NAWCWD LRAF MAY 2012 (Sorted by Requiring Organization)

Size: px
Start display at page:

Download "NAWCWD LRAF MAY 2012 (Sorted by Requiring Organization)"

Transcription

1 LRAF MAY 2012 (Sorted by ) (If NavMPS Engineering Support 10M to 50M Y E EW SITE system 5M to 10M N Sole Source D F/A-18 SCS 50M and Over N Sole Source D PMA-265 Tool Support for the development of EW system User Data Files (UDFs) and Mission Data Files (MDF) 2QFY13 3QFY13 5 Years Brandis Pt Mugu, Engineering support to accomplish systems engineering functions that are aligned to its Mission Planning Environment (MPE) Lead Guide Book; the guide defines and organizes the effort into repeatable development phases with specific artifacts required of the supporting disciplines that establish the integrated mission planning system. 4QFY12 2QFY13 3 Years ; Pt Mugu, 4QFY12 4QFY13 5 Years Boeing St. Louis, MO; China Lake, 1QFY13 2QFY13 3 Years Lockheed N D4143 M806 Radio Frequency (RF) Electronic Warfare Systems Integration Test Environment (SITE) system, upgrade to an existing system currently at and maintenance for all EW SITE and EW SITE Lite Systems for the Advanced Weapons Laboratory (AWL) located at and Pt Mugu,. System upgrades for the F/A -18 and EA-18G N D0002 aircraft, including Foreign Military Sales (FMS) variants based on System Configuration Set (SCS) life cycle phases. System improvement and demonstration products such as proposed prototypes, pre-production products, and support equipment enhancements, or simulations and models of weapons systems. System improvements will also provide obsolete parts replacements, improved processors, and technology demonstrations. Benches, hardware modifications, Weapons Replaceable Assemblies (WRAs), software models, non-recurring Engineering Change Proposals (ECPs) and studies. Analysis and definition of statements of requirements identified by the Government and correction of anomalies in software or hardware identified after release to the Government for OT and during fleet utilization of the SCS. Support requirements include updates to the Flight Plan Software engineering services in support of N D4079 tools for the development and test of EW GM01 system User Data Files (UDF) and Mission Data Files (MDF), and for the generation of software and documentation to support the implementation of the SP software into EW systems. Major EW systems to be supported are primarily radar warning receivers, tactical electronic jammers and dispensers that are deployed on foreign military platforms. Electronic Warfare Support Equipment Integrated Product Team Support 5M to 10M N Full and Open 1QFY13 3QFY13 3 Years Northrop Grumman Space & Mission Systems Corp. Engineering services that support the design, N D4091 development, evaluation, and deployment of EW GM03 SE Systems that work with the AN/USM-670 EW Test Set, the AN/USM-713 Swept Frequency Measurement Test Set and the Handheld Radar Simulator (HRS) Test Set Final Cumulative LRAF List.xlsx Page 1

2 LRAF MAY 2012 (Sorted by ) (If Attack (AEA) IPT Engineering Services 3QFY12 4QFY13 3 Years L-3 Communications Pt Mugu, Attack (AEA) IPT N P0674 Engineering Services to provide Engineering, Technical and Programmatic support services including design, development, integration, test and distribution of all Operational Flight Programs (OFPs) to the Fleet, for development of Electronic Attack and Electronic Warfare products within the AEA IPT located at the Naval Air Warfare Center, Weapons Division (), Point Mugu, California. Programs to be supported under this contract include: E- 2C, MH-60R, EA-6B, EA-18G and other advanced electronic attack derivatives. Also included is systems and in-service engineering test support, intelligence data analysis, test and evaluation, electronic warfare development support, threat analysis support and data in support of the following: Electronic Warfare Database Support (EWDS) including the retrieval and modification of intelligence data for Order of Battle, Characteristics and, library data, and tactical data; Electronic Warfare Information and Report Management System (ETIRMS); Jammer Technique Optimization (JATO) including threat analysis and JATO Tactics Analysis Technique(JTATS) development; and Electronic Attack Laboratory Simulations. Attack (AEA) IPT Engineering Services 4QFY12 2QFY14 5 years Chesapeake Technology International Corporation Attack (AEA) IPT N D0017 Engineering Services for the IP III EA-6B and USQ-113 Flight Simulation to provide for Engineering, Technical and Programmatic services, including design, develop, integrate, test and distribute all Operational Flight Programs (OFPs) to the Fleet, for development of communications jamming and receiver simulations. Programs to be supported under this contract include EA-6B, EA-18G and other advanced electronic attack derivatives. Attack (AEA) IPT and Joint Electronic Attack and Compatibility (JEACO) 650K to 5M Y 4QFY11 2QFY12 5 Years Pt Mugu, Joint Electronic Attack and Compatibility (JEACO), Electronic Warfare (EW) and Electronic Attack (EA) Systems requires ALQ-231 (V)1 Pod Assemblies, associated hardware, and incidental equipment modification services. Final Cumulative LRAF List.xlsx Page 2

