APPENDIX A - LIST OF PROJECT DELIVERY TEAM MEMBERS APPENDIX B - PROJECT MAPS APPENDIX C - WORK BREAKDOWN STURCTURE
|
|
- Kory Long
- 6 years ago
- Views:
Transcription
1 Table of ppendices PPENDIX - LIST OF PROJECT DELIVERY TEM MEMBERS PPENDIX B - PROJECT MPS PPENDIX C - WORK BREKDOWN STURCTURE TB CTIVITY LISTING BY WBS TB B CTIVITY DEFINITIONS, CONSTRINTS ND SSUMPTIONS TB C CTIVITY ID/WBS CROSS-REFERENCE PPENDIX D - PROJECT SCHEDULE TB GNTT CHRT FOR CURRENT PHSE TB B PROJECT MILESTONE REPORT PPENDIX E - PROJECT COST ESTIMTE ND BUDGET TB TOTL PROJECT COST SUMMRY TB B FULLY FUNDED COST ESTIMTE (POST PIR ONLY) TB C COST LISTING BY GENCY / ORGNIZTIONL UNIT TB D PROJECTED NNUL BUDGET TB E PROJECT CSH FLOW CURVE TB F CONTINGENCY SUMMRY ND STTUS PPENDIX F - FUNCTIONL RE PLNS TB CTIVITIES BY GENCY, ORGNIZTIONL UNIT, & RESOURCE PPENDIX G - CONTRCTING CQUISITION PLN PPENDIX H QULITY CONTROL PLN TB INDEPENDENT TECHNICL REVIEW TB B STTEMENT OF TECHNICL ND LEGL REVIEW PPENDIX I PUBLIC INVOLVEMENT PPENDIX J LIST OF REFERENCE DOCUMENTS PPENDIX K LIST OF PMP UPDTES ND REVISIONS Strazzulla Wetlands November 2003
2 ppendix Team Members PPENDIX - LIST OF PROJECT DELIVERY TEM MEMBERS Strazzulla Wetlands November
3 ppendix Team Members Table -1: List of Project Delivery Team Members PRTICIPNTS OFFICE E-MIL PHONE US RMY CORPS OF ENGINEERS, JCKSONVILLE DISTRICT costa, Jimmy USCE (904) lejandro, Luis USCE (904) Brown, Ed USCE (904) Clifton, Ray USCE (904) Grubb, Jerry USCE (904) Duke, Kathie USCE (561) Itani, Samir USCE (904) Jones, Keith USCE (904) Lizarribar, Jose USCE (904) Gerland, Diana USCE (904) Kendrick, Peter USCE (904) Soucek, Theresa USCE (904) Tarr, Brad USCE (904) Fischer, Frank USCE (904) Weiss, Rebecca USCE (904) Medina, Moises USCE (904) White, Mark USCE (904) Wittman, Kevin USCE (904) Zediak, Lynn USCE (904) SOUTH FLORID WTER MNGEMENT DISTRICT Collins, Kathy SFWMD (561) Day, Max SFWMD (561) Hiscock, Jenni SFWMD (561) Mills, Brenda SFWMD (561) Simpson, Wanda SFWMD (561) GOVERNMENT GENCIES Crigger, Dianne FDEP (561) Fury, Jon R. FFWCC (561) Brashear, Cindy USFWS (772) Melvin, Stefani USFWS (772) Rapach, Fred R.E.P. Palm Beach County (561) x3370 Rothman, l FDOT Steve Mortellaro USFWS (772) Telis, Pamela., USGS Pamela..Telis@usace.army.mil (904) Todd, Ken Palm Beach County (561) Trefry, llen Palm Beach County (561) Walesky, Richard Palm Beach County Walsh, Joe FFWCC Joe.Walsh@fwc.state.fl.us (561) Strazzulla Wetlands -- November2003
4 ppendix B Project Maps PPENDIX B - PROJECT MPS Strazzulla Wetlands November B-
5 ppendix B Project Maps Figure B-1 Strazzulla Wetlands Project rea Strazzulla Wetlands November B-
6 ppendix C Work Breakdown Structure PPENDIX C - WORK BREKDOWN STRUCTURE TB ctivity Listing by WBS TB B ctivity Definitions, Constraints and ssumptions TB C ctivity ID/WBS Cross-Reference Strazzulla Wetlands November C-
7 ppendix C Work Breakdown Structure TB ctivity Listing by WBS Strazzulla Wetlands November C-
8 ctivity Listing by WBS ctivity ID ctivity Name Remaining Duration Total Float Start Finish Primary Resource Data Date: 01-Nov-03 Budgeted Total Cost 39X - WIP WIP CERP Strazzulla Wetlands - 09/12/03 39X - WIP.1 PROJECT MNGEMENT PLN (PMP) 33d -2d 22-ug Dec-03 $229, d 0d 22-ug Jun-08 $17,133,940 39X - WIP.1.1 Project Management 17d 14d 22-ug Nov-03 $229, Project Management - PMP Development FY02 0d 22-ug Sep-0... EN-H HL.E... $34, Project Management - PMP Development FY03 0d 01-Oct Sep-0... DP-O HL.D... $104, PMP ctuals FY04 0d 01-Oct Oct-03 DP-O HL.D... $2, Project Management - PMP Development FY04 17d 14d 03-Nov-03* 26-Nov-03 DP-O HL.D... $88,240 39X - WIP.1.2 Initial PMP 33d -2d 22-ug Dec-03 $ PDT Interagency Invitation Mail 0d 22-ug ug-0... $ PDT Kick-off Meeting 0d 05-Sep-0... $ Hold PDT Kick-Off Meeting 0d 05-Sep Sep-0... $ Prepare Draft PMP 0d 06-Sep Mar-0... DP-E HL.D... $ PMP Initiated 0d 19-Nov-0... $ Initial PMP Coordination Meeting 0d 21-Nov Nov-0... $ PMP Internal Review Initiated 0d 20-Mar-0... $ Internal Review of PMP 0d 21-Mar May-0... DP-E HL.D... $ PMP Internal Review Complete 0d 09-May-0... $ Final Draft PMP Incorporating Internal Review 0d 12-May Oct-03 $ Present to DCT 0d 28-Oct Oct-03 DP-E HL.D... $ Distribute PMP for PRB and Non Federal Sponsor Senior Manag... 5d -2d 29-Oct Nov-03 DP-E HL.D... $ Present and Discuss PMP at PRB Meeting 2d -2d 10-Nov Nov-03 DP-E HL.D... $ PMP pproved by PRB 0d -2d 12-Nov-03 $ Present and discuss PMP at Non Federal Sponsor Meeting 10d -2d 13-Nov Nov-03 $ PMP pproved by Local Sponsor 0d -2d 26-Nov-03 $ Present and Discuss PMP at Non Federal Sponsor Meeting... 1d -2d 01-Dec Dec-03 DP-E HL.D... $ Final pproval by Non Federal Sponsor 5d -2d 02-Dec Dec-03 $ pproval by Corps Deputy District Engineer 5d -2d 09-Dec Dec-03 $ PMP DDE(PM) Signature 0d -2d 15-Dec-03 $ Work-in-Kind Letter from Corps Engineer 5d -2d 16-Dec Dec-03 $ Work-in-Kind Letter Signed by District Engineer 0d -2d 22-Dec-03 $0 39X - WIP.1.3 Design PMP Revision 0d 0d $0 39X - WIP.1.4 Construction PMP Revision 0d 0d $0 39X - WIP.2 PROJECT IMPLEMENTTION REPORT (PIR) 624d 520d 02-Dec Jun-06 $911,623 39X - WIP.2.1 Project Management 503d 0d 23-Dec Dec-05 $334,176 WIP CERP Strazzulla Wetlands - 09/12/03 Page 1 of 7 ppendix C Tab
9 ctivity Listing by WBS Data Date: 01-Nov-03 ctivity ID ctivity Name Remaining Duration Total Float Start Finish Primary Resource Budgeted Total Cost Project Management during PIR Phase - FY04 197d -2d 23-Dec Oct-04* Coll... $184, Project Management during PIR Phase - FY05 250d 0d 01-Oct Sep-05* Coll... $95, Project Management during PIR Phase - FY06 57d 0d 03-Oct-05* 27-Dec Coll... $55,000 39X - WIP.2.2 Plan Formulation 179d 25d 02-Dec ug-04 $315,685 39X - WIP Project Confirmation 9d 35d 22-Dec Jan-04 $27, H100 Initiate Decision Document 0d -2d 22-Dec-03 $0 39-H1360 Verify Current Project Scope, Costs, Beneifits, Lands and Efficie... 7d -2d 23-Dec Jan-04 PD-D HL.P... $13, H1580 ITR (prior to IPR/FSM) 1d 35d 05-Jan Jan-04 CO-C HL.C... $13, H1620 ITR Meeting with PDT to prepare for FSM 1d 35d 05-Jan Jan-04 CO-C HL.C... $ L220 ITR Meeting with PDT for FSM 0d 35d 06-Jan-04 $0 39X - WIP In-Progress Review (IPR) / Feasibility Scoping Meeting (FSM) 45d 35d 06-Jan Mar-04 $32, H1590 Prepare and Submit Documentation to HQ for FSM 10d 35d 06-Jan Jan-04 PD-R HL.P... $11, L225 FSM Material Submitted to HQ 0d 35d 21-Jan-04 $0 39-H2270 HQ Policy Review Comments to SJ & SD 22d 35d 21-Jan Feb-04 $0 39-H2280 SJ Response to HQ Policy Review Comments 1d 35d 23-Feb Feb-04 EN-H HL.E... $14, H1600 Feasibility Scoping Meeting 1d 35d 24-Feb Feb-04 PD-R HL.P... $7, L230 Feasibility Scoping Meeting (FSM) 0d 35d 26-Feb-04 $0 39-H1610 Receive FSM Guidance Memorandum 10d 35d 26-Feb Mar-04 $0 39-L235 FSM Guidance Memorandum Received 0d 35d 11-Mar-04 $0 39-H2320 Identify Preliminary Tenatively Selected Plan 1d 35d 11-Mar Mar-04 $0 39X - WIP Document Plan Formulation and Evaluation 108d 83d 02-Dec May-04 $120, H1550 Evaluate Existing & Future Without Project Condition 73d 108d 02-Dec Mar-04 EN-H HL.E... $27, H1570 Compare Existing Condition to Pre-CERP Baseline 10d 108d 02-Dec Dec-03 PD-E HL.P... $10, H1380 Confirm Economic, Environmental & Engineering Resources 43d 38d 05-Jan Mar-04 $0 39-H1670 Develop Planning Cost Estimate (Real Estate) 10d 116d 06-Jan Jan-04 $0 39-H1480 Prepare Predictive Simulation Models (Hydrologic/Hydrodynamic) 0d 45d 12-Mar Mar-04 $0 39-H1490 Prepare Predictive Simulation Models (Ecologic) 10d 35d 12-Mar Mar-04 PD-E HL.P... $2, H1500 Prepare Predictive Simulation Models (Water Quality) 10d 35d 12-Mar Mar-04 PD-E HL.P... $ H1510 Prepare Predictive Simulation Models (Economic) 10d 35d 12-Mar Mar-04 PD-D HL.P... $1, H1530 Compile Existing Conditions 5d 108d 12-Mar Mar-04 PD-R HL.P... $38, H2330 Document Planning Objectives, Constraints & Performance Mea... 15d 108d 12-Mar pr-04 PD-R HL.P... $6, P220 Project Performance Measures Complete 0d 35d 26-Mar-04 $0 39-H1560 Confirm & Evaluate Conceptual lternatives from the Draft WP... 5d 35d 26-Mar pr-04 PD-E HL.P... $14, H1640 Update Preliminary Design for lternatives 5d 35d 26-Mar pr-04 EN-H HL.E... $2, L240 Final rray of lternatives Selected 0d 35d 02-pr-04 $0 WIP CERP Strazzulla Wetlands - 09/12/03 Page 2 of 7 ppendix C Tab
