Mobile Crane Tips Forward Discussion and Lessons Learned
|
|
- Brittney Joseph
- 6 years ago
- Views:
Transcription
1 Mobile Crane Tips Forward Discussion and Lessons Learned Doug Fogel, Performance Assurance Manager Portsmouth Gaseous Diffusion Plant Fluor B&W Portsmouth May 7,
2 Mobile Crane Tips Forward EM--PPPO-FBP-PORTSDD / NTS--PPPO-FBP-PORTSDD Near Miss -- Mobile Crane Tips Forward On October 9, 2012, a wheel-mounted mobile crane tilted forward coming to rest on both its front end and extended boom. There were no injuries. A licensed crane operator was extending the boom from a 60 ton capacity mobile crane with the intent of inspecting the end of the cabling near the spool. When the boom was extended approximately 100 feet w/o the use of outriggers, the weight of the block, cable and boom caused the crane to tip. The crane tilted forward and came to rest on the boom and the front bumper of the crane. Once the crane had stabilized, the operator was able to safely exit the cab and contact his supervisor who reported the event. As a result of the crane being tilted, approximately 1 to 2 gallons of diesel fuel spilled. 2
3 3
4 Immediate Actions Taken Notified Plant Shift Superintendent and Emergency Response initiated. Verified no injuries of crane operator. Incident Commander directed that a boundary be erected to control the area and prevent unauthorized entry. Environmental Compliance notified of fuel drip coming from fuel tank cap area. Contained fuel leak. FBP Management, Safety, Performance Assurance and the on-site DOE Facility Representative were notified. All mobile crane usage suspended until further notice. Operator was sent for drug-screening. 4
5 Immediate Actions Taken A Fact Finding meeting was held. Revoked operating qualifications of personnel involved in the incident. Performed an extent of condition review and developed a matrix of qualifications/certifications status of all site operators for mobile cranes, fixed building cranes, forklifts, and specialty/heavy equipment. Inspected all the mobile cranes and boom trucks for satisfactory operation and/or tagged out of service. Implemented access control for all mobile cranes via key checkout and supervisor authorization process. Developed a pre-op checklist for mobile cranes, which was implemented by Long Term Order (LTO). 5
6 Corrective Actions Taken 22 Corrective Actions were identified. Among others, the following actions were taken: Briefings given to all Maintenance personnel on ISMS principles and the event Meetings held with all Maintenance Supervisors on roles & responsibilities Additional training developed and presented on: Work Control process Hoisting & Rigging Mobile crane safety (made an annual refresher) 6
7 Corrective Actions Taken (continued) 22 Corrective Actions were identified. Among others, the following were actions were taken: Hoisting & Rigging Manual Developed Formalized heavy equipment key control program Formalized the use of heavy equipment pre-operational checklists Heavy equipment operating procedures reviewed & revised Required accredited, trained crane operators from subcontractors 7
8 Timeline of Events 10/31/11 FBP D&D Project Assumes GDP Custody & Site Operations. Moves from NRC to DOE Regulation 10/9/12 Prompt Notification made; ORPS report filed on following day 10/12 12/12 RCA Event Investigation and CAP development 01/25 02/14/13 Fulfilling Document Requests 11/13 1/14 Enforcement Conference preparation 07/24/14 FBP Acknowledges PNOV 10/9/12 Crane Tip Event 11/15/12 NTS Report Submitted 01/16/13 Notice of intent to Investigate 04/8 04/12/13 OE Investigation Conducted 10/28/13 Investigation Report Issued 01/22/14 Enforcement Conference 07/08/14 PNOV Issued 8
9 Preparation for OE Investigation FBP Preparations included the following: Team introduction and preliminary detail conference call Charge Number set up for segregation of costs Established team to address DOE OE document requests Documents sent electronically and by disc Documents printed, indexed, and available in interview room Encouraged early completion of corrective actions identified in CAP Requested time in Entrance Meeting to make short presentation Assembled Senior Managers and SMEs to prepare Entrance Meeting presentation Self-identified program weaknesses Held dry runs of presentation Conducted tour of event scene and limited site tour 9
