1 MQ-8B Fire Scout and Fire-X Overview and Status Update June 2011 Mike Fuqua Director, Business Development Tactical Unmanned Systems Northrop Grumman Aerospace System Approved for Public Release, Distribution Unlimited: Approved for Public Release Northrop Grumman C/N UMS , February 2009; Approved for Public Release, Office of Security Review 09-S-2433; July 15, 2009; Approved for Public Release, Distribution Unlimited: NAVAIR Dated 11 May 2010; Approved for Public Release, Distribution Unlimited: NAVAIR Dated 25 March 2010; NGAS Case ; Approved for Public Release, Distribution Unlimited: NAVAIR Dated 11 March 2009; Approved for Public Release, Distribution Unlimited: NAVAIR , 1 February 2011; Approved for Public Release, Distribution Unlimited:, NAVAIR Dated 15 August 2008; Approved for Public Release, Distribution Unlimited: Northrop Grumman Aerospace Systems Case Dated 3/15/10; Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10; Approved for Public Release: Northrop Grumman Aerospace Systems Case , 2/9/11;NAVAIR Approval 2/16/11; Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10; Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11; Approved for Public Release, Distribution Unlimited: NAVAIR , 16 June 2011
2 OQ-2 OQ-19/SD-1 RP-76 BQM-74 X-47A UCAS RQ-4 Block 20/30/40 Global Hawk Euro Hawk BAMS RQ-8A Fire Scout Compass Cope RQ-4 ACTD/Block 10 Global Hawk Combat Dawn BQM-34 BQM-145A Compass Arrow M324 AQM-34 SPA Firebolt X-47B UCAS MQ-8B Fire Scout Bat MQ-5B Hunter BQM-74E BQM-74F RQ-5A Hunter E-Hunter 2 Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 5/13/10
3 MQ-8B Fire Scout U.S. Navy key enabler for the littoral combat ship mission Anti-submarine warfare Anti-surface warfare Mine warfare Will complement (not replace) and reduce the burden on manned systems USS McInerney FFG-8 Extremely mature, reliable and maintainable Primary missions intelligence, surveillance, reconnaissance and targeting Growth paths to communications relay and others USS Freedom LCS-1 The Enabler: Persistent, Flexible and Lethal 3 Approved for Public Release, Distribution Unlimited: NAVAIR Dated 25 March 2010; NGAS Case
4 MQ-8B Fire Scout Only US Navy Funded Vertical UAS Program of Record (POR) Ten years of development activity RQ-8A MQ-8B Spiral payload development enabled by Modular Mission Payload Architecture Demonstrated reliable continuous shipboard operations 4 Approved for Public Release, Distribution Unlimited: NAVAIR , 1 March 2011
5 Navy MQ-8B Fire Scout Program Description Mission: The Fire Scout System is designed to provide intelligence, surveillance, target acquisition and reconnaissance (ISTAR) to tactical users Platforms: The Fire Scout System is designed to operate from all air capable ships Description A Fire Scout System consists of: 1-3 MQ-8B Fire Scout unmanned rotary wing air vehicles Electro-optical/infra-red /laser pointer and range finder modular mission payloads Automatic Identification System Maritime Radar in 2012 Ground Control Station (integrated in ship CIC) incorporating the tactical common data link (TCDL) and tactical control system (TCS) 1 Unmanned Common Automatic Recovery Systems 1 grid (NATO standard) for shipboard operations Employment: Fielded on the USS McInerney (FFG 8). Deployments will continue aboard the USS Halyburton (FFG 40) followed by the Littoral Combat Ships 5 Approved for Public Release, Distribution Unlimited: NAVAIR , 1 March 2011
6 MQ-8B Fire Scout Program Description Mission: Intelligence, Surveillance, Reconnaissance, and Targeting data to Tactical users (ISR-T) Complementary Aircraft Capabilities Platforms: Designed to operate from all Air Capable Hosts Description - A Fire Scout System consists of: 1-3 VTUAV equipped with Brite Star II (EO/IR) MQ-8B MH-60 Ground Control Station (integrated into ship) incorporating the Tactical Control System (TCS), utilizing Tactical Common DataLink (TCDL), Unmanned Common Automatic Recovery System (UCARS) VTUAV OPERATIONS SCHEDULE Weapons Firing Approved for Public Release, Distribution Unlimited: NAVAIR , 16 June 2011
