a worker is working within an arc flash boundary as defined in NFPA 70E -2015, Standard for Electrical Safety in the Workplace. Informational Note No. 3: IEEE 1584, IEEE Guide for performing Arc Flash Hazard Calculations, is one of the available methods that provide guidance in determining arcing current. Submitter Information Verification Submitter Full Name: CMP 10 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Jan 12 17:30:04 EST 2015 Committee Statement Committee Statement: The benefits of an arc energy reduction requirement that reduces incident energy for circuit breakers rated 1200 ampere and greater have been well established. Those same Page 11

13 2 methods of incident energy reduction could also be utilized with 1200 ampere and greater fusible switches. This public input is based upon the requirements in , but modified to work with fusible switches. Arc energy reduction requirements for fuses and circuit breakers must be located in the appropriate part of Article 240. The present arc energy reduction requirement is properly located in Part VII Circuit Breakers. An arc energy reduction requirement for fuse applications is properly located in Part VI Cartridge Fuses and Fuseholders. The numbering sequence of is chosen to coincide with Basing this proposed new requirement on the existing text in retains the parent text modified for fusible switches. First level subdivision (A) is retained for necessary documentation. First level subdivision (B) similarly addresses methods to reduce clearing time as follows: (1) Differential relaying. (2) Energy-reducing maintenance switching with local status indicator. (3) Energy-reducing active arc flash mitigation system. (4) An available arcing current that would open the circuit in 0.07 seconds or less. Circuit breakers utilizing ZSI to meet the requirements of can take up to 0.07 seconds to open the circuit. Therefore, a maximum fuse opening time of 0.07 seconds was also chosen in list item (4) to provide equivalent protection to that provided by circuit breakers. (5) An approved equivalent means The existing informational notes in are retained for clarity. The delay in the effective date for this requirement is needed to ensure the electrical industry can respond with feasible solutions, available from multiple manufacturers, to meet this requirement. Informational Note No. 3 on IEEE 1584 has been added to describe at least one of the available methods to calculate incident energy. Response Message: Public Input No NFPA [New Section after ] Ballot Results This item has passed ballot 12 Eligible Voters 0 Not Returned 9 Affirmative All 2 Affirmative with Comments 1 Negative with Comments 0 Abstention Affirmative All Blizard, Scott A. Page 12

14 3 Burns, Julian R. Darling, Dennis M. Dollard, Jr., James T. Kauer, Robert J. Mount, Jr., Robert W. Rempe, Kenneth J. Saporita, Vincent J. Sobel, Richard Affirmative with Comment Hidaka, Jeffrey H. none Vance, Christopher R. The Informational Note 3 should be excluded as it is already covered by the work practice document NFPA 70E referenced in IN 2 Negative with Comment Fredericks, Carl I m voting against the panel action to create this new Section , because it lacks two key elements that were also proposed and rejected for : First as proposed in PI 1704 for , methods to reduce clearing time should not be required by the NEC for installations where the calculated incident energy at the working distance is 8 cal/cm2 or less. Required PPE for this energy level is consistent with the reduced PPE level that will be required after approved methods to reduce clearing time are applied to some installations, and consistent with what is needed for some installations that do not fall under or would not fall under It is common in many workplaces to provide 8 cal/cm2 clothing as daily wear. Second as proposed in PI 1764 for , there should be an exception to these requirements where the fusible switch serves continuous industrial processes where a lack of protective device coordination will introduce greater or other hazards. All of the measures that could be cost-effectively provided for loads served by an outgoing fusible switch would introduce some level of protective device miscoordination. Qualified industrial users should be allowed to appropriately manage the full spectrum of hazards, which they could do via the proposed exception. ACC could support the proposed new section if the above two changes were made. Page 13

15 14 First Revision No NFPA [ Section No (B) ] (B) Method to Reduce Clearing Time. One of the following or approved equivalent means shall be provided: (1) Zone-selective interlocking (2) Differential relaying (3) Energy-reducing maintenance switching with local status indicator (4) Energy-reducing active arc flash mitigation system (5) An approved equivalent means An instantaneous trip setting that is less than the available arcing current (6) An instantaneous override that is less than the available arcing current (7) An approved equivalent means Informational Note No. 1: An energy-reducing maintenance switch allows a worker to set a circuit breaker trip unit to no intentional delay to reduce the clearing time while the worker is working within an arc-flash boundary as defined in NFPA 70E , Standard for Electrical Safety in the Workplace, and then to set the trip unit back to a normal setting after the potentially hazardous work is complete. Informational Note No. 2: An energy-reducing active arc flash mitigation system helps in reducing arcing duration in the electrical distribution system. No change in the circuit breaker or the settings of other devices is required during maintenance when a worker is working within an arc flash boundary as defined in NFPA 70E , Standard for Electrical Safety in the Workplace. Informational Note No. 3: An instantaneous trip is a function that causes a circuit breaker to trip with no intentional delay when currents exceed the instantaneous trip setting or current level. If arcing currents are above the instantaneous trip level, the circuit breaker will trip in the minimum possible time. Informational Note No. 4: IEEE , IEEE Guide for Performing Arc Flash Hazard Calculations, is one of the available methods that provide guidance in determining arcing current. Submitter Information Verification Submitter Full Name: CMP 10 Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Jan 12 15:06:04 EST 2015 Committee Statement Committee Statement: The phrase or an approved equivalent means is removed from the parent text of (B) editorially as it exists in present list item (5). Page 14

