Attachment J-8 Contractor / Supplier Submittal Register

Size: px
Start display at page:

Download "Attachment J-8 Contractor / Supplier Submittal Register"

Transcription

1 Contractor / Supplier Register Number Title Technical Bid Package Subcontractor Request Form Labor Agreement Letter of Assent Proposal s L G 14 ACC Procurement s,,, Proc. File B H (7) 14 APP Proc. File H.18 D (7) INF Proc. File Performance Bond B.9 (a) Other APP Proc. File Payment Bond B.9 (a) Other APP Proc. File Pay Item Schedule, Other: Other: G.5.1 (b) Other APP Invoice CAM/WPM CAM/WPM Proc. File Pay Item Invoice Summary G.5.1 (b) Other APP Proc. File Commercial Request for H (7) 7 ACC Proc. File Information (RFI) Certificate of Insurance H.24 (i) Other 7 INF Proc. File Injury/Illness and/or DC (Project Off-Normal H (7) 7 APP File) Occurrence Report Contractor Overtime Request Progress Payment Release Final Release Payment C , Attachment J-12 H (7) 7 APP G.5.1 (a) Other 7 APP G.5.1 (c) Other 45 APP DC (Project File) A = Within X days after award = Procurement APP = = Eng of Record = Eng of Record = Eng of Record B = XX days max. from NTP DC = Control ACC = Acceptance = Quality = Quality = Quality C = Prior to Authorization to Mobilize INF = Information = Welding, Construction Eng = Welding, Construction Eng = Welding, Construction Eng E = XX days after completion of activity = Health, Safety, Environ. = Health, Safety, Environ. = Health, Safety, Environ.

2 Contractor / Supplier Register Number Title Pay Item Schedule Invoice 10 CFR 851 Fit For Duty Evaluation Contractor OSHA Competent Person Designation Contractor OS&H Representative Designation Contractor IH Representative Designation Final Contractor s Work Plan Job Hazard Analysis (JHA) Contractor s Project Safety and Health Program Final Contractor s Project Specific Quality Assurance Plan Final Contractor s Erosion and Sedimentation Control Plan Written hazardous Communication Program G.6.1 (b), Attachment J-27 Pre-Mobilization s A = Within X days after award = Procurement APP = = Eng of Record = Eng of Record = Eng of Record B = XX days max. from NTP DC = Control ACC = Acceptance = Quality = Quality = Quality C = Prior to Authorization to Mobilize INF = Information = Welding, Construction Eng = Welding, Construction Eng = Welding, Construction Eng E = XX days after completion of activity = Health, Safety, Environ. = Health, Safety, Environ. = Health, Safety, Environ. Other DC APP, Other: CAM/WPM Other: CAM/WPM C (14), H (7) 7 DC ACC, H (7) 7 DC ACC,, C (7) 7 DC APP, C (14) 7 DC APP, C A (7), C (14) 7 DC APP C A (7), C (14) 7 DC APP A (7), C (14) 7 DC APP C B (30), C (14) 7 DC APP C.3.5.1, 02270AR Part A (7), C (14) 7 DC APP Attachment J-13 B (30), C (14) 7 DC APP,, EP,, EP,,,,,

3 Contractor / Supplier Register Number Title -012 Detailed Schedule C C (14) 7 DC APP Pre-Employment Drug Testing Consent Form Statement Personnel Training Matrix Employee Resumes and Training Records with Verification Certificates Key Personnel Replacement Resumes Initial Baseline IH Survey Sample Results Heavy Equipment Checklists Proposed Control Points for Verification Chemical List and Safety Data Sheets, H.84 C (14) 7 DC ACC OTHER: HR OTHER: HR HR/, Exhibit 11 C.3.5.1, C (14) 7 DC APP, A (7), C (14) 7 DC ACC OTHER: TRAINING OTHER: TRAINING C C 7 DC APP,, Pre-Construction s D (7) 7 DC ACC C D (14) 7 DC ACC 1.05D D (7) 7 DC APP, Other: Equipment Manager C.5.3.3, D (14) 7 DC ACC A = Within X days after award = Procurement APP = = Eng of Record = Eng of Record = Eng of Record B = XX days max. from NTP DC = Control ACC = Acceptance = Quality = Quality = Quality C = Prior to Authorization to Mobilize INF = Information = Welding, Construction Eng = Welding, Construction Eng = Welding, Construction Eng E = XX days after completion of activity = Health, Safety, Environ. = Health, Safety, Environ. = Health, Safety, Environ.

4 Contractor / Supplier Register Number Title Lift Plan including hoisting and rigging operator and equipment Information Written Commitment to follow FBP Hoisting and Rigging Guidelines Signed Equipment Operator Statement of Personnel Proficiency including Operator Professional Surveyor s license and resumes of the party chief(s) List of survey instruments and equipment with calibration records. Technical Data for contractor provided lasers., 02760AR Part C , 1.05A 1.05B A = Within X days after award = Procurement APP = = Eng of Record = Eng of Record = Eng of Record B = XX days max. from NTP DC = Control ACC = Acceptance = Quality = Quality = Quality C = Prior to Authorization to Mobilize INF = Information = Welding, Construction Eng = Welding, Construction Eng = Welding, Construction Eng E = XX days after completion of activity = Health, Safety, Environ. = Health, Safety, Environ. = Health, Safety, Environ. D (7) 7 DC APP Other: Hoisting & Rigging Manager D (7) 7 DC ACC, D (7) 7 DC ACC, B (10) 7 DC APP B (10) 7 DC ACC D (14) 7 DC ACC,,,,,,

5 Contractor / Supplier Register Number Title Environmental Compliance for Fuel-Burning Equipment Pipe Testing procedures, pressure gauge calibration certificate, and calibration and pressure setting of relief valves. Operating Logs for Regulatory Exempt Equipment Additional Contractor Work Plans Technical Request for Information (RFI) Monthly Project Schedule Update Contractor Daily Report Transmittal Receipt Acknowledgment Field Change Request C H (14) 14 DC ACC 02510AR Part 1.04L C H (14) 14 DC APP Construction s C.3.5 H (7) 7 DC APP Attachment 6 H (14) 14 DC ACC EP, EP, C.6.6 H (7) 7 DC ACC, C.7.1 H (7) 7 DC ACC C.2.0 H (7) 7 DC ACC OTHER: RMDC C.8.6 H (7) 7 DC OTHER,, A = Within X days after award = Procurement APP = = Eng of Record = Eng of Record = Eng of Record B = XX days max. from NTP DC = Control ACC = Acceptance = Quality = Quality = Quality C = Prior to Authorization to Mobilize INF = Information = Welding, Construction Eng = Welding, Construction Eng = Welding, Construction Eng E = XX days after completion of activity = Health, Safety, Environ. = Health, Safety, Environ. = Health, Safety, Environ.

