Future Combat Systems

Size: px
Start display at page:

Download "Future Combat Systems"

Transcription

1

2 Future Combat Systems Advanced Planning Briefing for Industry (APBI) BG John Bartley 15 October

3 Overarching Acquisition Strategy Buy Future Combat Systems; Equip Soldiers; Field Units of Action (UA) Embrace Evolutionary Acquisition while Requirements Mature Contracting via Lead Systems Integrator Demonstrate-Live and Virtual-Force Operational Capabilities of the UA Balance Test and Evaluation with Modeling and Simulation Sustain DARPA/Army Collaborative Relationship for the Future Expand to Joint, Interagency, and Coalition Partners Design for Supportability-Performance-Based Logistics Identify and Manage Risk throughout the Program Accelerate fielding of FCS capability to the Current Force It is about the Networked System of Systems and how it enables Dominant Land Combat for Current and Future Forces

4 Key Tenets of the Program Create Opportunity for Best of Industry to Participate Leverage Government Technology Base to Maximum Extent Associate On-Going Enabling Efforts With LSI-Led Activity Collaborative Environment from Design Through Life Cycle As a Minimum, Commonality at Subsystem/Component Level Design/Plan for Technology Integration and Insertion Maintain and Shape the Industrial Base for the Future Retain Competition throughout Future Force Acquisition Appropriate Government Involvement in Procurement Processes Consistent and Continuous Definition of Requirements Maintain and Shape Government Acquisition Community Program Affordability Balance Performance and Sustainment One Team Operating with Partnership and Teamwork The tenets remain constant: Applying them to the Current and Future Force 10/26/ :23:56 AM 4

5 What Are Future Combat Systems Comprised of a family of systems Advanced, networked air- and ground-based maneuver, maneuver support, and sustainment systems Includes manned and unmanned platforms Networked via a Battle Command architecture Will operate as a system of systems Network existing systems, systems already under development, and new systems to be developed Network will enable: improved ISR, battle command, real time sensor-shooter linkages, and increased synergy between echelons and within small units. capabilities available to UA small units enable the UA to connect to UE, joint capabilities, and national assets

6 FCS Family of Systems FCS Network: key foundational integrating capability 8 Manned Ground Vehicle variants 4 Unmanned Air Vehicle classes (from small unit to brigade level) 3 categories of Unmanned Ground Vehicles: Armed Robotic Vehicles (Assault, RSTA, Light variants) MULEs (cargo & countermine variants) Small Unmanned Ground Vehicle (manpackable) Unattended Ground Sensors Unattended Munitions Non-Line of Sight Launch System (missiles in a box) Intelligent Munitions System Each of these systems is designed within a System of Systems Common Operating Environment (common integrating software)

7 Key Objectives Preserve the Systems of Systems focus, and Field all (to include currently deferred systems) FCS Systems plus the network, at threshold capability by 2014 Field Future Force capabilities to Current Force units in discrete spirals starting in FY08, and provide networked capability to UAs ( FCS-equipped UA) by 2014 Prioritize the development and demonstration of the network and SOSCOE, unattended munitions, sensors, and unmanned air and ground vehicles Embrace evolutionary acquisition through Spiral Development employing a design, build, experiment, and test approach in concert with the user, vice the current concurrent developmental construct. Increase Schedule (original scope intact, plus additional scope for experimentation/spiral out), to address internal and external assessment recommendations and provide Army with near-term funds required for current operations Deliberately identify and assess Spiral out candidate technologies/capabilities for integration into Current Force Units of Action. Incorporate a deliberate and robust design, build, experiment, and test approach to Build Knowledge, adequately inform Decision Points, facilitate assessment of spin-offs, provide feedback to software development, integration & verification, user activities and user tests Invest in Technology Maturity and reliability enhancement activities to reduce cost and schedule risk Meet congressional language for NLOS-C with an integrated approach to all MGV System development and production

