1 Regional Capacity Building Program for Health Risk Management of Persistent Organic Pollutants (POPs) in South East Asia Project Implementation Plans (PIP) April 2008

2 REGIONAL CAPACITY BUILDING PROGRAM FOR HEALTH RISK MANAGEMENT OF PERSISTENT ORGANIC POLLUTANTS (POPS) IN SOUTH EAST ASIA PROJECT IMPLEMENTATION PLAN (PIP) Project Number P Trust Fund Number Tf Prepared for: THE WORLD BANK GROUP 1818 H STREET, NW, WASHINGTON DC, 20433, USA. Prepared by: HATFIELD CONSULTANTS PARTNERSHIP SUITE BELLEVUE AVENUE WEST VANCOUVER, BC V7V 1A6 APRIL 2008 POP 1406 Hatfield Consultants Partnership Suite Bellevue Ave., West Vancouver, BC, Canada V7V 1A6 Tel: Fax: atfield Consultants Partnership Hatfield Consultants Partnership

3 TABLE OF CONTENTS LIST OF TABLES... ii LIST OF FIGURES... ii LIST OF APPENDICES... ii 1.0 INTRODUCTION BACKGROUND PROJECT IMPLEMENTATION PLAN (PIP) METHODOLOGY PROJECT MANAGEMENT MANAGEMENT APPROACH AND STRUCTURE NATIONAL EXPERTS AND COUNTER-PART INVOLVEMENT ROLES AND RESPONSIBILITIES OF THE IMPLEMENTING PARTNERS PROJECT PERSONNEL Project Collaborative Management Structure - World Bank Project Task Team and National Focal Points PROJECT IMPLEMENTATION RESULT-BASED MONITORING REPORTING AND DELIVERABLES FRAMEWORK STAKEHOLDER COMMUNICATIONS PLAN Regional Capacity Building Program for Health Risk Management i Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

4 LIST OF TABLES Table 1 Detailed breakdown of project personnel management responsibilities...8 LIST OF FIGURES Figure 1 Regional Map of Project Area...2 Figure 2 Matrix Project Implementation Organizational Structure....6 LIST OF APPENDICES Appendix A1 Project Gantt Chart Appendix A2 Project Detailed Work Plan - Activities Description Appendix A3 Result-Based Logical Framework Appendix A4 Terms of Reference Regional Capacity Building Program for Health Risk Management ii Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

5 1.0 INTRODUCTION Hatfield Consultants Ltd. (Hatfield) is pleased to present the Project Implementation Plan (PIP) for the project entitled the Regional Capacity Building Program for Health Risk Management of Persistent Organic Pollutants (POPs) in South East Asia Project (hereafter referred to as the POPs Project). The PIP was unanimously approved by the World Bank and the Regional Launching Workshop in Luang Prabang, Lao PDR, on 4 April The goal of the POPs Project is to enable officials responsible for POPs management to increase their understanding and their use of risk-based approaches for management of POPs and other chemicals and prioritize POPs interventions to reduce local health impacts, particularly on the poor and vulnerable. Funding for the POPs Capacity Building Project is provided by the Canadian International Development Agency s POPs Fund, and is implemented by the World Bank. This POPs Project is designed to respond to the needs to improve NIP methodology outlined in the TOR by enhancing the capacity of government agencies in the South East Asian Region to manage POPs and POP-like chemicals, using a risk-based management approach applied at a regional level. Improved regional cooperation on a broader list of pollutants, including persistent toxic substances (PTSs) is a secondary objective of the program. As a result of the program, officials responsible for POPs management within the four target countries will increase their understanding and use a risk-based approach to manage POPs and other chemicals, and prioritize POPs-related mitigation activities to reduce local health risk. Hatfield will use its 14 years experience working on dioxin/furan and other POPs assessment projects in the South East Asia region and Canada as the basis for implementing the current project. Hatfield s proposed strategies will support the development and strengthening of capacity, and will be aimed at enabling the participating countries to fulfill their obligations under the Stockholm Convention. Strategies will be ground-level aimed at implementing specific phase-out and remediation measures at national and/or regional level, and will include components of targeted capacity building. The four countries participating in the program include Cambodia, Lao PDR, Malaysia, and Thailand. However, China, Indonesia, Japan, Philippines and Viet Nam are also invited to participate in regional activities under the program. Other complementary program activities will be implemented by national consultants or World Bank staff, and will be incorporated into the results of the current program. Regional Capacity Building Program for Health Risk Management 1 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

6 1.1 BACKGROUND Toxic chemicals are increasingly of concern to the global community particularly in the rapidly-developing counties of South East Asia (Figure 1). Historically, key sources of contaminants including POPs, come from pesticides used in agriculture; however, rapid industrial development, improper handling, storage and import/export of banned chemicals, and historical herbicide usage during the US-Viet Nam War (e.g., Agent Orange) have resulted in widespread dispersion of the these toxic substances and the creation of high deposition areas or Hot spots. Figure 1 Regional Map of Project Area Regional Capacity Building Program for Health Risk Management 2 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

7 Growing international concern regarding the risk of exposure to POPs on human health resulted in coordinated efforts to reduce and/or eliminate releases of these substances into the environment. In May 2001, the Stockholm Convention on Persistent Organic Pollutants (UNEP/POPS/INC.5/7) was adopted by 92 signing parties. The Stockholm Convention was ratified by the Intergovernmental Negotiating Committee (INC) in Johannesburg in December, 2001 as an internationally legally binding instrument for implementing international action on certain persistent organic pollutants. With the objective of eliminating or restricting the production and use of intentionally produced POPs, the Stockholm Convention provides participating countries with basic objectives and principles in developing comprehensive programs and control regimes with respect to POPs management. The Stockholm Convention is intended to address POPs that are (1) intentionally produced, such as pesticides, insecticides, rodenticides and fungicides; (2) produced intentionally and whose use is restricted to disease vector control, for example DDT for control of malaria; and (3) produced and released unintentionally as the result of human activity. The latter category includes dioxins, furans, dioxin-like PCBs, and hexachlorobenzene that are generated primarily as by-products of incomplete combustion. There are two other UNEP Conventions that are closely related to the Stockholm Convention. The Basel Convention (Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and their Disposal, 1989), and the Rotterdam Convention (The Rotterdam Convention on the Prior Informed Consent Procedure for Certain Hazardous Chemicals and Pesticides in International Trade, 1998), seek to provide an international framework governing the environmentally sound management of hazardous chemicals throughout their lifecycles. Together, the Basel, Rotterdam and Stockholm Conventions constitute cradle-to-grave management of hazardous chemicals. All three Conventions address the technical assistance needs of developing countries. The treaties outline the need for regional centers for training and technology transfer, and a Technical Cooperation Trust Fund (or other financial mechanism ), to be operated by the Global Environment Facility on an interim basis). The combination of these three treaties will have the greatest influence on the future management of POPs. 2 1 UNEP official website on POPs, and 2 United Nations Environment Programme, Hazardous Chemicals and Wastes Conventions, Secretariat of the Basel Convention Interim Secretariat of the Rotterdam Convention Interim Secretariat of the Stockholm Convention. Regional Capacity Building Program for Health Risk Management 3 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

8 1.2 PROJECT IMPLEMENTATION PLAN (PIP) METHODOLOGY The PIP is designed to provide a guiding vision to ensure that all of the project implementation partners agree on the activities contained within the POPs Project, as well as to communicate to the Implementing Agency the monitoring and evaluation criteria for the project. Through the PIP development process, the project team has gathered significant information related to project activities and anticipated outputs, as well as the information gathered and confirmed during the technical and financials negotiation with the relevant officials of the World Bank in Washington DC, February 19 th and 21 st The PIP has been developed through a collaborative process that included background research, preliminary discussions with project partners, field missions to Lao PDR, Cambodia, and Thailand in early March 2008 and will be finalized with project stakeholders at the Launch Workshop on April 3 5, 2008 in Luang Prabang, Lao PDR. This has resulted in a strong understanding of the on-the-ground reality of the project, as well as identification of the needs of project beneficiaries. The document is divided into the following sections: Section 1: Introduction, background and methodology. Section 2: Project Design including context and rational, logical framework analysis, reach and beneficiaries, cross-cutting themes, public engagement, knowledge enhancement, and risk strategy. Section 3: Project Management including management approach and structure, roles and responsibilities, project personnel, and methods for tracking and reporting contributions. Section 4: Project Implementation including outputs and activities, work breakdown structure, schedule and budget. Section 5: Project Information including performance measurement framework, monitoring risk, reporting framework, and communications plan. Regional Capacity Building Program for Health Risk Management 4 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

9 2.0 PROJECT MANAGEMENT 2.1 MANAGEMENT APPROACH AND STRUCTURE The primary objective of the program is to enhance the capacity of government agencies in the South East Asia Region to manage POPs and POPs-like chemicals using human health risk assessment/management in a regional approach. Improved regional cooperation on a broader chemical agenda is a secondary objective of the program. The Project Team recognizes that effective decisionmaking depends on the involvement and collaboration of impacted stakeholders including the government, industries, NGOs, and the public. On the national and provincial government side, the project must include strategies to involve all relevant ministries and departments and address the relationships between them and civil society. The overall approach to management of the Project emphasizes the full participation of all project partners and beneficiaries. The project has been designed to ensure sustainability of project outputs. The management structure has been designed to reflect the collaborative nature of the project and the need for input from all project partners. A focus of the project management strategy will be to build upon the existing pool of knowledge and develop new collaborative mechanisms for promoting regional capacity in risk management of POPs. Key project themes include promotion of stakeholder participation, results-oriented outcomes, accountability, transparency, awareness, effectiveness and efficiency, equality and inclusiveness of both men and women. The Project Team will focus on developing individual capabilities through onthe-job training ( learning by doing ) for the national consultants, focal persons and other national counterparts; sharing technical expertise between advanced and least advanced countries; and, workshops, seminars and informal exchanges of knowledge in the region. A project organization chart is presented in Figure 2. The chart illustrates the relationships between the project partners, funding agency, in-country project recipients, and subcontractors, including Golder Associates in Vancouver, British Columbia. Project management will be overseen by Hatfield (based in Vancouver, British Columbia) with on-site project management provided by Hatfield field staff. The project partners include National POPs Focal points in all four participating countries. Regional Capacity Building Program for Health Risk Management 5 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

10 Global level CIDA/World Bank Government of Cambodia Government of Lao PDR Government of Malaysia Government of Thailand WB, UNEP, FAO, WHO, Canada etc., NGOs, Academia etc. Hatfield Consultants head Office, Canada Hatfindo Head office, Bogor Indonesia Pro-En Technologies, Ltd, Bangkok Thailand Golder Associates, Laboratory, Canada & Asia Legend: National Focal Point National Focal Point = Authority = Consultation & Technology Exchange ==== = Technical & field support National Focal Point Hatfield Project Team National Focal Point Regional level + China, Indonesia, Japan, Korea, the Philippines, Vietnam National level Concerned Sectoral Agencies Academia, NGOs, Mass Organizations Site level Concerned Provincial & Local Agencies Researchers, NGOs, Mass Organizations, and Communities Figure 2 Matrix Project Implementation Organizational Structure. A more detailed breakdown of project personnel management responsibilities is provided in Table NATIONAL EXPERTS AND COUNTER-PART INVOLVEMENT Four National Experts are recruited through the National POPs Focal Points to provide support in delivery of concrete result-based outputs, especially in the areas of data collection and analysis, supporting development of training and awareness materials, and actively participating in the capacity building activities and knowledge transfer. The objectives and activities of the Project are such that new experience and knowledge related to technical/environmental issues, POPs related human health risk, governance, and cross-cultural issues will be gained. The Project Team also foresee a necessity in organizing on-the-job training for national staff to maintain and operate the proposed Risk Management Toolkit and simple GIS database (POPs Toolkit). The Hatfield Project Team is consulting with the Implementing Agency in selecting an appropriate action plan to ensure sustainability of the project output, including the hosting of the POPs Toolkit. Regional Capacity Building Program for Health Risk Management 6 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