3 LRAF MAY 2012 (Sorted by ) (If Attack (AEA) IPT Electronic Warfare Information Technology Solutions 3QFY12 4QFY12 5 Years Pt Mugu, Provide Information Technology Solutions needed for Electronic Warfare (EW). s to be supported include: Naval Air Warfare Center Weapons Division (), Joint Electronic Attack Compatibility (JEACO), Airborne Electronic Attack (AEA) Integrated Product Team (IPT), Electronic Warfare Data Systems Laboratory (EWDS), Electronic Combat Simulation and Evaluation Laboratory (ECSEL), System Integration Laboratory (SIL), and Jammer Technique Optimization Laboratory (JATO). H-1 Joint Mission Planning System Support 5M to 10M N Sole Source 41240HD PMA-276 1QFY13 3QFY13 5 Years Joint Technology Engineering, Inc. (JTE) Support for the Joint Mission Planning System N D0022 (JMPS) H-1 Unique Planning Component (UPC) for Cobra 4 functionality. Data Sharing/Information Fusion ESS V 50M and Over TBD TBD after D D 1QFY13 4QFY13 3 Years Lockheed/ General Dynamics 2 QFY 13 1QFY14 3 Years Jacobs Conduct systems analysis to develop, federate, and vet DODAF Enterprise Architecture and documented statements of warfighter needs. N D0005 & N D0006 Engineering Support Services N D0040 Packaging Preservation and Containers 150K to 649K Y D 4QFY12 2QFY13 3 Years Container Manufacturing/Packaging Solutions and Preservation IAW technical drawings and specifications Advanced Weapons Products Acquistion Contract (AWPAC) 10M to 50M Y D 4QFY12 1QFY13 5 years Valley Tech Systems, Advanced Integrated Systems, LC Engineers, New Directions Technologies Advanced technology products for the Applied Manufacturing Technology Division. Procure various types of products, manufactured from several different materials, in different forms, shapes, sizes, and complexity. Such products will be procured for rapid delivery, ranging from single part requests to full production quantities, in support of on-going immediate response requirements. N D0002, N D0003, N D0004, N D0005 Electronics Components 5M to 10M Y D 1QFY13 3QFY13 5 years Laguna Components, Quality Magnetics Corp Follow on to Electronic Components MAC, FFP Contract in place with two vendors N D0053, N D0054 Painting, Plating and Coating 650K to 5M Y D 4QFY12 2QFY13 5 years Kryler Corp., Carter Plating, Elite metal Finishing, Schmidt Industries Follow on to Painting, Plating and Coating MAC, FFP Contract in place with four vendors. N D0029, N D0030, N D0031, N D0032 Final Cumulative LRAF List.xlsx Page 3