8 Acceleration Process FCS FCS Core Systems FY08 Spiral 1 M-UAs M-BCTs FY 08 Spiral 1 Protos with Eval BCT FY10 Spiral 2 FY12 Spiral FY 10 Spiral 1 Prod and Spiral 2 Protos with Eval BCT M-UAs M-BCTs M-BCTs M-BCTs S2 S2 S2 L1 S1 L1 S1 L1 S1 L1 S1 S2 S2 S2 S2 S2 S2 E1 L1 S1 E2 L1 S1 S2 E3 S2 L1 S1 S2 S2 S2 S2 S2 S2 S2 S2 Starting in FY 10 Spiral 1 Prod with M-BCTs 3 of 18 4 of 18 7 of 18 FY 12 Spiral 1, 2 Prod and Spiral 3 Protos with Eval BCT Starting in FY 12 Spiral 1 & 2 Prod with M-BCTs FY14 Spiral 4 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 L4 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 18 of 18 FY 14 Spiral 1, 2, 3 All Prod with Eval BCT ( ) NETWORK UA Battalion (11/36) (01/43) (20/43) (32/43) FY 14 Spiral 1, 2 & Starting in FY 15, Spiral 3 Prod with M-BCTs E Army Bde s Modular Construct Evaluation BCT UA w/ Spiraled Capabilities FCS UA (-) Pending FY06 Decision 10/26/ :23:56 AM 8

9 FCS Revised Program M-BCTs M-BCTs Fielding M-BCTs Support to E-BCT Production Decision Spiral 1 Spiral 2 Spiral 3 EVAL E-BCT Mod E-BCT Initial Product & Post Deployment Support, Including architectural integrity, CM, Commodity & SW support Feedback OT, Field, Sustainment EVAL E-BCT Mod E-BCT EVAL E-BCT Mod E-BCT Spiral 4 EVAL E-BCT Mod E-BCT Spiral 1 integration Assess FCS Main Program Continued Development Spiral 2 integration Assess Spiral 3 integration Continued Development Assess Spiral 4 integration Continued Development Assess FCS UA Thres/Obj Spec UA Unit Set Fielding 10/26/ :23:56 AM 9

10 FCS Program Adjustments Previously deferred FCS systems returned to FCS development UAV Class II UAV Class III Armed Robotic Vehicle (ARV)-Assault ARV-Reconnaissance FCS Maintenance and Recovery Vehicle Experimentation inserted into program to prove revolutionary concepts, mature architecture and components and assist spiral development "Spiral Out" packages start in FY 2008 and will successively insert FCS capability into Current Force Modular Units of Action 10/26/ :23:56 AM 10

11 Organization: FCS-equipped UA Commonality With Current Force Modularity (Less than 4,000 Soldiers in each Brigade) X X X Stryker Heavy Infantry + X FCS FCS Standard maneuver brigades with organic combined arms capabilities Current Future FCS-equipped UA design influenced Heavy and Infantry modular brigades Common design characteristics: Modular Campaign quality with joint and expeditionary capabilities Combined Arms battalions Increased Recon & Surveillance at lower echelons Organic fires battalion Organic logistics support battalion

12 Future Combat Systems Manned Systems Command and Control Vehicle Infantry Carrier Vehicle Mounted Combat System Recon and Surveillance Vehicle Unmanned Air Vehicles Class I Class II Unattended Ground Sensors Class III Class IV Unattended Munitions NLOS LS Intelligent Munitions System Unmanned Ground Vehicles Non-Line of Sight Cannon Non-Line of Sight Mortar FCS Recovery and Maintenance Vehicle Medical Treatment and Evacuation Armed Robotic Vehicle ARV RSTA ARV Aslt ARV-A (L) Small (Manpackable) UGV MULE: MULE: (Countermine) (Transport)

13 FCS Network Centric Architecture A New Way of Warfighting Interoperability Joint Common Database FSB HQ XX FSB Forward Support Battalion Unit of Employment Higher Headquarters Headquarters (UE/HQ) (HHQ) System of Systems Common Operating Environment (SOSCOE) WarfighterI Information Network-Tactical (WIN-T) Wideband Network Waveform ( WNW) Battle Command HQ Hierarchical Ad-Hoc Network Wideband Network Waveform ( WNW) Data Images Voice Video FCS Unit of Action/Unit of Employment Joint Tactical Radio Systems (JTRS)

