2 Snapshots of Space M D ata sheets that follow are snapshots of 17 key Air Force space programs experiments, development, production, sustainment, and upgrades. The list is not allinclusive. It is based on the official Air Force Handbook for the 106th Congress and other Air Force and company documents, current as of Nov. 1, Delta II Launch Vehicle Medium-weight spacelift provides access to space to deliver essential Global Positioning System capabilities. Atlas II Launch Vehicle Medium-weight spacelift provides access to space to deliver essential Defense Satellite Communications System and other capabilities. Status: operational, production. Contractors: Lockheed Martin, Rocketdyne, Pratt & Whitney, Honeywell, Marconi. Inventory: N/A. Upgrades: IIA and IIAS. Range: 6,100 pounds to Geosynchronous Earth Orbit. Length: up to 156 feet. Diameter: 10 feet. Weight: 414,000 pounds. Will be supplanted by Evolved Expendable Launch Vehicle. Status: operational, production, last five procured Fiscal Contractors: Boeing, Rocketdyne, Aerojet, Alliant. Inventory: 28 purchased. Upgrades: none planned. Range: 4,120 pounds to Geosynchronous Transfer Orbit. Length: up to 125 feet. Diameter: 8 feet. Fairing Diameter: 9.5 feet. Weight: 511,190 pounds. Placement accuracy apogee: 12,636 miles (+24 miles). Placement accuracy perigee: 116 miles (+0.9 miles). Placement accuracy inclination: 39.0 degrees (+0.0 degrees). 56

3 odernization Evolved Expendable Launch Vehicle Medium- to heavyweight spacelift to meet lift requirements for DoD, national, and civil users. Vehicles will replace current Delta, Atlas, and Titan space launch vehicles during Fiscal Status: engineering and manufacturing development. Contractors: Boeing (Delta IV), Lockheed Martin (Atlas V). Inventory: 28 purchased. First government medium launch Fiscal 2002; government heavy launch Fiscal 2003; commercial launch Fiscal Variants: Delta IV Medium/Heavy; Atlas V Medium/Heavy. Delta IV Range: (Medium) 9,100 pounds to GTO; (Heavy) 29,100 pounds to GTO. Atlas V Range: (Medium) 18,900 pounds to Low Earth Orbit; (Heavy) 42,000 to LEO. Delta IV Length: 235 feet. Atlas V Length: 89.3 feet. Delta IV Diameter: (Medium) 13 feet, (Heavy) 16.7 feet. Atlas V Diameter: 12.5 feet. Delta IV Weight: 565,000 pounds 1.6 million pounds. Atlas V Weight: 734,850 pounds 1.2 million pounds. Launch savings of $5 billion $10 billion through Competition for life of program. Payload interface standard by class for all. Reliability rate of 98 percent. Space Maneuver Vehicle Conceptual space vehicle for aircraft-like space operations with high responsiveness, on-orbit flexibility, and maneuverability. Could be launched from expendable booster, reusable booster, or space shuttle. Work undertaken in conjunction with NASA. Status: technology demonstration. Contractor: Boeing. Inventory: TBD. Altitude: LEO to GTO. Length: 25 feet. Weight: 12,000 pounds gross liftoff weight. Payload Capacity: 1,200 pounds. Mission Duration: up to 6 months. Perform significant orbital maneuvers from LEO, including transfer to GTO and aero-assisted orbital plane changes of more than 10 degrees. Loiter on orbit for up to six months, then return to US for refit and redeployment. Deployment, repositioning, and on orbit service and recovery of satellites. Support of Intelligence, Surveillance, Reconnaissance missions by maneuvering ISR payloads and reconfiguring constellations for optimal coverage. Rendezvous with and inspection of satellites. Titan IV Launch Vehicle Heavyweight spacelift capability to deliver nation s highest priority satellites Defense Support Program, Milstar, and National Reconnaissance Office satellites into orbit. Status: operational, production. Contractors: Lockheed Martin, Boeing, Alliant, Aerojet, Honeywell. Inventory: 40 purchased, 25 launched. Upgrades: none planned. Range: 12,700 pounds to GEO. Length: up to 204 feet. Diameter: 10 feet. Fairing Diameter: 16.7 feet. Weight: 2.2 million pounds. USAF s largest, most powerful expendable launch vehicle. Operational success rate 95 percent plus. 57

