Defense Cost and Resource Center The Defense Cost and Resource Center: An Update

Size: px
Start display at page:

Download "Defense Cost and Resource Center The Defense Cost and Resource Center: An Update"

Transcription

1 Defense Cost and Resource Center The Defense Cost and Resource Center: An Update Ronald Lile 40 th DoDCAS February 2007

2 We need good data reporting!! Acquisition Executives need to make decisions based on actual experience 2

3 DCARC Mission & Objectives Mission To collect historical Major Defense Acquisition Program cost and software resource data and make those data available for use by authorized government analysts to estimate the cost of ongoing and future government programs, particularly DoD weapon systems. Objectives Make CSDR reporting as inexpensive and least disruptive as possible for contractors. Provide wide availability of CSDR data to legitimate government users. Maintain integrity and accuracy of data collected. Improve quality of data reported by industry. Primary Objective: Ensure that DoD cost estimates provided to senior management reflect as accurately as possible DoD s experience 3

4 Actual Contractor Cost Data Provides basis of cost estimates of future systems Long and painful DoD experience has shown that actual cost of producing systems are, by far, the best basis for cost estimates To be useful for this purpose, definitionally consistent historical data are needed CCDRs are DoD s only systematic mechanism for capturing actual data 4

5 Software Resource Data Software is a cost driver on many systems and the DoD has little historical data upon which to base future estimates There are no data to compare estimated software cost and size with actual program results; no records of software metrics Tried and failed to match CARDs with CCDR data Software data routinely reported as red at annual DoD Cost Analysis Symposium 5

6 DCARC Goal Collect and make available data that are: Comparable (i.e., across programs) Meaningful (i.e., level of detail that provides insight) Transparent (i.e., well defined) Accurate Auditable 6

7 So where are we? 7

8 DoD 5000 Compliance 8

9 Active Programs w/caig Approved CSDR Plans & No Issues ACAT IC/ID CSDR Status Post-Dropping of Advisory Ratings Active Programs w/caig Approved CSDR Plans & Minor Issues 1 Active Programs w/caig Approved CSDR Plans & Major Issues 3 Pre-MDAP Programs Not Rated AARGM AMRAAM ADS 21" MRUUVS AWACS Upgrade AEHF** B-2 RMP C-130 AMP** ACS C-5 AMP AIM-9X CEC CH-47F AIAMD ERM ARH CH-53K COBRA JUDY APS FAB-T ATIRCM/CMWS DDG 1000 (DD(X)) CVN-21 AR/LSB JSTARS BRADLEY UPGD** E-2C REPROD EELV BMTC MEADS** C-130J F/A-18 E/F** F-22 CG(X) RMS C-17A F-35 GLOBAL HAWK** DCGS-A SIAP C-5 RERP FBCB2 GMLRS DCGS-AF VTUAV Fire Scout E/A-18G** FCS H-1 Upgrades** JNN No Action E-2D ADV Hawkeye JLENS JTRS GMR (CL 1) LBSD Programs Waived EFV LPD-17** JTRS HMS (CL 5) NGLRS EXCALIBUR MPS JTRS Joint Waveform ODSI CHEM DEMIL FMTV NAVSTAR GPS** LAND WARRIOR SR HPCM GBS NPOESS LB APACHE BLK III* STS CONNECTOR JPATS HIMARS SSGN** LCS** MIDS LVT JASSM V-22 LHA Replacement AOC-WS NAS JDAM (EMD) WIN-T MH-60R E-10 SSDS JSOW MIDS JTRS ECSS MH-60S MM III PRP JTRS AMF MM III GRP MP RTIP Programs Grandfathered MUOS NAVSTAR GPS UE B-2 EHF CVN77 P-8 (MMA) SM 2 (IV) BAMS DDG51 PATRIOT PAC-3 SSN 774 CSAR-X BMDS SBIRS HIGH T-AKE JCA SDB I JHSV SM-6 (ERAM) JPALS STRYKER JUCAS TAC TOMAHAWK Early Problems KC-X UH-60M Upgrade LUH VH-71 (VXX) WGS MPF(F) NAVSTAR GPS III NMT SDB II TSAT TOTAL PROGRAMS 126 As of January 10, Or Agreed Upon Path Forward 2- Includes Data Issues or Plan Implementation Issues 3- Includes No Progress on Data Issues or Plan Implementation Issues *-Initial Assessment **-Withhold program on a get well plan Proper CSDR Planning 9

10 CSDR Plans Approved Plans Analytical Activities CY2002 CY2003 CY2004 CY2005 CY2006 Total Plans IC ID Total IC ID Total IC ID Total IC ID Total IC ID Total IC ID Total Program Contract Subcontract Total ,042 Plans in progress Plans in Progress Plans IC ID Total Program Contract Subcontract Total As of December 31,

11 CY 2006 CSDR Plan Statistics Distribution of Plans Approved in CY Program Plans Approved Contract Plans Approved Subcontract Plans Approved Army Navy Air Force DoD Total 11

12 CY 2006 CSDR Plan Statistics- Cont d CY2006 CSDR Plans Approved 250 More than 50% of CY2006 Plans were revisions Revised New Program Plans Contract Plans Subcontract Plans 12

13 Analysis of CY2006 CSDR Plans NEW 1st Revision(R) 2nd Revision(R1) 3rd Revision(R2) 4th Revision(R3) Count (70%) 62(32%) 12(6%) 4(2%) Air Force Army Navy DoD 3 9 Aircraft Air Force Army 26 7 Navy DoD 1 9 Missile Army 18 An Example CSDR Plan Revisions Ordnance Revisions Air Force 2 2 1st 2nd 3rd 4th Navy 2 3 Missile 18 Electronics Army 18 Air Force 7 3 Javelin Jt Venture, Orlando JAVELIN Army 10 9 Raytheon, Tucson JAVELIN Navy 24 2 LMM&FC, Orlando JAVELIN DoD 2 LMM&FC, Dallas PAC-3, HIMARS GMLRS, HIMARS Space Aerojet GMLRS Air Force General Dynamics GMLRS Navy 2 Surface Vehicle Army 12 Navy 6 2 Ship Navy UAV Air Force 4 2 Navy 7 Sys of Sys Army 11 CAUSALITY: - AMCOM - EDUCATION & TRAINING - DEVIATIONS IN CWBS FROM MIL-HDBK-8881A MISSILE SYSTEM WBS - MULTIPLE PHASES PER CONTRACT - MULTIPLE VARIANTS PER CONTRACT - IMPROPER RFP PACKAGES - LACK OF PRIME-SUBCONTRACTOR-GOV'T PLANNING & POST-AWARD EXECUTION - WRONG WBSs in RFPs - LACK OF PRIME OVERSIGHT ON SUBCONTRACTOR REPORTING- 13

