THE AIR FORCE DEVELOPMENT TEAM

Size: px
Start display at page:

Download "THE AIR FORCE DEVELOPMENT TEAM"

Transcription

1 THE AIR FORCE DEVELOPMENT TEAM Commander RCAF LGen Hood CFAWC Col Elder Deputy Comd RCAF MGen Frawley D Air SP Col Lefebvre DG Air FD BGen lalumière DG Space BGen Whale DG FCO MGen pelletier S&T + DRDC + CORA DAR Col Chouinard DAST LCol Springate DADD Col Thibert D Air Prog Lcol Whalen MHP Aircra& (including UAS) Electronic Warfare Equipment Support Equipment Vehicles Uniforms & Accoutrements Modeling & Simula?on Future Air Crew Training Training contract management ie CATS / NFTC / CFTS Interna?onal Pilot Training Radar Systems IM/IT Systems C2 and C4ISR Cyber / NORAD / NWS RCAF Minor Capital Programme Oversight Minor Requirements Program Governance

2 RCAF Capability Development Framework 2

3 INVESTMENTS IN THE AIR FORCE Replace the CF-18 fleet with 88 advanced fighter aircraft. Acquire space capabilities to improve situational awareness and targeting Acquire new C3 systems. Replace the air-to-air tanker transport, utility transport and multi-mission aircraft fleets. Invest in medium altitude remotely piloted systems Modernize fighter aircraft air-to-air missiles. Upgrade air navigation, management, and control systems. Acquire new aircrew training systems Recapitalize existing capabilities until the arrival of next generation platforms. Sustain domestic search and rescue capability. Operationalize the new fixed-wing search and rescue aircraft fleet.

4 Future Fighter Capability Project SSE # 44 Current Stage: Option Analysis Acquire 88 Advanced Fighter aircraft including initial sustainment set up, in-service Support, initial cadre training, long term pilot training, weapons and infrastructure. Defini?on Approval 2020 Contract Award 2021 IOC

5 Maritime Helicopter Project CH148 Cyclone SSE # 54 Current Stage: Implementation Acquire 28 CH148 Cyclone helicopters (Sikorsky) to provide a shipborne maritime helicopter capable of conducting Anti-Submarine Warfare (ASW), Intelligence, Surveillance and Reconnaissance (ISR), Search and Rescue (SAR) and utility missions. Project includes ship modifications, training, facility upgrades and In-Service Support. Contract Award Nov 2004 Capability Delivery in Blocks Block I Ini?al Surveillance, ASW and U?lity (delivery in progress) Block II Fully Opera?onally Capable Release to Service 24 Aug 2017 Initial Operational Capability 2018 In-Service Support end 2038 (est) 5

6 CP140 Aurora AIMP Block III & IV / ASLEP Projects SSE #54 Current Stage: Implementation To structurally life-extend and operationally upgrade 14 CP140 Aurora aircraft in order to support operations to Blocks I and II upgraded legacy and communications and navigation systems. Block III and ALSEP are underway and will upgrade all mission and sensor systems concurrent with structural life extension. Block IV will add a wideband SATCOM capability as well as Link 16 and a selfprotection suite. ASLEP and AIMP Block III Initial Operational Capability in 2014 with Full Operational Capability by 2019 AIMP Block IV Initial Operational capability in 2019 with Full Capability in early/mid-2020s 6

7 Canadian Multi-Mission Aircraft (CMA) Initial Operational Capability in early 2030s Full Operational Capability by mid 2030s Estimated Life Expectancy 2060 SSE # 49 Current Stage: Identification To equip the RCAF with a long-range manned Maritime Patrol, Anti-Submarine Warfare (ASW) capable, Command and Control, Communications and Computers (C4) and Intelligence, Surveillance and Reconnaissance (ISR) aircraft to complement existing and future ASW and C4ISR capabilities such as JUSTAS, CH148 Cyclone and spacebased solutions. Intent is to pursue opportunities for innovation with industry with a view to building on the strengths of and lessons learned from AIMP 7