11 2.3 ROLES AND RESPONSIBILITIES OF THE IMPLEMENTING PARTNERS Overall project management and financial management of will be the responsibility of Hatfield, Canada. Hatfield has previously worked with most project partners, and has effective project management systems in place to manage a project of this size. In addition to project management expertise, Hatfield also provides key technical expertise in the form of an environmental specialist, risk management specialist, GIS specialist, Environmental Information Technology specialist and a communication specialist with extensive regional experience. Additional Hatfield technical staff in Canada and South East Asia will assist as needed. Hatfield s offices in Indonesia will provide local logistical and technical support to the project, especially in field studies and GIS/toolkit development. Pro-En Envirosciences Ltd. - Hatfield s partner in Thailand - will assist with data collection and logistical arrangements for work undertaken in the region. Hatfield will establish a field office in Vientiane, Lao PDR as a base for project activities. 2.4 PROJECT PERSONNEL Project personnel are detailed below in Table 1. Regional Capacity Building Program for Health Risk Management 7 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

12 Table 1 Detailed breakdown of project personnel management responsibilities Organization Title Name POPs Project Role Main Professional Team Project Director Thomas Boivin Overall project guidance Project Management - Performance Measurement Framework (PMF), PIP, reporting; Communication and liaison with Clients and key stakeholders; Quality assurance and quality control for all deliverables; Presenting results and training materials; Supervise development of risk assessment; Supervise development of tool-kit. Risk Management Specialist Environmental Specialists Project coordinator, Communication Specialist National team members from Cambodia, Lao PDR, Malaysia and Thailand Michael G. Rankin Grant Bruce Sokhem Pech Lead risk assessment; Co-lead data gathering and analysis; Assist developing GIS map/database; Assist Toolkit development; Assist economic valuation; Support developing management measures; Support training and workshop materials and delivery. Co-lead data gathering and analysis; Lead field data collection; Lead developing GIS map/database Support risk assessment; Support economic valuation Support training and workshop materials and delivery. Coordinate the project reporting, outputs, deliverables, staffing, and logistics Lead identifying stakeholders; Coordinate development and present human resources development works, and public outreach material. Lead desk review and developing management measures; Coordinate developing toolkit; Coordinate with Bank on team inputs to and outputs from regional cooperation component; Support/back-up project management in communication and reporting; Lead knowledge management. Support national data gathering and analysis; Support desk review and development of management measures; Support identification of stakeholders; Coordinate developing, training program & materials and delivery of training and workshops materials; Support risk assessment and GIS database; Support communication with national agencies Regional Capacity Building Program for Health Risk Management 8 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

13 Organization Title Name POPs Project Role Technical Staff Senior GIS and Remote Sensing Specialist Environmental Information System specialist Field Data & Risk Assessor Natural Resources Economist Data Analyst and Economic Valuation Andy Dean & Simon Hughes Jason Suwala John Wilcockson & Daniel Moats David Williams Tim Abercrombie Organization Title Name POPs Project Role Office Technical Backstopping GIS and Database Management Desk Top Designer and Word Processor Technical Staff Brian Grover and communities; and Support sustainability of information and database. Provide technical and management expertise for project activities in developing and maintaining GIS-based health risk database/map, and interactive Toolkit; Assist Communications Specialist in designing interactive training materials. Contribute technical expertise for project activities in designing, developing and maintaining Database and Web-Interface Toolkit Assist in risk assessment analysis, Assist in reporting; Assist in developing tool-kit and relevant training materials. Assist with economic analysis; Assist in reporting Assist in quality assurance in data gathering and analysis; Assist in economic valuation of health risk. Support GIS, spatial and environmental data integration; and Support designing training materials. Contribute technical expertise for project activities in: graphic design and the printing process; image editing software, specifically Adobe Photoshop and Illustrator; and Word processing program Project Collaborative Management Structure - World Bank Project Task Team and National Focal Points A Project Coordination and Supervision Team (PCST) comprised of the member(s) of the World Bank Project Task Team, the National POPs Focal Points, and Hatfield Project Manager will be established to provide guidance and agreed direction as necessitated by the project. The PCST will meet once every two months either in person or via teleconference, but will also meet as needed based on Project requirements. The PCST will be chaired by the World Bank Project Task Team Leader. Regional Capacity Building Program for Health Risk Management 9 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

14 3.0 PROJECT IMPLEMENTATION All activities and tasks listed in the TOR will be implemented in five inter-related work components as follows: Work Package/Component 1: Projection Initiation Work Package/Component 2: Risk Assessment Work Package/Component 3: Risk Management Work Package/Component 4: Regional Cooperation Work Package/Component 5: Final Report and Sustainability. A detailed explanation of each work component, their inter-links and timeframes, and expected outputs are provided in the Work Plan Gantt Chart in Appendix A1 and brief description of activities in Appendix A RESULT-BASED MONITORING Quality management is an essential part of our working process. The Project Team applies will use standard project management procedures for assessing and ensuring the quality of work and monitoring and evaluation of the project results and impacts. The efficient and effective management for project results depends on results-based planning, monitoring and leadership. The Project Team will work closely with project s World Bank and other partners to ensure that monitoring and reporting requirements meet the needs of key stakeholders. Efforts will be made to develop online collaborative tools that will facilitate sharing of project outputs, including monitoring data. This will be established through the online POPs Toolkit developed under the project. The Project Team will use the project initiation phase to develop a Result-Based Monitoring (RBM) strategy that will include performance indicators and baseline data for each of the outcome and output statements in the project RBM Framework as shown in Table 2 below. In order to build continuous learning into the project s implementation processes, the Project Team will use outcome mapping techniques in the initiation phase to foster participation in the Performance Measurement Framework, including project stakeholders from the World Bank, National Focal Points as well as selected organizations. Monitoring and reporting during project implementation will have four outcomes: (i) to encourage the project to look regularly at how it might improve its performance; (ii) to focus the project on change management; (iii) to assist the project in adapting to changing situations in an efficient way; and, (iv) to help the project report on its performance story. A key outcome of the monitoring and evaluation will be ensuring the project is sustainable in the long-term. Regional Capacity Building Program for Health Risk Management 10 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

15 The Results-Oriented Logical Framework Analysis is provided in Appendix A REPORTING AND DELIVERABLES FRAMEWORK Report Due Date Deliverables Lead by Support 1 Project Implementation Plan (PIP) including RBM Framework 2 Draft Progress Report 1 + Stakeholder Identification 27 March 08 Entire project Thomas Boivin Sokhem Pech 16 May 08 Task A1in TOR Thomas Boivin Sokhem Pech 3. Final Progress Report 1 30 May 08 Task A1in TOR Thomas Boivin Sokhem Pech 4. Paper on Methodology Selection and Outlines 5. Draft Report(s) on Hot Spot Integrated Risk Assessment for each Hot spot 6. Draft Report on Economic Analysis for each Hot spot 7. Final Report on Hot Spot Integrated Risk Assessment for each Hot spot 8. Final Report on Economic Analysis for each Hot spot 10. Paper on Desk Review of Risk Management Alternatives 11. Final Paper on Desk Review of Risk Management alternatives 12. Draft Risk Management Toolkits (POPs Toolkit) 25 May 08 Task A2/A in TOR 21 July 08 Task A2/A & B in TOR 25 July 08 Task A2/A & B in TOR 3 August 08 Task A2/A & B in TOR 3 August 08 Task A2/A & B in TOR Michael Rankin Michael Rankin Thomas Boivin, David Williams Michael Rankin Thomas Boivin, David Williams 15 July 08 Task B1 in TOR Michael Rankin, Sokhem Pech 8 August 08 Task B1 in TOR Michael Rankin, Sokhem Pech 14 July 08 Task B2 in TOR Andy Dean, John W, Michael Rankin, Jason Suwala Thomas Boivin, Grant Bruce, John Wilcockson Grant Bruce, John Wilcockson, Thomas Boivin Grant Bruce, John Wilcockson, Michael Rankin Grant Bruce, John Wilcockson, Thomas Boivin Grant Bruce, John Wilcockson, Sokhem Pech, Michael Rankin. Thomas Boivin, Grant Bruce and Andy Dean, David Williams Thomas Boivin, Grant Bruce, Andy Dean, David Williams Thomas Boivin, Grant Bruce, Simon Hughes, Sokhem Pech. Regional Capacity Building Program for Health Risk Management 11 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

16 13. Final Toolkits to be used in training activities 14. Draft Training Program and Sample Materials 15. Final Training Program and Materials 16. Draft Project Progress Report Final Project Progress Report Training Evaluation Report 19. Regional Workshop Reports and Consultants Presentations 30 July 08 Task B2 in TOR Andy Dean, John Wilcockson, Michael Rankin, Jason Suwala, 25 July 08 Task B4 in TOR Thomas Boivin & Sokhem Pech 1 August 08 Task B4 in TOR Thomas Boivin & Sokhem Pech 15 September September 08 4 national training events 2 regional workshops (in April and tentatively in October) Task B3 in TOR Task B3 in TOR 20. Draft Final Report 5 November 08 Whole assignment 21. Final Report 10 December 08 Whole assignment Thomas Boivin & Sokhem Pech Thomas Boivin & Sokhem Pech Thomas Boivin, Grant Bruce, Simon Hughes, Sokhem Pech Michael Rankin, Thomas Boivin, Grant Bruce, Andy Dean, John Wilcockson Michael Rankin, Grant Bruce, Andy Dean, John Wilcockson Michael Rankin & Grant Bruce, Andy Dean, John Wilcockson, Jason Suwala Michael Rankin, Grant Bruce, Andy Dean, John Wlcockson, Jason Suwala Task B4 in TOR Sokhem Pech Thomas Boivin, Grant Bruce, Andy Dean, John Wilcockson, Jason Suwala Task C1 in TOR Sokhem Pech Thomas Boivin, Grant Bruce, Andy Dean, John Wilcockson, Jason Suwala Thomas Boivin & Sokhem Pech Thomas Boivin & Sokhem Pech Michael Rankin, Grant Bruce, Andy Dean, John Wilcockson, Jason Suwala Michael Rankin, Grant Bruce, Andy Dean, John Wilcockson, Jason Suwala Regional Capacity Building Program for Health Risk Management 12 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

17 3.3 STAKEHOLDER COMMUNICATIONS PLAN Mechanism Purposes of Communication Target Audiences Messages and Information Responsibility and Schedule Project Website to be established by April 30, 2008 Share best practices to encourage replication Ensure coordination of donor support All project stakeholders Project Partners Donor and development partners community Information on project activities, lessons learned, best practices Project Manager; Communication specialist; Environment Information System Specialist Project Reports, training materials and POPs Toolkit Raise awareness with government stakeholders regarding project activities Share best practices to encourage replication Representatives of target sites and relevant government agencies NGOs and other international projects working in hot spot areas. Message is that dealing with POPs issues is critical to sustainable development nationally and regionally. Project Manager Communication specialist Periodically throughout project. Regional Capacity Building Program for Health Risk Management 13 Hatfield of Persistent Organic Pollutants (POPs) in South East Asia