16 5 This proposed revision creates new list items (5) and (6) for clarity and usability. These new list items will now clearly describe specific permitted methods of achieving the arc energy reduction required in this section. It is critical that the available arcing current exceeds the instantaneous trip or instantaneous override in order for the circuit breaker to open as quickly as possible during an arcing fault, and that is the whole purpose of Section (B), to open as quickly as possible during an arcing fault. It is not enough to just require an instantaneous trip or an instantaneous override, because the arcing current could be low enough that it takes the circuit breaker many cycles to many seconds to open. If the arcing current is greater than the instantaneous trip or instantaneous override, most circuit breakers will clear somewhere between ½ cycle (smaller molded case type) and 3 cycles (power or air-frame type), providing the increased protection that intends. This addresses the concerns that Mr. Kauer raised in the balloting stage on comment in the 2014 NEC revision cycle. Existing list item (5) is editorially relocated as list item (7) and continues to permit other approved methods which may include new technologies. Informational Note No. 3 on Instantaneous Trip from PI 1640 has been added to explain the relationship between an instantaneous trip and incident energy. Informational Note No. 4 on IEEE 1584 has been added to describe at least one of the available methods to calculate incident energy. Response Message: Public Input No. 567-NFPA [Section No (B)] Public Input No NFPA [Section No (B)] Public Input No NFPA [Section No (B)] Public Input No NFPA [Section No (B)] Public Input No NFPA [Section No (B)] Public Input No NFPA [Section No (B)] Ballot Results This item has passed ballot 12 Eligible Voters 0 Not Returned 11 Affirmative All 1 Affirmative with Comments 0 Negative with Comments 0 Abstention Affirmative All Blizard, Scott A. Burns, Julian R. Darling, Dennis M. Dollard, Jr., James T. Fredericks, Carl Kauer, Robert J. Mount, Jr., Robert W. Page 15

17 6 Rempe, Kenneth J. Saporita, Vincent J. Sobel, Richard Vance, Christopher R. Affirmative with Comment Hidaka, Jeffrey H. none Page 16

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: NEC Code-Making Panel 11 From: Kimberly Shea, Project Administrator

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: NEC Code-Making Panel 1 From: Kimberly Shea, Project Administrator

More information

MEMORANDUM. NFPA 85 BCS-SBB First Draft TC FINAL Ballot Results (F2014 Cycle)

MEMORANDUM. NFPA 85 BCS-SBB First Draft TC FINAL Ballot Results (F2014 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Single Burner Boilers

More information

Kimberly Shea, Administrator, Technical Projects. SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016)

Kimberly Shea, Administrator, Technical Projects. SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: NEC Code-Making Panel 12 FROM: Kimberly Shea, Administrator, Technical

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: NEC Code-Making Panel 2 From: Kimberly Shea, Project Administrator

More information

SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016)

SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org TO: NEC Code-Making Panel 15 FROM: Kimberly Shea, Administrator, Technical

More information

I. THE PROPOSED RULE: The proposed rule, including the analysis and text, are attached. REFERENCE TO APPLICABLE FORMS:

I. THE PROPOSED RULE: The proposed rule, including the analysis and text, are attached. REFERENCE TO APPLICABLE FORMS: STATE OF WISCONSIN DEPARTMENT OF SATETY AND PROFESSIONAL SERVICES ---------------------------------------------------------------------------------------------------------------------------- IN THE MATTER

More information

NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE. AGENDA October 23, 2013 Teleconference/Web Meeting

NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE. AGENDA October 23, 2013 Teleconference/Web Meeting National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-104101 Phone: 6110-10100-3000 Fax: 6110-10100-01000 www.nfpa.org NATIONAL ELECTRICAL CODE CORRELATING COMMITTEE AGENDA October

More information

A. General provisions and other electrical systems are specified in other Sections of Division 26.

A. General provisions and other electrical systems are specified in other Sections of Division 26. PART 1: GENERAL 1.01 DESCRIPTION: A. General provisions and other electrical systems are specified in other Sections of Division 26. B. Commissioning is an ongoing process and shall be performed throughout

More information

M E M O R A N D U M. NFPA 1122 First Draft Technical Committee FINAL Ballot Results (A2017)

M E M O R A N D U M. NFPA 1122 First Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Pyrotechnics Yvonne

More information

Buck & Boost Transformer Installation Instructions

Buck & Boost Transformer Installation Instructions Buck & Boost Installation Instructions 120 V x 240 V - 12/24 V Class 7414 Introduction This manual provides installation, operation, and maintenance instructions for the 2847 Buck & Boost transformer,

More information

This Letter. Re: PC Guide For Power System Protection Testing

This Letter. Re: PC Guide For Power System Protection Testing Approval Letter 1 of 2 8/11/2005 9:47 AM 11 August 2005 Email This Letter Jeffrey G Gilbert PPL Electric Utilities Corp 2 N 9th Street, GENN 4 Allentown, PA 18101-1179 jggilbert@pplweb.com Re: PC37.233

More information

1403 Second Draft Ballot Results SR 10, Section No , See SR 10 Eligible to Vote: 31 Not Returned : 3 Gagliano, Herndon, Jr.