8 Multi-Fleet Air Traffic Management Avionics (MFATMA) SSE # 52 - Current Stage: Options Analysis This project will upgrade RCAF aircraft avionics systems in response to civil and military regulatory changes. Aircraft will receive upgrades to GNSS, IFF, Radios, Antennae, and Cockpit Displays to allow continued operations in both Civil and Military controlled airspace. Contract Award Mul?ple IOC 2023 (or earlier) FOC 2025

9 CH146 Griffon Limited Life Extension (GLLE) Current Stage: Option Analysis To extend the CH146 operating life to mid 2030s through the replacement of obsolete avionics with an integrated digital systems architecture. Project will ensure operational relevance, regulatory compliance and interoperability with allies. Contract Award 2020 IOC 2024 FOC 2026

10 Cormorant Mid-Life Upgrade (CMLU) SSE # 55 Current Stage: Option Analysis To extend the operational life of the CH149 to at least 2040 and provide capability improvements to enhance its overall mission effectiveness. Defini?on Approval 2019 Contract Award

11 Remotely Piloted Aircraft Systems (RPAS) SSE # 50, 91 Current Stage: Option Analysis To provide all-weather, persistent, intelligence, surveillance, reconnaissance, target acquisition, and precision strike capabilities in support of CAF domestic and expeditionary operations. Definition: Spring 2019 Contract Award: IOC: (1 line of tasking available for operations) FOC: (3 lines of tasking, aircraft, infrastructure & personnel in-situ)

12 Snow and Ice Control Capability Recapitalization (SNICCR) SSE # 54 Current Stage: Option Analysis To provide a modern and reliable snow and ice control (SNIC) fleet of vehicles, in support of domestic airfield operations. It will replace 96 pieces of aging SNIC equipment at six RCAF bases. Implementation May 2018 IOC November 2020 Contract Award August 2019 FOC May 2022

13 Strategic Tanker Transport Capability (STTC) SSE # 47 Current Stage: Identification This project will replace the existing fleet capability, including strategic airlift, air-to-air refuelling and VIP transport after a potential life extension. The platform will provide air-to-air refuelling for both domestic and expeditionary coalition operations, while complementing the strategic airlift capabilities of the CC-177 fleet. Definition 2020 Contract Award

14 Utility Transport Aircraft (UTA) SSE # 48 Current Stage: Identification The UTA (CC-138 Twin Otter replacement) will provide support the CAF s mandate to provide utility airlift of personnel and equipment. This entails the ability to operate in extremes of weather and temperature from unpaved, austere airfields with no support facilities.. Definition 2020 Contract Award

15 Future Aircrew Training (FAcT) SSE # 53 Current Situation: Options Analysis Address the modernization/optimization of the ab initio Pilot, ACSO and AES Op training to Wings Standard. FAcT is to implement a relevant, flexible, effective solution which modernizes/optimizes the training system to meet current and future CAF requirements. The solution must continue and improve upon the training currently provided by the expiring NFTC and CFTS services contracts as well as the training currently conducted at 402 Squadron. Contract Award: 2021 Initial Operating Capability: 2023 Full Operating Capability:

16 Tactical Integrated Command, Control and Communications (TIC3) Air Current Situation: Options Analysis (1) Replace and modernize RCAF Air Traffic Management and Air Defence radio networks, (2) establish domestic Link-16 and Streaming Video Ground Entry Sites and standardize deployable Tactical Data Link and Streaming Video capability, and (3) provide a Link-16 capability to the CC150 Polaris Tankers. Contract Award 2018 IOC 2021 FOC

17 Defence Acquisition Guide h]p:// 17

18 Minor Capital Projects Buy and Sell Buyandsell.gc.ca

19 Questions? 19

Saab Press Briefing CANSEC May John Belanger V.P. Communications Saab North America