18 APPENDICES

19 Appendix A1 Project Gantt Chart

20 ID Task Name Start Finish 0 Appendix A1 - Work Schedule GANTT Chart Wed 3/12/08 Sat 12/13/08 1 Component 1 Wed 3/12/08 Fri 4/4/08 2 Initiation & Result Based Monitoring Wed 3/12/08 Sat 4/5/ Team Mobilization Wed 3/12/08 Sun 3/16/ Background Research Sun 3/16/08 Sat 3/22/ Project Implementation Plan Sun 3/23/08 Sun 3/23/ Submission of PIP to World Bank Sat 4/5/08 Sat 4/5/08 7 PIP Approval at Launch Workshop Fri 4/4/08 Fri 4/4/08 8 Component 2 Thu 4/10/08 Sun 7/6/08 9 Risk Assessment Thu 3/20/08 Sun 8/3/ Data Gathering Mon 3/24/08 Tue 4/29/08 11 Meeting with Thai officials on POPs - Tom Boivin Tue 3/25/08 Thu 3/27/08 12 Meeting with Laos officials on POPs in Vientiane - Tom Boivin & Andy Dean Fri 3/28/08 Wed 4/2/08 13 Meeting with Cambodian officials on POPs project in P Penh -Sokhem P & Mike R Mon 4/7/08 Thu 4/10/08 14 Meeting with Malaysian officials on POPs project - Tom Boivin & Jason S Wed 4/23/08 Wed 4/23/ Data Analysis & Literature Review Thu 3/20/08 Tue 3/25/ Characterization of Hot-spots Wed 4/30/08 Thu 6/12/ Draft 1st Progress Report Sat 5/10/08 Fri 5/16/ Final 1st Progress Report Sun 5/25/08 Fri 5/30/ Risk Analysis: Sun 5/4/08 Fri 7/25/ Methodology Selection and Outline Thu 5/15/08 Sun 5/25/ Hot Spot Identification and Selection Sun 5/25/08 Thu 5/29/ Field Data Collection & Lab Analysis Sun 5/4/08 Thu 5/29/08 23 Field data collection in Laos hotspot - Grant Bruce & John Wilcoxson Sun 5/4/08 Tue 5/6/08 24 Field data collection in Cambodian hotspots - Tom Boivin & Andy Dean Sun 5/4/08 Tue 5/6/08 25 Field data collection in Thai hotspot - Tom Boivin & Andy Dean Thu 5/8/08 Sun 5/11/08 26 Field data collection in Malaysian hotspots - Grant Bruce & John Wilcoxson Thu 5/8/08 Sun 5/11/08 27 Samples analysis in Lab XXX Sun 5/18/08 Mon 6/30/ Integrated Risk Assessment Analysis Fri 7/4/08 Mon 7/21/ Economic Valuation of Health Risk Sun 7/6/08 Fri 7/25/ GIS Health Risk Database/Mapping Tue 6/10/08 Mon 6/16/ Draft Report on Hotspot Assessment Wed 7/9/08 Mon 7/21/ Draft Report on Economic Analysis Fri 7/11/08 Fri 7/25/ Bank & Focal Points comment Sun 7/27/08 Wed 7/30/ Finalizing Hotspot Report Fri 8/1/08 Sun 8/3/08 February March April May June July August September October November December January 3/23 4/4 Project: Appendix A1 - Work Schedule Date: Wed 3/19/08 Task Split Progress Milestone Summary Project Summary External Tasks External Milestone Deadline Page 1

21 ID Task Name Start Finish 35 Component 3 Thu 4/24/08 Mon 11/10/08 36 Risk Management Wed 4/30/08 Mon 9/29/ Risk Management Measures Mon 6/23/08 Fri 8/8/ Management Desk Review Mon 6/23/08 Tue 7/15/ Short and Long-term Measures Tue 7/22/08 Tue 7/22/ Bank and National Focal Points comments Sat 8/2/08 Tue 8/5/ Finalizing Risk Management Measures Sun 8/3/08 Fri 8/8/ Risk Management Toolkit Thu 7/3/08 Wed 7/30/ Draft Toolkits for Review by Clients Thu 7/3/08 Mon 7/14/ Final Toolkits used in training activities Fri 7/18/08 Wed 7/30/ Training and Public Awareness Wed 4/30/08 Fri 8/29/ Identification of stakeholders Wed 4/30/08 Fri 5/9/ Training Program and Materials Fri 7/4/08 Fri 7/25/ Bank approval of Training Proposals Fri 8/1/08 Fri 8/1/ Conducting Training Workshops Tue 8/12/08 Fri 8/22/ Training Workshop Reporting Sat 8/23/08 Fri 8/29/ Draft 2nd Progress Report Fri 9/5/08 Mon 9/15/ WB and National Focal Points' comments on 2nd Progress Report Mon 9/15/08 Mon 9/22/ Finalizing 2nd Progress Report Mon 9/22/08 Mon 9/29/08 54 Component 4 Fri 4/4/08 Tue 10/14/08 55 Regional Cooperation Fri 4/4/08 Tue 10/21/ Regional Launch Workshop Fri 4/4/08 Sat 4/5/ Present overview on work and status Fri 4/4/08 Fri 4/4/ Present other relevant paper(s) Fri 4/4/08 Fri 4/4/ Launch Regional Workshop Report Tue 4/15/08 Sun 4/20/ Final Regional Workshop Wed 10/15/08 Wed 10/15/ Present overview on work and status Wed 10/15/08 Wed 10/15/ Present other relevant paper(s) Wed 10/15/08 Wed 10/15/ Brief Regional Workshop Report Sun 10/19/08 Tue 10/21/08 64 Final Report Wed 11/5/08 Sat 12/13/ Draft Final Report Wed 11/5/08 Sat 11/15/ Addressing WB and National Focal Points' comments/suggestions Sat 11/29/08 Mon 12/8/ Submission of Final Report & deliverables Mon 12/8/08 Sat 12/13/08 February March April May June July August September October November December January Project: Appendix A1 - Work Schedule Date: Wed 3/19/08 Task Split Progress Milestone Summary Project Summary External Tasks External Milestone Deadline Page 2

22 Appendix A2 Project Detailed Work Plan - Activities Description

23 Appendix A2: Detailed Work Schedule Brief Description of Activities Component 1: Initiation & Result Based Monitoring Task and Sub Task Brief Description of Main Activities Due Date 1.1. Team Mobilization International team were mobilized and began their work within one week after the date of the effectiveness of the contract (2 March) Background Research Initial data and information (NIPs, UNEP Report etc.) were obtained from the World Bank and relevant partners. More information is to be clarified or obtained during the Regional Launch workshop and country visits in April The initial background research is carried out by the Project Team members. 10 March 18 March 1.3. Project Implementation Plan Knowledge Management and Monitoring 1.4. PIP approval at Regional Launch workshop Due to time constraints, a simplified version of the Project Implementation Plan (PIP) was developed and submitted to the World Bank for preliminary review and will be approved at the Regional Launch Workshop on April Start up of system development to Hatfield Infrastructure standard Data and document populating Develop system to World Bank/host infrastructure standard Participants will receive the draft PIP for review one week in advance. PIP will be presented and discussed at the workshop plenary session. The web-based result monitoring collaboration tool will also be presented at the regional workshop. 23 March 28 March April October 31 August 4 April Appendix 2 Detailed Work Schedule 1 Hatfield

24 Component 2: Risk Assessment Task and Sub Task Brief Description of Main Activities Due Date 2.1 Data Gathering: - Meeting POPs Officials in Thailand, Lao PDR, Cambodia; and Malaysia Data analysis and Literature Review 2.3. Characterization of Hotspots 2.4. Draft 1 ST Progress Report 2.5. Final 1 st Progress Report 2.6. Risk Analysis Methodology Selection & Outlines Hotspot Identification & Selection Project Team will visit all four participating countries in late March and April. The purpose of the visit is for formal introduction of the team by the World Bank, discussion of work plan and country contribution in kind (data, staff), and visit to the candidate hotspot sites. Project Team review relevant literature and available datasets for their completeness and quality. Based on the result of the Data Analysis, the main hotspots are characterized for consultation with the National Focal Points. Includes areas suspected of high contamination with POPs, PTSs chemicals, or other toxic contaminants. GIS will be used to support the characterisation of Hotspots for each country and regionally for cataloging sources and stockpiles of target chemicals, document current uses and releases, and list known contaminated areas. Regional sources, trends or practices (e.g. illegal trade, new uses) will be identified where appropriate. All analytical results will then be integrated into a preliminary GIS data-base. The Project Team will flag presence of other contaminants of significant concern at the studied sites (Hotspots) and suggest target chemicals which need be considered at a particular Hotspot, e.g. for pesticides never registered or known to be used at the site. A draft progress report is submitted to the World Bank, and the National Focal Points for their comments. Comments are expected within one week after the submission 1 st Progress Report is finalized by addressing all comments and suggestion within one week after the receipt of the World Bank comments. The Project Team will submit a proposed risk assessment analysis methodology for approval by the World Bank; The Project Team proposes the Environment Canada approach to performing Human Health Risk Assessments, since it provides greater flexibility with regard to data availability and quality. Main components include: i) problem formulation (a qualitative/ semi-quantitative assessment); ii) Exposure and Toxicity; and iii) Risk Characterization. Based on the list of potential sites identified in the Characterization of Hotspots, the Project Team will assist relevant National Focal Points in selecting one Hotspot per country. The Hotspot selection will be supported by analyses performed using the POPs Toolkit and other agreed selection criteria such as access, relevance to the project goal, and being doable, complexity of sites, etc. 25 March 27 April 10 March 29 April 30 April 16 June 16 May 30 May 2 May 2 May Appendix 2 Detailed Work Schedule 2 Hatfield

25 Field data collection in Laos, Cambodia, Thai and Malaysian Hotspots Sample Analysis in Laboratory Integrated Risk Assessment Economic Valuation of Health Risk The study team will utilize existing analytical information (e.g., Japanese screening samples; recent dioxin analyses from Cambodia) to the extent possible. Hatfield recommends that high-quality analytical data be collected from at least some, if not all, of the 4 hotspots to be studied. To speed up the process, the Project Team will split into two sub-teams to collect samples from the selected hotspot in collaboration with the National Focal Points in each country, in line with the established sampling protocols, and the standard Quality Assurance/Quality Control (QA/QC) procedures. The national consultant, and counter-part staff from participating countries will also carry out additional socioeconomic data collectionwithin the vicinity of the hotspot areas of their respective countries. The samples will be transported to the agreed Laboratory(ies) for analysis. The National Focal Points are requested to assist with the required formality. The selection of methods and quality assurance (QA) samples will be employed by analytical laboratories to ensure confidence level needed, sensitivity desired (i.e., detection limits), and real objective of the Project. The Project Team will investigate possible laboratories in Asia or Australia which may be able to do some or all of the analyses; if quality/time/budget issues arise regarding analyses, Hatfield recommends that some or all analyses be performed in Canada. The assessment focuses on human health and healthrelated livelihood issues - clarification on relationship between emission levels, ambient POP concentrations, and potential exposure levels; exposure pathways, populations/social groups at risk, dose-response assessments and other parameters. The analysis will also focus on approaches to address data gaps. The decision tree adapted from the Environment Canada risk-based, tiered approach - will be used. It is a cost-effective and flexible assessment method that allows decision making to be appropriately tailored to site-specific conditions and hazards, while providing a framework for effectively allocating funding and resources. A tiered, iterative approach will start by asking simple questions and will require information which should be readily available. Subsequent questions will become more difficult. Estimate the cost to each country of health and other impacts associated with exposure to target chemicals at the evaluated Hotspots in line with the agreed Methodology Selection & Outlines. The main objective is: i) to compare and demonstrate benefits and costs of various management scenarios; ii) to set priorities of different actions; and iii) to get the attention of decision makers by presenting a quantitative analyses of alternative actions and cost of health impacts. The Economic Valuation and Draft Report on Economic Analysis (Task 2.9) will be limited to a general review of 4 May 11 May 11 May - 30 June 30 June 21 July 2 25 July Appendix 2 Detailed Work Schedule 3 Hatfield

26 economic impacts of POPs at the 4 Hotspots. There will likely not be sufficient site-specific data (analytical, socioeconomic, etc.) available from each hotspot to provide a high level of detail for this component. Hatfield will provide a rough economic estimate for each of the hotspots examined (i.e., 1 per country), appropriate to the limited time and budget allocated for this component GIS Health Risk Database/Mapping 2.8. Draft Report on Integrated Hotspot Assessment 2.9. Draft Report on Economic Analysis The Project Team will develop intuitive information products using the POPs Toolkit, including maps that are easy for decision-makers and other designated users to understand and apply. In addition to supporting efficient management and analysis of data, the GIS of POPs Toolkit provides a means for effective dissemination of environmental and vulnerability data. Hot spot inventory mapping (for both report and online POPs Toolkit use); GIS-based risk analysis (for both report and online POPs Toolkit use); GIS database support for socio-economic cost analysis. Draft assessment reports for each Hotspot will be submitted to World Bank and relevant National Focal Points. The draft Report on the Economic Valuation of Health Risk for each Hotspot, including map products, will be submitted to World Bank and relevant National Focal Points June May 1 June 20 June July 25 July 2.10 Bank and Focal Points Comments Finalizing Hotspot Reports Comments are expected within 7 days after the submission of both reports under 2.8 and 2.9. Both reports under 2.8 and 2.9 will be finalized based on the comments received. 30 July 3 August Appendix 2 Detailed Work Schedule 4 Hatfield