6 Contractor / Supplier Register Number Title Non-Conformance Report Corrective Action Report Requests for street closures Erosion Control Device Inspection Reports Material Test Reports Final Survey for Acceptance Survey notes and calculations Notice of Completion As-Built Drawings, Sketches, and Survey Notes Attachment J-16 H (7) 7 DC APP Attachment J-16 H (7) 7 DC APP C H (7) 7 DC APP C.3.6 H (30) 7 DC ACC C.8.4 H 7 DC APP C.3.6, 1.05G C.3.7, s 1.05E, 3.03B E (14) 14 DC ACC Construction Completion/Close Out s Other 7 DC APP,,,,,,, OTHER: PSS, Security,,,,,,,,,,,,,,, H.54 (a) Other 7 DC ACC C.3.6, 1.05G Other 14 DC ACC Contract s,,, A = Within X days after award = Procurement APP = = Eng of Record = Eng of Record = Eng of Record B = XX days max. from NTP DC = Control ACC = Acceptance = Quality = Quality = Quality C = Prior to Authorization to Mobilize INF = Information = Welding, Construction Eng = Welding, Construction Eng = Welding, Construction Eng E = XX days after completion of activity = Health, Safety, Environ. = Health, Safety, Environ. = Health, Safety, Environ.

7 Contractor / Supplier Register Number Title ation Verifying Accuracy of Survey Work Electronically Collected Field Survey Information Material Marker Tape Catalogue Cut Sheet Trench Shoring and Walkway Design Material Manufacturer s Product Data and Material Manufacturer s Product Data, drawings and sketches, and recommendatio ns. 1.05F 3.01A 02215AR Part 02215AR Part 1.04B 02215AR Part 02230AR Part 02270AR Part 02271AR Part 02721AR Part A = Within X days after award = Procurement APP = = Eng of Record = Eng of Record = Eng of Record B = XX days max. from NTP DC = Control ACC = Acceptance = Quality = Quality = Quality C = Prior to Authorization to Mobilize INF = Information = Welding, Construction Eng = Welding, Construction Eng = Welding, Construction Eng E = XX days after completion of activity = Health, Safety, Environ. = Health, Safety, Environ. = Health, Safety, Environ. D (7) 7 DC APP E (7) 7 DC APP,,,,,,,,,

8 Contractor / Supplier Register Number Title Pavement Marking Installation ation Manufacturer s Product Data, drawings and sketches, and recommendatio ns. Manufacturer s Personnel Training and Qualifications for fusible PVC from Manufacturer Pipe Label Samples and Material Rebar schedule, details, and drawings Concrete Design Mix Concrete Batch Ticket 02760AR Part 02510AR Part 02510AR Part 02510AR Part 1.04E 02510AR Part 1.04K 03100AR Part AR Part AR Part E (3) 7 DC ACC D (14) 7 DC ACC H (7) 7 DC ACC,,,,,,,, A = Within X days after award = Procurement APP = = Eng of Record = Eng of Record = Eng of Record B = XX days max. from NTP DC = Control ACC = Acceptance = Quality = Quality = Quality C = Prior to Authorization to Mobilize INF = Information = Welding, Construction Eng = Welding, Construction Eng = Welding, Construction Eng E = XX days after completion of activity = Health, Safety, Environ. = Health, Safety, Environ. = Health, Safety, Environ.

9 Contractor / Supplier Register Number Title Pre-engineered Metal Building Structural Steel s Cold-formed Steel Members Roof and Wall Panels Utility Piping Material List Test Equipment Certification 13120AR Part 13120AR Part 13120AR Part 13120AR Part 15074AR Part 1.02A 16450AR Part 16450AR Part D (14) 14 DC ACC D (14) 14 DC ACC D (14) 14 DC ACC D (14) 14 DC ACC D (30) 30 DC APP,,,,,,,,,,,,,,,,, A = Within X days after award = Procurement APP = = Eng of Record = Eng of Record = Eng of Record B = XX days max. from NTP DC = Control ACC = Acceptance = Quality = Quality = Quality C = Prior to Authorization to Mobilize INF = Information = Welding, Construction Eng = Welding, Construction Eng = Welding, Construction Eng E = XX days after completion of activity = Health, Safety, Environ. = Health, Safety, Environ. = Health, Safety, Environ.

10 Contractor / Supplier Register Instructions Completion of the Register Part I Instructions for Fluor-B&W Portsmouth LLC 1. FBP will insert the submittal number as follows: Contract Number/PO Number Sequential number Contract # Sequence# 001 Contract # Sequence # Note: When additional submittals are required the Contractor shall enter the next sequential number in that submittal group (i.e. if the last submittal number in a group was , the next submittal number would be --026).FBP will insert the Title 3. FBP will insert the /PO/or Contract the submittal is referenced in 4. FBP will replace the XX with the desired number of days on the Schedule date A Within XX days after award B XX days max from Notice to Proceed (NTP) C Prior to authorization to mobilize D XX days prior to start of the activity E XX days after completion of activity F Prior to entry G With Bid / With Proposal H As required/as Needed 5. FBP will insert the Period for each submittal listed 6. FBP will insert who the vendor is required to submit the submittal to within the FBP organization Procurement DC Control 7. FBP will insert the code APP Approved ACC Accepted INF Information Other As Identified 8. FBP will insert the ers Engineer of Record Quality Construction Procurement Health, Safety, Environmental J-8-10

11 Contractor / Supplier Register Other As identified 9. FBP will insert the Approver Engineer of Record Quality Construction Procurement Health, Safety, Environmental Other As Identified 10. FBP will insert the Requirements (i.e., once an approved or accepted submittal, who Control needs to distribute a controlled or certified copy to) Engineer of Record Quality Construction Procurement Health, Safety, Environmental Other As identified J-8-11

