1 MQ-8B Fire Scout and Fire-X Overview and Status Update June 2011 Mike Fuqua Director, Business Development Tactical Unmanned Systems Northrop Grumman Aerospace System Approved for Public Release, Distribution Unlimited: Approved for Public Release Northrop Grumman C/N UMS , February 2009; Approved for Public Release, Office of Security Review 09-S-2433; July 15, 2009; Approved for Public Release, Distribution Unlimited: NAVAIR Dated 11 May 2010; Approved for Public Release, Distribution Unlimited: NAVAIR Dated 25 March 2010; NGAS Case ; Approved for Public Release, Distribution Unlimited: NAVAIR Dated 11 March 2009; Approved for Public Release, Distribution Unlimited: NAVAIR , 1 February 2011; Approved for Public Release, Distribution Unlimited:, NAVAIR Dated 15 August 2008; Approved for Public Release, Distribution Unlimited: Northrop Grumman Aerospace Systems Case Dated 3/15/10; Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10; Approved for Public Release: Northrop Grumman Aerospace Systems Case , 2/9/11;NAVAIR Approval 2/16/11; Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10; Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11; Approved for Public Release, Distribution Unlimited: NAVAIR , 16 June 2011

2 OQ-2 OQ-19/SD-1 RP-76 BQM-74 X-47A UCAS RQ-4 Block 20/30/40 Global Hawk Euro Hawk BAMS RQ-8A Fire Scout Compass Cope RQ-4 ACTD/Block 10 Global Hawk Combat Dawn BQM-34 BQM-145A Compass Arrow M324 AQM-34 SPA Firebolt X-47B UCAS MQ-8B Fire Scout Bat MQ-5B Hunter BQM-74E BQM-74F RQ-5A Hunter E-Hunter 2 Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 5/13/10

3 MQ-8B Fire Scout U.S. Navy key enabler for the littoral combat ship mission Anti-submarine warfare Anti-surface warfare Mine warfare Will complement (not replace) and reduce the burden on manned systems USS McInerney FFG-8 Extremely mature, reliable and maintainable Primary missions intelligence, surveillance, reconnaissance and targeting Growth paths to communications relay and others USS Freedom LCS-1 The Enabler: Persistent, Flexible and Lethal 3 Approved for Public Release, Distribution Unlimited: NAVAIR Dated 25 March 2010; NGAS Case

4 MQ-8B Fire Scout Only US Navy Funded Vertical UAS Program of Record (POR) Ten years of development activity RQ-8A MQ-8B Spiral payload development enabled by Modular Mission Payload Architecture Demonstrated reliable continuous shipboard operations 4 Approved for Public Release, Distribution Unlimited: NAVAIR , 1 March 2011

5 Navy MQ-8B Fire Scout Program Description Mission: The Fire Scout System is designed to provide intelligence, surveillance, target acquisition and reconnaissance (ISTAR) to tactical users Platforms: The Fire Scout System is designed to operate from all air capable ships Description A Fire Scout System consists of: 1-3 MQ-8B Fire Scout unmanned rotary wing air vehicles Electro-optical/infra-red /laser pointer and range finder modular mission payloads Automatic Identification System Maritime Radar in 2012 Ground Control Station (integrated in ship CIC) incorporating the tactical common data link (TCDL) and tactical control system (TCS) 1 Unmanned Common Automatic Recovery Systems 1 grid (NATO standard) for shipboard operations Employment: Fielded on the USS McInerney (FFG 8). Deployments will continue aboard the USS Halyburton (FFG 40) followed by the Littoral Combat Ships 5 Approved for Public Release, Distribution Unlimited: NAVAIR , 1 March 2011

6 MQ-8B Fire Scout Program Description Mission: Intelligence, Surveillance, Reconnaissance, and Targeting data to Tactical users (ISR-T) Complementary Aircraft Capabilities Platforms: Designed to operate from all Air Capable Hosts Description - A Fire Scout System consists of: 1-3 VTUAV equipped with Brite Star II (EO/IR) MQ-8B MH-60 Ground Control Station (integrated into ship) incorporating the Tactical Control System (TCS), utilizing Tactical Common DataLink (TCDL), Unmanned Common Automatic Recovery System (UCARS) VTUAV OPERATIONS SCHEDULE Weapons Firing Approved for Public Release, Distribution Unlimited: NAVAIR , 16 June 2011

