1 IH 30 HOV/Managed Lanes and President George Bush Turnpike (PGBT) EE Revenue Projections (FY 2011-FY 2035) FISCAL YEAR IH 30 THROUGH FINANCE REPAYMENT IH 30 HOV/Managed Lanes Pass Through Finance & Excess Revenue Schedule 1 MANAGED LANE REVENUE (Baseline Assumption) MAINTENANCE & OPERATION COSTS 2 MANAGED LANE REVENUE NET TOTAL 4 MANAGED LANE CUMULATIVE TOTAL IH 30 REPAYMENT CUMULATIVE TOTAL CUMULATIVE TOTAL 5 President George Bush Turnpike (PGBT) Eastern Extension Revenue Sharing Schedule 6 FISCAL YEAR ANNUAL REVENUE (Gross Toll Receipts) TXDOT/NCTCOG ANNUAL REVENUE (20% of Annual Revenue) CUMULATIVE TOTAL $1,788,800 $357,760 $357, $22,843,100 $4,568,620 $4,926, $1,578,350 $3,534,130 -$3,534,130 -$3,534,130 $1,578,350 -$1,955, $25,775,600 $5,155,120 $10,081, $4,735,050 $6,963,000 $3,675,495 $3,287,505 -$246,625 $6,313,400 $6,066, $28,919,000 $5,783,800 $15,865, $4,735,050 $4,711,000 $3,822,515 $888,485 $641,860 $11,048,450 $11,690, $38,618,100 $7,723,620 $23,588, $4,735,050 $5,788,000 $3,975,416 $1,812,584 $2,454,444 $15,783,500 $18,237, $44,212,100 $8,842,420 $32,431, $4,735,050 $6,681,000 $4,134,432 $2,546,568 $5,001,012 $20,518,550 $25,519, $45,491,200 $9,098,240 $41,529, $4,735,050 $7,745,000 $4,299,810 $3,445,190 $8,446,202 $25,253,600 $33,699, $46,741,400 $9,348,280 $50,877, $4,735,050 $8,747,000 $4,471,802 $4,275,198 $12,721,401 $29,988,650 $42,710, $47,957,200 $9,591,440 $60,469, $4,735,050 $9,976,000 $4,650,674 $5,325,326 $18,046,727 $34,723,700 $52,770, $58,082,300 $11,616,460 $72,085, $4,735,050 $11,148,000 $4,836,701 $6,311,299 $24,358,026 $39,458,750 $63,816, $59,831,800 $11,966,360 $84,052, $4,735,050 $12,562,000 $5,030,169 $7,531,831 $31,889,857 $44,193,800 $76,083, $61,635,000 $12,327,000 $96,379, $4,735,050 $13,946,000 $5,231,376 $8,714,624 $40,604,481 $48,928,850 $89,533, $63,493,300 $12,698,700 $109,077, $4,735,050 $15,613,000 $5,440,631 $10,172,369 $50,776,850 $53,663,900 $104,440, $65,409,000 $13,081,800 $122,159, $4,735,050 $15,505,000 $5,658,256 $9,846,744 $60,623,594 $58,398,950 $119,022, $89,580,800 $17,916,160 $140,075, $4,735,050 $16,820,000 $5,884,586 $10,935,414 $71,559,008 $63,134,000 $134,693, $91,306,200 $18,261,240 $158,337, $18,259,000 $6,119,970 $12,139,030 $83,698,038 $146,832, $93,064,800 $18,612,960 $176,949, $19,821,000 $6,364,768 $13,456,232 $97,154,270 $160,288, $94,857,400 $18,971,480 $195,921, $21,510,000 $6,619,359 $14,890,641 $112,044,911 $175,178, $96,684,600 $19,336,920 $215,258, $23,343,000 $6,884,134 $16,458,866 $128,503,777 $191,637, $116,182,800 $23,236,360 $238,494, $25,368,000 $7,159,499 $18,208,501 $146,712,278 $209,846, $118,419,600 $23,683,920 $262,178, $27,545,000 $7,445,879 $20,099,121 $166,811,399 $229,945, $120,699,500 $24,139,900 $286,318, $29,992,000 $7,743,714 $22,248,286 $189,059,685 $252,193, $123,023,300 $24,604,660 $310,923, $32,530,000 $8,053,463 $24,476,537 $213,536,223 $276,670, $125,392,100 $25,078,420 $336,001, $35,044,000 $8,375,601 $26,668,399 $240,204,621 $303,338, $149,213,100 $29,842,620 $365,844,260 1 Source of data is the draft "Traffic and Revenue Refresh Study: IH 30 (Tom Landry Highway from Duncan Perry Road to Beckley Avenue)" submitted to TxDOT by Wilbur Smith and Associates on December 22, Managed lane excess revenue payments begin one year after project opens to traffic (FY 2014) 3 Assumes 4% Annual Inflation Rate for Maintenance and Operation Costs 6 Source of data is the "Investment Grade Traffic and Toll Revenue Study - President George Bush Turnpike Eastern Extension" by Wilbur Smith Associates dated August Repayment of PGBT EE loan finalized in FY 2025; Revenue sharing with all counties begins at that point 4 Includes managed lane revenue after maintenance and operation costs. 5 Includes the managed lane net revenue total and the IH 30 Pass Through Finance repayment. Source: North Central Texas Council of Governments 1

2 SH 161 Regional Toll Revenue (RTR) Funding Distribution by County 1 January 2011 Sum of Transaction Values Percentage of Total Transactions 5 Tarrant County Revenue ($2.4M) Sent to Eastern Subregion 6 Prorated Share of Revenue Added from Tarrant County 7 County NTTA TollTag 2 NTTA Cash 3 TxTag Transactions 4 Original Share of $50 M Total Share of $50M Collin $9,848,431 $283,820 $198,293 $10,330, % $18,074,175 $947,484 $19,021,658 Dallas $8,901,602 $496,120 $185,796 $9,583, % $16,767,186 $878,969 $17,646,155 Denton $5,203,378 $227,486 $185,104 $5,615, % $9,825,618 $515,078 $10,340,696 Ellis $109,326 $16,674 $5,911 $131, % $230,789 $12,098 $242,888 Hood $10,874 $3,983 $2,115 $16, % $29,694 $29,694 Hunt $57,253 $13,621 $2,779 $73, % $128,861 $6,755 $135,616 Johnson $37,402 11,496 $7,959 $56, % $99,476 $99,476 Kaufman $74,818 $9,029 $3,405 $87, % $152,654 $8,002 $160,657 Parker $26,577 10,249 $3,384 $40, % $70,351 $70,351 Rockwall $313,846 $23,383 $7,459 $344, % $603,062 $31,614 $634,675 Tarrant $1,824,131 $314,325 $131,824 $2,270, % $3,972,050 $2,400,000 $1,572,050 Wise $18,025 $5,862 $2,453 $26, % $46,084 $46,084 $26,425,662 $1,416,048 $736,482 $28,578, % $50,000,000 $2,400,000 $2,400,000 $50,000,000 Notes: 1 The value of toll transactions is determined using the total toll transactions in January NTTA provided county allocation of TollTag transactions in January NTTA provided cash transaction values at toll gantries in January 2010; NCTCOG provided county allocation using data from the Regional Travel Demand Model. 4 TxDOT provided county allocation of TxTag transactions for January These percentages will be used to allocate excess toll revenue from the SH 161 Excess Revenue payment. 6 Per RTC action on February 11, 2010, Tarrant County sends $2.4 M to the Eastern Subregion as part of the SH 161/Southwest Parkway agreement. 7 Prorated share of revenue added to the Eastern Subregion from Tarrant County is determined using the Percentage of Total Transcations (not including Tarrant

3 Cost Savings on Existing Projects COUNTY January 2011 AGENCY TIP CODE CSJ FACILITY/ PROJECT NAME LIMITS FEDERAL STATE REGIONAL LOCAL TOTAL AMOUNT COST SAVINGS NOTES/COMMENTS COUNTY/COST SAVINGS DESOTO LANCASTER LINK FROM MURPHY PARK TO IH 35E $335,445 $285,750 $621,195 $335,445 CANCEL PROJECT DUE TO INACTIVITY TXDOT SPUR 348 AT NEWKIRK $320,000 $80,000 $400,000 $320,000 CANCEL PROJECT PER TXDOT TXDOT IH 30 FROM IH 35E TO TARRANT/ COUNTY LINE $327,863 $81,966 $409,829 $189,036 LOW BID $138,827; REDUCE CMAQ 1 DFW AIRPORT DFW AIRPORT ALTERNATIVE FUEL CONVERSION $2,200,000 $550,000 $2,750,000 $2,200,000 CANCEL PROJECT PER DFW AIRPORT TOTAL COST SAVINGS - CMAQ $3,183,308 $80,000 $917,716 $4,181,024 $3,044,481 TXDOT-/ IH 20 AT SPUR 408 AND CLARK ROAD $3,525,192 $881,298 $3,200,000 $7,606,490 $3,200,000 REDUCE COST BY $3.2M IN RTR - CONGRESSIONAL STILL COVER PROJECT TXDOT-/ GRAND PRAIRIE BELT LINE ROAD AT IH 20 EB FR & TO BELT LINE RD AT IH 20 WB FR $540,346 $135,087 $3,700,000 $4,375,433 $2,118,456 $1,918,456 REDUCE RTR BY $2,118,456 $1,918,456; PROJECT BID FOR ($2,051,798 1 ); MOVE $200K FROM PE TO CONSTRUCTION PHASE TXDOT-/ IRVING SH 183 FROM EAST OF STORY RD TO WEST OF O'CONNER RD $9,000,000 $9,000,000 $4,042,312 $3,546,544 LOW BID $4,957,688; REDUCE RTR 1 TXDOT SPUR 348 AT LAS COLINAS $13,150,000 $13,150,000 $8,000,000 $5,150,000 $2,550,000 LEAVE $8M IN THE PROJECT AND REMOVE THE REST - PER TXDOT TOTAL COST SAVINGS - RTR $4,065,538 $1,016,385 $29,050,000 $34,131,923 $8,000,000 $11,215,000 Note: 1 reduced on project, however, staff proposes to leave enough funding to cover the low bid plus 5-10% for contingencies/change orders Source: North Central Texas Council of Governments 1

4 Cost Savings on Existing Projects COUNTY January 2011 AGENCY TIP CODE CSJ FACILITY/ PROJECT NAME LIMITS FEDERAL STATE REGIONAL LOCAL TOTAL AMOUNT COST SAVINGS NOTES/COMMENTS COUNTY/COST SAVINGS CO IH 635 FROM SKILLMAN TO MILLER $899,891 $224,973 $5,900,000 $7,024,864 $899,891 NO LONGER AN ACTIVE TXDOT PROJECT. COUNTY REPROGRAMMED FOR PROPOSED NEARBY, LBJ GATEWAY PROJECT AT SKILLMAN ST & AUDELIA RD; DELETE PROJECT TXDOT-/ MEDICAL DISTRICT DRIVE FROM HARRY HINES TO MAPLE AVENUE $4,149,600 $1,037,400 $5,187,000 $4,149,600 $2,068,422 LOW BID $2,601,473 1 ; REDUCE TXDOT-/ LOOP 12 FROM US 175/CF HAWN FREEWAY TO N OF LAKE JUNE ROAD $3,240,903 $1,260,226 $4,501,129 $3,240,903 CANCEL PROJECT PER CITY OF & TXDOT TXDOT-/ BELT LINE ROAD AT SH 289 (PRESTON ROAD) $785,400 $196,350 $981,750 $785,400 CANCEL PROJECT PER CITY OF & TXDOT RR RELIABILITY PARTNERSHIP PROGRAM - N /DART RR CROSSINGS 10 INTERSECTIONS AT DART RR INCLUDING MCCALLUM, CAMPBELL RD, DAVENPORT (EAST-WEST PORTION), HILLCREST, COIT, KNOLL TRAIL DR, MEANDERING WAY, DAVENPORT (NORTH-SOUTH PORTION), DICKERSON, & PKWY AT DART $1,244,000 $1,656,000 $2,900,000 $1,244,000 CANCEL PROJECT PER CITY OF TXDOT IH 635 AT ROYAL LANE $2,400,000 $600,000 $3,000,000 $2,400,000 CANCEL PROJECT PER TXDOT TXDOT- FROM.087M EAST OF ROCHELLE TO SH 114 $300,000 $75, M W OF TOM BRANIFF $375,000 $300,000 CANCEL PROJECT PER TXDOT TXDOT VALLEY VIEW/WALNUT STREET FROM IH 635/GREENVILLE TO FOREST RIDGE $10,201,427 $3,798,573 $14,000,000 $663,000 $7,000,000 SOME COSTS HAVE BEEN EXPENDED ON ENGINEERING; REDUCE SCOPE TO INTERSECTION IMPROVEMENTS; REDUCE ACCORDINGLY TOTAL COST SAVINGS - STP-MM $23,221,221 $1,096,323 $13,652,199 $37,969,743 $4,812,600 $17,938,616 TOTAL COST SAVINGS Note: 1 reduced on project, however, staff proposes to leave enough funding to cover the low bid plus 5-10% for contingencies/change orders $30,470,067 $2,192,708 $29,050,000 $14,569,915 $76,282,690 $12,812,600 $32,198,097 Source: North Central Texas Council of Governments 2