7 Fire Scout Specification & Size Comparisons L (ft) H (ft) Rtr D (ft) GW (lbs) Max (kts) Ceil (ft) End (hrs) MH-60S/R , , /3.5 MQ-8B , , Jet Ranger , , Length 30 ft (9.15 m) Rotor Diameter 27.5 ft (8.4 m) Height 9.7 ft (2.96 m) Gross Weight 3,150 lbs (1,429 kg) Engine Rolls-Royce 250-C20W Speed 85+ Knots Ceiling 12,500+ ft (3.8 km) Endurance 6+ Hours ft (4.2 m) 30 ft (9.15 m) 15.5 ft (4.7 m) 3 MQ-8B Aircraft Stowage within SH-60 Footprint 14.5 Degree 9.7 ft (2.96 m) 7.5 ft (2.3 m) WLO 1.92 ft (.6 m) 7.58 ft (2.3 m) 5.75 ft (1.8 m) 7 Approved for Public Release, Distribution Unlimited: NAVAIR , 1 March 2011
8 Fire Scout Operational Status Military Utility Assessments USS McInerney Summary 6 month deployment in Pacific Twenty-four (24) flights, 60+ flight hours Mission: Counter-narcotics and Air Det Training First UAV assist in successful drug interdiction mission (3.3 hrs. of covert surveillance) USCG detachment made the arrests USS Halyburton is deployed with Fire Scout in January for 5 th /6 th fleet operations to include Horn of Africa ISRTF will sponsor Navy Fire Scouts to deploy overseas in early 2011 Primary mission is full motion video (300 hours per month) Alternate mission is to Counter Improved Explosive Devices 8 Fire Scout tour on McInerney culminated with successful Detect-to-Intercept Counter Narcotics Operation Approved for Public Release, Distribution Unlimited: NAVAIR , 1 March 2011
9 MQ-8B Fire Scout Current Status Contracts FY11 -- Eleven vehicles NOV 2010 LCS-1 Dynamic Interface and FFG- 40 Workup Periods JAN 2011 USS HALYBURTON CENTCOM Deployment -- Counter piracy, maritime ISR, humanitarian tasking, maritime support of SOF proof of concept Excellent performance (220+ hrs / 98.2% sortie completion rate) Program record for single day long duration ops (18.1 hrs) Conducted dual H-60/VTUAV ops May >2000 total MQ-8B Flight Hours ISR TF Deployment to Afghanistan Aircraft & personnel arrived April Flight operations underway since early May Excellent interaction with US Army RADAR; SRR funded; awaiting budget Weapons; RDC; funded FY11 Littoral Combat Ship Dynamic Interface Testing LCS-1 DI (Completed NOV 2010, OT FY12) LCS-2 DI (APR 2011) USS HALYBURTON (FFG-40) Underway NOV 2010 Deployment Jan-Aug MQ-8B/1 SH60B Specialized Payloads AIS ISR TF CENTCOM Deployment Detachment in place; IOC May A/C, 2 GCS, 300 hrs/mo FMV using GOCO contract Approved for Public Release, Distribution Unlimited: NAVAIR , 16 June 2011
10 Demonstrated Flexibility The Army Maneuver Battle Lab conducts AEWE each year at Fort Benning, GA to refine capability gaps focused on Network-Enabled Warfare at the Small Unit Level Fire Scout demonstrated unique Vertical UAS capabilities in various scenarios Using its EO/IR sensor for RSTA/ISR Aerodynamic pods for MAINGATE communication relay UHF Wide Band Router (5 Mbps) Pelican case cargo pods for small unit resupply Unique sling system for Unmanned Ground Vehicle (UGV) and Unattended Ground Sensor (UGS) deployment Small Unit Logistics Resupply MAINGATE Comms Relay, RSTA/ISR Day/Night ops Autonomous Logistics Resupply at Unprepared Site Unmanned Ground Vehicle Deployment NG s Universal Control Station 10 Approved for Public Release, Distribution Unlimited: Northrop Grumman Aerospace Systems Case Dated 3/15/10
11 Mission Capability Comparison Fire Scout Complements Many Current Mission Sets MQ-8B and SH-60B Current Long Dwell Surveillance SAR Search Force Protection Multiplier Mine Warfare (compliment MH-60S) Future ASUW Large Area Surveillance ASUW Kill Data Relay ASUW Search ASUW Detect ASUW Track ASUW ID Surveillance Communication Relay Maintain Common Operating Picture Logistics Search and Rescue ASW Search ASW Detect ASW Track ASW Classify ASW Kill ASUW Large Area Surveillance ASUW Kill 11 Flexibility, Mission Enhancement and Future Capability at Low Maintenance and Logistics Cost Approved for Public Release, Distribution Unlimited: NAVAIR Dated 11 March 2009