4 Advanced EHF Satellite Communications System Extremely High Frequency communications spacecraft that will replace Milstar system and provide additional capabilities. Status: demonstration validation (development). Contractors: Hughes, TRW. Inventory: five in development, none on orbit. Coverage 24 hours a day between 65 degrees north and south. Anti-jam protection for users exposed to fixed and mobile jammers. Nuclear protection for networks supporting critical functions. Provides ability to plan, control, and reconfigure resources. Supports joint warfighter communications among EHF terminals. Low probability of interception/detection. High data rate. Defense Meteorological Satellite Program Provides capability, through all levels of conflict, to collect and disseminate visible and infrared cloud data and other meteorological, oceanographic, and space environment data. Status: operational, sustainment. Contractors: Lockheed Martin, Aerojet, Northrop Grumman, Hughes. Inventory: five on orbit, one more planned. Upgrades: solid-state data recorders. Satellite mean mission duration: 39 months. Primary sensor global resolution: 2.78 kilometers. Theater Resolution: 0.56 kilometers. Senses surface and atmospheric radiation in visible, infrared, and microwave bands. Flies instruments that measure space environmental parameters. Broadcasts critical regional data directly to user terminals in theater to support tactical missions. Global data is downloaded to processing centers. Defense Satellite Communications System Nuclear-hardened, jam-proof satellite backbone of MILSATCOM system, providing secure and high data rate superhigh frequency communications. Status: operational. Contractor: Lockheed Martin. Inventory: 10 on orbit, four in development. Upgrades: service life enhancement plan. 28 channels on five satellites. Defense Support Program Infrared satellite system that provides global coverage and warning of ballistic missile launches, nuclear detonations, and other events. Status: operational. Contractors: TRW, Aerojet. Inventory: classified number on orbit, four in storage. Upgrades: transition to Space Based Infrared System begins in Fiscal Classified number of GEO satellites. Near real-time detection and reporting of missile launches against US or allied forces, interests, and assets worldwide. Near real-time detection and reporting of endoatmospheric (0 50 kilometers), exoatmospheric ( kilometers), and deep space (more than 300 kilometers) detonations worldwide. Other classified parameters. Worldwide, responsive wideband, and anti-jam satellite communications supporting strategic and tactical C 3 I requirements. 58

5 Discoverer II Program Planned on-orbit demonstration of technologies that will permit acquisition of radar surveillance satellites for tactical surveillance and targeting. Status: technical demonstration, concept definition. Contractors: TBD. Inventory: Fiscal demo, two satellites and tactical ground station planned. Eventual constellation of 24. Orbit: two satellites, LEO, 770 kilometers altitude. Payload: phased-array radar for ground moving target indicator, imagery, and precision digital terrain elevation data. Tasking: direct downlink. Operations: day/night, all-weather capable. Two Discoverer II satellites are not operational prototypes but will have technology legacy in operational system. MILSATCOM Polar System Satellite that provides secure, survivable communications, supporting peacetime, contingency, and wartime operations in North Pole region. Status: engineering and manufacturing development. Contractors: classified. Inventory: one on orbit, two in development. Schedule: polar 2 Fiscal 2003 launch, Polar 3 Fiscal Coverage of North Pole region 24 hours/day. Milstar compatible low data rate service. EHF packages on three classified host satellites. Supports independent submarine operations, maritime task force operations, special operations forces, strategic force reconnaissance, single integrated operations plan, tactical warning/attack assessment, and intelligence collection/dissemination activities. Milstar type data rates. Low probability of interception/detection. Anti-jam protection. Anti-scintillation protection. MILSATCOM Wideband System Global Broadcast System satellite provides efficient, high data rate broadcast between many distributed information sources and warfighters using small, inexpensive terminals. Wideband Gapfiller is an interim replacement of current DoD wideband communication satellites. Advance Wideband is a DSCS follow-on, continuation of Gap-filler Ka service, and new GBS Phase 3. Status: GBS Phase 2 Milestone 2, Wideband Gap-filler first launch Fiscal 2004, Advanced Wideband first launch Fiscal Contractor: Raytheon (GBS Phase 2). Inventory: two GBS-2 on orbit, one GBS-2 in development. Upgrades: Wideband Gap-filler and Advanced Wideband systems. Milstar Satellite Communications System Satellite system that provides commanders assured, worldwide C 2 for tactical and strategic forces. Status: operational, engineering and manufacturing development. Contractors: Lockheed Martin, Hughes, TRW. Inventory: two Block I on orbit, four Block II in development. Upgrades: new mission control facilities to support medium data rate operations. Anti-jam capability. Anti-scintillation. Low probability of interception/detection. Protected communications at low and medium data rates. National Polar Orbiting Operational Environmental Satellite System Remote sensing satellite that acquires environmental imagery and specialized meteorological, oceanographic, climatic, land surface, space environmental, and other data supporting DoD and civil missions. Status: program definition and risk reduction. Contractors: TRW, Hughes, Lockheed Martin, Ball Aerospace, Orbital Sciences, ITT, Saab Ericsson. Inventory: none on orbit, five in development. Upgrades: TBD. Uses instruments to sense surface and atmospheric radiation in visible, infrared, and microwave bands. Flies an instrument suite that measures space environmental parameters. Measures 61 distinct environmental parameters such as soil moisture, cloud levels, sea ice, ionospheric scintillation, and more. Coverage: 65 degrees south to 65 degrees north. TBD. 59