Saab Press Briefing CANSEC May John Belanger V.P. Communications Saab North America Saab Press Briefing CANSEC 2018 30 May 2018 John Belanger V.P. Communications Saab North America 2 IN 1937 WE TOOK OFF A history from the 17th century through Alfred Nobel (Bofors) and the shipyard in

More information

Strong. Secure. Engaged: Canada s New Defence Policy

Strong. Secure. Engaged: Canada s New Defence Policy Strong. Secure. Engaged: Canada s New Defence Policy Putting People First Long-term Capability Investments Spending Growth and Financial Transparency Bold New Vision 2 Putting People First People are the

More information

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

A d. e P. nc e. a A. M d. e G. - P h ase 2 - M e d. r the ADF

A d. e P. nc e. a A. M d. e G. - P h ase 2 - M e d. r the ADF AIR6500t Battle Management System sile Defe is M d n a ir A d e -Phase 1 - Join und-bas ro G e g n a R m iu - P h ase 2 - M e d sile Defence fo is M d n a ir A d te istent Integra rs e P d se a B d n a

More information

Navy & Marine Corps Vertical Lift: Past and Future

Navy & Marine Corps Vertical Lift: Past and Future Navy & Marine Corps Vertical Lift: Past and Future 22 Oct 2015 Cleared for public release NAVAIR-PEOA-055-2014 1 Presented to: Center for Strategic and International Studies Presented by: Michael Fallon

More information

By Major Neil Scott, CD

By Major Neil Scott, CD By Major Neil Scott, CD By Lieutenant Colonel Roy C. Bacot (USAF) Photo: Pte Melissa Spence Photo composite by CFAWC Introduction The year is 2025 aboard Canada s newest warship of the Province class,

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 26.209 20.644 43.187-43.187 28.526 19.802 7.405 5.225 Continuing Continuing

More information

Acquisition Insights & Transformation. CG 9 RADM Gary T. Blore 31 October, 2007

Acquisition Insights & Transformation. CG 9 RADM Gary T. Blore 31 October, 2007 Acquisition Insights & Transformation CG 9 RADM Gary T. Blore 31 October, 2007 CG-9 Full Operational Capability, FY09 Director of Contracting and Procurement HCA/SES CG-91 Deputy HCA GS-15 CG-91D Matrix

More information

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910 TITLE III PROCUREMENT The fiscal year 2018 Department of Defense procurement budget request totals $113,906,877,000. The Committee recommendation provides $132,501,445,000 for the procurement accounts.

More information

Training Systems Integration (TSI) Your worldwide training partner of choice

Training Systems Integration (TSI) Your worldwide training partner of choice Training Systems Integration (TSI) Your worldwide training partner of choice Who is the world s most experienced training systems integrator? We are. CAE is an experienced and world-class training systems

More information

FORWARD, READY, NOW!

FORWARD, READY, NOW! FORWARD, READY, NOW! The United States Air Force (USAF) is the World s Greatest Air Force Powered by Airmen, Fueled by Innovation. USAFE-AFAFRICA is America s forward-based combat airpower, delivering

More information

Evolving Surveillance and Response Group s role in supporting Navy in the extended battlespace

Evolving Surveillance and Response Group s role in supporting Navy in the extended battlespace Evolving Surveillance and Response Group s role in supporting Navy in the extended battlespace GPCAPT David Hombsch, COS SRG The SRG Mission (revised 2016) To sustain and enhance multi-domain intelligence,

More information

ISR Full Crew Mission Simulator. Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training

ISR Full Crew Mission Simulator. Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145

More information

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success Detect, Deny, Disrupt, Degrade and Evade Lethal Threats Advanced Survivability Suite Solutions for Mission Success Countering Smart and Adaptive Threats Military pilots and aircrews must be prepared to

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

Spectrum contest: RAAF boosts electronic warfare capabilities

Spectrum contest: RAAF boosts electronic warfare capabilities Spectrum contest: RAAF boosts electronic warfare capabilities Jane's Defence Industry As the Royal Australian Air Force (RAAF) begins to beef up its capabilities in the electronic warfare spectrum, Charles