14 FCS Network-Centric Scenario

15 FCS LSI and Partner Opportunities Opportunities for LSI and partners listed or linked to FCS website FCS is pursuing innovative ways for maximizing Small Business involvement in upcoming competitions for previously deferred systems Unmanned Aerial Vehicles (UAVs) Class II, and III RFPs Q1 05 Source Selection Criteria may reward SB content and SB teaming LSI Spiral Development and Technology Planning (SD&TP) IPT will participate in the 8th Annual Army Small Business Conference High interest technologies to the FCS program to be identified Focus on innovative technology enablers for systems that are lightweight, inexpensive, mobile, lethal, reliable, sustainable, network-centric, and interoperable Soliciting technical white papers beginning Q1 05 Logistics (2005) Interoperability Kits Logistics Data Repository Interactive Approved Electronic for Public Release, Technical Distribution Manual Unlimited, (IETM) PM UA 11 October /26/ :23:56 AM 15

16 Opportunities (continued) Opportunities exist for 2 nd and 3 rd tier support to recent, pending and future selections Ground Sensor 2 nd tier suppliers just announced for: Multifunction RF System, Combat ID System, Reconnaissance & Surveillance Mast, Medium Range EO/IR System, and Automated Target Recognition System. MGV Competitions Guns and Ammo Handling Systems (announcement Q3 04) Propulsion (announcement pending) Traction Drive System (Q4, 04) Track Drive System (RFP 05) Liquid Cooled Power Module (RFP 05) Air Sensors (RFP Q4 04) Unmanned Ground Vehicle subsystems/component competitions will begin Q1 05 Air & Ground Communications: Antennas & other equipment RFPs beginning Q4 04 Previously selected Armed Reconnaissance Vehicle (ARV) with United Defense to enter System Development and Demonstration 10/26/ :23:56 AM 16

17 How to Get Involved with FCS Regularly check the FCS Website Home Page at: Located on this website: - FCS Business Opportunities of the LSI and 23 Partners (Contacts with websites) - Information on Submitting Unsolicited Proposals - Partners Requests for Quotes / Information - FCS Business Opportunities FCS Supplier Information Submittal Form - Supplier Diversity information (specific LSI / Partner Small Business contacts provided in FCS Business Opportunities Brochure) - FCS calendar with upcoming conferences and events - Submit Questions to LSI and Partners 10/26/ :23:56 AM 17

18 Looking Forward Outstanding efforts to date have allowed the Army to accelerate spiral capability to the current force The One Team partnership is working Our mission has been expanded due to confidence in our performance This is a good thing For the Army, for Industry and for the Soldier One Team Equipping our Joint Warfighters with the World s Best Capability 10/26/ :23:56 AM 18

19 Summary Future Combat Systems will provide a significant increase in Army warfighting capability to the Joint Force Commander A key land combat concept supporting joint concepts Enables a greater degree of joint interdependence FCS enables a campaign quality Army with Joint and expeditionary capabilities FCS is underpinned by operational and organizational concepts, documented future capabilities, and an operational architecture FCS is a transformational Acquisition process Program has a sound foundation Worth the risks A Campaign Quality Army with Joint and Expeditionary Capabilities

20 DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors. This document contains technical data for Administrative or Operational Use. Date of Determination October 29, Other requests for this document shall be referred to the PMUA Security Office ATTN: SFAE-PMUA-WS / MS #515, 6501 East 11 Mile Road, Warren, MI

Future Combat Systems Industry Day Briefing

Future Combat Systems Industry Day Briefing Future Future Industry Day Briefing MG Joseph L. Yakovac Program Executive Officer, Ground 11 February 2003 Program Manager s Intent: Field FCS-Equipped Units of Action With Threshold Objective Force Capability

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Estimate Complete F58 NON LINE OF SIGHT

More information

UNITED STATES ARMY. FCS - Sensors. LTG Stephen Speakes 14 Nov Army Strong 1

UNITED STATES ARMY. FCS - Sensors. LTG Stephen Speakes 14 Nov Army Strong 1 UNITED STATES ARMY FCS - Sensors Army Click Precision Modernization to add Strike Briefing Annual Strategy Review Title and April Approach 15, 2008 LTG Stephen Speakes 14 Nov 2007 Army Strong 1 AGENDA

More information

FCS Update & Testing. Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR

FCS Update & Testing. Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR FCS Update & Testing Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR 3/13/2009 10:36:11 AM 1 Army Leadership s View Future Combat Systems is the core of our modernization

More information

Eighth Annual Army Small Business Conference

Eighth Annual Army Small Business Conference Eighth Annual Army Small Business Conference Steve Marion FCS Senior Program Director McLean, VA 17 November 2004 12/8/2004 9:22:08 AM 1 Program Overview What is the FCS-Equipped Unit of Action? In 2003,

More information

An Interview With BG(P) Charles A. Cartwright. Meg Williams

An Interview With BG(P) Charles A. Cartwright. Meg Williams FCS AND THE UNIT OF ACTION ACCELERATING TECHNOLOGY TO THE MODULAR FORCE An Interview With BG(P) Charles A. Cartwright Meg Williams BG(P) Charles A. Cartwright, Program Manager Unit of Action (PM UA), recently

More information

2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT

2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT Our Army, combat seasoned but stressed after eight years of war, is still the best in the world and The Strength of Our Nation.