14 Why so many Plan Revisions? Systemic Problems- What we are doing wrong Incorrect, Incomplete & Non-Compliant WBS in RFP (e.g. NLOS-LS) Lack of CAIG-Approved CSDR Plan in RFP (JTRS SRW 1 day notice before contract award) Program Manager s & Contracting Officers uninformed/don t care about CSDR Requirements (e.g. MDA- SM-3) Prime-Subcontractor Flow-Down Requirement Deficiencies (e.g. Lockheed Martin failed to flow down requirement to Boeing on RF Missile Seeker- PAC-3) Lack of Discipline & Management Oversight by Gov t CWIPT leads (F Years of neglect lead to Resubmissions by Prime & Subs) Acquisition Reform Policies (e.g. AMRAAM, JASSM retroactive reporting) Program Unique- Normal Reasons for Revisions Restructures Contract Type Changes Make/Buy Changes Updated based on Contractor Responses 14

15 Analytical Activities Validate CSDR Submissions CCDR Metrics: CY2002 CY2003 CY2004 CY2005 CY2006 Total CCDR Reports Received CCDR Reports Validated CCDR Reports Accepted CCDR Reports Rejected Validation Rate/Yr 73% 59% 86% 100% 100% 98% Acception Rate/Yr 21% 11% 30% 47% 61% 49% SRDR Metrics: CY2002 CY2003 CY2004 CY2005 CY2006 Total SRDR Reports Received SRDR Reports Validated SRDR Reports Accepted SRDR Reports Rejected Validation Rate/Yr N/A N/A N/A 0% 100% 64% Acception Rate/Yr N/A N/A N/A 0% 18% 18% As of December 31,

16 CSDR Training Statistics CSDR Training Metrics > 1200 Students Trained # of Students Industry Gov't CY 2004 CY2005 CY2006 CY

17 DACIMS Holdings 17

18 Reports by Commodity Mil Handbook Number of Reports Aircraft Electronic/Automated Software 3507 Missile 9607 Ordnance 517 Ship 222 Space 1140 Surface Vehicle 708 System of System 9 UAV 95 Total

19 Top Aircraft Programs Program Number of Reports F F/A A EA A E-2 (Hawkeye) 583 P A UH AH

20 Current Aircraft Programs Program Number of Reports F/A AH CH F C V F EA MH H-1 Upgrades 45 E-2 (Advanced Hawkeye) 26 VH-71 (Presidential Helicopter) 20 P-8 (MMA) 8 CH-53K (HLR) 5 RAH-70 (ARH) 3 20

21 Top Missile Programs Program Number of Reports AIM-9 (Sidewinder) 1057 AIM-7; RIM-7 (Sparrow; Sea Sparrow) 973 AIM-54 (Phoenix) 707 LGM-118 (Peacekeeper) 597 AGM-84; RGM-84; UGM-84 (Harpoon) 548 AGM-114 (Hellfire) 540 FIM-92 (Stinger Basic) 441 MIM-72 (Chaparral) 434 UGM-96 (Trident I (C-4)) 376 MIM-104 (Patriot)

22 Current Missile Programs Program Number of Reports AIM-9 (Sidewinder) 1057 AIM-120 (AMRAAM) 292 LGM-30 (Minuteman III) 71 GMLRS (Guided Multiple Launch Rocket System) 64 AGM-154 (Joint Standoff Weapon (JSOW)) 55 MIM-104D (Patriot PAC-3) 26 MGM-164 (ATACMS BLOCK II) 24 NLOS-LS (Non-Line-of-Sight Launch System) 14 Extended Range Active Missile (Standard Missile-6) 10 RIM-66 (Standard Missile-2 (SM-2 MR )) 10 AGM-158 (Joint Air-To-Surface Standoff Missile (JASSM)) 8 RIM-156 (Standard Missile 2 (SM-2 ER)) 7 Joint Common Missile 6 R/UGM-109 (Tactical Tomahawk) 5 RIM-67 (Standard Missile 2 (SM-2)) 2 HIMARS (High Mobility Artillery Rocket System) 1 22

23 Top E/ASS Programs Program Number of Reports F-14 (Tomcat) 457 AH-64 (Apache) 279 B-1 (Lancer) 209 E-8 (Joint STARS) 185 Future Combat Systems (FCS) 153 F-16 (Fighting Falcon) 145 FBCB2 (FORCE XXI Battle Command Brigade & Below) 129 PLRS/JTIDS (Position Locating Reporting System/Joint Tactical Information Distribution 127 MIDS-LVT (Multifunctional Information Distribution System-Low Volume Terminal) 115 F/A-18 (Hornet)

24 Current E/ASS Programs Program Number of Reports AH-64 (Apache) 279 E-8 (Joint STARS) 185 Future Combat Systems (FCS) 153 FBCB2 (FORCE XXI Battle Command Brigade & Below) 129 MIDS-LVT (Multifunctional Information Distribution System-Low Volume Terminal) 115 CEC (Cooperative Engagement Capability) 63 Warfighter Information Network-Tactical (WIN-T) 62 F-35 (Joint Strike Fighter) 41 P-8 (MMA) 33 E-2 (Advanced Hawkeye) 27 F-22 (Raptor) 24 SSN-21 (Seawolf Submarine Combat System) 24 V-22 (Osprey) 22 JTRS Cluster 1 (Joint Tactical Radio System) 16 UH-60 (Black Hawk) 13 MP-RTIP (Multi-Platform Radar Technology Insertion Program) 12 Land Warrior 11 Cobra Judy Replacement (CJR) 9 GBS (Global Broadcast Service) 6 Electromagnetic Aircraft Launch System (EMALS) 4 24

25 Top Space Programs Program Number of Reports LS-3 (Defense Support Program (DSP)) 191 SLV-5 (Titan III) 145 NS-7 (Global Positioning System (NAVSTAR GPS)) 140 ES-8 (MILSTAR) 76 Transformational Satellite Communications System (TSAT) 69 WS-1 (Defense Meteorological Satellite Program (DMSP) 59 Advanced Extremely High Frequency (AEHF) Satellite 55 SB-5 (Titan IV) 49 SSB-7 (Inertial Upper Stage (IUS)) 47 SB-3 (Delta II) 42 25

26 Current Space Programs Program Number of Reports NS-7 (Global Positioning System (NAVSTAR GPS)) 140 Transformational Satellite Communications System (TSAT) 69 Advanced Extremely High Frequency (AEHF) Satellite 55 LS-3 (SBIRS-HIGH) 38 National Polar-orbiting Operational Environmental Satellite System (NPOESS) 30 Mobile User Objective System (MUOS) 27 EELV (Evolved Expendable Launch Vehicle) 7 ABL (Airborne Laser) 5 26

27 Surface Vehicle Programs Program Number of Reports Expeditionary Fighting Vehicle (EFV) 204 M2, M3 (Bradley Fighting Vehicle System (BFVS)/Upgrade) 194 M270 (Multiple Launch Rocket System (MLRS)) 90 M1126-M1135 (Stryker) 75 FMTV (Family of Medium Tactical Vehicles) 42 M1074; M1075 (Palletized Loading System (PLS)) 33 Future Combat Systems (FCS) 21 M1 (Abrams) 15 M6 (Bradley Linebacker) 12 HIMARS (High Mobility Artillery Rocket System) 11 27