10 ctivity Listing by WBS Data Date: 01-Nov-03 ctivity ID ctivity Name Remaining Duration Total Float Start Finish Primary Resource Budgeted Total Cost 39-H1660 Update Planning Cost Estimates (Engineering, Construction, O&M) 2d 25d 20-pr pr-04 EN-H HL.E... $13, H1650 Model & Evaluate lternatives (compare with & without plan) 5d 25d 22-pr pr-04 $ Cost Effectiveness and Incremental Cost nalysis 10d 36d 22-pr May-04 PD-D HL.P... $3, H1720 Compare lternative Plans 5d 25d 29-pr May-04 CO-C HL.C... $500 39X - WIP Design Selected Plan 100d 59d 06-Jan May-04 $20, H1990 Develop Scope Exploration Plan & Confirm with Sponsor 0d 152d 06-Jan Jan-04 $0 39-H2010 Review Detailed Geotechnical Data 0d 152d 06-Jan Jan-04 $0 39-H2040 Geotechnical nalysis 0d 152d 15-Jan Jan-04 $0 39-H2000 Develop Detailed Site Survey Scope 0d 103d 12-Mar Mar-04 $0 39-H2030 Civil/Structural & Mechanical/Electrical Design of the TSP 15d 66d 12-Mar pr-04 $0 39-H2090 Perform Final Hydrologic/Hydraulic nalysis 15d 58d 12-Mar pr-04 $0 39-H2020 Obtain Detailed Site Survey 0d 103d 12-Mar Mar-04 $0 39-H2060 Develop Project Monitoring Plan 15d 99d 12-Mar pr-04 $0 39-H2100 Develop Draft Operating Manual & Interim Operations 22d 92d 12-Mar pr-04 EN-H HL.E... $12, H2110 Quantify Water Made vailable 1d 58d 01-pr pr-04 $0 39-H2120 Savings nalysis 1d 58d 01-pr pr-04 $0 39-H2150 Prepare MCCES Cost Estimate 22d 66d 02-pr May-04 EN-C HL.E... $8, H150 Baseline Cost Estimate pproved 0d 66d 04-May-04 $0 39-H2140 Develop Implementation Plan 11d 59d 13-May May-04 $0 39X - WIP lternatives Formulation Briefing (FB) 62d 25d 20-May ug-04 $115, H1760 ITR (prior to FB) 1d 25d 20-May May-04 CO-C HL.C... $13, H1770 ITR Meeting with PDT to prepare for FB 0d 25d 21-May May-04 $0 39-H1800 Submit FB Documentation to HQ 2d 25d 24-May May-04 PD-R HL.P... $3, P225 ITR/PDT Pre-FB Meeting 0d 25d 24-May-04 $0 39-H122 Submit FB Documentation to HQ/SD 0d 25d 26-May-04 $0 39-H2290 HQ Policy Review Comments to SJ & SD 22d 25d 26-May Jun-04 $0 39-H1330 Compile (Preliminary) Draft PIR/NEP 5d 59d 28-May Jun-04 PD-R HL.P... $22, H1340 In-house Review of (Preliminary) Draft PIR/NEP 1d 59d 07-Jun Jun-04 PD-R HL.P... $12, L300 In House Review Draft PIR/NEP Report Complete 0d 59d 08-Jun-04 $0 39-H2310 Incorporate In-House Comments on Draft PIR 5d 59d 08-Jun Jun-04 PD-R HL.P... $7, P230 Incorporation of In-house Comments on Draft PIR/NEP Complete 0d 59d 15-Jun-04 $0 39-H1030 ITR on Draft PIR/NEP Document 1d 59d 15-Jun Jun-04 PD-P ITR.P... $16, L320 ITR on Draft PIR/NEP Report Complete 0d 59d 16-Jun-04 $0 39-H2300 SJ Response to HQ Policy Review Comments 5d 25d 28-Jun Jul-04 EN-H HL.E... $3, H1810 FB Meeting 1d 25d 06-Jul Jul-04 PD-R HL.P... $7,200 WIP CERP Strazzulla Wetlands - 09/12/03 Page 3 of 7 ppendix C Tab
11 ctivity Listing by WBS Data Date: 01-Nov-03 ctivity ID ctivity Name Remaining Duration Total Float Start Finish Primary Resource Budgeted Total Cost 39-H124 lternative Formulation Briefing (FB)/Site Visit 0d 25d 07-Jul-04 $0 39-H1820 FB Guidance Memorandum 10d 25d 07-Jul Jul-04 $0 39-H2070 Tentatively Selected Plan 1d 25d 20-Jul Jul-04 PD-R HL.P... $4, H126 FB Guidance Memorandum Received 0d 25d 21-Jul-04 $0 39-H1020 Prepare Draft PIR/NEP Document 10d 25d 21-Jul ug-04 EN-H HL.E... $20, L290 Draft PIR/NEP Report Complete 0d 25d 04-ug-04 $0 39-H1050 Release Draft PIR 10d 25d 04-ug ug-04 PD-R HL.P... $7,500 39X - WIP.2.3 Environ Evaluation ppendix 248d 25d 16-Dec Dec-04 $136, Cultural Resources SOW and Task Order ward 30d 132d 16-Dec Jan-04 PD-E HL.P... $8, H1680 Planning id Letters 43d 71d 23-Dec Feb-04 $0 39-H1940 Conduct NEP Scoping ctivities 43d 67d 23-Dec Feb-04 $22, L200 Notice of Intent to Prepare NEP Issued 0d 71d 25-Feb-04 $0 39-L255 USF&WS Planning id Letter Received 0d 71d 25-Feb-04 $ Update the WP WRP 10d 67d 26-Feb Mar-04 PD-E HL.P... $5, H1970 Draft CR 10d 94d 12-Mar Mar-04 $0 39-L285 Submit Draft USF&WS Coordination ct Report 0d 94d 26-Mar-04 $0 39-H1750 Conduct Environmental ssessments 15d 40d 09-pr pr-04 PD-E HL.P... $24, H2250 SHPO Coordination Phase 1 and Phase II 11d 68d 29-pr May-04 PD-E E.P... $75, H1100 Final CR 10d 25d 29-Nov Dec-04 $0 39-L340 Final USF&WS Coordination ct Report Received 0d 25d 13-Dec-04 $0 39X - WIP.2.4 Socio-Econ. nalysis ppendix 0d 0d $0 39X - WIP.2.5 Engineering & Design ppendix 74d 25d 05-Jan pr-04 $65, HTRW 74d 25d 05-Jan pr-04 EN-G HL.E... $65,000 39X - WIP.2.6 Real Estate nalysis ppendix 44d 59d 12-Mar May-04 $54, Physical Takings nalysis 10d 71d 12-Mar Mar-04 RE- HL.R... $10, Relocation nalysis 10d 71d 12-Mar Mar-04 RE- HL.R... $10, Real Estate - Updated Gross ppraisal 22d 59d 12-Mar pr-04 RE- HL.R... $20, Obtain Rights-of-Entry 22d 59d 12-Mar pr-04 RE- HL.R... $2, H2080 Update Real Estate ppendix 22d 59d 13-pr May-04 RE- HL.R... $12,000 39X - WIP.2.7 Project Monitoring Plan 0d 0d $0 39X - WIP.2.8 Project RECOVER Tasks 0d 0d $0 39X - WIP.2.9 PIR pproval 369d 187d 12-Mar ug-05 $5,531 39X - WIP Federal pproval Process 233d 25d 04-May pr-05 $2, Draft PC 10d 182d 04-May May-04 RE- HL.R... $2, H1060 Notice of vailability in Federal Register 11d 25d 18-ug Sep-04 $0 WIP CERP Strazzulla Wetlands - 09/12/03 Page 4 of 7 ppendix C Tab
12 ctivity Listing by WBS Data Date: 01-Nov-03 ctivity ID ctivity Name Remaining Duration Total Float Start Finish Primary Resource Budgeted Total Cost 39-L325 Draft PIR/NEP Published in Federal Register 0d 25d 02-Sep-04 $0 39-H1070 Public Review of PIR 32d 25d 02-Sep Oct-04 $0 39-H145 Public Review of Draft PIR/NEP Report Complete 0d 25d 20-Oct-04 $0 39-H1080 Respond to Public Comments on PIR 15d 25d 20-Oct Nov-04 EN-H HL.E... $ L335 Responses to Public Comments Draft PIR/NEP Complete 0d 25d 10-Nov-04 $0 39-H1090 ITR (on Draft PIR/NEP) 10d 25d 10-Nov Nov-04 $0 39-L330 ITR Review/Certification 0d 25d 29-Nov-04 $0 39-H1110 Draft Final PIR 15d 25d 13-Dec Jan-05 $0 39-L345 Final Draft PIR/NEP Report Complete 0d 25d 05-Jan-05 $0 39-H2200 In-House Review of Draft Final PIR 15d 25d 05-Jan Jan-05 $0 39-P235 In-House Review of Final Draft PIR/NEP Complete 0d 25d 27-Jan-05 $0 39-H1150 ITR/Legal Review on Final Draft PIR 14d 25d 27-Jan Feb-05 $0 39-L370 ITR/Legal Review of Final Draft PIR/NEP Complete 0d 25d 16-Feb-05 $0 39-H1160 NFS Letter of Support and Financial Capability Statement 10d 25d 16-Feb Mar-05 $0 39-L375 Sponsor's Letter of Intent Received 0d 25d 03-Mar-05 $0 39-H1170 ssemble Final PIR 22d 25d 03-Mar pr-05 $0 39-H165 Final PIR/NEP Report Complete 0d 25d 04-pr-05 $0 39-H1180 DE Signature 5d 25d 04-pr pr-05 $0 39-H170 MSC Commander's Public Notice (Complete PIR) 0d 25d 11-pr-05 $0 39X - WIP State pproval Process 369d 187d 12-Mar ug-05 $2, H1830 Pre-pplication Meeting 1d 110d 12-Mar Mar-04 $0 39-L245 PIR/FS 1501 Pre-pplication Meeting 0d 110d 15-Mar-04 $0 39-H1840 Pre-pplication Concurrence Letter 10d 110d 15-Mar Mar-04 $0 39-L250 PIR/FS 1501 Pre-pplication Concurrence Letter Received 0d 110d 29-Mar-04 $0 39-H1850 Meeting with FDEP (Reasonable Certainty) 5d 110d 29-Mar pr-04 $0 39-L295 PIR/FS 1501 Meeting with FDEP 0d 176d 05-pr-04 $0 39-H1120 Print and Distribute 1501 Submittal to State 10d 81d 04-ug ug-04 $0 39-L350 FS 1501 Submittal to FDEP with WQC pplication 0d 81d 18-ug-04 $0 39-H1130 State 1501 Review & pproval 42d 81d 18-ug Oct-04 EN-H HL.E... $2, L380 FS 1501 DEP pproval 0d 81d 19-Oct-04 $0 39-H1140 Incorporate State Comments 10d 81d 19-Oct Nov-04 $0 39-H1890 Submit 1502 WQC pplication 2d 187d 04-pr pr-05 $0 39-H pplication Completeness Review 22d 187d 06-pr May-05 $0 39-H1910 gency ction Review 65d 187d 06-May ug-05 $0 39-H1880 Reasonable ssurrances Status Meeting 5d 187d 02-ug ug-05 $0 WIP CERP Strazzulla Wetlands - 09/12/03 Page 5 of 7 ppendix C Tab
13 ctivity Listing by WBS Data Date: 01-Nov-03 ctivity ID ctivity Name Remaining Duration Total Float Start Finish Primary Resource Budgeted Total Cost 39-L355 FS 1502 Reasonable ssurances Status Meeting 0d 187d 09-ug-05 $0 39-H1920 Publish Notice of Intent and Draft Permit 15d 187d 09-ug ug-05 $0 39-H300 State WQC/Permits Received 0d 187d 30-ug-05 $0 39X - WIP.2. Project uthorization 286d 520d 11-pr Jun-06 $0 39-H1190 State and gency Letters Signed and Received by District 5d 25d 11-pr pr-05 $0 39-H1200 Mail Letters and Draft Final Report 5d 25d 18-pr pr-05 $0 39-L385 Final PIR/NEP Report Published in the Federal Register 0d 25d 25-pr-05 $0 39-H1210 Publish in Federal Register 0d 25d 25-pr pr-05 $0 39-H1220 State, gency and Public Review 22d 25d 25-pr May-05 $0 39-H180 Washington Level gency and Public Review Complete 0d 25d 25-May-05 $0 39-H1230 Respond to State, gency and Public Comments 15d 25d 25-May Jun-05 $0 39-H1240 HQ/MSC Review Conference 5d 25d 09-Jun Jun-05 $0 39-L390 Responses to Public Comments on Final PIR/NEP Complete 0d 25d 16-Jun-05 $0 39-H1250 Policy Review Documentation 7d 25d 16-Jun Jun-05 $0 39-H182 PIR ssessment to CECW-PM 0d 25d 27-Jun-05 $0 39-H2240 Filing of Final NEP Document 5d 25d 27-Jun Jul-05 $0 39-H310 Filing of Final NEP Document Complete 0d 25d 05-Jul-05 $0 39-H1260 Chief's Report 5d 25d 05-Jul Jul-05 $0 39-H320 Record of Decision (ROD) Signed 0d 115d 12-Jul-05 $0 39-H330 Chief's Report Submitted to S(CW) 0d 25d 12-Jul-05 $0 39-H1270 S(CW) Review 30d 25d 12-Jul ug-05 $0 39-H2210 ROD Signed 0d 115d 12-Jul Jul-05 $0 39-H2230 S (CW) Memorandum to OMB 10d 25d 23-ug Sep-05 $0 39-H175 S(CW) Memorandum to OMB 0d 25d 07-Sep-05 $0 39-H1280 OMB Review 50d 0d 13-Oct Dec-05 $0 39-H2220 S (CW) Letter Submitted to Congress 15d 0d 28-Dec Jan-06 $0 39-H340 S(CW) Report Submitted to Congress 0d 0d 19-Jan-06 $0 39-H1290 Congressional Review 70d 0d 20-Jan pr-06 $0 39-H1300 Congressional uthorization 22d 0d 01-May May-06 $0 39-H1310 President Signs WRD 0d 520d 01-Jun Jun-06 $0 39-H350 President Signs uthorization 0d 520d 01-Jun-06 $0 39X - WIP.2.B PIR Close-out 0d 520d 31-May May-06 $0 39-L395 PIR Fiscal Closeout 0d 520d 31-May-06 $0 39X - WIP.4 WTER RESERVTIONS (WR) 1d 58d 02-pr pr-04 $0 39-H2130 Identify Water to be Reserved 1d 58d 02-pr pr-04 $0 WIP CERP Strazzulla Wetlands - 09/12/03 Page 6 of 7 ppendix C Tab