6 Navstar Global Positioning System Constellation that provides highly accurate time and three-dimensional position and velocity information to unlimited number of users anywhere on or above Earth, in any weather. Status: operational, sustainment. Contractors: Boeing, Lockheed Martin, North American. Inventory: 27 operational satellites. Upgrades: modernization, second civil signal, user equipment upgrades, Navwar. Constellation: 24+ satellites. Altitude: 10,898 miles. Standard positioning service accuracy: 100 meters. Precise positioning service: 16 meters. Timing: 100 nanoseconds. User accuracy dependent on receiver type and number of satellites acquired. Space Based Infrared System Proposed High and Low infrared system that fulfills needs for missile warning, missile defense, technical intelligence, and battlespace characterization. Status: engineering and manufacturing development (High); program definition (Low). Contractors: Lockheed Martin, TRW, Raytheon, Boeing. Inventory (planned): five GEO satellites (High), 27 LEO satellites (Low). Missile warning North America and theater. Theater missile defense. National missile defense. Battlespace characterization. Technical intelligence. Space Based Laser Conceptual space-based weapon that would provide effective, continuous, boost-phase interception for theater and national missile defense, as well as global surveillance, target designation, and space and air defense. Status: technology experiment. Contractors: Lockheed Martin, TRW, Boeing. Inventory: TBD. Satellites: 30 (proposed). Altitude: 1,000 kilometers. Range: more than 3,000 kilometers. Length: TBD. Weight: less than 48,400 pounds. Magazine: 100 shots. Highly automated battle management capability with assured human control. Negation of enemy missiles within minutes. Provide impact point predictions. Provide data to support accurate kill assessment reports. Perform launch point detection of missiles by using onboard sensors within a defined focus area or by using cued data. Provides enhanced capabilities necessary to combat evolving theater and ballistic missile threats

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM Air Force ACAT ID Program Prime Contractor Total Number of Systems: 6 satellites Lockheed Martin Total Program Cost (TY$): N/A Average Unit

More information

SPACE POWER DELIVERING SPACE & MISSILE CAPABILITIES TO AMERICA AND ITS WARFIGHTING COMMANDS

SPACE POWER DELIVERING SPACE & MISSILE CAPABILITIES TO AMERICA AND ITS WARFIGHTING COMMANDS SPACE POWER DELIVERING SPACE & MISSILE CAPABILITIES TO AMERICA AND ITS WARFIGHTING COMMANDS at the Core of the Air Force Mission Assuring U.S. access to the high ground of Space. Protecting the freedom

More information

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM Air Force ACAT ID Program Prime Contractor Total Number of Satellites: 6 Lockheed Martin Total Program Cost (TY$): N/A Average Unit Cost

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603500F PE TITLE: MULTI-DISCIPLINARY ADV Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011

More information

Arms Control Today. U.S. Missile Defense Programs at a Glance

Arms Control Today. U.S. Missile Defense Programs at a Glance U.S. Missile Defense Programs at a Glance Arms Control Today For the past five decades, the United States has debated, researched, and worked on the development of defenses to protect U.S. territory against

More information

Defense Support Program Celebrating 40 Years of Service

Defense Support Program Celebrating 40 Years of Service Defense Support Program Celebrating 40 Years of Service S i l e n t S e n t r i e s i n S p a c e Defense Support Program Celebrating 40 Years of Service For four decades, the Defense Support Program s