10 Preparation for OE Investigation ESH&Q Manager and Performance Assurance Manager briefed interviewees OE investigation process and selection of interviewees Conduct of interviews: Individual interviews Union members may have Union Representation Can be conducted one-on-one or by investigation team Information will be confidential Interview Tips: Review pertinent information prior to the interview Relax they re not out to get you Answer the questions asked -- honestly and completely Don t relay assumptions/fill in the gaps It s okay to say I don t know but will get back with you. 10
11 OE Investigation Entrance Meeting Senior Manager Briefing All Directors in attendance Site Project Director, Event Owning Director, and ESH&Q Director presented overview of site transition: Most complex transition in DOE history Regulatory transition: NRC to DOE Dual operations SAR and BIO Consolidation of contracts Phased transition of 2 former contractors into FBP, Teaming Subcontractor, and 2 mentor Protégé Subcontractors Security program and infrastructure maintenance provided by another DOE prime contractor 11
12 OE Investigation Entrance Meeting Senior Manager Briefing D&D contract scope significantly expanded to complete accelerated delease of all former NRC regulated facilities Nuclear operations Uranium management Utility operations and service provider ISMS implementation status Immediate focus on highest hazard operations 5 event common cause analysis performed Implemented Reach-back program/process Numerous improvement initiatives centered on 5 ISMS Core Functions Site Project Director s Areas of Focus Where are we now? 12
13 Enforcement Conference Attendance limited to involved senior site management, corporate parent ESH&Q Directors, and Performance Assurance Manager Presentation: Senior Manager input, reviews, and dry runs Agreed with OE Investigation Report conclusions Summarized adjudication key points Emphasized accelerated and improved safety culture initiatives Provided factual accuracy comments Reviewed root and contributing causes for each noncompliance Provided summary corrective action lists and effectiveness evaluations for each Discussed mitigating factors: Event was self-revealing Prompt reporting Immediate actions and comprehensive investigation Programmatic ally focused corrective actions Prior fee reduction associated with event, 10 CFR 851.5(c) referenced 13
14 Enforcement Conference Room Preparation: Layout Name Tents Presentation computer-projected Presentation materials provided to OE to facilitate note-taking Call-in number provided Post-conference: Senior Manager debriefing Published meeting minutes / shared with OE for information 14
15 Final Investigation Results PNOV identified three noncompliances: Severity Level 1 Crane Operational Safety Severity Level 2 Hazard Identification, Assessment, Prevention and Abatement Severity Level 2 Training and Information Contract fee reduction previously imposed; no civil penalty proposed 15
16 Lessons Learned Incident Response: Immediate responsive actions and interim corrective actions are often necessary for safety issues and scene preservation Prompt reporting ORPS & NTS Ensure investigation is thorough and comprehensive Root Cause identified Contributing Causes identified Thorough extent of condition review Document document document 16
17 Lessons Learned Investigation preparation: Maintain open communications with OE promotes a good working relationship and ensures that additional information is provided if not requested Document Requests set up an electronic file transfer protocol if possible; it works better than and Fed-Ex. Prepare your interviewees; most are apprehensive and have never gone through an OE investigation Provide a site tour promotes better understanding of event, the site, and provides opportunity for informal discussion If unique circumstances exist, request opportunity to discuss at inbriefing Be available and flexible interview schedules will change routinely 17
18 Lessons Learned Enforcement Conference: This is your meeting: Use table tents it s helpful for both DOE OE and site personnel Provide a handout good for note-taking Do dry runs of presentation until comfortable Provide factual accuracy comments Provide an update on corrective actions and an effectiveness statement(s) Discuss mitigating factors 18
19 Questions? 19
Attachment J-8 Contractor / Supplier Submittal Register
Contractor / Supplier Register Number Title Technical Bid Package Subcontractor Request Form Labor Agreement Letter of Assent Proposal s L G 14 ACC Procurement s,,, Proc. File B H (7) 14 APP Proc. File
More information10CFR851 Worker Safety & Health Program Regulation February 2007