27 Component 3: Risk Management Task and Sub Task Brief Description of Main Activities Due Date 3.1. Risk Management Measures Management Desk Review Short & Long-term Measures Bank and Focal Points Comments Finalizing Risk Management Measures 3.2. Risk Management Toolkit (POPs Toolkit) The Project Team will carry out a baseline information desk review in the early project stage to assess existing technical and managerial capacity of the participating countries in POPs and PTSs chemical management. The existing donor projects related to POPs or environmental governance at the national and regional level will also be reviewed. The working paper on the proposed short-term and longterm measures/solutions will be developed and submitted to World Bank, and the National Focal Points. For each of the Hotspots analyzed, Hatfield Project Team will propose: Short-term measures to manage (prevent or reduce) human and environmental risks of chemical exposure (e.g. source containment); and cost estimates for these measures, at the local and regional levels; and Long-term solutions for remediation of the Hotspot. Recommendations will only consider options that are commercially available and that are applicable in the context of the country where they are being proposed. The proposed measures will be included both preliminary structural engineering solutions and nonstructural measures for achieving behavior changes. The cost analysis of each long-term and short term measure will be conducted. It is expected that the Project Team will receive comments on Draft Reports within 7 days of draft submission. The Project Team will address all comments and suggestion from the client and other stakeholders while finalizing the Report The POPs Toolkit will be a web-based information service, and also on CD-ROM to ensure accessibility. It will provide a step-by-step approach to conducting risk assessments for POPs and other toxic chemicals, in an interactive and easy-to-use format, and will serve as an invaluable tool for local stakeholders to perform future risk assessments. The POPs Toolkit will contain a separate section per country, and will be delivered in English with some information provided in local languages (executive summary). It will be the developed in a manner whereby it will become the primary training tool used during workshops. The POPs Toolkit will be developed to engage a wide audience and will feature an interactive risk management component, and also provide the GIS data and mapping tools. The technical and map content will be simple, clear, concise, and user-friendly, with references provided; chemical and environmental risk assessment analyses conducted at the Hotspots will be presented in the toolkit as case studies. 15 July 22 July 31 July 5 August 8 August 14 August Appendix 2 Detailed Work Schedule 5 Hatfield

28 Web-based toolkit mock-up development March 28, 2008 User needs assessment, mock-up review and data gathering April 3-5 World Bank web-hosting infrastructure determined April Draft POPs Toolkit Contents & Materials Development of system to World Bank infrastructure standard The POPs Toolkit will be a fully interactive reference, teaching and awareness raising tool with interactive diagrams, maps, quizzes and animation, as well as text about the various thematic issues identified. The information content organization and navigation schemes proposed for the POPs Toolkit will be submitted for approval by the end-user organization, and tested on potential users in order to develop the most intuitive interface possible. Consultation will identify the general expectations with respect to the POPs Toolkit's overall look and design appropriate to the countries cultural and social background. Content development includes production of new content by subject matter experts as well as through conversion of outside information assets. Throughout the content development process, all text and other content units will be reviewed by the production team in order to assess what types of supporting elements might be developed. The primary written content for the POPs Toolkit will be supported by photos and other interactive materials. Incorporate training materials and interactive risk management decision-support system in POPs Toolkit. August June-14 July Finalize POPs Toolkit The Draft POPs Toolkit will be submitted to the participating countries and the World Bank for comments. The working version of the toolkit is to be approved, so that it can be used for training activities; POPs Toolkit in use at training seminars; revisions will be made following participants feedback. 30 July Move hosting of POPs Toolkit (including knowledge management/collaboration system) to World Bank server Nov Training and Public Awareness Identification of Stakeholders In the early stage of the Project, the Team will review institutional arrangements and identify stakeholders in various government agencies, who could be invited to participate in national training and other meetings. Taking into account each participating country s specific situation, the Project Team will also identify potential participants from the private sector, Civil Society Organization and relevant academia. The proposed list of participants will be finalized through consultation with the National Focal Points and the World Bank prior to the conduct of national training and awareness activities Training Program and The Project Team, in close collaboration with National 30 June - 25 Appendix 2 Detailed Work Schedule 6 Hatfield

29 Materials developed Bank Approval of training program Conducting national training workshops Training Workshop Reporting 3.4 Draft 2 nd Progress Report 3.5 World Bank and Focal Points Comments 3.6 Final 2 nd Progress Report Focal Points will propose the content, format, duration and audience for the training, and received World Bank s approval. The training programs will be adjusted to emphasize each country s specific needs. It will consist of use of the interactive POPs Toolkit, including presentations on POPs and other toxic chemical background information, risk assessment methodologies, quality assurance/quality control, data gathering techniques, data management, and GIS-based mapping and analysis. The training will also include detailed presentation on methodologies undertaken in the risk assessment of the selected Hotspots. Training materials will be available in English and local languages (executive summary), where required and available. The approved training programs will need to be in place, before the actual training proceeds. Project Team will serve as resource persons and facilitators at the training workshops to be organized by the World Bank in each of the four target countries, which will be attended by the identified stakeholders. The training workshops will be well synchronized (e.g August in Thailand, August in Malaysia, August in Cambodia, and August in Lao PDR). It is expected that that training will last for two days in each country (1 day for theoretical presentation and discussion, half a day for field visit and practical work, and half a day for wrapping up and participants feed-back). Report will be prepared and disseminated to the World Bank, and the National Focal Points, summarizing all activities, key finding and the list of national priorities, as well as the synthesis of the training workshop evaluation performed by the participants. A summary of work completed since the 1 st Progress Report will be submitted. Comments requested within one week of submission of the draft progress report. The Final 2 nd Progress Report will address all comments and suggestions from the World Bank and all four National Focal Points. July 1 August 8 22 August to be confirmed with the World Bank 29 August 15 September 22 September 29 September Appendix 2 Detailed Work Schedule 7 Hatfield

30 Component 4: Regional Cooperation Task and Sub Task Brief Description of Main Activities Due Date 4.1 Regional Launch Workshop Present PIP, Methodology, Approach Present General principles of risk management and Proposed Knowledge Management/ Regional Launch workshop Reporting 4.2 Final Regional Workshop Present overview on work and progress Present other relevant papers Regional workshop Reporting World Bank organizes the regional launch workshop. The Project Team keep in close communication with the World Bank regarding the proposed time, location, program and specific requirements for the Project Team to present and facilitate as resource persons at the Regional Launch workshop. Project Team will present the PIP and receive comments from stakeholders. Approval of PIP to be received at Launch workshop Presentations on POPs Project methodology and approach will be made by the Project team The Project Team will prepare and submit the report of the launch workshop within 10 days of completion of the event and country visits. This report will include a summary of the key discussions, issues and recommendations from the workshop. The Project Team s presentations at the workshop will be attached as one of the annexes of the report. World Bank organizes the final regional workshop. The Project Team keep in close communication with the World Bank regarding the proposed time, location, program and specific requirements for the Hatfield Team to present at, and facilitate as resource persons for, the Regional Workshop. Project Team will communicate with the World Bank on the proposed agenda and requirements Upon request and agreement with the world Bank. The Project Team will prepare and submit the report of the launch workshop within 10 days of completion of the event. This report will include a summary of the key discussions, issues and recommendations from the workshop. The Project Team s presentations at the workshop will be attached as one of the annexes of the report. 3-5 April 20 April October (TBD) October (TBD) Appendix 2 Detailed Work Schedule 8 Hatfield

31 Final Report Task and Sub Task Brief Description of Main Activities Due Date 5.1 Draft Final Report A report summarizing all project activities (i.e. from 1 st and 2 nd Progress Reports) will be prepared and submitted to the World Bank. Project Team will ensure that the report meets or exceeds all requirements of the World Bank, in terms of content, annexes, etc. as required under the TOR. The report will be prepared in both hard copy and CD-ROM, for ease of distribution and review. 15 November 5.2 Addressing World Bank and Focal Points comments/suggestions 5.3 Submission of Final Report & Deliverables The World Bank and National Focal Points are expected to provide comments and suggestions on the Draft Final Report within 15 days after the submission. The Project Team will address all comments and suggestions provided by the Bank, and National Focal Points. Revisions to the final Report will be completed within 15 days of receipt of the comments and suggestions, and then will be re-submitted in final form to the World Bank and to the participating countries. The Final Report, as well as final POPs Toolkit materials will be handed over in final report submission. 01 December 10 December Appendix 2 Detailed Work Schedule 9 Hatfield

32 Appendix A3 Result-Based Logical Framework

33 Appendix A3 Results-Oriented Logical Framework Analysis for the Regional Capacity Building Program for Health Risk Management of Persistent Organic Pollutants (POPs) in South East Asia Project Goal: To enable officials responsible for POPs management to increase their understanding and use of health risk based approaches for management of POPs and other chemicals, and prioritize POPs interventions to reduce local health impacts, particularly on the poor and vulnerable. Performance Indicators (P.I): Improvements in national POPs management in: P.I.1: prioritizing among POPs issues; P.I. 2: managing chemicals beyond POPs, and P.I.3: harnessing regional cooperation for POPs and other chemicals management. Overall Objective: To enhance the capacity of the government agencies in the South East Asia Region to manage POPs and POPs-like chemicals using health risk-based and regional approaches. To improve regional cooperation on a broader chemicals agenda. Overall Objective Performance Indicators (OOPI): OOPI.1: Government officials are able to use and maintain the risk management toolkits and other decision support tools developed during the project to promote health risk assessment and regional approaches to POPs and POPs-like chemicals management. Appendix 3 - Results-Oriented Logical Framework 1 Hatfield

34 Component 1 Activities Outputs Use of Output Performance Indicators Initiation & Result Based Monitoring 1.1. Team Mobilization 1.2. Background Research 1.3. Project Implementation Plan 1.4. Approval of PIP Lead Team in place in week two after contract award (2 March) Relevant documents and literature identified by the client, within Hatfield s database and through Internet search are reviewed. PIP outlining clear schedules with critical milestones, all required deliverables, inputs from all project stakeholders, and Result-based Monitoring Framework. PIP document Project activities start right away to make up for the time loss and kick start the project before major national holidays in three of the four participating countries in April Background research finding is used as inputs for developing a more refined implementation plan and resultbased monitoring tools. Implementing Agency (WB) and Regional Launch workshop under Component three provide their inputs and comments on PIP. PIP is used as tool for collaborative planning and monitoring Team members, Implementing Agency and National focal points used PIP in project management and monitoring Better understanding of needs, priority and information gaps to contribute to P.I.1:; P.I.2, and P.I.3: Impact indicators All four international team members and key technical backstopping staff are on board by week two after the contract award. At least 2 national consultants are commissioned/on board by then. All available NIPs and relevant data from participating countries, relevant other POPs project are reviewed by week three of March Draft PIP is submitted to WB by week 4 of March; and to the Regional Launch Workshop by week one of April PIP is finalized in week 2 of April by the Project Team by incorporating all comments obtained from the Launch Workshop and WB (April 3-5).. Appendix 3 - Results-Oriented Logical Framework 2 Hatfield