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603432F PE TITLE: Polar MILSATCOM (Space) Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0603432F

More information

FORGING. Space Warriors. In Enduring Freedom, U 2s are flying LANCE W. LORD. 38 JFQ / Winter

FORGING. Space Warriors. In Enduring Freedom, U 2s are flying LANCE W. LORD. 38 JFQ / Winter U 2 returning from mission, Enduring Freedom. Arming B 1 with 2,000-pound JDAM. 1 st Combat Camera Squadron (Reynaldo Ramon) U.S. Air Force (Dave Nolan) By LANCE W. LORD FORGING Space Warriors General

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014

More information

Christine Anderson, SES Program Director MILSATCOM Joint Program Office

Christine Anderson, SES Program Director MILSATCOM Joint Program Office MJPO Lockheed Martin Transformational TRW Boeing Communications March 14, 2002, Rev 5 Christine Anderson, SES Program Director MILSATCOM Joint Program Office ... the ability of forces to communicate and

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0305178F PE TITLE: National Polar-Orbiting Op Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 14 R-1 Line #216 To Program Element

More information

Appendix A. Annex N Space

Appendix A. Annex N Space Appendix A Annex N Space INTRODUCTION Operations Plans (OPLANs) are the theater Combatant Commander key planning component for his Area of Responsibility (AOR). The OPLAN defines tasks and responsibilities

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE N / Navy Meteorological and Ocean Sensors-Space(METOC)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE N / Navy Meteorological and Ocean Sensors-Space(METOC) Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Prior Years

More information

CRS Report for Congress Received through the CRS Web

CRS Report for Congress Received through the CRS Web Order Code RS21148 Updated November 3, 2003 CRS Report for Congress Received through the CRS Web Military Space Programs: Issues Concerning DOD s SBIRS and STSS Programs Summary Marcia S. Smith Specialist

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001 COST ($ in Thousands) Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost 2487 MILSATCOM Terminals 7,572 17,634 41,763 57,601 98,275 81,748 68,438 30,738 25,500 2,324,552 Quantity of RDT&E

More information

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM.

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM. Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) FY 2017 FY 2018 FY 2019

More information

Joint Space Mission Areas

Joint Space Mission Areas Chapter 8 Joint Space Mission Areas Maj Christopher J. King, USAF; and MAJ Kenneth G. Kemmerly, USA Adm Alfred Thayer Mahan saw the earth s oceans as a medium for force projection and commerce which begged

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603432F PE TITLE: Polar MILSATCOM (Space) Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0603432F

More information

2017 Annual Missile Defense Small Business Programs Conference

2017 Annual Missile Defense Small Business Programs Conference 2017 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DISTRIBUTION STATEMENT A. Approved for public release; distribution

More information

US Military Space Organizations

US Military Space Organizations Chapter 10 US Military Space Organizations Maj Burton Catledge, USAF; and MAJ Dillard Young, USA The military s space functions are spread among the Air Force, Navy, and Army, each with its own space-related

More information

National Polar-Orbiting Operational Environmental Satellite System (NPOESS) - Archived 12/2005

National Polar-Orbiting Operational Environmental Satellite System (NPOESS) - Archived 12/2005 C 4 I Forecast National Polar-Orbiting Operational Environmental Satellite System (NPOESS) - Archived 12/2005 Outlook Forecast International projects the U.S. NOAA, U.S. DoD, and NASA will spend some US$5.21

More information

CRS Report for Congress

CRS Report for Congress Order Code RS21148 Updated January 30, 2006 CRS Report for Congress Received through the CRS Web Military Space Programs: Issues Concerning DOD s SBIRS and STSS Programs Summary Marcia S. Smith Specialist

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003 COST ($ in Thousands) FY 2002 Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Cost to Complete Total Cost 2865 Manufacturing Technology 55,694 44,381 39,396 40,112 39,505 40,157 40,787 41,336

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World Any Mission, Any Time... the F-16 Defines Multirole The enemies of world peace are changing. The threats are smaller,

More information

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE FOR OFFICIAL USE ONLY UNTIL RELEASE BY THE COMMITTEE ON ARMED SERVICES U.S. SENATE STATEMENT BY J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE

More information

UNCLASSIFIED. Unclassified

UNCLASSIFIED. Unclassified Clinton Administration 1993 - National security space activities shall contribute to US national security by: - supporting right of self-defense of US, allies and friends - deterring, warning, and defending

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 45.918 33.291 32.373 0.000

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Missile Defense Agency Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Development (ATD) COST ($

More information

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #89

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #89 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

CHAPTER V: SATELLITE SYSTEMS

CHAPTER V: SATELLITE SYSTEMS CHAPTER V: SATELLITE SYSTEMS Military satellite projects were added to the mission of the Western Development Division in the mid-1950's and came to play an increasingly important role in the activities

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 Air Force Page 1 of 25 R-1 Line #70 To Program Element 8,347.364

More information

ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II

ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II Army ACAT ID Program Total Number of BATs: (3,487 BAT + 8,478 P3I BAT) Total Number of Missiles: Total Program Cost (TY$): Average Unit Cost (TY$): Full-rate

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Complete 389 SCAMP BLK II 19493 6895 21006 28028

More information

Russian defense industrial complex s possibilities for development of advanced BMD weapon systems

Russian defense industrial complex s possibilities for development of advanced BMD weapon systems 134 Russian defense industrial complex s possibilities for development of advanced BMD weapon systems 135 Igor KOROTCHENKO Editor-in-Chief of the National Defense magazine The main task handled by the

More information

UNCLASSIFIED. COST ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015

UNCLASSIFIED. COST ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 R-1 ITEM NOMENCLATURE 0305160N NAVY METEOROLOGICAL & OCEAN SENSORS-SPACE (METOC)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 14 R-1 Line #147 Cost To Complete Total

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

Ballistic Missile Defense Update

Ballistic Missile Defense Update Ballistic Missile Defense Update DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. To: 2017 Space And Missile Defense Conference By: Lieutenant General Samuel A. Greaves,

More information

MEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM

MEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM MEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM MEADS WORLD CLASS THEATER AIR & MISSILE DEFENSE MEADS has been developed to defeat next-generation threats including tactical ballistic missiles (TBMs), unmanned

More information

RQ-4A GLOBAL HAWK UNMANNED AERIAL VEHICLE (UAV) SYSTEMS

RQ-4A GLOBAL HAWK UNMANNED AERIAL VEHICLE (UAV) SYSTEMS RQ-4A GLOBAL HAWK UNMANNED AERIAL VEHICLE (UAV) SYSTEMS Air Force Program Total Number of Systems Global Hawk Air Vehicles: Common Ground Segments: Total Program Cost (TY$): Average Unit Production Cost

More information

THAAD Overview. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THAAD Program Overview_1

THAAD Overview. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THAAD Program Overview_1 THAAD Overview DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THAAD Program Overview_1 Today s Ballistic Missile Defense System SENSORS Satellite Surveillance Forward-Based

More information

Military Radar Applications

Military Radar Applications Military Radar Applications The Concept of the Operational Military Radar The need arises during the times of the hostilities on the tactical, operational and strategic levels. General importance defensive

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

2018 Annual Missile Defense Small Business Programs Conference

2018 Annual Missile Defense Small Business Programs Conference 2018 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 15 May 2018 Mr. Joseph C. Keelon Program Executive for Advanced

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013

More information

mm*. «Stag GAO BALLISTIC MISSILE DEFENSE Information on Theater High Altitude Area Defense (THAAD) and Other Theater Missile Defense Systems 1150%

mm*. «Stag GAO BALLISTIC MISSILE DEFENSE Information on Theater High Altitude Area Defense (THAAD) and Other Theater Missile Defense Systems 1150% GAO United States General Accounting Office Testimony Before the Committee on Foreign Relations, U.S. Senate For Release on Delivery Expected at 10:00 a.m.,edt Tuesday May 3,1994 BALLISTIC MISSILE DEFENSE

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 R-1 Line #87

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 R-1 Line #87 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

First Announcement/Call For Papers

First Announcement/Call For Papers AIAA Strategic and Tactical Missile Systems Conference AIAA Missile Sciences Conference Abstract Deadline 30 June 2011 SECRET/U.S. ONLY 24 26 January 2012 Naval Postgraduate School Monterey, California

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Space Based Infrared System (SBIRS) High EMD. Prior Years (+) FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Space Based Infrared System (SBIRS) High EMD. Prior Years (+) FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)