12 Fire Scout Payload Spiral Development USN Baseline Near Term Payloads Future/Potential EO/IR/LRF Automatic Identification System RADAR (Baseline in 2012) Communications and data relay packages Chem/Bio/Nuclear Detect Homeland Security EW/SIGINT SATCOM Acoustic relay Lightweight sonobuoys FLIR Star SAFIRE III Logistics Supply Pods Maritime Multi-Mode Radar Mine Detection Logistics Supply Pods EO/IR/LRF Modular Payload Architecture Swap payloads between missions (Load and Go) System recognizes payload and automatically loads software module Easily accommodate new payloads via defined interface specifications and open architecture Minor control changes to hardware/software on air vehicle and GCS for new payloads Approved for Public Release, Distribution Unlimited: NAVAIR Dated 11 May 2010
13 13 Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10
14 14
15 Fire-X Description Mission: To provide ship-based and/or land-based intelligence, surveillance, target acquisition, reconnaissance (ISTAR) and cargo to tactical users Performance: 3200 lbs useful load 15 hrs time on station 140kts max airspeed 2650 lbs Max sling load 15 Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10
16 Fire-X System Evolution Schweizer 333 Navy RQ-8A Existing TCS Control Segment Navy MQ-8B Fire X Demonstrator Fire-X Production UAV Bell 407 Bell 206L OH-58D Leverages MQ-8B Ship Integration Leverages current Navy program of record and over 10 years of development 16 Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10
17 Fire-X System Makeup TCDL Wide band data link Component of LCS Added for other ship classes Ship Control Station Support Segment Deck Handling Refuel/Defuel Non-powered A/C movement Landing Grid MQ-8B Schweizer 333 Key Existing Modification New Common Equipment TCS Mission Execution Mission planning interface? Strike planning? Intel analysis LSO Method to monitor and communicate with aircraft Safety of Flight Ops UCARS Guidance, Nav, & Control Precision Nav ARC-210 Radios TCDL GPS/INS RADALT IFF Flight Power Conditioning Unit Aux Power Conditioning Unit Environmental Control System Ethernet Switch & Router Payload Interface Unit Ice Detector Vehicle Management Computers (2) Flight Control / Engine Actuators (6) Bell 407 Voice Digitizing Module Engine Interface Unit EO/IR Payload Ground control Panel I/O Data Panel Harpoon 3 UHF/VHF Antennas 1 UCARS Antenna 2 TCDL Antennas 2 GPS/INS Antennas 2 RADALT Antennas 2 IFF Antennas Air Vehicle Software 97% common software, 3% Vehicle Specific Module All system attributes greater than TRL 9 17 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11
18 MQ-8B to Fire-X Comparison Fire-X 17.5 ft (5.33m) Performance Metric Fire-X MQ-8B Fire Scout Maximum Speed 135 knots 100 knots Cruise Speed 120 knots 95 knots Service Ceiling 20,000 feet 12,500 feet Maximum Range (with 170 lb EO/IR sensor) Maximum Endurance (with 170 lb EO/IR sensor) 1227 nautical miles 618 nautical miles 15 hours 8 hours MQ-8B 1.4 ft (0.42 m) 8.7 ft (2.64 m) 34.7 ft (10.57 m) 41.4 ft (12.61 m) ft (4.2 m) 3.8 ft (1.16 m) 10.8 ft (3.30 m) Useful Load (total fuel plus payload) 3200 pounds 1242 pounds 9.7 ft (2.96 m) 7.5 ft (2.3 m) ft (1.8 m) 1.4 ft (0.42 m) Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/ ft (2.39 m) ft (7.29 m)
19 MQ-8B Fire-X Size Comparison 19 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11
20 Fire-X: Multiple Missions Capable Key Features Versatile Field-reconfigurable payload design Proven UAS architecture, FAA-certified airframe Supports multi-intelligence, surveillance and/or specialized payloads Flexibility for internal, external and combination cargo loads Operates with Navy and Army control stations Global logistics infrastructure already in place Available payloads: EO/IR, SAR, Communications Relay, SIGINT, ELINT, Multi-INT 20 Approved for Public Release: Northrop Grumman Aerospace Systems Case Dated 4/29/10
21 Fire-X Missions Maritime ISR Surface Warfare Mine Counter Measures Anti-Submarine Warfare Anti-Piracy Counter Drug Ops Logistics Communications Relay Search & Rescue Littoral ISR Special Operations support Humanitarian Assistance / Disaster Relief 21 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11