4 LRAF MAY 2012 (Sorted by ) (If Machine Shop Maintenance Contract Precision Strike Weapons Engineering Services MDA Mobile Range Instrumentation Support 5M to 10M Y 650K to 5M Y 8(a) 50M and Over N Full and Open Environmental Services Enhanced Joint Advanced Missile Instrumentation (JAMI) Time Space Position Information (TSPI) Unit Printed Circuit Boards 5M to 10M Y Conformal Coating 150K to 649K Y Full and Open Patriot Telemetry Kits Seaborne Targets 650K to 5M Y 8(a) Non Targets Assets Operation and Maintenance Combat Environment Simulation 50M and Over Y 50M and Over TBD Full and Open D 47L500D 52000ME 52F00MD 52J100E 52J31MD 52J31MD 52J31MD 53150ME 53200ME 53520MD 1QFY14 4QFY years Wesco Consultants China Lake (primary); Pt Mugu (potential) 4QFY12 2QFY13 3 Years ICI Services 4QFY12 3QFY13 5 Years ITT Systems Corporation ; Pt Mugu, 3QFY12 2QFY13 3 Years Epsilon ; Pt Mugu, 3QFY12 4QFY12 3 Years 2QFY15 3QFY15 5 Years MPI, Colonial, Avanti, JVB 4QFY12 1QFY13 3 Years Specialized Coating Surfaces 2QFY13 1QFY14 5 Years L-3 Communications Symetrics 1QTR14 3QFY15 5 Years Global and Technology Corp (GRTS) Stock and inventory support, maintenance, repair, upgrade, tear down, transportation, packaging and installation of Governmentowned machine tools and related equipment, including the electronic control unit for the Numeric Controller/Computer Numeric Controller (NC/CNC), for the Applied Mfg Technology Division at China Lake and Pt. Mugu. Technical Project (TPO) support for program management, engineering technical support, integrated logistics support, and configuration management support. N C0126 N D4065 GM01 MDA Mobile Range Instrumentation Support N D4395 GM01 Ongoing and new environmental resources projects primarily conducted on the Ranges at sites located at the California () Land Range, and at the Point Mugu, Sea Range Complex which includes the San Nicolas Island Test Facility Enhanced TSPI unit used in the AIM-9X Program N D0005 Printed Circuit Boards N D0049 N D0050 N D0051 N D0052 Multiple Conformal Coating on printed circuit boards N D0017 Award Single and Dual Channel Telemetry Kit for Test and Training of Patriot Missile N D0016 N D Years Seaborne Targets N C0107 3QFY12 1QFY13 5 Years SA-TECH China Lake 5 Years Operation and maintenance of aerial and, Pt Mugu, seaborne assets and associated equipment used to execute the mission of the PTMO. 1QFY14 3QFY15 5 Years TYBRIN, Lockheed Martin, L-3 Multiple Award N D4118 GM01 Design, develop, fabricate, analyze, augment, N D0034 acquire, install, integrate, and test warfare N D0035 systems used by the Defense community for N D0035 weapon systems development, real-time aircrew tactical training, test and evaluation of defense systems. Final Cumulative LRAF List.xlsx Page 4

5 LRAF MAY 2012 (Sorted by ) (If Offboard Related Material Technique Controller Modulator Cs High Frequency Microwave Power Module 5M to 10M N Sole Source 10M to 50M Y Dual Channel Amplifier 5M to 10M TBD TBD after Electronic Assemblies 10M to 50M Y Instaneous Frequency Measurement/ Integrated Stabilized RF Source Assemblies (IFM/ISRFS) Filthy Buzzard Digital RF Modulator (DRMF) Microwave Power Module Filthy Badger Digital RF Modulator (DRFM) Technique Controller Modulator RF Integrated Microwave Assemblies CPU Circuit Card Assemblies Transmitting Sets, Radar 10M to 50M N Sole Source NAWD Lakehurst NJ (N68335) 50M and Over N Sole Source 5M to 10M N Full and Open 5M to 10M N Full and Open 1QFY12 RFP Released 3QFY12 5 Years Meggitt Defense 1QFY13 3QFY13 5 Years US Technologies 4QFY13 2QFY14 5 Years L-3 Comm. Electron Devices 4QFY13 2QFY14 5 Years P Wireless 4QFY12 2QFY13 5 Years CTA 3QFY12 1QFY13 5 Years Teledyne Cougar 4QFY12 2QFY13 5 Years KOR Electronics 4QFY12 2QFY13 5 Years Triton 1QFY13 3QFY13 5 Years KOR Electronics 2QFY13 2QFY14 5 Years Symetrics Industries 3QFY13 3QFY14 5 Years Herley 2QFY14 4QFY14 5 Years Kontron 3QFY13 1QFY14 5 Years Airborne Threat Simulation Hardware Airborne Threat Simulation Hardware N D0025 Airborne Threat Simulation Hardware Airborne Threat Simulation Hardware Airborne Threat Simulation Hardware N D0023 Airborne Threat Simulation Hardware N D0046 SBIR Phase III BOA Airborne Threat Simulation Hardware N C0066 Airborne Threat Simulation Hardware N D0016 Airborne Threat Simulation Hardware N D0022 Airborne Threat Simulation Hardware N D0009 Airborne Threat Simulation Hardware N D0046 Airborne Threat Simulation Hardware N D0017 Airborne Threat Simulation Hardware Final Cumulative LRAF List.xlsx Page 5