More information

AIR NATIONAL GUARD REQUEST FOR ADDITIONAL FY 2017 APPROPRIATIONS MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017

AIR NATIONAL GUARD REQUEST FOR ADDITIONAL FY 2017 APPROPRIATIONS MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017 AIR NATIONAL GUARD REQUEST FOR ADDITIONAL FY 2017 APPROPRIATIONS MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017 Justification Data Submitted to Congress March 2017 DEPARTMENT OF THE AIR FORCE

More information

Aircraft Procurement Plan Fiscal Years (FY) Submitted with the FY 2012 Budget

Aircraft Procurement Plan Fiscal Years (FY) Submitted with the FY 2012 Budget Aircraft Procurement Plan Fiscal Years (FY) 212-241 Submitted with the FY 212 Budget March 2, 29 March 211 March 2, 29 Preparation of this study/report cost the Department of Defense a total of approximately

More information

Own the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family

Own the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family U.S. Air Force Fact Sheet 27TH SPECIAL OPERATIONS WING Cannon Air Force Base, home of the 27th Special Operations Wing, lies in the high plains of eastern New Mexico, near the Texas Panhandle. The base

More information

Balanced tactical helicopter force

Balanced tactical helicopter force What does a Balanced tactical force look like An International Comparison By Thierry Gongora and Slawomir Wesolkowski The Canadian Forces (CF) has operated a single fleet of CH146 Griffon s as its dedicated

More information

SPACE POWER DELIVERING SPACE & MISSILE CAPABILITIES TO AMERICA AND ITS WARFIGHTING COMMANDS

SPACE POWER DELIVERING SPACE & MISSILE CAPABILITIES TO AMERICA AND ITS WARFIGHTING COMMANDS SPACE POWER DELIVERING SPACE & MISSILE CAPABILITIES TO AMERICA AND ITS WARFIGHTING COMMANDS at the Core of the Air Force Mission Assuring U.S. access to the high ground of Space. Protecting the freedom

More information

The Transformation of Danish Air Power

The Transformation of Danish Air Power Centre for Military Studies The Transformation of Danish Air Power Dr. Gary Schaub, Jr. Centre for Military Studies 1 Overview The Cold War Context RDAF Pre-History Enter the F-16 Farewell F-35 Draken

More information

MC Network Modernization Implementation Plan

MC Network Modernization Implementation Plan MC Network Modernization Implementation Plan Mission Command Center of Excellence 1 Principles (Why) Warfighting Requirements CSA s Mission, Principles, Characteristics of the Network & Requirements Network

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207581F PE TITLE: JOINT STARS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207581F JOINT STARS Cost ($ in Millions) FY

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

Reconsidering the Relevancy of Air Power German Air Force Development

Reconsidering the Relevancy of Air Power German Air Force Development Abstract In a dynamically changing and complex security political environment it is necessary to constantly reconsider the relevancy of air power. In these days of change, it is essential to look far ahead

More information

5 June 2018 DOCUMENT C-M(2018)0025 (DNK-OVERVIEW) NATO DEFENCE PLANNING CAPABILITY REVIEW 2017/2018 DENMARK OVERVIEW

5 June 2018 DOCUMENT C-M(2018)0025 (DNK-OVERVIEW) NATO DEFENCE PLANNING CAPABILITY REVIEW 2017/2018 DENMARK OVERVIEW 5 June 2018 DOCUMENT C-M(2018)0025 (DNK-OVERVIEW) NATO DEFENCE PLANNING CAPABILITY REVIEW 2017/2018 DENMARK OVERVIEW 1. The 2018-2023 Danish Defence Agreement assesses that Denmark faces more serious threats