10CFR851 Worker Safety & Health Program Regulation February 2007 1 BACKGROUND The 2002 Bob Stump National Defense Authorization Act amended the Atomic Energy Act by adding section 234C Worker Health and
More informationProblem Solving Tools
Problem Solving Tools Report 162 Self Assessment of Radiation Safety Programs (2009) Report 173 - Investigation of Radiological Incidents (2012?) Mary L. Birch NC HPS Meeting October 4, 2012 Problem Solving
More informationDOE ENFORCEMENT PROGRAM ROLES AND RESPONSIBILITIES
NOT MEASUREMENT SENSITIVE DOE-HDBK-1085-95 August 1995 DOE HANDBOOK DOE ENFORCEMENT PROGRAM ROLES AND RESPONSIBILITIES U.S. Department of Energy Washington, D.C. 20585 AREA SAFT DISTRIBUTION STATEMENT
More informationNAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants
NAVSEA STANDARD ITEM ITEM NO: 009-01 DATE: 01 OCT 2017 CATEGORY: I 1. SCOPE: 1.1 Title: General Criteria; accomplish 2. REFERENCES: 2.1 Standard Items 2.2 40 CFR Part 61, National Emission Standards for
More informationSafety Policy and Procedure
Safety Policy and Procedure Policy Number: 024 Authorized By: The Cianbro Companies Alan Burton Title: Equipment Certification and Operation Program Effective Date: 09/05/05 Page 1 of 7 1 Status 1.1 Update
More informationRULES OF PROCEDURE FOR CALIBRATION LABORATORY ACCREDITATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RULES OF PROCEDURE FOR CALIBRATION LABORATORY ACCREDITATION 1.0 INTRODUCTION 1.1 Scope: The purpose of these rules is to
More informationRegulatory Approach for License Renewal for Commercial Nuclear Power Reactors in the USA
1 st NNR Regulatory Information Conference October 2016 Regulatory Approach for License Renewal for Commercial Nuclear Power Reactors in the USA William Bill M. Dean Director, Office of Nuclear Reactor
More informationAccident and Incident Investigation
Standard Operating Procedures Accident and Incident Investigation Last Modified: JAN 2013 1 of 8 Accident and Incident Investigation I Purpose To prevent the recurrence of Accidents and Incidents by ensuring
More informationINCIDENT COMMAND SYSTEM POSITION MANUAL HAZARDOUS MATERIALS GROUP SUPERVISOR ICS-1109
INCIDENT COMMAND SYSTEM POSITION MANUAL HAZARDOUS MATERIALS GROUP SUPERVISOR JULY 2016 JULY, 2016 This document contains information relative to the Incident Command System (ICS) component of the National
More informationNAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants
NAVSEA STANDARD ITEM ITEM NO: 009-01 DATE: 18 JUL 2014 CATEGORY: I 1. SCOPE: 1.1 Title: General Criteria; accomplish 2. REFERENCES: 2.1 40 CFR Part 61, National Emission Standards for Hazardous Air Pollutants
More informationAdministrative Policies and Procedures
Administrative Policies and Procedures Originating Venue: Environment of Care Policy No.: EC 2007 Title: Environment of Care Management Program Cross Reference: EC 2001 Date Issued: 04/14 Authority Environmental
More informationRULES OF PROCEDURE FOR TESTING LABORATORY ACCREDITATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RULES OF PROCEDURE FOR TESTING LABORATORY ACCREDITATION 1.0 INTRODUCTION 1.1 Scope: The purpose of these rules is to establish
More informationIncident Management Procedure
Incident Management Procedure Table of Contents 1 Intent... 3 2 Scope... 3 3 Responsibility... 3 4 Incident Management... 4 4.1 Incident Response And Investigation Flowchart... 4 4.2 Invoke Emergency Response...
More informationChapter 19 Section 3. Privacy And Security Of Protected Health Information (PHI)
Health Insurance Portability and Accountability Act (HIPAA) of 1996 Chapter 19 Section 3 1.0 BACKGROUND AND APPLICABILITY 1.1 The contractor shall comply with the provisions of the Health Insurance Portability
More informationSafety Management Functions, Responsibilities and Authorities Manual (FRAM) Revision 1
Safety Management Functions, Responsibilities and Authorities Manual (FRAM) Revision 1 DISTRIBUTION: All NNSA Revision INITIATED BY: Office of Operations and Construction Management Military Application
More informationESH Coordinator Roles and Responsibilities
This table lists each ESH Manual chapter (10 out of 40) with an entry for ESH coordinator in its Roles and Responsibilities section. The general responsibilities are described in Chapter 1. The other chapters
More informationMonitoring of Subgrantees
U.S. Department of Housing and Urban Development Monitoring of Subgrantees Thursday, May 5, 2011 2:00 PM 4:00 PM Community Planning and Development Introductions Jessie Handforth Kome, HUD David Noguera,
More informationWorkplace Inspections
