1 Army Integrated Air and Missile Defense (AIAMD) System of System Program Architecture and Materiel Test Directorate Program Support Prepared by Richard O. Martinez 28 January 2015 U.S. Army Test and Evaluation Command

2 Agenda AIAMD System Introduction And Architecture Test Methodology Test Schedule WSMR s Support Indirect Fire Protection Capability (IFPC) Program Support at WSMR Challenges/Concerns

3 Army Integrated Air and Missile Defense System (AIAMD) AIAMD integrates sensors and weapons and a common battle command across a single, Integrated Fire Control Network (IFCN). The common battle command element (IAMD Battle Command System or IBCS) provides the functional capabilities to control and manage the AIAMD sensors and weapons. As a SoS, AIAMD integrates Patriot, Indirect Fire Protection Capability (IFPC), Sentinel, and other weapons systems and sensors currently under development to support engagement of AIAMD threats. Each AIAMD sensor /weapon platform will have a plug and fight interface module which provides distributed battle management functionality to enable network-centric operations. 3

4 AIAMD Full Architecture JIIM GIG FDL JTAGS LINK 16 Patriot Fire Control Qual Engage Net Joint Data Net (Link-16) FAAD Data Link (Legacy) Global Information Grid Situation Dependent AAMDC Army Air and Missile Defense Command ADA Air Defense Artillery ADAM Air Defense Airspace Management AIAMD Army Integrated Air and Missile Defense ASoS Army System of Systems BCT Brigade Combat Team EOC Engagement Operations Center FCQ Fire Control Quality FDL FAAD Data Link GIG Global Information Grid IBCS IAMD Battle Command System IFC Integrated Fire Control IFPC Indirect Fire Protection Capability JIIM Joint, Interagency, Intergovernmental, Multinational JTAGS Joint Tactical Ground Station THAAD Theater High Altitude Area Defense AIAMD BN EOC BCT HQ ADAM Cell EOC ADA Brigade EOC ASoS Sentinel IFC-Net (FCQ Engagement Net) ASoS Patriot Launcher AAMDC EOC AIAMD Btry EOC ASoS Patriot Sensor Sentinel Radar IFPC Inc 2-I PLT IBCS EOC IFPC Inc 2-I Multi-Mission Launcher (MML) 4

5 AIAMD Test Program Methodology Qualification Test Qualification Testing: Environmental, E3, and Mobility/Shock & Vibration Testing Conducted to Determine Hardware Conformance to System Specification Requirements End-To-End Simulation (ETESIM): Permits Repeated and Exhaustive Testing of Multiple Scenarios, Configurations and Conditions ETESIM (Digital Models) S/HWIL G-SIL Search Track (Range) Flight Test Search Track: Serves to Anchor Simulations and Provides Realistic Comms and Live over Sim Loading A Method To Verify Many Requirements in Field Conditions with Tactical Hardware but Still at Less Expense than an Intercept Flight Test Software & Hardware (S/HWIL) : Permits Extensive Testing of Scenarios, Configurations and Conditions with Actual HW and SW as well as Distributed Joint testing Flight Test: Serves to Anchor Simulations and Verify those Requirements that Absolutely Require a Flight Test. Any Warfighter - Anywhere - All the Time For Official Use Only 5

6 AIAMD Government Qualification Units Under Test (UUTs) RIU IBCS EOC Rigid Wall Shelter (RWS) and Truck HP-6 Trailer IFCN Relay S280 Shelter Sentinel LINK ICE TENT Leverage Contractor Verification Testing for GOV Cost Avoidance to System Level Qual