5 Changes to Limits, Scope, and Timeframe STAFF RECOMMENDATION Changes will be done administratively AGENCY TIP CODE CSJ FACILITY/ PROJECT NAME LIMITS FEDERAL CATEGORY FEDERAL STATE REGIONAL LOCAL TOTAL Notes/Comments RECOMMENDATION DUNCANVILLE SD-021 N. MAIN STREET- PHASE I DUNCANVILLE WINTERGREEN RD ON NORTH MAIN STREET BETWEEN CENTER AND DAVIS STREET FROM DUNCANVILLE RD TO E OF STEWART BRANCH CREEK & DUNCANVILLE RD FROM WINTERGREEN TO S OF STEWART BRANCH CREEK RTR RTR $1,910,640 $477,660 $2,388,300 $2,580,000 $7,837,000 $10,417,000 CHANGE LIMITS TO ON NORTH MAIN STREET FROM CENTER STREET TO DAVIS STREET MOVE FUNDING OUT TO FISCAL YEARS 2011 & 2012 DUE TO ROW & UTILITY DELAYS INFORMATION WILL BE UPDATED IN THE TIP DATABASE (NO FORMAL TIP ACTION REQUIRED) FY 2010 FUNDING WILL BE ROLLED INTO FY2011, WHICH DOES NOT REQUIRE FORMAL TIP ACTION SACHSE BUNKER HILL ROAD FROM SH 78 TO NEW MILES ROAD RTR $7,614,464 $1,903,616 $9,518,080 CITY COMMITTED TO CONSTRUCTING SACHSE RD FROM SH 78 TO THE INTERSECTION WITH MILES ROAD, AND MERRITT ROAD FROM THE INTERSECTION OF PLEASANT VALLEY ROAD TO THE SOUTHERN CITY LIMIT WITH CITY FREED UP BY THIS PROJECT. FUNDING CHANGED TO $4,780,220 IN FY2011 AND $1,593,407 IN FY2012 WITH NO OVERALL CHANGE TO FUNDING AMOUNT INFORMATION WILL BE UPDATED IN THE TIP DATABASE (NO FORMAL TIP ACTION REQUIRED) DART/DCURD/ IRVING LAS COLINAS LRT STATION AREA RTC/LOCAL $1,300,000 $325,000 $1,625,000 URBAN CENTER MOVE TO FY 2011 ($1,300,000) DUE TO PROJECT DELAY, WITH NO OVERALL CHANGE TO FUNDING AMOUNT FY 2010 FUNDING WILL BE ROLLED INTO FY2011, WHICH DOES NOT REQUIRE FORMAL TIP ACTION IRVING LOOP 12 SH 183 AND SH 114 AREAS STP-MM $2,418,932 $304,336 $1,698,057 $4,421,325 $2,418,932 MOVE FY 2010 ($128,856) AND FY 2011 ($541,911) AND FY 2013 ($541,911); ESTIMATED COMPLETION DATE MOVED OUT LET AND COMPLETION DATES WILL BE UPDATED IN THE TIP DATABASE (NO FORMAL TIP ACTION REQUIRED) IRVING CONFLANS ROAD FROM W. OF SH 161 TO VALLEY VIEW LANE STP-MM $8,248,800 $2,062,200 $10,311,000 $789,000 PROJECT ESTIMATED LET & COMPLETIONS DATES MOVED OUT DUE TO AVAILABILITY OF LOCAL SHARE; FUNDING CHANGE TO FY 2011 ($200,000), FY 2012 ($200,000), FY 2013 ($200,000), FY 2014 ($189,000), AND FY 2015 ($9,600,000) LET AND COMPLETION DATES WILL BE REVISED IN TIP DATABASE; NO FORMAL TIP ACTION NEEDED AS PE AND CONSTRUCTION IN FY 2015 ALREADY Source: North Central Texas Council of Governments 1

6 Changes to Limits, Scope, and Timeframe STAFF RECOMMENDATION Changes will be done administratively AGENCY TIP CODE CSJ FACILITY/ PROJECT NAME LIMITS FEDERAL CATEGORY FEDERAL STATE REGIONAL LOCAL TOTAL Notes/Comments RECOMMENDATION IRVING HERITAGE DISTRICT LANDBANKING FROM BOUND BY NURSERY RD ON THE EAST, SOWERS RD, LARRY DR, HILLTOP DR ON THE WEST TO DART LIGHT RAIL TRACKS ON THE NORTH, AND SHADY GROVE RD ON THE SOUTH RTC/LOCAL $1,000,000 $250,000 $1,250,000 DELAY IN PROGRAM FULL IMPLEMENTATION MOVE TO FY 2011 ($1,000,000) INFORMATION WILL BE FUNDING WILL BE ROLLED INTO FY2011, WHICH DOES NOT REQUIRE FORMAL TIP ACTION IRVING ITS COMMUNICATIONS UPGRADE INSTALL FIBEROPTIC TO COMMUNICATE TO TRAFFIC SIGNALS AND ITS DEVICES; FILLS COMMUNICATION GAPS ON MAJOR THOROUGHFARES AND DESIGNATED DETOUR ROUTES WITH POINT-TO- POINT WIRELESS COMMUNICATIONS AND FIBER CMAQ $347,970 $149,130 $497,100 $347,970 PROJECT PARTIALLY COMPLETE; MOVE TO FY 2010 ($259,120) AND FY 2011 ($88,000) LET AND COMPLETION DATES WILL BE REVISED IN TIP DATABASE (NO FORMAL TIP ACTION REQUIRED) COUNTY TOTAL $11,015,702 $304,336 $14,405,104 $14,702,663 $40,427,805 $3,555,902 Source: North Central Texas Council of Governments 2

7 Request for Cost Increases on Existing Projects Staff Recommendation January 2011 AGENCY TIP CODE CSJ FACILITY/ PROJECT NAME LIMITS FEDERAL STATE REGIONAL LOCAL TOTAL CONSTRUCTED ADDITIONAL NEEDS (RTC PORTION) ADDITIONAL NEEDS (LOCAL/STATE PORTION) RESCORE RECOMMENDATION Notes/Comments COUNTY/FUNDING NEEDS MESQUITE TOWN CENTRE DRIVE TRAFFIC ACCESS IMPROVEMENTS AND INTERSECTION IMPROVEMENTS ON TOWN EAST BOULEVARD AT NORTH GALLOWAY AVENUE $591,251 $3,061 $144,707 $739,019 $347,602 $181,135 $45,284 ADDITIONAL REQUESTED 8/24/10; $226,419 TOTAL ($181,135 FEDERAL AND $45,284 LOCAL) MESQUITE DOWNTOWN MESQUITE TRAFFIC SIGNAL SYSTEM $728,989 $246,758 $975,747 $635,200 $89,729 $86,978 ADDITIONAL REQUESTED 8/24/10; $176,687 TOTAL ($89,729 FEDERAL, $64,526 STATE, AND $22,452 LOCAL) CARROLLTON DOWNTOWN CARROLLTON PEDESTRIAN ESPLANADES FOR BROADWAY/MAIN ST, BELT LINE RD/BROADWAY, AND BROADWAY/NORTH OF CROSBY RD $693,935 $173,484 $867,419 UNKNOWN UNKNOWN POSTPONE UNTIL CITY HAS FINAL COST ESTIMATE THIS PROJECT AND WILL BE DESIGNED AS ONE PROJECT;THERE MAY NOT BE SUFFIENCT TO CONSTRUCT ALL PHASES AT ONE TIME CARROLLTON BI CONNECTION FOR CARROLLTON TRANSIT $274,416 LINK DISTRICT $68,604 $343,020 UNKNOWN UNKNOWN POSTPONE UNTIL CITY HAS FINAL COST ESTIMATE THIS PROJECT AND WILL BE DESIGNED AS ONE PROJECT;THERE MAY NOT BE SUFFICIENT TO CONSTRUCT ALL PHASES AT ONE TIME RICHARDSON GALATYN PARKWAY EXTENSION US 75 TO PALISADES BLVD $2,369,442 $592,360 $3,001,802 $718,558 $179,640 RICHARDSON CENTRAL TRAIL OVER CAMPBELL RD $2,800,000 $700,000 $3,500,000 UNKNOWN UNKNOWN POSTPONE UNTIL CITY HAS FINAL COST ESTIMATE GARLAND WINTERS PARK/SPRING CREEK GREENBELT TRAIL TOTAL FUNDING NEEDS - CMAQ FROM BRAND RD TO RANGER DR $724,806 TOTAL FUNDING RECOMMENDATION - CMAQ $728,404 $1,453,210 $320,000 $80,000 $8,182,839 $3,061 $2,654,317 $10,880,217 $982,802 $1,309,422 $391,902 $1,309,422 $391,902 ADDITIONAL FUNDING OF $400,000 TOTAL ($320,000 FEDERAL AND $80,000 LOCAL) IS NEEDED FOR PROJECT TXDOT-/ HATCHER STREET SPRING AVENUE TO NORTH OF HASKELL AVENUE/MILITARY PARKWAY $2,648,832 $662,208 $3,311,040 $160,000 $172,349 $43,087 FAIL PROJECT NOT RECOMMENDED FOR RTC APPROVAL TXDOT REQUESTING ROW PHASE FUNDING; VERIFY CONSTRUCTION ESTIMATE TXDOT-/ PARK LANE FROM US 75 (CENTRAL EXPRESSWAY N) TO GREENVILLE $2,986,000 $747,000 $3,733,000 $300,000 $417,886 $104,472 TxDOT REQUESTING ROW PHASE FUNDING MESQUITE GALLOWAY AVE AT US 80 $342,000 $228,000 $570,000 $243,200 $18,000 $12,000 ADDITIONAL FUNDING OF $30,000 TOTAL ($18,000 FEDERAL AND $12,000 LOCAL) NEEDED TO COVER TXDOT & ROW COSTS MESQUITE US 80 AT TOWN EAST BLVD $1,056,863 $264,216 $3,363,360 $4,684,439 $1,056,863 $2,800,000 $700,000 TOTAL PROJECT COST FOR & TOTALS $20.6 MILLION; AN ADDITIONAL $3.5 MILLION NEEDED MESQUITE US 80 TOTAL FUNDING NEEDS - STP-MM AT TOWN EAST BLVD $2,922,000 $264,000 $4,453,125 $4,848,000 $12,487,125 $4,453,125 $9,955,695 $528,216 $4,453,125 $9,848,568 $24,785,604 $6,213,188 $3,408,235 $859,559 TOTAL FUNDING RECOMMENDATION - STP-MM $3,408,235 $859,559 TOTAL PROJECT COST FOR & TOTALS $20.6 MILLION; AN ADDITIONAL $3.5 MILLION NEEDED Source: North Central Texas Council of Governments 1