More information

ACC/C2ISR Delivering Desired Effects on the Battlefield

ACC/C2ISR Delivering Desired Effects on the Battlefield Headquarters Air Combat Command ACC/C2ISR Delivering Desired Effects on the Battlefield Col Tom Wozniak ACC/A8C 25 July 2006 This Briefing is: UNCLASSIFIED Overview Tactical Level Programs TTNT, TACP,

More information

Unmanned Systems. Northrop Grumman Today Annual Conference

Unmanned Systems. Northrop Grumman Today Annual Conference Unmanned Aircraft Builders Conference, Inc 2008 Annual Conference 21-23 September 2008 Doug Fronius Director, Tactical Unmanned IPT Program Manager, VTUAV Navy Fire Scout Northrop Grumman Corporation Northrop

More information

USCG Office of Aviation Forces Unmanned Aircraft Systems (UAS) Coast Guard UAS; Opening the Aperture

USCG Office of Aviation Forces Unmanned Aircraft Systems (UAS) Coast Guard UAS; Opening the Aperture USCG Office of Aviation Forces Unmanned Aircraft Systems (UAS) Coast Guard UAS; Opening the Aperture LCDR Ryan Lampe, SR-UAS Platform Manager USCG Office of Aviation Forces (CG-7114) 09 April 2018 Immense

More information

B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP)

B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP) B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP) Air Force ACAT IC Program Prime Contractor Total Number of Systems: 93 Boeing North American Aviation Total Program Cost (TY$): $2,599M Average Unit Cost

More information

Commonwealth of Australia 2016

Commonwealth of Australia 2016 Commonwealth of Australia 2016 ISBN: 978-0-9941680-6-1 This work is copyright. Apart from any use as permitted under the Copyright Act 1968 (Cwth), no part may be reproduced by any process without prior

More information

To THE DEFENSE ACQUISITION WORKFORCE

To THE DEFENSE ACQUISITION WORKFORCE To THE DEFENSE ACQUISITION WORKFORCE When I took over my duties as Deputy Under Secretary of Defense for Acquisition and Technology, I was awed by the tremendous professionalism and ability of our acquisition

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost

More information

Maximizing Mission Success. Canada s Arctic Sovereignty Creating a Foundation for an Achievable and Sustainable Presence

Maximizing Mission Success. Canada s Arctic Sovereignty Creating a Foundation for an Achievable and Sustainable Presence Maximizing Mission Success This slide intentionally left blank 2 Vertically Integrated Aerospace Business Aerospace & Defence: Aircraft Modification Mission Systems Integration In-Service Support Special

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 PE 6454N: Air Control FY 213 FY 214 FY 215 FY 216 To Complete Program Element 6.373 5.665

More information

CHAPTER 26 OPERATIONS ROOM PERSONNEL. (MOD Sponsor: FLEET COMMANDER ACOS(W))

CHAPTER 26 OPERATIONS ROOM PERSONNEL. (MOD Sponsor: FLEET COMMANDER ACOS(W)) CHAPTER 26 OPERATIONS ROOM PERSONNEL (MOD Sponsor: FLEET COMMANDER ACOS(W)) This chapter has been diversity and inclusion impact assessed by the sponsor in accordance with Departmental policy. No direct

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item Justif ication Exhibit R-2 0604633A ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) Actual Estimate Estimate to AIR TRAFFIC CONTROL 11676 14167 7578 Continuing Continuing

More information

STRATEGIC. ADF capability snapshot 2015 Part 1 RAAF. RAAF capability summary. November 2015

STRATEGIC. ADF capability snapshot 2015 Part 1 RAAF. RAAF capability summary. November 2015 STRATEGIC INSIGHTS 97 ADF capability snapshot 2015 Part 1 RAAF Andrew Davies This paper surveys the capability of the Royal Australian Air Force (RAAF). It updates previous reviews in 2008 and 2010. Other

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 Air Force Page 1 of 10 R-1 Line Item #185 To Program Element 12.939

More information

OPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS

OPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 9420.2A N2/N6 OPNAV INSTRUCTION 9420.2A From: Chief of Naval Operations Subj: NAVY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total