14 ctivity Listing by WBS Data Date: 01-Nov-03 ctivity ID ctivity Name Remaining Duration Total Float Start Finish Primary Resource Budgeted Total Cost 39-L270 Water Reservations Identified By Local Sponsor 0d 58d 05-pr-04 $0 39X - WIP.5 PLNS & SPECIFICTIONS (P & S) 438d 725d 03-Nov ug-05 $211, Detailed Design - USFWS Transfer - FY04 24d 1139d 03-Nov Dec-03 PD-E FWS... $14, Detailed Design 0d 205d 21-Jul Jul-04 DP-O PC.D... $170, Plans & Specifications 260d 205d 21-Jul ug-05 DP-O PC.D... $26,000 39X - WIP.6 PROJECT COOPERTION GREEMENT (PC) 110d 399d 18-May Oct-04 $ PC Updated 30d 399d 18-May Jun-04 $ PC Initiated 0d 399d 18-May-04 $ Submit PC to HQ for pproval 5d 399d 30-Jun Jul-04 $ PC Submitted to HQ for pproval 0d 399d 08-Jul-04 $ PC Review and pproval 60d 399d 08-Jul Oct-04 $ PC pproved 0d 399d 01-Oct-04 $ Execute PC 15d 399d 01-Oct Oct-04 $ PC Executed 0d 399d 25-Oct-04 $0 39X - WIP.7 REL ESTTE (RE) 260d 205d 21-Jul ug-05 $12,243,000 39X - WIP.7.1 Project Management 0d 0d $0 39X - WIP.7.2 cquisition 260d 205d 21-Jul ug-05 $12,243, Real Estate cquisition 260d 205d 21-Jul ug-05 RE-1.SFW... $12,243,000 39X - WIP.7.3 Land Certificate & Credit 0d 0d $0 39X - WIP.7.4 Interim Land Management 0d 0d $0 39X - WIP.7.5 Relocation 0d 0d $0 39X - WIP.8 CONSTRUCTION 520d 0d 01-Jun Jun-08 $3,539,000 39X - WIP.8.1 Project Management 0d 0d $0 39X - WIP.8.2 Construction Contract 520d 0d 01-Jun Jun-08 $3,539, Construction 520d 0d 01-Jun Jun-08 CO-C CC.C... $3,539,000 39X - WIP.8.3 Construction Management 0d 0d $0 39X - WIP.8.4 Construction Monitoring 0d 0d $0 39X - WIP.8.5 Engineering During Construction 0d 0d $0 39X - WIP.8.6 Interim OPS During Construction 0d 0d $0 39X - WIP.B PROJECT IMPLEMENTTION MONITORING (PIM) 0d 0d $0 39X - WIP.C PROJECT CLOSE-OUT 0d 0d $0 WIP CERP Strazzulla Wetlands - 09/12/03 Page 7 of 7 ppendix C Tab
15 ppendix C Work Breakdown Structure TB B ctivity Definitions, Constraints and ssumptions Strazzulla Wetlands November C-
16 39 X - WI P ctivity ppendix C Tab B - ctivity Definitions, Constraints & ssumptions WIP CERP Strazzulla Wetlands - 09/12/03 Print Date: 20-Nov-03 Constraints & ssumptions Detailed Design Plans & Specifications Real Estate cquisition Construction 39-H1020 Prepare Draft PIR/NEP Document ctivity Definition Includes all efforts necessary to compile and summarize all studies and decision making during the PIR. 39-H1030 ITR on Draft PIR/NEP Document ctivity Definition On draft PIR/NEP 39-H1200 Mail Letters and Draft Final Report ctivity Definition District sends reports to State/agencies & files EIS 39-H1210 Publish in Federal Register ctivity Definition Begin 30-day NEP review (publication of EIS in Federal Register is on Friday following the week received). Not required for E. 39-H1360 Verify Current Project Scope, Costs, Beneifits, Lands and Efficiency 39-H1380 Confirm Economic, Environmental & Engineering Resources ctivity Definition n inventory of critical resources relevant to the problems and opportunities under consideration will be developed at the project scale and used to further define and characterize problems and opportunities. n existing condition inventory includes preparation of land use maps, population, demographics, water demands etc. Contacts with County and State Planning gencies, agricultural extension offices, economic development boards and others are required. literature search of environmental resources of the area will be conducted. Site information will be obtained through use of the National Wetland Inventory, Geographic Information System, available aerial photography, and coordination with the State Historic Preservation Officer (SHPO), National Marine Fisheries Service (NMFS) and U.S. Fish and Wildlife Service (USFWS). Preliminary field investigations of each project site will be conducted. Cultural resources studies will begin with a literature survey of both the resources and previous coordination of these studies with the State Historic Preservation Office. literature search of hydrologic and geologic resources of the area will be conducted. The objectives of the hydrologic and geotechnical studies are to analyze appropriate data in order to understand, formulate, evaluate, and Page 1 of 5 ppendix C Tab B
17 39 X - WI P ctivity ppendix C Tab B - ctivity Definitions, Constraints & ssumptions WIP CERP Strazzulla Wetlands - 09/12/03 Print Date: 20-Nov-03 Constraints & ssumptions analyze appropriate data in order to understand, formulate, evaluate, and optimize the geotechnical and hydrologic portion of the project The tasks involved include collecting existing geotechnical and hydrogoelogic data, identifying and collecting additional field data, analyzing data, and updating the existing hydrologic model if necessary. Coordination with the non-federal sponsor s staff and other appropriate PDT members is required to produce the needed assessment. PDT members will work closely on data collection and data analyses. Sufficient data is required to document existing condition for performance measure documentation, assessment, and model validation and verification efforts. Data collected may include, but is not limited to, historic water stage and flow data, groundwater elevations, start-stop criteria for pump stations, headwater or tailwater elevations for structures, survey elevations, seepage rates and slope stabilities, and as-built drawings for existing structures. 39-H1480 Prepare Predictive Simulation Models (Hydrologic/Hydrodynamic) 39-H1490 Prepare Predictive Simulation Models (Ecologic) ctivity Definition Utilize the readily available models and analytical tools that are most appropriate for conducting analyses for the planning, design, construction, operation, and assessment of projects. Includes development of an evaluation methodology to identify ecosystem and economic outputs and to support a comparison of environmental benefits of the different alternative plans at the project scale. Identify specific ecosystem benefit quantification techniques. 39-H1500 Prepare Predictive Simulation Models (Water Quality) 39-H1510 Prepare Predictive Simulation Models (Economic) 39-H1550 Evaluate Existing & Future Without Project Condition ctivity Definition Forecasts of with- and without- project conditions will be based on consideration of national and regional forecasts of socio-economic parameters and other aggregate projections. 39-H1560 Confirm & Evaluate Conceptual lternatives from the Draft WP Feasibility Study Report 39-H1570 Compare Existing Condition to Pre-CERP Baseline 39-H1590 Prepare and Submit Documentation to HQ for FSM 39-H1600 Feasibility Scoping Meeting ctivity Definition The purpose of this conference is to review the planning objectives, evaluation methodology, the simulation modeling tools and the existing and without project conditions. Requires preparation of Page 2 of 5 ppendix C Tab B
18 39 X - WI P ctivity ppendix C Tab B - ctivity Definitions, Constraints & ssumptions WIP CERP Strazzulla Wetlands - 09/12/03 Print Date: 20-Nov-03 Constraints & ssumptions existing and without project conditions. Requires preparation of read-ahead materials and follow-up project guidance memorandum, project scope will not significantly impact duration. 39-H1640 Update Preliminary Design for lternatives ctivity Definition Includes sufficient hydraulic design for the modeling of alternatives and sufficient design for the development of preliminary cost estimates. Design from WP Feasibility Study - No additional work required. 39-H1650 Model & Evaluate lternatives (compare with & without plan) ctivity Definition Conduct alternative model runs to assess and evaluate ecologic and environmental effects at the project and regional (system-wide) levels. Tasks will be accomplished for system formulation and interim operations assessments. ssume that 3 alternatives are run for the sub-regional model with at least two model runs per alternative. RECOVER will conduct system-wide evaluations of alternative plans and make available boundary conditions from the regoinal model. Optimize performance of preferred alternative with RECOVER, operations, and engineering design's assistance. Complete system-wide simulations and evaluations and last added incremental analysis based on optimized preferred alternative. 39-H1660 Update Planning Cost Estimates (Engineering, Construction, O&M) ctivity Definition This tasks involves design and cost of conceptual plans for an evaluation and comparison of alternatives and selection of a recommended plan. (Reference: ER ) 39-H1670 Develop Planning Cost Estimate (Real Estate) ctivity Definition Includes all RE tasks required to support preparation of preliminary RE acquisition cost estimates for each alternative. Task initiated 60 days after start of H1720 Compare lternative Plans ctivity Definition Both informal and formal methods may be used to compare alternative project plans. Informal methods include simple descriptions, ranking of plans, weighting of plans, or development of matrix of plan effects. Formal methods include cost-effectiveness and incremental cost analysis, as described above, multi-criteria decision-making evaluations and trade-off analysis. ll such methods provide a framework to support analysis of alternative plans, expose conflicts and help determine what must be given up (in terms of one output) to gain more of another. They do not replace decision-making or the decision maker. 39-H1750 Conduct Environmental ssessments ctivity Definition ssumes that modeling results are complete on all alternatives. This includes tasks associated with NEP compliance requirements. Timeline for Phase I Page 3 of 5 ppendix C Tab B