Workplace Inspections 1.0 Purpose Workplace inspections help prevent injuries and illnesses. Through critical examination of the campus, inspections identify and record hazards for corrective action. A
More informationCorporate Safety Manual. Chapter 14 Near Miss Reporting
Corporate Safety Manual Chapter 14 Near Miss Reporting Last updated: April 2015 Near Miss Reporting Chapter 14: Near Miss Reporting Index Page Introduction...14-3 Process...14-4 Near Miss Events to be
More informationManager on Duty Tip of the Spear in Crisis Management
Manager on Duty Tip of the Spear in Crisis Management Your Guests Your Responsibility Vacation: Defined From Old French Vacare, verb: to be unoccupied, repose, left empty of thought or ineffective. Does
More informationIssued: Thursday, October 15, City of Grand Blanc, 203 E. Grand Blanc Road, Grand Blanc, MI 48439, Attn: Bethany Smith, City Clerk
CITY OF GRAND BLANC REQUEST FOR PROPOSAL FOR PRE-DEMOLITION INVESTIGATION AND SURVEY OF ASBESTOS AND HAZARDOUS MATERIALS FOR THE STRUCTURE AT 113 REID ROAD, GRAND BLANC, MICHIGAN 48439 Issued: Thursday,
More informationREQUEST FOR PROPOSAL NYS DOL HAB T & T. Occupational Safety and Health Training and Education Grant. for
REQUEST FOR PROPOSAL NYS DOL HAB T & T Occupational Safety and Health Training and Education Grant for 2014-2015 Awarded to The BEST Center at Genesee Community College One College Road Batavia, NY 14020
More informationUnderstanding Audits and Common Audit Findings. Draft Manageme nt Decision
Understanding Audits and Common Audit Findings CNCS and OIG Oversight Activities The OIG conducts four to six audits of commissions and or subgrantees each year CNCS program and/or grants staff conduct
More informationAudits, Administrative Reviews, & Serious Deficiencies
Audits, Administrative Reviews, & Serious Deficiencies 20 Contents Section A Audits...20.2 Section B Administrative Reviews...20.3 Entrance Interview...20.3 Records Review...20.3 Meal Observation...20.5
More informationNRC INSPECTION MANUAL IRIB
NRC INSPECTION MANUAL IRIB MANUAL CHAPTER 2517 WATTS BAR UNIT 2 CONSTRUCTION INSPECTION PROGRAM 2517-01 PURPOSE...1 2517-02 OBJECTIVES...1 2517-03 APPLICABILITY...2 2517-04 DEFINITIONS...2 2517-05 RESPONSIBILITIES
More informationINCIDENT COMMAND SYSTEM Hazardous Materials LESSON ICS Hazardous Materials Refuge Area Manager
LESSON TOPIC: HAZARDOUS MATERIALS REFUGE AREA MANAGER TIME FRAME: LEVEL OF INSTRUCTION: 15 Minutes Level I BEHAVIORAL OBJECTIVE: Condition: Given a written examination Behavior: The student will recognize
More informationREQUEST FOR QUALIFICATIONS
REQUEST FOR QUALIFICATIONS Architectural and Engineering Services Intermodal Transportation Center Complex Greensboro, North Carolina Invitation Date: September 19, 2014 1.0 INTRODUCTION The Piedmont Authority
More informationOklahoma State University Policy and Procedures INSTITUTIONAL RADIATION SAFETY POLICY
Oklahoma State University Policy and Procedures INSTITUTIONAL RADIATION SAFETY POLICY 4-0302 RESEARCH December 2014 PURPOSE 1.01 The purpose of this policy is to formalize Oklahoma State University s (hereinafter
More information2. The Director of Safe and Secure Schools shall have at least five (5) years of successful teaching, administrative, and/or supervisory experience.
DIRECTOR OF SAFE AND SECURE SCHOOLS A. QUALIFICATIONS: 1. The Director of Safe and Secure Schools shall hold at least a master s degree from an accredited college or university and a valid administrator
More informationOIG AUDIT A GRANTEE S PERSPECTIVE
OIG AUDIT A GRANTEE S PERSPECTIVE FLOOD SUMMER OF 2011 CDBG-DR ALLOCATION $67 MILLION 2012 CDBG-DR ALLOCATION $35 MILLION 2013 NOT AN ENTITLEMENT CITY BUT TREATED AS ONE THE LETTER OIG AUDIT NOTIFICATION
More informationOutreach Training Program
I. Directorate of Training and Education Outreach Training Program [ Construction Industry Procedures Revised January 1, 2018 Effective April 1, 2018 Occupational Safety and Health Administration (OSHA)
More informationAerial Work Platform Program. Risk Management
Aerial Work Platform Program Table of Contents I. Program Goals and Objectives... 3 II. Scope and Application... 3 III. Definitions... 3 IV. Responsibilities... 3 V. Personal Fall Arrest Equipment... 4
More informationSubrecipient Monitoring Under 2 CFR 200. Kris Rhodes, MS Director, Higher Education Practice
Subrecipient Monitoring Under 2 CFR 200 Kris Rhodes, MS Director, Higher Education Practice krisrhodes@maximus.com 1 MAXIMUS Higher Education Practice Headquartered in Northbrook, IL Satellite Offices
More informationMass Casualty Incident (MCI)