7 IAMD EMD DT IMS Summary (U) Last Updated 10SEP14 GSIL / Andover HWIL Non-FT Specific Activities RSA Demos / Exercises FT-1 Walkup Activities Key Deliveries FT-2 Walkup Activities FT-4 Walkup Activities LUT Walkup Activities IBCS EOC IFCN Relay IBCS SW Patriot RIU Adapted Sentinel Adapted Patriot Lnch CY13 CY14 A M J J A S O N D J F M A M J J A S O N D IBCS SW V2.1 1 D/M Relays RIU SW V2.0 2 A1 Adapted Sentinel LINK SW 1.0ER#1 Prototype #1 LINK 3 D/M EOCs IV2 10/4/13 3 EOCs 2 Relays IBCS SW V3.0.1 ED RIU SW V2.1 ER Config 3 ECS MWO LINK SW 1.0ER#2 Prototype #2 LINK 11/19/13IV3- IV3- INT#1 PMT Range IV3 IA 11/8/13 V2.1 V2.1 ER ER #2 #3 1 RIU Sentinel SW A3.S2.E IBCS SW TUB LINK SW LINK 1 EOC (Refurb) 2 D/M& 2 TAC V2.1 ER #4 3/24/ TAC TAC IBCS SW A ED 2 EOCs (Refurb) 2 EOC IV4 Andover Facility Standup RIU SW V2.1 Sentinel SW A3.S1.0.1E RICO SRR 8/6/14 4 EOCs 2 D/M IBCS SW A RIU SW 3.0 ED IV5 9/12/14 11/10/14 IV6-1 IV6-2 1/9/15 8/1/14 IBCS SW V3.0.2 ED1 1 RIU Sentinel SW A3.S1.0.2F SICO MRR 10/7/14 Eqmt I&CO 2 1 EOCs EOCs 7 3 TAC D/M Relays 1 RIU 1 A ER2 ER ED1 SICO SRR 10/8-14/14 Eqmt I&CO SICO 3.0.2ED3 TRR I&CO IBCS SW V3.0.2 ED2 RIU SW RIU Sentinel SW A3.S2.0.1F 4 P-L ES/T -1 CY15 CY16 J F M A M J J A S O N D J F M A M J J A S 4/24/15 IV8 Andover S/T Analysis Support GSIL/Adnover TRR PMT 3.0.2ED3 Safety Walkup EP IBCS SW IBCS SW V3.0.2 V3.0.2 ED3 ED4 3/11/15 IV7-1 IV7-2 S/T 2-1 S/T S/T IBCS SW V S-280 EOC GSIL/Andover PMT IBCS SW V3.1 ED1 SRR 6/30/15 GSIL/Andover PMT RFR TRR 3.1ED1 Safety Walkup EMD FT-2 (5/28/15) Walkup S/T S/T S/T 4-3 IBCS SW V3.1 ED2 Sentinel SW A3.S3.0.1F 2 A3 IV9 S/T S/T TRR EMD FT-4 (7/30/15) EMD FT-1 (11/19/15) OMAR (6/24/16) GSIL/Andover PMT RFR TRR NET Coll Train/ Customer Log Certs Test ATEC Assessments Demo Phase 1 Phase 2 Phase 3 FDE Qualification Testing / PPT 6 P-L IBCS SW V3.1 RIU SW V3.1 Synch d w/ PEO IMS as of 4 September /30/15 IV10 11/18/15 S/T 1-3 MS C (8/25/16) LUT (EMD DT FT3-1/3-2) (4/28/16) MEI HW Availability MEI SW Availability EMD DT Program Events Any Warfighter - Anywhere - All the Time FOR OFFICIAL USE For Official ONLY Use Only 7

8 FOR OFFICIAL USE ONLY Test Facilities Mobility/Transportability Electromagnetic Environmental Effects (E3) Search Tracks, Live Fires, Altitude & HEMP Climatic / Natural Environments Any Warfighter - Anywhere - All The Time For Official Use Only 8

9 White Sands Missile Range IAMD Range Testing will Occur at WSMR WSMR Las Cruces Albuquerque El Paso Huntsville

10 WSMR Area of Operations After S/T PMT, and a successful MRR/SRR, Test Activities begin at WSMR Uprange Test Locations Logistical and Operational aspects of testing become much more difficult ~ 100 Miles - Essential that Equipment and SW is stable and ready for Integration and Test before shipping - Activities must be well planned and coordinated delays are costly IAMD WSMR Operations will be Headquartered at Building DART Any Warfighter - Anywhere - All the Time For Official Use Only 10

11 90133 Staging Area: Fenced Area around PWR and TSN Drop Secured Area, Allows leaving HW in Tactical Configuration for extended durations Sized for 2 EOCs (BN) with Relays Deployed Area Appx 250 x350 3ea Vehicle Access Gates, 1 personnel Gate Auxiliary Area: Overflow Staging Area if required. Existing fenced in area large enough for MTN and 1 EOC Secured Parking. 2 Vehicle Gates WSMR IAMD Operations and Staging Areas Bldg 90140: Open Warehouse Storage with Secure Logistics Support Bay Large enough to store 2 BN EOCs, 4 IFCN Relays, and 2 BTRY EOCs Any Warfighter - Anywhere - All the Time For Official Use Only 11

12 IAMD East Operational Staging Area Anchor Points Lighting Rod on Light Pole. Relay Tower 25-50M Radius Dimensions Notional Perimeter Light Poles. 320 A MTT Trailers 1-5 Generator 24 Vehicle Access Gate 250 Fire Hyd T R A I L E R T R A I L E R E O C B N I C E I C E E O C B N Vehicle Access Way Parking Lot BN EOC Additional Vehicle Parking Area 24 Vehicle Access Gate LOG Expando Shelter 4 Personnel Access Gate M T N I C E MCR E O C Side Walk T R A I L E R HARFU Tower 25-50M Radius TSN/Phone & PWR Drop E O C B N BTRY EOC Vehicle Access Gate Fire Hyd Lighting Rod on Light Pole. Power Distribution HV Any Warfighter - Anywhere - All the Time For Official Use Only 12