19 39 X - WI P ctivity ppendix C Tab B - ctivity Definitions, Constraints & ssumptions WIP CERP Strazzulla Wetlands - 09/12/03 Print Date: 20-Nov-03 Constraints & ssumptions cultural resources survey depends on area to be surveyed. 39-H1800 Submit FB Documentation to HQ 39-H1810 FB Meeting ctivity Definition Purpose of this review is to obtain Division and HQUSCE confirmation that the plan formulation and selection process conform to current policy guidance. Requires preparation of read-ahead materials (minimum of 31 days in advance of meeting) and follow-up project guidance memorandum. Post-meeting documentation activities to select plan will be impacted by the scope of the project. To allow for the post-fb documentation cycle to be completed in order to complete the tentative plan selection it is assumed that the FB should take 50 days + 30>45>60 days to complete in order to select the tentative plan for design. (Reference: CECW-PM Memorandum Dated 5 July 2001) 39-H1940 Conduct NEP Scoping ctivities ctivity Definition Issue Scoping letter, Notice of Intent (if applicable). Includes public and agency correspondence with respect to issues and concerns and hold a scoping meeting to identify if significant impacts could occur as a result of the project and thereby require an Environmental Impact Statement (EIS). 39-H1990 Develop Scope Exploration Plan & Confirm with Sponsor ctivity Definition Develop scope exploration plan and obtain rights of entry. Meet with sponsor to confirm plan and amend plan based on sponsor input. Scope based on tentatively selected plan. 39-H2000 Develop Detailed Site Survey Scope 39-H2010 Review Detailed Geotechnical Data ctivity Definition Detailed subsurface investigations/site characterization, more closely spaced borings, and drill at structure locations. Includes core borings and HTRW survey. 39-H2020 Obtain Detailed Site Survey ctivity Definition Detailed site survey includes topographic and utility surveys. 39-H2030 Civil/Structural & Mechanical/Electrical Design of the TSP ctivity Definition ny design of the selected plan that can be accomplished without requiring completion of the detailed site surveys and geotechnical investigations will be performed during the preliminary civil/structural/mechanical & electrical design. Page 4 of 5 ppendix C Tab B
20 39 X - WI P ctivity ppendix C Tab B - ctivity Definitions, Constraints & ssumptions WIP CERP Strazzulla Wetlands - 09/12/03 Print Date: 20-Nov-03 Constraints & ssumptions civil/structural/mechanical & electrical design. 39-H2040 Geotechnical nalysis ctivity Definition Geotechnical analysis includes: slope stability, embankment, seepage, erosion control, structure foundation, dewatering, rock excavation & blasting, HWRW plan. Geotechnical ppendix for Engineering Report. 39-H2070 Tentatively Selected Plan 39-H2080 Update Real Estate ppendix 39-H2090 Perform Final Hydrologic/Hydraulic nalysis ctivity Definition Detailed hydraulic design of features and final model run of selected plan if necessary. 39-H2100 Develop Draft Operating Manual & Interim Operations ctivity Definition ssumes input from hydrologic modeling. Operating Manual will be incorporated into existing water control manuals. ssumes NEP & public involvement completed through PDT & public involvement process. Does not include multiple drafts or SD approval. 39-H2110 Quantify Water Made vailable ctivity Definition ssume the selected plan modeled by 2X2 or other regional hydrologic model capable of producing water budgets. No rule making required by State of Florida and no extra public involvement required. 39-H2150 Prepare MCCES Cost Estimate ctivity Definition Estimates include engineering, construction Real Estate, and Operations and Maintenance Page 5 of 5 ppendix C Tab B
21 ppendix C Work Breakdown Structure TB C ctivity ID/WBS Cross-Reference Strazzulla Wetlands November C-
22 WIP CERP Strazzulla Wetlands - 09/12/03 ppendix C Tab C ct ID/WBS Cross Reference 20-Nov-03 ctivity ID WBS ctivity Name Original Duration Start Finish X - WIP.1.2 Initial PMP Coordination Meeting 1d 21-Nov Nov X - WIP.1.2 PMP Initiated 0d 19-Nov X - WIP.1.2 PDT Interagency Invitation Mail 20d 22-ug ug X - WIP.1.2 Hold PDT Kick-Off Meeting 1d 05-Sep Sep X - WIP.1.2 PDT Kick-off Meeting 0d 05-Sep X - WIP.1.2 Prepare Draft PMP 40d 06-Sep Mar X - WIP.1.2 PMP Internal Review Initiated 0d 20-Mar X - WIP.1.2 Internal Review of PMP 10d 21-Mar May X - WIP.1.2 PMP Internal Review Complete 0d 09-May X - WIP.1.2 Final Draft PMP Incorporating Internal Review 5d 12-May Oct X - WIP.1.2 Present to DCT 10d 28-Oct Oct X - WIP.1.2 Distribute PMP for PRB and Non Federal Sponsor Senior Man... 5d 29-Oct Nov X - WIP.1.2 Present and Discuss PMP at PRB Meeting 2d 10-Nov Nov X - WIP.1.2 PMP pproved by PRB 0d 12-Nov X - WIP.1.2 Present and discuss PMP at Non Federal Sponsor Meeting 10d 13-Nov Nov X - WIP.1.2 PMP pproved by Local Sponsor 0d 26-Nov X - WIP.1.2 Present and Discuss PMP at Non Federal Sponsor Meeting... 1d 01-Dec Dec X - WIP.1.2 Final pproval by Non Federal Sponsor 5d 02-Dec Dec X - WIP.1.2 pproval by Corps Deputy District Engineer 5d 09-Dec Dec X - WIP.1.2 PMP DDE(PM) Signature 0d 15-Dec X - WIP.1.2 Work-in-Kind Letter from Corps Engineer 5d 16-Dec Dec X - WIP.1.2 Work-in-Kind Letter Signed by District Engineer 0d 22-Dec X - WIP.5 Detailed Design 0d 21-Jul Jul X - WIP.5 Plans & Specifications 260d 21-Jul ug X - WIP Draft PC 10d 04-May May X - WIP.7.2 Real Estate cquisition 260d 21-Jul ug X - WIP.8.2 Construction 520d 01-Jun Jun X - WIP.2.1 Project Management during PIR Phase - FY04 197d 23-Dec Oct-04* X - WIP.2.1 Project Management during PIR Phase - FY05 250d 01-Oct Sep-05* X - WIP.2.1 Project Management during PIR Phase - FY06 57d 03-Oct-05* 27-Dec X - WIP.5 Detailed Design - USFWS Transfer - FY04 24d 03-Nov Dec X - WIP Cost Effectiveness and Incremental Cost nalysis 10d 22-pr May X - WIP.2.3 Update the WP WRP 10d 26-Feb Mar X - WIP.2.6 Physical Takings nalysis 10d 12-Mar Mar X - WIP.2.6 Relocation nalysis 10d 12-Mar Mar X - WIP.2.6 Real Estate - Updated Gross ppraisal 22d 12-Mar pr X - WIP.2.6 Obtain Rights-of-Entry 22d 12-Mar pr X - WIP.2.5 HTRW 74d 05-Jan pr X - WIP.1.1 Project Management - PMP Development FY02 26d 22-ug Sep X - WIP.1.1 Project Management - PMP Development FY03 250d 01-Oct Sep X - WIP.1.1 Project Management - PMP Development FY04 17d 03-Nov-03* 26-Nov X - WIP.2.3 Cultural Resources SOW and Task Order ward 30d 16-Dec Jan X - WIP.6 PC Updated 30d 18-May Jun X - WIP.6 PC Initiated 0d 18-May X - WIP.6 Submit PC to HQ for pproval 5d 30-Jun Jul X - WIP.6 PC Submitted to HQ for pproval 0d 08-Jul X - WIP.6 PC Review and pproval 60d 08-Jul Oct X - WIP.6 PC pproved 0d 01-Oct X - WIP.6 Execute PC 15d 01-Oct Oct X - WIP.6 PC Executed 0d 25-Oct X - WIP.1.1 PMP ctuals FY04 26d 01-Oct Oct H100 39X - WIP Initiate Decision Document 0d 22-Dec-03 Page 1 of 4 ppendix C Tab C