Design Build Phase II Service Center Project

Design Build Phase II Service Center Project Design Build Phase II Service Center Project Diana L. Woltersdorf Manager, Contract Administration Julie Valadez, AIA Project Manager, Vertical Construction September 30, 2016 Pre-Submittal Meeting Pre-Submittal

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS RFP # 17-03-14 MINOR MAINTENANCE AND REPAIRS (LIKE FOR LIKE) NOTE: This RFP replaces RFP #16-10-34 previously cancelled by the District. PART II The Houston Independent School District

More information

Mobile Crane Tips Forward Discussion and Lessons Learned

Mobile Crane Tips Forward Discussion and Lessons Learned Mobile Crane Tips Forward Discussion and Lessons Learned Doug Fogel, Performance Assurance Manager Portsmouth Gaseous Diffusion Plant Fluor B&W Portsmouth May 7, 2015 1 Mobile Crane Tips Forward EM--PPPO-FBP-PORTSDD-2012-0027

More information

Health and Safety Plan (HASP) Sampling and Handling of Sediments from (Name & location of project site)

Health and Safety Plan (HASP) Sampling and Handling of Sediments from (Name & location of project site) Health and Safety Plan (HASP) Sampling and Handling of Sediments from (Name & location of project site) (Name & address of client) Prepared by (Name & address of Contractor/Consultant) (Date) 1 HASP Page(s)

More information

NOTICE OF PRE-QUALIFICATION OF CONTRACTORS FOR THE INSTALLATION, REPLACEMENT AND/OR RELOCATION OF STORMWATER CULVERTS, PIPES AND APPURTENANCES

NOTICE OF PRE-QUALIFICATION OF CONTRACTORS FOR THE INSTALLATION, REPLACEMENT AND/OR RELOCATION OF STORMWATER CULVERTS, PIPES AND APPURTENANCES April 03, 2014 NOTICE OF PRE-QUALIFICATION OF CONTRACTORS FOR THE INSTALLATION, REPLACEMENT AND/OR RELOCATION OF STORMWATER CULVERTS, PIPES AND APPURTENANCES Gwinnett County is soliciting applications

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Planning, Design & Construction March 17, 2015 Re: Request for Proposals- Commissioning Services Seamans Center for the Engineering Arts and Sciences-South Annex Addition University

More information

Accounts Payable. A written procedure to process invoice(s) for payment.

Accounts Payable. A written procedure to process invoice(s) for payment. 1.0 Purpose A written procedure to process invoice(s) for payment. 2.0 Scope This procedure will apply to invoices for payment. 3.0 Responsibility for Invoice Processing The purchasing Staff, herein referred

More information

Maintenance Mechanic I/II

Maintenance Mechanic I/II Date Established: 01-21-93 Revised: 07-17-08 Classification Code: 072/073 Unit: SLCEA FLSA: Non-exempt Range: 63/68 EEOC: 007 Maintenance Mechanic I/II Definition: Performs routine and general maintenance

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS/PROPOSALS Professional Construction Management Services Gettysburg Regional Airport Rehabilitate Runway 6-24, Phase IV Susquehanna

More information

CITY OF GOLDEN, COLORADO Parks and Recreation Department

CITY OF GOLDEN, COLORADO Parks and Recreation Department CITY OF GOLDEN, COLORADO Parks and Recreation Department Accredited by the Commission for Accreditation of Park and Recreation Agencies Rod Tarullo, Parks & Recreation Director REQUEST FOR QUALIFICATIONS

More information

EXHIBIT A SCOPE OF WORK

EXHIBIT A SCOPE OF WORK EXHIBIT A SCOPE OF WORK Asbestos Abatement Services for the Florida Department of Transportation FM 227775-1 / State Road 7 (SR-7) from Fillmore Street to South of Stirling Road Hollywood, Broward County,

More information

CUSTOM COMMERCIAL & INDUSTRIAL (C&I) Program Application

CUSTOM COMMERCIAL & INDUSTRIAL (C&I) Program Application CUSTOM COMMERCIAL & INDUSTRIAL (C&I) ENERGY IS PRECIOUS. LET S NOT WASTE IT. TABLE OF CONTENTS TERMS AND CONDITIONS... 2 CUSTOM C&I PROJECT SPECIFICATIONS... 3 STEPS FOR SUBMITTING YOUR APPLICATION...

More information

2018 Pipelines Engineering Services Boerne Stage Road, West Avenue, and Highway 90 & General McMullen

2018 Pipelines Engineering Services Boerne Stage Road, West Avenue, and Highway 90 & General McMullen 2018 Pipelines Engineering Services Boerne Stage Road, West Avenue, and Highway 90 & General McMullen M. Antonio Leyva, P.E. Manager Engineering Angelica Mata Manager Contract Administration Marisol V.

More information

Design Build Services Lake Shawnee Junior Pond Improvements

Design Build Services Lake Shawnee Junior Pond Improvements SHAWNEE COUNTY PARKS AND RECREATION REQUEST FOR PROPOSALS Design Build Services Lake Shawnee Junior Pond Improvements Proposal # 023-17 Lake Shawnee Shawnee County Topeka, KS. April 2017 1 PROPOSAL # 023-17

More information

VILLAGE OF PALM SPRINGS PROPERTY IMPROVEMENT PROGRAM Matching Grant Program Guidelines

VILLAGE OF PALM SPRINGS PROPERTY IMPROVEMENT PROGRAM Matching Grant Program Guidelines VILLAGE OF PALM SPRINGS PROPERTY IMPROVEMENT PROGRAM Matching Grant Program Guidelines Purpose. The objective of the Property Improvement Program ( PIP ) is to provide an economic catalyst for renovating

More information

PAL-MAR WATER CONTROL DISTRICT Security-Maintenance Services RFP Proposal Packet

PAL-MAR WATER CONTROL DISTRICT Security-Maintenance Services RFP Proposal Packet PAL-MAR WATER CONTROL DISTRICT Security-Maintenance Services RFP Proposal Packet A) Deadline for Submittal Proposal Due Date: On or before 4:00 p.m. on Tuesday, December 6, 2011. Interested applicants