13 AIAMD EMD DT Missions 2015 March S/T 2-1 3/15 3/ The Flight Test 2 mission is an AIAMD simulated engagement of a surrogate (Patriot-as-a-Target (PAAT) short range tactical ballistic missile (TBM) using Patriot Advanced Capability (PAC-2) Guidance Enhanced Missile April - May ST/ 2-2 4/6-4/ engagement of an actual PAAT flown on the FT-2 trajectory S/T 2-3 4/27 5/ engagement of an actual PAAT flown on the FT-2 trajectory June July S/T 4-1 6/8 6/ Will involve a live target (MQM-107) emitting ECM S/T 4-2 6/22 6/ Will involve a live target (MQM-107) emitting ECM S/T 4-3 7/06 7/ Will involve a live target (MQM-107) emitting ECM August- October S/T 1-1 8/31 9/ S/T with Live MQM-107 & Simulated PAC-3 engagement S/T 1-2 9/21 10/ S/T with Live MQM-107 & Simulated PAC-3 engagement S/T /13-10/ S/T with Live MQM -107 & simulated PAC-3 engagement 13

14 Flight Test 2 May/June 2015 The Flight Test -2 mission is an AIAMD engagement of a surrogate (Patriot-as-a-Target [PAAT]) short range tactical ballistic missile (TBM) using Patriot Advanced Capability (PAC-2) Guidance Enhanced Missile T (GEM-T) interceptors (shoot-shoot). Flight Test 4 7/13-7/ FT - 4 mission is an AIAMD engagement of an MQM-107 drone emitting electronic counter-measures (ECM) using a PAC-2 (shoot-look-shoot). Flight Test 1 11/02-11/ FT-1 is an IAMD engagement of a MQM-107 Cruise Missile (CM) surrogate with a PAC-3 interceptor 14

15 IAMD Flight Test Phases & Objectives EMD Phase - Provide supporting data to achieve a low risk MS-C decision LRIP Phase Demonstrate Proof of IAMD Architecture o Integrate with CAP adapted weapons & sensors o Demonstrate Common Command & Control - Provide supporting data to achieve a low risk IOC decision P3I Phase Mature system to demonstrate readiness for operational testing Support IOT&E - Continue to mature/demonstrate capabilities across the performance envelope post IOC decision/p3i Any Warfighter - Anywhere - All the Time For Official Use Only 15

16 IAMD Joint Analysis Team (JAT) Overview Purpose is to jointly analyze and publish test results - Provides single credible set of test results to developer, evaluators, and decision makers JAT test results are used to - Support decision-making process - Assess achievement of test objectives - Support SE requirements verification and system performance measures - Support the Test Incident Report (TIR) process Test events supported by tailored JAT plans - JAT organizational charts (analysis areas, team leaders and analysts) - Data Management and Analysis Plans (DMAP) - Draft strawman Quick-Look and Final Reports The JAT will Plan & Coordinate Data Management, Analysis, & Reporting Activities for all IAMD Test Events Including Qualification, PMT, S/T, & FTs

17 IAMD Joint Analysis Team (JAT) Responsibilities JAT Senior Review Board (SRB) JAT - Provide overall direction of JAT process - Approve test results/reports/briefings - Support Pre-mission Planning Activities Support development of test objectives, success criteria, test and analytical procedures Support review of test plans - Develop Data Management and Analysis Plan (DMAP) Timing and Instrumentation requirements Test Event Data Management & Handling Data Distribution & Archiving Coordination Data Reduction and Analysis - Lead Post-mission Reporting Activities QL Report/Brief (48-72 hr ) Final Report (60 Day)

18 18 IFPC Inc 2-I Block Approach Block 1: Point Defense (C-UAS / CMD) Started 24 March 2014 Leverage existing sensor (Sentinel) Leverage existing interceptors (AIM 9 Class) Leverage existing Mission Command (IBCS) Develop a Multi-Mission Launcher (MML) Block 2: Point Defense (Add C-RAM Capability) Starts in FY19 Leverage S&T /Army Interceptor Investments Leverage Next Generation Tactical Radar (NGTR) development (separate product within CMDS) Leverage existing Mission Command (IBCS) Leverage existing launcher (MML) Block 3: Area Defense (Long Range C-UAS and CMD) Starts in FY27 Leverage S&T (Lower Air Defense, Directed Energy) Modify sensor or compete new sensor

19 19 IFPC Inc 2-I Components Leverage Existing Interceptors Two AIM-9 Class Interceptors Integrated EAPS Missile Integrated Develop New Multi-Mission Launcher Existing FMTV 10 Ton Dump Vehicle Existing HIMARS Azimuth Drive Assembly New Launch Tubes and Rack New Launch Control Software 15 Tubes are Configurable to Load 6 Different Types of Interceptor

20 20 IFPC Inc 2-I Schedule March 2015 Demonstrate ability to launch multiple interceptors from a single MML Guided Mission - LC-50 - AIM-9 Class vs. UAS Ballistic Mission - LC-50 - Accelerated Improved Interceptor Initiative (AI3) Ballistic Mission - LC-50 - Mini Hit to Kill (MHTK) aka Extended Area Protection and Survivability (EAPS) Receive all C2 from Portable Fire Control Systems provided by missile vendors AIAMD participation has not been requested March 2016 Demonstrate ability to integrate into the AIAMD Architecture Engage multiple simultaneous targets with various fully integrated interceptors Guided Missions - WC-50 - Up to 22 combinations of target, flight profile and interceptor are being planned Ballistic Mission - WC-50 - Any new interceptors that are not fully integrated into the MML Receive all C2 from AIAMD EOC