6 LRAF MAY 2012 (Sorted by ) (If High Frequency Offboard Related Material High Frequency RF Translator High Frequency Antennas High Power Solid State Amplifier Power Converter, Solid State, AC / DC Engineering Services for RF Airborne Threat Simulation 5M to 10M TBD TBD after 5M to 10M TBD TBD after 5M to 10M TBD TBD after Fleet Weapons Support 10M to 50M Y 8(a) Team (FWST) Technical Representative Services Operator Services 150K to 649K Y HUBZone Set Aside STARS III 50M and Over N Full and Open and Set- Aside VTC 650K to 5M Y 8(a) Non China Lake Telecommunications Xerox Machine Lease and Maint 10M to 50M Y 8(a) D 650K to 5M Y Sole Source Generic Hardware Maint 650K to 5M Y HUBZone Set Aside 4QFY13 2QFY14 5 Years ArgonST (Boeing) 4QFY13 2QFY14 5 Years ArgonST (Boeing) 4QFY13 2QFY14 5 Years ArgonST (Boeing) 2QFY14 4QFY14 5 Years P Wireless 1QFY14 3QFY14 5 Years 2QFY13 4QFY13 5 Years Jacobs Technology Group 3QFY12 4QFY12 5 Years GPA Technologies Conus and Oconus. 1QFY16 4QFY16 5 Years Softcom 1QFY13 3QFY13 5 Years Jacobs Technology Inc. 4QFY12 2QFY13 5 Years J. Aguinaldo Group, Inc. 1QFY13 4QFY13 5 Years MCS of Tampa, Inc. Pt Mugu, ; Pt Mugu, 3QFY12 4QFY12 1 Year Xerox Corporation 4QFY14 2QFY15 5 Years R&D Training & Technical Services Airborne Threat Simulation Hardware Airborne Threat Simulation Hardware Airborne Threat Simulation Hardware Airborne Threat Simulation Hardware Airborne Threat Simulation Hardware Airborne Threat Simulation Engineering Services N D4072 GM03 Weapons technical representative services for Airborne Weapons Systems ensuring timely maintenance and operation of airborne systems during their employment, including on-site and on-call instruction and training. N D Years Base telephone operator services N P0600 Scientific, Technical, Administrative,, Development, Test, & Evaluation Services N D Years Video Conferencing Studio Operations N C Years Telephone Support Services N C Year Xerox machine maintenance and lease N F Years Non-NMCI Hardware maintenance N C0036 Final Cumulative LRAF List.xlsx Page 6

7 LRAF MAY 2012 (Sorted by ) (If er's Compensation Surveillance 150K to 649K Y Furniture 5M to 10M N Full and Open D 7J0000D 1QFY14 3QFY14 3 Years JHRI, Inc 3QFY12 1QFY13 3 Years Steelcase ; Pt Mugu, 3 Years Investigation and surveillance of employees' N P0369 physical abilities and limitations while on medical restrictions (er's Comp). furniture which features components, work surfaces, and storage that can be panel hung, freestanding or mobile N D0034 **DISCLAIMER** United States Code Title 15, Section 637(A) (12) (C), requires the Department of the Navy (DoN) to prepare a forecast of expected contract opportunities for the next and succeeding fiscal years and make the forecast available to small businesses. We fulfill this requirement by publishing this Long Range Acquisition Forecast (LRAF) and updating the information on an annual basis. The LRAF contains requirements valued at $150,000 or more that are forecasted for the upcoming and next two fiscal years. The forecast is for informational and marketing purposes only. It does not constitute a specific offer or commitment by the Navy to fund, in whole or in part, the opportunities referenced herein. This listing is not all inclusive and is subject to change. Final Cumulative LRAF List.xlsx Page 7

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements. Distribution Statement A - Approved for public release, distribution is unlimited.