8 Request for Cost Increases on Existing Projects Staff Recommendation January 2011 AGENCY TIP CODE CSJ FACILITY/ PROJECT NAME LIMITS FEDERAL STATE REGIONAL LOCAL TOTAL CONSTRUCTED ADDITIONAL NEEDS (RTC PORTION) ADDITIONAL NEEDS (LOCAL/STATE PORTION) RESCORE RECOMMENDATION Notes/Comments COUNTY/FUNDING NEEDS MESQUITE TOWN CENTRE DRIVE MESQUITE HIKE & BIKE TRAIL AT NORTHEAST MESQUITE CL - IH 30 - NORTHWEST DRIVE - TXU/ONCOR EASEMENT TOWNCENTRE DRIVE TO IH 635; ON MESQUITE HIKE & BIKE TRAIL $3,058,131 $764,533 $3,822,664 $1,200,000 $524,000 $300,000 $131,000 POSTPONE - NEED TO EVALUATE 40% COST INCREASE FURTHER ADDITIONAL FUNDING OF $655,000 TOTAL ($524,000 RTR AND $131,000 LOCAL) IS NEEDED FOR PROJECT TXDOT-/ US 175 FROM IH 45 TO SM WRIGHT (SH 310) $250,000 $1,000,000 $1,250,000 $3,000,000 $880,232 $750,000 $220,058 TXDOT REQUESTING ADDITIONAL PE/ROW TXDOT-/ SM WRIGHT BLVD FROM BUDD ST TO IH 45/JULIUS SCHEPPS $4,000,000 $1,250,000 $5,250,000 $1,106,185 $276,546 $606,185 $151,546 NEED ADDITIONAL FOR P.E. TOTAL FUNDING NEEDS - RTR $250,000 $8,058,131 $3,264,533 $9,072,664 $2,010,417 $502,604 TOTAL FUNDING RECOMMENDATION - RTR $2,010,417 $502,604 SUMMARY OF FUNDING NEEDS BY FUNDING CATEGORY TOTAL FUNDING NEEDS - CMAQ TOTAL FUNDING NEEDS - STP-MM TOTAL FUNDING NEEDS - RTR GRAND TOTAL FEDERAL STATE REGIONAL LOCAL TOTAL CONSTRUCTED ADDITIONAL NEEDS ADDITIONAL NEEDS $8,182,839 $3,061 $2,654,317 $10,880,217 $982,802 $1,309,422 $391,902 $9,955,695 $528,216 $4,453,125 $9,848,568 $24,785,604 $6,213,188 $3,408,235 $859,559 $250,000 $8,058,131 $3,264,533 $9,072,664 $2,010,417 $502,604 $18,138,534 $531,277 $4,453,125 $12,502,885 $35,665,821 $7,195,990 $6,728,074 $1,754,065 SUMMARY OF FUNDING RECOMMENDATION BY FUNDING CATEGORY FEDERAL/RTR RECOMMENDATION STATE/LOCAL RECOMMENDATION TOTAL FUNDING RECOMMENDATION - CMAQ TOTAL FUNDING RECOMMENDATION - STP-MM TOTAL FUNDING RECOMMENDATION - RTR GRAND TOTAL $1,309,422 $391,902 $3,408,235 $859,559 $2,010,417 $502,604 $6,728,074 $1,754,065 Source: North Central Texas Council of Governments 2

9 Summary of Funding Needs Submitted by DART NCTCOG, TxDOT, and DART to Finalize the Recommendation Later AGENCY TIP CODE CSJ FACILITY/ PROJECT NAME LIMITS CURRENT FEDERAL CURRENT STATE CURRENT REGIONAL CURRENT LOCAL CURRENT TOTAL CONSTRUCTED ADDITIONAL NEEDS (RTC PORTION) ADDITIONAL NEEDS (LOCAL/STATE PORTION) RESCORE RECOMMENDATION Notes/Comments DART HAMPTON RD FROM FORT WORTH AVE TO US 67 $2,162,091 $540,522 $2,702,613 $637,909 $159,478 FAIL TIP/STIP ADDITIONAL FUNDING OF $797,387 TOTAL ($637,909 FEDERAL AND $159,478 LOCAL) IS NEEDED FOR PROJECT DART MOCKINGBIRD LN AT INWOOD RD $500,000 $625,000 $1,125,000 $1,375,000 TIP/STIP ADDITIONAL FUNDING OF $1,375,000 TOTAL ($1,375,000 LOCAL) NEEDS TO BE ADDED TO PROJECT DART LEMMON AVE AT BLUFFVIEW $900,000 $297,000 $1,197,000 $1,500,000 $303,000 TIP/STIP ADDITIONAL FUNDING OF $1,803,000 TOTAL ($1,500,000 FEDERAL AND $303,000 LOCAL) IS NEEDED FOR PROJECT DART JUPITER RD AT SPUR 244 (NW HWY) $254,000 $63,500 $205,000 $522,500 $382,000 $95,500 TIP/STIP ADDITIONAL FUNDING OF $477,500 TOTAL ($382,000 FEDERAL AND $95,500) IS NEEDED FOR PROJECT DART PLANO RD AT SPUR 244 (NW HWY) $254,000 $63,500 $205,000 $522,500 $600,000 $150,000 TIP/STIP REVISE AUTHORIZED FUNDING TO $750,000 TOTAL ($600,000 FEDERAL AND $150,000 LOCAL) DART AIRDROME AT LEMMON TO MOCKINGBIRD $840,000 $575,000 $1,415,000 $1,800,000 $450,000 FAIL TIP/STIP REVISE AUTHORIZED FUNDING TO $2,250,000 TOTAL ($1,800,000 FEDERAL AND $450,000 LOCAL) DART HARRY HINES BLVD AT MOCKINGBIRD LN $400,000 $100,000 $500,000 $160,000 $40,000 TIP/STIP ADDITIONAL FUNDING OF $200,000 TOTAL ($160,000 FEDERAL AND $40,000 LOCAL) IS NEEDED FOR PROJECT DART SH 78 (GARLAND RD) FROM IH 635 TO FOREST LN $1,764,000 $441,000 $550,000 $2,755,000 $3,040,000 $760,000 FAIL TIP/STIP INCREASE FUNDING BY $1,045,000 TOTAL AND REVISE AUTHORIZED FUNDING TO ($3,040,000 FEDERAL AND $760,000 STATE) DART LEMMON AVE FROM INWOOD RD TO OAK LAWN -$1,727,000 -$653,000 -$2,380,000 TIP/STIP CANCEL PROJECT PER DART TOTAL FUNDING NEEDS - CMAQ $7,074,091 $568,000 $3,097,522 $10,739,613 $8,119,909 $3,332,978 DART LEMMON AVE FROM BLUFFVIEW TO AIRDROME $319,600 $79,900 $132,000 $531,500 $25,600 $2,080,400 $388,100 FAIL TIP/STIP ADDITIONAL FUNDING OF $2,468,500 TOTAL ($2,080,400 FEDERAL AND $388,100 LOCAL) IS NEEDED FOR PROJECT TOTAL FUNDING NEEDS - STP-MM $319,600 $79,900 $132,000 $531,500 $25,600 $2,080,400 $388,100 SUMMARY OF FUNDING NEEDS BY FUNDING CATEGORY FEDERAL STATE REGIONAL LOCAL TOTAL CONSTRUCTED ADDITIONAL NEEDS ADDITIONAL NEEDS TOTAL FUNDING NEEDS - CMAQ TOTAL FUNDING NEEDS - STP-MM COUNTY TOTAL $7,074,091 $568,000 $3,097,522 $10,739,613 $8,119,909 $3,332,978 $319,600 $79,900 $132,000 $531,500 $25,600 $2,080,400 $388,100 $7,393,691 $647,900 $3,229,522 $11,271,113 $25,600 $10,200,309 $3,721,078 Source: North Central Texas Council of Governments 3

10 COUNTY PROJECT AND REVENUE MATRIX ($ IN MILLIONS) Legend for Proposed Action Timing: Dec-10 = December 2010 = January 2011 () = February 2011 (Direct Staff to Resolve Remaining Funding Issues) Requesting Action Inventory of Projects Submitting Agency Date Funding Needed Cost Savings (CMAQ, STP-MM & RTR) SH 161 Near Neighbor Timeframe - SH 161 Excess Revenue Repayment PGBT EE Revenue Sharing LBJ Funding Balance IH 30 Pass Through Finance Repayment Category 2 Already Approved for Trinity Pkwy IH 30 HOV/Managed Lane Excess Revenue Prop 12 Local Match/ Leveraging Availability State Match Public/Private Partnership (PPP) 3 Total Existing RTC Funding Commitment? Leverage? Multimodal/Alternative Mode of Travel Local High Priority Strategic Air Quality Impact? Final Recommendation $32.19 $ $17.65 $ $11.28 $ $ $63.13 $71.55 $ $ $35.29 (Yes/No) (Yes/No) (Yes/No) (Yes/No) (Yes/No) Recommendation Comments Previous Commitments - Recommended for Funding December 2009 Emergency RTR Action (Already Approved) ($41.46) Loop 12/SH 114 Interchange (Already Approved) ($10.00) SH 161 at UP RR (Already Approved) ($12.00) NCTCOG/ Various TxDOT/ DART/ NCTCOG TxDOT/ DART/ NCTCOG /2010 $13.20 $28.26 $41.46 Yes Yes $10.00 $10.00 Yes Yes.60 $9.00 $2.40 $12.00 Yes Yes LBJ ROW Loan Repayment Including Interest ($58.40) NCTCOG/ TxDOT 12/2010 $21.20 $37.20 $58.40 Yes Yes HOV 3+ Subsidy ($17.59 for LBJ) NCTCOG/ TxDOT 01/2015 $17.59 $17.59 Yes Yes SH 161 Utilities [Conditional Award] ($1.70) TxDOT 12/2010 $1.70 $1.70 Yes Yes RTC approved funds for this project contingent upon use of alternative funding sources first. Sustainability of Transit Op. ($1.81) NCTCOG 02/2012 HOV Operations Outside DART Service Area (FY ) ($3.00) DART 09/2009 $ $1.81 Yes Yes $3.00 $3.00 Yes Yes IH 35E Dallas County portion of larger project with Denton County Dallas 06/2015 X.00 Yes Yes Conditional Approval Cost Overrun Pool $7.36 $20.00 $10.00 $37.36 Yes Yes Conditional Approval Trinity Parkway, Phase I (US 175 Connector; $81.70) Dallas 06/2012 $81.70 $81.70 Yes Reaffirmation of RTC commitment Trinity Parkway, Later Phases (Remaining $65.06) TxDOT-Dallas 06/2014 $65.06 $65.06 Yes Reaffirmation of RTC commitment New Projects - Recommended for Funding Dec-10 Dec-10 Kessler Theater Sidewalks (.224) McKinney Avenue Trolley Extension ($5.00) Dallas CBD to Oak Cliff Streetcar ($5.80) Dallas/ NCTCOG 12/2010 Dallas 12/2010 Dallas 12/ No Yes $5.00 $5.00 No Yes Yes Yes Yes Yes $5.80 $5.80 No Yes No Yes Yes Yes Resolution of SD Call for Projects; Staff Commitment Staff Commitment Staff Commitment IH 30 HOV/Managed Lanes and Frontage Roads ($78.90) Dallas/ NCTCOG 01/2011 $78.90 $78.90 No Yes Yes Yes Yes Yes IH 30 Bridge & Approaches ($270.00) (Including signature span) 1 Dallas/ TxDOT 06/2014 $30.00 $63.13 $35.67 $41.20 $ $ No Yes No Yes No Yes Conditional Approval SH 183 Partial ROW and Partial Frontage Roads ($100.00) Irving/ TxDOT 06/2013 $85.00 $15.00 X $ No Yes No Yes No Yes Conditional Approval SM Wright Reconstruction ($40.80) Dallas 01/2015 $32.64 $8.16 $32.64 No Yes No Yes No Yes Conditional Approval Legend: available in the short term available in mid to long term not currently available Source: North Central Texas Council of Governments 1