22 Operational View FORCEnet CSG/ESG EO/IR/LDRF Radar VTUAV TCDL BriteStar II EO/IR/LDRF and Radar Communications Relay Intel/Surv/ Recon/Targeting (ISRT) Anti-Submarine Warfare (ASW) Sonar Mine-Counter-Mine (MCM) DATA COMMS 22 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11
23 Maritime ISR Fire-X extends the ISR horizon for the Fleet by expanding the Common Operating Picture Radar EO/IR AIS DATA COMMS 23 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11
24 Littoral ISR Fire-X provides ISR data on ports of interest Radar imagery EO/IR video SIGINT SIGINT EO/IR Radar DATA COMMS 24 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11
25 Surface Warfare EO/IR Small Boat Swarm Radar Fire-X enables early detection and classification of enemy vessels Also provides cross cueing to armed manned helos DATA COMMS 25 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11
26 Logistics Fire-X can carry over 2,600 lbs with external sling load 26 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11
27 Anti-Submarine Warfare / Communications Relay Radar EO/IR Non-acoustic search capability Cross-cueing to other ASW platforms (MH-60R, P-3C) Communication relay to other airborne assets or back to the ship Sonar DATA COMMS 27 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11
28 Summary Fire-X demonstrates the MQ-8B s proven and highly-reliable architecture is transplantable and can significantly accelerate the time to field increased capability at an affordable cost 28 Approved for Public Release: Northrop Grumman Aerospace Systems Case , 4/5/11; NAVAIR Approval 4/7/11
29
MQ-8B FIRE SCOUT. Operational Scenario. MQ-8B Fire Scout Air Vehicle Specifications United States Navy
MQ-8B FIRE SCOUT AEROSPACE SYSTEMS Ver tical Takeof f and Landing Tactical Unmanned Aerial Vehicle System MQ-8B Fire Scout Air Vehicle Specifications United States Navy Air Vehicle Fuselage Length (with
More informationUnmanned Systems. Northrop Grumman Today Annual Conference
Unmanned Aircraft Builders Conference, Inc 2008 Annual Conference 21-23 September 2008 Doug Fronius Director, Tactical Unmanned IPT Program Manager, VTUAV Navy Fire Scout Northrop Grumman Corporation Northrop
More informationArmed Unmanned Systems
Armed Unmanned Systems A Perspective on Navy Needs, Initiatives and Vision Rear Admiral Tim Heely, USN Program Executive Officer Strike Weapons and Unmanned Aviation 10 July 2007 Armed UASs A first time
More informationUAV s And Homeland Defense Now More Critical Than Ever. LCDR Troy Beshears UAV Platform Manager United States Coast Guard
UAV s And Homeland Defense Now More Critical Than Ever LCDR Troy Beshears UAV Platform Manager United States Coast Guard Common Maritime Threats Counter- Terrorism Maritime Food Supply (Fish) Mass Migration
More informationSTATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE
NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE
More informationFreedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned November 2012
U.S. NAVY Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned 14-15 November 2012 Jimmy Johnson Lockheed Martin Senior Fellow Lockheed Martin Mission Systems & Sensors
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96
More informationSTATEMENT OF RADM ANTHONY L. WINNS DEPUTY CHIEF OF NAVAL OPERATIONS DEPUTY DIRECTOR, AIR WARFARE AND BGEN MARTIN POST ASSISTANT DEPUTY COMMANDANT
---------------------------------------------------------------- The United States Navy on the World Wide Web A service of the Navy Office of Information, Washington DC send feedback/questions to comments@chinfo.navy.mil
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481
More informationUNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7
CLASSIFICATION: EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 R-1 ITEM NOMENCLATURE 0305205N Endurance Unmanned Aerial Vehicles
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013
More informationNAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross
NAVAIR Overview PRESENTED TO: Radford University 30 November 2016 PRESENTED BY: David DeMauro / John Ross NAVAIR NOV 2016 Mission NAVAIR's mission is to provide full life-cycle support of naval aviation
More informationStatus of Unmanned Systems: EXECUTING!