More information

FCS Embedded Training: An Overview

FCS Embedded Training: An Overview FCS Embedded Training: An Overview Chuck Moler FCS LSI Training Systems IPT 12/13/2005 Training is THE factor in determining the victor. - DSB Task Force on Training Superiority and Training Surprise Approved

More information

FCS Program Overview 10 th Annual Army Small Business Conference

FCS Program Overview 10 th Annual Army Small Business Conference FCS Program Overview 10 th Annual Army Small Business Conference Steve Marion Sr. Program Director Combat Systems Supplier Management 2/1/2007 9:43:42 AM 1 FCS Program Status Program keeping pace with

More information

COMMON AVIATION COMMAND AND CONTROL SYSTEM

COMMON AVIATION COMMAND AND CONTROL SYSTEM Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) ARMY COMMON GROUND STATION (CGS) (TIARA) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0603008A Electronic Warfare Advanced Technology ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Total Program Element

More information

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION Joe Pelino ARDEC Director of Technology 18 April 2018 UNPARALLELED COMMITMENT &SOLUTIONS Act like someone s life depends on what we do.

More information

The Army s Future Combat System (FCS): Background and Issues for Congress

The Army s Future Combat System (FCS): Background and Issues for Congress The Army s Future Combat System (FCS): Background and Issues for Congress Andrew Feickert Specialist in Military Ground Forces August 3, 2009 Congressional Research Service CRS Report for Congress Prepared

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE and Sensor Tech COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Actual Estimate

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

Test and Evaluation WIPT

Test and Evaluation WIPT Test and Evaluation WIPT 11 December 2003 Mrs. Ellen M. Purdy Acting Director, Combined Test Organization Office: 703-647-1452 ellen.purdy@fcscto.army.mil 1 Analysis Synthesis Model Test via Operational

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

Towards a Robotics Strategy

Towards a Robotics Strategy Towards a Robotics Strategy LTG Michael A. Vane Deputy Commanding General, Futures, and Director, Army Capabilities Integration Center US Army Training and Doctrine Command 25 Mar 09 Army Capabilities

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160404BB Special Operations (SO) Tactical

More information

Army Science & Technology Overview. 4 Apr 2007 Dr. Thomas H. Killion Deputy Assistant Secretary for Research and Technology/ Chief Scientist

Army Science & Technology Overview. 4 Apr 2007 Dr. Thomas H. Killion Deputy Assistant Secretary for Research and Technology/ Chief Scientist Army Science & Technology Overview 4 Apr 2007 Dr. Thomas H. Killion Deputy Assistant Secretary for Research and Technology/ Chief Scientist Outline Science and Technology (S&T) Strategy Warfighter Guidance

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE Sensor Tech COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) 097 513 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 to Total COST (In Thousands) Actual Estimate Estimate Estimate Estimate Estimate Estimate Estimate Complete FCS Network Hardware

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 19.873 20.466 20.954 0.000 20.954 21.254 21.776 22.071 22.305 Continuing Continuing 771: Link-16

More information

FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2)

FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2) FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2) Army ACAT ID Program Prime Contractor Total Number of Systems: 59,522 TRW Total Program Cost (TY$): $1.8B Average Unit Cost (TY$): $27K Full-rate production:

More information

REQUIREMENTS TO CAPABILITIES

REQUIREMENTS TO CAPABILITIES Chapter 3 REQUIREMENTS TO CAPABILITIES The U.S. naval services the Navy/Marine Corps Team and their Reserve components possess three characteristics that differentiate us from America s other military

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Army DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

More information

Single Integrated Ground Picture

Single Integrated Ground Picture Single Integrated Ground Picture 2003 Interoperability and System Integration Presented by: Anthony Lisuzzo Director, Intelligence and Information Directorate US ARMY CECOM 732-532-5557 Email: anthony.lisuzzo@mail1.monmouth.army.mil