7 Fire Scout Specification & Size Comparisons L (ft) H (ft) Rtr D (ft) GW (lbs) Max (kts) Ceil (ft) End (hrs) MH-60S/R , , /3.5 MQ-8B , , Jet Ranger , , Length 30 ft (9.15 m) Rotor Diameter 27.5 ft (8.4 m) Height 9.7 ft (2.96 m) Gross Weight 3,150 lbs (1,429 kg) Engine Rolls-Royce 250-C20W Speed 85+ Knots Ceiling 12,500+ ft (3.8 km) Endurance 6+ Hours ft (4.2 m) 30 ft (9.15 m) 15.5 ft (4.7 m) 3 MQ-8B Aircraft Stowage within SH-60 Footprint 14.5 Degree 9.7 ft (2.96 m) 7.5 ft (2.3 m) WLO 1.92 ft (.6 m) 7.58 ft (2.3 m) 5.75 ft (1.8 m) 7 Approved for Public Release, Distribution Unlimited: NAVAIR , 1 March 2011

8 Fire Scout Operational Status Military Utility Assessments USS McInerney Summary 6 month deployment in Pacific Twenty-four (24) flights, 60+ flight hours Mission: Counter-narcotics and Air Det Training First UAV assist in successful drug interdiction mission (3.3 hrs. of covert surveillance) USCG detachment made the arrests USS Halyburton is deployed with Fire Scout in January for 5 th /6 th fleet operations to include Horn of Africa ISRTF will sponsor Navy Fire Scouts to deploy overseas in early 2011 Primary mission is full motion video (300 hours per month) Alternate mission is to Counter Improved Explosive Devices 8 Fire Scout tour on McInerney culminated with successful Detect-to-Intercept Counter Narcotics Operation Approved for Public Release, Distribution Unlimited: NAVAIR , 1 March 2011

9 MQ-8B Fire Scout Current Status Contracts FY11 -- Eleven vehicles NOV 2010 LCS-1 Dynamic Interface and FFG- 40 Workup Periods JAN 2011 USS HALYBURTON CENTCOM Deployment -- Counter piracy, maritime ISR, humanitarian tasking, maritime support of SOF proof of concept Excellent performance (220+ hrs / 98.2% sortie completion rate) Program record for single day long duration ops (18.1 hrs) Conducted dual H-60/VTUAV ops May >2000 total MQ-8B Flight Hours ISR TF Deployment to Afghanistan Aircraft & personnel arrived April Flight operations underway since early May Excellent interaction with US Army RADAR; SRR funded; awaiting budget Weapons; RDC; funded FY11 Littoral Combat Ship Dynamic Interface Testing LCS-1 DI (Completed NOV 2010, OT FY12) LCS-2 DI (APR 2011) USS HALYBURTON (FFG-40) Underway NOV 2010 Deployment Jan-Aug MQ-8B/1 SH60B Specialized Payloads AIS ISR TF CENTCOM Deployment Detachment in place; IOC May A/C, 2 GCS, 300 hrs/mo FMV using GOCO contract Approved for Public Release, Distribution Unlimited: NAVAIR , 16 June 2011

10 Demonstrated Flexibility The Army Maneuver Battle Lab conducts AEWE each year at Fort Benning, GA to refine capability gaps focused on Network-Enabled Warfare at the Small Unit Level Fire Scout demonstrated unique Vertical UAS capabilities in various scenarios Using its EO/IR sensor for RSTA/ISR Aerodynamic pods for MAINGATE communication relay UHF Wide Band Router (5 Mbps) Pelican case cargo pods for small unit resupply Unique sling system for Unmanned Ground Vehicle (UGV) and Unattended Ground Sensor (UGS) deployment Small Unit Logistics Resupply MAINGATE Comms Relay, RSTA/ISR Day/Night ops Autonomous Logistics Resupply at Unprepared Site Unmanned Ground Vehicle Deployment NG s Universal Control Station 10 Approved for Public Release, Distribution Unlimited: Northrop Grumman Aerospace Systems Case Dated 3/15/10

11 Mission Capability Comparison Fire Scout Complements Many Current Mission Sets MQ-8B and SH-60B Current Long Dwell Surveillance SAR Search Force Protection Multiplier Mine Warfare (compliment MH-60S) Future ASUW Large Area Surveillance ASUW Kill Data Relay ASUW Search ASUW Detect ASUW Track ASUW ID Surveillance Communication Relay Maintain Common Operating Picture Logistics Search and Rescue ASW Search ASW Detect ASW Track ASW Classify ASW Kill ASUW Large Area Surveillance ASUW Kill 11 Flexibility, Mission Enhancement and Future Capability at Low Maintenance and Logistics Cost Approved for Public Release, Distribution Unlimited: NAVAIR Dated 11 March 2009