More information

REQUEST FOR PROPOSAL FOUNDATION REINFORCING STEEL PACKAGE NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY

REQUEST FOR PROPOSAL FOUNDATION REINFORCING STEEL PACKAGE NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY REQUEST FOR PROPOSAL FOUNDATION REINFORCING STEEL PACKAGE FOR NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY17-1212 ISSUED NOVEMBER 21, 2017 RESPONSE DUE TUESDAY,

More information

Introduction: A. Scope of Work:

Introduction: A. Scope of Work: Request for Proposal (RFP) goos olgi gowa Community Center- Landscape & Roof Gutters/Drains Klamath Tribes Housing Department (KTHD) RFP # 18-08KTHD-3landscaping Introduction: The Klamath Tribes Housing

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-01 30 00 (August 2015) ----------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 30 00 (November 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

RESOLUTION NUMBER 2877

RESOLUTION NUMBER 2877 RESOLUTION NUMBER 2877 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PERRIS, STATE OF CALIFORNIA SETTING FORTH POLICIES INTENDED TO OBTAIN CONSISTENCY AND UNIFORMITY IN THE ADMINISTRATION OF THE FEDERALLY

More information

October 6, The proposal due date and time scheduled for Friday, November 3, at 04:30 P.M. remains unchanged.

October 6, The proposal due date and time scheduled for Friday, November 3, at 04:30 P.M. remains unchanged. October 6, 2017 Dear Sir/Madam Enclosed is Addendum No. 1 to SEPTA's Sealed Bid No. 17-00206-AMJP Elwyn to Wawa R3-2 Right of Way Improvements. The proposal due date and time scheduled for Friday, November

More information

University Facilities Personal Protective Equipment Procedure

University Facilities Personal Protective Equipment Procedure Personal Protective Equipment Procedure Internal Procedure: SP1.2 Effective date: 5/13/02 Last Modified: 9/5/2012 Approved by: Personal Protective Equipment PURPOSE To establish requirements for a Personal

More information

(2) Identification of operations and activities where hazardous chemicals are used or stored.

(2) Identification of operations and activities where hazardous chemicals are used or stored. Chapter 7 Hazard Communication Program 7-1. General a. This chapter establishes the Fort Lee Hazard Communication (HAZCOM) Program, to include the Globally Harmonized System, in compliance with OSHA Hazard

More information

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN REQUEST FOR PROPOSAL (RFP) #1314-15 CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN Request for Proposal must be received no later than January 3, 2014 at 2:00 pm CARRI MATSUMOTO

More information

CITY OF KYLE, TEXAS REQUESTS FOR PROPOSAL (RFP) RESURFACING OF CITY OF KYLE POOL AND SPA: RFP PARD

CITY OF KYLE, TEXAS REQUESTS FOR PROPOSAL (RFP) RESURFACING OF CITY OF KYLE POOL AND SPA: RFP PARD CITY OF KYLE, TEXAS REQUESTS FOR PROPOSAL (RFP) RESURFACING OF CITY OF KYLE POOL AND SPA: RFP-2014-07-PARD SPECIFICATIONS AND GENERAL PROPOSAL REQUIREMENTS FOR THE RESURFACING OF THE KYLE POOL AND SPA

More information

LABOR POLICY ORANGE COUNTY INDUSTRIAL DEVELOPMENT AGENCY

LABOR POLICY ORANGE COUNTY INDUSTRIAL DEVELOPMENT AGENCY LABOR POLICY ORANGE COUNTY INDUSTRIAL DEVELOPMENT AGENCY The Orange County Industrial Development Agency (IDA) was created for the purpose of creating employment opportunities for, and to promote the general

More information

TEXAS DEPARTMENT OF TRANSPORTATION INSPECT, SAMPLE, AND TEST FOR ASBESTOS CONTAINING MATERIAL AND MONITOR ABATEMENT PROJECTS PUBLICATION

TEXAS DEPARTMENT OF TRANSPORTATION INSPECT, SAMPLE, AND TEST FOR ASBESTOS CONTAINING MATERIAL AND MONITOR ABATEMENT PROJECTS PUBLICATION * TEXAS DEPARTMENT OF TRANSPORTATION INSPECT, SAMPLE, AND TEST FOR ASBESTOS CONTAINING MATERIAL AND MONITOR ABATEMENT PROJECTS PUBLICATION This specification is a product of the Texas Department of Transportation

More information

MECHANICAL REPAIRER, 3773 SENIOR MECHANICAL REPAIRER, 3772 MECHANICAL REPAIR SUPERVISOR, 3795

MECHANICAL REPAIRER, 3773 SENIOR MECHANICAL REPAIRER, 3772 MECHANICAL REPAIR SUPERVISOR, 3795 08-16-85 MECHANICAL REPAIRER, 3773 SENIOR MECHANICAL REPAIRER, 3772 MECHANICAL REPAIR SUPERVISOR, 3795 Summary of Duties : Performs a variety of tasks in maintaining and repairing mechanical equipment

More information

GENERAL SKILLS CLASSES improve general construction skills used by Construction Craft Laborers on a daily basis.

GENERAL SKILLS CLASSES improve general construction skills used by Construction Craft Laborers on a daily basis. GENERAL SKILLS CLASSES improve general construction skills used by Construction Craft Laborers on a daily basis. Aerial Lifts (Boom Lifts & Scissor Lifts) Aug 2 Oct 4 Nov 1 Hoisting, Rigging and Signaling

More information

GENERAL SKILLS CLASSES improve general construction skills used by Construction Craft Laborers on a daily basis.

GENERAL SKILLS CLASSES improve general construction skills used by Construction Craft Laborers on a daily basis. GENERAL SKILLS CLASSES improve general construction skills used by Construction Craft Laborers on a daily basis. Aerial Lifts (Boom Lifts & Scissor Lifts) Nov 1 Dec 13 Jan 24 Feb 14 Mar 7 Mar 14 Mar 29

More information

AC291 Special Inspection Agencies ACCREDITATION CRITERIA FOR IBC SPECIAL INSPECTION AGENCIES AC291

AC291 Special Inspection Agencies ACCREDITATION CRITERIA FOR IBC SPECIAL INSPECTION AGENCIES AC291 AC291 Special Inspection Agencies ACCREDITATION CRITERIA FOR IBC SPECIAL INSPECTION AGENCIES AC291 About IAS International Accreditation Service (IAS) is a wholly owned subsidiary of the International

More information

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final Solar Photovoltaic Standard Offer Program (SVPSOP) 2018 Program Manual Rev # Final CONTENTS 1 Introduction... 3 2 Program Overview... 3 3 Solar Photovoltaic Standard Offer Program... 3 3.1 Program Options...