1403 Second Draft Ballot Results SR 10, Section No , See SR 10 Eligible to Vote: 31 Not Returned : 3 Gagliano, Herndon, Jr. 1403 Second Draft Ballot Results SR 10, Section No. 1.3.3, See SR 10 Gagliano, Herndon, Jr., O'Donnell Affirmative with Comment 0 Negative 1 Taken out according to language in the comments. SR 15, New

More information

M E M O R A N D U M. Technical Committee on Industrial Fire Brigade Personnel Professional Qualifications

M E M O R A N D U M. Technical Committee on Industrial Fire Brigade Personnel Professional Qualifications National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Industrial Fire Brigade

More information

M E M O R A N D U M. NFPA 1801 Second Draft Technical Committee FINAL Ballot Results (A2017)

M E M O R A N D U M. NFPA 1801 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Electronic Safety

More information

Bristol Regional Wastewater Treatment Plant Arc Flash Study Engineering Services City of Bristol Tennessee RFP 18004

Bristol Regional Wastewater Treatment Plant Arc Flash Study Engineering Services City of Bristol Tennessee RFP 18004 Bristol Regional Wastewater Treatment Plant Arc Flash Study Engineering Services City of Bristol Tennessee March 2018 I. Introduction The City of Bristol Tennessee, herein after referred to as City, is

More information

M E M O R A N D U M. Technical Committee on Fire Service Occupational Safety and Health

M E M O R A N D U M. Technical Committee on Fire Service Occupational Safety and Health National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Fire Service Occupational

More information

M E M O R A N D U M. Technical Committee on Aircraft Rescue and Fire Fighting. NFPA 403 Second Draft Technical Committee FINAL Ballot Results (A2017)

M E M O R A N D U M. Technical Committee on Aircraft Rescue and Fire Fighting. NFPA 403 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Aircraft Rescue and

More information

MEMORANDUM. NFPA Technical Committee on Fire Service Training. NFPA 1403 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Fire Service Training. NFPA 1403 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Service Training

More information

(1) Electrical Arc Flash Safety Standing Operating Procedures (SOP)

(1) Electrical Arc Flash Safety Standing Operating Procedures (SOP) AIR STATION ORDER 9077.1 W(.,\1 l UNITED STATES MARINE CORPS MARINE CORPS AIR STATION POSTAL SERVICE CENTER BOX 8003 CHERRY POINT, NORTH CAROLINA 28533-0003 ASO 9077.1 SS From: To: Commanding Officer,

More information

Continuing Education Credits

Continuing Education Credits Understanding the hazards and qualifications involved with arc flash analysis fieldwork Steven J Abbott Stark Safety Consultants Continuing Education Credits NECA has been accredited as an Authorized Provider

More information

GE Energy Connections

GE Energy Connections GE Energy Connections Contents Industrial Services External Training Schedule...3 Industrial Services LV7000 Drives... 4 Industrial Services DC2100e Drives... 5 Industrial Services P80i Software Training...6

More information

Choosing Regulatory-Compliant Power Strips for Every Area of a Healthcare Facility

Choosing Regulatory-Compliant Power Strips for Every Area of a Healthcare Facility www.tripplite.com Choosing Regulatory-Compliant Power Strips for Every Area of a Healthcare Facility WHITE PAPER 95-2883 Executive Summary The tangled web of regulatory compliance governing healthcare

More information

ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS

ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS c t ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to June

More information

M E M O R A N D U M. Technical Committee on Public Emergency Service Communication

M E M O R A N D U M. Technical Committee on Public Emergency Service Communication National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Public Emergency

More information

First Revision No. 2-NFPA [ Sections 1.1, 1.2, 1.3 ]

First Revision No. 2-NFPA [ Sections 1.1, 1.2, 1.3 ] First Revision No. 2-NFPA 1091-2013 [ Sections 1.1, 1.2, 1.3 ] 1.1 Scope. This standard identifies the minimum job performance requirements (JPRs) necessary to perform temporary traffic control duties

More information

SOUTH AFRICAN NATIONAL STANDARD

SOUTH AFRICAN NATIONAL STANDARD ISBN 978-0-626-31239-8 Edition 1 and IEEE amdt 1 IEEE Std 1584-2002 and IEEE Std 1584a-2004 (amdt to IEEE Std 1584-2002) SOUTH AFRICAN NATIONAL STANDARD IEEE guide for performing arc-flash hazard calculations

More information

Rulemaking Hearing Rules of Department of Commerce and Insurance Division of Fire Prevention. Chapter Electrical Installations.