Status of Unmanned Systems: EXECUTING! CAPT Jon Rucker Program Manager PMS406 Jan 2018 Distribution Statement A: Approved for Public Release; Distribution Unlimited. This Brief is provided for Information
More informationUNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2
Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2007 Actual FY 2008 FY 2009 FY 2010 FY 2011
More informationNavy & Marine Corps Vertical Lift: Past and Future
Navy & Marine Corps Vertical Lift: Past and Future 22 Oct 2015 Cleared for public release NAVAIR-PEOA-055-2014 1 Presented to: Center for Strategic and International Studies Presented by: Michael Fallon
More informationLCS Mission Modules Program
LCS Mission Modules Program Delivering Capability to the Warfighter NAVSEA 1 Supporting the Fleet Today Surface Warfare MP has deployed on three different Littoral Combat Ships supporting operations in
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program
More informationUNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2
Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010
More informationAerial Targets & Unmanned Aviation
Aerial Targets & Unmanned Aviation Critical Threats Driving Future Requirements RADM Timothy L. Heely, USN Program Executive Officer Strike Weapons and Unmanned Aviation 31 October 2006 Naval UAS Family
More informationNaval Unmanned Combat Air Vehicle
Naval Unmanned Combat Air Vehicle Advanced Technology Program TTO Tactical Technology Office Dr. William Scheuren DARPA/TTO wscheuren@darpa.mil (703) 696-2321 UCAV-N Vision ❶ Revolutionary New Ship-based
More informationSea Air Space Symposium
Sea Air Space Symposium Howard Berkof Deputy Program Manager PMS406 03 April 2017 PEO LCS Portfolio LCS 1 LCS 2 IN SERVICE SUPPORT (SHIPS & MISSION PACKAGES) PMS 501 XLUUV / AUP RMMV AQS-20 LCS TRAINING
More informationDetect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success
Detect, Deny, Disrupt, Degrade and Evade Lethal Threats Advanced Survivability Suite Solutions for Mission Success Countering Smart and Adaptive Threats Military pilots and aircrews must be prepared to
More informationTrusted Partner in guided weapons
Trusted Partner in guided weapons Raytheon Missile Systems Naval and Area Mission Defense (NAMD) product line offers a complete suite of mission solutions for customers around the world. With proven products,
More informationThe Western UAS Symposium
The Western UAS Symposium http://www.ttcus/com @Techtrain Linkedin/Groups: Technology Training Corporation MARINE AVIATION USMC Future UAS Programs and Weapons LtCol James Tuck Compton HQMC Aviation, Deputy
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 65.844 127.925 21.000-21.000 8.000 -
More informationRQ-4A GLOBAL HAWK UNMANNED AERIAL VEHICLE (UAV) SYSTEMS
RQ-4A GLOBAL HAWK UNMANNED AERIAL VEHICLE (UAV) SYSTEMS Air Force Program Total Number of Systems Global Hawk Air Vehicles: Common Ground Segments: Total Program Cost (TY$): Average Unit Production Cost
More informationUNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 0305204N TACTICAL UNMANNED AERIAL VEHICLES COST ($ in
More information13 February Presented by: RDML Mat Winter PEO(U&W) Approved for Public Release V2.1
Presented by: RDML Mat Winter PEO(U&W) 13 February 2013 Approved for Public Release V2.1 FMU-139 Unmanned Air Systems Common Control System Tomahawk Weapon Control Systems Air Wing Ship Integration/ Digital
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
COST (In Thousands) ARMY COMMON GROUND STATION (CGS) (TIARA) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
COST (In Thousands) FY1999 Actual FY 2002 FY 2003 FY2004 FY2005 to Army Joint STARS (TIARA) 5316 25676 17898 17713 12833 14372 11527 Continuing Continuing A. Mission Description and Justification: The
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior
More informationDATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY
BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR
More informationNAVAIR Control & Guidance Activities ACGSC Meeting 99, Boulder Colorado, March Shawn T Donley Naval Air Systems Command
NAVAIR Control & Guidance Activities ACGSC Meeting 99, Boulder Colorado, March 2007 Shawn T Donley Naval Air Systems Command 1 EA-18G Electronic Warfare Replacement for EA-6B ALQ-218 wideband receiver
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 108.021 21.000 3.000-3.000 3.000 2.000 0.000
More informationFuture of MIW from the LCS Platform
Future of MIW from the LCS Platform 24 October 2011 RDML Jim Murdoch, USN PEO LCS Distribution Statement A: Approved for Public Release; Distribution Unlimited. (11/16/2011). This Brief is provided for
More informationVictory Starts Here!