More information

B-GA /Fp-001 A e r o s p A c e electronic WArFAre D o c T r I N e

B-GA /Fp-001 A e r o s p A c e electronic WArFAre D o c T r I N e B-GA-403-002/FP-001 A e r o s p a c e ELECTRONIC WARFARE D o c t r i n e Issued on the authority of the Chief of the Air Staff Commander 2 Canadian Air Division / Air Force Doctrine and Training Division

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 11.801 10.862

More information

FIGHTER DATA LINK (FDL)

FIGHTER DATA LINK (FDL) FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average

More information

16 Oct 2007 National Status Netherlands

16 Oct 2007 National Status Netherlands National Status Netherlands Major A. Remmelzwaal Head of Office of TDL (RNLAF) 1 Maj Bram Remmelzwaal Biography +31(0)76-5447351 tdl@clsk.af.dnet.mindef.nl NLD / Royal Netherlands Air Force Command Head

More information

Fighter/ Attack Inventory

Fighter/ Attack Inventory Fighter/ Attack Fighter/ Attack A-0A: 30 Grounded 208 27.3 8,386 979 984 A-0C: 5 Grounded 48 27. 9,274 979 984 F-5A: 39 Restricted 39 30.7 6,66 975 98 F-5B: 5 Restricted 5 30.9 7,054 976 978 F-5C: 7 Grounded,

More information

Combined Aerial Target Service (CATS)

Combined Aerial Target Service (CATS) 3 Combined Aerial Target Service () Preparing for the Future Flt Lt Neil Horn Aerial Target Systems Integrated Project Team, Defence Procurement Agency, Ministry of Defence, UK 4 SCOPE The Current UK Aerial

More information

552nd ACW (Air Control Wing), 2000, informal paper defining C2ISR package commander, 552 ACW/552 OSS, Tinker AFB, Okla.

552nd ACW (Air Control Wing), 2000, informal paper defining C2ISR package commander, 552 ACW/552 OSS, Tinker AFB, Okla. REFERENCES 552nd ACW (Air Control Wing), 2000, informal paper defining C2ISR package commander, 552 ACW/552 OSS, Tinker AFB, Okla. 93rd ACW, 1998, Draft Tactics Techniques and Procedures (TTP) for 93rd

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96 COST ($ in Millions) Prior Years FY 2015 FY 2016 FY 2017 Base FY 2017 OCO FY 2017 Total FY 2018 FY 2019 FY 2020 FY 2021 Cost To Complete Total Program Element - 8.916 10.476 11.529 0.000 11.529 11.985

More information

DEPARTMENT OF THE AIR FORCE WRITTEN TESTIMONY FOR THE SENATE ARMED SERVICES COMMITTEE SUBCOMMITTEE ON AIR LAND FORCES UNITED STATES SENATE

DEPARTMENT OF THE AIR FORCE WRITTEN TESTIMONY FOR THE SENATE ARMED SERVICES COMMITTEE SUBCOMMITTEE ON AIR LAND FORCES UNITED STATES SENATE NOT FOR PUBLICATION UNTIL RELEASED BY SENATE ARMED SERVICES COMMITTEE SUBCOMMITTEE ON AIR LAND FORCES UNITED STATES SENATE DEPARTMENT OF THE AIR FORCE WRITTEN TESTIMONY FOR THE SENATE ARMED SERVICES COMMITTEE

More information

PROFILE COMBAT SYSTEMS NAVAL SYSTEMS AEROSPACE ADVANCED TECHNOLOGIES LEADERS IN DEFENCE AND SECURITY INNOVATION

PROFILE COMBAT SYSTEMS NAVAL SYSTEMS AEROSPACE ADVANCED TECHNOLOGIES LEADERS IN DEFENCE AND SECURITY INNOVATION PROFILE COMBAT SYSTEMS NAVAL SYSTEMS AEROSPACE ADVANCED TECHNOLOGIES LEADERS IN DEFENCE AND SECURITY INNOVATION LEADERS IN DEFENCE & SECURITY INNOVATION 2 A GLOBAL BUSINESS Central Asia Europe South East