12 Fire Scout Payload Spiral Development USN Baseline Near Term Payloads Future/Potential EO/IR/LRF Automatic Identification System RADAR (Baseline in 2012) Communications and data relay packages Chem/Bio/Nuclear Detect Homeland Security EW/SIGINT SATCOM Acoustic relay Lightweight sonobuoys FLIR Star SAFIRE III Logistics Supply Pods Maritime Multi-Mode Radar Mine Detection Logistics Supply Pods EO/IR/LRF Modular Payload Architecture Swap payloads between missions (Load and Go) System recognizes payload and automatically loads software module Easily accommodate new payloads via defined interface specifications and open architecture Minor control changes to hardware/software on air vehicle and GCS for new payloads Approved for Public Release, Distribution Unlimited: NAVAIR Dated 11 May 2010

13 13 Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10

14 14

15 Fire-X Description Mission: To provide ship-based and/or land-based intelligence, surveillance, target acquisition, reconnaissance (ISTAR) and cargo to tactical users Performance: 3200 lbs useful load 15 hrs time on station 140kts max airspeed 2650 lbs Max sling load 15 Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10

16 Fire-X System Evolution Schweizer 333 Navy RQ-8A Existing TCS Control Segment Navy MQ-8B Fire X Demonstrator Fire-X Production UAV Bell 407 Bell 206L OH-58D Leverages MQ-8B Ship Integration Leverages current Navy program of record and over 10 years of development 16 Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10

17 Fire-X System Makeup TCDL Wide band data link Component of LCS Added for other ship classes Ship Control Station Support Segment Deck Handling Refuel/Defuel Non-powered A/C movement Landing Grid MQ-8B Schweizer 333 Key Existing Modification New Common Equipment TCS Mission Execution Mission planning interface? Strike planning? Intel analysis LSO Method to monitor and communicate with aircraft Safety of Flight Ops UCARS Guidance, Nav, & Control Precision Nav ARC-210 Radios TCDL GPS/INS RADALT IFF Flight Power Conditioning Unit Aux Power Conditioning Unit Environmental Control System Ethernet Switch & Router Payload Interface Unit Ice Detector Vehicle Management Computers (2) Flight Control / Engine Actuators (6) Bell 407 Voice Digitizing Module Engine Interface Unit EO/IR Payload Ground control Panel I/O Data Panel Harpoon 3 UHF/VHF Antennas 1 UCARS Antenna 2 TCDL Antennas 2 GPS/INS Antennas 2 RADALT Antennas 2 IFF Antennas Air Vehicle Software 97% common software, 3% Vehicle Specific Module All system attributes greater than TRL 9 17 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11

18 MQ-8B to Fire-X Comparison Fire-X 17.5 ft (5.33m) Performance Metric Fire-X MQ-8B Fire Scout Maximum Speed 135 knots 100 knots Cruise Speed 120 knots 95 knots Service Ceiling 20,000 feet 12,500 feet Maximum Range (with 170 lb EO/IR sensor) Maximum Endurance (with 170 lb EO/IR sensor) 1227 nautical miles 618 nautical miles 15 hours 8 hours MQ-8B 1.4 ft (0.42 m) 8.7 ft (2.64 m) 34.7 ft (10.57 m) 41.4 ft (12.61 m) ft (4.2 m) 3.8 ft (1.16 m) 10.8 ft (3.30 m) Useful Load (total fuel plus payload) 3200 pounds 1242 pounds 9.7 ft (2.96 m) 7.5 ft (2.3 m) ft (1.8 m) 1.4 ft (0.42 m) Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/ ft (2.39 m) ft (7.29 m)

19 MQ-8B Fire-X Size Comparison 19 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11

20 Fire-X: Multiple Missions Capable Key Features Versatile Field-reconfigurable payload design Proven UAS architecture, FAA-certified airframe Supports multi-intelligence, surveillance and/or specialized payloads Flexibility for internal, external and combination cargo loads Operates with Navy and Army control stations Global logistics infrastructure already in place Available payloads: EO/IR, SAR, Communications Relay, SIGINT, ELINT, Multi-INT 20 Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10

21 Fire-X Missions Maritime ISR Surface Warfare Mine Counter Measures Anti-Submarine Warfare Anti-Piracy Counter Drug Ops Logistics Communications Relay Search & Rescue Littoral ISR Special Operations support Humanitarian Assistance / Disaster Relief 21 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11

22 Operational View FORCEnet CSG/ESG EO/IR/LDRF Radar VTUAV TCDL BriteStar II EO/IR/LDRF and Radar Communications Relay Intel/Surv/ Recon/Targeting (ISRT) Anti-Submarine Warfare (ASW) Sonar Mine-Counter-Mine (MCM) DATA COMMS 22 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11

23 Maritime ISR Fire-X extends the ISR horizon for the Fleet by expanding the Common Operating Picture Radar EO/IR AIS DATA COMMS 23 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11

24 Littoral ISR Fire-X provides ISR data on ports of interest Radar imagery EO/IR video SIGINT SIGINT EO/IR Radar DATA COMMS 24 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11