11 COUNTY PROJECT AND REVENUE MATRIX ($ IN MILLIONS) Requesting Action Inventory of Projects Submitting Agency Date Funding Needed Cost Savings (CMAQ, STP-MM & RTR) SH 161 Near Neighbor Timeframe - SH 161 Excess Revenue Repayment PGBT EE Revenue Sharing LBJ Funding Balance IH 30 Pass Through Finance Repayment Category 2 Already Approved for Trinity Pkwy IH 30 HOV/Managed Lane Excess Revenue Prop 12 Local Match/ Leveraging Availability State Match Public/Private Partnership (PPP) 3 Total Existing RTC Funding Commitment? Leverage? Multimodal/Alternative Mode of Travel Local High Priority Strategic Air Quality Impact? Final Recommendation $32.19 $ $17.65 $ $11.28 $ $ $63.13 $71.55 $ $ $35.29 (Yes/No) (Yes/No) (Yes/No) (Yes/No) (Yes/No) Recommendation Comments US 67 from Cockrell Hill to FM 1382 ($50.00) TxDOT/ Duncanville/ Cedar Hill 06/2011 $40.00 $10.00 $50.00 No No No Yes No Yes Conditional Approval IH 35E Bridge and Approaches (Over the Trinity) ($258.00) Dallas 06/2015 $ $ No Yes No Yes No Yes Conditional Approval US 80 Frontage Road and Ramp Reconfiguration between IH 635 & N. Galloway ($7.10) Mesquite/ Dallas County 06/2012 $5.68 $1.42 $7.10 No No No Yes Yes Yes Mesquite Garland Richardson Bikeway ($2.55) Garland $ $2.55 No No Yes Yes Yes Yes IH 20 Frontage Road (Haymarket to W of US 175) ($3.56) TxDOT 06/2011 $ $3.56 No Yes No Yes No Yes Conditional Approval Aggressive Driving Pilot Study Richardson 06/ No No No Yes No Yes Dallas County Task Force requested a Motorcycle Speed Pilot Study for consideration; Staff proposes $500K Total but suggests that the project be generalized to an Aggressive Driving Pilot Program, and asks the Regional Safety Work Group to explore specific elements of the program further. Regional Safety Project (Wrong Way Driving Program) ($1.00) NTTA/ Richardson 02/ $1.00 No Yes No Yes No Yes Seek Partnership with TxDOT using State Safety funds; NTTA, TxDOT, and Cities to provide local match; the RTC's funds may need to come from multiple county RTR accounts, not just Dallas County; to be managed by NCTCOG Projects Not Recommended for Funding Cotton Belt Rail Line Addison 01/2015 X.00 Yes Yes Yes Yes Yes No RTC committed to find innovative funding that does not compete with other funding. Second Light Rail Transit Alignment through Downtown Dallas ($200.00) Dallas 02/ No No Yes No Yes No Continental Blvd. from IH 35E to Core Street (.70) Dallas 06/ No No No No No No Beckley/Commerce Intersection ($3.30) Dallas 01/ No No No No No No Complete Streets Initiative Implementation Dallas 10/ No No Yes No No No Legend: available in the short term available in mid to long term not currently available Source: North Central Texas Council of Governments 2

12 COUNTY PROJECT AND REVENUE MATRIX ($ IN MILLIONS) Requesting Action Inventory of Projects Submitting Agency Date Funding Needed Cost Savings (CMAQ, STP-MM & RTR) SH 161 Near Neighbor Timeframe - SH 161 Excess Revenue Repayment PGBT EE Revenue Sharing LBJ Funding Balance IH 30 Pass Through Finance Repayment Category 2 Already Approved for Trinity Pkwy IH 30 HOV/Managed Lane Excess Revenue Prop 12 Local Match/ Leveraging Availability State Match Public/Private Partnership (PPP) 3 Total Existing RTC Funding Commitment? Leverage? Multimodal/Alternative Mode of Travel Local High Priority Strategic Air Quality Impact? Final Recommendation $32.19 $ $17.65 $ $11.28 $ $ $63.13 $71.55 $ $ $35.29 (Yes/No) (Yes/No) (Yes/No) (Yes/No) (Yes/No) Recommendation Comments Wonderview Development (West of IH 45 and Overton) Dallas 06/ No No Yes No No No City of Rowlett Intersection Improvements at 3 Locations ($2.25) Rowlett 12/ No No No Yes Yes No SH 66 Trail between Chiesa and the Lake Ray Hubbard Bridge ($1.30) Rowlett 12/ No No No Yes Yes No City of Rowlett Traffic Signal improvements at 6 Locations ($1.70) Rowlett 12/ No No No Yes Yes No Medical District Drive - IH 35E to Southwestern Medical Drive ($10.00) Dallas 06/ No No No Yes No No Skillman/Audelia Bridge at IH 635 LBJ Freeway ($24.20) Dallas 06/ No No No No Yes No IH 35E Frontage Roads from Royal to NW Highway ($10.00) Dallas 06/ No No No No No No IH 20 at US 67 Ramps & Frontage Roads ($20.00) Dallas 06/ No No No No No No Loop 12/NW Hwy Intersection Improvement (Harry Hines to US 75) ($7.10) TxDOT 04/ No No No No Yes No Central Trail South of Buckingham through Restland ($2.50) Richardson/ Dallas Co. 06/ No No Yes Yes Yes No Central Trail from Arapaho to Buckingham ($.60) Richardson 06/ No Yes Yes Yes Yes No Luna Road (Northwest Highway to Royal Lane) ($10.00) Dallas County 06/ No No No No No No West Spring Valley Bridge Widening ($2.70) Richardson 06/ No No No No No No Arapaho Road LRT Station Trail along west side of Greenville (.60) Richardson 06/ No No Yes No Yes No Collins / US 75 Bridge Sidewalk and Trail Richardson 06/ No No Yes No Yes No Galatyn LRT Station Pedestrian Bridge over US75 Richardson 06/ No No Yes No Yes No Marsh Lane Bridge Farmers Branch 08/ No No No Yes No No Note: TOTAL $32.19 $ $17.65 $ $ $ $63.13 $51.35 $ $ $35.29 $1, SURPLUS $22.97 $ $20.20 $ $ Assumes Dallas pays existing commitment of the signature portion of the bridge. 2 Propose using surplus of $40.8 M for projects in the other Eastern Counties. 3 Public Private Partnership (PPP) proposed for remaining portions of North Tarrant Express (NTE) as well. 4 May need to exchange $39.7M in Denton Co RTR funds (from SH 121) for SH 161 funding to advance FM 1171 from IH35W to West of Shiloh Road through Pass Through Finance program Legend: available in the short term available in mid to long term not currently available Source: North Central Texas Council of Governments 3

13 Requests for Defederalization or to Advance Projects to Earlier Year Dallas County Currently Approved: BEFORE ACTION TIP Code CSJ Description Funding Source Fiscal Year Total Federal State Regional Local IH 20 Frontage Roads from Carrier to FM RTR-DA $20,000,000 $20,000, SH 121 (Section 13) from Tarrant County Line to Denton Creek 2 Cat $20,000,000 $16,000,000 $4,000,000 Subtotal $40,000,000 $16,000,000 $4,000,000 $20,000, Jefferson Boulevard at Cockrell Hill 3 CMAQ 2015 $2,787,500 $2,230,000 $300,000 $257, DART ITS System Integration CMAQ 2012 & 2013 $1,988,400 $1,590,720 $397, IH 35E at Belt Line Road RTR-DA2/Earmark 2014 $46,697,000 $5,555,200 $4,388,800 $25,402,400 $11,350,600 Subtotal $51,472,900 $9,375,920 $4,388,800 $25,702,400 $12,005, MacArthur Boulevard From IH 30 to Hunter-Ferrell 4 STP-MM 2013 $15,000,000 $10,956,096 $1,043,904 $3,000, IH 30 from NW 7th to Belt Line Rd RTR-DA $3,925,243 $3,925, IH 635 from Skillman to Miller RTR-DA $3,475,166 $2,780,133 $695, FM 1382 from New Clark to West of Straus Rd RTR-DA $3,116,215 $2,492,884 $623, & Cockrell Hill Rd at IH 20 RTR-DA1/CMAQ 2015 $3,038,024 $2,360,096 $590,024 $87, DFW Airport - Seamless Aviation Connection CAT 2 (TMF) 2014 $20,000,000 $20,000,000 Subtotal $48,554,648 $13,316,192 $20,590,024 $10,330,068 $4,318,364 STP-MM $19,523,605 $13,355,632 $6,167,973 RTR $11,503,750 $9,203,000 $2,300, Sylvan Ave at Trinity River 5 CAT 6 (Bridge) 2012 $30,959,355 $20,767,483 $2,595,936 $7,595,936 Subtotal $61,986,710 $34,123,115 $2,595,936 $9,203,000 $16,064,659 Revision Requested: REVISE FUNDING AND FISCAL YEARS TIP Code CSJ Description Funding Source Fiscal Year Total Federal State Regional Local IH 20 Frontage Roads from Carrier to FM Cat $20,000,000 $15,200,000 $3,800,000 $1,000, SH 121 (Section 13) from Tarrant County Line to Denton Creek 2 RTR-DA1 & DA2/Cat $20,000,000 $800,000 $200,000 $19,000,000 Subtotal $40,000,000 $16,000,000 $4,000,000 $20,000, Jefferson Boulevard at Cockrell Hill 3 RTR-DA $5,287,500 $4,530,000 $757, DART ITS System Integration RTR-DA $1,988,400 $1,590,720 $397, IH 35E at Belt Line Road RTR-DA2/CMAQ/Earmark 2014 $46,697,000 $9,375,920 $4,388,800 $21,581,680 $11,350,600 Subtotal $53,972,900 $9,375,920 $4,388,800 $27,702,400 $12,505, MacArthur Boulevard From IH 30 to Hunter-Ferrell 4 RTR-DA $15,000,000 $12,000,000 $3,000, IH 30 from NW 7th to Belt Line Rd STP-MM 2013 $3,925,243 $3,140,194 $785, IH 635 from Skillman to Miller STP-MM 2013 $3,475,166 $2,780,133 $695,033 $695, FM 1382 from New Clark to West of Straus Rd STP-MM 2013 $3,116,105 $2,492,884 $623,221 $623, & Cockrell Hill Rd at IH 20 STP-MM/CMAQ 2013 & 2015 $3,038,024 $2,430,419 $607, DFW Airport - Seamless Aviation Connection CAT 2 (TMF) 2011 & 2014 $20,000,000 $17,669,932 $2,330, Sylvan Ave at Trinity River 5 Notes: 1 Leaving $1 Million for PE; Balance goes to (TIP 11239) Subtotal Subtotal $48,554,538 $10,843,631 $20,380,839 $14,330,068 $3,000,000 STP-MM $19,523,605 $13,355,632 $6,167,973 RTR $11,503,750 $9,203,000 $2,300,750 CAT 6 (Bridge) 2012 $30,959,355 $20,767,483 $2,595,936 $7,595,936 $61,986,710 $34,123,115 $2,595,936 $9,203,000 $16,064,659 January Needs an additional $2 million for engineering 3 Includes $2.5 million cost over run request from Dallas County and expanded scope and limits to reconstruct roadway from 100 Block South of Cockrell Hill C/L to 100 Block North of Cockrell Hill C/L 4 Portion of project funding changed from RTR-DA2 (SH 121) to Repayment through final staff recommendation (RTC Electronic Reference Item 5.7) 5 Potential Partnership with the City of Dallas; pending February 2011 modification to clarify original funding Strikethrough/Bold Text = Changes since last RTC Meeting Source: North Central Texas Council of Governments