More information

Fundamentals of Electro-Optics and Infrared Sensors

Fundamentals of Electro-Optics and Infrared Sensors Fundamentals of Electro-Optics and Infrared Sensors Make Your Career Soar WELCOME MESSAGE Welcome Thank you very much for your interest in White Eagle Aerospace. Since our founding in 2006, we have become

More information

Global Vigilance, Global Reach, Global Power for America

Global Vigilance, Global Reach, Global Power for America Global Vigilance, Global Reach, Global Power for America The World s Greatest Air Force Powered by Airmen, Fueled by Innovation Gen Mark A. Welsh III, USAF The Air Force has been certainly among the most

More information

An Update on the A400M

An Update on the A400M An Update on the A400M Article 1: An Update on the A400M Training Facility in Seville: A Building Block in Allied Coalition Capabilities 04/20/2015 In this interview conducted at the Seville, Spain A400M

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207134F PE TITLE: F-15E SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207134F F-15E SQUADRONS Cost ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Air Force Page 1 of 12 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element

More information

USAF Gunship Precision Engagement Operations: Special Operations in the Kill Chain

USAF Gunship Precision Engagement Operations: Special Operations in the Kill Chain USAF Gunship Precision Engagement Operations: Special Operations in the Kill Chain Lieutenant Colonel Brenda P. Cartier Commander, 4th Special Operations Squadron Hurlburt Field, Florida Overview AC130U

More information

The Western UAS Symposium

The Western UAS Symposium The Western UAS Symposium http://www.ttcus/com @Techtrain Linkedin/Groups: Technology Training Corporation MARINE AVIATION USMC Future UAS Programs and Weapons LtCol James Tuck Compton HQMC Aviation, Deputy

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

The European Border and Coast Guard Agency

The European Border and Coast Guard Agency The European Border and Coast Guard Agency Remotely Piloted Aircraft Systems in the EU frontiers Montreal, 19 September 2017 Zdravko Kolev, Research & Innovation Unit zdravko.kolev@frontex.europa.eu WHAT

More information

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM.

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM. Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) FY 2017 FY 2018 FY 2019

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

REQUIREMENTS TO CAPABILITIES

REQUIREMENTS TO CAPABILITIES Chapter 3 REQUIREMENTS TO CAPABILITIES The U.S. naval services the Navy/Marine Corps Team and their Reserve components possess three characteristics that differentiate us from America s other military

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Cost Program Element 25.368 20.665 17.767-17.767

More information

AFCEA Mission Command Industry Engagement Symposium

AFCEA Mission Command Industry Engagement Symposium UNCLASSIFIED/ AFCEA Mission Command Industry Engagement Symposium MG Pete Gallagher Director, Network CFT 3 April 2018 Network CFT Collaboration, Fusion & Transparency WARFIGHTING REQUIREMENTS Army Warfighters

More information

Impact of the War on Terrorism on the USAF

Impact of the War on Terrorism on the USAF Headquarters U.S. Air Force Impact of the War on Terrorism on the USAF Brig Gen Dutch Holland Director of Current Operations & Training DCS, Air, Space, & Information Operations, Plans, & Requirements

More information

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2007 Actual FY 2008 FY 2009 FY 2010 FY 2011

More information

NAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross

NAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross NAVAIR Overview PRESENTED TO: Radford University 30 November 2016 PRESENTED BY: David DeMauro / John Ross NAVAIR NOV 2016 Mission NAVAIR's mission is to provide full life-cycle support of naval aviation

More information

United States Air Force Posture Statement 2009

United States Air Force Posture Statement 2009 University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln U.S. Air Force Research U.S. Department of Defense 2009 United States Air Force Posture Statement 2009 U.S. Air Force Follow