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0604645A Armored Systems Modernization (ASM)-Eng. Dev. ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2008 FY 2009 FY 2010 FY 2011 to Program Element (PE) 2098130

More information

Unclassified/FOUO RAMP. UNCLASSIFIED: Dist A. Approved for public release

Unclassified/FOUO RAMP. UNCLASSIFIED: Dist A. Approved for public release Unclassified/FOUO RAMP UNCLASSIFIED: Dist A. Approved for public release Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 CLASSIFICATION: EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 R-1 ITEM NOMENCLATURE 0305205N Endurance Unmanned Aerial Vehicles

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

RECORD VERSION STATEMENT BY THE HONORABLE MARK T. ESPER SECRETARY OF THE ARMY AND GENERAL MARK A. MILLEY CHIEF OF STAFF UNITED STATES ARMY BEFORE THE

RECORD VERSION STATEMENT BY THE HONORABLE MARK T. ESPER SECRETARY OF THE ARMY AND GENERAL MARK A. MILLEY CHIEF OF STAFF UNITED STATES ARMY BEFORE THE RECORD VERSION STATEMENT BY THE HONORABLE MARK T. ESPER SECRETARY OF THE ARMY AND GENERAL MARK A. MILLEY CHIEF OF STAFF UNITED STATES ARMY BEFORE THE SENATE APPROPRIATIONS COMMITTEE DEFENSE SECOND SESSION,

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

The Army s Future Combat System (FCS): Background and Issues for Congress

The Army s Future Combat System (FCS): Background and Issues for Congress Order Code RL32888 The Army s Future Combat System (FCS): Background and Issues for Congress Updated May 12, 2008 Andrew Feickert Specialist in Military Ground Forces Foreign Affairs, Defense, and Trade

More information

NOVEL METHODOLOGIES TO PREVENT LOSS OF HUMAN LIFE IN BATTLEFIELD USING SENSORS

NOVEL METHODOLOGIES TO PREVENT LOSS OF HUMAN LIFE IN BATTLEFIELD USING SENSORS NOVEL METHODOLOGIES TO PREVENT LOSS OF HUMAN LIFE IN BATTLEFIELD USING SENSORS *Dr. S.R.BOSELIN PRABHU, **Dr. E.GAJENDRAN, ***N.BALAKUMAR *Assistant Professor, Department of Electronics and Communication

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0305208A Distributed Common Ground/Surface Systems ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) Actual to Total Total Program Element (PE) 128334 68662 188425 Continuing

More information

COMMANDER S HANDBOOK DISTRIBUTED COMMON GROUND SYSTEM ARMY (DCGS-A)

COMMANDER S HANDBOOK DISTRIBUTED COMMON GROUND SYSTEM ARMY (DCGS-A) COMMANDER S HANDBOOK DISTRIBUTED COMMON GROUND SYSTEM ARMY (DCGS-A) FOR OFFICIAL USE ONLY TCM-SP Final Draft March 30, 2009 Distribution authorized to U.S. Government Agencies and their contractors only

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 MISSILE Total FY 2013 FY 2014 FY 2015 FY 2016 Army Page 1 of 11 R-1 Line Item #128 To

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603850F PE TITLE: Integrated Broadcast Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 03 Advanced Technology Development (ATD) 0603850F Integrated Broadcast

More information

Joint Program Executive Office Joint Tactical Radio System

Joint Program Executive Office Joint Tactical Radio System (24 APRIL 2006) Joint Program Executive Office Joint Tactical Radio System MIDS International Review Board JTRS Moving Forward JPEO JTRS 5 May 2006 Mr. Howard Pace Deputy JPEO JTRS 619-524-4498 Howard.Pace@navy.mil

More information

Directorate of Training and Doctrine Industry Day Break out Session

Directorate of Training and Doctrine Industry Day Break out Session Directorate of Training and Doctrine Industry Day 2018 Break out Session Mr. Chris K. Jaques Chief, Individual and Systems Training Division, DOTD (706) 545-5209 Mr. Richard C. Bell Chief, Simulations

More information

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost

More information

NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018

NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018 NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018 THE ARMY WILL FIELD A NETWORK THAT IS EASY TO USE, WORKS IN ALL ENVIRONMENTS,

More information

UNCLASSIFIED. Information Systems: The Key to Future Force Success in a CBRN Environment. January 9, 2007