28 Sea System Programs Program Number of Reports Littoral Combat Ship (LCS) 61 DDG 1000 (Zumwalt Class) 46 T-AKE (ADC(X) Auxiliary Dry Cargo Carrier) 26 LPD-17 (San Antonio Class) 19 FFG 7 (Guided Missile Frigate) 17 CVN SSGN (Trident) 11 SSN 21 (Seawolf Class) 6 SSBN 726 (Ohio Class Trident) 4 28

29 SRDR Holdings Number of Available Submissions Number of Available Submissions Total Number of 2630 Submissions Program B-2 RMP 1 1 C-130J 1 1 CEC Cobra Judy Replacement 1 1 DDG EA-18G 2 2 EFV FBCB FCS H-1 Upgrades 1 1 ISPAN JSF 3 3 LCS 1 1 MP-RTIP 2 2 THAAD TSAT 1 1 WIN-T Total

30 IT Systems 30

31 Public Web Site Today IT Systems Launch Pad 31

32 Today: User Registration Access of DCARC Systems requires a DCARC issued certificate. Register to Obtain a certificate Request account to access to DACIMS Request account to access to eroom Limitations Access to DACIMS is restricted to Govt only. Access to eroom areas is by MDAP. CSDR Submission Only Requires Certificate. 32

33 Today: User Registration New User Registration After you register, DCARC IT Support generates a digital certificate for you. Come back to this page to retrieve it 33

34 Today: User Registration Step 1 Request Roles: Submitter, DACIMS Access, or eroom Access 34

35 Today: User Registration Step 2 35

36 Today: User Registration Step 3 36

37 CSDR and EVM Reporting: Current Status Defense Acquisition Board CSDR EVM Metrics Summary level only EVM Cost Estimates & Analysis OSD/(AT&L) & Joint Staff Takes 3-6 months** post as of date, summary level only DoD Cost Community SERVICES **- For the Army it is 1-2 months post as of date Request DCARC CSDR Data Request PMs & Other DoD Organizations CSDR Data Data ready 15 days after receipt 75 days post as of date EVM Data: Manually entered, Summary level only Service Program Office CARS/DAMIR Joint Program Office Event-driven CSDR, 60 days post as of date, detailed Excel Industry PDF Word Paper Excel Monthly EVM, days post as of date, detailed WBS 37

38 Today: DACIMS 3.0a 38

39 Today: DACIMS 3.0a Search Button Weapon System Type (based on military designation) Program Name Model/Subsystem MIL-HDBK Category Organized around Mil Handbook, Weapon System Type, Program, and Model 39

40 Sample Search: F-22 Today: DACIMS 3.0a Info Opens page with metadata and attachment list Open Opens cost report in new window All file cabinets are accepted or historical reports and should contain DCARC memo Download Opens box with option to open/save (this will be the fastest way to download data in bulk) 40

41 Today: DACIMS 3.0a Data Record Types Folder Cabinets: typical for newer records to keep the submission components together Single files: Icon identifies file time; title describes content. Legacy TIF format (A) = Accepted (R) = Rejected (P) = Pending (H) = Historical 41

42 Today: DACIMS 3.0a Sample Data Record Detail (part 1) 42

43 Today: DACIMS 3.0a Sample Data Record Detail (part 1) 43

44 Coming Soon 44

45 DoD 5000 Compliance 45

46 Submitted for approval Policy Activities Revised CSDR Manual Revised CCDR Forms and DIDs SRDR DIDs Expect Approval by March 1, 2007 Effective April 2,

47 DoD M-1, CSDR Manual Transferred to the DCARC public web site: CSDR Plan (DD2794) format and instructions Contracting language (RFP & CDRL examples) SRDR Sample Format 1, Government Report Streamlined the Manual Deleted some background & introductory info Eliminated duplicative material, Combined Chapters 4, 5, and 6 into one Chapter (4), Processing and Reporting 47

48 DoD M-1, CSDR Manual Added pre-contract or post contract award conference Revised recurring and nonrecurring definitions Clarified reporting for undefinitized contractual actions Updated and added more detail to the CSDR Process Model in Chapter 4 48

49 CCDR Forms and DIDs Changed Progress Curve Report to its own form and DID Specified cost interrelationships among the three reports Revised recurring and nonrecurring definitions Changed the Manufacturing functional category to Manufacturing Operations Revised definitions of Tooling and Material (including subclasses) Added definition and reporting instructions for intercompany transfers Revised instructions for quantity to date Clarified reporting requirements for Initial, Interim, & Final Provided for submission of reports in XML format in addition to the Excel compatible formats 49

50 SRDR DIDs Disestablished DD Form & -3 Added sample formats Removed sample data dictionary Provided guidance on minimum acceptable set of information required in the SRDR data dictionary Added meta data fields to improve the clarity and context of the data Software functional descriptions Characterization of software development effort Software development method(s) used Cross-references to contract DD 2794 & contract WBS 50

51 SRDR DIDs Added required data fields to improve reported software size data Autogenerated code, Carryover code from previous builds, and Percent re-design, re-code, re-test (to be explained in the data dictionary) to clarify reporting of sub-contractor developed software code and sub-contractor software development effort Added optional data fields for: COTS/GOTS SW integration efforts Standardized software sizing counts via a code counting tool directed by the Government 51

52 DACIMS Holdings 52

53 Future Submissions Type Total CCDR Reports SRDR Reports Total Commodity CCDR SRDR Total Aircraft Electronic/Automated Software Missile Ordnance Ship Space Surface Vehicle System of Systems UAV Grand Total

54 Future Aircraft Submissions Program Total AB ARH C-5 RERP CH-47F CH-53K E-2C REPRO E-2D EA-18G F FA-18EF H-1 Upgrades JSF Longbow Apache MH-60R MH-60S MMA T - 45TS UH-60M V VH Total

55 Future E/ASS Submissions Program Total ADS AESA AOC-WS ATIRCM/CMWS B-2 EHF B-2 RMP CEC FBCB JLENS JTRS AMF JTRS GMR JTRS HMS JTRS SRW MIDS - JTRS 2 2 MP-RTIP MPS Total

56 Future Space Submissions Program Total AEHF EELV 2 2 FAB-T GPS MUOS NMT NPOESS SBIRS HI TSAT WGS Total

57 Future Ship Submissions Program Total CJR CVN DDG LCS LHA(R) LPD RMS SSGN SSN T-AKE Total

58 Future Missile Submissions Program Total AARGM AIM-9X AMRAAM GMLRS JASSM JSOW MM III GRP MM III PRP NLOS PAC SM SM Tactical Tomahawk Total

59 Future SV & UAV Submissions Program Total Bradley Upgrade EFV FMTV HIMARS Stryker Total Program Total Global Hawk NUCAS VTUAV Total