More information

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force KC-46A Tanker DoD Budget FY2013-FY2017 RDT&E U.S. Air Force Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 FY 2013 FY 2013 FY 2013 Cost To COST ($ in Millions) FY 2011

More information

Subj: REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR TACTICAL AIR CONTROL SQUADRONS

Subj: REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR TACTICAL AIR CONTROL SQUADRONS DEPARTMENT OF THE NAVY O FFICE OF THE CHIEF OF NAVAL O PERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3501.88F N95 OPNAV INSTRUCTION 3501.88F From: Chief of Naval Operations Subj: REQUIRED

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 5158.04 July 27, 2007 Incorporating Change 2, July 28, 2017 USD(AT&L) SUBJECT: United States Transportation Command (USTRANSCOM) References: (a) DoD Directive 5158.4,

More information

Development of the Dynamic Defense Force

Development of the Dynamic Defense Force Part II The Basics of Japan s Defense Policy and Dynamic Defense Force Chapter 3 Development of the Dynamic Defense Force In order to proceed with a systematic transfer toward the defense structure indicated

More information

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 3.350 3.874 - - - 1.977 - - - Continuing Continuing 645121: Physical

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 65.844 127.925 21.000-21.000 8.000 -

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY

More information

US Third Offset Strategy. ations of the. ment Canada. August Dr. Andrew. Billyard CAN UNCLASSIFIE

US Third Offset Strategy. ations of the. ment Canada. August Dr. Andrew. Billyard CAN UNCLASSIFIE CAN UNCLASSIFIED The Implica ations of the US Third Offset Strategy for the RCAF of the Future Dr. Brad Gladman Dr. Andrew Billyard DRDC Centre for Operational Research and Analysis Terms of Defence Research

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

Delivering Space Capabilities to Enable the Tactical Warfighter

Delivering Space Capabilities to Enable the Tactical Warfighter Delivering Space Capabilities to Enable the Tactical Warfighter LTG Richard P. Formica AUSA National Meeting 11 October 2011 1 Our Reporting Chain Our Mission USASMDC/ARSTRAT conducts space and missile

More information

2016 Major Automated Information System Annual Report

2016 Major Automated Information System Annual Report 2016 Major Automated Information System Annual Report Mission Planning System Increment 5 (MPS Inc 5) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents Common

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Cost To Complete Total Program Element - 17.754 16.197 13.610-13.610 14.019

More information

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ARCHIVED REPORT. For data and forecasts on current programs please visit  or call Electronic Systems Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Outlook Forecast International projects that the

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research,, Test & Evaluation, Air Force / BA 7: Operational Systems COST ($ in Millions) FY 2018 FY 2019 FY 2020 FY

More information

COL John Vannoy Program Executive Officer

COL John Vannoy Program Executive Officer COL John Vannoy Program Executive Officer ROTARY WING SCHEDULE OF PRESENTATIONS Day 1 Wednesday - 21 May (11:15-12:15 and 2:30-3:30) PEO RW Strategic Overview COL Vannoy Requirements & Technology Development

More information

Update on SwAF replacement of Air Surveillance, Air Defence Sensors and ground based naval sensors

Update on SwAF replacement of Air Surveillance, Air Defence Sensors and ground based naval sensors Update on SwAF replacement of Air Surveillance, Air Defence Sensors and ground based naval sensors LtCol (AF) Martin Bergstrand Head of sensor branch at the HQ C 4 I Department Scope Principles Where we

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 19.873 20.466 20.954 0.000 20.954 21.254 21.776 22.071 22.305 Continuing Continuing 771: Link-16

More information

STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE

STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE FOR OFFICIAL USE ONLY UNTIL RELEASED BY THE HOUSE ARMED SERVICES COMMITTEE STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE HOUSE

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62 COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 0.051-3.926-3.926 4.036 4.155 4.236 4.316 Continuing Continuing

More information