14 December 2009 Emergency RTR Action (Already Approved) DRAFT COUNTY SH 161 PROJECT RECOMMENDATION (RESULTING FROM COUNTY TASK FORCE MEETINGS) January 2011 Proposed Action Timing Project Name/Facility Project Limits Project Description/Scope Implementing Agency Fiscal Year Federal State Regional Local Funding Source Total Funded Phase(s) Recommendation Comments Previous Commitments Wildlife - Lower Tarrant Bridge over Trinity River Intersection of Wildlife and Hardrock Widen 0/2 Lane Rural to 2/4 Lane Divided Arterial TxDOT 2013 $20,000,000 Repayment - Confirm Funding Source for Previously Approved Project (TIP 20213/CSJ ) IH 35 E/Dickerson Parkway MacArthur Blvd. Loop 12/SH 114 Interchange (Already Approved) Sandy Lake Road/Whitlock Lane to PGBT IH 30 to Hunter-Ferrell South of Texas Plaza to North of SH 114 Lane Ramp and a 4 to 6 frontage road construction along IH 35E and a new 6 lane overpass at Dickerson Parkway Widen 2 to 4 Lane Urban Divided (Ultimate 6 Lanes) Widen 6 lane freeway to 8 lanes, add 2 reversible HOV lanes, add 2 reversible HOV lanes, 2/3 lane frontage roads, and ITS elements (Phase 1 of Loop 12/SH 114 Interchange) TxDOT 2012 TxDOT 2011 TxDOT 2010 $45,221,600 $13,221,600 SH 161 NN/NT RTR $8,236,642 $2,059,161 Repayment $3,763,358 $940,839 SH 121 RTR-DA2 $10,000,000 SH 161 NN/NT RTR $10,000,000 - Confirm Funding Source for Previously Approved Project - Confirm Funding Source for Previously Approved Project Funding for other phases on these projects will remain unchanged; (TIP 20208/CSJ ) (TIP /CSJ ) (TIP /CSJ ) SH 161 (Already Approved) Union Pacific Rail Road to Jefferson and Main Streets Frontage Road intersections with Main and Jefferson and at-grade crossings with UPRR; Overpass over future SH 161 mainlanes $9,000,000 SH 161 NN/NT RTR NTTA 2011 $2,400,000 SH 161 Excess Revenue $12,000,000 $600,000 RTR Cost Savings - Confirm Funding Source for Previously Approved Project (TIP 20009/CSJ ) IH 635/LBJ and SH 183 ROW On LBJ on Webb Chapel to West of US 75 (Merit Drive) and On SH 183 from West of SH 161 to 0.66 Mile West of Loop 12 LBJ ROW Loan Repayment Including Interest TxDOT 2011 $37,200,000 SH 161 NN/NT RTR ROW $13,731,568 RTR Cost Savings ROW $7,468,432 STP-MM Cost Savings $58,400,000 ROW Federal funds are STP-MM; IH 635/LBJ - $28.28M (TIP /CSJ ); SH $30.12M (TIP 20210/CSJ ) HOV 3+ Subsidy IH 635 (LBJ) HOV 3+ Subsidy for LBJ NCTCOG $17,590,000 Repayment $17,590,000 IMP SH 161 (Utilities) North of Conflans to Spur 303 Utilities moved for SH 161 project TxDOT/NTTA 2011 $1,700,000 SH 161 NN/NT RTR $1,700,000 UTIL RTC approved funds for this project contingent upon use of alternative funding sources first. (TIP 20026/CSJ and ) Sustainability of Transit Operations Regional Transit Operations Regional Coordination NCTCOG $1,448,000 SH 161 Excess Revenue $1,810,000 IMP (TIP 20200/CSJ ) $362,000 Local IMP HOV Operations Outside DART Service Area Regional HOV Operations Outside DART Service Area DART $3,000,000 SH 161 Excess Revenue $3,000,000 IMP Cost Overrun Pool Regional $7,620,184 STP-MM Cost Savings $20,000,000 Repayment $40,664,665 IH 30 HOV/ML Excess $10,000,000 Revenue $3,044,481 CMAQ Cost Savings Conditional Approval Trinity Parkway (US 175 Connector) - Phase 1 Trinity Parkway (Remaining Phases) US 175 to IH 45 (near Lamar Blvd) IH 35E/SH 183 to US 175/SH 310 ruct new location freeway with interchanges at IH 45 and SM Wright ruct new location 4 to 6 lane tollway (toll) TxDOT TxDOT $65,360,000 $16,340,000 Category 2 $81,700,000 $52,048,000 $13,012,000 Category 2 $65,060,000 Reaffirmation of RTC commitment for this phase of the project (TIP 20209/CSJ ) Reaffirmation of RTC commitment to remaining sections of Trinity Parkway (CSJ ) New Projects Kessler Theater Pedestrian Amenities along W Davis Street from Clinton Avenue to N Winnetka and N Clinton Avenue in the South Dallas Oak Cliff Area Sidewalk Enhancements and Pedestrian Amenities Dallas 2011 $44,800 Local $224,000 $179,200 RTR Cost Savings Resolution of previous call for projects; Staff commitment Dec-10 McKinney Avenue Trolley Extension on Woodall Rogers Service Road to St. Paul and Federal Restoration of 3 original streetcars to be placed back into service with the McKinney Avenue Transit Authority Dallas 2011 $5,000,000 SH 161 Excess Revenue $5,000,000 IMP Staff commitment; includes $4.9 million of Urban Circulator grant funding for total funding of $9.9 million; (TIP 52268/CSJ ) Dec-10 Dallas CBD Streetcar Circulator Expansion Downtown Dallas to Oak Cliff Expansion of existing streetcar line in Dallas CBD - Phase 1 Dallas 2011 $5,800,000 SH 161 Excess Revenue $5,800,000 IMP Staff commitment; includes $10 million of existing RTR funds and $23 million of TIGER I funds; (TIP 53066) Source: North Central Texas Council of Governments 1

15 COUNTY SH 161 PROJECT RECOMMENDATION (RESULTING FROM COUNTY TASK FORCE MEETINGS) January 2011 Proposed Action Timing Project Name/Facility Project Limits Project Description/Scope Implementing Agency Fiscal Year Federal State Regional Local Funding Source Total Funded Phase(s) Recommendation Comments IH 30 HOV/Managed Lanes and Frontage Roads SH 360 to Sylvan Avenue and WB/EB FR from Cockrell Hill Road to Westmoreland Road ruct permanent barrier separated Managed/HOV Lanes, toll gantries, two wishbone ramps, signs, pavement markings, and other median work; ruct 2 Lane WB/EB Frontage Road TxDOT 2012 $78,900,000 SH 161 NN/NT RTR $78,900,000 Part of Pass Through Finance Program; (TIP 20195/CSJ ; TIP 83211/ CSJ ) IH 30 Bridge & Approaches Sylvan Avenue to IH 35E Replacement of IH 30 bridge over Trinity River including signature span and partial reconstruction of the IH 30/IH 35E Mixmaster $30,000,000 LBJ Funding Balance $63,130,000 IH 30 PTF Repayment TxDOT IH 30 HOV/ML Excess $361,000,000 Conditional Approval $35,670,000 Revenue $41,200,000 Prop 12** $191,000,000 Local **Prop 12 request is part of Strategic Partnership with TxDOT; New RTC funding is for roadway and approaches only (not signature span); City of Dallas commitment to pay for signature span remains (estimated at $191,000,000); Additional earmark funds are also available for this project; (TIP 52564/CSJ ) SH 183 Partial ROW and Frontage Roads WB SH 183 FR Belt Line Rd to Carl Rd and WB and EB FR from Carl Rd to 1/4 Mile West of Loop 12 and EB FR Acquire partial ROW and construct 4 from William Brewster to Carl Rd; to 6 lane frontage roads ROW from SH 161 to West End of Elm Fork of Trinity River Bridge TxDOT $85,000,000 LBJ Funding Balance ROW/ $100,000,000 $15,000,000 State ROW/ Conditional Approval Public/Private Partnership authority needed to advance project; (TIP 20188/CSJ ); State match has not yet been identified. Staff will coordinate with State and local agencies to identify funds. SM Wright Blvd/US 175 Budd Street to IH 45/Julius Schepps Reconstruction to an arterial boulevard, including demolition of bridges, retaining walls and freeway main lanes $32,640,000 Repayment TxDOT $40,800,000 Conditional Approval $8,160,000 State State match has not yet been identified. Staff will coordinate with State and local agencies to identify funds; (TIP 20062, 20209/CSJ , ) US 67 Cockrell Hill to FM 1382 Provide auxiliary lane NB and SB TxDOT $40,000,000 LBJ Funding Balance $50,000,000 Conditional Approval $10,000,000 State (TIP 20182) IH 35E Bridge and Approaches 8th Street to IH 30 (Over the Trinity) Replacement of IH 35E bridge over Trinity River and partial reconstruction of the IH 30/IH 35E Mixmaster TxDOT 2015 $258,000,000 Prop 12** $258,000,000 Conditional Approval **Funding will be requested through Strategic Partnership with TxDOT; project also includes other funds (Congressional Earmark, private contributions, Dallas County, TxDOT P&E funds and Bridge funds); (TIP 54024/CSJ ) Source: North Central Texas Council of Governments 2