UNCLASSIFIED. Information Systems: The Key to Future Force Success in a CBRN Environment. January 9, 2007 Information Systems: The Key to Future Force Success in a CBRN Environment January 9, 2007 PRESENTED TO: 2007 CBIS Conference Austin, Tx Distribution Statement A: Approved for Public Release Edward Wack

More information

Excalibur - a Successful Swedish/U.S. Development Program

Excalibur - a Successful Swedish/U.S. Development Program Excalibur - a Successful Swedish/U.S. Development Program 09 October 2003 COL Nate Sledge Project Manager for Combat Ammunition Systems (973) 724-2003, sledge@pica.army.mil Purpose Excalibur as a Successful

More information

DISTRIBUTION STATEMENT A

DISTRIBUTION STATEMENT A IFPC Inc 2-I DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. 31 IFPC Inc 2-I Mission Mission: Primary Indirect Fire Protection Capability Increment 2 Intercept (IFPC Inc

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 1322.18 January 13, 2009 Incorporating Change 1, Effective February 23, 2017 USD(P&R) SUBJECT: Military Training References: (a) DoD Directive 1322.18, subject as

More information

U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC)

U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) Briefing for the SAS Panel Workshop on SMART Cooperation in Operational Analysis Simulations and Models 13 October 2015 Release of

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

BALANCING RISK RESOURCING ARMY

BALANCING RISK RESOURCING ARMY BALANCING RISK RESOURCING ARMY 9 TRANSFORMATION Managing risk is a central element of both the Defense Strategy and the Army program. The Army manages risk using the Defense Risk Framework. This risk management

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 125.44 31.649 4.876-4.876 25.655

More information

Test and Evaluation of Highly Complex Systems

Test and Evaluation of Highly Complex Systems Guest Editorial ITEA Journal 2009; 30: 3 6 Copyright 2009 by the International Test and Evaluation Association Test and Evaluation of Highly Complex Systems James J. Streilein, Ph.D. U.S. Army Test and

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 33.896 32.015 43.986-43.986 42.760 41.790

More information

S&T Community Perspective on Maneuver Support Challenges

S&T Community Perspective on Maneuver Support Challenges S&T Community Perspective on Maneuver Support Challenges Maneuver Support Conference 29 Jul 2008 Dr. Thomas H. Killion Deputy Assistant Secretary for Research and Technology/ Chief Scientist Outline Army

More information

Testing in a Distributed Environment

Testing in a Distributed Environment Testing in a Distributed Environment Mr. Stephen Kreider, SES Acting Deputy Program Executive Office Integration DISTRIBUTION STATEMENT: Approved for public release; distribution unlimited. Case 10-1069.

More information

MISSILE S&T STRATEGIC OVERVIEW

MISSILE S&T STRATEGIC OVERVIEW Presented to: THE SPACE AND MISSILE DEFENSE WORKING GROUP MISSILE S&T STRATEGIC OVERVIEW Distribution Statement A - Approved for Public Release - Distribution Unlimited. Review completed by AMRDEC Public

More information

Future Force Capabilities

Future Force Capabilities Future Force Capabilities Presented by: Mr. Rickey Smith US Army Training and Doctrine Command Win in a Complex World Unified Land Operations Seize, retain, and exploit the initiative throughout the range

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

Mission Command. Lisa Heidelberg. Osie David. Chief, Mission Command Capabilities Division. Chief Engineer, Mission Command Capabilities Division

Mission Command. Lisa Heidelberg. Osie David. Chief, Mission Command Capabilities Division. Chief Engineer, Mission Command Capabilities Division UNCLASSIFIED //FOR FOR OFFICIAL OFFICIAL USE USE ONLY ONLY Distribution Statement C: Distribution authorized to U.S. Government Agencies and their contractors (Critical Technology) 31 March 2016. Other

More information

Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet

Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet 1 LandWarNet (LWN) Initial Capabilities Document (ICD) / Network Enabled Mission Command (NeMC) ICD LandISRNet Intel Appendices

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

Tactical Edge Command and Control On-The-Move A New Paradigm

Tactical Edge Command and Control On-The-Move A New Paradigm Tactical Edge Command and Control On-The-Move A New Paradigm 16 th ICCRTS 22 June 2011 Paper ID 149 Mr. Ken Teske and Mr. Mike Tisdel FGM, Inc. C2OTM Focused Integration Team (FIT) 1 Agenda Define C2OTM