21 21 IFPC Inc 2-I AIAMD Configuration Leverage Existing Mission Command (IBCS) All Command and Control received from AIAMD IBCS EOC

22 Challenges/Concerns Resources Leverage WSMR s past experience base of JLENS, PAC3, SM6, and of course the Army s center-piece of SOS testing: the Network Integrated Evaluation (NIE). Use of WSMR capabilities such as our local Inter Range Control Center (IRCC), which connects through the DREN using JMETEC, and provides resources to other test ranges, labs and facilities across the nation. Test Program Challenging in Many Areas Concurrent Activities Stretched Resources/Spares Personnel Schedule. Competing requirements between AIAMD and various Unit systems (like PATRIOT, IFPC, Sentinel, etc.)

DISTRIBUTION STATEMENT A

DISTRIBUTION STATEMENT A IFPC Inc 2-I DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. 31 IFPC Inc 2-I Mission Mission: Primary Indirect Fire Protection Capability Increment 2 Intercept (IFPC Inc

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 205 Exhibit R2, RDT&E Budget Item Justification: PB 2040: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) R Program Element (Number/Name)

More information

SMDC/ARSTRAT Role In Support Of Army Integrated Air and Missile Defense

SMDC/ARSTRAT Role In Support Of Army Integrated Air and Missile Defense State of IAMD Symposium SMDC/ARSTRAT Role In Support Of Army Integrated Air and Missile Defense SMDC/ARSTRAT 25 June 2015 DISTRIBUTION A. APPROVED FOR PUBLIC RELEASE DISTRIBUTION UNLIMITED (Administrative

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 MISSILE Total FY 2013 FY 2014 FY 2015 FY 2016 Army Page 1 of 11 R-1 Line Item #128 To

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element - 2.885

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 Army Page 1 of 15 R-1 Line #54 To Complete Total

More information

UNCLASSIFIED PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE

UNCLASSIFIED PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE UNCLASSIFIED PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE Overview to HAMA Dr. Charles Basham Chief of Staff 9 December 2016 UNCLASSIFIED Distribution A Approved for Public Release UNCLASSIFIED Program

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2) Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

Army IAMD Modular Open Systems Approach

Army IAMD Modular Open Systems Approach Army IAMD Modular Open Systems Approach Presented to the Defense Daily OA Summit The Power of Modularity and New Open Business Models Panel Presented by Mr. Charley Robinson, Director, System Engineering,

More information

PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE International Industry Defense Fair Army Missile Systems Update

PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE International Industry Defense Fair Army Missile Systems Update PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE International Industry Defense Fair Army Missile Systems Update Mr. Barry Pike Deputy Program Executive Officer Missiles and Space May 2015 Distribution A: Approved

More information

Huntsville Aerospace Marketing Association (HAMA)

Huntsville Aerospace Marketing Association (HAMA) PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE Huntsville Aerospace Marketing Association (HAMA) Marcia Holmes Chief Engineer Program Executive Office Missiles and Space 9 October 2015 Program Executive Office

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 Army Page 1 of 10 R-1 Line Item #116 To Complete

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Army DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 Army Page 1 of 14 R-1 Line #167 To Program Element - 52.811 20.733

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 2: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 25 FY 26 R Program Element

More information

THAAD Program Summary

THAAD Program Summary Program Summary Lockheed Martin Space Systems Company Program Overview_1 1 Unique Battlespace High Altitude Area Defense Battlespace SM3 Block 1A Aegis SM3 / SM3 Altitude (km) / SM3 Atmosphere Transition

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 12.43 27.63 31.397-31.397 14.19 7.912 8.39

More information

PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE

PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE Acquisition Reform In a Rear View Mirror COL David Warnick Project Manager, Joint Attack Munition Systems PEO Missiles and Space Any Warfighter - Anywhere -

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #161

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #161 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2013 FY

More information

PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE

PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE Overview to Chamber of Commerce BG L. Neil Thurgood Program Executive Officer Missiles and Space Mr. Barry J. Pike Deputy Program Executive Officer Missiles

More information

ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2)

ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2) ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2) Joint ACAT ID Program (Navy Lead) Total Number of Systems: Total Program Cost (TY$): Average Unit Cost (TY$): Low-Rate

More information

Overview Huntsville Aerospace Marketing Association

Overview Huntsville Aerospace Marketing Association PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE Overview Huntsville Aerospace Marketing Association COL James Romero Project Manager Joint Attack Munition Systems (JAMS) 8 April 2016 UNCLASSIFIED Program Executive

More information

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE FOR OFFICIAL USE ONLY UNTIL RELEASE BY THE COMMITTEE ON ARMED SERVICES U.S. SENATE STATEMENT BY J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE

More information

MEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM

MEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM MEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM MEADS WORLD CLASS THEATER AIR & MISSILE DEFENSE MEADS has been developed to defeat next-generation threats including tactical ballistic missiles (TBMs), unmanned

More information

MEADS DoD Budget FY2013-FY2017. RDT&E U.S. Army

MEADS DoD Budget FY2013-FY2017. RDT&E U.S. Army MEADS DoD Budget FY2013-FY2017 RDT&E U.S. Army Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 BA 5: Development & Demonstration (SDD) FY 2013 FY 2013 FY 2013 Cost To COST

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Weapons and Munitions - Eng Dev

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Weapons and Munitions - Eng Dev Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 COST ($ in Millions) FY 21 FY 211 PE 6482A: Weapons and Munitions - Eng FY 213 FY 214 FY 215 FY 216 Army Page 1 of 17 R-1 Line

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Air Defense Command, Control and Intelligence - Eng Dev FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Air Defense Command, Control and Intelligence - Eng Dev FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 Army Page 1 of 22 R-1 Line #13 To Program Element 139.662 82.932

More information

Selected Acquisition Report (SAR)

Selected Acquisition Report (SAR) Selected Acquisition Report (SAR) RCS: DD-A&T(Q&A)823-205 IAMD As of December 31, 2011 Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents Program Information 3

More information

BMDO RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

BMDO RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) FY2000 Actual FY 2004 FY2005 FY2006 FY2007 to Theater High Altitude Area Defense (THAAD) 81614 540998 A. Mission Description and Budget Item Justification The Theater High Altitude

More information

Lockheed Martin Corporation Integrating Air & Missile Defense

Lockheed Martin Corporation Integrating Air & Missile Defense Lockheed Martin Corporation Integrating Air & Missile Defense RUSI Missile Defence Conference April 12-13, 2016 London, UK Howard Bromberg Vice President, Air & Missile Defense Strategy & Business Development,

More information

MQM-171 BROADSWORD IN SUPPORT OF TEST MISSIONS

MQM-171 BROADSWORD IN SUPPORT OF TEST MISSIONS MQM-171 BROADSWORD IN SUPPORT OF TEST MISSIONS 2010 NDIA Targets Conference Presenter: Larry French Title: CEO/CTO MQM-171 BroadSword Program Overview BroadSword is the result of the Army s need for a

More information

Advanced Technology Overview for the Huntsville Aerospace Marketing Association

Advanced Technology Overview for the Huntsville Aerospace Marketing Association Advanced Technology Overview for the Huntsville Aerospace Marketing Association DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited May 13, 2016 Mr. Richard Matlock Program

More information

MEADS Program Overview

MEADS Program Overview CLEARED FOR PUBLIC RELEASE INC. MEADS Program Overview MEADS International, Inc. P.O. Box 691749 Orlando, FL 32869-1749 World Class Air and Missile Defense for the 21 st Century Medium Extended Air Defense

More information

The Patriot Missile Failure

The Patriot Missile Failure The Patriot Missile Failure GAO United States General Accounting Office Washington, D.C. 20548 Information Management and Technology Division B-247094 February 4, 1992 The Honorable Howard Wolpe Chairman,

More information

THEATER HIGH ALTITUDE AREA DEFENSE (THAAD)

THEATER HIGH ALTITUDE AREA DEFENSE (THAAD) THEATER HIGH ALTITUDE AREA DEFENSE (THAAD) Army ACAT ID Program Prime Contractor Total Number of Missiles: 1250 Lockheed Martin Missiles and Space Total Program Cost (TY$): $23,000M (w/o&s costs) Sunnyvale,

More information

M&S for OT&E - Examples

M&S for OT&E - Examples Example 1 Aircraft OT&E Example 3.4.1. Modeling & Simulation. The F-100 fighter aircraft will use the Aerial Combat Simulation (ACS) to support evaluations of F-100 operational effectiveness in air-to-air

More information

THAAD Overview. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THAAD Program Overview_1

THAAD Overview. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THAAD Program Overview_1 THAAD Overview DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THAAD Program Overview_1 Today s Ballistic Missile Defense System SENSORS Satellite Surveillance Forward-Based

More information

SSC Pacific is making its mark as

SSC Pacific is making its mark as 5.3 FEATURE FROM THE SPAWAR SYSTEMS CENTER PACIFIC INTERNAL NEWSLETTER SSC Pacific C4I scoring direct hit for shore-based ballistic missile defense SSC Pacific is making its mark as a valued partner in

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 5 - ENG MANUFACTURING DEV 0604768A - BAT COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006

More information

MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER

MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER Army ACAT IC Program Prime Contractor Total Number of Systems: 857 Lockheed Martin Vought Systems Total Program Cost (TY$): $2,297.7M Average Unit Cost

More information

ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II

ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II Army ACAT ID Program Total Number of BATs: (3,487 BAT + 8,478 P3I BAT) Total Number of Missiles: Total Program Cost (TY$): Average Unit Cost (TY$): Full-rate