Rulemaking Hearing Rules of Department of Commerce and Insurance Division of Fire Prevention. Chapter Electrical Installations. Page 1 of 6 pages Rulemaking Hearing Rules of Department of Commerce and Insurance Division of Fire Prevention Chapter 0780-02-01 Electrical Installations Amendments Rule 0780-02-01-.01 Scope is amended

More information

INFORMATION BULLETIN OPERATING PERMITS

INFORMATION BULLETIN OPERATING PERMITS OPERATING PERMITS This guide supplements Directive NO: D-E3 070801 7 revised on May 4, 2015. The following document provides guidance on the application of policy for BCSA. Please check with municipal

More information

ATTACHMENT B. 1. Intent to Bid/Bidder Contact Information Form. 2. Executive Summary. 3. Proposal Characteristics and Term Sheet

ATTACHMENT B. 1. Intent to Bid/Bidder Contact Information Form. 2. Executive Summary. 3. Proposal Characteristics and Term Sheet ATTACHMENT B RFP RESPONSE PACKAGE Proposals should be developed to include all of the applicable information as detailed in Section 7 ( RFP Documentation/Forms in RFP Response Package ) of the Request

More information

CRITERIA FOR APPROVAL OF STATE HISTORICAL MARKERS Adopted by Resolution of the Pennsylvania Historical and Museum Commission (PHMC) [June 19, 2008]

CRITERIA FOR APPROVAL OF STATE HISTORICAL MARKERS Adopted by Resolution of the Pennsylvania Historical and Museum Commission (PHMC) [June 19, 2008] CRITERIA FOR APPROVAL OF STATE HISTORICAL MARKERS Adopted by Resolution of the Pennsylvania Historical and Museum Commission (PHMC) [June 19, 2008] 1. The nomination is clear and organized and includes

More information

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness Report to the Governor and to the Legislature 1999 Recommended Physical Plant Improvements to Existing Nursing

More information

ASSE International Seal Control Board Procedures

ASSE International Seal Control Board Procedures ASSE International Seal Control Board Procedures 2014 PREAMBLE Written operating procedures shall govern the methods used for maintaining the product listing program and shall be available to any interested

More information

TECHNICAL COMMITTEE ON TRANSPORTATION OF FLAMMABLE LIQUIDS

TECHNICAL COMMITTEE ON TRANSPORTATION OF FLAMMABLE LIQUIDS TECHNICAL COMMITTEE ON TRANSPORTATION OF FLAMMABLE LIQUIDS MEMORANDUM TO: FROM: Technical Committee on Transportation of Flammable Liquids R. P. Benedetti DATE: May 29, 2015 SUBJECT: Agenda for NFPA 385

More information

Meeting Notes Project Phase 2 of Relay Loadability: Generation Standard Drafting Team December 11-14, 2012

Meeting Notes Project Phase 2 of Relay Loadability: Generation Standard Drafting Team December 11-14, 2012 Meeting Notes Standard Drafting Team December 11-14, 2012 NERC Atlanta, GA Administrative 1. Introductions The meeting was brought to order by Charlie Rogers, chair, at 8:10 a.m. ET, Tuesday, December

More information

Minutes Board of Trustees

Minutes Board of Trustees Minutes Board of Trustees Action Without a Meeting September 14, 2009 On September 14, 2009, the members of the Board of Trustees of the North American Electric Reliability Corporation consented in writing

More information

Freeport Site Standard

Freeport Site Standard Environmental, Health and No.: BCF020.018 Page: 1 of 9 REVISION HISTORY Date Revision Number Details of Change 01/31/2014 1 added Exception and requirements for the exception to Section 4.1 for FRC to

More information

Ar#cle 517 in the 2011 and 2014 Na#onal Electrical Code (NEC)

Ar#cle 517 in the 2011 and 2014 Na#onal Electrical Code (NEC) Ar#cle 517 in the 2011 and 2014 Na#onal Electrical Code (NEC) 90.3 Code Arrangement Introduc#on and nine chapters Table of Contents Ar#cles Parts Sec#ons Subsec#ons Paragraphs Index 90.3 Code Arrangement

More information

The University of Texas at San Antonio

The University of Texas at San Antonio The University of Texas at San Antonio Job Description Job Title: Electrician III Code: 15211 Salary Grade: 60 FLSA Status: Non-Exempt Department/Division: Office of Facilities Reports To: Maintenance

More information

To ensure system protection is coordinated among operating entities.

To ensure system protection is coordinated among operating entities. A. Introduction 1. Title: System Protection Coordination 2. Number: PRC-001-1.1(ii) 3. Purpose: To ensure system protection is coordinated among operating entities. 4. Applicability 4.1. Balancing Authorities

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER RAMSTEIN AB RAMSTEIN AIR BASE INSTRUCTION 91-103 30 MARCH 2016 Safety AIRCRAFT SHELTER AND HANGAR DOOR OPERATION AND TRAINING PROGRAM COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

More information

CALIFORNIA STATE UNIVERSITY, OFFICE OF THE CHANCELLOR Telecommuting Policy and Guidelines For CSUEU Employees

CALIFORNIA STATE UNIVERSITY, OFFICE OF THE CHANCELLOR Telecommuting Policy and Guidelines For CSUEU Employees TELECOMMUTER S AGREEMENT For CSUEU Represented Employees This Telecommuter s Agreement is between the Chancellor s Office and (Employee). The employee s normal work location is, the employee s department

More information

Guidelines for the Myron Zucker Student-Faculty Grant Program

Guidelines for the Myron Zucker Student-Faculty Grant Program IEEE Industry Applications Society and the IEEE Foundation Guidelines for the Myron Zucker Student-Faculty Grant Program These Guidelines were first assembled for the Executive Board of the IEEE Industry

More information

(b) Artificial Tanning Device shall mean any equipment that as defined in Section (1), C.R.S. 1989, as amended.