More information

DEPARTMENT OF THE ARMY

DEPARTMENT OF THE ARMY DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, CORPS OF ENGINEERS Arizona-Nevada Area Office 3636 North Central Avenue, Suite 500 Phoenix, AZ 85012-1939 September 4, 2014 REPLY TO ATTENTION OF: CESPL-CO-AN

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO.: 1 Date: May 12, 2015 To: All Proposers From: Procurement Office RE: Questions and Answers RFP-DOT-14/15-9030-GH-ReAd: EMERGENCY MANAGEMENT SERVICES Notice

More information

COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES

COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO. 2018-19-CSB CONSTRUCTION MANAGEMENT SERVICES The County of Dunn is requesting proposals for Construction Management Services. The services

More information

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants NAVSEA STANDARD ITEM ITEM NO: 009-01 DATE: 01 OCT 2017 CATEGORY: I 1. SCOPE: 1.1 Title: General Criteria; accomplish 2. REFERENCES: 2.1 Standard Items 2.2 40 CFR Part 61, National Emission Standards for

More information

SCOPE OF WORK. Project No. A STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt. Governor

SCOPE OF WORK. Project No. A STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt. Governor SCOPE OF WORK Construction Management Services for Comprehensive Renovation and Restoration of the NJ Executive State House 125 West State Street, Trenton, Mercer County, NJ Project No. A1150-07 STATE

More information

Northern Sonoma County Air Pollution Control District Burn Clean! Wood Appliance Replacement Program

Northern Sonoma County Air Pollution Control District Burn Clean! Wood Appliance Replacement Program The 3-2-1 Burn Clean Program provides rebates to District residents for disabling non-epa-certified appliances and replacing them with cleaner burning heating appliances. PLEASE REVIEW CAREFULLY AND DO

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF SANTA ANA REQUEST FOR PROPOSALS RELOCATION OF TWO RESIDENTIAL STRUCTURES PROPOSALS DUE: Monday, May 9, 2011 at 11:00 AM 1. INTRODUCTION REQUEST FOR PROPOSALS

More information

REQUEST FOR PROPOSALS EMERGENCY GENERATOR INSTALL AT THE NEGAUNEE SERVICE CENTER (NSC)

REQUEST FOR PROPOSALS EMERGENCY GENERATOR INSTALL AT THE NEGAUNEE SERVICE CENTER (NSC) REQUEST FOR PROPOSALS EMERGENCY GENERATOR INSTALL AT THE NEGAUNEE SERVICE CENTER (NSC) The County of Marquette (County), seeks proposals from Electrical Contractors to install 30KW, 3 Phase, natural gas,

More information

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants NAVSEA STANDARD ITEM ITEM NO: 009-01 DATE: 18 JUL 2014 CATEGORY: I 1. SCOPE: 1.1 Title: General Criteria; accomplish 2. REFERENCES: 2.1 40 CFR Part 61, National Emission Standards for Hazardous Air Pollutants

More information

Request for Qualifications B Geotechnical Investigations / Professional Services Firms. RFQ Due Date: October 8, :00 P.M.

Request for Qualifications B Geotechnical Investigations / Professional Services Firms. RFQ Due Date: October 8, :00 P.M. Request for Qualifications B13.017 Geotechnical Investigations / Professional Services Firms RFQ Due Date: October 8, 2013 2:00 P.M. Mr. Dale Switzer Senior Director of Facilities Planning, Development

More information

NEW HAVEN UNIFIED SCHOOL DISTRICT REQUEST FOR BID

NEW HAVEN UNIFIED SCHOOL DISTRICT REQUEST FOR BID For DSA PROJECT INSPECTOR (CLASS 1) Itliong Vera Cruz Middle School 21 st Century Classroom Building RFP # 779 DSA PROJECT INSPECTOR (CLASS 1) Itliong Vera Cruz Middle School 21 st Century Classroom Building

More information

2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES

2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES 2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES WELCOME TO THE POWER MOVES C&I PROCESS VFD PROGRAM. We look forward to working with you. If you have questions after reading this application,

More information

CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION DEPARTMENT CIVIL ENGINEERING DIVISION REQUEST FOR PROPOSALS

CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION DEPARTMENT CIVIL ENGINEERING DIVISION REQUEST FOR PROPOSALS CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION DEPARTMENT CIVIL ENGINEERING DIVISION REQUEST FOR PROPOSALS WATER MAIN REPLACEMENT VARIOUS LOCATIONS PREPARED BY: Tristan D. Malabanan, P.E. City of

More information

HS16 Asbestos Management

HS16 Asbestos Management HS16 Asbestos Management Occupational Health, Safety and Injury Prevention Subject Matter Expert Greg Smith GJS25 CONTENTS 1.0 INTRODUCTION... 3 2.0 OBJECTIVES AND METRICS... 3 3.0 APPLICABILITY... 3 4.0

More information

OUTAGAMIE COUNTY REQUEST FOR PROPOSAL FOR RIGHT OF WAY RE MONUMENTATION SERVICES FOR HIGHWAY DEPARTMENT

OUTAGAMIE COUNTY REQUEST FOR PROPOSAL FOR RIGHT OF WAY RE MONUMENTATION SERVICES FOR HIGHWAY DEPARTMENT OUTAGAMIE COUNTY REQUEST FOR PROPOSAL FOR RIGHT OF WAY RE MONUMENTATION SERVICES FOR HIGHWAY DEPARTMENT DUE BY: May 26, 2015 1.0 Introduction and Background Outagamie County Highway Department is seeking

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS FACILITIES MANAGEMENT 4202 EAST FOWLER AVENUE / OPM 100 TAMPA, FL 33620-7550 EDITION: NOVEMBER 1, 2016 PHONE: (813) 974-2845 FAX: (813) 974-3542 REQUEST FOR QUALIFICATIONS PROJECT NAME: USF CPT REPLACE