25 Surface Warfare EO/IR Small Boat Swarm Radar Fire-X enables early detection and classification of enemy vessels Also provides cross cueing to armed manned helos DATA COMMS 25 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11

26 Logistics Fire-X can carry over 2,600 lbs with external sling load 26 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11

27 Anti-Submarine Warfare / Communications Relay Radar EO/IR Non-acoustic search capability Cross-cueing to other ASW platforms (MH-60R, P-3C) Communication relay to other airborne assets or back to the ship Sonar DATA COMMS 27 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11

28 Summary Fire-X demonstrates the MQ-8B s proven and highly-reliable architecture is transplantable and can significantly accelerate the time to field increased capability at an affordable cost 28 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11

29

MQ-8B FIRE SCOUT. Operational Scenario. MQ-8B Fire Scout Air Vehicle Specifications United States Navy

MQ-8B FIRE SCOUT. Operational Scenario. MQ-8B Fire Scout Air Vehicle Specifications United States Navy MQ-8B FIRE SCOUT AEROSPACE SYSTEMS Ver tical Takeof f and Landing Tactical Unmanned Aerial Vehicle System MQ-8B Fire Scout Air Vehicle Specifications United States Navy Air Vehicle Fuselage Length (with

More information

Unmanned Systems. Northrop Grumman Today Annual Conference

Unmanned Systems. Northrop Grumman Today Annual Conference Unmanned Aircraft Builders Conference, Inc 2008 Annual Conference 21-23 September 2008 Doug Fronius Director, Tactical Unmanned IPT Program Manager, VTUAV Navy Fire Scout Northrop Grumman Corporation Northrop

More information

Armed Unmanned Systems

Armed Unmanned Systems Armed Unmanned Systems A Perspective on Navy Needs, Initiatives and Vision Rear Admiral Tim Heely, USN Program Executive Officer Strike Weapons and Unmanned Aviation 10 July 2007 Armed UASs A first time

More information

UAV s And Homeland Defense Now More Critical Than Ever. LCDR Troy Beshears UAV Platform Manager United States Coast Guard

UAV s And Homeland Defense Now More Critical Than Ever. LCDR Troy Beshears UAV Platform Manager United States Coast Guard UAV s And Homeland Defense Now More Critical Than Ever LCDR Troy Beshears UAV Platform Manager United States Coast Guard Common Maritime Threats Counter- Terrorism Maritime Food Supply (Fish) Mass Migration

More information

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

More information

Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned November 2012

Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned November 2012 U.S. NAVY Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned 14-15 November 2012 Jimmy Johnson Lockheed Martin Senior Fellow Lockheed Martin Mission Systems & Sensors

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

STATEMENT OF RADM ANTHONY L. WINNS DEPUTY CHIEF OF NAVAL OPERATIONS DEPUTY DIRECTOR, AIR WARFARE AND BGEN MARTIN POST ASSISTANT DEPUTY COMMANDANT

STATEMENT OF RADM ANTHONY L. WINNS DEPUTY CHIEF OF NAVAL OPERATIONS DEPUTY DIRECTOR, AIR WARFARE AND BGEN MARTIN POST ASSISTANT DEPUTY COMMANDANT ---------------------------------------------------------------- The United States Navy on the World Wide Web A service of the Navy Office of Information, Washington DC send feedback/questions to comments@chinfo.navy.mil

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 CLASSIFICATION: EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 R-1 ITEM NOMENCLATURE 0305205N Endurance Unmanned Aerial Vehicles

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013

More information

NAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross

NAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross NAVAIR Overview PRESENTED TO: Radford University 30 November 2016 PRESENTED BY: David DeMauro / John Ross NAVAIR NOV 2016 Mission NAVAIR's mission is to provide full life-cycle support of naval aviation

More information

Status of Unmanned Systems: EXECUTING!

Status of Unmanned Systems: EXECUTING! Status of Unmanned Systems: EXECUTING! CAPT Jon Rucker Program Manager PMS406 Jan 2018 Distribution Statement A: Approved for Public Release; Distribution Unlimited. This Brief is provided for Information

More information

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2007 Actual FY 2008 FY 2009 FY 2010 FY 2011

More information

Navy & Marine Corps Vertical Lift: Past and Future

Navy & Marine Corps Vertical Lift: Past and Future Navy & Marine Corps Vertical Lift: Past and Future 22 Oct 2015 Cleared for public release NAVAIR-PEOA-055-2014 1 Presented to: Center for Strategic and International Studies Presented by: Michael Fallon

More information

LCS Mission Modules Program

LCS Mission Modules Program LCS Mission Modules Program Delivering Capability to the Warfighter NAVSEA 1 Supporting the Fleet Today Surface Warfare MP has deployed on three different Littoral Combat Ships supporting operations in