More information

THEATER HIGH ALTITUDE AREA DEFENSE (THAAD)

THEATER HIGH ALTITUDE AREA DEFENSE (THAAD) THEATER HIGH ALTITUDE AREA DEFENSE (THAAD) Army ACAT ID Program Prime Contractor Total Number of Missiles: 1,233 Lockheed Martin Missiles and Space Total Program Cost (TY$): $17,600M Sunnyvale, CA Average

More information

Phased Adaptive Approach Overview For The Atlantic Council

Phased Adaptive Approach Overview For The Atlantic Council Phased Adaptive Approach Overview For The Atlantic Council Distribution Statement A: Approved for public release; distribution is unlimited 12 OCT 10 LTG Patrick J. O Reilly, USA Director Missile Defense

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW SPACE AND MISSILE DEFENSE WORKING GROUP 22 SEPTEMBER 2016

WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW SPACE AND MISSILE DEFENSE WORKING GROUP 22 SEPTEMBER 2016 Presented to: SPACE AND MISSILE DEFENSE WORKING GROUP WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW Distribution Statement A - Approved for Public Release - Distribution Unlimited. Review completed

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 The Joint Staff Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support COST ($ in Millions)

More information

NAVY AREA THEATER BALLISTIC MISSILE DEFENSE (NATBMD)

NAVY AREA THEATER BALLISTIC MISSILE DEFENSE (NATBMD) NAVY AREA THEATER BALLISTIC MISSILE DEFENSE (NATBMD) Navy ACAT ID Program Prime Contractor Total Number of Systems: 1500 missiles Raytheon Missile Systems Company Total Program Cost (TY$): $6710M Lockheed

More information

MISSILE S&T STRATEGIC OVERVIEW

MISSILE S&T STRATEGIC OVERVIEW Presented to: THE SPACE AND MISSILE DEFENSE WORKING GROUP MISSILE S&T STRATEGIC OVERVIEW Distribution Statement A - Approved for Public Release - Distribution Unlimited. Review completed by AMRDEC Public

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED Exhibit R2, RDT&E Budget Item Justification: PB 207 000: Research, Development, Test & Evaluation, DefenseWide / BA : Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) Prior Years

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED Exhibit R2, RDT&E Budget Item Justification: PB 2017 0400: Research, Development, Test & Evaluation, DefenseWide / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) R1 Program

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 125.44 31.649 4.876-4.876 25.655

More information

MTRIOT MISSILE. Software Problem Led Dhahran, Saudi Arabia. II Hi. jri&^andiovers^ht;gbmmittee afeejs$ää%and Technology,House ofbepre^eiitativess^

MTRIOT MISSILE. Software Problem Led Dhahran, Saudi Arabia. II Hi. jri&^andiovers^ht;gbmmittee afeejs$ää%and Technology,House ofbepre^eiitativess^ ?*$m mw 1, H«"» it in laii Office jri&^andiovers^ht;gbmmittee afeejs$ää%and Technology,House ofbepre^eiitativess^ MTRIOT MISSILE Software Problem Led Dhahran, Saudi Arabia ^^y^ 19980513 249 II Hi SMSTRraDTlON

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

Air-Ground Integrated Layer Exploration (AGILE) Fire Phase II

Air-Ground Integrated Layer Exploration (AGILE) Fire Phase II I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air-Ground Integrated Layer Exploration (AGILE) Fire Phase II Success and Challenges of Distributed Testing Mr. Timothy Menke Technical Director

More information

FIGHTER DATA LINK (FDL)

FIGHTER DATA LINK (FDL) FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average

More information

PEO Missiles and Space Overview Briefing for the 2010 Corrosion Summit February 2010 Huntsville, AL

PEO Missiles and Space Overview Briefing for the 2010 Corrosion Summit February 2010 Huntsville, AL PEO Missiles and Space Overview Briefing for the 2010 Corrosion Summit 9 11 February 2010 Huntsville, AL Presented by: Program Executive Office Missiles and Space PEO MS Corrosion Summit Brief {Slide 1}

More information

Approved for public release; distribution unlimited. Review completed by the AMRDEC Public Affairs Office 16 Nov 2009; FN4324. DISCLAIMER: Reference

Approved for public release; distribution unlimited. Review completed by the AMRDEC Public Affairs Office 16 Nov 2009; FN4324. DISCLAIMER: Reference Approved for public release; distribution unlimited. Review completed by the AMRDEC Public Affairs Office 16 Nov 2009; FN4324. DISCLAIMER: Reference herein to any specific commercial, private or public

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

Headquarters U. S. Air Force. The Air Force s Perspective

Headquarters U. S. Air Force. The Air Force s Perspective Headquarters U. S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e The Air Force s Perspective Mr. Jack Manclark Phone: 703-697-4774 or DSN 227-4774 E-mail: John.Manclark@pentagon.af.mil