60 IT Systems 60

61 cpet 1.0 beta CSDR Planning & Execution Tool (cpet) Major functions: Implemented against Draft XML Schema. Development of Program / Contract plans Generates form DD2794 based on the selected program or contract. Create Responsibility Assignment Matrix. Creation and validation of 1921 and reports. 61

62 Basic Information cpet 1.0 beta 62

63 cpet 1.0 beta CSDR Planning Major Components 63

64 cpet 1.0 beta Creating the WBS, defaults to Mil Handbook 64

65 cpet 1.0 beta Block 15: Submission Events 65

66 Create DD2794 cpet 1.0 beta 66

67 cpet 1.0 beta Responsibility Assignment Matrix 67

68 Validation Example cpet 1.0 beta 68

69 Validation Example cpet 1.0 beta 69

70 Validation Example cpet 1.0 beta 70

71 CSDR and EVM Reporting: Improved Model Decisions required: 1. Location of repository 2. Single format and submission path 3. Business rules regarding data availability DoD Cost Community Request Cost Estimates & Analysis Data Defense Acquisition Board EVM Metrics OSD/(AT&L) & Joint Staff SERVICES PMs & Other DoD Organizations Data Request DAMIR Data ready 15 days after receipt 75 days post as of date EVM Data available to PMs Immediately upon receipt, days post as of date EVM Data Available via preset business Monthly EVM, days post as of date, detailed WBS Event-driven CSDR, 60 days post as of date, detailed WBS Format Excel Detailed EVM Data via Virtual Library Summary level EVM Data via Purview Industry 71

72 DACIMS 4.0 beta Limited beta test to begin Mar 2007 Organized around user functions Search CSDR FPR DCARC/OSD Review Area Integrated Web-Upload Function NOTES: Will support both certificates and CAC Submitters will need certificate AND username/password 72

73 Sample CSDR Search DACIMS 4.0 beta 73

74 DACIMS 4.0 beta Sample CSDR Search Results (contract list) Number of document meeting search criteria Organized by contract 74

75 DACIMS 4.0 beta Sample CSDR Search Results (document list) 75

76 EVM Central Repository Pilot DACIMS 4.0 Interface, Organized by User Role 76

77 EVM Central Repository Pilot Reviewer Pending Activity 77

78 EVM Central Repository Pilot Document Review Process: Document Detail 78

79 EVM Central Repository Pilot Document Review Process During review process, PM controls access to submission data. Can invite submitting contractor and support contractors to participate in review and provided comments. 79

80 Summary Actual Experience is the best predictor DCARC Tasked with collecting actual cost and software data Activities designed to Make CSDR reporting as inexpensive and least disruptive as possible for contractors Provide wide availability of CSDR data to legitimate government users Maintain integrity and accuracy of data collected Improve quality of data reported by industry Need proactive participation by CWIPT members Leads to collecting the right type of data 80

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: September 30, SAR Narrative Highlights 1. Program Acquisition Cost 4

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: September 30, SAR Narrative Highlights 1. Program Acquisition Cost 4 SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of Date: September 30, 2007 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 4 Distribution of Cost Changes - Base-Year Dollars

More information

Defense Cost and Resource Center

Defense Cost and Resource Center Defense Cost and Resource Center Contractor Cost and Software Data Reporting: An Update Ron Lile April 2004 1 Outline Recent Changes CSDR Status DAES Reporting Automation Training 2 Under Revision DoDD

More information

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: December 31, 2006 INDEX. SAR Narrative Highlights 1. Program Acquisition Cost 9

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: December 31, 2006 INDEX. SAR Narrative Highlights 1. Program Acquisition Cost 9 SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of Date: December 31, 2006 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 9 Distribution of Cost Changes - Base-Year Dollars

More information

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: September 30, 2002 INDEX. SAR Narrative Highlights 1. Program Acquisition Cost 4

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: September 30, 2002 INDEX. SAR Narrative Highlights 1. Program Acquisition Cost 4 SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of Date: September 30, 2002 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 4 Distribution of Cost Changes - Base-Year Dollars

More information

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: December 31, SAR Narrative Highlights 1. Program Acquisition Cost 10

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: December 31, SAR Narrative Highlights 1. Program Acquisition Cost 10 SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of Date: December 31, 2004 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 10 Distribution of Cost Changes - Base-Year Dollars

More information

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: December 31, SAR Narrative Highlights 1. Program Acquisition Cost 9

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: December 31, SAR Narrative Highlights 1. Program Acquisition Cost 9 SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of Date: December 31, 2002 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 9 Distribution of Cost Changes - Base-Year Dollars

More information

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: September 30, SAR Narrative Highlights 1. Program Acquisition Cost 4

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: September 30, SAR Narrative Highlights 1. Program Acquisition Cost 4 SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of Date: September 30, 2010 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 4 Distribution of Cost Changes 7 Distribution of Cost

More information

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of December 31, SAR Narrative Highlights 1. Program Acquisition Cost 9

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of December 31, SAR Narrative Highlights 1. Program Acquisition Cost 9 SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of December 31, 2012 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 9 Distribution of Cost Changes - 12 Distribution of Cost

More information

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of December 31, 2011 INDEX. Distribution of Cost Changes - Base-Year Dollars 12

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of December 31, 2011 INDEX. Distribution of Cost Changes - Base-Year Dollars 12 SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 8 Distribution of Cost Changes - 12 Distribution of Cost Changes - 15 Program Funding

More information

20 mm PGU-28/B Replacement Combat Round 187 Acoustic Rapid Commercial Off-the-Shelf (COTS) Insertion for Sonar AN/BQQ-10 (V) (A-RCI) 97 Advanced

20 mm PGU-28/B Replacement Combat Round 187 Acoustic Rapid Commercial Off-the-Shelf (COTS) Insertion for Sonar AN/BQQ-10 (V) (A-RCI) 97 Advanced CL CD X 20 mm PGU-28/B Replacement Combat Round 187 Acoustic Rapid Commercial Off-the-Shelf (COTS) Insertion for Sonar AN/BQQ-10 (V) (A-RCI) 97 Advanced Extremely High Frequency (AEHF) Satellite Communications

More information

Small Business Contributions to the Transformational Goals of the U.S. Military

Small Business Contributions to the Transformational Goals of the U.S. Military DoD Office of Small and Disadvantaged Business Utilization Small Business Contributions to the Transformational Goals of the U.S. Military Frank Ramos, Director DoD Office of Small and Disadvantaged Business

More information

Department of Defense

Department of Defense Department of Defense Selected Acquisition Reports (SARs) Summary Tables, 2000-2009 Collected and OCRed by AltGov2 www.altgov2.org/sars SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES

More information

I n d e x o f P r o g r a m s

I n d e x o f P r o g r a m s A AC-130J Ghostrider... 255 Acoustic Rapid Commercial Off the Shelf (COTS) Insertion (A-RCI)... 15, 137 Advanced Extremely High Frequency (AEHF) Satellite Communications System... 257 Aegis Ballistic Missile

More information

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: December 31, 2001 INDEX. SAR Narrative Highlights 1. Program Acquisition Cost 12