More information

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success Detect, Deny, Disrupt, Degrade and Evade Lethal Threats Advanced Survivability Suite Solutions for Mission Success Countering Smart and Adaptive Threats Military pilots and aircrews must be prepared to

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE SUBCOMMITTEE ON STRATEGIC FORCES SENATE ARMED SERVICES COMMITTEE UNITED STATES SENATE

DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE SUBCOMMITTEE ON STRATEGIC FORCES SENATE ARMED SERVICES COMMITTEE UNITED STATES SENATE NOT FOR PUBLICATION UNTIL RELEASED BY THE ARMED SERVICES COMMITTEE SUBCOMMITTEE ON STRATEGIC FORCES UNITED STATES SENATE DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE SUBCOMMITTEE ON STRATEGIC FORCES

More information

ARCHIVED REPORT. Defense Satellite Communications System - Archived 03/2003

ARCHIVED REPORT. Defense Satellite Communications System - Archived 03/2003 Electronic Systems Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Defense Satellite Communications System - Archived

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #188

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #188 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145

More information

Director, Intelligence and Security Research Center George Mason University

Director, Intelligence and Security Research Center George Mason University Maj Gen (Ret) Robert H. Latiff, USAF Director, Intelligence and Security Research Center George Mason University Introduction and Personal History Work I ve Done and How It Related Research and Development

More information

STATEMENT BY LIEUTENANT GENERAL RICHARD P. FORMICA, USA

STATEMENT BY LIEUTENANT GENERAL RICHARD P. FORMICA, USA RECORD VERSION STATEMENT BY LIEUTENANT GENERAL RICHARD P. FORMICA, USA COMMANDING GENERAL, U.S. ARMY SPACE AND MISSILE DEFENSE COMMAND AND ARMY FORCES STRATEGIC COMMAND BEFORE THE COMMITTEE ON ARMED SERVICES

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 21 R-1 Line #20

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 21 R-1 Line #20 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 121

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 121 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

9 th Annual Disruptive Technologies Conference

9 th Annual Disruptive Technologies Conference 9 th Annual Disruptive Conference Navy IAMD Distribution Statement A: Approved for Public Release; Distribution Unlimited. (12/05/2012). This Brief is provided for Information Only and does not constitute

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 121

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 121 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 5 - ENG MANUFACTURING DEV 0604768A - BAT COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006

More information

Science, Technology, and Attack Tactics Relevant to National Missile Defense Systems

Science, Technology, and Attack Tactics Relevant to National Missile Defense Systems MIT Security Studies Program Science, Technology, and Attack Tactics Relevant to National Missile Defense Systems Theodore A. Postol Professor of Science, Technology, and National Security Policy Security

More information

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION Joe Pelino ARDEC Director of Technology 18 April 2018 UNPARALLELED COMMITMENT &SOLUTIONS Act like someone s life depends on what we do.

More information

GOOD MORNING I D LIKE TO UNDERSCORE THREE OF ITS KEY POINTS:

GOOD MORNING I D LIKE TO UNDERSCORE THREE OF ITS KEY POINTS: Keynote by Dr. Thomas A. Kennedy Chairman and CEO of Raytheon Association of Old Crows Symposium Marriott Marquis Hotel Washington, D.C. 12.2.15 AS DELIVERED GOOD MORNING THANK YOU, GENERAL ISRAEL FOR

More information

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ARCHIVED REPORT. For data and forecasts on current programs please visit  or call Electronic Systems Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Outlook Forecast International projects that the

More information

Space and Counter. AIR FORCE Magazine / June Artists s conception by Eric Simonsen

Space and Counter. AIR FORCE Magazine / June Artists s conception by Eric Simonsen Space and Counter Artists s conception by Eric Simonsen The Pentagon is hoping it can avoid conflict in space. More than any other nation, the United States is heavily dependent on space assets for all

More information

Unmanned Systems. Northrop Grumman Today Annual Conference

Unmanned Systems. Northrop Grumman Today Annual Conference Unmanned Aircraft Builders Conference, Inc 2008 Annual Conference 21-23 September 2008 Doug Fronius Director, Tactical Unmanned IPT Program Manager, VTUAV Navy Fire Scout Northrop Grumman Corporation Northrop

More information

GLOBAL BROADCAST SERVICE (GBS)