Mass Casualty Incident (MCI) This Mass Casualty Incident (MCI) procedure is to be used for any incident when the number of injured exceed the capabilities of the first arriving units to efficiently triage,
More informationNOT FOR USE - REVIEW ONLY
Partnerships SECOR Self-Assessment Quality Assurance Form Audit Reviewer #: (Enter # only See PA for #) Employer Legal Name: Employer Trade Name: Assessor Name: Audit Review Date: Final Report Date: Final
More informationVERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES
ORDER DOE O 425.1D Approved: VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES U.S. DEPARTMENT OF ENERGY Office of Health, Safety and Security DOE O 425.1D 1 VERIFICATION OF READINESS
More information2018 CDBG Housing Fund
2018 CDBG APPLICATION WORKSHOP Housing Overview Steven Benne, Project Manager Nichole Hansen, Community Investments Team Leader» 2017 set-aside was approximately $4.7 million 2018 allocation could be similar
More informationANNEX Q HAZARDOUS MATERIALS EMERGENCY RESPONSE
ANNEX Q HAZARDOUS MATERIALS EMERGENCY RESPONSE PROMULGATION STATEMENT Annex Q: Hazardous Materials Emergency Response, and contents within, is a guide to how the University conducts a response specific
More informationWhy Investigate Incidents? Prevention Improve Systems and Quality Correction Minimize enforcement actions Compliance. Required Investigations
Abuse & Incident Investigations: Is Your Facility CSI Team In Place? OHCA Annual Convention / April 2015 Michele A. Conroy, Esq. Rolf Goffman Martin Lang LLP Dustin Ellinger, BSN, MHA, RN Rolf Consulting
More informationPROPOSAL SUBMITTALS: Responses to the Request for Proposal (RFP) are to be submitted to:
C I T Y O F T U S T I N 3 0 0 C e n t e n n i a l W a y T u s t i n, C a l i f o r n i a 9 2 7 8 0 R E Q U E S T F O R P R O P O S A L S for a Boom Lift PROPOSAL SUBMITTALS: Responses to the Request for
More informationWorkplace Safety and Health Management System Administration
Workplace Safety and Health Management System Administration - River East Transcon... Page 1 of 36 July 19, 2018 No school today Workplace Safety and Health Management System Administration SAFE OPERATING
More informationAC291 Special Inspection Agencies ACCREDITATION CRITERIA FOR IBC SPECIAL INSPECTION AGENCIES AC291
AC291 Special Inspection Agencies ACCREDITATION CRITERIA FOR IBC SPECIAL INSPECTION AGENCIES AC291 About IAS International Accreditation Service (IAS) is a wholly owned subsidiary of the International
More informationSCENARIO 19 Emergency Planning for a Propane Bulk Plant
INCIDENT OVERVIEW You are the manager of a large propane bulk plant. You receive a call from the Sheriff s Department at 2:15 am. There is a fire at your facility! The Sheriff s Department Dispatcher informs
More informationThe Safety Audit. Safety Audits Why Bother? Oh no.. 4/26/2017. I need some help but where can I get it????? Does it really matter? I hate metrics!
Safety Audits Why Bother? TriState Histology Symposium 2017 Double Tree Hotel, Rochester, MN May 5, 2017 10:30 am 12:00 pm Patricia J. Hlavka, MS, CSP Oh no.. I ve never done this before! Does it really
More informationDEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Los Angeles District, Phoenix Office 3636 N. Central Ave., Suite 900 Phoenix, AZ 85012
DEPARTMENT OF THE ARMY Los Angeles District, Phoenix Office 3636 N. Central Ave., Suite 900 Phoenix, AZ 85012 January 21, 2014 REPLY TO ATTENTION OF: Office of the Chief Roderick Lane, P.E. ADOT Tucson
More informationResearch and Test Reactor Licensing Actions and Lessons Learned
Research and Test Reactor Licensing Actions and Lessons Learned Duane A. Hardesty Research and Test Reactor Licensing Branch September 23, 2010 1 License Renewal General Overview Streamlined Process Outline
More informationNational Incident Management System (NIMS) & Water Utilities: Planning & Emergency Operations
National Incident Management System (NIMS) & Water Utilities: Planning & Emergency Operations Matthew P Bernard NIMS Coordinator FEMA Region X May 2016 Objectives Understand how NIMS fits into the National
More informationA Bill Regular Session, 2015 HOUSE BILL 1162
Stricken language would be deleted from and underlined language would be added to present law. Act of the Regular Session 0 State of Arkansas 0th General Assembly As Engrossed: H// S// A Bill Regular Session,
More informationToolbox Deployment Incident Overview
Toolbox Deployment Incident Overview Toolbox Complex Fire near Picture Rock Pass, Fremont National Forest, Oregon July 24, 2002 In this overview: A summary of the facts of the deployment incident An abridged