(b) Artificial Tanning Device shall mean any equipment that as defined in Section (1), C.R.S. 1989, as amended. DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT Division of Environmental Health and Sustainability ARTIFICIAL TANNING DEVICE REGULATIONS 6 CCR 1010-20 [Editor s Notes follow the text of the rules at the end

More information

Matching Assistance to Firefighters Grants to the Reported Needs of the U.S. Fire Service

Matching Assistance to Firefighters Grants to the Reported Needs of the U.S. Fire Service Matching Assistance to Firefighters Grants to the Reported Needs of the U.S. Fire Service May 2017 Hylton J.G. Haynes Abstract The intent of this report is to provide DHS with some additional intelligence

More information

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description TAHOE CITY PUBLIC UTILITY DISTRICT Job Description Job Title: Department: Utilities Supervised By: Utilities Superintendent FLSA Status: Non-Exempt Revised as of: January 2015 JOB SUMMARY To oversee and

More information

RESEARCH PROJECT GUIDELINES FOR CONTRACTORS PREPARATION, EVALUATION, AND IMPLEMENTATION OF RESEARCH PROJECT PROPOSALS

RESEARCH PROJECT GUIDELINES FOR CONTRACTORS PREPARATION, EVALUATION, AND IMPLEMENTATION OF RESEARCH PROJECT PROPOSALS RESEARCH PROJECT GUIDELINES FOR CONTRACTORS PREPARATION, EVALUATION, AND IMPLEMENTATION OF RESEARCH PROJECT PROPOSALS Fire Protection Research Foundation Issued: 28 February 2011; Updated: 22 December

More information

M E M O R A N D U M. Technical Committee on Hazardous Materials Response Personnel

M E M O R A N D U M. Technical Committee on Hazardous Materials Response Personnel National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Hazardous Materials

More information

Undergraduate Research Competition

Undergraduate Research Competition Undergraduate Research Competition PROCEDURES AND RULES (Failure to comply with any of the rules of the competition may result in disqualification.) Purpose 1. To encourage and stimulate interest in undergraduate

More information

NFPA Correlating Committee on Fire and Emergency Services Protective Clothing and Equipment (FAE-AAC) May 31 June 2, 2017 Providence, RI

NFPA Correlating Committee on Fire and Emergency Services Protective Clothing and Equipment (FAE-AAC) May 31 June 2, 2017 Providence, RI NFPA Correlating Committee on Fire and Emergency Services Protective Clothing and Equipment (FAE-AAC) May 31 June 2, 2017 Providence, RI Meeting Call-In Information: 877-860-3058 Participant Code: 139065

More information

TABLE OF CONTENTS Guidelines About the Leukemia & Lymphoma Society Description of Awards Who Can Apply General Eligibility Criteria

TABLE OF CONTENTS Guidelines About the Leukemia & Lymphoma Society Description of Awards Who Can Apply General Eligibility Criteria - TABLE OF CONTENTS Guidelines About the Leukemia & Lymphoma Society Description of Awards Who Can Apply General Eligibility Criteria Citizenship and Degree Leadership and Staffing Application Process

More information

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016 MAYOR GARY O. PHILLIPS VICE MAYOR KATE COLIN COUNCILMEMBER MARIBETH BUSHEY COUNCILMEMBER JOHN GAMBLIN COUNCILMEMBER ANDREW CUYUGAN MCCULLOUGH PUBLIC WORKS DEPARTMENT: (415)485-3355 FAX: (415)485-3334 Bill

More information

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON EM

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON EM PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Updated: July 1, 2017 CONTENTS SECTION 1:

More information

M E M O R A N D U M. NFPA Technical Committee on Health Care Occupancies. Diane Matthews, Project Administrator

M E M O R A N D U M. NFPA Technical Committee on Health Care Occupancies. Diane Matthews, Project Administrator M E M O R A N D U M TO: FROM: NFPA Technical Committee on Health Care Occupancies Diane Matthews, Project Administrator DATE: January 29, 2010 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

N.J.A.C. 5: New Jersey Register, Vol. 49 No. 12, June 19, 2017

N.J.A.C. 5: New Jersey Register, Vol. 49 No. 12, June 19, 2017 -1.1 SUBCHAPTER 1. GENERAL PROVISIONS 5:12-1.1 Title and citation This regulation shall be known and may be cited as N.J.A.C. 5:12, Ski Lifts. Page 2 of 30 N.J.A.C. 5:12-1.2 SUBCHAPTER 1. GENERAL PROVISIONS

More information

FIREGROUND COMMAND: THE ORGANIZATIONAL MODEL by Walter G. Green III

FIREGROUND COMMAND: THE ORGANIZATIONAL MODEL by Walter G. Green III Notes on the Science of Extreme Situations, Paper No. 6 FIREGROUND COMMAND: THE ORGANIZATIONAL MODEL 1985-1989 by Walter G. Green III Copyright 2002 by Walter G. Green III. All rights reserved. Permission

More information

Standard Development Timeline

Standard Development Timeline FAC-001-23 Interconnection Requirements Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes

More information

TELECOMMUTING AGREEMENT

TELECOMMUTING AGREEMENT TELECOMMUTING AGREEMENT Telecommuting is a work option which, when properly implemented and administered, benefits both the staff member and Pepperdine. Telecommuting is not a right, but rather, a privilege

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Coordination of Protection Systems for Performance During Faults and Specific Training for Personnel Reliability Standards ) ) )

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0800 - COMMISSIONING OF ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. The purpose of this section is to specify the Division 26 responsibilities and participation in the commissioning process.