23 WIP CERP Strazzulla Wetlands - 09/12/03 ppendix C Tab C ct ID/WBS Cross Reference 20-Nov-03 ctivity ID WBS ctivity Name Original Duration Start Finish 39-H X - WIP Prepare Draft PIR/NEP Document 10d 21-Jul ug H X - WIP ITR on Draft PIR/NEP Document 1d 15-Jun Jun H X - WIP Release Draft PIR 10d 04-ug ug H X - WIP Notice of vailability in Federal Register 11d 18-ug Sep H X - WIP Public Review of PIR 32d 02-Sep Oct H X - WIP Respond to Public Comments on PIR 15d 20-Oct Nov H X - WIP ITR (on Draft PIR/NEP) 10d 10-Nov Nov H X - WIP.2.3 Final CR 10d 29-Nov Dec H X - WIP Draft Final PIR 15d 13-Dec Jan H X - WIP Print and Distribute 1501 Submittal to State 10d 04-ug ug H X - WIP State 1501 Review & pproval 42d 18-ug Oct H X - WIP Incorporate State Comments 10d 19-Oct Nov H X - WIP ITR/Legal Review on Final Draft PIR 14d 27-Jan Feb H X - WIP NFS Letter of Support and Financial Capability Statement 10d 16-Feb Mar H X - WIP ssemble Final PIR 22d 03-Mar pr H X - WIP DE Signature 5d 04-pr pr H X - WIP.2. State and gency Letters Signed and Received by District 5d 11-pr pr H X - WIP.2. Mail Letters and Draft Final Report 5d 18-pr pr H X - WIP.2. Publish in Federal Register 0d 25-pr pr H122 39X - WIP Submit FB Documentation to HQ/SD 0d 26-May H X - WIP.2. State, gency and Public Review 22d 25-pr May H X - WIP.2. Respond to State, gency and Public Comments 15d 25-May Jun H124 39X - WIP lternative Formulation Briefing (FB)/Site Visit 0d 07-Jul H X - WIP.2. HQ/MSC Review Conference 5d 09-Jun Jun H X - WIP.2. Policy Review Documentation 7d 16-Jun Jun H126 39X - WIP FB Guidance Memorandum Received 0d 21-Jul H X - WIP.2. Chief's Report 5d 05-Jul Jul H X - WIP.2. S(CW) Review 30d 12-Jul ug H X - WIP.2. OMB Review 50d 13-Oct Dec H X - WIP.2. Congressional Review 70d 20-Jan pr H X - WIP.2. Congressional uthorization 22d 01-May May H X - WIP.2. President Signs WRD 0d 01-Jun Jun H X - WIP Compile (Preliminary) Draft PIR/NEP 5d 28-May Jun H X - WIP In-house Review of (Preliminary) Draft PIR/NEP 1d 07-Jun Jun H X - WIP Verify Current Project Scope, Costs, Beneifits, Lands and Effici... 7d 23-Dec Jan H X - WIP Confirm Economic, Environmental & Engineering Resources 43d 05-Jan Mar H145 39X - WIP Public Review of Draft PIR/NEP Report Complete 0d 20-Oct H X - WIP Prepare Predictive Simulation Models (Hydrologic/Hydrodynamic) 0d 12-Mar Mar H X - WIP Prepare Predictive Simulation Models (Ecologic) 10d 12-Mar Mar H150 39X - WIP Baseline Cost Estimate pproved 0d 04-May H X - WIP Prepare Predictive Simulation Models (Water Quality) 10d 12-Mar Mar H X - WIP Prepare Predictive Simulation Models (Economic) 10d 12-Mar Mar H X - WIP Compile Existing Conditions 5d 12-Mar Mar H X - WIP Evaluate Existing & Future Without Project Condition 73d 02-Dec Mar H X - WIP Confirm & Evaluate Conceptual lternatives from the Draft WP... 5d 26-Mar pr H X - WIP Compare Existing Condition to Pre-CERP Baseline 10d 02-Dec Dec H X - WIP ITR (prior to IPR/FSM) 1d 05-Jan Jan H X - WIP Prepare and Submit Documentation to HQ for FSM 10d 06-Jan Jan H X - WIP Feasibility Scoping Meeting 1d 24-Feb Feb H X - WIP Receive FSM Guidance Memorandum 10d 26-Feb Mar H X - WIP ITR Meeting with PDT to prepare for FSM 1d 05-Jan Jan H X - WIP Update Preliminary Design for lternatives 5d 26-Mar pr-04 Page 2 of 4 ppendix C Tab C
24 WIP CERP Strazzulla Wetlands - 09/12/03 ppendix C Tab C ct ID/WBS Cross Reference 20-Nov-03 ctivity ID WBS ctivity Name Original Duration Start Finish 39-H165 39X - WIP Final PIR/NEP Report Complete 0d 04-pr H X - WIP Model & Evaluate lternatives (compare with & without plan) 5d 22-pr pr H X - WIP Update Planning Cost Estimates (Engineering, Construction, O... 2d 20-pr pr H X - WIP Develop Planning Cost Estimate (Real Estate) 10d 06-Jan Jan H X - WIP.2.3 Planning id Letters 43d 23-Dec Feb H170 39X - WIP MSC Commander's Public Notice (Complete PIR) 0d 11-pr H X - WIP Compare lternative Plans 5d 29-pr May H175 39X - WIP.2. S(CW) Memorandum to OMB 0d 07-Sep H X - WIP.2.3 Conduct Environmental ssessments 15d 09-pr pr H X - WIP ITR (prior to FB) 1d 20-May May H X - WIP ITR Meeting with PDT to prepare for FB 0d 21-May May H180 39X - WIP.2. Washington Level gency and Public Review Complete 0d 25-May H X - WIP Submit FB Documentation to HQ 2d 24-May May H X - WIP FB Meeting 1d 06-Jul Jul H182 39X - WIP.2. PIR ssessment to CECW-PM 0d 27-Jun H X - WIP FB Guidance Memorandum 10d 07-Jul Jul H X - WIP Pre-pplication Meeting 1d 12-Mar Mar H X - WIP Pre-pplication Concurrence Letter 10d 15-Mar Mar H X - WIP Meeting with FDEP (Reasonable Certainty) 5d 29-Mar pr H X - WIP Reasonable ssurrances Status Meeting 5d 02-ug ug H X - WIP Submit 1502 WQC pplication 2d 04-pr pr H X - WIP pplication Completeness Review 22d 06-pr May H X - WIP gency ction Review 65d 06-May ug H X - WIP Publish Notice of Intent and Draft Permit 15d 09-ug ug H X - WIP.2.3 Conduct NEP Scoping ctivities 43d 23-Dec Feb H X - WIP.2.3 Draft CR 10d 12-Mar Mar H X - WIP Develop Scope Exploration Plan & Confirm with Sponsor 0d 06-Jan Jan H X - WIP Develop Detailed Site Survey Scope 0d 12-Mar Mar H X - WIP Review Detailed Geotechnical Data 0d 06-Jan Jan H X - WIP Obtain Detailed Site Survey 0d 12-Mar Mar H X - WIP Civil/Structural & Mechanical/Electrical Design of the TSP 15d 12-Mar pr H X - WIP Geotechnical nalysis 0d 15-Jan Jan H X - WIP Develop Project Monitoring Plan 15d 12-Mar pr H X - WIP Tentatively Selected Plan 1d 20-Jul Jul H X - WIP.2.6 Update Real Estate ppendix 22d 13-pr May H X - WIP Perform Final Hydrologic/Hydraulic nalysis 15d 12-Mar pr H X - WIP Develop Draft Operating Manual & Interim Operations 22d 12-Mar pr H X - WIP Quantify Water Made vailable 1d 01-pr pr H X - WIP Savings nalysis 1d 01-pr pr H X - WIP.4 Identify Water to be Reserved 1d 02-pr pr H X - WIP Develop Implementation Plan 11d 13-May May H X - WIP Prepare MCCES Cost Estimate 22d 02-pr May H X - WIP In-House Review of Draft Final PIR 15d 05-Jan Jan H X - WIP.2. ROD Signed 0d 12-Jul Jul H X - WIP.2. S (CW) Letter Submitted to Congress 15d 28-Dec Jan H X - WIP.2. S (CW) Memorandum to OMB 10d 23-ug Sep H X - WIP.2. Filing of Final NEP Document 5d 27-Jun Jul H X - WIP.2.3 SHPO Coordination Phase 1 and Phase II 11d 29-pr May H X - WIP HQ Policy Review Comments to SJ & SD 22d 21-Jan Feb H X - WIP SJ Response to HQ Policy Review Comments 1d 23-Feb Feb H X - WIP HQ Policy Review Comments to SJ & SD 22d 26-May Jun H X - WIP SJ Response to HQ Policy Review Comments 5d 28-Jun Jul-04 Page 3 of 4 ppendix C Tab C
25 WIP CERP Strazzulla Wetlands - 09/12/03 ppendix C Tab C ct ID/WBS Cross Reference 20-Nov-03 ctivity ID WBS ctivity Name Original Duration Start Finish 39-H X - WIP Incorporate In-House Comments on Draft PIR 5d 08-Jun Jun H X - WIP Identify Preliminary Tenatively Selected Plan 1d 11-Mar Mar H X - WIP Document Planning Objectives, Constraints & Performance Me... 15d 12-Mar pr H300 39X - WIP State WQC/Permits Received 0d 30-ug H310 39X - WIP.2. Filing of Final NEP Document Complete 0d 05-Jul H320 39X - WIP.2. Record of Decision (ROD) Signed 0d 12-Jul H330 39X - WIP.2. Chief's Report Submitted to S(CW) 0d 12-Jul H340 39X - WIP.2. S(CW) Report Submitted to Congress 0d 19-Jan H350 39X - WIP.2. President Signs uthorization 0d 01-Jun L200 39X - WIP.2.3 Notice of Intent to Prepare NEP Issued 0d 25-Feb L220 39X - WIP ITR Meeting with PDT for FSM 0d 06-Jan L225 39X - WIP FSM Material Submitted to HQ 0d 21-Jan L230 39X - WIP Feasibility Scoping Meeting (FSM) 0d 26-Feb L235 39X - WIP FSM Guidance Memorandum Received 0d 11-Mar L240 39X - WIP Final rray of lternatives Selected 0d 02-pr L245 39X - WIP PIR/FS 1501 Pre-pplication Meeting 0d 15-Mar L250 39X - WIP PIR/FS 1501 Pre-pplication Concurrence Letter Received 0d 29-Mar L255 39X - WIP.2.3 USF&WS Planning id Letter Received 0d 25-Feb L270 39X - WIP.4 Water Reservations Identified By Local Sponsor 0d 05-pr L285 39X - WIP.2.3 Submit Draft USF&WS Coordination ct Report 0d 26-Mar L290 39X - WIP Draft PIR/NEP Report Complete 0d 04-ug L295 39X - WIP PIR/FS 1501 Meeting with FDEP 0d 05-pr L300 39X - WIP In House Review Draft PIR/NEP Report Complete 0d 08-Jun L320 39X - WIP ITR on Draft PIR/NEP Report Complete 0d 16-Jun L325 39X - WIP Draft PIR/NEP Published in Federal Register 0d 02-Sep L330 39X - WIP ITR Review/Certification 0d 29-Nov L335 39X - WIP Responses to Public Comments Draft PIR/NEP Complete 0d 10-Nov L340 39X - WIP.2.3 Final USF&WS Coordination ct Report Received 0d 13-Dec L345 39X - WIP Final Draft PIR/NEP Report Complete 0d 05-Jan L350 39X - WIP FS 1501 Submittal to FDEP with WQC pplication 0d 18-ug L355 39X - WIP FS 1502 Reasonable ssurances Status Meeting 0d 09-ug L370 39X - WIP ITR/Legal Review of Final Draft PIR/NEP Complete 0d 16-Feb L375 39X - WIP Sponsor's Letter of Intent Received 0d 03-Mar L380 39X - WIP FS 1501 DEP pproval 0d 19-Oct L385 39X - WIP.2. Final PIR/NEP Report Published in the Federal Register 0d 25-pr L390 39X - WIP.2. Responses to Public Comments on Final PIR/NEP Complete 0d 16-Jun L395 39X - WIP.2.B PIR Fiscal Closeout 0d 31-May P220 39X - WIP Project Performance Measures Complete 0d 26-Mar P225 39X - WIP ITR/PDT Pre-FB Meeting 0d 24-May P230 39X - WIP Incorporation of In-house Comments on Draft PIR/NEP Comp... 0d 15-Jun P235 39X - WIP In-House Review of Final Draft PIR/NEP Complete 0d 27-Jan-05 Page 4 of 4 ppendix C Tab C
Sabine Pass to Galveston Bay, Texas
Sabine Pass to Galveston Bay, Texas Project Review Plan Independent Technical Review and External Peer Review 1. PURPOSE Pursuant to Engineering Circular (EC) 1105-2-408, Peer Review of Decision Documents,
More informationCHACON CREEK LAREDO, TEXAS Project Review Plan Independent Technical Review