More information

FM AIR DEFENSE ARTILLERY BRIGADE OPERATIONS

FM AIR DEFENSE ARTILLERY BRIGADE OPERATIONS Field Manual No. FM 3-01.7 FM 3-01.7 Headquarters Department of the Army Washington, DC 31 October 2000 FM 3-01.7 AIR DEFENSE ARTILLERY BRIGADE OPERATIONS Table of Contents PREFACE Chapter 1 THE ADA BRIGADE

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

Prepared for Milestone A Decision

Prepared for Milestone A Decision Test and Evaluation Master Plan For the Self-Propelled Artillery Weapon (SPAW) Prepared for Milestone A Decision Approval Authority: ATEC, TACOM, DASD(DT&E), DOT&E Milestone Decision Authority: US Army

More information

Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability

Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability U.S. Army Research, Development and Engineering Command Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability NDIA Systems Engineering Conference

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 0604272N, TADIRCM COST ($ in Millions) FY 2006 FY 2007

More information

Counter-Rocket, Artillery, Mortar (C-RAM) Delivers on Promises and Saves Lives

Counter-Rocket, Artillery, Mortar (C-RAM) Delivers on Promises and Saves Lives 25 th Annual NDIA National T&E Conference Atlantic City NJ Counter-Rocket, Artillery, Mortar (C-RAM) Delivers on Promises and Saves Lives Jim Bloodsworth PD C RAM Test Branch Chief Jim.Bloodsworth@us.army.mil

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Army Technical Test Instrumentation and Targets. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Army Technical Test Instrumentation and Targets. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013

More information

System Simulation and Development Directorate (SSDD) Overview

System Simulation and Development Directorate (SSDD) Overview Presented to: Huntsville Aerospace Marketing Association (HAMA) 14 Dec 2012 System Simulation and Development Directorate (SSDD) Overview DISTRIBUTION STATEMENT A: Approved for public release; distribution

More information

Ballistic Missile Defense Update

Ballistic Missile Defense Update Ballistic Missile Defense Update DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. To: 2017 Space And Missile Defense Conference By: Lieutenant General Samuel A. Greaves,

More information

Ballistic Missile Defense Overview

Ballistic Missile Defense Overview Ballistic Missile Defense Overview DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. To: Center For Strategic And International Studies By: Brigadier General Kenneth Todorov,

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Preparation (MTPS) Total FY 2014 FY 2015 FY 2016

More information

Selected Acquisition Report (SAR)

Selected Acquisition Report (SAR) Selected Acquisition Report (SAR) RCS: DD-A&T(Q&A)823-205 Integrated Air and Missile Defense (IAMD) As of FY 2015 President's Budget Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED

More information

REPORT ON THE IMPACT OF THE SUNZIA SOUTHWEST TRANSMISSION PROJECT ON CURRENT AND FUTURE CAPABILITIES OF WHITE SANDS MISSILE RANGE, NEW MEXICO

REPORT ON THE IMPACT OF THE SUNZIA SOUTHWEST TRANSMISSION PROJECT ON CURRENT AND FUTURE CAPABILITIES OF WHITE SANDS MISSILE RANGE, NEW MEXICO REPORT ON THE IMPACT OF THE SUNZIA SOUTHWEST TRANSMISSION PROJECT ON CURRENT AND FUTURE CAPABILITIES OF WHITE SANDS MISSILE RANGE, NEW MEXICO Pursuant to pages 327-330 of the Joint Explanatory Statement

More information

DoD Analysis Update: Support to T&E in a Net-Centric World

DoD Analysis Update: Support to T&E in a Net-Centric World Session C: Past and Present T&E Lessons Learned 40 Years of Excellence in Analysis DoD Analysis Update: Support to T&E in a Net-Centric World 2 March 2010 Dr. Wm. Forrest Crain Director, U.S. Army Materiel

More information

Arms Control Today. U.S. Missile Defense Programs at a Glance

Arms Control Today. U.S. Missile Defense Programs at a Glance U.S. Missile Defense Programs at a Glance Arms Control Today For the past five decades, the United States has debated, researched, and worked on the development of defenses to protect U.S. territory against

More information

NAVY AREA THEATER BALLISTIC MISSILE DEFENSE (NATBMD)

NAVY AREA THEATER BALLISTIC MISSILE DEFENSE (NATBMD) NAVY AREA THEATER BALLISTIC MISSILE DEFENSE (NATBMD) Navy ACAT ID Program Prime Contractor Total Number of Systems: 1,500 missiles Raytheon Missile Systems Company Total Program Cost (TY$): $6710M Lockheed

More information

Theater Ballistic Missile Defense Analyses

Theater Ballistic Missile Defense Analyses TBMD ANALYSES Theater Ballistic Missile Defense Analyses Wayne J. Pavalko, Kanaya R. Chevli, and Michael F. Monius The U.S. Department of Defense is funding the development of Army, Navy, and Air Force