More information

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES TESTING APPLICATION STANDARD (TAS) 201-94 IMPACT TEST PROCEDURES 1. 2. Scope: 1.1 This protocol covers procedures for conducting the impact test of materials as required by Section 1626 of the Florida

More information

BUILDING OFFICIALS ASSOCIATION OF FLORIDA CROSS TRAINING PROGRAM SYLLABUS. Electrical Plans Examiner Training Program

BUILDING OFFICIALS ASSOCIATION OF FLORIDA CROSS TRAINING PROGRAM SYLLABUS. Electrical Plans Examiner Training Program BUILDING OFFICIALS ASSOCIATION OF FLORIDA CROSS TRAINING PROGRAM SYLLABUS PROGRAM NAME: PROGRAM NUMBER: PROVIDER: Electrical Plans Examiner Training Program 5007984 #0001001 Building Officials Association

More information

Personal Protective Equipment Program. Risk Management Services

Personal Protective Equipment Program. Risk Management Services Personal Protective Equipment Program Services Table of Contents I. Program Goals and Objectives... 2 II. Scope and Application... 2 III. Responsibilities... 2 IV. Procedures... 3 V. Training... 5 VI.

More information

United States Small Business Administration Office of Hearings and Appeals

United States Small Business Administration Office of Hearings and Appeals Cite as: NAICS Appeal of Computer Cite, SBA No. NAICS-5010 (2008) United States Small Business Administration Office of Hearings and Appeals NAICS APPEAL OF: Computer Cite Appellant SBA No. NAICS-5010

More information

PART 1 - Rules and Regulations for the Renewable Energy Development Fund Programs

PART 1 - Rules and Regulations for the Renewable Energy Development Fund Programs 870-RICR-20-00-1 TITLE 870 - COMMERCE CORPORATION CHAPTER 20 - LOANS AND GRANTS SUBCHAPTER 00 N/A PART 1 - Rules and Regulations for the Renewable Energy Development Fund Programs 1.1 AUTHORITY These Rules

More information

Technical Committee on Traffic Control Incident Management Professional Qualifications. First Draft Meeting - NFPA Agenda

Technical Committee on Traffic Control Incident Management Professional Qualifications. First Draft Meeting - NFPA Agenda Technical Committee on Traffic Control Incident Management Professional Qualifications 1. Call to Order Chair Steve Austin 2. Introduction of Members and Guests 3. Chair s Remarks and Purpose of Meeting

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2035

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2035 SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2035 APPROVED: DATE: January 23, 2013 Morgan Lambert Director of Compliance TITLE: SUBJECT: RULE 1100 EQUIPMENT BREAKDOWN

More information

Personal Protective Equipment

Personal Protective Equipment Policies & Procedures Personal Protective Equipment Internal Procedure: PPE Effective Date: 1-15-18 Last Modified: 1-15-18 Approved By: Todd Barnette Contents Purpose... 2 Applicability... 2 Definitions...

More information

APPENDIX D CHECKLIST FOR PROPOSALS

APPENDIX D CHECKLIST FOR PROPOSALS APPENDIX D CHECKLIST FOR PROPOSALS Is proposal content complete, clear, and concise? Proposals should include a comprehensive scope of work, and have enough detail to permit the responsible public entity

More information

Medical Grade Power Strips

Medical Grade Power Strips Product Bulletin for Medical Grade Power Strips For use in Patient Care Areas of Health Care Facilities Conforms to UL 60601-1, UL 60950-1 and UL 1363A Leviton s family of medical-grade power strips are

More information

PROSPECTIVE FIRMS. Dear Sir/Madame:

PROSPECTIVE FIRMS. Dear Sir/Madame: TO: PROSPECTIVE FIRMS Subject: Request for Proposal (RFP) for Technical and Cost Proposals to Operate WiFi District(s) for the Community Redevelopment Agency of the City of Los Angeles Dear Sir/Madame:

More information

PROPOSAL SUBMITTALS: Responses to the Request for Proposal (RFP) are to be submitted to:

PROPOSAL SUBMITTALS: Responses to the Request for Proposal (RFP) are to be submitted to: C I T Y O F T U S T I N 3 0 0 C e n t e n n i a l W a y T u s t i n, C a l i f o r n i a 9 2 7 8 0 R E Q U E S T F O R P R O P O S A L S for a Boom Lift PROPOSAL SUBMITTALS: Responses to the Request for

More information

BURLINGTON COUNTY TECHNICAL RESCUE TASK FORCE OPERATING MANUAL

BURLINGTON COUNTY TECHNICAL RESCUE TASK FORCE OPERATING MANUAL BURLINGTON COUNTY TECHNICAL RESCUE TASK FORCE OPERATING MANUAL 1 I. Burlington County Technical Rescue Task Force Mission Statement The Mission of the Burlington County Technical Rescue Task Force shall