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program

More information

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010

More information

Aerial Targets & Unmanned Aviation

Aerial Targets & Unmanned Aviation Aerial Targets & Unmanned Aviation Critical Threats Driving Future Requirements RADM Timothy L. Heely, USN Program Executive Officer Strike Weapons and Unmanned Aviation 31 October 2006 Naval UAS Family

More information

Naval Unmanned Combat Air Vehicle

Naval Unmanned Combat Air Vehicle Naval Unmanned Combat Air Vehicle Advanced Technology Program TTO Tactical Technology Office Dr. William Scheuren DARPA/TTO wscheuren@darpa.mil (703) 696-2321 UCAV-N Vision ❶ Revolutionary New Ship-based

More information

Sea Air Space Symposium

Sea Air Space Symposium Sea Air Space Symposium Howard Berkof Deputy Program Manager PMS406 03 April 2017 PEO LCS Portfolio LCS 1 LCS 2 IN SERVICE SUPPORT (SHIPS & MISSION PACKAGES) PMS 501 XLUUV / AUP RMMV AQS-20 LCS TRAINING

More information

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success Detect, Deny, Disrupt, Degrade and Evade Lethal Threats Advanced Survivability Suite Solutions for Mission Success Countering Smart and Adaptive Threats Military pilots and aircrews must be prepared to

More information

Trusted Partner in guided weapons

Trusted Partner in guided weapons Trusted Partner in guided weapons Raytheon Missile Systems Naval and Area Mission Defense (NAMD) product line offers a complete suite of mission solutions for customers around the world. With proven products,

More information

The Western UAS Symposium

The Western UAS Symposium The Western UAS Symposium http://www.ttcus/com @Techtrain Linkedin/Groups: Technology Training Corporation MARINE AVIATION USMC Future UAS Programs and Weapons LtCol James Tuck Compton HQMC Aviation, Deputy

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 65.844 127.925 21.000-21.000 8.000 -

More information

RQ-4A GLOBAL HAWK UNMANNED AERIAL VEHICLE (UAV) SYSTEMS

RQ-4A GLOBAL HAWK UNMANNED AERIAL VEHICLE (UAV) SYSTEMS RQ-4A GLOBAL HAWK UNMANNED AERIAL VEHICLE (UAV) SYSTEMS Air Force Program Total Number of Systems Global Hawk Air Vehicles: Common Ground Segments: Total Program Cost (TY$): Average Unit Production Cost

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 0305204N TACTICAL UNMANNED AERIAL VEHICLES COST ($ in

More information

13 February Presented by: RDML Mat Winter PEO(U&W) Approved for Public Release V2.1

13 February Presented by: RDML Mat Winter PEO(U&W) Approved for Public Release V2.1 Presented by: RDML Mat Winter PEO(U&W) 13 February 2013 Approved for Public Release V2.1 FMU-139 Unmanned Air Systems Common Control System Tomahawk Weapon Control Systems Air Wing Ship Integration/ Digital

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) ARMY COMMON GROUND STATION (CGS) (TIARA) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) FY1999 Actual FY 2002 FY 2003 FY2004 FY2005 to Army Joint STARS (TIARA) 5316 25676 17898 17713 12833 14372 11527 Continuing Continuing A. Mission Description and Justification: The

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

NAVAIR Control & Guidance Activities ACGSC Meeting 99, Boulder Colorado, March Shawn T Donley Naval Air Systems Command

NAVAIR Control & Guidance Activities ACGSC Meeting 99, Boulder Colorado, March Shawn T Donley Naval Air Systems Command NAVAIR Control & Guidance Activities ACGSC Meeting 99, Boulder Colorado, March 2007 Shawn T Donley Naval Air Systems Command 1 EA-18G Electronic Warfare Replacement for EA-6B ALQ-218 wideband receiver

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 108.021 21.000 3.000-3.000 3.000 2.000 0.000

More information

Future of MIW from the LCS Platform

Future of MIW from the LCS Platform Future of MIW from the LCS Platform 24 October 2011 RDML Jim Murdoch, USN PEO LCS Distribution Statement A: Approved for Public Release; Distribution Unlimited. (11/16/2011). This Brief is provided for

More information

Victory Starts Here!

Victory Starts Here! Victory Starts Here! Robotic and Autonomous Systems (RAS) MAJ Mike Dvorak ARCIC Robotics Branch Victory Starts Here! Robotic and Autonomous Systems Strategy Objective Capabilities: Over the next 25 years,

More information

CRS Report for Congress

CRS Report for Congress Order Code RS21294 Updated October 25, 2006 CRS Report for Congress Received through the CRS Web Unmanned Vehicles for U.S. Naval Forces: Background and Issues for Congress Summary Ronald O Rourke Specialist

More information

Russian defense industrial complex s possibilities for development of advanced BMD weapon systems

Russian defense industrial complex s possibilities for development of advanced BMD weapon systems 134 Russian defense industrial complex s possibilities for development of advanced BMD weapon systems 135 Igor KOROTCHENKO Editor-in-Chief of the National Defense magazine The main task handled by the

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost

More information

Air Defense System Solutions.