More informationINCIDENT COMMAND SYSTEM. Position Manual SAFETY OFFICER- HIGH RISE INCIDENT ICS-HR-222-7
INCIDENT COMMAND SYSTEM Position Manual SAFETY OFFICER- HIGH RISE INCIDENT January 28, 1999 This document contains information relative to the Incident Command System (ICS) component of the National Incident
More informationNUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN ADMINISTRATIVE PROCEDURES - GENERAL REVIEW RESPONSIBILITIES
NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN 13.5.1.1 ADMINISTRATIVE PROCEDURES - GENERAL REVIEW RESPONSIBILITIES Primary - Organization responsible for the review of human performance
More informationINCIDENT COMMAND SYSTEM POSITION MANUAL ASSISTANT SAFETY OFFICER- HAZARDOUS MATERIALS ICS-1102
INCIDENT COMMAND SYSTEM POSITION MANUAL ASSISTANT SAFETY OFFICER- HAZARDOUS MATERIALS ICS-1102 JULY 2016 This document contains information relative to the Incident Command System (ICS) component of the
More information(Revised January 15, 2009) DISCLOSURE OF INFORMATION (DEC 1991)
(Revised January 15, 2009) 252.204-7000 Disclosure of Information. As prescribed in 204.404-70(a), use the following clause: DISCLOSURE OF INFORMATION (DEC 1991) (a) The Contractor shall not release to
More informationU.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN
U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN NUREG-0800 3.5.1.4 MISSILES GENERATED BY EXTREME WINDS REVIEW RESPONSIBILITIES Primary - Organization responsible for the review of plant design
More informationFlorida MIECHV Initiative Provider Quality Assurance Monitoring Procedure Manual
2016 Florida MIECHV Initiative Provider Quality Assurance Monitoring Procedure Manual Florida MIECHV Initiative This project is/was supported by the Health Resources and Services Administration (HRSA)
More informationSingle Audit Entrance Conference Uniform Guidance Refresher
Single Audit Entrance Conference Uniform Guidance Refresher MGO Audit Partner Annie Louie 31 Uniform Guidance Effective Date Federal Agencies Implement policies and procedures by promulgating regulations
More informationDOE B, SAFEGUARDS AGREEMENT WITH THE INTERNATIONAL ATOMIC SYMBOL, AND OTHER CHANGES HAVE BEEN BY THE REVISIONS,
DOE 1270.2B THIS WITH PAGE MUST BE KEPT THE INTERNATIONAL WITH DOE 1270.2B, SAFEGUARDS AGREEMENT ATOMIC ENERGY AGENCY. DOE 1270.2B, SAFEGUARDS AGREEMENT WITH THE INTERNATIONAL ATOMIC ENERGY AGENCY, HAS
More informationNRC REGULATORY ISSUE SUMMARY TRANSPORTATION OF RADIOACTIVE MATERIAL QUANTITIES OF CONCERN NRC THREAT ADVISORY AND PROTECTIVE MEASURES SYSTEM
SAFEGUARDS INFORMATION-MODIFIED HANDLING UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NUCLEAR MATERIALS SAFETY AND SAFEGUARDS WASHINGTON. D.C. 20555-0001 July
More informationNRC Public Meeting October 27, 2014
NRC Public Meeting October 27, 2014 Post-Shutdown Decommissioning Activities Report Decommissioning Principles Safety Stewardship Engagement For more information on SONGS please visit www.songscommunity.com
More informationERN Assessment Manual for Applicants 2. Technical Toolbox for Applicants
Share. Care. Cure. ERN Assessment Manual for Applicants 2. Technical Toolbox for Applicants An initiative of the Version 1.1 April 2016 1 History of changes Version Date Change Page 1.0 16.03.2016 Initial
More informationResearch Audits PGR. Effective: 12/04/2013 Reviewed: 12/04/2015. Name of Associated Policy: Palmetto Health Administrative Research Review
Effective: 12/04/2013 Reviewed: 12/04/2015 Name of Associated Policy: Palmetto Health Administrative Research Review Definitions Responsible Positions Equipment Needed Procedure Steps, Guidelines, Rules,
More informationNOVA SOUTHEASTERN UNIVERSITY
NOVA SOUTHEASTERN UNIVERSITY DIVISION OF RESPONSIBILITIES FOR RESEARCH AND SPONSORED PROGRAMS Vice President of Research & Technology Transfer: The responsibilities of the Vice President of Research &
More informationIncident Management June 2018
Incident Management June 2018 Table of Contents 1.0 Purpose... 1 2.0 Scope... 1 3.0 Definitions... 1 4.0 Responsibilities... 2 4.1. Senior Executives, Deans and Directors... 2 4.2. Supervisors... 3 4.3.
More informationNear-miss Injury Security Officer Hit by Vehicle
Near-miss Injury Security Officer Hit by Vehicle Purpose To share lessons learned gained from incident investigations through a small group discussion method format. To understand lessons learned through
More informationA. General provisions and other electrical systems are specified in other Sections of Division 26.