Victory Starts Here! Robotic and Autonomous Systems (RAS) MAJ Mike Dvorak ARCIC Robotics Branch Victory Starts Here! Robotic and Autonomous Systems Strategy Objective Capabilities: Over the next 25 years,
More informationCRS Report for Congress
Order Code RS21294 Updated October 25, 2006 CRS Report for Congress Received through the CRS Web Unmanned Vehicles for U.S. Naval Forces: Background and Issues for Congress Summary Ronald O Rourke Specialist
More informationRussian defense industrial complex s possibilities for development of advanced BMD weapon systems
134 Russian defense industrial complex s possibilities for development of advanced BMD weapon systems 135 Igor KOROTCHENKO Editor-in-Chief of the National Defense magazine The main task handled by the
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost
More informationAir Defense System Solutions.
Air Defense System Solutions www.aselsan.com.tr ADSS AIR DEFENSE SYSTEM SOLUTIONS AIR DEFENSE SYSTEM SOLUTIONS Effective air defense is based on integration and coordinated use of airborne and/or ground
More informationState of Coast Guard Aviation
State of Coast Guard Aviation Ptero Roost September 20, 2006 CDR Jim O Keefe Office of Aviation Forces Aircraft Total HC 130H 27* C 130J 6 HH 60 42* HH 65 B/C 95 MH 68 8 Ops Support 23* 4 6 0 35* 7 84
More informationOwn the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family
U.S. Air Force Fact Sheet 27TH SPECIAL OPERATIONS WING Cannon Air Force Base, home of the 27th Special Operations Wing, lies in the high plains of eastern New Mexico, near the Texas Panhandle. The base
More informationCOMMON AVIATION COMMAND AND CONTROL SYSTEM
Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 Navy Page 1 of 17 R-1 Line Item #30 To Program Element 25.144
More informationMQ-8B Fire Scout Program Support Analysis For Commander Helicopter Maritime Strike Wing Atlantic Fleet
Calhoun: The NPS Institutional Archive DSpace Repository Theses and Dissertations 1. Thesis and Dissertation Collection, all items 2009-03-10 MQ-8B Fire Scout Program Support Analysis For Commander Helicopter
More informationDATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY
APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR
More informationDDG 1000 Class Destroyer
DDG 1000 Class Destroyer 10 April 2018 Sea Air Space (SAS) DDG 1000 October February 2016 2017 DDG 1001 July February 20162018 DDG 1000 Program Manager, PMS 500 DDG 1002 December October 2016 2017 CAPT
More informationISR Full Crew Mission Simulator. Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training
Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Base OCO Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program
More informationCRS Report for Congress
Order Code RS21305 Updated January 3, 2006 CRS Report for Congress Received through the CRS Web Summary Navy Littoral Combat Ship (LCS): Background and Issues for Congress Ronald O Rourke Specialist in
More informationUSCG Office of Aviation Forces Unmanned Aircraft Systems (UAS) Coast Guard UAS; Opening the Aperture
USCG Office of Aviation Forces Unmanned Aircraft Systems (UAS) Coast Guard UAS; Opening the Aperture LCDR Ryan Lampe, SR-UAS Platform Manager USCG Office of Aviation Forces (CG-7114) 09 April 2018 Immense
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Office of the Secretary Of Defense Date: February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development
More informationEXPERIENCE A NEW PERSPECTIVE PUSHING PERFORMANCE LIMITS
This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior consent. EXPERIENCE A NEW PERSPECTIVE PUSHING PERFORMANCE