More information

Construction CCEI Survey Support. To be assigned by Individual Task Work orders (If required)

Construction CCEI Survey Support. To be assigned by Individual Task Work orders (If required) 3/15/2018 EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR Project Description Construction CCEI Survey Support Financial Project ID(s): 198285-1-62-06 Federal Project No.: TBD

More information

AMENDMENT OF SOLICITATION

AMENDMENT OF SOLICITATION 1. SOLICITATION NO.: 2. AMENDMENT NO.: DALLAS AREA RAPID TRANSIT DALLAS, TEXAS AMENDMENT OF SOLICITATION 3. EFFECTIVE DATE: 4. BRIEF SOLICITATION DESCRIPTION: B-1022113 1 September 21, 2012 5. REVISED

More information

Treatment Leader E M P LO YMENT O P PORTUN I T Y A U G U S T 2 2, 2 014

Treatment Leader E M P LO YMENT O P PORTUN I T Y A U G U S T 2 2, 2 014 NEW Water, the brand of the, is accepting applications for a. This position is a full-time exempt position (40 hours/ week) and reports to the Treatment Manager. Applications will be accepted until position

More information

Administrative Regulation SANGER UNIFIED SCHOOL DISTRICT. Business and Noninstructional Operations FEDERAL GRANT FUNDS

Administrative Regulation SANGER UNIFIED SCHOOL DISTRICT. Business and Noninstructional Operations FEDERAL GRANT FUNDS Administrative Regulation SANGER UNIFIED SCHOOL DISTRICT AR 3230(a) Business and Noninstructional Operations FEDERAL GRANT FUNDS Allowable Costs Prior to obligating or spending any federal grant funds,

More information

Draft Version Presentation Draft

Draft Version Presentation Draft EMERGENCY VEHICLE TECHNICIAN I CERTIFICATION TRAINING STANDARDS Draft 2011 Version 2.15.11 Presentation Draft Emergency Vehicle Technician I... 2 #1: The Role of the Emergency Vehicle Technician I... 2

More information

Colquitt Regional Medical Center

Colquitt Regional Medical Center March 21 st, 2018 REQUEST FOR QUALIFICATIONS (PHASE I) And REQUEST FOR PROPOSAL (PHASE II) To Provide CONSTRUCTION MANAGEMENT AT-RISK SERVICES For The Hospital Authority of Colquitt County At Colquitt

More information

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON EM

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON EM PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Updated: July 1, 2017 CONTENTS SECTION 1:

More information

TRANSBAY TRANSIT CENTER

TRANSBAY TRANSIT CENTER TRANSBAY TRANSIT CENTER Package Pre-Proposal Conference Webcor/Obayashi Joint Venture Office 175 Beale St. San Francisco, CA 2:00pm January 16, 2014 Please sign in! AGENDA Welcome and Introductions Trade

More information

APPENDIX A MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION PLANS

APPENDIX A MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION PLANS This document is not an official Corps of Engineers publication, but has been copied from the original EM 385 1 1 and presented here as a training aid. APPENDIX A MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION

More information

CUSTOM INCENTIVE GUIDE

CUSTOM INCENTIVE GUIDE 2017 CUSTOM INCENTIVE GUIDE NEED HELP? CALL 800.762.7077 HOW TO APPLY Custom incentives provide opportunities to upgrade equipment and receive incentives for technologies not available prescriptively.

More information

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR INSPECTION STAFF

EXHIBIT A CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR INSPECTION STAFF EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR INSPECTION STAFF Project Description: Continuing Services Contract Continuing Services Contract Inspection Support for the Gainesville

More information

Personal Protective Equipment

Personal Protective Equipment Policies & Procedures Personal Protective Equipment Internal Procedure: PPE Effective Date: 1-15-18 Last Modified: 1-15-18 Approved By: Todd Barnette Contents Purpose... 2 Applicability... 2 Definitions...

More information

Non-Federal Cost Share Match Program Grant Implementation Checklist

Non-Federal Cost Share Match Program Grant Implementation Checklist Non-Federal Cost Share Match Program Grant Implementation Checklist Non-Federal Cost Share Match Program Grant Implementation Checklist Table of Contents 1.0 Introduction... 2.0 Grant Implementation Process

More information

Procedures for Local Public Agency Project Administration (Revised 5/2014)

Procedures for Local Public Agency Project Administration (Revised 5/2014) Procedures for Local Public Agency Project Administration (Revised 5/2014) OVERVIEW A Local Public Agency (LPA) is defined as a county, municipal corporation, state or local authority, board, commission,

More information

MINUTES JOINT MEETING FINANCE AND CONSTRUCTION COMMITTEES UNIVERSITY OF SOUTHERN INDIANA BOARD OF TRUSTEES. July 13, 2000

MINUTES JOINT MEETING FINANCE AND CONSTRUCTION COMMITTEES UNIVERSITY OF SOUTHERN INDIANA BOARD OF TRUSTEES. July 13, 2000 MINUTES JOINT MEETING FINANCE AND CONSTRUCTION COMMITTEES UNIVERSITY OF SOUTHERN INDIANA BOARD OF TRUSTEES The University of Southern Indiana met in joint session on Thursday,, at 8:30 a.m. in Carter Hall

More information

City of Waterloo, Wisconsin. Request for Proposals. Municipal Engineering Services

City of Waterloo, Wisconsin. Request for Proposals. Municipal Engineering Services City of Waterloo, Wisconsin Request for Proposals Municipal Engineering Services Submission Date: December 1, 2011 @ 4:00 p.m. Issued by: Mo Hansen, Clerk/Treasurer City of Waterloo 136 N. Monroe Street

More information

REQUEST FOR PROPOSALS RFP # December 7, 2010 Proposals Due on January 7, 2011 at 4:00 pm

REQUEST FOR PROPOSALS RFP # December 7, 2010 Proposals Due on January 7, 2011 at 4:00 pm 4800 N. Broadway, Boulder, CO 80304 REQUEST FOR PROPOSALS RFP #29-2010 December 7, 2010 Proposals Due on January 7, 2011 at 4:00 pm TO: FROM: RE: Geotechnical Firms Liz Wolfert, Planning Assistant Subsurface

More information

WEATHERIZATION ASSISTANCE PROGRAM. Procurement. Trainer s Manual Three Hour Workshop

WEATHERIZATION ASSISTANCE PROGRAM. Procurement. Trainer s Manual Three Hour Workshop WEATHERIZATION ASSISTANCE PROGRAM Procurement Trainer s Manual Three Hour Workshop WEATHERIZATION ASSISTANCE PROGRAM Procurement for Department of Energy Weatherization Assistance Grantees Learning Objectives

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0800 - COMMISSIONING OF ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. The purpose of this section is to specify the Division 26 responsibilities and participation in the commissioning process.