PART 1: GENERAL 1.01 DESCRIPTION: A. General provisions and other electrical systems are specified in other Sections of Division 26. B. Commissioning is an ongoing process and shall be performed throughout
More informationMEMORANDUM OF UNDERSTANDING (MOU) BETWEEN THE CANADIAN NUCLEAR SAFETY COMMISSION AND ENVIRONMENT CANADA
1"' t 1",.. "1"''" "\ MEMORANDUM OF UNDERSTANDING (MOU) BETWEEN THE CANADIAN NUCLEAR SAFETY COMMISSION AND ENVIRONMENT CANADA WHEREAS the Canadian Nuclear Safety Commission (hereinafter, "the Commission")
More informationREGULATORY DOCUMENTS. The main classes of regulatory documents developed by the CNSC are:
Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire REGULATORY GUIDE Emergency Planning at Class I Nuclear Facilities and Uranium Mines and Mills G-225 August 2001 REGULATORY DOCUMENTS
More informationICS MANUAL CHAPTER 2 EMS OGP March 23, 2006 ICS POSITION DESCRIPTION AND RESPONSIBILITIES
ICS MANUAL CHAPTER 2 EMS OGP 112-02 ICS POSITION DESCRIPTION AND RESPONSIBILITIES 1. POSITION DESCRIPTION AND RESPONSIBILITIES 1.1 Incident Command Organization The Incident Command System (ICS) is a combination
More informationIncident Management Practice
Operations Health & Safety Incident Management Practice Program H&S Discipline Content Owner Custodian Document Number Incident Management Occupational Health and Safety Manager, Central Health & Safety
More informationSample worker orientation checklist
Employee name: Position (tasks): First day of work: Date(s) of orientation: Person providing orientation (name and position): Company name: Topic Initials (trainer) Initials (worker) Comments 1. Supervisor
More informationAgency for Health Care Administration
Page 1 of 13 ST - P0000 - Initial Comments Title Initial Comments Statute or Rule Type Memo Tag ST - P0102 - Registration Changes Title Registration Changes Statute or Rule 400.980(2) FS; 59A-27.002(1)
More informationVoluntary Protection (VPP) Orientation
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability
More information(Company name) Health and Safety Plan
(Company name) Health and Safety Plan 1 Index I II III IV V VI VII VIII IX Safety Policy Statement Accident/Injury Analysis Component Safety Program Record keeping Component Health and Safety Education
More informationUNIVERSITY OF SOUTHERN MAINE Office of Research Integrity & Outreach
UNIVERSITY OF SOUTHERN MAINE Office of Research Integrity & Outreach Procedure #: IACUC - 001 Date Adopted: May 5, 2017 Last Updated: Prepared By: Casey Webster, Research Compliance Administrator Reviewed
More informationREQUEST FOR PROPOSAL FOR. Security Cameras
REQUEST FOR PROPOSAL FOR Security Cameras December 2015 (THIS IS A FEDERALLY FUNDED PROJECT) RFP TABLE OF CONTENTS PAGE I. Introduction and Project Description 3 II. General Conditions 5 III. Locations
More informationCrane Bashes Pipes. Lessons Learned. Volume 03 Issue USW
Crane Bashes Pipes Lessons Learned Volume 03 Issue 13 2004 USW Crane Bashes Pipes Purpose To conduct a small group lessons learned activity to share information gained from incident investigations. To
More informationPHYSIOTHERAPY ACT STANDARDS AND DISCIPLINE REGULATIONS
c t PHYSIOTHERAPY ACT STANDARDS AND DISCIPLINE REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to July 11, 2009.
More informationCHAPTER SIX RESNET STANDARDS 600 ACCREDIATION STANDARD FOR SAMPLING PROVIDERS
CHAPTER SIX RESNET STANDARDS 600 ACCREDIATION STANDARD FOR SAMPLING PROVIDERS 601 GENERAL PROVISIONS 601.1 Purpose. Sampling is intended to provide certification that a group of new homes meets a particular
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 64-106 4 MAY 2017 Contracting CONTRACTOR LABOR RELATIONS ACTIVITIES COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications
More informationKanawha Putnam Emergency Management Plan Functional Annex. (completed by plan authors) Local / County Office of Emergency Management
Kanawha Putnam Emergency Management Plan Functional Annex Chemical HazMat Response A16 Coordination: Primary Agency: (completed by plan authors) Local / County Office of Emergency Management Support Agencies:
More informationThe U.S. military has successfully completed hundreds of Relief-in-Place and Transfers of
The LOGCAP III to LOGCAP IV Transition in Northern Afghanistan Contract Services Phase-in and Phase-out on a Grand Scale Lt. Col. Tommie J. Lucius, USA n Lt. Col. Mike Riley, USAF The U.S. military has
More informationNYC Agency Safe Handling Program for Universal & Electronic Waste
Agency Safe Handling Program for Universal & Electronic Waste Dave Hirschler Director, Waste Prevention Unit Department of Sanitation Consent Agreement In August, 2009, entered into a consent agreement
More information1. Definitions. See AFI , Air Force Nuclear Weapons Surety Program (formerly AFR 122-1).