Air Defense System Solutions. Air Defense System Solutions www.aselsan.com.tr ADSS AIR DEFENSE SYSTEM SOLUTIONS AIR DEFENSE SYSTEM SOLUTIONS Effective air defense is based on integration and coordinated use of airborne and/or ground

More information

State of Coast Guard Aviation

State of Coast Guard Aviation State of Coast Guard Aviation Ptero Roost September 20, 2006 CDR Jim O Keefe Office of Aviation Forces Aircraft Total HC 130H 27* C 130J 6 HH 60 42* HH 65 B/C 95 MH 68 8 Ops Support 23* 4 6 0 35* 7 84

More information

Own the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family

Own the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family U.S. Air Force Fact Sheet 27TH SPECIAL OPERATIONS WING Cannon Air Force Base, home of the 27th Special Operations Wing, lies in the high plains of eastern New Mexico, near the Texas Panhandle. The base

More information

COMMON AVIATION COMMAND AND CONTROL SYSTEM

COMMON AVIATION COMMAND AND CONTROL SYSTEM Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 Navy Page 1 of 17 R-1 Line Item #30 To Program Element 25.144

More information

MQ-8B Fire Scout Program Support Analysis For Commander Helicopter Maritime Strike Wing Atlantic Fleet

MQ-8B Fire Scout Program Support Analysis For Commander Helicopter Maritime Strike Wing Atlantic Fleet Calhoun: The NPS Institutional Archive DSpace Repository Theses and Dissertations 1. Thesis and Dissertation Collection, all items 2009-03-10 MQ-8B Fire Scout Program Support Analysis For Commander Helicopter

More information

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

DDG 1000 Class Destroyer

DDG 1000 Class Destroyer DDG 1000 Class Destroyer 10 April 2018 Sea Air Space (SAS) DDG 1000 October February 2016 2017 DDG 1001 July February 20162018 DDG 1000 Program Manager, PMS 500 DDG 1002 December October 2016 2017 CAPT

More information

ISR Full Crew Mission Simulator. Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training

ISR Full Crew Mission Simulator. Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Base OCO Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program

More information

CRS Report for Congress

CRS Report for Congress Order Code RS21305 Updated January 3, 2006 CRS Report for Congress Received through the CRS Web Summary Navy Littoral Combat Ship (LCS): Background and Issues for Congress Ronald O Rourke Specialist in

More information

USCG Office of Aviation Forces Unmanned Aircraft Systems (UAS) Coast Guard UAS; Opening the Aperture

USCG Office of Aviation Forces Unmanned Aircraft Systems (UAS) Coast Guard UAS; Opening the Aperture USCG Office of Aviation Forces Unmanned Aircraft Systems (UAS) Coast Guard UAS; Opening the Aperture LCDR Ryan Lampe, SR-UAS Platform Manager USCG Office of Aviation Forces (CG-7114) 09 April 2018 Immense

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Office of the Secretary Of Defense Date: February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

EXPERIENCE A NEW PERSPECTIVE PUSHING PERFORMANCE LIMITS

EXPERIENCE A NEW PERSPECTIVE PUSHING PERFORMANCE LIMITS This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior consent. EXPERIENCE A NEW PERSPECTIVE PUSHING PERFORMANCE

More information

Backgrounder. Boeing Military Aircraft

Backgrounder. Boeing Military Aircraft Boeing Defense, Space & Security P.O. Box 516 St. Louis, MO 63166 www.boeing.com Boeing Military Aircraft Boeing Military Aircraft (BMA) includes tactical, tanker and airlift aircraft, weapons, surveillance

More information

MQM-171 BROADSWORD IN SUPPORT OF TEST MISSIONS

MQM-171 BROADSWORD IN SUPPORT OF TEST MISSIONS MQM-171 BROADSWORD IN SUPPORT OF TEST MISSIONS 2010 NDIA Targets Conference Presenter: Larry French Title: CEO/CTO MQM-171 BroadSword Program Overview BroadSword is the result of the Army s need for a

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

More information

NAVAL AVIATION MAINTENANCE PROFESSIONAL SYMPOSIUM VADM DAVID ARCHITZEL. 29 June 2011 COMMANDER, NAVAL AIR SYSTEMS COMMAND. Presented to: Presented by:

NAVAL AVIATION MAINTENANCE PROFESSIONAL SYMPOSIUM VADM DAVID ARCHITZEL. 29 June 2011 COMMANDER, NAVAL AIR SYSTEMS COMMAND. Presented to: Presented by: NAVAL AVIATION: NOW AND IN THE FUTURE Presented to: Presented by: 29 June 2011 NAVAL AVIATION MAINTENANCE PROFESSIONAL SYMPOSIUM VADM DAVID ARCHITZEL COMMANDER, NAVAL AIR SYSTEMS COMMAND NAVAIR Public

More information

Annual Naval Technology Exercise ANTX 2016 Overview NUWC Division Newport

Annual Naval Technology Exercise ANTX 2016 Overview NUWC Division Newport Annual Naval Technology Exercise ANTX 2016 Overview NUWC Division Newport DISTRIBUTION STATEMENT A Approved for public release; Distribution is unlimited. 1 What is ANTX? ANTX is an annual event created

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

Backgrounder. ScanEagle Unmanned Aircraft Systems

Backgrounder. ScanEagle Unmanned Aircraft Systems Backgrounder ScanEagle Unmanned Aircraft Systems About ScanEagle unmanned aircraft systems (UAS) are a product of Insitu, a wholly owned subsidiary of The Boeing Company. ScanEagle is a cost-effective,

More information

LCS Mission Modules Program

LCS Mission Modules Program LCS Mission Modules Program Training Strategy Increasing Modularity for Maximum Adaptability Brief for ImplementationFest 2010 10 August 2010 Robin Kime, PMS 420L Wayne Gafford, NSWC PHD - ADL 1 Report

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014

More information

REQUEST FOR INFORMATION (RFI) RFI Number: DHS Robotic Aircraft for Public Safety

REQUEST FOR INFORMATION (RFI) RFI Number: DHS Robotic Aircraft for Public Safety REQUEST FOR INFORMATION (RFI) RFI Number: DHS 13-01 Robotic Aircraft for Public Safety 1. BACKGROUND/PROGRAM DESCRIPTION The Science and Technology (S&T) Directorate is the Department s primary research

More information

Acquisition Insights & Transformation. CG 9 RADM Gary T. Blore 31 October, 2007

Acquisition Insights & Transformation. CG 9 RADM Gary T. Blore 31 October, 2007 Acquisition Insights & Transformation CG 9 RADM Gary T. Blore 31 October, 2007 CG-9 Full Operational Capability, FY09 Director of Contracting and Procurement HCA/SES CG-91 Deputy HCA GS-15 CG-91D Matrix

More information

MEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM

MEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM MEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM MEADS WORLD CLASS THEATER AIR & MISSILE DEFENSE MEADS has been developed to defeat next-generation threats including tactical ballistic missiles (TBMs), unmanned

More information

Future Combat Systems

Future Combat Systems Future Combat Systems Advanced Planning Briefing for Industry (APBI) BG John Bartley 15 October Overarching Acquisition Strategy Buy Future Combat Systems; Equip Soldiers; Field Units of Action (UA) Embrace

More information

FFG(X) Update National Symposium - Surface Navy Association

FFG(X) Update National Symposium - Surface Navy Association FFG(X) Update National Symposium - Surface Navy Association Dr. Regan Campbell January 9, 2018 1 FFG(X) System Description Mission: Anti-Submarine Warfare, Surface Warfare, Electromagnetic Maneuver Warfare,

More information

THE AIR FORCE DEVELOPMENT TEAM

THE AIR FORCE DEVELOPMENT TEAM THE AIR FORCE DEVELOPMENT TEAM Commander RCAF LGen Hood CFAWC Col Elder Deputy Comd RCAF MGen Frawley D Air SP Col Lefebvre DG Air FD BGen lalumière DG Space BGen Whale DG FCO MGen pelletier S&T + DRDC

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Office of Secretary Of Defense DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 United States Special Operations Command : February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

2017 Annual Missile Defense Small Business Programs Conference

2017 Annual Missile Defense Small Business Programs Conference 2017 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DISTRIBUTION STATEMENT A. Approved for public release; distribution

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 United States Special Operations Command : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Cost To Complete Total Program Element - 94.303 174.316 149.804-149.804

More information

Unmanned Aerial Vehicle Operations

Unmanned Aerial Vehicle Operations MCWP 3-42.1 Unmanned Aerial Vehicle Operations U.S. Marine Corps DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited PCN 143 000141 00 DEPARTMENT OF THE NAVY Headquarters United

More information

UNCLASSIFIED. Cost To Complete Total Program Element : Undersea Warfare Advanced Technology

UNCLASSIFIED. Cost To Complete Total Program Element : Undersea Warfare Advanced Technology Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Technology Development (ATD) OCO FY 2016 FY 2017 FY 2018