16 COUNTY SH 161 PROJECT RECOMMENDATION (RESULTING FROM COUNTY TASK FORCE MEETINGS) January 2011 Proposed Action Timing Project Name/Facility Project Limits Project Description/Scope Implementing Agency Fiscal Year Federal State Regional Local Funding Source Total Funded Phase(s) Recommendation Comments US 80 NB IH 635 to EB US 80 FR and N. Galloway Avenue Frontage Road and Ramp Reconfiguration $1,420,000 State TxDOT $7,100,000 $5,680,000 IH 30 HOV/ML Excess Revenue State match has not yet been identified. Staff will coordinate with State and local agencies to identify funds; (CSJ ; ) Mesquite, Garland, Richardson Bikeway IH 635 at Town East Boulevard to Breckenridge Park Provides a cohesive, interconnected bike/pedestrian route in Mesquite- Garland-Richardson Garland 2014 $2,040,000 Repayment $510,000 Local $2,550,000 IH 20 Frontage Road Haymarket to West of US 175 ruct 4 lane frontage roads and ramps connecting IH 20 to Haymarket Road in Balch Springs $2,848,000 STP-MM Cost Savings TxDOT $3,560,000 Conditional Approval $712,000 State (TIP 52550/CSJ ) Aggressive Driving Pilot Study Regional Pilot study to determine and implement preventative measures to deter aggressive driving within the region $400,000 Repayment/RTR Cost Savings IMP NCTCOG $500,000 Conditional Approval $100,000 Local/State IMP Dallas County Task Force requested a Motorcycle Speed Pilot Study for consideration; Staff proposes $500K Total but suggests that the project be generalized to an Aggressive Driving Pilot Program, and asks the Regional Safety Work Group to explore specific elements of the program further. Regional Safety Wrong Way Driving Program Regional Pilot study and implementation of preventive measures that reduce wrong way driving occurrences in regional corridors NCTCOG $800,000 Repayment/RTR Cost Savings $1,000,000 $200,000 Local/State IMP IMP Conditional approval based upon possible partnership with TxDOT, RTC and NTTA; Cities could provide in-kind labor as local match Seek Partnership with TxDOT using State Safety funds; NTTA, TxDOT, and Cities to provide local match; the RTC's funds may need to come from multiple county RTR accounts, not just Dallas County; to be managed by NCTCOG TOTAL $263,389,097 $322,644,000 $453,151,168 $195,396,000 $1,251,580,265 Additional component of Strategic Partnership with TxDOT: Projects for which Public/Private Partnership authority will be requested as part of Strategic Partnership with TxDOT include SH 183, IH 35E, and the remaining portions of the North Tarrant Express. May need to exchange Denton County RTR funds from SH 121 for SH 161 funding in order to advance FM 1171 from West of US 377 to West of Shiloh Road (Section 2) and IH 35W to US 377 (Section 3) through Pass Through Finance program; ($39.7M in funding) RTR SH 161 NN/NT RTR SH 161 Excess Revenue Repayment IH 30 PTF Repayment IH 30 HOV/ML Excess Revenue Prop 12 LBJ Funding Balance Acronyms of Funding Sources Regional Toll Revenue from a variety of accounts, which are further identified below SH 161 Near Neighbor Timeframe - is the up front payment from SH 161 (all of which will fund projects in Dallas County) SH 161 Excess Revenue - is the funding paid by NTTA to the region that is split among all counties President George Bush Turnpike Eastern Extension Loan Repayment - that will be repaid from 20% of gross toll receipts once this project is open to traffic IH 30 Pass Through Finance Repayment - annual payments that will be received from TxDOT for use on Dallas County projects IH 30 HOV/Managed Lane Excess Revenue - RTR funds resulting from tolls paid on managed lanes (minus the management and operating costs) Proposition 12 Bonds that will be requested from TxDOT as part of the Strategic Partnership with TxDOT that TxDOT indicates are left over from LBJ project that can be reprogrammed to other projects RTR Cost Savings Cost savings from other RTR projects (i.e., projects bid for less than anticipated) that can be used for other projects CMAQ Cost Savings STP-MM Cost Savings Cost savings from existing air quality projects (i.e., projects were not feasible and could be deleted or bid for less than anticipated) that can be used for other projects Cost savings from existing mobility projects (i.e., projects were not feasible and could be deleted or bid for less than anticipated) that can be used for other projects Source: North Central Texas Council of Governments 3

REGIONAL 10-YEAR PLAN AND NEXT DECADE OF PROJECTS. Regional Transportation Council December 8, 2016

REGIONAL 10-YEAR PLAN AND NEXT DECADE OF PROJECTS. Regional Transportation Council December 8, 2016 REGIONAL 10-YEAR PLAN AND NEXT DECADE OF PROJECTS Regional Transportation Council December 8, 2016 POLICY SUMMARY Thank the Texas Transportation Commission for formula funds. Thank the Legislature and

More information

SH 121: FM 423 To SH 121 At US 75 Interchange. APPENDIX B: Coordination and Policy

SH 121: FM 423 To SH 121 At US 75 Interchange. APPENDIX B: Coordination and Policy Re-evaluation SH 121: FM 423 To SH 121 At US 75 Interchange APPENDIX B: Coordination and Policy Revised 10/4/2007 RESOLUTION NO. 2431-8-05(R) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ALLEN, COLLIN

More information

TRANSPORTATION ALTERNATIVES PROGRAM (TAP)

TRANSPORTATION ALTERNATIVES PROGRAM (TAP) TRANSPORTATION ALTERNATIVES PROGRAM (TAP) CALL FOR PROJECTS Surface Transportation Technical Committee September 26, 2014 North Central Texas Council of Governments ELECTRONIC ITEM 4.2 FUNDING AVAILABLE

More information

RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)

RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) TPC Agenda Item 6A Mailout 10/20/16 RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) Amendment Summary Amendment

More information

Public/Private Partnership Program Economic Development Committee February 4, 2008

Public/Private Partnership Program Economic Development Committee February 4, 2008 Public/Private Partnership Program Economic Development Committee February 4, 2008 Purpose Review the City s Public/Private Partnership Program Guidelines & Criteria. Receive further input from the committee

More information

Memorandum CITY OF DALLAS. February 1, Honorable Mayor and Members of the City Council

Memorandum CITY OF DALLAS. February 1, Honorable Mayor and Members of the City Council Memorandum CITY OF DALLAS February 1, 2013 Honorable Mayor and Members of the City Council S.M Wright Project and Job Opportunity Regional Pilot Program On Wednesday, February 6, 2013, the City Council

More information

Streetcar Planning Update Dallas City Council Transportation and Environment Committee November 8, 2010

Streetcar Planning Update Dallas City Council Transportation and Environment Committee November 8, 2010 Streetcar Planning Update Dallas City Council Transportation and Environment Committee November 8, 2010 Presentation Outline Streetcar Planning Background TIGER Funded Project Urban Circulator Grant Project

More information

Katy Trail Extension from McCommas Boulevard to White Rock Station

Katy Trail Extension from McCommas Boulevard to White Rock Station Katy Trail Extension from McCommas Boulevard to White Rock Station Presented to the Quality of Life Committee By Public Works and Transportation October 26, 2009 Purpose of Briefing Provide updates on

More information

Southeast Area Transportation Alliance (SEATA)

Southeast Area Transportation Alliance (SEATA) Southeast Area Transportation Alliance (SEATA) Sustainable Development Program and 2009 Call for Projects Karla Weaver, AICP May 28, 2009 North Central Texas Council of Governments Transportation Department

More information

AGENDA. Regional Transportation Council Thursday, September 13, 2018 North Central Texas Council of Governments

AGENDA. Regional Transportation Council Thursday, September 13, 2018 North Central Texas Council of Governments AGENDA Regional Transportation Council Thursday, September 13, 2018 North Central Texas Council of Governments 11:30 am Auto Occupancy Detection Technology Rewards Program and Tolled Managed Lanes Policy

More information

Apologies Michael, but lets work off of the attached update version. James Bass came back with a few additional minor tweaks to the language.

Apologies Michael, but lets work off of the attached update version. James Bass came back with a few additional minor tweaks to the language. REFERENCE ITEM 3.16 RTC Handout March 8, 2018 From: To: Cc: Subject: Date: Attachments: Marc Williams Michael Morris Bill Hale; Kelly Selman; Mo Bur; Brian Barth RE: Recommended RTC Action for LBJ/IH 635

More information

Greater Dallas Planning Council Metromorphosis Seminar October 9, 2009

Greater Dallas Planning Council Metromorphosis Seminar October 9, 2009 Greater Dallas Planning Council Metromorphosis Seminar October 9, 2009 Michael Morris, P.E. Director of Transportation www.nctcog.org/trans/presentations/index.asp North Central Texas Council of Governments

More information

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER WILSON NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 Beckwith Road/Eastern Connector TIP # 2008-71-038 New Road Mt. Juliet Wilson Length 5.00 Regional Plan ID 1072-132 Air Quality Status

More information

Tower 55 Rail Reliever Study

Tower 55 Rail Reliever Study Tower 55 Rail Reliever Study Technical Advisory Group June 19, 2009 Meeting Agenda Welcome & Introductions Approval of the April 17, 2009 Meeting Minutes Review of Project s s Goals & Objectives Status

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 ODESSA DISTRICT March 06 Out of Cycle Revisions 2009 Quarterly Revisions 3-03-2009 STIP REPORT: Transportation Improvement Program, Odessa District,

More information

STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING

STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING From FM 2578 in Terrell to SH 243 in Kaufman CSJ: 0173-04-056 June 28, 2018 WHAT IS A FEASIBILITY STUDY WHAT IS A FEASIBILITY STUDY? A feasibility

More information

AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch

AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch THOMAS L. JOHNSON, Executive Vice President Texas Transportation Commission Meeting Highlights September 18 and 24, 2014 September 18 Commissioner

More information

TAC Agenda Item 5A Mailout - 04/13/16

TAC Agenda Item 5A Mailout - 04/13/16 TAC Agenda Item 5A Mailout - 04/13/16 RECOMMENDATION FOR TRANSPORTATION POLICY COUNCIL (TPC) APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION

More information

Community Development Agency Capital Improvement Program TIM Fee Program Cash Proforma (by Revenue Grouping)

Community Development Agency Capital Improvement Program TIM Fee Program Cash Proforma (by Revenue Grouping) Community Development Agency Prior* 16/17 17/18 18/19 19/2 2/21 21/22-25/26 26/27-35/36 El Dorado Hills TIM Zone 8 Cash 14,38,412 5,952,818 19,991,23 Revenue 3,511,925 2,196,826 2,151,276 2,445,139 2,445,139

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION REQUEST FOR INFORMATION REGARDING THE DEVELOPMENT OF AND PROCUREMENT PROCESS FOR THE GRAND PARKWAY PROJECT TEXAS DEPARTMENT OF TRANSPORTATION RFI Issuance Date: June 10, 2011 RFI Closing Date: July 6,

More information

SCOTT COUNTY COMMUNITY SERVICES DIVISION

SCOTT COUNTY COMMUNITY SERVICES DIVISION SCOTT COUNTY COMMUNITY SERVICES DIVISION PHYSICAL DEVELOPMENT 600 COUNTRY TRAIL EAST JORDAN, MN 55352-9339 (952) 496-8346 Fax: (952) 496-8365 www.co.scott.mn.us MITCHELL J. RASMUSSEN, P.E. COUNTY ENGINEER

More information

FY May Quarterly Revision AUSTIN DISTRICT

FY May Quarterly Revision AUSTIN DISTRICT FY 2013-2016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM May Quarterly Revision AUSTIN DISTRICT HIGHWAY May 2013 Approved 4/08/2013 FYs 2013-2016 TIP Amendment Project Description 1 2 3 4 5 6

More information

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary Loop 9 Southeast Corridor/Feasibility Study Appendix F Public Meeting Summaries F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary Loop 9 Southeast Corridor/Feasibility Study

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY Amarillo District May FY 2010 Quarterly Revisions

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY Amarillo District May FY 2010 Quarterly Revisions STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amarillo District May FY 2010 Quarterly Revisions 5-2010 MONDAY, APRIL 26, 2010 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 1 OF 1 11:21:55

More information

2018 Regional Solicitation for Transportation Projects

2018 Regional Solicitation for Transportation Projects 2018 Regional Solicitation for Transportation Projects Regional Solicitation Workshop April 17 2018 Regional Solicitation Purpose To distribute federal Surface Transportation Block Grant Program (STBGP)

More information

Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14

Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14 Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14 DATE: August 27, 2014 ISSUE SUMMARY: PLAN 2040 RTP/TIP Amendment #1 FROM: Tom Worthan, Transportation & Air Quality Committee IMPORTANCE:

More information

Planning Department. RFP No. PLAN 09-01

Planning Department. RFP No. PLAN 09-01 Planning Department RFP No. PLAN 09-01 Request for Proposals Professional Services for Graphic Design as a part of the Envision Garland Comprehensive Plan Submissions for this Request for Proposals (RFP)

More information

Project Budget and Schedule Status

Project Budget and Schedule Status Program Management Project Budget and Schedule Status Highway Program Planning & Programming Committee June 19, 2013 Highway Program Project Schedules EIR/EIS Construction Various project stages Engineering

More information

UNFUNDED TRANSPORTATION PROJECTS OVERVIEW

UNFUNDED TRANSPORTATION PROJECTS OVERVIEW UNFUNDED TRANSPORTATION PROJECTS OVERVIEW THE LIST 40 unique unfunded projects are on the list All projects are important to the future of Arvada s transportation needs. The list has developed over many

More information

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS TO DEVELOP A STRATEGIC INTELLIGENT TRANSPORTATION SYSTEM DEPLOYMENT PLAN May 1, 2015 Page 1 of 13 REQUEST

More information

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By:

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By: Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor Submitted By: Robert P. Williams District Construction Engineer Salem District Virginia Department of Transportation Submitted

More information

Public/Private Partnership Program

Public/Private Partnership Program Public/Private Partnership Program Economic Development Committee February 1, 2010 Purpose Provide a review of the Public/Private Partnership Program ( P/PPP ). Present information requested by the Committee

More information

I-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas

I-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas I-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas 10:00 a.m. Welcome/ Introductions Mark Tomlinson Division Dir., Texas Turnpike Authority Div, TxDOT 10:15 a.m. Presentations

More information

DESIGN BID BUILD IS ALIVE & WELL 2007 Texas Transportation Forum. Doug Pitcock, P.E. President and CEO Williams Brothers Construction Co., Inc.