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements. Distribution Statement A - Approved for public release, distribution is unlimited. NAWCWD Long Range Acquisition Forecast (LRAF) Requirements Distribution Statement A - Approved for public release, distribution is unlimited. 1 Weapons Systems Integration and Software Support (WSISS)

More information

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17 NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17 Distribution Statement A Approved for public release, distribution is unlimited. File: NAVAIR Brief 1 Weapons Systems Integration and

More information

Small Business Opportunities with the Naval Air Systems Command

Small Business Opportunities with the Naval Air Systems Command Small Business Opportunities with the Naval Air Systems Command Presented by: LtCol David Walsh Program Manager, PMA-226 25 September 2013 NAVAIR Public Release 2012-299 Distribution Statement A Approved

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604256F PE TITLE: Threat Simulator Development RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST ($ In Thousands) FY 1998 Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research,, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program Element

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 14.370 15.574 - - - - - - - Continuing

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 174.037 11.276 8.610 1.971-1.971

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total

More information

Spectrum contest: RAAF boosts electronic warfare capabilities

Spectrum contest: RAAF boosts electronic warfare capabilities Spectrum contest: RAAF boosts electronic warfare capabilities Jane's Defence Industry As the Royal Australian Air Force (RAAF) begins to beef up its capabilities in the electronic warfare spectrum, Charles

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 12 R-1 Line #147

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 12 R-1 Line #147 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research,, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013 FY 2014 FY

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-6 0604759N Major T & E Investment Prior Total COST ($

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 22.63 3.676 32.789-32.789 35.932

More information

Subj: ELECTRONIC WARFARE DATA AND REPROGRAMMABLE LIBRARY SUPPORT PROGRAM

Subj: ELECTRONIC WARFARE DATA AND REPROGRAMMABLE LIBRARY SUPPORT PROGRAM DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3430.23C N2/N6 OPNAV INSTRUCTION 3430.23C From: Chief of Naval Operations Subj: ELECTRONIC

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 0604272N, TADIRCM COST ($ in Millions) FY 2006 FY 2007

More information

EW Modeling and Simulation: Meeting the Challenge

EW Modeling and Simulation: Meeting the Challenge EW Modeling and Simulation: Meeting the Challenge Dr. George Kailiwai III Director, Resources and Assessment (J8) United States Pacific Command July 2009 Rio Hotel, Las Vegas, Nevada Today s EW Threat

More information

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0203761N PROGRAM ELEMENT TITLE: RAPID TECHNOLOGY TRANSITION (RTT) COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010 FY 2011

More information

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success Detect, Deny, Disrupt, Degrade and Evade Lethal Threats Advanced Survivability Suite Solutions for Mission Success Countering Smart and Adaptive Threats Military pilots and aircrews must be prepared to

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 16.397 1.975 1.971-1.971 1.990 1.989 2.023

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 11.801 10.862

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research,, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2014

More information

AGENCY: Defense Security Cooperation Agency, Department of Defense.

AGENCY: Defense Security Cooperation Agency, Department of Defense. This document is scheduled to be published in the Federal Register on 000 and available online at https:federalregister.govd0-66, and on FDsys.gov Billing Code: 500-06 DEPARTMENT OF DEFENSE Office of the

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

CLASSIFICATION: UNCLASSIFIED

CLASSIFICATION: UNCLASSIFIED Exhibit P-40, BUDGET ITEM JUSTIFICATION APPROPRIATION/BUDGET ACTIVITY Aircraft Procurement, Navy/APN-5 Aircraft Modifications Program Element for Code B Items: P-1 ITEM NOMENCLATURE 051100, EA-6 SERIES