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: December 31, 2001 INDEX. SAR Narrative Highlights 1. Program Acquisition Cost 12 SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of Date: December 31, 2001 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 12 Distribution of Cost Changes - Base-Year Dollars

More information

529 AAG Advanced Arresting Gear MDAP Navy ID 472 ACV 1.1 Amphibious Combat Vehicle Phase 1 MDAP Navy IC

529 AAG Advanced Arresting Gear MDAP Navy ID 472 ACV 1.1 Amphibious Combat Vehicle Phase 1 MDAP Navy IC Department of Defense 393 3DELRR Three-Dimensional Expeditionary Long- MDAP Air Force ID Range Radar 529 AAG Advanced Arresting Gear MDAP Navy ID 472 ACV 1.1 Amphibious Combat Vehicle Phase 1 MDAP Navy

More information

Quick Reference & Background Materials. AV SOA & BI Tools Session

Quick Reference & Background Materials. AV SOA & BI Tools Session Quick Reference & Background Materials AV SOA & BI Tools Session AVSOA-DAMIR Conference 21-22 October 2009 Quick Reference Accessing the AV SOA Portal Go to: https://atl-portal.chs.spawar.navy.mil Enter

More information

202 AH-64E Remanufacture AH-64E Apache Remanufacture MDAP Army IC

202 AH-64E Remanufacture AH-64E Apache Remanufacture MDAP Army IC 393 3DELRR Three-Dimensional Expeditionary Long- MDAP Air Force IC 529 AAG Advanced Arresting Gear MDAP Navy ID 472 ACV 1.1 Amphibious Combat Vehicle Phase 1 MDAP Navy IC Increment 1 512 ACWS Army Contract

More information

Department of the Navy FY 2006/FY 2007 President s Budget. Winning Today Transforming to Win Tomorrow

Department of the Navy FY 2006/FY 2007 President s Budget. Winning Today Transforming to Win Tomorrow Department of the Navy FY 26/FY 27 President s Budget Winning Today Transforming to Win Tomorrow 4 February 25 1 1 Our budget resources are aligned to support both present responsibilities and future capabilities.

More information

Current Estimate (TY$ in Millions) December 2015 (79 programs) $ 1,644,420.5

Current Estimate (TY$ in Millions) December 2015 (79 programs) $ 1,644,420.5 Department of Defense Comprehensive Selected Acquisition Reports (SARs) For the December 31, 2016 Reporting Requirement as Updated by the President s FY 2018 Budget The Department of Defense (DoD) has

More information

Current Estimate (TY$ in Millions) December 2016 (87 programs) $ 1,748,659

Current Estimate (TY$ in Millions) December 2016 (87 programs) $ 1,748,659 Department of Defense Comprehensive Selected Acquisition Reports (SARs) For the December 31, 2017 Reporting Requirement as Updated by the President s FY 2019 Budget The Department of Defense (DoD) has

More information

Department of Defense MANUAL

Department of Defense MANUAL Department of Defense MANUAL NUMBER 5000.04-M-1 November 4, 2011 Incorporating Change 1, Effective April 18, 2018 CAPE SUBJECT: Cost and Software Data Reporting (CSDR) Manual References: See Enclosure

More information

FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK

FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK February 2018 Table of Contents The Fiscal Year 2019 Budget in Context 2 The President's Request 3 Nuclear Weapons and Non-Proliferation 6 State

More information

Ready to Profit: Corporate Beneficiaries of Congressional Add-Ons to 1. the FY 2018 Pentagon Budget

Ready to Profit: Corporate Beneficiaries of Congressional Add-Ons to 1. the FY 2018 Pentagon Budget Ready to Profit: Corporate Beneficiaries of Congressional Add-Ons to 1 the FY 2018 Pentagon Budget William Hartung and Ari Rickman Arms and Security Project Center for International Policy May 2018 Introduction

More information

FY 2011 Annual Report on Cost Assessment Activities

FY 2011 Annual Report on Cost Assessment Activities FY 2011 Annual Report on Cost Assessment Activities February 2012 This page intentionally left blank FY 2011 Annual Report on Cost Assessment Activities Director, Cost Assessment and Program Evaluation

More information

Cost and Software Data Reporting Training

Cost and Software Data Reporting Training Cost and Software Data Reporting Training CSDR Plan Development October 16, 2012 CSDR Plan Development CSDR IPT Contractor Data Reporting Structure Resource Distribution Table CSDR Plan Development Contracting

More information

a GAO SP GAO DEFENSE ACQUISITIONS Assessments of Selected Weapon Programs Report to Congressional Committees

a GAO SP GAO DEFENSE ACQUISITIONS Assessments of Selected Weapon Programs Report to Congressional Committees United States Government Accountability Office Report to Congressional Committees March 2008 DEFENSE ACQUISITIONS Assessments of Selected Weapon Programs a -08-467SP March 2008 Accountability Integrity

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003 COST ($ in Thousands) FY 2002 Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Cost to Complete Total Cost 0191 Initial Operational Test & Eval 32,550 26,483 34,646 26,896 27,866 28,399 33,656

More information

Number: DI-MGMT Approval Date:

Number: DI-MGMT Approval Date: DATA ITEM DESCRIPTION Title: Quantity Data Report Number: DI-MGMT-82164 Approval Date: 20171116 AMSC Number: 9870 Limitation: DTIC Applicable: No GIDEP Applicable: No Preparing Activity: CAPE Project Number:

More information

Longbow Apache and GMLRS had Nunn McCurdy but did not have any delays

Longbow Apache and GMLRS had Nunn McCurdy but did not have any delays 1 2 3 4 The canceled programs are: EFV VH 71 SADARM Comanche Armed Recon Helo EIBCT DDG 1000 had MS B rescinded (47 programs had performance in DT problems, 35 programs had performance in OT problems,

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2) February 2000 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY SIX LIVE FIRE TESTING PE 0605131D8Z $'s in Millions FY 1999 FY 2000 FY 2001 FY

More information

Activity Summary. Activity and Oversight 1

Activity Summary. Activity and Oversight 1 Activity Summary DOT&E activity for FY06 involved oversight of 293 programs, including 136 major defense acquisition programs and 45 major automated information systems. Oversight activity begins with

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2) July 2001 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY SIX OPERATIONAL TEST AND EVALUATION PE 0605118D8Z $'s in Millions PE 0605118D FY 2000

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Cost Program Element 25.368 20.665 17.767-17.767

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Cost To Complete Total Program Element - 17.754 16.197 13.610-13.610 14.019

More information

DEPARTMENT OF THE NAVY FY 2014 PRESIDENT S BUDGET. Rear Admiral Joseph P. Mulloy, USN Deputy Assistant Secretary of the Navy for Budget

DEPARTMENT OF THE NAVY FY 2014 PRESIDENT S BUDGET. Rear Admiral Joseph P. Mulloy, USN Deputy Assistant Secretary of the Navy for Budget DEPARTMENT OF THE NAVY FY 2014 PRESIDENT S BUDGET Rear Admiral Joseph P. Mulloy, USN Deputy Assistant Secretary of the Navy for Budget 10 April 2013 National Guidance Aligning to Strategic Guidance DoD