More information

205 CMR: MASSACHUSETTS GAMING COMMISSION

205 CMR: MASSACHUSETTS GAMING COMMISSION 205 CMR 119.00: PHASE 2 APPLICATION Section 119.01: Contents of the Application 119.02: Completing the Application 119.03: Evaluation of the Application by the Commission 119.01: Contents of the Application

More information

Minutes of the Meetings held on May 1 st, 2 nd and 3 rd 2013 in Galveston - TX, US

Minutes of the Meetings held on May 1 st, 2 nd and 3 rd 2013 in Galveston - TX, US Minutes of the Meetings held on May 1 st, 2 nd and 3 rd 2013 in Galveston - TX, US Joint IEC/IEEE revision of IEEE C37.013: IEEE Standard for AC High-Voltage Generator Circuit Breakers Rated on a Symmetrical

More information

AMENDMENT OF SOLICITATION

AMENDMENT OF SOLICITATION 1. SOLICITATION NO.: 2. AMENDMENT NO.: DALLAS AREA RAPID TRANSIT DALLAS, TEXAS AMENDMENT OF SOLICITATION 3. EFFECTIVE DATE: 4. BRIEF SOLICITATION DESCRIPTION: B-1022113 1 September 21, 2012 5. REVISED

More information

NPCC Tasks Related to NERC Blackout Recommendations Timeline

NPCC Tasks Related to NERC Blackout Recommendations Timeline Rec. 16 Due Feb. 1 st Rec. 7.a Rec. 8.b Rec. 8.c Rec. 10 Rec. 12.a,b Rec. 13.a Rec. 13.c Rec. 14 Rec. 16 Due Feb. 10 th Rec. 4.b Due March 31 st Rec. 4.c Due by March Rec. 4.a Rec. 8.a NPCC Tasks Related

More information

FAQ. Frequently Asked Questions

FAQ. Frequently Asked Questions FAQ Frequently Asked Questions CONTENTS General Efficiency... 3-4 Efficiency Auction.... 5 Pre-Qualification Process... 6 Project Eligibility Program... 7 Program Details... 8 Program Implementation...

More information

CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS

CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS ADDENDUM #1 ISSUSED ON May 13, 2005 REQUEST FOR PROPOSALS FOR A NEW VOTING SYSTEM RFP#NVS0305 1) Please add and substitute the following Addendum

More information

Technical Committee on Medical Equipment (HEA-MED)

Technical Committee on Medical Equipment (HEA-MED) Technical Committee on Medical Equipment () M E M O R A N D U M DATE: May 24, 2016 TO: and Alternate Members of the Technical Committee on Medical Equipment () FROM: Chelsea Tuttle, Staff Liaison SUBJECT:

More information

ELECTRONICS TECHNICIAN I ELECTRONICS TECHNICIAN II

ELECTRONICS TECHNICIAN I ELECTRONICS TECHNICIAN II CITY OF ROSEVILLE ELECTRONICS TECHNICIAN I ELECTRONICS TECHNICIAN II DEFINITION To perform work in the installation, testing, maintenance, calibration, repair and modification of electrical and electronic

More information

Box 221 Brasstown, NC Phone (828) Fax (678) CONSTRUCTION SAFETY AND HEALTH PROGRAM

Box 221 Brasstown, NC Phone (828) Fax (678) CONSTRUCTION SAFETY AND HEALTH PROGRAM BERG MOUNTAIN HOMES THE QUALITY IS IN THE DETAILS www.bergmountainhomes.com Box 221 Brasstown, NC 28902 Phone (828) 361-5050 Fax (678) 212-4011 CONSTRUCTION SAFETY AND HEALTH PROGRAM Berg Mountain Homes

More information

FIRST AWARD PROPOSAL

FIRST AWARD PROPOSAL FIRST AWARD PROPOSAL GENERAL INFORMATION: The mission of Morris Animal Foundation (MAF) is to advance the science of animal health. Toward this aim, we are dedicated to funding hypothesis-driven and humane

More information

Regional Greenhouse Gas Initiative, Inc. Request for Proposals #18-01 RGGI Auction Services Contractor. June 18, 2018

Regional Greenhouse Gas Initiative, Inc. Request for Proposals #18-01 RGGI Auction Services Contractor. June 18, 2018 Regional Greenhouse Gas Initiative, Inc. Request for Proposals #18-01 RGGI Auction Services Contractor June 18, 2018 PROPOSAL DUE DATE: July 23, 2018, 5:00 p.m. Eastern Daylight Time The Regional Greenhouse

More information

Powered by Safety. Powell Training Catalog

Powered by Safety. Powell Training Catalog Powell Training Catalog TABLE OF CONTENTS SAFE 102 ELECTRICAL SAFETY AND ARC FLASH AWARENESS 1 EL101 ELECTRICAL EQUIPMENT BASICS 1 PV102 LOW VOLTAGE SWITCHGEAR BASICS FOR OPERATORS AND ELECTRICIANS 2 PV202

More information

NFPA 79 (A2014) Technical Committee on Electrical Standard for Industrial Machinery First Draft Meeting Minutes August Denver, CO.