35 Component 2 Activities Outputs Use of Output Performance Indicators Risk Assessment 2.1 Data Gathering 2.2 Data Analysis & Literature Review 2.3. Characterization of Hot-spots 2.4. Draft 1 st Progress Report 2.5. Final 1 st Progress Report 2.6. Risk Analysis: Methodology Selection and Outline Good understanding of data availability and gaps Report on data analysis and hotspot characterization Hotspots at a national / regional scale are defined in consultation with National Focal Points, Draft 1 st Progress Report Final 1 st Progress Report Paper on methodology selection and outlines is proposed by the project team and is agreed upon by the World Bank Finding is used for communicating with partners on proposed approach for data management The report is used in selecting appropriate hot spots with National Focal Points Serve as a basis for more detailed risk management and capacity building. Project Team, WB and National Focal Points and concerned agencies uses the report as means for monitoring the progress and planning/coordina ting project activities. Project Team, WB, and National focal Points use it for monitoring progress and communication Project Team, WB and National Focal Points and concerned agencies use the report as a means for conducting detailed risk analysis in selected hot spots, and applying in capacity building. Better understanding of needs, priority and information gaps to contribute to P.I.1:; P.I.2, and P.I.3: P.I.1 and P.I.2 P.I.1; P.I.2, and P.I.3: Impact indicators Preliminary documentation on data availability is done by 30 April 2008 Short list of hotspots is provided at Launch workshop by each country. Preliminary documenting on Hotspots at a national /regional scale compiled by 26 May 2008 Concise progress report by 16 May 2008 Final Progress Report submitted by 30 May 2008 Detailed methodology and outline is submitted to WB and National Focal Points for consultation and endorsement by 25 May 2008 Appendix 3 - Results-Oriented Logical Framework 3 Hatfield

36 2.6.2 Hot Spot Identification and Selection Participating countries approval of the identified Hotspots Detailed risk management will be carried out in one selected hot spot in each country. P.I.1; P.I.2, Participating agree on the hot spot selection by 30 May Field Data Collection & Lab Analysis Additional data collection at selected Hotspots is carried out in April. Samples are analyzed at recognized laboratories (e.g. AXYS, Canada). The data are used together with other existing data for integrated risk assessment analysis P.I.1; P.I.2, and OOP.I.1 Additional field data collected by 30 May 2008 and analyzed by end of June Integrated Risk Assessment Analysis Working paper on integrated risk assessment for each hot spot is delivered Paperis used by the Team, WB, and participating countries for developing risk management measures, and training material P.I.1; P.I.2,, and OOP.I Economic Valuation of Health Risk Working paper on economic valuation Paper is used by the Team, WB, and participating countries for developing risk management measures, training material, awareness raising P.I.1; P.I.2, and OOP.I GIS Health Risk Database/ Mapping GIS Health Risk Database/Map POPS managers and decision making use database. P.I.1; P.I.2, and OOP.I.1 Database is delivered by 25 June Draft Report on Hot Spot Integrated Risk Assessment Draft Report on Integrated Risk Assessment of each Hot Spots WB and National Focal Points (NFP) provide their comments within 7 days Draft report is submitted by 21 July Draft Report on Economic Analysis for each Hot Spot Draft Report WB and NFP provide their comments within 7 days Draft report is submitted by 25 July Bank & Focal Points comment Comments from WB and NFP on both reports 2.8 and 2.9 Project Team revise both Reports by taking into account all relevant comments and suggestions Comments received from WB and NFP by 30 July 2008 Appendix 3 - Results-Oriented Logical Framework 4 Hatfield

37 2.11 Finalizing Hot Spot Reports under 2.8 and 2.9 Final Report on Hot Spot Integrated Risk Assessment, and on Economic Analysis for each Hot Spot including intuitive information products using the GIS/maps. WB and national and local agencies use the report for their decision on follow-up; Project Team use them for developing appropriate contents of the Tool Kit P.I.1 and P.I.2 Final Hotspot report is submitted by 3 August 2008 Appendix 3 - Results-Oriented Logical Framework 5 Hatfield

38 Component 3 Activities Outputs Use of Output Performance Indicators Risk Management 3.1. Risk Management Measures Management Desk Review Short and Long-term Measures Bank and National Focal Points comments Finalizing Risk Management Measures 3.2 Risk Management Toolkit Draft Risk Management Toolkit for review by Clients Desk review of existing technical and managerial capacity of each participating country is delivered by early July Working paper on Desk Review of Risk Management Alternatives is delivered to the WB and National Focal Points The comments and suggestion from NFP (participating countries) and WB Final Working Paper Tool kits The draft Risk Management Toolkit is developed in web-based and interactive format in English with executive summary in national Analytical result is used by the Project Team and National Focal Points in devising proposed Risk Management Measures The WB and National Focal Points review and provide their comments so that the working paper can be finalized for inclusion in the Tool Kit. The Team finalizes working paper and use them as capacity building material in Tool Kit. Team, WB and NFP use it for capacity building and policy development with decision-makers Risk management toolkit to guide decision-makers in health risk based management of POPs and POPslike chemicals is developed and used in capacity building activities in July and August The WB and National Focal Points (NFPs) review and provide their comments so that it can be used for the training P.I.1; P.I.2, and OOPI.1 P.I.1, P.I.2, and OOP.I.1 P.I.1, P.I.2, and OOP.I.1 P.I.1; P.I.2; OOP.I.1 OOP.I.1 Impact indicators Rview is completed by 15 July The working paper is submitted by 15 July 2008 Comment and suggestion from NFP are received by 22 July Final working paper is delivered by 8 August Draft Tool kit is delivered by 14 July 2008 Appendix 3 - Results-Oriented Logical Framework 6 Hatfield

39 languages where applicable Final working Risk Management Toolkits used in training activities Toolkit for each country is used for national training Based on feedback from the field-testing, the toolkit is updated continuously throughout the life of the project. OOP.I.1 Final Tool kit is delivered by 08 August Training and Public Awareness Identification of stakeholders Stakeholders mapping are agreed upon by the NFPs in each country. The Team use the stakeholders lists for involving them in various training and awareness activities OOP.I.1 Stakeholder identified and agreed by NFPs by 12 May Training Program and Sample Materials The training program - content, format, duration and audience, as well as the proposed field trip, are proposed in English with executive summary in local languages where applicable Training program and materials customized to meet each country s specific needs. OOPI.1 Training program and materials by 25 July WB s approval of Training Proposal The Training Program and sample material is approved Training program is used by the Project Team and NFPs in Capacity Building and Awareness activities OOP.I.1 WB approval by 1 August Preparing & conducting Training Workshops Training workshops are organized by the World Bank; Project Team is to provide facilitation and technical inputs. All required technical inputs and presentations are prepared and made available to participants well in advance. OOP.I.1 All participants have received the training materials one week prior to the training sessions. At least 80% of the participants confirm that they have read the materials in advance Training Workshop Reporting Report summarizing all activities, key findings and list of national priorities, as well as the synthesis of the training workshop evaluation performed by the WB, Project Team and NFP use it for assessing the impacts and evaluation by participants. OOP.I.1 Report for each training workshop is submitted to the World Bank and the National Focal Points within five days after training events. Appendix 3 - Results-Oriented Logical Framework 7 Hatfield

40 participants is prepared and disseminated 3.4 Draft 2 nd Progress Report (Aug 2008) 2 nd Progress Report is submitted WB and the National Focal Points review and provide their comments. Draft 2 nd Progress Report submitted by 15 September WB and National Focal Points comments on 2 nd Progress Comments and suggestions from WB and National Focal Points The Project Team finalize Progress Report 2 Comments and suggestions received by 22 September Finalizing 2 nd Progress Report Final Progress Report 2 WB and National Focal Points use them for communicating with their relevant stakeholders on project progress and upcoming activities Final 2 nd Progress Report submitted by 30 September Appendix 3 - Results-Oriented Logical Framework 8 Hatfield

41 Component 4 Activities Outputs Use of Output Performance Indicators Regional Cooperation 4.1 Regional Launch Workshop Present overview on work and status Present other relevant paper(s) Launch Regional Workshop Report 4.2 Final Regional Workshop Present overview on work and status Present other relevant paper(s) Brief Regional Workshop Report Regional Launch workshop is organized by the World Bank early April 2008 Report of Regional Launch Workshop Regional Launch workshop is organized by the World Bank Report is prepared summarising all key discussions, issues and recommendations from the workshop, and project Team s presentations Approval of PIP, confirmation of contribution and roles, and major milestones, adoption of resultbased monitoring methodology Participants share views and experiences in addressing crosscutting issues which either cannot be adequately solved on a national scale, or can bring higher cost-effectiveness when addressed on a regional level. P.I.3 and OOP.I.1 P.I.3 and OOP.I.1 Impact indicators At 3-5 April Workshop, PIP approved, and all other required arrangements are discussed and agreed upon. Report of the workshop is submitted to the World Bank and National Focal Points within 10 days of completion of the event. Report of the workshop is submitted to the World Bank and National Focal Points within 10 days of completion of the event Appendix 3 - Results-Oriented Logical Framework 9 Hatfield

42 Component 5 Activities Outputs Use of Output Performance Indicators Final Report 5.1 Draft Final Report 5.2 Addressing WB and National Focal Points comments/sugge stions 5.3 Submission of Final Report & deliverables The report meets or exceeds all requirements of the World Bank and other agencies, in terms of content, annexes, etc. as required under the TOR. The report will be prepared in both hard copy and CD-ROM, for ease of distribution and review. Final Report is submitted by 15 December Draft Final report is reviewed and commented by WB and NFPs All deliverables are used by WB and NFPs, and other relevant national agencies P.I.1; P.I.2, P.I.3 and OOP.I.1 P.I.1; P.I.2, P.I.3 and OOPI.1 Impact indicator Draft Report is submitted to the World Bank and National Focal Points by 15 November Submission by 10 December 2008 Appendix 3 - Results-Oriented Logical Framework 10 Hatfield

43 Appendix A4 Terms of Reference

44

45

46

47

48

PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS

PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS The GEF initial support on the implementation of the Stockholm Convention focuses on assisting Vietnam to

More information

TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR. 19 October 2017

TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR. 19 October 2017 TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR A) General Background Information 19 October 2017 Appendix 1 The United Nations Industrial Development Organization

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS EP United Nations Environment Programme Distr. GENERAL UNEP/POPS/INC.5/INF/2 13 October 2000 ENGLISH ONLY INTERGOVERNMENTAL NEGOTIATING COMMITTEE FOR AN INTERNATIONAL LEGALLY BINDING INSTRUMENT

More information

Second Workshop for the Stockholm Convention regional and subregional centres 28 September - 2 October 2009 AGENDA

Second Workshop for the Stockholm Convention regional and subregional centres 28 September - 2 October 2009 AGENDA Second Workshop for the Stockholm Convention regional and subregional centres 28 September - 2 October 2009 International Environment House- Geneva AGENDA Module I: Coordination among the Stockholm Convention

More information

INTERNATIONAL AGRICULTURE AND FORESTRY EXPERT TERMS OF REFERENCE

INTERNATIONAL AGRICULTURE AND FORESTRY EXPERT TERMS OF REFERENCE INTERNATIONAL AGRICULTURE AND FORESTRY EXPERT TERMS OF REFERENCE Country/Location: UNDP Office, Vientiane, Lao PDR Description of assignment: Short Term to develop the Environmental Impact Assessment Agriculture

More information

Constitutive Document Revised JAN 2017

Constitutive Document Revised JAN 2017 Constitutive Document Revised JAN 2017 Table of Contents Introduction... 2 Vision... 2 Objectives... 2 Membership... 3 Governance Structure... 5 I. Executive Committee.... 5 II. Secretariat... 6 III. Technical

More information

Basel Convention Regional Centre for Asia and the Pacific (BCRC China) and Its Regional Delivery

Basel Convention Regional Centre for Asia and the Pacific (BCRC China) and Its Regional Delivery Basel Convention Regional Centre for Asia and the Pacific (BCRC China) and Its Regional Delivery Lixia Zheng Basel Convention Regional Centre for Asia and the Pacific Stockholm Convention Regional Centre

More information

Asia and the Pacific Regional Coordinator

Asia and the Pacific Regional Coordinator Asia and the Pacific Regional Coordinator Consultant Job ID/Title : Scope of advertisement : Category (eligible applicants) : Brand : Practice Area : Additional Practice Area : Application Deadline : Type

More information

Terms of Reference. Consultancy for Third Party Monitor for the Aga Khan Development Network Health Action Plan for Afghanistan (HAPA)

Terms of Reference. Consultancy for Third Party Monitor for the Aga Khan Development Network Health Action Plan for Afghanistan (HAPA) Terms of Reference Consultancy for Third Party Monitor for the Aga Khan Development Network Health Action Plan for Afghanistan (HAPA) I. Purpose and Objectives of the Assignment Aga Khan Foundation Canada

More information

Guidelines for Completing the Grant Application Form

Guidelines for Completing the Grant Application Form Guidelines for Completing the Grant Application Form ESCAP Trust Fund for Tsunami, Disaster and Climate Preparedness in Indian Ocean and Southeast Asian Countries This document is intended to assist organizations

More information

PHEMAP Course Brochure. 11 th Inter-regional Course on Public Health and Emergency Management in Asia and the Pacific (PHEMAP-11)

PHEMAP Course Brochure. 11 th Inter-regional Course on Public Health and Emergency Management in Asia and the Pacific (PHEMAP-11) 11 th Inter-regional Course on Public Health and Emergency Management in Asia and the Pacific (PHEMAP-11) 19-30 September 2011 ADPC Thailand (exact venue to be announced) INTRODUCTION In 2001, ADPC in

More information

SUMMARY. CONTENTS I. Background.2 II. Decision and Recommendations of the Meeting 2 III. Summary of Proceedings 4 IV. Organization of the Meeting..