More information

Number: DI-MGMT Approval Date:

Number: DI-MGMT Approval Date: DATA ITEM DESCRIPTION Title: Technical Data Report Number: DI-MGMT-82165 Approval Date: 20171116 AMSC Number: 9871 Limitation: DTIC Applicable: No GIDEP Applicable: No Preparing Activity: CAPE Project

More information

System of Systems (SoS) Systems Engineering in Acquisition Program Planning

System of Systems (SoS) Systems Engineering in Acquisition Program Planning System of Systems () Systems Engineering in Acquisition Program Planning Kristen Baldwin Principal Deputy, Systems Engineering Office of the Assistant Secretary of Defense for Research and Engineering

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96 COST ($ in Millions) Prior Years FY 2015 FY 2016 FY 2017 Base FY 2017 OCO FY 2017 Total FY 2018 FY 2019 FY 2020 FY 2021 Cost To Complete Total Program Element - 8.916 10.476 11.529 0.000 11.529 11.985

More information

Proposed U.S. Arms Export Agreements From January 1, 2008 to December 31, 2008 Published on Arms Control Association (

Proposed U.S. Arms Export Agreements From January 1, 2008 to December 31, 2008 Published on Arms Control Association ( Proposed U.S. Arms Export Agreements From January 1, 2008 to December 31, 2008 Fact Sheets & Briefs Contact: Jeff Abramson, Non-Resident Senior Fellow for Arms Control and Conventional Arms Transfers,

More information

Welcome to GSAW2005. Collaboration and Common Solutions. Challenges and Opportunities in Transforming National Security Ground Systems

Welcome to GSAW2005. Collaboration and Common Solutions. Challenges and Opportunities in Transforming National Security Ground Systems Welcome to GSAW2005 Collaboration and Common Solutions Challenges and Opportunities in Transforming National Security Ground Systems Dr. William F. Ballhaus, Jr. President and CEO, The Aerospace Corporation

More information

Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress

Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs Moshe Schwartz Specialist in Defense Acquisition

More information

GAO Review of Best Practices for Quality Assurance 17th Annual Conference on Quality in the Space and Defense Industries March 17, 2009

GAO Review of Best Practices for Quality Assurance 17th Annual Conference on Quality in the Space and Defense Industries March 17, 2009 GAO Review of Best Practices for Quality Assurance 17th Annual Conference on Quality in the Space and Defense Industries March 17, 2009 Michael Sullivan, Director Cheryl Andrew, Senior Defense Analyst

More information

Number: DI-MGMT Approval Date:

Number: DI-MGMT Approval Date: DATA ITEM DESCRIPTION Title: MAINTENANCE AND REPAIR PARTS DATA REPORT Number: DI-MGMT-82163 Approval Date: 20171116 AMSC Number: 9869 Limitation: DTIC Applicable: No GIDEP Applicable: No Preparing Activity:

More information

To THE DEFENSE ACQUISITION WORKFORCE

To THE DEFENSE ACQUISITION WORKFORCE To THE DEFENSE ACQUISITION WORKFORCE When I took over my duties as Deputy Under Secretary of Defense for Acquisition and Technology, I was awed by the tremendous professionalism and ability of our acquisition

More information

Navy Affairs Committee Minutes BOD Meeting - 23 May 2008

Navy Affairs Committee Minutes BOD Meeting - 23 May 2008 Navy Affairs Committee Minutes BOD Meeting - May 008 - Meeting Report- The Navy Affairs Committee meeting was called to order at 9:0am by Chairman, RADM Robert Sutton (USN, Ret.) Chairman Sutton presented

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February, 1999 Appropriation: Operational Test and Program Element Name:Director of Operational Evaluation, Defense Test and Evaluation Budget Activity:

More information

March 9, Subject: Trends in Nunn-McCurdy Cost Breaches for Major Defense Acquisition Programs. Dear Mr. Chairman:

March 9, Subject: Trends in Nunn-McCurdy Cost Breaches for Major Defense Acquisition Programs. Dear Mr. Chairman: United States Government Accountability Office Washington, DC 20548 March 9, 2011 The Honorable Thomas Carper Chairman Committee on Homeland Security and Governmental Affairs Subcommittee on Federal Financial

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0604201A AIRCRAFT AVIONICS ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2008 FY 2009 FY 2010 FY 2011 to Program Element (PE) 72521 13259 61946 71307 85450 99440

More information

Summary: FY 2019 Defense Appropriations Bill Conference Report (H.R. 6157)

Summary: FY 2019 Defense Appropriations Bill Conference Report (H.R. 6157) Top Line 1 Summary: FY 2019 Defense Appropriations Bill Conference Report (H.R. 6157) September 24, 2018 A. Total Appropriations: House: Total discretionary funding: $667.5 billion (an increase of $20.1

More information

Department of Defense Developmental Test and Evaluation and Systems Engineering FY 2011 Annual Report. Washington, DC: DASD(DT&E) and DASD(SE), 2012.

Department of Defense Developmental Test and Evaluation and Systems Engineering FY 2011 Annual Report. Washington, DC: DASD(DT&E) and DASD(SE), 2012. Department of Defense Developmental Test and Evaluation and Systems Engineering FY 2011 Annual Report. Washington, DC: DASD(DT&E) and DASD(SE), 2012. Deputy Assistant Secretary of Defense for Developmental

More information

U. S. Navy Road Ahead Brief to: Precision Strike Association 21 January 2004

U. S. Navy Road Ahead Brief to: Precision Strike Association 21 January 2004 U. S. Navy Road Ahead Brief to: Precision Strike Association 21 January 2004 Sea Power 21 Joint Joint power power from from the the sea sea with with the the advantages of of security, immediate employability,

More information

NAVAL AVIATION MAINTENANCE PROFESSIONAL SYMPOSIUM VADM DAVID ARCHITZEL. 29 June 2011 COMMANDER, NAVAL AIR SYSTEMS COMMAND. Presented to: Presented by:

NAVAL AVIATION MAINTENANCE PROFESSIONAL SYMPOSIUM VADM DAVID ARCHITZEL. 29 June 2011 COMMANDER, NAVAL AIR SYSTEMS COMMAND. Presented to: Presented by: NAVAL AVIATION: NOW AND IN THE FUTURE Presented to: Presented by: 29 June 2011 NAVAL AVIATION MAINTENANCE PROFESSIONAL SYMPOSIUM VADM DAVID ARCHITZEL COMMANDER, NAVAL AIR SYSTEMS COMMAND NAVAIR Public

More information

Proposed U.S. Arms Export Agreements From January 1, 2012 to December 31, 2012 Published on Arms Control Association (

Proposed U.S. Arms Export Agreements From January 1, 2012 to December 31, 2012 Published on Arms Control Association ( Proposed U.S. Arms Export Agreements From January 1, 20 to December 31, 20 Fact Sheets & Briefs Contact: Jeff Abramson, Non-Resident Senior Fellow for Arms Control and Conventional Arms Transfers, jeff@armscontrol.org