GLOBAL BROADCAST SERVICE (GBS) GLOBAL BROADCAST SERVICE (GBS) DoD ACAT ID Program Prime Contractor Total Number of Receive Suites: 493 Raytheon Systems Company Total Program Cost (TY$): $458M Average Unit Cost (TY$): $928K Full-rate

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

To THE DEFENSE ACQUISITION WORKFORCE

To THE DEFENSE ACQUISITION WORKFORCE To THE DEFENSE ACQUISITION WORKFORCE When I took over my duties as Deputy Under Secretary of Defense for Acquisition and Technology, I was awed by the tremendous professionalism and ability of our acquisition

More information

Armed Unmanned Systems

Armed Unmanned Systems Armed Unmanned Systems A Perspective on Navy Needs, Initiatives and Vision Rear Admiral Tim Heely, USN Program Executive Officer Strike Weapons and Unmanned Aviation 10 July 2007 Armed UASs A first time

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

Phased Adaptive Approach Overview For The Atlantic Council

Phased Adaptive Approach Overview For The Atlantic Council Phased Adaptive Approach Overview For The Atlantic Council Distribution Statement A: Approved for public release; distribution is unlimited 12 OCT 10 LTG Patrick J. O Reilly, USA Director Missile Defense

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 R-1 Line #201

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 R-1 Line #201 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

Introduction to missiles

Introduction to missiles Introduction to missiles 5 th Residential Workshop for Young Scholars Global Nuclear Politics and Strategy Rajaram Nagappa International Strategic & Security Studies Programme National Institute of Advanced

More information

Welcome to GSAW2005. Collaboration and Common Solutions. Challenges and Opportunities in Transforming National Security Ground Systems

Welcome to GSAW2005. Collaboration and Common Solutions. Challenges and Opportunities in Transforming National Security Ground Systems Welcome to GSAW2005 Collaboration and Common Solutions Challenges and Opportunities in Transforming National Security Ground Systems Dr. William F. Ballhaus, Jr. President and CEO, The Aerospace Corporation

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

Trusted Partner in guided weapons

Trusted Partner in guided weapons Trusted Partner in guided weapons Raytheon Missile Systems Naval and Area Mission Defense (NAMD) product line offers a complete suite of mission solutions for customers around the world. With proven products,

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0305913F PE TITLE: Nudet Detection System BUDGET ACTIVITY COST ($ In Thousands) FY 1998 Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Nuc Detonation Det

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

AFCEA Industry Days LTC Anthony K. Whitfield Product Manager, Wideband Enterprise Satellite Systems (PdM WESS) 9351 Hall Road (Bldg.

AFCEA Industry Days LTC Anthony K. Whitfield Product Manager, Wideband Enterprise Satellite Systems (PdM WESS) 9351 Hall Road (Bldg. AFCEA Industry Days LTC Anthony K. Whitfield Product Manager, Wideband Enterprise Satellite Systems (PdM WESS) 9351 Hall Road (Bldg. 1456), Fort Belvoir, Virginia 22060 April 2018 Wideband Enterprise Satellite

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: SATCOM Ground Environment (SPACE) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: SATCOM Ground Environment (SPACE) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 PE 33142A: SATCOM Ground Environment Total

More information

Ballistic Missile Defense Overview

Ballistic Missile Defense Overview Ballistic Missile Defense Overview DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. To: Center For Strategic And International Studies By: Brigadier General Kenneth Todorov,

More information

Exhibit R-2, RDT&E Budget Item Justification February 2007

Exhibit R-2, RDT&E Budget Item Justification February 2007 PE NUMBER: 27133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification February 27 7 Operational System Development 27133F F-16 SQUADRONS ($ in Millions) 2671 Total Program Element (PE)

More information

STRATEGIC MASTER PLAN FY04 and Beyond

STRATEGIC MASTER PLAN FY04 and Beyond STRATEGIC MASTER PLAN FY04 and Beyond For copies of this document or for more information on the AFSPC Integrated Planning Process contact: HQ AFSPC/XPXP 150 Vandenberg Street, Suite 1105 Peterson AFB,

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96 COST ($ in Millions) Prior Years FY 2015 FY 2016 FY 2017 Base FY 2017 OCO FY 2017 Total FY 2018 FY 2019 FY 2020 FY 2021 Cost To Complete Total Program Element - 8.916 10.476 11.529 0.000 11.529 11.985

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element 966.537 66.374 29.083 54.838 0.000 54.838 47.369

More information