More information

HELICOPTER MECHANIC, HELICOPTER MECHANIC SUPERVISOR, 3749

HELICOPTER MECHANIC, HELICOPTER MECHANIC SUPERVISOR, 3749 HELICOPTER MECHANIC, 3742 4-16-93 HELICOPTER MECHANIC SUPERVISOR, 3749 Summary of Duties: Repairs, overhauls, inspects, maintains, services, cleans, and returns City owned helicopters and fixedwing aircraft

More information

CAMPBELL UNION HIGH SCHOOL DISTRICT

CAMPBELL UNION HIGH SCHOOL DISTRICT CAMPBELL UNION HIGH SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS PROPOSITION 39 ENERGY CONSERVATION AND ENERGY EFFICIENCY SERVICES OWNER CAMPBELL UNION HIGH SCHOOL DISTRICT 3235 Union Avenue San Jose, CA

More information

Request for Qualifications to Certify Qualified Providers for the Arkansas Energy Performance Contracting Program

Request for Qualifications to Certify Qualified Providers for the Arkansas Energy Performance Contracting Program Request for Qualifications to Certify Qualified Providers for the Arkansas Energy Performance Contracting Program Arkansas Economic Development Commission Energy Office 900 West Capitol Avenue Little Rock,

More information

PRE-PROPOSAL CONFERENCE

PRE-PROPOSAL CONFERENCE PRE-PROPOSAL CONFERENCE RFP No. LRT-12-180-TPOT POTHOLING SERVICES FOR TEMPE STREETCAR PROJECT December 1, 2011 Agenda Introductions / Opening Remarks Loralei Poll Project Overview / Scope Roy Alvarado

More information

ASSE International Seal Control Board Procedures

ASSE International Seal Control Board Procedures ASSE International Seal Control Board Procedures 2014 PREAMBLE Written operating procedures shall govern the methods used for maintaining the product listing program and shall be available to any interested

More information

Personal Protective Equipment Program. Risk Management Services

Personal Protective Equipment Program. Risk Management Services Personal Protective Equipment Program Services Table of Contents I. Program Goals and Objectives... 2 II. Scope and Application... 2 III. Responsibilities... 2 IV. Procedures... 3 V. Training... 5 VI.

More information

PRE-PROPOSAL CONFERENCE REQUEST FOR COMPETITIVE SEALED PROPOSAL (RFCSP)

PRE-PROPOSAL CONFERENCE REQUEST FOR COMPETITIVE SEALED PROPOSAL (RFCSP) PRE-PROPOSAL CONFERENCE REQUEST FOR COMPETITIVE SEALED PROPOSAL (RFCSP) PROJECT NO. 699 SOLICITATION NO. HWC-SEWER-2018-008 Warren Ching Sr. Procurement Specialist Houston Airports Thursday, May 17, 2018,

More information

Sincerely, Dwayne Scicchitano, Coordinator Northumberland County Weatherization

Sincerely, Dwayne Scicchitano, Coordinator Northumberland County Weatherization Thank you for your interest in providing home heating system replacement and repair work for our agency. We are currently accepting bids for the coming year (October 1, 2017- September 30, 2018 as funding

More information

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR Forward Capacity Market Support Services RFP NUMBER EM

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR Forward Capacity Market Support Services RFP NUMBER EM EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR Forward Capacity Market Support Services RFP NUMBER EM-006-2018 Date Issued: 11/20/2017 TABLE OF CONTENTS SECTION 1 RFP INFORMATION AND INSTRUCTIONS SECTION

More information

Instructions Regarding the Invitation for Bid and Contract Process For the National School Lunch and School Breakfast Programs Vended Meal Services

Instructions Regarding the Invitation for Bid and Contract Process For the National School Lunch and School Breakfast Programs Vended Meal Services Instructions Regarding the Invitation for Bid and Contract Process For the National School Lunch and School Breakfast Programs Vended Meal Services PLEASE READ THIS DOCUMENT THOROUGHLY All vended meal

More information

MULTIFAMILY UPGRADE CUSTOMER HANDBOOK

MULTIFAMILY UPGRADE CUSTOMER HANDBOOK MULTIFAMILY UPGRADE CUSTOMER HANDBOOK PACIFIC GAS AND ELECTRIC COMPANY PACIFIC GAS AND ELECTRIC P.O. Box 997300, Sacramento, CA 95899-7300 This page is intentionally left blank. 23 i Table of Contents

More information

1 Customer and Contact Information

1 Customer and Contact Information Appalachian Power C&I Program Rebate Application Before you start Review the eligibility detail requirements and terms and conditions at the end of this application to verify that you are eligible for

More information

Request for Proposals Emergency Response Plan, Training and Vulnerability Assessment

Request for Proposals Emergency Response Plan, Training and Vulnerability Assessment Request for Proposals Emergency Response Plan, Training and Vulnerability Assessment The North Texas Municipal Water District is soliciting proposals from firms qualified and experienced in providing Emergency

More information

INVITATION TO BID (ITB) BID # FY

INVITATION TO BID (ITB) BID # FY INVITATION TO BID (ITB) BID # FY 2016-2017-005 SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SOFTWARE SYSTEM INTEGRATION EXHIBIT I - SCOPE OF WORK PREPARED BY: CITY OF HALLANDALE BEACH DEPARTMENT OF

More information

REQUEST FOR PROPOSAL FOR: Grant Writing & Post-Award/Project Implementation Technical Assistance River Valley Community College BID #RVC15-09