More information

FY 2007 Annual Report

FY 2007 Annual Report Director, Operational Test and Evaluation FY 2007 Annual Report December 2007 This report satisfies the provisions of Title 10, United States Code, Section 139. The report summarizes the operational test

More information

FY 2017 Annual Report on Cost Assessment Activities. February 2018

FY 2017 Annual Report on Cost Assessment Activities. February 2018 A FY 2017 Annual Report on Cost Assessment Activities February 2018 This page intentionally left blank. FY 2017 Annual Report on Cost Assessment Activities Director, Cost Assessment and Program Evaluation

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item Justif ication Exhibit R-2 0603460A Joint A ir-to-ground Missile (JAGM) ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) Actual Estimate Estimate to JOINT AIR-TO-GROUND

More information

Challenges and opportunities Trends to address New concepts for: Capability and program implications Text

Challenges and opportunities Trends to address New concepts for: Capability and program implications Text Challenges and opportunities Trends to address New concepts for: Offensive sea control Sea based AAW Weapons development Increasing offensive sea control capacity Addressing defensive and constabulary

More information

Huntsville Aerospace Marketing Association (HAMA)

Huntsville Aerospace Marketing Association (HAMA) PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE Huntsville Aerospace Marketing Association (HAMA) Marcia Holmes Chief Engineer Program Executive Office Missiles and Space 9 October 2015 Program Executive Office

More information

F-35 Weapon System Overview

F-35 Weapon System Overview F-35 Weapon System Overview Doug Hayward Deputy Director F-35 Vehicle Systems Lockheed Martin Aeronautics 2010 Lockheed Martin Aeronautics Company DISTRIBUTION STATEMENT A: A. Approved for public release;

More information

DoD Systems Engineering Update

DoD Systems Engineering Update DoD Systems Engineering Update Kristen J. Baldwin Principal Deputy, Office of the Deputy Assistant Secretary of Defense for Systems Engineering (DASD(SE)), USD(AT&L) AIA Technical Operations Council (TOC)

More information

Activity Summary. D O T & E A c t i v i t y a n d O v e r s i g h t. Activity and Oversight

Activity Summary. D O T & E A c t i v i t y a n d O v e r s i g h t. Activity and Oversight Activity Summary DOT&E activity for FY07 involved oversight of 288 programs, including 43 major automated information systems. Oversight activity begins with the early acquisition milestones, continues

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 92.713 23.188 31.064 46.007-46.007

More information

FIGURE 6-1: PB18 PROCUREMENT REQUEST, AS COMPARED TO PB17 AND FY17 APPROPRIATIONS

FIGURE 6-1: PB18 PROCUREMENT REQUEST, AS COMPARED TO PB17 AND FY17 APPROPRIATIONS 2018 U.S. Defense Budget Procurement September 2017 l Katherine Blakeley Overview Although increased capacity and lethality are the second priority of the Pentagon s PB 2018 budget request behind restoring

More information

CENTER FOR ARMS CONTROL

CENTER FOR ARMS CONTROL CENTER FOR ARMS CONTROL AND NON-PROLIFERATION MILITARY BUDGET AND OVERSIGHT PROGRAM 322 Fourth Street NE * Washington, D.C. 20002 * (202) 546-0795 Online at http://www.armscontrolcenter.org/ Fiscal Year

More information

Industry Day RDML Mat Winter Commander, Naval Air Warfare Center Weapons Division. 23 May 2012

Industry Day RDML Mat Winter Commander, Naval Air Warfare Center Weapons Division. 23 May 2012 Industry Day 2012 Presented by: 23 May 2012 RDML Mat Winter Commander, Naval Air Warfare Center Weapons Division Distribution Statement A: Approved for public release; 1 distribution is unlimited. Strategic

More information

UNCLASSIFIED. Cost To Complete Total Program Element JA6: Joint Air-To-Ground Missile (JAGM)

UNCLASSIFIED. Cost To Complete Total Program Element JA6: Joint Air-To-Ground Missile (JAGM) Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

The World Military Market for Connectors

The World Military Market for Connectors The World Military Market for Connectors Bishop & Associates Inc. has just released a new report providing a quantitative analysis of the World Military Connector Market. This 16 chapter, 315-page research

More information

PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE

PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE Acquisition Reform In a Rear View Mirror COL David Warnick Project Manager, Joint Attack Munition Systems PEO Missiles and Space Any Warfighter - Anywhere -

More information

Future Combat Systems

Future Combat Systems Future Combat Systems Advanced Planning Briefing for Industry (APBI) BG John Bartley 15 October Overarching Acquisition Strategy Buy Future Combat Systems; Equip Soldiers; Field Units of Action (UA) Embrace

More information

LOCKHEED MARTIN MISSILES AND FIRE CONTROL OVERVIEW CLEARED FOR PUBLIC RELEASE PIRA DAL

LOCKHEED MARTIN MISSILES AND FIRE CONTROL OVERVIEW CLEARED FOR PUBLIC RELEASE PIRA DAL LOCKHEED MARTIN MISSILES AND FIRE CONTROL OVERVIEW 1 LOCKHEED MARTIN MISSION & VISION Our Mission Our Vision Our Values We solve complex challenges, advance scientific discovery, and deliver innovative

More information

April 25, Dear Mr. Chairman:

April 25, Dear Mr. Chairman: CONGRESSIONAL BUDGET OFFICE U.S. Congress Washington, DC 20515 Douglas Holtz-Eakin, Director April 25, 2005 Honorable Roscoe G. Bartlett Chairman Subcommittee on Projection Forces Committee on Armed Services

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 2: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 FY 216 R1 Program

More information

Exhibit R-2, RDT&E Budget Item Justification February 2007

Exhibit R-2, RDT&E Budget Item Justification February 2007 PE NUMBER: 27133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification February 27 7 Operational System Development 27133F F-16 SQUADRONS ($ in Millions) 2671 Total Program Element (PE)

More information

Gun and Missile Systems An Integrated Warfare Perspective

Gun and Missile Systems An Integrated Warfare Perspective Gun and Missile Systems An Integrated Warfare Perspective Mr. Christopher Deegan Executive Director PEO Integrated Warfare Systems Distribution Statement A: Approved for public release; distribution is

More information

Net Enabled Weapons (NEW) Support to ASuW. Brian Kelly Precision Strike Weapons March 2012

Net Enabled Weapons (NEW) Support to ASuW. Brian Kelly Precision Strike Weapons March 2012 Net Enabled Weapons (NEW) Support to ASuW Brian Kelly Precision Strike Weapons March 2012 Brian.p.Kelly@navy.mil 1 BLUF Net Enabled Weapons are critical to supporting the ASuW mission and the Navy s strategic

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 19.165 18.599 22.654-22.654 24.342 24.422 24.571 25.715 Continuing