DESIGN BID BUILD IS ALIVE & WELL 2007 Texas Transportation Forum. Doug Pitcock, P.E. President and CEO Williams Brothers Construction Co., Inc. DESIGN BID BUILD IS ALIVE & WELL 2007 Texas Transportation Forum Doug Pitcock, P.E. President and CEO Williams Brothers Construction Co., Inc. I. WHAT IS THE KATY FREEWAY PROJECT? Regional Map Bush Intercontinental

More information

Appendix E Federal and State Funding Categories

Appendix E Federal and State Funding Categories Appendix E Federal and State Funding Categories This page left blank intentionally. Federal and State Funding Categories Appendix E E 3 Appendix E Federal and State Funding Categories Highway Programs

More information

Appendix 5 Freight Funding Programs

Appendix 5 Freight Funding Programs 5. Chapter Heading Appendix 5 Freight Programs Table of Contents 4.1 Surface Transportation Block Grant (STBG);... 5-1 4.2 Transportation Investment Generating Economic Recovery Discretionary Grant Program

More information

The CAMPO FY

The CAMPO FY The CAMPO FY 2008-2011 Transportation Improvement Program Adopted February 12, 2007 Amended October 8, 2007 Transportation Policy Board 1 Kirk Watson, Chair State Senator 2 Cynthia Long, Vice-Chair Williamson

More information

Transportation Alternatives Program Application For projects in the Tulsa Urbanized Area

Transportation Alternatives Program Application For projects in the Tulsa Urbanized Area FFY 2015-2016 Transportation Alternatives Program Application For projects in the Tulsa Urbanized Area A Grant Program of Moving Ahead for Progress in the 21st Century (MAP-21) U.S. Department of Transportation

More information

Transportation and Trinity River Project Council Committee Meeting

Transportation and Trinity River Project Council Committee Meeting Transportation and Trinity River Project Council Committee Meeting Meeting Minutes Meeting Date: 8 June 2015 Convened: 1:07 p.m. Adjourned: 2:25 p.m. Councilmembers: Vonciel Jones Hill, Chair Lee Kleinman,

More information

Media Contacts Regarding Hyperloop

Media Contacts Regarding Hyperloop Media Contacts Regarding Hyperloop Media Type Media Person Media Affiliation On-camera Ben Russell NBC 5 On-camera Interview Lexie Houghtaling NBC 5 On-camera Interview Tom (Camera man) CBS 11 On-camera

More information

Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016

Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016 Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation September 2016 SMART SCALE Safety Factors Evaluation 1. Using Crash Modification Factors for SMART SCALE Safety Evaluation

More information

School Siting and Transportation

School Siting and Transportation School Siting and Transportation City of Denton and Denton ISD March 5, 2012 North Central Texas Council of Governments Common Goal All schools should provide a safe and healthy learning environment with

More information

TIGER DISCRETIONARY PROGRAM Project Application

TIGER DISCRETIONARY PROGRAM Project Application TIGER DISCRETIONARY PROGRAM Project Application Name of Project: US 175/Interstate Highway (IH) 45 Connector Agency Submitting Project: North Central Texas Council of Governments (NCTCOG) and the Texas

More information

Strategic Projects Division

Strategic Projects Division Strategic Projects Division DESIGN BUILD: The Texas Story 2012 AASHTO Conference May 2, 2012 Portland, Oregon Don Toner, Jr., SRWA Director Strategic Projects Right of Way Strategic Projects Division Texas

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY AMARILLO DISTRICT. AUGUST FY 2009 Quarterly Revisions

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY AMARILLO DISTRICT. AUGUST FY 2009 Quarterly Revisions STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 AMARILLO DISTRICT AUGUST FY 2009 Quarterly Revisions 8-01-2009 MINUTES AMARILLO METROPOLITAN PLANNING ORGANIZATION POLICY ADVISORY COMMITTEE MEETING

More information

KANSAS CITY REGIONAL TIGER PROJECT PMOC PROGESS REPORT 2014 Fiscal Quarter 1 October 1 December 31, 2013

KANSAS CITY REGIONAL TIGER PROJECT PMOC PROGESS REPORT 2014 Fiscal Quarter 1 October 1 December 31, 2013 KANSAS CITY REGIONAL TIGER PROJECT PMOC PROGESS REPORT 2014 Fiscal Quarter 1 October 1 December 31, 2013 January 16, 2014 PROJECT TYPE: Multimodal (bicycle, pedestrian, roadway, transit) LOCATION: Kansas

More information

DIRECTOR S REPORT TRANSPORTATION BOARD SEPTEMBER 10, 2018

DIRECTOR S REPORT TRANSPORTATION BOARD SEPTEMBER 10, 2018 DIRECTOR S REPORT TRANSPORTATION BOARD SEPTEMBER 10, 2018 1 EMERGENCY OPERATIONS MAINTENANCE FORCES IN DISTRICTS 2 AND 3 CLOSED ROADS DUE TO WILDFIRES FLOODING IN SOUTHERN NEVADA DUE TO MONSOON SEASON

More information

Genoa Township Area Road and Bridge Projects

Genoa Township Area Road and Bridge Projects Genoa Township Area Road and Bridge Projects Delaware County Engineer s Office May 18, 2017 Delaware County Engineer s Office 2016 Construction Highlights Biggest construction year in Delaware County Engineer

More information

Transportation Planning & Investment in Urban North Carolina

Transportation Planning & Investment in Urban North Carolina Transportation Planning & Investment in Urban North Carolina Using the Voice of Mayors to Advance North Carolina Almost all future NC growth projected to occur in urban areas Projected share of 2010-2035

More information

(This page intentionally left blank)

(This page intentionally left blank) (This page intentionally left blank) 1 INTERSTATE 564 INTERMODAL CONNECTOR PROJECT R000-122-108 FINANCIAL PLAN NOVEMBER 2014 FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION VIRGINIA

More information

Special State Funding Programs Breakout Session #5C Funding Programs Track. October 25, 2012

Special State Funding Programs Breakout Session #5C Funding Programs Track. October 25, 2012 Special State Funding Programs Breakout Session #5C Funding Programs Track October 25, 2012 SPECIAL STATE FUNDING PROGRAMS - REVENUE SHARING Debbi Webb-Howells Revenue Sharing Program Manager Local Assistance

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

2040 Transportation Policy Plan Update. Council Committee of the Whole December 6, 2017

2040 Transportation Policy Plan Update. Council Committee of the Whole December 6, 2017 2040 Transportation Policy Plan Update Council Committee of the Whole December 6, 2017 What is the Transportation Policy Plan (TPP)? Long-range transportation plan for the region Required under state and

More information

Welcome to the WebEx. The presentation for the 2018 Unified Transportation Program (UTP) Public Meeting will begin shortly.

Welcome to the WebEx. The presentation for the 2018 Unified Transportation Program (UTP) Public Meeting will begin shortly. Welcome to the WebEx. The presentation for the 2018 Unified Transportation Program (UTP) Public Meeting will begin shortly. We will take questions after the presentation, however, you may enter questions

More information

9. REVENUE SOURCES FEDERAL FUNDS

9. REVENUE SOURCES FEDERAL FUNDS 9. REVENUE SOURCES This Chapter summarizes multimodal revenue sources and estimates that are applicable to the City of Coolidge and the Town of Florence, together with financial constraints and opportunities

More information

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate Major in FY2013/2014 (By and ing Source) Environmental Services Solid Waste 4200 4200 06CON 4200 SWM01 Balance $13,753,504.00 Balance $4,631,754.00 Balance $2,738,918.00 ing Source Total: $21,124,176.00

More information

Regional Transportation Council 2009 Sustainable Development Funding Program Call for Projects

Regional Transportation Council 2009 Sustainable Development Funding Program Call for Projects Regional Transportation Council 2009 Sustainable Development Funding Program Call for Projects Council Transportation and Environment Committee Prepared by Public Works and Transportation Transportation

More information

Transportation Needs and Funding Role of Impact Fees. January 6, 2015 BoCC Workshop

Transportation Needs and Funding Role of Impact Fees. January 6, 2015 BoCC Workshop Transportation Needs and Funding Role of Impact Fees January 6, 2015 BoCC Workshop 1 Impact Fees Provide Facilities for: Roads* Schools Parks Fire EMS *Most significant element 2 Discussion Topics Current

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY

TABLE OF CONTENTS EXECUTIVE SUMMARY TABLE OF CONTENTS EXECUTIVE SUMMARY v SECTION 1 BACKGROUND. 1 Coalfields Expressway.. 1 Route 460 Connector... 3 Corridor Q. 4 Project History.. 5 Current Activities.. 7 Project Implementation Schedule.

More information

August 2007 Thomas Bohuslav Texas Department of Transportation

August 2007 Thomas Bohuslav Texas Department of Transportation Public Private Partnerships Activities in Texas AASHTO SOC 2007 Summer Meeting Biloxi Mississippi August 2007 Thomas Bohuslav Texas Department of Transportation Topics The Problem (Needs) Comprehensive

More information

Coolidge - Florence Regional Transportation Plan

Coolidge - Florence Regional Transportation Plan Coolidge - Florence Regional Transportation Plan A Partnership Among the City of Coolidge, Town of Florence, and ADOT FINAL REPORT Kimley-Horn Kimley Kimley-Horn and and Associates, Associates, Inc. Inc.

More information

MINUTES. Regional Transportation Council PUBLIC MEETING. Kaufman County Regional Toll Revenue Transportation Funding Initiative Recommendations

MINUTES. Regional Transportation Council PUBLIC MEETING. Kaufman County Regional Toll Revenue Transportation Funding Initiative Recommendations DRAFT MINUTES Regional Transportation Council PUBLIC MEETING Kaufman County Regional Toll Revenue Transportation Funding Initiative Recommendations Meeting Date and Location The North Central Texas Council

More information

Amendment 3 of Horizon 2030 Metropolitan Transportation Plan Amendment 3 of FY 2011 FY 2015 Transportation Improvement Program.

Amendment 3 of Horizon 2030 Metropolitan Transportation Plan Amendment 3 of FY 2011 FY 2015 Transportation Improvement Program. Amendment 3 of Horizon 2030 Metropolitan Transportation Plan Amendment 3 of FY 2011 FY 2015 Transportation Improvement Program November 2011 KIPDA ID State ID Project Name Project Description Project Sponsor

More information

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS 2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS TABLE OF CONTENTS Section 1: Background... 3 A. Policy Framework... 3 B. Development of the 2019-2022 Regional Transportation Improvement Program (TIP)..

More information

Please contact me or Director of Transportation Michael Rogers at (214) if you have any questions or concerns.