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item Justification Exhibit R-2 ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) - COST (In Thousands) INTERIM ARMORED VEHICLE (IAV) FAMILY FY 2010 FY 2011 FY 2012 FY 2013 to 8391 143568 108012

More information

Tactical Technology Office

Tactical Technology Office Tactical Technology Office Dr. Bradford Tousley, Director DARPA Tactical Technology Office Briefing prepared for NDIA s 2017 Ground Robotics Capabilities Conference & Exhibition March 22, 2017 1 Breakthrough

More information

NDIA Air Targets and UAV Division Symposium. LTC Scott Tufts 4 October 2012

NDIA Air Targets and UAV Division Symposium. LTC Scott Tufts 4 October 2012 NDIA Air Targets and UAV Division Symposium LTC Scott Tufts 4 October 2012 Topics PEO STRI is working numerous force on force initiatives to enhance training Bring indirect fire capability into the force

More information

Army Vision - Force 2025 White Paper. 23 January DISTRIBUTION RESTRICTION: Approved for public release.

Army Vision - Force 2025 White Paper. 23 January DISTRIBUTION RESTRICTION: Approved for public release. Army Vision - Force 2025 White Paper 23 January 2014 DISTRIBUTION RESTRICTION: Approved for public release. Enclosure 1 Problem Statement Force 2025 The future global security environment points to further

More information

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 6 R-1 Line #29

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 6 R-1 Line #29 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Joint Automated Deep Operation Coordination System (JADOCS)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Joint Automated Deep Operation Coordination System (JADOCS) Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2013 FY

More information

LTG Charles S. Mahan Jr. United States Army Deputy Chief of Staff, G-4. Tactical Wheeled Vehicles 27 January 2003

LTG Charles S. Mahan Jr. United States Army Deputy Chief of Staff, G-4. Tactical Wheeled Vehicles 27 January 2003 LTG Charles S. Mahan Jr. United States Army Deputy Chief of Staff, G-4 Tactical Wheeled Vehicles 27 January 2003 TRUCK HISTORY LESSON The first motor truck was built in 1896 by Gottlieb Daimler Pre-WWI

More information

USMC Small Arms Modernization Brief

USMC Small Arms Modernization Brief USMC Small Arms Modernization Brief Mr. Chris Woodburn Deputy, Maneuver Branch Marine Corps Capabilities Development Directorate Approved for Public Release - Distribution Unlimited 1 Summary CMC emphasis

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Soldier Systems - Warrior Dem/Val

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Soldier Systems - Warrior Dem/Val Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 20.602 20.886 48.309-48.309 60.003 53.434

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) Actual FY 2002 FY 2003 FY2004 FY 2005 to Force XXI Battle Command, Brigade & Below (FBCB2) 52003* 65176 63601 37699 29154 12179 0 0 264137 * Database presently shows 56328. Internal

More information

COMMITMENT. & SOLUTIONS Act like someone s life depends on what we do. MUM-T for the Abrams Lethality Enabler UNPARALLELED

COMMITMENT. & SOLUTIONS Act like someone s life depends on what we do. MUM-T for the Abrams Lethality Enabler UNPARALLELED MUM-T for the Abrams Lethality Enabler Presented by: Mr. Anand Bahadur U.S. Army Armaments Research Development and Engineering Center (ARDEC) Anand.Bahadur.civ@mail.mil Phone: (973) 724-8894 UNPARALLELED

More information

COL Michael Milner Project Manager Armored Multi-Purpose Vehicle

COL Michael Milner Project Manager Armored Multi-Purpose Vehicle COL Michael Milner Project Manager Armored Multi-Purpose Vehicle 1 June 2016 DISTRIBUTION STATEMENT A: Approved for public release. Chart valid 2 Feb 16 Mission and Vision Mission Modernize, sustain and

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

RECORD VERSION STATEMENT BY LIEUTENANT GENERAL JAMES O. BARCLAY III DEPUTY CHIEF OF STAFF OF THE ARMY, G-8 BEFORE THE

RECORD VERSION STATEMENT BY LIEUTENANT GENERAL JAMES O. BARCLAY III DEPUTY CHIEF OF STAFF OF THE ARMY, G-8 BEFORE THE RECORD VERSION STATEMENT BY LIEUTENANT GENERAL JAMES O. BARCLAY III DEPUTY CHIEF OF STAFF OF THE ARMY, G-8 BEFORE THE SUBCOMMITTEE ON AIRLAND COMMITTEE ON ARMED SERVICES UNITED STATES SENATE ON ARMY MODERNIZATION