SUMMARY. CONTENTS I. Background.2 II. Decision and Recommendations of the Meeting 2 III. Summary of Proceedings 4 IV. Organization of the Meeting.. REPORT OF THE SECOND MEETING OF THE NETWORK FOR THE COORDINATION OF STATISTICAL TRAINING IN ASIA AND THE PACIFIC 4 March 2016 SIAP, 4 TH Floor JETRO-IDE Building, Chiba, Japan SUMMARY In March 2016, the

More information

Consulting Opportunity to Support In-Country Capacity Building Workshops on Declaration of Origin under AANZFTA [AANZ-0077-ROO-12]

Consulting Opportunity to Support In-Country Capacity Building Workshops on Declaration of Origin under AANZFTA [AANZ-0077-ROO-12] ASEAN-Australia-New Zealand Free Trade Area (AANZFTA) Economic Cooperation Support Programme (AECSP) Request for Proposal Consulting Opportunity to Support In-Country Capacity Building Workshops on Declaration

More information

IMPACT REPORTING AND ASSESSMENT OFFICER IN SOUTH SUDAN

IMPACT REPORTING AND ASSESSMENT OFFICER IN SOUTH SUDAN Terms of Reference IMPACT REPORTING AND ASSESSMENT OFFICER IN SOUTH SUDAN BACKGROUND ON IMPACT AND REACH REACH was born in 2010 as a joint initiative of two International NGOs (IMPACT Initiatives and ACTED)

More information

Children's Health and Environment INSTRUCTIONS FOR THE USE OF THE WHO TRAINING PACKAGE FOR THE HEALTH SECTOR

Children's Health and Environment INSTRUCTIONS FOR THE USE OF THE WHO TRAINING PACKAGE FOR THE HEALTH SECTOR Children's Health and Environment INSTRUCTIONS FOR THE USE OF THE WHO TRAINING PACKAGE FOR THE HEALTH SECTOR Interventions for Healthy Environments Public Health and Environment World Health Organization

More information

TERMS OF REFERENCE Mission No. 14INI104/2

TERMS OF REFERENCE Mission No. 14INI104/2 TERMS OF REFERENCE Mission No. 14INI104/2 I. General information Title of the expertise mission Component Issue(s) Beneficiaries Countries Support to SR selection process (review of applications) Malaria

More information

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS GEF ID: 4894 Country/Region: Regional (Indonesia, Cambodia, Lao PDR, Mongolia, Philippines, Thailand, Vietnam) Project

More information

Overview of REDD Project Cycle Richard McNally Pro Poor REDD Project Launch Pro Poor REDD, Dalat 12/01/2010

Overview of REDD Project Cycle Richard McNally Pro Poor REDD Project Launch Pro Poor REDD, Dalat 12/01/2010 Overview of REDD Project Cycle Richard McNally Pro Poor REDD Project Launch, Dalat 12/01/2010 Contents 1. REDD Projects? 2. Steps in the Project cycle 3. Some Key tasks 1. REDD Projects REDD viewed as

More information

Regional meeting on the Strategic Approach to International Chemicals Management

Regional meeting on the Strategic Approach to International Chemicals Management Distr.: General 18 January 2018 English only Regional meeting on the Strategic Approach to International Chemicals Management Update on the Special Programme to support institutional strengthening at the

More information

TERMS OF REFERENCE CONSULTANCY TO CONDUCT A TRAINING NEEDS ASSESSMENT ON HEALTHCARE WASTE MANAGMENT IN SELECTED HEALTH FACILITIES.

TERMS OF REFERENCE CONSULTANCY TO CONDUCT A TRAINING NEEDS ASSESSMENT ON HEALTHCARE WASTE MANAGMENT IN SELECTED HEALTH FACILITIES. TERMS OF REFERENCE CONSULTANCY TO CONDUCT A TRAINING NEEDS ASSESSMENT ON HEALTHCARE WASTE MANAGMENT IN SELECTED HEALTH FACILITIES. 1. Background Kenya has received a grant from the Global Environment Facility

More information

PRF SHORT TERM CONSULTANT FOR NTFP VALUE CHAIN / MARKET STUDY Terms of Reference

PRF SHORT TERM CONSULTANT FOR NTFP VALUE CHAIN / MARKET STUDY Terms of Reference PRF SHORT TERM CONSULTANT FOR NTFP VALUE CHAIN / MARKET STUDY Terms of Reference Project Name: The Poverty Reduction Fund Livelihood Opportunities and Nutrition Gains Number of positions: 1 Position: Consultant

More information

Towards a Regional Strategy and Action Plan for Forest and Landscape Restoration (FLR) in the Asia-Pacific

Towards a Regional Strategy and Action Plan for Forest and Landscape Restoration (FLR) in the Asia-Pacific Twelfth APFC Executive Committee Meeting 12-14 October 2016, Chiang Mai, Thailand Towards a Regional Strategy and Action Plan for Forest and Landscape Restoration (FLR) in the Asia-Pacific Patrick B. Durst

More information

Terms of Reference. International Consultant GEF Project Development Specialist

Terms of Reference. International Consultant GEF Project Development Specialist Antigua and Barbuda Department of Environment GEF/UNDP Medium Sized Project (MSP) Monitoring and assessment of MEA implementation and environmental trends in Antigua and Barbuda Terms of Reference International

More information

Youth Employment in ASEAN. Matthieu Cognac Youth Employment Ho Chi Minh, March 21, 2012

Youth Employment in ASEAN. Matthieu Cognac Youth Employment Ho Chi Minh, March 21, 2012 Youth Employment in ASEAN Matthieu Cognac Youth Employment Ho Chi Minh, March 21, 2012 Decent Work for All ASIAN DECENT WORK DECADE 2006-2015 Presentation Outline: Facts and figures Key Challenges Key

More information

STDF MEDIUM-TERM STRATEGY ( )

STDF MEDIUM-TERM STRATEGY ( ) STDF MEDIUM-TERM STRATEGY (2012-2016) 1. This Medium-Term Strategy sets outs the principles and strategic priorities that will guide the work of the Standards and Trade Development Facility (STDF) and

More information

The Environmentally Safe Disposal of Intellectual Property-Infringing Goods

The Environmentally Safe Disposal of Intellectual Property-Infringing Goods E ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC ASIA-PACIFIC RESEARCH AND TRAINING NETWORK ON TRADE UNITED NATIONS ENVIRONMENT PROGRAMME (UNEP) REGIONAL WORKSHOP WIPO-UN-ESCAP-UNEP/IP/BKK/13/INF/1

More information

The Toyota Foundation 2018 International Grant Program. Program Guidelines

The Toyota Foundation 2018 International Grant Program. Program Guidelines The Toyota Foundation 2018 International Grant Program Program Guidelines Cultivating Empathy Through Learning from Our Neighbors Practitioners Exchange on Common Issues in Asia Application Period April

More information

The GEF. Was established in October 1991 as a $1 billion pilot program in the World Bank

The GEF. Was established in October 1991 as a $1 billion pilot program in the World Bank www.gefweb.org www.thegef.org Introduction to the GEF and its 5 th Replenishment; The Importance of the Involvement of Ministries of Agriculture in GEF Projects Climate Change Workshop 19-21 November 2009

More information

Request for Proposal Date: November 10 th, 2015 Traffic Calming Guide Deadline: Monday, December 7 th, 2015 at 13:00 E.T.

Request for Proposal Date: November 10 th, 2015 Traffic Calming Guide Deadline: Monday, December 7 th, 2015 at 13:00 E.T. A SCOPE The Traffic Operations and Management Standing Committee (TOMSC) of TAC and the Canadian Institute of Transportation Engineers (CITE) is undertaking a joint project about traffic calming measures.

More information

Higher Degree by Research Confirmation of Candidature- Guidelines

Higher Degree by Research Confirmation of Candidature- Guidelines Higher Degree by Research Confirmation of Candidature- Guidelines Introduction These Guidelines document Faculty, School or discipline specific requirements that are in addition to the information provided

More information

PROGRAM FOR ENHANCEMENT OF EMERGENCY RESPONSE (PEER)

PROGRAM FOR ENHANCEMENT OF EMERGENCY RESPONSE (PEER) ASIAN DISASTER PREPAREDNESS CENTER US AID Project PROGRAM DESCRIPTION PROGRAM FOR ENHANCEMENT OF EMERGENCY RESPONSE (PEER) 1. BACKGROUND Past experience shows that well developed Search and Rescue (SAR)

More information

DRAFT GUIDANCE NOTE ON THE FRAMEWORK FOR FINANCIAL RESOURCE MOBILISATION FOR IMPLEMENTING THE STRATEGIC PLAN FOR THE BASEL CONVENTION

DRAFT GUIDANCE NOTE ON THE FRAMEWORK FOR FINANCIAL RESOURCE MOBILISATION FOR IMPLEMENTING THE STRATEGIC PLAN FOR THE BASEL CONVENTION BC Distr GENERAL UNEP/SBC/BUREAU/6/2/INF/4 9 October 2003 ENGLISH ONLY SECOND MEETING OF THE EXPANDED BUREAU OF THE SIXTH MEETING OF THE CONFERENCE OF THE PARTIES TO THE BASEL CONVENTION Geneva, 25 October

More information

United Nations/India Workshop

United Nations/India Workshop United Nations/India Workshop Use of Earth Observation Data in Disaster Management and Risk Reduction: Sharing the Asian Experience Organized by United Nations Office for Outer Space Affairs (UNOOSA) Indian

More information

SUMMARY REPORT OF THE 17 th ACCSQ MDPWG MEETING

SUMMARY REPORT OF THE 17 th ACCSQ MDPWG MEETING SUMMARY REPORT OF THE 17 th ACCSQ MDPWG MEETING INTRODUCTION 1) The 17 th Meeting of the Medical Device Product Working Group (MDPWG) was held on 25-26 April 2013 in Petaling Jaya, Malaysia. The Meeting

More information

Outputs of the ASEAN ESC Model Cities Programme

Outputs of the ASEAN ESC Model Cities Programme Outputs of the ASEAN ESC Model Cities Programme INTRODUCTION Plenary Session 1 3 rd High Level Seminar on Environmentally Sustainable Cities 6 th March 2012 Siem Reap, Cambodia Masnellyarti Hilman Chairperson

More information

Terms of Reference (TOR) for Independent End of Project Evaluation

Terms of Reference (TOR) for Independent End of Project Evaluation Terms of Reference (TOR) for Independent End of Project Evaluation Project Name Increasing the provision of clean energy in Uganda hereafter referred to as Clean Energy Project Project Number(s) ESARPO0218;

More information

The undertaking involves 4 NGOs/CSOs under separate contract as follows:

The undertaking involves 4 NGOs/CSOs under separate contract as follows: TERMS OF REFERENCE FOR STRENGTHENING PARTICIPATORY STRUCTURES AND CONDUCTING CAPACITY BUILDING TRAININGS TO ENHANCE STAKEHOLDER ENGAGEMENT FOR UGANDA S NATIONAL REDD+ PROGRAMME IN CENTRAL, MID-EASTERN

More information

Vacancy Announcement. National Project Officer, Grassroots Capacity Building for REDD+ RECOFTC, Myanmar Country Program

Vacancy Announcement. National Project Officer, Grassroots Capacity Building for REDD+ RECOFTC, Myanmar Country Program Vacancy Announcement National Project Officer, Grassroots Capacity Building for REDD+ RECOFTC, Myanmar Country Program Application deadline: 2 nd November 2014 Background RECOFTC The Center for People

More information

Update of the Work plan on international activities 2012

Update of the Work plan on international activities 2012 Helsinki, 15 December 2011 Doc.: MB/57/2011 final Update of the Work plan on international activities 2012 (Document endorsed by the Management Board) WORK PLAN FOR INTERNATIONAL ACTIVITIES OF ECHA 2012

More information

UNICEF LAO PDR TERMS OF REFERENCE OF NATIONAL CONSULTANT (NOC) COMMUNICATION FOR DEVELOPMENT (C4D) IN IMPROVING ROUTINE IMMUNIZATION

UNICEF LAO PDR TERMS OF REFERENCE OF NATIONAL CONSULTANT (NOC) COMMUNICATION FOR DEVELOPMENT (C4D) IN IMPROVING ROUTINE IMMUNIZATION UNICEF LAO PDR TERMS OF REFERENCE OF NATIONAL CONSULTANT (NOC) COMMUNICATION FOR DEVELOPMENT (C4D) IN IMPROVING ROUTINE IMMUNIZATION UNICEF H&NH Outcome: UNICEF H&N OP #: 3 UNICEF Work Plan Activity: Objective:

More information

Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants

Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants Table of Contents INTRODUCTION... 1 1. Who can apply for STDF funding?... 1 2. What type of

More information

UNFCCC Capacity Building Activities on National Greenhouse Gas Inventories of non-annex I Parties

UNFCCC Capacity Building Activities on National Greenhouse Gas Inventories of non-annex I Parties UNFCCC Capacity Building Activities on National Greenhouse Gas Inventories of non-annex I Parties Mr. Dominique Revet (DRevet@unfccc.int) Programme Officer UNFCCC secretariat, Financial and Technical Support

More information

Phnom Penh, Cambodia preferred, but work can be done remotely. Location : Application Deadline : July 20 th, Languages Required : English

Phnom Penh, Cambodia preferred, but work can be done remotely. Location : Application Deadline : July 20 th, Languages Required : English Consultancy to prepare a Funding Proposal draft for the Project Climate-Smart Landscapes Network to mitigate and adapt to climate change impacts in Cambodia. for the Green Climate Fund Location : Phnom

More information

SGP. Small Grants Programme (GEF SGP) Global Environment Facility SOUTH AFRICA. implemented by United Nations Development Programme (UNDP)

SGP. Small Grants Programme (GEF SGP) Global Environment Facility SOUTH AFRICA. implemented by United Nations Development Programme (UNDP) Global Environment Facility Small Grants Programme (GEF SGP) implemented by United Nations Development Programme (UNDP) SGP environmental affairs Department: Environmental Affairs SOUTH AFRICA Community

More information

ASEAN REGIONAL FORUM (ARF) NON-PROLIFERATION AND DISARMAMENT (NPD) WORK PLAN

ASEAN REGIONAL FORUM (ARF) NON-PROLIFERATION AND DISARMAMENT (NPD) WORK PLAN ASEAN REGIONAL FORUM (ARF) NON-PROLIFERATION AND DISARMAMENT (NPD) WORK PLAN Context: Participants in the ASEAN Regional Forum (ARF) have indicated the desire to advance the focus of the organization beyond

More information

EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME

EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME 2001-2002 EUROPEAN AGENCY FOR SAFETY AND HEALTH AT WORK EXECUTIVE SUMMARY IDOM Ingeniería y Consultoría S.A.

More information

SOLICITATION FOR PROPOSALS: Website design and content creation

SOLICITATION FOR PROPOSALS: Website design and content creation National Estuary Program Puget Sound Marine and Nearshore Grant Program SOLICITATION FOR PROPOSALS: Website design and content creation December 1, 2014 WEBSITE DESIGN AND CONTENT CREATION SOLICITATION

More information

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION TERMS OF REFERENCE FOR PERSONNEL UNDER INDIVIDUAL SERVICE AGREEMENT (ISA)

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION TERMS OF REFERENCE FOR PERSONNEL UNDER INDIVIDUAL SERVICE AGREEMENT (ISA) UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION TERMS OF REFERENCE FOR PERSONNEL UNDER INDIVIDUAL SERVICE AGREEMENT (ISA) Title: Project: Main Duty Station and Location: Mission/s to: Start of Contract

More information

Organized in cooperation with the Nuclear Energy Agency of the Organisation for Economic Co-operation and Development (OECD/NEA)

Organized in cooperation with the Nuclear Energy Agency of the Organisation for Economic Co-operation and Development (OECD/NEA) International Experts Meeting on Strengthening Research and Development Effectiveness in the Light of the Accident at the Fukushima Daiichi Nuclear Power Plant Organized in cooperation with the Nuclear

More information

Terms of Reference for end of project evaluation

Terms of Reference for end of project evaluation Terms of Reference for end of project evaluation Young Entrepreneurs Program in the Eastern Caribbean (YEPEC), 2012 2015 Youth Business International (YBI) seeks the services of a skilled evaluation consultant

More information

TERMS OF REFERENCE. One year with possible extension. Based in Hanoi with frequent travel to Mekong Delta or based in Can Tho

TERMS OF REFERENCE. One year with possible extension. Based in Hanoi with frequent travel to Mekong Delta or based in Can Tho TERMS OF REFERENCE WWF-Greater Mekong WWF-Vietnam Position title: Reports to: Supervises: Senior project Officer, Aquaculture Program Coordinator, Aquaculture Local consultants as required Starting Date:

More information

Demonstration of BAT/BEP in fossil fuel-fired utilities and industrial boilers in response to the Stockholm Convention on POPs

Demonstration of BAT/BEP in fossil fuel-fired utilities and industrial boilers in response to the Stockholm Convention on POPs Independent terminal evaluation Demonstration of BAT/BEP in fossil fuel-fired utilities and industrial boilers in response to the Stockholm Convention on POPs UNIDO Project number: GF/RAS/10/003 UNIDO

More information

Workshop of APEC Nearly /Net Zero Energy Building Roadmap responding to COP21

Workshop of APEC Nearly /Net Zero Energy Building Roadmap responding to COP21 GENERAL INFORMATION CIRCULAR Workshop of APEC Nearly /Net Zero Energy Building Roadmap responding to COP21 4-6 September 2017 Honolulu, United States Organizer: China Academy of Building Research Event

More information

Mainstreaming Low Carbon Path in the Transport Sector in the National and Local Levels

Mainstreaming Low Carbon Path in the Transport Sector in the National and Local Levels Mainstreaming Low Carbon Path in the Transport Sector in the National and Local Levels By: ANNELI R. LONTOC (Undersecretary, Department of Transportation and Communications) Research Fellow/ Lecturer,

More information

Stockholm Convention on Persistent Organic Pollutants

Stockholm Convention on Persistent Organic Pollutants UNITED NATIONS SC UNEP/POPS/COP.7/INF/33 Stockholm Convention on Persistent Organic Pollutants Distr.: General 20 January 2015 English only Conference of the Parties to the Stockholm Convention on Persistent

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT POST TITLE: AGENCY/PROJECT NAME: COUNTRY OF ASSIGNMENT: Senior Coordinator on Inclusive Wildlife-based Management for the Buffer Zone and Protected areas of the

More information

Charities Partnership and Outreach Program. Funding Guide and Application

Charities Partnership and Outreach Program. Funding Guide and Application Funding Guide and Application Please Read This Guide Carefully Before Preparing Your Funding Application RC4411(E) Rev 09 Table of Contents Introduction Funding Eligibility Objectives of the Current funding

More information

FEDERAL MINISTRY OF HEALTH NATIONAL TUBERCULOSIS AND LEPROSY CONTROL PROGRAMME TERMS OF REFERENCE FOR ZONAL CONSULTANTS MARCH, 2017

FEDERAL MINISTRY OF HEALTH NATIONAL TUBERCULOSIS AND LEPROSY CONTROL PROGRAMME TERMS OF REFERENCE FOR ZONAL CONSULTANTS MARCH, 2017 FEDERAL MINISTRY OF HEALTH NATIONAL TUBERCULOSIS AND LEPROSY CONTROL PROGRAMME EPIDEMIOLOGICAL ANALYSIS OF TUBERCULOSIS BURDEN AT NATIONAL AND SUB NATIONAL LEVEL (EPI ANALYSIS SURVEY) TERMS OF REFERENCE

More information

Toolbox for the collection and use of OSH data

Toolbox for the collection and use of OSH data 20% 20% 20% 20% 20% 45% 71% 57% 24% 37% 42% 23% 16% 11% 8% 50% 62% 54% 67% 73% 25% 100% 0% 13% 31% 45% 77% 50% 70% 30% 42% 23% 16% 11% 8% Toolbox for the collection and use of OSH data 70% These documents

More information

PACA Pilot Country Activities Progress Report

PACA Pilot Country Activities Progress Report PACA Pilot Country Activities Progress Report In 2013, PACA developed its ten year strategy (2013 2022), with input from over 100 stakeholders from agriculture, health, and trade sectors and from across

More information

Consultancy to Develop the Model Guidelines for Child-Centred Emergency and Disaster Risk Management in Caribbean Schools and Adaptation Guide

Consultancy to Develop the Model Guidelines for Child-Centred Emergency and Disaster Risk Management in Caribbean Schools and Adaptation Guide 1 The Caribbean Disaster Emergency Management Agency REQUEST FOR PROPOSALS RFP #: UNICEF/9070/17 Consultancy to Develop the Model Guidelines for Child-Centred Emergency and Disaster Risk Management in

More information

GUIDELINES FOR THE IMPLEMENTATION OF THE PUBLIC INVOLVEMENT POLICY

GUIDELINES FOR THE IMPLEMENTATION OF THE PUBLIC INVOLVEMENT POLICY GEF Council Meeting October 28 30, 2014 Washington, D.C. GEF/C.47/Inf.06 October 01, 2014 GUIDELINES FOR THE IMPLEMENTATION OF THE PUBLIC INVOLVEMENT POLICY TABLE OF CONTENTS Introduction... 1 Objectives

More information

Guidelines for Master of Public Health Field Practice

Guidelines for Master of Public Health Field Practice Guidelines for Master of Public Health Field Practice MPH Concentrations include: Community Health Education (CHE) Health Policy and Management (HPM) Veterinary Public Health (VPH) Department of Public

More information

INTRODUCTION. I.1 Background I-1

INTRODUCTION. I.1 Background I-1 INTRODUCTION I.1 Background Due to their climatic environment and geological property, disaster risk in ASEAN area is high and it bring number of disasters to ASEAN countries. Approximately 90% of victims

More information

The projects interventions will be implemented at national level, as well as at local level commune/city.