CHACON CREEK LAREDO, TEXAS Project Review Plan Independent Technical Review 1. PURPOSE Pursuant to Engineering Circular (EC) 1105-2-408, Peer Review of Decision Documents, Office of Management and Budget
More informationRegulation 20 November 2007 ER APPENDIX H POLICY COMPLIANCE REVIEW AND APPROVAL OF DECISION DOCUMENTS TABLE OF CONTENTS
DEPARTMENT OF THE ARMY U. S. Army Corps of Engineers CECW-CP Washington, DC 20314-1000 Regulation 20 November 2007 ER 1105-2-100 APPENDIX H POLICY COMPLIANCE REVIEW AND APPROVAL OF DECISION DOCUMENTS TABLE
More informationREVIEW OF DECISION DOCUMENTS
REVIEW OF DECISION DOCUMENTS Section 2034, WRDA 2007 and EC 1105-2-410 Ken Claseman Office of Water Project Review HQUSACE 1 Applicability All feasibility, reevaluation reports, and project modifications
More informationPublic Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study
Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 7 February
More informationPlanning Bulletin : SMART Planning in the Reconnaissance Phase
Planning Bulletin 2014-02: SMART Planning in the Reconnaissance Phase Sue Hughes Deputy, Planning Community of Practice HQUSACE 17 April 2014 US Army Corps of Engineers Trends in New Recons 20 18 16 14
More informationKANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE
KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE REVISED MAY 2015 Prepared by: FOTENN Consultants Inc. 223 McLeod Street Ottawa, ON K2P 0Z8 T: 613-730-5709 F: 613-730-1136 www.fotenn.com Prepared
More informationFOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC
Page 1 of 39 Information on how to comment is available online at http://www.fs.usda.gov/goto/planningrule/directives. FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC CHAPTER 1920 LAND
More informationMemorandum. Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso
Memorandum DATE October 7, 2010 TO Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso Mayor Pro Tern Dwaine Caraway
More informationCWE Flow-based Market Coupling Project. at EMART Energy 2012
CWE Flow-based Market Coupling Project at EMART Energy 2012 1 Agenda Flow Based Market Coupling: reminder of essentials From ATC Market Coupling to Flow Based Market Coupling: key milestones and main impacts
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC 20314-1000 CECW-P MAR 2 0 2018 MEMORANDUM FOR DISTRIBUTION SUBJECT: Implementation Guidance for Section 1005 of the Water
More informationNew Draft Section 408 Policy Document EC
New Draft Section 408 Policy Document EC 11650-2-220 Presentation to the Lower American River Task Force Ryan Larson, P.E. March 13, 2018 US Army Corps of Engineers Outline 1. USACE Program Governance
More informationCivil Works Process Overview
Let Mon Lee Office of Assistant Secretary of the Army (Civil Works) Let.M.Lee.CIV@mail.mil Office: (703)614-3977 Mobile: (703)269-7676 Civil Works Process Overview Organizational Structure Assistant Secretary
More informationVALUE ENGINEERING PROGRAM
Approved: Effective: May 17, 2017 Review: March 30, 2017 Office: Production Support Office Topic No.: 625-030-002-i Department of Transportation PURPOSE: VALUE ENGINEERING PROGRAM To provide a consistent
More informationBY ORDER OF THE AIR FORCE POLICY DIRECTIVE SECRETARY OF THE AIR FORCE 20 JULY 1994
BY ORDER OF THE AIR FORCE POLICY DIRECTIVE 32-70 SECRETARY OF THE AIR FORCE 20 JULY 1994 Civil Engineering ENVIRONMENTAL QUALITY 1.1. Achieving and maintaining environmental quality is an essential part
More informationDIME-GAFSP First Quarterly Progress Report
DIME-GAFSP First Quarterly Progress Report Feburary 24, 2012 The World Bank s Development Impact Evaluation Initiative (DIME) has been contracted to lead in-depth impact evaluations on a subset of GAFSP
More informationNOAA Fisheries Update
NOAA Fisheries Update Brian Pawlak CFO/CAO Director, Office of Management and Budget Gulf States Marine Fisheries Commission March 16, 2017 Agenda FY 2017 Budget Status Funding to States and Grant Programs
More informationBMP Program Management Services
Pvwma1112i1-8708.pptx/1 BMP Program Management Services Program Team Quarterly Update to the Board of Directors September 20, 2017 1 Pvwma1112i1-8708.pptx/2 Purpose of this Quarterly Update Keep Board,
More informationAppendix G Peer Review Plan
Appendix G December 2007 Final U. S. Army Corps of Engineers Chicago District 111 North Canal Street, Suite 600 Chicago, IL 60606-7206 INTRODUCTION The International Joint Commission has listed the Grand
More informationHIMSS Nicholas E. Davies Award of Excellence Case Study Nebraska Medicine October 10, 2017
HIMSS Nicholas E. Davies Award of Excellence Case Study Nebraska Medicine October 10, 2017 Nebraska Medicine $1.2 billion academic health system 8,000 employees More than 1,000 affiliated physicians Primary
More informationFiscal Year 2009 National Defense Authorization Act, Section 322. Study of Future DoD Depot Capabilities
Fiscal Year 2009 National Defense Authorization Act, Section 322 Study of Future DoD Depot Capabilities Update for the DoD Maintenance Symposium Monday October 26, 2009 Phoenix, Arizona Goals For Today
More informationCentral City Line Kick-off and Tour
Central City Line Kick-off and Tour Phase C Preliminary Engineering, Environmental Documentation and Small Starts Submittal Kickoff Meeting Agenda Time Item 1:00 PM Welcome, Introductions and Agenda Review
More informationSCIENCE ADVISORY COMMITTEE TERMS OF REFERENCE
SCIENCE ADVISORY COMMITTEE TERMS OF REFERENCE FINAL Version 30 April 2012 Updates: 15 June 2012 29 July 2013 22 Aug 2013 20 Sep 2013 Marine Planning Partnership for the North Pacific Coast SCIENCE ADVISORY
More informationWater Resources Reform and Development Act (WRRDA) of Section Vertical Integration and Acceleration of Studies. Interim Report to Congress
Water Resources Reform and Development Act (WRRDA) of 2014 Section 1001. Vertical Integration and Acceleration of Studies Interim Report to Congress This is the interim report prepared to meet the requirements
More informationA: STATEMENT OF ACTIVITIES
A: STATEMENT OF ACTIVITIES 1. TYPE OF CONDITIONS FOR FINANCIAL ASSISTANCE The County of Fresno is applying to USDA, Rural Development for Housing Preservation Grant (HPG) program funds in the amount of
More informationREVIEW PLAN. San Clemente Storm Damage and Shoreline Protection Feasibility Study
REVIEW PLAN San Clemente Storm Damage and Shoreline Protection Feasibility Study May 2009 U.S. Army Corps of Engineers Los Angeles District Date: May 15, 2009 Subject: Review Plan Approval for San Clemente
More informationSUBJECT: South Atlantic Division Regional Programmatic Review Plan for the Continuing Authorities Program
DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA 30303-8801 CESAD-CG MEMORANDUM FOR Commander, Charleston District Commander, Jacksonville
More informationUS Army Corps of Engineers. Section 408 Overview. Regulatory Workshop July 22, Kim Leonard/Kevin Lee BUILDING STRONG
US Army Corps of Engineers Section 408 Overview Regulatory Workshop July 22, 2016 Kim Leonard/Kevin Lee Project Manager Flood Protection and Navigation US Army Corps of Engineers, Sacramento District US
More informationPEER REVIEW PLAN SANTA CRUZ RIVER FEASIBILITY STUDY (TRES RIOS DEL NORTE) LOS ANGELES DISTRICT
PEER REVIEW PLAN SANTA CRUZ RIVER FEASIBILITY STUDY (TRES RIOS DEL NORTE) LOS ANGELES DISTRICT February 2009 PEER REVIEW PLAN SANTA CRUZ RIVER FEASIBILITY STUDY (TRES RIOS DEL NORTE) LOS ANGELES DISTRICT
More informationREVIEW PLAN MALIBU CREEK ECOSYSTEM RESTORATION FEASIBILITY STUDY MALIBU, CALIFORNIA LOS ANGELES DISTRICT
REVIEW PLAN MALIBU CREEK ECOSYSTEM RESTORATION FEASIBILITY STUDY MALIBU, CALIFORNIA LOS ANGELES DISTRICT MSC Approval Date: December 2012 Last Revision Date: May 2017 REVIEW PLAN Malibu Creek Ecosystem
More informationAttachment A SCOPE OF WORK FOR THE CITIZEN SCRAP TIRE DROP-OFF DAY PROJECT
Attachment A SCOPE OF WORK FOR THE CITIZEN SCRAP TIRE DROP-OFF DAY PROJECT PURPOSE Overview The Maryland Environmental Service ( MES ) and the Board of County Commissioners of Washington County, Maryland
More informationNew Orleans Hurricane and Storm Damage Risk Reduction System Update
New Orleans Hurricane and Storm Damage Risk Reduction System Update by Team New Orleans U.S. Army Corps of Engineers November 13, 2008 New Orleans Area Hurricane Storm Damage Risk Reduction System 5 Parishes
More informationDEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA
CESAD-RBT REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA 30303-8801 1 3 JUN 2013 MEMORANDUM FOR COMMANDER,
More informationProject Management Plan (PMP) ARCHIVED. FY xx Project Title Base xxxx PDC AAAA Date
Project Management Plan (PMP) FY xx Project Title Base xxxx PDC AAAA12345 Date Table of Contents Section...Page A. Introduction...3 B. Acquisition Strategy...4 C. Project Schedule...6 D. Project Management
More informationPart III Guidelines