REQUEST FOR PROPOSAL FOR: Grant Writing & Post-Award/Project Implementation Technical Assistance River Valley Community College BID #RVC15-09 REQUEST FOR PROPOSAL FOR: Grant Writing & Post-Award/Project Implementation Technical Assistance River Valley Community College BID #RVC15-09 PURPOSE: River Valley Community College seeks professional

More information

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR TECHNICAL SERVICES TO DEVELOP A SPREADSHEET TOOL

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR TECHNICAL SERVICES TO DEVELOP A SPREADSHEET TOOL EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR TECHNICAL SERVICES TO DEVELOP A SPREADSHEET TOOL RFP EM-007-2018 Date Issued: January 31,2017 Closing Date: February 16, 2018-3:00 pm local time TABLE OF

More information

REQUEST FOR LETTERS OF INTEREST

REQUEST FOR LETTERS OF INTEREST REQUEST FOR LETTERS OF INTEREST THE MUNICIPALITY OF WADESBORO DESIRES TO ENGAGE A QUALIFIED PRIVATE ENGINEERING FIRM (PEF) FOR CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES FOR THE FOLLOWING PROJECT..

More information

Department of Defense Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing November 2007

Department of Defense Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing November 2007 Department of Defense Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing November 2007 This document will be maintained and routinely updated on the Defense Procurement

More information

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS The City of Hondo requests the submission of qualifications statements, which will lead to the possible award of a contract to provide planning, design

More information

LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS

LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS The Department of Environmental Protection

More information

Sprinkler Cost Assistance Program Application

Sprinkler Cost Assistance Program Application City of Mesa Sprinkler Cost Assistance Program Application In Fiscal Year 2010/2011, Mesa s City Council adopted a set of strategic initiatives aimed at guiding the efforts of City Staff. The Economic

More information

SmartStart Buildings Program Performance Lighting Application FY18 July 1, 2017 June 30, 2018

SmartStart Buildings Program Performance Lighting Application FY18 July 1, 2017 June 30, 2018 SmartStart Buildings Program Performance Lighting Application FY18 July 1, 2017 June 30, 2018 MEASURE DESCRIPTION Performance Lighting incentives are available for installation of new lighting in groundup

More information

Energy Efficiency Programs Process and Impact Evaluation

Energy Efficiency Programs Process and Impact Evaluation Energy Efficiency Programs Process and Impact Evaluation Issued: 4/3/2018 Questions Due: 4/17/2018 Responses Due: 5/18/2018 RFP Coordinator: Rob Ward *This RFP process will be conducted via Idaho Power

More information

Pipeline Operational Qualification (OQ) Crosswalks

Pipeline Operational Qualification (OQ) Crosswalks Pipeline Operational Qualification (OQ) Crosswalks A guide to the 3 rd edition pipeline covered task modules. Complete Packet Crosswalks provided for: 1 st & 2 nd Edition s 1 st & 2 nd Edition s 1 st &

More information

HEALTH AND SAFETY COORDINATION PLAN - EPPING

HEALTH AND SAFETY COORDINATION PLAN - EPPING PRACTICAL SAFETY SERVICES HEALTH AND SAFETY PROJECT DETAILS Site Details: Epping Market, 315 Cooper St, Epping Works: Holding period (26 August 2013 1 January 2014) Site Owner: Melbourne Market Authority

More information

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON EM

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON EM PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Revised: February 6, 2018 {P1472575.1} CONTENTS

More information

MEETING AGENDA. Meeting Time: 9:30 AM Project Name: Chicago Park District Group A

MEETING AGENDA. Meeting Time: 9:30 AM Project Name: Chicago Park District Group A MEETING AGENDA Meeting Date: January 30, 2018 Meeting Subject: PRE-BID CONFERENCE Meeting Time: 9:30 AM Project Name: Chicago Park District Group A Meeting Location: Columbus Park Facility Name/ Project

More information

Customer Tailored Energy Efficiency Pilot Program FY18 PROGRAM GUIDE

Customer Tailored Energy Efficiency Pilot Program FY18 PROGRAM GUIDE Customer Tailored Energy Efficiency Pilot Program FY18 PROGRAM GUIDE JULY 1, 2017 JUNE 30, 2018 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PILOT PROGRAM DESIGN... 2 Eligibility... 2 Incentives... 2 Base

More information

PRE-PROPOSAL CONFERENCE Tuesday, October 19, 2010 SOUTH CENTRAL CORRIDOR HIGH CAPACITY TRANSIT FEASIBILITY STUDY

PRE-PROPOSAL CONFERENCE Tuesday, October 19, 2010 SOUTH CENTRAL CORRIDOR HIGH CAPACITY TRANSIT FEASIBILITY STUDY PRE-PROPOSAL CONFERENCE Tuesday, October 19, 2010 SOUTH CENTRAL CORRIDOR HIGH CAPACITY TRANSIT FEASIBILITY STUDY Meeting Overview Sign-In Sheets: Be sure to sign in. Sign-In sheets will be available on

More information

EXHIBIT A. SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES. Revised 3/10/15

EXHIBIT A. SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES. Revised 3/10/15 EXHIBIT A SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES Revised 3/10/15 TABLE OF CONTENTS 1.0 PURPOSE... 3 2.0 PROJECT APPROACH... 3 3.0 SCOPE... 5 4.0 LENGTH OF SERVICE... 6 5.0 PERFORMANCE OF THE

More information

REQUEST FOR PROPOSALS FOR AS-NEEDED CIVIL ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019

REQUEST FOR PROPOSALS FOR AS-NEEDED CIVIL ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019 Board of Commissioners of the Port of New Orleans REQUEST FOR PROPOSALS FOR AS-NEEDED CIVIL ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019 June 30, 2016 Deadline for proposals is no

More information

Internal Audit Follow-Up Report

Internal Audit Follow-Up Report Internal Audit Follow-Up Report Civil Rights Division Program Management TxDOT Internal Audit Division Objective To assess the status of corrective actions for high-risk Management Action Plans (MAPs)

More information

Design-Build Procurement Overview Manual. Alternative Project Delivery

Design-Build Procurement Overview Manual. Alternative Project Delivery Design-Build Procurement Overview Manual Alternative Project Delivery Table of Contents Chapter 1: Introduction to Design-Build Procurements... 1 1.1 Introduction... 1 1.2 Scope... 1 1.3 Acronyms... 2

More information