More information

ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2)

ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2) ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2) Joint ACAT ID Program (Navy Lead) Total Number of Systems: Total Program Cost (TY$): Average Unit Cost (TY$): Low-Rate

More information

WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW SPACE AND MISSILE DEFENSE WORKING GROUP 22 SEPTEMBER 2016

WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW SPACE AND MISSILE DEFENSE WORKING GROUP 22 SEPTEMBER 2016 Presented to: SPACE AND MISSILE DEFENSE WORKING GROUP WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW Distribution Statement A - Approved for Public Release - Distribution Unlimited. Review completed

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Base OCO Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Advanced Tactical Computer Science and Sensor Technology

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Advanced Tactical Computer Science and Sensor Technology Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

Tank Automotive Research, Development & Engineering Center (TARDEC)

Tank Automotive Research, Development & Engineering Center (TARDEC) Tank Automotive Research, Development & Engineering Center (TARDEC) A major element of RDECOM and partner in the TACOM Life-Cycle Management Command: Provides full life-cycle engineering support provider-of-first-choice

More information

GAO. FORCE STRUCTURE Capabilities and Cost of Army Modular Force Remain Uncertain

GAO. FORCE STRUCTURE Capabilities and Cost of Army Modular Force Remain Uncertain GAO For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, April 4, 2006 United States Government Accountability Office Testimony Before the Subcommittee on Tactical Air and Land Forces, Committee

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603850F PE TITLE: Integrated Broadcast Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 6.021 8.312 7.963-7.963 8.046 8.146 8.194

More information

Victory Starts Here!

Victory Starts Here! Victory Starts Here! Robotic and Autonomous Systems (RAS) MAJ Mike Dvorak ARCIC Robotics Branch Victory Starts Here! Robotic and Autonomous Systems Strategy Objective Capabilities: Over the next 25 years,

More information

Army Experimentation

Army Experimentation Soldiers stack on a wall during live fire certification training at Grafenwoehr Army base, 17 June 2014. (Capt. John Farmer) Army Experimentation Developing the Army of the Future Army 2020 Van Brewer,

More information

AMRDEC Fuzing Activities

AMRDEC Fuzing Activities Presented to: NDIA Fuze Conference 2014 AMRDEC Fuzing Activities DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Control Number: pr0898 29 July 2014 Presented by: Anthony

More information

UNCLASSIFIED. Cost To Complete Total Program Element : Integrated Broadcast Service FY 2015

UNCLASSIFIED. Cost To Complete Total Program Element : Integrated Broadcast Service FY 2015 COST ($ in Millions) Prior Years FY 2013 FY 2014 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 5 R-1 Line #36 Complete Total Program Element - 18.216 - - - - - - - - - 18.216 644778:

More information

Synthetic Training Environment (STE) White Paper. Combined Arms Center - Training (CAC-T) Introduction

Synthetic Training Environment (STE) White Paper. Combined Arms Center - Training (CAC-T) Introduction Synthetic Training Environment (STE) White Paper Combined Arms Center - Training (CAC-T) The Army s future training capability is the Synthetic Training Environment (STE). The Synthetic Training Environment

More information

STATEMENT BY LIEUTENANT GENERAL RICHARD P. FORMICA, USA

STATEMENT BY LIEUTENANT GENERAL RICHARD P. FORMICA, USA RECORD VERSION STATEMENT BY LIEUTENANT GENERAL RICHARD P. FORMICA, USA COMMANDING GENERAL, U.S. ARMY SPACE AND MISSILE DEFENSE COMMAND AND ARMY FORCES STRATEGIC COMMAND BEFORE THE COMMITTEE ON ARMED SERVICES

More information

Next Gen Armored Reconnaissance: ARV Introduction and Requirements. - Brief to Industry-

Next Gen Armored Reconnaissance: ARV Introduction and Requirements. - Brief to Industry- Next Gen Armored Reconnaissance: ARV Introduction and Requirements - Brief to Industry- 09 January 2018 HQMC, CD&I, Capabilities Development Directorate Fires & Maneuver Integration Division 1 LAV Investment

More information