More information

Systems Engineering & LRASM

Systems Engineering & LRASM Systems Engineering & LRASM FOR 19 TH ANNUAL NDIA SYSTEMS ENGINEERING CONFERENCE 25 October 2016 LRASM Deployment Office (LDO) CAPT Tim Octa Hill, Former Director DISTRIBUTION STATEMENT A. Approved for

More information

2015 Assessment of the Ballistic Missile Defense System (BMDS)

2015 Assessment of the Ballistic Missile Defense System (BMDS) Director, Operational Test and Evaluation 2015 Assessment of the Ballistic Missile Defense System (BMDS) April 2016 This report satisfies the provisions of the National Defense Authorization Act for Fiscal

More information

10 August Space and Missile Defense Technology Development Panel AMRDEC Missile S&T. Mr. Jeffrey Langhout

10 August Space and Missile Defense Technology Development Panel AMRDEC Missile S&T. Mr. Jeffrey Langhout Space and Missile Defense Technology Development Panel AMRDEC Missile S&T Distribution Statement A: Approved for Public Release. Distribution is unlimited. 10 August 2017 Presented by: Mr. Jeffrey Langhout

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: FIREFINDER FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: FIREFINDER FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 COST ($ in Millions) FY 21 FY 211 FY 213 FY 214 FY 215 FY 216 To Program Element 19.534 24.736 1.358-1.358 3.977 41.223 37.431

More information

F-22 RAPTOR (ATF) BACKGROUND INFORMATION

F-22 RAPTOR (ATF) BACKGROUND INFORMATION F-22 RAPTOR (ATF) The F-22 is an air superiority fighter designed to dominate the most severe battle environments projected during the first quarter of the 21 st Century. Key features of the F-22 include

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 19.873 20.466 20.954 0.000 20.954 21.254 21.776 22.071 22.305 Continuing Continuing 771: Link-16

More information

AMERICA S ARMY THE STRENGTH OF THE NATION

AMERICA S ARMY THE STRENGTH OF THE NATION AMERICA S ARMY THE STRENGTH OF THE NATION TM Office, Assistant Secretary of the Army for Installations, Energy and Environment Methodology & Analysis for Energy Security in Military Operations (MAESMO)

More information

Close Combat Weapon Systems (CCWS) The CCWS Project Office manages a range of antiarmor missile and target acquisition

Close Combat Weapon Systems (CCWS) The CCWS Project Office manages a range of antiarmor missile and target acquisition MISSILES AND SPACE PROGRAMS The Program Executive Office (PEO) Missiles and Space provides centralized management for all Army air and missile defense and tactical missile programs as well as selected

More information

Analysis of Interface and Screen for Ground Control System

Analysis of Interface and Screen for Ground Control System Journal of Computer and Communications, 2016, 4, 61-66 Published Online May 2016 in SciRes. http://www.scirp.org/journal/jcc http://dx.doi.org/10.4236/jcc.2016.45009 Analysis of Interface and Screen for

More information

Interoperability Testing Using the Hardware-in-the-Loop Test Tool

Interoperability Testing Using the Hardware-in-the-Loop Test Tool Interoperability Testing Using the Hardware-in-the-Loop Test Tool by Capt Bradley Buxton, USAF, Max Cage, Marilyn Munkres, and David Perry TRW, Schriever AFB, Colorado Springs, CO CLEARED FOR OPEN PUBLICATION

More information

U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC)

U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) Briefing for the SAS Panel Workshop on SMART Cooperation in Operational Analysis Simulations and Models 13 October 2015 Release of

More information

Test and Evaluation of Highly Complex Systems

Test and Evaluation of Highly Complex Systems Guest Editorial ITEA Journal 2009; 30: 3 6 Copyright 2009 by the International Test and Evaluation Association Test and Evaluation of Highly Complex Systems James J. Streilein, Ph.D. U.S. Army Test and

More information

2013 Program Excellence Award. Phase I Submission Name of Program: Counter Rocket, Artillery, and Mortar Command and Control (C-RAM C2)

2013 Program Excellence Award. Phase I Submission Name of Program: Counter Rocket, Artillery, and Mortar Command and Control (C-RAM C2) 2013 Program Excellence Award Phase I Submission Name of Program: Counter Rocket, Artillery, and Mortar Command and Control (C-RAM C2) Name of Program Leader: Chris Frei Phone Number: 310-764-6909 Email:

More information

B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP)

B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP) B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP) Air Force ACAT IC Program Prime Contractor Total Number of Systems: 93 Boeing North American Aviation Total Program Cost (TY$): $2,599M Average Unit Cost

More information

The Armed Forces Communications and Electronics Association (AFCEA)

The Armed Forces Communications and Electronics Association (AFCEA) U.S. ARMY TEST AND EVALUATION COMMAND The Armed Forces Communications and Electronics Association (AFCEA) MG John W. Charlton 8 November 2017 Mission What does ATEC do for the Army? ATEC plans, integrates,

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item Justification Exhibit R-2 ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) - COST (In Thousands) INTERIM ARMORED VEHICLE (IAV) FAMILY FY 2010 FY 2011 FY 2012 FY 2013 to 8391 143568 108012

More information