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 Navy Page 1 of 17 R-1 Line Item #30 To Program Element 25.144

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: Development & Demonstration (SDD) COST ($ in Millions) # FY

More information

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

More information

COMMON AVIATION COMMAND AND CONTROL SYSTEM

COMMON AVIATION COMMAND AND CONTROL SYSTEM Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation

More information

FIGHTER DATA LINK (FDL)

FIGHTER DATA LINK (FDL) FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) FY 2017 FY 2018

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Base OCO Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element 168.157

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003 COST ($ in Thousands) FY 2002 Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Cost to Complete Total Cost 2865 Manufacturing Technology 55,694 44,381 39,396 40,112 39,505 40,157 40,787 41,336

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element 966.537 66.374 29.083 54.838 0.000 54.838 47.369

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

aselsan EW SPECTRUM MANAGEMENT

aselsan EW SPECTRUM MANAGEMENT EW SPECTRUM MANAGEMENT November 2014 CONTENTS What Is The Problem? Common Picture? (EW Spectrum) Area of Interest Preemptive Operations EW Spectrum Management Steps For EW Spectrum Management Planning,

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2008 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2008 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 0604272N, TADIRCM Total PE 92.490 32.552 63.244 64.668

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: C2ISR Tactical Data Link FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: C2ISR Tactical Data Link FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 1.604 1.584 1.536-1.536 1.626

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Test & Evaluation Support FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Test & Evaluation Support FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 65864N: Test & Evaluation Support FY 212 OCO FY 212 Total FY 213 FY 214 FY

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426

More information

Engaging U.S. Markets: Strategy and Programs

Engaging U.S. Markets: Strategy and Programs Engaging U.S. Markets: Strategy and Programs Ralph D. Crosby, Jr. CEO North America North America Investor Forum New York 7 th October 2003 1 EADS Accessing the U.S. Aerospace and Defense Market Executing

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research,, Test & Evaluation, Navy / BA 5: System & Demonstration (SDD) COST ($ in Millions) FY 2017 FY 2018 FY 2019 FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 109.887 133.105 148.297-148.297

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

SPS-TA THALES AIRBORNE SYSTEMS INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT.

SPS-TA THALES AIRBORNE SYSTEMS INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT. THALES AIRBORNE SYSTEMS ELECTRONIC WARFARE SYSTEMS SPS-TA INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT www.thales-airbornesystems.com THALES AIRBORNE SYSTEMS ELECTRONIC WARFARE

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 Navy Page 1 of 7 R-1 Line #203 To Program Element

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) EXHIBIT R-2, FY 2001 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0305206N PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) (U) COST: (Dollars in

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 213 Base FY 213 OCO FY 213 Total FY 214 FY 215 FY 216 FY 217 Navy Page 1 of 5 R-1 Line

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 46.823 63.563 12.906-12.906 15.663 15.125

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0101113F PE TITLE: B-52 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0101113F B-52 SQUADRONS ($ in Millions) FY

More information

GOOD MORNING I D LIKE TO UNDERSCORE THREE OF ITS KEY POINTS:

GOOD MORNING I D LIKE TO UNDERSCORE THREE OF ITS KEY POINTS: Keynote by Dr. Thomas A. Kennedy Chairman and CEO of Raytheon Association of Old Crows Symposium Marriott Marquis Hotel Washington, D.C. 12.2.15 AS DELIVERED GOOD MORNING THANK YOU, GENERAL ISRAEL FOR

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 3.350 3.874 - - - 1.977 - - - Continuing Continuing 645121: Physical

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

PROGRAM EXECUTIVE OFFICER TACTICAL AIRCRAFT PROGRAMS TECHNOLOGY GOALS. NAVAIR Small Business Aviation Technology Conference

PROGRAM EXECUTIVE OFFICER TACTICAL AIRCRAFT PROGRAMS TECHNOLOGY GOALS. NAVAIR Small Business Aviation Technology Conference PROGRAM EXECUTIVE OFFICER TACTICAL AIRCRAFT PROGRAMS TECHNOLOGY GOALS NAVAIR Small Business Aviation Technology Conference Rear Admiral David J. Venlet 29 November 2006 Discussion Outline Program Executive