The projects interventions will be implemented at national level, as well as at local level commune/city. 1. Background ROMANIA Integrated Nutrient Pollution Control Project (INPCP) Terms of Reference for Consulting services for ex-ante, mid-term and final impact assessment, including social surveys Romania

More information

FIFTH ASEAN STATE OF THE ENVIRONMENT REPORT

FIFTH ASEAN STATE OF THE ENVIRONMENT REPORT ASEAN SECRETARIAT FIFTH ASEAN STATE OF THE ENVIRONMENT REPORT PROPOSAL MUST BE RECEIVED BY Tuesday, 2 August 2016 before 12.00 PM DELIVER/MAIL PROPOSAL TO: ASEAN Secretariat Jl. Sisingamangaraja 70A Jakarta

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: Energy Efficiency Project Development Specialist Project Name : Advancing Indonesia s Lighting Market to High Efficient Technologies (ADLIGHT) Reports to:

More information

Governance and Implementation Mechanisms of ASEAN Post-2015 Health Development Agenda

Governance and Implementation Mechanisms of ASEAN Post-2015 Health Development Agenda Governance and Implementation Mechanisms of ASEAN Post-2015 Development Agenda 1 Overview In light of the ASEAN Community 2015 and the global post 2015 development, several health and social challenges

More information

Call for Proposals: Development of Teaching Resources for LINC Level 5-7

Call for Proposals: Development of Teaching Resources for LINC Level 5-7 Call for Proposals: Development of Teaching Resources for LINC Level 5-7 Issued by: Citizenship and Immigration Canada, Settlement and Intergovernmental Affairs Directorate, Ontario Region Purpose The

More information

Global Strategy IMPROVING AG-STATISTICS IN ASIA PACIFIC

Global Strategy IMPROVING AG-STATISTICS IN ASIA PACIFIC Global Strategy IMPROVING AG-STATISTICS IN ASIA PACIFIC Implementation of the Global Strategy to Improve Agricultural and Rural Statistics in Asia and the Pacific Reports from Implementing Partners on

More information

Call for Expression of Interest

Call for Expression of Interest Call for Expression of Interest Post Title: Expert Duty Station: Home-based Reference: UNWTO/HHRR/CFE/14/RPAP/2018 Start Date: As soon as possible Department: Regional Department for Asia and the Pacific

More information

Oil Spill Preparedness Regional Initiative Caspian Sea Black Sea Central Eurasia

Oil Spill Preparedness Regional Initiative Caspian Sea Black Sea Central Eurasia OSPRI Annual Report 2016 Oil Spill Preparedness Regional Initiative Caspian Sea Black Sea Central Eurasia Promoting Proven, Credible, Integrated and Sustainable Oil Spill Response Capability An Initiative

More information

SOCIAL AND SUSTAINABILITY SCIENCES IN THE ASEAN COMMUNITY: A Regional Research Symposium and Academic Policy Dialogue

SOCIAL AND SUSTAINABILITY SCIENCES IN THE ASEAN COMMUNITY: A Regional Research Symposium and Academic Policy Dialogue SOCIAL AND SUSTAINABILITY SCIENCES IN THE ASEAN COMMUNITY: A Regional Research Symposium and Academic Policy Dialogue (19-21 August 2015) Chulalongkorn University, Bangkok, THAILAND CALL FOR PAPERS (Extended

More information

Economic and Social Council

Economic and Social Council United Nations E/CN.3/2016/13 Economic and Social Council Distr.: General 18 December 2015 Original: English Statistical Commission Forty-seventh session 8-11 March 2016 Item 3 (i) of the provisional agenda*

More information

February Report of the GEF to the FIFTH Meeting of the Conference of the Parties to the Stockholm Convention on Persistent Organic Pollutants

February Report of the GEF to the FIFTH Meeting of the Conference of the Parties to the Stockholm Convention on Persistent Organic Pollutants February 2011 Report of the GEF to the FIFTH Meeting of the Conference of the Parties to the Stockholm Convention on Persistent Organic Pollutants 1 Table of Contents ABREVIATIONS AND ACRYNYMS... 3 EXECUTIVE

More information

Report on EIA twinning project between Lao PDR and Japan

Report on EIA twinning project between Lao PDR and Japan Report on EIA twinning project between Lao PDR and Japan TA 7566-REG: Strengthening and Use of Country Safeguards System: Sub-project: EIA Clearinghouse and Capacity Strengthening through Twinning Consultation

More information

TERMS OF REFERENCE RWANDA LESSONS LEARNED ON DISASTER RECOVERY

TERMS OF REFERENCE RWANDA LESSONS LEARNED ON DISASTER RECOVERY TERMS OF REFERENCE RWANDA LESSONS LEARNED ON DISASTER RECOVERY Job Title: Category: Duty Station: Type of contract: Expected starting date: Duration of assignment: Individual Consultancy Communications

More information

Building a Blue Economy Through ICM

Building a Blue Economy Through ICM 2015/SOM2/OFWG/015 Agenda Item: IX B Building a Blue Economy Through ICM Purpose: Information Submitted by: PEMSEA 5 th Oceans and Fisheries Working Group Meeting Boracay, Philippines 10-12 May 2015 Building

More information

2 June in annex I to. the meeting. summary of. Convention. conferences. individual letters. Yours sincerely, Rolph Payet.

2 June in annex I to. the meeting. summary of. Convention. conferences. individual letters. Yours sincerely, Rolph Payet. STOCKHOLM CONVENTION Secretariat of the Stockholm Convention United Nations Environment Programme International Environment House 1, 11 13, Chemin des Anémones, CH 1219 Châtelaine, Geneva, Switzerland

More information

IMCI at the Referral Level: Hospital IMCI

IMCI at the Referral Level: Hospital IMCI Integrated Management of Childhood Illness (IMCI) Implementation in the Western Pacific Region IMCI at the Referral Level: Hospital IMCI 6 IMCI at the Referral Level: Hospital IMCI Hospital referral care:

More information

This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.

This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. Technical Assistance Report Project Number: 51336-001 Knowledge and Support Technical Assistance (KSTA) February 2018 Capacity Building Support for Asia-Pacific Economic Cooperation Financial Regulators

More information

Concept Paper. I. Background

Concept Paper. I. Background Future Farmers Forum 31 August - 2 September 2017, Thailand Venue: Chonburi, Thailand Hosted by the Office of the Vocational Education Commission, Ministry of Education, Thailand Concept Paper I. Background

More information

IFCS CHAMPION. Children and Chemical Safety. Report on Activities. May 2006

IFCS CHAMPION. Children and Chemical Safety. Report on Activities. May 2006 Website: http://www.who.int/ifcs/documents/forums/forum4/children/en/index.html IFCS CHAMPION Children and Chemical Safety Report on Activities May 2006 The primary objective of the activities of the IFCS

More information

Economic and Social Council

Economic and Social Council United Nations E/ESCAP/CICT(3)/5 Economic and Social Council Distr.: General 23 October 2012 Original: English Economic and Social Commission for Asia and the Pacific Committee on Information and Communications

More information

Horizon 2020 Proposal Development Training Course

Horizon 2020 Proposal Development Training Course Horizon 2020 Proposal Development Training Course Focus: Impact Research Council of Norway Horizon 2020 Proposal Development Training Course Focus: Impact AGENDA DAY 1 08:30 09:00 Registration 09:00 09:15

More information

URBACT III Programme Manual

URBACT III Programme Manual URBACT III Programme Manual Fact Sheet 2B Implementation Networks Table of contents Fact Sheet 2B 1. Main objectives and expected results... 1 2. Network s development... 3 3. Partnership... 4 4. Activities

More information

MOBILE ASSET DATA COLLECTION. Pavement Condition Index Ground Penetrating Radar Deflection Testing. Contact Information:

MOBILE ASSET DATA COLLECTION. Pavement Condition Index Ground Penetrating Radar Deflection Testing. Contact Information: City of Mercer Island MOBILE ASSET DATA COLLECTION: Pavement Condition Index Ground Penetrating Radar Deflection Testing Contact Information: Leah Llamas, GIS Analyst The City of Mercer Island 9611 SE

More information

DRAFT INSARAG AP Strategy and Workplan for Proposed Actions:

DRAFT INSARAG AP Strategy and Workplan for Proposed Actions: Annex D DRAFT INSARAG AP Strategy and Workplan for 2018 - Proposed Actions: GOAL 1(Facilitated by Japan, Australia, Sam and Olga-OCHA) : Objective Action Plan Asia-Pacific Regional Actions Objective 1.1:

More information

Terms of reference for the external evaluation of the LINKS project

Terms of reference for the external evaluation of the LINKS project Terms of reference for the external evaluation of the LINKS project Paris, the 23 rd of February 2017 1. Introduction The Foundation La main à la pâte aims at improving the quality of science and technology

More information

HEALTH EMERGENCY MANAGEMENT CAPACITY

HEALTH EMERGENCY MANAGEMENT CAPACITY Module 3 HEALTH EMERGENCY MANAGEMENT CAPACITY INTER-REGIONAL TRAINING COURSE ON PUBLIC HEALTH AND EMERGENCY MANAGEMENT IN ASIA AND THE PACIFIC Learning Objectives By the end of this module, the participant

More information

Information Meeting. for the Regional Capacity Building Strategy and Associated Programmes in Asia and the Pacific Region

Information Meeting. for the Regional Capacity Building Strategy and Associated Programmes in Asia and the Pacific Region Information Meeting for the Regional Capacity Building Strategy and Associated Programmes in Asia and the Pacific Region World Heritage Institute of Training and Research for the Asia and the Pacific Region

More information

Format for the preparation of Final reports

Format for the preparation of Final reports CONVENTION ON WETLANDS (Ramsar, Iran, 1971) Rue Mauverney 28, CH-1196 Gland, Switzerland Tel. +41-22-999-0170, Fax +41-22-999-0169 E-mail: ramsar@ramsar.org - Web: www.ramsar.org/ Format for the preparation

More information

TERMS OF REFERENCE Individual Contractor. National Consultant Post Disaster Needs Assessment in Cambodia

TERMS OF REFERENCE Individual Contractor. National Consultant Post Disaster Needs Assessment in Cambodia TERMS OF REFERENCE Individual Contractor 1. Project Information Assignment Title Organization Post Level Cluster/Project Duty Station Duration National Consultant Post Disaster Needs Assessment in Cambodia

More information

Progress of Expert Working Group on ESM (EWG)

Progress of Expert Working Group on ESM (EWG) Workshop 2016 of the Asian Network for Prevention of Illegal Transboundary Movement of Hazardous Wastes 6-8 September 2016, Semarang, Indonesia Progress of Expert Working Group on ESM (EWG) Michikazu Kojima

More information

Integra. International Corporate Capabilities th Street NW, Suite 555W, Washington, DC, Tel (202)

Integra. International Corporate Capabilities th Street NW, Suite 555W, Washington, DC, Tel (202) Integra International Corporate Capabilities 1030 15th Street NW, Suite 555W, Washington, DC, 20005 Tel (202) 898-4110 www.integrallc.com Integra is an international development firm with a fresh and modern

More information

Measures to facilitate the implementation of small-scale afforestation and reforestation project activities under the clean development mechanism

Measures to facilitate the implementation of small-scale afforestation and reforestation project activities under the clean development mechanism UNITED NATIONS NATIONS UNIES FRAMEWORK CONVENTION ON CLIMATE CHANGE - Secretariat CONVENTION - CADRE SUR LES CHANGEMENTS CLIMATIQUES - Secrétariat FCCC/WEB/2004/1 7 April 2004 Methodological issues Small-scale

More information

5-3. Promoting Cooperation with Member Countries, International Organizations and NGOs

5-3. Promoting Cooperation with Member Countries, International Organizations and NGOs 5-3. Promoting Cooperation with Member Countries, International Organizations and NGOs 5-3-1. Establishing a Regional Network in Asia The ADRC places high priority on the development of institutional and

More information

United Nations Children s Fund (UNICEF)

United Nations Children s Fund (UNICEF) United Nations Children s Fund (UNICEF) Consultant: Design the Child Protection Pagoda Programme, Training Manual and Operational Plan for the Ministry of Cults and Religion Terms of Reference 1. Background

More information

ASEAN Mutual Recognition Arrangement on Medical Practitioners

ASEAN Mutual Recognition Arrangement on Medical Practitioners ASEAN Mutual Recognition Arrangement on Medical Practitioners PREAMBLE The Governments of Brunei Darussalam, the Kingdom of Cambodia, the Republic of Indonesia, Lao People s Democratic Republic, Malaysia,

More information

OED Evaluation of World Bank Support of Regional Programs

OED Evaluation of World Bank Support of Regional Programs OED Evaluation of World Bank Support of Regional Programs Approach Paper I. Introduction 1. The need to promote increased trade, prevent the spread of HIV/AIDS, and ensure adequate water resources are

More information