Guidelines for the Application of Criteria for under Part III of Title X, Subtitle A of Public Law 111-11 1.1.1 1.1.2 U.S. Department of the Interior Bureau of Reclamation August 2012 This page left blank
More informationAppendix B Review Matrix Text & Table Footnotes
Review Submissions The PDP includes a series of review submissions designed to ensure that all projects are developed in accordance with ODOT policies. The PDP Products Review Matrix found in this Appendix
More informationGAO. DOD Needs Complete. Civilian Strategic. Assessments to Improve Future. Workforce Plans GAO HUMAN CAPITAL
GAO United States Government Accountability Office Report to Congressional Committees September 2012 HUMAN CAPITAL DOD Needs Complete Assessments to Improve Future Civilian Strategic Workforce Plans GAO
More informationProject Management Plan (PMP) Park Ranger Community of Practice
Project Management Plan (PMP) Park Ranger Community of Practice 1 Table of Contents COVER SHEET TABLE OF CONTENTS LIST OF APPENDICES The Project Management Plan Project Management Plan (PMP) Park Ranger
More informationNational Exercise Program (NEP) Overview. August 2009
National Exercise Program (NEP) Overview August 2009 Creating a Unified Exercise Strategy In response to presidential and congressional requirements, the Homeland Security Council in coordination with
More informationY CARRIED I LOST TOWN OF CALEDON. Project Update and Proposed Revisions to the Work Program be received
6 2 TOWN OF CALEDON 190 2009 te April 2009 Moved by Seconded by THAT Report No PD 009 021 Mayfield West Phase 2 Secondary Plan MYV2 Project Update and Proposed Revisions to the Work Program be received
More informationApproved by WQGIT July 14, 2014
Page 1 Approved by WQGIT July 14, 2014 Protocol for the Development, Review, and Approval of Loading and Effectiveness Estimates for Nutrient and Sediment Controls in the Chesapeake Bay Watershed Model
More informationBowen Island Municipality. Bowen Island Community Centre. Project Briefing Note
Bowen Island Municipality Bowen Island Community Centre Project Briefing Note Presented: October 11, 2016 Sam Collins 1 of 8 1 Recommendations 1.1 That Council receive this project Briefing Note for information.
More informationMEMORANDUM OF UNDERSTANDING COOPERATIVE ECOSYSTEM STUDIES UNITS NETWORK
MEMORANDUM OF UNDERSTANDING Continuation of the COOPERATIVE ECOSYSTEM STUDIES UNITS NETWORK among the NATIONAL AERONAUTICS AND SPACE ADMINISTRATION U.S. DEPARTMENT OF AGRICULTURE Agricultural Research
More informationI. INTRODUCTION AND BACKGROUND
MEMORANDUM OF UNDERSTANDING BETWEEN THE CALIFORNIA DEPARTMENT OF FISH AND GAME, THE CALIFORNIA ENERGY COMMISSION, THE BUREAU OF LAND MANAGEMENT, THE U.S. FISH AND WILDLIFE SERVICE, AND THE U.S. DEPARTMENT
More informationStandard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit November 2, 2012
Bureau of Waterways Engineering and Wetlands Standard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit This SOP describes the procedures and work flows
More informationEnlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):
Enlisted Professional Military Education FY 18 Academic Calendar Table of Contents STAFF NON-COMMISSIONED OFFICER ACADEMIES: SNCO Academy Quantico SNCO Academy Camp Pendleton SNCO Academy Camp Lejeune
More informationCONTEXT FOR ANSWERING THE QUESTIONS: WHY DO WE HAVE TO DO VE? WHO HAS AUTHORITY OVER VE? THE CUSTOMER WON T PAY FOR VE!
CONTEXT FOR ANSWERING THE QUESTIONS: WHY DO WE HAVE TO DO VE? WHO HAS AUTHORITY OVER VE? THE CUSTOMER WON T PAY FOR VE! I. Pub. L. 111 350, 3, Jan. 4, 2011, 124 Stat. 3718 41 USC 1711 - Value engineering
More informationMidpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017
Request for Qualifications and Proposals (RFQP) for Design Consulting Services for the Webb Creek Bridge Replacement Project, Bear Creek Redwood Open Space Preserve Midpeninsula Regional Open Space District
More informationFY2013 LTA - MARION ENGR DEPOT EAST
FY2013 LTA - MARION ENGR DEPOT EAST Army Defense Environmental Restoration Program Installation Action Plan Printed 27 August 2013 Table of Contents Statement Of Purpose... Acronyms... Installation Information...
More informationDEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA
REPLY TO ATIENTIONOF DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA 30303-8801 CESAD-RBT 21 May 2012 MEMORANDUM FOR COMMANDER, JACKSONVILLE
More informationCWE Flow-based Market Coupling Project
CWE Flow-based Market Coupling Project 1 Agenda ATC CWE MC Operations CWE FB MC Project FB implementation status FB theoretical basics Market communication during the external parallel run 2 ATC CWE MC
More informationBRAC 2005 Issues. Briefing to the Infrastructure Steering Group. December 12, 2003
BRAC 2005 Issues Briefing to the Infrastructure Steering Group December 12, 2003 12 Purpose Process Overview JCSG Update Data Call Communication Plan Cost of Base Realignment Action Update 23 Process Overview
More informationReference Number: Form ALCRG APPLICATION FOR A MUHD ARIFF AHMAD RESEARCH GRANT FORM (ALCRG1) First Request for Proposals: 15 Dec 2014
APPLICATION FOR A MUHD ARIFF AHMAD RESEARCH GRANT FORM (ALCRG1) First Request for Proposals: 15 Dec 2014 Closing Date: 15 Feb 2015 Note: This application form (ALCRG1) should be submitted together with
More informationPlans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Avalos, Chiu, Wiener and Mirkarimi (Ex Officio)
10.14.11 Plans and Programs Committee October 18, 2011 Plans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Avalos, Chiu, Wiener and Mirkarimi (Ex Officio) Maria Lombardo Chief
More informationDepartments of the Army and the Air Force *NG Pamphlet National Guard Bureau Arlington, VA June Information Management
Departments of the rmy and the ir Force *NG Pamphlet 25-30 National Guard Bureau rlington, V 22202-3231 7 June 2002 Information Management INDEX OF PPLICBLE NG ND NGB DMINISTRTIVE PUBLICTIONS By Order
More informationCorporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,
Corporate Services Employment Report: January Employment by Staff Group Jan (Jan 20 figure: 1,462) Jan % Overall 1,520 +58 +4.0% 8 Management (VIII+) 403 +52 4.8% Clerical & Supervisory (III to VII) 907
More informationCal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC
Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC 16-006 A. INTRODUCTION California State Polytechnic University, Pomona ( Cal Poly Pomona ), is
More informationDoDI ,Operation of the Defense Acquisition System Change 1 & 2
DoDI 5000.02,Operation of the Defense Acquisition System Change 1 & 2 26 January & 2 February 2017 (Key Changes from DoDI 5000.02, 7 Jan 2015) Presented By: T.R. Randy Pilling Center Director Acquisition
More information1.0 EXECUTIVE SUMMARY
1.0 EXECUTIVE SUMMARY FEASIBILITY REPORT In November 2008, Measure R was approved by a significant two-thirds majority, committing a projected $40 billion to traffic relief and transportation upgrades
More informationAn Independent Perspective From a former PM & PEO. NDIA 13th Annual Systems Engineering Conference 26 Oct 10
n Independent Perspective From a former PM & PEO NDI 13th nnual Systems Engineering Conference 26 Oct 10 Purpose To offer some thoughts on how System Engineering can (should) contribute as The DoD seeks
More informationStandard Peer Review Process for Minimum Flows and Levels and Water Reservations within the Central Florida Water Initiative Area
Standard Peer Review Process for Minimum Flows and Levels and Water Reservations within the Central Florida Water Initiative Area Central Florida Water Initiative Minimum Flows and Levels and Reservations
More informationWelcome and Introductions
Fiscal Matters: An Overview of Annual Head Start and Early Head Start Grant Requirements U.S. Department of Health and Human Services, Welcome and Introductions Staff Grantee Representatives 1 Goals for
More informationCWE FB MC project. PLEF SG1, March 30 th 2012, Brussels
CWE FB MC project PLEF SG1, March 30 th 2012, Brussels 1 Content 1. CWE ATC MC Operational report 2. Detailed updated planning 3. Status on FRM settlement 4. FB model update since last PLEF Intuitiveness
More informationDEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC
CECW-P/CE Regulation No. 1165-2-504 DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000 ER 1165-2-504 12 July 2017 Water Resource Policies and Authorities CONSTRUCTION OF WATER
More informationf. Methodology for Updating Benefit-to-Cost Ratios (BCR) for Budget Development (CWPM ) (draft);
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON DC 20314-1000 CECW-P MEMORANDUM FOR MAJOR SUBORDINATE COMMANDS SUBJECT: U.S. Army Corps of Engineers Section 902 Cost Limit
More informationWebinar Control Panel
Clear Communications Through Dashboard Reports 1 2012 Community Action Program Legal Services, Inc. Webinar Control Panel Raise your hand to ask a question Only enabled if you have entered your Audio Pin!