More informationBackgrounder. Boeing Military Aircraft
Boeing Defense, Space & Security P.O. Box 516 St. Louis, MO 63166 www.boeing.com Boeing Military Aircraft Boeing Military Aircraft (BMA) includes tactical, tanker and airlift aircraft, weapons, surveillance
More informationMQM-171 BROADSWORD IN SUPPORT OF TEST MISSIONS
MQM-171 BROADSWORD IN SUPPORT OF TEST MISSIONS 2010 NDIA Targets Conference Presenter: Larry French Title: CEO/CTO MQM-171 BroadSword Program Overview BroadSword is the result of the Army s need for a
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
More informationNAVAL AVIATION MAINTENANCE PROFESSIONAL SYMPOSIUM VADM DAVID ARCHITZEL. 29 June 2011 COMMANDER, NAVAL AIR SYSTEMS COMMAND. Presented to: Presented by:
NAVAL AVIATION: NOW AND IN THE FUTURE Presented to: Presented by: 29 June 2011 NAVAL AVIATION MAINTENANCE PROFESSIONAL SYMPOSIUM VADM DAVID ARCHITZEL COMMANDER, NAVAL AIR SYSTEMS COMMAND NAVAIR Public
More informationAnnual Naval Technology Exercise ANTX 2016 Overview NUWC Division Newport
Annual Naval Technology Exercise ANTX 2016 Overview NUWC Division Newport DISTRIBUTION STATEMENT A Approved for public release; Distribution is unlimited. 1 What is ANTX? ANTX is an annual event created
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior
More informationBackgrounder. ScanEagle Unmanned Aircraft Systems
Backgrounder ScanEagle Unmanned Aircraft Systems About ScanEagle unmanned aircraft systems (UAS) are a product of Insitu, a wholly owned subsidiary of The Boeing Company. ScanEagle is a cost-effective,
More informationLCS Mission Modules Program
LCS Mission Modules Program Training Strategy Increasing Modularity for Maximum Adaptability Brief for ImplementationFest 2010 10 August 2010 Robin Kime, PMS 420L Wayne Gafford, NSWC PHD - ADL 1 Report
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014
More informationREQUEST FOR INFORMATION (RFI) RFI Number: DHS Robotic Aircraft for Public Safety
REQUEST FOR INFORMATION (RFI) RFI Number: DHS 13-01 Robotic Aircraft for Public Safety 1. BACKGROUND/PROGRAM DESCRIPTION The Science and Technology (S&T) Directorate is the Department s primary research
More informationAcquisition Insights & Transformation. CG 9 RADM Gary T. Blore 31 October, 2007
Acquisition Insights & Transformation CG 9 RADM Gary T. Blore 31 October, 2007 CG-9 Full Operational Capability, FY09 Director of Contracting and Procurement HCA/SES CG-91 Deputy HCA GS-15 CG-91D Matrix
More informationMEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM
MEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM MEADS WORLD CLASS THEATER AIR & MISSILE DEFENSE MEADS has been developed to defeat next-generation threats including tactical ballistic missiles (TBMs), unmanned
More informationFuture Combat Systems
Future Combat Systems Advanced Planning Briefing for Industry (APBI) BG John Bartley 15 October Overarching Acquisition Strategy Buy Future Combat Systems; Equip Soldiers; Field Units of Action (UA) Embrace
More informationFFG(X) Update National Symposium - Surface Navy Association
FFG(X) Update National Symposium - Surface Navy Association Dr. Regan Campbell January 9, 2018 1 FFG(X) System Description Mission: Anti-Submarine Warfare, Surface Warfare, Electromagnetic Maneuver Warfare,
More informationTHE AIR FORCE DEVELOPMENT TEAM
THE AIR FORCE DEVELOPMENT TEAM Commander RCAF LGen Hood CFAWC Col Elder Deputy Comd RCAF MGen Frawley D Air SP Col Lefebvre DG Air FD BGen lalumière DG Space BGen Whale DG FCO MGen pelletier S&T + DRDC
More informationC4I System Solutions.