More information

United States Air Force

United States Air Force United States Air Force The MathWorks Aerospace and Defense Conference 2006 Innovation Across the Industry Washington, DC 14 June 2006 Dr. Steve Butler Director, Engineering and Technical Management Wright-Patterson

More information

Kratos Defense & Security Solutions, Inc. Investor Briefing. March 2018 NASDAQ: KTOS 1

Kratos Defense & Security Solutions, Inc. Investor Briefing. March 2018 NASDAQ: KTOS 1 Kratos Defense & Security Solutions, Inc. Investor Briefing March 2018 NASDAQ: KTOS 1 Kratos Company Overview Kratos is a Technology and Products Company in the National Security Industry Primary Focus

More information

DOT&E ACTIVITY SUMMARY

DOT&E ACTIVITY SUMMARY DOT&E ACTIVITY SUMMARY DOT&E activity for FY00 involved oversight of 213 programs, including 26 major automated information systems. Oversight activity begins with the early acquisition milestones, continues

More information

PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE International Industry Defense Fair Army Missile Systems Update

PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE International Industry Defense Fair Army Missile Systems Update PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE International Industry Defense Fair Army Missile Systems Update Mr. Barry Pike Deputy Program Executive Officer Missiles and Space May 2015 Distribution A: Approved

More information

UNCLASSIFIED FY Quantity of RDT&E Articles

UNCLASSIFIED FY Quantity of RDT&E Articles COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 5 R-1 Line #159 Cost To Complete Total Program Element - 1.447 1.406 1.782-1.782 1.770

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY

More information

DEPARTMENT OF THE NAVY FY 2019 PRESIDENT S BUDGET

DEPARTMENT OF THE NAVY FY 2019 PRESIDENT S BUDGET DEPARTMENT OF THE NAVY FY 2019 PRESIDENT S BUDGET February 12, 2018 Agenda Strategic Guidance Operational Context Fiscal Context Balanced Choices Reform 1 1 The Foundation Strategic Guidance National Security;

More information

snapshots of 17 key Air Force space programs experiments, development, production, sustainment, and upgrades. The list is not allinclusive.

snapshots of 17 key Air Force space programs experiments, development, production, sustainment, and upgrades. The list is not allinclusive. Snapshots of Space M D ata sheets that follow are snapshots of 17 key Air Force space programs experiments, development, production, sustainment, and upgrades. The list is not allinclusive. It is based

More information

Joint Program Executive Office Joint Tactical Radio System

Joint Program Executive Office Joint Tactical Radio System (24 APRIL 2006) Joint Program Executive Office Joint Tactical Radio System MIDS International Review Board JTRS Moving Forward JPEO JTRS 5 May 2006 Mr. Howard Pace Deputy JPEO JTRS 619-524-4498 Howard.Pace@navy.mil

More information

DOD M-2 SOFTWARE RESOURCES DATA REPORT (SRDR) MANUAL

DOD M-2 SOFTWARE RESOURCES DATA REPORT (SRDR) MANUAL 1.1 Introduction DOD 5000.4-M-2 SOFTWARE RESOURCES DATA REPORT (SRDR) MANUAL CHAPTER 1. SCOPE AND PROCESS This manual describes and explains the collection and reporting of software element data on major

More information

Index of Programs guide to US Navy programs. Index of programs. appendix

Index of Programs guide to US Navy programs. Index of programs. appendix Index of programs appendix Index of Programs 2010 Mine 72 21st entury Destroyer 98 A AAD 82 AAR-47 MAWS 77 ABS 68 AES 137 ADS 150 Acoustic Rapid OTS Insertion 78 AS 142 Active Electronically Scanned Array

More information

MILITARY PERSONNEL, NAVY

MILITARY PERSONNEL, NAVY February 2003 Appropriation Tables MILITARY PERSONNEL, NAVY Table A-1 Military Personnel, Navy Pay and Allowances of Officers 5,232 5,291 5,594 Pay and Allowances of Enlisted 13,355 14,877 15,914 Pay and

More information

2017 Procure-to-Pay Training Symposium 2

2017 Procure-to-Pay Training Symposium 2 DEFENSE PROCUREMENT AND ACQUISITION POLICY PROCURE-TO-PAY TRAINING SYMPOSIUM Reporting Grants and Cooperative Agreements to DAADS Presented by: Jovanka Caton Brian Davidson May 30 June 1, 2017 Hyatt Regency

More information

TITLE III PROCUREMENT

TITLE III PROCUREMENT TITLE III PROCUREMENT The fiscal year 2008 Department of Defense procurement budget request totals $99,623,010,000. The accompanying bill recommends $99,608,169,000. The total amount recommended is a decrease

More information

DIVISION A DEPARTMENT OF DEFENSE AUTHORIZATION TITLE I PROCUREMENT

DIVISION A DEPARTMENT OF DEFENSE AUTHORIZATION TITLE I PROCUREMENT 20 committee conducted 19 sessions. In addition, a total of 55 sessions were conducted by 7 different subcommittees and 1 special oversight panel. DIVISION A DEPARTMENT OF DEFENSE AUTHORIZATION TITLE I

More information

DEPARTMENT OF THE NAVY FY 2016 PRESIDENT S BUDGET

DEPARTMENT OF THE NAVY FY 2016 PRESIDENT S BUDGET 2015 DEPARTMENT OF THE NAVY FY 2016 PRESIDENT S BUDGET Mr. Thomas F. Simoes Director, Investment & Development Division (FMB 2) Office of Budget ASMC National PDI 2015 The Foundation Strategic Guidance

More information

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM Air Force ACAT ID Program Prime Contractor Total Number of Systems: 6 satellites Lockheed Martin Total Program Cost (TY$): N/A Average Unit

More information

Activity Summary. Activity and Oversight 1

Activity Summary. Activity and Oversight 1 Activity Summary DOT&E activity for FY11 involved oversight of 311 programs, including 45 major automated information systems. Oversight activity begins with the early acquisition milestones, continues

More information

CRS Report for Congress

CRS Report for Congress CRS Report for Congress Received through the CRS Web Order Code RS21059 Updated May 31, 2005 Navy DD(X) and CG(X) Programs: Background and Issues for Congress Summary Ronald O Rourke Specialist in National

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 5 - ENG MANUFACTURING DEV 0604768A - BAT COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006

More information

Activity Summary. Activity and Oversight 1

Activity Summary. Activity and Oversight 1 Activity Summary DOT&E activity for FY08 involved oversight of 322 programs, including 47 major automated information systems. Oversight activity begins with the early acquisition milestones, continues

More information

Continuing Opportunities for Small Businesses

Continuing Opportunities for Small Businesses Continuing Opportunities for Small Businesses The Honorable Claude M. Bolton, Jr. Assistant Secretary of the Army (Acquisition, Logistics and Technology) and Army Acquisition Executive June 25, 2002 Small

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

NAVAIR OVERVIEW PRESENTATION TO: NAVAIR SMALL BUSINESS AVIATION TECHNOLOGY CONFERENCE