Please contact me or Director of Transportation Michael Rogers at (214) if you have any questions or concerns. Memorandum DATE January 12, 2018 CITY OF DALLAS TO Honorable Mayor and Members of the City Council SUBJECT Riverfront Boulevard Project Return of Unused Funds The Riverfront Boulevard project is a joint

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. 2017-2020 Transportation Improvement Program () for the Houston-Galveston Metropolitan Planning Area PUBLIC MEETING DATE OF THE 2017-2020 TRANSPORTATION IMPROVEMENT

More information

Funding the plan. STBG - This program is designed to address specific issues

Funding the plan. STBG - This program is designed to address specific issues Iowa DNR Solid Waste Alternatives Program USDA Rural Development Solid Waste Grants Hazard Mitigation Grant Program (HMGP) Pre-Disaster Mitigation (PDM) Flood Mitigation Assistance (FMA) Water Quality

More information

Performance and Production Review of the Florida Department of Transportation FY 2016/17

Performance and Production Review of the Florida Department of Transportation FY 2016/17 Performance and Production Review of the Florida Department of Transportation FY 2016/17 FLORIDA TRANSPORTATION COMMISSION DECEMBER 7, 2017 Introduction How we got here History behind the measures Conclusion

More information

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS CITY OF CEDAR HILL CITY CENTER TRANSIT-ORIENTED DEVELOPMENT PLAN August 19, 2011 REQUEST FOR PROPOSALS

More information

Long Range Transportation Plan

Long Range Transportation Plan Summary of Policy Governor in 2000. The baseline can The purpose of the Long Range also be considered as the scenario in Transportation Plan (LRTP) is to which no new transportation projects provide decision

More information

Welcome to the WebEx. The presentation for the 2019 Unified Transportation Program (UTP) Public Meeting will begin shortly.

Welcome to the WebEx. The presentation for the 2019 Unified Transportation Program (UTP) Public Meeting will begin shortly. Welcome to the WebEx. The presentation for the 2019 Unified Transportation Program (UTP) Public Meeting will begin shortly. We will take questions after the presentation, however, you may enter questions

More information

Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for

Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for 2012-2015 Part II: TIP Development and Project Selection Processes MPO Planning Process The NIRPC Board of Commissioners

More information

SUBJECT BACKGROUND PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

SUBJECT BACKGROUND PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS) KEY FOCUS AREA: Public Safety AGENDA DATE: March 22, 2017 COUNCIL DISTRICT(S): 3 DEPARTMENT: Aviation CMO: Mark McDaniel, 670-3256 MAPSCO: SUBJECT 63L Authorize (1) the Aviation Department to provide initial

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Transportation and the Federal Government

TEXAS DEPARTMENT OF TRANSPORTATION. Transportation and the Federal Government TEXAS DEPARTMENT OF TRANSPORTATION Transportation and the Federal Government The Role of the Federal Government in State Transportation Programs U.S. Highway 290 BACKGROUND The Federal-Aid Highway Program

More information

FY16 Annual Report WHAT IS GTIB? WHO ADMINSTERS GTIB? Summary of GTIB Funding Through FY16

FY16 Annual Report WHAT IS GTIB? WHO ADMINSTERS GTIB? Summary of GTIB Funding Through FY16 FY16 Annual Report PROVIDING FUNDS TO IMPROVE MOBILITY, SUSTAIN DEVELOPMENT AND ENHANCE COMMUNITIES THROUGHOUT GEORGIA WHAT IS GTIB? The Georgia Transportation Infrastructure Bank (GTIB) provides financial

More information

The Atlanta Region s Plan RTP/ FY TIP Amendment #4. Transportation Coordinating Committee January 5, 2018

The Atlanta Region s Plan RTP/ FY TIP Amendment #4. Transportation Coordinating Committee January 5, 2018 The Atlanta Region s Plan RTP/ FY 2018-2023 TIP Amendment #4 Transportation Coordinating Committee January 5, 2018 What s in Amendment #4? 2017 TIP Project Solicitation Funding Commitments Exempt projects

More information

Board Meeting. Wednesday, June 20, :00 a.m.

Board Meeting. Wednesday, June 20, :00 a.m. Board Meeting Wednesday, June 20, 2018 9:00 a.m. Invocation Pledge of Allegiance Roll Call of Members Announcements Introduction of FDOT Staff Call to Order Highlands Transit Plan Public Involvement Award

More information

NCDOT Planning Summary for NCTA Projects

NCDOT Planning Summary for NCTA Projects NCDOT Planning Summary for NCTA Projects Page 1 Triangle Expressway Southeast Extension Wake and Johnston Counties (STIP Projects R-2721, R-2828, and R-2829) The Triangle Expressway Southeast Extension

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: March 6, 2017 TO: FROM: ACTION TRANSMITTAL No. 2017-08 Transportation Advisory Board Technical Advisory Committee PREPARED

More information

PUBLIC MEETING. For I-10 East, I-410 to Loop 1604

PUBLIC MEETING. For I-10 East, I-410 to Loop 1604 PUBLIC MEETING For I-10 East, I-410 to Loop 1604 November 3, 2016 Welcome Thank you for participating in the Public Meeting for the proposed I-10 East, I-410 to Loop 1604 Project. The meeting is in an

More information

Appendix E Major Stakeholder Meeting Summaries. E1: Ash Grove Cement Company E2: Holcim E3: UPRR E3: BNSF E4: IIIPOD E5: Skyline Landfill E6: Oncor

Appendix E Major Stakeholder Meeting Summaries. E1: Ash Grove Cement Company E2: Holcim E3: UPRR E3: BNSF E4: IIIPOD E5: Skyline Landfill E6: Oncor Loop 9 Southeast Corridor/Feasibility Study Appendix E Major Stakeholder Meeting Summaries E1: Ash Grove Cement Company E2: Holcim E3: UPRR E3: BNSF E4: IIIPOD E5: Skyline Landfill E6: Oncor Loop 9 Southeast

More information

2016 Legislative Report for the Transportation Alternatives Program

2016 Legislative Report for the Transportation Alternatives Program 2016 Legislative Report for the Transportation Alternatives Program Introduction: The Transportation Alternatives Program (TAP) was authorized by the Federal transportation funding Act - the Moving Ahead

More information

MPO Staff Report MPO Technical Advisory Committee: February 14, 2018 MPO Executive Board: February 21, 2018

MPO Staff Report MPO Technical Advisory Committee: February 14, 2018 MPO Executive Board: February 21, 2018 MPO Staff Report MPO Technical Advisory Committee: February 14, 2018 MPO Executive Board: February 21, 2018 RECOMMENDED ACTION: Make a Recommendation on the Urban Grant, Regional and Urban Program Candidate

More information

Martin Pastucha, Director of Public Works David Martin, Director of Planning and Community Development

Martin Pastucha, Director of Public Works David Martin, Director of Planning and Community Development Information Item To: Mayor and City Council Date: November 13, 2013 From: Subject: Martin Pastucha, Director of Public Works David Martin, Director of Planning and Community Development 2013 Call For Projects

More information

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS FEDERAL FINANCIAL AND COMPLIANCE INFORMATION YEAR ENDED SEPTEMBER 30, 2007 TABLE OF CONTENTS Page Independent Auditor s Report on Compliance and Other Matters

More information

Contracted Insurance Plans

Contracted Insurance Plans Contracted Insurance Plans As of March 1, 2018, Children s Health SM has contracts with the following health care insurance plans for the following locations: Children s Medical Center Dallas Children

More information

WH EREAS, the funding will be used to provide support to the selected intern for individual semester activities related to Clean Cities support.

WH EREAS, the funding will be used to provide support to the selected intern for individual semester activities related to Clean Cities support. Exhibit: 2017-08-02-TR RESOLUTI ON AUTHORIZING RECEIPT OF FUNDS FROM THE AMERICAN SOCIETY FOR ENGINEERING EDUCATION FOR THE CLEAN CITIES UNIVERSITY WORKFORCE DEVELOPMENT PROGRAM WHEREAS, the (NCTCOG) is

More information

FFY Transportation Improvement Program

FFY Transportation Improvement Program Lawton Metropolitan Planning Organization DRAFT FFY 2018-2021 Transportation Improvement Program Approved, 2017 The Federal Fiscal Years (FFY) 2018-2021 Transportation Improvement Program (TIP) is updated

More information

CITY COUNCIL STUDY SESSION MEMORANDUM

CITY COUNCIL STUDY SESSION MEMORANDUM City and County of Broomfield, Colorado CITY COUNCIL STUDY SESSION MEMORANDUM To: From: Prepared By: Mayor and City Council George Di Ciero, City and County Manager Debra Baskett, Transportation Manager

More information

Agenda Item D.2 PRESENTATION Meeting Date: June 17, 2014

Agenda Item D.2 PRESENTATION Meeting Date: June 17, 2014 Agenda Item D.2 PRESENTATION Meeting Date: June 17, 2014 TO: FROM: SUBJECT: Mayor and Councilmembers Rosemarie Gaglione, Interim Public Works Director Capital Improvement Program Update RECOMMENDATION:

More information

Contracted Insurance Plans

Contracted Insurance Plans Contracted Insurance Plans As of December 1, 2017 Children s Health SM has contracts with the following health care insurance plans for the following locations: Children s Medical Center Dallas Children

More information

MINUTES WINSTON-SALEM URBAN AREA TECHNICAL COORDINATING COMMITTEE (TCC) JUNE 18, :00 P.M. SECOND FLOOR, CONFERENCE ROOM, BRYCE A

MINUTES WINSTON-SALEM URBAN AREA TECHNICAL COORDINATING COMMITTEE (TCC) JUNE 18, :00 P.M. SECOND FLOOR, CONFERENCE ROOM, BRYCE A MINUTES WINSTON-SALEM URBAN AREA TECHNICAL COORDINATING COMMITTEE (TCC) JUNE 18, 2015 2:00 P.M. SECOND FLOOR, CONFERENCE ROOM, BRYCE A. STUART MUNICIPAL BUILDING MEMBERS PRESENT: Pat Ivey, Division 9 Engineer,

More information

APPENDIX 5. Funding Plan

APPENDIX 5. Funding Plan STUDY: FINAL REPORT APPENDIX 5 Funding Plan May 2015 V:\2073\active\2073009060\report\DRAFT Final Report\rpt_MalPCH_DRAFTFinalReport-20150515.docx Pacific Coast Highway Safety Study: Funding Plan City

More information

Spirit Park. Opening August 2018

Spirit Park. Opening August 2018 Spirit Park Opening August 218 July 24, 218 Honorable Mayor and Members of the Allen City Council: The five-year Capital Improvement Program (CIP) represents the Capital Budget for 219 prepared in accordance

More information

Contracted Insurance Plans

Contracted Insurance Plans Contracted Insurance Plans As of September 1, 2018, Children s Health SM has contracts with the following health care insurance plans for the following locations: Children s Medical Center Dallas Children

More information

Meeting Minutes. Project: Subject: Date: Wednesday, December 16, 2015 Location: Attendees:

Meeting Minutes. Project: Subject: Date: Wednesday, December 16, 2015 Location: Attendees: Meeting Minutes Project: Subject: DART D2 Stakeholder Work Group for D2 Date: Wednesday, December 16, 2015 Location: Attendees: DART, 1401 Pacific Avenue, Dallas, TX Steve Salin, DART Ernie Martinez, DART

More information

Amendments to FY Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) August 2016

Amendments to FY Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) August 2016 Amendments to FY 2015-2018 Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) August 2016 The Transportation Improvement Program (TIP) is the MPO s short-range

More information

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of August 2, 2017.

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of August 2, 2017. COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, SEPTEMBER 13, 2017, 9:00 AM BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY, SAN DIEGO, CALIFORNIA Order of Business

More information

Transportation Projects for Which Federal Funds. Were Obligated During FY 2016/17. November 2017

Transportation Projects for Which Federal Funds. Were Obligated During FY 2016/17. November 2017 Transportation Projects for Which Federal Funds Were Obligated During FY 2016/17 November 2017 (This page intentionally left blank) Transportation Projects for which Federal Funds Were Obligated During

More information

AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch

AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch THOMAS L. JOHNSON, Executive Vice President Joint AGC/TxDOT Committee Meeting February 13, 2012 Minutes 1. Words of welcome Attendees AGC Members

More information