www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Office of Secretary Of Defense DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 United States Special Operations Command : February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development
More information2017 Annual Missile Defense Small Business Programs Conference
2017 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DISTRIBUTION STATEMENT A. Approved for public release; distribution
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 United States Special Operations Command : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Cost To Complete Total Program Element - 94.303 174.316 149.804-149.804
More informationUnmanned Aerial Vehicle Operations
MCWP 3-42.1 Unmanned Aerial Vehicle Operations U.S. Marine Corps DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited PCN 143 000141 00 DEPARTMENT OF THE NAVY Headquarters United
More informationUNCLASSIFIED. Cost To Complete Total Program Element : Undersea Warfare Advanced Technology
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Technology Development (ATD) OCO FY 2016 FY 2017 FY 2018
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior
More informationSaab Press Briefing CANSEC May John Belanger V.P. Communications Saab North America
Saab Press Briefing CANSEC 2018 30 May 2018 John Belanger V.P. Communications Saab North America 2 IN 1937 WE TOOK OFF A history from the 17th century through Alfred Nobel (Bofors) and the shipyard in
More informationGAO FORCE STRUCTURE. Improved Strategic Planning Can Enhance DOD's Unmanned Aerial Vehicles Efforts
GAO United States General Accounting Office Report to the Chairman, Subcommittee on Tactical Air and Land Forces, Committee on Armed Services, House of Representatives March 2004 FORCE STRUCTURE Improved
More informationUnmanned Systems and Mine Warfare RADM Matthew Klunder Chief of Naval Research November 5, 2014
Unmanned Systems and Mine Warfare RADM Matthew Klunder Chief of Naval Research November 5, 2014 DISTRIBUTION STATEMENT A. Approved for public release The Future of Mine Warfare Offboard unmanned systems
More informationMr. James Hondo Geurts Deputy Director for Acquisition United States Special Operations Command
Mr. James Hondo Geurts Deputy Director for Acquisition United States Special Operations Command A Unique Organization A Unified Combatant Command with Service, Military Department, and Defense Agency
More informationRC-135U Combat Sent. Headquarters U.S. Air Force. I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e RC-135U Combat Sent Capt Logan Schrank 45 RS/DOF-C 8 Sep 17 Version 1 RC-135U Combat Sent 2 History 17 Apr 1970: COMBAT
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58
Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 6.021 8.312 7.963-7.963 8.046 8.146 8.194
More informationARCHIVED REPORT. Battlefield Airborne Communications Node (BACN)
C4I - Command, Control, Communications, Computers & Intelligence Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Battlefield
More informationUpdate: (12 April 2017) USNS HERSHEL "WOODY" WILLIAMS EXPEDITIONARY SEA BASE SHIP T-ESB 4
Update: (12 April 2017) USNS HERSHEL "WOODY" WILLIAMS EXPEDITIONARY SEA BASE SHIP T-ESB 4 In September 2015, the Secretary of the Navy Renamed Three Ship Classes, Creates Expeditionary Designator in Naming
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement ADDENDUM_X 16 OCTOBER 2013 Maintenance EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING SYSTEM/MQ-1
More informationSpectrum contest: RAAF boosts electronic warfare capabilities
Spectrum contest: RAAF boosts electronic warfare capabilities Jane's Defence Industry As the Royal Australian Air Force (RAAF) begins to beef up its capabilities in the electronic warfare spectrum, Charles
More informationFighter/ Attack Inventory
Fighter/ Attack Fighter/ Attack A-0A: 30 Grounded 208 27.3 8,386 979 984 A-0C: 5 Grounded 48 27. 9,274 979 984 F-5A: 39 Restricted 39 30.7 6,66 975 98 F-5B: 5 Restricted 5 30.9 7,054 976 978 F-5C: 7 Grounded,
More information2018 Annual Missile Defense Small Business Programs Conference
2018 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 15 May 2018 Mr. Joseph C. Keelon Program Executive for Advanced
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)
PE 0603766E, R-1 #50 COST (In Millions) 2002 2003 2004 2005 2006 2007 2008 2009 Total Program Element (PE) Cost 0.000 0.000 95.654 151.966 205.382 183.796 200.335 203.073 Joint Warfare Systems NET-01 0.000
More informationUNCLASSIFIED. RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST (Dollars in Millions) FY03 FY04 FY05 FY06 FY07 FY08 FY09 Cost to Complete
RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE FEBRUARY 2004 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 3 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160402BB Special Operations (SO) Advanced
More information