NFPA 79 (A2014) Technical Committee on Electrical Standard for Industrial Machinery First Draft Meeting Minutes August Denver, CO. NFPA 79 (A2014) Technical Committee on Electrical Standard for Industrial Machinery First Draft Meeting Minutes August 13-17 2012 Denver, CO Minutes Item 12-8-1, Call to Order The meeting of the Technical

More information

ALS Canada-Brain Canada Discovery Grants

ALS Canada-Brain Canada Discovery Grants ALS Canada-Brain Canada Discovery Grants Terms of Reference I) OVERVIEW The Discovery Grants program has been established to encourage new basic research focused on identifying causes of, or treatments

More information

NEBRASKA ENVIRONMENTAL TRUST BOARD RULES AND REGULATIONS GOVERNING ACTIVITIES OF THE NEBRASKA ENVIRONMENTAL TRUST

NEBRASKA ENVIRONMENTAL TRUST BOARD RULES AND REGULATIONS GOVERNING ACTIVITIES OF THE NEBRASKA ENVIRONMENTAL TRUST NEBRASKA ENVIRONMENTAL TRUST BOARD TITLE 137 RULES AND REGULATIONS GOVERNING ACTIVITIES OF THE NEBRASKA ENVIRONMENTAL TRUST February 2005 1 TITLE 137 RULES AND REGULATIONS GOVERNING ACTIVITIES OF THE NEBRASKA

More information

1222 First Avenue, San Diego, CA Cycle Distributed: 05/22/2012

1222 First Avenue, San Diego, CA Cycle Distributed: 05/22/2012 Project Information Project Nbr: 278133 Title: MISSION GORGE REZONE Project Mgr: Dye, Morris (619) 446-5201 mdye@sandiego.gov Page 1 of 6 *278133* Reviewing Discipline: LDR-Planning Review Cycle Distributed:

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER 911TH AIRLIFT WING 911TH AIRLIFT WING INSTRUCTION 91-201 8 MAY 2015 Safety HANGAR DOOR OPERATION COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publication is available

More information

WarmWise Business Custom Rebates Program Manual

WarmWise Business Custom Rebates Program Manual WarmWise Business Custom Rebates Program Manual January, 2015 Contents CONTENTS... 1 SECTION 1 INTRODUCTION... 2 1.1 PROGRAM OVERVIEW... 2 SECTION 2 ELIGIBILITY REQUIREMENTS... 3 2.1 QUALIFYING CUSTOMERS...

More information

Commandant United States Coast Guard

Commandant United States Coast Guard Commandant United States Coast Guard 2703 Martin Luther King Jr. Ave. SE Washington, DC 20593-7509 Staff Symbol: CG-OES Phone: 202-372-1429 Fax: 202-372-8382 Email: Debbie.Duckworth@uscg.mil 5760 March

More information

The Provision and Use of Work Equipment (PUWER) Policy

The Provision and Use of Work Equipment (PUWER) Policy The Provision and Use of Work Equipment (PUWER) Policy DOCUMENT CONTROL Version: 4 Ratified by: Estates Sub-Committee Date Ratified: 12 December 2016 Name of originator / author: Health and Safety Lead

More information

PERSONAL PROTECTIVE EQUIPMENT (PPE) GUIDELINES

PERSONAL PROTECTIVE EQUIPMENT (PPE) GUIDELINES PERSONAL PROTECTIVE EQUIPMENT (PPE) GUIDELINES PURPOSE These guidelines support the Health and Safety Policy and provides assistance on the selection and use of PPE at the University. DEFINITIONS Hazard

More information

The University of Texas at San Antonio

The University of Texas at San Antonio The University of Texas at San Antonio Job Description Job Title: Electrician II Code: 15212 Salary Grade: 58 FLSA Status: Non-Exempt Department/Division: Office of Facilities Reports To: Maintenance Supervisor

More information

Trade Ally WPS Bonus Bid Program

Trade Ally WPS Bonus Bid Program Trade Ally WPS Bonus Bid Program Table of Contents Introduction... 3 I. Program Goals... 3 II. Anticipated Funding... 3 III. Timeline... 4 IV. Definitions... 5 Program Information... 7 I. Program Introduction...

More information

RADIATION EXPOSURE CONTROL PLAN

RADIATION EXPOSURE CONTROL PLAN RADIATION EXPOSURE CONTROL PLAN The use of Nova Radiographic Exposure Devices is limited to Nova Advanced Imaging Inc. employees under the supervision of the corporations Radiation Safety Officer (RSO).

More information

Northeast Power Coordinating Council, Inc. Regional Standard Processes Manual (RSPM)

Northeast Power Coordinating Council, Inc. Regional Standard Processes Manual (RSPM) Northeast Power Coordinating Council, Inc. Regional Standard Processes Manual (RSPM) Approved b y F ERC: December 23, 2014 App r oved by NER C B oard of Trustees: A u gust 14, 2014 App r oved by NPCC B

More information

TOLEDO METROPOLITAN AREA COUNCIL OF GOVERNMENTS

TOLEDO METROPOLITAN AREA COUNCIL OF GOVERNMENTS REGIONAL WATER STUDY TO DETERMINE LEVEL OF SERVICE, COST OF SERVICE AND FINANCIAL FEASIBILITY STUDY FOR TOLEDO CONTRACT COMMUNITIES REQUEST FOR PROPOSALS TOLEDO METROPOLITAN AREA COUNCIL OF GOVERNMENTS

More information