More information

Industry Day RDML Mat Winter Commander, Naval Air Warfare Center Weapons Division. 23 May 2012

Industry Day RDML Mat Winter Commander, Naval Air Warfare Center Weapons Division. 23 May 2012 Industry Day 2012 Presented by: 23 May 2012 RDML Mat Winter Commander, Naval Air Warfare Center Weapons Division Distribution Statement A: Approved for public release; 1 distribution is unlimited. Strategic

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 COST ($ in Millions) Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY 2019 To Program Element 242.669 68.656 70.614 82.195-82.195

More information

Terma and F-35 Global supplier to the Joint Strike Fighter program

Terma and F-35 Global supplier to the Joint Strike Fighter program Terma and F-35 Global supplier to the Joint Strike Fighter program The world s largest defense industrial project The F-35 project is headed by Lockheed Martin, with Northrop Grumman and BAE Systems as

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 2: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 25 FY 26 R Program Element

More information

Tobyhanna Army Depot Mission and Capabilities Partnering with Industry

Tobyhanna Army Depot Mission and Capabilities Partnering with Industry Tobyhanna Army Depot Mission and Capabilities Partnering with Industry Presented by: Mr. Ronald Cappellini Deputy Director Production Engineering TYAD 570.895.7177 ronald.cappellini@tobyhanna.army.mil

More information

Subj: CHEMICAL, BIOLOGICAL, RADIOLOGICAL, AND NUCLEAR DEFENSE REQUIREMENTS SUPPORTING OPERATIONAL FLEET READINESS

Subj: CHEMICAL, BIOLOGICAL, RADIOLOGICAL, AND NUCLEAR DEFENSE REQUIREMENTS SUPPORTING OPERATIONAL FLEET READINESS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3400.10G N9 OPNAV INSTRUCTION 3400.10G From: Chief of Naval Operations Subj: CHEMICAL,

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Prior Years FY 2018 FY 2019 FY 2020 FY 2021 To Complete Program Element - 130.376 166.297 132.795 0.000

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total Program Element 9.334 6.602 - - - - - - - 0.000 15.936 9.334 6.602 - - - - - -

More information

NAVAIR Commander s Awards recognize teams for excellence

NAVAIR Commander s Awards recognize teams for excellence NAVAIR News Release NAVAIR Commander Vice Adm. David Architzel kicks of the 11th annual NAVAIR Commander's National Awards Ceremony at Patuxent River, Md., June 22. (U.S. Navy photo) PATUXENT RIVER, Md.

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603500F PE TITLE: MULTI-DISCIPLINARY ADV Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011

More information

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/Space and Electronic Warfare (SEW) Support

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/Space and Electronic Warfare (SEW) Support APPROPRIATION/BUDGET ACTIVITY RDTEN/BA 6 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION R-1 ITEM NOMENCLATURE 0605866N/Space and Electronic Warfare (SEW) Support COST (In Millions) Total PE Cost 0706 / EMC

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 27448F PE TITLE: C2ISR Tactical Data Link Exhibit R-2, RDT&E Budget Item Justification 27448F C2ISR Tactical Data Link 23 24 25 26 27 28 29 Total Actual Complete Total Program Element (PE) Cost

More information

Joint Tactical Radio System (JTRS)

Joint Tactical Radio System (JTRS) C4I - Command, Control, Communications, Computers & Intelligence Forecast Outlook On September 30, 2012, the Joint Tactical Radio System program was officially closed Forecast International expects "residual"

More information

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 3 Page 1 of 15

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 3 Page 1 of 15 Exhibit R-2, RDT&E Project Justification May 2009 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY 6 (RDT&E MANAGEMENT SUPPORT) OPERATIONAL TEST ACTIVITIES AND ANALYSES (OT&A) PROGRAM ELEMENT

More information

Counter-Man-Portable Air Defense Systems. James Tuttle Program Manager U.S. Department of Homeland Security Science & Technology