Template modified: 27 May 1997 14:30 BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 91-103 11 FEBRUARY 1994 Safety AIR FORCE NUCLEAR SAFETY CERTIFICATION PROGRAM COMPLIANCE WITH THIS
More informationINJURY & ILLNESS PREVENTION PROGRAM REQUIREMENTS
INJURY & ILLNESS PREVENTION PROGRAM REQUIREMENTS The following represents an overview of the Cal/OSHA requirements for an Injury & Illness Prevention Program as presented in this Manual IN COMPLIANCE WITH
More informationTANZANIA CIVIL AVIATION AUTHORITY AERODROMES AND AIR NAVIGATION SERVICES. Foreword
AERODROMES AND AIR NAVIGATION SERVICES Revision: 1 Title: ANS Inspector Handbook Page 1 of 62 Foreword The Civil Aviation safety oversight program has been implemented to promote and ensure conformance
More informationSecurity Programs for Category I or II Nuclear Material or Certain Nuclear Facilities
REGULATORY GUIDE Security Programs for Category I or II Nuclear Material or Certain Nuclear Facilities G-274 March 2003 REGULATORY DOCUMENTS The Canadian Nuclear Safety Commission (CNSC) operates within
More informationADMINISTRATIVE PRACTICE LETTER TABLE OF CONTENTS
Page(s) 1 of 12 TABLE OF CONTENTS I. General II. Responsibilities a. Chancellor b. University Presidents c. Vice Presidents, Provosts, Deans d. Chairs and Directors e. Faculty and Instructors f. Supervisors
More informationColdspring Excelsior Fire and Rescue Standard Operating Policies 6565 County Road 612 NE Kalkaska, MI Section 4.13 INCIDENT COMMAND MANAGEMENT
Coldspring Excelsior Fire and Rescue Standard Operating Policies 6565 County Road 612 NE Kalkaska, MI 49646 Section 4.13 INCIDENT COMMAND MANAGEMENT The purpose of an Incident Command Management System
More informationPresentation to the Helicopter Offshore Safety Inquiry
EXHIBIT/P-00187 Presentation to the Helicopter Offshore Safety Inquiry Howard Pike Chief Safety Officer C-NLOPB February 2010 Incidents Agenda Complaints Safety Audits Communications Compliance and Enforcement
More informationAPPENDIX A MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION PLANS
This document is not an official Corps of Engineers publication, but has been copied from the original EM 385 1 1 and presented here as a training aid. APPENDIX A MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION
More informationSEC J - Appendix G Modifications to Applicable Directives
DOE O 110.3A DOE O 130.1 DOE M 140.1-1B DOE O 142.1 DOE M 142.2-1, DOE O 142.2A, DOE O 142.3A Conference Management Budget Formulation Interface with the Defense Nuclear Facilities Safety Board Classified
More informationWORKPLACE VIOLENCE PREVENTION CHECKLIST
WORKPLACE VIOLENCE PREVENTION CHECKLIST PURPOSE Workers in health care facilities face significant risks of workplace violence. This Health care Checklist is designed as a prevention tool to enable health
More informationIncident Reporting, Notification, and Review Procedure
Incident Reporting, Notification, and Review Procedure 1. Purpose and Scope 1.1. The purpose of this procedure is to require incident reporting and notification and to aid the University of Notre Dame
More informationReference Guide for Employer Incident Investigations
Reference Guide for Employer Incident Investigations Purpose of this guide This guide is intended for those who conduct or participate in workplace incident investigations: employers, joint health and
More informationDEPARTMENT OF THE ARMY HEADQUARTERS U.S. ARMY MANEUVER SUPPORT CENTER AND FORT LEONARD WOOD FORT LEONARD WOOD, MISSOURI
*FLW Reg 672-11 DEPARTMENT OF THE ARMY HEADQUARTERS U.S. ARMY MANEUVER SUPPORT CENTER AND FORT LEONARD WOOD FORT LEONARD WOOD, MISSOURI 65473-5000 FLW Regulation 19 June 2002 No 672-11 Decorations, Awards
More informationHealthcare Professions Registration and Standards Act 2007
You are here: PacLII >> Databases >> Consolidated Acts of Samoa 2015 >> Healthcare Professions Registration and Standards Act 2007 Database Search Name Search Noteup Download Help Healthcare Professions
More informationIncident Investigations Handbook
Incident Investigations Handbook The following agencies may respond to an incident (insert phone numbers of your location) Police Fire/rescue Ambulance Coroner WorkSafeBC BC Safety Authority ICBC BC Hydro
More informationU.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN
NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN 3.5.1.4 MISSILES GENERATED BY EXTREME WINDS REVIEW RESPONSIBILITIES Primary - Organization responsible for the review of plant design
More informationInjury and Illness Prevention Program and Safety Procedures Manual
Injury and Illness Prevention Program and Safety Procedures Manual City of Redding, California June 2007 City of Redding Injury and Illness Prevention Program and Safety Procedures Manual Table of Contents
More information