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

Saab Press Briefing CANSEC May John Belanger V.P. Communications Saab North America

Saab Press Briefing CANSEC May John Belanger V.P. Communications Saab North America Saab Press Briefing CANSEC 2018 30 May 2018 John Belanger V.P. Communications Saab North America 2 IN 1937 WE TOOK OFF A history from the 17th century through Alfred Nobel (Bofors) and the shipyard in

More information

GAO FORCE STRUCTURE. Improved Strategic Planning Can Enhance DOD's Unmanned Aerial Vehicles Efforts

GAO FORCE STRUCTURE. Improved Strategic Planning Can Enhance DOD's Unmanned Aerial Vehicles Efforts GAO United States General Accounting Office Report to the Chairman, Subcommittee on Tactical Air and Land Forces, Committee on Armed Services, House of Representatives March 2004 FORCE STRUCTURE Improved

More information

Unmanned Systems and Mine Warfare RADM Matthew Klunder Chief of Naval Research November 5, 2014

Unmanned Systems and Mine Warfare RADM Matthew Klunder Chief of Naval Research November 5, 2014 Unmanned Systems and Mine Warfare RADM Matthew Klunder Chief of Naval Research November 5, 2014 DISTRIBUTION STATEMENT A. Approved for public release The Future of Mine Warfare Offboard unmanned systems

More information

Mr. James Hondo Geurts Deputy Director for Acquisition United States Special Operations Command

Mr. James Hondo Geurts Deputy Director for Acquisition United States Special Operations Command Mr. James Hondo Geurts Deputy Director for Acquisition United States Special Operations Command A Unique Organization A Unified Combatant Command with Service, Military Department, and Defense Agency

More information

RC-135U Combat Sent. Headquarters U.S. Air Force. I n t e g r i t y - S e r v i c e - E x c e l l e n c e

RC-135U Combat Sent. Headquarters U.S. Air Force. I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e RC-135U Combat Sent Capt Logan Schrank 45 RS/DOF-C 8 Sep 17 Version 1 RC-135U Combat Sent 2 History 17 Apr 1970: COMBAT

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 6.021 8.312 7.963-7.963 8.046 8.146 8.194

More information

ARCHIVED REPORT. Battlefield Airborne Communications Node (BACN)

ARCHIVED REPORT. Battlefield Airborne Communications Node (BACN) C4I - Command, Control, Communications, Computers & Intelligence Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Battlefield

More information

Update: (12 April 2017) USNS HERSHEL "WOODY" WILLIAMS EXPEDITIONARY SEA BASE SHIP T-ESB 4

Update: (12 April 2017) USNS HERSHEL WOODY WILLIAMS EXPEDITIONARY SEA BASE SHIP T-ESB 4 Update: (12 April 2017) USNS HERSHEL "WOODY" WILLIAMS EXPEDITIONARY SEA BASE SHIP T-ESB 4 In September 2015, the Secretary of the Navy Renamed Three Ship Classes, Creates Expeditionary Designator in Naming

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement ADDENDUM_X 16 OCTOBER 2013 Maintenance EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING SYSTEM/MQ-1

More information

Spectrum contest: RAAF boosts electronic warfare capabilities

Spectrum contest: RAAF boosts electronic warfare capabilities Spectrum contest: RAAF boosts electronic warfare capabilities Jane's Defence Industry As the Royal Australian Air Force (RAAF) begins to beef up its capabilities in the electronic warfare spectrum, Charles

More information

Fighter/ Attack Inventory

Fighter/ Attack Inventory Fighter/ Attack Fighter/ Attack A-0A: 30 Grounded 208 27.3 8,386 979 984 A-0C: 5 Grounded 48 27. 9,274 979 984 F-5A: 39 Restricted 39 30.7 6,66 975 98 F-5B: 5 Restricted 5 30.9 7,054 976 978 F-5C: 7 Grounded,

More information

2018 Annual Missile Defense Small Business Programs Conference

2018 Annual Missile Defense Small Business Programs Conference 2018 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 15 May 2018 Mr. Joseph C. Keelon Program Executive for Advanced

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE 0603766E, R-1 #50 COST (In Millions) 2002 2003 2004 2005 2006 2007 2008 2009 Total Program Element (PE) Cost 0.000 0.000 95.654 151.966 205.382 183.796 200.335 203.073 Joint Warfare Systems NET-01 0.000

More information

UNCLASSIFIED. RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST (Dollars in Millions) FY03 FY04 FY05 FY06 FY07 FY08 FY09 Cost to Complete

UNCLASSIFIED. RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST (Dollars in Millions) FY03 FY04 FY05 FY06 FY07 FY08 FY09 Cost to Complete RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE FEBRUARY 2004 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 3 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160402BB Special Operations (SO) Advanced

More information