More information1. Situation. Reference (a) states that a quarterly checklist of effective directives shall be issued.
UNITED STTES MRINE CORPS MRINE IR GROUND TSK FORCE TRINING COMMND MRINE CORPS IR GROUND COMT CENTER OX 788100 TWENTYNINE PLMS, CLIFORNI 92278-8100 Cane: Jun 2018 COMT CENTER ULLETIN 5215 CCul 5215 MY-16
More information124 STAT PUBLIC LAW JAN. 7, 2011
124 STAT. 4198 PUBLIC LAW 111 383 JAN. 7, 2011 49 USC 44718 note. operational readiness budget of such department identified in the study; and (2) a description of how the modeling tools identified in
More information2013 Louisiana Transportation Conference
February 20, 2013 Baton Rouge River Center 2013 Louisiana Transportation Conference Partnerships for Progress in Transportation Mega Projects Session (I-12 to Bush) I-12 to Bush Agenda Inclusion into TIMED
More informationUNCLASSIFIED//FOR OFFICIAL USE ONLY
Fiscal Year 2014 Report on Training of General Purpose Forces of the United States Armed Forces With Military and Other Security Forces of Friendly Foreign Countries The estimated cost of this report for
More informationUHF Quality Institute. Patient-Reported Outcomes in Primary Care New York PROPC-NY. Module 2 Webinar
UHF Quality Institute Patient-Reported Outcomes in Primary Care New York PROPC-NY Module 2 Webinar Lucy Savitz, Assistant Vice President for Delivery System Science, Intermountain Healthcare January 24,
More information2016 Major Automated Information System Annual Report
2016 Major Automated Information System Annual Report Logistics Modernization Program Increment 2 (LMP Inc 2) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents
More informationDEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-ZB Washington, DC Circular No September 2018
DEPARTMENT OF THE ARMY EC 1165-2-220 US Army Corps of Engineers CECW-ZB Washington, DC 20314-1000 Circular No. 1165-2-220 10 September 2018 EXPIRES 30 SEPTEMBER 2020 Water Resource Policies and Authorities
More informationREQUEST FOR PROPOSALS BIG DARBY ACCORD. Proposals Due by October 25, 2004
REQUEST FOR PROPOSALS BIG DARBY ACCORD Proposals Due by October 25, 2004 Notification of Intent Due by October 11, 2004 The Importance of the Big Darby Watershed It has been well documented that the Big
More informationUNCLASSIFIED. LandWarNet Army Request for IT (ARFIT) Information Exchange Forum (IEF)
LandWarNet 2011 Army Request for IT (ARFIT) Information Exchange Forum (IEF) CIO/G-6 Governance, Acquisitions and Chief Knowledge Officer (GA&CKO) Governance Division Strategic Goals Approach Objectives
More informationMarshes Mitigation Banking Pilot. CM Services Informational Session 10:00 AM 12:00 PM July 10, 2015
Marshes Mitigation Banking Pilot CM Services Informational Session 10:00 AM 12:00 PM July 10, 2015 Agenda Introductions Contract Summary Project Overview M/WBE Goals Section 3 Goals RFP Schedule Next Steps
More informationU.S. Army Corps of Engineers Chicago District PM Symposium 2015
U.S. Army Corps of Engineers Chicago District PM Symposium 2015 Project Management Innovations for Complex Projects in a Dynamic Environment LTC Kevin Lovell, PMP Deputy District Commander Chicago District,
More informationKing County Flood Control District 2017 Work Program
Attachment A 2017 Budget Work Program November 7, 2016 FCD2016-20 Attach A King County Flood Control District 2017 Work Program The District work program is comprised of three categories: district oversight
More informationRecommended Projects for FY2019 State Springs Funding
Recommended Projects for FY2019 State Springs Sky Notestein Springs & Environmental Flows Section January 10, 2018 Overview 1) SCMC Meetings in 2017 2) DEP Guidance on Request for Springs 3) Projects Recommended
More informationOffice of Inspector General Research and Analytics
Office of Inspector General Research and Analytics Report #C-1516-021 November 2016 Executive Summary In accordance with the Department of Education s (department) fiscal year (FY) 2015-16 audit plan,
More informationSOUTH FLORIDA/CARIBBEAN COOPERATIVE ECOSYSTEM STUDIES UNIT AMENDMENT TWO TO COOPERATIVE AGREEMENT. between
SOUTH FLORIDA/CARIBBEAN COOPERATIVE ECOSYSTEM STUDIES UNIT AMENDMENT TWO TO COOPERATIVE AGREEMENT between DEPARTMENT OF THE INTERIOR Bureau of Land Management U.S. Geological Survey Biological Resources
More informationAR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES:
AR No. IR No. EIELSON AFB ALASKA NOTES: Administrative Record Cover Sheet THE UNITED STATES AIR FORCE INSTALLATION RESTORATION PROGRAM FINAL Site Management Plan Eielson AFB 8/30/2013 Table of Contents
More information2015 Policy Update for the Defense Installations Spatial Data Infrastructure (DISDI)
2015 Policy Update for the Defense Installations Spatial Data Infrastructure (DISDI) Mr. David LaBranche, PE DISDI Geospatial Information Officer OSD(EI&E) July 22, 2015 DUSD(I&E) is now the ssistant Secretary
More informationAddendum No. 1 WEBB CREEK BRIDGE REPLACEMENT PROJECT (DESIGN)
Addendum No. 1 WEBB CREEK BRIDGE REPLACEMENT PROJECT (DESIGN) To: Request for Qualifications / Proposals Recipients From: Matt Brunnings, Project Manager Date: February 7th, 2017 Re: Addendum 1 Addendum
More informationStrategic Fundraising Plan. for the. Gunnison Ranchland Conservation Legacy. July prepared by Susan Lohr
Strategic Fundraising Plan for the Gunnison Ranchland Conservation Legacy July 1999 -prepared by Susan Lohr Lohr Associates, P.O. Box 1757, Crested Butte, CO 81224 Phone/fax (970)349-7416, email: slohr@crestedbutte.net
More informationThe Toyota Foundation 2018 International Grant Program Application Form
The Toyota Foundation 2018 International Grant Program Application Form Notes: Please be sure to read the Program Guidelines before filling out this form. DO NOT alter the size of the text boxes. Altered
More information2011 Munitions Executive Summit. OSD Perspective
2011 Munitions Executive Summit OSD Perspective Jose M. Gonzalez OUSD (Acquisition, Technology & Logistics) Deputy Director, Portfolio Systems Acquisition, Land Warfare and Munitions Secretary of Defense
More informationSmithsonian Institution
Smithsonian Institution Recovery Act, 2009 Agency-wide and Program-specific Plan Updated May 2010 Smithsonian Institution American Recovery and Reinvestment Act of 2009 Agency-wide and Program-specific
More informationNational Council on Radiation Protection and Measurements Homeland Security Recommendations Related to Nuclear and Radiological Terrorism
National Council on Radiation Protection and Measurements Homeland Security Recommendations Related to Nuclear and Radiological Terrorism DHS Standards Program Review August 29, 2006 Name - DA Schauer
More informationALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results
ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results Fall 1 Section D Data Presentation Site NC3: Hwy :3 Lazy S -15 -.5.5 15 LEGEND Initial 1 Sep 1 Sep -75-37.5 37.5
More information2016 Major Automated Information System Annual Report
2016 Major Automated Information System Annual Report Defense Enterprise Accounting and Management System-Increment 1 (DEAMS Inc 1) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED
More information2017 Nationwide Permit Reissuance
2017 Nationwide Permit Reissuance Seattle District, U.S. Army Corps of Engineers 14 December 2015 Tribal Coordination Meeting 1 Seattle District s Limits of Regulatory Jurisdiction Northwest Field Office
More informationReclamation Fee Fiscal-Year Report 2017
Reclamation Fee Fiscal-Year Report 2017 The Department of Environmental Protection (DEP) has prepared a fiscal-year report containing a financial analysis of the revenue and expenditures of the Reclamation
More informationShellfish Aquaculture Permitting Program Update
Shellfish Aquaculture Permitting Program Update Seattle District U.S. Army Corps of Engineers April 2016 US Army Corps of Engineers Meeting Agenda 1:00 pm Opening Remarks 1:05 pm Update on ongoing activities
More informationU.S. Army Corps of Engineers Navigation Program Update
U.S. Army Corps of Engineers Navigation Program Update For American Association of Port Authorities Harbors and Navigation Meeting Jeffrey A. McKee Chief, Navigation Branch US Army Corps of Engineers August
More informationNorthern Health - Acute Services. Evidence Based Practice Venous Thromboembolism Prevention
Northern Health - Acute Services Evidence Based Practice Venous Thromboembolism Prevention (VTE) Jeannette Kamar Christine Lamotte, Liam Carter Improving Patient Safety Preventing and Managing Venous Thromboembolism
More informationREQUEST FOR STATEMENTS OF INTEREST NUMBER N R-800X PROJECT TO BE INITIATED IN FISCAL YEAR 2018
REQUEST FOR STATEMENTS OF INTEREST NUMBER N40192-18-R-800X PROJECT TO BE INITIATED IN FISCAL YEAR 2018 Project Title: SEA TURTLE MONITORING, PROTECTION, AND EDUCATIONAL OUTREACH ON ANDERSEN AIR FORCE BASE
More informationDepartment of the Army U.S. Army Corps of Engineers Washington, DC
CECW-CE Engineer Regulation 1110-2-1400 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design RESERVOIR/WATER CONTROL MANAGEMENT Distribution Restriction
More informationKaweah Project (FERC Project No. 298)
(FERC Project No. 298) FERC Relicensing Process Overview June 9, 2015 Power Presentation Production Title Relicensing Process Environmental Review Process Under FERC Jurisdiction Requires Specific Consultation
More information3 Year On-Call Contract - Threatened and Endangered Species Services
3 Year On-Call Contract - Threatened and Endangered Species Services Request For Proposal Iowa Department of Transportation Introduction The Iowa Department of Transportation s Office of Location and Environment
More information