Counter-Man-Portable Air Defense Systems. James Tuttle Program Manager U.S. Department of Homeland Security Science & Technology Counter-Man-Portable Air Defense Systems James Tuttle Program Manager U.S. Department of Homeland Security Science & Technology Threat Background C-MANPADS National Strategy Program Overview Briefing Outline

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element - 4.208 2.245 5.830 0.000 5.830 17.932 35.734

More information

Department of Defense DIRECTIVE. SUBJECT: Electronic Warfare (EW) and Command and Control Warfare (C2W) Countermeasures

Department of Defense DIRECTIVE. SUBJECT: Electronic Warfare (EW) and Command and Control Warfare (C2W) Countermeasures Department of Defense DIRECTIVE NUMBER 3222.4 July 31, 1992 Incorporating Through Change 2, January 28, 1994 SUBJECT: Electronic Warfare (EW) and Command and Control Warfare (C2W) Countermeasures USD(A)

More information

AGI Technology for EW and AD Dominance

AGI Technology for EW and AD Dominance AGI Technology for EW and AD Dominance Singapore 2015 Content Overview of Air Defense Overview of Electronic Warfare A practical example Value proposition Summary AMD - a multidisciplinary challenge Geography

More information

Billing Code:

Billing Code: This document is scheduled to be published in the Federal Register on 12/11/2015 and available online at http://federalregister.gov/a/2015-31245, and on FDsys.gov Billing Code: 5001-06 DEPARTMENT OF DEFENSE

More information

2017 Annual Missile Defense Small Business Programs Conference

2017 Annual Missile Defense Small Business Programs Conference 2017 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DISTRIBUTION STATEMENT A. Approved for public release; distribution

More information

Russian defense industrial complex s possibilities for development of advanced BMD weapon systems

Russian defense industrial complex s possibilities for development of advanced BMD weapon systems 134 Russian defense industrial complex s possibilities for development of advanced BMD weapon systems 135 Igor KOROTCHENKO Editor-in-Chief of the National Defense magazine The main task handled by the

More information

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 50 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2012 Ms.

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 99.992 132.881 143.000-143.000

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 11.589 20.727 63.853-63.853 60.995 19.248 19.291 15.230 Continuing

More information

Successful First AESA Deployment through Application of Systems Engineering

Successful First AESA Deployment through Application of Systems Engineering Successful First AESA Deployment through Application of Systems Engineering Terry Duggan Scott Nichols Christopher Moore 29 October 2009 Outline Background Approach Systems Engineering Activities Results

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 5 - ENG MANUFACTURING DEV 0604768A - BAT COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006

More information

2016 Major Automated Information System Annual Report

2016 Major Automated Information System Annual Report 2016 Major Automated Information System Annual Report Logistics Modernization Program Increment 2 (LMP Inc 2) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents

More information

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910 TITLE III PROCUREMENT The fiscal year 2018 Department of Defense procurement budget request totals $113,906,877,000. The Committee recommendation provides $132,501,445,000 for the procurement accounts.

More information

The Verification for Mission Planning System

The Verification for Mission Planning System 2016 International Conference on Artificial Intelligence: Techniques and Applications (AITA 2016) ISBN: 978-1-60595-389-2 The Verification for Mission Planning System Lin ZHANG *, Wei-Ming CHENG and Hua-yun

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 P-1 Line #50

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 P-1 Line #50 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 0204229N Tomahawk Weapons System (TWS) COST ($ in Millions)

More information

WARFIGHTER MODELING, SIMULATION, ANALYSIS AND INTEGRATION SUPPORT (WMSA&IS)

WARFIGHTER MODELING, SIMULATION, ANALYSIS AND INTEGRATION SUPPORT (WMSA&IS) EXCERPT FROM CONTRACTS W9113M-10-D-0002 and W9113M-10-D-0003: C-1. PERFORMANCE WORK STATEMENT SW-SMDC-08-08. 1.0 INTRODUCTION 1.1 BACKGROUND WARFIGHTER MODELING, SIMULATION, ANALYSIS AND INTEGRATION SUPPORT

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 92.713 23.188 31.064 46.007-46.007

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 The Joint Staff Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support COST ($ in Millions)

More information